RCRA Issues in the Demolition of a Copper Mine & Smelter •James Glasston, Environmental Coordinator •Juanita Hyde, HSEC and Risk Specialist

Upload: duongdang

Post on 19-Mar-2018

214 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: RCRA Issues in the Demolition of a Copper Mine &  · PDF fileRCRA Issues in the Demolition of a Copper Mine & Smelter ... SXEW Community Of Mammoth ... – APP Public Hearing

RCRA Issues in the Demolition of a Copper Mine & Smelter

•James Glasston, Environmental Coordinator•Juanita Hyde, HSEC and Risk Specialist

Page 2: RCRA Issues in the Demolition of a Copper Mine &  · PDF fileRCRA Issues in the Demolition of a Copper Mine & Smelter ... SXEW Community Of Mammoth ... – APP Public Hearing

History• 1944 Magma Copper Company purchases San Manuel claims and begins

exploration.• 1948 Underground exploration and development of San Manuel orebody

begins.• 1985 Development begins of Open Pit and Heap Leach facility at San

Manuel.• 1987 In-situ leaching production starts. Development of Kalamazoo orebody

begins.• 1996 Merger forms BHP Copper.• 1999 Facility goes into Care and Maintenance• 2003 BHP announces closure. • 2006 Reclamation of Mine was completed.

Page 3: RCRA Issues in the Demolition of a Copper Mine &  · PDF fileRCRA Issues in the Demolition of a Copper Mine & Smelter ... SXEW Community Of Mammoth ... – APP Public Hearing

Mine & Plant SiteCopper production operations included• An underground mine,• An Open Pit,• A Heap Leach facility,• In-situ leach mine in the Open Pit,• Solvent Extraction-Electrowinning (SW-EW) Plant and• Two limestone/quartz quarriesThe facilities at the plant site included• A 7 mile long rail line,• A smelter• Concentrator with associated thickeners,• Crushers• Maintenance FacilitiesThe Tailings Facilities included seven tailings dams covering 3,300 acres, a result of

over 50 years of mining.

Page 4: RCRA Issues in the Demolition of a Copper Mine &  · PDF fileRCRA Issues in the Demolition of a Copper Mine & Smelter ... SXEW Community Of Mammoth ... – APP Public Hearing

San Manuel Mine Site

Tailings

Open Pit

Shafts

Heap

SXEW

Community Of Mammoth

Community Of San Manuel

Page 5: RCRA Issues in the Demolition of a Copper Mine &  · PDF fileRCRA Issues in the Demolition of a Copper Mine & Smelter ... SXEW Community Of Mammoth ... – APP Public Hearing

Reclamation of Mine Site

Page 6: RCRA Issues in the Demolition of a Copper Mine &  · PDF fileRCRA Issues in the Demolition of a Copper Mine & Smelter ... SXEW Community Of Mammoth ... – APP Public Hearing

San Manuel Plant Site

Mill

Smelter

TailingsMine

Rod Plant

Refinery

Page 7: RCRA Issues in the Demolition of a Copper Mine &  · PDF fileRCRA Issues in the Demolition of a Copper Mine & Smelter ... SXEW Community Of Mammoth ... – APP Public Hearing

Plant Site During Demolition

Page 8: RCRA Issues in the Demolition of a Copper Mine &  · PDF fileRCRA Issues in the Demolition of a Copper Mine & Smelter ... SXEW Community Of Mammoth ... – APP Public Hearing

Plant Site Reclamation

Page 9: RCRA Issues in the Demolition of a Copper Mine &  · PDF fileRCRA Issues in the Demolition of a Copper Mine & Smelter ... SXEW Community Of Mammoth ... – APP Public Hearing

Schedule & Budget• Unknown Waste Types and

Volumes• Conflicting Schedule

Expectations• Unknown regulatory

requirements• Project Example – PCB Soils

Page 10: RCRA Issues in the Demolition of a Copper Mine &  · PDF fileRCRA Issues in the Demolition of a Copper Mine & Smelter ... SXEW Community Of Mammoth ... – APP Public Hearing

Resourcing• Internal

– Example – HSEC Department prior to project start-up

• External– Example - Contracting Waste

Broker

Page 11: RCRA Issues in the Demolition of a Copper Mine &  · PDF fileRCRA Issues in the Demolition of a Copper Mine & Smelter ... SXEW Community Of Mammoth ... – APP Public Hearing

Contractor Management• Contract Preparation• Competency• HSE Culture• Ownership• Example – RCRA Training

NOV

Page 12: RCRA Issues in the Demolition of a Copper Mine &  · PDF fileRCRA Issues in the Demolition of a Copper Mine & Smelter ... SXEW Community Of Mammoth ... – APP Public Hearing

Stakeholder Interface• Corporate• Regulatory

– Example – Coordination meeting with agency on characterization of buildings as waste

• Contractors• Community

– Example – Stack Abatement and Demolition

– APP Public Hearing

Page 13: RCRA Issues in the Demolition of a Copper Mine &  · PDF fileRCRA Issues in the Demolition of a Copper Mine & Smelter ... SXEW Community Of Mammoth ... – APP Public Hearing

Pre-Demolition HSE Surveys• Multi-disciplinary Team

approach• Initial Survey• Follow-up Survey• Sampling

Page 14: RCRA Issues in the Demolition of a Copper Mine &  · PDF fileRCRA Issues in the Demolition of a Copper Mine & Smelter ... SXEW Community Of Mammoth ... – APP Public Hearing

Sampling• Access• QA / QC• Turnaround times

Page 15: RCRA Issues in the Demolition of a Copper Mine &  · PDF fileRCRA Issues in the Demolition of a Copper Mine & Smelter ... SXEW Community Of Mammoth ... – APP Public Hearing

Material Characterization• Reclaimable• On-site disposal• Off-site disposal• Example – Flue Dust, Scrap

Steel, Explosives

Page 16: RCRA Issues in the Demolition of a Copper Mine &  · PDF fileRCRA Issues in the Demolition of a Copper Mine & Smelter ... SXEW Community Of Mammoth ... – APP Public Hearing

Remediation• Man-power• Equipment• Containers• Profiling• Transportation• Disposal

• Example – Vanadium Pentoxide Catalyst

Page 17: RCRA Issues in the Demolition of a Copper Mine &  · PDF fileRCRA Issues in the Demolition of a Copper Mine & Smelter ... SXEW Community Of Mammoth ... – APP Public Hearing

Regulated Waste Summary

41,073 tons1369Asbestos6,713 gallons2Asbestos Wastewater14,205,960 lbs = 521 tons329PCB Soil61,864 lbs = 31 tons119PCB Ballasts, Switches & Caps606,500 lbs = 303.3 tons31Transformers (PCB, non PCB)1,884,000 lbs = 942 tons53Vanadium Pentoxide4,452,000 lbs = 2226 tons125Refractory Brick1,470,000 lbs = 735 tons63RCRA Debris 85 drums2Cyanide Salts / Pipe 860 drums24Lab Pack Projects118, 750 gallons142Dielectric fluid (PCB, non PCB)52,700 lbs = 26.4 tons4Explosives18, 645 bulbs13Fluorescent Bulbs613, 281 lbs = 307 tons26Mixed BatteriesTotal Weight# LoadsWaste Name

Page 18: RCRA Issues in the Demolition of a Copper Mine &  · PDF fileRCRA Issues in the Demolition of a Copper Mine & Smelter ... SXEW Community Of Mammoth ... – APP Public Hearing

Documentation• Photo• Written• Reporting

Page 19: RCRA Issues in the Demolition of a Copper Mine &  · PDF fileRCRA Issues in the Demolition of a Copper Mine & Smelter ... SXEW Community Of Mammoth ... – APP Public Hearing

Reclamation Project Achievements• Working transparently with Regulatory Agencies throughout

Reclamation to obtain permitting• Tours• The transportation and disposal of approximately 20 million pounds

of regulated waste from the property with no associated incidents• Successful reclamation of flue dust / concentrate blend

– BHP HSEC Merit Award– Generated $545,193– Recycled 6,058 tons

• Project will be completed on-time and under budget• The Reclamation project preserved the property for future use.

Page 20: RCRA Issues in the Demolition of a Copper Mine &  · PDF fileRCRA Issues in the Demolition of a Copper Mine & Smelter ... SXEW Community Of Mammoth ... – APP Public Hearing

Credits