Submission folder Customer Hotline Customer Hotline Hong Kong 8228 8118 Macau (Toll free) 00800- 8228 8118 Hilti HIT-RE500 Injection Adhesive Sample Submission and 2 - 3 Approval Form Product Information 4 - 8 Technical Information 9 - 10 Consumption Table Mechanical Properties Method Statement 11 - 12 Test Reports - Loading Tests as per 13 - 26 BS5080 part one - Fire Test as per BS476 pt20 27 - 39 Government Letter 40 - 41 Country of Origin 42 Material Safety Data Sheet 43 - 50 Job Reference 51 - 60 Page 1 SEP 2011

Upload: homer-dong

Post on 21-Apr-2015

916 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: RE500 Fastening With Rebar (SEP 2011)

Submission folder

Customer Hotline Customer Hotline Hong Kong 8228 8118Macau (Toll free) 00800- 8228 8118

Hilti HIT-RE500 Injection Adhesive

Sample Submission and 2 - 3Approval Form

Product Information 4 - 8

Technical Information 9 - 10Consumption TableMechanical Properties

Method Statement 11 - 12

Test Reports - Loading Tests as per 13 - 26

BS5080 part one- Fire Test as per BS476 pt20 27 - 39

Government Letter 40 - 41

Country of Origin 42

Material Safety Data Sheet 43 - 50

Job Reference 51 - 60

Page 1 SEP 2011

Page 2: RE500 Fastening With Rebar (SEP 2011)

Page 1 of 2

SAMPLE SUBMISSION AND APPROVAL FORM

Contract Title: ________________________________ Ref. No.: ________________________

________________________________ Date: ________________________

Ref. No. of Previous Submission:

________________________

Contract No: ________________________________ (1) ________________________

File Reference: ________________________________ (2) ________________________

DETAILS OF SUBMISSION

To: Contract Manager’s Representative Attention: ________________________

From: ________________________________

The enclosed sample and catalogue* / certificate of origin* / technical data* / test report* / job reference* as described below have been checked for compliance with the Specifications and Drawings, and are submitted for approval. 1. General Information

a. Material Description HIT – RE500 Injection Adhesive __________________________________________________________ __________________________________________________________ b. Location: Re-bar fastening __________________________________________________________ __________________________________________________________ c. Specification Ref. Page: __________________________ Item: _______________________ __________________________ _______________________ __________________________ _______________________ d. Drawing Ref. No. __________________________________________________________ __________________________________________________________ __________________________________________________________ e. B.Q. Ref.No.: __________________________________________________________ __________________________________________________________ __________________________________________________________ f. Anticipated date of approval: __________________________________________________________

2. Technic al Information

The submitted sample has been checked against the specification and drawings as listed below:-

Specification Requirements Submitted Sample (State details against each item)

a. Brand Not specified Hilti b. Country of Origin Not specified Germany c. Manufacturer’s Name & Address Not specified Hilti Corporation, FL-9494 Principality of Liechtenstein. d. Factory’s Name & Address(es) Not specified Hilti Gmbh Ind. Ges. F. Befestigungstechnik Hiltistrasse 6, D-86916 Kaufering, Germany. e. Supplier (with Applicator, if any) Not specified Hilti (Hong Kong) Ltd

Page 2 SEP 2011

Page 3: RE500 Fastening With Rebar (SEP 2011)

Page 2 of 2

f. Appearance Not specified According to the sample submitted g. Color + Not specified Red h. Specification Not specified Attached i. Manufacturer’s Catalogue Not specified Attached j. Test Report (Original/Certificated True Copy) Not specified Attached k. Previous Job Reference Not specified Attached l. Supplementary Information Not specified NIL For and on behalf of the Contractor ____________________________

(Quality Control Manager)

CONTRACT MANAGER’S COMMENTS To: From: Contract Manager’s Representative: ________________________________

On the basis of the sample and information given, the above sample submitted is:

(1) * Approved. (2) * Not approved because ____________________________________________________ _______________________________________________________________________ _______________________________________________________________________ Remarks: _______________________________________________________________________ _______________________________________________________________________ _______________________________________________________________________ Approval does not alter the requirements of the Contract Contract Manager’s Representative: ____________________________

_____________________________ Date:

cc. _______________________________________ _______________________________________ _______________________________________ _______________________________________ (* Delete if appropriate) (+ For glass or vitreous mosaic tiles, the contractor is required to confirm the colour range(s) of the submitted sample, i.e. a) light and or medium; or b) dark)

Page 3 SEP 2011

Page 4: RE500 Fastening With Rebar (SEP 2011)

It's not just about strength.

Hilti HIT-RE 500 injection adhesive

High-performanceinjection adhesive forrebar fasteningsNew: extended workingtime for convenientinstallation

Page 4 SEP 2011

Page 5: RE500 Fastening With Rebar (SEP 2011)

Anchoring Systems

226Customer Hotline: Hong Kong 8228 8118 Macau 00800 8228 8118 (Mon - Fri 8:30 am - 6:00 pm / Sat 8:30 am - 1:00 pm) | Hilti online: www.hilti.com.hk

10

Anchoring Systems

Temperature of the base material Working time Curing time

40˚C 12 min. 4 hours 30˚C 20 min. 8 hours 20˚C 30 min. 12 hour 10˚C 2 hours 24 hours 0˚C 3 hours 50 hours -5˚C 4 hours 72 hours less than -5˚C Contact Hilti advisory service

HIT-RE 500 programme

Description Including Content Package Ordering designation Item no. (ml) (pcs)

HIT-RE 500 1 mixer 500 20 FOIL PACK RE 500 /500/1 369109 HIT-RE 500 1 mixer 330 25 FOIL PACK RE 500 /330/1 337109 HIT-RE-M mixer 100 HIT-RE-M 337111

Benefits■ Extremely high performance without expansion

pressure■ User-friendly, odourless (styrene free)■ Lower sensitivity to oversized, dusty, wet holes

and diamond coring holes■ Red colour adhesive for easy on site inspection■ Foil pack design reduces disposal cost■ With NSF and WRAS approvals for use in contact with drinking water■ Short dispensing time

HIT-RE 500 injection adhesiveBase material■ Concrete■ Hard natural stone■ Solid blockwork

Use■ Suitable to achieve high loads in concrete and stone■ For fixing the base of tower crane■ For fixing the fender in terminals■ For fixing post-installed rebar up to Y40 and anchor rod up M39■ For underwater application

Material■ 2-component ready mix epoxy resin (styrene-free)

Curing Time

Installation procedures

* Throw away first three trigger pulls for 330 ml cartridge, four trigger pulls for 500 ml cartridge.

4x* / 3x*

Approvals: (Rebar)

Page 5 SEP 2011

Page 6: RE500 Fastening With Rebar (SEP 2011)

Anchoring Systems

233 Customer Hotline: Hong Kong 8228 8118 Macau 00800 8228 8118 (Mon - Fri 8:30 am - 6:00 pm / Sat 8:30 am - 1:00 pm) | Hilti online: www.hilti.com.hk★ Special Request

Technical data

ED 3500 dispenser Dispensing time* 70 secDispenser piston force 3000 NBattery capacity: SFB 121 (12 V, 2.0 Ah NiCd) 50 foil packs* SFB 126 (12 V, 3.0 Ah NiMH) 75 foil packs*

ED 3500 electrical dispenser Powerful and effortless mortar injection.

Application■ Injection of Hilti HIT adhesive mortar for fastening anchor rods and rebars in concrete, masonry and stone

Benefits■ Ideal for working in difficult to reach locations as well as for repetitive, heavy use■ Less tiring to use - allows mortar to be dispensed more quickly for significantly higher productivity■ Effortless injection even at low temperatures and in deep holes■ Compatible with existing Hilti 12-volt batteries and chargers■ Allows the user to choose the most suitable power source for the job at on hand: high-performance 12-volt battery

Ordering designation Item no.

ED 3500 dispenser kit 273294 Dispenser, 2 cartridge holders, C7/24 charger, SFB 121 battery, 3 round brushes, blow-out pump, protective goggles, supplied in an impact-resistant Hilti toolbox

ED 3500 dispenser basic kit 273295 ★Dispenser, 2 cartridge holders, 3 round brushes, blow-out pump, protective goggles, supplied in an impact-resistant Hilti toolbox

ED 3500 dispenser 273291 Dispenser, cartridge holders, protective goggles, supplied in a cardboard box

* 500 ml foil pack HIT-RE 500 with mixing nozzle at 20˚C

Highlights■ Allows the user to choose the

most suitable power source for the job at hand: high-performance 12-volt battery

■ Uniquely efficient Hilti HIT-the leading injection system consisting of optimally-matched components

FLEET MANAGEMENT

Page 6 SEP 2011

Page 7: RE500 Fastening With Rebar (SEP 2011)

Anchoring Systems

234Customer Hotline: Hong Kong 8228 8118 Macau 00800 8228 8118 (Mon - Fri 8:30 am - 6:00 pm / Sat 8:30 am - 1:00 pm) | Hilti online: www.hilti.com.hk

10

★ Special Request

HIT systemBasic set the Hilti HIT system, as a basic set, in a practical plastic case, clearly arranged and always at hand

Description Package Ordering designation Item no.

ED 3500 dispenser kit � 1 273294Dispenser, 2 cartridge holders, C7/24 charger, SFB 121 battery, 3 round brushes, blow-out pump, protective goggles, supplied in an impact-resistant Hilti toolbox

ED 3500 dispenser � 1 273291 Dispenser, cartridge holders, protective goggles, supplied in a cardboard box Tool kit MD2500 (500ml) � 1 Tool kit MD2500 369220(content: case, dispenser, 2 foil pack holders, blow-out pump, brushes dia. 13, 18 & 28mm and protective google) MD2500 Dispenser (500 ml) � 1 MD2500 338853incl. 1 foil pack holderMD2500 Foil pack holder (500 ml) � 1 Holder 3:1 339477

Tool kit MD2000 (330ml) � 1 Tool kit MD2000 229155(content: case, dispenser, 2 foil pack holders, blow-out pump, brushes dia. 13, 18 & 28mm and protective google) MD2000 Dispenser (330ml) � 1 MD2000 229154incl.1 foil pack holder

MD2000 Foil pack holder (330ml) � 1 Holder 3:1 229170

Blow out pump � 1 Blow out pump 60579Brush with grip dia 13mm � 1 Brush dia 13mm HG 229133 ★Brush with grip dia 18mm � 1 Brush dia 18mm HG 229134 ★Brush with grip dia 28mm � 1 Brush dia 28mm HG 229135 ★Brush with GA dia 18mm* 1 Brush dia 18mm GA 229136 ★Brush with GA dia 28mm* 1 Brush dia 28mm GA 229137 ★Brush with GA dia 38mm* 1 Brush dia 38mm GA 229673 ★Brush with GA dia 50mm* 1 Brush dia 50mm GA 229674 ★Brush extension with GA* 1 Brush extension 229138 ★Brush adapter (middle section)* � 1 Brush adapter piece 238727 ★*GA= thread connection

Accessories for overhead application

Description Package Ordering designation Item no.

Overhead wedge � 100 HIT-OHW 387550Overhead cup (ø8-20mm)# 10 HIT-OHC 1 387551Overhead cup (ø20mm above)# 10 HIT-OHC 2 387552#Rebar or thread rod diameter

� �

� �

� �

Accessories for long embedment application

Description Package Ordering designation Item no.

Protective goggles � 1 HIT 005205 Air nozzle (dia.20mm) � 1 HIT-DL 20 371719 ★Air nozzle (dia.24mm) � 1 HIT-DL 25 371720 ★ Air nozzle (dia.32mm) � 1 HIT-DL 32 371721 ★Dust removal system � 1 HIT-DRS 362323 ★ Holder for brush extension RBS � 1 TE-Y 263439 ★Holder for brush extension RBS � 1 TE-C 263437 ★ Bursh extension for round steel brush (0.7m length) � 1 HIT-RBS 10/0.7 336645 ★Round steel brush (dia. 20mm) � 1 HIT-RB 20 336552 ★ Round steel brush (dia. 25mm) � 1 HIT-RB 25 336553 ★Round steel brush (dia. 30mm) � 1 HIT-RB 30 380920 ★ Round steel brush (dia. 40mm) � 1 HIT-RB 40 382260 ★Round steel brush (dia. 47mm) � 1 HIT-RB 47 382264 ★ Coupler for injection extensions � 1 HIT-VL K 335021 ★Piston Plug (dia. 20mm) � 1 HIT-SZ 20 335026 ★ Piston Plug (dia. 25mm) � 1 HIT-SZ 25 335027 ★Piston Plug (dia. 30mm) � 1 HIT-SZ 30 380925 ★ Piston Plug (dia. 40mm) � 1 HIT-SZ 40 380927 ★Piston Plug (dia. 47mm) � 1 HIT-SZ 47 380930 ★

Page 7 SEP 2011

Page 8: RE500 Fastening With Rebar (SEP 2011)

1Cu

stom

er H

otlin

e: H

ong

Kong

822

8 81

18

Mac

au 0

0800

8228

811

8 (

Mon

- F

ri 8

:30

am -

6:0

0 pm

/ S

at 8

:30

am -

1:0

0 pm

) |

Fa

st O

rder

ing,

Pro

mpt

& F

ree

Del

iver

yCu

stom

er H

otlin

e: H

ong

Kong

822

8 81

18

Mac

au 0

0800

8228

811

8 (

Mon

- F

ri 8

:30

am -

6:0

0 pm

/ S

at 8

:30

am -

1:0

0 pm

) |

Fa

st O

rder

ing,

Pro

mpt

& F

ree

Del

iver

y2

HIT

-RE

50

0In

jec

tio

nA

dh

esiv

e

Th

e B

est

Ch

em

ica

l A

nc

ho

rfo

r re

bar

faste

nin

g u

nd

er

diff

ere

nt

co

nd

itio

ns

Hig

h P

erf

orm

an

ce

& S

afe

ty

Vs o

the

r in

jec

tio

n a

dh

esiv

e

40%

hig

her

tens

ile lo

ad in

nor

mal

hol

e.

30%

hig

her

tens

ile lo

ad in

wet

and

wat

er-f

illed

hol

e.

Sui

tab

le fo

r b

oth

dril

led

or

dia

mon

d c

ored

hol

e.

✓ ✓ ✓

Sa

ve

Ma

teri

al &

La

bo

ur

Co

st

Vs

ha

rd c

art

rid

ge

in

jec

tio

n a

dh

esiv

e

70%

less

was

tage

com

par

ed t

o ha

rdca

rtrid

ge.

Red

uce

dis

pos

al c

ost.

Sho

rt d

isp

ensi

ng t

ime.

✓ ✓ ✓

Wid

ely

Ap

pro

ve

dfo

r re

ba

r fa

ste

nin

g

The

only

inje

ctio

n ad

hesi

ve li

sted

in “

Fire

pro

tect

ion

mat

eria

ls fo

r st

ruct

ural

use

of C

entr

al D

ata

Ban

k”.

4-ho

ur fi

re r

esis

tanc

e W

arrin

gton

tes

t re

por

t.

Eas

y an

d s

imp

le lo

adin

g se

lect

ion

tab

le.

✓ ✓ ✓ Co

nve

nie

nt

& F

lex

ible

Vs o

the

r in

jec

tio

n a

dh

esiv

e

Car

trid

ge c

an b

e us

ed fr

om 5

˚C t

o 40

˚C.

Long

wor

king

tim

e (2

0min

s) a

t 30

˚C.

Onl

y d

isp

ensi

ng fo

rce

req

uire

d, c

omp

ared

to

hard

cart

ridge

.

✓ ✓ ✓

� � � � � �

WE

AK

ER

bon

d s

tren

gth

70%

MO

RE

was

tage

com

par

ed t

o fo

il p

ack

LIM

ITE

Dte

mp

erat

ure

rang

e (2

0˚C

to

32˚C

) for

cart

ridge

dis

pen

sing

INS

UFF

ICIE

NT

wor

king

tim

e (8

.5m

ins)

at

30˚C

HIG

HE

Rd

isp

ensi

ng fo

rce

LAC

Kof

ref

eren

ce /

ap

pro

val

1 3

Oth

er

Inje

cti

on

Ad

he

siv

e

Page 8 SEP 2011

Page 9: RE500 Fastening With Rebar (SEP 2011)

HIT RE500 with Rebar

HIT RE500 Injection Adhesive with RebarFeatures: base material: concrete

Injection system with high loading capacitygood performance in diamond drilled holes and wet holessuitable for water saturated concretelarge diameter applicationslong working time at elevated temperaturesodourless epoxy resinno expansion force in base materialsmall edge distance and anchor spacingclean and simple application

Material:Rebar: Steel grade fy k: 460N/mm2

Foil pack: 500mlFoil pack: 330ml (special request)Jumbo cartridage: 1100ml (special request)MD2500 and P3500F (for 500ml package)MD2000, BD2500 and P3000F (for 330ml package)P5000HY (for 1100ml package)

Cartridge:

Dispenser:

Basic loading data & Installation DetailsY10 Y12 Y16 Y20 Y25 Y32 Y40

Rebar diameter (mm) [Ød] 10 12 16 20 25 32 40Hole diameter (mm) [d0] 12 16 20 25 30 40 47Embedment Depth (mm) [h1] 100 120 160 200 250 320 400Ultimate mean pull-out load as per BS5080 Part 1 (kN) 48.6 74.2 128.8 192.2 330.0 472.2 662.2Yield load of rebar (kN) 36.1 52.0 92.5 144.5 225.8 369.9 578.0

Drill bit TE-CX12 TE-CX16 TE-CX20 TE-CX25 TE-YX30 TE-YX40 -

Drilling systemCore bit DD-C12 DD-C16 DD-C20 DD-C25 DD-B30 DD-B40 DD-B47

Diamond core system DD-EC1

Installation system

DD 130

TE6 / TE16 / TE35 TE56 / TE76 ATC

Remarks:- It is based on non-cracked concrete with strength 30N/mm2;- Yield strength of rebar fyk is 460N/mm2;- There is no factor of safety introduced in the ultimate mean pull out load. Please apply appropriate factor of

safety in your design;- All the spacing and edge distance requirement for reinforced concrete design should be reference to BS8110;- If there is a fire resistance concern, the loading should be referred to the tables on page 34 & 35;.- Influence factor for water saturated concrete is applied.

Notes: The reduction factor shall only be applied, if anchor is settled into water-saturated concrete, e.g. concretemembers in water, filled water tanks, pre-drilled holes filled with water for more than 3 days. The reductiondoes not applied, if concrete is subjected to short-term water influence, e.g. diamond-cored holes.

Page 9 SEP 2011

Page 10: RE500 Fastening With Rebar (SEP 2011)

HIT RE500 with Rebar

Consumption Table

Property Standard Value

Density Cured Mortar DIN 53479 1.5g/cm3

Bond Strength ASTM C882-91 15.4N/mm2

Compressive Yield Strength ASTM D695-96 86 N/mm2

Compressive Strength ISO 604 7days - 120 N/mm2

Bending / Flexural Strength DIN 53452 90 N/mm2

Mechanical Properties

Remark:

1) The filled volume was calculated by the following equation and is for reference only.

Filled volume = [(D/2)2- (R/2)2] x 3.14 x I

where D = hole diameter, I = hole depth, R = rebar diameter

2) The filled volume showed in the table did not include any wastage during the installation.

3) 1 trigger pull of dispenser MD2500 is approx. 8ml of RE500. To dispense 1 cartridge of 500ml RE500 needs approx. 63 triggers.

Rebar Size Hole Diameter Hole Depth Filled Volume

φ D [ mm ] l [ mm ] V [ ml ]

Y8 10 80 2.3

Y10 12 100 3.5

Y12 16 120 10.6

Y16 20 160 18.1

Y20 25 200 35.3

Y25 30 250 54.0

Y32 40 320 144.7

Y40 47 400 191.2

Page 10 SEP 2011

Page 11: RE500 Fastening With Rebar (SEP 2011)

Anchor Technology Setting Operation

Hilti Injection Technique HIT RE500 – Rebar Material : Rebar Mortar cartridge : HIT RE500 (500ml packing) Dispenser : HIT MD2500, HIT P3500F, Reference : Hilti Fastening Technical Manual or Product Catalogue Setting Operation: 1. Drill the hole with dimension according to the

installation details.

2. Clean the drilled hole thoroughly by using the

tool kit (blow-pump & brushes). The hole should be free from water, or otherwise, the ultimate load will be reduced.

3. Open the cartridge cap, insert it into the holder

and screw the mixer on it.

4. Put the cartridge into the dispenser.

Page 11 SEP 2011

Page 12: RE500 Fastening With Rebar (SEP 2011)

Anchor Technology Setting Operation

5. Throw away (must) first 4 trigger pulls. Release dispenser to stop the grout flowing.

6. Insert the mixer head to the bottom of the hole and inject the mortar from bottom to the top of the hole. (Approx. 2/3 of the hole depth).

7. Insert the rebar slowly by turning it into the

mortar up to the required depth.

8. Fix the workpiece after the grout is cured.

Base material temperature

Working time or gel time

Initial curing time

Full curing time

(°C) twork/tgel tcure, ini tcure, full -5 4h 36h 72h 0 3h 25h 50h 10 2h 12h 24h 20 30min 6h 12h 30 20min 4h 8h 40 12min 2h 4h

Page 12 SEP 2011

Page 13: RE500 Fastening With Rebar (SEP 2011)

Page 13 SEP 2011

Page 14: RE500 Fastening With Rebar (SEP 2011)

Page 14 SEP 2011

Page 15: RE500 Fastening With Rebar (SEP 2011)

Page 15 SEP 2011

Page 16: RE500 Fastening With Rebar (SEP 2011)

Page 16 SEP 2011

Page 17: RE500 Fastening With Rebar (SEP 2011)

Page 17 SEP 2011

Page 18: RE500 Fastening With Rebar (SEP 2011)

Page 18 SEP 2011

Page 19: RE500 Fastening With Rebar (SEP 2011)

Page 19 SEP 2011

Page 20: RE500 Fastening With Rebar (SEP 2011)

Page 20 SEP 2011

Page 21: RE500 Fastening With Rebar (SEP 2011)

Page 21 SEP 2011

Page 22: RE500 Fastening With Rebar (SEP 2011)

Page 22 SEP 2011

Page 23: RE500 Fastening With Rebar (SEP 2011)

Page 23 SEP 2011

Page 24: RE500 Fastening With Rebar (SEP 2011)

Page 24 SEP 2011

Page 25: RE500 Fastening With Rebar (SEP 2011)

Page 25 SEP 2011

Page 26: RE500 Fastening With Rebar (SEP 2011)

Page 26 SEP 2011

Page 27: RE500 Fastening With Rebar (SEP 2011)

Page 27 SEP 2011

Page 28: RE500 Fastening With Rebar (SEP 2011)

Page 28 SEP 2011

Page 29: RE500 Fastening With Rebar (SEP 2011)

Page 29 SEP 2011

Page 30: RE500 Fastening With Rebar (SEP 2011)

Page 30 SEP 2011

Page 31: RE500 Fastening With Rebar (SEP 2011)

Page 31 SEP 2011

Page 32: RE500 Fastening With Rebar (SEP 2011)

Page 32 SEP 2011

Page 33: RE500 Fastening With Rebar (SEP 2011)

Page 33 SEP 2011

Page 34: RE500 Fastening With Rebar (SEP 2011)

Page 34 SEP 2011

Page 35: RE500 Fastening With Rebar (SEP 2011)

Page 35 SEP 2011

Page 36: RE500 Fastening With Rebar (SEP 2011)

Page 36 SEP 2011

Page 37: RE500 Fastening With Rebar (SEP 2011)

Page 37 SEP 2011

Page 38: RE500 Fastening With Rebar (SEP 2011)

Page 38 SEP 2011

Page 39: RE500 Fastening With Rebar (SEP 2011)

Page 39 SEP 2011

Page 40: RE500 Fastening With Rebar (SEP 2011)

Page 40 SEP 2011

Page 41: RE500 Fastening With Rebar (SEP 2011)

Page 41 SEP 2011

Page 42: RE500 Fastening With Rebar (SEP 2011)

Page 42 SEP 2011

Page 43: RE500 Fastening With Rebar (SEP 2011)

RE500-EN-INT-02.2004.doc

Material Safety Data Sheet

according to 91/155/EEC Printing date: 09.02.2004

Page 1 of 8

Company: Hilti Tel. Fax Product name: Hilti HIT -RE 500

Date of revision: Febr.16, 2004 Replaces edition of: Febr.10. 2003

1. Chemical product and company identification Product name: Hilti HIT-RE 500 Use of the preparation: Epoxy Injection system for anchor fastening Manufacturer: Hilti GmbH Hiltistrasse 6, D-86916 Kaufering Importer: Hilti Tel. Fax Emergency telephone number:

2. Composition / Information on ingredients Adhesive mortar, packaged in a 330-ml or 500 ml or 1400 ml two-component foil pack Adhesive mortar, packaged in an 1100-ml two-component plastic cartridge Component A: bisphenol A/F base epoxy resin with inorganic filler

CAS-no. Designation Content % Classification 25068-38-6 bisphenol-A-epoxy resin 30-40 Xi, R36/38, R43, N; R51/53 28064-14-4 bisphenol-F-epoxy resin 10-20 Xi; R43, N; R51/53, 16096-31-4 hexandiol glycidylether < 15 Xi; R36/38, R43, R52/53 30499-70-8 alkylglycidylether < 10 Xi; R36/38, R43, R52/53

Component B: aliphatic polyamine with inorganic filler

CAS-no. Designation Content % Classification 1477-55-0 m-xylylene diamine 30-40 C; R34, R41 Xn;R20/22

N; R52/53 For the wording of the risk phrases refer to section 16

3. Hazard identification Component A: Irritating to eyes and skin. May cause skin sensitization by skin contact. Toxic to aquatic organisms, may cause long-term adverse effects in the aquatic environment. Contains epoxy constituents. See information supplied by the manufacturer. Component B: Causes burns. Risk of serious damage to eyes. Harmful by inhalation, in contact with skin and if swallowed. Harmful to aquatic organisms, may cause long-term adverse effects in the aquatic environment.

Page 43 SEP 2011

Page 44: RE500 Fastening With Rebar (SEP 2011)

RE500-EN-INT-02.2004.doc

Material Safety Data Sheet

according to 91/155/EEC Printing date: 09.02.2004

Page 2 of 8

Company: Hilti Tel. Fax Product name: Hilti HIT -RE 500

Mixture Component A + B: Causes burns. Risk of serious damage to eyes. Harmful by inhalation, in contact with skin and if swallowed. May cause skin sensitization by skin contact. Harmful to aquatic organisms, may cause long-term adverse effects in the aquatic environment. Contains epoxy constituents. See information supplied by the manufacturer.

4. First - aid measures

Eyes: Do not delay. Immediately flush with plenty of water for at least 15 minutes. Seek medical advice.

Skin: Do not delay. Remove contaminated clothing. Wash with soap and water. If persistent irritation occurs, obtain medical attention.

Inhalation: Upon breathing in a higher quantity of vapor remove to fresh air. Seek medical advice, if necessary.

Ingestion: Rinse immediately, afterwards drink plenty of water. Seek medical advice.

5. Fire-fighting measures Extinguishing media: suitable: carbon dioxide, dry chemical, foam, water spray not to be used: water in a jet Special fire-fighting procedures: In case of fire toxic or irritating gas may be generated. Wear self-contained breathing

apparatus and protective clothing. Medical attention is necessary for symptoms which obviously come from the inhalation of the combustion fumes. Remains after a fire and contaminated extinguishing water must be disposed of

in accordance with local legislation. Hazardous combustion products: COx, NOx, carbon

6. Accidental release measures Personal precautions: Remove ignition sources. Ensure adequate ventilation or self-contained breathing apparatus. Avoid contact with skin, eyes and clothing. Environmental precautions:

Prevent escape into soil, waterways and sewage system. If the product does escape into soil, waterways and sewage systems, inform the responsible authorities.

Cleaning procedures: Take up by mechanical means. Remove remainder with solvent or liquid-binding material. Disposal according to local regulations.

Page 44 SEP 2011

Page 45: RE500 Fastening With Rebar (SEP 2011)

RE500-EN-INT-02.2004.doc

Material Safety Data Sheet

according to 91/155/EEC Printing date: 09.02.2004

Page 3 of 8

Company: Hilti Tel. Fax Product name: Hilti HIT -RE 500

7. Handling and storage

7.1 Handling: Avoid contact with skin, eyes and clothing. During use and handling, care must be taken to observe the valid MAC values and industrial safety regulations.

Observe the expiry date on the connection part of the foilpack or label on the cartridge. 7.2 Storage:

Store in original packaging in a cool (+5 to max. +25°C) and dark place. Keep away from direct sunlight. Observe the general rules of industrial fire prevention.

Storage Classification: 8 corrosive Notes on collective storage:

Don’t store and transport with foodstuffs.

8. Exposure control and personal protection Respiratory protection: Not normally required, use in a well-ventilated area Eye protection: Tightly sealed goggles Hand protection: suitable gloves - Nitrile rubber gloves or butyl

rubber gloves. Consider the specific conditions in the work place.

Body protection: Protective work clothing Other: Provide emergency eyewash facility in the work area

Constituents with exposure limits to be controlled: (α,α`-Diamino-1,3-xylol) m-Xylylene diamine CAS-Nr.1477-55-0 Limit in air: 0,1 mg/m³ Industrial hygiene:

- Don’t inhale vapors. - Avoid contact with skin, eyes or clothing. - Don’t smoke, drink or eat during working. - Wash thoroughly with soap and water after using and particulary before eating,

drinking and smoking. - Apply special protection cream as prophylactic skin protection. - Immediately take off contaminatet clothing. - Keep away from food and drink. - Clean with means not damaging to the skin (polyethylene glycole) after skin contact

and wash afterwards with soap and water.

Page 45 SEP 2011

Page 46: RE500 Fastening With Rebar (SEP 2011)

RE500-EN-INT-02.2004.doc

Material Safety Data Sheet

according to 91/155/EEC Printing date: 09.02.2004

Page 4 of 8

Company: Hilti Tel. Fax Product name: Hilti HIT -RE 500

9. Physical and chemical properties Tested as per:

Form: 2-component-foilpack with paste or 2-component cartridge with paste

Colour: component A: grey component B: red

Odour: like amine Changes in condition:

Density:

Density [g/cm3] (°C) 1,5 (20) Bulk density [kg/cm3] not applicable Vapour pressure [mbar] (°C) component A: < 0,1 (20)

component B: < 0,1 (25)

Viskosity:

Viscosity [Pa⋅s] (°C) about 50 (23) DIN 53 015 Efflux time 4 mm nozzle [s] above 20 (23) DIN 53 211 Efflux time 8 mm nozzle [s] --- Solubility [g/l] (°C):

in water component A: insoluble component B: insoluble

pH-value ( g/l H2O;°C): component B: 11 (suspension with water 1:1)

Flash point [°C]: component A and B: >100 DIN 53 213 Ignition temperature [°C]: not determined DIN 51 794

Explosive limit [vol%]:

lower: not determined upper: not determined

Thermic decomposition [°C] not determined Autoignition temperature [°C]:

The product is not self igniting.

ASTM D 2155

10. Stability and reactivity Conditions to avoid: Don’t overheat. Hazardous decomposition products: None, if used for the intended purpose.

Page 46 SEP 2011

Page 47: RE500 Fastening With Rebar (SEP 2011)

RE500-EN-INT-02.2004.doc

Material Safety Data Sheet

according to 91/155/EEC Printing date: 09.02.2004

Page 5 of 8

Company: Hilti Tel. Fax Product name: Hilti HIT -RE 500

11. Toxicological information The classification takes place according to the determination process in 1999/45/EC. Local contact of Hilti HIT-RE 500 may be harmful, causes burns and sensitization.

12. Ecological information Toxic for aquatic organisms. The product is difficulty biodegradable. Keep away from drains, surface-water, ground-water and soil. Class of risk for water: 2, hazardous for water

13. Disposal considerations

Our product packaging bears the „Green Spot“ Emptied containers can be disposed of via the Dual Collecting-System (yellow bin). Full or partly emptied containers, whose contents have become unusable, e.g. expiry date exceeded or container damaged, must be collected separately and disposed of as special waste, while observing the respective authorities‘ regulations. Dispose in accordance with Federal, State and Local Environmental Regulations.

Kind of waste: (EC Directive 2000/532/EU) On handling over small quantities to communal / municipal collection points: EAK-No. 200127( ........adhesives and sythetik resins….)

Disposal of large quantities via disposal companies: EAK-No. 080409 (… adhesives and sealants …..)

Recommandation to avoid special waste: Dispense contents of unusable containers through the static mixer in the proper way. The cured adhesive is inert and may be disposed of in remaining waste. The empty packaging can be put in the „Yellow bin“.

14. Transport information Landtransport/Road: GGVS / ADR UN 3259 Amines, solid, corrosive n.o.s.

(m-Xylylenediamine) , 8, II Limited Quantity LQ 23

Landtransport/Bahn: GGVE / RID UN 3259 Amines, solid, corrosive n.o.s. (m-Xylylenediamine) , 8, II Limited Quantity LQ 23

Maritime transport: GGVSee / IMDG-Code UN 3259 Amines, solid, corrosive n.o.s.

(m-Xylylenediamine) , 8, II EmS-No. F-A S-B

Air transport: ICAO / IATA UN 3259 Amines, solid, corrosive n.o.s. (m-Xylylenediamine) , Class 8, Pkg-Gr. II, PIN 814

Page 47 SEP 2011

Page 48: RE500 Fastening With Rebar (SEP 2011)

RE500-EN-INT-02.2004.doc

Material Safety Data Sheet

according to 91/155/EEC Printing date: 09.02.2004

Page 6 of 8

Company: Hilti Tel. Fax Product name: Hilti HIT -RE 500

Proper Shipping Name: Amines, solid, corrosive n.o.s.

(m-Xylylenediamine)

Page 48 SEP 2011

Page 49: RE500 Fastening With Rebar (SEP 2011)

RE500-EN-INT-02.2004.doc

Material Safety Data Sheet

according to 91/155/EEC Printing date: 09.02.2004

Page 7 of 8

Company: Hilti Tel. Fax Product name: Hilti HIT -RE 500

15. Regulatory information Classification according to guidelines 1999/45 EEC an 67/548 EEC as well as to their

supplements. Observe the usual precautionary measures for handling chemicals. Labelling:

Symbol: Danger identification C corrosive N Dangerous for the environment Contains epoxy constituents. See information supplied by the manufacturer. contains: m-xylylene diamine alkylglycidylether Risk-phrases:

R34 Causes burns R20/22 Harmful by inhalation and if swallowed R43 May cause sensitization by skin contact.

R51/53 Toxic to aquatic organisms, may cause long-term adverse effects in the aquatic environment.

Safety phrases: S1/2 Keep locked up and out of the reach of children. S36/37/39 Wear suitable protecting clothing, gloves and eye protection. S26 In case of contact with eyes, rinse immediately with plenty of water

and seek medical advice. S28 After contact with skin, wash immediately with plenty of soap and

water. S61 Avoid release to the environment. Refer to special

instructions/safety data sheets.

Further information: Observe: Information sheets of trade associations „Epoxy resins in the construction industry“ Council Directive 94/33/EC of 22 June 1994 on the protection of young people at work § 2 and / or (DE) children and young persons act § 22, § 29

16. Other information

Relevant R-phrases: R34 Causes burns R 20/22 Harmful by inhalation and if swallowed R 36/38 Irritating to eyes and skin R43 May cause sensitization by skin contact R51/53 Toxic to aquatic organisms, may cause long-term adverse effects in the aquatic environment. R52/53 Harmful to aquatic organisms, may cause long-term adverse effects in the aquatic environment. Body issuing data sheet: Hilti Entwicklungs GmbH

Tel: 08191 906310 All information and recommendation contained herein are based upon data believed to be correct. However,

Page 49 SEP 2011

Page 50: RE500 Fastening With Rebar (SEP 2011)

RE500-EN-INT-02.2004.doc

Material Safety Data Sheet

according to 91/155/EEC Printing date: 09.02.2004

Page 8 of 8

Company: Hilti Tel. Fax Product name: Hilti HIT -RE 500

no guarantee or warranty of any kind expressed or implied is made with respect to the information provided.

Page 50 SEP 2011

Page 51: RE500 Fastening With Rebar (SEP 2011)

Ref No Date Project Contractor Consulting Engineer Product Application

Job/Application Reference04-Apr-11

40884 09-10 Airport CHINA STATE CONST ENG COR

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

40558 09-10 MGM Grand Macau NGAN KUI ENGINEERING LIMITED

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

40563 09-10 The Venetian Casino Resort (Parcel 1) Gammon Bldg Constr (Macau) Ltd

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

40564 09-10 The Venetian Casino Resort (Parcel 1) Gammon Bldg Constr (Macau) Ltd

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

40567 09-10 The Venetian Casino Resort (Parcel 1) HONGAN ENGINEERING (MACAU) CO LTD

Injectable mortar HIT-RE 500/500/1 (20) steel bracket fixing

40569 09-10 The Venetian Casino Resort (Parcel 1) HONGAN ENGINEERING (MACAU) CO LTD

Injectable mortar HIT-RE 500/500/1 (20) steel bracket fixing

40612 09-10 Shangri-la and Traders HotelsSheraton and St. Regis Hotels

(Parcel 5&6)

HONGAN ENGINEERING (MACAU) CO LTD

Injectable mortar HIT-RE 500/500/1 (20) steel bracket fixing

40871 09-10 Shangri-la and Traders HotelsSheraton and St. Regis Hotels

(Parcel 5&6)

PICO SANDERSON JV PTE LTD

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

40494 09-10 Galaxy Mega Resort DRAGON CHENG BUILDING Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

40886 09-10 Kai Tak Development CHINA STATE CONST ENG COR

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

40892 09-10 Pak Shek Kok Development CHINA STATE CONST ENG COR

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

40894 09-10 Pak Shek Kok Development PAUL Y. - CONCENTRIC JOINT VENTURE

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

40546 09-10 Galaxy Mega Resort WENG HENG CONSTR UCAO CIVIL

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

40602 09-10 Shangri-la and Traders HotelsSheraton and St. Regis Hotels

(Parcel 5&6)

GENYIELD CONSTRUCTION CO LTD

Injectable mortar HIT-RE 500/500/1 (20) cladding / pre-cast panel fixing

Units 701-704, 7/F, Tower A, Manulife Financial Centre, No 223 Wai Yip Street, Kwun Tong, Kowloon, Hong Kong. 1

Hotline : 8228 8118 Fax : 29541751

Ref No Date Project Contractor Consulting Engineer Product Application

Job/Application Reference04-Apr-11

40609 09-10 Shangri-la and Traders HotelsSheraton and St. Regis Hotels

(Parcel 5&6)

HONGAN ENGINEERING (MACAU) CO LTD

Injectable mortar HIT-RE 500/500/1 (20) steel bracket fixing

40571 09-10 The Venetian Casino Resort (Parcel 1) TOP BUILDERS GROUP LTD Injectable mortar HIT-RE 500/500/1 (20) steel bracket fixing

40361 09-10 Hong Kong University Re-development LEIGHTON-LNS JOINT VENTURE

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

40274 09-10 MTR West Island Line HO MING CONSTRUCTION Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

40276 09-10 MTR West Island Line YHK ENGINEERING CO LTD Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

40321 09-10 Tamar Development HIP HING CONST CO LTD Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

40330 09-10 Airport GAMMON - HIP HING JOINT VENTURE

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

40351 09-10 Che Kung Temple Station Development GAMMON CONSTRUCTION LTD

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

40352 09-10 Che Kung Temple Station Development HIP HING BUILDERS CO LTD Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

40506 09-10 Galaxy Mega Resort KIN PANG CONSTRUCTION & ENGINEERING

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

40354 09-10 Hong Kong University Re-development GAMMON CONSTRUCTION LTD

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

40503 09-10 Galaxy Mega Resort IAU LUEN-COMANHIA DE CONSTRUCAO

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

40362 09-10 Kai Tak Development HIP HING CONST CO LTD Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

40368 09-10 MTR West Island Line GAMMON CONSTRUCTION LTD

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

40396 09-10 Ocean Park Master Development YKK AP FACADE HONG KONG LTD

Injectable mortar HIT-RE 500/500/1 (20) steel bracket fixing

40416 09-10 Lohas Park Phase 1 & Phase 2 SHUN WING ALUMINIUM WORKS CO., LTD

Injectable mortar HIT-RE 500/500/1 (20) steel bracket fixing

Units 701-704, 7/F, Tower A, Manulife Financial Centre, No 223 Wai Yip Street, Kwun Tong, Kowloon, Hong Kong. 2

Hotline : 8228 8118 Fax : 29541751Page 51 SEP 2011

Page 52: RE500 Fastening With Rebar (SEP 2011)

Ref No Date Project Contractor Consulting Engineer Product Application

Job/Application Reference04-Apr-11

40423 09-10 SHK, Tuen Mun Station (TMTL 447) GAMMON CONSTRUCTION LTD

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

40883 09-10 Galaxy Star World Hotel, Macau DECORACAO CHEONG KONG Meinhardt Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

40353 09-10 Che Kung Temple Station Development HIP HING CONST CO LTD Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

40775 09-10 Galaxy Mega Resort SHUN SENG ENGINEERING CO

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

40616 09-10 Shangri-la and Traders HotelsSheraton and St. Regis Hotels

(Parcel 5&6)

HUAN YU CONSTRUCTION CO LTD

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

40839 09-10 Shangri-la and Traders HotelsSheraton and St. Regis Hotels

(Parcel 5&6)

CONSTRUCOES E OBRAS PUBLICAS

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

40820 09-10 Shangri-la and Traders HotelsSheraton and St. Regis Hotels

(Parcel 5&6)

CIRCLE ENGINEERING COMPANY LTD

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

40819 09-10 Shangri-la and Traders HotelsSheraton and St. Regis Hotels

(Parcel 5&6)

CHON PO DECO. ENG CO LTD Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

40817 09-10 Shangri-la and Traders HotelsSheraton and St. Regis Hotels

(Parcel 5&6)

BOYA DECORATION AND ENGINEERING

Injectable mortar HIT-RE 500/500/1 (20) block work fixing

40808 09-10 The Venetian Casino Resort (Parcel 1) PICO SANDERSON JV PTE LTD

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

40791 09-10 The Venetian Casino Resort (Parcel 1) AD&C ENG & CON CO LTD Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

40757 09-10 Galaxy Mega Resort MAN SHING ENGINEERING (MACAO) LTD

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

40756 09-10 Galaxy Mega Resort KENEKIN ENGINEERING CO LTD

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

40746 09-10 Galaxy Mega Resort CREATOR'S METAL & GLASS ENG (MACAU)

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

Units 701-704, 7/F, Tower A, Manulife Financial Centre, No 223 Wai Yip Street, Kwun Tong, Kowloon, Hong Kong. 3

Hotline : 8228 8118 Fax : 29541751

Ref No Date Project Contractor Consulting Engineer Product Application

Job/Application Reference04-Apr-11

40738 09-10 Galaxy Mega Resort CREATOR'S METAL & GLASS ENG (MACAU)

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

40664 09-10 Kai Tak Development YIP SHING CIVIL ENG CO LTD Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

40795 09-10 The Venetian Casino Resort (Parcel 1) CIRCLE ENGINEERING COMPANY LTD

Injectable mortar HIT-RE 500/500/1 (20) block work fixing

40661 09-10 Alternation of Park Hotel KIN YIP ENGINEERING Injectable mortar HIT-RE 500/500/1 (20) steel bracket fixing

40699 09-10 SHK Development, Tseung Kwan O (Area 56)

JUMBO ORIENT CONTRACTING LTD

Injectable mortar HIT-RE 500/500/1 (20) steel bracket fixing

40679 09-10 MTR West Island Line GEOTECH ENG LTD Injectable mortar HIT-RE 500/500/1 (20) fixing the mesh in the slope

40636 09-10 Shangri-la and Traders HotelsSheraton and St. Regis Hotels

(Parcel 5&6)

TOP BUILDERS GROUP LTD Injectable mortar HIT-RE 500/500/1 (20) steel bracket fixing

40693 09-10 MTR West Island Line GOLDENWALL CURTAIN WALL LTD

Injectable mortar HIT-RE 500/500/1 (20) cladding / pre-cast panel fixing

40233 06-10 Galaxy Mega Resort INTERIOR CONTRACT KENG VUI

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

40207 06-10 SHK Development, Tseung Kwan O (Area 56)

WAH SING CONST ENG LTD Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

40205 06-10 Shangri-la and Traders HotelsSheraton and St. Regis Hotels

(Parcel 5&6)

TOP BUILDERS INTERNATIONAL CO.LTD

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

40197 06-10 Galaxy Mega Resort WAI HING STEEL & ALUMINIUM

Injectable mortar HIT-RE 500/500/1 (20) structural steel / I-beam fixing

40192 06-10 KCRC Tai Wai Depot HIP HING BUILDERS CO LTD Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

40191 06-10 Pak Shek Kok Development HSIN CHONG CONSTRUCTION (ASIA) LTD

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

40190 06-10 Pak Shek Kok Development GAMMON CONSTRUCTION LTD

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

Units 701-704, 7/F, Tower A, Manulife Financial Centre, No 223 Wai Yip Street, Kwun Tong, Kowloon, Hong Kong. 4

Hotline : 8228 8118 Fax : 29541751Page 52 SEP 2011

Page 53: RE500 Fastening With Rebar (SEP 2011)

Ref No Date Project Contractor Consulting Engineer Product Application

Job/Application Reference04-Apr-11

40180 06-10 MTR West Island Line GAMMON - NISHIMATSU WIL JV

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

40178 06-10 Hennessy Center Redevelopment GAMMON CONSTRUCTION LTD

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

40153 06-10 Galaxy Mega Resort YUNG KEE ELECTRICAL MECHANICAL &

Injectable mortar HIT-RE 500/500/1 (20) fire services fixing

40255 06-10 Shangri-la and Traders HotelsSheraton and St. Regis Hotels

(Parcel 5&6)

MODERN CONCRETE DRILL CUT (MACAU)

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

40250 06-10 SHK Development, Tseung Kwan O (Area 56)

SHUI ON BUILDING CONTRACTORS LTD

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

40248 06-10 MTR West Island Line PAUL Y CONST CO LTD Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

40243 06-10 Development of Ponte 16 SAN WAI HOI CONSTRUCTION &

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

40242 06-10 One Grantai AGENCIA COMERCIAL MAN UN NG KAM KIN

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

40140 06-10 City of Dreams Resort DRAGONE MACAU LIMITED Injectable mortar HIT-RE 500/500/1 (20) steel bracket fixing

40105 05-10 Galaxy Mega Resort SUNDART ENGINEERING SERVICES

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

40086 05-10 Airport CHUEN KEE CONST CO LTD Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

39987 04-10 Hennessy Center Redevelopment SHUI WING ENGRG CO LTD Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

40020 04-10 One Central Macau WING CHEUNG ENGINEERING CO LTD

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

39895 03-10 Airport DRAGAGES HONG KONG LIMITED

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

39911 03-10 Pak Shek Kok Development CHUN SING ENGRG CO LTD Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

39916 03-10 SHK, Tuen Mun Station (TMTL 447) LEIGHTON CONT (ASIA) LTD Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

Units 701-704, 7/F, Tower A, Manulife Financial Centre, No 223 Wai Yip Street, Kwun Tong, Kowloon, Hong Kong. 5

Hotline : 8228 8118 Fax : 29541751

Ref No Date Project Contractor Consulting Engineer Product Application

Job/Application Reference04-Apr-11

39904 03-10 MTR West Island Line HSIN CHONG CONSTRUCTION (ASIA) LTD

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

39899 03-10 SHK Development, Tseung Kwan O (Area 56)

WAH SENG GENERAL CONT LTD

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

39913 03-10 SHK Development, Tseung Kwan O (Area 56)

GAMMON CONSTRUCTION LTD

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

39935 03-10 SHK, Tuen Mun Station (TMTL 447) ACTIVE WAY LTD Injectable mortar HIT-RE 500/500/1 (20) roofing fixing

39941 03-10 Tamar Development SUN HING ELECTRICAL & MECHANICAL

Injectable mortar HIT-RE 500/500/1 (20) machine fixing

39912 03-10 Pak Shek Kok Development HSIN CHONG CONST CO LTD Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

39806 02-10 Airport HIP HING CONST CO LTD Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

39773 02-10 Ocean Park Master Development HONG KI ENG LTD Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

39792 02-10 One Central Macau MELCO CROWN (COD) DEVELOPMENTS LTD

Injectable mortar HIT-RE 500/500/1 (20) steel bracket fixing

39817 02-10 Macau - Science Centre TONG LEI INTERNATIONAL CO. LTD.

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

39829 02-10 Galaxy Mega Resort MACAO SHUOQUAN Injectable mortar HIT-RE 500/500/1 (20) marble / granite fixing

39837 02-10 Ocean Park Master Development KADEN CONSTRUCTION LTD Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

39779 02-10 KCRC Tai Wai Depot GOLDEN RESOURCES ENG. LTD.

Injectable mortar HIT-RE 500/500/1 (20) hand rail fixing

39648 01-10 Pak Shek Kok Development CHUN SING ENGRG CO LTD Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

39766 01-10 Wynn Macau Casino IBI MACAU LIMITADA Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

39751 01-10 One Central Macau CHI WO ENG CO Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

39700 01-10 Pak Shek Kok Development CHINA RESOURCES CONSTRUCTION CO LTD

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

Units 701-704, 7/F, Tower A, Manulife Financial Centre, No 223 Wai Yip Street, Kwun Tong, Kowloon, Hong Kong. 6

Hotline : 8228 8118 Fax : 29541751Page 53 SEP 2011

Page 54: RE500 Fastening With Rebar (SEP 2011)

Ref No Date Project Contractor Consulting Engineer Product Application

Job/Application Reference04-Apr-11

39680 01-10 PTM Projects - Hip Hing CHOI KEE ENG (HK) CO LTD Injectable mortar HIT-RE 500/500/1 (20) steel hanger fixing

39658 01-10 City of Dreams Resort BIWATER MACAU LIMITED Injectable mortar HIT-RE 500/500/1 (20) Plumbing works fixing

Units 701-704, 7/F, Tower A, Manulife Financial Centre, No 223 Wai Yip Street, Kwun Tong, Kowloon, Hong Kong. 7

Hotline : 8228 8118 Fax : 29541751

Page 54 SEP 2011

Page 55: RE500 Fastening With Rebar (SEP 2011)

Ref No Date Project Contractor Consulting Engineer Product Application

Job/Application Reference24-Feb-10

39101 09-09 Four Seasons Hotel, Macau (Parcel 2) CHOI NAM KEE (MACAU) CONSTRUCTION

Injectable mortar HIT-RE 500/500/1 (20) structural steel / I-beam fixing

38638 08-09 PTM Projects - Paul Y PAUL Y. INTERIOR CONTRACTORS

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

38567 08-09 School Improvement Program CF. FERREIRO ALUMINIC VA NGAI

ASD Injectable mortar HIT-RE 500/500/1 (20) decoration fixing

38642 08-09 PTM Projects - Shui On SUN FOOK KONG CONST LTD Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

38839 08-09 City of Dreams Resort MAN SHING ENGINEERING (MACAO) LTD

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

38846 08-09 One Central Macau SZE CHEONG (HK) ENG CO LTD

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

38727 08-09 PTM Projects - China State HANG YUE ENG LTD Injectable mortar HIT-RE 500/500/1 (20) hand rail fixing

38724 08-09 PTM Projects - Cheung Kong ABLE ENG CO LTD Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

38496 07-09 One Central Macau JOSEF GARTNER & CO (HK) LTD

Injectable mortar HIT-RE 500-SD/500/1 curtain wall fixing

38398 07-09 Airport UNION CONTRACTORS LTD Injectable mortar HIT-RE 500/500/1 (20) glass rail fixing

38257 07-09 Macau Fisherman's Wharf (Phase 1&2) IU FAI CHONG SAU GONG CHENG

Injectable mortar HIT-RE 500/500/1 (20) steel bracket fixing

38262 07-09 The Venetian Casino Resort (Parcel 1) CIA SAN SON I ENGENHARIA Injectable mortar HIT-RE 500/500/1 (20) block work fixing

38270 07-09 City of Dreams Resort THEMEWORKS INTERNATIONAL (MACAU)

Injectable mortar HIT-RE 500/500/1 (20) decoration fixing

38470 07-09 Macau - Science Centre SAN MENG FAI ENG & CONST.CO LTD

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

38476 07-09 City of Dreams Resort 3-STRINGS ENGINEERING CO LTD

Injectable mortar HIT-RE 500/500/1 (20) structural steel / I-beam fixing

38485 07-09 Shangri-la and Traders HotelsSheraton and St. Regis Hotels

(Parcel 5&6)

TYSAN CONSTRUCTION (MACAU) LIMITED

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

17/F, Tower 6, China Hong Kong City, 33 Canton Road, Tsimshatsui, Kowloon, Hong Kong. 3

Hotline : 8228 8118 Fax : 29541751

Ref No Date Project Contractor Consulting Engineer Product Application

Job/Application Reference24-Feb-10

38513 07-09 Oceanus Entertainment Complex HONG TOU ENGINEERING Injectable mortar HIT-RE 500/500/1 (20) steel hanger fixing

38517 07-09 School Improvement Program MANSION ENGINEERING & CONSTRUCTION

ASD Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

38479 07-09 Four Seasons Hotel, Macau (Parcel 2) GENYIELD CONSTRUCTION CO LTD

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

38119 06-09 Galaxy Star World Hotel, Macau SUN KOU NGAI CONST. MATERIAL & ENG.

Meinhardt Injectable mortar HIT-RE 500/500/1 (20) steel hanger fixing

38046 06-09 PTM Projects - Hip Hing HOP FAT STRUCTURAL STEEL ENG CO LTD

Injectable mortar HIT-RE 500/500/1 (20) steel bracket fixing

38094 06-09 One Central Macau HING WAH CONSTRUCTION COMPANY LTD

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

38090 06-09 Galaxy Mega Resort GENYIELD CONSTRUCTION CO LTD

Injectable mortar HIT-RE 500/500/1 (20) steel bracket fixing

38092 06-09 Crown Macau PAK LUN FAT ENGINEERING (MACAU) CO

Injectable mortar HIT-RE 500/500/1 (20) steel bracket fixing

38061 06-09 City of Dreams Resort ASSOCIATED TECHNOLOGIES MACAU

Injectable mortar HIT-RE 500/500/1 (20) singage / advertising sign fixing

37973 05-09 Four Seasons Hotel, Macau (Parcel 2) KENEKIN ENGINEERING CO LTD

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

37749 05-09 KCRC Tai Wai Depot KPA ENGINEERING LTD Injectable mortar HIT-RE 500/500/1 (20) steel bracket fixing

37782 05-09 PTM Projects - Sun Hung Kai HOP KEE (KAM FAI) ENG CO LTD

Injectable mortar HIT-RE 500/500/1 (20) steel bracket fixing

37789 05-09 PTM Projects - Sun Hung Kai WAH SENG GENERAL CONT LTD

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

37817 05-09 PTM Projects - Gammon COMMANDING VIEW ENG CO LTD

Injectable mortar HIT-RE 500/500/1 (20) sound / noise barrier fixing

37854 05-09 Macao Studio City VIBRO (MACAU) LIMITED Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

17/F, Tower 6, China Hong Kong City, 33 Canton Road, Tsimshatsui, Kowloon, Hong Kong. 4

Hotline : 8228 8118 Fax : 29541751Page 55 SEP 2011

Page 56: RE500 Fastening With Rebar (SEP 2011)

Ref No Date Project Contractor Consulting Engineer Product Application

Job/Application Reference24-Feb-10

37807 05-09 One Central Macau SAN WO DECORATION ENGINEERING LTD

Injectable mortar HIT-RE 500/500/1 (20) reinforcement for block wall system

37960 05-09 Macau - Science Centre LUIS KWOK ENGENHARIA E CONSTRUCAO

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

37869 05-09 PTM Projects - Shui On FUJITA CORPORATION Injectable mortar HIT-RE 500/500/1 (20) steel bracket fixing

37855 05-09 The Venetian Casino Resort (Parcel 1) ARTTECH ENGINEERING (MACAU) CO LTD

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

37540 04-09 One Central Macau SAN YIU CHEONG DECORATION

Injectable mortar HIT-RE 500/500/1 (20) reinforcement for block wall system

37530 04-09 City of Dreams Resort GRADATION DESIGN & ENG CO LTD

Injectable mortar HIT-RE 500/500/1 (20) canopy fixing

37553 04-09 PTM Projects - Sun Hung Kai GOLDEN REGION CONSTRUCTION

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

37568 04-09 Le Royal Arc KIN PANG CONSTRUCTION & ENGINEERING

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

37675 04-09 Macau - Science Centre CONSORCIO SOC.CONST.ENG.

Injectable mortar HIT-RE 500/500/1 (20) marble / granite fixing

37527 04-09 City of Dreams Resort COMPANHIA PIU HENG LONG (MACAU) LTD

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

37677 04-09 Macau - Science Centre MODERN CONCRETE DRILL CUT (MACAU)

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

37576 04-09 One Central Macau CHOI KEE METAL BLDG MATERIALS LTD

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

37662 04-09 Oceanus Entertainment Complex MERCURIO SERVICOS DE ENGENHARIA

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

37645 04-09 Le Royal Arc CHONG SAN INTERIOR DESIGN &

Injectable mortar HIT-RE 500/500/1 (20) block work fixing

37633 04-09 Lohas Park Phase 1 & Phase 2 CREATOR'S METAL & GLASS ENG LTD

Injectable mortar HIT-RE 500/500/1 (20) glass rail fixing

17/F, Tower 6, China Hong Kong City, 33 Canton Road, Tsimshatsui, Kowloon, Hong Kong. 5

Hotline : 8228 8118 Fax : 29541751

Ref No Date Project Contractor Consulting Engineer Product Application

Job/Application Reference24-Feb-10

37607 04-09 SHK Development, Tseung Kwan O (Area 56)

HONG CHANG CONSTRUCTION TRANS-

Injectable mortar HIT-RE 500/500/1 (20) steel bracket fixing

37255 03-09 One Central Macau UNITED MARBLE CO LTD Injectable mortar HIT-RE 500/500/1 (20) marble / granite fixing

37173 03-09 Four Seasons Hotel, Macau (Parcel 2) APGRC (MACAU) LIMITED Injectable mortar HIT-RE 500/500/1 (20) steel bracket fixing

37336 03-09 PTM Projects - Gammon G & M ENG CO LTD Injectable mortar HIT-RE 500/500/1 (20) glass rail fixing

37361 03-09 City of Dreams Resort COMPANHIA DE OBRAS DE CONSTRUCAO

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

37065 02-09 One Central Macau UNITED MARBLE CO LTD Injectable mortar HIT-RE 500/500/1 (20) marble / granite fixing

36775 02-09 One Grantai MAN LEI FONG CONSTRUCTION

Injectable mortar HIT-RE 500/500/1 (20) steel bracket fixing

36806 02-09 PTM Projects - China State RICHWELL ENGINEERING LTD

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

36812 02-09 Airport UNITED SOUNDFAIR ENG CO LTD

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

36865 02-09 City of Dreams Resort BRIGHT STAR MACHINERY ENG LTD

Injectable mortar HIT-RE 500/500/1 (20) machine fixing

36955 02-09 City of Dreams Resort BRIGHT STAR MACHINERY ENG LTD

Injectable mortar HIT-RE 500/500/1 (20) machine fixing

36964 02-09 PTM Projects - Gammon AMEN CONSTRUCTION CO LTD

Injectable mortar HIT-RE 500/500/1 (20) hanger fixing

36968 02-09 PTM Projects - Hsin Chong AMEN CONSTRUCTION CO LTD

Injectable mortar HIT-RE 500/500/1 (20) hanger fixing

37055 02-09 Wynn Macau Casino ASTEL (MACAO) LIMITED Injectable mortar HIT-RE 500/500/1 (20) machine fixing

36979 02-09 Union Square 7, Kowloon Station CHINA SKY FIRE ENGINEERING LTD

Injectable mortar HIT-RE 500/500/1 (20) hanger fixing

36523 01-09 City of Dreams Resort FONG CHEONG CONCRETE CORING (MACAU)

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

17/F, Tower 6, China Hong Kong City, 33 Canton Road, Tsimshatsui, Kowloon, Hong Kong. 6

Hotline : 8228 8118 Fax : 29541751Page 56 SEP 2011

Page 57: RE500 Fastening With Rebar (SEP 2011)

Ref No Date Project Contractor Consulting Engineer Product Application

Job/Application Reference24-Feb-10

36714 01-09 SHK Development, Tseung Kwan O (Area 56)

KUEN CHEONG CONST & ENG CO LTD

Injectable mortar HIT-RE 500/500/1 (20) structural steel / I-beam fixing

36713 01-09 SHK Development, Tseung Kwan O (Area 56)

KUEN CHEONG CONST & ENG CO LTD

Injectable mortar HIT-RE 500/330/1 (25) structural steel / I-beam fixing

36711 01-09 PTM Projects - Sun Hung Kai MAN HO METALLIC ENGINEERING CO LTD

Injectable mortar HIT-RE 500/500/1 (20) structural steel / I-beam fixing

36702 01-09 PTM Projects - China State HUNG LEE STEEL & IRON ENG LTD

Injectable mortar HIT-RE 500/500/1 (20) roofing fixing

36647 01-09 PTM Projects - Hanison JUMBO ORIENT CONTRACTING LTD

Injectable mortar HIT-RE 500/500/1 (20) hanger fixing

36645 01-09 City of Dreams Resort FONG CHEONG CONCRETE CORING (MACAU)

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

36640 01-09 KCRC Wu Kai Sa Depot - Lake W D K ENG LTD Injectable mortar HIT-RE 500/500/1 (20) machine fixing

36567 01-09 PTM Projects - Sun Hung Kai CHUN LUEN ENG CO LTD Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

17/F, Tower 6, China Hong Kong City, 33 Canton Road, Tsimshatsui, Kowloon, Hong Kong. 7

Hotline : 8228 8118 Fax : 29541751

Page 57 SEP 2011

Page 58: RE500 Fastening With Rebar (SEP 2011)

Ref No Date Project Contractor Consulting Engineer Product Application

Job/Application Reference27-Jul-09

33647 12-08 City of Dreams Resort SUN KOU NGAI CONST. MATERIAL & ENG.

Injectable mortar HIT-RE 500/500/1 (20) structural steel / I-beam fixing

33963 12-08 PTM Projects - Paul Y PAUL Y. GENERAL CONTRACTORS LIMITED

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

33740 12-08 Wynn Macau Casino Leighton-China State Joint Venture

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

33341 12-08 PTM Projects - Gammon CHEVALIER (ALUMINIUM ENG) LTD

Injectable mortar HIT-RE 500/500/1 (20) cladding / pre-cast panel fixing

33962 12-08 PTM Projects - Paul Y PAUL Y. BUILDERS LIMITED Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

33235 12-08 Oceanus Entertainment Complex MERCURIO SERVICOS DE ENGENHARIA

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

33971 12-08 PTM Projects - Shui On SHUI ON BUILDING CONTRACTORS LTD

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

33355 12-08 PTM Projects - Hsin Chong HSIN CHONG CONST CO LTD Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

33136 12-08 PTM Projects - Hsin Chong BEST TIME ENGINEERING LIMITED

Injectable mortar HIT-RE 500/500/1 (20) steel bracket fixing

33351 12-08 PTM Projects - Hsin Chong HSIN CHONG - YAU LEE JOINT VENTURE

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

33356 12-08 PTM Projects - Hsin Chong HSIN CHONG CONSTRUCTION (ASIA) LTD

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

33233 12-08 Galaxy Mega Resort SHANGHAI CONSTRUCTION GROUP (MACAU)

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

33712 12-08 Macau - Science Centre TONG LEI INTERNATIONAL CO. LTD.

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

33940 12-08 PTM Projects - China State CHINA STATE CONST ENG COR

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

33960 12-08 PTM Projects - Paul Y PAUL Y CONST CO LTD Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

33367 12-08 PTM Projects - Yau Lee YAU LEE CONST CO LTD Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

17/F, Tower 6, China Hong Kong City, 33 Canton Road, Tsimshatsui, Kowloon, Hong Kong. 1

Hotline : 8228 8118 Fax : 29541751

Ref No Date Project Contractor Consulting Engineer Product Application

Job/Application Reference27-Jul-09

33836 12-08 City of Dreams Resort COMPANHIA DE CONSTRUCAO &

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

33858 12-08 City of Dreams Resort LIN WONG CONSTRUCTION CO.,LTD

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

33364 12-08 PTM Projects - Sun Hung Kai SANFIELD BLDG CONTRACTOR

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

33521 12-08 PTM Projects - Sun Hung Kai WANG WAI CONST WORKS LTD

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

34027 12-08 PTM Projects - Sun Hung Kai KIN LUEN CONSTRUCTION ENGINEERING

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

33859 12-08 City of Dreams Resort SAN IO WA CONSTRUCTION Injectable mortar HIT-RE 500/500/1 (20) structural steel / I-beam fixing

33689 12-08 One Central Macau URC - PROJECTS MANAGEMENT (MACAU),

Injectable mortar HIT-RE 500/500/1 (20) steel hanger fixing

33710 12-08 One Central Macau YAU LUEN METAL WORKS Injectable mortar HIT-RE 500/500/1 (20) steel hanger fixing

33223 12-08 City of Dreams Resort UNION MANOR (MACAU) ENG CO LTD

Injectable mortar HIT-RE 500/500/1 (20) steel bracket fixing

33264 12-08 One Central Macau SZE CHEONG (HK) ENG CO LTD

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

33947 12-08 PTM Projects - China State CHINA STATE-LEIGHTON JOINT VENTURE

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

33340 12-08 Kowloon Southern Link (KSL - Link200, 300 & 400)

LINK 200 JOINT VENTURE Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

33904 12-08 The Venetian Casino Resort (Parcel 1) CONSTRUCOES E OBRAS PUBLICAS

Injectable mortar HIT-RE 500/500/1 (20) structural steel / I-beam fixing

33604 12-08 Le Royal Arc PAUL Y. CONSTRUCTION COMPANY,LTD.

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

33916 12-08 Four Seasons Hotel, Macau (Parcel 2) GREAT HARVEST CONSTRUCTION LIMITED

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

17/F, Tower 6, China Hong Kong City, 33 Canton Road, Tsimshatsui, Kowloon, Hong Kong. 2

Hotline : 8228 8118 Fax : 29541751Page 58 SEP 2011

Page 59: RE500 Fastening With Rebar (SEP 2011)

Ref No Date Project Contractor Consulting Engineer Product Application

Job/Application Reference27-Jul-09

33152 12-08 Airport KPA ENGINEERING LTD Injectable mortar HIT-RE 500/500/1 (20) steel hanger fixing

33394 12-08 Airport RICHWELL ENGINEERING LTD

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

33722 12-08 Four Seasons Hotel, Macau (Parcel 2) TOP BUILDERS INTERNATIONAL CO.LTD

Injectable mortar HIT-RE 500/500/1 (20) structural steel / I-beam fixing

33922 12-08 Four Seasons Hotel, Macau (Parcel 2) NEW BASE ENGINEERING CO LIMITED

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

33785 12-08 Airport AMEN CONSTRUCTION CO LTD

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

33796 12-08 Airport IHI (HK) LTD Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

33743 12-08 Wynn Macau Casino PERMASTEELISA MACAU LIMITED

Injectable mortar HIT-RE 500/500/1 (20) window fixing

33938 12-08 Airport CHINA STATE-LEIGHTON JOINT VENTURE

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

33580 12-08 PTM Projects - Hip Hing HIP HING CONST CO LTD Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

33477 12-08 Kowloon Southern Link (KSL - Link200, 300 & 400)

WAI HING IRON WORKS LTD Injectable mortar HIT-RE 500/500/1 (20) steel hanger fixing

33977 12-08 Lohas Park Phase 1 & Phase 2 CHINA STATE CONST ENG COR

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

33583 12-08 PTM Projects - Hip Hing HIP HING JOINT VENTURE Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

33507 12-08 Union Square 7, Kowloon Station WAI HING IRON WORKS LTD Injectable mortar HIT-RE 500/500/1 (20) steel bracket fixing

33584 12-08 KCRC Tai Wai Depot HIP HING CONST CO LTD Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

33509 12-08 KCRC Tai Wai Depot SI-O ENGINEERING CO LTD Injectable mortar HIT-RE 500/500/1 (20) steel bracket fixing

33410 12-08 KCRC Tai Wai Depot YUEN CHEONG ENG CO LTD Injectable mortar HIT-RE 500/500/1 (20) pipe ring fixing

33984 12-08 KCRC Tai Wai Depot PAUL Y. BUILDERS LIMITED Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

17/F, Tower 6, China Hong Kong City, 33 Canton Road, Tsimshatsui, Kowloon, Hong Kong. 3

Hotline : 8228 8118 Fax : 29541751

Ref No Date Project Contractor Consulting Engineer Product Application

Job/Application Reference27-Jul-09

33979 12-08 KCRC Tai Wai Depot CHINA STATE CONST ENG COR

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

33936 12-08 Wynn Macau Casino MODERN CONCRETE DRILL CUT (MACAU)

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

33495 12-08 PTM Projects - Hip Hing WAI HING IRON WORKS LTD Injectable mortar HIT-RE 500/500/1 (20) steel bracket fixing

32756 11-08 City of Dreams Resort CAPTURE CONSTRUCTION (MACAO) LTD

Injectable mortar HIT-RE 500/500/1 (20) block work fixing

32547 11-08 City of Dreams Resort ENGENHARIA HUNG YIP Injectable mortar HIT-RE 500/500/1 (20) steel bracket fixing

32768 11-08 City of Dreams Resort COMPANHIA DE CONSTRUCAO &

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

32564 11-08 City of Dreams Resort LEIGHTON - CHINA STATE - JOHN

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

32687 11-08 Wynn Macau Casino Leighton-China State Joint Venture

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

32097 11-08 City of Dreams Resort SAMPO ENGINEERING LTD Injectable mortar HIT-RE 500/500/1 (20) steel bracket fixing

32540 11-08 Le Royal Arc PAUL Y. CONSTRUCTION COMPANY,LTD.

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

32776 11-08 City of Dreams Resort DAVID DECORATION (MACAU) LIMITED

Injectable mortar HIT-RE 500/500/1 (20) cladding / pre-cast panel fixing

32690 11-08 Wynn Macau Casino PERMASTEELISA MACAU LIMITED

Injectable mortar HIT-RE 500/500/1 (20) curtain wall fixing

32134 11-08 Galaxy Mega Resort SHANGHAI CONSTRUCTION GROUP (MACAU)

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

32075 11-08 City of Dreams Resort KA KING ENG CO Injectable mortar HIT-RE 500/500/1 (20) steel bracket fixing

32864 11-08 Wynn Macau Casino MODERN CONCRETE DRILL CUT (MACAU)

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

32074 11-08 City of Dreams Resort KA KING ENG CO Injectable mortar HIT-RE 500/330/1 (25) steel bracket fixing

17/F, Tower 6, China Hong Kong City, 33 Canton Road, Tsimshatsui, Kowloon, Hong Kong. 4

Hotline : 8228 8118 Fax : 29541751Page 59 SEP 2011

Page 60: RE500 Fastening With Rebar (SEP 2011)

Ref No Date Project Contractor Consulting Engineer Product Application

Job/Application Reference24-Feb-10

39623 12-09 City of Dreams Resort BIWATER MAN LEE LTD Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

39562 12-09 Tung Ying Re-development, Nathan Road

ATAL ENGINEERING LTD Injectable mortar HIT-RE 500/500/1 (20) hanger fixing

39530 12-09 PTM Projects - Sun Hung Kai MAN TUNG AIR-CONDITIONING WORKS LTD

Injectable mortar HIT-RE 500/500/1 (20) MVAC fixing

39525 12-09 Union Square 7, Kowloon Station KAM KEE STEEL WORKS LTD Injectable mortar HIT-RE 500/500/1 (20) steel hanger fixing

39522 12-09 PTM Projects - Sun Hung Kai KAM KEE STEEL WORKS LTD Injectable mortar HIT-RE 500/500/1 (20) steel hanger fixing

39635 12-09 One Central Macau FAI WANG ENGENHARIA LDA Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

39424 11-09 Union Square 7, Kowloon Station ATAL ENGINEERING LTD Injectable mortar HIT-RE 500/500/1 (20) hanger fixing

39385 11-09 Union Square 7, Kowloon Station DYNAMIC POWER (HONG KONG) LIMITED

Injectable mortar HIT-RE 500/500/1 (20) Plumbing works fixing

39358 11-09 Wynn Macau Casino IBI MACAU LIMITADA Injectable mortar HIT-RE 500/500/1 (20) decoration fixing

39413 11-09 Union Square 7, Kowloon Station TUNG LIK ENGINEERING CO Injectable mortar HIT-RE 500/500/1 (20) MVAC fixing

39428 11-09 Union Square 7, Kowloon Station BUILD STAR LTD Injectable mortar HIT-RE 500/500/1 (20) hanger fixing

39430 11-09 Union Square 7, Kowloon Station MGEUPS Injectable mortar HIT-RE 500/500/1 (20) hanger fixing

39476 11-09 Macao Studio City LUN FONG TAI COMPANHIA DE

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

39498 11-09 One Central Macau COMPANHIA DE CONSTRUCAO WINING

Injectable mortar HIT-RE 500/500/1 (20) water pipe / pipe duct fixing

39479 11-09 One Central Macau ART DRAGON DEVELOPMENT LTD

Injectable mortar HIT-RE 500/500/1 (20) steel hanger fixing

39490 11-09 Oceanus Entertainment Complex PAK KAI ENG CO Injectable mortar HIT-RE 500/500/1 (20) steel hanger fixing

39491 11-09 Oceanus Entertainment Complex NGAI SENG FURNITURE DECORATION

Injectable mortar HIT-RE 500/500/1 (20) steel hanger fixing

17/F, Tower 6, China Hong Kong City, 33 Canton Road, Tsimshatsui, Kowloon, Hong Kong. 1

Hotline : 8228 8118 Fax : 29541751

Ref No Date Project Contractor Consulting Engineer Product Application

Job/Application Reference24-Feb-10

39474 11-09 The Venetian Casino Resort (Parcel 1) 3-STRINGS ENGINEERING CO LTD

Injectable mortar HIT-RE 500/500/1 (20) steel bracket fixing

39401 11-09 Union Square 7, Kowloon Station KA SHING ENGINEERING CO Injectable mortar HIT-RE 500/500/1 (20) cable bracket / tray / trucking fixing

39311 10-09 Hotel Grand Lisboa Development CONST. MAN WENG Injectable mortar HIT-RE 500/500/1 (20) steel bracket fixing

39123 10-09 City of Dreams Resort APPLIED TECHNOLOGY INTEGRATION

Injectable mortar HIT-RE 500/500/1 (20) decoration fixing

39224 10-09 Lohas Park Phase 1 & Phase 2 WILLEY CONST & ENG CO LTD

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

39227 10-09 PTM Projects - Cheung Kong ABLE CONTRACTORS LIMITED

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

39283 10-09 One Central Macau KIN PANG CONSTRUCTION & ENGINEERING

Injectable mortar HIT-RE 500/500/1 (20) steel bracket fixing

39312 10-09 Hotel Grand Lisboa Development CIRCLE ENGINEERING COMPANY LTD

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

39326 10-09 One Central Macau DECORACAO CHEONG KONG Injectable mortar HIT-RE 500/500/1 (20) cladding / pre-cast panel fixing

39121 10-09 School Improvement Program COMPANHIA DE FOMENTO PREDIAL

ASD Injectable mortar HIT-RE 500/500/1 (20) decoration fixing

39271 10-09 School Improvement Program SAN MENG FAI ENG & CONST.CO LTD

ASD Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

38920 09-09 Union Square 7, Kowloon Station JUMBO ORIENT CONTRACTING LTD

Injectable mortar HIT-RE 500/330/1 (25) steel bracket fixing

38869 09-09 City of Dreams Resort LAI HENG KONG CHENG Injectable mortar HIT-RE 500/500/1 (20) singage / advertising sign fixing

39096 09-09 City of Dreams Resort APPLIED TECHNOLOGY INTEGRATION

Injectable mortar HIT-RE 500/500/1 (20) rebar fastening

39099 09-09 Le Royal Arc TIN WUI ENGINEERING COMPANY

Injectable mortar HIT-RE 500/500/1 (20) structural steel / I-beam fixing

39056 09-09 Hotel Grand Lisboa Development SAN TAK POU ENGINEERING &

Injectable mortar HIT-RE 500/500/1 (20) structural steel / I-beam fixing

17/F, Tower 6, China Hong Kong City, 33 Canton Road, Tsimshatsui, Kowloon, Hong Kong. 2

Hotline : 8228 8118 Fax : 29541751Page 60 SEP 2011