Maximize … Optimize … Protect …Realize the Value in modern Data Center Infrastructure

Christian SchillabMarketing Engineer / EMEA

Fluke [email protected]

© FlukeNetworks

Agenda

Driving forces to reduced uncertainty

The ‘6 Steps’ of the Right Fiber Certification Process

Opportunities and methods to maximize performance margins

© FlukeNetworks 2

3

Yesterdays fast is todays slow

Yesterdays incredible is todays expected

Yesterdays connector budget is todays link budget

Link budgets are tight because:

• “Zoned” Data Centers require 4 or more connections in a channel

• Manufacturers offer “Ultra Low Loss” components

• Customer seek a “Future Ready” infrastructure

© FlukeNetworks

Testing - “Zoned” Data Centers

After the installation only the links can be tested

The “Patched Channel” is configured by the network user

Total budget 10G: 2.6dB 40/100G 1.5-1.9dB

There is very little room for error !

Link Test #1 Link Test #2 Link Test #3

Channel

© FlukeNetworks 4

Tight budgest driving for reduced uncertainty

The Challenge The Answer

Tight Loss

Budgets

Littleroom for

measurement uncertainty

The ‘6 Steps’ of the Right Fiber

Certification Process

Fiber Testing Best Practices

x

BASIC Tests

Verify TRC

• Inspect & Clean

• Replaceo.k.?

yn

Set Reference

Pass

Fail

Trouble Shoot

LSPM: Loss Length Test

OTDR? y

n

Isolate Problem& Correct

• Inspect & Clean• Visible Light Source• Replace / Re-Terminate

EXTENDED Tests

EXT.Tests

>300 Tests?

yn

no

all orconditional

OTDR:• Connector Loss• Link Loss• Reflectance• Length

PassFail

Isolate Problem& Correct

Doc.Endf.

GradeEnd faces

Grade per IEC • Scratches• Dirt• Dust

PassFail

• Clean• Replace

no

all

Inspect & Clean

Inspect for• Dust• Dirt• Scratches

o.k.? yn

• Clean Dry• Clean Wet• Replace

Create ProjX… fetch from

LinkWare LIVE

Document… upload to

LinkWare LIVE

Fiber Testing Best Practices

Create ProjX… fetch from

LinkWare LIVE

Document… upload to

LinkWare LIVEInspect & Clean

BASIC Tests

Trouble Shoot

Doc.Endf.

GradeEnd faces

no

all

EXTENDED Tests

EXT.Tests

no

all orconditional

Standard Methods

TIA-568-C

Tier-1 Tier-2

ISO 11801 AMD.1 / ISO/IEC 14763-3

BASIC Test Regime EXTENDED Test Regime

Note: EXTENDED supplements BASIC test regime rather then replacing it

LSPM: Light Source & Power Meteror OLTS: Optical Loss Test System

OTDR: Optical Time Domain Reflectometer

Pro & Con

Truly measure the loss Most accurate Not suited for trouble shooting

Most effective for trouble shooting Identifies bottlenecks Less accurate loss “calulcation”

Standards for Fiber Optic Test Methods

© FlukeNetworks 9

BASIC Tests

Trouble Shoot

EXTENDED Tests

EXT.Tests

no

all orconditional

Doc.Endf.

GradeEnd faces

no

all

Document… upload to

LinkWare LIVEInspect & Clean

6 Steps….1

23

4

3B

5

6Create ProjX… fetch from

LinkWare LIVE

BASIC Tests

Trouble Shoot

EXTENDED Tests

EXT.Tests

no

all orconditional

Doc.Endf.

GradeEnd faces

no

all

Document… upload to

LinkWare LIVEInspect & Clean

ProjectDefinition

Project Definition

800+ Installers VOCs: Top eight problems (hours wasted)

Average amongst all respondents in the previous 30 days

Top eight problems: Wrong Configuration (Limit, IDs, Standard, …..)

Average amongst all respondents in the previous 30 days

Project Definition

New relaxed ISO limits do not reflect what is possible and/or needed to be future ready Custom Limits

Limits, Cable Types, Cable ID are best known by planner/project-manager

• Limits• Cables• Cable ID

BASIC Tests

Trouble Shoot

EXTENDED Tests

EXT.Tests

no

all orconditional

Doc.Endf.

GradeEnd faces

no

all

Inspect&

Clean

Create ProjX… fetch from

LinkWare LIVE

Document… upload to

LinkWare LIVE

Inspect & Clean

Dry clean will only remove dust and fresh skin oil

Inspection will tell whether…

– Wet cleaning is needed

– Wet cleaning was successful

– Abrasive dust could damage the mated plug

– Replacement is needed

Dirt will transfer

Conclusion: Clean measurement cord after every mating

=+

BASICTests

Trouble Shoot

EXTENDED Tests

EXT.Tests

no

all orconditional

Doc.Endf.

GradeEnd faces

no

all

Inspect & Clean

Create ProjX… fetch from

LinkWare LIVE

Document… upload to

LinkWare LIVE

Being certain of loss uncertainty

© FlukeNetworks 19

Sign

ific

ance

• TRC varication stored as part of project

• A TRC verification test should be run with regular intervals

Set Reference &TRC verification

© FlukeNetworks 20

Normative Requirement• ANSI/TIA-526-14-B • ISO 1180 ISO/IEC 14763-3 Ed.1 62• EN 50173 IEC IEC 61280-4-2

In the past …

…Expensive & Bulky

It is highly recommended by many manufacturers in particular when testing highest grade components for very demanding limits

Today …

… 1.) Less expensive 2.) Smaller then a mandrel

It helps to prevent1. FASLE FAILs

… Revenue at risk2. FALSE PASSes

… Reputation at risk

Never …

… does not work reliably

Encircled Flux

Marginal Compliant Link Marginal Failing Link

EF

MPD

Encircled Flux helps to preventFALSE PASSes and FALSE FAILs

“FALSE FAIL“…Revenue at

Risk

“FALSE PASS“…Application at

Risk

LIMITTRUE LOSS

Similar to SC/LC/ST/FX/…

• Non critical connection on the power meter (critical for 1 jumper method)

• EF compliance

Unique to MPO….

• Test all 12 fibers

• Identify polarity: “A”, “B”, “C”& “special”

• 1 jumper method & pinned or un-pinned links… solved with PanMPO™

Special MPO testing needs ?

BASIC Tests

Trouble-Shoot

EXTENDED Tests

EXT.Tests

no

all orconditional

Doc.Endf.

GradeEnd faces

no

all

Create ProjX… fetch from

LinkWare LIVE

Document… upload to

LinkWare LIVEInspect & Clean

Trouble Shoot

OTDRs are not only for “Gurus”

EventMaps simplify the presentation

Overall (Link) limits complement component limits

Launch & Tail fibers are automatically excluded

BASIC Tests

Trouble Shoot EXTENDED Tests

EXT.Tests

no

all orconditional

Doc.Endf.

GradeEnd faces

no

all

Inspect & Clean

Create ProjX… fetch from

LinkWare LIVE

Document… upload to

LinkWare LIVE

EXTENDED Test Regime

Why EXTENDED Testing ?

Identify, locate and eliminate unnecessary bottlenecks in otherwise compliant links

Further increase performance margin

Identify connectors with excessive reflectance

Document the state of the installation

Testing with a SMART Loop

> 9 out of 10 OTDR tests are performed incorrectly. The list of reasons is long– No Bi-Directional test and/or

averaging

– No tail fiber

– Incorrect handling of launch and tail fiber

– Adaption with hybrid cords

– etc.

A SMART Loop concepts forces the user to perform the test correctly

Multiple remote loops support operation by 1 technician

ACCELERATED EXTENDED Testingwith a SMART Loop

29

A built in experts verifies the integrity of the test setup

The testing time reduced by > 50%

Tail Fiber

Launch Fiber

Fiber A

Fiber B

Phase #1:End 1 End 2

Launch Fiber

Fiber A

Fiber B

Phase #2:

Testing with a SMART Loop

> 9 out of 10 OTDR tests are performed incorrectly. The list of reasons is long– No Bi-Directional test and/or

averaging

– No tail fiber

– Incorrect handling of launch and tail fiber

– Adaption with hybrid cords

– etc.

A SMART Loop concepts forces the user to perform the test correctly

Multiple remote loops support operation by 1 technician

BASIC Tests

Trouble Shoot

EXTENDED Tests

EXT.Tests

no

all orconditional

Doc.Endf.

GradeEnd

Faces

no

all

Create ProjX… fetch from

LinkWare LIVE

Document… upload to

LinkWare LIVEInspect & Clean

Inspection equipment

Without inspection equipment, you will never know if the connector is clean or not

Even with inspection equipment, thereare arguments as to what is acceptablefor a fiber connector

IEC 61300-3-35 defines levels ofacceptable scratches and debris on theend faces of fiber connectors

Automated field inspection is something to consider

Images can be stored and made part of the documentation

© FlukeNetworks 32

BASIC Tests

Trouble Shoot

EXTENDED Tests

EXT.Tests

no

all orconditional

Doc.Endf.

GradeEnd faces

no

all

Create ProjX… fetch from

LinkWare LIVEDocument

and/or

upload to Cloud

Inspect & Clean

Documentation

Reporting

• Progress• Results• Unexpected

Documentation

There is always some copper somewhere !

Fiber Testing Best Practices

x

BASIC Tests

Verify TRC

• Inspect & Clean

• Replaceo.k.?

yn

Set Reference

Pass

Fail

Trouble Shoot

LSPM: Loss Length Test

OTDR? y

n

Isolate Problem& Correct

• Inspect & Clean• Visible Light Source• Replace / Re-Terminate

EXTENDED Tests

EXT.Tests

>300 Tests?

yn

no

all orconditional

OTDR:• Connector Loss• Link Loss• Reflectance• Length

PassFail

Isolate Problem& Correct

Doc.Endf.

GradeEnd faces

Grade per IEC • Scratches• Dirt• Dust

PassFail

• Clean• Replace

no

all

Inspect & Clean

Inspect for• Dust• Dirt• Scratches

o.k.? yn

• Clean Dry• Clean Wet• Replace

Create ProjX… fetch from

LinkWare LIVE

Document… upload to

LinkWare LIVE

Qualified instruments and personnel paired with an efficient work flow ensures …

• “Next Generation Readiness” by maximizing performance margins

• ensures a profitable certification of fiber optic cabling systems

Conclusio

37© FlukeNetworks

[email protected]

THANK YOU FOR YOUR ATTENTION ?

Questions?

Back Up Slides

ISO/IEC 14763-3 states …..

40