10/1/2013 1 Basulto , David. "Impressive Storm Sewer System / Saitama, Japan" 07 Jul 2008. ArchDaily. Accessed 24 Feb 2013. <http://www.archdaily.com/3591> WELCOME TO: ARCH 2430 BUILDING TECHNOLOGY IV Saitama-Storm Sewer Theory: Clearance Sizes Wall to floor connections Beam to floor connections Lab [Computer Topics]: a. Wall to floor connections b. Beam to floor connections ARCH 2430 Placing Rebar Prepared by; Tyheem Joiner ED. Alexander Aptekar © 2013

Upload: others

Post on 10-May-2022

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: REBAR - City Tech OpenLab

10/1/2013

1

Basulto , David. "Impressive Storm Sewer System / Saitama, Japan" 07 Jul 2008. ArchDaily. Accessed 24 Feb 2013. <http://www.archdaily.com/3591>

WELCOME TO: ARCH 2430

BUILDING TECHNOLOGY IV

Saitama-Storm Sewer

Theory:Clearance SizesWall to floor connectionsBeam to floor connections

Lab [Computer Topics]:a. Wall to floor connectionsb. Beam to floor connections

ARCH 2430 

Placing Rebar

Prepared

 by; Tyheem

Joiner ED. A

lexander Aptekar © 2013

Page 2: REBAR - City Tech OpenLab

10/1/2013

2

ARCH 2430  Prepared

 by; Alexander Aptekar ED

. Barbara Mishara  ©

 2012

Rules of Thumb

• 1” min clear between unattached bar

• 1.5” min. cover to edge 

• Rebar extends down and into beam column or wall for structural continuity

Top bars are for tension, but are not always necessary.

• First we will place 2 sections through our model:

• One at a beam to floor connection, the other to a wall to floor connection.

• Then we turn on fine detail and set the scale to 1 1/2”=1’‐0”

Page 3: REBAR - City Tech OpenLab

10/1/2013

3

Placing Rebar 

• Go to the structural tab, then to Rebar

Placing Rebar 

• There are three ways to place rebar:

• Parallel to work plane (place in same plane as the section)

• Parallel to cover (place perpendicular to plane as the section and parallel to nearest edge)

• Perpendicular to cover (place perpendicular to plane as the section and parallel to nearest edge)

Page 4: REBAR - City Tech OpenLab

10/1/2013

4

Placing Rebar 

• There are three ways to place rebar:

• Parallel to work plane (place in same plane as the section)

• Parallel to cover (place perpendicular to plane as the section and parallel to nearest edge)

• Perpendicular to cover (place perpendicular to plane as the section and parallel to nearest edge)

Placing Rebar 

• There are three ways to place rebar:

• Parallel to work plane (place in same plane as the section)

• Parallel to cover (place perpendicular to plane as the section and parallel to nearest edge)

• Perpendicular to cover (place perpendicular to plane as the section and parallel to nearest edge)

Page 5: REBAR - City Tech OpenLab

10/1/2013

5

Placing Rebar 

• You can place a single element or multiple by selecting different option next to layout.

• Using  a set number or a maximum amount of space in between, following suggested guidelines.

Placing Rebar 

Beam to Floor Connection

1. lets load in all of the rebar shapes, from the structural rebar folder.

2. click on ... to close or open shape browser

2

1

Page 6: REBAR - City Tech OpenLab

10/1/2013

6

Placing Rebar 

Beam to Floor Connection

We can place shape T1 from the shape browser; using parallel to work plane button 

lets place the bars with a minimum clear spacing of 6"  on the layout panel

we can adjust the bars using the triangular buttons, if necessary.

Placing Rebar 

Beam to Floor Connection

Finally we can place a fixed number of 3 shape 00 bars perpendicular to section  and along the edge of beam. 

using the perpendicular to cover button. adjust as necessary.

Add more bars and repeat as necessary on the wall to floor detail.

Page 7: REBAR - City Tech OpenLab

10/1/2013

7

Basulto , David. "Impressive Storm Sewer System / Saitama, Japan" 07 Jul 2008. ArchDaily. Accessed 24 Feb 2013. <http://www.archdaily.com/3591>

Saitama-Storm Sewer

Placing Rebar 

• Load

Page 8: REBAR - City Tech OpenLab

10/1/2013

8

Page 9: REBAR - City Tech OpenLab

10/1/2013

9

Page 10: REBAR - City Tech OpenLab

10/1/2013

10

http://incli-nation.com/2009/01/14/unbelievable-tokyo-underground-sewer-labyrinth-dreamscape/

Saitama-Storm Sewer