recap clamp for mutr station-3 itaru nakagawa for the phenix muon trigger upgrade collaboration...
DESCRIPTION
Solution 3 HV (1800 V) 1 M Anode wire 100 pF.... Cathode strips (96 strip) ~0.1 pF/strip Rise time of anode signal ~ 10 nsec RTRANSCRIPT
1
Recap Clamp for MuTr Station-3
Itaru NakagawaFor the PHENIX Muon Trigger
Upgrade CollaborationEspecially credit to:Tsutomu Mibe (KEK)Yoshinori Fukao (RIKEN)Yoshimitsu Imazu (RIKEN)Kentaro Watanabe (Rikkyo)
2
MuTr Cross Talk
HV (1800 V)
1 MWAnode wire
1 MW
100 pF ....
Cathode strips (96 strip)
~0.1 pF/strip
Rise time of anode signal ~ 10 nsec
Removed to reduce HV trips
Anode Readout
100mV
3V
Serious Issue for Big Pulse
Pointed out by Tsutomu Mibe@KEK
Decap
Doesn’t exist.
3
SolutionHV (1800 V)
1 MWAnode wire
100 pF ....
Cathode strips (96 strip)
~0.1 pF/strip
Rise time of anode signal ~ 10 nsec
R<<1M W1 MW
Additional Circuit to let anode current escape to ground.
4
Pads for surface mount capacitorsLeft over Solder + Coating
To Anode Wire
MuTr Station-3 Anode Card
Capacitor (Removed)
5
North Station-3 Anode Gap
25mm28mm
Geometrical Constraint
Anode cards are only accessible from their back. Front pattern can only be visible using an inspection mirror.
6
Mounting A Clamp on Anode Card
Probe
Gap-1 Station-3 Anode Card
Screw
Station-3 Chamber
Capacitor
Pad
Gap-2 Station-3 Anode Card
28mm
MuID SideIP side
Anode card
Clamp
7
Recap Clamp Prototypes
半田の残りかす(C) ShinEtsu Rubber Co.: EC-BM300 (2.5Wcm)
(A) 4 pin probes
(B) single pin probe
8
Advantage/Disadvantage of Different Prototypes
Advantage
Disadvantage
9
Effect of Recap
10
Test Bench Setup
90Sr Source
Anode wire
Strip
#22
w/ and w/o Clamp
11
Comparison w/ .vs w/o Terminator
22
27
17
Trigger
w/o Clamp
Strip#
22
27
17
w/ Clamp w/ Clamp
Trigger
w/o Clamp
Comparison w/ .vs w/o Clamp
w/o Clamp
With Clamp
Strip Number
Aver
age
ADC
[cha
nnel
]Conductive Rubber
12
13
Towards Successful Installation
14Fiber Scope
Alignment
Spacer determines Transversedirection within ~ 300mm.
Possible misalignment can be found by visual inspection using a fiber scope
Fiber scope shot
15
Electrical Contact
Readout socket
Readout BoardElectrical Contact will be confirmedby measuring Voltage using temporaryreadout tool.
To be removed after the measurement.
16
Clamp Coating Max Current Average Current
w/o w/ <1uA <1uA
w/ w/o >100uA Tripped after 2 min.
w/ w/ 1uA 1uA
w/ w/o >100uA Tripped after 1min.
w/ w/ 2uA 2uA
Extreme Breathing TestHV=1900VDuration 2min
17
Installation Proposal
To be installed North Bottom Octants
18
Summary
• We have developed prototype clamps for re-capacitation to MuTr St-3.
• Good Contact was established more than 90% channels with present design in North MuTr.
• We propose to install 3 different prototypes (each 20) to North bottom Octants for Run11.
• They can be uninstalled during Run if they cause trouble in HV operation.
19
Backup Slides
20
ADC
MIP
MIP
Event Display of ADC Distribution
Strip
Gap 1Stereo
Gap 2Stereo
Gap 3Stereo
Gap 1NonStereo
Gap 2NonStereo
Gap 3NonStereo