Report run on: April 7, 2011 5:19 PM RECAPP Facility Evaluation Report Wye School B4031A Sherwood Park Elk Island Pub Sch Reg Div #14

Upload: others

Post on 26-Oct-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: RECAPP Facility Evaluation Report - Alberta€¦ · alarm system is a Mircom FX-2000 installed in 2006. PA system is the product of Dukane with return call switches in each class

Report run on: April 7, 2011 5:19 PM

RECAPP Facility Evaluation Report

Wye SchoolB4031A

Sherwood Park

Elk Island Pub Sch Reg Div #14

Page 2: RECAPP Facility Evaluation Report - Alberta€¦ · alarm system is a Mircom FX-2000 installed in 2006. PA system is the product of Dukane with return call switches in each class

Report run on: April 7, 2011 5:19 PM Page 2 of 42

B4031ABuilding Id:

Wye SchoolBuilding Name:

Sherwood ParkLocation:163 Wyecliff, 22560 Wye RoAddress:

3,467.60Gross Area (sq. m): $9,298,023Replacement Cost:1954Construction Year:

Evaluation Date: October 27 2010

Wade EngineeringEvaluation Company:

Mike PangmanEvaluator Name:

In 1954 the original single storey 2973.3m² building was constructed. In 1955 a single storey 437.8m² addition was constructed. In 1971 a single story 1034.5m² addition was constructed. In 1991 two portable classrooms were installed. (206.1m²) In 1992 two portable classrooms were installed. (196.6m²) In 1999 two portable classrooms were installed. (223.7m²) In 2007 two portable classrooms were installed. (230.6m²) GFA of building is 4451.6m². GFA of portables is 626.4m²) Current enrolment is 426. Student capacity is 525. Grades K-6. Building mechanical systems include Overall system rating is acceptable.

General Summary:

Structural Summary:The 1954 original building has wood deck, wood joist, glue lam beams, concrete blocks, cast-in-place concretefoundation wall and continuous concrete footing, and concrete slab on grade. The 1955 addition has wood deck, glue lam arch beams, cast-in-place concrete wall on continuous concrete footing, andconcrete slab on grade. The 1971 addition has wood deck, wood joists, glue lam beams, cast-in-place concrete wall on continuous concretefooting, and concrete slab on grade. Portables (1977 - located in 1991 and 1992) have wood roof joists, glue lam beams, wood stud frame, wood floor joists,concrete foundation. Portables (1980 - located in 1999 and 2007) have wood roof joists, glue lam beams, wood stud frame, wood floor joists,concrete foundation. Overall structural system rating is good.

Envelope Summary:The 1954 original building has stucco, metal siding fascia, bricks, concrete blocks, aluminum windows, metal exteriordoors and frames and built-up roofing system. The 1955 addition has stucco and asphalt shingle roofing system. The 1971 addition has stucco, metal siding fascia, bricks, concrete blocks, aluminum windows, metal exterior doorsand frames and built-up roofing system. The 1977 portables (located in 1991 and 1992) have stucco, metal siding fascia, sealed unit windows in wood framesand built-up roofing system. The 1980 portables (located in 1999 and 2007) have stucco, metal siding fascia, aluminum windows and built-uproofing system. Provide automatic door operator. Replacement of roofing system. Overall envelope system rating is acceptable.

Interior Summary:The 1954 original building requires replacement of interior window panes; replacement of ceiling tiles; replacement ofsheet vinyl flooring; repainting of GWB ceiling; repainting of concrete floor; replacement of carpet. The 1955 addition requires replacement of sheet vinyl flooring.

24.77%5 year Facility Condition Index (FCI):

Facility Details Evaluation Details

Total Maintenance Events Next 5 years: $2,303,010

Sherwood Park - Wye School (B4031A)

Page 3: RECAPP Facility Evaluation Report - Alberta€¦ · alarm system is a Mircom FX-2000 installed in 2006. PA system is the product of Dukane with return call switches in each class

Report run on: April 7, 2011 5:19 PM Page 3 of 42

The 1971 addition requires replacement of carpet flooring. The 1977 portables (located in 1991 and 1992) require replacement of wood doors and frames; repainting of GWBceiling; replacement of sheet vinyl and vinyl tile flooring; replacement of millwork. Provide wheel chair platform or lift to Stage. Provide elevator for barrier free access to Gymnasium Mezzanine. Overall interior system rating is acceptable.

Mechanical Summary:Building mechanical systems include 19-gas fired furnaces and 6-packaged heat/cool unit. Ventilation provided by thefurnaces and heat/cool units with general and dedicated exhaust systems. Conventional plumbing system with 2-gasfired domestic hot water heaters. Fire hose cabinets and fire extinguishers located throughout building. Mechanicalservices include domestic water supply from outside source (delivered by truck). Sanitary system to septic field withstorm drainage to surface run-off. Metered natural gas supply from Utility. The 1954 Classroom, 1955 Gymnasiumfurnaces and associated ductwork have surpassed Theoretical Life Expectancy and is required to be replaced. The1971 Section has been replaced with new RTU. Additional recommendations include connection of site domesticwater system to municipal system. Primary outstanding mechanical issues are: -1954 and 1955 air handlers need to be replaced -1954 and 1955 underfloor ductwork needs to be replaced -tie into municipal water supply The building mechanical system meets minimal requirements. Overall mechanical system rating is acceptable.

Electrical Summary:The school has been provided with an 800A, 120/240V, 1 phase 3 wire service and is obtained from an on-site padmounted transformer. The main distribution centre was installed in 1993 and has ample spare capacity. Lighting is provided by fluorescent fixtures which were upgraded with T8 lamps and electronic ballasts in 2004. Firealarm system is a Mircom FX-2000 installed in 2006. PA system is the product of Dukane with return call switches ineach class room. Electrical systems are generally in good condition.

Sherwood Park - Wye School (B4031A)

Condition Rating Performance1 - Critical Unsafe, high risk of injury or critical system failure.2 - Poor Does not meet requirements, has significant deficiencies. May have high operating/maintenance costs.

3 - Marginal Meets minimum requirements, has significant deficiencies. May have above average operating maintenance costs.4 - Acceptable Meets present requirements, minor deficiencies. Average operating/maintenance costs.

Rating Guide

5 - Good Meets all present requirements. No deficiencies.6 - Excellent As new/state of the art, meets present and foreseeable requirements.

Page 4: RECAPP Facility Evaluation Report - Alberta€¦ · alarm system is a Mircom FX-2000 installed in 2006. PA system is the product of Dukane with return call switches in each class

Report run on: April 7, 2011 5:19 PM Page 4 of 42

A1010 Standard Foundations*

A1030 Slab on Grade*

B1010.01 Floor Structural Frame (Building Frame)*

4 - Acceptable

3 - Marginal

4 - Acceptable

Rating

Rating

Rating

0

0

0

Installed

Installed

Installed

0

0

0

Design Life

Design Life

Design Life

APR-11

APR-11

APR-11

Updated

Updated

Updated

Repair floor slab. (86m²)

Repair 2012 $7,508 Low

The 1954 original building (Classroom 102) has unleveledfloor.

Concern:

Repair floor slab.Recommendation:

Sherwood Park - Wye School (B4031A)S1 STRUCTURAL

Event:

Type Year Cost Priority

Updated: APR-11

The 1954 original building has concrete wall on continuous concrete footings on both sides. The 1954 original building (West of Classrooms 101 and 102; East of Classrooms 103 and 104; North of Classrooms 102and 105 to 112, 104; East of Classrooms 114 and 116) has U shape thick wall, bottom, and concrete foundation forsupply duct along perimeter. The 1954 original building (Corridor between Classrooms 101, 102, 103, 104) has L shape concrete wall continuousconcrete for return air space. The 1955 addition concrete wall on concrete footing. The 1971 addition has diameter cast-in-place concrete belled piles. The 1971 addition has concrete grade beams on cast-in-place concrete belled piles along perimeter and interior.

The 1954 original building (Classrooms) has 50 mm zonolite on 75 mm concrete slab on 150 mm gravel. The 1954 original building has 75 mm zonolite along perimeter. The 1955 addition (Gymnasium) has 125 concrete slab on 150 mm gravel. The 1971 addition has 125 mm concrete slab on 6 mil polyethylene on compacted sand.

The 1954 original building (Corridor between Classrooms 101, 102, 103, 104) has 38 x 184 mm wood joists at 400 mmo.c. The 1955 addition (Stage 122) has 38 x 140 mm joists at 400 mm o.c. on 140 x 140 mm fir posts on 600 x 200 mmconcrete footing.

Page 5: RECAPP Facility Evaluation Report - Alberta€¦ · alarm system is a Mircom FX-2000 installed in 2006. PA system is the product of Dukane with return call switches in each class

Report run on: April 7, 2011 5:19 PM Page 5 of 42

B1010.02 Structural Interior Walls Supporting Floors (or Roof)*

B1010.03 Floor Decks, Slabs, and Toppings*

B1010.05 Mezzanine Construction*

B1010.09 Floor Construction Fireproofing*

B1010.10 Floor Construction Firestopping*

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

Rating

1954

0

1955

0

0

Installed

Installed

Installed

Installed

Installed

0

0

0

0

0

Design Life

Design Life

Design Life

Design Life

Design Life

APR-11

APR-11

APR-11

APR-11

APR-11

Updated

Updated

Updated

Updated

Updated

Sherwood Park - Wye School (B4031A)

Concrete block.

The 1954 original building (Corridors) has 6 mm poplar plywood on 16 mm plywood on 38 x 184 mm wood joists at 400mm o.c. The 1955 addition (Stage 122) has 12 mm maple finish on 16 mm rough floor plywood on 38 x 140 mm joists at 400 mmo.c. on 2 - 38 x 184 mm fir beams 140 x 140 fir posts on 600 x 200 mm concrete footing. The 1955 addition (Stage Storage Rooms) has 12 mm maple finish on 16 mm rough floor plywood on 38 x 140 mm joistsat 300 mm o.c, on 2 - 38 x 184 mm fir beams 140 x 140 fir posts on 600 x 200 mm concrete footing.

The 1955 addition (Mezzanine) has plywood on 38 x 286 mm joists at 400 mm o.c.

Adequate fireproofing measures are present where necessary throughout building.

Adequate firestopping measures are present where necessary throughout building.

Page 6: RECAPP Facility Evaluation Report - Alberta€¦ · alarm system is a Mircom FX-2000 installed in 2006. PA system is the product of Dukane with return call switches in each class

Report run on: April 7, 2011 5:19 PM Page 6 of 42

B1020.01 Roof Structural Frame*

B1020.03 Roof Decks, Slabs, and Sheathing*

B1020.04 Canopies*

B1020.06 Roof Construction Fireproofing*

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

0

0

1971

0

Installed

Installed

Installed

Installed

0

0

0

0

Design Life

Design Life

Design Life

Design Life

APR-11

FEB-06

APR-11

APR-11

Updated

Updated

Updated

Updated

Sherwood Park - Wye School (B4031A)

The 1954 original building (West Main Entrance) has 300 x 600 mm face brick piers on 300 x 300 mm concrete piers on710 x 710 x 250 mm concrete footing. The 1954 original building has 89 mm diameter steel pipes. The 1954 original building (Typical) has 2 - 38 x 286 mm beams on 150 x 300 mm glue lam beams on 89 mm diametersteel pipes. The 1954 original building (South of Classrooms 101 and 103) has 2 - 38 x 286 mm wood beams on 184 x 184 posts on300 x 300 mm concrete piers on 710 x 710 x 250 mm concrete footing. The 1954 original building has 150 x 300 mm glue lam beams on 89 mm diameter steel pipes. The 1954 original building (Classrooms) has 38 x 286 mm wood joists at 400 mm o.c. The 1955 addition (North side) has 89 x 140 mm solid fir posts. The 1955 addition (South side) has 760 mm glue lam arch at 1800 mm o.c. The 1971 addition has 178 x 454 mm glue lam beams at 2100 mm o.c. on 200 mm concrete block.

The 1954 original building has 19 mm diagonal board on 50 mm board 150 x 300 mm glue lam beams on 89 mmdiameter steel pipes. The 1955 addition (barrel shape) has 9 mm plywood on 38 mm T & G planking on glue lam arch at 1800 mm o.c. The 1971 addition (Classrooms) has 38 mm cedar deck on 178 x 454 mm glue lam beams on 200 mm concrete block. The 1971 addition (Corridors) has 64 mm fir deck.

The 1971 addition (West Canopy) has 38 mm fir deck on 178 x 454 mm glue lam beams

Adequate fireproofing measures are in place where necessary throughout building.

Page 7: RECAPP Facility Evaluation Report - Alberta€¦ · alarm system is a Mircom FX-2000 installed in 2006. PA system is the product of Dukane with return call switches in each class

Report run on: April 7, 2011 5:19 PM Page 7 of 42

B2010.01.02.01 Brick Masonry: Ext. Wall Skin*

B2010.01.06.03 Metal Siding**

B2010.01.08 Cement Plaster (Stucco): Ext. Wall*

B2010.01.11 Joint Sealers (caulking): Ext. Wall**

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

1954

1954

0

2000

Installed

Installed

Installed

Installed

0

40

0

20

Design Life

Design Life

Design Life

Design Life

APR-11

APR-11

APR-11

APR-11

Updated

Updated

Updated

Updated

Replace metal siding (17m²)

Replace caulking (127.6m)

Lifecycle Replacement

Lifecycle Replacement

2014

2020

$2,100

$3,700

Unassigned

Unassigned

Sherwood Park - Wye School (B4031A)S2 ENVELOPE

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

APR-11

APR-11

The 1954 original building (West Main Entrance) has 300 x 600 mm face brick piers on 300 x 300 mm concrete piers on710 x 710 x 250 mm concrete footing. The 1954 original building (Mech 117) has face brick chimney above roof.

The 1954 original building has metal siding fascia on 89 x 286 mm wood beam. The 1971 addition has metal siding fascia on glue lam beams.

The 1954 original building has stucco on 200 mm concrete block. The 1955 addition has stucco on 200 mm concrete block. The 1971 addition has stucco on 200 mm light weight concrete block.

Caulking around windows on all sections.

Page 8: RECAPP Facility Evaluation Report - Alberta€¦ · alarm system is a Mircom FX-2000 installed in 2006. PA system is the product of Dukane with return call switches in each class

Report run on: April 7, 2011 5:19 PM Page 8 of 42

B2010.01.13 Paints (& Stains): Exterior Wall**

B2010.02.03 Masonry Units: Ext. Wall Const.*

B2010.02.05 Wood Framing: Ext. Wall Const.*

B2010.02.99 Other Exterior Wall Construction*

B2010.03 Exterior Wall Vapor Retarders, Air Barriers, and Insulation*

B2010.06 Exterior Louvers, Grilles, and Screens*

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

Rating

Rating

1990

0

1954

1954

0

0

Installed

Installed

Installed

Installed

Installed

Installed

15

0

0

0

0

0

Design Life

Design Life

Design Life

Design Life

Design Life

Design Life

APR-11

APR-11

FEB-06

APR-11

APR-11

APR-11

Updated

Updated

Updated

Updated

Updated

Updated

Repaint exterior surfaces (598.6m²)

Lifecycle Replacement 2014 $11,400 Unassigned

Sherwood Park - Wye School (B4031A)

Event:

Type Year Cost Priority

Updated: APR-11

Building has painted stucco.

The 1954 original building has stucco on 200 mm concrete block. The 1971 addition has 200 mm light weight concrete block.

The 1955 addition (South wall) has 2- 38 x 184 mm wood studs on 200 mm concrete wall on 457 x 200 mm concretefooting. The 1955 addition (North wall) has 2- 38 x 184 mm wood studs on existing 1954 original building roof.

The 1954 original building (Classrooms) has stucco on 150 mm haydite (concrete) block below windows.

Assumed air barrier and insulation installed throughout.

School has exterior metal louvres, grilles and screen throughout.

Page 9: RECAPP Facility Evaluation Report - Alberta€¦ · alarm system is a Mircom FX-2000 installed in 2006. PA system is the product of Dukane with return call switches in each class

Report run on: April 7, 2011 5:19 PM Page 9 of 42

B2010.09 Exterior Soffits*

B2020.01.01.02 Aluminum Windows (Glass & Frame)** - All Sections

B2020.01.01.06 Vinyl, Fibreglass & Plastic Windows**

B2030.01.01 Aluminum-Framed Storefronts: Doors**

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

0

1994

1994

1954

Installed

Installed

Installed

Installed

0

40

40

30

Design Life

Design Life

Design Life

Design Life

APR-11

APR-11

APR-11

APR-11

Updated

Updated

Updated

Updated

Replace windows (91.5m²)

Replace windows (3.5m²)

Replace doors (9 panels)

Lifecycle Replacement

Lifecycle Replacement

Lifecycle Replacement

2034

2034

2014

$68,625

$2,625

$28,500

Unassigned

Unassigned

Unassigned

Sherwood Park - Wye School (B4031A)

Event:

Event:

Event:

Type

Type

Type

Year

Year

Year

Cost

Cost

Cost

Priority

Priority

Priority

Updated:

Updated:

Updated:

APR-11

APR-11

APR-11

The 1954 original building (overhang) has perforated metal soffit. The 1954 original building (Main Entrance) has perforated metal soffit. The 1971 addition (West Canopy) has metal soffit.

double glazed sealed units and 4 pane sliders in aluminum frames.

Double glazed sealed units in PVC frame

Aluminum framed storefront and doors c/w half glazed panels located at various entries to the school.

Page 10: RECAPP Facility Evaluation Report - Alberta€¦ · alarm system is a Mircom FX-2000 installed in 2006. PA system is the product of Dukane with return call switches in each class

Report run on: April 7, 2011 5:19 PM Page 10 of 42

B2030.02 Exterior Utility Doors**

B3010.01 Deck Vapor Retarder and Insulation*

B3010.02.01.01 Asphalt Shingles**

4 - Acceptable

4 - Acceptable

3 - Marginal

Rating

Rating

Rating

1954

0

1988

Installed

Installed

Installed

40

0

25

Design Life

Design Life

Design Life

APR-11

APR-11

APR-11

Updated

Updated

Updated

Replace utility doors (3 steel panels, 6 woodpanels)

Replace shingle roofing. (450m²)

Lifecycle Replacement

Failure Replacement

2014

2012

$14,200

$50,679

Unassigned

Low

Asphalt shingles worn out, missing and damagedConcern:

Replace shingles.Recommendation:

Sherwood Park - Wye School (B4031A)

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

APR-11

APR-11

Steel doors in steel frames c/w glass inserts, and wood doors in wood frames located at various secondary access pointsinto the school. When replaced, upgrade from wood doors/frames to steel.

The 1954 original building has 25 mm rigid insulation on building paper on 19 mm diagonal board on 50 mm board on150 x 300 mm glue lam beams on 89 mm diameter steel pipes. The 1955 addition (barrel shape) has 89 mm rigid insulation on 9 mm plywood on 38 mm T & G planking on glue lamarch at 1800 mm o.c. The 1971 addition has 2 layers of 25 mm rigid insulation on 4 mil polyethylene on 38 mm cedar deck on 178 x 454 mmglue lam beams on 200 mm concrete block.

The 1955 addition (barrel shape) has asphalt shingles on 89 mm rigid insulation on 9 mm plywood on 38 mm T & Gplanking on glue lam arch at 1800 mm o.c.

Page 11: RECAPP Facility Evaluation Report - Alberta€¦ · alarm system is a Mircom FX-2000 installed in 2006. PA system is the product of Dukane with return call switches in each class

Report run on: April 7, 2011 5:19 PM Page 11 of 42

B3010.04.01 Built-up Bituminous Roofing (Asphalt & Gravel)**

B3010.04.04 Modified Bituminous Membrane Roofing (SBS)** - 2006

B3010.04.04 Modified Bituminous Membrane Roofing (SBS)** - 2010

3 - Marginal

5 - Good

6 - Excellent

Rating

Rating

Rating

1983

2006

2010

Installed

Installed

Installed

25

25

25

Design Life

Design Life

Design Life

APR-11

APR-11

APR-11

Updated

Updated

Updated

Replace with new SBS roofing system. (approx.1984 square metres)

Replace roofing (621m²)

Replace SBS roofing (1086m²)

Failure Replacement

Lifecycle Replacement

Lifecycle Replacement

2012

2031

2035

$122,419

$119,400

$208,800

Low

Unassigned

Unassigned

Roof has water ponds, blisters.Concern:

Replace with new SBS roofing system. (approx. 1087 squaremetres of 1954 original building)

Recommendation:

Sherwood Park - Wye School (B4031A)

Event:

Event:

Event:

Type

Type

Type

Year

Year

Year

Cost

Cost

Cost

Priority

Priority

Priority

Updated:

Updated:

Updated:

APR-11

APR-11

APR-11

The 1954 original building has built-up roofing on 25 mm rigid insulation on building paper on 19 mm diagonal board on50 mm board on 150 x 300 mm glue lam beams on 89 mm diameter steel pipes.

SBS roofing system on the 1955 addition.

SBS roofing on the 1971 addition

Page 12: RECAPP Facility Evaluation Report - Alberta€¦ · alarm system is a Mircom FX-2000 installed in 2006. PA system is the product of Dukane with return call switches in each class

Report run on: April 7, 2011 5:19 PM Page 12 of 42

B3010.08.02 Metal Gutters and Downspouts**

B3020.01 Skylights**

B3020.02 Other Roofing Openings (Hatch, Vent, etc)*

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

1955

1954

1955

Installed

Installed

Installed

30

25

0

Design Life

Design Life

Design Life

APR-11

APR-11

APR-11

Updated

Updated

Updated

Replace downspouts (32m)

Replace skylight (1)

Lifecycle Replacement

Lifecycle Replacement

2014

2014

$1,000

$1,200

Unassigned

Unassigned

Sherwood Park - Wye School (B4031A)

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

APR-11

APR-11

The 1955 addition has G.I. gutters and exterior downspouts.

The 1954 original building (Main Entrance) has a vaulted metal framed skylight.

The 1955 addition (Mezzanine) has a man door to roof.

Page 13: RECAPP Facility Evaluation Report - Alberta€¦ · alarm system is a Mircom FX-2000 installed in 2006. PA system is the product of Dukane with return call switches in each class

Report run on: April 7, 2011 5:19 PM Page 13 of 42

C1010.01 Interior Fixed Partitions*

C1010.04 Interior Balustrades and Screens, Interior Railings*

C1010.05 Interior Windows*

C1020.01 Interior Swinging Doors (& Hardware)*

C1020.03 Interior Fire Doors*

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

Rating

0

1954

0

0

0

Installed

Installed

Installed

Installed

Installed

0

0

0

0

0

Design Life

Design Life

Design Life

Design Life

Design Life

FEB-06

APR-11

APR-11

APR-11

APR-11

Updated

Updated

Updated

Updated

Updated

Sherwood Park - Wye School (B4031A)S3 INTERIOR

The 1954 original building (around Gymnasium) has 200 mm haydite (concrete) block. The 1954 original building (West Corridor, East Corridor, walls between Classrooms) has 150 mm haydite (concrete)blocks. The 1971 addition (Corridor) has 200 mm concrete block.

Balustrades located at gymnasium mezzanine.

The 1971 addition (Administration 125) has an interior window. The 1954 original building (Corridor between Classrooms 101, 102, 103 and 104) has plain glass wood frame clerestoreywindows.

The 1954 original building (Classrooms) has wood doors and wood frames. The 1955 addition (Administration Area) has wood doors and wood frames. The 1971 addition (Classrooms) has wood doors and metal frames Corridor near Mech 117 has a pair of wood doors c/w glazed panels, metal mullion, metal frame.

Corridor between the 1954 original building and 1971 addition has a pair of metal doors, metal mullion, metal frame andmetal panel above doors. Corridor between the 1954 original building and 1977 portables has a pair of metal doors c/w glazed panels, metalmullion, metal frame. Corridor between the 1971 addition and 1980 portables has a pair of metal doors, metal mullion, metal frame. Corridor between the 1971 addition and 1977 portables has a pair of metal doors, metal mullion, metal frame.

Page 14: RECAPP Facility Evaluation Report - Alberta€¦ · alarm system is a Mircom FX-2000 installed in 2006. PA system is the product of Dukane with return call switches in each class

Report run on: April 7, 2011 5:19 PM Page 14 of 42

C1030.01 Visual Display Boards** - 1954

C1030.01 Visual Display Boards** - 2007

C1030.02 Fabricated Compartments (Toilets/Showers)**

C1030.05 Wall and Corner Guards*

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

1954

2007

1995

1954

Installed

Installed

Installed

Installed

20

20

30

0

Design Life

Design Life

Design Life

Design Life

APR-11

APR-11

APR-11

APR-11

Updated

Updated

Updated

Updated

Replace display boards (96)

Replace Smart boards (13)

Replace with new toilet partitions (19)

Lifecycle Replacement

Lifecycle Replacement

Lifecycle Replacement

2014

2027

2025

$38,500

$58,500

$24,100

Unassigned

Unassigned

Unassigned

Sherwood Park - Wye School (B4031A)

Event:

Event:

Event:

Type

Type

Type

Year

Year

Year

Cost

Cost

Cost

Priority

Priority

Priority

Updated:

Updated:

Updated:

APR-11

APR-11

APR-11

Classrooms have chalkboards, whiteboards, and tackboards.

Smart boards located in some classrooms.

Metal toilet partitions are present in washrooms in 1954 & 1971 sections.

Metal corner guards are present in some hallways.

Page 15: RECAPP Facility Evaluation Report - Alberta€¦ · alarm system is a Mircom FX-2000 installed in 2006. PA system is the product of Dukane with return call switches in each class

Report run on: April 7, 2011 5:19 PM Page 15 of 42

C1030.06 Handrails*

C1030.08 Interior Identifying Devices*

C1030.12 Storage Shelving*

C1030.14 Toilet, Bath, and Laundry Accessories*

C1030.17 Other Fittings*

C2010 Stair Construction*

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

Rating

Rating

0

0

0

0

1954

1954

Installed

Installed

Installed

Installed

Installed

Installed

0

0

0

0

0

0

Design Life

Design Life

Design Life

Design Life

Design Life

Design Life

APR-11

APR-11

APR-11

APR-11

APR-11

APR-11

Updated

Updated

Updated

Updated

Updated

Updated

Sherwood Park - Wye School (B4031A)

The 1954 original building (Corridor to 1977 portables) has painted metal pipe handrail for a wood ramp. The 1971 addition (Corridor to 1977 portables) has painted metal pipe handrail for a wood ramp.

Plastic name and room number plates throughout.

Wood and steel shelving throughout.

Washrooms in 1954 & 1971 sections have ceramic sinks with stainless steel faucets, and soap, toilet paper, and papertowel dispensers.

The 1954 original building (South Exit) has plastic laminated wood boot racks.

The 1954 original building (Mech 121, Mech 117, Store 118) has unpainted concrete stairs. The 1955 addition (stage 122, Mezzanine to Stage 122 and Main Entrance Lobby) has wood stairs with hardwood finish.

Page 16: RECAPP Facility Evaluation Report - Alberta€¦ · alarm system is a Mircom FX-2000 installed in 2006. PA system is the product of Dukane with return call switches in each class

Report run on: April 7, 2011 5:19 PM Page 16 of 42

C2020.08 Stair Railings and Balustrades*

C2020.11 Other Stair Finishes*

C2030 Interior Ramps*

C3010.06 Tile Wall Finishes** - 1954

C3010.06 Tile Wall Finishes** - 1971

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

Rating

1954

1955

0

1954

1971

Installed

Installed

Installed

Installed

Installed

0

0

0

40

40

Design Life

Design Life

Design Life

Design Life

Design Life

FEB-06

APR-11

APR-11

APR-11

APR-11

Updated

Updated

Updated

Updated

Updated

Refurbish ceramic wall tiles (34m²)

Refurbish ceramic wall tiles (80m²)

Lifecycle Replacement

Lifecycle Replacement

2014

2014

$1,600

$3,800

Unassigned

Unassigned

Sherwood Park - Wye School (B4031A)

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

APR-11

APR-11

The 1954 original building (Mech 121, Mech 117, Store 118) has painted metal pipe for concrete stairs. The 1955 addition (Stage 122) has wood handrail for wood stairs. The 1955 addition (Mezzanine to Stage 122 and Main Entrance Lobby) has metal plate handrail for wood stairs.

Stairs to stage area have hardwood finish.

The 1954 original building (Corridor to 1977 portables) has a wood ramp with VC tile finish. The 1971 addition (Corridor to 1977 portables) has a wood ramp with VC tile finish and tubular steel handrails. The 1971 addition (Corridor to 1980 portables) has a wood ramp with VC tile finish and tubular steel handrails.

Ceramic wall tiles.

Ceramic wall tiles.

Page 17: RECAPP Facility Evaluation Report - Alberta€¦ · alarm system is a Mircom FX-2000 installed in 2006. PA system is the product of Dukane with return call switches in each class

Report run on: April 7, 2011 5:19 PM Page 17 of 42

C3010.11 Interior Wall Painting*

C3020.01.02 Paint Concrete Floor Finishes*

C3020.02 Tile Floor Finishes** - 1954

C3020.02 Tile Floor Finishes** - 1971

4 - Acceptable

3 - Marginal

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

1954

1954

1954

1971

Installed

Installed

Installed

Installed

0

0

50

50

Design Life

Design Life

Design Life

Design Life

APR-11

APR-11

APR-11

APR-11

Updated

Updated

Updated

Updated

Repaint concrete floor. (50m²)

Replace ceramic flooring (29.7m²)

Replace ceramic flooring (52.4²)

Failure Replacement

Lifecycle Replacement

Lifecycle Replacement

2011

2014

2021

$1,502

$5,100

$8,800

Low

Unassigned

Unassigned

Paint scratched and peeled off.Concern:

Repaint concrete floor.Recommendation:

Sherwood Park - Wye School (B4031A)

Event:

Event:

Event:

Type

Type

Type

Year

Year

Year

Cost

Cost

Cost

Priority

Priority

Priority

Updated:

Updated:

Updated:

APR-11

APR-11

APR-11

Walls are painted concrete block throughout majority of school.

The 1954 original building (Jan 112, Mech 121) has painted concrete floor.

Ceramic floor tile located in washrooms.

Cermic flooring located in washrooms.

Page 18: RECAPP Facility Evaluation Report - Alberta€¦ · alarm system is a Mircom FX-2000 installed in 2006. PA system is the product of Dukane with return call switches in each class

Report run on: April 7, 2011 5:19 PM Page 18 of 42

C3020.04 Wood Flooring**

C3020.07 Resilient Flooring** - Sheet vnyl flooring

C3020.07 Resilient Flooring** - VA tiles

4 - Acceptable

3 - Marginal

4 - Acceptable

Rating

Rating

Rating

1955

1954

1954

Installed

Installed

Installed

30

20

20

Design Life

Design Life

Design Life

APR-11

APR-11

APR-11

Updated

Updated

Updated

Replace hardwood flooring. (59.9m²)

Replace sheet vinyl flooring (347.9m²)

Replace VA tile (540.8m²)

Lifecycle Replacement

Lifecycle Replacement

Lifecycle Replacement

2014

2014

2014

$11,500

$28,000

$27,400

Unassigned

Unassigned

Unassigned

Sheet vinyl floor finish worn out.Concern:

Replace with new sheet vinyl floor finish.Recommendation:

Sherwood Park - Wye School (B4031A)

Event:

Event:

Event:

Type

Type

Type

Year

Year

Year

Cost

Cost

Cost

Priority

Priority

Priority

Updated:

Updated:

Updated:

APR-11

APR-11

APR-11

The 1955 addition (Stage 122) has hardwood flooring.

The 1955 addition (Gymnasium 119) has sheet vinyl flooring.

VA tile located in various classrooms throughout 1954 original building.

Page 19: RECAPP Facility Evaluation Report - Alberta€¦ · alarm system is a Mircom FX-2000 installed in 2006. PA system is the product of Dukane with return call switches in each class

Report run on: April 7, 2011 5:19 PM Page 19 of 42

C3020.07 Resilient Flooring** - VA tiles

C3020.07 Resilient Flooring** - VC tiles

C3020.08 Carpet Flooring** - 1954

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

1971

1954

1995

Installed

Installed

Installed

20

20

15

Design Life

Design Life

Design Life

APR-11

APR-11

APR-11

Updated

Updated

Updated

Replace VC tile (662.7m²)

Replace VC tile flooring (302.3²)

Replace carpeting (24.5m²)

Lifecycle Replacement

Lifecycle Replacement

Lifecycle Replacement

2014

2014

2014

$34,000

$15,300

$4,200

Unassigned

Unassigned

Unassigned

Sherwood Park - Wye School (B4031A)

Event:

Event:

Event:

Type

Type

Type

Year

Year

Year

Cost

Cost

Cost

Priority

Priority

Priority

Updated:

Updated:

Updated:

APR-11

APR-11

APR-11

VC tile located in corridors and classrooms in 1971 addition.

VC tile located in corridors, washrooms, and kitchen in in 1954 and 1955 sections.

Carpet flooring located in one classroom (E.L.A. 108) in 1954 section.

Page 20: RECAPP Facility Evaluation Report - Alberta€¦ · alarm system is a Mircom FX-2000 installed in 2006. PA system is the product of Dukane with return call switches in each class

Report run on: April 7, 2011 5:19 PM Page 20 of 42

C3020.08 Carpet Flooring** - 1971

C3030.02 Ceiling Paneling (Wood)*

C3030.06 Acoustic Ceiling Treatment (Susp. T-Bar)**

3 - Marginal

4 - Acceptable

3 - Marginal

Rating

Rating

Rating

1971

1971

1954

Installed

Installed

Installed

0

0

25

Design Life

Design Life

Design Life

APR-11

APR-11

APR-11

Updated

Updated

Updated

Replace carpeting (304.6m²)

Replace with new acoustic ceiling tiles. (650.7m²)

Failure Replacement

Failure Replacement

2012

2011

$19,900

$28,700

Low

Low

Carpet worn out.

Tiles are damaged, missing or stained.

Concern:

Concern:

Replace with new sheet carpet. (approx. 40 square metres in1954 original building and 285 square metres in 1971addition)

Replace with painted GWB in washrooms.

Recommendation:

Recommendation:

Sherwood Park - Wye School (B4031A)

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

APR-11

APR-11

The 1971 addition (VP 123, Principal 124, Administration 125, Classroom 137, Library 139) has carpet floors.

The 1971 addition (Classrooms 131, 132, 133, 134, 137, 138, Staff 135, Library 139) has wood deck.

The 1954 original building (SWR 105, Washroom 107, ELA 108, GWR 109, BWR 111) has acoustic ceiling tiles withsuspended T-bar system.

Page 21: RECAPP Facility Evaluation Report - Alberta€¦ · alarm system is a Mircom FX-2000 installed in 2006. PA system is the product of Dukane with return call switches in each class

Report run on: April 7, 2011 5:19 PM Page 21 of 42

C3030.07 Interior Ceiling Painting*

C3030.09 Other Ceiling Finishes*

4 - Acceptable

4 - Acceptable

Rating

Rating

0

1971

Installed

Installed

0

0

Design Life

Design Life

APR-11

APR-11

Updated

Updated

Sherwood Park - Wye School (B4031A)

The 1954 original building (Main Entrance Vestibule, Mech 117, Jan 112, North Exit vestibule, BWR 113) has paintedgypsum board ceiling. The 1955 addition (Store adjacent to South Exit doors) has painted gypsum board ceiling. The 1971 addition (BWR 127, GWR 128, Corridors) has painted gypsum board ceiling.

The 1971 addition (VP 123, Principal 124, Administration 125, Infirmary 126, CNS 130) has textured ceiling.

Page 22: RECAPP Facility Evaluation Report - Alberta€¦ · alarm system is a Mircom FX-2000 installed in 2006. PA system is the product of Dukane with return call switches in each class

Report run on: April 7, 2011 5:19 PM Page 22 of 42

D2010.04 Sinks**

D2010.08 Drinking Fountains/Coolers**

D2010.10 Washroom Fixtures (WC, Lav, Urnl)**

D2020.01.01 Pipes and Tubes: Domestic Water*

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

1954

1954

1954

1954

Installed

Installed

Installed

Installed

30

35

35

0

Design Life

Design Life

Design Life

Design Life

APR-11

APR-11

APR-11

APR-11

Updated

Updated

Updated

Updated

Replace 7 stainless steel sinks and 2 enamel mopsinks

Replace 4 non-refrigerated drinking fountains.

Replace 15 WC, 6 UR, and 15 LAVS

Lifecycle Replacement

Lifecycle Replacement

Lifecycle Replacement

2014

2014

2014

$13,000

$6,300

$31,300

Unassigned

Unassigned

Unassigned

Sherwood Park - Wye School (B4031A)S4 MECHANICAL

Event:

Event:

Event:

Type

Type

Type

Year

Year

Year

Cost

Cost

Cost

Priority

Priority

Priority

Updated:

Updated:

Updated:

APR-11

APR-11

APR-11

There are approximately 2 enamel sinks in custodial rooms and 7 stainless steel sinks lunch rooms and classrooms inthe building.

Non-refrigerated drinking fountains.

There are approximately 15 vitreous china water closets (tankless), 6 wall/floor mounted vitreous urinals and 15 vitreouschina lavatories in washrooms throughout the building.

Domestic water piping is mainly copper and ranges in size from 100 mm down to 15 mm.

Page 23: RECAPP Facility Evaluation Report - Alberta€¦ · alarm system is a Mircom FX-2000 installed in 2006. PA system is the product of Dukane with return call switches in each class

Report run on: April 7, 2011 5:19 PM Page 23 of 42

D2020.01.02 Valves: Domestic Water**

D2020.01.03 Piping Specialties (Backflow Preventors)**

D2020.02.02 Plumbing Pumps: Domestic Water**

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

1954

1954

1954

Installed

Installed

Installed

40

20

20

Design Life

Design Life

Design Life

APR-11

APR-11

APR-11

Updated

Updated

Updated

Replace (60) Valves: Domestic Water

Replace (1) Backflow Preventors

Replace circulation pumps (2)

Lifecycle Replacement

Lifecycle Replacement

Lifecycle Replacement

2014

2014

2014

$19,000

$5,000

$3,000

Unassigned

Unassigned

Unassigned

Sherwood Park - Wye School (B4031A)

Event:

Event:

Event:

Type

Type

Type

Year

Year

Year

Cost

Cost

Cost

Priority

Priority

Priority

Updated:

Updated:

Updated:

APR-11

APR-11

APR-11

There are isolation valves installed on the domestic cold and hot water systems throughout the building.

Backflow prevention provided for boiler water make-up.

The building has circulation pumps for domestic water.

Page 24: RECAPP Facility Evaluation Report - Alberta€¦ · alarm system is a Mircom FX-2000 installed in 2006. PA system is the product of Dukane with return call switches in each class

Report run on: April 7, 2011 5:19 PM Page 24 of 42

D2020.02.03 Water Storage Tanks**

D2020.02.06 Domestic Water Heaters**

D2020.03 Water Supply Insulation: Domestic*

D2030.01 Waste and Vent Piping*

D2030.02.04 Floor Drains*

3 - Marginal

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

Rating

1954

1998

1954

1954

1954

Installed

Installed

Installed

Installed

Installed

0

20

0

0

0

Design Life

Design Life

Design Life

Design Life

Design Life

APR-11

APR-11

APR-11

APR-11

APR-11

Updated

Updated

Updated

Updated

Updated

Replace storage tanks

Replace Domestic Water Heaters (2)

Lifecycle Replacement

Lifecycle Replacement

2014

2018

$10,000

$5,000

Unassigned

Unassigned

Sherwood Park - Wye School (B4031A)

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

APR-11

APR-11

Domestic water is delivered to site from an off-site source (trucked), and stored in underground holding tanks fordomestic water usage. Recommend to connect to County water supply.

1-Bradford White natural gas fired domestic hot water heater, 36 MBH input with capacity of 151 litres servicing 1954/55Section of Building. 1-John Wood natural gas fired domestic hot water heater, 32 MBH input with capacity of 151 litres servicing 1971Section of Building.

The domestic water piping is insulated with canvas covering.

A combination of cast iron and copper piping used for gravity sanitary waste and vent piping was observed in the building.

There are floor drains in washrooms, janitor and mechanical rooms.

Page 25: RECAPP Facility Evaluation Report - Alberta€¦ · alarm system is a Mircom FX-2000 installed in 2006. PA system is the product of Dukane with return call switches in each class

Report run on: April 7, 2011 5:19 PM Page 25 of 42

D2040.01 Rain Water Drainage Piping Systems*

D2040.02.04 Roof Drains*

D3010.02 Gas Supply Systems*

D3020.03.01 Furnaces** 1954 and 1955

4 - Acceptable

4 - Acceptable

4 - Acceptable

3 - Marginal

Rating

Rating

Rating

Rating

1954

1954

1954

1955

Installed

Installed

Installed

Installed

0

0

0

25

Design Life

Design Life

Design Life

Design Life

FEB-06

APR-11

APR-11

APR-11

Updated

Updated

Updated

Updated

Replace 4 furnaces

Failure Replacement 2011 $111,000 Low

The Gymnasium furnaces have surpassed Theoretical LifeExpectancy. The furnaces do not provide sufficient ventilationof meet current indoor air quality standards with aboveaverage operating and maintenance costs.

Concern:

Replace Gymnasium furnaces with roof mounted gas fired airhandling unit c/w penthouse. Replacement of the furnaceswill improve energy and operating efficiency.

Recommendation:

Sherwood Park - Wye School (B4031A)

Event:

Type Year Cost Priority

Updated: APR-11

Rain water collection via scuppers and roof drains to storm water piping located inside building to surface run-off.

The roof drains are fitted with debris screens and are incorporated into the roof system.

The natural gas piping feeds the heating boilers, emergency generator, make-up air units and domestic hot waterheaters.

3-Lennox natural gas fired furnaces servicing 1955 Gymnasium. 1-Lennox natural gas fire furnace servicing 1955 gymnasium Stage area.

Consequences of Deferral:Potential operational failure with above average operating andmaintenance costs.

Page 26: RECAPP Facility Evaluation Report - Alberta€¦ · alarm system is a Mircom FX-2000 installed in 2006. PA system is the product of Dukane with return call switches in each class

Report run on: April 7, 2011 5:19 PM Page 26 of 42

D3020.03.02 Chimneys (& Comb. Air): Furnace* 1954 & 1955

D3040.01.04 Ducts: Air Distribution*

3 - Marginal

3 - Marginal

Rating

Rating

1954

1954

Installed

Installed

0

0

Design Life

Design Life

APR-11

APR-11

Updated

Updated

Replace Classrooms furnaces chimneys.

Replace 1954 Classrooms underfloor ductworkdistribution system.

Failure Replacement

Indoor Air Quality Upgrade

2011

2011

$2,000

$76,000

Low

Low

The Classrooms furnaces chimneys have surpassedTheoretical Life Expectancy.

The 1954 Classroom under floor ductwork have surpassedTheoretical Life Expectancy with above average heat loss dueto underfloor ductwork is not insulated.

Concern:

Concern:

Replace Classrooms furnaces chimneys with furnacereplacements. Remove furnace chimneys if furnaces arereplaced with roof mounted heat/cool units.

Abandon underfloor ductwork and replace with overheadductwork distribution system at furnace replacements toservice Classrooms.

Recommendation:

Recommendation:

Sherwood Park - Wye School (B4031A)

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

APR-11

APR-11

Classroom furnaces chimneys. Combustion air provided for furnaces.

Underfloor ductwork distribution system servicing 1954 Classrooms.

Consequences of Deferral:Potential operational failure.

Page 27: RECAPP Facility Evaluation Report - Alberta€¦ · alarm system is a Mircom FX-2000 installed in 2006. PA system is the product of Dukane with return call switches in each class

Report run on: April 7, 2011 5:19 PM Page 27 of 42

D3040.01.04 Ducts: Air Distribution*1954

D3040.01.04 Ducts: Air Distribution*1955

D3040.01.07 Air Outlets & Inlets: Air Distribution*

4 - Acceptable

3 - Marginal

4 - Acceptable

Rating

Rating

Rating

1954

1955

1954

Installed

Installed

Installed

0

0

0

Design Life

Design Life

Design Life

APR-11

APR-11

APR-11

Updated

Updated

Updated

Replace 1955 Gymnasium underfloor ductworkdistribution system.

Indoor Air Quality Upgrade 2011 $60,000 Medium

The 1955 Gymnasium under floor ductwork has surpassedTheoretical Life Expectancy with above average heat loss dueto under floor ductwork is not insulated.

Concern:

Abandon underfloor ductwork and replace with overheadductwork distribution system at furnace replacements toservice Gymnasium.

Recommendation:

Sherwood Park - Wye School (B4031A)

Event:

Type Year Cost Priority

Updated: APR-11

The duct distribution system consists of sheet metal insulated supply air ducts, ceiling return air plenums and sheet metalreturn air ducts.

Underfloor ductwork distribution system servicing Gymnasium Area.

Ceiling and floor mounted linear grilles and square diffusers are used for supply and return air.

Consequences of Deferral:Potential deterioration and failure of underfloor ductwork withabove average operational costs.

Page 28: RECAPP Facility Evaluation Report - Alberta€¦ · alarm system is a Mircom FX-2000 installed in 2006. PA system is the product of Dukane with return call switches in each class

Report run on: April 7, 2011 5:19 PM Page 28 of 42

D3040.04.01 Fans: Exhaust**

D3040.04.03 Ducts: Exhaust*

D3040.04.05 Air Outlets and Inlets: Exhaust*

D3050.01.02 Packaged Rooftop Air Conditioning Units (& Heating Units)**

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

1954

1954

1954

2007

Installed

Installed

Installed

Installed

30

0

0

25

Design Life

Design Life

Design Life

Design Life

APR-11

APR-11

APR-11

APR-11

Updated

Updated

Updated

Updated

Replace exhaust fans (11)

Replace 12 RTU

Lifecycle Replacement

Lifecycle Replacement

2014

2032

$10,000

$60,000

Unassigned

Unassigned

Sherwood Park - Wye School (B4031A)

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

APR-11

APR-11

There are approximately 11 rooftop mounted exhaust fans of varying sizes serving various areas of the building.

Sheet metal, uninsulated ductwork connects the floor level exhaust grills to the various exhaust fans throughout thebuilding.

Ceiling and wall mounted metal exhaust grills are connected to the exhaust ductwork.

12 Engineered Air roof mounted natural gas furnaces servicing 1971 Section of Building.

Page 29: RECAPP Facility Evaluation Report - Alberta€¦ · alarm system is a Mircom FX-2000 installed in 2006. PA system is the product of Dukane with return call switches in each class

Report run on: April 7, 2011 5:19 PM Page 29 of 42

D3060.02.01 Electric and Electronic Controls**

D3060.02.05 Building Systems Controls (BMCS, EMCS)**

D4020 Standpipes*

D4030.01 Fire Extinguisher, Cabinets and Accessories*

D4090.07 Fire Pumps & Water Storage Tanks*

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

Rating

1954

2000

1954

1954

1954

Installed

Installed

Installed

Installed

Installed

30

20

0

0

0

Design Life

Design Life

Design Life

Design Life

Design Life

APR-11

APR-11

FEB-06

FEB-06

APR-11

Updated

Updated

Updated

Updated

Updated

Replace electrical controls (21)

Replace BMCS (1)

Lifecycle Replacement

Lifecycle Replacement

2014

2020

$6,000

$46,000

Unassigned

Unassigned

Sherwood Park - Wye School (B4031A)

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

APR-11

APR-11

Local electric controls servicing HVAC equipment.

Delta BMCS System. Basic on/off control.

Firehose cabinets located throughout building. Firehose cabinets annually inspected.

Dry chemical fire extinguishers located throughout building and inside fire hose cabinets. Fire extinguishers annuallyinspected.

On site underground domestic water holding tank for building domestic use is also used for firefighting (fire hosecabinets).

Page 30: RECAPP Facility Evaluation Report - Alberta€¦ · alarm system is a Mircom FX-2000 installed in 2006. PA system is the product of Dukane with return call switches in each class

Report run on: April 7, 2011 5:19 PM Page 30 of 42

D5010.03 Main Electrical Switchboards (Main Distribution)**

D5010.05 Electrical Branch Circuit Panelboards (Secondary Distribution)**

D5010.07.02 Motor Starters and Accessories**

D5020.01 Electrical Branch Wiring*

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

1993

1954

1954

1954

Installed

Installed

Installed

Installed

40

30

30

0

Design Life

Design Life

Design Life

Design Life

APR-11

APR-11

APR-11

APR-11

Updated

Updated

Updated

Updated

Replace Main Electrical Switchboard

Replace Electrical Branch Circuit Panelboards (8Panels)

Replace Motor Starters and Accessories (2 mag 16man)

Lifecycle Replacement

Lifecycle Replacement

Lifecycle Replacement

2033

2014

2014

$43,400

$37,200

$8,700

Unassigned

Unassigned

Unassigned

Sherwood Park - Wye School (B4031A)S5 ELECTRICAL

Event:

Event:

Event:

Type

Type

Type

Year

Year

Year

Cost

Cost

Cost

Priority

Priority

Priority

Updated:

Updated:

Updated:

APR-11

APR-11

APR-11

A Cutler Hammer main distribution centre located in the mechanical room is rated at 800A, 120/240 Volts, 1 phase, 3wire, and is complete with an 800A main breaker. The distribution section is complete with feeder breakers that areadequately identified and there is ample spare capacity in the distribution section.

Panel boards have been provided throughout the school. Panels are about 95% full, however, there is ample room in themain distribution centre to add more panels.

Motor control is provided by wall mounted manual and magnetic starters located in the vicinity of the motor beingcontrolled. Starters are complete with pilot lights and magnetic starters have "hand-off-auto" selector switches.

All branch wiring is copper in conduit and armored cable.

Page 31: RECAPP Facility Evaluation Report - Alberta€¦ · alarm system is a Mircom FX-2000 installed in 2006. PA system is the product of Dukane with return call switches in each class

Report run on: April 7, 2011 5:19 PM Page 31 of 42

D5020.02.01 Lighting Accessories: Interior (Lighting Controls)*

D5020.02.02.01 Interior Incandescent Fixtures*

D5020.02.02.02 Interior Fluorescent Fixtures**

D5020.02.02.03 Interior Metal Halide Fixtures*

D5020.02.03.02 Emergency Lighting Battery Packs**

4 - Acceptable

4 - Acceptable

4 - Acceptable

5 - Good

4 - Acceptable

Rating

Rating

Rating

Rating

Rating

1954

1954

2004

2004

1954

Installed

Installed

Installed

Installed

Installed

0

0

30

0

20

Design Life

Design Life

Design Life

Design Life

Design Life

APR-11

APR-11

APR-11

APR-11

APR-11

Updated

Updated

Updated

Updated

Updated

Replace Interior Florescent Fixtures (3467 MsqGFA)

Replace Emergency Lighting Battery Packs (12Packs)

Lifecycle Replacement

Lifecycle Replacement

2034

2014

$302,700

$13,300

Unassigned

Unassigned

Sherwood Park - Wye School (B4031A)

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

APR-11

APR-11

Lighting control is provided by line voltage switches and each area is locally switched.

There is minimal incandescent lighting in the school for accent purposes and some closets.

Lighting is provided by fluorescent fixtures. Fixtures are either of the recessed type or surface mounted depending on theapplication and the ceiling system. Fixtures have been upgraded with T8 lamps and electronic ballasts.

The gymnasium has been provided with 400/350 Watt pulse start metal halide fixtures.

Battery Packs have been provided in essential areas throughout the school and are maintained and tested on a regularbasis.

Page 32: RECAPP Facility Evaluation Report - Alberta€¦ · alarm system is a Mircom FX-2000 installed in 2006. PA system is the product of Dukane with return call switches in each class

Report run on: April 7, 2011 5:19 PM Page 32 of 42

D5020.02.03.03 Exit Signs*

D5020.03.01.04 Exterior H.P. Sodium Fixtures*

D5020.03.02 Lighting Accessories: Exterior (Lighting Controls)*

D5030.01 Detection and Fire Alarm**

D5030.02.02 Intrusion Detection**

4 - Acceptable

4 - Acceptable

4 - Acceptable

5 - Good

5 - Good

Rating

Rating

Rating

Rating

Rating

1954

1990

1954

2006

2000

Installed

Installed

Installed

Installed

Installed

0

0

0

25

25

Design Life

Design Life

Design Life

Design Life

Design Life

APR-11

APR-11

APR-11

APR-11

APR-11

Updated

Updated

Updated

Updated

Updated

Replace Detection and Fire Alarm (3467 Msq GFA)

Replace Intrusion Detection (3467 Msq GFA)

Lifecycle Replacement

Lifecycle Replacement

2031

2025

$90,800

$25,300

Unassigned

Unassigned

Sherwood Park - Wye School (B4031A)

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

APR-11

APR-11

Original exit lights have been retro-fitted with led lamps.

Wall mounted 70 Watt H.P. sodium fixtures have been provided around the perimeter of the building.

Exterior lighting is controlled by photo cell with manual override. Exterior lighting controls are located in the mechanicalroom.

A Mircom FX-2000 addressable hard wired fire alarm system has been provided. It is complete with smoke detectors,heat detectors, pull stations and bells.

A DSC 864 intrusion alarm system has been provided. It is complete with motion sensors, door contacts, and keypads.System is monitored externally.

Page 33: RECAPP Facility Evaluation Report - Alberta€¦ · alarm system is a Mircom FX-2000 installed in 2006. PA system is the product of Dukane with return call switches in each class

Report run on: April 7, 2011 5:19 PM Page 33 of 42

D5030.04.01 Telephone Systems*

D5030.04.04 Data Systems*

D5030.04.05 Local Area Network Systems*

D5030.05 Public Address and Music Systems**

5 - Good

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

2005

1999

1999

2004

Installed

Installed

Installed

Installed

0

0

0

20

Design Life

Design Life

Design Life

Design Life

APR-11

APR-11

APR-11

APR-11

Updated

Updated

Updated

Updated

Replace Public Address and Music Systems (24Stn)

Lifecycle Replacement 2024 $46,000 Unassigned

Sherwood Park - Wye School (B4031A)

Event:

Type Year Cost Priority

Updated: APR-11

A Panasonic TDA100 telephone system has been provided. Telephone sets have been provided in the administrationarea.

Cat 5 data cabling has been provided throughout the school with data outlets in each classroom, the administration areaand the computer lab.

Data network located in a dedicated server room behind the Library and is complete with a data rack, and patch panels.All data cables from the various areas terminate in this room.

A Dukane MC5350 PA system has been provided. The head end equipment is located in the main office. A desktelephone set for the system has been provided in the main office for communicating with the classrooms, either on anindividual basis or on an all call basis. Each classroom has been provided with a return call switch. Speakers have beenprovided throughout the school including classrooms, corridors and the outdoors.

Page 34: RECAPP Facility Evaluation Report - Alberta€¦ · alarm system is a Mircom FX-2000 installed in 2006. PA system is the product of Dukane with return call switches in each class

Report run on: April 7, 2011 5:19 PM Page 34 of 42

E1010.05.03 Display Cases*

E1010.07 Vending Equipment*

E1020.05 Audiovisual Equipment*

E1090.04 Residential Equipment*

E1090.07 Athletic, Recreational, and Therapeutic Equipment*

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

Rating

1954

0

0

1954

1954

Installed

Installed

Installed

Installed

Installed

0

0

0

0

0

Design Life

Design Life

Design Life

Design Life

Design Life

APR-11

APR-11

APR-11

APR-11

FEB-06

Updated

Updated

Updated

Updated

Updated

Provide exhaust fan hood and ducting to outside.(2 hoods)

Indoor Air Quality Upgrade 2011 $3,003 Low

Range does not have exhaust fan hood.Concern:

Provide exhaust fan hood and ducting to outside.Recommendation:

Sherwood Park - Wye School (B4031A)S6 EQUIPMENT, FURNISHINGS AND SPECIAL CONSTRUCTION

Event:

Type Year Cost Priority

Updated: APR-11

The 1954 original building (Corridor near SWR 105) has display case.

The 1954 original building (Main Entrance) has a vending machine.

Classrooms have projection screens.

The 1954 original building ( Classroom 114) has microwave. The 1955 addition (Kitchen 120) has microwaves, dishwasher, range, fridge. The 1971 addition (Staff 135) has microwaves, dishwasher, range, fridge. The 1971 addition (Infirmary 126, Storage 136) has fridge.

The 1955 addition (Gymnasium 119) has ceiling suspended basketball backstops, side folded basketball backstops,climbing racks, score board.

Page 35: RECAPP Facility Evaluation Report - Alberta€¦ · alarm system is a Mircom FX-2000 installed in 2006. PA system is the product of Dukane with return call switches in each class

Report run on: April 7, 2011 5:19 PM Page 35 of 42

E2010.02 Fixed Casework**

E2010.03.01 Blinds**

4 - Acceptable

4 - Acceptable

Rating

Rating

1954

1954

Installed

Installed

35

30

Design Life

Design Life

APR-11

APR-11

Updated

Updated

Replace casework (4444m²/gfa)

Replace blinds (104.5m²)

Lifecycle Replacement

Lifecycle Replacement

2014

2014

$465,500

$5,225

Unassigned

Unassigned

Sherwood Park - Wye School (B4031A)

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

APR-11

APR-11

All classrooms have plastic laminate countertop c/w fixed shelves, open cupboards and cupboards c/w plywood doors. The 1971 addition (Staff Room 135) has kitchen countertops, cupboards c/w doors and overhead cabinets.

The 1954 original building and 1971 addition (Classrooms) have vertical blinds over windows.

Page 36: RECAPP Facility Evaluation Report - Alberta€¦ · alarm system is a Mircom FX-2000 installed in 2006. PA system is the product of Dukane with return call switches in each class

Report run on: April 7, 2011 5:19 PM Page 36 of 42

F1010.02.04 Portable and Mobile Buildings** - 1977 Portables

3 - MarginalRating

1977Installed

30Design Life

APR-11Updated

Replace Electrical systems (402.7m²/gfa)

Replace Mechanical systems (402.7m²/gfa)

Replace resilient flooring (402.7m²), lockers (68),blinds (42m²), fixed casework (402.7m²/gfa), visualdisplay boards (22 panels)

Replace roofing (402.7m²), downspouts (30m),

Lifecycle Replacement

Lifecycle Replacement

Lifecycle Replacement

2014

2014

2014

$80,540

$100,675

$128,400

Unassigned

Unassigned

Unassigned

Sherwood Park - Wye School (B4031A)

Event:

Event:

Event:

Event:

Type

Type

Type

Year

Year

Year

Cost

Cost

Cost

Priority

Priority

Priority

Updated:

Updated:

Updated:

APR-11

APR-11

APR-11

1991 Addition (2) attached portables - 206.1m² (const. 1977) 1992 Addition (2) attached portable - 196.6m² (const. 1977) Portables have been installed as noted, but all four were manufactured in 1977. Total gross area is 402.7m². Overallcondition of all portables is marginal. Structural: The four portables added have concrete flat piles. These portables are wood frame construction Envelope: All four portable have stucco, wire mesh, building paper, plywood sheathing, 38 x 140 mm wood studs at 400 mm o.c.,RSI 3.5 batt insulation, vapour barrier, 16 mm fireguard, (exterior walls), built-up roofing, 13 mm plywood sheathing withspacers, 38 x 184 mm fir joists at 400 mm o.c., RSI 2.1 batt insulation paper face, vapour barrier, 19 x 140 mm woodstrapping at 400 mm o.c., 16 mm Fireguard, exposed glue-lam beams (roof), all wood frame construction. Steel storefrontexit doors. Exterior has metal fascia with metal gutters and metal downspouts on exterior walls. Corridor Exit has exteriorwood landing c/w 38 x 90 mm stained wood decking spaced 10 mm apart on 38 x 286 mm pressured treated wood joistsat 300 mm o.c. supported on piles; wood stair and wood ramp c/w wood handrails. Interior: Interior components include Sheet vinyl on plywood underlay, vapour barrier, 16 mm T & G plywood sheathing, 38 x 184mm fir joists at 400 mm o.c., RSI 3.5 batt insulation, 8 mm plywood, with wood framing, solid core wood doors in woodframes, painted gypsum board walls and ceiling, full length lockers, painted/clear finish millwork and white boards/ tackboards, and a corridor c/w sheet vinyl connecting to the 1971 and 1955 sections. Mechanical: Carrier roof mounted packaged gas fired heating/dx cooling units with side wall distribution ductwork andgrills, schedule 30m steel gas piping, wall mounted ABC type multi-purpose fire extinguishers. Electrical: Recess mounted fluorescent light fixtures with T8 lamps. Recess mounted paging speakers, heat detectors.120/240V/1PH/3W power panel in classrooms.

Page 37: RECAPP Facility Evaluation Report - Alberta€¦ · alarm system is a Mircom FX-2000 installed in 2006. PA system is the product of Dukane with return call switches in each class

Report run on: April 7, 2011 5:19 PM Page 37 of 42

aluminum windows (40m²), doors (4 panels)

Replace roofing (402.7m²). Install splashpads (3)

Replace/Repair resilient flooring (402.7m²), fixedcasework (402.7m²/gfa), interior doors (4 panels).Repaint ceiling (402.7m²)

Lifecycle Replacement

Failure Replacement

Failure Replacement

2014

2012

2012

$133,200

$70,527

$80,700

Unassigned

Medium

Medium

1. Roofing has blisters and water ponds. 2. Downspouts are too short and there are no concretesplashpads.

1. Sheet vinyl floor finish worn out in Classrooms. 2. Vinyl tiles worn out in furnace room. 3. Drywall ceiling stained in Classrooms. 4. Millwork worn out. 5. Wood doors and wood frames deteriorated.

Concern:

Concern:

1. Replace with new SBS roofing system. 2. Extend downspouts and provide new concrete splashpads.

1. Provide new sheet vinyl floor finish in Classrooms. 2. Replace with new sheet vinyl floor finishes in furnacerooms. 3. Repaint ceiling in Classrooms. 4. Provide new millwork. 5. Replace doors and hardware.

Recommendation:

Recommendation:

Sherwood Park - Wye School (B4031A)

Event:

Event:

Type

Type

Type

Year

Year

Year

Cost

Cost

Cost

Priority

Priority

Priority

Updated:

Updated:

Updated:

APR-11

APR-11

APR-11

Page 38: RECAPP Facility Evaluation Report - Alberta€¦ · alarm system is a Mircom FX-2000 installed in 2006. PA system is the product of Dukane with return call switches in each class

Report run on: April 7, 2011 5:19 PM Page 38 of 42

F1010.02.04 Portable and Mobile Buildings** - 1980 Portables

4 - AcceptableRating

1980Installed

30Design Life

APR-11Updated

Replace Electrical systems (454.3m²/gfa)

Replace Mechanical systems (454.3m²/gfa)

Replace resilient flooring (454.3m²), lockers (65),blinds (56.7m²), fixed casework (454.3m²/gfa),visual display boards (22 panels)

Replace roofing (454.3m²), windows (54m²),caulking (60m), doors (4 panels)

Lifecycle Replacement

Lifecycle Replacement

Lifecycle Replacement

2014

2014

2014

$90,860

$113,575

$136,700

Unassigned

Unassigned

Unassigned

Sherwood Park - Wye School (B4031A)

Event:

Event:

Event:

Event:

Type

Type

Type

Year

Year

Year

Cost

Cost

Cost

Priority

Priority

Priority

Updated:

Updated:

Updated:

APR-11

APR-11

APR-11

1999 Addition (2) attached portables - 223.7m² (const. 1980) 2007 Addition (2) attached portable - 230.6m² (const. 1980) Portables have been installed as noted, but all four were manufactured in 1980. Total gross area is 454.3m². Overallcondition of all portables is acceptable. Structural: The four portables added have wood frame on steel perimeter, on concrete pile foundation. These portables are woodframe construction Envelope: All four portable have stucco, wire mesh, building paper, plywood sheathing, 38 x 140 mm wood studs at 400 mm o.c.,RSI 3.5 batt insulation, vapour barrier, 16 mm fireguard, (exterior walls), built-up roofing, 13 mm plywood sheathing withspacers, 38 x 184 mm fir joists at 400 mm o.c., RSI 2.1 batt insulation paper face, vapour barrier, 19 x 140 mm woodstrapping at 400 mm o.c., 16 mm Fireguard, exposed glue-lam beams (roof), all wood frame construction. Steel storefrontexit doors and aluminum framed glazed windows complete with wire mesh. Exterior has metal fascia and internal metaldownspouts on exterior walls. Corridor Exit has exterior wood landing c/w stained wood decking spaced 10 mm apart onpressured treated wood joists at 300 mm o.c. supported on piles; wood stair and wood ramp c/w wood handrails. Interior: Interior components include Sheet vinyl on plywood underlay, vapour barrier, 16 mm T & G plywood sheathing, 38 x 184mm fir joists at 400 mm o.c., RSI 3.5 batt insulation, 8 mm plywood, with wood framing, solid core wood doors in woodframes, painted gypsum board walls and ceiling, painted/clear finish millwork and white boards/ tack boards, and acorridor c/w sheet vinyl connecting to the 1971 addition. Mechanical: Carrier roof mounted packaged gas fired heating/dx cooling units with side wall distribution ductwork andgrills, schedule 30m steel gas piping, wall mounted ABC type multi-purpose fire extinguishers. Electrical:

Page 39: RECAPP Facility Evaluation Report - Alberta€¦ · alarm system is a Mircom FX-2000 installed in 2006. PA system is the product of Dukane with return call switches in each class

Report run on: April 7, 2011 5:19 PM Page 39 of 42

F1010.02.05 Grandstands and Bleachers**

4 - AcceptableRating

1955Installed

30Design Life

APR-11Updated

Replace bleachers (50 seats)

Lifecycle Replacement

Lifecycle Replacement

2014

2014

$145,300

$17,500

Unassigned

Unassigned

Sherwood Park - Wye School (B4031A)

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

APR-11

APR-11

The 1955 addition (Mezzanine) has retractable wood bleachers.

Page 40: RECAPP Facility Evaluation Report - Alberta€¦ · alarm system is a Mircom FX-2000 installed in 2006. PA system is the product of Dukane with return call switches in each class

Report run on: April 7, 2011 5:19 PM Page 40 of 42

K3010.01 Plumbing for Program Equipment*

K4010.01 Barrier Free Route: Parking to Entrance*

K4010.02 Barrier Free Entrances*

4 - Acceptable

4 - Acceptable

2 - Poor

Rating

Rating

Rating

0

1971

0

Installed

Installed

Installed

0

0

0

Design Life

Design Life

Design Life

APR-11

APR-11

APR-11

Updated

Updated

Updated

Upgrade -Domestic Water Supply

Install barrier free paddles

Operating Efficiency Upgrade

Barrier Free Access Upgrade

2011

2011

$45,000

$6,000

Medium

Medium

The school presently operates on a well (cistern) system andincludes fire reseivour.

There are no barrier free push paddles on entrance doors.

Concern:

Concern:

School should connect to the County water system

Install barrier free push paddles on the entrance doors of oneentrance.

Recommendation:

Recommendation:

Sherwood Park - Wye School (B4031A)S8 FUNCTIONAL ASSESSMENT

Event:

Event:

Type

Type

Year

Year

Cost

Cost

Priority

Priority

Updated:

Updated:

APR-11

APR-11

Refer D2020.02.03 - Water storage tanks. School to connect to County water supply.

School building has handicapped access and parking to school entrance.

The school building does not have handicapped entrance.

Page 41: RECAPP Facility Evaluation Report - Alberta€¦ · alarm system is a Mircom FX-2000 installed in 2006. PA system is the product of Dukane with return call switches in each class

Report run on: April 7, 2011 5:19 PM Page 41 of 42

K4010.03 Barrier Free Interior Circulation*

K4010.04 Barrier Free Washrooms*

K4030.01 Asbestos*

K4030.04 Mould*

3 - Marginal

4 - Acceptable

4 - Acceptable

4 - Acceptable

Rating

Rating

Rating

Rating

0

1954

0

0

Installed

Installed

Installed

Installed

0

0

0

0

Design Life

Design Life

Design Life

Design Life

APR-11

APR-11

APR-11

APR-11

Updated

Updated

Updated

Updated

Provide wheel chair platform or lift.

Barrier Free Access Upgrade 2011 $15,016 Low

Stage and Mezzanine do not have barrier free access.Concern:

Provide wheel chair platform or lift.Recommendation:

Sherwood Park - Wye School (B4031A)

Event:

Type Year Cost Priority

Updated: APR-11

Corridors are wide enough for wheelchairs. The 1955 addition (Stage 122) is 965 mm above Main Floor. The 1955 (Mezzanine) is approx. 2500 mm above Main Floor.

The 1954 original building (Washroom 107, BWR 113) has barrier free washrooms.

The 1971 addition (Janitor 129) has asbestos on pipe elbow; (Classroom 132) has asbestos on roof drain pot insulation;(Corridor B) has asbestos on pipe elbow in ceiling space; Corridor has asbestos on wall plaster. (School BoardSeptember 1994 Asbestos Inventory Report indicated medium hazard) (HBT Agra Limited Bulk Asbestos Report ofOctober 6, 1993 indicated Chrysotile) The 1955 addition (VP 123, Principal 124, Administration 125, Infirmary 126) has textured ceiling. (School BoardSeptember 1994 Asbestos Inventory Report indicated medium hazard) The 1954 original building, 1955 addition and 1971 addition has vinyl tile flooring. (School Board September 1994Asbestos Inventory Report indicated low hazard) (HBT Agra Limited Bulk Asbestos Report of October 6, 1993 indicatedChrysotile)

None noted or reported.

Page 42: RECAPP Facility Evaluation Report - Alberta€¦ · alarm system is a Mircom FX-2000 installed in 2006. PA system is the product of Dukane with return call switches in each class

Report run on: April 7, 2011 5:19 PM Page 42 of 42

K4030.09 Other Hazardous Materials*

K5010 Reports and Studies*

4 - Acceptable

4 - Acceptable

Rating

Rating

0

1954

Installed

Installed

0

0

Design Life

Design Life

APR-11

APR-11

Updated

Updated

Floor plan & Site plan

Study 2010 $0 Unassigned

Sherwood Park - Wye School (B4031A)

Event:

Type Year Cost Priority

Updated: APR-11

None noted or reported. Janitorial cleaning supplies appropriately stored.

Floor plan