rece! - kentucky case referenced... · 11/3/2017 · rece! nov 0s zui? tfie foiiowing items:...
TRANSCRIPT
[LIWIII^ ©IF TTlMDsfl^IMlDW^IL
11/2/2017 4166
HMB Professional Engineers, inc.3 HMB Circle, US 460
Frankfort, KY 40601
Phone: 502/695-9800
Fax: 502/695-9810Gwen Pinson, Executive Director
PROFESSIONALENGINEERSJNC
Case No. 2016-00229
Public Service CommissionFountain Run Water District
211 Sower Bouievard
Frankfort. KY 40602-0615
WE ARE SENDING YOU • Attacfied • Under Separate Cover Via:
• Stiop Drawings • Prints • Pians • Samples '
• Copy ofLetter • Ctiange Order •
RECE!
NOV 0 S ZUI?tfie foiiowing items:
PUBLIC SERVICE• I r\ x:_
)im\'
COPIES DATE NO. DESCRIPTION
Record Drawings (Contract i & II)
Substantial Completion Letter (Contract 1& II)
Letter stating when project started and reached 50% complete
Documentation of Costs
i
'
1
THESE ARE TRANSMITTED as checked below:
• For Approval
• For Your Use
i • As RequestedI '
1 • For Reviewand Comment
I.• FOR BIDS DUE
REMARKS
If you have any questions, please call.
• Approvedas Submitted
• Approved as Noted
• Returned for Corrections
•
COPY TO Chris Veach, Fountain Run Water District
• Approved as Submitted
• Approved as Noted
• Returned for Corrections
• PRINTS RETURNED AFTER LOAN TO US
SIGNED: Jeff Reynolds. P.E.If enclosures are not as noted, kindly notify us at once
PROFESSIOMALfclMGCNEEnS. IfS/C
3 HMB CircleUS 460
Frankfort, KY 40601Office: (502) 695-9800Fax: (502) 695-9810
Highway Engineering
Structural Engineering
Water &Wastewater
Sit^ Development
Right-of-Way1
Master Planning
Environmental Planning
SurveyingiI
Projept Management
Cost EstimationI
Construction Inspection
Aviation Services
Environmental Remediation
December 6,2016
Joe Comwell, ChairmanFountain Run Water District #1P.O. Box 118
Fountain Run, KY 42133
RECEIVED DEC 0 I mi8
RECEIVED
RE: Substantial Completion and WarrantyContract I —Pump Station Rehab.HMB Project No. 4166.00
Dear Mr. Comwell:
NOV 0 3 2017
PUBLIC SERVICECOMMISSION
Substantial completion of the above referenced project was achieved on December 6,2016. The contractor's one-year warranty period began on that date and shall expire'onDecember 5, 2017.
To the best of our knowledge and belief this project was completed in accordance with theDivision ofWater approved plans and specifications.
It has been apleasure working with you and the Fountain Run Water District on anothersuccessful project. We look forward to future opportunities to continue our relationship..
Should you have any questions, or ifadditional information is required, please do nothesitate to contact meat (502)695-9800.
Sincerely,
HMBProfessionalEngineers, Inc.
Jeff Reynolds, P.E.Project Manager
cc: Neal Zabkar, N.E. Zabkar, Corp.Mark Givens, RD
Kentucky . Tennessee . Indiana • Alabama
3 HMB Circle
' US 460Frankfort, KY40601
Office: (502) 695-9800Fax: (502) 695-9810
Highway Engineering
Structural Engineering
Water &Wastewater
Site Development
Right-of-Way
Master Planning
Environmental Planning!ISurveyingt
Project Managementi
Cost EstimationI
Construction Inspection
Aviation Services
Environmental Remediation
December 6,2016
Joe Comwell, ChairmanFountain Run Water District #1P.O. Box 118
Fountain Run, KY 42133
'̂ ^CtiVEu LiPC 3 I 201S
RECEIVED DEC fl 1 .o.o
RECEIVED DEC 0 1 T":;
RE: Substantial Completion and WarrantyContract II- Small Dia. Gravity SewerHMB Project No. 4166.00
Dear Mr. Comwell:
Substantial completion of the above referenced project was achieved on December 6,2016. The contractor's one-year warranty period began on that date and shall expireonDecember 5, 2017.
To Ae best ofour knowledge and belief this project was completed in accordance with theDivision ofWater approved plans and specifications.
It has been a pleasure working with you and the Fountain Run Water District on anothersuccessful project. We look forward to future opportunities to continue our relationship..
Should you have any questions, or ifadditional information is required, please do nothesitateto contactme at (502)695-9800.
Sincerely,
HMB Professional Engineers, Inc.
Jeff Reynolds, P.E.Project Manager
cc: Gene Wilbum, N.E. KY EnvironmentalMark Givens, RD
Kentucky . Tennessee . Indiana . Alabama
PROFESSIONALENGINEERS, INC
3 HMB Circle
US 460
Frankfort, KY 40601Office; (502) 695-9800
Fax: (502) 695-9810
' Highway Engineering
Structural Engineering
Water &Wastewater
SiteDevelopment
Right-of-Way
Master Planning
Environmental Planning
Surveying
Project Management
Cost Estimation
Construction Inspection
Aviation Services
Environmental Remediation
Landscape Architecture
November 2,2017
Gwen Pinson, Executive DirectorPublic Service Commission
211 Sower Boulevard
Frankfort, KY 40602-0615
RE: Case No. 2016-00229
Fountain Run Water District #1
HMB #4166.00
Dear Mrs. Pinson:
This letter is to inform you that construction on the above reference project startedon approximately September 10, 2016. The 50 percent complete was reached onapproximately October 15, 2016.
If you have any questions or need additional information, please call.
Sincerely
HMB Professional Engineers, Inc.
.^JeffReynoldsf^^^
Kentucky . Tennessee . Indiana . Alabama . West Virginia . Georgia
Sanitary Sewer Improvements ProjectFountain Run Water District #1
Draw Request 5Dec-16
Job No. 4166
Engineer JR
Date 12/28/2016
Admin
PayeeRUS Loan
($133,000)
RUS Grant
($74,000)
ARC Grant
($218,000)Prior Request Total to Date Amount Due
HMB Professional Engineers, Inc. $1,297.00 $61,553.00 $62,850.00 $1,297.00
Rubin and Hays $6,704.81 $6,704.81 $0.00
Richard D. Jackson, Attorney $1,939.13 $1,939.13 $0.00
Wells Fargo Bank - Loan Payoff $49,335.86 $49,335.86 $0.00
N.E. Zabkar, Corp $172,556.00 $172,556.00 $0.00
N.E. KY Environmental Services $42,306.00 $42,306.00 $0.00
Fountain Rim Sinking Ftmd $5,000.00 $5,000.00 $0.00
Total $0.00 $0.00 $1,297.00 $339,394.80 $340,691.80 $1,297.00
Prior Request $133,000.00 $51,598.34 $154,796.46
Total to Date $133,000.00 $51,598.34 $156,093.46 $340,691.80
1
mUa
0
a
0
0
.-1
.-1
0
LU>0U
13
I—z0U
0
0
0V
6
‘.0
I
SANITARY SEWER IMPROVEMENTS PROJECTFOUNTAIN RUN WATER DISTRICT #1
MONROE COUNTY, KENTUCKYCONTRACT I - PUMP STATION REHAB
FOUNTAIN RUN WATER DISTRICTJOE CORNWELLPRESIDENT
RAVEN PROPESVICE PRESIDENT
NOV15 LANCASTERSECRETARY
BRENDA STEENBERGENTREASURER
FRANCES HOWARDMEMBER
CHRIS VEACUMANAGER
NO. 20,40
RECORD DRAWINGSDATE: DECEME 2øI
EVlSED T: SA
DATE REVISED: DECEME 201e’
DECEMBER 201611MB PROJECT No. 4166.00
Plans Prepared By:
Pfl0FE5IOUAL -
ENGI?.aEERS. INC
3 lIMB CIrcle (502)695—9800Frankfort, Kentucky Fax (502)695—9810
GENERAL NOTES
I. IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO ASCERTAIN THELOCATIONS OF ANY AND ALL UTILITIES ENCOUNTERED BY THE FINALALIG’$1ENT OF SEUER LINE. THE CONTRACTOR SHALL USE CAUTION LLI4ENEXCAVATING AND SHALL TAKE THE NECESSARY MEASURES TO PROTECTTHE EXISTING UTILITIES TO KEEP THEM IN SERVICE. IF UTILITIES ARE SHOWN,THE IF’.FO-1ATICN IS GENERAL IN NATURE AND NOT TO BE TAKEN ASAS-BUILTS. ADDITIONAL UTILITIES OTHER THAN THOSE SWCIJ.N WILL BEENCOUNTERED. CONTRACTOR SHALL CONTACT REPRESENTATIVES OF LOCALUTILITIES A MINIMUM OF 48 HRS. BEFORE COMMENCING UJOC ON THE PROJECT.ALL DAMAGE TO EXISTING UTILITIES CAUSED BY THE CONTRACTORSOPERATION SHALL BE REPAIRED BY THE CONTRACTOR AT NO COST TOTHE OWNER OR THE ENGINEER
2. THE CONTRACTOR SHALL CONFORI TO ALL LOCAL CODES AND RECEIVEAPPROVAL WHERE NECESSARY BEFORE CONSTRJCTION.
3. ALL DAMAGE TO EXISTING UTILITIES CAUSED BY THE CONTRACTORSOPERATION SHALL BE REPAIRED BY THE CONTRACTOR AT NO COST TOTHE OWNER NOT ALL CULVERTS ARE SHCtLN. CONTRACTOR SHALL USECAUTION WHEN WO(ING IN THESE AREAS.
4. THE CONTRACTOR SHALL MAINTAIN A CUPRENT SET OF CONSTRJCTIONPLANS ON THE JOB SITE DURING ALL PHASES OF CONSTRJCTIOft
5. ALL CONSTRJCTION AND INSTALLATION OF MATERIALS BEING USEDSHALL BE IN COI’ORIANCE WITH THE PLANS AND SPECIFICATIONSPREPARED BY THE ENGNEER OF RECORD. SUBSTITUTION ANDDEVIATION SHALL BE PERIITTED ONLY WHEN WIT1EN APPROVALHAS BEEN ISSUED BY THE ENGINEER
6. THE CONTRACTOR SHALL TAKE APPROPRIATE ACTION TO DETE1NESUB5UACE CONDITIONS.
1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE TEMPORARY REMOVAL,RELOCATION AND REPLACEMENT OF TRAILERS, BUILDINGS, FENCES, ETC.
8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDINGTEMPORARY PUMPS TO PUMP THE SEWAGE AROUND THE CONSTRJCTIONAREA, IF NECESSARY. THE CONTRACTOR SHALL PROvIDE THE NECESSARYEQUIPMENT TO PREVENT BY-PASS OF SEWAGE AND SUBMIT A PLANINDICATING HOW THIS WILL BE ACCOMPLISHED. NO ADDITIONAL COST SHALLBE PAID TO THE CONTRACTOR FOR ANY REASON, FOR SELlER PLMPINGREQUIRED TO COMPLETE CONSTRJCTION.
Sl-4T (NDX
COVERQNI LOCATION MAP, GENERAL NOTES 4 SHEET INDEXGN2 OVERALL PUMP STATION LOCATIONS
I TYPICAL PUMP STATION
2 PUMP STATION ‘2SDI STANDARD DETAILS
LOCATION MAF
SCALE: I” 2øø
0.
00I
0mty
(N
‘-I0(N
(Nrl
I—U
Iz0UxUI0z
I—U
F—z0U
C
0-o0(Ia)—0
U
I
RECORD DRAWINGSDCEM 21
EVI5ED SA
AT VISE 2øI
— — — —
— PJECT: 415102 DATE JAN. 2014 SANITARY SEWER IMPROVEMENTS PROJECT SHEET
SCALE NTS FOUNTAiN RUN WATER DISTRICT #1 4IDATE FRANI<FORT, KENTUCKr MONROE COUNTY KENTUCKY3 WM CIRCLE
DE5IED SY JOR (S02) CONTRACT I - PUMP TAUON REHABDRAN SY SAB (E’02) S-’SIø FAXCHECJ(ED I JDR LOCATION MAP/GENERAL NOTES/SHEET INDEX
NO. DATE vI5Iaq8 C14(D ARD DATE CC DUS.— — — —
PROFESSIONALENGINEERS, INC
P:\
engr
env\
4166
\CA
D\R
ecor
dD
raw
ings
\CO
NT
RA
CtI
\OV
ERA
LLSI
TEM
AP.
dwg,
12/1
9/20
162:
19:1
0PM
,D
WG
To
PDF.
pc3
4
1/
-o -Ti
mm
m
1
: ar
V
•
bE “IL
%4
4
4
ll4
‘L
11,
d(p
-.
—I
‘.
—I
.0 z
rV
I;ii ‘i
i
(p m -(
cJ -t rn (p P7 P1 0 P1 U) P1
O C Cb
J
(p 133
-,.
2’
j,,
RUMP STATION GENERAL NOTES
,-CONTRACTOR SHALL CORE/ DRILL EXISTING CONCRETE TOP
/ TO INSTALL CONTROL PANEL(NOTE PUMP STATION 1, M, , ‘
AND 8 WERE MOUNTED ON THESIDE OF TI-IE WET WELL)
1*
POWER SUPPLY
‘—2” SCH. SO PVC FLANGED(SEE NOTE .)
—2’ DISCI-IARCzE PIPING,PVC SCH. 80
I” SCH. 40 PIPE 5.5.GUIDE RAILS
I KEENE PUMP MODEL KE202SUBMERSIBLE PUMP
iL-i .—LIFT-OUT ASSEMBLY, TOBE MOUNTED ON EXIST.
I CONCRETE PEDESTAL
__J_L CHECK VALVE
J
I. ALL BOLTS FOR LIFT STATION SHALL BE STAINLESS STEELTYPE 304 WITH STAINLESS STEEL HARDWARE.
2. CONTROL PANEL SHALL BE FIELD LOCATED ON THE TOPSLAB OF TI-IE WET WELL AND APPROVED BY OWNER ANDENGINEER (NOTE PUMP STATION I, 4, ¶‘, ‘, 7 AND *5 WEREMOUNTED TO TI-IE SIDE OF THE WET WELL.)
3. CONTRACTOR SHALL FABRICATE STAINLESS STEEL WALLMOUNT BRACKET FOR TOP RAIL SUPPORT PLATE.
4. ALL PVC FITTINGS SHALL BE FLANGED. NO GLUE FITTINGSUJILL BE ALLOWED.
‘. PROPOSED DISCHARGE PIPING SHALL ALIGN WITH EXISTINGDISCHARGE LINE. DISCHARGE PIPING SHALL TRANSITION TOPVC OUTSIDE OF WET WELL AND CONNECT TO EXISTINGFORCE MAIN.
S. BYPASS CONNECTION SHALL BE INSTALLED PRIOR TOTAKING EXISTING PUMP STATION OUT OF SERVICE.CONTRACTOR SHALL BE RESPONSIBLE FOR PUMPING OFSEWAGE AROUND EXISTING WET WELL DURING CONSTRUCTION.
7. CONTRACTOR SHALL REMOVE EXISTING PUMPS, GUIDE RAILS,FLOATS, PIPING, ETC. ALL MATERIALS REMOVED SHALLREMAIN THE PROPERTY OF THE DISTRICT AND SHALL BEPLACED AT A LOCATION AS DIRECTED BY THE DISTRICT.
3 -1MB CIRCLEFRANKFORT, KENTUCKr(ø2) (-‘3Søø(02) 6’35-3SI FAX
ALARM LIGHT
5.5. WEATHERPROOF CONTROLPANEL MOUNTED PEDESTAL,SHOWN IN THIS VIEW FOR CLARITY
S.S. WALL MOUNT BRACKETFOR TOP RAIL SUPPORTPLATE (SEE NOTES)
2’ FLG x FLG ‘O BEND,PVC SCH. 50
Y4” S.S.LIFTING CHAIN
\
PUMP STATION DIM. ‘A’
3 10-0”4 8-0”E’S7S
HIGH WATER‘ALARM’ LEVEL—
LAG PUMP “ON’ LEVEL—
LEAD PUMP “ON’ LEVEI-
PUMPS “OFF” LEVEL—
cia
0
co
r7
Lar-10
a,-1
,-1
a,
00NLaLi,
-1Lfz
I
PROPOSED BYPASS-CONNECTION (SEEDETAIL SHEET)
7
RECORD DRAWINGSDATE: DECEMBER 2016
REVISED SA
DATE REVI8ED: CEMER 2016
]
NO. DATE VISIC?4S— —
JECT 4b PATh, NOV. 2ø
8CALE, T5.
EXIST. 3”GATE VALVE
SANITARY SEWER IMPROVEMENTS PROJECTFOUNTAIN RUN WATER DISTRICT tl
MONROE COUNTY KENTUCKYCONTRACT I - PUMP TATION REHAB
4EET
TYPICAL PUMP STATION
P:\
engr
env\
4166
\CA
D\R
ecor
dD
raw
ings
\CO
NT
RA
Cf
I\SD
1-C
ON
TR
AC
t I.d
wg,
12/1
9/20
162:
38:4
5PM
,D
WG
To
PDF.
pc3
- 2 -4
Ze II
cJ
—I “IC
‘ii
‘ii EJJ In l’j
— rJ)
-4 -o 0 I UI -n (J 11 03 -a (p z m 0 -4 0 z L:J
(p -4 3,- I-
III
III
4,
mm
-o
---
m 0U ‘
I;
I•
II
I—
cøco
c
tDcfI0 r
71
—
c3AJ
1I11
-t<
InIn ‘3 UI -<
m
—
cJwin -I
m0
O
0
r
U,
,-10(N
0,
C-’).-1
0,
-qI-u>0U
I—U
F
0U
0,C
(0
000I-)0)
ID
I)
SANITARY SEWER IMPROVEMENTS PROJECTFOUNTAIN RUN WATER DISTRICT #1
MONROE COUNTY, KENTUCKYCONTRACT II - SMALL DIAMETER GRAVITY SEWER
FOUNTAIN RUN WATER DISTRICTJOE COENWELLPRESIDENT
RAVEN PROPESVICE PRESIDENT
NOV28 LANCASTERSECRETARY
BRENDA STEENBERGENTREASURER
FRANCES HOWARDMEMBER
CHRIS VEACHMANAGER
-‘--;:
JEFi . \4flEYNOLD$
-;.\ 20469 j,
_f___
JE,F6 1EYN6LDS, P1.KENTUCKY REGIA11ON NO. 20,469
RECORD DRAWINGSDATE: DECEME 2ZI6
REVISED Y: SA
DATE REVISED: DECEME 2ø1
DECEMBER 2016HMB PROJECT No. 4166.00
Plans Prepared By:
PROFESSIONALENGINEERS, INC
3 1043 CIrcle (502)895—9800Fraiikfort. Kentucky Fax (502)895—9810
ENEAL NOTES
I. IT SHALL SE THE CONTRACTORS RESPONSISILITY TO ASCERTAIN THELOCATIONS OF ANY AND ALL UTILITIES ENCO4TERED SY THE FINALALIGNMENT CF SELER LINE. THE CONTRACTOR SHALL USE CAUTION WHENEXCAVATING AND SHALL TAKE TI-4E NECESSARY MEASURES TO PROTECTTHE EXISTING UTILITIES TO KEEP THEM IN SERVICE. IF UTILITIES ARE SI4CU1,THE INFOR-IATIQN IS GENERAL IN NATURE AND NOT TO SE TAKEN ASAS-SUILTS. ADDITIONAL UTILITIES OTHER THAN THOSE S4-IOUX4 WILL SEENCOTERED. CONTRACTOR SHALL CONTACT REPRESENTATIVES OF LOCALUTILITIES A MINIMUM OF 46 I-IRS. SEFORE COMMENCING UJOR( ON THE PROJECT.ALL DAM,aCE TO EXISTING UTILITIES CAUSED SY THE CONTRACTORSOPERATION SHALL SE REPAIRED SY THE CONTRACTOR AT NO COST TOTI-1E NER OR THE ENGINEER.
2. THE CONTRACTOR 5l-IALL COFO1 TO ALL LOCAL CODES AND RECEIVEAPPROVAL WHERE NECESSARY SEFORE CONSTRiCTION.
3. TI-E CONTRACTOR IS TO VERIFY ALL EXISTING AND FINISHED GRADESAND ELEVATIONS IN THE FIELD AND REPORT ANY DISCREPANCIESTO THE OUNER’S REPRESENTATIVE
4. ALL DAMAGE TO EXISTING UTILITIES CAUSED SY TI-4E CONTRACTOR’SOPERATION SHALL SE REPAIRED SY THE CONTRACTOR AT NO COST TOTI-IE OU.NER NOT ALL CULVERTS ARE SHOU1. CONTRACTOR SHALL USECAUTION WHEN ILJOR(ING IN THESE AREAS.
5. THE CONTRACTOR SHALL NOTIFY PROPERTY CU4ERS PRIOR TOPEOPMING DRIVEWAY CUTS IN ORDER TO PROVIDE PROPERTY OUNERACCESS TO THE PUSLIC RIGHT-CF-WAY. THE CONTRACTOR SHALLINSTALL THESE DRIVEWAY CROSSINGS WITH EXPEDIENCE AND SHALLRESTORE THE DRIVEWAY AS SOON AS POSSISLE.
6. CONCRETE ENCASEMENT SHALL SE USED WHEN CLEARANCE SETILEENWATER MAIN AND SEU.ER LINE IS IS” OR LESS. SEE DETAIL-UTILITYCROSSING,ENCASEMENT. CONCRETE ENCASEMENT IS NOT A SEPARATEPAY ITEM, PRICE TO SE INCLUDED IN UNIT PRICE SID FOR PIPE.
7. THE CONTRACTOR SHALL MAINTAIN A CURRENT SET OF CONSTRiCTIONPLANS ON THE JOS SITE DURING ALL PHASES OF CONSTRiCTION.
S. ALL CONSTRiCTION AND INSTALLATION OF MATERIALS SEING USEDSHALL SE IN CaFOR-1ANCE WITH THE PLANS AND SPECIFICATIONSPREPARED S’r THE ENGINEER CF RECORD. 54JSSTrnJTION ANDDEVIATION SHALL SE PER-IITrED ONLY WHEN LLRITtEN APPROVALHAS SEEN ISSUED SY THE ENGNEER
‘. THE CONTRACTOR SHALL TAKE APPROPRIATE ACTION TO DETERIINESUS5UACE CONDITIONS.
10. THE CONTRACTOR SHALL SE RESPONSISLE FOR ALL LINES ANDGRADES REQUIRED FOR THE CONSTRiCTION OF THE SEU,R LINES.
THE CONTRACTOR SHALL RJRISH ALL MATERIALS AND EQUIPMENTTHAT ARE REQUIRED FOR LAYQUT SY THE CONTRACTOR’S FORCES.
II. THE CONTRACTOR SHALL SE RESPONSISLE FOR THE TEMPORARY REMOVAL,
RELOCATION AND REPLACEMENT OF TRAILERS, SUILDINGS, FENCES, ETC.
12. ELECTRONIC MAR<ER SYSTEM (EMS) FULL-RANGE MARKERS SHALL SEINSTALLED AT ALL SENDS, TEES, FITTINGS AND WHERE DIRECTED SY THEO*1ER/ENGINEER
SHEET INDEX
COVER
GNI LOCATION MAP, GENERAL NOTES I SHEET INDEX
I MILL STREET2 AKERSVILLE ROAD
3 EXISTING PUMP STATION 5
4 EXISTING #MP STATION MODIFICATIONS
S SIPHON
6 SIPHON ‘3
501 STANDARD DETAILS
LOCATION MAPSCALE: I” 000’
U
0I
Lj7
,-1
(Na.,.-•1(N
a.,
0
I—U
I—z0U
z
I:I—z0UVI
C
‘U
000Ua)
CKU
RECORD DRAWINGSDATE: DECEMSE 2øI
EVI5ED
_____________
DATE REVISED: DECEME 2ø!
— — — —— — — PROJECT 4I6& DATE, NOV. 2I5 SANITARY SEWER IMPROVEMENTS PROJECT
5CALE t’cr.s. FOUNTAIN RUN WATER DISTRICT #1 NI— F’3 HM CIRCLE
NA1E DATE FANK0RT, KENTUCKYMONROE COUNTY, KENTUCKY
DESIGNEa BY I (02) -‘soa CONTRACf II - SMALL DIAMETER GRAVITY SEWER— PRAIU’I BY I (ø2) !-I0 FAX
CHECI<E BY II
LOCATION MAP/GENERAL NOTES/SHEET INDEXNO DATE vI5IQ* CHICp AFPRD 1 cc aae. I —— — — —
PROFESSIONALENGINEERS, INC
-. 4
1.
.4
, 4 SMALL DIAMETER
/ G,AvITT SEWER B-3
•
.
1
;.-t . \_•‘•
* -———.—.—-.-..: Is--
1• —,
1CLEANOUT
L__
__
CONNECTED TO EXIST.
SEWER LINE T
It A 4fl LUTE
:
L NE
EXISt
STATION
- CLEANOUT
‘4
.+ ———.,-.. .----:.-,
1ECTED TO EXIST.
SEWER LINE LATERAL T
INSTALLING A 4-45 EN
i’.
4
‘...-.
- CLEANOUT
MILL 5TET KY 21ø
.‘ P,.
ci0
0I
CLñLñ
-4Crj
C(N(N-4
-qz
0U
zV.’
0U
a)
00cia)
U
-4
Ca)
Ca)
0
LUTE
-
30” MI
110
— —
• —
—
RECORD DRAWINGSDECEME 2øI
EVI5ED r: 54
DATE REVISED: DECEME 2øI
1—---—
NOTE:
I. SPECIAL ATTENTION S-4ALL E PAID TO T4E DEPT4 1 -
1AN PLACEMENT OF ALL LINES WITI-1 .ECARD TO
T-IEI ELATIQNSI-4IP TO EXISTINC SEWER INVESTS.
2. SEWER LINE SI4ALL MAINTAIN A MINIMUM SLOPE OF
160 .00% 160
0+00 0+0 1+00 I+0 2+00 2+0 3+00 3+S0 4+00 4+50 5+00 5+50 6+00 6+50— — —
SANITARY SEWER IMPROVEMENTS PROJECT ET— PJECT, 4I66ø PATE, NOV. 2I5
C4LE 140RT. I”.ø FOUNTAIN RUN WATER DISTRICT No. 1— 3 HM CIRCLE
MONROE COUNTY, KENTUCKYANI<FOT, KENThCKrE
PE Y (2) CONTRACT II - SMALL DIAMETER GRAVITY SEWER—
—P.btt4ET A1 (2) -SI0 MX
— —
— CNECEP BY JOR MILL STREETco pts.
— — — —
175
110
1I-
Ici)
(‘4
LII
wU‘Uci
1j)
zC‘UI—4ci
(‘4
‘UE‘UUUI
ciciUI
ci)>IIIFIci
>-IficiUI
ci)>‘U
—
8—
ox
ilj
_tc
UoL
fI
a’a’
vzc*c’4
:1:I—n
0i-
OL
t4uI
zIzjjA
_I
IF
jOd)F
-4
zwo
-E
00
:1:
-J—
1_
d)
_I
-Z
Z4
UIW
Ei-I,
f-W4
&0.j
—0_n,
(w
U!!
mI-L
U1IU
3O
D_
ZI
Ui
Zd
1,-
cfl_
.
(‘4
+(‘4
6z+
a’a’
I-
In1r1
Ed
fad
0±
DM
a‘VJV
OE
:L9IO
/O/T
‘6MP
NV
ldhiS
AV
flNy
S\flID
V1N
OJ\S
6u
MeJG
pJo)a
N\G
VJ\9
gt\A
uaJ6ua\:d
I•
I
mm
-U I z 111 x (p -o 11 (p -I -f S
(p m 0 -4 S z -4 m x (p -o -o (p -4 -4 S z
P:\
engr
env\
4166
\CA
D\R
ecor
dD
raw
ings
\CO
NT
RA
CtI
I\SH
EE
TS
3&
4,C
ON
TRA
CT
ll.dw
g,12
/20/
2016
9:29
:48
AM
,D
WG
To
PDF.
pc3
U m I U
U U II
“U
cDCD
oc:
CDL
DO t
xo
—
0
L
--
t r
——
—J
um rx I 1D’
0<
or-
m (p m UI
cj
-1-
min “C
in p
UI mil
l
—
I•
I
mm U iI
—
—
wo
-U ] z 0 0 11 m ‘:3 -U -U (p -f —I 0 z I
(p m 0 -4 0 z -4 r 0 0 11 m 0 -o -o (p -4 -I 0 z
P:\
engr
env\
4166
\CA
D\R
ecor
dD
raw
ings
\CO
NT
RA
Cr
ff\S
HE
ET
S3
&4,
CO
NTR
AC
TU
.dw
g,12
/20/
2016
9:30
:05
AM
,
DW
GT
oPD
F.pc
3
z 0 U ci U
U m
U
tu
cDLo
ocUT
U’
o,o
4fl F
x0
‘ii K (p m ‘:3 ‘33
-1 Ill •A3
Cm K
cJ
p ci m p—
P:\
engr
env\
4166
\CA
D\R
ecor
dD
raw
ings
\CO
NT
RA
CtU
\SH
EET
5SI
PHO
N#1
CO
NTR
AC
TIL
dwg,
12/2
0/20
169:
37:5
6A
M,
DW
GTo
PDF.
pc3
II
I•
I•
II
z p 0
(p ii°
U -o I—n
1I
—
L
cooc
LOI
xn
(p—
m(p
0fl
0
Z
S 7 ni
IIU63
I
—
r-a H
-1
m (p P1 ‘:3 03
‘3 -4—
4m
m “C
P1‘3 P1 C
’03 ‘i
i
03 Iii
— Cl)
(p 03
1
—n m
0—
0—
I -o T
-n t
I. mm
—
LIL
DO
T1j
11-t
Jtz
xo
—
‘C
!l
P:\
engr
env\
4166
\CA
D\R
ecor
dD
raw
ings
\CO
NT
RA
CT
II\S
HEE
T6
SWH
ON
#3C
ON
TR
AC
Tli
.dw
g,12
/20/
2016
9:44
:45
AM
,D
WG
To
PDF.
pc3
F1
U I U
(p -o r S z -o zU m U Al
§ U Al
U
r13 H -o
b 44
(p m C) —I S z
k 4.
—--V.0
—
‘3;ii
‘3]>
111
1>-4
<-I m
(j
A1
Iii
f1
1cj :1:1
In -4
NOTES.
U
0
0I
0
0
0.
a.0
0
0
‘-I
0)
0
Iz0U,-10
Iz0U
0)C
000
0
I
NOTES.I TNIS DETAIL. APPLIES IN GRASS AREAS. ThIE WORC REQJIRED
Y TWIS DETAIL IS INCIDENTAL TO TWE SELlER PIPE.
2. ELECTRONIC NARER S’tSTEPI (EMS) RJLL-WIGE MA.ES+4ALL EE INSTALLED AT AU. EENDS, TEES, FITThIGS ANDUA-IERE DIRECTED t TI.E CUNER/ENGINEER.
I. CONCRETE ENCASEENT SNALL E USED UR4EN CLEARANCEEETILEEN SEUER OR NON-POTASLE WATER lINE AND UTILITYLINE IS IS OR LESS.
2. AN4 ENC21TERISIG UTLLLrr LINE WITI4 SEPARATION LESS TWANIS” VERTICAL OR 10-0” WORIZONTAL. CONCRETE ENCASEMENTSWALL E USED. PJLL SECTION OF SELlER OR NON-POTAISLELUSTER LINE SWALL EE CENTERED L1’LDER UTILITY LI.LE TOACI-HEVE MA)<II1J1 JOINT DISPLACEMENT.
3. CONCRETE ENCASEMENT IS NOT A SEPARATE PAY ITEt
SI4AT LOCATION PORPLLJ VALVES WITI4 DIALINDICATOR (OEN-SI4UT?
ZONE 3 - NO ROCK ALLOIED INTOPS OFEAcLcFILL
_
ISLESS
I - SELECT EARTN S MIN.DEPTI4 FREE OF
1-0 OP. 1-0’ F- SEU.ER OR- — —. —I / NON-POTAISLE
LUSTER LINE
F
vALvE 4 VALVE e.oxSCALE. N.TS.
CRAVITr EMBENMENT
,
4JCRItESS
____________
E)ISTLrtILITY LINE
SIDE VIEW EN VIEW
UTILITh CRCSSINC / ENCASEtIENT
SCALE • N.TS.
SCALE • N.T.S.
TNREAPED PVC CAP4”4” - UJAxWIA WIUF. ,—tFLUSI4 WITI4 GJ’C)REQ. FOR GRASS ORGRAVEL AREAS - 24” 50. CONC.NO C4C. REQ. FOR 5” TWICK —PAVED AREAS
RECORD DRAWINGSD,6TE: CEMER 2I
REVISED Y:
_____________
DATE REVISED: DECEMBER 2I
PVC ELUENT SELlER
NOTE.CLEANOUTS SI4ALL EE LOCATED ASSWaIN ON PLANS WIT)4 A MAxS-U1SEPARATION OF 350.
EFFLUENT SEWER CLEAN OUT
SCALE • N.T
— — —— PROJECT. 4600 DATE, DEC. 2015 SAlUTARY SEWER IMPROVEMENTS PROJECT ET— SCALE. . FOUNTAIN RUN WATER DISTRICT #1— r13 4M CIRCLE
— -DATE FRANKFORT, KENTUCK’r MONROE COUNTY, KENTUCKY
— DESIGNED SY JDR I (52) CONTRACT II - SMALL DIAMETER GRAVITY SEWERVI5ED
DRAWN I t5@2) -Iø FAXCI4ECKED I
NO. W REVIONS C44D AFPRD DATE RECORO DUIGS. I ISTANDARD SANITARY SEWER DETAILS
— — — —
PROFESSIONALENGINEERS. INC