Recent Experience in the CAISO Energy
Imbalance Market
Paul Wetherbee
Director, Energy Supply Merchant
September 15, 2017
2
Agenda
• EIM Basics
• Lessons Learned
• Q & A
3
EIM Basics
4
EIM Basics: What an EIM is
• EIM stands for Energy Imbalance Market
• An EIM is an automated sub-hourly economic
optimization of loads and resources
• The market is operated by a Market Operator who
optimizes resources within the EIM footprint
• Market Participants voluntarily bid in resources and the
Market Operator runs an automated economic
dispatch every five minutes
• Only the most economic resources are dispatched
subject to transmission congestion
5
EIM Basics: What an EIM is Not
• An EIM is not a Regional Transmission Organization
(RTO)• All participating balancing authorities maintain control of their assets
and associated reliability compliance obligations
• The EIM does not affect a balancing authority’s contingency reserve
obligations or reserve sharing agreements
• An EIM does not require that parties consolidate
balancing authority areas
• EIM Participants are not required to bid• Participants voluntarily make available generation resources that will
be optimized to balance load and generation every five minutes
across the EIM footprint
6
EIM Basics: How an EIM Works
7
Lessons
Learned, so far
8
Lesson 1 – Diversity of Connections is Key
• PSE is directly connected to PACW but one step removed from
CAISO.
• PACW dedicates transmission to connect to CAISO which results
in payments for congestion
Market Performance Average Hourly Imports to PACW
(October-December 2016)
From DMM’s Q4 2016 Report on Market Issues and Performance
10
Diversity of Load and Resources +
Connectivity = Benefits
IPCO has great connectivity to PACE,
PACW, NVE
11
Lesson 2 – PSE Thermal Operations are
changing
• More cycling of combined cycle plants
• More runtime for simple cycle plants
• Better understanding of operational and maintenance
costs
• Flexibility of plants is valuable
• Lower PMINs
• Higher PMAX
• Faster startup times
• Shorter minimum runtimes
• A/S capabilities
• Ramp rate
12
Example Plant Operations
as EIM Participating
Resource
13
Lesson 3: Flexible Hydro is Valuable
14
Lesson 4 – CAISO is Impressive but not
Perfect
Areas for Improvement
• VER and load forecasting accuracy and processing time is area for improvement
• Improvements desired for MSG modeling
• Flexible ramping test methodology may require revisions
• Balancing test doesn’t take into account startup MWs
Positives
• CAISO daily report review and informative stakeholder process
• Turnaround is quick for submitted requests and questions
Key Takeaways
• Collaborate with CAISO and other EIM entities through forums and stakeholder process
15
Lesson 5 – Get smart and nimble to deliver
results
• Operational excellence in EIM requires the right
people, tools, and strategies to deliver results
• Level of sophistication is rising steadily as PSE SMEs are
emerging in all areas.
• EIM team is applying analysis and collaboration to come up
with solutions. Recent examples include:
✓Root cause analysis and mitigation for Front Office
balancing test failures.
✓Regulation allocation algorithm by Load Office.
✓Revamped cost analysis for participating resources by
engineers, thermal asset management, Front Office
analysts.
✓Data analysis tool implementation by IT group.
16
Questions