recent experience in the caiso energy imbalance market · 4 eim basics: what an eim is • eim...

16
Recent Experience in the CAISO Energy Imbalance Market Paul Wetherbee Director, Energy Supply Merchant September 15, 2017

Upload: vuonganh

Post on 13-Apr-2018

225 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Recent Experience in the CAISO Energy Imbalance Market · 4 EIM Basics: What an EIM is • EIM stands for Energy Imbalance Market • An EIM is an automated sub-hourly economic optimization

Recent Experience in the CAISO Energy

Imbalance Market

Paul Wetherbee

Director, Energy Supply Merchant

September 15, 2017

Page 2: Recent Experience in the CAISO Energy Imbalance Market · 4 EIM Basics: What an EIM is • EIM stands for Energy Imbalance Market • An EIM is an automated sub-hourly economic optimization

2

Agenda

• EIM Basics

• Lessons Learned

• Q & A

Page 3: Recent Experience in the CAISO Energy Imbalance Market · 4 EIM Basics: What an EIM is • EIM stands for Energy Imbalance Market • An EIM is an automated sub-hourly economic optimization

3

EIM Basics

Page 4: Recent Experience in the CAISO Energy Imbalance Market · 4 EIM Basics: What an EIM is • EIM stands for Energy Imbalance Market • An EIM is an automated sub-hourly economic optimization

4

EIM Basics: What an EIM is

• EIM stands for Energy Imbalance Market

• An EIM is an automated sub-hourly economic

optimization of loads and resources

• The market is operated by a Market Operator who

optimizes resources within the EIM footprint

• Market Participants voluntarily bid in resources and the

Market Operator runs an automated economic

dispatch every five minutes

• Only the most economic resources are dispatched

subject to transmission congestion

Page 5: Recent Experience in the CAISO Energy Imbalance Market · 4 EIM Basics: What an EIM is • EIM stands for Energy Imbalance Market • An EIM is an automated sub-hourly economic optimization

5

EIM Basics: What an EIM is Not

• An EIM is not a Regional Transmission Organization

(RTO)• All participating balancing authorities maintain control of their assets

and associated reliability compliance obligations

• The EIM does not affect a balancing authority’s contingency reserve

obligations or reserve sharing agreements

• An EIM does not require that parties consolidate

balancing authority areas

• EIM Participants are not required to bid• Participants voluntarily make available generation resources that will

be optimized to balance load and generation every five minutes

across the EIM footprint

Page 6: Recent Experience in the CAISO Energy Imbalance Market · 4 EIM Basics: What an EIM is • EIM stands for Energy Imbalance Market • An EIM is an automated sub-hourly economic optimization

6

EIM Basics: How an EIM Works

Page 7: Recent Experience in the CAISO Energy Imbalance Market · 4 EIM Basics: What an EIM is • EIM stands for Energy Imbalance Market • An EIM is an automated sub-hourly economic optimization

7

Lessons

Learned, so far

Page 8: Recent Experience in the CAISO Energy Imbalance Market · 4 EIM Basics: What an EIM is • EIM stands for Energy Imbalance Market • An EIM is an automated sub-hourly economic optimization

8

Lesson 1 – Diversity of Connections is Key

• PSE is directly connected to PACW but one step removed from

CAISO.

• PACW dedicates transmission to connect to CAISO which results

in payments for congestion

Page 9: Recent Experience in the CAISO Energy Imbalance Market · 4 EIM Basics: What an EIM is • EIM stands for Energy Imbalance Market • An EIM is an automated sub-hourly economic optimization

Market Performance Average Hourly Imports to PACW

(October-December 2016)

From DMM’s Q4 2016 Report on Market Issues and Performance

Page 10: Recent Experience in the CAISO Energy Imbalance Market · 4 EIM Basics: What an EIM is • EIM stands for Energy Imbalance Market • An EIM is an automated sub-hourly economic optimization

10

Diversity of Load and Resources +

Connectivity = Benefits

IPCO has great connectivity to PACE,

PACW, NVE

Page 11: Recent Experience in the CAISO Energy Imbalance Market · 4 EIM Basics: What an EIM is • EIM stands for Energy Imbalance Market • An EIM is an automated sub-hourly economic optimization

11

Lesson 2 – PSE Thermal Operations are

changing

• More cycling of combined cycle plants

• More runtime for simple cycle plants

• Better understanding of operational and maintenance

costs

• Flexibility of plants is valuable

• Lower PMINs

• Higher PMAX

• Faster startup times

• Shorter minimum runtimes

• A/S capabilities

• Ramp rate

Page 12: Recent Experience in the CAISO Energy Imbalance Market · 4 EIM Basics: What an EIM is • EIM stands for Energy Imbalance Market • An EIM is an automated sub-hourly economic optimization

12

Example Plant Operations

as EIM Participating

Resource

Page 13: Recent Experience in the CAISO Energy Imbalance Market · 4 EIM Basics: What an EIM is • EIM stands for Energy Imbalance Market • An EIM is an automated sub-hourly economic optimization

13

Lesson 3: Flexible Hydro is Valuable

Page 14: Recent Experience in the CAISO Energy Imbalance Market · 4 EIM Basics: What an EIM is • EIM stands for Energy Imbalance Market • An EIM is an automated sub-hourly economic optimization

14

Lesson 4 – CAISO is Impressive but not

Perfect

Areas for Improvement

• VER and load forecasting accuracy and processing time is area for improvement

• Improvements desired for MSG modeling

• Flexible ramping test methodology may require revisions

• Balancing test doesn’t take into account startup MWs

Positives

• CAISO daily report review and informative stakeholder process

• Turnaround is quick for submitted requests and questions

Key Takeaways

• Collaborate with CAISO and other EIM entities through forums and stakeholder process

Page 15: Recent Experience in the CAISO Energy Imbalance Market · 4 EIM Basics: What an EIM is • EIM stands for Energy Imbalance Market • An EIM is an automated sub-hourly economic optimization

15

Lesson 5 – Get smart and nimble to deliver

results

• Operational excellence in EIM requires the right

people, tools, and strategies to deliver results

• Level of sophistication is rising steadily as PSE SMEs are

emerging in all areas.

• EIM team is applying analysis and collaboration to come up

with solutions. Recent examples include:

✓Root cause analysis and mitigation for Front Office

balancing test failures.

✓Regulation allocation algorithm by Load Office.

✓Revamped cost analysis for participating resources by

engineers, thermal asset management, Front Office

analysts.

✓Data analysis tool implementation by IT group.

Page 16: Recent Experience in the CAISO Energy Imbalance Market · 4 EIM Basics: What an EIM is • EIM stands for Energy Imbalance Market • An EIM is an automated sub-hourly economic optimization

16

Questions