Recent Trend on Case Histories of Reinforced
Soil Walls in Japan
J. OTANIKumamoto University, Japan
Secretary of Technical Committee No.9 “Earth Reinforcement”, ISSMGE
13th Africa Regional Conference on SMGE, ISSMGELecture, Marrakech, December 11, 2003
Earth Reinforcement Technique in this three decades
Development for several geotechnical methods
Recently, Combined technology with other
techniques has been widely used.
Establishment of analysis and design methods
Development of seismic design
Improvement of new products and geotechnical methods
This 30 years
Rapid & spread
Lecture at 13ARC2003
Contents
• Methods– Geogrid Method, Multi-Anchored Method, Metallic Strip
Method
• Statistical data of performance– Application fields, Scale and Reinforcement layout,
and Fill and foundation materials
• New trend– Combined Method with other methods
State of the art report on reinforced soil wall technique in Japan
Lecture at 13ARC2003
Based on the statistical study by Japanese Supporting TC9 members
Reinforced Soil Wall Methods in Japan
1. Geogrid method2. Multi-anchored method3. Metallic strip method
Lecture at 13ARC2003
1. Geogrid method
Lecture at 13ARC2003
Sandbags
Geosynthetics
Soil layer
Steel wire frame
Geosynthetics
Soil layer
GeosyntheticsPC
panelfacing
Soil layer
RCblockfacing
Geosynthetics
Soil layer
2. Multi-anchor methodConcrete Facing
Connector
Turn Buckle
Tie bar
NonwovenGeotextile
Spacer
Base Concrete
Anchor PlateLecture at 13ARC2003
3. Metallic strip method
Lecture at 13ARC2003
Foundation
Metallic Strip
Concrete SkinConnective
Bolt and Nat
Metallic SkinBolt and Nat
Metallic Strip
Covered Joint
Statistical Data of Performance
1.Application fields2. Scale & layout of
reinforcements 3. Fill and foundation
materials
Lecture at 13ARC2003
0
500
1000
1500
2000
2500
3000
3500
Bef
ore
1980
1981
1982
1983
1984
1985
1986
1987
1988
1989
1990
1991
1992
1993
1994
1995
1996
1997
1998
1999
2000
Year of execution
Num
ber o
f app
licat
ions
(cas
es)
GeogridMulti-AnchorMetallic Strip
Lecture at 13ARC2003Number of applications
Only Metallic 3 methods
Lecture at 13ARC2003
Purpose of constructions
0
10
20
30
40
50
60
70
Expr
essw
ayR
oad
Nat
iona
lR
oad
Roa
d(O
ther
s)
Rai
lway
Site
Prep
arat
ion
Perc
enta
ge b
y th
e pu
rpos
e of
con
stru
ctio
n (%
)Metallic StripMulti-AnchorGeogrid
0
10
20
30
40
50
60
70
< 10
0㎡
100㎡~
400㎡
400㎡~
700㎡
700㎡~
1000㎡
1000㎡~
2000㎡
≧ 2
000㎡
Perc
enta
ge b
y th
e w
all a
rea
(%)
Metallic StripMulti-AnchorGeogrid
Lecture at 13ARC2003
Scale of the walls
0
10
20
30
40
50
60
70
< 3m
3≦H
<5m
5≦H
<9m
9≦H
<15m
≧15
m
Height of construction examples
Perc
enta
ge (%
)Metallic StripMulti-AnchorGeogrid
Lecture at 13ARC2003Height of the walls
010
2030
4050
6070
8090
< 5m 5~10m 10~15m 15~20m ≧ 20m
Length of reinforcement
Perc
enta
ge (%
)Metallic StripMulti-AnchorGeogrid
Lecture at 13ARC2003Length of the reinforcement
0
20
40
60
80
100
Sand
and
grav
elm
ater
ials
Rock
(Cla
stic
s)
Cohe
sive
soil
Tre
ated
soil
(Cla
y)
Wea
ther
ing
rock
Perc
enta
ge (%
) Metallic StripMulti-AnchorGeogrid
Lecture at 13ARC2003Fill materials
0
10
20
30
40
50
60
Soil
Bed
rock
Har
d C
lay
Soft
grou
nd
Soil
impr
ovem
ent
(Rep
lace
men
t)
Soil
impr
ovem
ent
(Sta
biliz
atio
n)
Eolia
nde
posi
t
Perc
enta
ge (%
)
Metallic StripMulti-AnchorGeogrid
Lecture at 13ARC2003Foundation materials
NEW TREND– COMBINED METHOD –
• Needs of High Performance– Application to more important and permanent
structures• Request of Cost Reduction
– One main factor in the selection of optimum geotechnical solution
• Reduction of Environmental Impact– Regional or global environmental aspect,
such as landscape design and others
Lecture at 13ARC2003Five Examples
Ex.1 RSW with Mixing of Cement & Fiber
2.0m
1.0m 2.7m0.7m
6.0m
0.3m
0.8m
GeogridTmax = 35kN/m
Fill materialc = 0 kN/m2
φ = 30 deg
c = 210 kN/m2
φ = 0 deg
Improved soil (soil / cement / short fiber)
Improvement of stability of connection portion (without connection)
Connection portion
Lecture at 13ARC2003
Simple construction !
Ex.2 RSW with Mixing of Foam Glass
Improved soil(recycled foam glass/ soil)φ = 41 degc = 20kN/m2
γt = 1.1 kN/m3
Achievement of required stability by shorter reinforcing member
Lecture at 13ARC2003
Ex.3 RSW with Deep Mixing and Grouting
Deep Mixing Zone
Jet Grouting Zone
Soft Soil
Reinforced soil wall
Prevention of undesirable deformation in neighboring construction
Lecture at 13ARC2003
RC Slab
RC Slab
Cover soil
Sand
Tie bar
EPS Blocks
Ex.4 RSW with EPSReduce of overburden load
Lecture at 13ARC2003
Tie rods
Ex.5 RSW with Preloading + PrestressingImprovement of vertical stiffness of RSW
Lecture at 13ARC2003
Conclusions• Number of applications of reinforced soil wall in
the year of 2000 is about one hundred times as much as those in 1981.
• The main application field is road construction and the height of the wall which is from 5m to 15m was most commonly used.
• Reinforced soil wall method combined with the other method such as soil improvement and others is a powerful solution for earth reinforcement technique.
Lecture at 13ARC2003