reconstruct the access road to provide for e … · dconcept design issue revision 2 13/02/18m.w...
TRANSCRIPT
14.00
15.00
16.00
20.00
20.00
21.00
TYPICAL CROSS SECTION E
-SCALE 1 : 100
3%
6m EXISTINGSURFACE,TYPICAL.
10:1
EXISTING VEGETATEDEMBANKMENT. BATTER
SLOPE VARIES.
NEW ROCK LINEDCATCH DRAIN.
PROPOSED POLYETHYLENEREINFORCED VEGETATEDEMBANKMENT.
EXISTING ROAD TOBE RECONSTRUCTED
TO FALL TOWARDSNEW CATCH DRAIN.
BOAT HARBOURBEACH
NEW RAISED GRATED INLET PITAT EXISTING STORMWATER PIPELOCATIONS. LOCALLY ADJUSTROCK CATCH DRAIN PROFILE ATPITS AS REQUIRED.
EXISTINGSTORMWATER
DRAINAGE PIPE(BEYOND).
NEWSUBSURFACEDRAINAGE
MIN.
600
REFER TO DETAILON DRAWING
DN170120/C03
/C05STAGE 3 - CONCEPT LAYOUT PLAN
REVISION AMENDMENTS APP'DDATE
A1
PROJECT :
DRAWING NAME:
DESIGNED:
SHEET SIZE:
REVISION:
APPROVED:
SCALE:
DRAWING NUMBER:
DRAWN:
DATE:
SYDNEY OFFICE
83 - 89 Renwick Street, Redfern 2016
Tel (02) 8396 6565 Fax (02) 8396 6564
SOUTH COAST OFFICE
49 Berry Street, Nowra NSW 2541
Tel (02) 44 230 566 Fax (02) 44 233 228
W : www.miengineers.com
THIS DRAWING AND THE CONCEPTS CONTAINED
THEREIN ARE THE PROPERTY OF MI ENGINEERS.
NO UNAUTHORISED COPYING IS PERMITTED.
NOTHING IS TO BE CONSTRUCTED BASED ON
THIS DRAWING, OR PART OF THIS DRAWING,
WITHOUT THE WRITTEN PERMISSION OF MI
ENGINEERS. DRAWINGS TO BE READ IN
CONJUNCTION WITH OTHER RELATED DESIGN
DOCUMENTATION. FURTHERMORE, WHERE
MIENGINEERS RELIES ON THE INFORMATION
SUPPLIED BY OTHERS TO PRODUCE THE
DESIGNS, WE ACCEPT NO LIABILITY FOR
ERRORS, TO THE EXTENT THAT THE DESIGN HAS
MADE RELIANCE ON THIS INFORMATION.
DO NOT SCALE
CLIENT:SURVEYOR:
DATE OF SURVEY:
ORIGIN:
HEIGHT OF DATUM:
HORIZONTAL DATUM:
1 : 750
BENDALONG HEADLAND COASTAL EROSION
PROPOSED STORMWATER UPGRADE WORKS
M.W
DN170120
R.M
12/06/19
F
M.W
Environment - Growth - Community
City CouncilB
SKETCH ISSUE FOR DISCUSSION (INCLUDING SECTIONS) 05/12/17M.W
A SKETCH ISSUE FOR DISCUSSION02/08/17
M.W
C CONCEPT DESIGN ISSUE12/01/18
M.W
D CONCEPT DESIGN ISSUE REVISION 213/02/18
M.W
E CONCEPT DESIGN ISSUE REVISION 316/04/18
M.W
F CONCEPT DESIGN ISSUE REVISION 412/06/19
M.W
Ø375
Ø375
Ø300
Ø375
Ø375
-E
BOAT HARBOUR BEACH
Ø150
LEGEND:
OCEAN
BOAT HARBOUR BEACH
EXISTING ROADWAY
PROPOSED ROAD RECONSTRUCTION
EXISTING VEGETATED EMBANKMENT
STAGE 1 COMPLETED WORKS
DT1DT2
PROPOSED DETENTION AREA
EXTEND ROCK LINEDCATCH DRAIN (TYPICAL).
RECONSTRUCT THE ACCESS ROAD TO PROVIDE FORINCREASED OVERLAND FLOW CAPTURE AND CREATE TWODETENTION AREA AS INDICATED ON THE TYPICAL CROSSSECTION. WORK IS TO BE UNDERTAKEN IN CONJUNCTIONWITH THE SCC MASTER PLAN AND RECOMMENDATIONSFROM THE COASTAL ENGINEERING REPORT.
DT1
EXTEND ROCK LINEDCATCH DRAIN (TYPICAL).