reconstruction project white oak lake reconstruction ... · 16 * presented design flows are subject...

31
White Oak Lake Reconstruction Project October 18, 2017 At Thomas Woodland Center White Oak Lake Reconstruction Project March 26, 2018 Public Meeting At Thomas Woodland Center

Upload: others

Post on 07-Oct-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Reconstruction Project White Oak Lake Reconstruction ... · 16 * Presented design flows are subject to final design changes to best achieve project goals. Proposed Emergency Spillway/Plunge

White Oak Lake Reconstruction Project

October 18, 2017

At Thomas Woodland Center

White Oak Lake Reconstruction Project

March 26, 2018

Public Meeting At Thomas Woodland Center

Page 2: Reconstruction Project White Oak Lake Reconstruction ... · 16 * Presented design flows are subject to final design changes to best achieve project goals. Proposed Emergency Spillway/Plunge

Phasing and Project Orientation

2

Kaplan Culvert

Lail Culvert

Swift Culvert

Phase 2

White Oak Lake

DA = 1.2 sq. mi.

Phase 1§ Lail, Kaplan, and Swift Culverts

Phase 2 § Pineview Drive Culvert§ Swift Drive Culvert§ Driveway Bridge§ Bank Stabilization

Phase 3§ White Oak Lake

You Are Here

Page 3: Reconstruction Project White Oak Lake Reconstruction ... · 16 * Presented design flows are subject to final design changes to best achieve project goals. Proposed Emergency Spillway/Plunge

Project Objectives

3

1. Improve public safety 2. Reconstruct failing or missing lake

controls (embankment, riser, emergency spillway)

3. Move embankment out of future NCDOT I-440 widening project

4. Address future maintenance challenges5. Reduce downstream flooding

§ Eliminate roadway flooding for a 10-year flood§ Minimize flooding of homes and yards

Page 4: Reconstruction Project White Oak Lake Reconstruction ... · 16 * Presented design flows are subject to final design changes to best achieve project goals. Proposed Emergency Spillway/Plunge

I-440 Right-of-Way Line

4

Proposed Spillway

Proposed Dam Embankment

New NCDOT Right-of-Way

Line

Existing Dam Embankment

Proposed Riser/Barrel

Page 5: Reconstruction Project White Oak Lake Reconstruction ... · 16 * Presented design flows are subject to final design changes to best achieve project goals. Proposed Emergency Spillway/Plunge

Flood Reduction

5

§ Lower normal pool from 401.8’ to 397.0’§ Raise emergency spillway from 402’ to 403.3’§ Install new riser with 90” dia. Barrel§ Take temporary storage from 0 cf. to more than 1,500,000 cf.§ Peak flow is delayed by almost one hour

Proposed Temporary StorageProposed Top of Dam

Proposed Normal Pool

Temporary Storage Permanent Lake Level

Existing Normal Pool

Proposed pond bottom to be determined

Page 6: Reconstruction Project White Oak Lake Reconstruction ... · 16 * Presented design flows are subject to final design changes to best achieve project goals. Proposed Emergency Spillway/Plunge

Current Lake

6

Page 7: Reconstruction Project White Oak Lake Reconstruction ... · 16 * Presented design flows are subject to final design changes to best achieve project goals. Proposed Emergency Spillway/Plunge

Failed Primary Spillway

7

Page 8: Reconstruction Project White Oak Lake Reconstruction ... · 16 * Presented design flows are subject to final design changes to best achieve project goals. Proposed Emergency Spillway/Plunge

Failed Primary Spillway

8

Page 9: Reconstruction Project White Oak Lake Reconstruction ... · 16 * Presented design flows are subject to final design changes to best achieve project goals. Proposed Emergency Spillway/Plunge

Failed Emergency Spillway

9

Page 10: Reconstruction Project White Oak Lake Reconstruction ... · 16 * Presented design flows are subject to final design changes to best achieve project goals. Proposed Emergency Spillway/Plunge

Failed Emergency Spillway

10

Page 11: Reconstruction Project White Oak Lake Reconstruction ... · 16 * Presented design flows are subject to final design changes to best achieve project goals. Proposed Emergency Spillway/Plunge

Tree Lined Dam Embankment

11

Page 12: Reconstruction Project White Oak Lake Reconstruction ... · 16 * Presented design flows are subject to final design changes to best achieve project goals. Proposed Emergency Spillway/Plunge

Design Objectives

12

Reduce downstream flows

Convey 500-yr flood with 1.0’ of freeboard on top of dam

Avoid flooding of FFE in 500-yr flood

Avoid garage flooding in the 100-yr flood

Maintain lake footprint (if possible)

Target a normal pool depth of 3.0 ‘

Page 13: Reconstruction Project White Oak Lake Reconstruction ... · 16 * Presented design flows are subject to final design changes to best achieve project goals. Proposed Emergency Spillway/Plunge

Summary of Proposed WSELs

13

5227 Melbourne Road - Garage @ 409.2’

5207 Hawksbury Ln Road FFE @ 408.5’

10-yr WSEL = 403.3 Top of Dam = 406.5

100-yr WSEL = 404.75se Emergency Spillway = 403.3

500-yr WSEL = 405.1

* Presented design elevations are subject to final design changes to best achieve project goals

Page 14: Reconstruction Project White Oak Lake Reconstruction ... · 16 * Presented design flows are subject to final design changes to best achieve project goals. Proposed Emergency Spillway/Plunge

Summary of Flows Changes

14

Existing Conditions

10-yr Q = 553 cfs

100-yr Q = 1112 cfs

500-yr Q = 1317 cfs

Proposed Conditions

10-yr Q = 305 cfs

100-yr Q = 749 cfs

500-yr Q = 882 cfs

* Presented design flows are subject to final design changes to best achieve project goals

Page 15: Reconstruction Project White Oak Lake Reconstruction ... · 16 * Presented design flows are subject to final design changes to best achieve project goals. Proposed Emergency Spillway/Plunge

Proposed Improvements

15

Emergency Spillway

RavenwoodDrive

I-440

Riser

90” Dia. Barrel

Page 16: Reconstruction Project White Oak Lake Reconstruction ... · 16 * Presented design flows are subject to final design changes to best achieve project goals. Proposed Emergency Spillway/Plunge

Proposed Lake Footprint

16* Presented design flows are subject to final design changes to best achieve project goals

Page 17: Reconstruction Project White Oak Lake Reconstruction ... · 16 * Presented design flows are subject to final design changes to best achieve project goals. Proposed Emergency Spillway/Plunge

Proposed Emergency Spillway/Plunge Pool

17

Emergency Spillway

90” Dia. Barrel

Riser

Concrete Plunge Pool

Rip-Rap Transition

NCDOT Culvert

Page 18: Reconstruction Project White Oak Lake Reconstruction ... · 16 * Presented design flows are subject to final design changes to best achieve project goals. Proposed Emergency Spillway/Plunge

Proposed Emergency Spillway

18

§ 35’ wide concrete lined spillway§ Crest elevation = 403.3’§ Top of dam elevation is 406.5’

Emergency Spillway

Ravenwood Drive

I-440

Page 19: Reconstruction Project White Oak Lake Reconstruction ... · 16 * Presented design flows are subject to final design changes to best achieve project goals. Proposed Emergency Spillway/Plunge

Proposed Riser/Barrel

19

§ 10’x10’ concrete riser (vault)§ 90” dia. barrel (110 LF)§ Steel trash rack§ Anti-vortex plate

Page 20: Reconstruction Project White Oak Lake Reconstruction ... · 16 * Presented design flows are subject to final design changes to best achieve project goals. Proposed Emergency Spillway/Plunge

Proposed Riser/Barrel

20

BarrelConcrete Riser

Concrete Foundation

Trash Rack

Elev. 397.0’

Riser Top Elev. 401.9’

Page 21: Reconstruction Project White Oak Lake Reconstruction ... · 16 * Presented design flows are subject to final design changes to best achieve project goals. Proposed Emergency Spillway/Plunge

Proposed Sewer Improvements

21

Existing Sewer

Proposed Sewer

Existing Sewer

Existing Lake Surface

Page 22: Reconstruction Project White Oak Lake Reconstruction ... · 16 * Presented design flows are subject to final design changes to best achieve project goals. Proposed Emergency Spillway/Plunge

Construction Access Options

22

Page 23: Reconstruction Project White Oak Lake Reconstruction ... · 16 * Presented design flows are subject to final design changes to best achieve project goals. Proposed Emergency Spillway/Plunge

Construction Access Options

23

Wade Property

HorstProperty

MarklingProperty

Powell Drive

Hawksburg Lane

Ebert Property

Proposed Spillway

Proposed Riser/Barrel

Page 24: Reconstruction Project White Oak Lake Reconstruction ... · 16 * Presented design flows are subject to final design changes to best achieve project goals. Proposed Emergency Spillway/Plunge

Maintenance Access

24

Access RouteShore Protection

Concrete Riser Structure

Page 25: Reconstruction Project White Oak Lake Reconstruction ... · 16 * Presented design flows are subject to final design changes to best achieve project goals. Proposed Emergency Spillway/Plunge

Fish Restocking

25

§ Remove and Relocate§ Restock after Construction§ NC State Fisheries Guidelines

% of Adults & % of Fingerlings

Page 26: Reconstruction Project White Oak Lake Reconstruction ... · 16 * Presented design flows are subject to final design changes to best achieve project goals. Proposed Emergency Spillway/Plunge

Dam Classification

26

Hazard Classification = High

Size = Small (total storage of 68 acre-feet and height = 17 feet)

Regulated by NC Dam Safety

Emergency Operation Plan

Submittal for Dam Safety Permit

Page 27: Reconstruction Project White Oak Lake Reconstruction ... · 16 * Presented design flows are subject to final design changes to best achieve project goals. Proposed Emergency Spillway/Plunge

Permitting

27

§ NC Dam Safety

§ US Army Corps: Ø < ½ wetland impacts (PCN submittal – Nationwide Permit)

§ NCDWR 401§ NCDENR Erosion Control Permit § NCDOT Encroachment Permit

§ City of Raleigh Permits

Page 28: Reconstruction Project White Oak Lake Reconstruction ... · 16 * Presented design flows are subject to final design changes to best achieve project goals. Proposed Emergency Spillway/Plunge

Easement Acquisition

28

Easement Types§ Temporary Construction Easement (TCE)

§ Permanent Sanitary Sewer Easement (PSE)

§ Permanent Drainage Easement (PDE)

Easement Requirements§ Public Utilities – No structures (sheds, fences, etc.) in sanitary

sewer easement

§ Stormwater Management – Allow exceptions for fencing on a

case-by-case basis

Page 29: Reconstruction Project White Oak Lake Reconstruction ... · 16 * Presented design flows are subject to final design changes to best achieve project goals. Proposed Emergency Spillway/Plunge

Project Schedule – White Oak Lake

29

March 2018: 65% design complete

March 26, 2018: Public meeting

March - June 2018: Private utility relocation, obtain permits, easement

acquisition; finalized construction plan

May- June 2018: Project bid

Permits must be in hand to begin construction. Delays in receiving permits could delay start of construction. Dates reflect a projected scheduled which may have

to be adjusted to account for delays in acquiring permits and approvals to begin construction

August 2018: Project award

September: Project construction begins

October 2019: Project completed

Page 30: Reconstruction Project White Oak Lake Reconstruction ... · 16 * Presented design flows are subject to final design changes to best achieve project goals. Proposed Emergency Spillway/Plunge

Questions?

Questions?

Page 31: Reconstruction Project White Oak Lake Reconstruction ... · 16 * Presented design flows are subject to final design changes to best achieve project goals. Proposed Emergency Spillway/Plunge

Project Contact Information and Updates

City of Raleigh Stormwater Management Division

David Kiker [email protected]

Raleighnc.gov (Search “White Oak Lake”)[email protected]

919-996-4074

31