reduction of worker ethylene oxide exposure (interim measures)
DESCRIPTION
Reduction of Worker Ethylene Oxide Exposure (Interim Measures). Craig Torres M. Healy, S. Jahn, D. Gardner. Project Proposal. Implement exposure controls to Worker Health: reduce worker exposure to Ethylene Oxide (human carcinogen) and Compliance: achieve compliance with OSHA regulations - PowerPoint PPT PresentationTRANSCRIPT
Reduction of Worker Ethylene Oxide Exposure
(Interim Measures)
Craig TorresM. Healy, S. Jahn, D. Gardner
2
Project Proposal
Implement exposure controls to – Worker Health: reduce worker exposure to
Ethylene Oxide (human carcinogen) and – Compliance: achieve compliance with OSHA
regulations – Operability: maintain operability during period
of rapid growth
over the next 6 months.
3
Project Development
• OSHA Citation for lack of monitoring program
• Air testing shows workers exposed above allowed level
• Not addressing issues can result in:– increased risk of cancer, – serious OSHA citation & significant fines and– restrictions on sterilizer operation
4
Objectives
Implement a respiratory protection and OSHA compliance program within the next 6 months
5
Project Benefits
• Tangible– Reduced risk of
cancer in workers– Avoid OSHA citation
and fines– Maintain
manufacturing capacity by preserving sterilizer operability
• Intangible– Reduced future
liability– Improved worker
morale– Consistent with our
stewardship principle
6
Conclusions and Recommendations
• Budget allowance for $20.4 (PV) will allow us to implement the Ethylene Oxide exposure reduction and compliance program which will:– Maintain worker health and minimize future liability– Prevent citations and fines and protect reputation– Protect product capacity by maintaining operability of
sterilizer
7
EHS Strategy MapKey EHS
Opportunities
StakeholderInvolvement
Learning &Growth
EffectiveProcesses
Industrial HygieneFacility ManagementFacility Engineering
Finance
Reduce EtO Risks
Conduct Exposure
Assessment
Implement Hierarchy of controls
Learn Standard
and Industry Best Practices
Establish game plan
for strategy
ID vendor for Breathing
Air temp solution
Develop Training
and medical surveillance
Status Monthly
8
Estimated Project Costs
Costs to Implement
Year Engineering Materials Annual Costs Total Costs
1 $ 2,000 $ 15,000 $ 2,000 $ 19,000
2 $ 2,000 $ 2,000
3 $ 2,000 $ 2,000
4 $ -
Total Costs = $ 23,000
9
Estimated Savings
Savings to be Realized
Year OSHA Citation Savings 2 Savings 3 Total Savings
1 $ 10,000 $ 10,000
2 $ 10,000 $ 10,000
3 $ 10,000 $ 10,000
4 $ -
Total Saving = $ 30,000
10
Financial Analysis
Year Net Savings
1 $ (9,000)
2 $ 8,000
3 $ 8,000
4 $ -
Total $ 7,000