REFERENCE LIST (ALL PRODUCTS) INDEX COMMODITIES FROM PAGE TO PAGE Metering Systems…………………………………………………………… 1 6 Wellhead Control Systems………………………………………………….. 7 17 Prefabricated Shelters………………………………………………………. 18 28 Process Packages……………………………………………………………. 29 46 EPC Contract………………………………………………………………... 47 50 Pressure Vessels…...………………………………………………………... 51 77 Gas Dehydration Packages………………………………………………….. 78 82 Fuel Gas Packages………………………………………………………….. 83 90 Chemical Injection Packages……………………………………………….. 91 95 Oil & Gas Filtration and Separation Systems………………………………. 96 111 Desalters and Oil Treatment……………………………………………….. 112 113 Heaters and Exchangers……………………………………………….. 114 130 Reference List

Upload: others

Post on 23-Oct-2021

9 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: REFERENCE LIST (ALL PRODUCTS) INDEX

REFERENCE LIST (ALL PRODUCTS)

INDEX

COMMODITIES

FROM PAGE

TO

PAGE

Metering Systems……………………………………………………………

1 6

Wellhead Control Systems…………………………………………………..

7 17

Prefabricated Shelters……………………………………………………….

18 28

Process Packages…………………………………………………………….

29 46

EPC Contract………………………………………………………………...

47 50

Pressure Vessels…...………………………………………………………...

51 77

Gas Dehydration Packages…………………………………………………..

78 82

Fuel Gas Packages…………………………………………………………..

83 90

Chemical Injection Packages………………………………………………..

91 95

Oil & Gas Filtration and Separation Systems……………………………….

96 111

Desalters and Oil Treatment………………………………………………..

112 113

Heaters and Exchangers………………………………………………..

114 130

Reference List

Page 2: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Sistemi Di Misura O&GJob References: Metering Systems O&G

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2010

Daewoo E & C Co Ltd

N A O C

N.1 Sistema di misura fiscale per olio con no. 3 linee di misura dia. 8", rating 600, con PD Meters, completo di prover integrato a scorpione e sitema di controllo e supervisione.

N.1 Oil fiscal metering system, with no. 3 meter runs dia. 8", rating 600, with PD Meters, complete of integrated scorpion type prover and control system plus supervisory system.

Ogbainbiri Flow Station

Ogbainbiri Flow Station

Ogbainbiri

Nigeria

890.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2010

Petrofac International

Adco

N. 8 Sistemi di misura per iniezione di acque di strato, con misuratori magnetici, dia. 4", rating 1500, completi di flow computers

N. 8 Metering systems for produced water re injection, with magnetic flow meters, dia. 4", rating 1500, complete with flow computers

Campo olio di ASAB

ASAB oil field

Abu Dhabi

UAE

548.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2009

Ansaldo

Sorgenia

N. 1 Sistema FG composto da sistema di filtrazione, misura, riscaldamento e riduzione pressione gas naturale da 64 a 34 barg per alimentare N. 2 TG. Dia. Linee 14", Portata 16,2 kg/sec.

N. 1 Fuel Gas package composed of filtration system, gas metering system, heating system and pressure reduction system for natural gas from 64 to 34 barg to feed N. 2 turbines. Lines Dia. 14", Flow rate 16,2 kg/sec each turbines

C.le Elettrica a Ciclo Combinato 800 MW Aprilia

800 MW Combined Cycle Power Plant Aprilia

Aprilia

Italy

2.200.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2009

Petrofac International

Sonatrach

N. 6 Sistema di misura fiscale per Olio/Condensato/LPG, due linee al 100% cadauno, rating variabili da 150 a 600, con misuratori a turbina completi di sistemi prover integrati a scorpione e sistemi di controllo e comunicazione ridondatiN. 6 Oil/Condensate/LPG fiscal metering systems with two lines at 100% each, rating from 150 to 600, turbine meters equipped with scorpion type integrated prover systems and redundant control and communication networks.

El Merk Project

El Merk Project

Sahara Desert

Algeria

3.879.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 1 di 130

21-gen-11

Page 3: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Sistemi Di Misura O&GJob References: Metering Systems O&G

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2008

Ansaldo

Sorgenia

N. 1 Sistema di misura gas fiscale, filtrazione, riscaldamento e riduzione pressione gas naturale da 50 a 28,5 barg per alimentare N. 2 TG. Dia. Linee 14", Portata 17,6 kg/sec.

N. 1 Custody transfer gas metering system for turbines fueling, complete of filtration system, heating system, pressure reduction system for natural gas from 50 to 28,5 barg. Lines Dia. 14", Flow rate 17,6 kg/sec each turbines

C.le Elettrica a Ciclo Combinato 800 MW Turano Lodigian

800 MW Combined Cycle Power Plant Turano Lodigiano

Lodi

Italy

2.050.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2007

Enppi

Agiba

N.1 Sistema di misurazione fiscale per gas da 15.000 kg/hr con misuratori a ultrasuoni

N.1 Gas metering skid; flowrate: 15.000 kg/hr with ultrasonic flowmeter

West Ashrafi plant

West Ashrafi plant

Egyptian desert

Egypt

218.590,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2007

Enppi

Agiba

N.1 Sistema di misurazione fiscale per greggio da 25.000 kg/hr con misuratori a turbina completo di flow computer e supervisory computer

N.1 Oil metering package; flowrate: 25.000 kg/hr with turbine flowmeter, flowcomputer and supervisory computer

West Ashrafi plant

West Ashrafi plant

Egyptian desert

Egypt

568.500,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2006

Alstom Power

Eurosviluppo Elettrica

N. 1 Sistema misura gas composto da separazione e filtrazione, 2 linee misura gas fiscali a turbine da 16" al 100%, riscaldatori , valvole riduzione pressione, flow computers, sistema di controllo, sistema di campionamento e strumenti di analisi . Portata Gas 37 Kg/secN.1 Gas Metering System composed of sepration and filtration stage, two fiscal 100% measuring lines x 16" with turbines, heaters, pressure reducing valves, flow computers, control systems, sampling system and analysers. Gas flow rate 37 Kg/sec

Centrale Elettrica di Modugno

Modugno Power Plant

Modugno

Italy

1.440.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 2 di 130

21-gen-11

Page 4: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Sistemi Di Misura O&GJob References: Metering Systems O&G

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2006

Ansaldo

Calenia Energia

N. 1 Sistema misura gas fiscale, filtrazione, riscaldamento e riduzione pressione gas naturale da 65 a 27 barg, per alimentazione turbine.Diametro linee da 12" , portata gas 32 kg/sec.

N. 1 Custody transfer gas metering system for turbines fueling, complete of filtration system, heating system, pressure reducing system from 65 to 27 bearg.Lines diameter 12", gas flowrate 32 kg/sec.

Centrale Elettrica Di Rizziconi

Rizziconi Power Plant

Rizziconi

Italy

1.280.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2005

Ansaldo

Calenia Energia

N. 1 Sistema di misura gas fiscale, filtrazione, riscaldamento e riduzione pressione da 64 a 32 barg gas naturale per alimentazione turbine - Diametro linee 10" - Portata 170.000 nm3/hr

N. 1 Custody transfer gas metering system for turbines fueling, complete of filtration, heating and pressure reduction from 64 to 32 barg. - Lines diameter 10". - Flow rate 170.000 Sm3/hr.

Centrale Elettrica Di Sparanise

Sparanise Power Plant

Sparanise

Italy

1.050.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2005

Enppi

Khalda Petr. Co (Apache)

N.1 Sistema di misura per gas fiscale da 50 MMSCFD, pressione: 146 bar con misuratori a turbina completi di flowcomputer

N.1 Gas metering skid; flowrate: 50 MMSCFD; pressure: 146 bar with turbine flowmeter and flowcomputer

Qasr Gas plant

Qasr Gas plant

Egyptian desert

Egypt

344.230,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2005

Agip Kco

Agip Kco

N. 1 Sistema di misura olio per export con misuratori a turbina, linee da 16", portata max 2.060 m3/hr, completo di sistema automatico di campionamento.

N. 1 Export oil metering system with turbine meters, 16" lines, max flow rate 2.060 m3/hr, complete with automatic sampling system.

Campo Olio Di Kashagan

Kashagan Oil Field

Caspian Sea

Kazakistan

538.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 3 di 130

21-gen-11

Page 5: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Sistemi Di Misura O&GJob References: Metering Systems O&G

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2005

Sahatransneftegas

Sahatransneftegas

N.2 Sistemi di misura per gas da 100 MMSCFD cad. con misuratori a turbina completi di flowcomputer e supervisory computer

N.2 Gas metering skid; flowrate: 100 MMSCFD each with turbine flowmeter, flowcomputer and supervisory computer

Saha Gas plant

Saha Gas plant

Saha

Russia

654.300,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2003

U O P

O G D C

Sistema di misura gas naturale con linee da 14" e misuratore tipo anubar. Portata: 220MMscfd - Pressione: 108barg - Temperatura: 56°C

Gas metering system with 14" line and anubar type flow element. Flow: 220MMscfd - Pressure: 108barg - Temperature: 56°C

C.le Gas Quadripur

Quadripur Gas Plant

Islamabad

Pakistan

692.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2003

U O P

N A O C

Sistema di misura gas con sistema di separazione a membrane e sistema di filtrazione.

Gas metering system with membrane separation and fltration stations,

Stazione Di Compressione Di Irri

Irri Compression Station

Lagos

Nigeria

1.638.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2002

Enppi

Fayum GasCo(Shell Gas BV)

N.2 Sistema di misura fiscale per gas; portata 35.000 Nm3/hr, pressione: 77 bar e portata 70.000 Nm3/hr a 77bar con misuratori a turbina completi di flowcomputer, con n° 2 linee da 6" e 8" al 100% della portataN.2 Gas metering skid; flow rate: 35.000 Nm3/hr, pressure: 77 bar and 70.000 Nm3/hr, pressure: 77bar both with turbine flowmeter and flowcomputer. Each skid composed by N°2 lines diam. 6" and 8" sized for 100% flowrate

Fayum gas plant

Fayum gas plant

Fayum city

Egypt

460.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 4 di 130

21-gen-11

Page 6: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Sistemi Di Misura O&GJob References: Metering Systems O&G

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2002

Snamprogetti

Enipower

Sistema di misura fiscale e riduzione pressione gas per alimentazione turbogas - diametro 16" - portata 240.000Sm3/h - riduzione pressione da 75 a 30,5barg

Custody transfer gas metering system and pressure reduction for turbogas fuel - diameter 16" - flow 240.000Sm3/h - pressure reduction from 75 to 30,5barg

Centrale Elettrica Di Brindisi

Brindisi Power Plant

Brindisi

Italy

1.029.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2001

Snamprogetti

Enipower

Sistema di misura fiscale e riduzione pressione gas per alimentazione turbogas - diametro 16" - portata 240.000Sm3/h - riduzione pressione da 75 a 30,5barg

Custody transfer gas metering system and pressure reduction for turbogas fuel - diameter 16" - flow 240.000Sm3/h - pressure reduction from 75 to 30,5barg

Centrale Elettrica Di Ravenna

Ravenna Power Plant

Ravenna

Italy

1.061.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

1998

Bechtel

A D N O C

Sistema di misura per condensato e gas completo di filtrazione, flow computers, sistema di controllo con supervisory computer e prover per idrocarburi liquidi. Dimensioni linee 12" per olio, 10" per gas.

Condensate and Gas metering system complete of filtration system, flow computers, supervisory computer, control system and prover for liquid hydrocarbons. Oil lines size 12", gas lines size 10"

Onshore Development Project

Onshore Development Project

Abu Dhabi

United Arab Emirates

1.800.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

1998

Snamprogetti

Frene

Sistema di misura fiscale gas di alimentazione turbina da 10" con orifizi calibrati estraibili in pressione

Gas fiscal metering system for tubrogenerator with senior orefice of 10"

Centrale Elettrica Di Ravenna

Ravenna Power Plant

Ravenna

Italy

155.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 5 di 130

21-gen-11

Page 7: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Sistemi Di Misura O&GJob References: Metering Systems O&G

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

1997

Sicon Oil&gas (CCC Group)

O G D C

N°2 sistemi di misura fiscale gas con orifizi calibrati da 6" estraibili in pressione.

N°2 custody transfer gas metering systems with senior calibrated orefice 6"

Campo Gas Di Panjpir

Panjpir Gas Field

Panjpir

Pakistan

860.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 6 di 130

21-gen-11

Page 8: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Quadri Testa Pozzo Pneumo IdrauliciJob References: Wellhead Control Systems

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2010

J G C Corporation

Sonatrach

N.56 Quadri idraulici di controllo teste pozzo con PLC, 10.000 psi, per installazione onshore in area desertica

N.56 Well head control panels hydraulic with PLC, 10.000 psi, for onshore installation in desert area

Campo Gas di Gassi Touil

Gassi Touil Gas Field

Onshore

Algeria

2.362.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2010

Eni - Div. Agip

Eni - Div. Agip

N.1 Quadro pneumo idraulico di controllo testa pozzo, 6.000 psi, per installazione offshore.

N.1 Well head control panel pneumo-hydraulic, 6.000 psi, for offshore installation.

Piattaforma Off-shore PCME

PCME Off-shore platform

Adriatic Sea

Italy

74.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2010

Enppi

Amapetco

N.2 Quadri pneumo idraulici di controllo teste pozzo (14 pozzi cadauno), 6.000 psi, per installazione offshore.

N.2 Well head control panels pneumo-hydraulic (14 wells each), 6.000 psi, for offshore installation.

Campo Gas di Al Amal

Al Amal gas Field

Cairo

Egypt

448.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2010

Groupement Sonatrach Agip

Groupement Sonatrach Agip

N.10 Quadri pneumo idraulici di controllo teste pozzo, 6.000 psi, per installazione onshore in area desretica

N.10 Well head control panels pneumo-hydraulic, 6.000 psi, for onshore installation in desert area

Blocco 403

Block 403

Onshore

Algeria

428.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 7 di 130

21-gen-11

Page 9: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Quadri Testa Pozzo Pneumo IdrauliciJob References: Wellhead Control Systems

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2009

Mobil Producing Nigeria

Mobil Producing Nigeria

N. 1 Quadro di controllo testa pozzo con 6 casetti cadauno. Pressione di lavoro 10.000 psi

N. 1 Wellhead Control Panel with 6 well modules each. Working pressure 10.000 psi.

Unam A PH2 Slot Additional Project

Unam A PH2 Slot Additional Project

Lagos

Nigeria

236.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2009

Stogit

Stogit

N. 9 Quadri di controllo testa pozzo con tre cassetti cadauno, pressione di lavoro 6.000 psi

N. 9 Wellhead Control Panels with three well module each, 6.000 psi working pressure.

Polo Fiume Treste (Chieti)

Polo Fiume Treste (Chieti)

Chieti

Italy

745.500,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2009

Eni div. E & P

Agip

N. 1 Quadro di controllo testa pozzo con 18 stringhe, pressione di lavoro 6.000 psi

N. 1 Wellhead Control Panel with 18 strings, 6.000 psi working pressure.

Piattaforma Barbara F

Barbara F Platform

Adriatic Sea

Italy

90.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2008

Eni div. E & P

Eni div. E & P

N. 1 Quadro di controllo testa pozzo 10 stringhe, pressione di lavoro 6.000 psi

N. 1 Wellhead Control Panel 10 strings, 6.000 psi working pressure.

Piattaforma Antares

Antares Platform

Adriatic Sea

Italy

96.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 8 di 130

21-gen-11

Page 10: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Quadri Testa Pozzo Pneumo IdrauliciJob References: Wellhead Control Systems

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2008

Saipem Energy Services

Stogit

N. 1 Quadro di controllo testa pozzo, pressione di lavoro 6.000 psi

N. 1 Wellhead Control Panel, 6.000 psi working pressure

C.le Stogit Fiume Treste (Chieti)

Stogit Fiume Treste Station

Chieti

Italy

92.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2008

Eni div. E & P

Eni - Div. Agip

N.1 Skid di pressurizzazione stringhe con acqua salata

N. 1 Pressirizing strings skid with salt water

Piattaforma Antares

Antares Platform

Adriatic Sea

Italy

70.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2008

Enppi

Petrobel

N. 1 Quadro di controllo testa pozzo con tre cassetti + hot backup cadauno, pressione di lavoro 6.000 psi

N. 1 Wellhead Control Panel with three well module each + hot backup, 6.000 psi working pressure.

Tuna 60 Development Project

Tuna 60 Development Project

Cairo

Egypt

235.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2008

Groupement Sonatrach Agip

Groupement Sonatrach Agip

N. 5 Quadri di controllo testa pozzo per una testa pozzo cadauno, pressione di lavoro 7.700 psi

N. 5 Wellhead Control Panels for one well each, 7.700 psi working pressure

Impianto Hassi Messaud

Hassi Messaud Plant

Algeri

Algeria

206.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 9 di 130

21-gen-11

Page 11: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Quadri Testa Pozzo Pneumo IdrauliciJob References: Wellhead Control Systems

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2008

Eni div. E & P

Eni div. E & P

N. 1 Quadro di controllo testa pozzo 10 stringhe, pressione di lavoro 6.000 psi

N. 1 Wellhead Control Panel 10 strings, 6.000 psi working pressure.

Piattaforma Azalea B

Azalea B Platform

Adriatic Sea

Italy

76.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2007

Eni Iran BV

Pedec

N. 4 Pannelli di controllo testa pozzo, pressione di lavoro 7.500 psi, completi di charging kit per azoto e sistema di flussaggio

N. 4 Well Head Control Panels 7.500 psi working pressure, complete with nitrogen charging kit and flushing kit

Campo Olio di Darquain

Darquain Oil Field

Bandar Assaluye

Iran

380.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2006

Sonatrach / Agip

Sonatrach

N. 8 Pannelli di controllo per teste pozzo, isolate, singolaq string, pressione di lavoro 5.000 psi

N. 8 Isolated well head control panels for single string wells, working pressure 5.000 psi

Campo Olio Di Berkine

Berkine Oil Field

Berkine

Algeria

292.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2006

Enppi

Petrobel

N. 3 Quadri di controllo per testa pozzo, per controllo di n. 3 pozzi cadauno, con logica elettro-pneumo-idraulica, pressione di lavoro 5.000 psi, pressione di progetto 6.000 psi, completi di unità ricarica azoto con motore elettrico ADF.N. 3 WHCP controlling n. 3 wells each, with electro-pneumatic-hydraulic logyc, working pressure 5.000 psi, design pressure 6.000 psi, complete with nitrogen gas booster in ADF execution.

Piattaforma Off-shore Semman

Semman Off-shore Platform

Mediterranean Sea

Egypt

274.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 10 di 130

21-gen-11

Page 12: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Quadri Testa Pozzo Pneumo IdrauliciJob References: Wellhead Control Systems

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2006

Eni - Div. Agip

Stogit

N. 2 Quadri di controllo testa pozzo, per pozzi isolati singola string, con logica elettro -pneumo-idraulica, pressione di lavoro 5.000 psi pressione di progetto 6.000 psi.

N. 2 WHCP for isolated wells single string, with electro-pneumatic-hydraulic logyc cintrol, working pressure 5.000 psi, design pressure 6.000 psi

C.le Gas Cortemaggiore

Cortemaggiore Gas Station

Piacenza

Italy

83.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2006

Eni - Div. Agip

Eni - Div. Agip

N. 1 Pannello di controllo pneumatico per 6 teste pozzo e relative SSV

N. 1 Pneumatic Well Head Control Panel for the control of no. 6 well heads and related SSV

Piattaforma Off-shore Basil

Basil Off-shore Platform

Adriatic Sea

Italy

62.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2006

Eni - Div. Agip

Eni - Div. Agip

N. 1 Pannello di controllo testa pozzo, 10.000 psi pressione di lavoro

N.1 Well head control panel 10.000 psi working pressure

Campo Olio di Monte dell' Aquila

Monte dell' Aquila Oil Field

Gela

Italy

52.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2004

Sadra

Statoil

N°3 quadri idraulici di controllo di 10 teste pozzo cadauno più cinque di riserva - Standard API - 10.000PSI

N°3 wellhead control panels for 10 wells each plus five wells spare - Standard API - 10.000PSI

Piattaforme Offshore S P D 6,7 & 8

Offshore Platform S P D 6,7 & 8

Persian Gulf

Iran

1.191.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 11 di 130

21-gen-11

Page 13: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Quadri Testa Pozzo Pneumo IdrauliciJob References: Wellhead Control Systems

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2004

Rashpetco

Rashpetco

Quadro idraulico di comando per 9 pozzi in cluster. Pressione di lavoro 10.000 psi.

Wellhead control panel for 9 clustered wells. Working pressure 10.000 psi.

Piattaforma Off-shore Rosetta

Rosetta Off-shore Platform

Cairo

Egypt

251.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2004

Sonatrach / Agip

Sonatrach / Agip

N.7 Pannelli di controllo testa pozzo 10.000 psi pressione di lavoro per pozzi isolati a doppia string.

N.7 Well Head Control Panels 10.000 psi working pressure for double string isolated wells.

Campo Gas Di Beer Rebaa

Beer Rebaa Gas Field

Beer Rebaa

Algeria

315.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2004

Sadra

N I O C

N.2 Pannelli di controllo teste pozzo in cluster. Pressione di lavoro 6.000 psi. Ogni pannello controlla 3 + 3 pozzi.

N.2 Well head control panels for clustered wells. Working pressure 6.000 psi. Each WHCP controls 3 + 3 wells.

Campo Gas Di Salman Offshore Iran

Salman Gas Field Offshore Iran

Teheran

Iran

790.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2004

I O E C

P O G C

N. 2 Pannelli di controllo teste pozzo in clusters, pressione di lavoro 10.000 psi. Ogni pannello controlla 15 teste pozzo.

N. 2 Well head control panels for clustered wells, working pressure 10.000 psi. Each WHCP controls 15 well heads.

Campo Di South Pars - Fasi 9&10

South Pars Field - Phases 9&10

Teheran

Iran

786.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 12 di 130

21-gen-11

Page 14: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Quadri Testa Pozzo Pneumo IdrauliciJob References: Wellhead Control Systems

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2004

Adco

Adco

Pannelo di controllo testa pozzo dual string per pozzo isolato. Pressione di lavoro 6.000 psi.

Dual string well head control panel for isolated well. Working pressure 6.000 psi.

Campo Oilio Di Bab

Bab Oil Field

Abu Dhabi

United Arab Emirates

11.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2003

Eni - Div. Agip

Eni - Div. Agip

Contratto quadro per la fornitura di quadri idraulici di controllo pozzi - Pressione 6.000PSI

Frame agreement for wellhead control panels - Pressure 6.000PSI

Siti Vari

Various Sites

Varie

Italy

255.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2003

Saipem / Hyundai H. I.

Agip Gas B V

N°2 quadri idraulici di controllo per 10 pozzi cadauno - Pressione 20.000PSI - ATI con Fores Eng.

N°2 wellhead control panels for 10 wells each - Pressure 20.000PSI - JV with Fores Eng.

Piattaforma Off-shore Sabratha

Off-shore Platform Sabratha

Mediterranean Sea - Libya

Libya

570.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2003

Saipem / Bouigues Jv

Sonatrach

N°35 quadri idraulici di controllo pozzi (19 per produzione olio, 5 per iniezione gas, 11 per iniezione acqua) - Pressione 10.000PSI - ATI con Fores Eng.

N°35 wellhead control panels (19 for oil production, 5 for gas injection, 11 for water injection) - Pressure 10.000PSI - JV with Fores Eng.

Campo Olio Di Berkine

Berkine Oil Field

Berkine

Algeria

1.998.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 13 di 130

21-gen-11

Page 15: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Quadri Testa Pozzo Pneumo IdrauliciJob References: Wellhead Control Systems

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2003

J G C Corporation

Agip Gas B V

N°37 quadri idraulici di controllo di un pozzo - Standard API - 10.000PSI - ATI con Fores Eng.

N°37 wellhead control panels for single well - API Standard - 10.000PSI - JV with Fores Eng.

Campo Gas Di Wafa

Wafa Gas Field

Libyan Desert

Libya

3.232.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2002

Petrobel

Petrobel

N°2 quadri idraulici di controllo di 3 teste pozzo e valvole di superficie cadauno - Standard API - 10.000PSI

N°2 wellhead control panels for 3 wellheads and surface valves each - API standard - 10.000PSI

Piattaforma Off-shore Nouras A - B

Off-shore Platform Nouras A - B

Mediterranean Sea

Egypt

223.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2002

Sadra

Agip Iran

N°2 quadri idraulici di controllo di 12 teste pozzo cadauno - Standard API - 10.000PSI

N°2 wellhead control panels for 12 wellheads each - API standard - 10.000PSI

Piattaforme Off-shore S P D 4 & 5

Off-shore Platform S P D 4 & 5

Persian Gulf

Iran

610.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2001

Eni - Div. Agip

Eni - Div. Agip

Quadro elettro pneumo idraulico per comando di singolo pozzo. Pressione di lavoro 6.000 psi.

Electro pneumo hydraulic control panel for single well. Working pressure 6.000 psi.

C.le Gas Casteggio

Casteggio Gas Plant

Casteggio

Italy

48.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 14 di 130

21-gen-11

Page 16: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Quadri Testa Pozzo Pneumo IdrauliciJob References: Wellhead Control Systems

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2001

Eni - Div. Agip

Eni - Div. Agip

N°5 quadri elettro - idraulici per comando pozzi isolati a singola string. Pressione di lavoro 6.000 psi.

N°5 electro - hydraulic wellhead control panels for isolated single string wells. Working pressure 6.000 psi.

Centro Olio Ragusa

Ragusa Oil Plant

Ragusa

Italy

290.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2000

Agip

Agip

Impianto completo di produzione gas con separatore 125.000Sm3/g , trappole di lancio e ricevimento da 14", riscaldatore a gas da 150.000Kcal/h, N°3 quadri idraulici di controllo pozzi, sistema di controllo e trasmissione dati, sistemi ausiliari - ATI con KomesComplete gas production plant with separator 125.000Sm3/d , launching and receiving traps 14", gas heater 150.000Kcal/h, N°3 hydraulic wellhead control panels, distributed control system and data transimission, auxiliary systems - JV with Komes

Campo Gas Di Samperi 1

Samperi 1 Gas Field

Enna

Italy

1.200.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2000

Tecnomare

Agip

N°1 quadro idraulico di controllo di due pozzi in esecuzione ridondante - 6000PSI

N°1 wellhead control panel for two wells, redundant execution - 6000PSI

Piattaforma Off-shore Emilio

Emilio Off-shore Platform

Adriatic Sea

Italy

168.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

1999

Agip

Agip

N°4 quadri di comando pozzi e valvole di superficie da 6000psi

N°4 wellhead and surface valves control panels - 6000psi

Campo Gas Di Fiume Salso

Fiume Salso Gas Field

Gela

Italy

186.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 15 di 130

21-gen-11

Page 17: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Quadri Testa Pozzo Pneumo IdrauliciJob References: Wellhead Control Systems

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

1999

Intermare Sarda

Agip

Quadro idraulico per il comando di 9 pozzi - 6000psi

Hydraulic wellhead control panel for 9 wells - 6000psi

Piattaforma Off-shore Annalisa

Off-shore Platform Annalisa

Adriatic Sea

Italy

197.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

1999

Agip

Agip

Quadro di comando di due pozzi (6.000psi) con cassetti estraibili in pressione - Serie Fastech

Wellhead control panel for two wells (6.000psi) with drawers removable under pressure - Fastech series

Campo Gas Di Colombarola

Colobarola Gas Field

Crema

Italy

60.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

1998

Agip

Agip

N°3 quadri idraulici di comando pozzi e n°7 pannelli pneumatici di comando valvole

N°3 hydraulic wellhead control panels and n°7 pneumantic local panel

Piattaforma Off-shore Garibaldi B & D

Offshore Platforms Garibaldi B & D

Adriatic Sea

Italy

75.500,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

1998

Agip

Agip

N°12 quadri idraulci di comando tre pozzi cadauno - Pressione di esercizio 250bar

N°12 hydraulic wellhead control panels for three wells each - Working pressure 250bar

Centro Olio Val D'agri

Val D'agri Oil Plant

Viggiano

Italy

940.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 16 di 130

21-gen-11

Page 18: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Quadri Testa Pozzo Pneumo IdrauliciJob References: Wellhead Control Systems

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

1997

Agip

Agip

Qaudro di comando pozzo elettro pneumo idraulico per pozzo isolato. Pressione di lavoro 6.000 psi.

Wellhead control panel electro pneumo hydroulic for isolated well. Working pressure 6.000 psi.

C.le Gas Hera Lacinia

Hera Lacinia Gas Plant

Crotone

Italy

58.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

1997

Agip

Agip

N°3 quadri di comando 12 e 24 pozzi - 10.000psi

N°3 wellhead control panels for 12 and 24 wells - 10.000psi

Piattaforme Off-shore Agostino A, Cervia A, Pc C

Off-shore Platforms Agostino A, Cervia A, Pc C

Adriatic Sea

Italy

170.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 17 di 130

21-gen-11

Page 19: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Cabine PrefabbricateJob References: Prefabricated Shelters

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2010

G E Oil & Gas

Snamretegas

N. 3 Sale controllo prefabbricate, complete di impianti di condizionamento, rilevazione fumo e fiamma e spegnimento incendi automatico a CO2.

N. 2 Control prefabricated rooms, complete with HVAC systems, fire and smoke detecting system and CO2 automatic fire fighting system.

C.le Gas Messina

Messina Gas Station

Messina

Italy

483.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2010

CGT

JVTS

N.1 Cabinato con resistenza al fuoco H60 J45 per motogeneratore Caterpillar completo di sistemi di condizionamento, ventilazione, sistemi elettrici e antincendio.

N.1 prefabricated cab with fire resistance H60 J45, to host a Caterpillar power generator, complete with HVAC system, electrical system, fire fighting and safety systems.

Campo Olio Di Kashagan

Kashagan Oil Field

Caspian Sea

Kazakistan

1.500.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2010

G E Oil & Gas

B P

N.1 Cabinato con control room e locale batterie con resistenza al fuoco A60 e resistente a sovrapressione dovuta a scoppio completo di sistema di condizionamento, ventilazione, sistemi elettrici e antincendioN.1 Local control cabinet with battery cabin with fire resistance A60 and "blast resistant", complete with HVAC system, electrical system, fire fighting system and safety systems

In Amenas Field

In Amenas Field

Onshore Algeria

Algeria

508.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2010

G E Oil & Gas

Chevron Australia

N.6 Cabinati di controllo locale per turbine GE, completi di HVAC, sistema antincendio, sistema UPS, quadri di media e bassa tensione e sistema di controllo

N.6 Local control cabs for GE turbines, complete with HVAC, fire fighting systems, UPS, medium and low voltage electrical panels and control system

Progetto Gorgon

Gorgon Project

Onshore

Australia

3.060.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 18 di 130

21-gen-11

Page 20: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Cabine PrefabbricateJob References: Prefabricated Shelters

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2009

G E Oil & Gas

ENI Div. Congo

N. 1 Sala controllo prefabbricata e Pannelli Elettrici per controllo turbine, complete di impianto di condizionamento, rilevazione fumo e fiamma e spegnimento incendi automatico

N. 1 prefabricated control room and electrical panels for turbines local control, complete with HVAC system, fire and smoke detecting system and automatic fire fighting system

M' Boundi Project

M' Boundi Project

On-shore

Congo

1.314.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2008

G E Oil & Gas

Petrobras

N. 2 Sale controllo prefabbricate, complete di impianti di condizionamento, rilevazione fumo e fiamma e spegnimento incendi automatico a CO2.

N. 2 Control prefabricated rooms, complete with HVAC systems, fire and smoke detecting system and CO2 automatic fire fighting system.

Marlim sul field development FPSO P56

Marlim sul field development FPSO P56

Atlantic Ocean

Brasil

780.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2007

G E Oil & Gas

Shell

N. 6 Sale controllo prefabbricate per controllo turbine, complete di impianto di condizionamento, rilevazione fumo e fiamma e spegnimento incendi

N. 6 prefabricated control rooms for turbines local control, complete with HVAC system, fire and smoke detecting system and fire fighting system.

Impianto Liquefazione Gas Pearl GTL

Pearl GTL Gas Liquefaction Plant

Ras Laffan

Qatar

2.415.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2007

G E Oil & Gas

Shell - Woodside

N. 4 Sale controllo prefabbricate per controllo turbine, complete di impianto di condizionamento, rilevazione fumo e fiamma e spegnimento incendi

N. 4 prefabricated control rooms for turbines local control, complete with HVAC system, fire and smoke detecting system and fire fighting system

Impianto Liquefazione Gas di Pluto

Pluto Gas Liquefaction Plant

Onshore

Australia

1.750.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 19 di 130

21-gen-11

Page 21: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Cabine PrefabbricateJob References: Prefabricated Shelters

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2006

Alcon

N A O C

N. 2 Shelter per turbo generatori e turbo compressori completamente attrezzati con carri ponte ed utilities, superficie totale 1.400 m2

N. 2 Shelters for turbo generators and turbo compressors fully equipped with over head cranes and utilities, total covered surface 1.400 m2

I D U

I D U

Port Harcourt

Nigeria

579.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2006

G E Oil & Gas

Conoco Phillips

N.2 Sale controllo prefabbricate per controllo turbine, complete di impianto di condizionamento, rilevazione fumo e fiamma e spegnimento incendi.

N. 2 Prefabricated control rooms for turbined local control, complete with HVAC system, fire and smoke detecting system and fire fighting system.

Progetto Bohay Bay

Bohay Bay Project

Chinese Sea

China

740.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2006

G E Oil & Gas

Shell - Woodside

N. 1 Sala controllo prefabbricata per controllo turbina, completa di impianti di condizionamento, rilevazione fumo e fiamma e spegnimento incendio.

N. 1 Prefabricated Control Room for turbine local control, complete of HVAC system, fire and smoke detection system and fire fighting system.

Impianti Vari

Various Plants

Onshore.

Australia

500.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2005

Alcon

N A O C

No. 1 Edificio elettrico e di controllo prefabbricato a due piani da 1.600 m2, completo di impianti e sistemi F&G e HVAC

No. 1 Electrical and control prefabricated building on two floors, having a total surface of 1.600 m2, complete of all systems including F&G and HVAC.

Campo Gas Di I D U

I D U Gas Field

Port Harcourt

Nigeria

1.270.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 20 di 130

21-gen-11

Page 22: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Cabine PrefabbricateJob References: Prefabricated Shelters

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2005

G E Oil & Gas

Petrobras

N. 2 Sale controllo prefabbricate complete di impianti di condizionamento, rilevazione fumo e fiamma e spagnimento incendi.

N. 2 prefabricated control rooms complete of HVAC system, fire and smoke detection system and fire fughting system.

F P S O P54

F P S O P54

Atlantic Ocean

Brasil

1.020.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2005

G E Oil & Gas

Petrobras

N.2 Sale controllo prefabbricate, complete di impianti di condizionamento, rilevazione fumo e fiamma e spegnimento incendi.

N.2 Control prefabricated rooms, complete with HVAC systems, fire and smoke detecting system and fire fighting system.

F P S O P51

F P S O P51

Atlantic Ocean

Brasil

720.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2004

G E Oil & Gas

Marathon Oil

Sala controllo prefabbricata completa di impianto di condizionamento, rivelazione fumo e fiamma, spegnimento incendi

Prefabricated control room with air conditioning system, fire and smoke detection, fire fighting

Campo Olio Di Alba

Alba Oil Filed

Malabo

Guinea Equatoriale

587.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2004

G E Oil & Gas

Pemex

N°2 sale controllo prefabbricate complete di impianti di condizionamento, rivelazione fumo e fiamma, spegnimento incendi

N°2 prefabricated control rooms with air conditioning system, fire and smoke detection, fire fighting

Raffineria Di Atasta

Atasta Refinery

Atasta

Mexico

472.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 21 di 130

21-gen-11

Page 23: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Cabine PrefabbricateJob References: Prefabricated Shelters

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2004

G E Oil & Gas

Petrobras

N°2 sale controllo prefabbricate complete di impianti di condizionamento, rivelazione fumo e fiamma, spegnimento incendi

N°2 prefabricated control rooms with air conditioning system, fire and smoke detection, fire fighting

F P S O P52

F P S O P52

Atlantic Ocean

Brasil

700.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2004

Eni - Div. Agip

Eni - Div. Agip

Complesso di generazione energia di emergenza da 137KVA con motore a gas - ATI con Fores Engineering

Emergency power generation package of 137KVA with gas engine - JV with Fores Engineering

Piattaforma Off-shore Garibaldi B & D

Offshore Platforms Garibaldi B & D

Adriatic Sea

Italy

1.166.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2003

G E Oil & Gas

Marathon Oil

N°1 sala controllo prefabbricata completa di impianti di condizionamento, rivelazione fumo e fiamma, spegnimento incendi

N°1 prefabricated control room with air conditioning system, fire and smoke detection, fire fighting

Campo Olio Di Alba

Alba Oil Filed

Malabo

Guinea Equatoriale

593.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2003

Ciet

Telecom Italia Mobile

n°2 cabina per apparati di telecomunicazione rete GSM

n°2 prefabricated shelters for GSM telecomunication network

Siti Vari

Various Sites

Varie

Italy

115.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 22 di 130

21-gen-11

Page 24: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Cabine PrefabbricateJob References: Prefabricated Shelters

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2003

Eni - Div. Agip

Eni - Div. Agip

Cabinato per reiniezione acqua con motore a gas - Portata: 10 - 25m3/h - Pressione: 85bar

Prefabricated cabinet for water injection with gas engine - Flow: 10 - 25m3/h - Pressure: 85bar

C.le Gas Ravenna Mare

Ravenna Mar Gas Plant

Ravenna

Italy

515.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2002

G E Oil & Gas

Marathon Oil

N°3 sale controllo prefabbricate complete di impianti di condizionamento, rivelazione fumo e fiamma, spegnimento incendi

N°3 prefabricated control room with air conditioning system, fire and smoke detection, fire fighting

Campo Olio Di Alba

Alba Oil Filed

Malabo

Guinea Equatoriale

1.054.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2002

Enppi

Fayum GasCo(Shell Gas BV)

N.2 Sala controllo remota con PLC tipo PRMS

N.2 PRMS control system - remoted controlled PLC

Kom Aushim Gas Field

Kom Aushim Gas Field

Onshore Egypt

Egypt

920.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2002

Ciet

Telecom Italia Mobile

N°21 cabine per apparati di telecomunicazione rete GSM

N°21 prefabricated shelters for GSM telecomunication network

Siti Vari

Various Sites

Varie

Italy

823.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 23 di 130

21-gen-11

Page 25: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Cabine PrefabbricateJob References: Prefabricated Shelters

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2002

Imet

Telecom Italia Mobile

N°2 cabina per apparati di telecomunicazione rete GSM

N°2 prefabricated shelter for GSM telecomunication network

Siti Vari

Various Sites

Varie

Italy

84.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2001

Abb Energy Automation

Enel

Realizzaione della sala controllo per due gruppi di generazione energia da 250MW cadauno

Construction of control room for two power generator of 250MW each

Centrale Elettrica Di Porto Corsini

Porto Corsini Power Plant

Ravenna

Italy

552.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2001

Ciet

Telecom Italia Mobile

N° 26 cabine per apparati di telecomunicazione rete GSM.

N°26 prefabricated shelters for GSM telecomunication network

Siti Vari

Various Sites

Varie

Italy

955.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2001

G E Oil & Gas

Total

N°2 sale controllo prefabbricate complete di impianti di condizionamento, rivelazione fumo e fiamma, spegnimento incendi

N°2 prefabricated control room with air conditioning system, fire and smoke detection, fire fighting

Piattaforma Off-shore Tunu 8

Off-shore Platform Tunu 8

Indian Ocean

Indonesia

742.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 24 di 130

21-gen-11

Page 26: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Cabine PrefabbricateJob References: Prefabricated Shelters

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2001

Sirti

Telecom Italia Mobile

N°6 cabine per apparati di telecomunicazione rete GSM

N°6 prefabricated shelters for GSM telecomunication network

Siti Vari

Various Sites

Varie

Italy

347.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2000

Tozzi Sud

Petrobel

Cabina per sottostazione di distribuzione elettrica

Prefabricated cabinet for electrical distribution substation

Campo Gas Di Temsah

Temsah Gas Field

Cairo

Egypt

354.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2000

Mbf Edilizia

Telecom Italia Mobile

N°1 cabina per apparati di telecomunicazione rete GSM

N°1 prefabricated shelter for GSM telecomunication network

Siti Vari

Various Sites

Varie

Italy

40.300,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2000

Nuovo Pignone

K I O

N°3 sale controllo turbocompressori e N°1 sala controllo utilities prefabbricate complete di impianti di condizionamento, rivelazione fumo fiamma e gas, spegnimento incendi

N°3 turbocompressor prefabricated control room and N°1utilities prefabricated control room with air conditioning system, smoke fire and gas detection, fire fighting

Campo Olio Di Karachaganak

Karachaganak Oil Field

Alma Ata

Kazakistan

577.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 25 di 130

21-gen-11

Page 27: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Cabine PrefabbricateJob References: Prefabricated Shelters

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2000

Agip

Agip

N°2 complessi di generazione energia di emergenza da 137KVA cadauno - ATI con Fores Engineering

N°2 emergency power generator packages of 137KVA each - JV with Fores Engineering

Piattaforme Off-shore Agostino A & B

Off-shore Platforms Agostino A & B

Adriatic Sea

Italy

1.917.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2000

Ciet

Telecom Italia Mobile

N°25 cabine per apparati di telecomunicazione rete GSM

N°25 prefabricated shelters for GSM telecomunication network

Siti Vari

Various Sites

Varie

Italy

1.003.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

1999

Rashpetco

Rashpetco

Modulo alloggi per 16 persone completo di tutte le attrezzature interne

Living quarter for 16 person complete with all internal forniture

Piattaforma Off-shore Rosetta

Rosetta Off-shore Platform

Cairo

Egypt

680.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

1999

Icot

Telecom Italia Mobile

N°3 cabine per apparati di telecomunicazione rete GSM

N°3 prefabricated shelters for GSM telecomunication network

Siti Vari

Various Sites

Varie

Italy

182.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 26 di 130

21-gen-11

Page 28: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Cabine PrefabbricateJob References: Prefabricated Shelters

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

1999

Nuovo Pignone

Total

N°2 sale controllo prefabbricate complete di impianti di condizionamento, rivelazione fumo e fiamma, spegnimento incendi

N°2 prefabricated control room with air conditioning system, fire and smoke detection, fire fighting

Piattaforma Off-shore Tunu 7

Off-sore Platform Tunu 7

Indian Ocean

Indonesia

544.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

1998

Enppi

Agiba

Cabina di distribuzione energia completa di quadri di distribuzione e impianti ausiliari

Prefabricated cabinet for power distribution with electrical distrbution boards and auxiliary plants

Campo Olio Di Meleiha

Meleiha Oil Fiels

Western Desert

Egypt

229.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

1998

Agip

Agip

N°3 cabine per produzione aria strumenti con essicatori e compressori

N°3 prefabricated cabins for instrument air dryers and compressors

Centro Olio Val D'agri

Val D'agri Oil Plant

Viggiano

Italy

160.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

1997

Nuovo Pignone

B P Exploration

Sala controllo prefabbricata completa di impianto di condizionamento, rivelazione fumo e fiamma, spegnimento incendi

Preabricated control room with air conditioning system, fire and smoke detection, fire fighting

Centrale Elettrica Di Cupiaga

Cupiaga Power Plant

Cupiaga

Colombia

145.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 27 di 130

21-gen-11

Page 29: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Cabine PrefabbricateJob References: Prefabricated Shelters

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

1997

A C E A

A C E A

N°8 cabine prefabbricate con trasformatore MT/BT e quadri di distribuzione energia

N°8 prefabricated cabins with power transformer /MV/LV and power distribution panels

Siti Vari

Various Sites

Varie

Italy

140.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

1997

Procter & Gamble

Procter & Gamble

Laboratorio analisi completo di strumenti per il controllo di qualità

Analisys cabinet with instruments for quality control

Impianto Chimico

Chemical Plant

Novomoskovsk

Russia

116.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

1996

Nuovo Pignone

B P Exploration

Sala controllo prefabbricata completa di impianto di condizionamento, rivelazione fumo e fiamma, spegnimento incendi

Preabricated control room with air conditioning system, fire and smoke detection, fire fighting

Centrale Elettrica Di Cusiana

Cusiana Power Plant

Cupiaga

Colombia

145.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 28 di 130

21-gen-11

Page 30: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Sistemi di Processo VariJob References: Process Packages Various

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2010

ErSai (Saipem Kazakhstan)

Agip Kco

Fornitura package bombole per stoccaggio aria - pressione progetto: 450barg - per teamporary refuge barge offshore - progetto breathing air system

High pressure cylinders package for breathing air system - design pressure: 450barg - for temporary refuge barge offshore - Breathing air system project

Campo Offshore Di Kashagan

Kashagan Offshore Field

Caspian Sea

Kazakistan

1.882.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2010

UOP Illinois

Gulf Farabi

N.6 Skid PEP

N.6 Bed PEP skid

Impianto Petrolchimico

Petrochemical Plant

Jama'a

UAE

184.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2010

ErSai (Saipem Kazakhstan)

Agip Kco

N.1 Breathing air system composto da N.10 compressori per generazione aria a 450barg, skid riduzione e controllo pressione e sistemi linee di distribuzione aria e ricarica dei sistemi di respirazione su temporary refuge barge offshoreN.1 Breathing air system completed of N.10 air compressor at 450barg, pressure reduction skid, control pressure and distribution lines for breathing air vessels on temporary refuge barge offshore

Campo Offshore Di Kashagan

Kashagan Offshore Field

Caspian Sea

Kazakistan

3.218.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2010

Haldor Topsoe

EFCO

N.1 Impianto hot oil + scambiatore

N.1 Hot oil plant plus heat exchanger

Impianto Petrolchimico EFCO

EFCO Petrochemical Plant

Mosca

Russia

186.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 29 di 130

21-gen-11

Page 31: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Sistemi di Processo VariJob References: Process Packages Various

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2010

U O P

Sener Cobra Castor

Costruzione e fornitura di Separex Membrane Skids e Scavenger Skids

Construction and supply of Separex Membrane Skids and Scavenger Skids

Raffineria di Sener Cobra

Sener Cobra Refinery

Onshore

Spain

1.791.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2010

U O P Usa

Air Liquide Gulf Coast

N.1 Unità PSA (Polybed Swing Adsorbtion) a 12 letti

N.1 x 12 beds PSA (Polybed Swing Adsorbtion) Unit

Impianto Petrolchimico Air Liquid di Heracles

Heracles Air Liquid Petrochemical Plant

Onshore

USA

692.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2010

Haldor Topsoe

YPF

N.1 impianto HTCR per produzione idrogeno; portata: 6.000 Nm3/hr

N.1 HTCR H2 plant; flowrate: 6.000 Nm3/hr

Raffineria di Mendoza

Mendoza refinery

Mendoza

Argentina

3.700.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2009

U O P

Sonatrach

N. 1 Separex Membrane Unit

N. 1 Separex Membrane Unit

Arzew Project

Arzew Project

Unk.

Algeria

1.540.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 30 di 130

21-gen-11

Page 32: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Sistemi di Processo VariJob References: Process Packages Various

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2009

U O P Usa

Takreer

N. 1 Unità PSA (Polybed Swing Adsorbtion) a 10 letti

N. 1 x 10 beds PSA (Polybed Swing Adsorption) Unit

GDP Takreer

GDP Takreer

Onshore UAE

UAE

625.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2009

Tamoil SA

Tamoil SA

N. 1 Sistema di iniziezione ammoniaca per ridurre emissione di Nox nel gas di scarico. Portata soluzione ammoniaca 250 kg/h @ 6 barg.

N. 1 Ammonia Injection Skid for reducing Nox emission in exhaust gas. Ammonia solution flow rate 250 kh/h @ 6 barg.

Raffineria di Collombey

Collombey Refinery

Collombey

Switzerland

240.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2009

U O P

Cafco

N. 2 Polysep Membrane Skids

N. 2 Polysep Membrane Skids

H6520 Cafco

H6520 Cafco

Onshore Qatar

Qatar

500.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2009

U O P

Rompetrol / TBTV

N. 1 Unità PSA (Polybed Swing Adsorbtion) a 10 letti

N. 1 x 10 beds PSA (Polybed Swing Adsorption) Unit

Raffineria di Rompetrol

Rompetrol Refinery

Constanta

Romania

448.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 31 di 130

21-gen-11

Page 33: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Sistemi di Processo VariJob References: Process Packages Various

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2008

Petrojet

Khalda Petr. Co (Apache)

Sistemi per la condensazione di gas naturale da 150.000 kg/hr

Additional condensate facilities; flowrate: 150.000 kg/hr condenaste

Qasr Gas plant

Qasr Gas plant

Egyptian desert

Egypt

3.298.400,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2008

Intermare Sarda

N A O C

N.12 Collettori da 4" per produzione e test di gas

N.12 Stream diam. 4" - Production and test manifolds

Olowi Platform

Olowi Platform

Atlantic Ocean Nigeria

Nigeria

2.308.400,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2008

Intermare Sarda

N A O C

N.8 Collettori per gas da 4"

N.8 Gas lift manifolds; diam. 4"

Olowi Platform

Olowi Platform

Atlantic Ocean Nigeria

Nigeria

2.489.500,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2008

Rosetti Marino SpA

Edina

N. 2 Diesel Fuel Skids e N. 2 Oily Water Filtration and Treatment Skids

N. 2 Diesel Fuel Skids e N. 2 Oily Water Filtration and Treatment Skids

Piattaforma Isabella Nord Sud

Izabella North South Platform

Adriatic Sea

Croatia

520.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 32 di 130

21-gen-11

Page 34: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Sistemi di Processo VariJob References: Process Packages Various

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2008

U O P

Lukoil norsi

N. 1 Unità PSA (Polybed Swing Adsorbtion) a 10 letti

N. 1 x 10 beds PSA (Polybed Swing Adsorption) Units

Raffineria di Lukoil norsi

Lukoil norsi Refinery

Nižnij Novgorod

Russia

478.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2008

Snamprogetti

SEF

N. 1 Sistema di riduzione pressione gas naturale

N. 1 Natural Gas Pressure Reducing Station

C.le Termica CTE 2

Ferrara CTE 2 Thermal Station

Ferrara

Italy

105.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2008

Air Liquid

Air Liquid

No. 1 Cold Box Skid

No. 1 Cold Box Skid

EZZ - Sigma

EZZ - Sigma

Alexandria

Egypt

642.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2008

U O P

Grupa Lotos

N. 1 Unità PSA (Polybed Swing Adsorbtion) a 12 letti

N. 1 x 12 beds PSA (Polybed Swing Adsorption) Units

Impianti Vari

Various Plants

Onshore.

Australia

555.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 33 di 130

21-gen-11

Page 35: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Sistemi di Processo VariJob References: Process Packages Various

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2008

U O P

Ecopetrol

N. 2 Unità PSA (Polybed Swing Adsorbtion) a 6 letti

N. 2 x 6 beds PSA (Polybed Swing Adsorption) Units

Barranca Bermeja

Barranca Bermeja

Barranca Bermeja

Colombia

500.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2008

Air Liquid

Air Liquid

N. 2 Unità PSA (Polybed Swing Adsorbtion) a più letti, Modulo B & M

N. 2 x multi beds PSA (Polybed Swing Adsorption) Units Modules B & M

Esterreja Hyco 3

Esterreja Hyco 3

Porto

Portugal

1.368.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2008

Air Liquid

Air Liquid

No. 1 Warm skid

No. 1 Warm skid

EZZ - Sigma

EZZ - Sigma

Alexandria

Egypt

306.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2007

U O P

PKN Orlen

N. 1 Unità PSA (Polybed Swing Adsorbtion) a 10 letti per purificazione idrogeno

N. 1 x 10 beds PSA (Polybed Swing Adsorption) Unit for hydrogen purification

Impianto Petrolchimico di Orlen

Orlen Petrolchemical Plant

Orlen

Poland

408.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 34 di 130

21-gen-11

Page 36: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Sistemi di Processo VariJob References: Process Packages Various

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2007

Enppi

Agiba

N.1 Treno di pompaggio greggio da 40 m3/hr; prevalenza: 18 bar

N.1 Oil pumping train; flowrate: 40 m3/hr; pressure: 18 bar

West Ashrafi plant

West Ashrafi plant

Egyptian desert

Egypt

106.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2007

Sadelmi Power

Saudi Cement Company

N. 1 impianto rimozione H2S da olio combustibile con N. 1 colonna di strippaggio dia. 1,4 m x h 2,5 m. Portata olio 50 m3/h @ 1,14 bar. H2S contenuto in uscita < 5 ppm wt. Il sistemè è completo di tutte le apparecchiature ausiliarie.N. 1 package for H2S removal from Crude Oil composed of N. 1 stripping column dia. 1,4 m x h 2,5 m. Crude oil Flow Rate 50 m3/h @ 1,14 bar. H2S content in outlet < 5 ppm wt. The package is complete with all auxiliary systems.

Hofuf Power Plant

Hofuf Power Plant

Hofuf

Saudi Arabia

1.075.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2007

U O P

Foster Wheeler

N. 1 Unità PSA (Polybed Swing Adsorbtion) a 10 letti

N. 1 x 10 beds PSA (Polybed Swing Adsorption) Unit

ISAB Energy

ISAB Energy

Priolo

Italy

923.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2007

Air Liquid

Sipchem

N. 5 Skids di processo per produzione azoto

N. 5 process warm skids for nitrogen production

Impianto Petrolchimico Jubail Acetyls Complex

Petrochemical Plant Jubail Acetyls Complex

Jubail Industrial City

Saudi arabia

422.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 35 di 130

21-gen-11

Page 37: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Sistemi di Processo VariJob References: Process Packages Various

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2007

U O P

Reliance

N. 1 Unità PSA (Polybed Swing Adsobtion) a 10 letti per purificazione idrogeno

N. 1 x 10 beds PSA (Polybed Swing Adsorbtion) unit for hydrogen purification

Raffineria Di Gujarat

Gujarat Refinery

Gujarat

India

448.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2007

Busi Impianti SpA

Hera Multy Utilities

N. 1 Impianto prototipo per la produzione di bio gas da fermentazione di residui organici in ambiente anaerobico

N. 1 Pilot plant for bio-gas production from fermentation of organic waste in anaerobic environment

Centrale Hera Corticella

Corticella Hera Plant

Bologna

Italia

1.110.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2007

Haldor Topsoe

EFCO

N. 1 Impianto produzione idrogeno da 300 m3/hr

N. 1 Hydrogen producing plant capacity 300 m3/hr

Impianto Petrolchimico EFCO

EFCO Petrochemical Plant

Mosca

Russia

510.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2007

U O P

Mazeikiu Nafta

N. 1 Unità PSA (Polybed Swing Adsorbtion) a 10 letti per purificazione idrogeno

N. 1 x 10 beds PSA (Polybed Swing Adsorption) Unit for hydrogen purification

Raffineria di Mazeikiu

Mazeikiu Refinery

Mazeikiu

Lithuania

428.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 36 di 130

21-gen-11

Page 38: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Sistemi di Processo VariJob References: Process Packages Various

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2006

U O P

Samir Refinery Morocco

N. 1 Sistema Pressure Swing Adsorption (PSA) a 12 letti + N. 1 Sistema Pressure Swing Adsorption (PSA) a 6 letti per purificazione idrogeno.

N. 1 x 12 Beds Pressure Swing Adsorption (PSA) Skid + N. 1 x 6 Beds Pressure Swing Adsorption (PSA) Skid for hydrogen purification.

Raffineria di Samir

Samir Refinery

Casablanca

Morocco

647.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2006

Enppi

Khalda Petr. Co (Apache)

N.3 Treni di pompaggio; portata: 115 m3/hr; prevalenza: 720 mt

N.3 Shipping pumps trains; flowrate: 115 m3/hr; pressure: 720 mt

Kahram Oil Field

Kahram Oil Field

Kahram

Egypt

755.900,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2006

U O P

O G D C

N. 1 Skid di raffreddamento + n. 1 skid di raffreddamento gas + n. 1 skid compressore

N. 1 Chiller skid + n. 1 gas cooling skid + n. 1 compressor skid

C.le Gas Quadripur

Quadripur Gas Plant

Islamabad

Pakistan

458.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2006

Enppi

Khalda Petr. Co (Apache)

N.3 Sistemi di pompaggio booster da 115 m3/hr cad.; prevalenza: 72 mt

N.3 Booster pumps trains; flowrate: 115m3/hr each; pressure: 72 mt

Kahram Oil Field

Kahram Oil Field

Kahram

Egypt

456.780,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 37 di 130

21-gen-11

Page 39: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Sistemi di Processo VariJob References: Process Packages Various

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2006

U O P

O G D C

Fornitura di un package comprendente N. 1 skid con 49 housing per membrane filtrazione gas naturale, N. 1 unità memguard per produzione idrogeno da gas naturale.

Supply of one package including N. 1 skid with 49 membrane housings for natural gas filtration, N.1 memguard unit for hydrogen production from natural gas.

C.le Gas Quadripur

Quadripur Gas Plant

Islamabad

Pakistan

859.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2005

Alcon

N A O C

No. 1 sistema raccolta drenaggi impianto, completo di pompe di trasferimento, vessel diametro 2.000 mm, lunghezza (tang to tang) 6.000 mm.

No. 1 plant closed drain system, complete of transfer pumps, vessel diameter 2.000 mm, length (tang to tang) 6.000 mm.

Campo Gas Di I D U

I D U Gas Field

Port Harcourt

Nigeria

140.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2004

Petrojet

Khalda Petr. Co (Apache)

N.2 Sistemi di rimozione mercurio da gas; portata: 120.000 m3/hr; pressione: 100 bar

N.2 Mercury removal packages; flowrate:120.000 m3/hr; pressure: 100 bar

Salam Gas Plant

Salam Gas Plant

Onshore Egypt

Egypt

3.085.800,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2004

Air Liquid

Air Liquid

Polybed Pressure Swing Adsorption (PSA) per purificazione idrogeno con skid accessori (scambiatori e trattamento butano)

Polybed Pressure Swing Adsorption (PSA) for hydrogen purification with accessories (heat exchanger and butane treatment)

Raffineria Di Priolo

Priolo Refinery

Priolo

Italy

887.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 38 di 130

21-gen-11

Page 40: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Sistemi di Processo VariJob References: Process Packages Various

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2004

U O P

Total

Polybed Pressure Swing Adsorption (PSA) per purificazione idrogeno

Polybed Pressure Swing Adsorption (PSA) fore hidrogen purification

Raffineria Di Gonfreville

Gonfreville Refinery

Gonfreville

France

628.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2004

U O P

Fortum

No. 1 Unità Polybed Pressure Swing Adsorption (PSA) a 12 letti per purificazione idrogeno.

No. 1 x 12 beds Polybed Pressure swing Adsorption (PSA) unit for hydrogen purification.

Raffineria Di Porvoo

Porvoo Refinery

Porvoo

Finland

620.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2004

Air Liquid

Repsol

Polybed Pressure Swing Adsorption (PSA) per purificazione idrogeno

Polybed Pressure Swing Adsorption (PSA) for hydrogen purification

Impianto Petrolchimico

Petrochemical Plant

La Coruna

Spain

458.500,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2004

U O P

Bapco

N° 2 Polybed Pressure Swing Adsorption (PSA) per purificazione idrogeno

N°2 Polybed Pressure Swing Adsorption (PSA) for hydrogen purification

Raffineria Di Manama

Manama Refinery

Manama

Bahrain

700.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 39 di 130

21-gen-11

Page 41: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Sistemi di Processo VariJob References: Process Packages Various

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2004

Enppi

Belayim Pet.Co.(Petrobel)

N.1 Sistema di collettori per 9 stream di misura rating 600# in DUPLEX

N.1 Manifold skid for 9 streams rating 600# DUPLEX material

Baltim platform

Baltim platform

Mediterranean Sea

Egypt

649.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2004

Petrojet

Khalda Petr. Co (Apache)

N.1 Sistema rimozione mercurio da gas; portata: 120.000 m3/hr, pressione: 100 bar

N.1 Mercury removal package; flowrate: 120.000 m3/hr, pressure: 100 bar

Tarek Gas Plant

Tarek Gas Plant

Onshore Egypt

Egypt

1.542.900,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2004

Enppi

Belayim Pet.Co.(Petrobel)

N.1 Skid collegamento strumentazione per gas system da 600 m3/hr

N.1 Instrument gas skid for gas system; flowrate: 600 m3/hr

Baltim platform

Baltim platform

Mediterranean Sea

Egypt

280.450,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2003

U O P

O G D C

Impianto di separazione idrogeno a membrane con 98 moduli.

Hydrogen separex membrane system with 98 modules.

C.le Gas Quadripur

Quadripur Gas Plant

Islamabad

Pakistan

692.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 40 di 130

21-gen-11

Page 42: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Sistemi di Processo VariJob References: Process Packages Various

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2003

Enppi

Unit.Gas Deriv.Co(BP/ENI)

N.1 Skid generazione idrogeno; portata 100.000Nm3/hr, pressione: 7bar

N.1 Nitrogen generation skid; flowrate: 100.000 Nm3/hr, pressure: 7bar

Damietta Gas Plant

Damietta Gas Plant

Port Said

Egypt

346.070,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2003

U O P

N A O C

Impianto di separazione a membrane, impianto di filtrazione e sistema di misura gas

Separex membrane system, gas filtration system and gas metering system

Stazione Di Compressione Di Irri

Irri Compression Station

Lagos

Nigeria

1.638.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2002

U O P

Basf

Polybed Pressure Swing Adsorption (PSA) per purificazione idrogeno.

Polybed Pressure Swing Adsorption (PSA) for hydrogen purfication

Impianto Chimico

Chemical Plant

Antwerp

Belgium

740.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2002

U O P

O M V

Polybed Pressure Swing Adsorption (PSA) per purificazione idrogeno da off-gas di raffineria

Polybed Pressure Swing Adsorption (PSA) for hydrogen purification from refinery off-gas

Raffineria Di Schwechat

Schwechat Refinery

Schwechat

Austria

265.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 41 di 130

21-gen-11

Page 43: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Sistemi di Processo VariJob References: Process Packages Various

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2002

Enppi

Badredin Petr.Co (Shell)

Revamping sistema shut down di impianto trattamento gas

Gas treatment plant - shut down revamping

Obayed Gas Field

Obayed Gas Field

Onshore Egypt

Egypt

125.890,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2002

Enppi

Fayum GasCo(Shell Gas BV)

N.4 Trappole di lancio per PIG 12"x8" e 16" x 12", pressione: 77 bar

N.4 PIG launchers 12"x8" and 16" x 12", pressure: 77 bar

Kom Aushim Gas Field

Kom Aushim Gas Field

Onshore Egypt

Egypt

280.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2002

U O P

O G D C

Impianto di trattamento gas con filtri, separatori e filtri a membrane "separex"

Gas treatment package with filters, separators and membrane filters "separex"

C.le Gas Quadripur

Quadripur Gas Plant

Islamabad

Pakistan

1.373.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2002

Enppi

Fayum GasCo(Shell Gas BV)

N. 1 Skid emergenza shut-down; portata 70.000 Nm3/hr, 77 bar

N.1 Emergency shut down skid; flow rate 70.000 Nm3/hr, 77 bar

Kom Aushim Gas Field

Kom Aushim Gas Field

Onshore Egypt

Egypt

195.800,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 42 di 130

21-gen-11

Page 44: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Sistemi di Processo VariJob References: Process Packages Various

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2001

International Power

N. 1 Skid emergenza shut-down; portata 130.000 Nm3/hr, 77 bar

N. 1 Emergency shut down skid; flow rate 130.000 Nm3/hr, 77 bar

Al Kamil Field

Al Kamil Field

Onshore Oman

Oman

205.460,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2001

U O P Usa

Grupo Alvica

Polybed Pressure Swing Adsorption (PSA) per produzione idrogeno

Polybed Pressure Swing Adsorption (PSA) for hydrogen production

Raffineria Hamaca

Hamaca Refinery

Josè

Venezuela

890.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2000

Agip

Agip

Impianto completo di produzione gas con separatore 125.000Sm3/g , trappole di lancio e ricevimento da 14", riscaldatore a gas da 150.000Kcal/h, N°3 quadri idraulici di controllo pozzi, sistema di controllo e trasmissione dati, sistemi ausiliari - ATI con KomesComplete gas production plant with separator 125.000Sm3/d , launching and receiving traps 14", gas heater 150.000Kcal/h, N°3 hydraulic wellhead control panels, distributed control system and data transimission, auxiliary systems - JV with Komes

Campo Gas Di Samperi 1

Samperi 1 Gas Field

Enna

Italy

1.200.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2000

U O P

Q-chem

Polybed Pressure Swing Adsorption (PSA) per purificazione e raffreddamento idrogeno da off-gas di raffineria

Polybed Pressure Swing Adsorption (PSA) for hydrogen cooling system and purification from refinery off-gas

Impianto Petrolchimico

Petrochemical Plant

Mesaieed

Qatar

475.700,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 43 di 130

21-gen-11

Page 45: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Sistemi di Processo VariJob References: Process Packages Various

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

1999

U O P

Petronor

Polysep Pressure Swing Adsorption (PSA) per purificazione idrogeno e moduli di purificazione a membrane

Polysep Pressure Swing Adsorption (PSA) for hydrogen purification and membrane modules

Impianto Petrolchimico

Petrochemical Plant

Sommorostro

Spain

420.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

1998

Enichem

Enichem

Modulo di processo chimico per produzione metaxilene - Dimensioni 12mt (l) x 8mt (p) x 8mt (h) - Processo fornito da Reitheon E&C

Chemical process module for metaxilene production - Dimensions 12mt (l) x 8mt (w) x 8mt (h) - Process by Reitheon E&C

Impianto Petrolchimico

Petrochemical Plant

Sarroch

Italy

760.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

1998

Enichem

Enichem

Impianto pilota per la produzione sperimentale di gomma in esecuzione package

Pilot plant for rubber experimental production - Package execution

Impianto Petrolchimico

Petrochemical Plant

Ravenna

Italy

420.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

1998

U O P

Saras

Package di filtrazione idrogeno con 72 moduli a membrane - Seconda linea

Hydrogen filtering package with 72 membrane module - Second line

Raffineria Di Sarroch

Sarroch Refinery

Sarroch

Italy

450.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 44 di 130

21-gen-11

Page 46: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Sistemi di Processo VariJob References: Process Packages Various

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

1997

U O P

Saras

Package di filtrazione idrogeno con 72 moduli a membrane - Prima linea

Hydrogen filtering package with 72 membrane module - First line

Raffineria Di Sarroch

Sarroch Refinery

Sarroch

Italy

510.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

1997

Sicon Oil&gas (CCC Group)

O G D C

N°4 package di separazione gas da 40MMscf/g, N°4 trappole di lancio e ricevimento pig da 12" e 6", N°11 package di iniezione chemical , N°2 sistemi di misura fiscale gas con orifizi calibrati da 6".

N°4 gas separation packages for 40MMscf/d, N°4 launching and receivign traps 12" and 6", N°11 chemical injection packages, N°2 gas metering systems with senior calibrated orefice 6".

Campo Gas Di Panjpir

Panjpir Gas Field

Panjpir

Pakistan

860.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

1996

Procter & Gamble

Procter & Gamble

Impianto trasportabile per la produzione di candeggina

Mobile bleach production plant

Impianto Chimico

Chemical Plant

Esquintla

Guatemala

153.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

1996

Procter & Gamble

Procter & Gamble

Impianto per la produzionr detergenti liquidi montato su skid

Skid mounted liquid detergent production plant

Impianto Chimico

Chemical Plant

Dammam

Saudi Arabia

600.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 45 di 130

21-gen-11

Page 47: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Sistemi di Processo VariJob References: Process Packages Various

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

1996

Procter & Gamble

Procter & Gamble

Impianto trasportabile per la produzione di candeggina

Mobile bleach production plant

European Technical Center

European Technical Center

Bruxelles

Belgium

290.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

1996

Procter & Gamble

Procter & Gamble

Impianto trasportabile per la produzione di candeggina

Mobile bleach production plant

Impianto Chimico

Chemical Plant

Barquisimento

Venezuela

246.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 46 di 130

21-gen-11

Page 48: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Contratti EPCJob References: EPC Contract

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2010

Naftan

Contratto EPC per ingegneria e costruzione dell'impianto Visbreaker di raffineria

EPC Supervision for engineering and construction of Visbreaker plant

Raffineria in Bielorussia

Naftan refinery

Onshore

Belorus

3.160.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2010

Grodno Azot

Grodno Azot

Contratto EPC per lo studio di processo, fornitura delle attrezzature e materiali e supervisione al revamping per l'impianto distillazione del Cicloesanone

EPC - Process engineering, supply of equipment and materials and revamping supervision for GA petrolchemical plant Cycloexanone distillation unit in Grodno - Belarus

Impianto petrolchimico

Petrochemical Plant

Grodno

Belarus

8.280.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2010

Naftan

Contratto EPC per l'ingegneria, costruzione e la fornitura della strumentazione dell'impianto Vacuum Vis Breaking di raffineria

EPC Supervision for engineering and construction plus instrumentation supply for Vacuum Vise Braking plant

Raffineria in Bielorussia

Naftan refinery

Onshore

Belorus

739.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2008

ETAP / ENI Tunisia

Contratto per piano trattamento Oil & Gas; portata: 850.000 MMSCFD

Oil and gas tratement plant; flowrate: 850.000 MMSCFD

Maamoura Field

Maamoura Field

Onshore Tunisia

Tunisia

25.100.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 47 di 130

21-gen-11

Page 49: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Contratti EPCJob References: EPC Contract

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2008

Enppi

Khalda Petr. Co (Apache)

Sistemi di separazione per gas naturlae da 500 MMSCFD, peso total: 400 tons, completamente accessoriato e installato in site

Slug catcher facilities; flowrate: 500 MMSCFD, total weight: 400tons, with all accessories and installed at site

Salam Gas Plant

Salam Gas Plant

Onshore Egypt

Egypt

32.190.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2007

Khalda Petr. Co (Apache)

N.1 Separatore per gas naturale; diametro: 3 mt; Tangent-line: 20 mt; pressione: 149 bar; peso: 300 tons completamente accessoriato e installato in sito

N.1 Slug catchers; diameter: 3mt; tangent-line: 20mt; pressure: 149 bar; weight: 300 tonns, totally accessoried and installed at site

Salam Gas Plant

Salam Gas Plant

Onshore Egypt

Egypt

11.246.680,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2007

Khalda Petr. Co (Apache)

N.1 Sistema di separazione gas da 150 MMSCFD; pressione: 146 bar completamente accessoriato e installato in sito

N.1 Gas separator; flowrate: 150 MMSCFD; pressure: 146 bar, totally accessoried and installed at site

Qasr field

Qasr field

Onshore Egypt

Egypt

9.552.458,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2006

Khalda Petr. Co (Apache)

N.5 Sistemi rimozione mercurio per greggio; portata: 50 MMSCFD cad; pressione: 146 bar

N.5 Mercury removal trains; flowrate: 50 MMSCFD each; pressure: 146 bar

Obayed Gas Field

Obayed Gas Field

Onshore Egypt

Egypt

8.850.650,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 48 di 130

21-gen-11

Page 50: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Contratti EPCJob References: EPC Contract

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2004

Eni - Div. Agip

Eni - Div. Agip

Revamping della centrale con inserimento di tre compressori gas da 1.000.000 Sm3/giorno, nuovo sistema di blowdown, nuovo sistema di ricevimento gas, revamping del sistema di controllo e dei sistemi ausiliari - ATI con BonattiRevamping of gas plant with installation of three compressors (1.000.000 Sm3/day), new blowdown system, new gas receiving system, revamping of distributed control system and auxiliary systems - JV with Bonatti

C.le Gas Gagliano

Gagliano Gas Plant

Gagliano

Italy

8.000.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2002

Eni - Div. Agip

Eni - Div. Agip

Revamping della centrale gas con inserimento di due impianti di degasolinaggio da 1.000.000 Sm3/giorno per incremento di produzione - ATI con Bonatti

Revamping of gas plant with installation of two gasoline removal plants (1.000.000 Sm3/day) for production enhancement - JV with Bonatti

C.le Gas Gagliano

Gagliano Gas Plant

Gagliano

Italy

3.250.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2001

Enelpower

A E M Milano

Revamping del sistema di controllo della centrale - ATI con ABB Energy Automation

Control system revamping of power plant - JV with ABB Energy Automation

Centrale Elettrica Di Cassano D'adda

Cassana D'adda Power Plant

Cassano D'adda

Italy

3.256.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2000

Agip

Agip

Revamping della centrale gas con iserimento di un turbocompressore da 3.000.000Sm3/g, impianto stabilizzazione gasoilna da 5.000Kg/h, N°2 serbatoi stoccaggio gasolina da 350m3, separatore bifasico, sistema di controllo a DCS, sistemi ausiliari - ATI con AISGas plant revamping for production enhancement with one new turbocompressor for 3.000.000Sm3/d, gasoline stabilization system for 5.000Kg/h, N°2 gasoline tank for 350m3, two phase separators, control system with DCS, auxiliary systems - JV with AIS

C.le Gas Pineto

Pineto Gas Plant

Pineto

Italy

5.950.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 49 di 130

21-gen-11

Page 51: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Contratti EPCJob References: EPC Contract

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2000

Agip

Agip

Impianto completo di produzione gas con separatore 125.000Sm3/g , trappole di lancio e ricevimento da 14", riscaldatore a gas da 150.000Kcal/h, N°3 quadri idraulici di controllo pozzi, sistema di controllo e trasmissione dati, sistemi ausiliari - ATI con KomesComplete gas production plant with separator 125.000Sm3/d , launching and receiving traps 14", gas heater 150.000Kcal/h, N°3 hydraulic wellhead control panels, distributed control system and data transimission, auxiliary systems - JV with Komes

Campo Gas Di Samperi 1

Samperi 1 Gas Field

Enna

Italy

1.200.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 50 di 130

21-gen-11

Page 52: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Caldareria e Recipienti a PressioneJob References: Pressure Vessels

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2010

Process Components

Trinidad

N.1 Scrubber vessel; diametro: 18", tangent-line: 10'

N.1 Scrubber vessel; diameter: 18"; tangent-line: 10'

Impianti Vari

Several Plants

Onshore USA

USA

53.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2010

Chesa Peak En.

N.1 Separatore a filtri coaliscenti orizzontale in acciaio inox; diametro: 42"; tangent line:18'

N.1 Horizzontal double barrel coalescing separator in stainless steel; diameter: 42"; tangent-line: 18'

Impianti Vari

Several Plants

Onshore USA

USA

62.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2010

B P

N.1 Separatore trifase verticale in acciaio inox montato su skid, diameter: 30"; tangent line: 10'

N.1 Skid mounted vertical 3-phase separator in stainless steel; diameter: 96"; tangent line: 10'

Impianti Vari

Several Plants

Onshore USA

USA

181.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2010

DCP Midstream

Conoco Philips

N.1 Separatore bifasico orizzontale; materiale: acciaio inox; diametro: 96"; tangent-line: 20'

N.1 Inlet scrubber 2-phase horizzontal separator in stainless steel; diameter: 96", tangent line: 20'

Impianti Vari

Several Plants

Onshore USA

USA

144.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 51 di 130

21-gen-11

Page 53: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Caldareria e Recipienti a PressioneJob References: Pressure Vessels

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2010

Chesa Peak En.

N.1 Contactor per ammine in acciaio inox; diametro: 72"; tangent line: 54'

N.1 Amine contactor in stainless steel; diameter: 72"; tangent-line: 54'

Impianti Vari

Several Plants

Onshore USA

USA

248.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2010

S-Con Inc.

Center Point Energy

N.1 Separatore in acciaio inox; diametro: 84"; tangent-line: 16'

N.1 Inlet separator in stainless steel; diameter: 84"; tangent-line: 16'

Impianti Vari

Several Plants

Onshore USA

USA

130.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2010

S-Con Inc.

Center Point Energy

N.1 Separatore per glicole; diametro: 84"; tangent-line: 16', materiale: acciaio inox

N.1 Glycol after scrubber; material; stainless steel; diameter: 84"; tangent-line: 16'

Impianti Vari

Several Plants

Onshore USA

USA

133.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2010

S-Con Inc.

S-Con Inc.

N.1 Separatore di ammine; diametro: 84"; tangent-line: 20'

N.1 Amine after scrubber vane mist eliminator; diameter: 84"; tangent-line: 20'

Impianti Vari

Several Plants

Onshore USA

USA

171.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 52 di 130

21-gen-11

Page 54: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Caldareria e Recipienti a PressioneJob References: Pressure Vessels

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2010

Process Components

Trinidad

N.1 Scrubber vessel; diametro: 18", tangent-line: 6'

N.1 Scrubber vessel; diameter: 18"; tangent-line: 6'

Impianti Vari

Several Plants

Onshore USA

USA

49.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2010

S-Con Inc.

S-Con Inc.

N.2 Separatori per glicole in acciaio inox; diametro: 84"; tangent line: 16'

N.2 Glycol after scrubber mist eliminators in stainless steel; diameter: 84"; tangent line: 16'

Impianti Vari

Several Plants

Onshore USA

USA

300.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2010

EXPRO Americas

N.1 Surge drum verticale in acciaio inox; diametro: 96"; tangent-line: 10'

N.1 Vertical surge drum in stainless steel; diameter: 96"; tangent line: 10'

Impianti Vari

Several Plants

Onshore USA

USA

67.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2010

Hijet international

Esso

N.2 Eiettori gas-liquido

N.2 Gas-liquid ejector

Raffineria Esso Fos Sur Mare

Esso refinery For Sur Mare

Fos Sur Mer

France

137.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 53 di 130

21-gen-11

Page 55: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Caldareria e Recipienti a PressioneJob References: Pressure Vessels

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2010

VME Process Inc.

N.1 Separatore trifase verticale; diametro: 32" tangent-linei:14' in acciaio inox

N.1 Stainless steel vertical 3 phase separator; diameter: 36" tangent line: 14'

VME plant

VME plant

Onshore USA

USA

14.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2010

Eastern Reservoir

N.14 Separatori di diverse tipologie in acciaio inox

N.14 Separators several typologies in stainless steel

Eastern Reservoir Plant

Eastern Reservoir Plant

Onshore USA

USA

2.075.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2010

Hijet international

Exxon Mobil

N.2 Recipienti a pressione; materiale: duplex SAF 2205; diametro: 273mm; spessore: 12,7mm; peso totale: 1,9tons

N.2 Pressure vessels; material: duplex SAF 2205; diameter: 273mm; thk: 12,7mm; total weight: 1,9tons

Raffineria Di Gonfreville

Gonfreville Refinery

Gonfreville

France

150.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2010

Azzawiya

N.1 Recipiente a pressione in acciaio al carbonio; diametro: 5000mm; spessore: 10mm; peso totale: 1 ton

N.1 Pressure vessel; material: carbon steel; diameter: 5000mm; thk: 10mm; total weight: 1ton

Azzawiya refinery

Azzawiya refinery

Azzawiya

Libya

18.300,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 54 di 130

21-gen-11

Page 56: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Caldareria e Recipienti a PressioneJob References: Pressure Vessels

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2010

S-Con Inc.

Center Point Energy

N.1 Separatore di ammine; diametro: 84"; tangent-line: 20'

N.1 Amine after scrubber; diameter: 84"; tangent-line: 20'

Impianti Vari

Several Plants

Onshore USA

USA

155.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2010

Center Point Energy

N.1 First stage discharge dampener in acciaio inox; diametro: 18"; tangent line: 63"

N.1 First stage discharge dampener in stainless steel; Diameter: 18"; tangent-line: 63"

Impianti Vari

Several Plants

Onshore USA

USA

24.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2010

Mustang Eng.

Mellitah Gas BV

N.1 Recipiente a pressione per greggio caldo; diamtero: 1.500mm; tangent line: 3.000mm

N.1 Hot Oil Expansion Vessel; diameter: 1.500mm; tangent-line: 3.000mm

Bouri Project

Bouri Project

Mediterranean Sea - Libya

Libya

49.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2010

JGC-Tecnimont JV

Gasco

N.10 Recipienti a pressione

N.10 Pressure vessels

Campo Gas Di Habshan

Habshan Gas Field

Abu Dhabi

United Arab Emirates

75.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 55 di 130

21-gen-11

Page 57: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Caldareria e Recipienti a PressioneJob References: Pressure Vessels

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2010

DCP Midstream

DCP Midstream

N.2 Slug catchers per alta pressione in acciaio inox; diametro: 120"; tangent line: 40'

N.2 HP Slug catchers in stainless steel; diameter: 120"; tangent-line: 40'

Impianti Vari

Several Plants

Onshore USA

USA

886.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2010

Chesa Peak En.

N.3 Coalescer filter verticale in acciaio inox; diametro: 42"; tangent line: 7'

N.3 Vertical coalescer filter in stainless steel; diameter: 42"; tangent-line: 7'

Impianti Vari

Several Plants

Onshore USA

USA

140.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2010

Chesa Peak En.

N.1 Slug Catcher orizzontale in acciaio inox; diametro: 84"; tangent-line: 40'

N.1 Horizontal Slug Catcher in stainless steel; diameter: 84"; tangent line: 40'

Impianti Vari

Several Plants

Onshore USA

USA

73.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2010

Sepra-Chem

N.1 Separatore per Gas - riparazione

N.1 Gas coalescer repair

Impianti Vari

Several Plants

Onshore USA

USA

17.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 56 di 130

21-gen-11

Page 58: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Caldareria e Recipienti a PressioneJob References: Pressure Vessels

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2010

Sepra-Chem

N.1 Coalescer vessel orizzontale in acciaio inox; diametro: 44"; tangentline: 8'

N.1 Horizontal coalescer vessel in stainless steel; diameter: 44"; tangent line: 8'

Impianti Vari

Several Plants

Onshore USA

USA

21.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2010

Center Point Energy

N.1 Slug Catcher vessel da 500 MMSCFD in acciaio inox

N.1 Slug Catcher vessel; flowrate: 500 MMSCFD in stainless steel

Impianti Vari

Several Plants

Onshore USA

USA

277.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2010

DCP Midstream

N.1 Slug Catcher per bassa pressione in acciaio inox, diametro: 120"; tangent-line: 50'

N.1 LP Slug Catcher in stainless steel; diameter: 120"; tangent line: 50'

Impianti Vari

Several Plants

Onshore USA

USA

523.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2010

Chesa Peak En.

N.1 Slug Catcher orizzontale in acciaio inox, diametro: 84"; tangent line: 40'

N.1 Horizontal Slug Catcher in stainless steel; diameter: 84"; tangent-line: 40'

Impianti Vari

Several Plants

Onshore USA

USA

324.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 57 di 130

21-gen-11

Page 59: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Caldareria e Recipienti a PressioneJob References: Pressure Vessels

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2010

Center Point Energy

N.1 Slug Catcher vessel da 500 MMSCFD in acciaio inox

N.1 Slug Catcher vessel; flowrate: 500 MMSCFD in stainless steel

Impianti Vari

Several Plants

Onshore USA

USA

1.108.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2010

Center Point Energy

N.1 Slug Catcher vessel da 350/250 MMSCFD

N.1 Slug Catcher vessel; flowrate: 350/250 MMSCFD

Impianti Vari

Several Plants

Onshore USA

USA

386.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2010

DCP Midstream

N.1 Slug Catcher per alta pressione in acciaio inox, diametro: 120"; tangent-line: 40'

N.1 HP Slug Catcher in stainless steel; diameter: 120"; tangent line: 40'

Impianti Vari

Several Plants

Onshore USA

USA

889.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2010

B P

N.1 Vessel verticale in acciaio inox; diametro: 30"; tangent line: 10'

N.1 Vertical fluid inlet vessel in stainless steel; diameter: 30"; tangent line: 10'

Impianti Vari

Several Plants

Onshore USA

USA

18.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 58 di 130

21-gen-11

Page 60: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Caldareria e Recipienti a PressioneJob References: Pressure Vessels

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2009

Gupco

Gupco

N.1 Sistema lancio e ricezione PIG da 8" e 10" rispettivamente

N.1 PIG launcher and PIG receiver; 8" x 10"

North Shadwan Oil Field

Notrh Shadwan Oil Field

Egyptian desert

Egypt

84.560,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2009

APS

Eni - Div. Agip

N.7 Recipienti a pressione in acciaio inox/carbonio; diametro: 2500mm; spessore: 12mm; peso totale: 3tons

N.7 Pressure vessels; material: stainless/carbon steel; diameter: 2500mm; thk: 12mm; total weight: 3 tons

Raffineria di Sannazzaro

Sannazzaro Refinery

Sannnazzaro

Italy

250.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2009

C & G impianti N.2 Recipienti a pressione in acciaio al carbonio; diametro: 2400mm; spessore: 18mm; peso totale: 1,5tons

N.2 Pressure vessels; material: carbon steel; diameter: 2400mm; thk: 18mm; total weight: 1,5tons

Impianti vari

Several Plants

Onshore Iran

Iran

97.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2009

Hijet international N.1 Recipiente a pressione in acciaio inox 316L; diametro: 323,8mm; spessore:12,7mm; peso totale: 1 ton

N.1 Pressure vessel; material: 316L stainless steel; diameter: 323,8mm; thk: 12,7mm; total weight: 1ton

Impianto USA

USA plant

Onshore USA

USA

60.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 59 di 130

21-gen-11

Page 61: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Caldareria e Recipienti a PressioneJob References: Pressure Vessels

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2009

Sanco N.1 Recipiente a pressione in acciaio al carbonio; diametro: 2000mm; spessore: 12mm; peso totale: 2tons

N.1 Pressure vessel; material: carbon steel; diameter: 2000mm; thk: 12mm; total weight: 2tons

Impianti vari

Several Plants

Onshore Tunisia

Tunisia

25.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2009

Saipem Energy Int.

Eni div. E & P

N.1 Test saparator; Diametro: 99"; tangent-line: 28'

N.1 Production and test separator; Diameter: 99"; tangent-line: 28'

Aquila FPSO

Aquila FPSO

Mediterranean Sea - Italy

Italy

442.894,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2009

Saipem

Sonatrach

N.8 Apparecchiature a pressione in acciaio inox AISI 316L

N.8 Stainless steel vessels - AISI 316L

MLE field

MLE field

Onshore Algeria

Algeria

2.315.700,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2009

UMM Al Jawaby

Azzawiya

N.1 Recipiente a pressione in acciaio al carbonio; diametro: 1067mm; spessore: 10mm; peso totale: 6.000kg

N.1 Vessel in carbon steel; diameter: 1067mm; thk: 10mm; total weight: 6.000kg

Azzawiya refinery

Azzawiya refinery

Azzawiya

Libya

130.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 60 di 130

21-gen-11

Page 62: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Caldareria e Recipienti a PressioneJob References: Pressure Vessels

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2009

Saipem

Sonatrach

N.6 Test separator claddati; Diametro: 60"; tangent-line: 15'

N.6 Cladded test separators; Diameter: 60"; tangent-line: 15'

MLE field

MLE field

Onshore Algeria

Algeria

888.300,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2009

Saipem Energy Int.

Eni div. E & P

N.1 Separatore; Diametro: 63"; tangent-line: 12' ; N.1 Desalter elettrostatico; Diametro: 95"; tangent-line: 17'

N.1 Overhead separator; Diameter: 63"; tangent-line: 12' ; N.1 Electrostatic separator Diameter: 95"; tangent-line: 17'

Aquila FPSO

Aquila FPSO

Mediterranean Sea - Italy

Italy

610.788,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2008

Enppi

Khalda Petr. Co (Apache)

Sistemi di separazione per gas naturlae da 500 MMSCFD, peso totale: 400 tons

Slug catcher facilities; flowrate: 500 MMSCFD, total weight: 400tons

Salam Gas Plant

Salam Gas Plant

Onshore Egypt

Egypt

32.190.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2008

Ansaldo N.1 Recipiente a pressione in acciaio al carbonio; diametro: 6000mm; spessore: 15mm; peso totale: 18tons

N.1 Pressure vessel in acrbon steel; diameter: 6000mm; thk: 15mm; total weight: 18tons

Impianto di Saluggia

Saluggia plant

Saluggia

Italy

150.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 61 di 130

21-gen-11

Page 63: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Caldareria e Recipienti a PressioneJob References: Pressure Vessels

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2008

Sanco N.2 Recipienti a pressione in acciaio inox; diametro: 1670mm; spessore: 20mm; peso totale: 15tons

N.2 Pressure vessels in stainless steel;; diameter: 1670mm; thk: 20mm; total weight: 15tons

Impianto in South Africa

South Africa plant

Onshore South Africa

South Africa

300.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2008

C & G impianti N.6 Recipienti a pressione in acciaio al carbonio; diametro: 2400mm; spessore: 8mm; peso totale: 10tons

N.6 Pressure vessels in carbon steel; diameter: 2400mm; thk: 8mm; total weight: 10tons

Impianti Vari

Several Plants

Onshore Albania

Albania

50.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2008

Markwest

N.1 Torre debutanizzatrice; Diameter: 48"; Tangent-line: 119' 0"

N.1 Debutaniser tower; diameter: 48"; tangent-line: 119' 0"

Impianti Vari

Several Plants

Onshore USA

USA

399.367,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2008

Simeco

Eni - Div. Agip

N.1 Colonna in acciaio al carbonio; diametro: 2000mm; spessore: 19mm; peso totale: 8tons

N.1 Tower in carbon steel; diameter: 2000mm; thk: 19mm; total weight: 8tons

Raffineria di Sannazzaro

Sannazzaro Refinery

Sannnazzaro

Italy

120.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 62 di 130

21-gen-11

Page 64: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Caldareria e Recipienti a PressioneJob References: Pressure Vessels

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2008

Eltron Chromalox N.2 Recipienti a pressione in acciaio basso legato; diametro: 323,8mm; spessore: 9,5mm; peso totale: 2tons

N.2 Pressure vessels; material: low alloy steel; diameter: 323,8mm; thk: 9,5mm; total weight: 2tons

Impianti vari

Several Plants

Onshore Switzerland

Switzerland

50.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2008

Enppi

Khalda Petr. Co (Apache)

N.1 Separatore tipo "celle API" trifase da 2.550 BOWPD

N.1 API three-phase separator; flowrate: 2.550 BOWPD

Western Desert Field

Western Desert Field

Onshore Egypt

Egypt

139.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2008

Cross Tex

N.1 Separatore finale per gas; diametro: 84"; Tangent-line: 24'

N.1 Slug catcher; diameter: 84"; tangent-line: 24'

Impianti Vari

Several Plants

Onshore USA

USA

260.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2007

Technip Italy

Grupa Lotos

N.7 Recipienti a pressione in acciaio al carbonio; diametro: 3550mm; spessore: 29mm; peso totale: 70tons

N.7 Pressure vessels in carbon steel; diameter: 3550mm; thk: 29mm; total weight: 70tons

Raffineria di Gdansk

Gdansk refinery

Gdansk

Poland

1.050.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 63 di 130

21-gen-11

Page 65: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Caldareria e Recipienti a PressioneJob References: Pressure Vessels

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2007

Enppi

Agiba

N.3 Separatori tri-fase; diametro: 2,2 mt; Tangent-line: 6 mt

N.1 Three phase separator; Diameter: 2,2 mt; Tangent-line:6 mt

West Ashrafi plant

West Ashrafi plant

Egyptian desert

Egypt

125.450,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2007

Enppi

Agiba

N.1 Slug Catcher con doppio mantello; diametro: 3 mt; tangent-line: 10 mt

N.1 Slug catcher - double body; diameter: 3mt; Tangent line: 10 mt

West Ashrafi plant

West Ashrafi plant

Egyptian desert

Egypt

245.680,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2007

Markwest

N.1 Recipiente a pressione verticale per setacci molecolari

N.1 Vertical mole sieve vessel

Impianti Vari

Several Plants

Onshore USA

USA

224.342,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2007

Samir

N.8 Recipienti a pressione in acciaio al carbonio; diametro: 324mm; spessore: 9,5mm; peso totale: 13tons

N.8 Pressure vessels in carbon steel; diameter: 324mm; spessore: 9,5mm; total weight: 13tons

Samir Refinery Upgrade

Samir Refinery Upgrade

Mohammedia

Morocco

190.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 64 di 130

21-gen-11

Page 66: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Caldareria e Recipienti a PressioneJob References: Pressure Vessels

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2007

Markwest Javeline Co

N.1 Colonna ad assorbimento per Gas di ricircolo da 42"x24"x61"

N.1 Recycle gas absorber 42"x24"x61"

Impianti Vari

Several Plants

Onshore USA

USA

217.002,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2007

Enppi

Agiba

N.1 Trappola per PIG; lunghezza: 6mt; diametro: 10"

N.1 PIG trap; 6mt x 10"

West Ashrafi plant

West Ashrafi plant

Egyptian desert

Egypt

52.540,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2007

Technip Italy

Grupa Lotos

N.4 Colonne in acciaio al carbonio; diametro: 2500mm; spessore: 17mm; peso totale: 75tons

N.4 Towers in carbon steel; diameter: 2500mm; thk: 17mm; total weight: 75tons

Raffineria di Gdansk

Gdansk refinery

Gdansk

Poland

1.050.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2007

Khalda Petr. Co (Apache)

N.1 Separatore per gas naturale; diametro: 3 mt; Tangent-line: 20 mt; pressione: 149 bar; peso: 300 tons

N.1 Slug catchers; diameter: 3mt; tangent-line: 20mt; pressure: 149 bar; weight: 300 tonns

Salam Gas Plant

Salam Gas Plant

Onshore Egypt

Egypt

11.246.680,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 65 di 130

21-gen-11

Page 67: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Caldareria e Recipienti a PressioneJob References: Pressure Vessels

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2007

Khalda Petr. Co (Apache)

N.1 Sistema di separazione gas da 150 MMSCFD; pressione: 146 bar

N.1 Gas separator; flowrate: 150 MMSCFD; pressure: 146 bar

Qasr field

Qasr field

Onshore Egypt

Egypt

9.552.458,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2007

Markwest Javeline Co

N.1 Colonna di strippaggio da 42"x30"x83"

N.1 Stripper tower; 42"x30"x83"

Impianti Vari

Several Plants

Onshore USA

USA

248.761,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2006

Naftec

N.1 Recipiente a pressione verticale per separazione olii; diametro: 34"; Tangent line: 2450 mm

N.1 Vertical oil separator; Diameter: 34"; Tangent-line: 2450 mm

Raffinerie de Skidda

Skidda refinery

Skidda

Algeria

230.670,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2006

Naftec

N.1 Recipiente a pressione orizzontale per riflusso Xylene; Diametro: 2,5 mt; Tangent line: 10 mt

N.1 Horizontal reflux Xylene splitter; diameter: 2,5 mt; Tangent line: 10 mt

Raffinerie de Skidda

Skidda refinery

Skidda

Algeria

348.980,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 66 di 130

21-gen-11

Page 68: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Caldareria e Recipienti a PressioneJob References: Pressure Vessels

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2006

Enppi

Khalda Petr. Co (Apache)

N.1 Slug Catcher; diametro: 2 mt; Tangent line: 6 mt

N.1 Slug catcher package; diameter: 2 mt; Tangent-line: 6 mt

Hayat Field

Hayat Field

Onshore Egypt

Egypt

386.500,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2006

Samir Refinery

Samir Refinery

N. 2 Reattori in acciaio al carbonio, dimensioni 3600"dia., 15 mm. spessore, peso totale 116 tonnellate

N. 2 Reactors, carbon steel material, size 3600 dia., 15mm. Thk., total weight 116 tons.

Samir Refinery Upgrade

Samir Refinery Upgrade

Mohammedia

Morocco

865.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2006

Unidro N.4 Recipienti a pressione in acciaio carbonio / inossidabile; diametro: 2000mm; spessore: 25mm; peso totale: 34tons

N.4 Pressure vessels; material: carbon / stainless steel; diameter: 2000mm; thk: 25mm; total weight: 34tons

Hawiyah project

Hawiyah project

Onshore UAE

Arabia Saudita

210.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2006

Eurotecnica

N.4 Recipienti a pressione; materiale: A240 UNS S31803; diametro: 390mm; spessore: 15mm; peso totale: 2,7tons

N.4 Pressure vessels; material: A240 UNS S31803; diameter: 390mm; thk: 15mm; total weight: 2,7tons

Raffineria di Pulawy

Pulawy refinery

Pulawy

Poland

70.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 67 di 130

21-gen-11

Page 69: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Caldareria e Recipienti a PressioneJob References: Pressure Vessels

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2006

Tecnimont

Q-Chem

N.15 Recipienti apressione in acciaio inossidabile / carbonio; diametro: 2440mm; spessore: 18mm; peso totale: 168tons

N.15 Pressure vessels in carbon / stainless steel; diameter: 2440mm; thk: 18mm; total weight: 168tons

Impianto petrolchimico

Petrochemical Plant

Mesaieed

Qatar

340.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2006

Linde Impianti

Jamnagar

N.34 Recipienti a pressione in acciaio inox / carbonio; diametro: 2500mm; spessore: 27mm; peso totale: 765tons

N.34 Pressure vessels in stainless/carbon steel; diameter: 2500mm; thk: 27mm; total weight: 765tons

Impianto Idrogeno

Hydrogen plant

Onshore India

India

1.700.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2006

Borregaard Italia

N.1 Colonna in acciaio inox; diametro: 600mm; spessore: 8mm; peso totale: 1,5tons

N.1 Tower in stainless steel; diameter: 600mm; thk; 8mm; total weight: 1,5tons

Impianto Petrolchimico

Petrochemical Plant

Ravenna

Italy

50.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2006

Idroconsulting N.5 Recipienti a pressione in acciaio al carbonio; diametro: 3000mm; spessore: 28mm; peso totale: 125tons

N.5 Pressure vessels in stainless steel; diameter: 3000mm; thk: 28mm; total weight: 125tons

Impianto petrolchimico

Petrochemical Plant

Sharq

Qatar

250.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 68 di 130

21-gen-11

Page 70: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Caldareria e Recipienti a PressioneJob References: Pressure Vessels

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2005

Alcon

N A O C

N. 2 Launching & Receiving Traps 18" x 20", più N.1 Gas Boot, più N.1 Slug Catcher.

N. 2 Launching & Receiving Traps 18" x 20", plus N. 1 Gas boot, plus N. 1 Slug Catcher.

Campo Gas Di I D U

I D U Gas Field

Port Harcourt

Nigeria

281.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2005

Tamoil SA

N.2 Scambiatori shell & tube materiale: acciaio inox; diametro: 350mm; spessore: 10mm; peso totale: 1,5tons

N.2 Shell & tube heat eschangers; material: stainless steel; diameter: 350mm; thk: 10mm; total weight: 1,5tons

Raffineria di Collombey

Collombey Refinery

Collombey

Switzerland

25.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2005

Linde Impianti

Jamnagar

N.16 Recipienti a pressione in acciaio al carbonio e acciaio inox; diametro: 80"; spessore: 40"; peso totale: 80tons

N.16 Vessels in carbon sell and stainless steel; diameter: 80"; thk: 40"; total weight: 80tons

Impianto Idrogeno

Hydrogen plant

Onshore India

India

500.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2005

Peremba construction N.8 Recipienti a pressione in acciaio inox e carbonio; diametro: 140"; spessore: 20"; peso totale: 70tons

N.8 Vessels in carbon / stainless steel; diameter: 140"; spessore: 20"; total weight: 13tons

Melut Basin project

Melut Basin project

Onshore Sudan

Sudan

290.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 69 di 130

21-gen-11

Page 71: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Caldareria e Recipienti a PressioneJob References: Pressure Vessels

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2005

API

N.3 Recipienti a pressione in acciaio al carbonio; diametro: 3000mm; spessore: 8mm; peso totale: 13tons

N.3 Vessels in carbon steel; diameter: 3000mm; thk: 8mm; total weight: 13tons

Raffineria Di Falconara

Falconara Refinery

Falconara

Italy

73.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2005

York France

N.4 Recipienti a pressione in acciaio inox; diametro: 1100mm; spessore: 18mm; peso totale: 3tons

N.4 Pressure vessels in stainless steel; diameter: 1100mm; thk: 18mm; total weight: 3tons

York France plant

York France plant

Onshore France

France

25.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2005

Edison

N.3 Recipienti a pressione in acciaio inox / carbonio; diametro: 2600mm; spessore: 10mm; peso totale: 12tons

N.3 Pressure vessels in stainless/carbon steel; diameter: 2600mm; thk: 10mm; total weight: 12tons

Impianto Chimico

Chemical plant

Simeri Crichi

Italy

75.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2005

Eltron Chromalox N.4 Recipienti a pressione in acciaio inox; diametro: 609mm; spessore: 10mm; peso totale: 2,5tons

N.4 Pressure vessels in stainless steel; diameter: 609mm; thk: 10mm; total weight: 2,5tons

Impianto in China

China plant

Onshore China

China

70.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 70 di 130

21-gen-11

Page 72: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Caldareria e Recipienti a PressioneJob References: Pressure Vessels

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2005

MAE

N.6 Recipienti a pressione in acciaio al carbonio/P275NH; diametro: 1100mm; spessore: 8mm; peso totale: 14tons

N.6 Pressure vessels in carbon steel/P275NH; diameter: 1100mm; thk: 8mm; total weight: 14 tons

MAE plant

MAE plant

Fiorenzuola

Italy

140.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2004

RM - raffineria milazzo

N.2 Recipienti a pressione; materiale: P275NH; diametro: 1250mm; spessore: 18mm; peso totale: 10 tons

N.2 Vessels; material: P275NH; diameter: 1250mm; thk: 18mm; total weight: 10tons

Raffineria di Milazzo

Milazzo refinery

Messina

Italy

75.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2004

Basell

N.2 Recipienti a pressione; materiale: P275NH; diametro: 1700mm; spessore: 15mm; peso totale: 5tons

N.2 Vessels; material: P275NH; diameter: 1700mm; thk: 15mm; total weight: 5tons

Impianto Petrolchimico

Petrochemical Plant

Ferrara

Italy

50.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2004

Eltron Chromalox N.23 Recipienti a pressione in acciaio inox; diametro: 610mm; spessore: 20mm; peso totale: 10tons

N.23 Vessels in stainless steel; diameter: 610mm; thk:20mm; otal weight: 10tons

Impianto in China

China plant

Onshore China

China

250.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 71 di 130

21-gen-11

Page 73: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Caldareria e Recipienti a PressioneJob References: Pressure Vessels

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2004

Praoil Oleodotti Italiani

N.2 Recipienti a pressione; materiale: acciaio carbonio P355 NH; diametro: 1850mm; peso totale: 17tons

N.2 Vessels; material: carbon steel P355 NH; diameter: 1850mm; total weight: 17tons

Raffineria di Genova

Genova refinery

Genova

Italy

90.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2004

Tecnimont

Arak Refinery

N.1 Recipiente a pressione in acciaio al carbonio; diametro: 3000mm; spessore: 22mm; peso totale: 25tons

N.1 Vessel in carbon steel; diameter: 3000mm; thk: 22mm; total weight: 25tons

Raffineria di Arak

Arak refinery

Onshore Iran

Iran

110.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2004

Vinavil Egypt

Vinavil Egypt

N. 1 Reattore in acciaio inossidabile, dimensioni 2800"dia., 18 mm. spessore, peso totale 17 tonnellate

N. 1 Reactor, stainless steel material, size 2800" dia., 18mm. Thk., total weight 17 tons

Impianto Chemicals S.A.E.

Chemicals S.A.E.

Alexandria

Egypt

135.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2003

Eni div. E & P

Leghorn Refinery

N. 1 Reattore in acciaio al carbonio, dimensioni 76"dia., 35 mm. spessore, peso totale 17 tonnellate

N. 1 Reactor, carbon steel material, size 76" dia., 35mm. Thk., total weight 17 tons.

Centrale Idrogenazione

Hydrogenation Plant

Livorno

Italy

65.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 72 di 130

21-gen-11

Page 74: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Caldareria e Recipienti a PressioneJob References: Pressure Vessels

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2003

Enppi

Unit.Gas Deriv.Co(BP/ENI)

N.1 Colonna ad adsorbimento; Diametro: 5,39 mt, Tangent line: 18,04 mt

N.1 Adsorber tower; Internal diameter: 5,39 mt, tangent line: 18,04 mt

Damietta Gas Plant

Damietta Gas Plant

Port Said

Egypt

2.345.900,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2003

Enppi

Unit.Gas Deriv.Co(BP/ENI)

N.1 Colonna depropanizzatrice; Diametro: 3,6 mt, Tangent line: 26,04 mt

N.1 Depropaniser tower; Internal diameter: 3,6 mt, tangent line: 26,04 mt

Damietta Gas Plant

Damietta Gas Plant

Port Said

Egypt

2.762.540,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2003

Tecnimont

Daquing

N. 1 Reattore in acciaio inossidabile, dimensioni 130"dia., 25 mm. spessore, peso totale 40 tonnellate

N. 1 Reactor, stainless steel material, size 130" dia., 25mm. Thk., total weight 40 tons.

PP Daquing

PP Daquing

Daquing

China

300.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2003

Enppi

Unit.Gas Deriv.Co(BP/ENI)

N.1 Colonna detanizzatrice; Diametro: 4,85 mt, Tangent line: 29 mt

N.1 Deethanizer tower; Internal diameter: 4,85 mt, tangent line: 29 mt

Damietta Gas Plant

Damietta Gas Plant

Port Said

Egypt

2.762.540,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 73 di 130

21-gen-11

Page 75: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Caldareria e Recipienti a PressioneJob References: Pressure Vessels

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2003

Enppi

Unit.Gas Deriv.Co(BP/ENI)

N.1 Separatore liquido - gas; Diametro: 4,75 mt, Tangent line: 12,2 mt

N.1 Residue gas KO drum; Internal diameter: 4,75 mt, tangent line: 12,2 mt

Damietta Gas Plant

Damietta Gas Plant

Port Said

Egypt

1.058.460,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2003

Enppi

Unit.Gas Deriv.Co(BP/ENI)

N.5 Vessel per setacci molecolari; Diametro: 3,7 mt, Tangent line: 3,9 mt

N.5 Molecular sieves vessels; Internal diameter: 3,7 mt; tangent line: 3,9 mt

Damietta Gas Plant

Damietta Gas Plant

Port Said

Egypt

2.345.896,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2003

Enppi

Unit.Gas Deriv.Co(BP/ENI)

N.1 Separatore liquido - gas; Diametro: 3 mt, Tangent line: 12 mt

N.1 Inlet separator; Internal diameter: 3mt, tangent line: 12 mt

Damietta Gas Plant

Damietta Gas Plant

Port Said

Egypt

894.500,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2002

Progetti Europa & Global

Scop

Fornitura trappole di lancio e di ricevimento pig con handling system - 4 da 22", 2 da 28", 2 da 34" e 2 da 46" - Rating 600#

Supply of pig lauchers and receivers with handling systems - 4 by 22", 2 by 28", 2 by 34" and 2 by 46" - Rating 600#

Impianti Vari

Various Plants

Onshore.

Australia

400.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 74 di 130

21-gen-11

Page 76: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Caldareria e Recipienti a PressioneJob References: Pressure Vessels

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2002

Snamprogetti

Eni - Div. Agip

N.6 Colonne in acciaio al carbonio e acciaio 410S; diametro: 2400mm; spessore: 26mm; peso totale: 61tons

N.6 Towers in carbon steel and stainless steel 410S; diameter: 2400mm: thk: 26mm; total weight: 61tons

Raffineria di Taranto

Taranto refinery

Taranto

Italy

445.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2002

Tecnoco N.6 Recipienti a pressione in acciaio al carbonio; diametro: 1600mm; spessore: 18mm; peso totale: 20tons

N.6 Vessels in carbon steel; diameter: 1600mm; thk:18mm; total weight: 20tons

Tengizchevroil project

Tengizchevroil project

Unk.

Kazakistan

120.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2002

Eurotecnica

N.1 Colonna in acciaio inossidabile; diametro: 1600mm; spessore: 31mm; peso totale: 35tons

N.1 Tower in stainless steel; diameter: 1600mm; thk: 31mm; total weight: 35tons

MPTY new melamine plant

MPTY new melamine plant

Onshore Poland

Poland

240.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2002

Snamprogetti

Eni - Div. Agip

N.18 Recipienti a pressione in acciaio inox 410S; diametro: 2200mm; spessore: 22mm; peso totale: 56,2 tons

N.18 Vessels in 410S stainless steel; diameter: 2200mm; thk: 22mm; total weight: 56,2 tons

Raffineria di Taranto

Taranto refinery

Taranto

Italy

430.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 75 di 130

21-gen-11

Page 77: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Caldareria e Recipienti a PressioneJob References: Pressure Vessels

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2002

ICOSS

ICOSS

N. 2 Reattori in acciaio inossidabile, dimensioni 2100mm. Dia., 40 mm. Spessore, peso totale 24 tonnellate

N. 2 Reactors, stainless steel material, size 2100 mm. Dia., 40mm. Thk., total weight 24 tons.

C.le Bergamo

Bergamo Plant

Bergamo

Italy

95.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2002

Snamprogetti Sud

Eni - Div. Agip

N.1 Colonna in acciaio al carbonio; diametro: 4000mm; spessore: 18mm; peso totale: 34tons

N.1 Tower in carbon steel; diameter: 4000mm: thk: 18mm; total weight: 34tons

Raffineria di Sannazzaro

Sannazzaro Refinery

Sannnazzaro

Italy

130.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2001

Snamprogetti Sud

Agip Petroli

N. 1 Reattore in materiale di bassa lega, dimensioni 1450 mm dia., 40 mm spessore, peso totale 32 tonnellate

N. 1 Reactor low alloy material, size 1450 mm dia., 40 mm. Thk., total weight 32 tons

Raffineria di Sannazzaro

Sannazzaro Refinery

Sannnazzaro

Italy

210.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2001

Great Lakes

N.6 Colonne in acciaio inox; diametro: 900mm; spessore: 6mm; peso totale: 13 tons

N.6 Towers in stainless steel; diameter: 900mm; thk: 6mm; total weight: 13tons

Impianto Petrolchimico

Petrochemical Plant

Ravenna

Italy

145.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 76 di 130

21-gen-11

Page 78: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Caldareria e Recipienti a PressioneJob References: Pressure Vessels

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2001

Noyvallesina

KZPC ENC

N.7 recipienti a pressione in acciaio al carbonio e acciaio inox; diametro: 2200mm; spessore: 25mm; peso totale: 25tons

N.7 Vessels in carbon steel and stainless steel; diameter: 2200mm; thk:25mm; total weight: 25tons

Impianti vari

Several Plants

Onshore Iran

Iran

400.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2001

Noyvallesina

KZPC ENC

N.9 Recipienti a pressione in acciaio inox; diametro: 4000mm; spessore: 12mm; peso totale: 35,6tons

N.9 Vessels in stainless steel; diameter: 4000mm; thk:12mm; total weight: 35,6 tons

Impianti vari

Several Plants

Onshore Iran

Iran

480.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2001

UMM Al Jawaby

Azzawiya

N.1 Colonna in acciaio al carbonio; diametro: 1067mm; spessore: 10mm; peso totale:6.000kg

N.1 Tower in carbon steel; diameter: 1067mm; thk: 10mm; total weight: 6.000kg

Azzawiya refinery

Azzawiya refinery

Azzawiya

Libya

130.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2001

Snamprogetti Sud

Eni - Div. Agip

N.5 Recipienti a pressione in acciaio al carbonio; diametro: 1900mm; spessore: 18mm; peso totale: 38,9tons

N.5 Vessels in carbon steel; diameter: 1900mm; thk: 18mm; total weight: 38,9tons

Raffineria di Taranto

Taranto refinery

Taranto

Italy

200.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 77 di 130

21-gen-11

Page 79: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Sistemi Disidratazione GasJob References: Gas Dehydration Packages

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2010

Chicago Bridge & Iron

Reficar

N.1 Impianto di disdratazione aria strumenti con no. 2 reattori a setacci molecolari e circuito associato di rigenerazione

N.1 Instrument air regeneration plant with no. 2 reactors with molecular sieves and associated regeneration loop

Raffineria di Cartagena

Cartagena Refinery

Cartagena

Colombia

774.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2010

Demont

Eni div. E & P

N. 1 Impianto rigenerazione glicole completo di ribollitore e colonna di rigenerazione, portata glicole 1.000 Kg/ora

N. 1 Glycol regeneration plant complete of reboiler and regeneration column, capacity 1.000 kg/hr glycol flow rate

C.le Gas Capparruccia

Capparruccia Gas Station

Capparruccia

Italy

480.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2009

Daewoo E & C Co Ltd

N A O C

N. 1 impianto di disidratazione gas a TEG composto da contactor Dia. 2.2 x H = 9 m, s = 48 mm. Sistema di rigenerazione glicole con riscaldatori a gas, pompe glicole da 17 mc/hr. Punto di rugiada gas in uscita - 5°C @ 82 bara. Portata gas 300 MMSCFDN. 1 TEG gas dehydtarion package composed contactor Dia. 2,2 x H = 9 m, thick. = 48 mm. Glycol regeneration package with gas heaters, glycol pumps flow rate 17 cm/h. Dew point - 5°C @ 82 bara. Gas flow rate 300 MMSCFD

Ogbainbiri Flow Station

Ogbainbiri Flow Station

Ogbainbiri

Nigeria

4.741.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2008

Chicago Bridge & Iron

Chicago Bridge & l

N.2 Sistemi rigenerazione glicole da 3 MMSCFD

N.2 Glycol regeneration skids; flowrate: 3 MMSCFD

Impianti vari

Several Plants

Onshore

USA

1.760.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 78 di 130

21-gen-11

Page 80: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Sistemi Disidratazione GasJob References: Gas Dehydration Packages

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2008

GIE Yling

GIE Yling

N.3 Sistemi di disidratazione gas a glicole da 1MMSCFD

N.3 Glycol regeneration skids; flowrate: 1MMSCFD

Impianti vari

Several Plants

Sanah'a

Yemen

1.130.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2007

Technip Italy

PKN Orlen

N. 1 impianto di rigenerazione azoto a setacci molecolari con N. 2 colonne Dia. 1,8 m x 5,0 m TL/TL completo di N. 3 scambiatori e KO drum. Portata 16.000 kg/h @ 370 kPa

N. 1 nitrogen regeneration package with mole sieves with N. 2 columns Dia. 1,8 m x 5,0 m TL/TL complete with N. 3 heat exchangers and KO drum. Gas flow rate 16.000 kg/h @ 370 kPa

Paraxilene

Paraxilene

Orlen

Poland

1.100.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2006

OIEC

IOOC

N. 1 Impianto disidratazione gas a setacci molecolari e rimozione mercurio a letto sacrificale, con n.2 reattori dia. 3.6 x h 7.5 m spessore 80 mm, sistema rigenerazione adsorbers. - Punto di rugiada gas in uscita @ - 90°C; portata gas 4 MM nm3/giorno.N.1 gas dehydration package with mole sieves and mercury removal with sacrifical bed, including n. 2 reactors dia. 3.6 x h 7.5 m, 80 mm thick., complete of regeneration system for adsorbers. - Gas outlet dew point @ - 90°C; gas flow rate 4 MM nm3/day.

Impianto Petrolchimico di Sirri Island

Sirri Island Petrochemical Plant

Sirri Island

Iran

5.729.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2006

Chagalesh Consulting Eng.

Lavan Refinery

N. 1 Impianto disidratazione LPG a setacci molecolari con due colonne diametro 1.100 mm, completo di sistema di rigenerazione, sistema di filtrazione e separazione, sistema di controllo.Capacità 8.000 kg/ora.N. 1 LPG molecular sieves dehydration package with two columns 1.100 mm diameter, complete with regeneration system, filtration and separation system, control system.Capacity 8.000 kg/hr.

Impianto Petrolchimico di Lavan

Lavan Petrolchemical Plant

Lavan

Iran

1.339.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 79 di 130

21-gen-11

Page 81: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Sistemi Disidratazione GasJob References: Gas Dehydration Packages

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2006

Daewoo-Fluor JV

Shell Nigeria

N. 2 impianti disidratazione gas a TEG composti contactors dia. 2.7 x h 10.7 m. spess. 100 mm, sistema rigenerazione glicole con riscaldatori elettrici, pompe glicole da 19.400 kg/hr. - Punto di rugiada gas in uscita 0°C @ 90 bara. - Portata gas 14.8 MM Sm3/giorno cad.N.2 TEG gas dehydration packages, composed contactors dia. 2.7 x h 10.7 m. thick. 100 mm, glycol regeneration package with electrical heaters, glycol pumps flow rate 19.400 kg/hr - Dew point 0°C @ 90 bara. - Gas flow rate 14.800.000 Sm3/day each.

C.le Gas Gbaran Ubie

Gbaran Ubie Gas Station

Worri

Nigeria

12.433.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2004

Prosernat

Kuwait Oil Company

Impianto di disidratazione condensato a tre colonne con setacci molecolari da 70.000Kg/h a 85bar

Condensate dehydration package, three columns with molecular sieves, flow rate 70.000Kg/h at 85bar

Boosting Station 131

Boosting Station 131

Kuwait

Kuwait

3.012.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2004

Sibneftegas

Sibneftegas

N.3 Sistema di disidratazione gas a glicole da 150 MMSCFD cadauno

N.3 Glycol dehtdration package; flow rate: 150 MMSCFD each

East Urengoy Project

East Urengoy Project

East Urengoy

Russia

3.468.900,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2004

Mezhregionkomplet

Gazprom

N.2 Sistemi di disidratazione gas a glicole; portata: 150 MMSCFD cad., pressione: 70 bar

N.2 Glycol dehydration package; flowrate: 150 MMSCFD each, pressure: 70 bar

Byazhkizy Project

Byazhkizi Project

Byazhkizy

Turkmenistan

6.844.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 80 di 130

21-gen-11

Page 82: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Sistemi Disidratazione GasJob References: Gas Dehydration Packages

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2003

Mezhregionkomplet

Gazprom

N.3 Sistemi di disidratazione gas a glicole da 120 MMSCFD cadauno

N.3 Glycol dehydration package - 120 MMSCFD each

Purosxvy Project

Purosxvy Project

Purosvy region

Russia

1.245.900,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2003

Prosernat

Kuwait Oil Company

Impianto di disidratazione gas a una colonna con TEG da 320.000 Nm3/h a 70bar

Gas dehydration package, one column with TEG, flow rate 320.000Nm3/h 70bar

Boosting Station 131

Boosting Station 131

Kuwait

Kuwait

1.460.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2002

Eni - Div. Agip

Eni - Div. Agip

Revamping della centrale gas con inserimento di due impianti di degasolinaggio da 1.000.000 Sm3/giorno per incremento di produzione - ATI con Bonatti

Revamping of gas plant with installation of two gasoline removal plants (1.000.000 Sm3/day) for production enhancement - JV with Bonatti

C.le Gas Gagliano

Gagliano Gas Plant

Gagliano

Italy

3.250.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2000

Agip

Agip

Impianto di rimozione gasolina e disidratazione gas a setacci molecolari a 3 colonne, riscaldatore gas da 4.000.000Kcal a sali fusi - Portata 1.000.000Sm3/g - Pressione 80bar - Temperatura 20-50°C - ATI con Nuova OmaGasoline removal and gas dehydration with molecular sieves in 3 columns, with gas heater of 4.000.000Kcal melted salts. Flow 1.000.000Sm3/d - Pressure 80bar - Temperature 20-50°C - JV with Nuova Oma

C.le Gas Gagliano

Gagliano Gas Plant

Gagliano

Italy

3.000.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 81 di 130

21-gen-11

Page 83: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Sistemi Disidratazione GasJob References: Gas Dehydration Packages

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2000

Agip

Agip

Revamping della centrale gas con iserimento di un turbocompressore da 3.000.000Sm3/g, impianto stabilizzazione gasoilna da 5.000Kg/h, N°2 serbatoi stoccaggio gasolina da 350m3, separatore bifasico, sistema di controllo a DCS, sistemi ausiliari - ATI con AISGas plant revamping for production enhancement with one new turbocompressor for 3.000.000Sm3/d, gasoline stabilization system for 5.000Kg/h, N°2 gasoline tank for 350m3, two phase separators, control system with DCS, auxiliary systems - JV with AIS

C.le Gas Pineto

Pineto Gas Plant

Pineto

Italy

5.950.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

1997

Intermare Sarda

Agip

Sistema fuel gas con due filtri a cartucce, due filtri a setacci molecolari e due filtri coalescer e riduzione e controllo pressione a 48bar - Portata 120Nm3/h, P 148bar, T 50°C

Fuel gas system with two cartridge filters, two molecular sieve filters and two coalescer filters, pressure reduction and control at 48bar - Flow 120Nm3/h, P 148bar, T 50°C

Piattaforma Off-shore Regina

Off-shore Platform Regina

Adriatic Sea

Italy

193.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 82 di 130

21-gen-11

Page 84: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Sistemi Fuel GasJob References: Fuel Gas Packages

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2010

Khalda Petr. Co (Apache)

N.2 Sistemi trattamento olio/gas composti da separatore trifase e heater treater

N.2 Fuel oil/gas systems composed by 3-phase separators and heater treaters

Khalabsha Project

Khalabsha Project

Onshore Egypt

Egypt

990.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2009

Ansaldo

Sorgenia

N. 1 Sistema FG composto da sistema di filtrazione, misura, riscaldamento e riduzione pressione gas naturale da 64 a 34 barg per alimentare N. 2 TG. Dia. Linee 14", Portata 16,2 kg/sec.

N. 1 Fuel Gas package composed of filtration system, gas metering system, heating system and pressure reduction system for natural gas from 64 to 34 barg to feed N. 2 turbines. Lines Dia. 14", Flow rate 16,2 kg/sec each turbines

C.le Elettrica a Ciclo Combinato 800 MW Aprilia

800 MW Combined Cycle Power Plant Aprilia

Aprilia

Italy

2.200.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2008

Ansaldo

Sorgenia

N. 1 Sistema FG composto da sistema di filtrazione, misura, riscaldamento e riduzione pressione gas naturale da 50 a 28,5 barg per alimentare N. 2 TG. Dia. Linee 14", Portata 17,6 kg/sec.

N. 1 Fuel Gas package composed of filtration system, gas metering system, heating system and pressure reduction system for natural gas from 50 to 28,5 barg to feed N. 2 turbines. Lines Dia. 14", Flow rate 17,6 kg/sec each turbines

C.le Elettrica a Ciclo Combinato 800 MW Turano Lodigian

800 MW Combined Cycle Power Plant Turano Lodigiano

Lodi

Italy

2.050.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2008

ABB SPA PA Div.

ENI Div. Congo

N. 1 Sistema FG composto da sistema di filtrazione, riscaldamento e riduzione pressione gas naturale da 33 a 22 barg per alimentare TG (2 x 146 MW) + black start up 1 x 9 MW. Dia. Linee 12", Portata 21 kg/secN. 1 Fuel Gas package composed of filtration system, heating system and pressure reduction system for natural gas from 33 to 22 barg to feed turbines (2 x 146 MW) + black start up 1 x 9 MW. Lines Dia. 12", Flow rate 21 kg/sec

M'Boundi integrated gas power generation WP5

M'Boundi integrated gas power generation WP5

Republic of Congo

Republic of Congo

1.350.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 83 di 130

21-gen-11

Page 85: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Sistemi Fuel GasJob References: Fuel Gas Packages

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2007

Technip Italy

PKN Orlen

N. 1 Sistema Fuel Gas composto da KO Drum, sistema di filtrazione bistadio e riscaldamento gas naturale. Dia. Linee 10", Portata 3 kg/sec.

N. 1 Fuel Gas package composed of KO Drum, double stage filtration system and heating system for natural gas. Lines Dia. 10", Flow rate 3 kg/sec

Paraxilene

Paraxilene

Orlen

Poland

355.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2006

G E Oil & Gas

Gasco

N. 2 Fuel Gas Skids completi di sistema di filtrazione e separazione. Portata 3 kg/sec. @ 25 barg.

N. 2 Fuel Gas skids complete of separation and filtration systems. Flow rate 3 kg/sec @ 25 barg

Campo Gas Di Habshan

Habshan Gas Field

Abu Dhabi

United Arab Emirates

240.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2006

Alstom Power

Eurosviluppo Elettrica

N. 1 Impianto Fuel Gas con sistema di separazione e filtrazione, 2 linee misura gas fiscali a turbine da 16" al 100%, riscaldatori , valvole riduzione pressione, flow computers, sistema di controllo, sistema di campionamento e strumenti di analisi . Portata Gas 37 Kg/secN.1 Fuel Gas Package composed of sepration and filtration stage, two fiscal 100% measuring lines x 16" with turbines, heaters, pressure reducing valves, flow computers, control systems, sampling system and analysers. Gas flow rate 37 Kg/sec

Centrale Elettrica di Modugno

Modugno Power Plant

Modugno

Italy

1.440.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2006

Enppi

Petrobel

N. 1 Skid per gas strumenti comprendente n. 1 stadio di separazione, n. 2 stadi di filtrazione e n. 1 stadio di essicazione a setacci molecolari, portata gas 100 nm3/hr. - Tutti gli stadi sono ridondati.

N. 1 Gas instrument skid composed of n. 1 separation phase, n. 2 filtration phases and n. 1 drying phase with molecular sieves, gas rate 100 nm3/hr. - All process equipments are redundant.

Piattaforma Off-shore Semman

Semman Off-shore Platform

Mediterranean Sea

Egypt

184.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 84 di 130

21-gen-11

Page 86: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Sistemi Fuel GasJob References: Fuel Gas Packages

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2006

Ansaldo

Calenia Energia

N. 1 Sistema Fuel Gas composto da sistema di filtrazione, misura fiscale, riscaldamento e riduzione pressione gas naturale da 62 to 27 barg, per alimentazione turbine. Diametro linee 12", portata 32 kg/sec.

N. 1 Fuel Gas Package composed of filtration system, Custody transfer gas metering system for turbines fueling, heating system and pressure reduction system for natural gas from 62 to 27 barg. Lines diameter 12", flowrate 32 kg/sec.

Centrale Elettrica Di Rizziconi

Rizziconi Power Plant

Rizziconi

Italy

1.280.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2006

Shakalin energy Inv. Co.

Fluor

N.2 Sistemi di trattamento gas da 1 MMSCFD; pressione: 70 15 bar

N.2 Fuel gas conditioning skids; flowrate: 1MMSCFD; pressure: 70 / 15 bar

Shakalin Gas Field

Shakalin Gas Field

Shakalin Island

Russia

1.984.560,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2005

Alcon

N A O C

No. 1 Fuel Gas Package completo di skids separazione, skids filtrazione, sistema di riduzione pressione e riscaldatori elettrici gas, incluso il piping di interconnessione e gestione tecnica di 3 compressori alternativi.No. 1 Fuel gas Package complete of separating skids, filtering skids, pressure reduction system and electrical gas heaters, including the interconnecting piping and the technical handling of 3 reciprocating compressors.

Campo Gas Di I D U

I D U Gas Field

Port Harcourt

Nigeria

801.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2005

Enppi

Khalda Petr. Co (Apache)

N.3 Sistemi trattamento gas da 500 kg/hr

N.3 Fuel gas conditioning skids; flowrate: 500 kg/hr

Obayed Gas Field

Obayed Gas Field

Onshore Egypt

Egypt

1.558.234,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 85 di 130

21-gen-11

Page 87: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Sistemi Fuel GasJob References: Fuel Gas Packages

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2005

G E Oil & Gas

Gasco

No. 8 Fuel Gas Skids completi di sistema separazione e filtrazione, portata 6.050 kg/hr, pressione 24 barg.

No. 8 Fuel Gas Skids complete of separating and filtering systems, flowrate 6.050 kg/hr, pressure 24 barg.

Campo Gas Di Habshan

Habshan Gas Field

Abu Dhabi

United Arab Emirates

750.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2005

Ansaldo

Calenia Energia

N. 1 Sistema di filtrazione, misura fiscale, riscaldamento e riduzione pressione da 64 a 32 barg gas naturale per alimentazione turbine.Diametro linee 10", portata gas 170.000 nm3/hr.

N. 1 Custody transfer gas metering system for turbines fueling.Complete of filtration system, heating system and pressure reducing system from 64 to 32 barg.Lines diameter 10", gas flowrate 170.000 nm3/hr.

Centrale Elettrica Di Sparanise

Sparanise Power Plant

Sparanise

Italy

1.050.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2005

Mantrac Caterpillar

Khalda

N.2 Skid condizionamento gas; portata: 1 MMSCFD; pressione: 146 / 5 bar

N.2 Fuel gas conditioning skids; flowrate: 1MMSCFD; pressure: 146 / 5 bar

Qasr Gas plant

Qasr Gas plant

Egyptian desert

Egypt

1.895.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2004

G E Oil & Gas

Chiyoda

N°5 sistemi fuel gas con filtro separatore - Pressione: 28,3barg - Portata: 10m3/h

N°5 fuel gas systems with filter separator - Pressure: 28,3barg - Flow rate: 10m3/h

Campo Di Shakalin

Shakalin Field

Shakalin

Russia

520.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 86 di 130

21-gen-11

Page 88: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Sistemi Fuel GasJob References: Fuel Gas Packages

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2004

G E Oil & Gas

Encana

N°3 sistemi alimentazione fuel gas - Portata: 6.200 Nm3/ora - Pressione: 51 barg

N°3 fuel gas packages - Flow: 6.200 Nm3/h - Pressure: 51 barg

Piattaforma Off-shore Buzzard

Off-shore Platform Buzzard

North Sea

United Kingdom

177.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2004

Petrofac International

B P

N°4 sistemi di alimentazione fuel gas. Portata: 260 - 14.000Sm3/h, Pressione ingresso: 35 - 86barg, Pressione uscita: 31- 34,5barg

N°4 fuel gas packages. Flow range: 260 - 14.000Sm3/h, Input pressure: 35 - 86barg, Output pressure: 31- 34,5barg

Georgia - Azerbaijan Pipeline

Georgia - Azerbaijan Pipeline

Unk.

Unk.

886.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2004

Mezhregionkomplet

Gazprom

N.2 Sistemi trattamento gas; portata: 1MMSCFD cad.

N.2 Fuel gas conditioning skids; flowrate: 1 MMSCFD each

Byazhkizy Project

Byazhkizi Project

Byazhkizy

Turkmenistan

1.560.700,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2002

G E Oil & Gas

Shell Nigeria

No. 1 Package Fuel Gas (separazione e condizionamento gas a monte dei compressori).

No. 1 Fuel Gas Package (gas separation and conditioning upstream compressors).

Campo Gas Di Cawthorne

Cawthorne Gas Field

Krakama

Nigeria

427.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 87 di 130

21-gen-11

Page 89: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Sistemi Fuel GasJob References: Fuel Gas Packages

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2002

Snamprogetti

Enipower

Sistema di misura fiscale e riduzione pressione gas per alimentazione turbogas - diametro 16" - portata 240.000Sm3/h - riduzione pressione da 75 a 30,5barg

Custody transfer gas metering system and pressure reduction for turbogas fuel - diameter 16" - flow 240.000Sm3/h - pressure reduction from 75 to 30,5barg

Centrale Elettrica Di Brindisi

Brindisi Power Plant

Brindisi

Italy

1.029.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2002

Enppi

Fayum GasCo(Shell Gas BV)

N.1 Sistema riduzione pressione finale; portata 35.000 Nm3/hr, pressione: 77 bar

N.1 Pressure reduction skid; flow rate: 35.000 Nm3/hr, pressure: 77 bar

Kom Aushim Gas Field

Kom Aushim Gas Field

Onshore Egypt

Egypt

387.648,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2002

Enppi

Fayum GasCo(Shell Gas BV)

N.1 Sistema riduzione pressione; portata 70.000 Nm3/hr, 77 bar

N.1 Pressure reduction skid; flow rate 70.000 Nm3/hr, 77 bar

Kom Aushim Gas Field

Kom Aushim Gas Field

Onshore Egypt

Egypt

484.560,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2001

International Power

N.1 Sistema finale di riduzione pressione; portata 130.000 Nm3/hr, 77bar

N.1 Pressure reduction skid; flow rate: 130.000 Nm3/hr, 77bar

Al Kamil Field

Al Kamil Field

Onshore Oman

Oman

452.340,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 88 di 130

21-gen-11

Page 90: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Sistemi Fuel GasJob References: Fuel Gas Packages

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2001

Snamprogetti

Enipower

Sistema di misura fiscale e riduzione pressione gas per alimentazione turbogas - diametro 16" - portata 240.000Sm3/h - riduzione pressione da 75 a 30,5barg

Custody transfer gas metering system and pressure reduction for turbogas fuel - diameter 16" - flow 240.000Sm3/h - pressure reduction from 75 to 30,5barg

Centrale Elettrica Di Ravenna

Ravenna Power Plant

Ravenna

Italy

1.061.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2000

Intermare Sarda

Agip

Impianto alimentazione fuel gas - Filtrazione e separazione da 500Sm3/h e controllo pressione a 90barg

Fuel gas package - Filtration and separation of 500Sm3/h and pressure control at 90barg

Piattaforma Off-shore Naomi - Pandora

Off-shore Platform Naomi - Pandora

Adriatic Sea

Italy

135.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

1997

Turbotecnica

S T E G

N°2 sistemi fuel gas con due filtri a cartucce e un separatore a pacco lamellare cadauno - Portata 50.000Nm3/h, P 23bar, T 30°C

N°2 fuel gas systems with two cartridge filters and one separator with vane pack, each - Flow 50.000Nm3/h, P 23bar, T 30°C

Centrale Elettrica Di Bouchemma

Bouchemma Power Plant

Bouchemma

Tunisia

130.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

1997

Intermare Sarda

Agip

Sistema fuel gas con due filtri a cartucce, due filtri a setacci molecolari e due filtri coalescer e riduzione e controllo pressione a 48bar - Portata 120Nm3/h, P 148bar, T 50°C

Fuel gas system with two cartridge filters, two molecular sieve filters and two coalescer filters, pressure reduction and control at 48bar - Flow 120Nm3/h, P 148bar, T 50°C

Piattaforma Off-shore Regina

Off-shore Platform Regina

Adriatic Sea

Italy

193.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 89 di 130

21-gen-11

Page 91: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Sistemi Fuel GasJob References: Fuel Gas Packages

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

1996

Turbotecnica

S T E G

N°2 sistemi fuel gas con due filtri a cartucce e un separatore a pacco lamellare cadauno - Portata 50.000Nm3/h, P 23bar, T 30°C

N°2 fuel gas systems with two cartridge filters and one separator with vane pack, each - Flow 50.000Nm3/h, P 23bar, T 30°C

Centrale Elettrica Di Bir M'cherga

Bir M'cherga Power Plant

Bir M'cherga

Tunisia

245.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 90 di 130

21-gen-11

Page 92: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Sistemi Iniezione Agenti ChimiciJob References: Chemical Injection Packages

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2010

JGC-Tecnimont JV

Gasco

N.18 Sistemi iniezione agenti chimici vari e varie pressioni di iniezione, con serbatoi, pompe dosatrici a diaframma e relativi accessori (smorzatori di pulsazione, cilindri di calibrazione etc…)

N.18 Chemical injection packages, different typologies and different injection pressures, with tanks and diaphragm pumps and related accessories (pulsation dumpeners, calibration pots etc…)

Campo Gas Di Habshan

Habshan Gas Field

Abu Dhabi

United Arab Emirates

2.368.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2010

Mellitah Gas BV

N.3 Sistemi iniezione agenti chimici vari e varie pressioni di iniezione, con serbatoi, pompe dosatrici a diaframma e relativi accessori (smorzatori di pulsazione, cilindri di calibrazione etc…)

N.3 Chemical injection packages, different typologies and different injection pressures, with tanks and diaphragm pumps and related accessories (pulsation dumpeners, calibration pots etc…)

Wafa Plant

Wafa Plant

Libyan Desert

Libya

375.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2009

Tamoil SA

Tamoil SA

N. 1 Sistema di iniziezione ammoniaca per ridurre emissione di Nox nel gas di scarico. Portata soluzione ammoniaca 250 kg/h @ 6 barg.

N. 1 Ammonia Injection Skid for reducing Nox emission in exhaust gas. Ammonia solution flow rate 250 kh/h @ 6 barg.

Raffineria di Collombey

Collombey Refinery

Collombey

Switzerland

240.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2008

Man Ferroostaal

Mellitah Gas BV

N. 3 Skid inibitori di corrosione

N. 3 Corrosion Inhibitor Injection Packages

Wafa Plant

Wafa Plant

Libyan Desert

Libya

168.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 91 di 130

21-gen-11

Page 93: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Sistemi Iniezione Agenti ChimiciJob References: Chemical Injection Packages

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2007

Enppi

Agiba

N. 2 Package con pompe dosatrici e relativi accessori (smorzatori di pulsazione, cilindri di calibrazione etc...) per l'iniezione di metanolo e anti corrosivo

N. 2 Chemical injection packages with dosing pumps and related accessories (pulsation dampeners, calibration pots etc....) for methanol and corrosion inhibitor injection

Campo Gas West Ashrafi

West Ashrafi Gas Field

Cairo

Egypt

459.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2007

ENI - Angola

Saipem France S.A.

N.6 Chemical injection e metanolo skids; portrte da 250 a 1.1250 lt/hr e pressioni da 70 a 650 barg

N.6 Chemical injection and methanol skids; flowrate: from 250 to 1.250 lt/hr; pressure: from 70 to 650 barg

Gimboa Platform

Gimboa Platform

Atlantic Ocean Angola

Angola

2.430.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2006

Enppi

Petrobel

N. 1 Sistema di iniezione agenti chimici con serbatoio a due scomparti da 2 m3 e quattro pompe dosatrici a pistoni (2 mono testa e due multitesta) complete di accessori (smorzatori pulsazioni, cilindri di calibrazione etc..).N. 1 chemical injection system composed of 1 x 2m3 tank with 2 compartments and 4 piston dosing pumps (2 single head and 2 multi heads) complete of accessories (pulsation dumpeners, calibration pots etc...).

Piattaforma Off-shore Semman

Semman Off-shore Platform

Mediterranean Sea

Egypt

127.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2006

Petrobras

Saipem

N.1 Skid caricamento chemical tramite pompe; portata: 5,5 m3/hr; pressione: 100 bar

N.1 Chemical charging pump skid; flowrate: 5,5 m3/hr; pressure: 100 bar

Victoria FPSO

Victoria FPSO

Atlantic Ocean Brasil

Brasil

275.890,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 92 di 130

21-gen-11

Page 94: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Sistemi Iniezione Agenti ChimiciJob References: Chemical Injection Packages

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2006

Dodsal

Takreer

N. 1 Skid di inizione per agenti chimici con pompe dosatrici a diaframma e relativi accessori ( smorzatori di pulsazione, cilindri di calibrazione, etc. )

N. 1 Chemical injection skid with diaphragm dosing pumps and relative accessories ( pulsation dumpeners, calibration pots, etc. )

Progetto di interconnessione raffinerie via pipeline

Inter refineries pipeline project

Abu Dhabi

United Arab Emirates

170.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2004

Progetti Europa & Global

Scop

N°8 packages di iniezione chemicals. Pressione: 5 - 27 barg. Portata: 2 - 33 lt/ora

N°8 chemical injection packages. Pressure: 5 - 27 barg. Flow: 2 - 33 lt/ora

Campo Olio Di Majnoon

Majnoon Oil Field

Majnoon

Iraq

225.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2003

Eni - Div. Agip

Eni - Div. Agip

Impianto iniezione acqua con motore a gas - Portata: 10 - 25m3/h - Pressione: 85bar

Water injection with gas engine - Flow: 10 - 25m3/h - Pressure: 85bar

C.le Gas Ravenna Mare

Ravenna Mar Gas Plant

Ravenna

Italy

515.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2003

Chagalesh Consulting Eng.

N I S O C

N°5 packages di iniezione chemicals. Pressione: 460bar - Portata: 25 - 200 lt/h

N°5 chemical injection packages. Pressure: 460bar - Flow: 25 - 200 lt/h

Campo Di Khami

Khami Field

Teheran

Iran

1.376.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 93 di 130

21-gen-11

Page 95: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Sistemi Iniezione Agenti ChimiciJob References: Chemical Injection Packages

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2003

J G C Corporation

Agip Gas B V

N°55 packages di iniezione chemicals. Pressione: 10 - 184 barg. Portata: 0,1 - 3.000 lt/h

N°55 chemical injection packages. Pressure: 10 - 184 barg. Flow: 0,1 - 3.000 lt/h

Campo Gas Di Wafa

Wafa Gas Field

Libyan Desert

Libya

1.702.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2002

Eni - Div. Agip

Eni - Div. Agip

Package di reiniezione acque di strato a 9 pompe - Pressione 70 bar

Water re-injection package with 9 pumps - Pressure 70 bar

C.le Gas Ravenna Mare

Ravenna Mar Gas Plant

Ravenna

Italy

100.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2002

B P Exploration

B P Exploration

N°3 skid per iniezione di vari additivi chimici con 6 pompe metering multiteste. Portata: 3,25 - 222 lt/h. Pressione: 17,5 - 75 barg.

N°3 chemical injection packages for various additives with 6 multi-head metering pumps. Flow: 3,25 - 222 lt/h. Pressure: 17,5 - 75 barg.

Piattaforma Off-shore Claire

Off-shore Platform Claire

North Sea

United Kingdom

428.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2002

Enppi

Fayum GasCo(Shell Gas BV)

N.1 Sistema iniezione odorante; portata 3,5 lt/h, pressione: 7 bar

N.1 Odorant injection unit; flowrate: 3,5 lt/h, pressione: 7 bar

Fayum gas plant

Fayum gas plant

Fayum city

Egypt

145.670,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 94 di 130

21-gen-11

Page 96: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Sistemi Iniezione Agenti ChimiciJob References: Chemical Injection Packages

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2002

Hyundai Eng. & Cont.

Agip Iran

N°28 packages di iniezione chemical - Pressione: 15 - 80 barg - Portata: 0,2 - 3.000 lt/h

N°28 chemical injection packages - Pressure: 15 - 80 barg - Flow: 0,2 - 3.000 lt/h

Campo Di South Pars - Fasi 4&5

South Pars Field - Phases 4&5

Teheran

Iran

1.579.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2000

Petrolifera Italo Rumena

Petrolifera Italo Rumena

Impianto di miscelazione acido solforico e acqua e sistema caricamento autobotti

Water and solfuric acid mixing plant and truck loading system

Raffineria Di Ravenna

Ravenna Refinery

Ravenna

Italy

76.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2000

Intermare Sarda

Agip

N°2 packages di iniezione chemicals con 27 pompe cadauno in acciao inox - Pressioni tra 14e 133barg - Portate tra 1,4 e 9lt/h

N°2 chemical injection packages with 27 pumps each - Pressure range between 14 and 133barg - Flow range between 1,4 and 9lt/h

Piattaforma Off-shore Mwafi Foukanda

Off-shore Platform Mwafi Foukanda

Guinea Gulf

Nigeria

510.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

1997

Sicon Oil&gas (CCC Group)

O G D C

N°4 package di separazione gas da 40MMscf/g, N°4 trappole di lancio e ricevimento pig da 12" e 6", N°11 package di iniezione chemical , N°2 sistemi di misura fiscale gas con orifizi calibrati da 6".

N°4 gas separation packages for 40MMscf/d, N°4 launching and receivign traps 12" and 6", N°11 chemical injection packages, N°2 gas metering systems with senior calibrated orefice 6".

Campo Gas Di Panjpir

Panjpir Gas Field

Panjpir

Pakistan

860.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 95 di 130

21-gen-11

Page 97: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Sistemi Filtrazione e Separazione O&GJob References: O&G Filtration and Separation Systems

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2010

Mellitah Gas BV

N.2 Filtri per greggio caldo; diametro: 500mm; tangent line: 1.100mm

N.2 Hot Oil Filters; diameter: 500mm; tangent-line: 1.100mm

Bouri Project

Bouri Project

Mediterranean Sea - Libya

Libya

42.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2010

Mustang Eng.

Mellitah Gas BV

Fornitura di filtri conici e filtri a Y in DUPLEX material

Filters and Strainers in DUPLEX material

Bouri Project

Bouri Project

Mediterranean Sea - Libya

Libya

74.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2009

Ansaldo

Sorgenia

N. 1 Sistema FG composto da sistema di filtrazione, misura, riscaldamento e riduzione pressione gas naturale da 64 a 34 barg per alimentare N. 2 TG. Dia. Linee 14", Portata 16,2 kg/sec.

N. 1 Fuel Gas package composed of filtration system, gas metering system, heating system and pressure reduction system for natural gas from 64 to 34 barg to feed N. 2 turbines. Lines Dia. 14", Flow rate 16,2 kg/sec each turbines

C.le Elettrica a Ciclo Combinato 800 MW Aprilia

800 MW Combined Cycle Power Plant Aprilia

Aprilia

Italy

2.200.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2009

Enppi

Petroshadh

N.1 Separatore trifase per greggio da 15.000 BOPD

N.1 3-Phase crude oil separator; flowrate: 15.000 BOPD

Impianti Vari

Several Plants

Onshore Egypt

Egypt

159.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 96 di 130

21-gen-11

Page 98: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Sistemi Filtrazione e Separazione O&GJob References: O&G Filtration and Separation Systems

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2009

Enppi

Wasco

N.1 Separatore gas 3° fase; diametro: 56"; tangent line: 20'

N.1 3 Phase separator; diameter: 56"; tangent-line: 20'

Impianti Vari

Several Plants

Onshore Egypt

Egypt

397.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2008

Petrojet

Khalda Petr. Co (Apache)

N.1 Separatore greggio-acqua da 50.000 BWPD

N.1 Oily-water separator; flowrate: 50.000 BWPD

Qasr field

Qasr field

Onshore Egypt

Egypt

203.456,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2008

ABB SPA PA Div.

ENI Div. Congo

N. 1 Sistema FG composto da sistema di filtrazione, riscaldamento e riduzione pressione gas naturale da 33 a 22 barg per alimentare TG (2 x 146 MW) + black start up 1 x 9 MW. Dia. Linee 12", Portata 21 kg/secN. 1 Fuel Gas package composed of filtration system, heating system and pressure reduction system for natural gas from 33 to 22 barg to feed turbines (2 x 146 MW) + black start up 1 x 9 MW. Lines Dia. 12", Flow rate 21 kg/sec

M'Boundi integrated gas power generation WP5

M'Boundi integrated gas power generation WP5

Republic of Congo

Republic of Congo

1.350.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2008

Ansaldo

Sorgenia

N. 1 Sistema Fuel Gas composto da sistema di filtrazione e separazione, misura fiscale, riscaldamento e riduzione pressione gas naturale da 50 a 28,5 barg per alimentare N. 2 TG. Dia. Linee 14", Portata 17,6 kg/sec.N. 1 Fuel Gas Package composed of filtration and separation system, custody transfer gas metering system, heating and pressure reduction system for natural gas from 50 to 28,5 barg. Lines Dia. 14", Flow rate 17,6 kg/sec each turbines.

C.le Elettrica a Ciclo Combinato 800 MW Turano Lodigian

800 MW Combined Cycle Power Plant Turano Lodigiano

Lodi

Italy

2.050.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 97 di 130

21-gen-11

Page 99: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Sistemi Filtrazione e Separazione O&GJob References: O&G Filtration and Separation Systems

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2008

DCP Midstream

N.1 Separatore gas naturale in aspirazione stazione di compressione; diametro: 126"; Tangent-line: 18'

N.1 Suction drum for natural gas compressing station; diameter: 126"; tangent-line: 18'

Impianti Vari

Several Plants

Onshore USA

USA

213.983,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2008

DCP Midstream

N.1 Slug catcher orizzontale gas naturale diametro: 84"; tangent-line: 80'

N.1 Horizzontal slug catcher; diameter: 84"; tangent-line: 80'

Impianti Vari

Several Plants

Onshore USA

USA

295.230,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2008

Marlin Midstream

N.1 Surge tank orizzontale; diametro: 120"; tangent-line: 45' 6"

N.1 Horizontal surge tank; diameter: 120"; tangent-line: 45' 6"

Impianti Vari

Several Plants

Onshore USA

USA

303.620,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2008

Enppi

Khalda Petr. Co (Apache)

N.4 Separatori gas di terza fase da 10.000 BOPD

N.4 Three phase separators; flowrate: 10.000 BOPD

Western Desert Field

Western Desert Field

Onshore Egypt

Egypt

856.780,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 98 di 130

21-gen-11

Page 100: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Sistemi Filtrazione e Separazione O&GJob References: O&G Filtration and Separation Systems

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2008

Centerpoint

N.2 Separatori a gas (collegamento ad arpa); diametro: 48"; Tangent-line: 30'

N.2 Harp style slug catcher; diameter: 48"; tangent-line: 30'

Impianti Vari

Several Plants

Onshore USA

USA

449.200,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2008

Eastern Reservoir

N.5 Separatori gas a sabbia; diametro: 90"; tangent-line: 30'

N.5 Sand flow back separators; diameter: 90"; tangent line: 30'

Impianti Vari

Several Plants

Onshore Egypt

Egypt

360.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2008

Rosetti Marino SpA

Edina

N. 2 Diesel Fuel Skids e N. 2 Oily Water Filtration and Treatment Skids

N. 2 Diesel Fuel Skids e N. 2 Oily Water Filtration and Treatment Skids

Piattaforma Isabella Nord Sud

Izabella North South Platform

Adriatic Sea

Croatia

520.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2008

Enppi

Khalda Petr. Co (Apache)

Sistemi di separazione per gas naturlae da 500 MMSCFD, peso totale: 400 tons, completamente accessoriato e installato in site

Slug catcher facilities; flowrate: 500 MMSCFD, total weight: 400tons, with all accessories and installed at site

Salam Gas Plant

Salam Gas Plant

Onshore Egypt

Egypt

32.190.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 99 di 130

21-gen-11

Page 101: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Sistemi Filtrazione e Separazione O&GJob References: O&G Filtration and Separation Systems

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2007

Khalda Petr. Co (Apache)

N.1 Separatore per gas naturale; diametro: 3 mt; Tangent-line: 20 mt; pressione: 149 bar; peso: 300 tons completamente accessoriato e installato in sito

N.1 Slug catchers; diameter: 3mt; tangent-line: 20mt; pressure: 149 bar; weight: 300 tonns, totally accessoried and installed at site

Salam Gas Plant

Salam Gas Plant

Onshore Egypt

Egypt

11.246.680,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2007

Khalda Petr. Co (Apache)

N.1 Sistema di separazione gas da 150 MMSCFD; pressione: 146 bar completamente accessoriato e installato in sito

N.1 Gas separator; flowrate: 150 MMSCFD; pressure: 146 bar, totally accessoried and installed at site

Qasr field

Qasr field

Onshore Egypt

Egypt

9.552.458,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2007

Enppi

Agiba

N.1 Separatore gas; diametro: 1 mt; Tangent-line: 3 mt; pressione: 11,5 bar

N.1 KO drum; diameter: 1mt; Tangent-line: 3 mt; pressure: 11,5 bar

West Ashrafi plant

West Ashrafi plant

Egyptian desert

Egypt

45.650,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2007

C C C

Khafji JO (Aramco-KOC)

N. 3 Separatori di processo bassa pressione, dia. 5,5 mt x 24 mt tg-tg, 110 tons cadauno

N.3 LP process separators, dia. 5,5 mt x 24 mt tg-tg, weight 110 tons each

Campo Olio di Khafji

Khafji Oil Field

Khafji

Saudi arabia

1.838.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 100 di 130

21-gen-11

Page 102: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Sistemi Filtrazione e Separazione O&GJob References: O&G Filtration and Separation Systems

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2006

Ansaldo

Calenia Energia

N. 1 Sistema Fuel Gas composto da sistema di filtrazione, misura fiscale, riscaldamento e riduzione pressione gas naturale da 62 to 27 barg, per alimentazione turbine. Diametro linee 12", portata 32 kg/sec.

N. 1 Fuel Gas Package composed of filtration system, Custody transfer gas metering system for turbines fueling, heating system and pressure reduction system for natural gas from 62 to 27 barg. Lines diameter 12", flowrate 32 kg/sec.

Centrale Elettrica Di Rizziconi

Rizziconi Power Plant

Rizziconi

Italy

1.280.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2006

Khalda Petr. Co (Apache)

N.5 Sistemi rimozione mercurio per greggio; portata: 50 MMSCFD cad; pressione: 146 bar

N.5 Mercury removal trains; flowrate: 50 MMSCFD each; pressure: 146 bar

Obayed Gas Field

Obayed Gas Field

Onshore Egypt

Egypt

8.850.650,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2006

Enppi

Khalda Petr. Co (Apache)

N.1 Sistema di separazione idrocarburi da gas naturale; portata: 5,5 m3/hr

N.1 Flare knock out drum package; flowrate: 5,5 m3/hr

Hayat Field

Hayat Field

Onshore Egypt

Egypt

58.540,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2006

G E Oil & Gas

Gasco

N. 2 Fuel Gas Skids completi di sistema di filtrazione e separazione

N. 2 Fuel Gas skids complete of separation and filtration systems

Campo Gas Di Habshan

Habshan Gas Field

Abu Dhabi

United Arab Emirates

240.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 101 di 130

21-gen-11

Page 103: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Sistemi Filtrazione e Separazione O&GJob References: O&G Filtration and Separation Systems

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2006

Shakalin energy Inv. Co.

Fluor

N.1 Separatore olio - acqua da 5.000 m3/hr

N.1 Oliy water separator; flowrate: 5.000 m3/hr

Shakalin Gas Field

Shakalin Gas Field

Shakalin Island

Russia

2.134.560,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2006

Alstom Power

Eurosviluppo Elettrica

N. 1 Sistema di filtrazione e separazione composto da 2 linee misura gas fiscali a turbine da 16" al 100%, riscaldatori , valvole riduzione pressione, flow computers, sistema di controllo, sistema di campionamento e strumenti di analisi . Portata Gas 37 Kg/secN.1 Sepration and Filtration system composed of 2 fiscal 100% measuring lines x 16" with turbines, heaters, pressure reducing valves, flow computers, control systems, sampling system and analysers. Gas flow rate 37 Kg/sec

Centrale Elettrica di Modugno

Modugno Power Plant

Modugno

Italy

1.440.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2005

Sahatransneftegas

N.2 Sistemi di separazione gas per alta pressione da 100 MMSCFD cad.

N.2 HP gas separators; flowrate: 100 MMSCFD each

Saha Gas plant

Saha Gas plant

Saha

Russia

1.860.430,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2005

Ansaldo

Calenia Energia

N. 1 Sistema di misura gas fiscale, filtrazione, riscaldamento e riduzione pressione da 64 a 32 barg gas naturale per alimentazione turbine - Diametro linee 10" - Portata 170.000 nm3/hr

N. 1 Custody transfer gas metering system for turbines fueling, complete of filtration, heating and pressure reduction from 64 to 32 barg. - Lines diameter 10". - Flow rate 170.000 Sm3/hr.

Centrale Elettrica Di Sparanise

Sparanise Power Plant

Sparanise

Italy

1.050.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 102 di 130

21-gen-11

Page 104: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Sistemi Filtrazione e Separazione O&GJob References: O&G Filtration and Separation Systems

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2005

China oil corporation

N.1 Separatore greggio da 15.000 BOPD

N.1 Crude oil separator; flowrate: 15.000 BOPD

Aktobe Project

Aktobe Project

Onshore Kazakistan

Kazakistan

329.760,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2005

Enppi

Khalda Petr. Co (Apache)

N.1 Sistema di separazione gas alta pressione da 50 MMSCFD, pressione: 146 bar

N.1 HP test separator; flowrate: 50 MMSCFD; pressure: 146 bar

Qasr field

Qasr field

Onshore Egypt

Egypt

2.390.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2005

Toyo Eng. India Ltd.

K N P C

No. 1 Filtro per sabbia e no. 1 filtro per sale, pressione di esercizio 30 barg, diametro 5.100 mm lunghezza (tang to tang) 7.900 mm

No. 1 sand filter and no. 1 clay filter, working pressure 30 barg, diameter 5.100 mm length (tang to tang) 7.900 mm

Raffineria Di Mina Abdulla

Mina Abdulla Refinery

Kuwait

Kuwait

482.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2005

Alcon

N A O C

N. 1 Separatore NAG, bifasico orizzontale, completamente strumentato, dimesioni 4,2 x 10 h=6 m.

N. 1 NAG Separator, horizontal, 2 phases, completely instrumented, dimensions 4,2 x 10 x h=6 m.

Campo Gas Di I D U

I D U Gas Field

Port Harcourt

Nigeria

517.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 103 di 130

21-gen-11

Page 105: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Sistemi Filtrazione e Separazione O&GJob References: O&G Filtration and Separation Systems

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2005

Enppi

Khalda Petroleum Company

N.3 Sistemi di separazione per alta pressione; portata: 150 MMSCFD; pressione: 146 bar

N.3 HP production separators; flowrate: 150 MMSCFD; pressure: 146 bar

Qasr field

Qasr field

Onshore Egypt

Egypt

7.980.300,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2005

Enppi

Khalda Petr. Co (Apache)

N.3 Sistemi di separazione gas - primo stadio da 57 MMScfd di vapore cad.

N.3 First stage gas separator; flowrate:57 MMScfd vapour each

Obayed Gas Field

Obayed Gas Field

Onshore Egypt

Egypt

6.456.340,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2005

Alcon

N A O C

No. 1 Fuel Gas Package completo di skids separazione, skids filtrazione, sistema di riduzione pressione e riscaldatori elettrici gas, incluso il piping di interconnessione e gestione tecnica di 3 compressori alternativi.No. 1 Fuel gas Package complete of separating skids, filtering skids, pressure reduction system and electrical gas heaters, including the interconnecting piping and the technical handling of 3 reciprocating compressors.

Campo Gas Di I D U

I D U Gas Field

Port Harcourt

Nigeria

801.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2005

Nuovo Pignone

Gasco

No. 8 Sistemi di separazione e filtrazione, portata 6.050 kg/hr, pressione 24 barg.

No. 8 Separating and filtering systems, flowrate 6.050 kg/hr, pressure 24 barg.

Campo Gas Di Habshan

Habshan Gas Field

Abu Dhabi

United Arab Emirates

750.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 104 di 130

21-gen-11

Page 106: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Sistemi Filtrazione e Separazione O&GJob References: O&G Filtration and Separation Systems

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2004

Enppi

Khalda Petr. Co (Apache)

N.2 Sistemi di separazione gas da 20 MMSCFD rating 600#

N.2 HP Gas separators; flowrate: 20 MMSCFD rating 600#

Salam Gas Plant

Salam Gas Plant

Onshore Egypt

Egypt

680.780,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2004

Sibneftegas

Sibneftegas

N.1 Seaparatore Bassa Temperatura da 150 MMSCFD

N.1 Low Temperature Separator ; flow rate: 150 MMSCFD

East Urengoy Project

East Urengoy Project

East Urengoy

Russia

869.450,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2004

Enppi

Belayim Pet.Co.(Petrobel)

N.1 Separatore gas; portata: 150 MMSCFD

N.1 Production separator; flowrate: 150 MMSCFD

Baltim platform

Baltim platform

Mediterranean Sea

Egypt

1.145.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2004

Mezhregionkomplet

Gazprom

N.2 Sistemi di separione gas per alta pressione; portata: 150 MMSCFD cad., pressione: 70 bar

N.2 HP gas separators; flowrate: 150 MMSCFD each; pressure: 70 bar

Byazhkizy Project

Byazhkizi Project

Byazhkizy

Turkmenistan

1.846.785,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 105 di 130

21-gen-11

Page 107: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Sistemi Filtrazione e Separazione O&GJob References: O&G Filtration and Separation Systems

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2004

G E Oil & Gas

Chiyoda

N°5 sistemi fuel gas con filtro separatore - Pressione: 28,3barg - Portata: 10m3/h

N°5 fuel gas systems with filter separator - Pressure: 28,3barg - Flow rate: 10m3/h

Campo Di Shakalin

Shakalin Field

Shakalin

Russia

520.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2004

Enppi

Khalda Petr. Co (Apache)

N.1 Sistema separazione gas da 35 MMSCGD rating 900#

N.1 HP Gas separator; flowrate: 35 MMSCFD rating 900#

Salam Gas Plant

Salam Gas Plant

Onshore Egypt

Egypt

457.690,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2004

Enppi

Khalda Petr. Co (Apache)

N.1 Sistema separazione gas da 50 MMSCGD rating 900#

N.1 HP Gas separator; flowrate: 50 MMSCFD rating 900#

Salam Gas Plant

Salam Gas Plant

Onshore Egypt

Egypt

645.780,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2004

Enppi

East Zeit Petr.Co.(Exxon)

N.1 Sistama di separazione olio tri-fase da 12.000 BOPD

N.1 Three phase oil separator; flowrate:12.000 BOPD

East Zeit Field

East Zeit Field

Onshore Egypt

Egypt

195.400,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 106 di 130

21-gen-11

Page 108: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Sistemi Filtrazione e Separazione O&GJob References: O&G Filtration and Separation Systems

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2004

Enppi

Belayim Pet.Co.(Petrobel)

N.1 Separatore gas; portata: 150 MMSCFD

N.1 Test separator; flowrate: 150 MMSCFD

Baltim platform

Baltim platform

Mediterranean Sea

Egypt

758.900,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2002

G E Oil & Gas

Shell Nigeria

No. 1 Package Fuel Gas (separazione e condizionamento gas a monte dei compressori).

No. 1 Fuel Gas Package (gas separation and conditioning upstream compressors).

Campo Gas Di Cawthorne

Cawthorne Gas Field

Krakama

Nigeria

427.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2002

Enppi

Fayum GasCo(Shell Gas BV)

N.1 Sistema di filtrazione gas; portata 35.000 Nm3/hr, pressione: 77bar

N.1 Filter separator skid; flow rate: 35.000 Nm3/hr, pressure: 77 bar

Kom Aushim Gas Field

Kom Aushim Gas Field

Onshore Egypt

Egypt

258.048,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2002

Enppi

Fayum GasCo(Shell Gas BV)

N.1 Sistema di filtrazione con blocco di emergenza, portata: 35.000 Nm3/hr, pressione: 77 bar

N.1 ESD filtering skid; flow rate: 35.000 Nm3/hr, pressure: 77 bar

Kom Aushim Gas Field

Kom Aushim Gas Field

Onshore Egypt

Egypt

156.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 107 di 130

21-gen-11

Page 109: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Sistemi Filtrazione e Separazione O&GJob References: O&G Filtration and Separation Systems

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2002

Enppi

Fayum GasCo(Shell Gas BV)

N.1 Skid filtrazione; portata 70.000 Nm3/hr, 77 bar

N.1 Filter separator skid; flow rate 70.000 Nm3/hr, 77 bar

Kom Aushim Gas Field

Kom Aushim Gas Field

Onshore Egypt

Egypt

322.560,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2001

AIC

International Power

N. 1 Skid filtrazione e separazione gas; portata 130.000 Nm3/hr, 77 bar

N. Filter separators skid; flow rate 130.000 Nm3/hr, 77 bar

Al Kamil Field

Al Kamil Field

Onshore Oman

Oman

363.452,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2001

U O P Usa

Khalda Petroleum Company

Impianto trattamento gas con due separatori a demister, un filtro a coalescenza e un filtro a cartucce - Portata 6.000Sm3/h - Pressione 77barg

Gas treatment package with two demister separators, one coalescer filter and one cartridge filter - Flow 6.000Sm3/h - Pressure 77barg

C.le Gas Salam

Salam Gas Plant

Western Desert

Egypt

251.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2001

Petrofac International

Sonatrach

N°2 filtri a cartucce da 33m3/h di Ammine in acciaio al carbonio - N°2 filtri a carbone attivo da 16.435 Kg/h di Ammine in acciaio al carbonio - N°1 filtro separatore in acciaio inox da 344.610Kg/h di gas e 2.500Kg/h condensatoN°2 cartridge filters for 33m3/h of lean amine in carbon steel - N°2 activated carbon filters for 16.435 Kg/h of lean amine in carbon steel - N°1 filter separator in stainless steel for 344.610Kg/h of gas and 2.500Kg/h of condensate

Campo Gas Di Ohanet

Ohanet Gas Field

Algeri

Algeria

290.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 108 di 130

21-gen-11

Page 110: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Sistemi Filtrazione e Separazione O&GJob References: O&G Filtration and Separation Systems

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2001

Agip

Agip Congo

N.1 Sistema separazione olio; portata 20.000 BOPD

N.1 Three phase oil separator; flow rate: 20.000 BOPD

Loango Field

Loango Field

Onshore Congo

Congo

563.860,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2000

Agip

Agip

Separatore da 125.000Sm3/g - Trappole di lancio e ricevimento da 14" - Riscaldatore gas da 150.000Kcal/h

Separator 125.000Sm3/g - Launching and receiving traps 14" - Gas heater 150.000Kcal/h

Campo Gas Di Samperi 1

Samperi 1 Gas Field

Enna

Italy

1.200.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2000

Intermare Sarda

Agip

Impianto alimentazione fuel gas - Filtrazione e separazione da 500Sm3/h e controllo pressione a 90barg

Fuel gas package - Filtration and separation of 500Sm3/h and pressure control at 90barg

Piattaforma Off-shore Naomi - Pandora

Off-shore Platform Naomi - Pandora

Adriatic Sea

Italy

135.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

1998

C M G

Agip

N°6 sistemi di filtrazione acque oleose

N°6 oily water filtering system

Impianti Vari

Various Plant

Italy

Italy

95.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 109 di 130

21-gen-11

Page 111: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Sistemi Filtrazione e Separazione O&GJob References: O&G Filtration and Separation Systems

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

1998

Saipem / Techint J V

Saudi Aramco

N°4 impianti di separazione gas a ciclotubi - PS3: un impianto da 1200MMscfd a tre separatori- PP7, PP8, PP9: tre impianti i da 600MMscfd cadauno a quattro separatori. P 70bar - ATI con Perry Equipment Corp.N°4 gas separation plants with cyclotubes - PS3: one plant of 1200MMscfd with three separators - PP7, PP8, PP9: three plants of 600MMscfd with four separators each. P 70bar - JV with Perry Equipment Corp.

C.le Gas Hawiyah

Hawiyah Gas Plant

Hawiyah

Saudi Arabia

4.675.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

1997

Turbotecnica

S T E G

N°2 sistemi fuel gas con due filtri a cartucce e un separatore a pacco lamellare cadauno - Portata 50.000Nm3/h, P 23bar, T 30°C

N°2 fuel gas systems with two cartridge filters and one separator with vane pack, each - Flow 50.000Nm3/h, P 23bar, T 30°C

Centrale Elettrica Di Bouchemma

Bouchemma Power Plant

Bouchemma

Tunisia

130.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

1997

Sicon Oil&gas (CCC Group)

O G D C

N°4 package di separazione gas da 40MMscf/g, N°4 trappole di lancio e ricevimento pig da 12" e 6", N°11 package di iniezione chemical , N°2 sistemi di misura fiscale gas con orifizi calibrati da 6".

N°4 gas separation packages for 40MMscf/d, N°4 launching and receivign traps 12" and 6", N°11 chemical injection packages, N°2 gas metering systems with senior calibrated orefice 6".

Campo Gas Di Panjpir

Panjpir Gas Field

Panjpir

Pakistan

860.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

1997

Intermare Sarda

Agip

Sistema fuel gas con due filtri a cartucce, due filtri a setacci molecolari e due filtri coalescer e riduzione e controllo pressione a 48bar - Portata 120Nm3/h, P 148bar, T 50°C

Fuel gas system with two cartridge filters, two molecular sieve filters and two coalescer filters, pressure reduction and control at 48bar - Flow 120Nm3/h, P 148bar, T 50°C

Piattaforma Off-shore Regina

Off-shore Platform Regina

Adriatic Sea

Italy

193.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 110 di 130

21-gen-11

Page 112: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Sistemi Filtrazione e Separazione O&GJob References: O&G Filtration and Separation Systems

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

1996

Turbotecnica

S T E G

N°2 sistemi fuel gas con due filtri a cartucce e un separatore a pacco lamellare cadauno - Portata 50.000Nm3/h, P 23bar, T 30°C

N°2 fuel gas systems with two cartridge filters and one separator with vane pack, each - Flow 50.000Nm3/h, P 23bar, T 30°C

Centrale Elettrica Di Bir M'cherga

Bir M'cherga Power Plant

Bir M'cherga

Tunisia

245.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 111 di 130

21-gen-11

Page 113: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Desalters e Trattamento OlioJob References: Desalters and Oil Treatment

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2010

Enppi

Khalda Petr. Co (Apache)

N.2 Treni trattamento olio composti da: desalter elettrostatici 25.000 BOPD; N4$ riscaldatori indiretti da 3,96 MBTU/hr cad. e N.4 Heater treaters

N.2 Train treatment oil composed by: electrostatic desalters; flowrate: 25.000 BO00PD, N.4 indirect water bath heaters; power: 3,96 MBTU/hr each and N.4 Heater treaters

Khalabsha Project

Khalabsha Project

Onshore Egypt

Egypt

9.140.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2010

Khalda Petr. Co (Apache)

N.2 Sistemi trattamento olio/gas composti da separatore trifase e heater treater

N.2 Fuel oil/gas systems composed by 3-phase separators and heater treaters

Khalabsha Project

Khalabsha Project

Onshore Egypt

Egypt

990.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2005

China oil corporation

N.1 Heater treater da 15.000 BOPD

N.1 Heater treater; flowrate: 15.000 BOPD

Aktobe Project

Aktobe Project

Onshore Kazakistan

Kazakistan

450.600,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2004

Enppi

Quarun Petroleum Co.

N.1 Separatore tri-fase; portata: 3.000BOPD + N.4 Desalters da 3.000BOPD

N.1 Three phase oil separator; flowrate: 3.000 BOPD + N.4 Desalters; flowrate: 3.000BOPD

Western Desert Field

Western Desert Field

Onshore Egypt

Egypt

850.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 112 di 130

21-gen-11

Page 114: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Desalters e Trattamento OlioJob References: Desalters and Oil Treatment

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2003

Mezhregionkomplet

Gazprom

N.1 Desalter per greggio, portata: 20.000 BOPD + N.4 Heater treater

N.1 Crude oil deslater, flowrate: 20.000 BOPD + N.4 Heater treater

Purosxvy Project

Purosxvy Project

Purosvy region

Russia

2.730.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 113 di 130

21-gen-11

Page 115: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Riscaldatori e ScambiatoriJob References: Heaters and Exchangers

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2010

Enppi

Khalda

N.4 Riscaldatori indiretti da 3,96 milioni di BTU/ora cad.

N.4 Indirect water bath heaters; power: 3,96 milion of BTU/hr

Khalabsha Project

Khalabsha Project

Onshore Egypt

Egypt

3.524.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2009

Eni - Div. Agip

N.2 Fasci tubieri in acciaio al carbonio; lunghezza: 10.652mm; peso totale: 7 tons

N.2 Tube bundles in carbon steel; lenght: 10.652mm; total weight: 7tons

Raffineria di Sannazzaro

Sannazzaro Refinery

Sannnazzaro

Italy

35.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2009

Ecofuel

N.3 Scambiatori shell & tube in acciaio al carbonio; lunghezza: 8317mm; peso totale: 10tons

N.3 Shell & tube heat exchangers in carbon steel; lenght: 8317; total weight: 10tons

Impianto Petrolchimico

Petrochemical Plant

Ravenna

Italy

60.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2009

Azzawiya

N.3 Fasci tubieri in acciaio al carbonio; lunghezza: 9.144mm; peso totale: 20tons

N.3 Tube bundles in carbon steel; lenght: 9.144mm; total weight: 20tons

Azzawiya refinery

Azzawiya refinery

Azzawiya

Libya

140.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 114 di 130

21-gen-11

Page 116: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Riscaldatori e ScambiatoriJob References: Heaters and Exchangers

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2009

Vomm

N.7 Scambiatori shell & tube; diametro: 396mm; spessore: 5mm; peso totale: 6tons

N.7 Shell & tube heat exchangers; diameter: 396mm; thk: 5mm; total weight: 6tons

Impianto in China

China plant

Onshore China

China

50.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2009

A2A N.3 Scambiatori shell & tube; materiale: acciaio al carbonio per basse temperature; diametro: 662mm; diametro: 8mm; peso totale: 15tons

N.3 Shell & tube heat exchangers; material: low temperature carbon steel; diameter: 662mm; thk: 8mm; total weight: 15tons

Impianto chimico

Chemical plant

Macconago

Italy

120.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2009

API

N.4 Fasci tubieri in acciaio al carbonio; lunghezza: 6100mm; peso totale: 40tons

N.4 tube bundles in carbon steel; lenght: 6100mm; total weight: 40tons

Raffineria Di Falconara

Falconara Refinery

Falconara

Italy

250.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2008

Bellelli Engineering N.4 Scambiatori shell & tube in acciaio al carbonio; diametro: 1219mm; spessore: 25mm; peso totale: 70tons

N.4 Shell & tube heat exchangers; diameter: 1219mm; thk: 25mm; total weight: 70tons

Impianto Petrolchimico

Petrochemical Plant

Porvoo

Finland

450.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 115 di 130

21-gen-11

Page 117: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Riscaldatori e ScambiatoriJob References: Heaters and Exchangers

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2008

Enppi

Khalda Petr. Co (Apache)

N.4 Riscaldatori indiretti a gas da 8.000 BOPD cad.

N.4 Heatr treaters; flowrate: 8.000 BOPD

Western Desert Field

Western Desert Field

Onshore Egypt

Egypt

1.423.896,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2008

API

Parti di ricambio per scambiatori shell & tube; peso totale fornitura: 20 tons

Spare parts for heat exchangers; total weight: 20 tons

Raffineria Di Falconara

Falconara Refinery

Falconara

Italy

350.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2008

Galp energia

Galp energia

N.2 Scambiatori shell & tube; materiale: acciaio inox basso legato; diametro: 1143; spessore: 35mm; peso totale: 15 tons

N.2 Shell & tube heat exchangers; material: low alloy steel; diameter: 1143mm; thk: 35mm; total weight: 15 tons

Raffineria di Porto

Porto refinery

Porto

Portugal

120.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2008

Technip Italy N.3 Scambiatori in acciaio legato; diametro: 1150mm; spessore: 13mm; peso totale: 30tons

N.3 Shell & tube heat exchangers; material: alloy steel; diameter: 1150mm; thk: 13mm; total weight: 30tons

Impianto petrolchimico

Petrochemical Plant

Gdansk

Poland

300.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 116 di 130

21-gen-11

Page 118: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Riscaldatori e ScambiatoriJob References: Heaters and Exchangers

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2008

Galp energia

N.2 Scambiatori in lega leggera; diametro: 1143mm; spessore: 35mm; peso totale: 15tons

N.2 Shell & tube heat exchangers in low alloy; diameter: 1143mm; thk: 35mm; total weight: 15tons

Raffineria di Porto

Porto refinery

Porto

Portugal

120.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2008

Galp energia

N.5 Scambiatori shell & tube in acciaio al carbonio; diametro: 1050mm; spessore: 13mm; peso totale: 40tons

N.5 Shell & tube heat eschangers in carbon steel; diameter: 1050mm; thk: 13mm; total weight: 40tons

Raffineria di Sines

Sines refinery

Sines

Portugal

335.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2007

API

N.6 Fasci tubieri in acciaio al carbonio; lunghezza: 6100mm; peso totale: 50tons

N.6 Tube bundles in carbon steel; lenght: 6100mm; total weight: 50tons

Raffineria Di Falconara

Falconara Refinery

Falconara

Italy

280.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2007

Korting Hannover

N.6 Scambiatori shell & tube in acciaio inox; diametro: 1200mm; spessore: 10mm; peso totale: 38tons

N.6 shell & tube heat exchangers; diameter: 1200mm; thk: 10mm; total weight: 38tons

Qafco plant

Qafco plant

Onshore Qatar

Qatar

395.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 117 di 130

21-gen-11

Page 119: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Riscaldatori e ScambiatoriJob References: Heaters and Exchangers

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2006

Enppi

Khalda Petr. Co (Apache)

N.3 Riscaldatori acqua indiretti per gas naturale; portata: 57.000 kh/hr cad., pressione: 146 bar

N.3 Water bath heaters; flowrate: 57.000 kg/hr; pressure: 146 bar

Tarek Field

Tarek Field

Onshore Egypt

Egypt

3.560.780,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2006

Linde Impianti

Jamnagar

N.4 Scambiatori shell & tube, materiale: A789-S31803; diametro: 1268mm; spessore: 16mm; peso totale: 59 tons

N.4 Shell & tube heat exchangers, material: A789-S31803; diameter: 1268mm; thk: 16mm; total weight: 59 tons

Impianto Idrogeno

Hydrogen plant

Onshore India

India

800.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2006

ITP N.5 Scambiatori shell & tube; materiale: A789-S31803; diametro: 457mm; spessore: 25mm; peso totale: 1,7 tons

N.2 Shell & tube heat exchangers; material: A789-S31803; diameter: 457mm; thk: 25mm; total weight: 1,7 tons

Siti Vari

Various Sites

Onshore Italy

Italy

318.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2006

Tecnimont

Tasnee

N.10 Scambiatori shell & tube in acciaio al carbonio; diametro: 840mm; spessore: 12mm; peso totale: 60 tons

N.10 Shell & tube heat exchangers in carbon steel; diameter: 840mm; thk; 12mm; total weight: 60tons

HD-LDPE plant

HD-LDPE plant

Al Jubail

Arabia Saudita

280.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 118 di 130

21-gen-11

Page 120: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Riscaldatori e ScambiatoriJob References: Heaters and Exchangers

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2006

Edison

N.1 Scambiatore shell & tube in acciaio al carbonio; diametro: 685mm; spessore: 10mm; peso totale: 5tons

N.1 Shell & tube heat exchangers in carbon steel; diameter: 685mm; thk: 10mm; total weight: 5tons

Impianto Chimico

Chemical plant

Simeri Crichi

Italy

40.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2006

Linde Impianti

Jamnagar

N.20 Scambiatori shell & tube; materiale mantello: acciaio al carbonio; materiale fascio tubiero: acciaio inox; diametro: 1012mm; spessore: 16mm; peso totale: 220tons

N.20 Shell & tube heat exchangers; shell material: carbon steel; tuble bundle material: stainless steel; diameter: 1012; thk: 16mm; total weight: 220tons

Impianto Idrogeno

Hydrogen plant

Onshore India

India

1.200.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2005

Linde Impianti

Jamnagar

N.10 Scambiatori shell & tube, materiale: CrMo/acciaio inox; diametro: 1000mm; spessore: 20mm; peso totale: 50 tons

N.10 Shell & tube heat exchangers CrMo/stainless steel material; diameter: 1000mm; thk: 20mm; total weight: 50 tons

Impianto Idrogeno

Hydrogen plant

Onshore India

India

400.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2005

RM - raffineria milazzo

N.1 Scambiatore shell & tube in acciaio inox; diametro: 1250mm; spessore: 12mm; peso totale: 12 tons

N.1 Shell & tube heat exchanger; material: stainless steel; diameter: 1250mm; thk: 12mm; total weight: 12tons

Raffineria di Milazzo

Milazzo refinery

Messina

Italy

80.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 119 di 130

21-gen-11

Page 121: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Riscaldatori e ScambiatoriJob References: Heaters and Exchangers

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2005

Enppi

Khalda Petr. Co (Apache)

N.3 Riscaldatori indiretti ad acqua da 57 MMScfd di vapore cad.

N.3 Gas fired water bath heaters; flowrate: 57 MMScfd each

Obayed Gas Field

Obayed Gas Field

Onshore Egypt

Egypt

3.490.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2005

China oil corporation

N.1 Heater treater da 15.000 BOPD

N.1 Heater treater; flowrate: 15.000 BOPD

Aktobe Project

Aktobe Project

Onshore Kazakistan

Kazakistan

450.600,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2005

Sapio

N.2 Scambiatori shell & tube in acciaio al carbonio; diametro: 700mm; spessore: 10mm; peso totale: 7tons

N.2 Shell & tube heat exchangers; diameter: 700mm; thk: 10mm; total weight: 7tons

Crion Sapio plant

Crio Sapio plant

Porto Marghera

Italy

60.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2005

Eurotecnica

N.8 Scambiatori shell & tube; materiale mantello: acciaio al carbonio; materiale fascio tubiero: acciaio inox; diemtro: 1200mm; spessore: 10mm; peso totale: 18tons

N.8 Shell & tube heat exchangers; shell material: carbon steel; tuble bundle material: stainless steel; diameter: 1200mm; thk: 10mm; total weight: 18 tons

Eurotecnica plant

Eurotecnica plant

Pulawy

Poland

220.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 120 di 130

21-gen-11

Page 122: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Riscaldatori e ScambiatoriJob References: Heaters and Exchangers

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2005

Korting Hannover

N.2 Scambiatori shell & tube, materiale mantello: acciaio carbonio; materiale fascio tubiero: acciaio inox; diametro: 455mm; spessore: 6mm; peso totale: 2tons

N.2 Shell & tube heat exchangers; shell material: carbon steel; bandle tube material: stainless steel;; diameter: 455mm; thk: 6mm; total weight: 2tons

Korting plant

Korting plant

Onshore Poland

Poland

35.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2005

Linde Impianti

Jamnagar

N.20 Scambiatori shell & tube; materiale mantello: acciaio al carbonio; materiale fascio tubiero: acciaio inox; diametro: 1000mm; spessore: 20mm; peso totale: 100tons

N.20 Shell & tube heat exchangers; shell material: carbon steel; tuble bundle material; stainless steel; diameter: 1000mm; thk: 20mm; total weight: 100tons

Impianto Idrogeno

Hydrogen plant

Onshore India

India

600.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2005

Medoil

N.1 Scambiatore shell & tube in acciaio inox; diametro: 273mm; spessore: 9,52mm; peso totale: 1ton

N.1 Shell & tube heat exchanger; diameter: 273mm; thk: 9,52mm; total weight: 1ton

Jowfe refinery

Jowfe refinery

Jowfe

Libya

20.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2005

Caffaro

N.2 Scambiatori shell & tube materiale: acciaio inox / Ti; diametro: 500mm; spessore: 5mm; peso totale: 2 tons

N.2 Shell & tube heat exchangers; material: stainless steel/Ti; diameter: 500mm; thk: 5mm; total weight: 2tons

Caffaro plant

Caffaro plant

Torviscosa

Italy

35.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 121 di 130

21-gen-11

Page 123: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Riscaldatori e ScambiatoriJob References: Heaters and Exchangers

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2004

Edison

N.1 Scambiatore shell & tube materiale: A210-A1; diametro: 457mm; spessore: 8mm; peso totale: 2 tons

N.1 Shell & tube heat exchangers; material: A210-A1; diametro: 457mm; thk: 8mm; total weight: 2 tons

Torviscosa plant

Torviscosa plant

Torviscosa

Italy

22.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2004

RM - raffineria milazzo

N.2 Scambiatori shell & tube; materiale: A210-A1; diametro: 940mm; spessore: 11mm; peso totale: 20 tons

N.2 Shell & tube heat exchangers; material: A210-A1; diameter: 940mm; thk: 11mm; total weight: 20 tons

Raffineria di Milazzo

Milazzo refinery

Messina

Italy

105.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2004

Bentini N.F. Energy N.1 Scambiatore shell & tube; materiale: SA 179; diametro: 890mm; spessore: 38mm; peso totale: 234 tons

N.3 Shell & tube heat exchangers; material: SA 179; diameter: 890mm; thk: 38mm; total weight: 234 tons

Petrodar pumping fac. Project

Petrodar pumping fac. Project

Onshore Sudan

Sudan

770.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2004

Siirtec Nigi

API

N.1 Scambiatore shell & tube; materiale: A210-A1; diametro: 3000mm; spessore: 15mm; peso totale: 43tons

N.1 Shell & tube heat exchangers; material: A210-A1; diameter: 3000mm; thk: 15mm; total weight: 43 tons

Raffineria Di Falconara

Falconara Refinery

Falconara

Italy

230.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 122 di 130

21-gen-11

Page 124: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Riscaldatori e ScambiatoriJob References: Heaters and Exchangers

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2004

MAE

N.5 Scambiatori Shell & tube in acciaio al carbonio; diametro: 1100mm; spessore: 8mm; peso totale: 6tons

N.5 Shell & tube heat exchangers in carbon steel; diameter: 1100mm; thk: 8mm; total weight: 6 tons

MAE plant

MAE plant

Fiorenzuola

Italy

12.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2004

Tamoil SA

N.2 Scambiatori shell & tube; materiale mantello: acciaio al carbonio; materiale fascio tubiero: acciaio inox; diametro: 674mm; spessore: 13mm; peso totale: 9 tons

N.2 Shell & tube heat exchangers; shell material: carbon steel; tube bundles material: stainless steel; diameter: 674mm; thk: 13mm; total weight: 9tons

Raffineria di Collombey

Collombey Refinery

Collombey

Switzerland

84.400,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2004

Tessenderlo

N.2 Scambiatori shell & tube in acciaio al carbonio; diametro: 1586mm; spessore: 7mm; peso totale: 7tons

N.2 Shell & tube heat exchangers in carbon steel; diameter: 1586mm; thk: 7mm; total weight: 7tons

Impianto di Tessenderlo

Tessenderlo plant

Pieve Vergonte

Italy

45.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2004

York France N.2 Scambiatori shell & tube in acciaio al carbonio; diametro: 406,4mm; spessore: 9,5mm; peso totale: 1ton

N.2 Shell & tube heat exchangers in carbon steel; diameter: 406,4mm; thk: 9,5mm; total weight: 1ton

Impianto in China

China plant

Onshore China

China

11.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 123 di 130

21-gen-11

Page 125: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Riscaldatori e ScambiatoriJob References: Heaters and Exchangers

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2004

Eni - Div. Agip

N.1 Scambiatore shell & tube materiale: A210-A1; diametro: 991mm; spessore: 13mm; peso totale: 12 tons

N.1 Shell & tube heat exchangers; material: A210-A1; diameter: 991mm; thk: 13mm; total weight: 12 tons

Raffineria di Taranto

Taranto refinery

Taranto

Italy

52.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2004

A B B Solutions N.2 Scambiatori shell & tube in acciaio al carbonio; diametro: 686mm; spessore: 10mm; peso totale: 15tons

N.2 Shell & tube heat exchangers in carbon steel; diameter: 686mm; thk: 10mm; total weight: 15tons

Bir Berkine plant

Bir Berkine plant

Onshore Algeria

Algeria

98.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2004

RM - raffineria milazzo

N.8 Scambiatori shell & tube; materiale: A210-A1; diametro: 2700mm; spessore: 9mm; peso totale: 55tons

N.8 Shell & tube heat exchangers; material: A210-A1; diameter: 2700mm; thk: 9mm; total weght: 55tons

Raffineria di Milazzo

Milazzo refinery

Messina

Italy

220.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2004

UMM Al Jawaby

Azzawiya

N.12 Scambiatori shell & tube in acciaio al carbonio; diametro: 690mm; spessore: 10mm; peso totale: 5tons

N.12 Shell & tube heat exchangers in carbon steel; diameter: 690mm; thk: 10mm; total weight: 5tons

Azzawiya refinery

Azzawiya refinery

Azzawiya

Libya

50.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 124 di 130

21-gen-11

Page 126: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Riscaldatori e ScambiatoriJob References: Heaters and Exchangers

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2004

Siirtec Nigi

API

N.1 Scambiatore shell & tube; material: A210-A1/acciaio al carbonio; diametro: 2472; spessore: 15mm; peso totale: 87 tons

N.1 Shell & tube, material: A210-A1/carbon steel; diameter: 2472mm; thk: 15mm; total weight: 87 tons

Raffineria Di Falconara

Falconara Refinery

Falconara

Italy

130.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2003

Mezhregionkomplet

Gazprom

N.1 riscaldatore a gas, portata: 20.000 BOPD

N.1 heater treater, flowrate: 20.000 BOPD

Purosxvy Project

Purosxvy Project

Purosvy region

Russia

1.235.700,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2003

Techint

Agip Petroli

N.1 Scambiatore shell & tube materiale low carbon steel / claddatura in AISI 304; diametro: 52"; spessore: 5mm + 3 mm cladd.; peso totale: 50 tons

N.1 Shell & tube heat exchangers; low carbon steel material, clad: 304; diameter: 52"; thk: 50mm+3mm clad; total weight: 50 tons

Raffineria di Gela

Gela refinery

Gela

Italy

400.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2003

Tecnimont

Jam Iran

N.9 Scambiatori shell & tube materiale mantello: acciaio al carbonio; materiale fascio tubiero: acciaio inox; diametro: 20"; spessore: 10mm; peso totale: 10 tons

N.9 Shell & tube heat exchangers; shell material: carbon steel; tube bundle: stainless steel; Diameter: 20"; thk: 10mm; total weight: 10 tons

Jam plant

Jam plant

Onshore Iran

Iran

150.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 125 di 130

21-gen-11

Page 127: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Riscaldatori e ScambiatoriJob References: Heaters and Exchangers

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2003

Snamprogetti/TKP

Omifco

N.34 Scambiatori shell & tube; mantello in acciaio al carbonio; fascio tubiero in acciaio inox 316L; diametro: 66"; spessore: 25mm; peso totale: 180 tons

N.34 Shell & tube heat exchangers; shell material: carbon steel; tuble bundles material: stainless steel 316L; diameter: 66"; thk: 25mm; total weighit: 180 tons

Omifco plant

Omifco plant

Onshore India

India

2.100.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2002

Aeromeccanica Stranich N.1 Scambiatore shell & tube materiale CrMo; diametro: 850 mm; spessore: 12mm; peso totale: 0,5 ton

N.1 Shell & tube heat exchangers CrMo material; diametro: 850 mm; spessore: 12mm; total weight: 0,5 ton

Impianto in China

China plant

Onshore China

China

40.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2002

Enppi

Fayum GasCo(Shell Gas BV)

N. 2 Caldaie indirette a gas; potenzialità: 700 kW, pressione: 77 bar

N.2 Gas fired water bath heater, duty 700 kW, pressure: 77 bar

Fayum gas plant

Fayum gas plant

Fayum city

Egypt

820.480,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2002

Enppi

Fayum GasCo(Shell Gas BV)

N. 2 Caldaie indirette a gas; potenzialità: 1,4 MW, pressione: 77 bar

N.2 Gas fired water bath heater, duty 1,4 MW, pressure: 77 bar

Kom Aushim Gas Field

Kom Aushim Gas Field

Onshore Egypt

Egypt

1.025.600,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 126 di 130

21-gen-11

Page 128: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Riscaldatori e ScambiatoriJob References: Heaters and Exchangers

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2002

Snamprogetti Sud

Agip Petroli

N.10 Scambiatori shell & tube in acciaio al carbonio; diametro: 1219mm; spessore: 13mm; peso totale: 150 tons

N.10 Shell & tube heat exchangers in carbon steel; diameter: 1219mm; thk: 13mm; total weight: 640.000,00

Raffineria di Gela

Gela refinery

Gela

Italy

640.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2002

Tecnimont N.3 Scambiatori shell & tube; materiale: A210-A1 / acciaio al carbonio; diametro: 465mm; spessore: 10mm; peso totale: 6tons

N.3 Shell & tube heat exchangers; material: A210-A1 / carbon steel; diameter: 465mm; thk: 10mm; total weight: 6 tons

PP Hungary plant

PP Hungary plant

Onshore Hungary

Hungary

55.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2001

AIC

International Power

N.2 Riscaldatore indiretto a gas; potenza 4,5 MW, 77 bar

N.2 Gas fired water bath heater; 4,5 MW, 77 bar

Al Kamil Field

Al Kamil Field

Onshore Oman

Oman

1.504.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2001

Noyvallesina

KZPC ENC

N.5 Scambiatori shell & tube materiale: Incoloy 825; diametro: 900", spessore: 12mm; peso totale: 29 tons

N.5 Shell & tube heat exchangers Incoloy 825 material; diameter: 900"; thk: 12 mm; total weight: 55 tons

KZPC ENC

KZPC ENC

Onshore Iran

Iran

1.000.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 127 di 130

21-gen-11

Page 129: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Riscaldatori e ScambiatoriJob References: Heaters and Exchangers

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2001

Agip Petroli

N.3 Scambiatori shell & tube materiale: CrMo; diametro: 940mm; spessore: 11mm; peso totale: 38 tons

N.3 Shell & tube heat exchangers CrMo material; diameter: 940 mm; spessore: 11mm; total weight: 38 tons

Raffineria di Taranto

Taranto refinery

Taranto

Italy

300.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2001

Agip

N.2 Scambiatori shell & tube materiale mantello: acciaio carbonio, fascio tubiero: acciaio inox 316L; peso totale: 2 tons

N.2 Shell & tube heat exchangers; shell material: carbon steel; tube bundles material: stainless stell 316L; total weight: 2 tons

Raffineria di Livorno

Livorno retinery

Livorno

Italy

30.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2001

Sonatrach / Agip

Agip

N.4 Scambiatori shell & tube; materiale: acciaio al carbonio; diametro: 30"; spessore: 12mm; peso totale: 25 tons

N.4 Shell & tube heat exchangers; material: carbon steel; diameter: 30"; thk: 12mm; total weight: 25 tons

Agip bir rebaa

Agip bir rebaa

Onshore Algeria

Algery

120.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2001

Technip China

Quiri refrigeration

N.16 Scambiatori shell & tube; materiale mantello acciaio al carbonio, materiale fascio tubiero: acciaio inox 316L; diametro: 28"; spessore: 8mm; peso totale: 14 tons

N.16 Shell & tube heat exchangers; shell material: carbon steel; tube bundles: stainless steel 316L; diameter: 28"; thk: 8mm; total weight: 14 tons

Impianti vari

Several Plants

Onshore China

China

160.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 128 di 130

21-gen-11

Page 130: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Riscaldatori e ScambiatoriJob References: Heaters and Exchangers

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2001

Medoil

Sirte Oil Company

N.3 Scambiatori shell & tube in acciaio inox 316L; diametro:950mm; spessore: 10mm; peso totale: 36 tons

N.3 Shell & tube heat exchangers; material: stainless steel 316L; diameter: 950mm; thk: 10mm; total weight: 36 tons

Raffineria della S.O.C.

S.O.C. refinery

Onshore Libya

Libya

450.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2001

API

N.2 Scambiatori shell & tube materiale: acciaio al carbonio; peso totale: 0,5 ton

N.2 Shell & tube heat exchangers; material: carbon steel; total weight: 0,5 ton

Raffineria di Ancona

Ancona refinery

Ancona

Italy

12.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2000

Snamprogetti Sud

Agip Petroli

N.8 Scambiatori shell & tube in acciaio al carbonio Gr. 11; Diametro: 36"; spessore: 25 mm peso tot.: 55 tons

N.8 shell & tube heat exchangers in carbon steel Gr.11; Diametro: 36"; thk: 25 mm; total weight 55 tons

Raffineria di Sannazzaro

Sannazzaro Refinery

Sannnazzaro

Italy

230.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

2000

York France N.9 Scambiatori shell & tube; materiale mantello: acciaio al carbonio, materiale tubi: rame; diemtro: 60"; spessore: 15mm; peso totale: 17 tons

N.9 Shell & tube heat exchangers; shell material: carbon steel, tube material: copper; diameter: 60"; thk: 15mm; total weight: 17tons

Impianto in China

China plant

Onshore China

China

155.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 129 di 130

21-gen-11

Page 131: REFERENCE LIST (ALL PRODUCTS) INDEX

Referenze: Riscaldatori e ScambiatoriJob References: Heaters and Exchangers

Main ContractorCliente Finale / End UserValore / ValueAnno / Year

Descrizione Lavoro

Job Description

ImpiantoPlantLocalità / LocationPaese / Country

Ingegneria AttivitàEngineering Activity

2000

Vinavil

N.3 Scambiatori shell & tube; materiale: acciaio inox 316L; diametro: 38"; spessore: 10mm; peso totale: 19 tons

N.3 Shell & tube heat exchangers; material: stainless steel 316L; diameter: 38"; thk: 10mm; total weight: 19tons

Impianto Vinavil

Vinavil plant

Onshore Italy

Italy

230.000,00

Procurement

Construction

Pre-comm. / comm.

Start-up /Training

Basic / Process

Civil / Structural

Electrical / Instrum.

MechanicalEuro Installation

Pag. 130 di 130

21-gen-11