REFERENCE LIST (ALL PRODUCTS)
INDEX
COMMODITIES
FROM PAGE
TO
PAGE
Metering Systems……………………………………………………………
1 6
Wellhead Control Systems…………………………………………………..
7 17
Prefabricated Shelters……………………………………………………….
18 28
Process Packages…………………………………………………………….
29 46
EPC Contract………………………………………………………………...
47 50
Pressure Vessels…...………………………………………………………...
51 77
Gas Dehydration Packages…………………………………………………..
78 82
Fuel Gas Packages…………………………………………………………..
83 90
Chemical Injection Packages………………………………………………..
91 95
Oil & Gas Filtration and Separation Systems……………………………….
96 111
Desalters and Oil Treatment………………………………………………..
112 113
Heaters and Exchangers………………………………………………..
114 130
Reference List
Referenze: Sistemi Di Misura O&GJob References: Metering Systems O&G
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2010
Daewoo E & C Co Ltd
N A O C
N.1 Sistema di misura fiscale per olio con no. 3 linee di misura dia. 8", rating 600, con PD Meters, completo di prover integrato a scorpione e sitema di controllo e supervisione.
N.1 Oil fiscal metering system, with no. 3 meter runs dia. 8", rating 600, with PD Meters, complete of integrated scorpion type prover and control system plus supervisory system.
Ogbainbiri Flow Station
Ogbainbiri Flow Station
Ogbainbiri
Nigeria
890.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2010
Petrofac International
Adco
N. 8 Sistemi di misura per iniezione di acque di strato, con misuratori magnetici, dia. 4", rating 1500, completi di flow computers
N. 8 Metering systems for produced water re injection, with magnetic flow meters, dia. 4", rating 1500, complete with flow computers
Campo olio di ASAB
ASAB oil field
Abu Dhabi
UAE
548.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2009
Ansaldo
Sorgenia
N. 1 Sistema FG composto da sistema di filtrazione, misura, riscaldamento e riduzione pressione gas naturale da 64 a 34 barg per alimentare N. 2 TG. Dia. Linee 14", Portata 16,2 kg/sec.
N. 1 Fuel Gas package composed of filtration system, gas metering system, heating system and pressure reduction system for natural gas from 64 to 34 barg to feed N. 2 turbines. Lines Dia. 14", Flow rate 16,2 kg/sec each turbines
C.le Elettrica a Ciclo Combinato 800 MW Aprilia
800 MW Combined Cycle Power Plant Aprilia
Aprilia
Italy
2.200.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2009
Petrofac International
Sonatrach
N. 6 Sistema di misura fiscale per Olio/Condensato/LPG, due linee al 100% cadauno, rating variabili da 150 a 600, con misuratori a turbina completi di sistemi prover integrati a scorpione e sistemi di controllo e comunicazione ridondatiN. 6 Oil/Condensate/LPG fiscal metering systems with two lines at 100% each, rating from 150 to 600, turbine meters equipped with scorpion type integrated prover systems and redundant control and communication networks.
El Merk Project
El Merk Project
Sahara Desert
Algeria
3.879.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 1 di 130
21-gen-11
Referenze: Sistemi Di Misura O&GJob References: Metering Systems O&G
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2008
Ansaldo
Sorgenia
N. 1 Sistema di misura gas fiscale, filtrazione, riscaldamento e riduzione pressione gas naturale da 50 a 28,5 barg per alimentare N. 2 TG. Dia. Linee 14", Portata 17,6 kg/sec.
N. 1 Custody transfer gas metering system for turbines fueling, complete of filtration system, heating system, pressure reduction system for natural gas from 50 to 28,5 barg. Lines Dia. 14", Flow rate 17,6 kg/sec each turbines
C.le Elettrica a Ciclo Combinato 800 MW Turano Lodigian
800 MW Combined Cycle Power Plant Turano Lodigiano
Lodi
Italy
2.050.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2007
Enppi
Agiba
N.1 Sistema di misurazione fiscale per gas da 15.000 kg/hr con misuratori a ultrasuoni
N.1 Gas metering skid; flowrate: 15.000 kg/hr with ultrasonic flowmeter
West Ashrafi plant
West Ashrafi plant
Egyptian desert
Egypt
218.590,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2007
Enppi
Agiba
N.1 Sistema di misurazione fiscale per greggio da 25.000 kg/hr con misuratori a turbina completo di flow computer e supervisory computer
N.1 Oil metering package; flowrate: 25.000 kg/hr with turbine flowmeter, flowcomputer and supervisory computer
West Ashrafi plant
West Ashrafi plant
Egyptian desert
Egypt
568.500,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2006
Alstom Power
Eurosviluppo Elettrica
N. 1 Sistema misura gas composto da separazione e filtrazione, 2 linee misura gas fiscali a turbine da 16" al 100%, riscaldatori , valvole riduzione pressione, flow computers, sistema di controllo, sistema di campionamento e strumenti di analisi . Portata Gas 37 Kg/secN.1 Gas Metering System composed of sepration and filtration stage, two fiscal 100% measuring lines x 16" with turbines, heaters, pressure reducing valves, flow computers, control systems, sampling system and analysers. Gas flow rate 37 Kg/sec
Centrale Elettrica di Modugno
Modugno Power Plant
Modugno
Italy
1.440.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 2 di 130
21-gen-11
Referenze: Sistemi Di Misura O&GJob References: Metering Systems O&G
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2006
Ansaldo
Calenia Energia
N. 1 Sistema misura gas fiscale, filtrazione, riscaldamento e riduzione pressione gas naturale da 65 a 27 barg, per alimentazione turbine.Diametro linee da 12" , portata gas 32 kg/sec.
N. 1 Custody transfer gas metering system for turbines fueling, complete of filtration system, heating system, pressure reducing system from 65 to 27 bearg.Lines diameter 12", gas flowrate 32 kg/sec.
Centrale Elettrica Di Rizziconi
Rizziconi Power Plant
Rizziconi
Italy
1.280.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2005
Ansaldo
Calenia Energia
N. 1 Sistema di misura gas fiscale, filtrazione, riscaldamento e riduzione pressione da 64 a 32 barg gas naturale per alimentazione turbine - Diametro linee 10" - Portata 170.000 nm3/hr
N. 1 Custody transfer gas metering system for turbines fueling, complete of filtration, heating and pressure reduction from 64 to 32 barg. - Lines diameter 10". - Flow rate 170.000 Sm3/hr.
Centrale Elettrica Di Sparanise
Sparanise Power Plant
Sparanise
Italy
1.050.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2005
Enppi
Khalda Petr. Co (Apache)
N.1 Sistema di misura per gas fiscale da 50 MMSCFD, pressione: 146 bar con misuratori a turbina completi di flowcomputer
N.1 Gas metering skid; flowrate: 50 MMSCFD; pressure: 146 bar with turbine flowmeter and flowcomputer
Qasr Gas plant
Qasr Gas plant
Egyptian desert
Egypt
344.230,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2005
Agip Kco
Agip Kco
N. 1 Sistema di misura olio per export con misuratori a turbina, linee da 16", portata max 2.060 m3/hr, completo di sistema automatico di campionamento.
N. 1 Export oil metering system with turbine meters, 16" lines, max flow rate 2.060 m3/hr, complete with automatic sampling system.
Campo Olio Di Kashagan
Kashagan Oil Field
Caspian Sea
Kazakistan
538.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 3 di 130
21-gen-11
Referenze: Sistemi Di Misura O&GJob References: Metering Systems O&G
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2005
Sahatransneftegas
Sahatransneftegas
N.2 Sistemi di misura per gas da 100 MMSCFD cad. con misuratori a turbina completi di flowcomputer e supervisory computer
N.2 Gas metering skid; flowrate: 100 MMSCFD each with turbine flowmeter, flowcomputer and supervisory computer
Saha Gas plant
Saha Gas plant
Saha
Russia
654.300,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2003
U O P
O G D C
Sistema di misura gas naturale con linee da 14" e misuratore tipo anubar. Portata: 220MMscfd - Pressione: 108barg - Temperatura: 56°C
Gas metering system with 14" line and anubar type flow element. Flow: 220MMscfd - Pressure: 108barg - Temperature: 56°C
C.le Gas Quadripur
Quadripur Gas Plant
Islamabad
Pakistan
692.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2003
U O P
N A O C
Sistema di misura gas con sistema di separazione a membrane e sistema di filtrazione.
Gas metering system with membrane separation and fltration stations,
Stazione Di Compressione Di Irri
Irri Compression Station
Lagos
Nigeria
1.638.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2002
Enppi
Fayum GasCo(Shell Gas BV)
N.2 Sistema di misura fiscale per gas; portata 35.000 Nm3/hr, pressione: 77 bar e portata 70.000 Nm3/hr a 77bar con misuratori a turbina completi di flowcomputer, con n° 2 linee da 6" e 8" al 100% della portataN.2 Gas metering skid; flow rate: 35.000 Nm3/hr, pressure: 77 bar and 70.000 Nm3/hr, pressure: 77bar both with turbine flowmeter and flowcomputer. Each skid composed by N°2 lines diam. 6" and 8" sized for 100% flowrate
Fayum gas plant
Fayum gas plant
Fayum city
Egypt
460.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 4 di 130
21-gen-11
Referenze: Sistemi Di Misura O&GJob References: Metering Systems O&G
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2002
Snamprogetti
Enipower
Sistema di misura fiscale e riduzione pressione gas per alimentazione turbogas - diametro 16" - portata 240.000Sm3/h - riduzione pressione da 75 a 30,5barg
Custody transfer gas metering system and pressure reduction for turbogas fuel - diameter 16" - flow 240.000Sm3/h - pressure reduction from 75 to 30,5barg
Centrale Elettrica Di Brindisi
Brindisi Power Plant
Brindisi
Italy
1.029.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2001
Snamprogetti
Enipower
Sistema di misura fiscale e riduzione pressione gas per alimentazione turbogas - diametro 16" - portata 240.000Sm3/h - riduzione pressione da 75 a 30,5barg
Custody transfer gas metering system and pressure reduction for turbogas fuel - diameter 16" - flow 240.000Sm3/h - pressure reduction from 75 to 30,5barg
Centrale Elettrica Di Ravenna
Ravenna Power Plant
Ravenna
Italy
1.061.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
1998
Bechtel
A D N O C
Sistema di misura per condensato e gas completo di filtrazione, flow computers, sistema di controllo con supervisory computer e prover per idrocarburi liquidi. Dimensioni linee 12" per olio, 10" per gas.
Condensate and Gas metering system complete of filtration system, flow computers, supervisory computer, control system and prover for liquid hydrocarbons. Oil lines size 12", gas lines size 10"
Onshore Development Project
Onshore Development Project
Abu Dhabi
United Arab Emirates
1.800.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
1998
Snamprogetti
Frene
Sistema di misura fiscale gas di alimentazione turbina da 10" con orifizi calibrati estraibili in pressione
Gas fiscal metering system for tubrogenerator with senior orefice of 10"
Centrale Elettrica Di Ravenna
Ravenna Power Plant
Ravenna
Italy
155.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 5 di 130
21-gen-11
Referenze: Sistemi Di Misura O&GJob References: Metering Systems O&G
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
1997
Sicon Oil&gas (CCC Group)
O G D C
N°2 sistemi di misura fiscale gas con orifizi calibrati da 6" estraibili in pressione.
N°2 custody transfer gas metering systems with senior calibrated orefice 6"
Campo Gas Di Panjpir
Panjpir Gas Field
Panjpir
Pakistan
860.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 6 di 130
21-gen-11
Referenze: Quadri Testa Pozzo Pneumo IdrauliciJob References: Wellhead Control Systems
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2010
J G C Corporation
Sonatrach
N.56 Quadri idraulici di controllo teste pozzo con PLC, 10.000 psi, per installazione onshore in area desertica
N.56 Well head control panels hydraulic with PLC, 10.000 psi, for onshore installation in desert area
Campo Gas di Gassi Touil
Gassi Touil Gas Field
Onshore
Algeria
2.362.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2010
Eni - Div. Agip
Eni - Div. Agip
N.1 Quadro pneumo idraulico di controllo testa pozzo, 6.000 psi, per installazione offshore.
N.1 Well head control panel pneumo-hydraulic, 6.000 psi, for offshore installation.
Piattaforma Off-shore PCME
PCME Off-shore platform
Adriatic Sea
Italy
74.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2010
Enppi
Amapetco
N.2 Quadri pneumo idraulici di controllo teste pozzo (14 pozzi cadauno), 6.000 psi, per installazione offshore.
N.2 Well head control panels pneumo-hydraulic (14 wells each), 6.000 psi, for offshore installation.
Campo Gas di Al Amal
Al Amal gas Field
Cairo
Egypt
448.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2010
Groupement Sonatrach Agip
Groupement Sonatrach Agip
N.10 Quadri pneumo idraulici di controllo teste pozzo, 6.000 psi, per installazione onshore in area desretica
N.10 Well head control panels pneumo-hydraulic, 6.000 psi, for onshore installation in desert area
Blocco 403
Block 403
Onshore
Algeria
428.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 7 di 130
21-gen-11
Referenze: Quadri Testa Pozzo Pneumo IdrauliciJob References: Wellhead Control Systems
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2009
Mobil Producing Nigeria
Mobil Producing Nigeria
N. 1 Quadro di controllo testa pozzo con 6 casetti cadauno. Pressione di lavoro 10.000 psi
N. 1 Wellhead Control Panel with 6 well modules each. Working pressure 10.000 psi.
Unam A PH2 Slot Additional Project
Unam A PH2 Slot Additional Project
Lagos
Nigeria
236.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2009
Stogit
Stogit
N. 9 Quadri di controllo testa pozzo con tre cassetti cadauno, pressione di lavoro 6.000 psi
N. 9 Wellhead Control Panels with three well module each, 6.000 psi working pressure.
Polo Fiume Treste (Chieti)
Polo Fiume Treste (Chieti)
Chieti
Italy
745.500,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2009
Eni div. E & P
Agip
N. 1 Quadro di controllo testa pozzo con 18 stringhe, pressione di lavoro 6.000 psi
N. 1 Wellhead Control Panel with 18 strings, 6.000 psi working pressure.
Piattaforma Barbara F
Barbara F Platform
Adriatic Sea
Italy
90.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2008
Eni div. E & P
Eni div. E & P
N. 1 Quadro di controllo testa pozzo 10 stringhe, pressione di lavoro 6.000 psi
N. 1 Wellhead Control Panel 10 strings, 6.000 psi working pressure.
Piattaforma Antares
Antares Platform
Adriatic Sea
Italy
96.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 8 di 130
21-gen-11
Referenze: Quadri Testa Pozzo Pneumo IdrauliciJob References: Wellhead Control Systems
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2008
Saipem Energy Services
Stogit
N. 1 Quadro di controllo testa pozzo, pressione di lavoro 6.000 psi
N. 1 Wellhead Control Panel, 6.000 psi working pressure
C.le Stogit Fiume Treste (Chieti)
Stogit Fiume Treste Station
Chieti
Italy
92.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2008
Eni div. E & P
Eni - Div. Agip
N.1 Skid di pressurizzazione stringhe con acqua salata
N. 1 Pressirizing strings skid with salt water
Piattaforma Antares
Antares Platform
Adriatic Sea
Italy
70.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2008
Enppi
Petrobel
N. 1 Quadro di controllo testa pozzo con tre cassetti + hot backup cadauno, pressione di lavoro 6.000 psi
N. 1 Wellhead Control Panel with three well module each + hot backup, 6.000 psi working pressure.
Tuna 60 Development Project
Tuna 60 Development Project
Cairo
Egypt
235.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2008
Groupement Sonatrach Agip
Groupement Sonatrach Agip
N. 5 Quadri di controllo testa pozzo per una testa pozzo cadauno, pressione di lavoro 7.700 psi
N. 5 Wellhead Control Panels for one well each, 7.700 psi working pressure
Impianto Hassi Messaud
Hassi Messaud Plant
Algeri
Algeria
206.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 9 di 130
21-gen-11
Referenze: Quadri Testa Pozzo Pneumo IdrauliciJob References: Wellhead Control Systems
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2008
Eni div. E & P
Eni div. E & P
N. 1 Quadro di controllo testa pozzo 10 stringhe, pressione di lavoro 6.000 psi
N. 1 Wellhead Control Panel 10 strings, 6.000 psi working pressure.
Piattaforma Azalea B
Azalea B Platform
Adriatic Sea
Italy
76.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2007
Eni Iran BV
Pedec
N. 4 Pannelli di controllo testa pozzo, pressione di lavoro 7.500 psi, completi di charging kit per azoto e sistema di flussaggio
N. 4 Well Head Control Panels 7.500 psi working pressure, complete with nitrogen charging kit and flushing kit
Campo Olio di Darquain
Darquain Oil Field
Bandar Assaluye
Iran
380.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2006
Sonatrach / Agip
Sonatrach
N. 8 Pannelli di controllo per teste pozzo, isolate, singolaq string, pressione di lavoro 5.000 psi
N. 8 Isolated well head control panels for single string wells, working pressure 5.000 psi
Campo Olio Di Berkine
Berkine Oil Field
Berkine
Algeria
292.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2006
Enppi
Petrobel
N. 3 Quadri di controllo per testa pozzo, per controllo di n. 3 pozzi cadauno, con logica elettro-pneumo-idraulica, pressione di lavoro 5.000 psi, pressione di progetto 6.000 psi, completi di unità ricarica azoto con motore elettrico ADF.N. 3 WHCP controlling n. 3 wells each, with electro-pneumatic-hydraulic logyc, working pressure 5.000 psi, design pressure 6.000 psi, complete with nitrogen gas booster in ADF execution.
Piattaforma Off-shore Semman
Semman Off-shore Platform
Mediterranean Sea
Egypt
274.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 10 di 130
21-gen-11
Referenze: Quadri Testa Pozzo Pneumo IdrauliciJob References: Wellhead Control Systems
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2006
Eni - Div. Agip
Stogit
N. 2 Quadri di controllo testa pozzo, per pozzi isolati singola string, con logica elettro -pneumo-idraulica, pressione di lavoro 5.000 psi pressione di progetto 6.000 psi.
N. 2 WHCP for isolated wells single string, with electro-pneumatic-hydraulic logyc cintrol, working pressure 5.000 psi, design pressure 6.000 psi
C.le Gas Cortemaggiore
Cortemaggiore Gas Station
Piacenza
Italy
83.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2006
Eni - Div. Agip
Eni - Div. Agip
N. 1 Pannello di controllo pneumatico per 6 teste pozzo e relative SSV
N. 1 Pneumatic Well Head Control Panel for the control of no. 6 well heads and related SSV
Piattaforma Off-shore Basil
Basil Off-shore Platform
Adriatic Sea
Italy
62.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2006
Eni - Div. Agip
Eni - Div. Agip
N. 1 Pannello di controllo testa pozzo, 10.000 psi pressione di lavoro
N.1 Well head control panel 10.000 psi working pressure
Campo Olio di Monte dell' Aquila
Monte dell' Aquila Oil Field
Gela
Italy
52.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2004
Sadra
Statoil
N°3 quadri idraulici di controllo di 10 teste pozzo cadauno più cinque di riserva - Standard API - 10.000PSI
N°3 wellhead control panels for 10 wells each plus five wells spare - Standard API - 10.000PSI
Piattaforme Offshore S P D 6,7 & 8
Offshore Platform S P D 6,7 & 8
Persian Gulf
Iran
1.191.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 11 di 130
21-gen-11
Referenze: Quadri Testa Pozzo Pneumo IdrauliciJob References: Wellhead Control Systems
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2004
Rashpetco
Rashpetco
Quadro idraulico di comando per 9 pozzi in cluster. Pressione di lavoro 10.000 psi.
Wellhead control panel for 9 clustered wells. Working pressure 10.000 psi.
Piattaforma Off-shore Rosetta
Rosetta Off-shore Platform
Cairo
Egypt
251.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2004
Sonatrach / Agip
Sonatrach / Agip
N.7 Pannelli di controllo testa pozzo 10.000 psi pressione di lavoro per pozzi isolati a doppia string.
N.7 Well Head Control Panels 10.000 psi working pressure for double string isolated wells.
Campo Gas Di Beer Rebaa
Beer Rebaa Gas Field
Beer Rebaa
Algeria
315.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2004
Sadra
N I O C
N.2 Pannelli di controllo teste pozzo in cluster. Pressione di lavoro 6.000 psi. Ogni pannello controlla 3 + 3 pozzi.
N.2 Well head control panels for clustered wells. Working pressure 6.000 psi. Each WHCP controls 3 + 3 wells.
Campo Gas Di Salman Offshore Iran
Salman Gas Field Offshore Iran
Teheran
Iran
790.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2004
I O E C
P O G C
N. 2 Pannelli di controllo teste pozzo in clusters, pressione di lavoro 10.000 psi. Ogni pannello controlla 15 teste pozzo.
N. 2 Well head control panels for clustered wells, working pressure 10.000 psi. Each WHCP controls 15 well heads.
Campo Di South Pars - Fasi 9&10
South Pars Field - Phases 9&10
Teheran
Iran
786.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 12 di 130
21-gen-11
Referenze: Quadri Testa Pozzo Pneumo IdrauliciJob References: Wellhead Control Systems
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2004
Adco
Adco
Pannelo di controllo testa pozzo dual string per pozzo isolato. Pressione di lavoro 6.000 psi.
Dual string well head control panel for isolated well. Working pressure 6.000 psi.
Campo Oilio Di Bab
Bab Oil Field
Abu Dhabi
United Arab Emirates
11.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2003
Eni - Div. Agip
Eni - Div. Agip
Contratto quadro per la fornitura di quadri idraulici di controllo pozzi - Pressione 6.000PSI
Frame agreement for wellhead control panels - Pressure 6.000PSI
Siti Vari
Various Sites
Varie
Italy
255.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2003
Saipem / Hyundai H. I.
Agip Gas B V
N°2 quadri idraulici di controllo per 10 pozzi cadauno - Pressione 20.000PSI - ATI con Fores Eng.
N°2 wellhead control panels for 10 wells each - Pressure 20.000PSI - JV with Fores Eng.
Piattaforma Off-shore Sabratha
Off-shore Platform Sabratha
Mediterranean Sea - Libya
Libya
570.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2003
Saipem / Bouigues Jv
Sonatrach
N°35 quadri idraulici di controllo pozzi (19 per produzione olio, 5 per iniezione gas, 11 per iniezione acqua) - Pressione 10.000PSI - ATI con Fores Eng.
N°35 wellhead control panels (19 for oil production, 5 for gas injection, 11 for water injection) - Pressure 10.000PSI - JV with Fores Eng.
Campo Olio Di Berkine
Berkine Oil Field
Berkine
Algeria
1.998.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 13 di 130
21-gen-11
Referenze: Quadri Testa Pozzo Pneumo IdrauliciJob References: Wellhead Control Systems
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2003
J G C Corporation
Agip Gas B V
N°37 quadri idraulici di controllo di un pozzo - Standard API - 10.000PSI - ATI con Fores Eng.
N°37 wellhead control panels for single well - API Standard - 10.000PSI - JV with Fores Eng.
Campo Gas Di Wafa
Wafa Gas Field
Libyan Desert
Libya
3.232.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2002
Petrobel
Petrobel
N°2 quadri idraulici di controllo di 3 teste pozzo e valvole di superficie cadauno - Standard API - 10.000PSI
N°2 wellhead control panels for 3 wellheads and surface valves each - API standard - 10.000PSI
Piattaforma Off-shore Nouras A - B
Off-shore Platform Nouras A - B
Mediterranean Sea
Egypt
223.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2002
Sadra
Agip Iran
N°2 quadri idraulici di controllo di 12 teste pozzo cadauno - Standard API - 10.000PSI
N°2 wellhead control panels for 12 wellheads each - API standard - 10.000PSI
Piattaforme Off-shore S P D 4 & 5
Off-shore Platform S P D 4 & 5
Persian Gulf
Iran
610.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2001
Eni - Div. Agip
Eni - Div. Agip
Quadro elettro pneumo idraulico per comando di singolo pozzo. Pressione di lavoro 6.000 psi.
Electro pneumo hydraulic control panel for single well. Working pressure 6.000 psi.
C.le Gas Casteggio
Casteggio Gas Plant
Casteggio
Italy
48.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 14 di 130
21-gen-11
Referenze: Quadri Testa Pozzo Pneumo IdrauliciJob References: Wellhead Control Systems
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2001
Eni - Div. Agip
Eni - Div. Agip
N°5 quadri elettro - idraulici per comando pozzi isolati a singola string. Pressione di lavoro 6.000 psi.
N°5 electro - hydraulic wellhead control panels for isolated single string wells. Working pressure 6.000 psi.
Centro Olio Ragusa
Ragusa Oil Plant
Ragusa
Italy
290.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2000
Agip
Agip
Impianto completo di produzione gas con separatore 125.000Sm3/g , trappole di lancio e ricevimento da 14", riscaldatore a gas da 150.000Kcal/h, N°3 quadri idraulici di controllo pozzi, sistema di controllo e trasmissione dati, sistemi ausiliari - ATI con KomesComplete gas production plant with separator 125.000Sm3/d , launching and receiving traps 14", gas heater 150.000Kcal/h, N°3 hydraulic wellhead control panels, distributed control system and data transimission, auxiliary systems - JV with Komes
Campo Gas Di Samperi 1
Samperi 1 Gas Field
Enna
Italy
1.200.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2000
Tecnomare
Agip
N°1 quadro idraulico di controllo di due pozzi in esecuzione ridondante - 6000PSI
N°1 wellhead control panel for two wells, redundant execution - 6000PSI
Piattaforma Off-shore Emilio
Emilio Off-shore Platform
Adriatic Sea
Italy
168.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
1999
Agip
Agip
N°4 quadri di comando pozzi e valvole di superficie da 6000psi
N°4 wellhead and surface valves control panels - 6000psi
Campo Gas Di Fiume Salso
Fiume Salso Gas Field
Gela
Italy
186.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 15 di 130
21-gen-11
Referenze: Quadri Testa Pozzo Pneumo IdrauliciJob References: Wellhead Control Systems
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
1999
Intermare Sarda
Agip
Quadro idraulico per il comando di 9 pozzi - 6000psi
Hydraulic wellhead control panel for 9 wells - 6000psi
Piattaforma Off-shore Annalisa
Off-shore Platform Annalisa
Adriatic Sea
Italy
197.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
1999
Agip
Agip
Quadro di comando di due pozzi (6.000psi) con cassetti estraibili in pressione - Serie Fastech
Wellhead control panel for two wells (6.000psi) with drawers removable under pressure - Fastech series
Campo Gas Di Colombarola
Colobarola Gas Field
Crema
Italy
60.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
1998
Agip
Agip
N°3 quadri idraulici di comando pozzi e n°7 pannelli pneumatici di comando valvole
N°3 hydraulic wellhead control panels and n°7 pneumantic local panel
Piattaforma Off-shore Garibaldi B & D
Offshore Platforms Garibaldi B & D
Adriatic Sea
Italy
75.500,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
1998
Agip
Agip
N°12 quadri idraulci di comando tre pozzi cadauno - Pressione di esercizio 250bar
N°12 hydraulic wellhead control panels for three wells each - Working pressure 250bar
Centro Olio Val D'agri
Val D'agri Oil Plant
Viggiano
Italy
940.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 16 di 130
21-gen-11
Referenze: Quadri Testa Pozzo Pneumo IdrauliciJob References: Wellhead Control Systems
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
1997
Agip
Agip
Qaudro di comando pozzo elettro pneumo idraulico per pozzo isolato. Pressione di lavoro 6.000 psi.
Wellhead control panel electro pneumo hydroulic for isolated well. Working pressure 6.000 psi.
C.le Gas Hera Lacinia
Hera Lacinia Gas Plant
Crotone
Italy
58.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
1997
Agip
Agip
N°3 quadri di comando 12 e 24 pozzi - 10.000psi
N°3 wellhead control panels for 12 and 24 wells - 10.000psi
Piattaforme Off-shore Agostino A, Cervia A, Pc C
Off-shore Platforms Agostino A, Cervia A, Pc C
Adriatic Sea
Italy
170.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 17 di 130
21-gen-11
Referenze: Cabine PrefabbricateJob References: Prefabricated Shelters
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2010
G E Oil & Gas
Snamretegas
N. 3 Sale controllo prefabbricate, complete di impianti di condizionamento, rilevazione fumo e fiamma e spegnimento incendi automatico a CO2.
N. 2 Control prefabricated rooms, complete with HVAC systems, fire and smoke detecting system and CO2 automatic fire fighting system.
C.le Gas Messina
Messina Gas Station
Messina
Italy
483.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2010
CGT
JVTS
N.1 Cabinato con resistenza al fuoco H60 J45 per motogeneratore Caterpillar completo di sistemi di condizionamento, ventilazione, sistemi elettrici e antincendio.
N.1 prefabricated cab with fire resistance H60 J45, to host a Caterpillar power generator, complete with HVAC system, electrical system, fire fighting and safety systems.
Campo Olio Di Kashagan
Kashagan Oil Field
Caspian Sea
Kazakistan
1.500.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2010
G E Oil & Gas
B P
N.1 Cabinato con control room e locale batterie con resistenza al fuoco A60 e resistente a sovrapressione dovuta a scoppio completo di sistema di condizionamento, ventilazione, sistemi elettrici e antincendioN.1 Local control cabinet with battery cabin with fire resistance A60 and "blast resistant", complete with HVAC system, electrical system, fire fighting system and safety systems
In Amenas Field
In Amenas Field
Onshore Algeria
Algeria
508.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2010
G E Oil & Gas
Chevron Australia
N.6 Cabinati di controllo locale per turbine GE, completi di HVAC, sistema antincendio, sistema UPS, quadri di media e bassa tensione e sistema di controllo
N.6 Local control cabs for GE turbines, complete with HVAC, fire fighting systems, UPS, medium and low voltage electrical panels and control system
Progetto Gorgon
Gorgon Project
Onshore
Australia
3.060.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 18 di 130
21-gen-11
Referenze: Cabine PrefabbricateJob References: Prefabricated Shelters
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2009
G E Oil & Gas
ENI Div. Congo
N. 1 Sala controllo prefabbricata e Pannelli Elettrici per controllo turbine, complete di impianto di condizionamento, rilevazione fumo e fiamma e spegnimento incendi automatico
N. 1 prefabricated control room and electrical panels for turbines local control, complete with HVAC system, fire and smoke detecting system and automatic fire fighting system
M' Boundi Project
M' Boundi Project
On-shore
Congo
1.314.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2008
G E Oil & Gas
Petrobras
N. 2 Sale controllo prefabbricate, complete di impianti di condizionamento, rilevazione fumo e fiamma e spegnimento incendi automatico a CO2.
N. 2 Control prefabricated rooms, complete with HVAC systems, fire and smoke detecting system and CO2 automatic fire fighting system.
Marlim sul field development FPSO P56
Marlim sul field development FPSO P56
Atlantic Ocean
Brasil
780.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2007
G E Oil & Gas
Shell
N. 6 Sale controllo prefabbricate per controllo turbine, complete di impianto di condizionamento, rilevazione fumo e fiamma e spegnimento incendi
N. 6 prefabricated control rooms for turbines local control, complete with HVAC system, fire and smoke detecting system and fire fighting system.
Impianto Liquefazione Gas Pearl GTL
Pearl GTL Gas Liquefaction Plant
Ras Laffan
Qatar
2.415.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2007
G E Oil & Gas
Shell - Woodside
N. 4 Sale controllo prefabbricate per controllo turbine, complete di impianto di condizionamento, rilevazione fumo e fiamma e spegnimento incendi
N. 4 prefabricated control rooms for turbines local control, complete with HVAC system, fire and smoke detecting system and fire fighting system
Impianto Liquefazione Gas di Pluto
Pluto Gas Liquefaction Plant
Onshore
Australia
1.750.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 19 di 130
21-gen-11
Referenze: Cabine PrefabbricateJob References: Prefabricated Shelters
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2006
Alcon
N A O C
N. 2 Shelter per turbo generatori e turbo compressori completamente attrezzati con carri ponte ed utilities, superficie totale 1.400 m2
N. 2 Shelters for turbo generators and turbo compressors fully equipped with over head cranes and utilities, total covered surface 1.400 m2
I D U
I D U
Port Harcourt
Nigeria
579.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2006
G E Oil & Gas
Conoco Phillips
N.2 Sale controllo prefabbricate per controllo turbine, complete di impianto di condizionamento, rilevazione fumo e fiamma e spegnimento incendi.
N. 2 Prefabricated control rooms for turbined local control, complete with HVAC system, fire and smoke detecting system and fire fighting system.
Progetto Bohay Bay
Bohay Bay Project
Chinese Sea
China
740.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2006
G E Oil & Gas
Shell - Woodside
N. 1 Sala controllo prefabbricata per controllo turbina, completa di impianti di condizionamento, rilevazione fumo e fiamma e spegnimento incendio.
N. 1 Prefabricated Control Room for turbine local control, complete of HVAC system, fire and smoke detection system and fire fighting system.
Impianti Vari
Various Plants
Onshore.
Australia
500.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2005
Alcon
N A O C
No. 1 Edificio elettrico e di controllo prefabbricato a due piani da 1.600 m2, completo di impianti e sistemi F&G e HVAC
No. 1 Electrical and control prefabricated building on two floors, having a total surface of 1.600 m2, complete of all systems including F&G and HVAC.
Campo Gas Di I D U
I D U Gas Field
Port Harcourt
Nigeria
1.270.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 20 di 130
21-gen-11
Referenze: Cabine PrefabbricateJob References: Prefabricated Shelters
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2005
G E Oil & Gas
Petrobras
N. 2 Sale controllo prefabbricate complete di impianti di condizionamento, rilevazione fumo e fiamma e spagnimento incendi.
N. 2 prefabricated control rooms complete of HVAC system, fire and smoke detection system and fire fughting system.
F P S O P54
F P S O P54
Atlantic Ocean
Brasil
1.020.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2005
G E Oil & Gas
Petrobras
N.2 Sale controllo prefabbricate, complete di impianti di condizionamento, rilevazione fumo e fiamma e spegnimento incendi.
N.2 Control prefabricated rooms, complete with HVAC systems, fire and smoke detecting system and fire fighting system.
F P S O P51
F P S O P51
Atlantic Ocean
Brasil
720.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2004
G E Oil & Gas
Marathon Oil
Sala controllo prefabbricata completa di impianto di condizionamento, rivelazione fumo e fiamma, spegnimento incendi
Prefabricated control room with air conditioning system, fire and smoke detection, fire fighting
Campo Olio Di Alba
Alba Oil Filed
Malabo
Guinea Equatoriale
587.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2004
G E Oil & Gas
Pemex
N°2 sale controllo prefabbricate complete di impianti di condizionamento, rivelazione fumo e fiamma, spegnimento incendi
N°2 prefabricated control rooms with air conditioning system, fire and smoke detection, fire fighting
Raffineria Di Atasta
Atasta Refinery
Atasta
Mexico
472.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 21 di 130
21-gen-11
Referenze: Cabine PrefabbricateJob References: Prefabricated Shelters
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2004
G E Oil & Gas
Petrobras
N°2 sale controllo prefabbricate complete di impianti di condizionamento, rivelazione fumo e fiamma, spegnimento incendi
N°2 prefabricated control rooms with air conditioning system, fire and smoke detection, fire fighting
F P S O P52
F P S O P52
Atlantic Ocean
Brasil
700.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2004
Eni - Div. Agip
Eni - Div. Agip
Complesso di generazione energia di emergenza da 137KVA con motore a gas - ATI con Fores Engineering
Emergency power generation package of 137KVA with gas engine - JV with Fores Engineering
Piattaforma Off-shore Garibaldi B & D
Offshore Platforms Garibaldi B & D
Adriatic Sea
Italy
1.166.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2003
G E Oil & Gas
Marathon Oil
N°1 sala controllo prefabbricata completa di impianti di condizionamento, rivelazione fumo e fiamma, spegnimento incendi
N°1 prefabricated control room with air conditioning system, fire and smoke detection, fire fighting
Campo Olio Di Alba
Alba Oil Filed
Malabo
Guinea Equatoriale
593.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2003
Ciet
Telecom Italia Mobile
n°2 cabina per apparati di telecomunicazione rete GSM
n°2 prefabricated shelters for GSM telecomunication network
Siti Vari
Various Sites
Varie
Italy
115.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 22 di 130
21-gen-11
Referenze: Cabine PrefabbricateJob References: Prefabricated Shelters
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2003
Eni - Div. Agip
Eni - Div. Agip
Cabinato per reiniezione acqua con motore a gas - Portata: 10 - 25m3/h - Pressione: 85bar
Prefabricated cabinet for water injection with gas engine - Flow: 10 - 25m3/h - Pressure: 85bar
C.le Gas Ravenna Mare
Ravenna Mar Gas Plant
Ravenna
Italy
515.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2002
G E Oil & Gas
Marathon Oil
N°3 sale controllo prefabbricate complete di impianti di condizionamento, rivelazione fumo e fiamma, spegnimento incendi
N°3 prefabricated control room with air conditioning system, fire and smoke detection, fire fighting
Campo Olio Di Alba
Alba Oil Filed
Malabo
Guinea Equatoriale
1.054.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2002
Enppi
Fayum GasCo(Shell Gas BV)
N.2 Sala controllo remota con PLC tipo PRMS
N.2 PRMS control system - remoted controlled PLC
Kom Aushim Gas Field
Kom Aushim Gas Field
Onshore Egypt
Egypt
920.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2002
Ciet
Telecom Italia Mobile
N°21 cabine per apparati di telecomunicazione rete GSM
N°21 prefabricated shelters for GSM telecomunication network
Siti Vari
Various Sites
Varie
Italy
823.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 23 di 130
21-gen-11
Referenze: Cabine PrefabbricateJob References: Prefabricated Shelters
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2002
Imet
Telecom Italia Mobile
N°2 cabina per apparati di telecomunicazione rete GSM
N°2 prefabricated shelter for GSM telecomunication network
Siti Vari
Various Sites
Varie
Italy
84.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2001
Abb Energy Automation
Enel
Realizzaione della sala controllo per due gruppi di generazione energia da 250MW cadauno
Construction of control room for two power generator of 250MW each
Centrale Elettrica Di Porto Corsini
Porto Corsini Power Plant
Ravenna
Italy
552.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2001
Ciet
Telecom Italia Mobile
N° 26 cabine per apparati di telecomunicazione rete GSM.
N°26 prefabricated shelters for GSM telecomunication network
Siti Vari
Various Sites
Varie
Italy
955.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2001
G E Oil & Gas
Total
N°2 sale controllo prefabbricate complete di impianti di condizionamento, rivelazione fumo e fiamma, spegnimento incendi
N°2 prefabricated control room with air conditioning system, fire and smoke detection, fire fighting
Piattaforma Off-shore Tunu 8
Off-shore Platform Tunu 8
Indian Ocean
Indonesia
742.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 24 di 130
21-gen-11
Referenze: Cabine PrefabbricateJob References: Prefabricated Shelters
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2001
Sirti
Telecom Italia Mobile
N°6 cabine per apparati di telecomunicazione rete GSM
N°6 prefabricated shelters for GSM telecomunication network
Siti Vari
Various Sites
Varie
Italy
347.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2000
Tozzi Sud
Petrobel
Cabina per sottostazione di distribuzione elettrica
Prefabricated cabinet for electrical distribution substation
Campo Gas Di Temsah
Temsah Gas Field
Cairo
Egypt
354.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2000
Mbf Edilizia
Telecom Italia Mobile
N°1 cabina per apparati di telecomunicazione rete GSM
N°1 prefabricated shelter for GSM telecomunication network
Siti Vari
Various Sites
Varie
Italy
40.300,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2000
Nuovo Pignone
K I O
N°3 sale controllo turbocompressori e N°1 sala controllo utilities prefabbricate complete di impianti di condizionamento, rivelazione fumo fiamma e gas, spegnimento incendi
N°3 turbocompressor prefabricated control room and N°1utilities prefabricated control room with air conditioning system, smoke fire and gas detection, fire fighting
Campo Olio Di Karachaganak
Karachaganak Oil Field
Alma Ata
Kazakistan
577.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 25 di 130
21-gen-11
Referenze: Cabine PrefabbricateJob References: Prefabricated Shelters
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2000
Agip
Agip
N°2 complessi di generazione energia di emergenza da 137KVA cadauno - ATI con Fores Engineering
N°2 emergency power generator packages of 137KVA each - JV with Fores Engineering
Piattaforme Off-shore Agostino A & B
Off-shore Platforms Agostino A & B
Adriatic Sea
Italy
1.917.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2000
Ciet
Telecom Italia Mobile
N°25 cabine per apparati di telecomunicazione rete GSM
N°25 prefabricated shelters for GSM telecomunication network
Siti Vari
Various Sites
Varie
Italy
1.003.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
1999
Rashpetco
Rashpetco
Modulo alloggi per 16 persone completo di tutte le attrezzature interne
Living quarter for 16 person complete with all internal forniture
Piattaforma Off-shore Rosetta
Rosetta Off-shore Platform
Cairo
Egypt
680.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
1999
Icot
Telecom Italia Mobile
N°3 cabine per apparati di telecomunicazione rete GSM
N°3 prefabricated shelters for GSM telecomunication network
Siti Vari
Various Sites
Varie
Italy
182.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 26 di 130
21-gen-11
Referenze: Cabine PrefabbricateJob References: Prefabricated Shelters
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
1999
Nuovo Pignone
Total
N°2 sale controllo prefabbricate complete di impianti di condizionamento, rivelazione fumo e fiamma, spegnimento incendi
N°2 prefabricated control room with air conditioning system, fire and smoke detection, fire fighting
Piattaforma Off-shore Tunu 7
Off-sore Platform Tunu 7
Indian Ocean
Indonesia
544.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
1998
Enppi
Agiba
Cabina di distribuzione energia completa di quadri di distribuzione e impianti ausiliari
Prefabricated cabinet for power distribution with electrical distrbution boards and auxiliary plants
Campo Olio Di Meleiha
Meleiha Oil Fiels
Western Desert
Egypt
229.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
1998
Agip
Agip
N°3 cabine per produzione aria strumenti con essicatori e compressori
N°3 prefabricated cabins for instrument air dryers and compressors
Centro Olio Val D'agri
Val D'agri Oil Plant
Viggiano
Italy
160.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
1997
Nuovo Pignone
B P Exploration
Sala controllo prefabbricata completa di impianto di condizionamento, rivelazione fumo e fiamma, spegnimento incendi
Preabricated control room with air conditioning system, fire and smoke detection, fire fighting
Centrale Elettrica Di Cupiaga
Cupiaga Power Plant
Cupiaga
Colombia
145.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 27 di 130
21-gen-11
Referenze: Cabine PrefabbricateJob References: Prefabricated Shelters
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
1997
A C E A
A C E A
N°8 cabine prefabbricate con trasformatore MT/BT e quadri di distribuzione energia
N°8 prefabricated cabins with power transformer /MV/LV and power distribution panels
Siti Vari
Various Sites
Varie
Italy
140.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
1997
Procter & Gamble
Procter & Gamble
Laboratorio analisi completo di strumenti per il controllo di qualità
Analisys cabinet with instruments for quality control
Impianto Chimico
Chemical Plant
Novomoskovsk
Russia
116.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
1996
Nuovo Pignone
B P Exploration
Sala controllo prefabbricata completa di impianto di condizionamento, rivelazione fumo e fiamma, spegnimento incendi
Preabricated control room with air conditioning system, fire and smoke detection, fire fighting
Centrale Elettrica Di Cusiana
Cusiana Power Plant
Cupiaga
Colombia
145.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 28 di 130
21-gen-11
Referenze: Sistemi di Processo VariJob References: Process Packages Various
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2010
ErSai (Saipem Kazakhstan)
Agip Kco
Fornitura package bombole per stoccaggio aria - pressione progetto: 450barg - per teamporary refuge barge offshore - progetto breathing air system
High pressure cylinders package for breathing air system - design pressure: 450barg - for temporary refuge barge offshore - Breathing air system project
Campo Offshore Di Kashagan
Kashagan Offshore Field
Caspian Sea
Kazakistan
1.882.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2010
UOP Illinois
Gulf Farabi
N.6 Skid PEP
N.6 Bed PEP skid
Impianto Petrolchimico
Petrochemical Plant
Jama'a
UAE
184.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2010
ErSai (Saipem Kazakhstan)
Agip Kco
N.1 Breathing air system composto da N.10 compressori per generazione aria a 450barg, skid riduzione e controllo pressione e sistemi linee di distribuzione aria e ricarica dei sistemi di respirazione su temporary refuge barge offshoreN.1 Breathing air system completed of N.10 air compressor at 450barg, pressure reduction skid, control pressure and distribution lines for breathing air vessels on temporary refuge barge offshore
Campo Offshore Di Kashagan
Kashagan Offshore Field
Caspian Sea
Kazakistan
3.218.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2010
Haldor Topsoe
EFCO
N.1 Impianto hot oil + scambiatore
N.1 Hot oil plant plus heat exchanger
Impianto Petrolchimico EFCO
EFCO Petrochemical Plant
Mosca
Russia
186.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 29 di 130
21-gen-11
Referenze: Sistemi di Processo VariJob References: Process Packages Various
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2010
U O P
Sener Cobra Castor
Costruzione e fornitura di Separex Membrane Skids e Scavenger Skids
Construction and supply of Separex Membrane Skids and Scavenger Skids
Raffineria di Sener Cobra
Sener Cobra Refinery
Onshore
Spain
1.791.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2010
U O P Usa
Air Liquide Gulf Coast
N.1 Unità PSA (Polybed Swing Adsorbtion) a 12 letti
N.1 x 12 beds PSA (Polybed Swing Adsorbtion) Unit
Impianto Petrolchimico Air Liquid di Heracles
Heracles Air Liquid Petrochemical Plant
Onshore
USA
692.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2010
Haldor Topsoe
YPF
N.1 impianto HTCR per produzione idrogeno; portata: 6.000 Nm3/hr
N.1 HTCR H2 plant; flowrate: 6.000 Nm3/hr
Raffineria di Mendoza
Mendoza refinery
Mendoza
Argentina
3.700.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2009
U O P
Sonatrach
N. 1 Separex Membrane Unit
N. 1 Separex Membrane Unit
Arzew Project
Arzew Project
Unk.
Algeria
1.540.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 30 di 130
21-gen-11
Referenze: Sistemi di Processo VariJob References: Process Packages Various
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2009
U O P Usa
Takreer
N. 1 Unità PSA (Polybed Swing Adsorbtion) a 10 letti
N. 1 x 10 beds PSA (Polybed Swing Adsorption) Unit
GDP Takreer
GDP Takreer
Onshore UAE
UAE
625.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2009
Tamoil SA
Tamoil SA
N. 1 Sistema di iniziezione ammoniaca per ridurre emissione di Nox nel gas di scarico. Portata soluzione ammoniaca 250 kg/h @ 6 barg.
N. 1 Ammonia Injection Skid for reducing Nox emission in exhaust gas. Ammonia solution flow rate 250 kh/h @ 6 barg.
Raffineria di Collombey
Collombey Refinery
Collombey
Switzerland
240.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2009
U O P
Cafco
N. 2 Polysep Membrane Skids
N. 2 Polysep Membrane Skids
H6520 Cafco
H6520 Cafco
Onshore Qatar
Qatar
500.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2009
U O P
Rompetrol / TBTV
N. 1 Unità PSA (Polybed Swing Adsorbtion) a 10 letti
N. 1 x 10 beds PSA (Polybed Swing Adsorption) Unit
Raffineria di Rompetrol
Rompetrol Refinery
Constanta
Romania
448.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 31 di 130
21-gen-11
Referenze: Sistemi di Processo VariJob References: Process Packages Various
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2008
Petrojet
Khalda Petr. Co (Apache)
Sistemi per la condensazione di gas naturale da 150.000 kg/hr
Additional condensate facilities; flowrate: 150.000 kg/hr condenaste
Qasr Gas plant
Qasr Gas plant
Egyptian desert
Egypt
3.298.400,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2008
Intermare Sarda
N A O C
N.12 Collettori da 4" per produzione e test di gas
N.12 Stream diam. 4" - Production and test manifolds
Olowi Platform
Olowi Platform
Atlantic Ocean Nigeria
Nigeria
2.308.400,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2008
Intermare Sarda
N A O C
N.8 Collettori per gas da 4"
N.8 Gas lift manifolds; diam. 4"
Olowi Platform
Olowi Platform
Atlantic Ocean Nigeria
Nigeria
2.489.500,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2008
Rosetti Marino SpA
Edina
N. 2 Diesel Fuel Skids e N. 2 Oily Water Filtration and Treatment Skids
N. 2 Diesel Fuel Skids e N. 2 Oily Water Filtration and Treatment Skids
Piattaforma Isabella Nord Sud
Izabella North South Platform
Adriatic Sea
Croatia
520.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 32 di 130
21-gen-11
Referenze: Sistemi di Processo VariJob References: Process Packages Various
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2008
U O P
Lukoil norsi
N. 1 Unità PSA (Polybed Swing Adsorbtion) a 10 letti
N. 1 x 10 beds PSA (Polybed Swing Adsorption) Units
Raffineria di Lukoil norsi
Lukoil norsi Refinery
Nižnij Novgorod
Russia
478.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2008
Snamprogetti
SEF
N. 1 Sistema di riduzione pressione gas naturale
N. 1 Natural Gas Pressure Reducing Station
C.le Termica CTE 2
Ferrara CTE 2 Thermal Station
Ferrara
Italy
105.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2008
Air Liquid
Air Liquid
No. 1 Cold Box Skid
No. 1 Cold Box Skid
EZZ - Sigma
EZZ - Sigma
Alexandria
Egypt
642.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2008
U O P
Grupa Lotos
N. 1 Unità PSA (Polybed Swing Adsorbtion) a 12 letti
N. 1 x 12 beds PSA (Polybed Swing Adsorption) Units
Impianti Vari
Various Plants
Onshore.
Australia
555.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 33 di 130
21-gen-11
Referenze: Sistemi di Processo VariJob References: Process Packages Various
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2008
U O P
Ecopetrol
N. 2 Unità PSA (Polybed Swing Adsorbtion) a 6 letti
N. 2 x 6 beds PSA (Polybed Swing Adsorption) Units
Barranca Bermeja
Barranca Bermeja
Barranca Bermeja
Colombia
500.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2008
Air Liquid
Air Liquid
N. 2 Unità PSA (Polybed Swing Adsorbtion) a più letti, Modulo B & M
N. 2 x multi beds PSA (Polybed Swing Adsorption) Units Modules B & M
Esterreja Hyco 3
Esterreja Hyco 3
Porto
Portugal
1.368.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2008
Air Liquid
Air Liquid
No. 1 Warm skid
No. 1 Warm skid
EZZ - Sigma
EZZ - Sigma
Alexandria
Egypt
306.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2007
U O P
PKN Orlen
N. 1 Unità PSA (Polybed Swing Adsorbtion) a 10 letti per purificazione idrogeno
N. 1 x 10 beds PSA (Polybed Swing Adsorption) Unit for hydrogen purification
Impianto Petrolchimico di Orlen
Orlen Petrolchemical Plant
Orlen
Poland
408.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 34 di 130
21-gen-11
Referenze: Sistemi di Processo VariJob References: Process Packages Various
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2007
Enppi
Agiba
N.1 Treno di pompaggio greggio da 40 m3/hr; prevalenza: 18 bar
N.1 Oil pumping train; flowrate: 40 m3/hr; pressure: 18 bar
West Ashrafi plant
West Ashrafi plant
Egyptian desert
Egypt
106.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2007
Sadelmi Power
Saudi Cement Company
N. 1 impianto rimozione H2S da olio combustibile con N. 1 colonna di strippaggio dia. 1,4 m x h 2,5 m. Portata olio 50 m3/h @ 1,14 bar. H2S contenuto in uscita < 5 ppm wt. Il sistemè è completo di tutte le apparecchiature ausiliarie.N. 1 package for H2S removal from Crude Oil composed of N. 1 stripping column dia. 1,4 m x h 2,5 m. Crude oil Flow Rate 50 m3/h @ 1,14 bar. H2S content in outlet < 5 ppm wt. The package is complete with all auxiliary systems.
Hofuf Power Plant
Hofuf Power Plant
Hofuf
Saudi Arabia
1.075.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2007
U O P
Foster Wheeler
N. 1 Unità PSA (Polybed Swing Adsorbtion) a 10 letti
N. 1 x 10 beds PSA (Polybed Swing Adsorption) Unit
ISAB Energy
ISAB Energy
Priolo
Italy
923.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2007
Air Liquid
Sipchem
N. 5 Skids di processo per produzione azoto
N. 5 process warm skids for nitrogen production
Impianto Petrolchimico Jubail Acetyls Complex
Petrochemical Plant Jubail Acetyls Complex
Jubail Industrial City
Saudi arabia
422.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 35 di 130
21-gen-11
Referenze: Sistemi di Processo VariJob References: Process Packages Various
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2007
U O P
Reliance
N. 1 Unità PSA (Polybed Swing Adsobtion) a 10 letti per purificazione idrogeno
N. 1 x 10 beds PSA (Polybed Swing Adsorbtion) unit for hydrogen purification
Raffineria Di Gujarat
Gujarat Refinery
Gujarat
India
448.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2007
Busi Impianti SpA
Hera Multy Utilities
N. 1 Impianto prototipo per la produzione di bio gas da fermentazione di residui organici in ambiente anaerobico
N. 1 Pilot plant for bio-gas production from fermentation of organic waste in anaerobic environment
Centrale Hera Corticella
Corticella Hera Plant
Bologna
Italia
1.110.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2007
Haldor Topsoe
EFCO
N. 1 Impianto produzione idrogeno da 300 m3/hr
N. 1 Hydrogen producing plant capacity 300 m3/hr
Impianto Petrolchimico EFCO
EFCO Petrochemical Plant
Mosca
Russia
510.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2007
U O P
Mazeikiu Nafta
N. 1 Unità PSA (Polybed Swing Adsorbtion) a 10 letti per purificazione idrogeno
N. 1 x 10 beds PSA (Polybed Swing Adsorption) Unit for hydrogen purification
Raffineria di Mazeikiu
Mazeikiu Refinery
Mazeikiu
Lithuania
428.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 36 di 130
21-gen-11
Referenze: Sistemi di Processo VariJob References: Process Packages Various
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2006
U O P
Samir Refinery Morocco
N. 1 Sistema Pressure Swing Adsorption (PSA) a 12 letti + N. 1 Sistema Pressure Swing Adsorption (PSA) a 6 letti per purificazione idrogeno.
N. 1 x 12 Beds Pressure Swing Adsorption (PSA) Skid + N. 1 x 6 Beds Pressure Swing Adsorption (PSA) Skid for hydrogen purification.
Raffineria di Samir
Samir Refinery
Casablanca
Morocco
647.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2006
Enppi
Khalda Petr. Co (Apache)
N.3 Treni di pompaggio; portata: 115 m3/hr; prevalenza: 720 mt
N.3 Shipping pumps trains; flowrate: 115 m3/hr; pressure: 720 mt
Kahram Oil Field
Kahram Oil Field
Kahram
Egypt
755.900,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2006
U O P
O G D C
N. 1 Skid di raffreddamento + n. 1 skid di raffreddamento gas + n. 1 skid compressore
N. 1 Chiller skid + n. 1 gas cooling skid + n. 1 compressor skid
C.le Gas Quadripur
Quadripur Gas Plant
Islamabad
Pakistan
458.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2006
Enppi
Khalda Petr. Co (Apache)
N.3 Sistemi di pompaggio booster da 115 m3/hr cad.; prevalenza: 72 mt
N.3 Booster pumps trains; flowrate: 115m3/hr each; pressure: 72 mt
Kahram Oil Field
Kahram Oil Field
Kahram
Egypt
456.780,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 37 di 130
21-gen-11
Referenze: Sistemi di Processo VariJob References: Process Packages Various
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2006
U O P
O G D C
Fornitura di un package comprendente N. 1 skid con 49 housing per membrane filtrazione gas naturale, N. 1 unità memguard per produzione idrogeno da gas naturale.
Supply of one package including N. 1 skid with 49 membrane housings for natural gas filtration, N.1 memguard unit for hydrogen production from natural gas.
C.le Gas Quadripur
Quadripur Gas Plant
Islamabad
Pakistan
859.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2005
Alcon
N A O C
No. 1 sistema raccolta drenaggi impianto, completo di pompe di trasferimento, vessel diametro 2.000 mm, lunghezza (tang to tang) 6.000 mm.
No. 1 plant closed drain system, complete of transfer pumps, vessel diameter 2.000 mm, length (tang to tang) 6.000 mm.
Campo Gas Di I D U
I D U Gas Field
Port Harcourt
Nigeria
140.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2004
Petrojet
Khalda Petr. Co (Apache)
N.2 Sistemi di rimozione mercurio da gas; portata: 120.000 m3/hr; pressione: 100 bar
N.2 Mercury removal packages; flowrate:120.000 m3/hr; pressure: 100 bar
Salam Gas Plant
Salam Gas Plant
Onshore Egypt
Egypt
3.085.800,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2004
Air Liquid
Air Liquid
Polybed Pressure Swing Adsorption (PSA) per purificazione idrogeno con skid accessori (scambiatori e trattamento butano)
Polybed Pressure Swing Adsorption (PSA) for hydrogen purification with accessories (heat exchanger and butane treatment)
Raffineria Di Priolo
Priolo Refinery
Priolo
Italy
887.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 38 di 130
21-gen-11
Referenze: Sistemi di Processo VariJob References: Process Packages Various
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2004
U O P
Total
Polybed Pressure Swing Adsorption (PSA) per purificazione idrogeno
Polybed Pressure Swing Adsorption (PSA) fore hidrogen purification
Raffineria Di Gonfreville
Gonfreville Refinery
Gonfreville
France
628.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2004
U O P
Fortum
No. 1 Unità Polybed Pressure Swing Adsorption (PSA) a 12 letti per purificazione idrogeno.
No. 1 x 12 beds Polybed Pressure swing Adsorption (PSA) unit for hydrogen purification.
Raffineria Di Porvoo
Porvoo Refinery
Porvoo
Finland
620.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2004
Air Liquid
Repsol
Polybed Pressure Swing Adsorption (PSA) per purificazione idrogeno
Polybed Pressure Swing Adsorption (PSA) for hydrogen purification
Impianto Petrolchimico
Petrochemical Plant
La Coruna
Spain
458.500,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2004
U O P
Bapco
N° 2 Polybed Pressure Swing Adsorption (PSA) per purificazione idrogeno
N°2 Polybed Pressure Swing Adsorption (PSA) for hydrogen purification
Raffineria Di Manama
Manama Refinery
Manama
Bahrain
700.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 39 di 130
21-gen-11
Referenze: Sistemi di Processo VariJob References: Process Packages Various
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2004
Enppi
Belayim Pet.Co.(Petrobel)
N.1 Sistema di collettori per 9 stream di misura rating 600# in DUPLEX
N.1 Manifold skid for 9 streams rating 600# DUPLEX material
Baltim platform
Baltim platform
Mediterranean Sea
Egypt
649.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2004
Petrojet
Khalda Petr. Co (Apache)
N.1 Sistema rimozione mercurio da gas; portata: 120.000 m3/hr, pressione: 100 bar
N.1 Mercury removal package; flowrate: 120.000 m3/hr, pressure: 100 bar
Tarek Gas Plant
Tarek Gas Plant
Onshore Egypt
Egypt
1.542.900,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2004
Enppi
Belayim Pet.Co.(Petrobel)
N.1 Skid collegamento strumentazione per gas system da 600 m3/hr
N.1 Instrument gas skid for gas system; flowrate: 600 m3/hr
Baltim platform
Baltim platform
Mediterranean Sea
Egypt
280.450,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2003
U O P
O G D C
Impianto di separazione idrogeno a membrane con 98 moduli.
Hydrogen separex membrane system with 98 modules.
C.le Gas Quadripur
Quadripur Gas Plant
Islamabad
Pakistan
692.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 40 di 130
21-gen-11
Referenze: Sistemi di Processo VariJob References: Process Packages Various
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2003
Enppi
Unit.Gas Deriv.Co(BP/ENI)
N.1 Skid generazione idrogeno; portata 100.000Nm3/hr, pressione: 7bar
N.1 Nitrogen generation skid; flowrate: 100.000 Nm3/hr, pressure: 7bar
Damietta Gas Plant
Damietta Gas Plant
Port Said
Egypt
346.070,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2003
U O P
N A O C
Impianto di separazione a membrane, impianto di filtrazione e sistema di misura gas
Separex membrane system, gas filtration system and gas metering system
Stazione Di Compressione Di Irri
Irri Compression Station
Lagos
Nigeria
1.638.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2002
U O P
Basf
Polybed Pressure Swing Adsorption (PSA) per purificazione idrogeno.
Polybed Pressure Swing Adsorption (PSA) for hydrogen purfication
Impianto Chimico
Chemical Plant
Antwerp
Belgium
740.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2002
U O P
O M V
Polybed Pressure Swing Adsorption (PSA) per purificazione idrogeno da off-gas di raffineria
Polybed Pressure Swing Adsorption (PSA) for hydrogen purification from refinery off-gas
Raffineria Di Schwechat
Schwechat Refinery
Schwechat
Austria
265.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 41 di 130
21-gen-11
Referenze: Sistemi di Processo VariJob References: Process Packages Various
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2002
Enppi
Badredin Petr.Co (Shell)
Revamping sistema shut down di impianto trattamento gas
Gas treatment plant - shut down revamping
Obayed Gas Field
Obayed Gas Field
Onshore Egypt
Egypt
125.890,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2002
Enppi
Fayum GasCo(Shell Gas BV)
N.4 Trappole di lancio per PIG 12"x8" e 16" x 12", pressione: 77 bar
N.4 PIG launchers 12"x8" and 16" x 12", pressure: 77 bar
Kom Aushim Gas Field
Kom Aushim Gas Field
Onshore Egypt
Egypt
280.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2002
U O P
O G D C
Impianto di trattamento gas con filtri, separatori e filtri a membrane "separex"
Gas treatment package with filters, separators and membrane filters "separex"
C.le Gas Quadripur
Quadripur Gas Plant
Islamabad
Pakistan
1.373.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2002
Enppi
Fayum GasCo(Shell Gas BV)
N. 1 Skid emergenza shut-down; portata 70.000 Nm3/hr, 77 bar
N.1 Emergency shut down skid; flow rate 70.000 Nm3/hr, 77 bar
Kom Aushim Gas Field
Kom Aushim Gas Field
Onshore Egypt
Egypt
195.800,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 42 di 130
21-gen-11
Referenze: Sistemi di Processo VariJob References: Process Packages Various
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2001
International Power
N. 1 Skid emergenza shut-down; portata 130.000 Nm3/hr, 77 bar
N. 1 Emergency shut down skid; flow rate 130.000 Nm3/hr, 77 bar
Al Kamil Field
Al Kamil Field
Onshore Oman
Oman
205.460,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2001
U O P Usa
Grupo Alvica
Polybed Pressure Swing Adsorption (PSA) per produzione idrogeno
Polybed Pressure Swing Adsorption (PSA) for hydrogen production
Raffineria Hamaca
Hamaca Refinery
Josè
Venezuela
890.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2000
Agip
Agip
Impianto completo di produzione gas con separatore 125.000Sm3/g , trappole di lancio e ricevimento da 14", riscaldatore a gas da 150.000Kcal/h, N°3 quadri idraulici di controllo pozzi, sistema di controllo e trasmissione dati, sistemi ausiliari - ATI con KomesComplete gas production plant with separator 125.000Sm3/d , launching and receiving traps 14", gas heater 150.000Kcal/h, N°3 hydraulic wellhead control panels, distributed control system and data transimission, auxiliary systems - JV with Komes
Campo Gas Di Samperi 1
Samperi 1 Gas Field
Enna
Italy
1.200.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2000
U O P
Q-chem
Polybed Pressure Swing Adsorption (PSA) per purificazione e raffreddamento idrogeno da off-gas di raffineria
Polybed Pressure Swing Adsorption (PSA) for hydrogen cooling system and purification from refinery off-gas
Impianto Petrolchimico
Petrochemical Plant
Mesaieed
Qatar
475.700,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 43 di 130
21-gen-11
Referenze: Sistemi di Processo VariJob References: Process Packages Various
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
1999
U O P
Petronor
Polysep Pressure Swing Adsorption (PSA) per purificazione idrogeno e moduli di purificazione a membrane
Polysep Pressure Swing Adsorption (PSA) for hydrogen purification and membrane modules
Impianto Petrolchimico
Petrochemical Plant
Sommorostro
Spain
420.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
1998
Enichem
Enichem
Modulo di processo chimico per produzione metaxilene - Dimensioni 12mt (l) x 8mt (p) x 8mt (h) - Processo fornito da Reitheon E&C
Chemical process module for metaxilene production - Dimensions 12mt (l) x 8mt (w) x 8mt (h) - Process by Reitheon E&C
Impianto Petrolchimico
Petrochemical Plant
Sarroch
Italy
760.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
1998
Enichem
Enichem
Impianto pilota per la produzione sperimentale di gomma in esecuzione package
Pilot plant for rubber experimental production - Package execution
Impianto Petrolchimico
Petrochemical Plant
Ravenna
Italy
420.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
1998
U O P
Saras
Package di filtrazione idrogeno con 72 moduli a membrane - Seconda linea
Hydrogen filtering package with 72 membrane module - Second line
Raffineria Di Sarroch
Sarroch Refinery
Sarroch
Italy
450.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 44 di 130
21-gen-11
Referenze: Sistemi di Processo VariJob References: Process Packages Various
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
1997
U O P
Saras
Package di filtrazione idrogeno con 72 moduli a membrane - Prima linea
Hydrogen filtering package with 72 membrane module - First line
Raffineria Di Sarroch
Sarroch Refinery
Sarroch
Italy
510.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
1997
Sicon Oil&gas (CCC Group)
O G D C
N°4 package di separazione gas da 40MMscf/g, N°4 trappole di lancio e ricevimento pig da 12" e 6", N°11 package di iniezione chemical , N°2 sistemi di misura fiscale gas con orifizi calibrati da 6".
N°4 gas separation packages for 40MMscf/d, N°4 launching and receivign traps 12" and 6", N°11 chemical injection packages, N°2 gas metering systems with senior calibrated orefice 6".
Campo Gas Di Panjpir
Panjpir Gas Field
Panjpir
Pakistan
860.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
1996
Procter & Gamble
Procter & Gamble
Impianto trasportabile per la produzione di candeggina
Mobile bleach production plant
Impianto Chimico
Chemical Plant
Esquintla
Guatemala
153.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
1996
Procter & Gamble
Procter & Gamble
Impianto per la produzionr detergenti liquidi montato su skid
Skid mounted liquid detergent production plant
Impianto Chimico
Chemical Plant
Dammam
Saudi Arabia
600.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 45 di 130
21-gen-11
Referenze: Sistemi di Processo VariJob References: Process Packages Various
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
1996
Procter & Gamble
Procter & Gamble
Impianto trasportabile per la produzione di candeggina
Mobile bleach production plant
European Technical Center
European Technical Center
Bruxelles
Belgium
290.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
1996
Procter & Gamble
Procter & Gamble
Impianto trasportabile per la produzione di candeggina
Mobile bleach production plant
Impianto Chimico
Chemical Plant
Barquisimento
Venezuela
246.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 46 di 130
21-gen-11
Referenze: Contratti EPCJob References: EPC Contract
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2010
Naftan
Contratto EPC per ingegneria e costruzione dell'impianto Visbreaker di raffineria
EPC Supervision for engineering and construction of Visbreaker plant
Raffineria in Bielorussia
Naftan refinery
Onshore
Belorus
3.160.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2010
Grodno Azot
Grodno Azot
Contratto EPC per lo studio di processo, fornitura delle attrezzature e materiali e supervisione al revamping per l'impianto distillazione del Cicloesanone
EPC - Process engineering, supply of equipment and materials and revamping supervision for GA petrolchemical plant Cycloexanone distillation unit in Grodno - Belarus
Impianto petrolchimico
Petrochemical Plant
Grodno
Belarus
8.280.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2010
Naftan
Contratto EPC per l'ingegneria, costruzione e la fornitura della strumentazione dell'impianto Vacuum Vis Breaking di raffineria
EPC Supervision for engineering and construction plus instrumentation supply for Vacuum Vise Braking plant
Raffineria in Bielorussia
Naftan refinery
Onshore
Belorus
739.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2008
ETAP / ENI Tunisia
Contratto per piano trattamento Oil & Gas; portata: 850.000 MMSCFD
Oil and gas tratement plant; flowrate: 850.000 MMSCFD
Maamoura Field
Maamoura Field
Onshore Tunisia
Tunisia
25.100.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 47 di 130
21-gen-11
Referenze: Contratti EPCJob References: EPC Contract
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2008
Enppi
Khalda Petr. Co (Apache)
Sistemi di separazione per gas naturlae da 500 MMSCFD, peso total: 400 tons, completamente accessoriato e installato in site
Slug catcher facilities; flowrate: 500 MMSCFD, total weight: 400tons, with all accessories and installed at site
Salam Gas Plant
Salam Gas Plant
Onshore Egypt
Egypt
32.190.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2007
Khalda Petr. Co (Apache)
N.1 Separatore per gas naturale; diametro: 3 mt; Tangent-line: 20 mt; pressione: 149 bar; peso: 300 tons completamente accessoriato e installato in sito
N.1 Slug catchers; diameter: 3mt; tangent-line: 20mt; pressure: 149 bar; weight: 300 tonns, totally accessoried and installed at site
Salam Gas Plant
Salam Gas Plant
Onshore Egypt
Egypt
11.246.680,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2007
Khalda Petr. Co (Apache)
N.1 Sistema di separazione gas da 150 MMSCFD; pressione: 146 bar completamente accessoriato e installato in sito
N.1 Gas separator; flowrate: 150 MMSCFD; pressure: 146 bar, totally accessoried and installed at site
Qasr field
Qasr field
Onshore Egypt
Egypt
9.552.458,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2006
Khalda Petr. Co (Apache)
N.5 Sistemi rimozione mercurio per greggio; portata: 50 MMSCFD cad; pressione: 146 bar
N.5 Mercury removal trains; flowrate: 50 MMSCFD each; pressure: 146 bar
Obayed Gas Field
Obayed Gas Field
Onshore Egypt
Egypt
8.850.650,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 48 di 130
21-gen-11
Referenze: Contratti EPCJob References: EPC Contract
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2004
Eni - Div. Agip
Eni - Div. Agip
Revamping della centrale con inserimento di tre compressori gas da 1.000.000 Sm3/giorno, nuovo sistema di blowdown, nuovo sistema di ricevimento gas, revamping del sistema di controllo e dei sistemi ausiliari - ATI con BonattiRevamping of gas plant with installation of three compressors (1.000.000 Sm3/day), new blowdown system, new gas receiving system, revamping of distributed control system and auxiliary systems - JV with Bonatti
C.le Gas Gagliano
Gagliano Gas Plant
Gagliano
Italy
8.000.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2002
Eni - Div. Agip
Eni - Div. Agip
Revamping della centrale gas con inserimento di due impianti di degasolinaggio da 1.000.000 Sm3/giorno per incremento di produzione - ATI con Bonatti
Revamping of gas plant with installation of two gasoline removal plants (1.000.000 Sm3/day) for production enhancement - JV with Bonatti
C.le Gas Gagliano
Gagliano Gas Plant
Gagliano
Italy
3.250.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2001
Enelpower
A E M Milano
Revamping del sistema di controllo della centrale - ATI con ABB Energy Automation
Control system revamping of power plant - JV with ABB Energy Automation
Centrale Elettrica Di Cassano D'adda
Cassana D'adda Power Plant
Cassano D'adda
Italy
3.256.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2000
Agip
Agip
Revamping della centrale gas con iserimento di un turbocompressore da 3.000.000Sm3/g, impianto stabilizzazione gasoilna da 5.000Kg/h, N°2 serbatoi stoccaggio gasolina da 350m3, separatore bifasico, sistema di controllo a DCS, sistemi ausiliari - ATI con AISGas plant revamping for production enhancement with one new turbocompressor for 3.000.000Sm3/d, gasoline stabilization system for 5.000Kg/h, N°2 gasoline tank for 350m3, two phase separators, control system with DCS, auxiliary systems - JV with AIS
C.le Gas Pineto
Pineto Gas Plant
Pineto
Italy
5.950.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 49 di 130
21-gen-11
Referenze: Contratti EPCJob References: EPC Contract
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2000
Agip
Agip
Impianto completo di produzione gas con separatore 125.000Sm3/g , trappole di lancio e ricevimento da 14", riscaldatore a gas da 150.000Kcal/h, N°3 quadri idraulici di controllo pozzi, sistema di controllo e trasmissione dati, sistemi ausiliari - ATI con KomesComplete gas production plant with separator 125.000Sm3/d , launching and receiving traps 14", gas heater 150.000Kcal/h, N°3 hydraulic wellhead control panels, distributed control system and data transimission, auxiliary systems - JV with Komes
Campo Gas Di Samperi 1
Samperi 1 Gas Field
Enna
Italy
1.200.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 50 di 130
21-gen-11
Referenze: Caldareria e Recipienti a PressioneJob References: Pressure Vessels
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2010
Process Components
Trinidad
N.1 Scrubber vessel; diametro: 18", tangent-line: 10'
N.1 Scrubber vessel; diameter: 18"; tangent-line: 10'
Impianti Vari
Several Plants
Onshore USA
USA
53.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2010
Chesa Peak En.
N.1 Separatore a filtri coaliscenti orizzontale in acciaio inox; diametro: 42"; tangent line:18'
N.1 Horizzontal double barrel coalescing separator in stainless steel; diameter: 42"; tangent-line: 18'
Impianti Vari
Several Plants
Onshore USA
USA
62.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2010
B P
N.1 Separatore trifase verticale in acciaio inox montato su skid, diameter: 30"; tangent line: 10'
N.1 Skid mounted vertical 3-phase separator in stainless steel; diameter: 96"; tangent line: 10'
Impianti Vari
Several Plants
Onshore USA
USA
181.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2010
DCP Midstream
Conoco Philips
N.1 Separatore bifasico orizzontale; materiale: acciaio inox; diametro: 96"; tangent-line: 20'
N.1 Inlet scrubber 2-phase horizzontal separator in stainless steel; diameter: 96", tangent line: 20'
Impianti Vari
Several Plants
Onshore USA
USA
144.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 51 di 130
21-gen-11
Referenze: Caldareria e Recipienti a PressioneJob References: Pressure Vessels
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2010
Chesa Peak En.
N.1 Contactor per ammine in acciaio inox; diametro: 72"; tangent line: 54'
N.1 Amine contactor in stainless steel; diameter: 72"; tangent-line: 54'
Impianti Vari
Several Plants
Onshore USA
USA
248.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2010
S-Con Inc.
Center Point Energy
N.1 Separatore in acciaio inox; diametro: 84"; tangent-line: 16'
N.1 Inlet separator in stainless steel; diameter: 84"; tangent-line: 16'
Impianti Vari
Several Plants
Onshore USA
USA
130.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2010
S-Con Inc.
Center Point Energy
N.1 Separatore per glicole; diametro: 84"; tangent-line: 16', materiale: acciaio inox
N.1 Glycol after scrubber; material; stainless steel; diameter: 84"; tangent-line: 16'
Impianti Vari
Several Plants
Onshore USA
USA
133.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2010
S-Con Inc.
S-Con Inc.
N.1 Separatore di ammine; diametro: 84"; tangent-line: 20'
N.1 Amine after scrubber vane mist eliminator; diameter: 84"; tangent-line: 20'
Impianti Vari
Several Plants
Onshore USA
USA
171.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 52 di 130
21-gen-11
Referenze: Caldareria e Recipienti a PressioneJob References: Pressure Vessels
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2010
Process Components
Trinidad
N.1 Scrubber vessel; diametro: 18", tangent-line: 6'
N.1 Scrubber vessel; diameter: 18"; tangent-line: 6'
Impianti Vari
Several Plants
Onshore USA
USA
49.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2010
S-Con Inc.
S-Con Inc.
N.2 Separatori per glicole in acciaio inox; diametro: 84"; tangent line: 16'
N.2 Glycol after scrubber mist eliminators in stainless steel; diameter: 84"; tangent line: 16'
Impianti Vari
Several Plants
Onshore USA
USA
300.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2010
EXPRO Americas
N.1 Surge drum verticale in acciaio inox; diametro: 96"; tangent-line: 10'
N.1 Vertical surge drum in stainless steel; diameter: 96"; tangent line: 10'
Impianti Vari
Several Plants
Onshore USA
USA
67.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2010
Hijet international
Esso
N.2 Eiettori gas-liquido
N.2 Gas-liquid ejector
Raffineria Esso Fos Sur Mare
Esso refinery For Sur Mare
Fos Sur Mer
France
137.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 53 di 130
21-gen-11
Referenze: Caldareria e Recipienti a PressioneJob References: Pressure Vessels
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2010
VME Process Inc.
N.1 Separatore trifase verticale; diametro: 32" tangent-linei:14' in acciaio inox
N.1 Stainless steel vertical 3 phase separator; diameter: 36" tangent line: 14'
VME plant
VME plant
Onshore USA
USA
14.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2010
Eastern Reservoir
N.14 Separatori di diverse tipologie in acciaio inox
N.14 Separators several typologies in stainless steel
Eastern Reservoir Plant
Eastern Reservoir Plant
Onshore USA
USA
2.075.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2010
Hijet international
Exxon Mobil
N.2 Recipienti a pressione; materiale: duplex SAF 2205; diametro: 273mm; spessore: 12,7mm; peso totale: 1,9tons
N.2 Pressure vessels; material: duplex SAF 2205; diameter: 273mm; thk: 12,7mm; total weight: 1,9tons
Raffineria Di Gonfreville
Gonfreville Refinery
Gonfreville
France
150.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2010
Azzawiya
N.1 Recipiente a pressione in acciaio al carbonio; diametro: 5000mm; spessore: 10mm; peso totale: 1 ton
N.1 Pressure vessel; material: carbon steel; diameter: 5000mm; thk: 10mm; total weight: 1ton
Azzawiya refinery
Azzawiya refinery
Azzawiya
Libya
18.300,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 54 di 130
21-gen-11
Referenze: Caldareria e Recipienti a PressioneJob References: Pressure Vessels
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2010
S-Con Inc.
Center Point Energy
N.1 Separatore di ammine; diametro: 84"; tangent-line: 20'
N.1 Amine after scrubber; diameter: 84"; tangent-line: 20'
Impianti Vari
Several Plants
Onshore USA
USA
155.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2010
Center Point Energy
N.1 First stage discharge dampener in acciaio inox; diametro: 18"; tangent line: 63"
N.1 First stage discharge dampener in stainless steel; Diameter: 18"; tangent-line: 63"
Impianti Vari
Several Plants
Onshore USA
USA
24.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2010
Mustang Eng.
Mellitah Gas BV
N.1 Recipiente a pressione per greggio caldo; diamtero: 1.500mm; tangent line: 3.000mm
N.1 Hot Oil Expansion Vessel; diameter: 1.500mm; tangent-line: 3.000mm
Bouri Project
Bouri Project
Mediterranean Sea - Libya
Libya
49.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2010
JGC-Tecnimont JV
Gasco
N.10 Recipienti a pressione
N.10 Pressure vessels
Campo Gas Di Habshan
Habshan Gas Field
Abu Dhabi
United Arab Emirates
75.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 55 di 130
21-gen-11
Referenze: Caldareria e Recipienti a PressioneJob References: Pressure Vessels
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2010
DCP Midstream
DCP Midstream
N.2 Slug catchers per alta pressione in acciaio inox; diametro: 120"; tangent line: 40'
N.2 HP Slug catchers in stainless steel; diameter: 120"; tangent-line: 40'
Impianti Vari
Several Plants
Onshore USA
USA
886.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2010
Chesa Peak En.
N.3 Coalescer filter verticale in acciaio inox; diametro: 42"; tangent line: 7'
N.3 Vertical coalescer filter in stainless steel; diameter: 42"; tangent-line: 7'
Impianti Vari
Several Plants
Onshore USA
USA
140.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2010
Chesa Peak En.
N.1 Slug Catcher orizzontale in acciaio inox; diametro: 84"; tangent-line: 40'
N.1 Horizontal Slug Catcher in stainless steel; diameter: 84"; tangent line: 40'
Impianti Vari
Several Plants
Onshore USA
USA
73.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2010
Sepra-Chem
N.1 Separatore per Gas - riparazione
N.1 Gas coalescer repair
Impianti Vari
Several Plants
Onshore USA
USA
17.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 56 di 130
21-gen-11
Referenze: Caldareria e Recipienti a PressioneJob References: Pressure Vessels
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2010
Sepra-Chem
N.1 Coalescer vessel orizzontale in acciaio inox; diametro: 44"; tangentline: 8'
N.1 Horizontal coalescer vessel in stainless steel; diameter: 44"; tangent line: 8'
Impianti Vari
Several Plants
Onshore USA
USA
21.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2010
Center Point Energy
N.1 Slug Catcher vessel da 500 MMSCFD in acciaio inox
N.1 Slug Catcher vessel; flowrate: 500 MMSCFD in stainless steel
Impianti Vari
Several Plants
Onshore USA
USA
277.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2010
DCP Midstream
N.1 Slug Catcher per bassa pressione in acciaio inox, diametro: 120"; tangent-line: 50'
N.1 LP Slug Catcher in stainless steel; diameter: 120"; tangent line: 50'
Impianti Vari
Several Plants
Onshore USA
USA
523.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2010
Chesa Peak En.
N.1 Slug Catcher orizzontale in acciaio inox, diametro: 84"; tangent line: 40'
N.1 Horizontal Slug Catcher in stainless steel; diameter: 84"; tangent-line: 40'
Impianti Vari
Several Plants
Onshore USA
USA
324.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 57 di 130
21-gen-11
Referenze: Caldareria e Recipienti a PressioneJob References: Pressure Vessels
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2010
Center Point Energy
N.1 Slug Catcher vessel da 500 MMSCFD in acciaio inox
N.1 Slug Catcher vessel; flowrate: 500 MMSCFD in stainless steel
Impianti Vari
Several Plants
Onshore USA
USA
1.108.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2010
Center Point Energy
N.1 Slug Catcher vessel da 350/250 MMSCFD
N.1 Slug Catcher vessel; flowrate: 350/250 MMSCFD
Impianti Vari
Several Plants
Onshore USA
USA
386.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2010
DCP Midstream
N.1 Slug Catcher per alta pressione in acciaio inox, diametro: 120"; tangent-line: 40'
N.1 HP Slug Catcher in stainless steel; diameter: 120"; tangent line: 40'
Impianti Vari
Several Plants
Onshore USA
USA
889.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2010
B P
N.1 Vessel verticale in acciaio inox; diametro: 30"; tangent line: 10'
N.1 Vertical fluid inlet vessel in stainless steel; diameter: 30"; tangent line: 10'
Impianti Vari
Several Plants
Onshore USA
USA
18.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 58 di 130
21-gen-11
Referenze: Caldareria e Recipienti a PressioneJob References: Pressure Vessels
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2009
Gupco
Gupco
N.1 Sistema lancio e ricezione PIG da 8" e 10" rispettivamente
N.1 PIG launcher and PIG receiver; 8" x 10"
North Shadwan Oil Field
Notrh Shadwan Oil Field
Egyptian desert
Egypt
84.560,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2009
APS
Eni - Div. Agip
N.7 Recipienti a pressione in acciaio inox/carbonio; diametro: 2500mm; spessore: 12mm; peso totale: 3tons
N.7 Pressure vessels; material: stainless/carbon steel; diameter: 2500mm; thk: 12mm; total weight: 3 tons
Raffineria di Sannazzaro
Sannazzaro Refinery
Sannnazzaro
Italy
250.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2009
C & G impianti N.2 Recipienti a pressione in acciaio al carbonio; diametro: 2400mm; spessore: 18mm; peso totale: 1,5tons
N.2 Pressure vessels; material: carbon steel; diameter: 2400mm; thk: 18mm; total weight: 1,5tons
Impianti vari
Several Plants
Onshore Iran
Iran
97.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2009
Hijet international N.1 Recipiente a pressione in acciaio inox 316L; diametro: 323,8mm; spessore:12,7mm; peso totale: 1 ton
N.1 Pressure vessel; material: 316L stainless steel; diameter: 323,8mm; thk: 12,7mm; total weight: 1ton
Impianto USA
USA plant
Onshore USA
USA
60.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 59 di 130
21-gen-11
Referenze: Caldareria e Recipienti a PressioneJob References: Pressure Vessels
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2009
Sanco N.1 Recipiente a pressione in acciaio al carbonio; diametro: 2000mm; spessore: 12mm; peso totale: 2tons
N.1 Pressure vessel; material: carbon steel; diameter: 2000mm; thk: 12mm; total weight: 2tons
Impianti vari
Several Plants
Onshore Tunisia
Tunisia
25.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2009
Saipem Energy Int.
Eni div. E & P
N.1 Test saparator; Diametro: 99"; tangent-line: 28'
N.1 Production and test separator; Diameter: 99"; tangent-line: 28'
Aquila FPSO
Aquila FPSO
Mediterranean Sea - Italy
Italy
442.894,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2009
Saipem
Sonatrach
N.8 Apparecchiature a pressione in acciaio inox AISI 316L
N.8 Stainless steel vessels - AISI 316L
MLE field
MLE field
Onshore Algeria
Algeria
2.315.700,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2009
UMM Al Jawaby
Azzawiya
N.1 Recipiente a pressione in acciaio al carbonio; diametro: 1067mm; spessore: 10mm; peso totale: 6.000kg
N.1 Vessel in carbon steel; diameter: 1067mm; thk: 10mm; total weight: 6.000kg
Azzawiya refinery
Azzawiya refinery
Azzawiya
Libya
130.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 60 di 130
21-gen-11
Referenze: Caldareria e Recipienti a PressioneJob References: Pressure Vessels
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2009
Saipem
Sonatrach
N.6 Test separator claddati; Diametro: 60"; tangent-line: 15'
N.6 Cladded test separators; Diameter: 60"; tangent-line: 15'
MLE field
MLE field
Onshore Algeria
Algeria
888.300,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2009
Saipem Energy Int.
Eni div. E & P
N.1 Separatore; Diametro: 63"; tangent-line: 12' ; N.1 Desalter elettrostatico; Diametro: 95"; tangent-line: 17'
N.1 Overhead separator; Diameter: 63"; tangent-line: 12' ; N.1 Electrostatic separator Diameter: 95"; tangent-line: 17'
Aquila FPSO
Aquila FPSO
Mediterranean Sea - Italy
Italy
610.788,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2008
Enppi
Khalda Petr. Co (Apache)
Sistemi di separazione per gas naturlae da 500 MMSCFD, peso totale: 400 tons
Slug catcher facilities; flowrate: 500 MMSCFD, total weight: 400tons
Salam Gas Plant
Salam Gas Plant
Onshore Egypt
Egypt
32.190.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2008
Ansaldo N.1 Recipiente a pressione in acciaio al carbonio; diametro: 6000mm; spessore: 15mm; peso totale: 18tons
N.1 Pressure vessel in acrbon steel; diameter: 6000mm; thk: 15mm; total weight: 18tons
Impianto di Saluggia
Saluggia plant
Saluggia
Italy
150.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 61 di 130
21-gen-11
Referenze: Caldareria e Recipienti a PressioneJob References: Pressure Vessels
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2008
Sanco N.2 Recipienti a pressione in acciaio inox; diametro: 1670mm; spessore: 20mm; peso totale: 15tons
N.2 Pressure vessels in stainless steel;; diameter: 1670mm; thk: 20mm; total weight: 15tons
Impianto in South Africa
South Africa plant
Onshore South Africa
South Africa
300.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2008
C & G impianti N.6 Recipienti a pressione in acciaio al carbonio; diametro: 2400mm; spessore: 8mm; peso totale: 10tons
N.6 Pressure vessels in carbon steel; diameter: 2400mm; thk: 8mm; total weight: 10tons
Impianti Vari
Several Plants
Onshore Albania
Albania
50.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2008
Markwest
N.1 Torre debutanizzatrice; Diameter: 48"; Tangent-line: 119' 0"
N.1 Debutaniser tower; diameter: 48"; tangent-line: 119' 0"
Impianti Vari
Several Plants
Onshore USA
USA
399.367,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2008
Simeco
Eni - Div. Agip
N.1 Colonna in acciaio al carbonio; diametro: 2000mm; spessore: 19mm; peso totale: 8tons
N.1 Tower in carbon steel; diameter: 2000mm; thk: 19mm; total weight: 8tons
Raffineria di Sannazzaro
Sannazzaro Refinery
Sannnazzaro
Italy
120.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 62 di 130
21-gen-11
Referenze: Caldareria e Recipienti a PressioneJob References: Pressure Vessels
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2008
Eltron Chromalox N.2 Recipienti a pressione in acciaio basso legato; diametro: 323,8mm; spessore: 9,5mm; peso totale: 2tons
N.2 Pressure vessels; material: low alloy steel; diameter: 323,8mm; thk: 9,5mm; total weight: 2tons
Impianti vari
Several Plants
Onshore Switzerland
Switzerland
50.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2008
Enppi
Khalda Petr. Co (Apache)
N.1 Separatore tipo "celle API" trifase da 2.550 BOWPD
N.1 API three-phase separator; flowrate: 2.550 BOWPD
Western Desert Field
Western Desert Field
Onshore Egypt
Egypt
139.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2008
Cross Tex
N.1 Separatore finale per gas; diametro: 84"; Tangent-line: 24'
N.1 Slug catcher; diameter: 84"; tangent-line: 24'
Impianti Vari
Several Plants
Onshore USA
USA
260.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2007
Technip Italy
Grupa Lotos
N.7 Recipienti a pressione in acciaio al carbonio; diametro: 3550mm; spessore: 29mm; peso totale: 70tons
N.7 Pressure vessels in carbon steel; diameter: 3550mm; thk: 29mm; total weight: 70tons
Raffineria di Gdansk
Gdansk refinery
Gdansk
Poland
1.050.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 63 di 130
21-gen-11
Referenze: Caldareria e Recipienti a PressioneJob References: Pressure Vessels
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2007
Enppi
Agiba
N.3 Separatori tri-fase; diametro: 2,2 mt; Tangent-line: 6 mt
N.1 Three phase separator; Diameter: 2,2 mt; Tangent-line:6 mt
West Ashrafi plant
West Ashrafi plant
Egyptian desert
Egypt
125.450,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2007
Enppi
Agiba
N.1 Slug Catcher con doppio mantello; diametro: 3 mt; tangent-line: 10 mt
N.1 Slug catcher - double body; diameter: 3mt; Tangent line: 10 mt
West Ashrafi plant
West Ashrafi plant
Egyptian desert
Egypt
245.680,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2007
Markwest
N.1 Recipiente a pressione verticale per setacci molecolari
N.1 Vertical mole sieve vessel
Impianti Vari
Several Plants
Onshore USA
USA
224.342,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2007
Samir
N.8 Recipienti a pressione in acciaio al carbonio; diametro: 324mm; spessore: 9,5mm; peso totale: 13tons
N.8 Pressure vessels in carbon steel; diameter: 324mm; spessore: 9,5mm; total weight: 13tons
Samir Refinery Upgrade
Samir Refinery Upgrade
Mohammedia
Morocco
190.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 64 di 130
21-gen-11
Referenze: Caldareria e Recipienti a PressioneJob References: Pressure Vessels
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2007
Markwest Javeline Co
N.1 Colonna ad assorbimento per Gas di ricircolo da 42"x24"x61"
N.1 Recycle gas absorber 42"x24"x61"
Impianti Vari
Several Plants
Onshore USA
USA
217.002,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2007
Enppi
Agiba
N.1 Trappola per PIG; lunghezza: 6mt; diametro: 10"
N.1 PIG trap; 6mt x 10"
West Ashrafi plant
West Ashrafi plant
Egyptian desert
Egypt
52.540,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2007
Technip Italy
Grupa Lotos
N.4 Colonne in acciaio al carbonio; diametro: 2500mm; spessore: 17mm; peso totale: 75tons
N.4 Towers in carbon steel; diameter: 2500mm; thk: 17mm; total weight: 75tons
Raffineria di Gdansk
Gdansk refinery
Gdansk
Poland
1.050.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2007
Khalda Petr. Co (Apache)
N.1 Separatore per gas naturale; diametro: 3 mt; Tangent-line: 20 mt; pressione: 149 bar; peso: 300 tons
N.1 Slug catchers; diameter: 3mt; tangent-line: 20mt; pressure: 149 bar; weight: 300 tonns
Salam Gas Plant
Salam Gas Plant
Onshore Egypt
Egypt
11.246.680,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 65 di 130
21-gen-11
Referenze: Caldareria e Recipienti a PressioneJob References: Pressure Vessels
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2007
Khalda Petr. Co (Apache)
N.1 Sistema di separazione gas da 150 MMSCFD; pressione: 146 bar
N.1 Gas separator; flowrate: 150 MMSCFD; pressure: 146 bar
Qasr field
Qasr field
Onshore Egypt
Egypt
9.552.458,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2007
Markwest Javeline Co
N.1 Colonna di strippaggio da 42"x30"x83"
N.1 Stripper tower; 42"x30"x83"
Impianti Vari
Several Plants
Onshore USA
USA
248.761,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2006
Naftec
N.1 Recipiente a pressione verticale per separazione olii; diametro: 34"; Tangent line: 2450 mm
N.1 Vertical oil separator; Diameter: 34"; Tangent-line: 2450 mm
Raffinerie de Skidda
Skidda refinery
Skidda
Algeria
230.670,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2006
Naftec
N.1 Recipiente a pressione orizzontale per riflusso Xylene; Diametro: 2,5 mt; Tangent line: 10 mt
N.1 Horizontal reflux Xylene splitter; diameter: 2,5 mt; Tangent line: 10 mt
Raffinerie de Skidda
Skidda refinery
Skidda
Algeria
348.980,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 66 di 130
21-gen-11
Referenze: Caldareria e Recipienti a PressioneJob References: Pressure Vessels
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2006
Enppi
Khalda Petr. Co (Apache)
N.1 Slug Catcher; diametro: 2 mt; Tangent line: 6 mt
N.1 Slug catcher package; diameter: 2 mt; Tangent-line: 6 mt
Hayat Field
Hayat Field
Onshore Egypt
Egypt
386.500,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2006
Samir Refinery
Samir Refinery
N. 2 Reattori in acciaio al carbonio, dimensioni 3600"dia., 15 mm. spessore, peso totale 116 tonnellate
N. 2 Reactors, carbon steel material, size 3600 dia., 15mm. Thk., total weight 116 tons.
Samir Refinery Upgrade
Samir Refinery Upgrade
Mohammedia
Morocco
865.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2006
Unidro N.4 Recipienti a pressione in acciaio carbonio / inossidabile; diametro: 2000mm; spessore: 25mm; peso totale: 34tons
N.4 Pressure vessels; material: carbon / stainless steel; diameter: 2000mm; thk: 25mm; total weight: 34tons
Hawiyah project
Hawiyah project
Onshore UAE
Arabia Saudita
210.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2006
Eurotecnica
N.4 Recipienti a pressione; materiale: A240 UNS S31803; diametro: 390mm; spessore: 15mm; peso totale: 2,7tons
N.4 Pressure vessels; material: A240 UNS S31803; diameter: 390mm; thk: 15mm; total weight: 2,7tons
Raffineria di Pulawy
Pulawy refinery
Pulawy
Poland
70.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 67 di 130
21-gen-11
Referenze: Caldareria e Recipienti a PressioneJob References: Pressure Vessels
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2006
Tecnimont
Q-Chem
N.15 Recipienti apressione in acciaio inossidabile / carbonio; diametro: 2440mm; spessore: 18mm; peso totale: 168tons
N.15 Pressure vessels in carbon / stainless steel; diameter: 2440mm; thk: 18mm; total weight: 168tons
Impianto petrolchimico
Petrochemical Plant
Mesaieed
Qatar
340.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2006
Linde Impianti
Jamnagar
N.34 Recipienti a pressione in acciaio inox / carbonio; diametro: 2500mm; spessore: 27mm; peso totale: 765tons
N.34 Pressure vessels in stainless/carbon steel; diameter: 2500mm; thk: 27mm; total weight: 765tons
Impianto Idrogeno
Hydrogen plant
Onshore India
India
1.700.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2006
Borregaard Italia
N.1 Colonna in acciaio inox; diametro: 600mm; spessore: 8mm; peso totale: 1,5tons
N.1 Tower in stainless steel; diameter: 600mm; thk; 8mm; total weight: 1,5tons
Impianto Petrolchimico
Petrochemical Plant
Ravenna
Italy
50.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2006
Idroconsulting N.5 Recipienti a pressione in acciaio al carbonio; diametro: 3000mm; spessore: 28mm; peso totale: 125tons
N.5 Pressure vessels in stainless steel; diameter: 3000mm; thk: 28mm; total weight: 125tons
Impianto petrolchimico
Petrochemical Plant
Sharq
Qatar
250.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 68 di 130
21-gen-11
Referenze: Caldareria e Recipienti a PressioneJob References: Pressure Vessels
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2005
Alcon
N A O C
N. 2 Launching & Receiving Traps 18" x 20", più N.1 Gas Boot, più N.1 Slug Catcher.
N. 2 Launching & Receiving Traps 18" x 20", plus N. 1 Gas boot, plus N. 1 Slug Catcher.
Campo Gas Di I D U
I D U Gas Field
Port Harcourt
Nigeria
281.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2005
Tamoil SA
N.2 Scambiatori shell & tube materiale: acciaio inox; diametro: 350mm; spessore: 10mm; peso totale: 1,5tons
N.2 Shell & tube heat eschangers; material: stainless steel; diameter: 350mm; thk: 10mm; total weight: 1,5tons
Raffineria di Collombey
Collombey Refinery
Collombey
Switzerland
25.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2005
Linde Impianti
Jamnagar
N.16 Recipienti a pressione in acciaio al carbonio e acciaio inox; diametro: 80"; spessore: 40"; peso totale: 80tons
N.16 Vessels in carbon sell and stainless steel; diameter: 80"; thk: 40"; total weight: 80tons
Impianto Idrogeno
Hydrogen plant
Onshore India
India
500.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2005
Peremba construction N.8 Recipienti a pressione in acciaio inox e carbonio; diametro: 140"; spessore: 20"; peso totale: 70tons
N.8 Vessels in carbon / stainless steel; diameter: 140"; spessore: 20"; total weight: 13tons
Melut Basin project
Melut Basin project
Onshore Sudan
Sudan
290.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 69 di 130
21-gen-11
Referenze: Caldareria e Recipienti a PressioneJob References: Pressure Vessels
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2005
API
N.3 Recipienti a pressione in acciaio al carbonio; diametro: 3000mm; spessore: 8mm; peso totale: 13tons
N.3 Vessels in carbon steel; diameter: 3000mm; thk: 8mm; total weight: 13tons
Raffineria Di Falconara
Falconara Refinery
Falconara
Italy
73.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2005
York France
N.4 Recipienti a pressione in acciaio inox; diametro: 1100mm; spessore: 18mm; peso totale: 3tons
N.4 Pressure vessels in stainless steel; diameter: 1100mm; thk: 18mm; total weight: 3tons
York France plant
York France plant
Onshore France
France
25.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2005
Edison
N.3 Recipienti a pressione in acciaio inox / carbonio; diametro: 2600mm; spessore: 10mm; peso totale: 12tons
N.3 Pressure vessels in stainless/carbon steel; diameter: 2600mm; thk: 10mm; total weight: 12tons
Impianto Chimico
Chemical plant
Simeri Crichi
Italy
75.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2005
Eltron Chromalox N.4 Recipienti a pressione in acciaio inox; diametro: 609mm; spessore: 10mm; peso totale: 2,5tons
N.4 Pressure vessels in stainless steel; diameter: 609mm; thk: 10mm; total weight: 2,5tons
Impianto in China
China plant
Onshore China
China
70.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 70 di 130
21-gen-11
Referenze: Caldareria e Recipienti a PressioneJob References: Pressure Vessels
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2005
MAE
N.6 Recipienti a pressione in acciaio al carbonio/P275NH; diametro: 1100mm; spessore: 8mm; peso totale: 14tons
N.6 Pressure vessels in carbon steel/P275NH; diameter: 1100mm; thk: 8mm; total weight: 14 tons
MAE plant
MAE plant
Fiorenzuola
Italy
140.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2004
RM - raffineria milazzo
N.2 Recipienti a pressione; materiale: P275NH; diametro: 1250mm; spessore: 18mm; peso totale: 10 tons
N.2 Vessels; material: P275NH; diameter: 1250mm; thk: 18mm; total weight: 10tons
Raffineria di Milazzo
Milazzo refinery
Messina
Italy
75.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2004
Basell
N.2 Recipienti a pressione; materiale: P275NH; diametro: 1700mm; spessore: 15mm; peso totale: 5tons
N.2 Vessels; material: P275NH; diameter: 1700mm; thk: 15mm; total weight: 5tons
Impianto Petrolchimico
Petrochemical Plant
Ferrara
Italy
50.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2004
Eltron Chromalox N.23 Recipienti a pressione in acciaio inox; diametro: 610mm; spessore: 20mm; peso totale: 10tons
N.23 Vessels in stainless steel; diameter: 610mm; thk:20mm; otal weight: 10tons
Impianto in China
China plant
Onshore China
China
250.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 71 di 130
21-gen-11
Referenze: Caldareria e Recipienti a PressioneJob References: Pressure Vessels
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2004
Praoil Oleodotti Italiani
N.2 Recipienti a pressione; materiale: acciaio carbonio P355 NH; diametro: 1850mm; peso totale: 17tons
N.2 Vessels; material: carbon steel P355 NH; diameter: 1850mm; total weight: 17tons
Raffineria di Genova
Genova refinery
Genova
Italy
90.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2004
Tecnimont
Arak Refinery
N.1 Recipiente a pressione in acciaio al carbonio; diametro: 3000mm; spessore: 22mm; peso totale: 25tons
N.1 Vessel in carbon steel; diameter: 3000mm; thk: 22mm; total weight: 25tons
Raffineria di Arak
Arak refinery
Onshore Iran
Iran
110.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2004
Vinavil Egypt
Vinavil Egypt
N. 1 Reattore in acciaio inossidabile, dimensioni 2800"dia., 18 mm. spessore, peso totale 17 tonnellate
N. 1 Reactor, stainless steel material, size 2800" dia., 18mm. Thk., total weight 17 tons
Impianto Chemicals S.A.E.
Chemicals S.A.E.
Alexandria
Egypt
135.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2003
Eni div. E & P
Leghorn Refinery
N. 1 Reattore in acciaio al carbonio, dimensioni 76"dia., 35 mm. spessore, peso totale 17 tonnellate
N. 1 Reactor, carbon steel material, size 76" dia., 35mm. Thk., total weight 17 tons.
Centrale Idrogenazione
Hydrogenation Plant
Livorno
Italy
65.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 72 di 130
21-gen-11
Referenze: Caldareria e Recipienti a PressioneJob References: Pressure Vessels
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2003
Enppi
Unit.Gas Deriv.Co(BP/ENI)
N.1 Colonna ad adsorbimento; Diametro: 5,39 mt, Tangent line: 18,04 mt
N.1 Adsorber tower; Internal diameter: 5,39 mt, tangent line: 18,04 mt
Damietta Gas Plant
Damietta Gas Plant
Port Said
Egypt
2.345.900,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2003
Enppi
Unit.Gas Deriv.Co(BP/ENI)
N.1 Colonna depropanizzatrice; Diametro: 3,6 mt, Tangent line: 26,04 mt
N.1 Depropaniser tower; Internal diameter: 3,6 mt, tangent line: 26,04 mt
Damietta Gas Plant
Damietta Gas Plant
Port Said
Egypt
2.762.540,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2003
Tecnimont
Daquing
N. 1 Reattore in acciaio inossidabile, dimensioni 130"dia., 25 mm. spessore, peso totale 40 tonnellate
N. 1 Reactor, stainless steel material, size 130" dia., 25mm. Thk., total weight 40 tons.
PP Daquing
PP Daquing
Daquing
China
300.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2003
Enppi
Unit.Gas Deriv.Co(BP/ENI)
N.1 Colonna detanizzatrice; Diametro: 4,85 mt, Tangent line: 29 mt
N.1 Deethanizer tower; Internal diameter: 4,85 mt, tangent line: 29 mt
Damietta Gas Plant
Damietta Gas Plant
Port Said
Egypt
2.762.540,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 73 di 130
21-gen-11
Referenze: Caldareria e Recipienti a PressioneJob References: Pressure Vessels
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2003
Enppi
Unit.Gas Deriv.Co(BP/ENI)
N.1 Separatore liquido - gas; Diametro: 4,75 mt, Tangent line: 12,2 mt
N.1 Residue gas KO drum; Internal diameter: 4,75 mt, tangent line: 12,2 mt
Damietta Gas Plant
Damietta Gas Plant
Port Said
Egypt
1.058.460,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2003
Enppi
Unit.Gas Deriv.Co(BP/ENI)
N.5 Vessel per setacci molecolari; Diametro: 3,7 mt, Tangent line: 3,9 mt
N.5 Molecular sieves vessels; Internal diameter: 3,7 mt; tangent line: 3,9 mt
Damietta Gas Plant
Damietta Gas Plant
Port Said
Egypt
2.345.896,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2003
Enppi
Unit.Gas Deriv.Co(BP/ENI)
N.1 Separatore liquido - gas; Diametro: 3 mt, Tangent line: 12 mt
N.1 Inlet separator; Internal diameter: 3mt, tangent line: 12 mt
Damietta Gas Plant
Damietta Gas Plant
Port Said
Egypt
894.500,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2002
Progetti Europa & Global
Scop
Fornitura trappole di lancio e di ricevimento pig con handling system - 4 da 22", 2 da 28", 2 da 34" e 2 da 46" - Rating 600#
Supply of pig lauchers and receivers with handling systems - 4 by 22", 2 by 28", 2 by 34" and 2 by 46" - Rating 600#
Impianti Vari
Various Plants
Onshore.
Australia
400.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 74 di 130
21-gen-11
Referenze: Caldareria e Recipienti a PressioneJob References: Pressure Vessels
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2002
Snamprogetti
Eni - Div. Agip
N.6 Colonne in acciaio al carbonio e acciaio 410S; diametro: 2400mm; spessore: 26mm; peso totale: 61tons
N.6 Towers in carbon steel and stainless steel 410S; diameter: 2400mm: thk: 26mm; total weight: 61tons
Raffineria di Taranto
Taranto refinery
Taranto
Italy
445.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2002
Tecnoco N.6 Recipienti a pressione in acciaio al carbonio; diametro: 1600mm; spessore: 18mm; peso totale: 20tons
N.6 Vessels in carbon steel; diameter: 1600mm; thk:18mm; total weight: 20tons
Tengizchevroil project
Tengizchevroil project
Unk.
Kazakistan
120.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2002
Eurotecnica
N.1 Colonna in acciaio inossidabile; diametro: 1600mm; spessore: 31mm; peso totale: 35tons
N.1 Tower in stainless steel; diameter: 1600mm; thk: 31mm; total weight: 35tons
MPTY new melamine plant
MPTY new melamine plant
Onshore Poland
Poland
240.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2002
Snamprogetti
Eni - Div. Agip
N.18 Recipienti a pressione in acciaio inox 410S; diametro: 2200mm; spessore: 22mm; peso totale: 56,2 tons
N.18 Vessels in 410S stainless steel; diameter: 2200mm; thk: 22mm; total weight: 56,2 tons
Raffineria di Taranto
Taranto refinery
Taranto
Italy
430.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 75 di 130
21-gen-11
Referenze: Caldareria e Recipienti a PressioneJob References: Pressure Vessels
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2002
ICOSS
ICOSS
N. 2 Reattori in acciaio inossidabile, dimensioni 2100mm. Dia., 40 mm. Spessore, peso totale 24 tonnellate
N. 2 Reactors, stainless steel material, size 2100 mm. Dia., 40mm. Thk., total weight 24 tons.
C.le Bergamo
Bergamo Plant
Bergamo
Italy
95.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2002
Snamprogetti Sud
Eni - Div. Agip
N.1 Colonna in acciaio al carbonio; diametro: 4000mm; spessore: 18mm; peso totale: 34tons
N.1 Tower in carbon steel; diameter: 4000mm: thk: 18mm; total weight: 34tons
Raffineria di Sannazzaro
Sannazzaro Refinery
Sannnazzaro
Italy
130.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2001
Snamprogetti Sud
Agip Petroli
N. 1 Reattore in materiale di bassa lega, dimensioni 1450 mm dia., 40 mm spessore, peso totale 32 tonnellate
N. 1 Reactor low alloy material, size 1450 mm dia., 40 mm. Thk., total weight 32 tons
Raffineria di Sannazzaro
Sannazzaro Refinery
Sannnazzaro
Italy
210.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2001
Great Lakes
N.6 Colonne in acciaio inox; diametro: 900mm; spessore: 6mm; peso totale: 13 tons
N.6 Towers in stainless steel; diameter: 900mm; thk: 6mm; total weight: 13tons
Impianto Petrolchimico
Petrochemical Plant
Ravenna
Italy
145.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 76 di 130
21-gen-11
Referenze: Caldareria e Recipienti a PressioneJob References: Pressure Vessels
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2001
Noyvallesina
KZPC ENC
N.7 recipienti a pressione in acciaio al carbonio e acciaio inox; diametro: 2200mm; spessore: 25mm; peso totale: 25tons
N.7 Vessels in carbon steel and stainless steel; diameter: 2200mm; thk:25mm; total weight: 25tons
Impianti vari
Several Plants
Onshore Iran
Iran
400.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2001
Noyvallesina
KZPC ENC
N.9 Recipienti a pressione in acciaio inox; diametro: 4000mm; spessore: 12mm; peso totale: 35,6tons
N.9 Vessels in stainless steel; diameter: 4000mm; thk:12mm; total weight: 35,6 tons
Impianti vari
Several Plants
Onshore Iran
Iran
480.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2001
UMM Al Jawaby
Azzawiya
N.1 Colonna in acciaio al carbonio; diametro: 1067mm; spessore: 10mm; peso totale:6.000kg
N.1 Tower in carbon steel; diameter: 1067mm; thk: 10mm; total weight: 6.000kg
Azzawiya refinery
Azzawiya refinery
Azzawiya
Libya
130.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2001
Snamprogetti Sud
Eni - Div. Agip
N.5 Recipienti a pressione in acciaio al carbonio; diametro: 1900mm; spessore: 18mm; peso totale: 38,9tons
N.5 Vessels in carbon steel; diameter: 1900mm; thk: 18mm; total weight: 38,9tons
Raffineria di Taranto
Taranto refinery
Taranto
Italy
200.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 77 di 130
21-gen-11
Referenze: Sistemi Disidratazione GasJob References: Gas Dehydration Packages
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2010
Chicago Bridge & Iron
Reficar
N.1 Impianto di disdratazione aria strumenti con no. 2 reattori a setacci molecolari e circuito associato di rigenerazione
N.1 Instrument air regeneration plant with no. 2 reactors with molecular sieves and associated regeneration loop
Raffineria di Cartagena
Cartagena Refinery
Cartagena
Colombia
774.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2010
Demont
Eni div. E & P
N. 1 Impianto rigenerazione glicole completo di ribollitore e colonna di rigenerazione, portata glicole 1.000 Kg/ora
N. 1 Glycol regeneration plant complete of reboiler and regeneration column, capacity 1.000 kg/hr glycol flow rate
C.le Gas Capparruccia
Capparruccia Gas Station
Capparruccia
Italy
480.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2009
Daewoo E & C Co Ltd
N A O C
N. 1 impianto di disidratazione gas a TEG composto da contactor Dia. 2.2 x H = 9 m, s = 48 mm. Sistema di rigenerazione glicole con riscaldatori a gas, pompe glicole da 17 mc/hr. Punto di rugiada gas in uscita - 5°C @ 82 bara. Portata gas 300 MMSCFDN. 1 TEG gas dehydtarion package composed contactor Dia. 2,2 x H = 9 m, thick. = 48 mm. Glycol regeneration package with gas heaters, glycol pumps flow rate 17 cm/h. Dew point - 5°C @ 82 bara. Gas flow rate 300 MMSCFD
Ogbainbiri Flow Station
Ogbainbiri Flow Station
Ogbainbiri
Nigeria
4.741.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2008
Chicago Bridge & Iron
Chicago Bridge & l
N.2 Sistemi rigenerazione glicole da 3 MMSCFD
N.2 Glycol regeneration skids; flowrate: 3 MMSCFD
Impianti vari
Several Plants
Onshore
USA
1.760.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 78 di 130
21-gen-11
Referenze: Sistemi Disidratazione GasJob References: Gas Dehydration Packages
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2008
GIE Yling
GIE Yling
N.3 Sistemi di disidratazione gas a glicole da 1MMSCFD
N.3 Glycol regeneration skids; flowrate: 1MMSCFD
Impianti vari
Several Plants
Sanah'a
Yemen
1.130.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2007
Technip Italy
PKN Orlen
N. 1 impianto di rigenerazione azoto a setacci molecolari con N. 2 colonne Dia. 1,8 m x 5,0 m TL/TL completo di N. 3 scambiatori e KO drum. Portata 16.000 kg/h @ 370 kPa
N. 1 nitrogen regeneration package with mole sieves with N. 2 columns Dia. 1,8 m x 5,0 m TL/TL complete with N. 3 heat exchangers and KO drum. Gas flow rate 16.000 kg/h @ 370 kPa
Paraxilene
Paraxilene
Orlen
Poland
1.100.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2006
OIEC
IOOC
N. 1 Impianto disidratazione gas a setacci molecolari e rimozione mercurio a letto sacrificale, con n.2 reattori dia. 3.6 x h 7.5 m spessore 80 mm, sistema rigenerazione adsorbers. - Punto di rugiada gas in uscita @ - 90°C; portata gas 4 MM nm3/giorno.N.1 gas dehydration package with mole sieves and mercury removal with sacrifical bed, including n. 2 reactors dia. 3.6 x h 7.5 m, 80 mm thick., complete of regeneration system for adsorbers. - Gas outlet dew point @ - 90°C; gas flow rate 4 MM nm3/day.
Impianto Petrolchimico di Sirri Island
Sirri Island Petrochemical Plant
Sirri Island
Iran
5.729.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2006
Chagalesh Consulting Eng.
Lavan Refinery
N. 1 Impianto disidratazione LPG a setacci molecolari con due colonne diametro 1.100 mm, completo di sistema di rigenerazione, sistema di filtrazione e separazione, sistema di controllo.Capacità 8.000 kg/ora.N. 1 LPG molecular sieves dehydration package with two columns 1.100 mm diameter, complete with regeneration system, filtration and separation system, control system.Capacity 8.000 kg/hr.
Impianto Petrolchimico di Lavan
Lavan Petrolchemical Plant
Lavan
Iran
1.339.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 79 di 130
21-gen-11
Referenze: Sistemi Disidratazione GasJob References: Gas Dehydration Packages
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2006
Daewoo-Fluor JV
Shell Nigeria
N. 2 impianti disidratazione gas a TEG composti contactors dia. 2.7 x h 10.7 m. spess. 100 mm, sistema rigenerazione glicole con riscaldatori elettrici, pompe glicole da 19.400 kg/hr. - Punto di rugiada gas in uscita 0°C @ 90 bara. - Portata gas 14.8 MM Sm3/giorno cad.N.2 TEG gas dehydration packages, composed contactors dia. 2.7 x h 10.7 m. thick. 100 mm, glycol regeneration package with electrical heaters, glycol pumps flow rate 19.400 kg/hr - Dew point 0°C @ 90 bara. - Gas flow rate 14.800.000 Sm3/day each.
C.le Gas Gbaran Ubie
Gbaran Ubie Gas Station
Worri
Nigeria
12.433.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2004
Prosernat
Kuwait Oil Company
Impianto di disidratazione condensato a tre colonne con setacci molecolari da 70.000Kg/h a 85bar
Condensate dehydration package, three columns with molecular sieves, flow rate 70.000Kg/h at 85bar
Boosting Station 131
Boosting Station 131
Kuwait
Kuwait
3.012.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2004
Sibneftegas
Sibneftegas
N.3 Sistema di disidratazione gas a glicole da 150 MMSCFD cadauno
N.3 Glycol dehtdration package; flow rate: 150 MMSCFD each
East Urengoy Project
East Urengoy Project
East Urengoy
Russia
3.468.900,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2004
Mezhregionkomplet
Gazprom
N.2 Sistemi di disidratazione gas a glicole; portata: 150 MMSCFD cad., pressione: 70 bar
N.2 Glycol dehydration package; flowrate: 150 MMSCFD each, pressure: 70 bar
Byazhkizy Project
Byazhkizi Project
Byazhkizy
Turkmenistan
6.844.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 80 di 130
21-gen-11
Referenze: Sistemi Disidratazione GasJob References: Gas Dehydration Packages
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2003
Mezhregionkomplet
Gazprom
N.3 Sistemi di disidratazione gas a glicole da 120 MMSCFD cadauno
N.3 Glycol dehydration package - 120 MMSCFD each
Purosxvy Project
Purosxvy Project
Purosvy region
Russia
1.245.900,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2003
Prosernat
Kuwait Oil Company
Impianto di disidratazione gas a una colonna con TEG da 320.000 Nm3/h a 70bar
Gas dehydration package, one column with TEG, flow rate 320.000Nm3/h 70bar
Boosting Station 131
Boosting Station 131
Kuwait
Kuwait
1.460.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2002
Eni - Div. Agip
Eni - Div. Agip
Revamping della centrale gas con inserimento di due impianti di degasolinaggio da 1.000.000 Sm3/giorno per incremento di produzione - ATI con Bonatti
Revamping of gas plant with installation of two gasoline removal plants (1.000.000 Sm3/day) for production enhancement - JV with Bonatti
C.le Gas Gagliano
Gagliano Gas Plant
Gagliano
Italy
3.250.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2000
Agip
Agip
Impianto di rimozione gasolina e disidratazione gas a setacci molecolari a 3 colonne, riscaldatore gas da 4.000.000Kcal a sali fusi - Portata 1.000.000Sm3/g - Pressione 80bar - Temperatura 20-50°C - ATI con Nuova OmaGasoline removal and gas dehydration with molecular sieves in 3 columns, with gas heater of 4.000.000Kcal melted salts. Flow 1.000.000Sm3/d - Pressure 80bar - Temperature 20-50°C - JV with Nuova Oma
C.le Gas Gagliano
Gagliano Gas Plant
Gagliano
Italy
3.000.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 81 di 130
21-gen-11
Referenze: Sistemi Disidratazione GasJob References: Gas Dehydration Packages
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2000
Agip
Agip
Revamping della centrale gas con iserimento di un turbocompressore da 3.000.000Sm3/g, impianto stabilizzazione gasoilna da 5.000Kg/h, N°2 serbatoi stoccaggio gasolina da 350m3, separatore bifasico, sistema di controllo a DCS, sistemi ausiliari - ATI con AISGas plant revamping for production enhancement with one new turbocompressor for 3.000.000Sm3/d, gasoline stabilization system for 5.000Kg/h, N°2 gasoline tank for 350m3, two phase separators, control system with DCS, auxiliary systems - JV with AIS
C.le Gas Pineto
Pineto Gas Plant
Pineto
Italy
5.950.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
1997
Intermare Sarda
Agip
Sistema fuel gas con due filtri a cartucce, due filtri a setacci molecolari e due filtri coalescer e riduzione e controllo pressione a 48bar - Portata 120Nm3/h, P 148bar, T 50°C
Fuel gas system with two cartridge filters, two molecular sieve filters and two coalescer filters, pressure reduction and control at 48bar - Flow 120Nm3/h, P 148bar, T 50°C
Piattaforma Off-shore Regina
Off-shore Platform Regina
Adriatic Sea
Italy
193.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 82 di 130
21-gen-11
Referenze: Sistemi Fuel GasJob References: Fuel Gas Packages
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2010
Khalda Petr. Co (Apache)
N.2 Sistemi trattamento olio/gas composti da separatore trifase e heater treater
N.2 Fuel oil/gas systems composed by 3-phase separators and heater treaters
Khalabsha Project
Khalabsha Project
Onshore Egypt
Egypt
990.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2009
Ansaldo
Sorgenia
N. 1 Sistema FG composto da sistema di filtrazione, misura, riscaldamento e riduzione pressione gas naturale da 64 a 34 barg per alimentare N. 2 TG. Dia. Linee 14", Portata 16,2 kg/sec.
N. 1 Fuel Gas package composed of filtration system, gas metering system, heating system and pressure reduction system for natural gas from 64 to 34 barg to feed N. 2 turbines. Lines Dia. 14", Flow rate 16,2 kg/sec each turbines
C.le Elettrica a Ciclo Combinato 800 MW Aprilia
800 MW Combined Cycle Power Plant Aprilia
Aprilia
Italy
2.200.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2008
Ansaldo
Sorgenia
N. 1 Sistema FG composto da sistema di filtrazione, misura, riscaldamento e riduzione pressione gas naturale da 50 a 28,5 barg per alimentare N. 2 TG. Dia. Linee 14", Portata 17,6 kg/sec.
N. 1 Fuel Gas package composed of filtration system, gas metering system, heating system and pressure reduction system for natural gas from 50 to 28,5 barg to feed N. 2 turbines. Lines Dia. 14", Flow rate 17,6 kg/sec each turbines
C.le Elettrica a Ciclo Combinato 800 MW Turano Lodigian
800 MW Combined Cycle Power Plant Turano Lodigiano
Lodi
Italy
2.050.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2008
ABB SPA PA Div.
ENI Div. Congo
N. 1 Sistema FG composto da sistema di filtrazione, riscaldamento e riduzione pressione gas naturale da 33 a 22 barg per alimentare TG (2 x 146 MW) + black start up 1 x 9 MW. Dia. Linee 12", Portata 21 kg/secN. 1 Fuel Gas package composed of filtration system, heating system and pressure reduction system for natural gas from 33 to 22 barg to feed turbines (2 x 146 MW) + black start up 1 x 9 MW. Lines Dia. 12", Flow rate 21 kg/sec
M'Boundi integrated gas power generation WP5
M'Boundi integrated gas power generation WP5
Republic of Congo
Republic of Congo
1.350.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 83 di 130
21-gen-11
Referenze: Sistemi Fuel GasJob References: Fuel Gas Packages
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2007
Technip Italy
PKN Orlen
N. 1 Sistema Fuel Gas composto da KO Drum, sistema di filtrazione bistadio e riscaldamento gas naturale. Dia. Linee 10", Portata 3 kg/sec.
N. 1 Fuel Gas package composed of KO Drum, double stage filtration system and heating system for natural gas. Lines Dia. 10", Flow rate 3 kg/sec
Paraxilene
Paraxilene
Orlen
Poland
355.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2006
G E Oil & Gas
Gasco
N. 2 Fuel Gas Skids completi di sistema di filtrazione e separazione. Portata 3 kg/sec. @ 25 barg.
N. 2 Fuel Gas skids complete of separation and filtration systems. Flow rate 3 kg/sec @ 25 barg
Campo Gas Di Habshan
Habshan Gas Field
Abu Dhabi
United Arab Emirates
240.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2006
Alstom Power
Eurosviluppo Elettrica
N. 1 Impianto Fuel Gas con sistema di separazione e filtrazione, 2 linee misura gas fiscali a turbine da 16" al 100%, riscaldatori , valvole riduzione pressione, flow computers, sistema di controllo, sistema di campionamento e strumenti di analisi . Portata Gas 37 Kg/secN.1 Fuel Gas Package composed of sepration and filtration stage, two fiscal 100% measuring lines x 16" with turbines, heaters, pressure reducing valves, flow computers, control systems, sampling system and analysers. Gas flow rate 37 Kg/sec
Centrale Elettrica di Modugno
Modugno Power Plant
Modugno
Italy
1.440.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2006
Enppi
Petrobel
N. 1 Skid per gas strumenti comprendente n. 1 stadio di separazione, n. 2 stadi di filtrazione e n. 1 stadio di essicazione a setacci molecolari, portata gas 100 nm3/hr. - Tutti gli stadi sono ridondati.
N. 1 Gas instrument skid composed of n. 1 separation phase, n. 2 filtration phases and n. 1 drying phase with molecular sieves, gas rate 100 nm3/hr. - All process equipments are redundant.
Piattaforma Off-shore Semman
Semman Off-shore Platform
Mediterranean Sea
Egypt
184.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 84 di 130
21-gen-11
Referenze: Sistemi Fuel GasJob References: Fuel Gas Packages
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2006
Ansaldo
Calenia Energia
N. 1 Sistema Fuel Gas composto da sistema di filtrazione, misura fiscale, riscaldamento e riduzione pressione gas naturale da 62 to 27 barg, per alimentazione turbine. Diametro linee 12", portata 32 kg/sec.
N. 1 Fuel Gas Package composed of filtration system, Custody transfer gas metering system for turbines fueling, heating system and pressure reduction system for natural gas from 62 to 27 barg. Lines diameter 12", flowrate 32 kg/sec.
Centrale Elettrica Di Rizziconi
Rizziconi Power Plant
Rizziconi
Italy
1.280.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2006
Shakalin energy Inv. Co.
Fluor
N.2 Sistemi di trattamento gas da 1 MMSCFD; pressione: 70 15 bar
N.2 Fuel gas conditioning skids; flowrate: 1MMSCFD; pressure: 70 / 15 bar
Shakalin Gas Field
Shakalin Gas Field
Shakalin Island
Russia
1.984.560,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2005
Alcon
N A O C
No. 1 Fuel Gas Package completo di skids separazione, skids filtrazione, sistema di riduzione pressione e riscaldatori elettrici gas, incluso il piping di interconnessione e gestione tecnica di 3 compressori alternativi.No. 1 Fuel gas Package complete of separating skids, filtering skids, pressure reduction system and electrical gas heaters, including the interconnecting piping and the technical handling of 3 reciprocating compressors.
Campo Gas Di I D U
I D U Gas Field
Port Harcourt
Nigeria
801.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2005
Enppi
Khalda Petr. Co (Apache)
N.3 Sistemi trattamento gas da 500 kg/hr
N.3 Fuel gas conditioning skids; flowrate: 500 kg/hr
Obayed Gas Field
Obayed Gas Field
Onshore Egypt
Egypt
1.558.234,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 85 di 130
21-gen-11
Referenze: Sistemi Fuel GasJob References: Fuel Gas Packages
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2005
G E Oil & Gas
Gasco
No. 8 Fuel Gas Skids completi di sistema separazione e filtrazione, portata 6.050 kg/hr, pressione 24 barg.
No. 8 Fuel Gas Skids complete of separating and filtering systems, flowrate 6.050 kg/hr, pressure 24 barg.
Campo Gas Di Habshan
Habshan Gas Field
Abu Dhabi
United Arab Emirates
750.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2005
Ansaldo
Calenia Energia
N. 1 Sistema di filtrazione, misura fiscale, riscaldamento e riduzione pressione da 64 a 32 barg gas naturale per alimentazione turbine.Diametro linee 10", portata gas 170.000 nm3/hr.
N. 1 Custody transfer gas metering system for turbines fueling.Complete of filtration system, heating system and pressure reducing system from 64 to 32 barg.Lines diameter 10", gas flowrate 170.000 nm3/hr.
Centrale Elettrica Di Sparanise
Sparanise Power Plant
Sparanise
Italy
1.050.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2005
Mantrac Caterpillar
Khalda
N.2 Skid condizionamento gas; portata: 1 MMSCFD; pressione: 146 / 5 bar
N.2 Fuel gas conditioning skids; flowrate: 1MMSCFD; pressure: 146 / 5 bar
Qasr Gas plant
Qasr Gas plant
Egyptian desert
Egypt
1.895.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2004
G E Oil & Gas
Chiyoda
N°5 sistemi fuel gas con filtro separatore - Pressione: 28,3barg - Portata: 10m3/h
N°5 fuel gas systems with filter separator - Pressure: 28,3barg - Flow rate: 10m3/h
Campo Di Shakalin
Shakalin Field
Shakalin
Russia
520.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 86 di 130
21-gen-11
Referenze: Sistemi Fuel GasJob References: Fuel Gas Packages
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2004
G E Oil & Gas
Encana
N°3 sistemi alimentazione fuel gas - Portata: 6.200 Nm3/ora - Pressione: 51 barg
N°3 fuel gas packages - Flow: 6.200 Nm3/h - Pressure: 51 barg
Piattaforma Off-shore Buzzard
Off-shore Platform Buzzard
North Sea
United Kingdom
177.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2004
Petrofac International
B P
N°4 sistemi di alimentazione fuel gas. Portata: 260 - 14.000Sm3/h, Pressione ingresso: 35 - 86barg, Pressione uscita: 31- 34,5barg
N°4 fuel gas packages. Flow range: 260 - 14.000Sm3/h, Input pressure: 35 - 86barg, Output pressure: 31- 34,5barg
Georgia - Azerbaijan Pipeline
Georgia - Azerbaijan Pipeline
Unk.
Unk.
886.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2004
Mezhregionkomplet
Gazprom
N.2 Sistemi trattamento gas; portata: 1MMSCFD cad.
N.2 Fuel gas conditioning skids; flowrate: 1 MMSCFD each
Byazhkizy Project
Byazhkizi Project
Byazhkizy
Turkmenistan
1.560.700,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2002
G E Oil & Gas
Shell Nigeria
No. 1 Package Fuel Gas (separazione e condizionamento gas a monte dei compressori).
No. 1 Fuel Gas Package (gas separation and conditioning upstream compressors).
Campo Gas Di Cawthorne
Cawthorne Gas Field
Krakama
Nigeria
427.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 87 di 130
21-gen-11
Referenze: Sistemi Fuel GasJob References: Fuel Gas Packages
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2002
Snamprogetti
Enipower
Sistema di misura fiscale e riduzione pressione gas per alimentazione turbogas - diametro 16" - portata 240.000Sm3/h - riduzione pressione da 75 a 30,5barg
Custody transfer gas metering system and pressure reduction for turbogas fuel - diameter 16" - flow 240.000Sm3/h - pressure reduction from 75 to 30,5barg
Centrale Elettrica Di Brindisi
Brindisi Power Plant
Brindisi
Italy
1.029.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2002
Enppi
Fayum GasCo(Shell Gas BV)
N.1 Sistema riduzione pressione finale; portata 35.000 Nm3/hr, pressione: 77 bar
N.1 Pressure reduction skid; flow rate: 35.000 Nm3/hr, pressure: 77 bar
Kom Aushim Gas Field
Kom Aushim Gas Field
Onshore Egypt
Egypt
387.648,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2002
Enppi
Fayum GasCo(Shell Gas BV)
N.1 Sistema riduzione pressione; portata 70.000 Nm3/hr, 77 bar
N.1 Pressure reduction skid; flow rate 70.000 Nm3/hr, 77 bar
Kom Aushim Gas Field
Kom Aushim Gas Field
Onshore Egypt
Egypt
484.560,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2001
International Power
N.1 Sistema finale di riduzione pressione; portata 130.000 Nm3/hr, 77bar
N.1 Pressure reduction skid; flow rate: 130.000 Nm3/hr, 77bar
Al Kamil Field
Al Kamil Field
Onshore Oman
Oman
452.340,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 88 di 130
21-gen-11
Referenze: Sistemi Fuel GasJob References: Fuel Gas Packages
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2001
Snamprogetti
Enipower
Sistema di misura fiscale e riduzione pressione gas per alimentazione turbogas - diametro 16" - portata 240.000Sm3/h - riduzione pressione da 75 a 30,5barg
Custody transfer gas metering system and pressure reduction for turbogas fuel - diameter 16" - flow 240.000Sm3/h - pressure reduction from 75 to 30,5barg
Centrale Elettrica Di Ravenna
Ravenna Power Plant
Ravenna
Italy
1.061.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2000
Intermare Sarda
Agip
Impianto alimentazione fuel gas - Filtrazione e separazione da 500Sm3/h e controllo pressione a 90barg
Fuel gas package - Filtration and separation of 500Sm3/h and pressure control at 90barg
Piattaforma Off-shore Naomi - Pandora
Off-shore Platform Naomi - Pandora
Adriatic Sea
Italy
135.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
1997
Turbotecnica
S T E G
N°2 sistemi fuel gas con due filtri a cartucce e un separatore a pacco lamellare cadauno - Portata 50.000Nm3/h, P 23bar, T 30°C
N°2 fuel gas systems with two cartridge filters and one separator with vane pack, each - Flow 50.000Nm3/h, P 23bar, T 30°C
Centrale Elettrica Di Bouchemma
Bouchemma Power Plant
Bouchemma
Tunisia
130.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
1997
Intermare Sarda
Agip
Sistema fuel gas con due filtri a cartucce, due filtri a setacci molecolari e due filtri coalescer e riduzione e controllo pressione a 48bar - Portata 120Nm3/h, P 148bar, T 50°C
Fuel gas system with two cartridge filters, two molecular sieve filters and two coalescer filters, pressure reduction and control at 48bar - Flow 120Nm3/h, P 148bar, T 50°C
Piattaforma Off-shore Regina
Off-shore Platform Regina
Adriatic Sea
Italy
193.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 89 di 130
21-gen-11
Referenze: Sistemi Fuel GasJob References: Fuel Gas Packages
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
1996
Turbotecnica
S T E G
N°2 sistemi fuel gas con due filtri a cartucce e un separatore a pacco lamellare cadauno - Portata 50.000Nm3/h, P 23bar, T 30°C
N°2 fuel gas systems with two cartridge filters and one separator with vane pack, each - Flow 50.000Nm3/h, P 23bar, T 30°C
Centrale Elettrica Di Bir M'cherga
Bir M'cherga Power Plant
Bir M'cherga
Tunisia
245.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 90 di 130
21-gen-11
Referenze: Sistemi Iniezione Agenti ChimiciJob References: Chemical Injection Packages
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2010
JGC-Tecnimont JV
Gasco
N.18 Sistemi iniezione agenti chimici vari e varie pressioni di iniezione, con serbatoi, pompe dosatrici a diaframma e relativi accessori (smorzatori di pulsazione, cilindri di calibrazione etc…)
N.18 Chemical injection packages, different typologies and different injection pressures, with tanks and diaphragm pumps and related accessories (pulsation dumpeners, calibration pots etc…)
Campo Gas Di Habshan
Habshan Gas Field
Abu Dhabi
United Arab Emirates
2.368.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2010
Mellitah Gas BV
N.3 Sistemi iniezione agenti chimici vari e varie pressioni di iniezione, con serbatoi, pompe dosatrici a diaframma e relativi accessori (smorzatori di pulsazione, cilindri di calibrazione etc…)
N.3 Chemical injection packages, different typologies and different injection pressures, with tanks and diaphragm pumps and related accessories (pulsation dumpeners, calibration pots etc…)
Wafa Plant
Wafa Plant
Libyan Desert
Libya
375.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2009
Tamoil SA
Tamoil SA
N. 1 Sistema di iniziezione ammoniaca per ridurre emissione di Nox nel gas di scarico. Portata soluzione ammoniaca 250 kg/h @ 6 barg.
N. 1 Ammonia Injection Skid for reducing Nox emission in exhaust gas. Ammonia solution flow rate 250 kh/h @ 6 barg.
Raffineria di Collombey
Collombey Refinery
Collombey
Switzerland
240.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2008
Man Ferroostaal
Mellitah Gas BV
N. 3 Skid inibitori di corrosione
N. 3 Corrosion Inhibitor Injection Packages
Wafa Plant
Wafa Plant
Libyan Desert
Libya
168.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 91 di 130
21-gen-11
Referenze: Sistemi Iniezione Agenti ChimiciJob References: Chemical Injection Packages
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2007
Enppi
Agiba
N. 2 Package con pompe dosatrici e relativi accessori (smorzatori di pulsazione, cilindri di calibrazione etc...) per l'iniezione di metanolo e anti corrosivo
N. 2 Chemical injection packages with dosing pumps and related accessories (pulsation dampeners, calibration pots etc....) for methanol and corrosion inhibitor injection
Campo Gas West Ashrafi
West Ashrafi Gas Field
Cairo
Egypt
459.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2007
ENI - Angola
Saipem France S.A.
N.6 Chemical injection e metanolo skids; portrte da 250 a 1.1250 lt/hr e pressioni da 70 a 650 barg
N.6 Chemical injection and methanol skids; flowrate: from 250 to 1.250 lt/hr; pressure: from 70 to 650 barg
Gimboa Platform
Gimboa Platform
Atlantic Ocean Angola
Angola
2.430.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2006
Enppi
Petrobel
N. 1 Sistema di iniezione agenti chimici con serbatoio a due scomparti da 2 m3 e quattro pompe dosatrici a pistoni (2 mono testa e due multitesta) complete di accessori (smorzatori pulsazioni, cilindri di calibrazione etc..).N. 1 chemical injection system composed of 1 x 2m3 tank with 2 compartments and 4 piston dosing pumps (2 single head and 2 multi heads) complete of accessories (pulsation dumpeners, calibration pots etc...).
Piattaforma Off-shore Semman
Semman Off-shore Platform
Mediterranean Sea
Egypt
127.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2006
Petrobras
Saipem
N.1 Skid caricamento chemical tramite pompe; portata: 5,5 m3/hr; pressione: 100 bar
N.1 Chemical charging pump skid; flowrate: 5,5 m3/hr; pressure: 100 bar
Victoria FPSO
Victoria FPSO
Atlantic Ocean Brasil
Brasil
275.890,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 92 di 130
21-gen-11
Referenze: Sistemi Iniezione Agenti ChimiciJob References: Chemical Injection Packages
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2006
Dodsal
Takreer
N. 1 Skid di inizione per agenti chimici con pompe dosatrici a diaframma e relativi accessori ( smorzatori di pulsazione, cilindri di calibrazione, etc. )
N. 1 Chemical injection skid with diaphragm dosing pumps and relative accessories ( pulsation dumpeners, calibration pots, etc. )
Progetto di interconnessione raffinerie via pipeline
Inter refineries pipeline project
Abu Dhabi
United Arab Emirates
170.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2004
Progetti Europa & Global
Scop
N°8 packages di iniezione chemicals. Pressione: 5 - 27 barg. Portata: 2 - 33 lt/ora
N°8 chemical injection packages. Pressure: 5 - 27 barg. Flow: 2 - 33 lt/ora
Campo Olio Di Majnoon
Majnoon Oil Field
Majnoon
Iraq
225.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2003
Eni - Div. Agip
Eni - Div. Agip
Impianto iniezione acqua con motore a gas - Portata: 10 - 25m3/h - Pressione: 85bar
Water injection with gas engine - Flow: 10 - 25m3/h - Pressure: 85bar
C.le Gas Ravenna Mare
Ravenna Mar Gas Plant
Ravenna
Italy
515.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2003
Chagalesh Consulting Eng.
N I S O C
N°5 packages di iniezione chemicals. Pressione: 460bar - Portata: 25 - 200 lt/h
N°5 chemical injection packages. Pressure: 460bar - Flow: 25 - 200 lt/h
Campo Di Khami
Khami Field
Teheran
Iran
1.376.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 93 di 130
21-gen-11
Referenze: Sistemi Iniezione Agenti ChimiciJob References: Chemical Injection Packages
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2003
J G C Corporation
Agip Gas B V
N°55 packages di iniezione chemicals. Pressione: 10 - 184 barg. Portata: 0,1 - 3.000 lt/h
N°55 chemical injection packages. Pressure: 10 - 184 barg. Flow: 0,1 - 3.000 lt/h
Campo Gas Di Wafa
Wafa Gas Field
Libyan Desert
Libya
1.702.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2002
Eni - Div. Agip
Eni - Div. Agip
Package di reiniezione acque di strato a 9 pompe - Pressione 70 bar
Water re-injection package with 9 pumps - Pressure 70 bar
C.le Gas Ravenna Mare
Ravenna Mar Gas Plant
Ravenna
Italy
100.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2002
B P Exploration
B P Exploration
N°3 skid per iniezione di vari additivi chimici con 6 pompe metering multiteste. Portata: 3,25 - 222 lt/h. Pressione: 17,5 - 75 barg.
N°3 chemical injection packages for various additives with 6 multi-head metering pumps. Flow: 3,25 - 222 lt/h. Pressure: 17,5 - 75 barg.
Piattaforma Off-shore Claire
Off-shore Platform Claire
North Sea
United Kingdom
428.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2002
Enppi
Fayum GasCo(Shell Gas BV)
N.1 Sistema iniezione odorante; portata 3,5 lt/h, pressione: 7 bar
N.1 Odorant injection unit; flowrate: 3,5 lt/h, pressione: 7 bar
Fayum gas plant
Fayum gas plant
Fayum city
Egypt
145.670,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 94 di 130
21-gen-11
Referenze: Sistemi Iniezione Agenti ChimiciJob References: Chemical Injection Packages
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2002
Hyundai Eng. & Cont.
Agip Iran
N°28 packages di iniezione chemical - Pressione: 15 - 80 barg - Portata: 0,2 - 3.000 lt/h
N°28 chemical injection packages - Pressure: 15 - 80 barg - Flow: 0,2 - 3.000 lt/h
Campo Di South Pars - Fasi 4&5
South Pars Field - Phases 4&5
Teheran
Iran
1.579.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2000
Petrolifera Italo Rumena
Petrolifera Italo Rumena
Impianto di miscelazione acido solforico e acqua e sistema caricamento autobotti
Water and solfuric acid mixing plant and truck loading system
Raffineria Di Ravenna
Ravenna Refinery
Ravenna
Italy
76.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2000
Intermare Sarda
Agip
N°2 packages di iniezione chemicals con 27 pompe cadauno in acciao inox - Pressioni tra 14e 133barg - Portate tra 1,4 e 9lt/h
N°2 chemical injection packages with 27 pumps each - Pressure range between 14 and 133barg - Flow range between 1,4 and 9lt/h
Piattaforma Off-shore Mwafi Foukanda
Off-shore Platform Mwafi Foukanda
Guinea Gulf
Nigeria
510.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
1997
Sicon Oil&gas (CCC Group)
O G D C
N°4 package di separazione gas da 40MMscf/g, N°4 trappole di lancio e ricevimento pig da 12" e 6", N°11 package di iniezione chemical , N°2 sistemi di misura fiscale gas con orifizi calibrati da 6".
N°4 gas separation packages for 40MMscf/d, N°4 launching and receivign traps 12" and 6", N°11 chemical injection packages, N°2 gas metering systems with senior calibrated orefice 6".
Campo Gas Di Panjpir
Panjpir Gas Field
Panjpir
Pakistan
860.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 95 di 130
21-gen-11
Referenze: Sistemi Filtrazione e Separazione O&GJob References: O&G Filtration and Separation Systems
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2010
Mellitah Gas BV
N.2 Filtri per greggio caldo; diametro: 500mm; tangent line: 1.100mm
N.2 Hot Oil Filters; diameter: 500mm; tangent-line: 1.100mm
Bouri Project
Bouri Project
Mediterranean Sea - Libya
Libya
42.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2010
Mustang Eng.
Mellitah Gas BV
Fornitura di filtri conici e filtri a Y in DUPLEX material
Filters and Strainers in DUPLEX material
Bouri Project
Bouri Project
Mediterranean Sea - Libya
Libya
74.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2009
Ansaldo
Sorgenia
N. 1 Sistema FG composto da sistema di filtrazione, misura, riscaldamento e riduzione pressione gas naturale da 64 a 34 barg per alimentare N. 2 TG. Dia. Linee 14", Portata 16,2 kg/sec.
N. 1 Fuel Gas package composed of filtration system, gas metering system, heating system and pressure reduction system for natural gas from 64 to 34 barg to feed N. 2 turbines. Lines Dia. 14", Flow rate 16,2 kg/sec each turbines
C.le Elettrica a Ciclo Combinato 800 MW Aprilia
800 MW Combined Cycle Power Plant Aprilia
Aprilia
Italy
2.200.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2009
Enppi
Petroshadh
N.1 Separatore trifase per greggio da 15.000 BOPD
N.1 3-Phase crude oil separator; flowrate: 15.000 BOPD
Impianti Vari
Several Plants
Onshore Egypt
Egypt
159.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 96 di 130
21-gen-11
Referenze: Sistemi Filtrazione e Separazione O&GJob References: O&G Filtration and Separation Systems
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2009
Enppi
Wasco
N.1 Separatore gas 3° fase; diametro: 56"; tangent line: 20'
N.1 3 Phase separator; diameter: 56"; tangent-line: 20'
Impianti Vari
Several Plants
Onshore Egypt
Egypt
397.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2008
Petrojet
Khalda Petr. Co (Apache)
N.1 Separatore greggio-acqua da 50.000 BWPD
N.1 Oily-water separator; flowrate: 50.000 BWPD
Qasr field
Qasr field
Onshore Egypt
Egypt
203.456,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2008
ABB SPA PA Div.
ENI Div. Congo
N. 1 Sistema FG composto da sistema di filtrazione, riscaldamento e riduzione pressione gas naturale da 33 a 22 barg per alimentare TG (2 x 146 MW) + black start up 1 x 9 MW. Dia. Linee 12", Portata 21 kg/secN. 1 Fuel Gas package composed of filtration system, heating system and pressure reduction system for natural gas from 33 to 22 barg to feed turbines (2 x 146 MW) + black start up 1 x 9 MW. Lines Dia. 12", Flow rate 21 kg/sec
M'Boundi integrated gas power generation WP5
M'Boundi integrated gas power generation WP5
Republic of Congo
Republic of Congo
1.350.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2008
Ansaldo
Sorgenia
N. 1 Sistema Fuel Gas composto da sistema di filtrazione e separazione, misura fiscale, riscaldamento e riduzione pressione gas naturale da 50 a 28,5 barg per alimentare N. 2 TG. Dia. Linee 14", Portata 17,6 kg/sec.N. 1 Fuel Gas Package composed of filtration and separation system, custody transfer gas metering system, heating and pressure reduction system for natural gas from 50 to 28,5 barg. Lines Dia. 14", Flow rate 17,6 kg/sec each turbines.
C.le Elettrica a Ciclo Combinato 800 MW Turano Lodigian
800 MW Combined Cycle Power Plant Turano Lodigiano
Lodi
Italy
2.050.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 97 di 130
21-gen-11
Referenze: Sistemi Filtrazione e Separazione O&GJob References: O&G Filtration and Separation Systems
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2008
DCP Midstream
N.1 Separatore gas naturale in aspirazione stazione di compressione; diametro: 126"; Tangent-line: 18'
N.1 Suction drum for natural gas compressing station; diameter: 126"; tangent-line: 18'
Impianti Vari
Several Plants
Onshore USA
USA
213.983,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2008
DCP Midstream
N.1 Slug catcher orizzontale gas naturale diametro: 84"; tangent-line: 80'
N.1 Horizzontal slug catcher; diameter: 84"; tangent-line: 80'
Impianti Vari
Several Plants
Onshore USA
USA
295.230,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2008
Marlin Midstream
N.1 Surge tank orizzontale; diametro: 120"; tangent-line: 45' 6"
N.1 Horizontal surge tank; diameter: 120"; tangent-line: 45' 6"
Impianti Vari
Several Plants
Onshore USA
USA
303.620,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2008
Enppi
Khalda Petr. Co (Apache)
N.4 Separatori gas di terza fase da 10.000 BOPD
N.4 Three phase separators; flowrate: 10.000 BOPD
Western Desert Field
Western Desert Field
Onshore Egypt
Egypt
856.780,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 98 di 130
21-gen-11
Referenze: Sistemi Filtrazione e Separazione O&GJob References: O&G Filtration and Separation Systems
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2008
Centerpoint
N.2 Separatori a gas (collegamento ad arpa); diametro: 48"; Tangent-line: 30'
N.2 Harp style slug catcher; diameter: 48"; tangent-line: 30'
Impianti Vari
Several Plants
Onshore USA
USA
449.200,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2008
Eastern Reservoir
N.5 Separatori gas a sabbia; diametro: 90"; tangent-line: 30'
N.5 Sand flow back separators; diameter: 90"; tangent line: 30'
Impianti Vari
Several Plants
Onshore Egypt
Egypt
360.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2008
Rosetti Marino SpA
Edina
N. 2 Diesel Fuel Skids e N. 2 Oily Water Filtration and Treatment Skids
N. 2 Diesel Fuel Skids e N. 2 Oily Water Filtration and Treatment Skids
Piattaforma Isabella Nord Sud
Izabella North South Platform
Adriatic Sea
Croatia
520.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2008
Enppi
Khalda Petr. Co (Apache)
Sistemi di separazione per gas naturlae da 500 MMSCFD, peso totale: 400 tons, completamente accessoriato e installato in site
Slug catcher facilities; flowrate: 500 MMSCFD, total weight: 400tons, with all accessories and installed at site
Salam Gas Plant
Salam Gas Plant
Onshore Egypt
Egypt
32.190.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 99 di 130
21-gen-11
Referenze: Sistemi Filtrazione e Separazione O&GJob References: O&G Filtration and Separation Systems
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2007
Khalda Petr. Co (Apache)
N.1 Separatore per gas naturale; diametro: 3 mt; Tangent-line: 20 mt; pressione: 149 bar; peso: 300 tons completamente accessoriato e installato in sito
N.1 Slug catchers; diameter: 3mt; tangent-line: 20mt; pressure: 149 bar; weight: 300 tonns, totally accessoried and installed at site
Salam Gas Plant
Salam Gas Plant
Onshore Egypt
Egypt
11.246.680,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2007
Khalda Petr. Co (Apache)
N.1 Sistema di separazione gas da 150 MMSCFD; pressione: 146 bar completamente accessoriato e installato in sito
N.1 Gas separator; flowrate: 150 MMSCFD; pressure: 146 bar, totally accessoried and installed at site
Qasr field
Qasr field
Onshore Egypt
Egypt
9.552.458,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2007
Enppi
Agiba
N.1 Separatore gas; diametro: 1 mt; Tangent-line: 3 mt; pressione: 11,5 bar
N.1 KO drum; diameter: 1mt; Tangent-line: 3 mt; pressure: 11,5 bar
West Ashrafi plant
West Ashrafi plant
Egyptian desert
Egypt
45.650,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2007
C C C
Khafji JO (Aramco-KOC)
N. 3 Separatori di processo bassa pressione, dia. 5,5 mt x 24 mt tg-tg, 110 tons cadauno
N.3 LP process separators, dia. 5,5 mt x 24 mt tg-tg, weight 110 tons each
Campo Olio di Khafji
Khafji Oil Field
Khafji
Saudi arabia
1.838.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 100 di 130
21-gen-11
Referenze: Sistemi Filtrazione e Separazione O&GJob References: O&G Filtration and Separation Systems
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2006
Ansaldo
Calenia Energia
N. 1 Sistema Fuel Gas composto da sistema di filtrazione, misura fiscale, riscaldamento e riduzione pressione gas naturale da 62 to 27 barg, per alimentazione turbine. Diametro linee 12", portata 32 kg/sec.
N. 1 Fuel Gas Package composed of filtration system, Custody transfer gas metering system for turbines fueling, heating system and pressure reduction system for natural gas from 62 to 27 barg. Lines diameter 12", flowrate 32 kg/sec.
Centrale Elettrica Di Rizziconi
Rizziconi Power Plant
Rizziconi
Italy
1.280.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2006
Khalda Petr. Co (Apache)
N.5 Sistemi rimozione mercurio per greggio; portata: 50 MMSCFD cad; pressione: 146 bar
N.5 Mercury removal trains; flowrate: 50 MMSCFD each; pressure: 146 bar
Obayed Gas Field
Obayed Gas Field
Onshore Egypt
Egypt
8.850.650,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2006
Enppi
Khalda Petr. Co (Apache)
N.1 Sistema di separazione idrocarburi da gas naturale; portata: 5,5 m3/hr
N.1 Flare knock out drum package; flowrate: 5,5 m3/hr
Hayat Field
Hayat Field
Onshore Egypt
Egypt
58.540,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2006
G E Oil & Gas
Gasco
N. 2 Fuel Gas Skids completi di sistema di filtrazione e separazione
N. 2 Fuel Gas skids complete of separation and filtration systems
Campo Gas Di Habshan
Habshan Gas Field
Abu Dhabi
United Arab Emirates
240.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 101 di 130
21-gen-11
Referenze: Sistemi Filtrazione e Separazione O&GJob References: O&G Filtration and Separation Systems
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2006
Shakalin energy Inv. Co.
Fluor
N.1 Separatore olio - acqua da 5.000 m3/hr
N.1 Oliy water separator; flowrate: 5.000 m3/hr
Shakalin Gas Field
Shakalin Gas Field
Shakalin Island
Russia
2.134.560,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2006
Alstom Power
Eurosviluppo Elettrica
N. 1 Sistema di filtrazione e separazione composto da 2 linee misura gas fiscali a turbine da 16" al 100%, riscaldatori , valvole riduzione pressione, flow computers, sistema di controllo, sistema di campionamento e strumenti di analisi . Portata Gas 37 Kg/secN.1 Sepration and Filtration system composed of 2 fiscal 100% measuring lines x 16" with turbines, heaters, pressure reducing valves, flow computers, control systems, sampling system and analysers. Gas flow rate 37 Kg/sec
Centrale Elettrica di Modugno
Modugno Power Plant
Modugno
Italy
1.440.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2005
Sahatransneftegas
N.2 Sistemi di separazione gas per alta pressione da 100 MMSCFD cad.
N.2 HP gas separators; flowrate: 100 MMSCFD each
Saha Gas plant
Saha Gas plant
Saha
Russia
1.860.430,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2005
Ansaldo
Calenia Energia
N. 1 Sistema di misura gas fiscale, filtrazione, riscaldamento e riduzione pressione da 64 a 32 barg gas naturale per alimentazione turbine - Diametro linee 10" - Portata 170.000 nm3/hr
N. 1 Custody transfer gas metering system for turbines fueling, complete of filtration, heating and pressure reduction from 64 to 32 barg. - Lines diameter 10". - Flow rate 170.000 Sm3/hr.
Centrale Elettrica Di Sparanise
Sparanise Power Plant
Sparanise
Italy
1.050.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 102 di 130
21-gen-11
Referenze: Sistemi Filtrazione e Separazione O&GJob References: O&G Filtration and Separation Systems
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2005
China oil corporation
N.1 Separatore greggio da 15.000 BOPD
N.1 Crude oil separator; flowrate: 15.000 BOPD
Aktobe Project
Aktobe Project
Onshore Kazakistan
Kazakistan
329.760,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2005
Enppi
Khalda Petr. Co (Apache)
N.1 Sistema di separazione gas alta pressione da 50 MMSCFD, pressione: 146 bar
N.1 HP test separator; flowrate: 50 MMSCFD; pressure: 146 bar
Qasr field
Qasr field
Onshore Egypt
Egypt
2.390.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2005
Toyo Eng. India Ltd.
K N P C
No. 1 Filtro per sabbia e no. 1 filtro per sale, pressione di esercizio 30 barg, diametro 5.100 mm lunghezza (tang to tang) 7.900 mm
No. 1 sand filter and no. 1 clay filter, working pressure 30 barg, diameter 5.100 mm length (tang to tang) 7.900 mm
Raffineria Di Mina Abdulla
Mina Abdulla Refinery
Kuwait
Kuwait
482.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2005
Alcon
N A O C
N. 1 Separatore NAG, bifasico orizzontale, completamente strumentato, dimesioni 4,2 x 10 h=6 m.
N. 1 NAG Separator, horizontal, 2 phases, completely instrumented, dimensions 4,2 x 10 x h=6 m.
Campo Gas Di I D U
I D U Gas Field
Port Harcourt
Nigeria
517.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 103 di 130
21-gen-11
Referenze: Sistemi Filtrazione e Separazione O&GJob References: O&G Filtration and Separation Systems
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2005
Enppi
Khalda Petroleum Company
N.3 Sistemi di separazione per alta pressione; portata: 150 MMSCFD; pressione: 146 bar
N.3 HP production separators; flowrate: 150 MMSCFD; pressure: 146 bar
Qasr field
Qasr field
Onshore Egypt
Egypt
7.980.300,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2005
Enppi
Khalda Petr. Co (Apache)
N.3 Sistemi di separazione gas - primo stadio da 57 MMScfd di vapore cad.
N.3 First stage gas separator; flowrate:57 MMScfd vapour each
Obayed Gas Field
Obayed Gas Field
Onshore Egypt
Egypt
6.456.340,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2005
Alcon
N A O C
No. 1 Fuel Gas Package completo di skids separazione, skids filtrazione, sistema di riduzione pressione e riscaldatori elettrici gas, incluso il piping di interconnessione e gestione tecnica di 3 compressori alternativi.No. 1 Fuel gas Package complete of separating skids, filtering skids, pressure reduction system and electrical gas heaters, including the interconnecting piping and the technical handling of 3 reciprocating compressors.
Campo Gas Di I D U
I D U Gas Field
Port Harcourt
Nigeria
801.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2005
Nuovo Pignone
Gasco
No. 8 Sistemi di separazione e filtrazione, portata 6.050 kg/hr, pressione 24 barg.
No. 8 Separating and filtering systems, flowrate 6.050 kg/hr, pressure 24 barg.
Campo Gas Di Habshan
Habshan Gas Field
Abu Dhabi
United Arab Emirates
750.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 104 di 130
21-gen-11
Referenze: Sistemi Filtrazione e Separazione O&GJob References: O&G Filtration and Separation Systems
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2004
Enppi
Khalda Petr. Co (Apache)
N.2 Sistemi di separazione gas da 20 MMSCFD rating 600#
N.2 HP Gas separators; flowrate: 20 MMSCFD rating 600#
Salam Gas Plant
Salam Gas Plant
Onshore Egypt
Egypt
680.780,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2004
Sibneftegas
Sibneftegas
N.1 Seaparatore Bassa Temperatura da 150 MMSCFD
N.1 Low Temperature Separator ; flow rate: 150 MMSCFD
East Urengoy Project
East Urengoy Project
East Urengoy
Russia
869.450,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2004
Enppi
Belayim Pet.Co.(Petrobel)
N.1 Separatore gas; portata: 150 MMSCFD
N.1 Production separator; flowrate: 150 MMSCFD
Baltim platform
Baltim platform
Mediterranean Sea
Egypt
1.145.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2004
Mezhregionkomplet
Gazprom
N.2 Sistemi di separione gas per alta pressione; portata: 150 MMSCFD cad., pressione: 70 bar
N.2 HP gas separators; flowrate: 150 MMSCFD each; pressure: 70 bar
Byazhkizy Project
Byazhkizi Project
Byazhkizy
Turkmenistan
1.846.785,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 105 di 130
21-gen-11
Referenze: Sistemi Filtrazione e Separazione O&GJob References: O&G Filtration and Separation Systems
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2004
G E Oil & Gas
Chiyoda
N°5 sistemi fuel gas con filtro separatore - Pressione: 28,3barg - Portata: 10m3/h
N°5 fuel gas systems with filter separator - Pressure: 28,3barg - Flow rate: 10m3/h
Campo Di Shakalin
Shakalin Field
Shakalin
Russia
520.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2004
Enppi
Khalda Petr. Co (Apache)
N.1 Sistema separazione gas da 35 MMSCGD rating 900#
N.1 HP Gas separator; flowrate: 35 MMSCFD rating 900#
Salam Gas Plant
Salam Gas Plant
Onshore Egypt
Egypt
457.690,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2004
Enppi
Khalda Petr. Co (Apache)
N.1 Sistema separazione gas da 50 MMSCGD rating 900#
N.1 HP Gas separator; flowrate: 50 MMSCFD rating 900#
Salam Gas Plant
Salam Gas Plant
Onshore Egypt
Egypt
645.780,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2004
Enppi
East Zeit Petr.Co.(Exxon)
N.1 Sistama di separazione olio tri-fase da 12.000 BOPD
N.1 Three phase oil separator; flowrate:12.000 BOPD
East Zeit Field
East Zeit Field
Onshore Egypt
Egypt
195.400,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 106 di 130
21-gen-11
Referenze: Sistemi Filtrazione e Separazione O&GJob References: O&G Filtration and Separation Systems
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2004
Enppi
Belayim Pet.Co.(Petrobel)
N.1 Separatore gas; portata: 150 MMSCFD
N.1 Test separator; flowrate: 150 MMSCFD
Baltim platform
Baltim platform
Mediterranean Sea
Egypt
758.900,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2002
G E Oil & Gas
Shell Nigeria
No. 1 Package Fuel Gas (separazione e condizionamento gas a monte dei compressori).
No. 1 Fuel Gas Package (gas separation and conditioning upstream compressors).
Campo Gas Di Cawthorne
Cawthorne Gas Field
Krakama
Nigeria
427.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2002
Enppi
Fayum GasCo(Shell Gas BV)
N.1 Sistema di filtrazione gas; portata 35.000 Nm3/hr, pressione: 77bar
N.1 Filter separator skid; flow rate: 35.000 Nm3/hr, pressure: 77 bar
Kom Aushim Gas Field
Kom Aushim Gas Field
Onshore Egypt
Egypt
258.048,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2002
Enppi
Fayum GasCo(Shell Gas BV)
N.1 Sistema di filtrazione con blocco di emergenza, portata: 35.000 Nm3/hr, pressione: 77 bar
N.1 ESD filtering skid; flow rate: 35.000 Nm3/hr, pressure: 77 bar
Kom Aushim Gas Field
Kom Aushim Gas Field
Onshore Egypt
Egypt
156.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 107 di 130
21-gen-11
Referenze: Sistemi Filtrazione e Separazione O&GJob References: O&G Filtration and Separation Systems
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2002
Enppi
Fayum GasCo(Shell Gas BV)
N.1 Skid filtrazione; portata 70.000 Nm3/hr, 77 bar
N.1 Filter separator skid; flow rate 70.000 Nm3/hr, 77 bar
Kom Aushim Gas Field
Kom Aushim Gas Field
Onshore Egypt
Egypt
322.560,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2001
AIC
International Power
N. 1 Skid filtrazione e separazione gas; portata 130.000 Nm3/hr, 77 bar
N. Filter separators skid; flow rate 130.000 Nm3/hr, 77 bar
Al Kamil Field
Al Kamil Field
Onshore Oman
Oman
363.452,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2001
U O P Usa
Khalda Petroleum Company
Impianto trattamento gas con due separatori a demister, un filtro a coalescenza e un filtro a cartucce - Portata 6.000Sm3/h - Pressione 77barg
Gas treatment package with two demister separators, one coalescer filter and one cartridge filter - Flow 6.000Sm3/h - Pressure 77barg
C.le Gas Salam
Salam Gas Plant
Western Desert
Egypt
251.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2001
Petrofac International
Sonatrach
N°2 filtri a cartucce da 33m3/h di Ammine in acciaio al carbonio - N°2 filtri a carbone attivo da 16.435 Kg/h di Ammine in acciaio al carbonio - N°1 filtro separatore in acciaio inox da 344.610Kg/h di gas e 2.500Kg/h condensatoN°2 cartridge filters for 33m3/h of lean amine in carbon steel - N°2 activated carbon filters for 16.435 Kg/h of lean amine in carbon steel - N°1 filter separator in stainless steel for 344.610Kg/h of gas and 2.500Kg/h of condensate
Campo Gas Di Ohanet
Ohanet Gas Field
Algeri
Algeria
290.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 108 di 130
21-gen-11
Referenze: Sistemi Filtrazione e Separazione O&GJob References: O&G Filtration and Separation Systems
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2001
Agip
Agip Congo
N.1 Sistema separazione olio; portata 20.000 BOPD
N.1 Three phase oil separator; flow rate: 20.000 BOPD
Loango Field
Loango Field
Onshore Congo
Congo
563.860,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2000
Agip
Agip
Separatore da 125.000Sm3/g - Trappole di lancio e ricevimento da 14" - Riscaldatore gas da 150.000Kcal/h
Separator 125.000Sm3/g - Launching and receiving traps 14" - Gas heater 150.000Kcal/h
Campo Gas Di Samperi 1
Samperi 1 Gas Field
Enna
Italy
1.200.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2000
Intermare Sarda
Agip
Impianto alimentazione fuel gas - Filtrazione e separazione da 500Sm3/h e controllo pressione a 90barg
Fuel gas package - Filtration and separation of 500Sm3/h and pressure control at 90barg
Piattaforma Off-shore Naomi - Pandora
Off-shore Platform Naomi - Pandora
Adriatic Sea
Italy
135.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
1998
C M G
Agip
N°6 sistemi di filtrazione acque oleose
N°6 oily water filtering system
Impianti Vari
Various Plant
Italy
Italy
95.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 109 di 130
21-gen-11
Referenze: Sistemi Filtrazione e Separazione O&GJob References: O&G Filtration and Separation Systems
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
1998
Saipem / Techint J V
Saudi Aramco
N°4 impianti di separazione gas a ciclotubi - PS3: un impianto da 1200MMscfd a tre separatori- PP7, PP8, PP9: tre impianti i da 600MMscfd cadauno a quattro separatori. P 70bar - ATI con Perry Equipment Corp.N°4 gas separation plants with cyclotubes - PS3: one plant of 1200MMscfd with three separators - PP7, PP8, PP9: three plants of 600MMscfd with four separators each. P 70bar - JV with Perry Equipment Corp.
C.le Gas Hawiyah
Hawiyah Gas Plant
Hawiyah
Saudi Arabia
4.675.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
1997
Turbotecnica
S T E G
N°2 sistemi fuel gas con due filtri a cartucce e un separatore a pacco lamellare cadauno - Portata 50.000Nm3/h, P 23bar, T 30°C
N°2 fuel gas systems with two cartridge filters and one separator with vane pack, each - Flow 50.000Nm3/h, P 23bar, T 30°C
Centrale Elettrica Di Bouchemma
Bouchemma Power Plant
Bouchemma
Tunisia
130.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
1997
Sicon Oil&gas (CCC Group)
O G D C
N°4 package di separazione gas da 40MMscf/g, N°4 trappole di lancio e ricevimento pig da 12" e 6", N°11 package di iniezione chemical , N°2 sistemi di misura fiscale gas con orifizi calibrati da 6".
N°4 gas separation packages for 40MMscf/d, N°4 launching and receivign traps 12" and 6", N°11 chemical injection packages, N°2 gas metering systems with senior calibrated orefice 6".
Campo Gas Di Panjpir
Panjpir Gas Field
Panjpir
Pakistan
860.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
1997
Intermare Sarda
Agip
Sistema fuel gas con due filtri a cartucce, due filtri a setacci molecolari e due filtri coalescer e riduzione e controllo pressione a 48bar - Portata 120Nm3/h, P 148bar, T 50°C
Fuel gas system with two cartridge filters, two molecular sieve filters and two coalescer filters, pressure reduction and control at 48bar - Flow 120Nm3/h, P 148bar, T 50°C
Piattaforma Off-shore Regina
Off-shore Platform Regina
Adriatic Sea
Italy
193.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 110 di 130
21-gen-11
Referenze: Sistemi Filtrazione e Separazione O&GJob References: O&G Filtration and Separation Systems
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
1996
Turbotecnica
S T E G
N°2 sistemi fuel gas con due filtri a cartucce e un separatore a pacco lamellare cadauno - Portata 50.000Nm3/h, P 23bar, T 30°C
N°2 fuel gas systems with two cartridge filters and one separator with vane pack, each - Flow 50.000Nm3/h, P 23bar, T 30°C
Centrale Elettrica Di Bir M'cherga
Bir M'cherga Power Plant
Bir M'cherga
Tunisia
245.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 111 di 130
21-gen-11
Referenze: Desalters e Trattamento OlioJob References: Desalters and Oil Treatment
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2010
Enppi
Khalda Petr. Co (Apache)
N.2 Treni trattamento olio composti da: desalter elettrostatici 25.000 BOPD; N4$ riscaldatori indiretti da 3,96 MBTU/hr cad. e N.4 Heater treaters
N.2 Train treatment oil composed by: electrostatic desalters; flowrate: 25.000 BO00PD, N.4 indirect water bath heaters; power: 3,96 MBTU/hr each and N.4 Heater treaters
Khalabsha Project
Khalabsha Project
Onshore Egypt
Egypt
9.140.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2010
Khalda Petr. Co (Apache)
N.2 Sistemi trattamento olio/gas composti da separatore trifase e heater treater
N.2 Fuel oil/gas systems composed by 3-phase separators and heater treaters
Khalabsha Project
Khalabsha Project
Onshore Egypt
Egypt
990.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2005
China oil corporation
N.1 Heater treater da 15.000 BOPD
N.1 Heater treater; flowrate: 15.000 BOPD
Aktobe Project
Aktobe Project
Onshore Kazakistan
Kazakistan
450.600,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2004
Enppi
Quarun Petroleum Co.
N.1 Separatore tri-fase; portata: 3.000BOPD + N.4 Desalters da 3.000BOPD
N.1 Three phase oil separator; flowrate: 3.000 BOPD + N.4 Desalters; flowrate: 3.000BOPD
Western Desert Field
Western Desert Field
Onshore Egypt
Egypt
850.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 112 di 130
21-gen-11
Referenze: Desalters e Trattamento OlioJob References: Desalters and Oil Treatment
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2003
Mezhregionkomplet
Gazprom
N.1 Desalter per greggio, portata: 20.000 BOPD + N.4 Heater treater
N.1 Crude oil deslater, flowrate: 20.000 BOPD + N.4 Heater treater
Purosxvy Project
Purosxvy Project
Purosvy region
Russia
2.730.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 113 di 130
21-gen-11
Referenze: Riscaldatori e ScambiatoriJob References: Heaters and Exchangers
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2010
Enppi
Khalda
N.4 Riscaldatori indiretti da 3,96 milioni di BTU/ora cad.
N.4 Indirect water bath heaters; power: 3,96 milion of BTU/hr
Khalabsha Project
Khalabsha Project
Onshore Egypt
Egypt
3.524.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2009
Eni - Div. Agip
N.2 Fasci tubieri in acciaio al carbonio; lunghezza: 10.652mm; peso totale: 7 tons
N.2 Tube bundles in carbon steel; lenght: 10.652mm; total weight: 7tons
Raffineria di Sannazzaro
Sannazzaro Refinery
Sannnazzaro
Italy
35.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2009
Ecofuel
N.3 Scambiatori shell & tube in acciaio al carbonio; lunghezza: 8317mm; peso totale: 10tons
N.3 Shell & tube heat exchangers in carbon steel; lenght: 8317; total weight: 10tons
Impianto Petrolchimico
Petrochemical Plant
Ravenna
Italy
60.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2009
Azzawiya
N.3 Fasci tubieri in acciaio al carbonio; lunghezza: 9.144mm; peso totale: 20tons
N.3 Tube bundles in carbon steel; lenght: 9.144mm; total weight: 20tons
Azzawiya refinery
Azzawiya refinery
Azzawiya
Libya
140.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 114 di 130
21-gen-11
Referenze: Riscaldatori e ScambiatoriJob References: Heaters and Exchangers
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2009
Vomm
N.7 Scambiatori shell & tube; diametro: 396mm; spessore: 5mm; peso totale: 6tons
N.7 Shell & tube heat exchangers; diameter: 396mm; thk: 5mm; total weight: 6tons
Impianto in China
China plant
Onshore China
China
50.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2009
A2A N.3 Scambiatori shell & tube; materiale: acciaio al carbonio per basse temperature; diametro: 662mm; diametro: 8mm; peso totale: 15tons
N.3 Shell & tube heat exchangers; material: low temperature carbon steel; diameter: 662mm; thk: 8mm; total weight: 15tons
Impianto chimico
Chemical plant
Macconago
Italy
120.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2009
API
N.4 Fasci tubieri in acciaio al carbonio; lunghezza: 6100mm; peso totale: 40tons
N.4 tube bundles in carbon steel; lenght: 6100mm; total weight: 40tons
Raffineria Di Falconara
Falconara Refinery
Falconara
Italy
250.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2008
Bellelli Engineering N.4 Scambiatori shell & tube in acciaio al carbonio; diametro: 1219mm; spessore: 25mm; peso totale: 70tons
N.4 Shell & tube heat exchangers; diameter: 1219mm; thk: 25mm; total weight: 70tons
Impianto Petrolchimico
Petrochemical Plant
Porvoo
Finland
450.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 115 di 130
21-gen-11
Referenze: Riscaldatori e ScambiatoriJob References: Heaters and Exchangers
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2008
Enppi
Khalda Petr. Co (Apache)
N.4 Riscaldatori indiretti a gas da 8.000 BOPD cad.
N.4 Heatr treaters; flowrate: 8.000 BOPD
Western Desert Field
Western Desert Field
Onshore Egypt
Egypt
1.423.896,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2008
API
Parti di ricambio per scambiatori shell & tube; peso totale fornitura: 20 tons
Spare parts for heat exchangers; total weight: 20 tons
Raffineria Di Falconara
Falconara Refinery
Falconara
Italy
350.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2008
Galp energia
Galp energia
N.2 Scambiatori shell & tube; materiale: acciaio inox basso legato; diametro: 1143; spessore: 35mm; peso totale: 15 tons
N.2 Shell & tube heat exchangers; material: low alloy steel; diameter: 1143mm; thk: 35mm; total weight: 15 tons
Raffineria di Porto
Porto refinery
Porto
Portugal
120.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2008
Technip Italy N.3 Scambiatori in acciaio legato; diametro: 1150mm; spessore: 13mm; peso totale: 30tons
N.3 Shell & tube heat exchangers; material: alloy steel; diameter: 1150mm; thk: 13mm; total weight: 30tons
Impianto petrolchimico
Petrochemical Plant
Gdansk
Poland
300.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 116 di 130
21-gen-11
Referenze: Riscaldatori e ScambiatoriJob References: Heaters and Exchangers
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2008
Galp energia
N.2 Scambiatori in lega leggera; diametro: 1143mm; spessore: 35mm; peso totale: 15tons
N.2 Shell & tube heat exchangers in low alloy; diameter: 1143mm; thk: 35mm; total weight: 15tons
Raffineria di Porto
Porto refinery
Porto
Portugal
120.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2008
Galp energia
N.5 Scambiatori shell & tube in acciaio al carbonio; diametro: 1050mm; spessore: 13mm; peso totale: 40tons
N.5 Shell & tube heat eschangers in carbon steel; diameter: 1050mm; thk: 13mm; total weight: 40tons
Raffineria di Sines
Sines refinery
Sines
Portugal
335.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2007
API
N.6 Fasci tubieri in acciaio al carbonio; lunghezza: 6100mm; peso totale: 50tons
N.6 Tube bundles in carbon steel; lenght: 6100mm; total weight: 50tons
Raffineria Di Falconara
Falconara Refinery
Falconara
Italy
280.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2007
Korting Hannover
N.6 Scambiatori shell & tube in acciaio inox; diametro: 1200mm; spessore: 10mm; peso totale: 38tons
N.6 shell & tube heat exchangers; diameter: 1200mm; thk: 10mm; total weight: 38tons
Qafco plant
Qafco plant
Onshore Qatar
Qatar
395.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 117 di 130
21-gen-11
Referenze: Riscaldatori e ScambiatoriJob References: Heaters and Exchangers
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2006
Enppi
Khalda Petr. Co (Apache)
N.3 Riscaldatori acqua indiretti per gas naturale; portata: 57.000 kh/hr cad., pressione: 146 bar
N.3 Water bath heaters; flowrate: 57.000 kg/hr; pressure: 146 bar
Tarek Field
Tarek Field
Onshore Egypt
Egypt
3.560.780,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2006
Linde Impianti
Jamnagar
N.4 Scambiatori shell & tube, materiale: A789-S31803; diametro: 1268mm; spessore: 16mm; peso totale: 59 tons
N.4 Shell & tube heat exchangers, material: A789-S31803; diameter: 1268mm; thk: 16mm; total weight: 59 tons
Impianto Idrogeno
Hydrogen plant
Onshore India
India
800.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2006
ITP N.5 Scambiatori shell & tube; materiale: A789-S31803; diametro: 457mm; spessore: 25mm; peso totale: 1,7 tons
N.2 Shell & tube heat exchangers; material: A789-S31803; diameter: 457mm; thk: 25mm; total weight: 1,7 tons
Siti Vari
Various Sites
Onshore Italy
Italy
318.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2006
Tecnimont
Tasnee
N.10 Scambiatori shell & tube in acciaio al carbonio; diametro: 840mm; spessore: 12mm; peso totale: 60 tons
N.10 Shell & tube heat exchangers in carbon steel; diameter: 840mm; thk; 12mm; total weight: 60tons
HD-LDPE plant
HD-LDPE plant
Al Jubail
Arabia Saudita
280.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 118 di 130
21-gen-11
Referenze: Riscaldatori e ScambiatoriJob References: Heaters and Exchangers
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2006
Edison
N.1 Scambiatore shell & tube in acciaio al carbonio; diametro: 685mm; spessore: 10mm; peso totale: 5tons
N.1 Shell & tube heat exchangers in carbon steel; diameter: 685mm; thk: 10mm; total weight: 5tons
Impianto Chimico
Chemical plant
Simeri Crichi
Italy
40.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2006
Linde Impianti
Jamnagar
N.20 Scambiatori shell & tube; materiale mantello: acciaio al carbonio; materiale fascio tubiero: acciaio inox; diametro: 1012mm; spessore: 16mm; peso totale: 220tons
N.20 Shell & tube heat exchangers; shell material: carbon steel; tuble bundle material: stainless steel; diameter: 1012; thk: 16mm; total weight: 220tons
Impianto Idrogeno
Hydrogen plant
Onshore India
India
1.200.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2005
Linde Impianti
Jamnagar
N.10 Scambiatori shell & tube, materiale: CrMo/acciaio inox; diametro: 1000mm; spessore: 20mm; peso totale: 50 tons
N.10 Shell & tube heat exchangers CrMo/stainless steel material; diameter: 1000mm; thk: 20mm; total weight: 50 tons
Impianto Idrogeno
Hydrogen plant
Onshore India
India
400.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2005
RM - raffineria milazzo
N.1 Scambiatore shell & tube in acciaio inox; diametro: 1250mm; spessore: 12mm; peso totale: 12 tons
N.1 Shell & tube heat exchanger; material: stainless steel; diameter: 1250mm; thk: 12mm; total weight: 12tons
Raffineria di Milazzo
Milazzo refinery
Messina
Italy
80.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 119 di 130
21-gen-11
Referenze: Riscaldatori e ScambiatoriJob References: Heaters and Exchangers
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2005
Enppi
Khalda Petr. Co (Apache)
N.3 Riscaldatori indiretti ad acqua da 57 MMScfd di vapore cad.
N.3 Gas fired water bath heaters; flowrate: 57 MMScfd each
Obayed Gas Field
Obayed Gas Field
Onshore Egypt
Egypt
3.490.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2005
China oil corporation
N.1 Heater treater da 15.000 BOPD
N.1 Heater treater; flowrate: 15.000 BOPD
Aktobe Project
Aktobe Project
Onshore Kazakistan
Kazakistan
450.600,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2005
Sapio
N.2 Scambiatori shell & tube in acciaio al carbonio; diametro: 700mm; spessore: 10mm; peso totale: 7tons
N.2 Shell & tube heat exchangers; diameter: 700mm; thk: 10mm; total weight: 7tons
Crion Sapio plant
Crio Sapio plant
Porto Marghera
Italy
60.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2005
Eurotecnica
N.8 Scambiatori shell & tube; materiale mantello: acciaio al carbonio; materiale fascio tubiero: acciaio inox; diemtro: 1200mm; spessore: 10mm; peso totale: 18tons
N.8 Shell & tube heat exchangers; shell material: carbon steel; tuble bundle material: stainless steel; diameter: 1200mm; thk: 10mm; total weight: 18 tons
Eurotecnica plant
Eurotecnica plant
Pulawy
Poland
220.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 120 di 130
21-gen-11
Referenze: Riscaldatori e ScambiatoriJob References: Heaters and Exchangers
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2005
Korting Hannover
N.2 Scambiatori shell & tube, materiale mantello: acciaio carbonio; materiale fascio tubiero: acciaio inox; diametro: 455mm; spessore: 6mm; peso totale: 2tons
N.2 Shell & tube heat exchangers; shell material: carbon steel; bandle tube material: stainless steel;; diameter: 455mm; thk: 6mm; total weight: 2tons
Korting plant
Korting plant
Onshore Poland
Poland
35.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2005
Linde Impianti
Jamnagar
N.20 Scambiatori shell & tube; materiale mantello: acciaio al carbonio; materiale fascio tubiero: acciaio inox; diametro: 1000mm; spessore: 20mm; peso totale: 100tons
N.20 Shell & tube heat exchangers; shell material: carbon steel; tuble bundle material; stainless steel; diameter: 1000mm; thk: 20mm; total weight: 100tons
Impianto Idrogeno
Hydrogen plant
Onshore India
India
600.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2005
Medoil
N.1 Scambiatore shell & tube in acciaio inox; diametro: 273mm; spessore: 9,52mm; peso totale: 1ton
N.1 Shell & tube heat exchanger; diameter: 273mm; thk: 9,52mm; total weight: 1ton
Jowfe refinery
Jowfe refinery
Jowfe
Libya
20.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2005
Caffaro
N.2 Scambiatori shell & tube materiale: acciaio inox / Ti; diametro: 500mm; spessore: 5mm; peso totale: 2 tons
N.2 Shell & tube heat exchangers; material: stainless steel/Ti; diameter: 500mm; thk: 5mm; total weight: 2tons
Caffaro plant
Caffaro plant
Torviscosa
Italy
35.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 121 di 130
21-gen-11
Referenze: Riscaldatori e ScambiatoriJob References: Heaters and Exchangers
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2004
Edison
N.1 Scambiatore shell & tube materiale: A210-A1; diametro: 457mm; spessore: 8mm; peso totale: 2 tons
N.1 Shell & tube heat exchangers; material: A210-A1; diametro: 457mm; thk: 8mm; total weight: 2 tons
Torviscosa plant
Torviscosa plant
Torviscosa
Italy
22.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2004
RM - raffineria milazzo
N.2 Scambiatori shell & tube; materiale: A210-A1; diametro: 940mm; spessore: 11mm; peso totale: 20 tons
N.2 Shell & tube heat exchangers; material: A210-A1; diameter: 940mm; thk: 11mm; total weight: 20 tons
Raffineria di Milazzo
Milazzo refinery
Messina
Italy
105.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2004
Bentini N.F. Energy N.1 Scambiatore shell & tube; materiale: SA 179; diametro: 890mm; spessore: 38mm; peso totale: 234 tons
N.3 Shell & tube heat exchangers; material: SA 179; diameter: 890mm; thk: 38mm; total weight: 234 tons
Petrodar pumping fac. Project
Petrodar pumping fac. Project
Onshore Sudan
Sudan
770.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2004
Siirtec Nigi
API
N.1 Scambiatore shell & tube; materiale: A210-A1; diametro: 3000mm; spessore: 15mm; peso totale: 43tons
N.1 Shell & tube heat exchangers; material: A210-A1; diameter: 3000mm; thk: 15mm; total weight: 43 tons
Raffineria Di Falconara
Falconara Refinery
Falconara
Italy
230.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 122 di 130
21-gen-11
Referenze: Riscaldatori e ScambiatoriJob References: Heaters and Exchangers
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2004
MAE
N.5 Scambiatori Shell & tube in acciaio al carbonio; diametro: 1100mm; spessore: 8mm; peso totale: 6tons
N.5 Shell & tube heat exchangers in carbon steel; diameter: 1100mm; thk: 8mm; total weight: 6 tons
MAE plant
MAE plant
Fiorenzuola
Italy
12.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2004
Tamoil SA
N.2 Scambiatori shell & tube; materiale mantello: acciaio al carbonio; materiale fascio tubiero: acciaio inox; diametro: 674mm; spessore: 13mm; peso totale: 9 tons
N.2 Shell & tube heat exchangers; shell material: carbon steel; tube bundles material: stainless steel; diameter: 674mm; thk: 13mm; total weight: 9tons
Raffineria di Collombey
Collombey Refinery
Collombey
Switzerland
84.400,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2004
Tessenderlo
N.2 Scambiatori shell & tube in acciaio al carbonio; diametro: 1586mm; spessore: 7mm; peso totale: 7tons
N.2 Shell & tube heat exchangers in carbon steel; diameter: 1586mm; thk: 7mm; total weight: 7tons
Impianto di Tessenderlo
Tessenderlo plant
Pieve Vergonte
Italy
45.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2004
York France N.2 Scambiatori shell & tube in acciaio al carbonio; diametro: 406,4mm; spessore: 9,5mm; peso totale: 1ton
N.2 Shell & tube heat exchangers in carbon steel; diameter: 406,4mm; thk: 9,5mm; total weight: 1ton
Impianto in China
China plant
Onshore China
China
11.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 123 di 130
21-gen-11
Referenze: Riscaldatori e ScambiatoriJob References: Heaters and Exchangers
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2004
Eni - Div. Agip
N.1 Scambiatore shell & tube materiale: A210-A1; diametro: 991mm; spessore: 13mm; peso totale: 12 tons
N.1 Shell & tube heat exchangers; material: A210-A1; diameter: 991mm; thk: 13mm; total weight: 12 tons
Raffineria di Taranto
Taranto refinery
Taranto
Italy
52.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2004
A B B Solutions N.2 Scambiatori shell & tube in acciaio al carbonio; diametro: 686mm; spessore: 10mm; peso totale: 15tons
N.2 Shell & tube heat exchangers in carbon steel; diameter: 686mm; thk: 10mm; total weight: 15tons
Bir Berkine plant
Bir Berkine plant
Onshore Algeria
Algeria
98.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2004
RM - raffineria milazzo
N.8 Scambiatori shell & tube; materiale: A210-A1; diametro: 2700mm; spessore: 9mm; peso totale: 55tons
N.8 Shell & tube heat exchangers; material: A210-A1; diameter: 2700mm; thk: 9mm; total weght: 55tons
Raffineria di Milazzo
Milazzo refinery
Messina
Italy
220.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2004
UMM Al Jawaby
Azzawiya
N.12 Scambiatori shell & tube in acciaio al carbonio; diametro: 690mm; spessore: 10mm; peso totale: 5tons
N.12 Shell & tube heat exchangers in carbon steel; diameter: 690mm; thk: 10mm; total weight: 5tons
Azzawiya refinery
Azzawiya refinery
Azzawiya
Libya
50.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 124 di 130
21-gen-11
Referenze: Riscaldatori e ScambiatoriJob References: Heaters and Exchangers
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2004
Siirtec Nigi
API
N.1 Scambiatore shell & tube; material: A210-A1/acciaio al carbonio; diametro: 2472; spessore: 15mm; peso totale: 87 tons
N.1 Shell & tube, material: A210-A1/carbon steel; diameter: 2472mm; thk: 15mm; total weight: 87 tons
Raffineria Di Falconara
Falconara Refinery
Falconara
Italy
130.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2003
Mezhregionkomplet
Gazprom
N.1 riscaldatore a gas, portata: 20.000 BOPD
N.1 heater treater, flowrate: 20.000 BOPD
Purosxvy Project
Purosxvy Project
Purosvy region
Russia
1.235.700,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2003
Techint
Agip Petroli
N.1 Scambiatore shell & tube materiale low carbon steel / claddatura in AISI 304; diametro: 52"; spessore: 5mm + 3 mm cladd.; peso totale: 50 tons
N.1 Shell & tube heat exchangers; low carbon steel material, clad: 304; diameter: 52"; thk: 50mm+3mm clad; total weight: 50 tons
Raffineria di Gela
Gela refinery
Gela
Italy
400.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2003
Tecnimont
Jam Iran
N.9 Scambiatori shell & tube materiale mantello: acciaio al carbonio; materiale fascio tubiero: acciaio inox; diametro: 20"; spessore: 10mm; peso totale: 10 tons
N.9 Shell & tube heat exchangers; shell material: carbon steel; tube bundle: stainless steel; Diameter: 20"; thk: 10mm; total weight: 10 tons
Jam plant
Jam plant
Onshore Iran
Iran
150.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 125 di 130
21-gen-11
Referenze: Riscaldatori e ScambiatoriJob References: Heaters and Exchangers
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2003
Snamprogetti/TKP
Omifco
N.34 Scambiatori shell & tube; mantello in acciaio al carbonio; fascio tubiero in acciaio inox 316L; diametro: 66"; spessore: 25mm; peso totale: 180 tons
N.34 Shell & tube heat exchangers; shell material: carbon steel; tuble bundles material: stainless steel 316L; diameter: 66"; thk: 25mm; total weighit: 180 tons
Omifco plant
Omifco plant
Onshore India
India
2.100.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2002
Aeromeccanica Stranich N.1 Scambiatore shell & tube materiale CrMo; diametro: 850 mm; spessore: 12mm; peso totale: 0,5 ton
N.1 Shell & tube heat exchangers CrMo material; diametro: 850 mm; spessore: 12mm; total weight: 0,5 ton
Impianto in China
China plant
Onshore China
China
40.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2002
Enppi
Fayum GasCo(Shell Gas BV)
N. 2 Caldaie indirette a gas; potenzialità: 700 kW, pressione: 77 bar
N.2 Gas fired water bath heater, duty 700 kW, pressure: 77 bar
Fayum gas plant
Fayum gas plant
Fayum city
Egypt
820.480,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2002
Enppi
Fayum GasCo(Shell Gas BV)
N. 2 Caldaie indirette a gas; potenzialità: 1,4 MW, pressione: 77 bar
N.2 Gas fired water bath heater, duty 1,4 MW, pressure: 77 bar
Kom Aushim Gas Field
Kom Aushim Gas Field
Onshore Egypt
Egypt
1.025.600,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 126 di 130
21-gen-11
Referenze: Riscaldatori e ScambiatoriJob References: Heaters and Exchangers
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2002
Snamprogetti Sud
Agip Petroli
N.10 Scambiatori shell & tube in acciaio al carbonio; diametro: 1219mm; spessore: 13mm; peso totale: 150 tons
N.10 Shell & tube heat exchangers in carbon steel; diameter: 1219mm; thk: 13mm; total weight: 640.000,00
Raffineria di Gela
Gela refinery
Gela
Italy
640.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2002
Tecnimont N.3 Scambiatori shell & tube; materiale: A210-A1 / acciaio al carbonio; diametro: 465mm; spessore: 10mm; peso totale: 6tons
N.3 Shell & tube heat exchangers; material: A210-A1 / carbon steel; diameter: 465mm; thk: 10mm; total weight: 6 tons
PP Hungary plant
PP Hungary plant
Onshore Hungary
Hungary
55.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2001
AIC
International Power
N.2 Riscaldatore indiretto a gas; potenza 4,5 MW, 77 bar
N.2 Gas fired water bath heater; 4,5 MW, 77 bar
Al Kamil Field
Al Kamil Field
Onshore Oman
Oman
1.504.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2001
Noyvallesina
KZPC ENC
N.5 Scambiatori shell & tube materiale: Incoloy 825; diametro: 900", spessore: 12mm; peso totale: 29 tons
N.5 Shell & tube heat exchangers Incoloy 825 material; diameter: 900"; thk: 12 mm; total weight: 55 tons
KZPC ENC
KZPC ENC
Onshore Iran
Iran
1.000.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 127 di 130
21-gen-11
Referenze: Riscaldatori e ScambiatoriJob References: Heaters and Exchangers
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2001
Agip Petroli
N.3 Scambiatori shell & tube materiale: CrMo; diametro: 940mm; spessore: 11mm; peso totale: 38 tons
N.3 Shell & tube heat exchangers CrMo material; diameter: 940 mm; spessore: 11mm; total weight: 38 tons
Raffineria di Taranto
Taranto refinery
Taranto
Italy
300.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2001
Agip
N.2 Scambiatori shell & tube materiale mantello: acciaio carbonio, fascio tubiero: acciaio inox 316L; peso totale: 2 tons
N.2 Shell & tube heat exchangers; shell material: carbon steel; tube bundles material: stainless stell 316L; total weight: 2 tons
Raffineria di Livorno
Livorno retinery
Livorno
Italy
30.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2001
Sonatrach / Agip
Agip
N.4 Scambiatori shell & tube; materiale: acciaio al carbonio; diametro: 30"; spessore: 12mm; peso totale: 25 tons
N.4 Shell & tube heat exchangers; material: carbon steel; diameter: 30"; thk: 12mm; total weight: 25 tons
Agip bir rebaa
Agip bir rebaa
Onshore Algeria
Algery
120.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2001
Technip China
Quiri refrigeration
N.16 Scambiatori shell & tube; materiale mantello acciaio al carbonio, materiale fascio tubiero: acciaio inox 316L; diametro: 28"; spessore: 8mm; peso totale: 14 tons
N.16 Shell & tube heat exchangers; shell material: carbon steel; tube bundles: stainless steel 316L; diameter: 28"; thk: 8mm; total weight: 14 tons
Impianti vari
Several Plants
Onshore China
China
160.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 128 di 130
21-gen-11
Referenze: Riscaldatori e ScambiatoriJob References: Heaters and Exchangers
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2001
Medoil
Sirte Oil Company
N.3 Scambiatori shell & tube in acciaio inox 316L; diametro:950mm; spessore: 10mm; peso totale: 36 tons
N.3 Shell & tube heat exchangers; material: stainless steel 316L; diameter: 950mm; thk: 10mm; total weight: 36 tons
Raffineria della S.O.C.
S.O.C. refinery
Onshore Libya
Libya
450.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2001
API
N.2 Scambiatori shell & tube materiale: acciaio al carbonio; peso totale: 0,5 ton
N.2 Shell & tube heat exchangers; material: carbon steel; total weight: 0,5 ton
Raffineria di Ancona
Ancona refinery
Ancona
Italy
12.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2000
Snamprogetti Sud
Agip Petroli
N.8 Scambiatori shell & tube in acciaio al carbonio Gr. 11; Diametro: 36"; spessore: 25 mm peso tot.: 55 tons
N.8 shell & tube heat exchangers in carbon steel Gr.11; Diametro: 36"; thk: 25 mm; total weight 55 tons
Raffineria di Sannazzaro
Sannazzaro Refinery
Sannnazzaro
Italy
230.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
2000
York France N.9 Scambiatori shell & tube; materiale mantello: acciaio al carbonio, materiale tubi: rame; diemtro: 60"; spessore: 15mm; peso totale: 17 tons
N.9 Shell & tube heat exchangers; shell material: carbon steel, tube material: copper; diameter: 60"; thk: 15mm; total weight: 17tons
Impianto in China
China plant
Onshore China
China
155.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 129 di 130
21-gen-11
Referenze: Riscaldatori e ScambiatoriJob References: Heaters and Exchangers
Main ContractorCliente Finale / End UserValore / ValueAnno / Year
Descrizione Lavoro
Job Description
ImpiantoPlantLocalità / LocationPaese / Country
Ingegneria AttivitàEngineering Activity
2000
Vinavil
N.3 Scambiatori shell & tube; materiale: acciaio inox 316L; diametro: 38"; spessore: 10mm; peso totale: 19 tons
N.3 Shell & tube heat exchangers; material: stainless steel 316L; diameter: 38"; thk: 10mm; total weight: 19tons
Impianto Vinavil
Vinavil plant
Onshore Italy
Italy
230.000,00
Procurement
Construction
Pre-comm. / comm.
Start-up /Training
Basic / Process
Civil / Structural
Electrical / Instrum.
MechanicalEuro Installation
Pag. 130 di 130
21-gen-11