references - ebis.waterboard.lkebis.waterboard.lk/documentation/it/development/engi… · web...
TRANSCRIPT
Kotte Water Supply Scheme
OIC Kotte
WATER SAFETY PLAN (WSP)
Managing Drinking Water Quality from Catchment to Consumer
Prepared By
Water safety plan team Kotte
NATIONAL WATER SUPPLY AND DRAINAGE BOARD
Revision II
December 2019
Revision II
Contents
1. Introduction........................................................................................................................................1
1.1 Background.........................................................................................................................................2
1.2 Main Risks in the System.....................................................................................................................2
1.3 Objectives of the WSP Development..................................................................................................3
1.4 Key Reference Material for the WSP...................................................................................................3
1.4.1 Water Quality Standards.....................................................................................................................4
1.4.2 Hazard Analysis Critical Control Points Matrix....................................................................................4
1.4.3 Monitoring..........................................................................................................................................4
1.4.4 Management procedures....................................................................................................................4
1.4.5 A system of independent surveillance................................................................................................4
2. Water Safety Plan Team......................................................................................................................5
2.1 History of the team development.......................................................................................................5
2.2 WSP Teams, Roles of the Teams and Responsibility...........................................................................5
2.2.1 Assembling WSP Working team from NWS&DB.................................................................................5
2.2.2 Identification of Stakeholders for the WSP at Kotte WSS....................................................................8
2.2.3 Supporting team for the WSP.............................................................................................................9
2.2.4 Detail of Water Safety Plan Meetings schedule................................................................................10
3. System Description...........................................................................................................................11
3.1 General Information on the Supplier................................................................................................11
3.1.1 Vision of the Organization.................................................................................................................11
3.1.2 Mission of the Organization..............................................................................................................11
3.1.3 Principles and Values of the Organization.........................................................................................11
3.1.4 Functions of the Organization...........................................................................................................12
3.1.5 Goals of the Organization..................................................................................................................12
3.2 Kotte Water Distribution System......................................................................................................13
3.2.1 Zone 01 (Rajagiriya)...........................................................................................................................15
3.2.2 Zone 02 (Nawala)..............................................................................................................................15
3.2.3 Zone 03 (EthulKotte).........................................................................................................................15
3.2.4 Zone 04 (Pita Kotte)..........................................................................................................................16
3.2.5 Zone 05 (Mirihana)............................................................................................................................16
3.2.6 Zone 06 (Madiwela)..........................................................................................................................16
3.3 Valve details in Kotte Area................................................................................................................16
3.4 Flow Diagram....................................................................................................................................22
3.5 Intended user/users (Consumer)......................................................................................................23
3.6 Water Quality....................................................................................................................................26
3.7 Sample Location –AE Kotte...............................................................................................................28
3.7.1 Operational Monitoring....................................................................................................................28
3.7.2 Verification monitoring.....................................................................................................................33
3.7.3 Water Quality Analysis......................................................................................................................34
4. HAzard Identification and Assessment of Risks.................................................................................35
4.1 Risk Assessment Methodology..........................................................................................................35
4.2 Hazards Risk Table.............................................................................................................................38
5. Identifying Existing Controls and Reassess Risk with Controls..........................................................40
5.1 Risk prioritizing table.........................................................................................................................45
5.1.1 Distribution System...........................................................................................................................45
5.1.2 Consumer Interface...........................................................................................................................47
6. Identify and Develop Improvement Plan..........................................................................................48
7. Operation Monitoring and Corrective Actions..................................................................................52
8. Verification Procedure......................................................................................................................56
8.1 Compliance monitoring.....................................................................................................................57
8.2 Consumer Satisfaction......................................................................................................................58
9. Management Procedures..................................................................................................................59
10. Supporting Programme.....................................................................................................................61
11. Review of WSP..................................................................................................................................62
12. Incident Response Plan.....................................................................................................................65
13. Achievements....................................................................................................................................67
13.1 Rajagiriya Bridge Crossing.................................................................................................................67
13.2 Yakbedda Bridge Crossing Rajagiriya & Kolonnawa Ends..................................................................68
List of Tables
Table 1: WSP Operation Team.....................................................................................................6
Table 2: WSP Stakeholders' Identification...................................................................................8
Table 3: Supporting Team............................................................................................................9
Table 4 Distribution Pipe detail in Kotte area...........................................................................13
Table 5: No of connection as GND wise.....................................................................................18
Table 6 Consumer survey analysis report (Physical parameters)...............................................24
Table 7 Consumer survey analysis report (Water usage analysis).............................................24
Table 8 Water storage analysis..................................................................................................24
Table 9 Water storage cleaning process analysis......................................................................24
Table 10: Details of uses in Kotte Area.....................................................................................25
Table 11: Consumer Categorization of Kotte WSS.....................................................................25
Table 12: Standard for Water Quality – Physical Requirement.................................................26
Table 13: Standard for Water Quality – Biological Requirement...............................................26
Table 14: Standard for water quality: Chemical Requirement...................................................27
Table 15: RCL location point at operational monitoring............................................................28
Table 16: RCL location point at Verification monitoring...........................................................33
Table 17: Description of Likelihood or Frequency.....................................................................35
Table 18: Description of the Severity of the Consequences......................................................35
Table 19: Semi Quantitative Risk Matrix for Risk Assessment...................................................36
Table 20: Prioritizing Matrix......................................................................................................37
Table 21: Hazard / Risk Table....................................................................................................38
Table 22: Reassessment of Risk with Existing Controls..............................................................40
Table 23: Risk prioritizing table-Distribution system.................................................................45
Table 24: Risk prioritizing table- Consumer interface................................................................47
Table 25: Improvements to the Kotte WSP...............................................................................48
Table 26: Operation Monitoring and Corrective Actions...........................................................52
Table 27: Verification –Compliance monitoring........................................................................57
Table 28 : Verification – Consumer satisfaction........................................................................58
Table 29: Management Procedures..........................................................................................59
Table 30: Supporting Programme..............................................................................................61
Table 31: Review Schedule........................................................................................................62
Table 32: WSP auditing arrangement........................................................................................64
List of Figures
Figure 1 WSP Operation Committee............................................................................................5
Figure 2 Type of Distribution Pipe as percentages....................................................................13
Figure 3: Kotte area zonal map..................................................................................................14
Figure 4: Valve Detail.................................................................................................................16
Figure 5 GNDS –Area Engineer Kotte.........................................................................................17
Figure 6: Jubilee new reservoir..................................................................................................19
Figure 7: Jubilee Old Reservoir..................................................................................................19
Figure 8:Edirisinghe Water Tower.............................................................................................20
Figure 9: Moragasmulla water tower........................................................................................20
Figure 10: Pagoda Water tower.................................................................................................21
Figure 11:Madiwela Booster Pump house.................................................................................21
Figure 12: flow diagram.............................................................................................................22
Figure 13 :Trend curve for RCLConsumer end...........................................................................30
Figure 14: RCL Summery report at jubilee reservoir..................................................................31
Figure 15: Trend curve for RCL (Operational Monitoring).........................................................32
Figure 16: Trend curve for RCL..................................................................................................34
Figure 17: Planning Cycle...........................................................................................................65
Figure 18: Before & after WSP at Rajagriya bridge crossing......................................................67
Figure 19: Before & after WSP Yakbadda Bridge crossing Rajagiriya end..................................68
Figure 20: Before & after WSP Yakbaddabridge crossing Kolonnawa end.................................68
Figure 21 Before & after WSP consumer meter location..........................................................69
Figure 22 : Stakeholder meeting...............................................................................................69
List of Annex
Annex 01- Individual Responsibilities of WSP Operational Team
Annex 02- WSP Stakeholders Individual role & responsibilities
Annex 03 - WSP Supporting team Individual responsibilities in WSP team
Annex 04 - Meeting Calendar, Action Plan
Annex 05- Distribution network -Area engineer Kotte
Annex 06 - Valve location map
Annex 07- RCL Location point Map
Annex 08- Water Quality Analysis Report
REFERENCES
(n.d.). Guidlines for Drinking Water Quality.
(2019). MIS Report. Kotte: Manager Office.
(2017,2018). Sampath Pathikada. Kotte,Maharagama: M.C, U.C.
(2016)A practical guide to Auditing water safety plans(World Health Organization)
(2014)Urban Water Safety Planning capacity training-Participant Hand book
(2018)Water Safety Plan Internal Audit Report Kolonnawa
(2016)Water Safety Plan External Audit Report Panadura water supply Scheme
Abbreviations
ADB – Asian Development Bank
AE – Area Engineer
AGM – Assistant General Manager
CBO – Community Based Organization
CO – Commercial Officer
DGM – Deputy General Manager
DI – Ductile Iron
DS – Divisional Secretariat
EAP – Emergency Action Plan
EE – Electrical Engineer
GDP – Gross Domestic Product
GND – GramaNiladhari Division
MCM – Mega Cubic Metre
ME – Mechanical Engineer
Mn – Manganese
MOH – Medical Officer of Health
MSL – Mean Sea Level
n/a – Not Applicable
NGO – Non Government Organization
NWSDB/NWS&DB – National Water Supply & Drainage Board
O&M – Operation and Maintenance
OIC – Officer-in-Charge
PAC – Powder Activated Carbon
PE – Poly Ethylene
PHI – Public Health Inspector
PT – Plant Technician
PVC – Poly Vinyl Chloride
RCl – Residual Chlorine
RDA – Road Development Authority
RM – Regional Manager
RSC (S) – Regional Support Centre (Southern)
SLS – Sri Lanka Standard
SOP – Standard Operation Procedure
SOBE _ State Organization Business Enterprise
TOC – Total Organic Carbon
TP – Treatment Plant
UB –Unobjectionable
UDA – Urban Development Authority
UNICEF – United Nations International Children Emergency Fund
uPVC – un plasticized Poly Vinyl Chloride
WHO – World Health Organization
WSP – Water Safety Plan
WSS – Water Supply Scheme
WTP – Water Treatment Plant
i
1. INTRODUCTION
Water is a challengeable natural resource for many countries and studies predicted that the
world will face water dilemma in 2025-2030, if not consumed in sustainable way. Moreover,
population growth, climate change, and industrialisation are critical factors that impact on the
water sector and ultimately result in freshwater shortage and continued water pollution.
There is no such thing as naturally pure water. In nature, all water contains some impurities.
As water flows in streams, sits in lakes, and filters through layers of soil and rock in the
ground, it dissolves or absorbs the substances that it touches. Some of these substances are
harmless. In fact, some people prefer mineral water precisely because minerals give it an
appealing taste. However, at certain levels, minerals, just like man-made chemicals, are
considered contaminants that can make water unpalatable or even unsafe.
Over one billion men, women and children all over the world do not have access to clean, safe
drinking water. Roughly two million people die each year of diarrhoea caused by infectious
water-borne diseases; roughly 70% are children (The 3rd United Nations World Water
Development Report: Water in a Changing World, 2009). Children's bodies aren't strong
enough to fight waterborne diseases.
Outbreaks of waterborne disease continue to occur in both developed and developing
countries, leading to loss of life, disease and economic burden for individuals and
communities (Davison, et al., 2005). It is a fact that access to safe water directly combines
with a nation’s social and economic development.
Over the past decade, sustainable access to water supply has emerged as one of the most
critical development challenges facing the developing world (Water Demand Management
Strategy and Implementation Plan, 2006). Sri Lanka is blessed with naturally reliable water
sources which keeps Sri Lanka at the level of the developed countries considering access to
the potable water. But still there exists the challenge of protecting and safe guarding the
reliability of the country’s water sources perspective of the quality of the raw water. Raw
water can be identified as rain water, surface water or ground water that has not subjected to
any of the treatment processes. The public investment on the infrastructure development
programme in Sri Lanka amounted to Rs. 407.5 billion (6.2 per cent of Gross Domestic
Product/GDP) in 2011 (Central Bank Annual Report, 2011). Hence, being a developing nation,
it is always better to focus on protecting raw water than treating it after been contaminated.
Not only the water supply but the water demand also arises rapidly in all over the world.
Population growth, rapid urbanization, and overall expansion in economic activities are major
1
causal factors underlying such increases in water consumption. Urban and regional demand
for freshwater in Sri Lanka has grown significantly over the last decade (Hussain, Thrikawala, &
Barker, 2002). Hence it is very clear, National Water Supply & Drainage Board (NWSDB), as the
water supplier of the nation, challenges with the not only the supply of the safe, reliable
drinking water to the nation but also provide water in consistent, sufficient and desirable
quantity.
Therefore, the time has come to think about a holistic, systematic, and integrated
management approach used to identify and prioritize potential threats to water quality at
each step in a specific system’s water supply chain from catchment to consumer and
implement best practices to mitigate those threats and ensure drinking-water quality which is
in other words can be identified as the Water Safety Plan (WSP).World Health Organization
(WHO) promoting water safety plans as the most effective means of consistently ensuring the
safety of drinking water supply and it safe guard drinking water form catchment to consumer.
1.1 Background
Water Safety Plan (WSP) is the most effective way of ensuring access to the safe drinking
water in sufficient quantity provided that the word “safe” stands for the water that does not
contain harmful contaminants in concentrations that could make a person sick and the word
“sufficient” stands for the quantity of the water that is fair enough for the day to day activities
such as drinking, cooking and personal hygiene. Safe and sufficient drinking water prevents
the occurrence of waterborne diseases and directly contributes to any community’s social
development with sustainable family livelihood and hence the economic development of the
community. The WSP clearly a multiple barrier process but emphasizes on prevention. The
WSP helps to identify, prioritize and assess risks, that could threatened the reliability of the
water supply, and then to control and manage the identified risks, finally to monitor and verify
the procedures. As it is continuously being on operation, WSP is but a live process of managing
water quality from catchment to the consumer, not a prepared document. WSP is but a
continuous process, not an ending business.
1.2 Main Risks in the System
Industrial development and intensive agriculture are essential for development process. Since
many pollutants are added to water sources by the aforementioned development activities, a
lot of public money is invested to advanced water treatment processes and still prevails the
possibility of affecting to the health of the public. At present Sri Lanka is in a difficult situation
2
to prevent source pollution by focusing point source pollution (eg: - industrial pollution) and
non-point source pollution (eg: - agricultural runoff).Some research studies show that present
heavy metals and persistent chemical concentration in water increasing day by day possibly
due to adverse agrochemical usage. Strengthening pollution prevention lows and legislations,
declaration of boundary protection zones and rendering legal power to water supplier for
involving in catchment protection are identified as helpful legislative approach to the
catchment protection. Further financing shall be ensured at the national level by introducing a
penalty scheme for polluters under “Polluter Pays” principle.
1.3 Objectives of the WSP Development
The objectives of a water safety plan are to ensure safe drinking-water through a better water
supply practice, that is:
To prevent water source contamination;
To treat water to reduce and/or remove contamination that could be present to the
extent necessary to meet the water quality targets; and
To prevent re-contamination during storage, distribution and handling of drinking
water.
The water supplier is the key player in a WSP but other stakeholders play their own significant
roles. As the principal water supplying authority in Sri Lanka, National Water Supply &
Drainage Board (NWSDB) bears the responsibility to implement Water Safety Plan for Water
Supply Schemes at their possession in the island. The objective of this document is to ensure
benefits of the WSP to the water consumers depending on Kotte Water Supply Scheme (WSS)
by implementing the WSP.
1.4 Key Reference Material for the WSP
The World Health Organization’s guide line for drinking water quality, aims to protect public
health. Adaption of WSP can be identified as the key approach to ensure this goal. WSP is the
most effective mean of consistently ensuring the safety of drinking water supply, through the
use of a comprehensive risk assessment and risk management approach that encompasses all
steps in water supply from catchment to consumer. This WSP is dynamic and practical.
WSP approach of WHO Guide Lines (2004) is a preventive management framework for safe
drinking water that consists with 11 learning modules.
3
1.4.1 Water Quality Standards
Sri Lanka Standard (SLS), health based targets (based on the evaluation of health
concerns)
1.4.2 Hazard Analysis Critical Control Points Matrix
System assessment to determine whether the water supply chain from catchment to
the point of consumption as a whole can deliver water of a quality that meets the
health based targets.
1.4.3 Monitoring
Monitoring of the control measures in the supply chain, which are of particular
importance in securing drinking water safety. (Monitoring Plan for monitoring of multi
barriers or control measures)
1.4.4 Management procedures
Documentation and communication the system assessment and monitoring describing
actions to be taken in normal operation and incident conditions including upgrade and
improvement plans through –Standard Operation Procedures (SOP), Incident
management plans, Preventive maintenance Programme, Rehabilitation and
improvement plans
1.4.5 A system of independent surveillance
Verifies that the above all are operating properly. (Water Quality Surveillance
Programme carried out by Health Department)
Water Supplier should get involved the stakeholders in the catchment to consumer of the
water supply system in preparation of the WSP.
4
2. WATER SAFETY PLAN TEAM (MODULE 01)
2.1 History of the team development
Since the water safety plan deals with catchment to consumer approach of water safety,
NWS&DB along could not guarantee a proper implementation and execution of WSP. Hence
three teams were formed to coordinate with WSP development, monitoring and
implementation.
Hence, teams were assembled for the preparation of the WSP for Kotte Water Supply Scheme
(WSS).
2.2 WSP Teams, Roles of the Teams and Responsibility
Relevant officers of the NWS&DB were selected based on their field expertise for the
preparation, monitoring implementing and reviewing of the WSP for Kotte WSS.
2.2.1 Assembling WSP Working team from NWS&DB
According to the preliminary step of WHO Guideline, a team was assembled for the
preparation of WSP for Kotte WSS. Relevant officers of the NWSDB were selected considering
their field of expertise for the preparation and continuous monitoring of the performance and
carry out periodic review of the WSP.
5
Figure 1 WSP Operation Committee
Table 1: WSP Operation Team
No Name Section Designation Role of WSP
Contact Information
Reference(Responsibility)
01 Mr.AbeykoonBandara Manager Office, Kotte
Manager
(O&M)
Team Leader 0777633713 WSP/Kotte/
OIC/02
02 Mrs.M.L.R.K. Perera RSC .Western Central Senior Chemist Team
member 0718064184 WSP/Kotte/OIC/02
03 Mr.D.A.D.U.Nishantha A.E Office, Kotte
Area Engineer, Kotte
Deputy team leader
0714426642 WSP/Kotte/OIC/02
04 Mr.S.M.R.C.JayathilakaRSC Western Central
Priority Engineer Team member 0774098152 WSP/Kotte/
OIC/02
05 Mr.H.P.N. C. Siriwardana
Manager Office, Kotte
Development Engineer
Team member 0714870574 WSP/Kotte/
OIC/02
06 Mr.D.P.DeZoysa O.I.C Office, Kotte OIC (Kotte) Coordinat
or 0714437046 WSP/Kotte/OIC/02
07 Mr.D.S.R. Kolambaarachchi
O.I.C Office, Kotte
E.A. (Sp.) Civil Zone Officer. Rajagiriya
Team member 0716466539 WSP/Kotte/
OIC/02
08 Ms.R.S. Kannangara O.I.C Office, Kotte
E.A.(Sp.) Civil Zone Officer,Ethul kotte
Secretary 0714444898 WSP/Kotte/OIC/02
09 Mr.T.K.Pathirana O.I.C Office, Kotte
E.A. Civil Zone Officer,Nawala
Team member 0716853232 WSP/Kotte/
OIC/02
10 Mr.K.K.C. Jayawardana O.I.C Office, Kotte
E.A. Civil Zone Officer,Pitakotte
Team member 0712543797 WSP/Kotte/
OIC/02
11 Mr.M.Y.Dhammika O.I.C Office, Kotte
E.A. Civil Zone Officer,Mirihana
Team member 0783077735 WSP/Kotte/
OIC/02
12 Mr.H.M.C.Senevirathne O.I.C Office, Kotte
E.A. Civil Zone Officer,Madiwela Facilitator 711116346 WSP/Kotte/
OIC/02
No Name Section Designation Role of Contact Reference
6
WSP Information (Responsibility)
13 Ms.H.T. N. Jayawardana
AE office, Kotte E.A. Civil Team
member 0714495075 WSP/Kotte/OIC/02
14 Ms.B. A. Pathirathna AE office, Kotte E.A. Civil Team
member 0718159621 WSP/Kotte/OIC/02
15 Mr.D.A.S.Dematagoda Manager Office, Kotte E.A Mechanical Team
member 0718391042 WSP/Kotte/OIC/02
16 Mr.I.B.Dissanayaka Manager Office, Kotte E.A.Electrical Team
member 0775495056 WSP/Kotte/OIC/02
17 Mr.K.D.S.P. Jayweera O.I.C Office, Kotte
Meter Reader Inspector
Team member 0714419119 WSP/Kotte/
OIC/02
18 W.S.N.De Silva O.I.C Office, Kotte
Management Assistant HR 0713472540 WSP/Kotte/
OIC/02
19 Ms.D.R. Thisera O.I.C Office, Kotte
Management Assistant
(Covering)
Team member 0772485224 WSP/Kotte/
OIC/02
20 Mr.S.G.Sugath O.I.C Office, Kotte Meter Reader Media
Officer 0750458944WSP/Kotte/OIC/02
21 Mr. K.A. Indrajith O.I.C. Office, Kotte Store Keeper Team
member 0714497842 WSP/Kotte/OIC/02
22 Mr.N.Jayathissa O.I.C Office, Kotte Pipe Fitter Team
member 0721239587WSP/Kotte/OIC/02
23 Mr.U.I. Amarasinghe O.I.C. office,Kotte Driver Team
member 0714406775 WSP/Kotte/OIC/02
24 Mr.Pradeep Rangana O.I.C. office,Kotte Pump Operator Team
member 0710735172 WSP/Kotte/OIC/02
25 Mr. A.T.R Pathirana O.I.C. Office, Kotte Labour Team
Member 0754338205 WSP/Kotte/OIC/02
26 Mr. A.M. Vipulasena O.I.C.office , Kotte Labour Team
member 0711907956WSP/Kotte/OIC/02
Refer Annex 1 -Individual Responsibilities of WSP Operational Team
7
2.2.2 Identification of Stakeholders for the WSP at Kotte WSS.
Officers from other relevant organizations and stake holders were selected for the WSP team.
Table 2: WSP Stakeholders' Identification
Stakeholder's Organization
Job Title Contactperson
TelephoneNumber
Reference(Responsibility)
01 Divisional Secretary Office Divisional Secretary
(Maharagama)Ms.W.Dilrukshi(Kotte)Mrs.Y.K.Shiromi Jeewamala.
0713848629
0714409103
WSP/Kotte/OIC/03/II
02 Police –Mirihana, Walikada Officer in Charge OIC Walikada
OIC Mirihana07185916500718591644
WSP/Kotte/OIC/03/II
03 Central Environmental Authority
Environmental Officer Kotte
Mr. K. P. Sanjeewa 0112862173 WSP/Kotte/OIC/03/II
04 Municipal Council Kotte Municipal Engineer Mr. Thiwahari 0777383528 WSP/Kotte/OIC/03/II
05Lanka Electricity Company Pvt. Ltd. Nugegoda
Electrical Engineer Mr. Nuwan Danapala 0112856380 WSP/Kotte/OIC/03/II
06 ConsumerMember of Community Police unit-Arunodaya mw.
K. A. Athula Premalal 0779441453 WSP/Kotte/OIC/03/II
07Medical Officer of Health(MOH) office- Kotte&Maharagama
MOH,
Kotte&Maharagama
PitakotteDelkanda
0112862973
0112852718WSP/Kotte/OIC/03/II
08 Sri Lanka TelecomRegional Telecom Office
Manager
Mr.
V.Weerasekara0711300312 WSP/Kotte/OIC/03/II
09Road Development Authority
Executive EngineerMrs.
T.D.Maheshani0714457192 WSP/Kotte/OIC/03/II
10
Provincial Road Development Authority (Mulleriyawa)
Executive Engineer Mrs.K.M.P.Fernan
do
0714393288 WSP/Kotte/OIC/03/II
11Provincial Road Development Authority (Moratuwa)
Executive EngineerMr.Lal
Jayaneththi0718192967 WSP/Kotte/OIC/03/II
12NWSDB Production,
Ambathale
Chief Engineer Mr. Rajapaksa0772984165 WSP/Kotte/OIC/03/II
13 NWSDB Sewarage. Area Engineer Mrs. Ganga de Alwis
0714870566 WSP/Kotte/OIC/03/II
Refer Annex 2- Individual role & responsibilities of WSP Stakeholders
8
2.2.3 Supporting team for the WSP
Supporting team was nominated to guide and to arrange necessary financial support and
higher management attention.
Table 3: Supporting Team
Name Designation Role within Team
Contact details
Reference(Responsibility)
1 Eng. K.P.R.SSamarasinghe
DGM WC Team Leader 0777725294 WSP/Kotte/OIC/03/III
2 Eng.A.K.Kapuruge AGM O&M Team Member 0777891511 WSP/Kotte/OIC/03/III
3 Eng. T.Abewardene AGM develop Team Member 0777562373 WSP/Kotte/OIC/03/III
4 Mr.L.P.R.J. WijesingheAGM (Laboratory Service)
Team Member 0777250375 WSP/Kotte/OIC/03/III
5 Mrs. V.P.I.Jayawardana
Chief chemist Team Member 0718221968 WSP/Kotte/OIC/03/III
6 Eng. K. L. Edirisinghe NRW(AGM) Team Member 0777717652 WSP/Kotte/OIC/03/III
7 Eng.G.G. R. Chandani CE coordination Team Member 0718478135 WSP/Kotte/OIC/03/III
8 Eng.G.A. Dinesh Chief Eng. E&M Team Member 0714418337 WSP/Kotte/OIC/03/III
9 Ms.Shiromi Karunathilaka
Se.Public R. O. Team Member 0773044933 WSP/Kotte/OIC/03/III
10 Mr.Nalin Paranawithana
Training Officer Team Member 0714470714 WSP/Kotte/OIC/03/III
Annex 3 - Individual role & responsibilities of WSP Supporting team
9
Meeting Frequency Meeting minutes(Reference)
Calendar(Reference)
01 Operational Team Meeting Once per month (WSP/KOTTE/OIC/01/I)
WSP/KOTTE/OIC/01/IAnnex 04
02 Supporting Team Meeting Once per 3 month (WSP/KOTTE/OIC/01/I)
03 Stakeholders Team Meeting Once per year (WSP/KOTTE/OIC/01/I)
04 Other Special Meeting As per requirement (WSP/KOTTE/OIC/01/I)
05 WSP progress meetings with manager Once per month
Progress meeting minutes(Kotte Region)
2.2.4 Detail of Water Safety Plan Meetings schedule
10
3. SYSTEM DESCRIPTION (MODULE 02)
3.1 General Information on the Supplier
National Water Supply & Drainage Board has its beginning as a sub department under the
Public Works Department with responsibility for the water supply and drainage system of Sri
Lanka. From 1965, it functioned as a division under various ministries until January 1975 when
it was converted to Statutory Board by an Act of Parliament. Hence now, the National Water
Supply & Drainage Board is a statutory board established under National Water Supply &
Drainage Board Act No. 2 of 1974. An addendum was introduced to the initial act by the
National Water Supply & Drainage Board Amendment Act No. 13 of 1992.
Around 80% of the population has access to the safe drinking water of which 30% (in 2010) is
through piped water supply system of the NWSDB. National Water Supply & Drainage Board
being the principal water supplying authority in Sri Lanka has a responsibility to supply water
to meet the social aspiration of the people in terms of safety, reliability and effectively. Safe
drinking water access is a one of the most important criteria in millennium development goals.
Often in Sri Lankan drinking water supply was developed focusing the quantity or the
treatment than the catchment protection or the consumer side water safety.
3.1.1 Vision of the Organization
To be the most prestigious utility organization in Sri Lanka through technological and service
excellence.
3.1.2 Mission of the Organization
Serve the nation by providing sustainable water and sanitation solutions ensuring total user
satisfaction.
3.1.3 Principles and Values of the Organization
Commitment to total customer needs
Motivation of staff towards creativity to achieve organizational objectives
Maintain Ethics and Professionalism in all activities
Facilitate for Prevention of Environmental Degradation
Positive contribution to National Economic Growth respecting Government Policy
initiatives
Work as a Team with Honesty, Integrity and Transparency
11
3.1.4 Functions of the Organization
Primary Functions
o Identification of the “unserved”, especially those prone to health problemso Preliminary Investigations, Planning, Design and Construction of Water Supply ando Sewerage Projects with local funds and donor assistance. Study all possible
options & carry out feasibility studies, Comprehensive analysis (including social economic impact, environmental impact, health aspects, etc.) cost estimation & Environmental Impact Assessment of such projects
o Operation and maintenance of Water Supply and Sewerage Schemes to provide satisfactory service to customers
o Billing and Collection through affordable tariff setting
Secondary Functions
o Human Resource Planning and Developmento Research & Development for service improvement utilizing innovative techniqueso Budgeting and Financial Controlo Publicity and Consumer awareness programs on effective use of water and
reduction of non-revenue watero Corporate Planning and Strategic Managemento Laboratory Services for quality monitoring and controlo Overall responsibility to monitor the drinking water quality of the people of the
country and to provide Technical Assistance to Community Based Organizations, Local Authorities, State Agencies and Private/ Public Sector Institutions on their water supply and sanitation facilities.
o Consultancy Services on water supply & sanitationo Project formulation and Managemento Coordination with sector actors and stakeholderso Information Management
3.1.5 Goals of the Organization
Goal 1 - Increase the water supply and sanitation coverage
Goal 2 - Improve Business Efficiency
Goal 3 - Improve greater accountability & transparency.
Goal 4- Ensure safe drinking water supply and sanitation to rural and underserved
communities
12
3.2 Kotte Water Distribution System
The average daily water demand is 37600 cum. Total No of Population 177866 (Sampath
Pathikada 2017).There are three elevated towers named as
Moragasmulla(2000cum),Edirisinghe Road(2000cum) and Pagoda(1500cum). Ground
reservoirs called Jubilee New and Jubilee old capacities are 11250cum and 4500cum. water.
Distribution system is approximately 371km.
Table 4 Distribution Pipe detail in Kotte area
Figure 2 Type of Distribution Pipe as percentages
There are some areas low pressure due to lack of water. (Moragasmulla,
Rajagiriya,Nawala).Total affected no of connections are 15000. It has 50290 connections and
water coverage is 98%.The total area divided into six zones as below.
Refer annex 5- Distribution network -Area engineer Kotte
13
PVC74%
Cact Iron21%
Ductile Iron3%
Galvanize Iron1%
Type Length (Km)
PVC. 276.3
Cast Iron 80
Ductile Iron 13
Galvanize Iron 4
Total Length 373.3
Figure 3: Kotte area zonal map
14
3.2.1 Zone 01 (Rajagiriya)
Zone is directly fed from Kolonnawa WSS
No of service connections -10016
Distribution lines are under the road carriage way
More time taken for leak repairing
Apply 4 hr water interruption daily due to lack of water and available some
low pressure areas.
Majority of the customers not collected the water in the storage tank
Water quality monitoring of the system is done once a week
Population density is very high
3.2.2 Zone 02 (Nawala)
Water received to system from both Kolonnawa and Kotte WSS
No of service connections - 7983
Majority of the customers collected the water in the storage tank
Water quality monitoring of the system is done once a week
Apply 4hr water interruption daily due to lack of water and available low
pressure areas.
3.2.3 Zone 03 (EthulKotte)
Water supplied to system from Kotte WSS
No of service connections -8027
Above 1 bar pressure is maintained in the system
Majority of the customers collected the water in the storage tank
Distribution system is under the road carriage way.
Water quality monitoring of the system is done once a week.
15
3.2.4 Zone 04 (Pita Kotte)
Water supplied to system for Kotte WSS
No of service connections -8344
Population density is high
Above 1 bar pressure is maintained in the system
Majority of the customers collected the water in the storage tank
3.2.5 Zone 05 (Mirihana)
Water supplied to system for Kotte WSS
No of service connections - 8381
Population density is high
Low pressure area due to cast iron pipe lines and smaller diameters.
Majority of the customers collected the water in the storage tank
3.2.6 Zone 06 (Madiwela)
Water supplied to system for Kotte WSS
No of service connections -7539
Population density is high
Low pressure area due to higher elevation.
Majority of the customers are not collected the water in the storage tank
3.3 Valve details in Kotte Area
Figure 4: Valve Detail
Valve Total NoCritical no of
valveReference
Main Sluice Valve 257 30 WSP/KOTTE/OIC/PMP/M1 Annex 06
Fire Hydrant Valve 6 6
WSP/KOTTE/OIC/PMP/M2 Annex 06Air Valve 12 12
Washout Valve 14 14
Total 289 62
16
All of these valves are servicing as the Preventive maintenance programme.
(WSP/KOTTE/OIC/PMP)
Figure 5 GNDS –Area Engineer Kotte
17
Table 5: No of connection as GND wise
DS DIVISION
GND No GND NAME NO. OF CONNECTION
POPULATION
Mah
arag
ama
1 523 Mirihana North 2002 6458
2 523A Mirihana South 1928 6760
3 524 Madiwela 1828 6225
4 524A Pragathipura 1693 6056
5 525 Thalapathpitiya 1882 6543
6 525A Udahamulla East 1840 6620
7 525B Udahamulla West 1426 4958
8 526B Gangodawila South 1510 4947
9 526C Wijerama 825 3217
10 526D Jambugasmulla 1401 4862
11 527 Nawinna 1635 1170
Sri
Jaya
war
dena
pura
Kotte
12 514 Walikada East 1960 8022
13 514A Walikada West 1969 7420
14 514B Rajagiriya 1068 4333
15 514B Obeyasekarapura 2157 12501
16 514D Walikada North 1660 5085
17 519 Nugegoda 1220 5543
18 519A Pagoda 1773 5673
19 519B Nugegoda West 1520 5861
20 519C Pagoda East 1675 6540
21 520 Nawala West 1301 4306
22 520A Koswatta 2010 6963
23 520B Nawala East 1710 5740
24 521 EthulKotte 2016 6339
25 521A EthulKotte West 1124 3603
26 522 PitaKotte West 1699 5603
27 522A PitaKotte East 1493 4115
28 522B PitaKotte 1105 4650
29 526 Gangodawila North 1610 6097
30 526A Gangodawila South 2231 4947
31 526C Gangodawila East 1019 3484
Total 50290 174641
18
Figure 6: Jubilee new reservoir
Figure 7: Jubilee Old Reservoir
19
CAPACITY- 11325CUM
T W L - 36.57 MSL
B W L - 27.43 MSL
CONSTRUCTED ON - 1992
WASHOUT - FUNCTION
LEVEL INDICATOR - FUNCTION
STRUCTURE - CONCRETE
OVERFLOW -FUNCTION
INLET - FUNCTION
OUTLET -FUNCTION
FLOW METER -FUNCTION
RESPONSIBILITY-OIC
CAPACITY - 4530 CUM
T W L- 36.57 MSL
B W L -27.43 MSL
CONSTRUCTED ON - 1964
WASHOUT - FUNCTION
LEVEL INDICATOR - FUNCTION
STRUCTURE - CONCRETE
OVERFLOW - FUNCTION
INLET - FUNCTION
OUTLET - FUNCTION
FLOW METER – FUNCTION
RESPONSIBILITY- OIC
Figure 8: Edirisinghe Water Tower
Figure 9: Moragasmulla water tower
20
CAPACITY - 2000CUM
T W L - 36.57 MSL
B W L - 27.43 MSL
CONSTRUCTED ON - 1972
WASHOUT - FUNCTION
LEVEL INDICATOR- FUNCTION
STRUCTURE - CONCRETE
OVERFLOW -FUNCTION
INLET - FUNCTION
OUTLET - FUNCTION
FLOW METER - AVAILABLE
RESPONSIBILITY-ZONE OFFICER
CAPACITY -1500CUM
T W L - 35.66 MSL
B W L - 28.48 MSL
CONSTRUCTED ON - 1972
WASHOUT - FUNCTION
LEVEL INDICATOR- FUNCTION
STRUCTURE - CONCRETE
OVERFLOW -FUNCTION
INLET - FUNCTION
OUTLET - FUNCTION
FLOW METER –NOT FUNCTION
RESPONSIBILITY – ZONE OFFICER
Figure 10: Pagoda Water tower
Figure 11:Madiwela Booster Pump house
CAPACITY - 108M3 /H
HEAD - 26M
TOTAL COST -25MILLION
CONSTRUCTED ON - 2014
RESPONSIBILITY-OIC
21
CAPACITY - 2000CUM
T W L - 38.7 MSL
B W L - 31.4 MSL
CONSTRUCTED ON - 1964
RESPONSIBILITY - AE
ABANDANT WATER
TOWER
USED AS RECORD ROOM
AND AUDITORIUM
Edirisighe rd. Pumps210m3/h
3.4 Flow Diagram
Figure 12: flow diagram
22
Mah
arag
ama
WSS
900m
3/h
Jubilee pumps1200m3/h
Colo
mbo
W
SS22
00m
3/h
Edirisinghe tower
Gravity main450m3/h
Jubilee Reservoir
Ambathale WTP
Kolonnawa reservoir
Distribution system
Distribution system
Distribution system
Gravity main (Baddagana)110m3/h
Distribution system
Moragasmulla tower
Madiwela B.Pumps108m3/h
Distribution MainTransmission Main Pumps750m3/h
Kolonnawa Reservoir
Transmission Main
Transmission Main
Legend
Transport step Storage step Combined step
Operation
step
3.5 Intended user/users (Consumer)
Since this WSP discusses catchment to consumer approach of water safety, it is essential to
follow best practices from the consumer interface to ensure the water quality at the point of
consumption.
Improved water supply for domestic use brings about several benefits to water users including
prevention water borne diseases, saving of time spent on water fetching and storage,
maintaining clean and domestic environment and enhanced convenience. Similarly, better
sanitation results in prevention of water borne and water related diseases through safe
disposal of human waste and clean living environment. As people enjoy healthy living, they
can save time and energy that was spent on arduous water fetching, and be engaged in
economically beneficial activities and management of household affairs such as caring for
children.
Domestic consumers of Kotte WSS use water mainly for drinking, preparation of foods,
personal hygiene, washing of clothes, domestic livestock. Non-domestic consumers use water
for their business purposes in addition to the uses of water by the domestic consumers.
It is necessary to keep attention for the hospitals which are located in Kotte area.
Consumption of Sri Jayawardanapura Hospital is 36000m3 /month. They use water for drink,
cooking, A/C machine laundry, Theaters and personal hygiene purpose. Also special attention
to be delivered to the major consumers as Navi Camp 7500 m3/month ,Madiwala M P
quarters2500 m3/month&2000 plaza building2000 m3/month etc. They use water for
drinking, washing, laundry, personal hygiene & vehicle washing purpose. Further schools in
weekdays, religious places in important religious festival days (eg: - temples in Poya Days) shall
be identified as critical places where special attention is required periodically.
We have done a consumer survey under the OIC Kotte area. It has done by through the zone
officers and covered all the 6 zones. Data were analyzed by the WSP team and the results are
shown as below. The data has been included in Consumer Survey analysis report
(WSP/KOTTE/OIC/04)
23
Table 6 Consumer survey analysis report (Physical parameters)
Parameter Bad Not bad Good Very Good
Taste 2% 5% 73% 20%
Colour 2% 7% 73% 18%
Odor 1% 5% 73% 21%
Turbidity 2% 5% 71% 22%
Table 7 Consumer survey analysis report (Water usage analysis)
Description Percentage
Direct water use 54%
Boil water use 29%
Filter use 11%
Bottle water use 6%
Table 8 Water storage analysis
Description Percentage
Overhead tank only 35%
Sump & Overhead tank 13%
Use direct tap 52%
Table 9 Water storage cleaning process analysis
Monthly Once in 3 month
Once in 6 month Once in year Over one
yearWater storage cleaning (Percentage)
5% 12% 12% 20% 51%
It has given special attention to the Sri Jayewardene Hospital & taken their observation with in
the consumer survey. Hospital requirement has been satisfied with water board standards
(Standard (SLS) 2013: 614).Thus there are no differences between water board requirement &
24
the hospital requirement. However the location of the hospital included in the sample testing
point.
Table 10: Details of uses in Kotte Area
Consumer Category
No of Connecti
onsIntended Uses
Domestic 44560 Drinking, Washing, Sanitary purpose, Bathing,Laundry,Food processing
Commercial 5123 Drinking, Washing, Laundry, Food processing, manufacturing
Schools 32 Drinking, Washing, Gardening
Government Institution 32 Drinking, Washing, Bathing, Food processing, Gardening
Religious 124 Drinking, Washing, Bathing, Food processing
Tourist / Guest Houses 1 Washing, Bathing, Food processing
Hospitals 2 Drinking, Washing, Mechanical Plants, Laundry
Army Camps 2 Drinking, Washing, Bathing, Food processing, Gardening
Table 11: Consumer Categorization of Kotte WSS
Category No Customer Category No of Connections10 Domestic 4459111 Board Quarters 812 Schools 3013 Govt Quarters 14114 Tenaman Garden 1515 Assisted Schools 218 Condominium 1220 Domestic Samurdhi 2451 Stand Posts 960 Govt Institution 3261 Army 262 Police 565 SOBE 8463 Hospital 270 Commercial Institutes 516971 Tourist/Guest 180 Other Comm and Priv. 1781 Religious 12482 NWSDB premises 1185 Other non-Profit Organizations 10
25
90 Bulk 1Total 50290
3.6 Water Quality
The national targets for provision of water supply and sanitation had been prepared and
revised from time to time since planning stage of International Water Supply and Sanitation
Decade. All the WSSs operate under NWSDB including Kotte WSS follows the Sri Lanka
Standard (SLS) 2013: 614 Part 1 and Part 2. Further NWSDB is interested to comply with WHO
Water Quality Standard and American Standard for Drinking Water and NWSDB’s focus is to
follow the limits whichever the lowest.
Table 12: Standard for Water Quality – Physical Requirement
Item Characteristic Requirement Target Method of Test
1 Colour 15 15 APHA 2120 B
2 Odor Unobjectionable - Sensory
evaluation
3 Taste Unobjectionable - Sensory
evaluation
4 Turbidity 2 NTU 0.5NTU APHA 2310 B
5 pH 6.5 – 8.5 6.5-8.5 APHA 4500- H B
Table 13: Standard for Water Quality – Biological Requirement
Item Characteristic
Requirement
(nos /100ml)
(Max.Allow.)
Target value Method of Test
1 E- Coli 0 0Multiple tube
method
2 Coliform 3 0Multiple tube
method
26
Table 14: Standard for water quality: Chemical Requirement
Item CharacteristicRequirement (mg/l)
Max.Target value Method of Test
1 Chloride (as Cl) 250 - APHA 4500 – Cl B
2Free residual Chlorine
(as Cl)Rcl1.0 0.2 min APHA 4500 – Cl G
3Alkalinity (total as
CaCO3)200 - APHA 2320 – B
4 Free Ammonia 0.06 - -
5 Albuminoidal Ammonia 0.15 - -
6 Nitrate (as NO3) 50 -ALHA 4500 – NO3
E
7 Nitrite (as NO2) 3 -ALHA 4500 – NO3
B
8 Fluoride 1 - APHA 4500 – F C
9 Total Phosphate 2 - APHA 4500 – P C
10 Total Dissolved Solids 500 - APHA 2540 – C
11 Total Hardness 250 - APHA 2340 – C
12 Total Iron 0.3 - APHA 3500 – Fe B
13 Sulphate 250 -APHA 4500 – SO4
E
14 Oil and Grease 0.2 - APHA 5520 B
15 Calcium 100 - APHA 3500 – Ca B
16 Magnesium 30 -APHA 3500 – Mg
B
17 Sodium 200 - APHA 3111B
18 Manganese 0.1 - APHA 3111B
27
3.7 Sample Location –AE Kotte
3.7.1 Operational Monitoring
The water quality is tested weekly under AE Kotte by Zone officers. (Operational Monitoring)
Refer annex 7-RCL Location point Map
Table 15: RCL location point at operational monitoring
Operational Monitoring
Source Tested by No RCL Location Points Reference
Kolonnawa
reservoirzone officer
1 No. 68/C New Kolonnawa Rd,Obeysekarapura
WSP/
KOTTE/OIC/05
2 No. 111/1 Buthgamuwa Rd, Rajagiriya
3 No.04, Bandaranayakapura, Rajagiriya
4 No.18, 4th Lane,Nawala,Koswatta
5 No. 15/3, Nuwarawatta Rd, Nawala
6 No. 129/1, Temple Rd, Nawala
Jubili
reservoir zone officer
7 No.31, D M Colombage Mw,Nawala
8 No.51/12 C, Ananda Balika Mw,Pagoda Rd
9 No. 171, Thlawathugoda rd,Pitakotte
10 No.148, Epitamulla Rd, EthulKotte
11 No.105, Ferry Rd,Ethulk kotte
12 No. 204, Duwa Rd,Beddagana
13 No. E 16, MP Quarters, Madiwela
14 Buddha Mandiraya,Pragathipura Junction
15 No.100/10,Kurunda mw,Thalpthpitiya
16 No. 58/48 B,3rd Lane, Somathalagal mw
17 No.14/3 B, Station Lane,Udahamulla
18 No.366, High Level Rd,Gangodawila
Jubili Reservoir outlet
Pump operator
Pump house outside tap
28
Figure 13 : Trend curve for RCL Consumer end
January Febuary March April May June0
0.10.20.30.40.50.60.70.8
Water Quality analysis(RCL) Report(Consumer end)2019Tested by:OIC Kotte
RCL(
mg/
l)
29
Figure 14: RCL Summery report at jubilee reservoir
30
Figure 15: Trend curve for RCL (Operational Monitoring)
January February March April May June0.00
0.20
0.40
0.60
0.80
1.00
1.20
Water Quality (RCL)Analysis Report(Jubili Resovoir Outlet)2019(Tested by-OIC Kotte)
RCL(
mg/
l)
31
3.7.2 Verification monitoring
The water quality is tested weekly under Ambathale production unit (Verification Monitoring)
Table 16: RCL location point at Verification monitoring
Verification Monitoring
Source Tested by No RCL Location Points Reference
Jubili
reservoir
Ambathale Production unit
1 "ApiWenuwenApi" Hotel, Kimbulwala junction,
Kotte.
WSP/
KOTTE/OIC/05
2 H/H outside tap at No. 536 A, Kongahawatta Road,
Thalawathugoda.
3 H/H outside tap at Refresh Saloon , Athul Kotte
4 Car wash center, Old kottawa Rd, Kotte.
5 Jubili Reservoir
6 Hospital outside tap at Base Hospital,
Jayawardanapura
32
3.7.3 Water Quality Analysis
Water quality analysis for chemical requirement
Figure 16: Trend curve for RCL
January Feburay March April May June0.00
0.10
0.20
0.30
0.40
0.50
0.60
0.70
WaterQuality (RCL)Analysis Report-2019 (Consumer end)(Tested by -Ambathale Production unit)
RCL(
mg/
l)
Refer annex 8-Water quality analysis report
33
4. HAZARD IDENTIFICATION AND ASSESSMENT OF RISKS (MODULE 03)
A biological, chemical, physical and/or radiological agents in, or condition of water, with the
potential to cause adverse health effect is a hazard. Another word for hazard includes
“contaminants”.
Hazard identification from catchment to the consumer was done and the analysis of risk was
performed with using a semi-quantitative risk matrix. For the matrix frequency of the
identified hazard event and the severity caused by the particular hazard event were taken into
account.
4.1 Risk Assessment Methodology
Semi Quantitative Risk Matrix was developed by frequency of occurring of the particular
hazard event and the severity of the particular hazard event was measured considering the
following guideline.
Table 17: Description of Likelihood or Frequency
Risk Score Likelihood Descriptions
1 Rare Once every 5 years
2 Unlikely Once per year
3 Moderately likely Once per month
4 Likely Once per week
5 Almost certain Once per day
Table 18: Description of the Severity of the Consequences
Risk Score Severity/Consequence Descriptions
1 Insignificant No impact or not detectable
2 Minor Potentially harmful to small population
3 Moderate Potentially harmful to large population
4 Major Potentially lethal to small population
5 Catastrophic Potentially lethal to large population
Based on the frequency index and the severity index of a particular hazard event the risk score
of the event was calculated and the risk rates are as follows;
34
Table 19: Semi Quantitative Risk Matrix for Risk Assessment
Severity or ConsequenceLi
kelih
ood
or F
requ
ency
InsignificantNo impact or not
detectable(1)
MinorPotentially harmful
to small population(2)
ModeratePotentially harmful to large population (3)
MajorPotentially lethal to small population (4)
CatastrophicPotentially lethal to large population(5)
Almost certainOnce per day(5) Low (5) Moderate(10) High(15) High(20) High(25)
LikelyOnce per week(4) Low(4) Moderate (8) High(12) High(16) High (20)
ModerateOnce per month(3) Low(3) Moderate (6) Moderate (9) High(12) High(15)
UnlikelyOnce per year(2) Low (2) Low(4) Moderate (6) Moderate (8) Moderate (10)
RareOnce every five years(1) Low (1) Low (2) Low (3) Low(4) Low(5)
Risk score < 6 6 - 12 12<
Risk rating Low Moderate HighDepending on the risk rating the actions that are to be performed were categorized as follows;
35
Table 20: Prioritizing Matrix
Risk Rating Action
Low risk Manage by routine procedures, keep under review.
Moderate risk
management responsibility must be specifies
Less priority action required; or
Action required, plan and prepare.
High management attention needed
Priority action required to mitigate hazard in short term.
36
4.2 Hazards Risk Table
Table 21 Hazard / Risk Table.
(Refer for Hazard table WSP/KOTTE/OIC/03/IV)
No. Component Hazard Event Hazard Type
Like
lihoo
d
Seve
rity
Row Risk Rating
KD-01 Distribution
Contamination enters into pipe network due to frequent unidentified invisible pipe leakages& pipe burst. Thalapathpitiya Temple Rd
Physical, Chemical, Biologic
4 3 12High
KD-02 Distribution
Contamination enters into pipe network due to unhygienic repair procedure due to high ground water level. Arunodaya mw.
Physical, Chemical, Biological
5 3 15High
KD-03 Distribution
Contamination enters into pipe network due to low pressure in the system. Obeysekarapura,Arunodaya mw, U.E.Perera Mw.
Physical, Chemic al, Biological 5 3 15
High
KD-04 DistributionContamination enters in to pipe lines due to improper valve operationsduring leak repairing.
Physical, Chemical, Biological
3 2 6Moderate
KD-05 Distribution
High turbidity water stagnates in pipe network due to low flow velocity in pipe network (dead ends).Mahawatta Road,ThalapathpitiyaKanatta Road.Papiliyana Rd
Physical,Chemical,Biological
4 3 12High
KD-06 Distribution
Contamination enters into pipe network due to scaling in old Cast Iron pipes.Edirisinghe Road,Pangiriwatta Road
Physical, ChemicalBiological
3 3 9Moderate
KD-07 Distribution
Turbidity increase in the pipe system due to intermittent water supplyMoragasmulla,Rajagiriya,Nawala.15000 connection
Physical, ChemicalBiological
4 3 12High
KD-08 DistributionContamination enters in to pipe network system due to illegal tapping or unauthorized water connection.
Physical, Chemical, Biological
3 3 9Moderate
KD-09 Distribution
Sewer Contamination enters into network pipe due to close laying of sewerage lines.Mirihana Rd,Maddumagewatta,Hospital-Thalapathpitiya
Physical, Chemical, Biological
2 5 10Moderate
37
No. Component Hazard Event Hazard Type
Like
lihoo
d
Seve
rity Row
RiskRating
KD-10 Ground Reservoir
Turbidity and color increasing due to poor maintenance procedures of service reservoirs.Jubili old reservoirJubili new reservoir
Physical, Chemical, Biological
3 3 9Moderate
KD-11 Ground Reservoir
Contamination enters to the Reservoir water due to penetration of rain water & other impurities through reservoir top
Physical, Chemical, Biological
3 4 12High
KD-12 Water Tower
Contamination enters to the elevated water towers due to uncovered openings (Access by animals / birds through the unscreened vents.)
Physical, Chemical, Biological
3 3 9Moderate
KC-01 Consumer Interface
Contamination enters in to the consumer overhead tank due to vulnerable to access by birds/animals
Physical, Chemical, Biological
3 2 6Moderate
KC-02 Consumer Interface
Contamination enters to the underground sumps due to lack of maintenance, unprotected openings & poor construction (Especially small scale restaurant).
Physical, Chemical, Biological
4 3 12High
KC-03 Consumer Interface
Contamination enters into network pipe due to poor plumbing practices & materials.(not suitable for portable water)
Physical, Chemical, Biological
2 3 6Moderate
KC-04 Consumer Interface
Contamination enters in to network system due to backflow from residential commercial & industrial service lines during low pressure in the system.
Physical, Chemical, Biological
3 3 9Moderate
38
5. IDENTIFYING EXISTING CONTROLS AND REASSESS RISK WITH CONTROLS (MODULE 04)
Identified risk were reassessed with the existing control measures taken to preventing, removing, inactivating and maintaining of particular hazard event.
Table 22: Reassessment of Risk with Existing Controls
No
Proc
ess S
tep
Haza
rdou
s Eve
nt
Haza
rd T
ype
Risk if there was no controls
BASI
S (R
easo
ns fo
r Se
lecti
on o
f Li
kelih
ood
and
Cons
eque
nce
Scor
es)
Existi
ng C
ontr
ol
Mea
sure
s
If th
is co
ntro
l m
easu
re e
ffecti
ve Risk with existingControls
Impr
ovem
ent P
lan
No
Like
lihoo
d
Cons
eque
nce Ri
sk R
ating
Risk
Ban
d
Like
lihoo
d
Cons
eque
nce Ri
sk R
ating
Risk
Ban
d
KD1
Dist
ributi
on
Contamination enters into pipe network due to frequent unidentified invisible pipe leakages & pipe burst.Thalapathpitiya Temple Rd
B,C,P
4 3 12 H Consumer Complain
.Flushing the line after repairing the leak.Fixing of air Valves.Identify the leak from LD Gang &immediately repair the leak.
yes 3 3 9 M KD1/IP1
KD2
Contamination enters into pipe network due to unhygienic repair procedure due to high ground water level.Arunodaya mw.
B,C,P
5 3 15 H Consumer complain
.Dewatering the pipe trench before repair..Flushing the line.Awareness programme for accurate repair method.
Yes 3 2 6 M
KD2/IP1
KD2/IP2
KD3
Contamination enters into pipe network due to low pressure in the system.Obeysekarapura.Arunodaya mw.U.E.Perera mw.
B,C,P
5 3 15 HInformation
from the public
.Immediately attend to repair leak in low pressure area..Raising & shifting the water meters which are below the ground level.(specially toilet areas& near garbage)
Yes 4 2 8 M
KD3/IP1
KD3/IP2
39
No
Proc
ess S
tep
Haza
rdou
s Eve
nt
Haza
rd T
ype
Risk if there was no controls
BASI
S (R
easo
ns fo
r Se
lecti
on o
f Lik
elih
ood
and
Cons
eque
nce
Scor
es)
Existi
ng C
ontr
ol M
easu
res
If th
is co
ntro
l mea
sure
eff
ectiv
e
Risk with existing Controls
Impr
ovem
ent P
lan
No
Like
lihoo
d
Cons
eque
nce
Risk
Rati
ng
Risk
Ban
d
Like
lihoo
d
Cons
eque
nce
Risk
Rati
ng
Risk
Ban
d
KD4
Dist
ributi
on
Contamination enters in to pipe lines due to improper valve operations during leak repairing.
B,C,P
3 2 6 MField visit & consumer complain
.Valve operation is done according to the SOP..Awareness programme.
Yes 2 2 4 L
KD5
High turbidity water stagnates in pipe network due to low flow velocity in pipe network (dead ends).Mahawatta Road,ThalapathpitiyaKanatta Road.Papiliyana Rd
P, B 4 3 12 H
Field visit &Consumer complain
.Flushing the pipe lines according to the Preventive maintenance programme . .Fixing washout valve.
Yes 3 3 9 M
KD5/IP1
KD5/IP2
KD5/IP3
KD6
Contamination enters into pipe network due toscaling in old Cast Iron pipes.Edirisinghe Road,Pangiriwatta Road
P, C 4 3 12 H
Field visit & consumer complain
.Descaling cast iron pipe
.Flushing the pipe lines according to the Preventive maintenance programme .
Yes 3 3 9 M
KD6/IP1
KD6/IP2
KD6/IP3
No
Proc
e
Haza
rdo
us
Even
t Risk if there was no controls BA
SIS
(Rea
son
s fo
r Ex
isting
Co
ntr
ol
Mea
sur
es
If th
is Risk with existing Controls Im
pro
vem
ent
Pl
an
40
Like
lihoo
d
Cons
eque
nce
Risk
Rati
ng
Risk
Ban
d
Like
lihoo
d
Cons
eque
nce
Risk
Rati
ng
Risk
Ban
d
KD7
Dist
ributi
on Turbidity increase in the pipe system due to intermittent water supplyMoragasmulla,Rajagiriya,Nawala.15000 connection
P,C 4 3 12 HField visit & consumer complain
.Flushing the pipe lines according to the Preventive maintenance programme
Yes 3 3 9 M KD7/IP1
KD8
Contamination enters in to pipe network system due to illegal tapping or unauthorized water connection.
P,C,B 3 3 9 M
Field visit & consumer complain
.Inspection of illegal connection Yes 3 2 6 M KD8/IP1
KD9
Sewer Contamination enters into network pipe due to close laying of sewerage lines.Mirihana Rd,MaddumagewattaHospital-Thalapathpitiya
B,C,P
2 5 10 MField visit & Consumer complain
.Fix Identification tape in sewer lines..Proper planning at planning stage..When there is a leak immediately contact the relevant officer in sewerage
Yes 2 4 8 M KD9/IP1
41
No
Proc
ess S
tep
Haza
rdou
s Eve
nt
Haza
rd T
ype
Risk if there was no controls
BASI
S (R
easo
ns fo
r Sel
ectio
n of
Like
lihoo
d an
d Co
nseq
uenc
e Sc
ores
)
Existi
ng C
ontr
ol M
easu
res
If th
is co
ntro
l mea
sure
eff
ectiv
e
Risk with existing Controls
Impr
ovem
ent P
lan
No
Like
lihoo
d
Cons
eque
nce
Risk
Rati
ng
Risk
Ban
d
Like
lihoo
d
Cons
eque
nce
Risk
Rati
ng
Risk
Ban
d
KD10
Rese
rvoi
r
Turbidity and color increasing due to poor maintenance procedures of service reservoirsJubili old reservoirJubili new reservoir
PC, B 3 3 9 M
.Consumer complain.O&M Report
.Clean the reservoir once in two years Yes 2 3 6 M KD10/IP1
KD11
Contamination enters to the Reservoir water due to penetration of rain water & other impurities through reservoir top
P,C, B 3 4 12 H .O&M Report
.Clean the debris at top of the reservoir. Yes 3 3 9 M KD11/IP1
KD12
Tow
er
Contamination enters to the elevated water towers due to uncovered openings (Access by animals / birds through the unscreened vents.)
P,C,B 3 3 9 M
.Consumer complain
.O&M Report
.Covered the openings by screen mesh Yes 1 1 1 L
No
Proc
e
Haza
rdo
us
Even
t
Haza
rd Risk if there was no
controls BASI
S (R
eas
ons
Existi
ng
Cont
rol
M
eas
ures
If th
is co
ntr Risk with existing
Controls Impr
ovem en
t
42
ss S
tep
Type
for S
elec
tion
of Li
kelih
ood
and
Cons
eque
nc
ol m
easu
re
effec
tive
Plan
No
Like
lihoo
d
Cons
eque
nce Ri
sk R
ating
Risk
Ban
d
Like
lihoo
d
Cons
eque
nce Ri
sk R
ating
Risk
Ban
d
KC-1
Cons
umer
inte
rfac
eContamination enters in to the consumer overhead tank due to vulnerable to access by birds/animals
P,B,C 3 2 6 M Consumer complain Consumer awareness No 3 2 6 M
KC/IP1KC/IP2KC/IP3
KC-2
Contamination enters to the underground sumps due to lack of maintenance,unprotected openings & poor construction (Especially small scale restaurant).
P,C,B 4 3 12 H Consumer complain
Consumer awareness Yes 3 2 6 MKC/IP1KC/IP2KC/IP3
KC-3
Contamination enters into network pipe due to poor plumbing practices & materials.(not suitable for portable water)
P,C,B 2 3 6 M Consumer complain Consumer awareness No 2 3 6 M
KC/IP1KC/IP2KC/IP3
KC-4
Contamination enters in to network system due to backflow from residential commercial & industrial service lines during low pressure in the system.
C 3 3 9 M Consumer complain
.Replacing the water meter with non-return valve.Instructions given for fixing non return valve
Yes 3 2 6 M KC4/IP1
43
5.1 Risk prioritizing table
5.1.1 Distribution System
Table 23: Risk prioritizing table-Distribution system
No Hazardous Event
Risk Assessment
before control
measure
Control Measures
Risk Assessment
After control
measures
KD-5
High turbidity water stagnates in pipe network due to low flow velocity in pipe network (dead ends).Mahawatta Road,ThalapathpitiyaKanatta Road.Papiliyana Rd
12
.Flushing the pipe lines according to the Preventive maintenance programme . .Fixing washout valve.
9
KD-6
Contamination enters into pipe network due to scaling in old Cast Iron pipes.Edirisinghe Road,Pangiriwatta Road
12
.Descaling cast iron pipe
.Flushing the pipe lines according to the Preventive maintenance programme .
9
KD-1
Contamination enters into pipe network due to frequent unidentified invisible pipe leakages & pipe burst. Thalapathpitiya Temple Rd
12
.Flushing the line after repairing the leak.Fixing of air Valves.Identify the leak fromLD Gang &immediately repair the leak.
9
KD-11 Contamination enters to the Reservoir water due to penetration of rain water & other impurities through reservoir top
12 .Clean the debris at top of the reservoir. 9
KD-7
Turbidity increase in the pipe system due to intermittent water supplyMoragasmulla,Rajagiriya,Nawala.15000 connection
12 .Flushing the pipe lines according to the Preventive maintenance programme
9
KD-3
Contamination enters into pipe network due to low pressure in the system. Obeysekarapura.Arunodaya mw,U.E. Perera mw.
15
.Immediately attend to repair leak in low pressure area..Raising & shifting the water meters which are below the ground level.(specially toilet areas & near garbage)
8
44
No Hazardous Event
Risk Assessmen
tbefore control
measure
Control Measures
Risk Assessmen
tAfter
control measures
KD-9
Sewer Contamination enters into network pipe due to close laying of sewerage lines.Mirihana Rd,MaddumagewattaHospital-Thalapathpitiya
10
.Fix Identification tape in sewer lines.
.Proper planning at planning stage.
.When there is a leak immediately contact the relevant officer in sewerage
8
KD-2Contamination enters into pipe network due to unhygienic repair procedure due to high ground water level. Arunodaya mw.
15
.Dewatering the pipe trench before repair..Flushing the line.Awareness programmefor accurate repair method.
6
KD-10
Turbidity and color increasing due to poor maintenance procedures of service reservoirsJubili old reservoirJubili new reservoir
9 .Clean the reservoir once in two years 6
KD-8Contamination enters in to pipe network system due to illegal tapping or unauthorized water connection.
9 .Inspection of illegal connection 6
KD-4Contamination enters in to pipe lines due to improper valve operations during leak repairing.
6
.Flushing the pipe lines according to the Preventive maintenance programme . .Awareness programme.
4
KD-12
Contamination enters to the elevated water towers due to uncovered openings (Access by animals / birds through the unscreened vents.)
9 .Covered the openings by screen mesh 1
.
45
5.1.2 Consumer Interface
Table 24: Risk prioritizing table- Consumer interface
No Hazardous Event
Risk Assessme
ntbefore control
measure
Control Measures
Risk AssessmentAfter
control measure
2
Contamination enters to the underground sumps due to lack of maintenance, unprotected openings & poor construction (Especially small scale restaurant).
12 Consumer awareness 6
4
Contamination enters in to network system due to backflow from residential commercial & industrial service lines during low pressure in the system.
9.Replacing the water meter with non-return valve.Instructions given for fixing non return valve
6
1Contamination enters in to the consumer overhead tank due to vulnerable to access by birds/animals
6Consumer awareness 6
3
Contamination enters into network pipe due to poor plumbing practices & materials.(not suitable for portable water)
6Consumer awareness 6
6.
46
7. IDENTIFY AND DEVELOP IMPROVEMENT PLAN (MODULE 05)
An improvement plan was developed for the hazard events which does not indicate the green light in the reassessment stage. An improvement plan
were carried out for each of the significant risks with effective or not controls identified in the reassessment of risk recognizing that other less
significant risk can controlled by these improvement measures. Improvement plans can include short, medium or long term programs. These plans
should be monitored to be improved have been made and that WSP has been updated accordingly .(Refer for improvement Plan
WSP/KOTTE/OIC/06)
Table 25: Improvements to the Kotte WSP
Proc
ess S
tep
Hazard EventsImproveme
nt Plan NoImprovement Plan
Responsibi
lityTime frame
Progra
mme
for
Status of
progress
Sourc
e of
Fund
ed
Indicative
Cost
Dist
ributi
on S
yste
m
Contamination enters into pipe network due to frequent unidentified invisible pipe leakages & pipe burst.Thalapathpitiya Temple Rd
KD1/IP1 Proposed new pipe
replacement at Thalapathpitiya Temple rd.
Manager AE
2019- Mar-
2020-DecMediu
m term
Preparation of estimate
RH–
201958million
Contamination enters into pipe network due to unhygienic repair procedure due to high ground water level.Arunodaya mw.
KD2/IP1 Fixing of 2” washout valve &
Sluice valve at Arunodaya mw.
AE OIC
2019-Apr Short term
Completed O&M 0.1 million
KD2/IP2 Training programme Manager2019 Jan-
DecLong term
On going O&M 0.05 million
47
Proc
ess S
tep
Hazard Events
Improvem
ent Plan
No
Improvement PlanRespon
sibility
Time
frame
Program
me for
Status of
progress
Sourc
e of
Fund
ed
Indicati
ve CostDi
strib
ution
Sys
tem
Contamination enters into pipe network due to low pressure in the system.Obeysekarapura.Arunodaya mw.U.E.Perera mw.
KD3/IP1 Pressure improvement by line
enlargement(110dia.410m PVC pipe laying)Arunodaya Mw.
AE OIC
2018 Sept Medium
termCompleted RH 2
million
KD3/IP2 Proposed new pipe laying by Jubilee system improvement project(ADB) DGM 2018-
2020 Long term
Ongoing ADBDollar million 53
KD3/IP3 Pressure improvement by line
enlargement(110dia.620m PVC pipe laying)UE Perera Mw.
AE OIC
2019 Feb-May Medium
termCompleted O&M 4.7
million
High turbidity water stagnates in pipe network due to low flow velocity in pipe network (dead ends).Mahawatta Road,Thalapathpitiya Kanatta Road.Papiliyana Rd
KD5/IP1 Fixing 2” Washout valve at Mahawatta road.
AE OIC
2018 Mar
Short term Completed O&M 0.1
million
KD5/IP2 Fixing 3” Washout valve at Thalapathpitiya Kanatta Road.
AE OIC
2019 Apr Short term Completed O&M 0.12
million
KD5/IP3 Fixing 4” Washout valve at Papiliyanard
AE OIC 2019 Apr Short
term Completed O & M
0.13million
Contamination enters into pipe network due to scaling in old Cast Iron pipes.Edirisinghe Road,Pangiriwatta Road
KD6/IP1 100m new 110dia.PVC pipe laying Pangiriwatta road
Manager
AE Kotte
2018- Dec
Medium term Completed O&M 0.8
million
KD6/IP2 960m new 160Dia.PVC pipe laying Edirisinghe Road
Manager
AE Kotte
2019- feb-2020-Dec
Medium term On going RH 7.4
million
48
Proc
ess S
tep
Hazard Events
Impr
ovem
ent
Plan
No
Improvement PlanResponsibi
lity
Time
Frame
Program
me for
Status of
progress
Sour
ce of
Fund
ed
Indicative
CostDi
strib
ution
Turbidity increase in the pipe system due to intermittent water supplyMoragasmulla,Rajagiriya,Nawala.15000 connection
KD7/IP1 Proposed new pipe laying by
Jubilee system improvement project
DGM2019-
2021Long term On going ADB
Dollar
million 53
Contamination enters in to pipe network system due to illegal tapping or unauthorized water connection.
KD8/IP1 Periodically checking &
implement a programme for remove illegal connection
AE2019
Jan-Dec
Short
termOn going
Done by NRW
project
Sewer Contamination enters into network pipe due to close laying of sewerage lines.Mirihana Rd,MaddumagewattaHospital-Thalapathpitiya
KD9/IP1 Proposed new blue colour
HDPE pipe laying by Jubilee system improvement Project.
DGM2019-
2021
Long
term On going ADB
Dollar
million 53
Rese
rvoi
r
Turbidity and color increasing due to poor maintenance procedures of service reservoirsJubili old reservoirJubili new reservoir
KD10/IP1 Turbidity removal of reservoir OIC2019
May
Short
term
To be
commencedO&M 15,000
Contamination enters to the Reservoir water due to penetration of rain water & other impurities through reservoir top
KD11/IP1 Cover the holes with suitable material
AE 2019 FebShort
termOn going O&M 15000
49
Proc
ess S
tep
Hazard Events
Impr
ovem
ent
Pla
n N
o
Improvement PlanResponsibi
lity
Time
FrameProgramm
e for
Status of
progress
Sourc
e of
Fund
ed
Indica
tive
CostCo
nsum
er in
terf
ace
Contamination enters in to the consumer overhead tank due to vulnerable to access by birds/animals
Contamination enters to the underground sumps due to lack of maintenance, unprotected openings & poor construction (Especially small scale restaurant).
Contamination enters into network pipe due to poor plumbing practices & materials.(not suitable for portable water)
KC/IP1 Consumer awareness programme, meeting.
Manager AE
2019
Feb,DecShort term Ongoing O&M 150000
KC/IP2 Announcement
programme Manager AE
2019
Feb,Dec Short term Ongoing O&M 15000
KC/IP3 Publishing Posters,
Banners, & leaflet. Manager AE
2019
Feb,DecShort term Ongoing O&M 100000
Contamination enters in to network system due to backflow from residential commercial & industrial service lines during low pressure in the system.
KC4/IP1 Meter rectification programme
AE2019
Jan-DecShort term Ongoing O&M 50000
The improvement plan is prioritized based on the level of risk of each hazard event after reassessing the risks, as high, medium and low prioritized
improvement activities.
50
8. OPERATION MONITORING AND CORRECTIVE ACTIONS (MODULE 06)
Hazard events which is controlled by an existing control measures are taken into consideration while developing the operation monitoring programme. The
objective of this operation monitoring and corrective action programme is to dedicate the responsibility of the monitoring of the existing controls, define
alert and critical limits of operational limits and describe the corrective action in a simple way.
Table 26: Operation Monitoring and Corrective Actions
No Hazardous event Control Measure
Operational limits Operational Monitoring of the control measure Corrective Action if the operational limits are
exceeded
Target
Critical
What will be
monitored?
How will it be monitored?
Where will it be
monitored?
Who will be monito
red?
When is it monitored?
What action is to be taken?
Who take the
action?
Who needs to be
informed?
KD-01
Contamination enters into pipe network due to frequent unidentified invisible pipe leakages & pipe burst.Thalapathpitiya temple rd
.Flushing the line after repairing the leak.Fixing of air Valves.Identify the leak from LD Gang &immediately repair the leak.
0.2 0.1 RCL Test Kit End of distribution Dead ends
Zone officer weekly
.Flushing the line
.Bowser supply
.Immediate action taken to repair the leak
Zone officer
AE
Colour Visible inspection
KD-02
Contamination enters into pipe network due to unhygienic repair procedure due to high ground water level.Arunodaya mw.
.Dewatering the pipe trench before repair..Flushing the line.Awareness programme for accurate repair method.
0.2 0.1 RCL Test Kit Around the leak location
Zone officer
Occasionally .Flushing the line Zone officer
AE
Colour Visible inspection
Weekly
.Collect the water sample & check Chemist
0 1 Per100ml
E-ColiColiform
Micro Biological test
End of the distribution
Chemist Incidentally
KD-03
Contamination enters into pipe network due to unhygienic repair procedure due to high ground water level.Arunodaya mw.ObeysekarapuraU.E.Perera mw.
.Immediately attend to repair leak in low pressure area..Raising or shifting the water meters which are below the ground level.(specially toilet areas& near garbage)
0.2 0.1 RCL Test Kit
End of distribution Dead ends
Zone officer Weekly .Flushing the line
.Bowser supply
.Immediate action taken to repair the leak.Replace the water meter at Toilet area
Zone officer
AEColour Visible
inspection
Chemist
Occasionally Chemist AE0
1 Per100m
E-ColiColiform
Micro Biological test
No Hazardous event Control Measure Operational limits Operational Monitoring of the control measure Corrective Action if the operational limits are
exceeded
51
Target
Critical
What will be
monitored?
How will it be
monitored?
Where will it be monitored?
Who will be monito
red?
When is it monitored
?
What action is to be taken?
Who take the
action?
Who needs to be
informed?
KD-04
Contamination enters in to pipe lines due to improper valve operations during leak repairing.
.Valve operation is done according to the SOP..Awareness programme.
0.2 0.1 RCL Test Kit Around the leak location
Zone officer
Occasionally
.Flushing the line Zone officer AE
Weekly
KD-05
High turbidity water stagnates in pipe network due to low flow velocity in pipe network (dead ends).Mahawatta Road,ThalapathpitiyaKanatta Road.Papiliyana rd
.Flushing the pipe lines according to the Preventive maintenance programme . .Fixing washout valve.
0.2 0.1 RCL Test Kit End of distribution Dead ends
Zone officer
WeeklyComplain location .Flushing the pipe
lines.Fixing washout valve.
Zone officer AETurbidity Turbidity
meterEnd of distribution Dead ends
Chemist
Occasionally
01 Per100ml
E-ColiColiform
Micro Biological test
KD-06
Contamination enters into pipe network due to scaling in old Cast Iron pipes.Edirisinghe Road,Pangiriwatta Road
.Descaling cast iron pipe
.Flushing the pipe lines according to the Preventive maintenance programme .
0.2 0.1 RCL Test Kit
End of distribution of Cast iron lines
Zone officer weekly
.Descaling cast iron pipe.Flushing the pipe lines
Zone officer AE
6.5-8.5
6.5>8.5< PH PH meter Chemis
tOccasionally
KD-07
Turbidity increase in the pipe system due to intermittent water supplyMoragasmulla,Rajagiriya,Nawala.15000 connection
.Flushing the pipe lines according to the Preventive maintenance programme
0.2 0.1 RCL Test Kit
Complain location
Zone officer
Occasionally
Flushing the line Zone officer AE
Sample locations
Zone officer Weekly
No Hazardous event Control Measure Operational limits
Operational Monitoring of the control measure Corrective Action if the operational limits are exceeded
52
Target Critical What will be
monitored?
How will it be
monitored?
Where will it be
monitored?
Who will be
monitored?
When is it monitored?
What action is to be taken?
Who take the action?
Who needs to
be informed?
KD-08
Contamination enters in to pipe network system due to illegal tapping or unauthorized water connection.
.Inspection of illegal connection 0.2 0.1 RCL Test Kit
At illegal connection
NRW Periodically
Inspection & Detect the illegal connection.D\C the illegal connection & line flush.
Zone officer AE
KD-09
Sewer Contamination enters into network pipe due to close laying of sewerage lines.Mirihana Rd,MaddumagewattaHospital-Thalapathpitiya
.Fix Identification tape in sewer lines..Proper planning at planning stage..When there is a leak immediately contact the relevant officer in sewerage
0.2 0.1 RCL Test KitAt the leak location
Zone officer
Occasionally Immediately repair the leak & Flush the line
Zone officer AE
0 1 Per100ml
E-ColiColiform
Micro Biological test
Chemist
KD-10
Turbidity and color increasing due to poor maintenance procedures of service reservoirsJubili old reservoirJubili new reservoir
.Clean the reservoir once in two years
0.4 0.3 RCL Test Kit
At reservoir
Zone officer
DailyOccasionally
Clean the ground reservoir
Zone officer AETurbidity Turbidity
meterChemist Occasionally
0 1 Per100ml
E-ColiColiform
Micro Biological test
KD-11
Contamination enters to the Reservoir water due to penetration of rain water & other impurities through reservoir top
.Clean the debris at top of the reservoir
Is there any debris on reservoir top
Visual inspection
At reservoir
Pump Operator Monthly Clean the surface
Pump operatorLabour
OIC
KD-12Contamination enters to the elevated water towers due to uncovered openings
.Covered the openings by screen mesh
Availability of openings
Visual inspection
Inside the towers
Zone officer
Once in three months
Covered the openings Zone officer OIC
53
No Hazardous event Control Measure
Operational limits Operational Monitoring of the control measure Corrective Action if the operational limits are
exceeded
Target Critical What will be monitored?
How will it be
monitored?
Where will it be
monitored?
Who will be
monitored?
When is it monitored?
What action is to be taken?
Who take the action?
Who needs to
be informed?
KC-01
Contamination enters in to the consumer overhead tank due to vulnerable to access by birds/animals
Consumer awareness 0.2 0.1 RCL Test Kit Consumer
Tap
Zone officer
WeeklyOccasionally
.Instructions given to consumer to cover the overhead tanks.Temporally Supply water by using bourses
Zone officer AE
Chemist
KC-02
Contamination enters to the underground sumps due to lack of maintenance, unprotected openings & poor Construction (Especially small scale restaurant).
Consumer awareness 0.2 0.1 RCL Test Kit Consumer
Tap
Zone officer
WeeklyOccasionally
.Instructions given to consumer clean the sump and overhead tanks.Temporally Supply water by using bourses
Zone officer AE
Chemist
KC-03
Contamination enters into network pipe due to poor plumbing practices & materials.(not suitable for portable water)
Consumer awareness 0.2 0.1 RCL Test Kit Consumer
Tap
Zone officer
Weekly Occasionally
.Instructions given to consumer to improve internal pipe system
Zone officer AE
Chemist
KC-04
Contamination enters in to network system due to backflow from residential commercial & industrial service lines during low pressure in the system.
.Replacing the water meter with non-return valve.Instructions given for fixing non return valve
0.2 0.1 RCL Test Kit Consumer Tap
Zone officer
Weekly Occasionally
. Instructions given to consumer tofix non return valve.Open the washouts.Flush the pipe lines.Temporally Supply water by using bourses
Zone officer
OIC
Chemist
54
9. VERIFICATION PROCEDURE (MODULE 07)
The objective of developing a verification procedure is to build a body of evidence that the produced water by the Kotte WSS is compliance with SLS standard, to confirm whether the WSP is being implementing as suggested and to confirm the appropriateness of adopted operational limits.
There are three key features of the verification procedure as follows;
1. Compliance monitoring- confirmation of compliance with water quality targets
2. Internal and external auditing of operational activities it can have both an assessment and compliance checking role. The frequency audit depends on the level of confidence required by the water utility and the regulatory body.
3. Consumer satisfaction includes checking that consumers are satisfied with the water supplied
55
9.1 Compliance monitoring
Table 27: Verification –Compliance monitoring
Process Step Operational Monitoring Verification Monitoring Quality
ReportsWhat When Who What When Who
Distribution
Network
RCL
Weekly Zone Officer
Chemical
Parameters
RCL Weekly Senior Chemist
(W/C)
WSP/KOTTE/
OIC/05/I
Randomly Zone OfficerOther
chemicalMonthly
Special Cases Chemist (W/C)
Color Weekly Zone OfficerPhysical
Parameters
Colour
Weekly
Senior Chemist
(W/C)PH
TurbiditySpecial Cases Chemist (W/C)
Turbidity
PH
E-ColiSpecial Cases Chemist (W/C)
Bacteriological
Parameters
E-Coli
Coli formsWeekly
Senior Chemist
(W/C)Coli forms
Ground Reservoir
& Over Head Tank
RCL Daily Pump operatorChemical
Physical
Bacteriological Parameters
Monthly
Senior Chemist
(W/C)Turbidity
Occasionally Chemist (C/C)E-Coli
Coli forms
Consumer's
Premises
RCL
Randomly &
When ComplainedZone Officer
Chemical
Physical
Bacteriological Parameters
Monthly
Senior Chemist
(W/C)Color
Odor
56
9.2 Consumer Satisfaction
It is important that consumers are using the safe, managed water supply rather than less safe alternatives. Verification includes consumers are
satisfied with the water supplied.
Table 28 : Verification – Consumer satisfaction
Process
Step
Operational Monitoring Verification Monitoring Records
What When Who What When Who
WSP/KOTTE/OIC/05Dist
ributi
on N
etw
ork
Complains DailyZone
Officer
Chemical Parameters Monthly Chemist
Physical Parameters
Weekly Chemist
Bacteriological Parameters
Cons
umer
's
Prem
ises
Complains DailyZone
Officer
Chemical, Physical and
Bacteriological
Parameters
Monthly Chemist
57
10. MANAGEMENT PROCEDURES(MODULE 08)
Management procedures are clear documentation of operational procedures for action to be taken
when the system is operating under normal conditions, and incident situations. The procedures
should be written by experienced staff and should be updated as necessary, particularly in light of
implementation of the improvement / upgrade plan, review of incidents, emergencies and near
misses. It also includes documentation of the system assessment, monitoring and communication
plans and supporting programs.
Management Procedures are discussed basically under five (5) event categories as shown in table.
Table 29: Management Procedures
No. Event Management Procedure Reference
1 NormalOperational Activities Standard Operation Procedure WSP/KOTTE/OIC/07
2 Regular Maintenance Preventive Maintenance Schedule WSP/KOTTE/OIC/PMP
3 Break Downs Operation & Maintenance Manual WSP/KOTTE/OIC/07
4 Incidents Incident Review Plan WSP/KOTTE/OIC/ERP
5 Emergencies Emergency Response Plan WSP/KOTTE/OIC/ERP
6 Health & safety Occupational Health & Safety Plan WSP/KOTTE/OIC/10
Item Frequency
time
Responsible officer Monitoring
Office
1 Ground reservoir
a. Inspect inside the manhole cover Daily Caretaker/Labour OIC
b. Overall cleaning Once in 2
year
OIC/Caretaker/Labour AE
c. Preventive maintenance for valves 6 months Caretaker/Labour OIC
d. Security checking –Fencing & Gates Daily Caretaker/Labour OIC
e. Checking Manhole covers and
ladders- lock & key
Daily Caretaker/Labour OIC
f. Checking Ventilation – cover with
mesh
Daily Caretaker/Labour OIC
g. Cleaning of site Monthly Caretaker/Labour OIC
58
Item Frequency
time
Responsible officer Monitoring
Office
2. Tower
a. Inspect inside and man hole cover Daily Caretaker/Labour OIC
b. Overall Cleaning Once in 2
year
OIC/Labour AE
c. Preventive maintenance for valve 6 months Zone officer OIC
d. Security checking –Fencing and Gates Daily Caretaker/Labour OIC
e. Checking Manhole covers and
ladders- lock & key
Daily Caretaker/Labour OIC
f. Checking Ventilation – cover with
mesh
Daily Caretaker/Labour OIC
g. Cleaning of site Monthly Caretaker/Labour OIC
3. Pipe line distribution System
a. Preventive maintenance for valves
and manhole
6 months Zone Officer AE
b. Thoroughly follow the procedure at
road crossing
Continuous Zone Officer AE
c. Sample collection and analysis up to
the SLS 614;2 guide line
Monthly Chemist AE
D Flush out the line after attending any
repairs
As
required
Zone Officer AE
4. Check & evaluation of Distribution
performance
a. Water quality checking in end point Weekly Zone Officer Chemist
i. Taking corrective action to reduction
of UFW & pollution
Continuous Zone Officer AE
5. System cleaning
a. Drain /Disinfection As per the
programm
e
Zone Officer AE
59
11. SUPPORTING PROGRAMME(MODULE 09)
Operations that are essential for proper operation of control measures and still perform as indirect
support to the water safety are identified in the supporting programme.
Table 30: Supporting Programme
No Activity Purpose Examples Reference01 Training &
awareness programs for WSP
To aware activities of water safety plan for staff, stakeholders and customers.
Awareness programme for customers1.Anousement2.SMS3.Leaflet
Awareness programme for staff members.
WSP/KOTTE/OIC/09
02 Documentation of standard operation procedures, standard preventive & corrective maintenance procedures time schedule.
Upgrade efficiencies and quality of leak repair and preventive maintenance duties
SOP manual Preventive
maintenance & corrective & maintenance manual.
WSP/KOTTE/OIC/07 WSP/KOTTE/OIC/PMP
03 Installing laboratory facility to regional support center.
To upgrade water testing facility.
Upgrade testing facility for the Kotte region
04 Customer complainProtocol
To get consumer feedback to improve water quality.
Complain recording, reporting and analysis
Call center module
60
12. REVIEW OF WSP (MODULE 10)
Review of each component of WSP and itself is discussed under this chapter.
Table 31: Review Schedule
No Activity Table no Relevant file Responsibility How Often?
1 Contact detail update Table 01 WSP/KOTTE/OIC/02 Ms.D.R.Thisera Monthly
2 Stakeholder list update Table 02 WSP/KOTTE/OIC/03/II Ms.D.R.Thisera Semi-annually
3 Supporting team Table 03 WSP/KOTTE/OIC/03/III Ms.D.R.Thisera Semi-annually
4 Distribution map update Kotte GIS Map MS.H.T.N. Jayawardana Monthly
5 Hazard table update Table 21 WSP/KOTTE/OIC/03/IV Mr.D.S.R. Colambaarachchi Semi-annually
6 Control measure update Table 22 WSP/KOTTE/OIC/03/v Mr.D.S.R. Colambaarachchi Semi-annually
7 Improvement plan update Table 25 WSP/KOTTE/OIC/06 Ms. R.S. Kannangara Annually
8 Prioritizing risk update Table 23, 24 WSP/KOTTE/OIC/03/VI Mr.D.S.R. Colambaarachchi Annually
9 Operation monitoring update Table 26 WSP/KOTTE/OIC/03/VII Mr.K.C. Jayawardana. Annually
10 Corrective action plan update Table 26 WSP/KOTTE/OIC/03/VII Mr.K.C. Jayawardana. Annually
11 Verification procedure update Table 27,28 WSP/KOTTE/OIC/05 Mr.T.K.Pathirana Annually
No Activity Table no Relevant file Responsibility How Often?
61
12 Management procedure update Table 29 Area Engineer(Mr. D.A.D.U.Nishantha) Annually
13 Standard operation procedure update WSP/KOTTE/OIC/07 Ms. R.S. Kannangara Annually
14 Preventive maintenance Programme PMP WSP/KOTTE/OIC/PMP OIC(Mr.D.P. Zoyza) Annually
15 Operation & maintenance manual WSP/KOTTE/OIC/07 Ms. R.S. Kannangara Annually
16 Emergency response plan update ERP WSP/KOTTE/OIC/ERP Mr.T.K.Pathirana.
Mr.M.Y.Dammika Annually
17 Supporting program update Table 30 WSP/KOTTE/OIC/09 Area Engineer(Mr. D.A.D.U.Nishantha) Annually
18 WSP document update Ms.B.A.PathirathnaMr.M.Y.Dammika Annually
62
Table 32 : WSP auditing arrangement
Description Schedule date Held on Remarks Reference
Internal informal audit 30 Aug 2018 30 Aug 2018 Conducted by
WSP advisory
unit Peradeniya
WSP/KOTTE/OIC/11
Internal formal audit Apr 2019
External audit Oct 2019
WSP initial report has been completed in August 2018. WSP 1st revision2018 December
63
13. INCIDENT RESPONSE PLAN (MODULE 11)
Incident response is planned in pre-incident stage. Once the incident occurs, emergency response
plan is implemented followed by the recovery activities. It is assumed that after the recovery, again
the cycle return to pre-incident stage and the emergency action plan to be updated using the lessons
learned, i.e. the tacit knowledge turn into the documented knowledge.
Pre-incident planning plays a vital part of emergency response. Emergency response plan is
separately developed and discussed under management procedure in this report. Planning cycle is
described in
Figure 17: Planning Cycle
And once the incident occur incident response can be attended through six main phases as follows;
1. Preparation (described in Figure 4: Planning Cycle)
2. Identification
a. How to note the incident?
b. What tools to be used?
c. Communication Process
3. Classification (what kind of incident?)
64
4. Trace back
a. From where the incident is coming?
b. Where and how it is affecting the existing system?
c. What are the consequences?
5. Reaction
a. Is emergency response plan address the incident?
b. If ”no”, how communicate?
c. What options in the emergency response plan?
d. Which option is the best?
e. Communication Process
6. Post Mortem
a. What was done?
b. What would be preventive measures?
c. How to control?
Eg – Polduwa incident review report
(Polduwa incident review report Refer for Emergency Response Plan
WSP/KOTTE/OIC/ERP)
65
14. ACHIEVEMENTS
14.1 Rajagiriya Bridge Crossing
Figure 18: Before & after WSP at Rajagriya bridge crossing
Before WSP After WSP
66
14.2 Yakbedda Bridge Crossing Rajagiriya & Kolonnawa Ends
Figure 19: Before & after WSP Yakbadda Bridge crossing Rajagiriya end
Before WSP After WSP
Figure 20: Before & after WSP Yakbaddabridge crossing Kolonnawa end
Before WSPAfter
WSP
67
Figure 21: Before & after WSP consumer meter location
Before WSP After WSP
Figure 22 : Stakeholder meeting
68
69