Regional perspectives of the Romanian-Hungarian interconnector Three seas initiative 06/06/2019 Szabolcs I. Ferencz

Upload: others

Post on 19-Jul-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Regional perspectives of the Romanian-Hungarian interconnector · ROHU phase I: •0.75 bcma capacity from 2019.10.01. •1.75 bcma capacity from the beginning of 2020 ROHU phase

Regional perspectives of the

Romanian-Hungarian interconnector

Three seas initiative

06/06/2019

Szabolcs I. Ferencz

Page 2: Regional perspectives of the Romanian-Hungarian interconnector · ROHU phase I: •0.75 bcma capacity from 2019.10.01. •1.75 bcma capacity from the beginning of 2020 ROHU phase

5800 km pipeline The current network

Page 3: Regional perspectives of the Romanian-Hungarian interconnector · ROHU phase I: •0.75 bcma capacity from 2019.10.01. •1.75 bcma capacity from the beginning of 2020 ROHU phase

ROHU phase I:

• 0.75 bcma capacity from 2019.10.01.

• 1.75 bcma capacity from the beginning of 2020

ROHU phase II:

• Open Season deadline prolonged until 2019.10.01.

• 4.4 bcm from 2022.10.01.

Page 4: Regional perspectives of the Romanian-Hungarian interconnector · ROHU phase I: •0.75 bcma capacity from 2019.10.01. •1.75 bcma capacity from the beginning of 2020 ROHU phase
Page 5: Regional perspectives of the Romanian-Hungarian interconnector · ROHU phase I: •0.75 bcma capacity from 2019.10.01. •1.75 bcma capacity from the beginning of 2020 ROHU phase
Page 6: Regional perspectives of the Romanian-Hungarian interconnector · ROHU phase I: •0.75 bcma capacity from 2019.10.01. •1.75 bcma capacity from the beginning of 2020 ROHU phase
Page 7: Regional perspectives of the Romanian-Hungarian interconnector · ROHU phase I: •0.75 bcma capacity from 2019.10.01. •1.75 bcma capacity from the beginning of 2020 ROHU phase

Świnoujście LNG terminal

Black Sea gas project KRK LNG terminal

Page 8: Regional perspectives of the Romanian-Hungarian interconnector · ROHU phase I: •0.75 bcma capacity from 2019.10.01. •1.75 bcma capacity from the beginning of 2020 ROHU phase

Świnoujście LNG terminal

Black Sea gas project KRK LNG terminal

Page 9: Regional perspectives of the Romanian-Hungarian interconnector · ROHU phase I: •0.75 bcma capacity from 2019.10.01. •1.75 bcma capacity from the beginning of 2020 ROHU phase

Świnoujście LNG terminal

Black Sea gas project KRK LNG terminal

Page 10: Regional perspectives of the Romanian-Hungarian interconnector · ROHU phase I: •0.75 bcma capacity from 2019.10.01. •1.75 bcma capacity from the beginning of 2020 ROHU phase

fgsz.hu

What do we need?

Three Seas & new sources!

Thank you for your attention!