No. Company Name and Address Project Name Date Approved
1 Mr. Francis S. Medina 7F Columbia Tower, Ortigs Ave., Mandaluyong City
Proposed 7-Eleven Foodstore-Fitout Emerald Ave., Ortigas Center, Pasig City
2/12/2018
2 Mr. Alfonso O. Purugganan #14 Montemayor St., San Francisco, Del Monte, Quezon City
Renovation of Easy Tiger (SM PODIUM) ADB Ave. cor J. Vargas Ave., Pasig City
2/12/2018
3 Ma. Cecilia Formoso 25 Jose A. Santos St., Ayala Heights Village, Quezon City
Proposed Warehouse Located at F. Pasco Ave. Santolan, Pasig 45 F. Pasco Ave., Santolan, Pasig City
2/21/2018
4 Mr. Edwin S.P. Manahan 112 Gen. Luna ST., Guitnang Bayan I, San Mateo, Rizal
2-Storey Residential Block 1 Lot 1 Brazil St., LGV, Brgy. Malanday, Marikina City
2/5/2018
5 Ms. Erlinda S. Morales L27 B2 Ephesians St., Oro Vista Subd., Concepcion Uno, Marikina City
Construction of Concrete Fence Firewall For Morales Residence L27 B2 Ephesians St., Oro Vista Subd., Concepcion Uno, Marikina City
2/8/2018
6 Mr. Robert N. De Guzman 33-B Pres. Marcos St., Industrial Valley Complex, Marikina City
Proposed Two Unit 2-Storey Residential Apartment Lot 15-B, Pres. Marcos St., Industrial Valley Complex, Marikina City
2/12/2018
7 Ms. Jinkeyleen D. Lim #2 Opal St., Concepcion Subd., Concepcion I, Marikina City
Proposed Renovation and Additional 2nd Floor Duplex Lot 10-B-2-B Garnet St., Concepcion I, Marikina City
2/13/2018
8 Mr. & Mrs. Arnel Laurente Fernando St., Barangka, Marikina City
Proposed Renovation and Additional Structure on 2 Storey Residential Unit Fernando St., Barangka, Marikina City
2/14/2018
9 Ms. Robina Sakurai Lot 45, Lot 6, M. Gonzales St.,Barangka, Marikina City
Proposed One Storey Residence Lot 45, Lot 6, M. Gonzales St.,Barangka, Marikina City
2/14/2018
10 Mr. Jose Rhonel Eusebio Champaca St., Marikina Heights, Marikina Ccity
Proposed Daniel's Coffee Shop Champaca St., Marikina Heights, Marikina City
2/28/2018
11 Mr. Jose Mijares, Jr. # 24 Apitong St., Marikina Heights, Marikina City
Two (2) Storey Units with Roofdeck Residential Bldg. # 24 Apitong St., Marikina Heights, Marikina City
2/28/2018
12 Ms. Lotus Mae R. Dulla 12 Del carmen St., Sta. Teresita Village, Malanday, Marikina City
Proposed Softlink Trading and Construction Office Dela Paz Street, Centro Buenviaje, Sto. Niño, Marikina City
2/19/2018
13 Mr. Cipriano P Balbuena Unit 4108-4111 E COM Bldg., River Bank Center, A. Bonifacio
Giligan's Restaurant Unit 4108-4111 E COM Bldg., River Bank Center, A. Bonifacio
2/26/2018
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-National Capital Region February 2018
Page 2 of 80
No. Company Name and Address Project Name Date Approved
Ave., Marikina City Ave., Marikina City
14 Ms. Lina M. Laguisma / 530 Gen. Ordoñez St., Marikina Heights, Marikina City
Proposed Installation of Trusses, Weiding and Roofing of Carwash 530 Gen. Ordoñez St., Marikina Heights, Marikina City
2/26/2018
15 Ms. Dolores Q. Santiago / Marikina City
Proposed Tempura King Interior Fit-Out Unit 30-A SF SM City Marikina
2/28/2018
16 Ms. Christine Charmie / Liwasang Kalayaan, Marikina Heights, Marikina City
Construction of Barenaked Body Sugaring Salon Liwasang Kalayaan, Marikina Heights, Marikina City
2/28/2018
17 Ms. Sylvette G. Marcelo / # 23 Mohawk St., cor Jerusalem St., St. Claire 1 Subd., Marikina City
Proposed Additional Terrace Residential / # 23 Mohawk St., cor Jerusalem St., St. Claire 1 Subd., Marikina City
2/28/2018
18 Ms. Regina T. Galang / 278 Pineda Building, Boni Avenue, Plainview, Mandaluyong City
Renovation of One (1) Studio Type Unit 278 Pineda Building, Boni Avenue, Plainview, Mandaluyong City
2/8/2018
19 Mr. Pablo B. Del Rosario / 344 A. Bonifacio St. cor. Pinagtipunan St., Brgy. Hagdan Bato Libis, Mandaluyong City
Proposed Renovation of One Storey Existing House 344 A. Bonifacio St. cor. Pinagtipunan St., Brgy. Hagdan Bato Libis, Mandaluyong City
2/8/2018
20 Ms. Erlinda A. Morales 126 Private Road, Hulo, Mandaluyong City
Proposed Construction of Two Storey Residence 126 Private Road, Hulo, Mandaluyong City
2/9/2018
21 Mr. Daryl Kong / SM Light Mall, EDSA cor. Madison St., Barangka Ilaya, Mandaluyong City
Proposed Renovation of Jollibee SM Light SM Light Mall, EDSA cor. Madison St., Barangka Ilaya, Mandaluyong City
2/9/2018
22 Mr. Cesar C. Guillermo 3/F Unit 3356-A Sm Mega Mall, Mandaluyong City
Proposed Renovation of Fatfook Restaurant 3/F Unit 3356-A Sm Mega Mall, Mandaluyong City
2/9/2018
23 Mr. Kelvn Lester Ngo Unit C, # 41, 11th St., Brgy. Damayang Lagi, Quezon City
Proposed Renovation of SUNDAYS 2F cor. Market Food Hall, Podium Mall, Mandaluyong City
2/9/2018
24 Mr. Francis S. Medina 7F Columbia Tower, Ortigs Ave., Mandaluyong City
Proposed 7-Eleven Foodstore-Fitout G/F Sun Plaza, Shaw Blvd cor Princeton St., Mandaluyong City
2/12/2018
25 Ms. Marivic Aguibiador Unit 104, Royal Plaza Bldg., M. Guevarra St.,Brgy. Highwayhills, Mandaluyong City
Proposed Renovation of David Salon Royal Plaza Unit 104, Royal Plaza Bldg., M. Guevarra St.,Brgy. Highwayhills, Mandaluyong City
2/14/2018
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-National Capital Region February 2018
Page 3 of 80
No. Company Name and Address Project Name Date Approved
26 Mr. Mark Christopher Lena 7A, 2nd Street, Bgry. Kapitolyo, Pasig City
Renovation of Char Express Store 2F The Podium, Barangay Wack-Wack, Mandaluyong City
2/15/2018
27 Ms. Irene Garcia 14Joy St., Grace Village, Brgy. Apolonio Samson, Quezon City
Renovation of MI Authorized Reseller Store 4F Cyberzone, SM Megamall, Brgy. Wack-Wack, Mandaluyong City
2/15/2018
28 Mr. Mark Anthony Caguioa 394 P. Lopez St., Mandaluyong City
Proposed Extension Penthouse 394 P. Lopez St., Mandaluyong City
2/15/2018
29 Mr. Edwin M. Villasin Mandaluyong
Proposed Renovation/ Building Care Realty Corp. 215 J. Cardinal Sin St. cor De La Paz St., Brgy. Pleasant Hills, Mandaluyong City
2/28/2018
30 Mr. Jose Coronel Mandaluyong
Proposed Renovation of Esprit 2nd Level Bldg. A, SM Megamall Mandaluyong City
2/28/2018
31 Ms. Erlinda Padua 16A W Road 11, 1st West, San Juan City
Two Storey Residence w/ Roofdeck 16W Road 11, 1st West, San Juan City
2/19/2018
32 Ms. Emma Aristorenas 7 Van Buren, North Greenhills Subd., San Juan City
Renovation of Extension of Second Floor Residential 7 Van Buren, North Greenhills Subd., San Juan City
2/21/2018
33 Mr. Richard Ong. #50 Buchanan St., North Greenhills, San Juan City
Demolition of 1 Storey Residential with Basement #50 Buchanan St., North Greenhills, San Juan City
2/28/2018
34 ANNA LYNE S. PONFERRADO 43 Commonwealth Ave. Brgy. Holy Spirit, Quezon City
Hyundai CV Renovation 43 Commonwealth Ave., Brgy. Holy Spirit, Quezon City
2/19/2018
35 HILARIO O. AÑEDEZ BLK. 49 G. ST. LOT 14 E2, ALUPIHANG DAGAT-DAGATAN, LONGOS, MALABON CITY
PROPOSED 2 STOREY RESIDENTIAL BUILDING BLK. 49 G. ST. LOT 14 E2, ALUPIHANG DAGAT-DAGATAN, LONGOS, MALABON CITY
2/13/2018
36 LERMA P. PATRICIO BLK. 11 LOT 120 HASA-HASA ST. LONGOS, MALABON CITY
2-STOREY RESIDENTIAL HOUSE LK. 11 LOT 120 HASA-HASA ST. LONGOS, MALABON CITY
2/19/2018
37 CARMELITA PEREZ 2 HONRADEZ ST. BARANGAY TUGATOG, MALABON CITY
2 STOREY RESIDENTIAL HOUSE 2 HONRADEZ ST. BARANGAY TUGATOG, MALABON CITY
2/19/2018
38 MARISSA S. SANTOS 112 HERNANDEZ ST. CATMON, MALABON CITY
PROPOSED 1-STOREY WITH ATTIC RESIDENTIAL HOUSE 112 HERNANDEZ ST. CATMON, MALABON CITY
2/21/2018
39 CRISTINA G. FLORORITA 89 MH DEL PILAR ST. TUGATOG, MALABON CITY
PROPOSED 2-STOREY RESIDENTIAL 89 MH DEL PILAR ST. TUGATOG, MALABON CITY
2/21/2018
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-National Capital Region February 2018
Page 4 of 80
No. Company Name and Address Project Name Date Approved
40 AGERICO DEL ROSARIO NAVAL ST. BRGY. FLORES, MALABON CITY
PROPOSED RENOVATION 2-STOREY RESIDENTIAL BUILDING NAVAL ST. BRGY. FLORES, MALABON CITY
2/21/2018
41 SALVADOR FLORES 47 BASILLIO ST. BAUTISTA BLVD., HULONG DUHAT, MALABON CITY
PROPOSED ONE-STOREY 3-UNITS COMMERCIAL BUILDING 47 BASILLIO ST., BAUTISTA BLVD., HULONG DUHAT, MALABON CITY
2/21/2018
42 PATERNO R. ROQUE 36 NAVAL ST. BRGY. FLORES, MALABON CITY
PROPOSED 2-STOREY RESIDENTIAL BUILDING 36 NAVAL ST. BRGY. FLORES, MALABON CITY
2/21/2018
43 CORAZON B. DE JESUS 180 INTERIOR, GEN. LUNA ST. BRGY. IBABA, MALABON CITY
PROPOSED 2-STOREY RESIDENTIAL BUILDING 180 INTERIOR, GENERAL LUNA ST. BRGY. IBABA, MALABON CITY
2/21/2018
44 ALBERTO I. BERNABE/ NAVAL ST., BRGY. FLORES, MALABON CITY
PROPOSED ONE-STOREY VETERINARY/COMMERCIAL BUILDING NAVAL ST. BRGY. FLORES, MALABON CITY
2/21/2018
45 KYNAR DANEL PHILS. CORP. / 7B PLATINUM ST. GOLDEN DALE SUBD. TUGATOG, MALABON CITY
PROPOSED ONE-STOREY OFFICE WITH MEZZANINE BUILDING 92 MH DEL PILAR ST. CORNER LT. ROQUE ST. TUGATOG, MALABON CITY
2/23/2018
46 DIOMEDES M. QUINTO/ BRGY. SAN AGUSTIN, MALABON CITY
PROPOSED 2-STOREY RESIDENTIAL BUILDING BRGY. SAN AGUSTIN, MALABON CITY
2/26/2018
47 ERIKA HAZEL TSAY TY LOT 25-B-2-C-4-G-1-3 ARANETA VILLAGE POTRERO MALABON CITY
PROPOSED TWO STOREY RESIDENTIAL BUILDING LOT 25-B-2-C-4-G-1-3 ARANETA VILLAGE POTRERO MALABON CITY
2/27/2018
48 AQUILINO IGNACIO JR. # 2 KATIPUNAN ST. BAYAN BAYANAN, MALABON CITY
PROPOSED RENOVATION 2-STOREY RESIDENTIAL BUILDING # 2 KATIPUNAN ST. BAYAN BAYANAN, MALABON CITY
2/28/2018
49 MR. & MRS. MAURO REYES/ BAGUMBAYAN, NAVOTAS CITY
PROPOSED 3 UNITS TWO STOREY W/ DECK RESIDENTIAL BLDG. BAGUMBAYAN, NAVOTAS CITY
2/27/2018
50 PRIME KITCHEN 2345 OSMENA ST., BRGY. VALENZUELA, MAKATI CITY
INTERIOR FIT-OUT WORKS OF RAMEN TERU JAPANESE RESTAURANT
2-Feb-2018
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-National Capital Region February 2018
Page 5 of 80
No. Company Name and Address Project Name Date Approved
GROUND FLOOR UNIT 131-132 SEA RESIDENCE, SUNSET DRIVE MOA COMPLEX PASAY CITY, PHILIPPINES
51 SAVE DESIGNBUILD ENTERPRISE INC. 615-B HOUSE OF L. BLDG. GAMBAN ST. PASAY
THE COFFEE BEAN AND TEA LEAF-DOUBLE DRAGON 24 DIOSDADO MACAPAGAL BLVD. PASAY DOUBLE DRAGON MALL, PASAY CITY
12-feb-2018
52 CRISTOPHER SALES 12th - 15th ST., VILLAMOR AIR BASE, PASAY CITY
PROPOSED TWO STOREY RESIDENCE WITH DECK 12th - 15th ST., VILLAMOR AIR BASE, PASAY CITY
22-Feb-2018
53 SPS. FELIMON & SYLVIA BRIONES BLK. 38 LOT 9-A PHASE 2, VILLAMOR AIR BASE, PASAY CITY
PROPOSED TWO STOREY RESIDENCE BLK. 38 LOT 9-A PHASE 2, VILLAMOR AIR BASE, PASAY CITY
22-Feb-2018
54 GRACE COMMUNITY CHRISTIAN SCHOOL VETALES ST. MALIBAY , PASAY CITY
TWO STOREY SCHOOL BUILDING VETALES ST. MALIBAY , PASAY CITY
23-Feb-2018
55 TIMOTHY PAUL T. PICHAY 17 FOREST HILL, ROLLING HILLS SUBD., NEW MANILA, QUEZON CITY
RENOVATION OF STORE OUTLET 2170 (MM) MALL OF ASIA, DIOKNO BLVD., BRGY. 76, PASAY CITY
27-Feb-2018
56 ROSARIO HIPOLITO 403 4/F MIDLAND BLDG., BUENDIA SEN GIL PUYAT, MAKATI
PROPOSED RENOVATION OF LACOSTE STORE-MOA MM 271 B 272 MALL OF ASIA JW DIOKNO BLVD., MOA COMPLEX, PASAY CITY
28-Feb-2018
57 HERMINIO E. ABARICO LOT 1 BLOCK 154, BRGY. RIZAL, MAKATI CITY
CONSTRUCTION OF TWO(2) STOREY WITH ROOF DECK RESIDENTIAL BUILDING LOT 1 BLOCK 154, BRGY. RIZAL, MAKATI CITY
5-Feb-2018
58 AMADOR TORRES BARRAMEDA / NO.06 BILBAO ST., INTERCITY HOMES SUBDIVISION, CUPANG MUNTINLUPA CITY
PROPOSED CONSTRUCTION OF "A BITE OF HUNAN RESTAURANT" GOLDEN MANGO TECHNOLOGY INNOVATION INC. UPPER GROUND LEVEL, CIRCUIT LANE, BRGY. OLYMPIA, MAKATI CITY
28-Feb-2018
59 TOSHIYA TANIGUCHI/NIPPON PREMIUM BAKERY, INC. UNIT 304-307 3/F LA FUERZA PLAZA 2, 2241 DON CHINO ROCESS AVE., BANGKAL, MAKATI
PROPOSED OFFICE RENOVATION UNIT 304-307 3/F LA FUERZA PLAZA 2, 2241 DON CHINO ROCESS AVE., BANGKAL, MAKATI
26-Feb-2018
60 LONGINES R. HERNANDEZ 29TH FLOOR PBCOM TOWER, AYALA AVE. COR. V.A. RUFINO ST. BEL-AIR, MAKATI CITY
OFFICE FIT-OUT OF ESTERLY SERVICE INC. 29TH FLOOR PBCOM TOWER, AYALA AVE. COR. V.A. RUFINO ST., BEL-AIR, MAKATI CITY
23-Feb-2018
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-National Capital Region February 2018
Page 6 of 80
No. Company Name and Address Project Name Date Approved
61 ROLANDO M. AUDIJE BLOCK 89 LOT 17 PASCUA ST., BRGY. RIZAL, MAKATI CITY
PROPOSED EXTENSIION FOR TWO STOREY RESIDENCE WITH ROOF DECK BLOCK 89 LOT 17 PASCUA ST., BRGY. RIZAL, MAKATI CITY
27-Feb-2018
62 MARY SUSAN V. CATAQUIZ #30 BAYABAS ST. COMEMBO, MAKATI CITY
PROPOSED TWO(2) STOREY WITH DECK #30 BAYABAS ST. COMEMBO, MAKATI CITY
19-Feb-2018
63 H.I.S. CONSTRUCTION, INC. U/G CITYLAND CONDOMINIUM 8, BUENDIA, PIO DEL PILAR, MAKATI CITY
DEMOLITION OF TWO (2) STOREY RESIDENTIAL BUILDING /H.I.S. CONSTRUCTION, INC. U/G CITYLAND CONDOMINIUM 8, BUENDIA, PIO DEL PILAR, MAKATI CITY 33050 / JUL-01-17 5 DEMOLITION DEMOLITION OF TWO (2) STOREY RESIDENTIAL BUILDING / #38 ZODIAC STREET, NRGY. BEL-AIR, MAKATI CITY 20-Feb-2018 20-Feb-2018 0 #38 ZODIAC STREET, NRGY. BEL-AIR, MAKATI CITY
20-Feb-2018
64 MACKINTOSH CORPORATION 700 ROAD-1, TANDANG SORA AVE., OLD BALARA, QUEZON CITY
RE-WATERPROOFING OF ROOF DECK 93 CAMBRIDGE CIRCLE, NORTH FORBES, MAKATI CITY
20-Feb-2018
65 ANDREA MONICA I. GONZALES 34 Doña Aurora St., Tahanan Village, Parañaque City
TWO STOREY RESIDENCE Lot 4 Blk 11, Aragona St., Cittadella Executive Village, Pulang Lupa Dos, Las Piñas City
2/19/2018
66 RODRIGO G. CASTILLO Block 4 Lot 16 St., Luningning Subd., Talon 5, Las Piñas City
PROPOSED TWO STOREY RESIDENTIAL BUILDING Block 4 Lot 16 St., Luningning Subd., Talon 5, Las Piñas City
2/21/2018
67 LIBERATO R. LAPIÑA C. Raymond St., BF Resort Village, Las Piñas City
PROPOSED 2 STOREY RESIDENTIAL BUILDING C. Raymond St., BF Resort Village, Las Piñas City
2/21/2018
68 JOHN LOUIGI C. ABELARDO Block 3 Lot 7 Remarville Subd., Pamplona, Las Piñas City
PROPOSED 2 STOREY RESIDENTIAL BUILDING Block 3 Lot 7 Remarville Subd., Pamplona, Las Piñas City
2/21/2018
69 CONCHITA L. REYES B-6 L-5, Sta. Monica St., PH 2-C Gatchalian, Parañaque City
TWO-STOREY RESIDENTIAL HOUSE 812-D S. Marquez St., Gatchalian Subd., Las Piñas City
2/21/2018
70 CONCHITA L REYES B-6 L5 Sta. Monica St. PH 2-C, Gatchalian Subdivision, Parañaque City
TWO STOREY RESIDENTIAL HOUSE 812-D S. Marquez St. Gatchalian Subdivision, Las Piñas City
2/21/2018
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-National Capital Region February 2018
Page 7 of 80
No. Company Name and Address Project Name Date Approved
71 EDWIN CHRISTIAN B. ILANO B6 L18, 22 St. Golden Gate Subd. Talon 3, Las Piñas City
CONSTRUCTION OF ONE STOREY RESIDENTIAL BONGALO Lot 16 Blk 41 Mt. Carmel St., Christianville, Talon Singko, Las Piñas City
2/21/2018
72 KEVIN CHRISTIAN CARREON 1901 Richville Tower, Alabang, Muntinlupa City
PROPOSED TWO (2) RESIDENTIAL BLDG. L 13, B 8, Portofino Heights, Almanza Dos, Las Piñas City
2/21/2018
73 JENVIT D. SISON Blk 4, Lot 2-A Calle Segovia, BF Resort Village, Talon 2, Las Piñas City
PROPOSED ADDITIONAL SECOND FLOOR Blk 4, Lot 2-A Calle Segovia, BF Resort Village, Talon 2, Las Piñas City
2/22/2018
74 JOSELITA NONNATA G. BAGAIN RM. 510 Malate Crown Plaza, Adriatico corner San Andres St., Malate, Manila
PROPOSED ONE STOREY OFFICE Blk 8 Lot 3 Dahlia St., TS Cruz Subdivision, Almanza Dos, Las Piñas City
2/22/2018
75 MICHAEL SAN PEDRO ALEJANDRO Lazo St. Alejandro Compound, Almanza Uno, Las Piñas City
PROPOSED TWO STOREY RESIDENTIAL BUILDING Lazo St. Alejandro Compound, Almanza Uno, Las Piñas City
2/22/2018
76 PROSERPINA TADEO Blk 35 Lot 10-A G. D. Sekiat BF Resort Village, Las Piñas City
PROPOSED TWO (2) STOREY RESIDENTIAL Blk 35 Lot 10-A G. D. Sekiat BF Resort Village, Las Piñas City
2/23/2018
77 MYUN SOO JANG BGU Almanza, Las Piñas City
PROPOSED TWO (2) STOREY RESIDENTIAL BUILDING BGU Almanza, Las Piñas City
2/23/2018
78 LUGENE ENRILE V. AMPARO Lot 15A Block 2, Villanueva Compound, J. Aguilar, Pamplona, Las Piñas City
PROPESED 16 UNIT 2 STOREY STUDIO TYPE RESIDENCE Lot 15A Block 2, Villanueva Compound, J. Aguilar, Pamplona, Las Piñas City
2/26/2018
79 NESTOR RAMOS B9 L7, Dona Josefa Subd. Almanza 1, Las Piñas City
PROPOSED 2 STOREY RESIDENTIAL APARTMENT B20 L27 Josefa Ave., Dona Josefa Subd. Almanza 1, Las Pinas City
2/26/2018
80 ROY JANAYON #56 Aguirre Road, Pilar Village, Las Piñas City
RENOVATION OF OFFICE Starmall, Las Piñas City
2/26/2018
81 BEATRIZ R. MENDOZA Blk. 16 Lot 2, Villamer St., Soldiers II, Almanza 1, Las Piñas City
PROPOSED TWO (2) STOREY RESIDENTIAL BLDG. Blk. 16 Lot 2, Villamer St., Soldiers II, Almanza 1, Las Piñas City
2/26/2018
82 GEM ZEÑAROSA 15 Mercury Ave. Maries Village, Quezon City
DEMOLITION OF TWO(2) STOREY RESIDENTIAL F. Ocampo Ave., Manuela Subd. Las Piñas City
2/26/2018
83 GERALD A. AREVALO Lot 6 Blk 4 B1 Naga Road, Pulang Lupa Dos, Las Piñas City
PROPOSED 2 STOREY 3 DOOR RESIDENTIAL BLDG. 903 San Jose St. Brgy. Ilaya, Las Piñas City
2/26/2018
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-National Capital Region February 2018
Page 8 of 80
No. Company Name and Address Project Name Date Approved
84 MICHELLE V. JUAN B13 L5 Royal South Village, Talon 5, Las Piñas City
TWO (2) STOREY RESIDENTIAL BUILDING B13 L5 Royal South Village, Talon 5, Las Piñas City
2/26/2018
85 ARTHUR FILOTEO EVANGELISTA 32 Topland Ave., Golden Gate Subd., Talon 3, Las Piñas City
PROPOSED TWO (2) STOREY COMMERCIAL BLDG. WITH ROOF DECK 32 Topland Ave., Golden Gate Subd., Talon 3, Las Piñas City
2/27/2018
86 ANNA DENISE A. BALDOS Lot 20 Blk 2 E. Cojuanco St. BF Resort Village, Talon Dos, Las Piñas City
PROPOSED TWO (2) STOREY 3 RESIDENTIAL UNITS Blk. 4 Lot 42 Charlemagne St. Talia 500, BF Resort Village, Talon Dos, Las Piñas City
2/28/2018
87 JOSELITA NONNATA G. BAGAIN Blk 8 Lot 3 Dahlia St., TS Cruz Subdivision, Almanza Dos, Las Piñas City
PROPOSED ONE STOREY STAFF HOUSE Blk 8 Lot 3 Dahlia St., TS Cruz Subdivision, Almanza Dos, Las Piñas City
2/28/2018
88 NARITO T. BATALLER 300 DBP Comp. Rosal St., Pulanglupa Dos, Las Piñas City
TWO STOREY RESIDENCE Lot 3A 1 Hunter St., Greenview, Las Piñas City
2/28/2018
89 DEBORAH N. WANIA Camella 2E, Putatan, Muntinlupa City
WANIA RESIDENCES PROJECT B8 L31, Maya St., Camella 2E, Putatan Muntinlupa City
2/12/2018
90 JUNE ANTOINETTE DACANAY Unit 07-08 Avida Tower, Alabang, Muntinlupa City
JAMES COOPER SALON INTERIOR RENOVATION Unit 07-08 Avida Tower, Alabang, Muntinlupa City
2/14/2018
91 JAIME B. GOSTILLO #1560 Estanilao St., Lakeview Homes, Brgy. Putatan, Muntinlupa City
PROPOSED RENOVATION CBC INTEGRATED SCHOOL #1560 Estanilao St., Lakeview Homes, Brgy. Putatan, Muntinlupa City
2/14/2018
92 NOELLE CATHERINE SIDAYON #12 Jose Q. Ver, Brgy BF Homes, BF Classic, Parañaque City
STORE RENOVATION OF 1 UNIT RENTED SPACE @ ALABANG TOWN CENTER (MUMUSO) 1109 Alabang Center Entertainment Complex, Muntinlupa City
2/19/2018
93 BARNABY L. CHONG 19 V. Mapa St., Caloocan City
WORLD BALANCE - FIT OUT Unit 114 Ground Floor SM Munitnlupa City
2/21/2018
94 MARIVIC AGUIBIADO Unit 1127 Festival Mall, Alabang Muntinlupa City
UNION JACK TAVERN INTERIOR RENOVATION Unit 1127 Festival Mall, Alabang Muntinlupa City
2/21/2018
95 ALBERT R. PUJOL 228 Makiling St., Ayala Alabang, Muntilupa City
HOUSE RENOVATION 228 Makiling St., Ayala Alabang, Muntilupa City
2/21/2018
96 KRISTINE TOBILLO 2F Festival Mall, Albang, Muntinlupa City
PROPOSED THE BROW STUDIO 2F Festival Mall, Albang, Muntinlupa City
2/21/2018
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-National Capital Region February 2018
Page 9 of 80
No. Company Name and Address Project Name Date Approved
97 WILSON CHU 6/F Bonifacio Tech Center, 31st corner 2nd Ave., Bonifacio Global City
GUU INC. - FESTIVAL MALL BRANCH 1st Lavel Festival Supermall, Filinvest Alabang, Muntinlupa City
2/21/2018
98 MICHAEL DA Blk 11 Lot 7 Ph 3, Mabuhay City, Mamatid Cabuyao, Laguna
POWER SWITCH DGI-1.2 Level 3, Festival Mall, Alabang, Muntinlupa City
2/21/2018
99 ANTHONY R. QUIJANO Paco, Manila
ALABANG HILLS 2 STOREY RESIDENCE L 36 B22 Phase 2, Don Manalo Blvd., Alabang Hills Village, Alabang, Muntinlupa City
2/21/2018
100 FRANCIS MEDINA G/F Civic Pime Filinvest Corporation, Alabang, Muntinlupa City
RENOVATION 7/11 FOOD STORE G/F Civic Pime Filinvest Corporation, Alabang, Muntinlupa City
2/22/2018
101 GEN. MELENDRINO DULIG Lot 12 Block 15, Soldiers Hills Village, Putatan, Muntinlupa City
PROPOSED THREE DOORS TWO (2) STOREY APARTMENT Lot 12 Block 15, Soldiers Hills Village, Putatan, Muntinlupa City
2/22/2018
102 FRANCIS MEDINA Unit 4, CTP Alpha Investment Drive, Macapagal Businesss Park, Alabang-Zapote Road, Alabang, Muntinlupa City
RENOVATION 7/11 FOOD STORE Unit 4, CTP Alpha Investment Drive, Macapagal Businesss Park, Alabang-Zapote Road, Alabang, Muntinlupa City
2/22/2018
103 YHK F&B INC. Unit 1005 & 1006 Ayala Malls South Park, Alabang, Muntinlupa City
SAMGYUPSALAMAT Unit 1005 & 1006 Ayala Malls South Park, Alabang, Muntinlupa City
2/22/2018
104 DR. JAMES M. DELA CRUZ B 14 Lot 7, Jubilation, Brgy. Platero, Biñan, Laguna
PROPOSED CONSTRUCTION OF ADVANCED DENTISTRY 2nd Floor, Festival Mall Alabang Expansion, Alabang, Muntinlupa City
2/22/2018
105 RYAN LABRADOR Vermillion St. Agro Homes, Muntinlupa City
PROPOSED 2 STOREY RESIDENCE Vermillion St. Agro Homes, Muntinlupa City
2/23/2018
106 MICHELLE GO SM Muntinlupa, National Road, Tunasan, Muntinlupa City
RENOVATION OF BNY CLOTHING APAREL SM Muntinlupa, National Road, Tunasan, Muntinlupa City
2/26/2018
107 DR. SILVERIO SALILENG 457 Villa Sarmiento Cupang, Muntinlupa City
TWO STOREY 3 DOORS APARTMENT Blk. 96 Lot 26, Jaramilla St., Katarungan Village Polacion, Muntinlupa City
2/26/2018
108 G.A. Corvera Construction Corp. RM. 201-202 Capitol Masonic Bldg. II, # 37 Matalino St., Central Diliman, Quezon City
ASICS (FIT-OUT) Space 2241 Upper Ground Floor Level Expansion Bldg., Alabang Town Center, Muntinlupa City
2/26/2018
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-National Capital Region February 2018
Page 10 of 80
No. Company Name and Address Project Name Date Approved
109 REAGAN MCWILSON L. TAN Unit 3339 Festival Supermall, Alabang, Muntinlupa City
GRINGO - RENOVATION OF RESTAURANT Unit 3339 Festival Supermall, Alabang, Muntinlupa City
2/28/2018
110 ANNA ROSE CABRERA Unit 14-42 Fountain Breeze Condo, Lombo St.,Brgy. San Isidro, Parañaque City
DEMOLITION OF EXISTING ONE STOREY HOUSE AND CONSTRUCTION OF TWO STOREY RESIDENCE (4-UNITS) WITH DECK L-2 152 Lamberto St., Dela Cruz Compound, San Isidro, Parañaque City
2/8/2018
111 HENEDINA F. PECANA L3 B24, Dapo St., Tahanan Village Brgy. BF Homes, Parañaque City
PROPOSED 2 STOREY RESIDENCE L3 B24, Dapo St., Tahanan Village, Brgy. BF Homes, Parañaque City
2/14/2018
112 JEANETTE CHENG L4550 East Service Rd., SMDP, Parañaque City
PROPOSED DEMOLITION OF BUNGALOW L4550 East Service Rd., SMDP, Parañaque City
2/14/2018
113 Amalia Reyes #12 Pamona St., Mahogany Place, 2 Acacia Estate, Bambang Taguig City
TWO STOREY RESIDENCE Lot 14 Blk. 2 Montevideo St., Merville Park Subdivision, Parañaque City
2/15/2018
114 FLORIFE L. JOSE B6 L15 Tantona St., IWA Executive Homes, SAV-1, Sucat, Parañaque City
JOSE'S RESIDENCE B6 L15 Tantona St., IWA Executive Homes, SAV-1, Sucat, Parañaque City
2/19/2018
115 MICHAEL R. GONZALES 34 Doña Aurora St., Tahanan Village, Parañaque City
TWO STOREY RESIDENCE Lot 29, Blk 10 Lily St., Tahanan Village, Parañaque City
2/19/2018
116 GISELLE P. LEPITEN 9810 ilang-ilang St., Viitalez Compound, Baltao, Parañaque City
RESIDETIAL TWO STOREY BUILDING 9810 ilang-ilang St., Vitalez Compound, Baltao, Parañaque City
2/21/2018
117 ELADIO C. FERMIN Lot 18 B4 Sampaguita Circle Salvador Estate, Brgy. San Isidro, Parañaque City
PROPOSED TWO STOREY RESIDENTIAL Lot 18 B4 Sampaguita Circle Salvador Estate, Brgy. San Isidro, Parañaque City
2/21/2018
118 WINSTON MARTIN A. TONGOL 22 Herbs St. Purok 16 Zone 6B South Signal Taguig City
TWO (2) STOREY RESIDENTIAL LOT 6, BLK 14, MABOLO ST. DOÑA JOSEFA VILLAGE , ALMANZA UNO LAS PIÑAS CITY
2/28/2018
119 JIANBING CHEN U-215 Monach Park Suites, Aseana Business Park, Bradco Ave., Parañaque City
MACARTHY BAKERY - PASTRY SHOP U-215 Monach Park Suites, Aseana Business Park, Bradco Ave., Parañaque City
2/28/2018
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-National Capital Region February 2018
Page 11 of 80
No. Company Name and Address Project Name Date Approved
120 JIANBING CHEN U-215 Monach Park Suites, Aseana Business Park, Bradco Ave., Parañaque City
NEW CONCEPT BARBERSHOP U-215 Monach Park Suites, Aseana Business Park, Bradco Ave., Parañaque City
2/28/2018
121 JIANBING CHEN Unit 216-217 Monach Park Suites, Aseana Business Park, Bradco Ave., Parañaque City
ELLIS (PHIL) FURNITURE STORE LTD. Unit 216-217 Monach Park Suites, Aseana Business Park, Bradco Ave., Parañaque City
2/28/2018
122 JAYSON T. ARELLANO 4th Floor, PCCI Bldg., 118 LP Leviste St., Salcedo Village, Makati City
ILAHUI STORE RENOVATION B25 2F Upotown Mall, Bonifacio global City, Taguig City
2/14/2018
123 ROSARIO B. HIPOLITO 403 4th Floor Midland Bldg. Buendia Sen. Gil Puyat Ave., Makati City
HOUSE OF SAMSONITE Space No NW-UG Upperground Floor, Central Square Bonifacio, High Street Central, Brgy. Fort Bonifacio, Taguig City
2/27/2018
124 Inchoi Development, Inc. / Cai Yao Huang 692 6th Flr., Pines Tower Numancia St., San Nicolas, Binondo, Manila
Demolition of Two (2) Storey Old House Arianan cor. Camba St., Binondo, Manila
2/7/2018
125 Nordin B. Macapa, Jr. 2534 J. Posadas St., Punta, Sta. Ana, Manila
Proposed One (1) Storey Residential Building 2534 J. Posadas St., Punta, Sta. Ana, Manila
2/9/2018
126 Photoline Enterprise Corp. / Kristoferson Dany L. Ting Level 2, Adriatico Wing, Space No. 190 Robinson's, Manila
Proposed Renovation of Photoline Enterprises Corp. Level 2, Adriatico Wing, Space No. 190 Robinson's, Manila
2/9/2018
127 Josefine B. Sunga 3575 Buenos Aires St., Sta. Mesa, Manila
Proposed Repair of Two (2) Storey Old House 3575 Buenos Aires St., Sta. Mesa, Manila
2/9/2018
128 Robertino M. Ramos 1337 Burgos St., Paco, Manila
Proposed Demolition of Two (2) Storey Residence 1337 Burgos St., Paco, Manila
2/12/2018
129 Erlinda B. Reyes 651 A. H. Lacson Ave., Sampaloc, Manila
Repair of 3rd Floor Ceiling, Roofing, Truss and CHB 651 A. H. Lacson Ave., Sampaloc, Manila
2/12/2018
130 Beyond Concepts, Inc. / Howard N. Paw Level 1 Space No. 092-094 Orosa Wing, Robinsons Place, Ermita, Manila
EYB - Eat Yourself Bankrupt Renovation Level 1 Space No. 092-094 Orosa Wing, Robinsons Place, Ermita, Manila
2/13/2018
131 Ester S. Del Rosario 639 Interior 3-A, Geronimo St., Sampaloc, Manila
Proposed Two (2) Storey Residential Building 639 Interior 3-A, Geronimo St., Sampaloc, Manila
2/13/2018
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-National Capital Region February 2018
Page 12 of 80
No. Company Name and Address Project Name Date Approved
132 Anna Loren Riguera Unit 310, SM City Manila
Boutique Store Renovation Unit 310, SM City Manila
2/13/2018
133 Security Bank Corporation/Leslie Yu Chan 6776 Security Bank Center, Ayala Ave., Makati City
Proposed Renovation of Security Bank Corporation Adriatico cor. San Andres St., Malate, Manila
2/15/2018
134 Jeanybel Mc Carthy / Joblane International Manpower Services, Inc. 6F BDO Bldg., 707 Churruca St. cor. TM Kalaw, Ermita, Manila
6th Floor Office Renovation/ 6F BDO Bldg., 707 Churruca St. cor. TM Kalaw, Ermita, Manila
2/15/2018
135 Felmar Junifer T. Picar 1958 Angel Linao St., Brgy. 743 Zone 80 District 5, Malate, Manila
Proposed Construction of Two (2) Storey Building 1958 Angel Linao St., Brgy. 743 Zone 80 District 5, Malate, Manila
2/15/2018
136 Dominic Construction, Inc. 229-A Basilan Corner Talayan Streets, Mandaluyong City
Proposed PLDT Sta. Mesa Exchange Improvement #3510 Ramon Magsaysay Blvd., Brgy. 593, Sta. Mesa, Manila
2/16/2018
137 Leonora M. Tumbaga 1225 Trece de Agosto cor. Estero de Paco Sts., Paco, Manila
Repair of Two (2) Storey with Deck Building 1225 Trece de Agosto cor. Estero de Paco Sts., Paco, Manila
2/20/2018
138 Ricardo Banzon 2139 Rd. 7, NDC Compound, Sta. Mesa, Manila
Proposed Second Floor Addition 2139 Rd. 7, NDC Compound, Sta. Mesa, Manila
2/22/2018
139 Norma C. Bornilla Matagbac, Tabaco City
Proposed Demolition of Existing Old House corner A. Roxas St., 2646 Arellano Ave., Malate, Manila
2/22/2018
140 Mervin Banta 274 P. Faura St., cor. Guerrero St., Ermita, Manila
Proposed construction of Perimeter Fence 274 P. Faura St., cor. Guerrero St., Ermita, Manila
2/22/2018
141 Marilou S. Yu Lit 415 Gen. Vicente Lim St., San Rafael Village, Navotas City
Proposed Renovation of Anding's Toys and Flower Inc. Tutuban Mall, Prime Block, C. M. Recto, Tondo, Manila
2/22/2018
142 Shelley N. Reyes 3426 G. Santiago St., Bo. Obrero, Tondo, Manila
Demolition of Two (2) Storey Old House 3426 G. Santiago St., Bo. Obrero, Tondo, Manila
2/22/2018
143 Ronualdo Aguilar 2323 Antenor St., Pandacan, Manila
Proposed Construction of Two (2) Storey Residential Bldg. 2323 Antenor St., Pandacan, Manila
2/22/2018
144 Daisy B. Sotelo 5120 Charlemagne St., Italia 500, BF Resort, Las Pinas
Proposed Construction of Two (2) Storey Residential Bldg. 2657 Old Panaderos St., Sta. Ana, Manila
2/22/2018
145 Christine C. Tano 727 Interior 2, T. Alonzo St., Sta. Cruz, Manila
Demolition of Two (2) Storey Bldg. with Deck 727 Interior 2, T. Alonzo St., Sta. Cruz, Manila
2/22/2018
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-National Capital Region February 2018
Page 13 of 80
No. Company Name and Address Project Name Date Approved
146 Rolando L. Hombrebueno 1825-C M. Hizon St., Sta. Cruz, Manila
Proposed Construction of Two (2) Storey Residence with Roof Deck 1825-B Felix Huertas St., Sta. Cruz, Manila
2/26/2018
147 Louie Anthony Tan 88 Rev. Aglipay St., Mandaluyong City
Minor Construction Works at The Generics Pharmacy Kiosk #3 & 4 Puregold Bldg., Tayuman cor. Juan Luna St., Tondo, Manila
2/26/2018
148 Louie Anthony Tan 88 Rev. Aglipay St., Mandaluyong City
Minor Construction Works at The Generics Pharmacy 3E - 03A 3rd Floor 999 Shopping Mall Bldg., Soler St., Binondo, Manila
2/26/2018
149 JPM Cavat Construction 406 Sta. Teresita St., Sampaloc, Manila
Demolition of Concrete Pavement Petron Pandacan Terminal, Jesus St., Pandacan, Manila
2/27/2018
150 LBP Resources and Development Corporation 24th Floor, LBP Plaza 1598 MH Del Pilar St. corner Dr. J. Quintos St., Malate, Manila 1004
Landbank Harrison Plaza Branch Renovation Project Century Park Hotel, Harrison Plaza, Manila, Philippines
2/27/2018
151 LBP Resources and Development Corporation 24th Floor, LBP Plaza 1598 MH Del Pilar St. corner Dr. J. Quintos St., Malate, Manila 1004
Overseas Filipino Bank Main Building Repainting and Minor Repairs Postal Bank Center, Liwasang Bonifacio, Manila
2/27/2018
No. Company Name/Project Owner and Address Project Name Date Approved Remarks
152 Cesar O. Sison & Teresita P. Sison 2355 Marconi St., Brgy. Palanan, Makati City
Proposed Three (3) Storey Residential with Deck 2355 Marconi St., Brgy. Palanan, Makati City
1-Feb-2018
153 TM Abad Construction No. 34 Mt. Fuji ST., Filinvest 1, Subd., Batasan Hills
Improvement of Roads and Drainage along Bambi St., Brgy. Gen. T. De Leon Valenzuela City
1-Feb-2018 Department of Public Works and Highways
154 TM Abad Construction No. 34 Mt. Fuji ST., Filinvest 1, Subd., Batasan Hills
Improvement of Roads and Drainage along Victoria Homes, Brgy. Gen. T. De Leon Valenzuela City
1-Feb-2018 Department of Public Works and Highways
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-National Capital Region February 2018
Page 14 of 80
155 TM Abad Construction No. 34 Mt. Fuji ST., Filinvest 1, Subd., Batasan Hills
Improvement of Roads and Drainage along Bahay Pari-Rosario-San Miguel and Delos Reyes Compound, Brgy. Gen. T. De Leon Valenzuela City
1-Feb-2018 Department of Public Works and Highways
156 TM Abad Construction No. 34 Mt. Fuji ST., Filinvest 1, Subd., Batasan Hills
Improvement of Roads and Drainage along Ricky Street, Brgy. Gen. T. De Leon, Valenzuela City Valenzuela City
1-Feb-2018 Department of Public Works and Highways
157 TM Abad Construction No. 34 Mt. Fuji ST., Filinvest 1, Subd., Batasan Hills
Improvement of Roads and Drainage along Karen Street., Brgy. T. De Leon Valenzuela City
1-Feb-2018 Department of Public Works and Highways
158 Metrics Const. & Trading 766 Tandang Sora Ave., Tandang Sora, Quezon City
Construction of Four (4) Storey, 16-Classroom School Building Aguinaldo Elementary School, Quezon City 3rd LD Brgy. San Roque, Quezon City
1-Feb-2018 DPWH-Quezon City 2nd Eng'g. District
159 JC Albason Builders & Supply Diversion Road, Dungon A., Jaro, Ilo-ilo City
Rehabilitation of FSIS Building at CAAP Compound Old MIA Road, cor. Ninoy Aquino Ave., Pasay City
1-Feb-2018
160 V.S. Cerdon Iron Works & Construction Lot 8 Blk. 26 Katipunan St., Kingspoint Subd., Brgy. Bagbag, Novaliches, Quezon City
N2017-01-Proposed Demolition of Four (4) Storey and Two (2) Storey Structural Concrete Buildings, at Lupang Pangako, Brgy. Payatas, Quezon city Brgy. Payatas, Quezon City
1-Feb-2018
161 C.B. Garay Philwide Builders GBG Building, #16 Yakal West St., Santolan, Pasig City
Construction of Academic Building (Mandaluyong City College) Including Completion of Facilities and Ground Improvement Mandaluyong City, Metro Manila
2-Feb-2018 DPWH-National Capital Region
162 C.B. Garay Philwide Builders 16 Yakal West St., Marcos Highway, Santolan, Pasig City
Constract ID: 17E00103 Extension of Planning Design Division, Maintenance Division and Procurement Office DPWH, Region IV-B, EDSA, Quezon City
2-Feb-2018 DPWH, Region IV-B, EDSA, Quezon City
163 C.B. Garay Philwide Builders 16 Yakal West St., Marcos Highway, Santolan, Pasig City
Constract ID: 17E00104 Construction of DPWH 4B Covered Court with Stage, Comfort Rooms and Office DPWH, Region IV-B, EDSA, Quezon City
2-Feb-2018 DPWH, Region IV-B, EDSA, Quezon City
164 C.B. Garay Philwide Builders 16 Yakal West St., Marcos Highway, Santolan, Pasig City
Constract ID: 17E00102 Extension of Equipment Management Division for DPWH 4B Regional Director and Assistant Regional Director's Quarters DPWH, Region IV-B, EDSA, Quezon City
2-Feb-2018 DPWH, Region IV-B, EDSA, Quezon City
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-National Capital Region February 2018
Page 15 of 80
165 Danilo C. Manalo, Jr. Lot 12 Blk. 7, Amatiista, Sta. Ana, Manila
Proposed Four (4) Storey Residential with Covered Court Lot 12 Blk. 7, Amatiista, Sta. Ana, Manila
2-Feb-2018
166 Ciriaco Corporation 15th Floor Victoria Bldg., 429 U.N. Ave., Ermita, Manila
Flood Control Project based on Master Plan for Metro Manila and Surrounding areas, Upper marikina River Improvement (Upstream of Procurement/Contract ID 16Z00018 Marikina City
2-Feb-2018 DPWH-Central Office, Port Area, Manila
167 Jethrock Construction Corporation Suite 703, Atlanta Centre, #31 Annapolis St., Greenhills, San Juan City
Facade Facelift Chinese General- 286 Blumentritt St., Sta. Cruz, Manila Hospital-
2-Feb-2018
168 Nila I. Alarcon #23 14 Roxas St., San Roque, Marikina City
Three (3) Storey with Roofdeck Residential & Commercial #23 14 Roxas St., San Roque, Marikina City
2-Feb-2018
169 Hilarch Builders Corp. 15 A. Luna St. Brgy. Malinao Paig City
Improvement of Satop and Social Hygiene Office at 5th Floor Health Department, Pasig City Hall Pasig City Hall, Pasig City
2-Feb-2018
170 Hilarch Builders Corp. 15 A. Luna St. Brgy. Malinao Paig City
Construction of R.E.D. Storage with Connector at Pasig Motorpool C. Raymundo Ave., Brgy. Caniogan, Pasig City
2-Feb-2018
171 Hilarch Builders Corp. 15 A. Luna St. Brgy. Malinao Paig City
Construction of New Pasig City Central Fire Station & Batas ng Ciudad Enforcement Office (B.C.E.O.) (Structural Works-Phase 1) Brgy. Sto. Tomas, Pasig City
2-Feb-2018
172 Hilarch Builders Corp. 15 A. Luna St. Brgy. Malinao Paig City
Proposed Additional Loads for Sta. Lucia Senior High School (Electrical Works) at GSIS Road, Sta. Lucia High School Compound Brgy. Sta. Lucia, Pasig City
2-Feb-2018
173 CKI Builders & Engineering Services #7 Maginhawa St., UP Vill., Diliman, Quezon City
Rolex Store (Interior Fit-out Works) SM Mall of Asia, Pasay City
2-Feb-2018
174 Flordes Construction and Trading Corp. 3401 Magistrado Arellano St., Bacood, Sta.Mesa, Manila
18OD0059-Construction of Flood Control River Wall along Lingahan Creek, Sta. 0+000 to Sta. 0+300, Brgy. Coloong, Valenzuela City Coloong, Valenzuela City
2-Feb-2018
Metro Manila Third Engineering District Marulas, Valenzuela City
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-National Capital Region February 2018
Page 16 of 80
175 Flordes Construction and Trading Corp. 3401 Magistrado Arellano St., Bacood, Sta.Mesa, Manila
18OD0063-Rehabilitation of Roads and Drainage along Capt. Cruz Stret, Brgy. Malinta, Valenzuela City Malinta, Valenzuela City
2-Feb-2018
Metro Manila Third Engineering District Marulas, Valenzuela City
176 Flordes Construction and Trading Corp. 3401 Magistrado Arellano St., Bacood, Sta.Mesa, Manila
18OD0045-Construction/Rehabilitation of Riverwall along Tullahan River, Sta. 6+024-Sta.6+128, Brgy. Marulas, Valenzuela City Marulas, Valenzuela City
2-Feb-2018
Metro Manila Third Engineering District Marulas, Valenzuela City
177 Santos M. Laguinta 56 Cherry Gail St., Gabriel Subd. II, H-Duhat, Malabon City
Additional 3rd Floor 56 Cherry Gail St., Gabriel Subd. II, H-Duhat, Malabon City
2-Feb-2018
178 Richard Ngui 265 N. Domnigo, san Juna City
Proposed Warehouse Two (2) Storey 265 N. Domnigo, San Juan City
2-Feb-2018
179 F.G. Guintu Construction & Trading, Inc. 35 Fema Road, Project 8, Quezon City
Proposed 2017 Partial Pipe Replacement due to Drainage Improvement Project in H.S. D. Tuazon at 19-RSV01M. Along D. Tuazon St., Brgy. Lourdes, Quezon City under Quirino Roosevelt B.A. along D. Tuazon, Brgy. Lourdes, Quezon City
2-Feb-2018
180 Isagani Dominguez L29 B1 Biyaya St., Bacood Sta. Mesa, Manila
Proposed Additional Floors 6th to 9th Floors L29 B1 Biyaya St., Bacood Sta. Mesa, Manila
2-Feb-2018
181 Redcar Trading & Construction 16 Ilang-ilang Road, San Antonio Valley, Las Piñas City
17OB0458 Construction of Four (4) Storey Six (6) Classroom Upper bicutan National High School, Taguig City Taguig City
2-Feb-2018 DPWH-Metro Manila 1st District Engineering
182 Jeffrey Mangaliag 14-B Francisco Lane, Villa San Juan, Sto. Tomas, Pasig City
Proposed Three (3) Storey Residential Building 14-B Francisco Lane, Villa San Juan, Sto. Tomas, Pasig City
2-Feb-2018
183 Fastrack Home Developers, Inc. No. 33 Collantes St., Xaviersville Subd., Brgy. Loyola Heights, Quezon City
17-19025B Improvement of Road & Drainage of Sampaguita Street Sampaguita St., Brgy. Talipapa, Quezon City
2-Feb-2018
184 C.L. Morales Construction and Trading #35 Tatco Compound, Jacinto St., Brgy. Malinao, Pasig City
18OD0010-Rehabilitation of Roads and Drainage in Catleya and Dama De Noche Street, Brgy. Tagalag, Valenzuela City Tagalag, Valenzuela City
2-Feb-2018 DPWH MM 3rd DEO , Marulas, Valenzuela City
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-National Capital Region February 2018
Page 17 of 80
185 St. Timothy Construction Corp. #35 Tatco Compound, Jacinto St., Brgy. Malinao, Pasig City
18OD0035-Construction of Flood Control Wall along F. Dela Cruz Creek, Brgy. Paso De Blas, Valenzuela City Paseo De Blas, Valenzuela City
2-Feb-2018 DPWH MM 3rd DEO , Marulas, Valenzuela City
186 C.L. Morales Construction and Trading #35 Tatco Compound, Jacinto St., Brgy. Malinao, Pasig City
18OD0037-Improvement of Roads and Drainage along Guava St., Brgy. Gen. T. De Leon, Valenzuela City Gen. T. De Leon, Valenzuela City
2-Feb-2018 DPWH MM 3rd DEO , Marulas, Valenzuela City
187 St. Timothy Construction Corp. #35 Tatco Compound, Jacinto St., Brgy. Malinao, Pasig City
18OD0053-Construction of Flood Control Wall along Parada Creek, Brgy. Parada, Valenzuela City Parada, Valenzuela City
2-Feb-2018 DPWH MM 3rd DEO , Marulas, Valenzuela City
188 C.L. Morales Construction and Trading #35 Tatco Compound, Jacinto St., Brgy. Malinao, Pasig City
18OD0064-Improvement of Roads and Drainage along Fruit Salad,Grapes and Star Apple Street, Brgy. Gen. T. De Leon, Valenzuela City Gen. T. De Leon, Valenzuela City
2-Feb-2018 DPWH MM 3rd DEO , Marulas, Valenzuela City
189 C.L. Morales Construction and Trading #35 Tatco Compound, Jacinto St., Brgy. Malinao, Pasig City
18OD0068-Improvement of Roads and Drainage along Molave Street and Derupa Street, Brgy. Maysan, Valenzuela City Maysan, Valenzuela City
2-Feb-2018 DPWH MM 3rd DEO , Marulas, Valenzuela City
190 C.L. Morales Construction and Trading #35 Tatco Compound, Jacinto St., Brgy. Malinao, Pasig City
18OD0070-Improvement of Roads and Drainage along Del Mundo Street, Brgy. Ugong, Valenzuela City Ugong, Valenzuela City
2-Feb-2018 DPWH MM 3rd DEO , Marulas, Valenzuela City
191 C.L. Morales Construction and Trading #35 Tatco Compound, Jacinto St., Brgy. Malinao, Pasig City
18OD0073-Improvement of Roads and Drainage along Bandino Street, Brgy. Parada, Valenzuela City Parada, Valenzuela City
2-Feb-2018 DPWH MM 3rd DEO , Marulas, Valenzuela City
192 C.L. Morales Construction and Trading #35 Tatco Compound, Jacinto St., Brgy. Malinao, Pasig City
18OD0075-Rehabilitation of Roads and Drainage in Cuadra Street, Brgy. Coloong, Valenzuela City Brgy. Coloong, Valenzuela City
2-Feb-2018 DPWH MM 3rd DEO , Marulas, Valenzuela City
193 C.L. Morales Construction and Trading #35 Tatco Compound, Jacinto St., Brgy. Malinao, Pasig City
18OD0074-Construction of Flood Control Wall and Bridge along Metro Village, Brgy. Mapulang Lupa, Valenzuela City Karuhatan, Valenzuela City
2-Feb-2018 DPWH MM 3rd DEO , Marulas, Valenzuela City
194 C.L. Morales Construction and Trading #35 Tatco Compound, Jacinto St., Brgy. Malinao, Pasig City
18OD0077-Rehabilitation of Flood Control Wall along Parada creek, Brgy. Gen. T. de Leon, Valenzuela City Brgy. Gen. T. De Leon, Valenzuela City
2-Feb-2018 DPWH MM 3rd DEO , Marulas, Valenzuela City
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-National Capital Region February 2018
Page 18 of 80
195 C.L. Morales Construction and Trading #35 Tatco Compound, Jacinto St., Brgy. Malinao, Pasig City
18OD0091-Improvement of Roads and Drainage along Miguelo Homes, Brgy. Gen. T. De Leon, Valenzuela City Gen. T. De Leon, Valenzuela City
2-Feb-2018 DPWH MM 3rd DEO , Marulas, Valenzuela City
196 C.L. Morales Construction and Trading #35 Tatco Compound, Jacinto St., Brgy. Malinao, Pasig City
18OD0087-Improvement of Roads and Drainage along Fruit Salad Street, Brgy. Gen. T. De Leon, Valenzuela City Gen. T. De Leon, Valenzuela City
2-Feb-2018 DPWH MM 3rd DEO , Marulas, Valenzuela City
197 C.L. Morales Construction and Trading #35 Tatco Compound, Jacinto St., Brgy. Malinao, Pasig City
18OD0088-Improvement of Roads and Drainage along Tata Indo Street, Brgy. Karuhatan, Valenzuela City Karuhatan, Valenzuela City
2-Feb-2018 DPWH MM 3rd DEO , Marulas, Valenzuela City
198 St. Timothy Construction Corp. #35 Tatco Compound, Jacinto St., Brgy. Malinao, Pasig City
18OD0079-Rehabilitation of Roads and Drainage in Cabesang IMO Street, Brgy. Balangkas, Valenzuela City Balangkas, Valenzuela City
2-Feb-2018 DPWH MM 3rd DEO , Marulas, Valenzuela City
199 Jeorge P. De Vera #501 F. Cruz St., Malibay, Pasay city
Proposed Additional 2nd to 5th Floor Resiudential Building #501 F. Cruz St., Malibay, Pasay city
2-Feb-2018
200 TM Abad Construction No. 34 Mt. Fuji ST., Filinvest 1, Subd., Batasan Hills
Construction of Road, Brgy. 171 Caloocan City
2-Feb-2018
DPWH-Metro Manila III District Engineering Office
201 TM Abad Construction No. 34 Mt. Fuji ST., Filinvest 1, Subd., Batasan Hills
Improvement of Roads and Drainage along Gregorio Street, Brgy. Gen. T. De Leon Valenzuela City
2-Feb-2018
DPWH-Metro Manila III District Engineering Office
202 TM Abad Construction No. 34 Mt. Fuji ST., Filinvest 1, Subd., Batasan Hills
Construction of Road, Phase 7, Brgy. 176 Caloocan City
2-Feb-2018
DPWH-Metro Manila III District Engineering Office
203 TM Abad Construction No. 34 Mt. Fuji ST., Filinvest 1, Subd., Batasan Hills
Construction of Road, Phase 8, Brgy. 176 Caloocan City
2-Feb-2018
DPWH-Metro Manila III District Engineering Office
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-National Capital Region February 2018
Page 19 of 80
204 TM Abad Construction No. 34 Mt. Fuji ST., Filinvest 1, Subd., Batasan Hills
Improvement of Drainage along Angeles Extension Compound, Peacock Street and Santolan Street, Brgy. Gen. T. De Leon Valenzuela City
2-Feb-2018
DPWH-Metro Manila III District Engineering Office
205 TM Abad Construction No. 34 Mt. Fuji ST., Filinvest 1, Subd., Batasan Hills
Construction/Rehabilitation of Riverwall along Tullahan River Sta. 8+274-Sta. 8+354, Brgy. Marulas Valenzuela City
2-Feb-2018
DPWH-Metro Manila III District Engineering Office
206 TM Abad Construction No. 34 Mt. Fuji ST., Filinvest 1, Subd., Batasan Hills
Construction of Flood Control Riverwall Lingahan Creek Sta. 0+300 to Sta. 0+450, Brgy. Coloong Valenzuela City
2-Feb-2018
DPWH-Metro Manila III District Engineering Office
207 Carry On Construction 2030 Gen. T. De Leon Road, Valenzuela City
Improvement of Roads and Drainage along Gumamela Street, Brgy. Gen. T. De Leon Valenzuela City
2-Feb-2018
DPWH- Metro Manila Third District Engineering Office
208 Carry On Construction Unit 4 ERN Commercial Complex, Lot 1125 Tandang Sora Ave., Tandang Sora, Quezon City
Improvement of Roads and Drainage along Lanzones Street and Ubas Street, Brgy. Gen. T. De Leon Valenzuela City
2-Feb-2018
DPWH- Metro Manila Third District Engineering Office
209 Mostrales & Luzviminda M. Espiritu Blk. 188 Lot 5 Tambuli St., Zone 8, Brgy. Pembo, Makati City
Proposed Additional 3rd Floor Residential Blk. 188 Lot 5 Tambuli St., Zone 8, Brgy. Pembo, Makati City
5-Feb-2018
210 Lina F. Hizon Lot 11 Blk. 43 Mola St., Brgy. La Paz, Makati city
Proposed Four (4) Storey Apartment Lot 11 Blk. 43 Mola St., Brgy. La Paz, Makati City
5-Feb-2018
211 Ernesto Galura 3870 Pasong Makipo t, Putatan, Muntinlupa City
Proosed Two (2) Storey 6-Door Apartment 3870 Pasong Makipo t, Putatan, Muntinlupa City
5-Feb-2018
212 Octovino Q. Esguerra Lot 23 Blk. 8 St. Anne St., Provident Vill., Marikina City
Proposed Extension of Three (30 Storey Residence Lot 23 Blk. 8 St. Anne St., Provident Vill., Marikina City
5-Feb-2018
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-National Capital Region February 2018
Page 20 of 80
213 JASA Builders La Perla St., Bolinao, Pangasinan
Contract ID 18OD0026 Rehabilitation of Flood Control Wall Along Orbe Creek, Barangay Bagbaguin, Valenzuela City Valenzuela City
5-Feb-2018 DPWH MM 3rd DEO, Marulas, Valenzuela City
214 JASA Builders La Perla St., Bolinao, Pangasinan
Contract ID 18OD0047 Construction/Rehabilitation of Riverwall Along Tullahan River, Sta. 8+217 - Sta. 8+217 and Sta. 8+255 - Sta. 8+274, Barangay Marulas, Valenzuela City Valenzuela City
5-Feb-2018 DPWH MM 3rd DEO, Marulas, Valenzuela City
215 JASA Builders La Perla St., Bolinao, Pangasinan
Contract ID 18OD0049 Construction/Rehabilitation of Riverwall Along Tullahan River, Sta. 5+816 - Sta. 5+920, Barangay Marulas, Valenzuela City Valenzuela City
5-Feb-2018 DPWH MM 3rd DEO, Marulas, Valenzuela City
216 JASA Builders La Perla St., Bolinao, Pangasinan
Contract ID 18OD0050 Construction/Rehabilitation of Riverwall Along Tullahan River, Sta. 4+896 - Sta. 4+989, Right Bank Barangay Marulas, Valenzuela City Valenzuela City
5-Feb-2018 DPWH MM 3rd DEO, Marulas, Valenzuela City
217 JASA Builders La Perla St., Bolinao, Pangasinan
Contract ID 18OD0056 Construction of Road Dike Along Meycauayan River Polo Area, Valenzuela City Valenzuela City
5-Feb-2018 DPWH MM 3rd DEO, Marulas, Valenzuela City
218 Victoria Development and Construction Supply Corp. 103 Lopez Jaena St., Tacloban City
Contract ID 18OD0057 Flood Control Project and Dike Improvement Along Polo River, Valenzuela City Valenzuela City
5-Feb-2018 DPWH MM 3rd DEO, Marulas, Valenzuela City
219 Victoria Development and Construction Supply Corp./J. Simeon Construction, JV La Perla St., Bolinao, Pangasinan
Contract ID 18OD0080 Dredging of Meycauayan River, Wawang Polo Side Sta. 1+260 to Sta. 1+810, Caloocan City Caloocan City
5-Feb-2018 DPWH MM 3rd DEO, Marulas, Valenzuela City
220 JASA Builders La Perla St., Bolinao, Pangasinan
Contract ID 18OD0081 Construction of Flood Control Wall/Riprapping Along Banks of Creeks, Barangay 172, Caloocan City Caloocan City
5-Feb-2018 DPWH MM 3rd DEO, Marulas, Valenzuela City
221 J. Simeon Construction/Solenko Construction, JV 2038-A Santos Subd., Brgy. Gen. T. De Leon, Valenzuela City
Contract ID 17 OOD0187 Construction of Four (4) Storey Twelve (12) Classroom School Building Gen. t. de leon National High School, Valenzuela City Valenzuela City
5-Feb-2018 DPWH MM 3rd DEO, Marulas, Valenzuela City
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-National Capital Region February 2018
Page 21 of 80
222 Interbuild Construction Brgy. Maybunga, Pasig City
Upgrading of Service Entrance (Revolving Tower and tanghalang Pasigeño) and Installation of 950KVA, Generator Set (Existing from PCGH) Carucho Ave., Brgy. San Nicolas, Pasig City
5-Feb-2018
223 Greenheat Corporation MTC Bldg. A. Soriano St. cor. Arzobispo St., Intramuros, Manila
Renovation of Goniophotometer Building Rizal Drive, Bonifacio Global City, Taguig City, Metro Manila
5-Feb-2018
224 EEI Corporation 12 Manggahan St., Bagumbayan, Quezon City
Erection and Construction of the Relocation Works for the Affected Transmission Facilities by the Metro Manila Skyway Stage 3 Project 878 G. Araneta Ave., Brgy. Tatalon, Quezon City
5-Feb-2018
225 Alpha & Omega Gen. Contractor & Dev't. Corp. #35 Tatco Cmpd. E. Jacinto St. Malinao, Pasig City
17OB0421 Construction of Four (4) Storey Workshop Building (7x18) at Rizal Exp. Sta. and Pilot Sci. (RESPCI), Pasig City Rizal Exp. Sta. and Pilot Sci. (RESPCI), Pasig City
6-Feb-2018
DPWH-Metro Manila 1st District Engineering Office
226 Alpha & Omega Gen. Contractor & Dev't. Corp. #35 Tatco Cmpd. E. Jacinto St. Malinao, Pasig City
17OB0388 Construction of Four (4) Storey, Nine (9) Classroom Buting Elementary School, Pasig City
6-Feb-2018
DPWH-Metro Manila 1st District Engineering Office
227 MSB Vitug Construction 13 San Antonio, Lubao, Pampanga
Contract ID: 17OB0441 Maintenance, Repair and Rehabilitation of Flood Control Structures along Pasig-Marikina River Channel, Sta. 0+575-Sta. 1+500 Pasig-Marikina River Channel, Sta. 0+575-Sta. 1+500
6-Feb-2018
DPWH-Metro Manila 1st District Engineering Office
228 MSB Vitug Construction 6 Bangkal St., Amparo Village, Caloocan City
Contract ID: 17OB0442 Maintenance, Repair and Rehabilitation of Flood Control Structures along Pasig-Marikina River Channel, Sta. 0+000-Sta. 0+525 Pasig-Marikina River Channel, Sta. 0+000-Sta. 0+525
6-Feb-2018
DPWH-Metro Manila 1st District Engineering Office
229 MSB Vitug Construction 6 Bangkal St., Amparo Village, Caloocan City
Contract ID: 17OB0443 Maintenance, Repair and Rehabilitation of Flood Control Structures within Pasig-Marikina River Basin, Mandaluyong City Pasig-Marikina River Basin, Mandaluyong City
6-Feb-2018
DPWH-Metro Manila 1st District Engineering Office
230 GR Fevidal Construction Developers Corporation Unit 603 Jovan Bldg. Shaw Blvd., Mandaluyong City
17OB0433 Construction of Four (4) Storey Twelve (12) Classroom, Malanday Elementary School, Marikina City Malanday Elementary School, Marikina City
6-Feb-2018
DPWH-Metro Manila 1st District Engineering Office
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-National Capital Region February 2018
Page 22 of 80
231 Edison Development & Construction #121 Le Mariche Subdivision, E. Roriguez, Sr. Avenue, Quezon City
Construction of Four (4) Storey, Thirty Six (36) Classroom, Industrial Valley Complex (IVC) National High School, Marikina City Industrial Valley Complex (IVC) National High School, Marikina City
6-Feb-2018 DPWH-1st Metro
232 Dimaguila Construction & Supply, Inc. 107 Mabilis St., Pinyahan, Diliman, Quezon City
Asset Preservation Program: Preventive Maintenance, Slab Replacement-EDSA, K0018 + 869 - K0017 + 493, Quezon City (Contract ID 17-OG-0125) EDSA, Quezon City
6-Feb-2018
DPWH-Quezon City Second Engineering District
233 New Arcond Builders, Inc. 107 Mabilis St., Piñyahan, Diliman, Quezon City
Asset Preservation Program: Preventive Maintenance, Slab Replacement-EDSA, K0016 + 654 - K0017 + 294, K0018 +569 - K0019 + 185, Quezon City (Contract ID 17-OG-0111) EDSA, Quezon City
6-Feb-2018
DPWH-Quezon City Second Engineering District
234 Addplus Solutions Group, Inc. 6/F The Valero Tower, 122 Valero St., Salcedo Vill., Makati City
International Committee of the Red Cross (ICRC)/ Renovation 27th Floor, Petron Mega Plaza, 358 Sen Gil. Puyat Ave., Makati City
6-Feb-2018
235 C.S.L. Construction Corporation 510 Sandoval Avenue, Palatiw, Pasig City
Landscape Development of Pasig Housing Village 1 ay Jenny's Avenue, Brgy. Maybunga, Pasig City Pasig Housing Village 1 ay Jenny's Avenue, Brgy. Maybunga, Pasig City
6-Feb-2018
236 LBP Resources & Development Corporation 24/F LBP Plaza Building 1598 M.H. Del Pilar cor. Quintos Sts., Manila
LBP Owwa Extension Office Relayout/Renovation Ground Floor, OWWa Building, F.B. Harrison St. cor. 7th St., Pasay City
6-Feb-2018
237 Sps. Norman & Joana Lourdes L. Deogracias 6071 R. Palma St. St., Poblacion, Makati City
Proposed Five (5) Storey Residential Building with Basement 6071 R. Palma St. St., Poblacion, Makati City
7-Feb-2018
238 William Tan Chua & Susan Tan Chua 354,358Clavel St., Binondo, Manila
Demolition of Four (4) Storey Building 354,358Clavel St., Binondo, Manila
7-Feb-2018
239 Sps. Abelardo/Ruby Fugen Blk. 5 Lot 6 Trevi Subd., J.P. Rizal Concepcion Uno, Marikina City
Proposed Three (3) Storey Residential Building Blk. 5 Lot 6 Trevi Subd., J.P. Rizal Concepcion Uno, Marikina City
7-Feb-2018
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-National Capital Region February 2018
Page 23 of 80
240 Francisco S. Tan, Jr. Et. Al. Blumentritt St., Sampaloc, Manila
Proposed Four (4) Storey Residential Building Only Blumentritt St., Sampaloc, Manila
7-Feb-2018
241 Jared S. Guiang 923-G San Jose St., Brgy. Mauaway, Mandaluyong City
Proposed Four (4) Storey Studio Type Apartment 923-G San Jose St., Brgy. Mauaway, Mandaluyong City
7-Feb-2018
242 Vhoug International Construction Group, Inc. 507 OMM-CITRA Bldg., San Miguel Ave., Ortigas Center, San Antonio, Pasig City
Proposed Level 32 ILCC Fit-out Level 32 Insular Life Corporate Center, Insular Drive, Filinvest City, Alabang, Muntinlupa City
7-Feb-2018
243 KP Gonzales Construction Supply And Trading Blk 3D L19 Phi Tierra Nevada San Francisco Gen. Trias Cavite
Contract ID 18OH0016- Repair/Rehabilitation of Multi-purpose Building 24, Pasay City Pasay City
7-Feb-2018 DPWH- SMDEO
244 KP Gonzales Construction Supply And Trading Blk 3D L19 Phi Tierra Nevada San Francisco Gen. Trias Cavite
Contract ID 18OH0011- Rehabilitation of Drainage System Augustine Street, Barrio Filipino, Pasay City Pasay City
7-Feb-2018 DPWH- SMDEO
245 LMG Construction Malasin Sto. Domingo, Nueva Ecija
Contract ID#: 17OI0142-Const. of Four (4) Storey, Twenty (20) Classrooms School Building at Muntinlupa National High School Building 2 Muntinlupa City Muntinlupa City
7-Feb-2018 DPWH-LPMDEO
246 R.C. Geronimo Builders, Inc. 967 Estrada St., Malate, Manila
CBG Renovation G/F UCPB Office, 7907 Makati Ave., Makati City
7-Feb-2018
247 J Simeon Construction/Solenko Construction-JV 2038-a Santis Subdivision Brgy. Gen T. De Leon, Valenzuela City
Construction of Four (4) Storey 12-Classroom School Building Gen,. T. De Leon National High School Valenzuela City
7-Feb-2018
DPWH-Metro Manila 3rd District Engineering Office
248 Asia Structural Developer Corporation L17 -G NCIC, Brgy. Manggahan, Gen. Trias, Cavite
Proposed Twenty One (21) Storey -^Towers with Roof Deck and Basement Marina Seaview, Parañaque City
7-Feb-2018
249 Ironforge Construction and Supply 28 A. Barrion St., BF Homes, Brgy. Holy Spirit, Quezon City
17OH0151-Proposed Rainwater Collection Sytem Manila City
7-Feb-2018
DPWH-South Manila District Engineering Office
250 Ironforge Construction and Supply 28 A. Barrion St., BF Homes, Brgy. Holy Spirit, Quezon City
17OO0031-Repair of Flagpole/Parking Area at DPWH-NCR Compound, 2nd St., Port Area Manila City
7-Feb-2018 DPWH-NCR Regional Office
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-National Capital Region February 2018
Page 24 of 80
251 Jumar Cirillo T. Merina 187.1 27th Ave., Brgy. East Rembo, Makati City
Proposed Three (3) Storey Residential Building with Roofdeck 187.1 27th Ave., Brgy. East Rembo, Makati City
7-Feb-2018
252 Ragojos Heritage Construction Corporation 51 Vicente Ave. North Susana Exec. Village, Old Balara Diliman, Quezon City
Wells Fargo Building D Office Fit-out Wells Fargo Center 1180 Wells Fargo Drive, Mckinley Hill, Cyberpark, Taguig City
7-Feb-2018
253 Ragojos Heritage Construction Corporation 51 Vicente Ave. North Susana Exec. Village, Old Balara Diliman, Quezon City
CBTL Holdings @ Menarco Tower, Philippines Office Fit-out 30th Floor Menarco Tower, Lot 8 Blk. 5 32nd St., Bonifacio Global City, Taguig City
7-Feb-2018
254 Sto. Cristo Construction and Trading Sto. Cristo Hermosa, Bataan
180E0040 Organizational Outcome 2: Protect Lives and Properties against Major Floods-Flood Management Program-Construction/Maintenance of Flood Mitigation Structures and Drainage Systems-Bank Improvement (Steel Sheet Pile) Estero De Binondo, Sta. 0+202.76 Manila City
7-Feb-2018 DPWH-North Manila DEO
255 Sto. Cristo Construction and Trading Sto. Cristo Hermosa, Bataan
180E0023 Organizational Outcome 2: Protect Lives and Properties against Major Floods-Flood Management Program-Construction/Maintenance of Flood Mitigation Structures and Drainage Systems-Bank Improvement (Steel Sheet Pile) Estero De San Lazaro, Sta. 0+047 Manila City
7-Feb-2018 DPWH-North Manila DEO
256 C.T. Leoncio Construction & Trading 171 Guyong Sta. Maria, Bulacan
17OE0201 Deepening of Estero De Maypajo Manila City
7-Feb-2018 DPWH-North Manila DEO
257 C.T. Leoncio Construction & Trading 171 Guyong Sta. Maria, Bulacan
18OE0017 Organizational Outcome 2: Protect Lives and Properties against Major Floods-Flood Management Program-Construction/Maintenance of Flood Mitigation Structures and Drainage Systems-Bank Improvement (Steel Sheet Pile) Estero De Maypajo, Sta. 0+372.36 Manila City
7-Feb-2018 DPWH-North Manila DEO
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-National Capital Region February 2018
Page 25 of 80
258 C.T. Leoncio Construction & Trading 171 Guyong Sta. Maria, Bulacan
18OE0031 Organizational Outcome 2: Protect Lives and Properties against Major Floods-Flood Management Program-Construction/Maintenance of Flood Mitigation Structures and Drainage Systems-Bank Improvement (Steel Sheet Pile) Estero De Vitas, Sta. 0+592.80 t Manila City
7-Feb-2018 DPWH-North Manila DEO
259 C.T. Leoncio Construction & Trading/M.V. Caldo Engineering Construction & Supplies (J.V.) 44 San Jose, Sto. Tomas, Batangas
18OE0057 Organizational Outcome 2: Protect Lives and Properties against Major Floods-Flood Management Program-Construction/Maintenance of Flood Mitigation Structures and Drainage Systems-Bank Improvement (Steel Sheet Pile) Estero Dela Reina, Sta. 0+172.80 Manila City
7-Feb-2018 DPWH-North Manila DEO
260 C.T. Leoncio Construction & Trading/M.V. Caldo Engineering Construction & Supplies (J.V.) 44 San Jose, Sto. Tomas, Batangas
18OE0052 Organizational Outcome 2: Protect Lives and Properties against Major Floods-Flood Management Program-Construction/Maintenance of Flood Mitigation Structures and Drainage Systems-Bank Improvement (Steel Sheet Pile) Estero Dela Reina, Sta. 0+103 to Manila City
7-Feb-2018 DPWH-North Manila DEO
261 Aylan Construction and Trading/Ale-j Construction Trading Joint Venture #16 NS Amoranto Avenue, La Loma, Quezon City
17-OE0197 - Construction of Four (4) Storey Sixteen (16) Classroom Tondo High School, (Phase II), Tondo, Manila Tondo, Manila
7-Feb-2018 DPWH-North Manila DEO
262 ISH Construction, Inc. #38 Carmira's Drive South Green Park Village, Project 8, Quezon City
17OA0095 - Construction of Three (3) Storey, Nine (9) Classroom School Building, Catmon Integrated School, Malabon City Malabon City
7-Feb-2018
Department of Public Works and Highways (DPWH)
263 Dominic Construction, Inc. 229 A. Basilan cor. Talayan Sts., Mandaluyong City
Proposed Construction of Six (6) Swtorey School Building (Structural Works Only) Roosevelt College, 504 J.P. Rizal St., Malanday, Marikina City
7-Feb-2018
264 Eduardo Lopez Murillo 44 Jose P. Bautista St., Potrero, Malabon City
Proposed Additional Third Floor Warehouse Building 44 Jose P. Bautista St., Potrero, Malabon City
7-Feb-2018
265 Mr. & Mrs. Fernando Dela Paz 222 Don Basilio Blvd., Dampalit, Malabon City
Proposed Two (2) Storey Commercial Building 222 Don Basilio Blvd., Dampalit, Malabon City
7-Feb-2018
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-National Capital Region February 2018
Page 26 of 80
266 Lizabeth Brotonel 445 Vicencio St., Hulong Duhat, Malabon City
Proposed Three (3) Storey Residential Townhouse 445 Vicencio St., Hulong Duhat, Malabon City
7-Feb-2018
267 Janel Ivana Dionisio/Jane Bianca Dionisio Dakila St., Tonsuya, Malabon city
Two (2) Storey Three (3) Units Residential Building Dakila St., Tonsuya, Malabon City
7-Feb-2018
268 Ernilito Chan Daez St., Concepcion, Malabon city
Four (4) Units Three (30 Storey Residential Building Daez St., Concepcion, Malabon city
7-Feb-2018
269 C.T. Leoncio Construction & Trading 171 Guyong Sta. Maria, Bulacan
18OE0064 Organizational Outcome 2: Protect Lives and Properties against Major Floods-Flood Management Program-Construction/Maintenance of Flood Mitigation Structures and Drainage Systems-Bank Improvement (Steel Sheet Pile) Estero De Vitas, Sta. 0+659.20 t Manila City
7-Feb-2018 DPWH-North Manila DEO
270 G.F. Fabian Construction 772 F. Halili Ave., Turo Bocaue, Bulacan
17OE0162, MFO-1 National Road Network Service-Asset Preservation of National Roads Construction and Maintenance of Bridges along National Roads, Rehabilitationor Major Repair of Bridges-Claro M. Recto, Manila City Manila City
7-Feb-2018 DPWH-North Manila DEO
271 J.C. Piñon Construction Inc. 212 Goc. F. Halili Avenue, Bagbaguin, Sta. Maria, Bulacan
Construction of Tandang Sora Senior High School (Project No. 17-16004) Brgy. Tandang Sora, Quezon City
8-Feb-2018
272 ARCC Construction Unit 3 Monarch Square#77 Sct. Sikatuna St., Laging Handa, Quezon city
Improvement of Road & Drainage at Centerville St., Brgy. Pasong tamo, Quezon City Centerville St., Brgy. Pasong Tamo, Quezon City
8-Feb-2018
273 JRB and Associates Construction, inc. Unit 811 Citiland 10 Tower II, H.V. Dela Costa St., Makati Cityy
Elevated Food Recipe Inc. 5F Podium, ADB Ave., Ortigas Center, Mandaluyong City
8-Feb-2018
274 Rosand Builders Corporation 94 Doña Rosario Ext., Brgy. Novaliches Proper, Quezon City
17-25003-Construction of Covered Pathwalk Bonifacio Memorial Elementary School, Brgy. Unang Sigaw, Quezon City
8-Feb-2018
275 Rosand Builders Corporation 94 Doña Rosario Ext., Brgy. Novaliches Proper, Quezon City
17-25007-Improvement of Imelda (Admin Building) Bonifacio Elementary School, Brgy. Unang Sigaw, Quezon City
8-Feb-2018
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-National Capital Region February 2018
Page 27 of 80
276 Hi-Tone Construction & Dev't. Corp. Bogtong, Legaspi City
Repair of Pavement, Drainage System, Lighting Facilities and Concrete Fence at Collector Road inside PMO Compound, North Harbor, Tondo, Manila PMO Compound, North Harbor, Tondo, Manila
8-Feb-2018
277 E.M. Cuerpo Inc. E.M. Cuerpo Inc. Bldg., No. 3 Metropoli Drive, Metropoli Residenza, Bagumbayan, Quezon City
Renovation of the Department of Finance Building Offices - Package 2 Department of Finance, BSP Complex, Roxas Blvd., Malate, Manila
8-Feb-2018
278 RA Ignacio Construction Corporation Unit 413 Cedar Executive Bldg. II, Timog Ave., cor. Sct. Tobias, Quezon City
Organizational Outcome 1; Ensure Safe and Reliable National Ropad System-Asset Preservation Program-Preventive Maintenance-Tertiary Roads-Ma. Clara, K0008+ (-354.00) To K008+ (-458.00) Manila City Manila City
8-Feb-2018 Department of Public Works & Highways
279 RA Ignacio Construction Corporation Unit 413 Cedar Executive Bldg. II, Timog Ave., cor. Sct. Tobias, Quezon City
Organizational Outcome 1; Ensure Safe and Reliable National Ropad System-Asset Preservation Program-Preventive Maintenance-Tertiary Roads-Manga St., (SO2548LZ) Chainage O-Chainage 51.30, Manila City Manila City
8-Feb-2018 Department of Public Works & Highways
280
Atlantica Fire Systems, Inc. 3F Atlantica Fire Systems, Inc. 655 Severina Ave., Km. 18 West Service Road, Brgy. Marcelo Green, Parañaque City
Supply & Installation of Fire Prevention System at San Juan & Siruna Warehouses (Contract Number: 017-0123-01-SCOHMI-SOMO1) Manila Water Logistic Hub San Juan 15 N. Domingo St., San Juan, Manila Water San Juan Logistic Hub & Siruna Logistic Hub
8-Feb-2018
281 Ann-gie Builders #9 Almaciga St., Old Balara, Quezon City
#17-25009 Drainage Improvement and Concreting of Pathwalk at Sapalad HOA Brgy. Commonwealth, Quezon City
9-Feb-2018
282 Ann-gie Builders #9 Almaciga St., Old Balara, Quezon City
#17-25014 Improvement of Road and Drainage of Doña Filomena Street Brgy. Matandang Balara, Quezon city
9-Feb-2018
283 Lucky Princejon Construction 36 Earth St., Greenland Village, Rosario, Pasig City
Improvement of Administration Building (Exterior & Second Floor) at RESPSCI, Jenny's Extension, Brgy. Maybunga, Pasig City RESPSCI, Jenny's Extension, Brgy. Maybunga, Pasig City
9-Feb-2018
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-National Capital Region February 2018
Page 28 of 80
284 Oscar S. Viola 25 Aquarius St., LA Consolacion Village, Parang, Marikina City
Proposed Two (2) Storey Multi-Family Dwelling 25 Aquarius St., La Consolacion Village, Parang, Marikina City
9-Feb-2018
285 Mr. & Mrs. Angelo Salarza 15 Old 113 New Tangerine St., Concepcion Dos, Marikina City
Proposed One (1) Storey Residential with Roof Slab 15 Old 113 New Tangerine St., Concepcion Dos, Marikina City
9-Feb-2018
286 R.B. Soriano Construction No. 11 Lauren St., Simeona Village, Concepcion, Marikina City
Renovation and Extension of Surgical Intensive Care Unit (SICU) (Lot No. 69-Phividec-UOI-2017) VMMC, North Ave., Diliman, Quezon City
9-Feb-2018
287 R.B. Soriano Construction No. 9 Lauren St., Simeona Village, Concepcion, Marikina City
Pamantasan ng Lungsod ng Pasig - HRM/Multi-Purpose Bldg. (HVAC Works and Vertical Transport) at Industria St. Barangay Kapasigan, Pasig City
9-Feb-2018
288 Iconstructors and Developers, Inc. Block 18 Lot 27 Acacia St., Mahogany Village 1, Brgy. Pulo, Cabuyao, Laguna
AMPI Building 3 Sampaguita Street, marimar Village, Parañaque City
9-Feb-2018
289 St. Timothy Construction Corporation 35 Tatco Compound Jacinto St., Pasig City
17OB0462 Construction of Four (4) Storey, Twenty Four (24) Classroom, Leodegario Victorino Elementary School, Marikina City Marikina City
9-Feb-2018
290 Aichu Therese Luy Manila Midtown Executive House UN Ave. Paco, Manila
Proposed Three (3) Storey Residential with Penthouse Manila Midtown Executive House UN Ave. Paco, Manila
9-Feb-2018
291 Daniel Cabildo, Jr. 843 Ibarra St., Sampaloc, Manila
Proposed Four (4) Storey Residential 843 Ibarra St., Sampaloc, Manila
9-Feb-2018
292 Sps. Andrew & Mary Ann Garcia Lot 30, Block 7, Brazilia Heights, Brgy. Tunasan, Muntinlupa City
Proposed Construction of Two (2) Storey Residential Structure Lot 30, Block 7, Brazilia Heights, Brgy. Tunasan, Muntinlupa City
9-Feb-2018
293 Ellen E. Topacio 518 D. Santiago St., San Juan City
Four (4) Storey Residential Bldg. 518 D. Santiago St., San Juan City
9-Feb-2018
294 Bong Macaranas No. 5 Banada Circle South Forbes Park, Makati City
Proposed Demolition of Existing Structure No. 5 Banada Circle South Forbes Park, Makati City
9-Feb-2018
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-National Capital Region February 2018
Page 29 of 80
295 Cindy Haw Lot 11 Blk. 12 Pacencia Park St., Teresa Park Subd., Pilar Village, Las Piñas City
Proposed Duplex Two (2) Storey Residence Lot 11 Blk. 12 Pacencia Park St., Teresa Park Subd., Pilar Village, Las Piñas City
9-Feb-2018
296 Danilo Ignacio, Jr. 3691 Gabong St., Brgy. Pinagkaisahan, Makati City
Proposed Six (6) Storey Commercial Building 3691 Gabong St., Brgy. Pinagkaisahan, Makati City
9-Feb-2018
297 Mary Joanne Castillo Araullo St., Katarungan village, brgy. Poblacion, Muntinlupa City
Proposed Construction of Two (2) Storey Duplex Structure Araullo St., Katarungan village, brgy. Poblacion, Muntinlupa City
9-Feb-2018
298 C.B. Garay Philwide Builders CBG Building, #16 Yakal West St., Santolan, Pasig City
16O00051 - Construction of Taguig General Hospital Taguig City, Metro Manila
9-Feb-2018 DPWH - National Capital Region
299 Philip Camiguing 3 Agoho St., Concepcion Uno, Marikina City
Proposed Two (2) Storey Four (4) Units Residence 3 Agoho St., Concepcion Uno, Marikina City
9-Feb-2018
300 Lovely Mangilit Aviso Lot 1-A Lavender St., Concepcion Dos, Marikina City
Proposed One (1) Storey Residence with Store Lot 1-A Lavender St., Concepcion Dos, Marikina City
9-Feb-2018
301 Jeanette Cheng Lot 4450 A&B East Service Road, San Martin de Porres, Parañaque City
Proposed One (1) Storey Warehouse Lot 4450 A&B East Service Road, San Martin de Porres, Parañaque City
9-Feb-2018
302 Christopher Chilip 054 4th Ave., Bagumbayan, Taguig City
Proposed One (1) Storey Warehouse 054 4th Ave., Bagumbayan, Taguig City
9-Feb-2018
303 Greenheat Corporation MTC Bldg. A. Soriano cor. Arzobispo Sts., Intramuros, Manila
Supply, Delivery, Installation and Commissioning of 31 KWp. Grid Tied Roof Mounted Solar PV Power Plant Boni Avenue, Mandaluyong City
9-Feb-2018
304 Greenheat Corporation MTC Bldg. A. Soriano cor. Arzobispo Sts., Intramuros, Manila
Supply, Delivery, Installation and Commissioning of 99.2 KWp. Grid Tied Roof Mounted Solar PV Power Plant Rizal Technological University, Eusebio Avenue San Miguel, Pasig City
9-Feb-2018
305 Charifer Builders, Inc. Lot 15 Boundary Camachile St. Amparo Subd., Caloocan City
Removal of Underground pipes & Excavation of Soil Jesus St., Pandacan, Manila
9-Feb-2018
306 R.C. Ramos Construction Corporation 194 Quezon Road, San Roque, Mexico, Pampanga
BIR RR5 Revenue District Office Rdo 25A & 25B Brgy. Bagong Barrio, EDSA, Caloocan City
9-Feb-2018
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-National Capital Region February 2018
Page 30 of 80
307 Asia Structural Developer Corporation L17-G B3 NCIC, Brgy, Manggahan, Gen. Trias, Cavite
Proposed Forty Six (46) Storey Condominium & Thirty nine (39) Storey Office-Warehouse, Two-Tower Building Alvarado Street, Binondo, Manila
9-Feb-2018
308 Hexamindz Corporation Pearl St., Marifori Heights Subd., Davao City
18OE0027 - Organizational Outcome 2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems - Bank Improvement (Steel Sheet Pile) Estero de Vitas, Sta. 0+ Manila City
9-Feb-2018 DPWH-North Manila DEO
309 Hexamindz Corporation Pearl St., Marifori Heights Subd., Davao City
18OE0059 - Organizational Outcome 2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems - Bank Improvement (Steel Sheet Pile) Estero de Vitas, Sta. 0+ Manila City
9-Feb-2018 DPWH-North Manila DEO
310 Hexamindz Corporation Pearl St., Marifori Heights Subd., Davao City
18OE0020 - Organizational Outcome 2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems - Bank Improvement (Steel Sheet Pile) Estero de Sampaloc, Sta. Manila City
9-Feb-2018 DPWH-North Manila DEO
311 Hexamindz Corporation Pearl St., Marifori Heights Subd., Davao City
18OE0015 - Organizational Outcome 2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems - Bank Improvement (Steel Sheet Pile) Estero de Maypajo, Sta. Manila City
9-Feb-2018 DPWH-North Manila DEO
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-National Capital Region February 2018
Page 31 of 80
312 Hexamindz Corporation Pearl St., Marifori Heights Subd., Davao City
18OE0008 - Organizational Outcome 2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems Improvement of Drainage System J. Posadas St., Punta Sta. Ana Manila City
9-Feb-2018 DPWH-North Manila DEO
313 JASA Builders 123 La Perla St., Luciente 1st, Bolinao, Pangasinan
18OE0048 - Organizational Outcome 2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems - Bank Improvement (Steel Sheet Pile) Estero de North Maypajo, Manila City
9-Feb-2018 DPWH-North Manila DEO
314 JASA Builders 123 La Perla St., Luciente 1st, Bolinao, Pangasinan
18OE0032 - Organizational Outcome 2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems - Bank Improvement (Steel Sheet Pile) Estero de Sunog Apog, St Manila City
9-Feb-2018 DPWH-North Manila DEO
315 Orani Builders Supply Arellano Ave., Mulawin, Orani, Bataan
18OE0026 - Organizational Outcome 2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems - Bank Improvement (Steel Sheet Pile) Estero de la Reina, Sta. Manila City
9-Feb-2018 DPWH-North Manila DEO
316 Alleyway Construction #72 Bancal Meycauayan, Bulacan
18OE0019 - Organizational Outcome 2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems-Construction/Riverwall at Estero de San Lazaro (Tayuman Sectio Manila City
9-Feb-2018 DPWH-North Manila DEO
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-National Capital Region February 2018
Page 32 of 80
317 Alleyway Construction #72 Bancal Meycauayan, Bulacan
17OE0194 Completion/Upgrading/Expansion/Repair/Rehabilitation and/or Completion of Velasquez Health Center Manila City Tondo, Manila
9-Feb-2018 DPWH-North Manila DEO
318 Ferdinand Marcos A. Eslabon & Ma Blk. 5B Lot 14A Rio Grande St., Brazilla Mts., Brgy. Tunasan, Muntinlupa city
Proposed Three (3) Level Residence Blk. 5B Lot 14A Rio Grande St., Brazilla Mts., Brgy. Tunasan, Muntinlupa city
12-Feb-2018
319 Arnel S. Berganio & Jaycel R. Berganio Lot 7-A Uding Santiago Sr. Compound, Brgy. Alabang, Muntinlupa City
Lot 7-A Uding Santiago Sr. Compound, Brgy. Alabang, Muntinlupa City Lot 7-A Uding Santiago Sr. Compound, Brgy. Alabang, Muntinlupa City
12-Feb-2018
320 R.M. Mondares Construction Buhisan Road, Brgy. Buhisan. Cebu City
Construction of Four (4) Storey Sixteen (16) Classroom School Building Navotas Elementary School Navotas City
12-Feb-2018 Departemnt of Public Works & Highways
321 BF Corporation Km. 17 Ortigas Ave. Ext. Brgy. Sto. Domingo, Cainta, Rizal
Design and Build of the Proposed Construction of a New Dormitory Building Roces St., U.P. Diliman, Quezon City
12-Feb-2018
322 Christopher Brian Co Yu #35 Libertad St., cor. Esteban St., brgy. Highway Hills, Mandaluyong City
Proposed 6-Storey with Roof Top #35 Libertad St., cor. Esteban St., brgy. Highway Hills, Mandaluyong City
12-Feb-2018
323 Sps. Judith H. De Villa/Valentina G. De Villa 626 Ventura St., Sampaloc, Manila
Proposed Three (3) Storey Residential Building 626 Ventura St., Sampaloc, Manila
12-Feb-2018
324 Ernesto B. Dinlasan P. Villanueva St., Pasay City
Proposed Three (3) Storey Residential Building P. Villanueva St., Pasay City
12-Feb-2018
325 Sps. Melinda Joson & Raymundo Joson Lot 5 Blk. 2 Rizal Village, Alabang, Muntinlupa city
Proposed Three (3) Storey Residential Building Lot 5 Blk. 2 Rizal Village, Alabang, Muntinlupa city
12-Feb-2018
326 Lolita Tiu GF Unit 12, The Beacon, Don Chino Roces Ave., cor. Arnaiz Ave., Legaspi Village, Makati City
Proposed Construction of Matsuda Japanese Cuisine Restaurant GF Unit 12, The Beacon, Don Chino Roces Ave., cor. Arnaiz Ave., Legaspi Village, Makati City
12-Feb-2018
327 Erlinda A. Morales 126 Private Road, Hulo, Mandaluyong City
Proposed Construction of Two (2) Storey Commercial/Residential 126 Private Road, Hulo, Mandaluyong City
12-Feb-2018
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-National Capital Region February 2018
Page 33 of 80
328 Gemma Cuntada Matsui Lot 1 Blk. 3 Sapphire Cor. Opal Sts., Manuela Homes, Las Piñas City
Proposed Two (2) Storey 6-Units Apartment Lot 1 Blk. 3 Sapphire Cor. Opal Sts., Manuela Homes, Las Piñas City
12-Feb-2018
329 Edward Hao Chua 45 Kennedy cor. Roosevelt Sts., San Juan City
Proposed Two (20 Storey with Basement 45 Kennedy cor. Roosevelt Sts., San Juan City
12-Feb-2018
330 4 Doublers Trading & Contractor 22 Caliraya St., Napocor Village, Tandang Sora, Quezon City
Improvement of School Managed Canteen at Camp Gen. Aguinaldo High School Brgy. Camp. Aguinaldo, Quezon City
12-Feb-2018
331 4 Doublers Trading & Contractor 22 Caliraya St., Napocor Village, Tandang Sora, Quezon City
Improvement/Replacement of Feeding Center at Camp Gen. Aguinaldo High School (Cgeahs) Brgy. Camp Aguinaldo, Quezon city
12-Feb-2018
332
CG General Construction and Development Corporation 22 Caliraya St., Napocor Village, Tandang Sora, Quezon City
Repair/Renovation of Sambong Tennis Court at Malac Street Brgy. Masambong, Quezon city
12-Feb-2018
333
CG General Construction and Development Corporation 22 Caliraya St., Napocor Village, Tandang Sora, Quezon City
Construction of Two (2) Storey Multi-purpose Building along Greenville Drive, Greenville Subd. Brgy. Sauyo, Quezon City
12-Feb-2018
334
CG General Construction and Development Corporation 22 Caliraya St., Napocor Village, Tandang Sora, Quezon City
Movable Handwashing Facilities in Various Day Care Centers Brgy. Sauyo (5-Units), Talipapa (6-Units), Baesa (6-Units) Sangandaan (2-Units), Balon Bato (1-Unit), Unang Sigaw (1-Unit), Apolonio Samson (4-Units), Pasong Tamo (7-Units), Tandang Sora (3-Units), and Culiat (3-Units) Quezon City
12-Feb-2018
335 IM Construction Corporation No. 47 Kasay-kasay St., Mira-Nila Homes, Tandang Sora, Quezon City
Contract ID 18OD0032 Rehabilitation of Roads and Drainage System along Mariano Ponce Road, Brgy. 135 Connectiong EDSA, Caloocan City Caloocan City
12-Feb-2018
DPWH Metro Manila 3rd DEO, Marulas, Velenzuela City
336 IM Construction Corporation No. 47 Kasay-kasay St., Mira-Nila Homes, Tandang Sora, Quezon City
Contract ID 18OD0060 Construction/Rehabilitation/Improvement of Road and Drainage System (Phase 1), Barangay 2, Caloocan City Caloocan City
12-Feb-2018
DPWH Metro Manila 3rd DEO, Marulas, Velenzuela City
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-National Capital Region February 2018
Page 34 of 80
337 IM Construction Corporation No. 47 Kasay-kasay St., Mira-Nila Homes, Tandang Sora, Quezon City
Contract ID 18OD0082 ConstructionOF Flood Control Wall/Riprapping Along Banks of Creeks, Brgy. 174, King Solomon, Caloocan City Caloocan City
12-Feb-2018
DPWH Metro Manila 3rd DEO, Marulas, Velenzuela City
338 IM Construction Corporation No. 47 Kasay-kasay St., Mira-Nila Homes, Tandang Sora, Quezon City
Contract ID 18OD0029 Rehabilitation of Road and Drainage System along Gen. Tinio Road Brgy. 134 from Tirad Pass Connecting EDSA, Caloocan City Caloocan City
12-Feb-2018
DPWH Metro Manila 3rd DEO, Marulas, Velenzuela City
339 IM Construction Corporation No. 47 Kasay-kasay St., Mira-Nila Homes, Tandang Sora, Quezon City
Contract ID 18OD0078 Construction of Drainage System along Brgy. 170, Deparo 2, Caloocan city Caloocan City
12-Feb-2018
DPWH Metro Manila 3rd DEO, Marulas, Velenzuela City
340 JBMG Builders, Co., Inc. 1888 Becerra St., Sta. Cruz, Manila
BDO SM Megamall B Branch-Interior Renovation BDO Corporate Center Ortigas, 12 ADB Ave., Ortigas Center, Mandaluyong city
12-Feb-2018
341 Vergilio Lopena 330 Lope K. Santos St., Marikina Heights, Marikina City
Proposed Two (2) Storey Four (4) Units Apartment 330 Lope K. Santos St., Marikina Heights, Marikina City
12-Feb-2018
342 Apolinario Marquez B131 L3 Liway st., Katarungan Village, Poblacion, Muntinlupa City
Proposed Two (2) Storey Residential Duplex Structure B131 L3 Liway st., Katarungan Village, Poblacion, Muntinlupa City
12-Feb-2018
343 Ernesto Nepomuceno L4 B22 J.B Roxas Olympia, Makati City
Two (2) Storey Residential L4 B22 J.B Roxas Olympia, Makati City
12-Feb-2018
344 ELPA Construction 92 Selecta Drive, Balintawak, Quezon City
#17-25013- Asphalt Overlay of Summer Drive, November Drive, Administration Street and Maria Elena Street Brgy. Bahay Toro, Quezon city
12-Feb-2018
345 ELPA Construction 92 Selecta Drive, Balintawak, Quezon City
#17-25010- Improvement of Road and Drainage of Barcelona Street Brgy. Bahay Toro, Quezon city
12-Feb-2018
346 Mattro Construction 6/F Victoria 1 Bldg., 1670 Quezon Ave., Quezon City
Construction of Stage at Culiat High School Brgy. Culiat, Quezon City
12-Feb-2018
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-National Capital Region February 2018
Page 35 of 80
347 Joratech Corporation RM-202 State Condo V, 452 EDSA Gaudalupe, Makati City
Rehabilitation of 43-Units LRV Carbody, Flooring and Ceiling LRT-1 Depot Airport Road cor. Andrews Ave., Pasay City, Philippines
12-Feb-2018
348
Three W Builders, Inc./R.A. Ignacio Construction Corporation Unit 415-416 Cedar Executive Building, Timog Ave., Sct. Tobias, Quezon City
Organizational Outcome 2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems - Bank Improvement (Steel Sheet Pile) Estero de Valencia (Phase 1) Sta.0+ Manila City
12-Feb-2018 Department of Public Works and Highways
349
Three W Builders, Inc./R.A. Ignacio Construction Corporation Unit 415-416 Cedar Executive Building, Timog Ave., Sct. Tobias, Quezon City
Organizational Outcome 2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems - Bank Improvement (Steel Sheet Pile) Estero de Valencia (Phase II) Sta . Manila City
12-Feb-2018 Department of Public Works and Highways
350 TM Abad Construction No. 34 Mt. Fuji ST., Filinvest 1, Subd., Batasan Hills
Construction of Multi-purpose Building, Panghulo NationalHigh School, Brgy. Panghulo Malabon City
13-Feb-2018 Department of Public Works and Highways
351 TM Abad Construction No. 34 Mt. Fuji ST., Filinvest 1, Subd., Batasan Hills
Rehabilitation of Road, Inocencia St., Brgy. Tugatog Malabon City
13-Feb-2018 Department of Public Works and Highways
352 TM Abad Construction No. 34 Mt. Fuji ST., Filinvest 1, Subd., Batasan Hills
Rehabilitation of Road, San Marcos Street, Brgy. Bagumbayan South Navotas City
13-Feb-2018 Department of Public Works and Highways
353 TM Abad Construction No. 34 Mt. Fuji ST., Filinvest 1, Subd., Batasan Hills
Rehabilitation of Road, Javier Street, Brgy. Baritan Malabon City
13-Feb-2018 Department of Public Works and Highways
354 IM Construction Corporation No. 47 Kasay-kasay St., Mira-Nila Homes, Tandang Sora, Quezon City
Rehabilitation/Construction of Dela Paz Elementary School, Brgy. San Agustin Malabon City
13-Feb-2018 Department of Public Works and Highways
355 IM Construction Corporation No. 47 Kasay-kasay St., Mira-Nila Homes, Tandang Sora, Quezon City
Rehabilitation of Road, Espiritu Street, Brgy. Panghulo Malabon City
13-Feb-2018 Department of Public Works and Highways
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-National Capital Region February 2018
Page 36 of 80
356 IM Construction Corporation No. 47 Kasay-kasay St., Mira-Nila Homes, Tandang Sora, Quezon City
Rehabilitation of Victoneta Avenue (Phase 2), Brgy. Potrero Malabon City
13-Feb-2018 Department of Public Works and Highways
357 Big C Construction #2469 P. Zamora St., Pasay City
Rehabilitation of Road, Champaca Street, Brgy. Tanza Navotas City
13-Feb-2018 Department of Public Works and Highways
358 Big C Construction #2469 P. Zamora St., Pasay City
Rehabilitation of Road, Dama De Noche Street, Brgy. Tanza Navotas City
13-Feb-2018 Department of Public Works and Highways
359 C.B. Tampengco Construction and Supply Block 3 Lot 15, Medallion Homes, Ibayo, Marilao, Bulacan
Asset Preservation-Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads-Tertiary Roads R-10 Road-K0007+098 to K0007+351, K0007+412 to K0007+424 Navotas City
13-Feb-2018 Department of Public Works and Highways
360 Eight J'S Construction Services Brgy. Quintong, San Carlos City, Pangasinan
Rehabilitation of Road Commercio Street, Brgy. Tugatog Malabon City
13-Feb-2018 Department of Public Works and Highways
361 Ayana Construction and Trading # 15 D. Noriel St.,Brgy.Hulo Sto.Domingo,Nueva Ecija
Construction of Drainage System along Brgy. 149 Caloocan City
13-Feb-2018 Department of Public Works and Highways
362 Globalcrete Builders, Inc. 620 Mandasig, Candaba, Pampanga
Asset Preservation-Preventive Maintenance-Tertiary Road-P. Aquino (Letre)- K0012+377.20 to K0012+125.30 to Koo12+158, K0012+464.20 to K0012+544.20 Malabon City
13-Feb-2018
Department of Public Works and Highways (DPWH)
363 ISH Construction, Inc. #38 Carmira's Drive South Green Park Village, Project 8, Quezon City
Construction of Three (30 storey 9-Classroom School Malabon City
13-Feb-2018
Department of Public Works and Highways (DPWH)
364 RCDG Construction Corp. A. Ruste Drive, San Jose Road, Zamboagan City, Zamboanga Del Sur
Rehabilitation of Road, Rosas Street, Brgy. Tanza Navotas City
13-Feb-2018
Department of Public Works and Highways (DPWH)
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-National Capital Region February 2018
Page 37 of 80
365 Studio 26 Construction, Inc. 59 West Capitol Drive, Kapitolyo, Pasig city
Rehabilitation of Roads, Basilio Street, Brgy. Acacia Malabon City
13-Feb-2018
Department of Public Works and Highways (DPWH)
366 St. Timothy Construction Corporation 35 Tatco Compound Jacinto St., Pasig City
Construction of Four (4) Storey Twenty (20) Classroom School Building Santiago Syjuco Memorial School Malabon City
13-Feb-2018
Department of Public Works and Highways (DPWH)
367 Vicenta Orodio Lot 2 Blk. 7 Barasoain St., Tejeros, Makati
Proposed Two (2) Storey Residential with Roof Deck Lot 2 Blk. 7 Barasoain St., Tejeros, Makati
13-Feb-2018
368 Arvie Garcia/ Family Health Beauty GF Villa Bldg., Jupiter Brgy. Bel Air, Makati City
Proposed Renovation of Watson GF Villa Bldg., Jupiter Brgy. Bel Air, Makati City
13-Feb-2018
369 Fernando Evalla Gallardo, Jr. A.I. Osmeña St., Brgy. Poblacion, Makati City
Four (4) Storey Residence with Roof Deck A.I. Osmeña St., Brgy. Poblacion, Makati City
13-Feb-2018
370 Star William Construction 128 Mabini St., Pinagbakahan, Malolos City, Bulacan
Rehabilitation of Drainage System Including Curb & Gutter and Sidewalk along DR. Sixto Antonio Ave., Pasig City Pasig City
13-Feb-2018
DPWH- Metro Manila 1st District Engineering Office
371 Adora Herico 214 Shaw Blvd., cor. M. Yulo St., Mandaluyong City
Proposed Quality Sleep 214 Shaw Blvd., cor. M. Yulo St., Mandaluyong City
13-Feb-2018
372 Wing-An Construction and Development Corp. 410-412 A. Luna St., Cor. Asinas San Juan City
Retrofitting/Strengthening of Mac Arthur Bridge along Lawton-Sta. Cruz, Manila City Manila City
13-Feb-2018 DPWH Central NCR, 2nd St., Port Area, Manila
373 R.E. Orlina Construction Corporation 13 Emerald St., Northview 1, Batasan Hills, Quezon City
Improvement of Road and Drainage of Samat Street Brgy. Holy Spirit, Quezon City
13-Feb-2018
374 Jerico T. Serevo Lot 3 Blk. 4 Don Abdon Homes, Sto. Niño, Marikina City
Proposed Three (3) Doors Two (2) Storey Residential House Lot 3 Blk. 4 Don Abdon Homes, Sto. Niño, Marikina City
13-Feb-2018
375 Sps. Narciso & Aurora Cruz Lot 10 Blk. 42 East Drive, Marikina Heights, Marikina City
Proposed Two (2) Storey Residence with Private Swimming Pool Lot 10 Blk. 42 East Drive, Marikina Heights, Marikina City
13-Feb-2018
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-National Capital Region February 2018
Page 38 of 80
376 Precision Foundry of the Philippines/Martin D. Tuazon Armscor Ave., Brgy. Fortune, Marikina City
Proposed Heat Treatment Warehouse Building Armscor Ave., Brgy. Fortune, Marikina City
13-Feb-2018
377 Ramona Serevilla Talumpong St., Brgy. Malamig, Mandaluyong City
Four (4) Storey Residential Building Talumpong St., Brgy. Malamig, Mandaluyong City
13-Feb-2018
378 JPM Cavat Construction 406 Sta. Teresita St., Sampaloc, Manila
Demolition of One (1) Storey Building Dr. A. Santos Ave., Brgy. San Antonio, Parañaque City
13-Feb-2018
379 JPM Cavat Construction 406 Sta. Teresita St., Sampaloc, Manila
Proposed Shell Gasoline Station Dr. A. Santos Ave., Brgy. San Antonio, Parañaque City
13-Feb-2018
380 JPM Cavat Construction 406 Sta. Teresita St., Sampaloc, Manila
Proposed Shell Gasoline Station P. Sanchez St., Brgy. 607, Sta. Mesa, Manila
13-Feb-2018
381 C.S.L. Construction Corporation 510 Sandoval Avenue, Palatiw, Pasig City
Bonifacio Park, Pasig Bonifacio Linear Park Redevelopment (Phase II) Alcalde Jose St., and P. ConcepcionSt., Brgy. Kapasigan, Pasig City Alcalde Jose St., and P. Concepcion St., Brgy. Kapasigan, Pasig City
13-Feb-2018
382 Ragojos Heritage Construction Corporation 51 Vicente Ave. North Susana Exec. Village, Old Balara Diliman, Quezon City
CNX EXXA Tower Fit-out Phase 1 4F, 7F-10F EXXA Tower, Bridgetowne IT Park, C% Road, Ugong Norte, Quezon City, Philippines
13-Feb-2018
383 Ragojos Heritage Construction Corporation 51 Vicente Ave. North Susana Exec. Village, Old Balara Diliman, Quezon City
British Council Manila Office Fit-out Level 7, The Curve Tower BGC, Taguig City
13-Feb-2018
384
Tracsom Builders, Inc. Unit 202 2nd Floor Skyway Twin Tower Condominium#351 Capt. Henry Javier St., Brgy. Oranbo, Pasig City
#16O000014 Construction of Administrative Building (Mandaluyong City College) Including Completion of Facilities and Ground Improvement City College Welfare Compound, Acacia Lane Extension, Mandaluyong City
13-Feb-2018 DPWH-NCR 2nd St., Port Area, Manila
385 Dastec Construction and Supply #43 Bohol Mansions, Bohol Ave., Quezon City
Proposed Conversion of Vacant Lot into Parking Area Km. 20 East Service Road, South Superhiway, Alabang, Muntinlupa City
13-Feb-2018
386 Filipinas Benzon Industrial & Development corp. MCL Cmpd., E. Rodriguez Ave., Tunasan, Muntinlupa City
Proposed Warehouse MCL Cmpd., E. Rodriguez Ave., Tunasan, Muntinlupa City
13-Feb-2018
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-National Capital Region February 2018
Page 39 of 80
387 Elsie A. Ediong Blk. 93 Lot 42 San Francisco St., Rizal, Makati City
Proposed Four (4) Storey Residential Project Blk. 93 Lot 42 San Francisco St., Rizal, Makati City
13-Feb-2018
388 Three W Builders, Inc. Unit 415-416 Cedar Executive Building, Timog Ave., Sct. Tobias, Quezon City
Organizational Outcome 1: Ensure Safe and Reliable National Ropad System-Asset Preservation Program-Rehabilitation/Reconstruction/Upgrading of Damaged PAved Roads-Secondary Roads-R. MAgsaysay Blvd.-K0005+0589-189.1, K0005+237.9-K0005+688.0, Manila Manila City
13-Feb-2018 Department of Public Works and Highways
389 Three W Builders, Inc. Unit 415-416 Cedar Executive Building, Timog Ave., Sct. Tobias, Quezon City
Organizational Outcome 2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems - Bank Improvement (Steel Sheet Pile) Estero de Sampaloc II, Sta. 0+180.0 Manila City
13-Feb-2018 Department of Public Works and Highways
390 M.G. Salazar Construction Corp. 371 Sto Tomas, Sta Maria, Bulacan
18OA0017 Construction/Sealing of Riverwall along Navotas River from Estrella Bridge to City Hall, Navotas City Navotas City
13-Feb-2018
DPWH-Malabon-Navotas-Engineering District
391 R.V. Rieta Treding & Gen. Construction Advincula Avenue, san Sebastian Kawit, Cavite 4104
17OI0114 Preventive Maintenance of Road: Asphalt Overlay along Muntinlupa Railroad Station Road-K0028+269-K0028+890.4 (80mm, with Correction), Muntinlupa City, Metro manila Muntinlupa City
13-Feb-2018 DPWH -Las Piñas Muntinlupa
392 Pacific Summit Const. Group, Inc. 2101 One Global Place Bldg. 5th Ave. cor. 25th St., BGC Fort Bonifacio, Taguig City
DJFMH-Outpatient Department Building DOH Compound, Sta. Cruz, Manila
14-Feb-2018
393 Ana Marie Sarmiento 18F Vector 3, Northgate Cyberzone, Filinvest, Alabang, Muntinlupa City
Construction of Top Sky Supreme Communication 18F Vector 3, Northgate Cyberzone, Filinvest, Alabang, Muntinlupa City
14-Feb-2018
394 R.A. Nolido Construction Corporation Unit B. Rama Building, 165 Roosevelt Ave., Quezon City
Civil/Structural & Masonry Works Urban Loft Guevent Project J. Fabella St., Mandaluyong City
14-Feb-2018
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-National Capital Region February 2018
Page 40 of 80
395 Cardrian Builders Co. Units 505-508 WEB JET Building, 88 E. Rodriguez Jr. Ave., Bagumbayan, Quezon City
17OD0128 Construction,Upgrading, Expansion, Repair, Rehabilitation and Completion of Valenzuela City Emergency Hospital Valenzuela City
14-Feb-2018 Department of Public Works and Highways
396 Maricel Lopena Agustin TM Road, Brgy. Buli, Muntinlupa City
Proposed Two (2) Storey residence with Commercial TM Road, Brgy. Buli, Muntinlupa City
14-Feb-2018
397 Sandra Garganta Uy #12 Rita St., Sta. Teresita Village, Malanday, Marikina City
Proposed Two (2) Storey Residential Four (4) Units #12 Rita St., Sta. Teresita Village, Malanday, Marikina City
14-Feb-2018
398 Cristina Tolentino Lot A-6 Victor St., Greenview Village, Pamplona 3, Las Piñas City
Proposed Two (2) Storey Residential Apartment Lot A-6 Victor St., Greenview Village, Pamplona 3, Las Piñas City
14-Feb-2018
399
Sps. Moshe Brenn M. Peñaverde & Jemellee V. Peñaverde 109 C. Nuestra Señora Subd., Panghulo, Malabon City
Proposed Three (3) Storey Residential Building 109 C. Nuestra Señora Subd., Panghulo, Malabon City
14-Feb-2018
400 Julieta Morales #318 Anne St., Perpetual Pulang Lupa, Las Piñas City
Proposd Two (2) Storey Residential Apartment with Deck #318 Anne St., Perpetual Pulang Lupa, Las Piñas City
14-Feb-2018
401 Roy Victor Lopez, Jr. #30 A. De Guzman St., Concepcion I, Marikina City
Proposed Carwash & Detailing Shop #30 A. De Guzman St., Concepcion I, Marikina City
15-Feb-2018
402 John Mardy Rongavilla Lot 31-B Blk. 48, Morning Glory St., SGH, Putatan, Muntinlupa City
Construction of Two (2) Storeys Residential Building Lot 31-B Blk. 48, Morning Glory St., SGH, Putatan, Muntinlupa City
15-Feb-2018
403 Anastacio C. Jaen Lot 4-B-1 Daang Bakal, Nangka, Marikina City
Proposed Additional Second Floor Residential Lot 4-B-1 Daang Bakal, Nangka, Marikina City
15-Feb-2018
404 Jose Marie Santos 76 Sulu St., Ayala Alabang, Muntinlupa City
Three (3) Storey Residential Structure 76 Sulu St., Ayala Alabang, Muntinlupa City
15-Feb-2018
405 Kishore I. Chugani 9542 Akle St., Brgy. San Antonio, Makati City
Proposed Four (4) Storey Residential/Commercial with Roofdeck 9542 Akle St., Brgy. San Antonio, Makati City
15-Feb-2018
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-National Capital Region February 2018
Page 41 of 80
406 Melinda M. David No. 118 Bayabas St., Blk. 5 Sitio 1, West Rembo, Makati City
Proposed Three (3) Storey Residential Building with Roof Deck No. 118 Bayabas St., Blk. 5 Sitio 1, West Rembo, Makati City
15-Feb-2018
407 Maxima S. Salvador 2998 Kakarong St., Brgy. Sta. Cruz, Makati City
Proposed Three (3) Storey Residential Building with Roof Deck 2998 Kakarong St., Brgy. Sta. Cruz, Makati City
15-Feb-2018
408 Victor Felix Lot 26 Blk. 68, Catleya St., Brgy. Rizal, Makati city
Proposed Four (4) Storey Residential/Commercial Building Lot 26 Blk. 68, Catleya St., Brgy. Rizal, Makati City
15-Feb-2018
409 Sheryl B. Almario, Et. Al Araro St., Brgy. Palanan, Makati City
Proposed Three (3) Storey Residential Building Araro St., Brgy. Palanan, Makati City
15-Feb-2018
410 Hawkinson Adrian Yao Lato Molito 3 Ground Floor Unit 6, Madrigal Ave., Ayala Alabang, Muntinlupa City
Proposed Construction of Technopop Molito 3 Ground Floor Unit 6, Madrigal Ave., Ayala Alabang, Muntinlupa City
15-Feb-2018
411 Imelda Baruela 2962 Balacbac St., Brgy. Pinagkaisahan, Makati city
Proposed As-Built Plan of G/F and 2/F and Additional 3/F, 4F & 5F 2962 Balacbac St., Brgy. Pinagkaisahan, Makati city
15-Feb-2018
412 Conrado Sinchioco Blk. 249 Lot 1, Venus St., Pembo, Makati City
Proposed Three (3) Storey Residential with Penthouse with Commercial at Ground Floor Blk. 249 Lot 1, Venus St., Pembo, Makati City
15-Feb-2018
413 Ma. Patricia F. Villareal GF EBC Bldg., Paseo De Roxas cor. Gil Puyat Ave., Brgy. Bel Air, Makati City
Construction of Banco De Oro Unibank, Inc. GF EBC Bldg., Paseo De Roxas cor. Gil Puyat Ave., Brgy. Bel Air, Makati City
15-Feb-2018
414 Nieva M. Dela L ots 2 & 4 Blk. 35, Sampaguita St., Pilar Village, Las Piñas City
Proposed Construction of two (2) Storey Duplex Residential L ots 2 & 4 Blk. 35, Sampaguita St., Pilar Village, Las Piñas City
15-Feb-2018
415 KB Holding Corporation #2 Davila St., Brgy. La Paz, Makati City
Three (3) Storey Residential Building #2 Davila St., Brgy. La Paz, Makati City
15-Feb-2018
416 Raymond Tan 621 Gen. Malvar St., Malate, Manila
Demolition of Old Residential House 621 Gen. Malvar St., Malate, Manila
15-Feb-2018
417 Benjamin Dela Cuadra, Jr. I. Delos Reyes St., cor. Eloisa St., Sampaloc, Manila
Proposed Four (4) Storey Residential Building I. Delos Reyes St., cor. Eloisa St., Sampaloc, Manila
15-Feb-2018
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-National Capital Region February 2018
Page 42 of 80
418 Ma. Lourdes Senna Gavanzo Lot 38 Blk. 12, Topacio St., San Andres Bukid, Sta. Ana, Manila
Proposed Three (3) Storey Residential Building Lot 38 Blk. 12, Topacio St., San Andres Bukid, Sta. Ana, Manila
15-Feb-2018
419 Adrian Ang 1445 Mahatma Gandhi St., Paco, Manila
Proposed Three (3) Storey Building 1445 Mahatma Gandhi St., Paco, Manila
15-Feb-2018
420 Ala E. Dela Peña Lot 17 Blk. 27 Soldiers Hills Village, Putatan, Muntinlupa city
Proposed One (1) Storey Residential with Three 93) Bedrooms Lot 17 Blk. 27 Soldiers Hills Village, Putatan, Muntinlupa city
15-Feb-2018
421 Manuelita M. Castañeda Lot 5 Blk. 2 Paseo De Magallanes, Magallanes Village, Makati City
Proposed Two (2) Storey Residence with Attic Lot 5 Blk. 2 Paseo De Magallanes, Magallanes Village, Makati City
15-Feb-2018
422 Ruben Rafael Lot 27 Blk. 59 Charlamagne St., BF Resort Village, Talon 2, Las Piñas City
Proposed Two (2) Storey Residence with Roof Deck Lot 27 Blk. 59 Charlamagne St., BF Resort Village, Talon 2, Las Piñas City
15-Feb-2018
423 Franchesca Marie Escoto 45 Virginia St., Manotoc Subd., Sto. Niño, Marikina city
Proposed Additional 2nd & 3rd Floor Residence 45 Virginia St., Manotoc Subd., Sto. Niño, Marikina city
15-Feb-2018
424 Catherine Del Rosario Tablizo Lot 65 Blk. 3 Apitong St., Monte Vista Subd., I.V.C., Marikina City
Proposed Two (2) Storey Residence with Deck Lot 65 Blk. 3 Apitong St., Monte Vista Subd., I.V.C., Marikina City
15-Feb-2018
425 KB Konstrak Bilding Solusyons Lot 2A Blk. 3 Villa Gracia Homes, Litex Road, Payatas B, Quezon City
Proposed Nursery of Indigeneous and Endemic Plants DOST-ASTI Complex, CP Garcia Ave., U.P. Diliman, Quezon City
15-Feb-2018
426 Jaime Del Rosario, Jr. #124 Bantayog St., Concepcion Uno, Marikina City
Proposed Two (2) Unit Studio Type & Four 94) Residential Room for Rent Three (3) Storey Building with Deck #124 Bantayog St., Concepcion Uno, Marikina City
15-Feb-2018
427 RGDG Construction/AARCON Builders (J.V.) #148 Diamond St., Bernabe Subd. I, Parañaque City
17OI0140 Construction of Flood Control Structures along Laguna De Bay, Brgy. Tunasan, Muntinlupa City Muntinlupa City
13-Feb-2018
DPWH-Las Piñas Muntinlupa District Engineering Office 2nd St., Port Area, Manila
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-National Capital Region February 2018
Page 43 of 80
428 JASA Builders 123 La Perla St., Luciente 1st, Bolinao, Pangasinan
18OE0032 - Organizational Outcome 2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems - Bank Improvement (Steel Sheet Pile) Estero de Sunog Apog Sta Brgy. 145, Manila City
15-Feb-2018
DPWH-North Manila District Engineering Office
429 JASA Builders 123 La Perla St., Luciente 1st, Bolinao, Pangasinan
18OA0014 - Construction/Sealing/Improvement of Riverwall along South Pinagkabalian River, Sta. 0+292 to Sta. 0+584 (Phase II) Brgy. Panghulo, Malabon city
15-Feb-2018
DPWH-Malabon-Navotas District Engineering Office
430 JASA Builders 123 La Perla St., Luciente 1st, Bolinao, Pangasinan
18OE0053 - Organizational Outcome 2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems - Bank Improvement (Steel Sheet Pile) Estero de Sunog Apog, St Brgy. 137, Manila City
15-Feb-2018
DPWH-North Manila District Engineering Office
431 JASA Builders 123 La Perla St., Luciente 1st, Bolinao, Pangasinan
18OE0048 - Organizational Outcome 2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems - Bank Improvement (Steel Sheet Pile) Estero de North Maypajo, Manila City
15-Feb-2018
DPWH-North Manila District Engineering Office
432 Palmary Corp./Perry Weinne Lato Lot C Blk. 12-8 Savoy St., Mckinley West Fort Bonifacio, Taguig City
Proposed Three (30 Storey Residence Lot C Blk. 12-8 Savoy St., Mckinley West Fort Bonifacio, Taguig City
15-Feb-2018
433
E.M. Cuerpo Inc./G.G. Uy Construction/Coco Technologies Corporation-Joint Venture #102 Ligay St. (former Col. Asistio St.) 7th Ave., Brgy. 122, Grace Park East, Caloocan City
Raising of Polder Dike including Slope Protection Works (Phase 4: Sta. 2+030 to Sta. 2+530, Phase 5 Sta. 5+720 to Sta. 5+200 Phase 6 Contract ID: 17Z00010 Brgy. Dampalit, Malabon city
15-Feb-2018
DPWH-Malabon-Navotas District Engineering Office
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-National Capital Region February 2018
Page 44 of 80
434 Ale-J Construction and Trading M.H. Del Pilar St., San Rafael, Rodriguez, Rizal
17-OF0093-Construction of DENR, Hostel Retaining Wall, DENR Compound, Visayas Ave., Quezon City DENR Compound, Visayas Ave., Quezon City
15-Feb-2018
DPWH-Quezon City First District Engineering Office
435 PHPC Co., Ltd. Inc. 11/F 6788 Oledan Square Ayala Avenue Makati City
Petron New Lube Oil Blending Plant (Package 3) Manila North Harbor, Tondo, Manila
15-Feb-2018
436 Grandeur Construction & Vibrant Realty, Inc. 43 Road 7, Project 6, Quezon City
Improvement and Upgrading of Electrical System at Apolonio Samson Senior High School, Camp Emelio Aguinaldo High School, Fort Aguinaldo Elementary School and Flora Ylagan Senior High School Brgy. Apolonio Samson, Camp Aguinaldo, & Pinyahan, Quezon City
15-Feb-2018
437 Philippine Chemsteel Industrial, Inc. 2309 Antel Global Corporate Center, Doñ Julia Vargas Ave., Ortigas, Pasig City
Contract ID#: 17OI0068 Repair/Maintenance along Alabang-Zapote Road, K0023+ (-615)-K0023+(-420), Muntinlupa City Metro Manila
15-Feb-2018 DPWH-LPMDEO
438 AKN Construction Corporation 5085 Filmore St., Palanan, Makati City
17OI0135 Preventive Maintenance of Road: Asphalt Overlay along Daang Maharlika (LZ) K0026+ (-1036)-K0026+(-496) (100MM with Correction), Muntinlupa City Muntinlupa City
15-Feb-2018 DPWH-LPMDEO
439 Er Dela Cruz Construction and Supply Brgy. West Feria, San Felipe, Zambales
Improvement of Open Spaces at DepEd Central Office (Lot No. 2-Hardscape) Pasig City
15-Feb-2018
440 C.T. Leoncio Construction & Trading 171 Guyong Sta. Maria, Bulacan
18OE0009 Organizational Outcome 2: Protect Lives and Properties against Major Floods-Flood Management Program-Construction/Maintenance of Flood Mitigation Structures and Drainage Systems-Bank Improvement (Steel Sheet Pile) Estero De Maypajo Sta. 0+239.56 Manila City
15-Feb-2018 DPWH-North Manila DEO
441 Hexamindz Corporation Pearl St., Marifori Heights Subd., Davao City
18OE0011 Organizational Outcome 2: Protect Lives and Properties against Major Floods-Flood Management Program-Construction/Maintenance of Flood Mitigation Structures and Drainage Systems-Bank Improvement (Steel Sheet Pile) Estero De Maypajo Sta. 0+305.96 Manila City
15-Feb-2018 DPWH-North Manila DEO
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-National Capital Region February 2018
Page 45 of 80
442 A.M. Mauricio Construction & Builders, Inc. Parugan Block 3, Brgy. San Jose, Antipolo City
Proposed Landscape Development of Pasig Housing Village II (Westbank) at Westbank Road, Eusebio Village Brgy. Maybunga, Pasig City
15-Feb-2018
443 A.M. Mauricio Construction & Builders, Inc. Parugan Block 3, Brgy. San Jose, Antipolo City
Renovation of Manggahan Annex Office Brgy. Manggahan, Pasig City
15-Feb-2018
444 Asahi Asia Construction Inc. Unit 606 Prime Land Tower, Market St., Madrigal Business Park, Alabang, Muntinlupa City
Kidzooona Indoor Playground 4/F Level Waltermart Mall, Bay City, D. Macapagal Blvd., Reclamation Area, Pasay City
15-Feb-2018
445 Manna Builders, Inc. #42 Betzaya St., Brgy. San Agustin, Novaliches, Quezon City
Jollibe Muntinlupa Bayan Katihan Road, Muntinlupa City
15-Feb-2018
446 Jefermag Progress & Dev't., Inc. 113 Angeles Subd., Pasolo, Valenzuela City
2018 Pipelaying Project along Dubai Main Road, Baseco Compound in Port Area, Manila City Under South Manila, Pasay Makati Business Area Dubai Main Road, Baseco Compound, Port Area, Manila City
15-Feb-2018
447 Will Decena and Associates, Inc. 3F/4F #73 Rose Building, West Avenue, Quezon City
The Aster Project (6-Storey Office Building), Mandala Park, Shaw Blvd., Mandaluyong City Mandala Park, Shaw Blvd., Mandaluyong City
15-Feb-2018
448 Will Decena and Associates, Inc. 3F/4F #73 Rose Building, West Avenue, Quezon City
Proposed Alabang West Retail (2-Storey) Daang Hari Road-Alabang West, Las Piñas City
15-Feb-2018
449 Don Lee Builders, Inc. 215 Juan Luna St., Binondo, Manila
Proposed 30-Storey RC Building with 2 Storey Penthouse 354 Juan Luna St., Binondo, Manila
15-Feb-2018
450 Link Energie Industries, Co., Inc. No. 2 Gen. Atienza St., San Antonio Vill., Pasig City
Supply and Installation of the 34.5 kV Underground Power Distribution Line at LA Mesa Treatment Plant 2 and La Mesa Booster Pumping Station La Mesa Treatment Plant 2, Novaliches, Quezon City
15-Feb-2018
451 Vinnell-Belvoir Corporation 2322 DPC Place Building Chino Roces Ave. Ext., Magallanes, Makati City
Construction of Four (4) Storey Twelve (12) Classrooms Concepcion Integrated School Concepcion, Marikina City
19-Feb-2018 Department of Public Works and Highways
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-National Capital Region February 2018
Page 46 of 80
452 Vinnell-Belvoir Corporation 2322 DPC Place Building Chino Roces Ave. Ext., Magallanes, Makati City
Construction of Four (4) Storey sixteen (16) Classrooms Parang High School Parang, Marikina City
19-Feb-2018 Department of Public Works and Highways
453 Vinnell-Belvoir Corporation 2322 DPC Place Building Chino Roces Ave. Ext., Magallanes, Makati City
Construction of Four (4) Storey Eight (8) Classrooms Parang High School Parang, Marikina City
19-Feb-2018 Department of Public Works and Highways
454 Dreamworx Builder & Trading, Inc. Room 312 Anita Building, 1300 Quezon Ave., Quezon City
Rehabilitation of Local Road Gonio Street, Brgy. Panghulo, Malabon City Gonio St., Brgy. Panghulo, Malabon City
19-Feb-2018 Department of Public Works and Highways
455 Dreamworx Builder & Trading, Inc. Room 312 Anita Building, 1300 Quezon Ave., Quezon City
Rehabilitation of Local Road Plata St., Brgy. Panghulo, Malabon City Plata St., Brgy. Panghulo, Malabon City
19-Feb-2018 Department of Public Works and Highways
456 Dreamworx Builder & Trading, Inc. Room 312 Anita Building, 1300 Quezon Ave., Quezon City
Rehabilitation of Road Jasmin St., Brgy. Tanza, Navotas City Jasmin St., Brgy. Tanza, Navotas City
19-Feb-2018 Department of Public Works and Highways
457 Dreamworx Builder & Trading, Inc. Room 312 Anita Building, 1300 Quezon Ave., Quezon City
Contract ID: 18OA0055-Upgrading of Road with Improvement of Drainage Canal at Luna St., Bangkulasi, Navotas City Luna St., Bangkulasi, Navotas City
19-Feb-2018 Department of Public Works and Highways
458 Globalcrete Builders, Inc. 620 Mandasig, Candaba, Pampanga
Contract ID: 18OA0056-Rehabilitation of Road, Yangco-Verdadero St., Brgy. Navotas West, Navotas City Brgy. Navotas West, Navotas City
19-Feb-2018
Department of Public Works and Highways (DPWH)
459 Globalcrete Builders, Inc. 620 Mandasig, Candaba, Pampanga
Contract ID: 18OA0062-Construction of Multi-purpose Building, Brgy. Ibababa, Malabon City Brgy. Ibaba, Malabon City
19-Feb-2018
Department of Public Works and Highways (DPWH)
460 Ayana Construction & Trading 15 D. Noriel St., Brgy. Hulo, Sto. Domingo, Nueva Ecija
Contract ID#: 18OA0053- Raising/Improvement of Drainage System along Jorge St., Brgy. San Rafael Village, Navotas City Jorge St., Brgy. San Rafael Village, Navotas City
19-Feb-2018
Department of Public Works and Highways (DPWH)
461 Ayana Construction & Trading 15 D. Noriel St., Brgy. Hulo, Sto. Domingo, Nueva Ecija
Contract ID#: 18OA0037- Rehabilitation of Road, Benjamin St., Brgy. San Rafael Village, Navotas City Brgy. San Rafael Village, Navotas City
19-Feb-2018
Department of Public Works and Highways (DPWH)
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-National Capital Region February 2018
Page 47 of 80
462 C.L. Morales Construction and Trading #35 Tatco Compound, Jacinto St., Brgy. Malinao, Pasig City
Expansion/Construction of TB Dots Serrano Health Center Valenzuela City
19-Feb-2018 Department of Public Works and Highways
463 TM Abad Construction No. 34 Mt. Fuji ST., Filinvest 1, Subd., Batasan Hills
Contract ID: 18OA0040-Construction of Roadincluding Drainage within Tanza Socialized Housing (Phase 2) Brgy. Tanza, Navotas City Brgy. Tanza, Navotas City
19-Feb-2018 Department of Public Works and Highways
464 Justbuilt Builders Unit 19L One Adriatico Place Manila, Adriatico St., Manila
Rehabilitation of Local Road Pureza St., Brgy. Tugatog, Malabon City Pureza St., Brgy. Tugatog, Malabon City
19-Feb-2018 Department of Public Works and Highways
465 Newbig Four J Construction Inc. # 21 Mustang St., Rancho Estate I, Marikina City
Contract ID: 18OA0012-Construction/ Sealing/Improvement of Riverwall Malabon Tullahan River (Sta. 1+841 to Sta.2+135), Brgy. Niugan, Mabon City Brgy. Niugan, Malabon City
19-Feb-2018 Department of Public Works and Highways
466 R.G. Villanueva Construction 36 San Bernardo St., Brgy. San Joaquin, Pasig City
Proposed Teenzone (Two Rooms, Ground Floor RCE School Building at Rizal High School Complex, Brgy. Caniogan, Pasig City
19-Feb-2018
467 R.G. Villanueva Construction 36 San Bernardo St., Brgy. San Joaquin, Pasig City
Repair of Dilapidated Comfort Rooms at BCE & SCE Building Nagpayong Elementary School, Pasig City
19-Feb-2018
468 Henscah Philippines, Incorporated 107 Carmay West, Rosales, Pangasinan
Construction of Four (4) Storey, Twenty (20) Classroom, Bagong Ilog Elementary School, Pasig City Bagong Ilog Elementary School, Pasig City
19-Feb-2018
DPWH-Metro Manila 1st District Engineering Office
469 Express Construction 52 Scout Chuatoco Street, Roxas District, Quezon City
017OB0451-Completion of Three (3) Storey, Nine (9) Classroom at Fortune Elementary School, Marikina City Fortune Elementary School, Marikina City
19-Feb-2018
DPWH-Metro Manila 1st District Engineering Office
470 Red Matrix Builders & Trading Red Matrix Builders & Trading
017OB0452-Completion of Four (4) Storey, 18-Classroom School Building, H. Bautista Elementary School, Marikina City H. Bautista Elementary School, Marikina City
19-Feb-2018
DPWH-Metro Manila 1st District Engineering Office
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-National Capital Region February 2018
Page 48 of 80
471 Roberto Aserios 107 F. Yuseco St., Tondo, Manila
Proposed Three (3) Storey Residential Building (with Mezz.) 107 F. Yuseco St., Tondo, Manila
19-Feb-2018
472 Arnold Padilla Fraternal St., Quiapo, Manila
Proposed Four (4) Storey with Mezzanine and Roof Deck Fraternal St., Quiapo, Manila
19-Feb-2018
473 Michael Eric D.S. Apelario Ong 1371 San Marcelino st., Ermita, Manila
Proposed Three (3) Storey Parkintg- Yakult phils. 1371 San Marcelino st., Ermita, Manila
19-Feb-2018
474 Rochelle K. Baringa 18662 Dominga St., Pasay City
Rochelle K. Baringa-Proposed Demolition 18662 Dominga St., Pasay City
19-Feb-2018
475
J-Marbela Construction and Supply/Jamvaz Builders and Supply (JV) D6 RBNI Building, Princeton St., Concepcion Pequeña, Naga City
Contract ID No. 17E00105 Contract Name: Extension/Renovation/Improvement of Various Offices in DPWH Region IV-B 1.1 Cashier, P.R.O. and Administrative Division. 1.2 Conference Room 1 and Chapel, 1.3 Construction Division, 1.4 Financial and Management Divi DPWH Region IV-B Compound/EDSA Diliman, Quezon City
19-Feb-2018
DPWH Region IV-B EDSA, Diliman, Quezon City
476 Mega Bricks Builders & Trading Phils., Inc. 232 Dr. Pilapil St., San Miguel, Pasig City
Improvement Works at Bagong Ilog Elementary School Bagong Ilog Elementary School, Brgy. Bagong Ilog Elementary School
19-Feb-2018
477 Newbig Four J Construction Inc. # 21 Mustang St., Rancho Estate I, Marikina City
18OF0082-Preventive Maintenance of G. Araneta Ave., K0011+-1236-K0011+871, K--11+891-K0011+1216 Quezon City
20-Feb-2018 DPWH-QCFIRST
478 Newbig Four J Construction Inc. # 21 Mustang St., Rancho Estate I, Marikina City
18OF0029-Rehab/Improvement of Tullahan River, Brgy. Nagkaisang Nayon (Phase IV) Quezon City Quezon City
20-Feb-2018 DPWH-QCFIRST
479 E.L. Torres Construction & Trading, Inc. Lot-15 Blk. 136 Mindanao Ave. Ext., Brgy. Greater Lagro, Quezon City
18OF0008 Road Improvement of Road 20 Q.C. Phase V Quezon City
20-Feb-2018 DPWH-QCFED
480 E.L. Torres Construction & Trading, Inc. Lot-15 Blk. 136 Mindanao Ave. Ext., Brgy. Greater Lagro, Quezon City
18OF0101 Construction of Slope Protection Tributaries, Brgy. Nagkaisang Nayon, Quezon city Quezon City
20-Feb-2018 DPWH-QCFED
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-National Capital Region February 2018
Page 49 of 80
481 St. Timothy Construction Corporation 35 Tatco Compound Jacinto St., Pasig City
Contract ID# 18OH0008 Const./Maintenance of Flood Mitigation Structures & Drainage System- Construction of Drainage System (Box Culvert) along Calderon St., from LA Torre St., to Estero De Sta. Clara, Manila City Manila City
13-Feb-2018 DPWH-SMDEO
482 St. Timothy Construction Corporation 35 Tatco Compound Jacinto St., Pasig City
Contract ID# 18OH0014 Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads along Romualdez St., Manila City Manila City
13-Feb-2018 DPWH-SMDEO
483 St. Timothy Construction Corporation 35 Tatco Compound Jacinto St., Pasig City
Contract ID# 18OH0012 Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads along Paco Park Road, Manila City Manila City
13-Feb-2018 DPWH-SMDEO
484 St. Timothy Construction Corporation 35 Tatco Compound Jacinto St., Pasig City
Contract ID# 18OH0018 Proposed Construction of Retaining Wall-Estero De Sto. Niño (Phase III), Pasay City Pasay City
13-Feb-2018 DPWH-SMDEO
485 St. Timothy Construction Corporation 35 Tatco Compound Jacinto St., Pasig City
Contract ID# 18OH0003 Const./Maintenance of Flood Mitigation Structures & Drainage System-Construction of Drainage System (Box Culvert) along Medel St., from Syquia St. to Estero De Sta. Clara, Manila anila Manila City
13-Feb-2018 DPWH-SMDEO
486 Simeon Bacaoco Manlunas St., Airmens Village, Villamor Airbase, Pasay City
Proposed Three (3) Storey Residence Manlunas St., Airmens Village, Villamor Airbase, Pasay City
20-Feb-2018
487 Rochelle R. Floerich Lots 28 & 30, Blk. 15, San Clemente St., Metrocor-B, Talon 5, Las Piñas City
Proposed Construction of Two (2) Storey, 8-Units Residential Apartment Lots 28 & 30, Blk. 15, San Clemente St., Metrocor-B, Talon 5, Las Piñas City
20-Feb-2018
488 Cynthia Aguinaldo 319 Jefferson St., Taylo St., Pio Del Pilar, Makati City
Four (4) Storey Commercial Residential with Deck 319 Jefferson St., Taylo St., Pio Del Pilar, Makati City
20-Feb-2018
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-National Capital Region February 2018
Page 50 of 80
489 Mia Sarah Casais 5060 P. Burgos St., cor. L.M. Guerrero St., Poblacion, Makati City
Proposed Construction of Fyre Rooftop Lounge, Inc. 5060 P. Burgos St., cor. L.M. Guerrero St., Poblacion, Makati City
20-Feb-2018
490 Elbert P. Cuenca 25th & 26th Fort Bonifacio Global, Taguig City
Proposed Construction of Steak Room Concepts, Inc./Elbert's Upstairs Bar 25th & 26th Fort Bonifacio Global, Taguig City
20-Feb-2018
491 Elbert P. Cuenca S248, R2, Level, Power Plant Mall, Rockwell Cednter, Makati City
Proposed Construction of Steak Room Concepts, Inc./Elbert's Sandwiches S248, R2, Level, Power Plant Mall, Rockwell Cednter, Makati City
20-Feb-2018
492 Hajjie B. Gonzales 2nd Floor Lionas Building, 252 Muntillano St., Brgy. Alabang, Muntinlupa City
Construction of Cebuana Lhullier 2nd Floor Lionas Building, 252 Muntillano St., Brgy. Alabang, Muntinlupa City
20-Feb-2018
493 Dr. Rosela B. Fullante 2519-C Tramo St., Brgy. 107, Zone 2, Pasay City
Proposed Additional Two (2) Storey and Renovation Residential Building 2519-C Tramo St., Brgy. 107, Zone 2, Pasay City
20-Feb-2018
494 Cerlyn Rimando Aison P. Vhora St., Brgy. Balagtas, Pamplona Uno, Las Piñas City
Proposed Three (3) Storey Residential with Loft Bedrooms P. Vhora St., Brgy. Balagtas, Pamplona Uno, Las Piñas City
20-Feb-2018
495 Roberto De Leon G/F/ D.D. Meridian Park Mall, Pasay City
Project Chi (PHO 24) G/F/ D.D. Meridian Park Mall, Pasay City
20-Feb-2018
496 Visionproperties Development Corporation 2nd Floor Lawyers Cooperative Building, 459 Quezon Ave., Sto. Domingo I, Quezon City
Hill Residences SMDC Vacant Lot #23 General Luis St., Sitio Kapre, Reliance St., Brgy. Nagkaisang Nayon Area 9 District 2, Novaliches, Quezon City
20-Feb-2018
497 L.R. Tiqui Builders, Inc. 147 Bagbaguin Sta.Maria, Bulacan
Contract ID: 018-OF-0028 Contruction of Slope Protection of Marikina River Brgy. Batasan Hills, 000 to Sta. 17+915-Sta. 18+058 Brgy. Batasan Hills, Quezon City
20-Feb-2018 DPWH-Quezon City 1st DEO
498 L.R. Tiqui Builders, Inc. 147 Bagbaguin Sta.Maria, Bulacan
Contract ID: 018OF0054 Construction of Slope Protection of Tullahan River, Brgy. Gulod, Quezon City, Phase IV Brgy. Gulod, Quezon City
20-Feb-2018 DPWH-Quezon City 1st DEO
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-National Capital Region February 2018
Page 51 of 80
499 L.R. Tiqui Builders, Inc. 147 Bagbaguin Sta.Maria, Bulacan
Contract ID: 018OF0085 Construction of Slope Protection in Marikina River Sta. 17+769 to Sta. 17+915, Brgy. Batasan Hills, Quezon City Brgy. Batasan Hills, Quezon City
20-Feb-2018 DPWH-Quezon City 1st DEO
500 L.R. Tiqui Builders, Inc. 147 Bagbaguin Sta.Maria, Bulacan
Contract ID: 018OB0213 Construction of RCBC along Balanti Creek, Brgy. Sta. Elena, Marikina City Brgy. Sta. Elena, Marikina City
20-Feb-2018
DPWH-Metro Manila 1st District Engineering Office
501 Margarita Construction 147 Bagbaguin, Sta. Maria, Bulacan
Contract ID No.O18OB0003 Excavation/Desilting of Nangka River, Brgy. Parang, Marikina City Brgy. Parang, Marikina City
20-Feb-2018
DPWH-Metro Manila 1st District Engineering Office
502 Margarita Construction 147 Bagbaguin, Sta. Maria, Bulacan
Contract ID No.O18OB0004 Excavation/Desilting of Nangka River, Brgy. Fortune, Marikina City Brgy. Fortune, Marikina City
20-Feb-2018
DPWH-Metro Manila 1st District Engineering Office
503 Margarita Construction 147 Bagbaguin, Sta. Maria, Bulacan
Contract ID No.O18OB0002 Excavation/Desilting of Nangka River, Brgy. Nangka, Marikina City Brgy. Nangka, Marikina City
20-Feb-2018
DPWH-Metro Manila 1st District Engineering Office
504
PGM Construction & Plumbing Services Lot 1 Blk. 11 Greenlane cor. Green Valley St., Greenview Ph. 3, Sauyo Road, West Fairview, Quezon City
Proposed MSEP Renovation CSRC Building, National Science Complex, U.P. Diliman, Quezon City
20-Feb-2018
505
PGM Construction & Plumbing Services Lot 1 Blk. 11 Greenlane cor. Green Valley St., Greenview Ph. 3, Sauyo Road, West Fairview, Quezon City
Proposed Power Supply of Air-Conditioning Units at CSWD College of Social Work and Community Development, Magsaysay St., U.P. Diliman, Quezon city
20-Feb-2018
506 Helen M. Santos Lot 6 Blk. 5 Paolo St., Golden Acres, Talon 5, Las Piñas City
Proposed Two (2) Storey, Six (6) Units Residential Apartment Lot 6 Blk. 5 Paolo St., Golden Acres, Talon 5, Las Piñas City
21-Feb-2018
507 Eliza May Santiago Caranto, Elynn Santiago Ampol, Elenita Santiago Villar, Ell-ey Ganol Santiago Lot 4-A-1 Valentina St., Paco, Manila
Proposed Four (4) Storey Residential Building with Deck Lot 4-A-1 Valentina St., Paco, Manila
21-Feb-2018
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-National Capital Region February 2018
Page 52 of 80
508 Antonio Lim Ang 27 A. Mabini St., Brgy. Mabini, J.P. Rizal, Mandaluyong City
Proposed Three (3) Storey Building 27 A. Mabini St., Brgy. Mabini, J.P. Rizal, Mandaluyong City
21-Feb-2018
509 Jasen Ngo Lot 15 Blk. 24, Manansala St., North Susana Executive Village, Quezon City
Two (2) Storey Residential Lot 15 Blk. 24, Manansala St., North Susana Executive Village, Quezon City
21-Feb-2018
510 Aaron Wong Lot 37 Blk. 15, Manansala St., North Susana Executive Village, Quezon City
Two (2) Storey with Attic Lot 37 Blk. 15, Manansala St., North Susana Executive Village, Quezon City
21-Feb-2018
511 Alpha & Omega Gen. Contractor & Dev't. Corp. F. Manalo St. cor. J. Pueblo St., Bambang, Pasig City
18OE0004 - Organizational Outcome 2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems -Bank Improvement (Steel Sheet Pile) Estero De Cabulusan Sta. Manila City
21-Feb-2018 DPWH-North Manila DEO
512 Alpha & Omega Gen. Contractor & Dev't. Corp. F. Manalo St. cor. J. Pueblo St., Bambang, Pasig City
18OE0003 - Organizational Outcome 2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems -Bank Improvement (Steel Sheet Pile) Estero De Cabulusan Sta. Manila City
21-Feb-2018 DPWH-North Manila DEO
513 Alpha & Omega Gen. Contractor & Dev't. Corp. F. Manalo St. cor. J. Pueblo St., Bambang, Pasig City
18OE0042 - Organizational Outcome 2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems -Bank Improvement (Steel Sheet Pile) Estero De Quiapo, Sta. 0+ Manila City
21-Feb-2018 DPWH-North Manila DEO
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-National Capital Region February 2018
Page 53 of 80
514 C.T. Leoncio Construction & Trading 171 Guyong Sta. Maria, Bulacan
18OE0016 Organizational Outcome 2: Protect Lives and Properties against Major Floods-Flood Management Program-Construction/Maintenance of Flood Mitigation Structures and Drainage Systems-Bank Improvement (Steel Sheet Pile) Estero De Maypajo, Sta. 0+766.40 Manila City
21-Feb-2018 DPWH-North Manila DEO
515 C.T. Leoncio Construction & Trading 171 Guyong Sta. Maria, Bulacan
18OE0001 Organizational Outcome 2: Protect Lives and Properties against Major Floods-Flood Management Program-Construction/Maintenance of Flood Mitigation Structures and Drainage Systems-Bank Improvement (Steel Sheet Pile) Estero De Vitas Sta. 0+368.25 to Manila City
21-Feb-2018 DPWH-North Manila DEO
516 C.T. Leoncio Construction & Trading/M.V. Caldo Engineering Construction and Supplies (JV) 171 Guyong Sta. Maria, Bulacan
18OE0024 Organizational Outcome 2: Protect Lives and Properties against Major Floods-Flood Management Program-Construction/Maintenance of Flood Mitigation Structures and Drainage Systems-Bank Improvement (Steel Sheet Pile) Estero De Vitas Sta. 0+469.65 to Manila City
21-Feb-2018 DPWH-North Manila DEO
517 DAHL Construction Corp. #6 Uranus St., Brgy. Bahay Toro, Quezon City
18OE0050 Organizational Outcome 2: Protect Lives and Properties against Major Floods-Flood Management Program-Construction/Maintenance of Flood Mitigation Structures and Drainage Systems-Bank Improvement (Steel Sheet Pile) Estero De North Maypajo, Sta. 0= Manila City
21-Feb-2018 DPWH-North Manila DEO
518 El-Jake Construction Blk. 19 Lot 18 Hosea St, Exodus, Sta. Ana, Taytay, Rizal
18-OG-0012, Improvement/Rehabilitation of Drainage System, Brgy. Valencia, Quezon City Quezon City
21-Feb-2018 DPWH-Quezon City 2nd DEO
519 Hexamindz Corporation Pearl St., Marifori Heights Subd., Davao City
18OE0014 - Organizational Outcome 2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems - Bank Improvement (Steel Sheet Pile) Estero de Maypajo, Sta. Manila City
21-Feb-2018 DPWH-North Manila DEO
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-National Capital Region February 2018
Page 54 of 80
520 St. Timothy Construction Corporation 35 Tatco Compound Jacinto St., Pasig City
18OE0006 - Organizational Outcome 2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems - Bank Improvement (Steel Sheet Pile) Estero de San Miguel 0+5 Manila City
21-Feb-2018 DPWH-North Manila DEO
521 Sto. Cristo Construction and Trading Sto. Cristo Hermosa, Bataan
180E0060 Organizational Outcome 2: Protect Lives and Properties against Major Floods-Flood Management Program-Construction/Maintenance of Flood Mitigation Structures and Drainage Systems-Bank Improvement (Steel Sheet Pile) Estero De San Miguel, Sta. 1+963 Manila City
21-Feb-2018 DPWH-North Manila DEO
522 Conscore Corporation 786 J.P. Rizal Street, Concepcion Uno, Marikina City
17OE0196, Locally- - Funded Projects Local Infrastructure Program Buildings and Other Structures Multi-Purpose/Facilities-Renovation of Day Care Center District 4 Zone 41, Brgy. 401, Manila City Manila City
21-Feb-2018 DPWH-North Manila DEO
523
D.R. Robles Construction/Triches Construction and Trading (J.V.) 124 Divine Mercy Village, c6 Road, Gb 1, San Mateo, Rizal
17-OG-0139, Improvement of Roads at Brgy. San Isidro Galas, Quezon City Quezon City
21-Feb-2018 DPWH-Quezon City 2nd Deo
524 FFJJ Construction #12 2nd Batch, Blk. XI, Notre Dame Village, Cotabato City, Region 12 L21, Cotabato City
180E0049 Organizational Outcome 2: Protect Lives and Properties against Major Floods-Flood Management Program-Construction/Maintenance of Flood Mitigation Structures and Drainage Systems-Bank Improvement (Steel Sheet Pile) Estero De Vitas, Sta. 0+460.00 t Manila City
21-Feb-2018 DPWH-North Manila DEO
525 J.H. Pajara Construction Corporation #33 San Rafael cor. San Roque St., Brgy. Kapitolyo, Pasig City
Improvement/Clearing and Desilting of Zapo te River (Phase II) Las Piñas City Las Piñas City
21-Feb-2018
DPWH-District Engineer Office Las Piñas-Muntinlupa, NCR
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-National Capital Region February 2018
Page 55 of 80
526 BMDG Construction Unit 1 Green Manor Townhouse 101 11th Street, Mariana, New Manila, Quezon city
Organizational Outcome 1: Ensure Safe and Reliable National Road System-Asset Preservation Program-Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads-Tertiary Roads-Paltok St., (SO2265LZ) Chainage 008.8-Chainage 258.8 Manila City
21-Feb-2018 Department of Public Works & Highways
527 BMDG Construction Unit 1 Green Manor Townhouse 101 11th Street, Mariana, New Manila, Quezon city
Organizational Outcome 1: Ensure Safe and Reliable National Road System-Asset Preservation Program-Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads-Tertiary Roads-F. Cayco St. (SO2514LZ) Chainage 227.00-Chainage 430.00 Manila City
21-Feb-2018 Department of Public Works & Highways
528 ASEC Development & Const. Corp. 3rd Floor, Regalia Park Tower Building A, 150 P.Tuazon Ave., Cubao, Quezon City
San Antonio Residence Malugay St., Makati City
21-Feb-2018
529 Datem Incorporated 99 Mindanao Ave., Quezon City
Senior High School Building-UST España cor. Cayco St., Manila
21-Feb-2018
530 New Arcond Builders, Inc. 107 Mabilis St., Piñyahan, Diliman, Quezon City
Construction of Slope Protection Tawid Sapa Brgy. Kaligayahan, Quezon city
22-Feb-2018
DPWH-Quezon City First Engineering District
531 Dimaguila Construction & Supply, Inc. 107 Mabilis St., Pinyahan, Diliman, Quezon City
Improvement of Road, NBAnawe St., Quezon City Banawe St., Quezon City
22-Feb-2018
DPWH-Quezon City Second Engineering District
532 Astran Marketing & General Contractor, Inc. B3 L7 Royalle Parthenon Square, 685 Tandang Sora Ave., Quezon City
Construction of Bridge Steel Fence at Odelco Subdivision Brgy. Nagkaisang Nayon & San Bartolome, Quezon City
22-Feb-2018
533 New Arcond Builders, Inc. 107 Mabilis St., Piñyahan, Diliman, Quezon City
Construction of Slope Protection Tributaries Brgy. Sta. Monica, Quezon city
22-Feb-2018
DPWH-Quezon City First Engineering District
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-National Capital Region February 2018
Page 56 of 80
534 New Arcond Builders, Inc. 107 Mabilis St., Piñyahan, Diliman, Quezon City
Rehabilitation/Improvement of Drainage System of Calamba St., Phase II (Mariveles to Mayon sts.) Quezon City
22-Feb-2018
DPWH-Quezon City First Engineering District
535 New Arcond Builders, Inc. 107 Mabilis St., Piñyahan, Diliman, Quezon City
Rehabilitation/Improvement of Drainage System of Simoun St., Phase II (Baco to Mayon St.) Quezon City
22-Feb-2018
DPWH-Quezon City First Engineering District
536 CNC Construction & Development Corporation 62 D. Tuazon St., Lourdes, Quezon city
Proposed Six (6) Storey Office & Commercial Building 8860 Sampaloc St., Makati City
22-Feb-2018
537 Crisalle G. Domingo 2614 Tirso Cruz St., Callejon II, Gagalangin, Tondo, Manila
Proposed Three (3) Storey with Roof Deck 2614 Tirso Cruz St., Callejon II, Gagalangin, Tondo, Manila
22-Feb-2018
538 Romeo E. Dellomas Blk. 13 Lot 20 Pampano St., Longos, Malabon City
Proposed Three (3) Storey with Deck Residential Building Blk. 13 Lot 20 Pampano St., Longos, Malabon City
22-Feb-2018
539 Jose Sandy Sevilla 35 Int. F. Nicolas St., Niugan, Malabon city
Proposed Three (3) Storey Duplex with deck Residential Building 35 Int. F. Nicolas St., Niugan, Malabon city
22-Feb-2018
540 Cherrylyn Ingilla Mantunas St., Airmens Village, Villamor Airbase, Pasay City
Proposed Three (3) Storey Residential with Deck Mantunas St., Airmens Village, Villamor Airbase, Pasay City
22-Feb-2018
541 Gemmaluz A. Hosana Lot 5-7 B1 Banner Ave., 4th Estate Subd., San Antonio, Parañaque City
Proposed Three (3) Storey Residence with Penthouse and Deck Lot 5-7 B1 Banner Ave., 4th Estate Subd., San Antonio, Parañaque City
22-Feb-2018
542 Ferdinand Lansang 7108 M. Ocampo St., Brgy. Pio Del Pilar, Makati City
Proposed Four (4) Storey Residential with Roof Deck 7108 M. Ocampo St., Brgy. Pio Del Pilar, Makati City
22-Feb-2018
543 Veronica J. Betzing No. 4344 Montojo St., Brgy. Sta. Cruz, Makati City
Proposed Four Storey Residential with Deck No. 4344 Montojo St., Brgy. Sta. Cruz, Makati City
22-Feb-2018
544 Liyi Yan/Huaxin Global Support, Inc.) Circuit, Brgy. Carmona, Makati City
Proposed Renovation Circuit Corporadte Center II (9th -12th-14th-18th Floor) Circuit, Brgy. Carmona, Makati City
22-Feb-2018
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-National Capital Region February 2018
Page 57 of 80
545 Rosanto G. Misa Lot 14 Edison St., Makati city
Proposed Renovation of two (2) Storey Commercial building Lot 14 Edison St., Makati city
22-Feb-2018
546 Jaime Que Rivera St., Tinajeros, Malabon City
Proposed One (1) Storey Six (6) Units with Deck Commercial Stalls Rivera St., Tinajeros, Malabon city
22-Feb-2018
547 Wilcy Phua B9 L21 Pine St., Lindenwood Residences, Susana Heights, Putatan, Muntinlupa City
Two (2) Storey Residential Building with Lower Ground floor B9 L21 Pine St., Lindenwood Residences, susana Heights, Putatan, Muntinlupa City
22-Feb-2018
548 Ruby Francisco Jacinto St., Brgy. Ibara, Malabon city
Proposed Two (2) storey with Deck Jacinto St., Brgy. Ibara, Malabon city
22-Feb-2018
549 Kathlyn Sebastian Blk. 61 Lot 8 G. Villazon St., Katarungan Village, Poblacion, Muntinlupa City
Two (2) Storey Residential Blk. 61 Lot 8 G. Villazon St., Katarungan Village, Poblacion, Muntinlupa City
22-Feb-2018
550 Charrisse Felipe Gallardo/ Edward Silverio Delfin Lot 4801-B A. Bonifacio St., san Dionisio, Parañaque City
Two (2) Storey Warehouse Lot 4801-B A. Bonifacio St., san Dionisio, Parañaque City
22-Feb-2018
551 Catalina D. Yap #10 Ruby Road, Pilar Village, Las Piñas City
Proposed Two (2) Storey, Three (3) Units Residential Apartment #10 Ruby Road, Pilar Village, Las Piñas City
22-Feb-2018
552 Jhanssen V. Castillo Lot 9 Blk. 4 cor. Ballad St., Sta. Cecilla
Proposed Two (2) Storey, Eight (8) Units Residential Lot 9 Blk. 4 cor. Ballad St., Sta. Cecilla
22-Feb-2018
553 Maribel Comendador/Chiara's Gelateria Caffe Bar & Ristorante Corp. 2299.3 Festival Supermall, Alabang, Muntinlupa City
Chiara's Gelateria 2299.3 Festival Supermall, Alabang, Muntinlupa City
22-Feb-2018
554 Mat P. Tee/Vulbrite Sunrise Bistro, Inc. 2299.2 Festival Supermall, Alabang, Muntinlupa City
Fiery Style Southwestern Flaming Grill 2299.2 Festival Supermall, Alabang, Muntinlupa City
22-Feb-2018
555 Rizhle Construction & Development Corp. 718 Garland Compound, Talon 3, Kawit, Kavite
Three (30 Storey Residence Tindig na Mangga, Las Piñas City, Metro manila
22-Feb-2018
556 Ironcon Builders & Development Corporation 471 Gen. Luna St., Intramuros, Manila
Proposed Fifteen (15) Storey Mixed Used Building with Roofdeck C.M. Recto Ave., Brgy. 313 Zone 031, Sta. cruz, Manila
22-Feb-2018
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-National Capital Region February 2018
Page 58 of 80
557 Ironcon Builders & Development Corporation 471 Gen. Luna St., Intramuros, Manila
Proposed Eight (8) Storey Office Building 900 D. Romualdez St., Paco, Manila
22-Feb-2018
558 Power K Construction Supply & Services Brgy. San Antonio, Pila, Laguna
Contract ID 18OD0025 Improvement of Flood Control Wall along Pugad Baboy Creek, Brgy. Gen. T. De Leon, Valenzuela City Valenzuela City
22-Feb-2018 DPWH MM 3rd DEO, Marulas, Valenzuela City
559 St. Timothy Construction Corporation 35 Tatco Compound Jacinto St., Pasig City
Contract ID 18OA0028 Raising/ Improvement of Drainage System along Escoda St., Brgy. San Rafael Village, navotas Cityy Brgy. San Rafael, Navotas City
22-Feb-2018
DPWH Malabon Navotas DEO, C$ Road, Bagumbayan North, Navotas City
560 Alpha & Omega Gen. Contractor & Dev't. Corp. F. Manalo St. cor. J. Pueblo St., Bambang, Pasig City
Contract ID 17OH0169 Proposed Repair/Renovation/Improvement of Central Office Motorpool BOE, Bonifacio Drive, Port Area, Manila Manila City
22-Feb-2018 DPWH-SMDEO
561 Alpha & Omega Gen. Contractor & Dev't. Corp. F. Manalo St. cor. J. Pueblo St., Bambang, Pasig City
Contract ID 18OH0013 Rehabili tation of rafael PalmaElem. School Building/Facilities Pablo Ocampo St., cor. San Andres Bukid Manila City 5th LD Manila City
22-Feb-2018 DPWH-SMDEO
562 KP Gonzales Construction Supply And Trading Blk 3D L19 Phi Tierra Nevada San Francisco Gen. Trias Cavite
Contract ID#: 17OH0115, Local Infrastructure Program Buildings and Other Structures Multi-Purpose/ Facilities-Construction of Multi-purpose Building (Center) Brgy. 857 Zone 93, Pandacan, Manila City Manila City
22-Feb-2018 DPWH- LPMDEO
563 KP Gonzales Construction Supply And Trading Blk 3D L19 Phi Tierra Nevada San Francisco Gen. Trias Cavite
Contract ID#: 17OH0117 Locally Funded Projects: Local Infrastructure Program Buildings and Other Structures Multi-Purpose/ Facilities-Construction of Multi-purpose Building (Center) Paraiso ng Batang Maynila, Manila City Manila City
22-Feb-2018 DPWH- LPMDEO
564 KP Gonzales Construction Supply And Trading Blk 3D L19 Phi Tierra Nevada San Francisco Gen. Trias Cavite
Contract ID#: 17OH0173 Construction (Completion) of Multi-purpose Building Sucat Muntinlupa City Muntinlupa City
22-Feb-2018 DPWH- LPMDEO
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-National Capital Region February 2018
Page 59 of 80
565 KP Gonzales Construction Supply And Trading Blk 3D L19 Phi Tierra Nevada San Francisco Gen. Trias Cavite
Contract ID#: 17Oi0122-Routine Maintenance of National Roads-Repair of Roads Brought Abaout by Typhoon "Gorio", Muntinlupa City Muntinlupa City
22-Feb-2018 DPWH- LPMDEO
566 Hexamindz Corporation 10-A Pearl St. Heights, Davao city
Reference No. 18-OE0020 Organizational Outcome 2: Protect Lives and Properties against Major Floods-Flood Management Program-Construction/Maintenance of Flood Mitigation Structures and Drainage Systems-Bank Improvement (Steel Sheet Pile) Estero De Sampalo Tondo, Manila City
22-Feb-2018
North Manila Engineering District, Nagtahan, Manila (NCR-DPWH)
567 Hexamindz Corporation Pearl St., Marifori Heights Subd., Davao City
Reference No. 18-OE0021 Organizational Outcome 2: Protect Lives and Properties against Major Floods-Flood Management Program-Construction/Maintenance of Flood Mitigation Structures and Drainage Systems-Bank Improvement (Steel Sheet Pile) Estero De San Mig Manila City
22-Feb-2018
North Manila Engineering District, Nagtahan, Manila (NCR-DPWH)
568 Specified Contractors & Development, Inc. Suite 305 Xavierville Square Condo, Xavierville Ave., Loyola Heights, Quezon City
Siena Showroom and Model Units Sumulong Highway, Marikina City
22-Feb-2018
569 A.M. Cañete Construction & Trading St. Anthony Subd., Sto. Niño, San Fernando City, Pampanga
Contract ID: 18OA0018-Rehabilitation of Alleys in Brgy. Longos, Malabon City Brgy. Longos, Malabon City
22-Feb-2018 Department of Public Works & Highways
570 A.M. Cañete Construction & Trading St. Anthony Subd., Sto. Niño, San Fernando City, Pampanga
Contract ID: 18OA0036-Construction of Multi-purpose Building, Brgy. Longos, Malabon City Brgy. Longos, Malabon City
22-Feb-2018 Department of Public Works & Highways
571 A.M. Cañete Construction & Trading St. Anthony Subd., Sto. Niño, San Fernando City, Pampanga
Contract ID: 18OA0034-Rehabilitation of Road in Hito St., Pampano St., Brgy. Longos, Malabon City Hito St.-Pampano St., Malabon City
22-Feb-2018 Department of Public Works & Highways
572 A.M. Cañete Construction & Trading St. Anthony Subd., Sto. Niño, San Fernando City, Pampanga
Contract ID: 18OA0002-Rehabilitation of Road in General Lim St., Brgy. San Rafael Village, Navotas City Gen. Lim St., Brgy. San Rafael, Navotas City
22-Feb-2018 Department of Public Works & Highways
573 Ayana Construction & Trading 15 D. Noriel St., Brgy. Hulo, Sto. Domingo, Nueva Ecija
Contract ID#: 17OC0119- Construction of Multi-purpose Building UPS-V Area 7, Brgy. San Isidro, Parañaque City, Metro Manila Parañaque City, Metro, Manila
22-Feb-2018
Arleen D. Beltran District Engineer MMIIDEO-DPWH-NCR
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-National Capital Region February 2018
Page 60 of 80
574 Ayana Construction & Trading 15 D. Noriel St., Brgy. Hulo, Sto. Domingo, Nueva Ecija
Contract ID#: 18OC0033- Rehabilitation of South Super Highway from Magallanes towards Gil Puyat Ave., (Intermittent Section) Makati City, Metro Manila Makati City, Metro, Manila
22-Feb-2018
Arleen D. Beltran District Engineer MMIIDEO-DPWH-NCR
575 Aarcon Builders Unit 206 FSS Bldg., #18 Scout Tuason Castor, Quezon City
18OC0026 Improvement/Sheet Piling along Parañaque River South Phase II, Brgy. san Dionisio, Parañaque City Parañaque City, Metro Manila
22-Feb-2018
Arleen D. Beltran District Engineer MMIIDEO-DPWH-NCR
576 Aarcon Builders Unit 206 FSS Bldg., #18 Scout Tuason Castor, Quezon City
18OC0016 Improvement/Sheet Piling of Parañaque River South East Section, Brgy. San Dionisio, Parañaque City, Metro Manila Parañaque City, Metro Manila
22-Feb-2018
Arleen D. Beltran District Engineer MMIIDEO-DPWH-NCR
577 Aarcon Builders Unit 206 FSS Bldg., #18 Scout Tuason Castor, Quezon City
18OC0022 Improvement/Sheet Piling of Parañaque River, South Phase I, Brgy. San Dionisio, Parañaque City, Metro Manila Parañaque City, Metro Manila
22-Feb-2018
Arleen D. Beltran District Engineer MMIIDEO-DPWH-NCR
578 Grac-ta Builders Ilang Ilang St., Saint Mary Subd., Brgy. Mayamot, Antipolo city, Rizal
18OC0025 Construction of Four (4) Storey Four (4) Classroom School Building at Don Galo Elementary School, Parañaque City, Metro Manila Parañaque City, Metro Manila
22-Feb-2018
Arleen D. Beltran District Engineer MMIIDEO-DPWH-NCR
579 Grac-ta Builders Ilang Ilang St., Saint Mary Subd., Brgy. Mayamot, Antipolo city, Rizal
17OC0114 Construction of Four (4) Storey Twelve (12) Classroom School Building at Parañaque National High School Don Galo Annex, Parañaque City, Metro Manila Parañaque City, Metro Manila
22-Feb-2018
Arleen D. Beltran District Engineer MMIIDEO-DPWH-NCR
580 Grac-ta Builders Ilang Ilang St., Saint Mary Subd., Brgy. Mayamot, Antipolo city, Rizal
17OC0115 Completion of Four (4) Storey Sixteen (16) Classroom School Building at Don Galo National High School Annex, Parañaque City, Metro Manila Parañaque City, Metro Manila
22-Feb-2018
Arleen D. Beltran District Engineer MMIIDEO-DPWH-NCR
581 Rain Construction Corp. #5044 Filmore St., Palanan, Makti City
18OC0006 Drainage Improvementof Camia Street including Laterals, Brgy. Pembo, District II, makati City, Metro Manila Makati City, Metro Manila
22-Feb-2018
Arleen D. Beltran District Engineer MMIIDEO-DPWH-NCR
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-National Capital Region February 2018
Page 61 of 80
582 Rain Construction Corp. #5044 Filmore St., Palanan, Makti City
18OC0005 Drainage Improvementof Dahlia Street including Laterals, Brgy. Pembo, District II, Makati City, Metro Manila Makati City, Metro Manila
22-Feb-2018
Arleen D. Beltran District Engineer MMIIDEO-DPWH-NCR
583 Rain Construction Corp. #5044 Filmore St., Palanan, Makti City
18OC0014 Rehabilitation of Road and Drainage Improvement along Maya Creek, Brgy. Rizal District II, Makati City, Metro Manila Makati City, Metro Manila
22-Feb-2018
Arleen D. Beltran District Engineer MMIIDEO-DPWH-NCR
584 Rain Construction Corp. #5044 Filmore St., Palanan, Makti City
17OC0062 Cleaning and Improvement of Ayala Creek, Ayala Avenue Extension to Makati Avenue, Makati City, Metro Manila Makati City, Metro Manila
22-Feb-2018
Arleen D. Beltran District Engineer MMIIDEO-DPWH-NCR
585 NMJ Builder Unit 28 1552 Diamante St., cor. Zapiro St., Brgy. 802, San Andres Bukid, Manila
Proposed Dyson Flagship Store EX 221 & 222 2nd Level the Podium, ADB Ave., Ortigas, Mandaluyong City
22-Feb-2018
586 AKN Construction Corporation 5085 Filmore St., Palanan, Makati City
18OC0004-Improvement/Sheet Piling of Kaybuboy Creek (South Side) Brgy. San Dionisio, Parañaque City, Metro Manila Parañaque City, Metro Manila
22-Feb-2018
Arleen D. Beltran District Engineer MMIIDEO-DPWH-NCR
587 R.E. Orlina Construction Corporation 13 Emerald St., Northview 1, Batasan Hills, Quezon City
18OC0032-Improvement of J.P. Rizal Street from Makati Ave. to EDSA (Intermittent Section) Makati City, Metro Manila Makati City, Metro Manila
22-Feb-2018
Arleen D. Beltran District Engineer MMIIDEO-DPWH-NCR
588 MPJR Builders Company Unit 515, Cityland Shaw Tower cor. St. Francis St., Mandaluyong City
18OC0008 Construction of Four (4) Storey Eight (8) Classroom School Building at Parañaque Science High School, Parañaque City, Metro Manila Parañaque City, Metro Manila
22-Feb-2018
Arleen D. Beltran District Engineer MMIIDEO-DPWH-NCR
589 Springstar Const. & Supply #143-C Balagtas St., Brgy. 719, Malate, Manila
17OC0122 Construction of Four (4) Storey Twenty Eight (28) Classroom at Parañaque National High Schooll-Main, Parañaque City, Metro Manila (12) Classroom School Building at Parañaque National High School Don Galo Annex, Parañaque City, Metro Manila Parañaque City, Metro Manila
22-Feb-2018
Arleen D. Beltran District Engineer MMIIDEO-DPWH-NCR
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-National Capital Region February 2018
Page 62 of 80
590 Precious Construction J.V. King Eight Builders & Supply San Isidro, Magarao, Camarines Sur
18OC0001-Improvement/Sheet Piling of Kaybuboy Creek (South Side) Brgy. San Dionisio, Parañaque City, Metro Manila Parañaque City
22-Feb-2018
Arleen D. Beltran District Engineer MMIIDEO-DPWH-NCR
591 Flordes Construction and Trading Corp. 3401 Magistrado Arellano St., Bacood, Sta.Mesa, Manila
18OD0027-Rehabilitation/Reconstruction Mac Arthur Highway, Valenzuela City Mac Arthur Highway, Valenzuela City
22-Feb-2018
Metro Manila Third Engineering District Marulas, Valenzuela City
592 Sanper Ventures, Inc. Unit 211 Don Raul Building, Kamuning Road, Quezon City
18OC0024 Repair & Rehabilitation of Health Center of La Paz Archimedes St. cor. Dumas St., Brgy. La Paz, Makati City, Metro Manila Makati City & Parañaque City
22-Feb-2018
Arleen D. Beltran-District Engineer MMIIIDEO-DPWH NCR
593 D.C.R. Construction Christmas Day St., Holiday Village, Bayan Luma IV, Imus City Cavite
18OC0009 Rehabilitation/Upgrading and Drainage Improvement of Kamagong Street and its Vicinity (Phase II), Brgy. San Antonio, District, Makati City, Metro Manila Makati City
22-Feb-2018
Arleen D. Beltran-District Engineer MMIIIDEO-DPWH NCR
594 RGDG CONSTRUCTION 148 Diamond St. Bernabe Subd. I, Parañaque City
17OC0118 Completion of Four (4) Storey Sixteen (16) Classroom School Building at Parañaque National High School Baclaran, Parañaque City, Metro Manila Parañaque City
22-Feb-2018
Arleen D. Beltran-District Engineer MMIIIDEO-DPWH NCR
595 Kyro Builders, Inc. 14 Ongianco St., Sta. veronica, Guimba, Nueva Ecija
18OC0007 Rehabilitation/Upgrading and Drainage Improvement of Camachile Street and its Vicinity, Brgy. San antonio, District I, Makati City, Metro Manila Makati City, Metro Manila
22-Feb-2018
Arleen D. Beltran-District Engineer MMIIIDEO-DPWH NCR
596 Archipelago Builders 29 North Ave., Quezon City
Vista Recto Residences 1896 CM Recto Ave., Quiapo, Manila
22-Feb-2018
597 New C.C. Barcelona Construction Corporation No. 2343 Yangfco St., Gagalangin, Tondo, Manila
Rizal Medical Center (RMC) Procurement of Infrastructure Projects Design and Build for the Proposed Cancer Center Facility Rizal Medical Center, Pasig Blvd., Pasig City
22-Feb-2018
598 Megawide Construction Corporation N. Domingo St., Brgy. Valencia, Quezon City
Double Dragon Tower Double Dragon Meridian Park EDSA Extension cor. Diosdado Macapagal Ave., Pasay City
22-Feb-2018
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-National Capital Region February 2018
Page 63 of 80
599 Megawide Construction Corporation N. Domingo St., Brgy. Valencia, Quezon City
Ascott Hotel Double Dragon Meridian Park Manila, EDSA Extension cor. Diosdado Macapagal Ave., Pasay City
22-Feb-2018
600 Megawide Construction Corporation N. Domingo St., Brgy. Valencia, Quezon City
Golden Bay Tower Macapagal Ave., CBP-1, Pasay City
22-Feb-2018
601 EEI Corporation 12 Manggahan St., Bagumbayan, Quezon City
Hi Corporate Center (8-Storey Building with 2 Basement) Pablo Ocampo Sr. Extension, Brgy. Sta. Cruz, Makati City
22-Feb-2018
602 Mr. Joseph & Mrs. Janna Santamarina Lot 15 Blk. 3 Brtazilla Heights, Tunasan, muntinlupa City
Proposed Two (2) Storey Residence Lot 15 Blk. 3 Brtazilla Heights, Tunasan, Muntinlupa City
23-Feb-2018
603 I.F. Clemente Construction Corporation Door 1 Villa Isabel Townhouse Compound P. Angeles, San Jose Baliuag, Bulacan
Construction of Perimeter Rear Fence Civil Aviation Training Center (CATC) Compound, Merville, Parañaque City
23-Feb-2018
604 R.A. Pahati Const. & Supply, Inc. 283 Payawal Subd., San Lorenzo, Gapan City
18OG0021 Improvement of Road Samar Street Quezon City
25-Jan-2018
Quezon City Second Engineering District Office-DPWH
605 Nueda builders Construction and Supply, Inc. P. Cruz Brgy. Mangino, Gapan City, Nueva Ecija
18OG0023 Widening of Road and Drainage Improvement of Eugenio Lopez Drive Quezon City
23-Feb-2018
Quezon City Second Engineering District Office-DPWH
606 Nueda builders Construction and Supply, Inc. P. Cruz Brgy. Mangino, Gapan City, Nueva Ecija
18OG0016 Improvement/Rehabilitation of Drainage System at 11th Jamboree St. Quezon City
23-Feb-2018
Quezon City Second Engineering District Office-DPWH
607 DMCI- Project Developers, Inc. 1321 Apolinario St., Brgy. Bangkal, Makati City
Mulberry Place Brgy. Bangbang Acacia Estate, Taguig City
23-Feb-2018
608 DMCI- Project Developers, Inc. 1321 Apolinario St., Brgy. Bangkal, Makati City
The Orabella Lot 6 21st Ave., Brgy. Tagumpay, Cubao, Quezon City
23-Feb-2018
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-National Capital Region February 2018
Page 64 of 80
609 Marilou Montes 13A Jasmine St., TS Cruz Subd., Las Piñas City
Four (4) Storey Apartment with Roofdeck 13a Jasmine St., TS Cruz Subd., Las Piñas City
23-Feb-2018
610 St. Timothy Construction Corp. #35 Tatco Compound Jacinto St., Brgy. Malinao, Pasig City
18OE0012-Organizational Outcome 2: Protect Lives and Properties Against Major Floods - Flood Management Program-Construction/Maintenance of Flood Mitigation Structures and Drainage Systems-Bank Improvement Steel Sheet Pile, Estero de San Miguel Sta. 0+000 Manila City
16-Jan-2018
North Manila Engineering District, Nagtahan Manila (NCR-DPWH)
611 St. Timothy Construction Corp. #35 Tatco Compound Jacinto St., Brgy. Malinao, Pasig City
18OE005-Organizational Outcome 2: Protect Lives and Properties Against Major Floods, Flood Management Program, Construction/Maintenance of Flood Mitigation Structures and Drainage Systems: Bank Improvement (Steel Sheet Pile) Estero de Aviles, Sta. 0+200 t Manila City
26-Feb-2018
North Manila Engineering District, Nagtahan Manila (NCR-DPWH)
612 Shamrock Development Corporation/Mr. Tommy K. Tan 382 Shaw Blvd., Pleasant Hills, Mandaluyong City
Proposed Ten (10) Storey Office Building With Deck 382 Shaw Blvd., Pleasant Hills, Mandaluyong City
26-Feb-2018
613 Mundo Builders Inc. 1477 Apolinari St. cor. Gen. Mascardo Bangkal, Makati City
Megami Boutique Okada Manila, New Seaside Drive, Entertainment City, Barangay Tambo, Parañaque City
26-Feb-2018
614 Antonio Lim Ang 27 A. Mabini St. Brgy. Mabini, J.p. Rizal, Mandaluyong City
Proposed Three (3) Storey Building 27 A. Mabini St. Brgy. Mabini, J.p. Rizal, Mandaluyong City
26-Feb-2018
615 Jesus Noel & Maria Gina De Villa B5B L32 Plum St., Underwood Residence, Tunasan, Muntinlupa City
Two(2) Storey Residence B5B L32 Plum St., Underwood Residence, Tunasan, Muntinlupa City
27-Feb-2018
616 Mr. & Mrs. Teofista R. Presnedi L12 B2 Filinvest Palms Pointe Alabang, Muntinlupa City
Two(2) Storey Residential Building L12 B2 Filinvest Palms Pointe Alabang, Muntinlupa City
27-Feb-2018
617 Gilbert Palmero 22 Norfil Bldg. national Road, Brgy. Putatan, Muntinlupa City
Interior Renovation of SSS Alabang Office 22 Norfil Bldg. national Road, Brgy. Putatan, Muntinlupa City
27-Feb-2018
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-National Capital Region February 2018
Page 65 of 80
618 Nueda Builders Construction and Supply, Inc. P. Cruz Brgy. Mangino, Gapan City, Nueva Ecija
180G0019 Widening of road abd Drainage Improvement of 11th Jamboree St., Quezon City Quezon City
27-Feb-2018
Quezon City Second Engineering District Office-DPWH
619 R.A. Pahati Const. & Supply, Inc./Nueda Builders Construction and Supply, Inc. (JV) P. Cruz Brgy. Mangino Gapan City, Nueva Ecija
180F0045 Const./Maint. Of Flood Control Structures, Tributaries and Drainage System of Brgy. Bagong Silangan (Phase 4) Quezon City
25-Jan-2018
Quezon City Second Engineering District Office-DPWH
620 Myung Soo Jang Yan L20 B6 Intramuros St., The Enclave Alabang Brgy. Almanza Dos, Las Piñas City
Proposed Two (2) Storey Residence L20 B6 Intramuros St., The Enclave Alabang Brgy. Almanza Dos, Las Piñas City
27-Feb-2018
621 Sps. Andy/Leanie Paner 821 Cebu St., Sampaloc, Manila
Proposed Three (3) Storey Residence w/ Mezz. Only 821 Cebu St., Sampaloc, Manila
27-Feb-2018
622 Apolinario Marquez #8 G. Araneta and #25 mariano St. Katarungan Village, Brgy. Poblacion, Muntinlupa City
Three (3) Storey Residential Structure w/ Roofdeck #8 G. Araneta and #25 mariano St. Katarungan Village, Brgy. Poblacion, Muntinlupa City
27-Feb-2018
623 Michael Chua Festival Mall, Brgy. Alabang, Muntinlupa City
Fit-out PC Work Festival Mall, Brgy. Alabang, Muntinlupa City
27-Feb-2018
624 I.M. Construction Corp. 47 Kasay-Kasay St., Mira Nila Subd., Tandang Sora District 2, Quezon City
Contract ID:18-OF0100- Construction of Slope Protection Tributaries, Brgy. Fairview, Quezon City Brgy. Fairview, Quezon City
27-Feb-2018 Department of Public Works and Highways
625 I.M. Construction Corp. 47 Kasay-Kasay St., Mira Nila Subd., Tandang Sora District 2, Quezon City
Contract ID:18-OF0083- Road Improvement of Banawe St., Quezon City Banawe St., Quezon City
27-Feb-2018 Department of Public Works and Highways
626 I.M. Construction Corp. 47 Kasay-Kasay St., Mira Nila Subd., Tandang Sora District 2, Quezon City
Contract ID:18-OF0055- Rehab./Improvement of Tullahan River, Brgy. Nova Proper, Quezon City Banawe St., Quezon City
27-Feb-2018 Department of Public Works and Highways
627 I.M. Construction Corp. 47 Kasay-Kasay St., Mira Nila Subd., Tandang Sora District 2, Quezon City
Contract ID:18-OF0087- Opening of Katipunan Ave. Ext., Quezon City Quezon City
27-Feb-2018 Department of Public Works and Highways
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-National Capital Region February 2018
Page 66 of 80
628 Hexamindz Corporation Pearl St., Marifori Heights Subd., Davao City
Contract ID: 18OA0050- Rehabilitation of Road, Camia St., Brgy. Tanza, Navotas City Navotas City
27-Feb-2018 Department of Public Works and Highways
629 Hexamindz Corporation Pearl St., Marifori Heights Subd., Davao City
Contract ID: 18OA0013- Construction/Sealing of River Wall Along Tanza Dike, Navotas City (Phase II) Navotas City
27-Feb-2018 Department of Public Works and Highways
630 Ayana Construction & Trading 15 D. Noriel St., Brgy. Hulo, Sto. Domingo, Nueva Ecija
Contract ID#: 18OA0067- Upgrading of Basketball Court, Block 10 Phase 3, Brgy. Longos, Malabon City Malabon City
27-Feb-2018 Department of Public Works and Highways
631 Ayana Construction & Trading 15 D. Noriel St., Brgy. Hulo, Sto. Domingo, Nueva Ecija
Contract ID#: 18OA0068- Construction of Multi-Purpose Building, Santiago City Syjuco Elementary School, Brgy. Ibaba, Malabon City Malabon City
27-Feb-2018 Department of Public Works and Highways
632 Jagonbuild Construction Corp. 141 Gov. F. Hall St., Bagbaguin, Sta.Maria, Bulacan
Contract ID: 18OA0066- Raising/Improvement of Drainage System Along Dalagang Bukid St., Brgy. NBBS, Navotas City Navotas City
27-Feb-2018 Department of Public Works and Highways
633 Altius Trading and Construction #35 Alkalde Jose Street, Pasig City
Contract ID: 18-OF0109- Construction of Slope Protection Goodwill Creek, Brgy. Bagbag, Quezon City Quezon City
27-Feb-2018 Department of Public Works and Highways
634 Advance Tech Construction & Trading Corp. Unit 832 City & Land Mega Plaza Condominium, ADB Avenue, Ortigas Center, Pasig City
Upgrading of Earist Quadrangle including Construction of Drainage System and Sewerage System thru Design And Build Nagtahan, Sampaloc, Manila
27-Feb-2018
635 Kenneth Pundanera L2A Dr. A. Santos Ave., Brgy. San Antonio, Parañaque City
Proposed Unioil Gas Station L2A Dr. A. Santos Ave., Brgy. San Antonio, Parañaque City
27-Feb-2018
636 Ma. Antonia C. Cuneta 2724 Fogueroa St., Pasay City
Four (4) Storey Residential Building 2724 Fogueroa St., Pasay City
28-Feb-2018
637 Brysar Builders #60 Don Manuel cor. Cadig St., Brgy. Salvacion, Quezon City
Karangalan Sewer Rehabilitation Works Karangalan Village, Pasig City
28-Feb-2018
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-National Capital Region February 2018
Page 67 of 80
638 The Steadfast Builders Lot3B B5 Villa Corinna Subdivision, Pasong Tamo, Quezon City
18OC0010- Rehabilitation/Upgrading and Drainage Improvement of Catmon St., Brgy. San Antonio, District I, Makati City, Metro Manila Makati City, Metro Manila
28-Feb-2018
Arleen D. Beltran, District Engineer, NMIIDEO-DPWH,NCR
639 The Steadfast Builders Lot3B B5 Villa Corinna Subdivision, Pasong Tamo, Quezon City
18OC0015- Rehabilitation/Upgrading and Drainage Improvement of Dita St., Brgy. San Antonio, District I, Makati City, Metro Manila Makati City, Metro Manila
28-Feb-2018
Arleen D. Beltran, District Engineer, NMIIDEO-DPWH,NCR
640 The Steadfast Builders Lot3B B5 Villa Corinna Subdivision, Pasong Tamo, Quezon City
18OC0048- Rehabilitation/Upgrading and Drainage Improvement of Santol St. and its Vicinity, Brgy. San Antonio, District I, Makati City, Metro Manila Makati City, Metro Manila
28-Feb-2018
Arleen D. Beltran, District Engineer, NMIIDEO-DPWH,NCR
641 RNN Construction Corp. 5044 Filmore St., Barangay Palanan, Makati City
17OC0120- Construction of Flood Gates, Calatagan Creek cor. Chino Roces Avenue, Makati City, Metro Manila Makati City, Metro Manila
28-Feb-2018
Arleen D. Beltran - District Engineer, MMIIDEO-DPWH-NCR
642 RNN Construction Corp. 5044 Filmore St., Barangay Palanan, Makati City
18OC0012- Rehabilitation/Upgrading and Drainage Improvement of Balimbing St. including Laterals, Brgy. Comembo, District II, Makati City, Metro Manila Makati City, Metro Manila
28-Feb-2018
Arleen D. Beltran - District Engineer, MMIIDEO-DPWH-NCR
643 ACJ Construction Resources Noter Dame Drive, Poblacion, Pikit, Cotabato
18OC0031- Retrofitting of Pasong Tamo Bridge (B01861LZ), Pasong Tamo Extension, Makati City, Metro Manila Makati City, Metro Manila
28-Feb-2018
Arleen D. Beltran - District Engineer, MMIIDEO-DPWH-NCR
644 El Kapitan Construction Services 50 Purok 1, San Felipe, San Fernando, Pampanga
018OC0029, Rehabilitation/Upgrading of Road including Drainage of Davilla St., and its Vicinity (Phase 2) District I, Makati City, Metro Manila Makati City, Metro Manila
28-Feb-2018
Arleen D. Beltran - District Engineer, MMIIDEO-DPWH-NCR
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-National Capital Region February 2018
Page 68 of 80
645 E.P. De Guzman Consulting Engineer Contractor 250 Mc Arthur St., Veterans Village, Brgy. Pasong Tamo, Quezon City
18-OF0020-Improvement of Drainage along NLEX Service Road, Quezon City Quezon City
28-Feb-2018
DPWH-Quezon City 1st District Engineering Office
646 D.R. Robles Construction Blk. 21 Lot 11 Phase 5 Dizon Estate, San Agustin, San Fernando, Pampanga
18-OF0103-Improvement of Drainage along Mindanao Ave. Ext., Quezon City Quezon City
28-Feb-2018
DPWH-Quezon City 1st District Engineering Office
647 D.R. Robles Construction Blk. 21 Lot 11 Phase 5 Dizon Estate, San Agustin, San Fernando, Pampanga
18-OF0110-Construction of Slope Protection Kaybukot Creek, Brgy. Gulod, Quezon City, Phase II Brgy. Gulod, Quezon City, Phase II
28-Feb-2018
DPWH-Quezon City 1st District Engineering Office
648 D.R. Robles Construction Blk. 21 Lot 11 Phase 5 Dizon Estate, San Agustin, San Fernando, Pampanga
18-OF0036-Rehabilitation/Improvement of Drainage System of Biak na Bato, Quezon City Quezon City
28-Feb-2018
DPWH-Quezon City 1st District Engineering Office
649
Aquaterra Konstrukt, Inc./Legacy Construction Corp. (Joint Venture) f-136, 3rd Floor Bldg.. FI Jose Rizal Drive, Smile City Homes 1, Zabarte Ext., Novaliches, Quezon City
18-OF0040-Road Improvement of D. Tuazon Street, Quezon City Quezon City
28-Feb-2018
DPWH-Quezon City 1st District Engineering Office
650
Aquaterra Konstrukt, Inc. f-136, 3rd Floor Bldg.. FI Jose Rizal Drive, Smile City Homes 1, Zabarte Ext., Novaliches, Quezon City
18-OF0096 Rehabilitation/ Improvement of Culiat Creek, Quezon City Quezon City
28-Feb-2018
DPWH-Quezon City 1st District Engineering Office
651 Alpiz Construction & Development Corp. 131-A, Panay Ave., South Triangle, Quezon City
18-OF0007-Road Improvement of Speaker Perez, Quezon City Speaker Perez, Quezon City
28-Feb-2018
DPWH-Quezon City First District Engineering Office
652 Alpiz Construction & Development Corp. 131-A, Panay Ave., South Triangle, Quezon City
18-OF0046-Rehabilitation/Improvement of Drainage System of Apo Street, Quezon City Apo Street, Quezon City
28-Feb-2018
DPWH-Quezon City First District Engineering Office
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-National Capital Region February 2018
Page 69 of 80
653 Alpiz Construction & Development Corp. 131-A, Panay Ave., South Triangle, Quezon City
18-OF0017-Rehabilitation/Improvement of Drainage System of Speaker Perez St., Quezon City, Phase II Speaker Perez, Quezon City
28-Feb-2018
DPWH-Quezon City First District Engineering Office
654 C.E. Mercado Construction 57 along National Road, Brgy. Niugan, Angat, Bulacan
18-OF0115-Construction of Slope Protection Zabarte Creek, Quezon city Brgy. Zabarte, Quezon City
28-Feb-2018
DPWH-Quezon City 1st District, Engineering Office
655 Ramon Borromeo J.B. Roxas St., Brgy. Olympia, Makati City
Proposed Four (4) Storey Residence with Mezzanine and Deck J.B. Roxas St., Brgy. Olympia, Makati City
28-Feb-2018
656 Normando R. De Leon Estrera Compound, Magdaong Road, SLEX, Poblacion, Muntinlupa City
Advertising Billboard Estrera Compound, Magdaong Road, SLEX, Poblacion, Muntinlupa City
28-Feb-2018
657 Cynthia Antonio Lot 7&8, Sta. Teresita Subd., Malanday, Marikina City
Proposed Two (2) Storey with Roofdeck with Events Place Lot 7&8, Sta. Teresita Subd., Malanday, Marikina City
28-Feb-2018
658 Lea Rodil Ipil St., Marikina Heights, marikina City
Proposed Two (2) Storey Residential Ipil St., Marikina Heights, marikina City
28-Feb-2018
659 Jerome Go/Alfamart Trading Phil., Inc. Lot 10 Blk. 2, St. Mary Ave., Tañong, Marikina City
Proposed Alfamart One (1) Storey Commercial Building Lot 10 Blk. 2, St. Mary Ave., Tañong, Marikina City
28-Feb-2018
660 Karen Roa Lot 11 Blk. 53 Cordillera St., Brgy. Malamig, Mandaluyong City
Proposed Four (4) Storey Residential and Commercial Lot 11 Blk. 53 Cordillera St., Brgy. Malamig, Mandaluyong City
28-Feb-2018
661 Mr. & Mrs. Samuel Lucanas 64 Dela Paz cor. Guerilla St., Sto. Niño, Marikina City
Proposed Three (3) Storey Studio Apartment with Deck 64 Dela Paz cor. Guerilla St., Sto. Niño, Marikina City
28-Feb-2018
662 SDW Realty & Development, Inc. Pioneer cor. Reliance Sts., 1501, Mandaluyong City
Kids Church Unit 6007, 6008,6011, 6012 6/F East Wing, Shangri-la Plaza Mall, Mandaluyong City
28-Feb-2018
663 Naorman T. Miranda & Arnold T. Miranda 2059 cor. Dallas St., M. Reyes St., Pio Del Pilar, Makati City
Proposed Two (2) Storey Five (5) units Studio Type with Roofdeck 2059 cor. Dallas St., M. Reyes St., Pio Del Pilar, Makati City
28-Feb-2018
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-National Capital Region February 2018
Page 70 of 80
664 Charles V. Jose Lot 1-A Blk. 177 Morning Glory St., Brgy. Pembo, Makati City
Proposed Three (3) Storey Residential Building with Roofdeck Lot 1-A Blk. 177 Morning Glory St., Brgy. Pembo, Makati City
28-Feb-2018
665 Framecon Builders #625 Diversion Road San Anton San Leonardo, Nueva Ecija
Rehabilitation of MPB PCCAES Brgy. Batasan Hills, Quezon City Brgy. Batasan Hills, Quezon City
28-Feb-2018 DPWH
666 Framecon Builders #625 Diversion Road San Anton San Leonardo, Nueva Ecija
Rehabilitation/Improvement of Drainage System of Baco St., Quezon City Baco St., Quezon City
28-Feb-2018 DPWH
667 Framecon Builders #625 Diversion Road San Anton San Leonardo, Nueva Ecija
Road Improvement of Soliven St., Brgy. Commonwealth, Quezon City Phase II Soliven St., Brgy. Commonwealth, Quezon City Phase II
28-Feb-2018 DPWH
668 Framecon Builders #625 Diversion Road San Anton San Leonardo, Nueva Ecija
Construction/Maintenance of Flood Control Structures, Tributaries & Drainage System at Brgy. Payatas, Quezon City Brgy. Payatas, Quezon City
28-Feb-2018 DPWH
669 Framecon Builders #625 Diversion Road San Anton San Leonardo, Nueva Ecija
Improvement/Concreting Road Brgy. Philam, Quezon City Brgy. Philam, Quezon City
28-Feb-2018 DPWH
670 Framecon Builders #625 Diversion Road San Anton San Leonardo, Nueva Ecija
Proposed Renovation of UPMO-FCMO-Satellite Officer for Pasig-Marikina River Channel Improvement Project & World Bank Funded Control Projects including Office Equipment and Furnitures and the Proposed Multi-Purpose Building, West Bank Road, Manggahan Flood Manggahan Floodway, Rosario, Pasig City
28-Feb-2018 DPWH
671 Rosand Builders Corporation 94 Doña Rosario Ext., Brgy. Novaliches Proper, Quezon City
Rehabilitation/Reconstruction/Upgrading of Batasan Road, Quezon City Quezon City
28-Feb-2018
DPWH- Quezon City 1st District Engineering Office
672 New Arcond Builders, Inc. 107 Mabilis St., Piñyahan, Diliman, Quezon City
Rehabilitation/Improvement of Drainage System of Halcon St. Quezon City
28-Feb-2018
DPWH-Quezon City First Engineering District
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-National Capital Region February 2018
Page 71 of 80
673 A.L. Salazar Construction, Inc./Yakal Construction Joint Venture Fatima, Ormoc City
Construction of Slope Protection Marikina River at Vista Real Subd., Phase II, Quezon City Marikina River at Vista Real Subd., Phase II, Quezon City
28-Feb-2018
674 Alpiz Construction & Development Corp./MDRIDR Const. & Dev't. Corp. Joint Venture 2 Pio Del Pilar St., Sto. Niño, Marikina City
Road Improvement of NS Amoranto St., Quezon City Amoranto St., Quezon City
28-Feb-2018 DPWH
675 I.D.R Construction Katipunan Rd. cor. Pio Del Pilar St., Sto. Niño, Marikina City
Preventive Maintenance of Susano Road, Quezon City Susano Road, Quezon City
28-Feb-2018 DPWH
676 I.D.R Construction Katipunan Rd. cor. Pio Del Pilar St., Sto. Niño, Marikina City
Proposed Constrcution of Small Scale Pilot Trial on the Use of Marble Dust as Mineral Filler in Hot Mix Asphalt (HMA) along Kanlaon St., Q.C. K007+602-K006+711 with Exception Kanlaon St., Quezon City
28-Feb-2018 DPWH
677 I.D.R Construction Katipunan Rd. cor. Pio Del Pilar St., Sto. Niño, Marikina City
Road Improvement of West 4th St. and West 6th St., Q.C. West 4th St. and West 6th St., Quezon City
28-Feb-2018 DPWH
678 I.D.R Construction Katipunan Rd. cor. Pio Del Pilar St., Sto. Niño, Marikina City
Proposed Constrcution of Small Scale Pilot Trial on the Use of Evotherm as warm Mix Asphalt Additive along Tandang Sora Ave., K0013+(-230.90)-K0013+671.10 with Exception, Q.C. Tandang Sora Ave., Quezon city
28-Feb-2018 DPWH
679 I.D.R Construction Katipunan Rd. cor. Pio Del Pilar St., Sto. Niño, Marikina City
Constrcution of Small Scale Pilot Trial on the Use of Viatop plus FEP in Asphalt Pavement along Commonwealth Ave., Q.C. Commonwealth Ave., Quezon City
28-Feb-2018 DPWH
680 Golden Success Trading & Construction #1 Mozzart cor. Beethoven Greenville Subd., Brgy. Sauyo, Quezon City
Road Improvement of Fairlane St., Q.C. Fairlane St., Quezon City
28-Feb-2018 DPWH
681 LMG Construction/I.D.R Construction Sto. Domingo, Nueva Ecija
Asphalt Overlay with Concreting of Del Monte Ave., Q.C. Del Monte, Quezon City
28-Feb-2018 DPWH
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-National Capital Region February 2018
Page 72 of 80
682 RCDG Construction Corporation/Prismodial Construction Corporation, Joint Venture 4 Republic Ave., Brgy. Holy Spirit, D@, Quezon City
Construction/Maintenance of Flood Control Structures, Tributaries and Drainage System Brgy. Holy Spirit, Q.C. (Phase 3) Holy Spirit, Quezon city
28-Feb-2018 DPWH
683 Precious Construction #136 Zone San Isidro Magarao, camarines Sur
Preventive Maintenance of La Mesa Dam La Mesa Dam, Quezon City
28-Feb-2018 DPWH
684 Precious Construction #136 Zone San Isidro Magarao, camarines Sur
Rehab./Improvement of Tullahan River, North Fairview, Quezon City Tullahgan River, North FAirview3, Quezon City
28-Feb-2018 DPWH
685 Triches Construction and Trading Lot 1A Blk. 8 Amethyst St., Goldriverville Subd., Burgos, Rodriguez, Rizal
Road Improvement of Don Victorino St., Brgy. Holy Spirit, Quezon City Quezon City
28-Feb-2018 DPWH
686 Triches Construction and Trading Lot 1A Blk. 8 Amethyst St., Goldriverville Subd., Burgos, Rodriguez, Rizal
Construction of Slope Protection Asyenda Balai, Q.C. Balai, Quezon City
28-Feb-2018 DPWH
687 Aga & Sons Construction Development Corporation L 11-A-7 M. Eusebio Ave., Brgy. San Miguel, Pasig City
Proposed Seven (7) Storey BNC Building Project South Superhighway, ACSIE Ave., LA Huerta, Parañaque City
28-Feb-2018
688 Alexi Lousse Construction and General Merchandise Brgy. Bayabas, Dipaculao, Aurora
Design and Build Phase I Construction of the Four (4) Storey Shoe and Leathercraft Building #2 Mayor Juan Chanyungco St., Sta. Elena, marikina City
28-Feb-2018
689 FF Cruz & Co., Inc. 800 EDSA, Quezon City
Full-Blast Construction of the R-1 Enhancement Project PEATC Compound, Km. 11, CAVITEX, Aguinaldo Blvd., Parañaque City
28-Feb-2018
690 Nadenn Eve O. Guido Lot 1 Blk. 5 Florante cor. Laura Sts., Pamplona Uno, Las Piñas City
Construction of One (1) Storey-Bakery Arbee Bakeshop Lot 1 Blk. 5 Florante cor. Laura Sts., Pamplona Uno, Las Piñas City
28-Feb-2018
691 Martin F. Fulge Blk. 189 Lot 4 Las Maria St., Zone 8, Pembo, Makati City
Proposed Renovation of Three (3) Storey Residence with Deck Blk. 189 Lot 4 Las Maria St., Zone 8, Pembo, Makati City
28-Feb-2018
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-National Capital Region February 2018
Page 73 of 80
692 I.M. Construction Corp. 47 Kasay-Kasay St., Mira Nila Subd., Tandang Sora District 2, Quezon City
18-OF0100- Construction of Slop e Protection Tributaries, Brgy. Fairview, Quezon City Brgy. Fairview, Quezon City
28-Feb-2018
DPWH- Quezon City 1st District Engineering Office
693 I.M. Construction Corp. 47 Kasay-Kasay St., Mira Nila Subd., Tandang Sora District 2, Quezon City
18-OF0081- Rehabilitation/Improvement of Drainage System of Mauban Street, Quezon City Brgy. Mauban, Quezon City
28-Feb-2018
DPWH- Quezon City 1st District Engineering Office
694 Shirvan Cabales Opina Lot 34-B Blk. 5, Guyabano St., Doña Josefa Village, Almanza Uno, Las Piñas City
Proposed Three (3) Storey Residence Lot 34-B Blk. 5, Guyabano St., Doña Josefa Village, Almanza Uno, Las Piñas City
28-Feb-2018
695 E.L. Anolin Construction #14 B Mariano St., Brgy. Sta. Ana, San Mateo, Rizal
18-OF0097- Rehabilitation/Improvement of Flood Control, Structure of Flood Control Structures and Tributaries at Brgy. Batasan Hills Phase 3, Quezon City Batasan Hills, Quezon City
28-Feb-2018
DPWH-Quezon City 1st District Engineering Office
696 E.L. Anolin Construction #14 B Mariano St., Brgy. Sta. Ana, San Mateo, Rizal
18-OF0070- Road Improvement of Shorthorn Street, Brgy. Bahay Toro, Quezon City Brgy. Baghay Toro, Quezon City
28-Feb-2018
DPWH-Quezon City 1st District Engineering Office
697 LMG Construction/E.L. Anolin Construction (Joint Venture) #14 B Mariano St., Brgy. Sta. Ana, San Mateo, Rizal
18-OF0041- Road Improvement of Mayon Street, Quezon City Mayon Street, Quezon City
28-Feb-2018
DPWH-Quezon City 1st District Engineering Office
698 Philippine Chemsteel Industries, Inc. 2309 Antel Global Corporate Center, Doñ Julia Vargas Ave., Ortigas, Pasig City
Contract ID#: 17OH0101 Proposed Asphalt Overlay at Coconut Palace Compound, CCP Complex, Pasay City Pasay City
28-Feb-2018 DPWH-LPMDEO
699 Socor Construction Corporation Velasquez St., Bangiad Floodway Brgy. San Juan Taytay, Rizal
Contract ID: 18OH0019 Proposed Improvement of Drainage along A. Linao St., San Gregorio St., to P. Gil St., Manila City Manila City
28-Feb-2018 DPWH-SMDEO
700 Socor Construction Corporation Velasquez St., Bangiad Floodway Brgy. San Juan Taytay, Rizal
Contract ID: 18OH0024 Asset Preservation Program-Preventive Maintenance-Tertiary Road along Sta. Lucia (SQ2738LZ) Chainage o-Chainage 698, Manila City Manila City
28-Feb-2018 DPWH-SMDEO
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-National Capital Region February 2018
Page 74 of 80
701 Northern Builders Km. 131 C.P. Romulo Highway, Baras-Baras, Tarlac City
#18OH0020 Rehabilitation of Seawall at the Back of Diokno Bouleverd (Phase VII) Pasay City Pasay City
28-Feb-2018 DPWH-SMDEO, Port Area, Manila
702 Northern Builders Km. 131 C.P. Romulo Highway, Baras-Baras, Tarlac City
#18OH0086 Construction of Slope Pro tection in Marikina River Sta. 17+617 to Sta. 17+769, Brgy. Batasan Hills, Quezon city Brgy. Batasan Hills, Quezon City
28-Feb-2018
DPWH-Quezon City 1st District Engineering Office
703 Northern Builders Km. 131 C.P. Romulo Highway, Baras-Baras, Tarlac City
#18OH0088 Preventive Maintenance of Fairview Ave., SO5451LZ (K0022+931 to K0023+250), SO5455LZ (K0024+9-881) to K0024+ (-836), K0024+638 to K0025+203) SO5456LZ (K0023+076 to K0023+500, K0024+(-907) to K0024+(-323), SO5468LZ (Chainage 0 to Chainage 025), S Quezon city
28-Feb-2018
DPWH-Quezon City 1st District Engineering Office
704 Northern Builders Km. 131 C.P. Romulo Highway, Baras-Baras, Tarlac City
#18OH0089 Preventive Maintenance of Regalado Avenue (North) SO5457LZ (K0025+389 to K0025+1012) Quezon City Quezon city
28-Feb-2018
DPWH-Quezon City 1st District Engineering Office
705 Northern Builders Km. 131 C.P. Romulo Highway, Baras-Baras, Tarlac City
#18O00001 Proposed Widening of Fort Bonifacio-Nichols Field Road (Lawton Ave.) Project Phase II, Fort Bonifacio, Taguig City Taguig City
28-Feb-2018 DPWH-NCR 2nd St.,Port Area, Manila
706 C & F Construction and Development Corp. #34 Inaman St., Masambong, Quezon City
18-OE0092- Organizational Outcome 1: Ensure Safe and Reliable National Road System-Asset Preservation Program-Preventive Maintenance-Tertiary Roads-H. Lopez St.-K006+(-528) - K006+215.9, Tondo Manila City H. Lopez St., Tondo, Manila City
28-Feb-2018
DPWH-North Manila Engineering District, Nagtahan, Sta. Mesa, Manila
707 C & F Construction and Development Corp. #34 Inaman St., Masambong, Quezon City
18-OG0018- Concreting of Road and Drainage Improvement of Mother Ignacia (Phase 4), Quezon City Mother Ignacia (Phase 4) Quezon City
28-Feb-2018
DPWH-QC Second Engineering District #790 EDSA, Diliman, Quezon City
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-National Capital Region February 2018
Page 75 of 80
708 C & F Construction and Development Corp. #34 Inaman St., Masambong, Quezon City
18-OG0033- Improvement/Rehabilitation of Drainage Sytem at Sct. Chuatoco St., Quezon City Sct. Chuatoco St., Quezon City
28-Feb-2018
DPWH-QC Second Engineering District #790 EDSA, Diliman, Quezon City
709 C & F Construction and Development Corp. #34 Inaman St., Masambong, Quezon City
18-OG0034- Improvement/Rehabilitation of Drainage Sytem at Sct. Chuatoco St., Quezon City San Juan River, Quezon city
28-Feb-2018
DPWH-QC Second Engineering District #790 EDSA, Diliman, Quezon City
710 C & F Construction and Development Corp. #34 Inaman St., Masambong, Quezon City
18-OF0012- Improvement of Sta. Catalina St., and San Simon St., Brgy. Holy Spirit, Quezon City Sta. Catalina St., and San Simon St., Brgy. Holy Spirit, Quezon City
28-Feb-2018
DPWH-QC First Engineering District, Sta. Catalian St., Brgy. Holy Spirit, Quezon City
711 C & F Construction and Development Corp. #34 Inaman St., Masambong, Quezon City
18-OG0102- Construction of Road Network including Drainage System and Sidewalk University of the Philippines, Diliman, Quezon City University of the Philippines, Diliman, Quezon City
28-Feb-2018
DPWH-QC Second Engineering District #790 EDSA, Diliman, Quezon City
712 C & F Construction and Development Corp. #34 Inaman St., Masambong, Quezon City
18-OF0030- Upgrading of Republic Avenue, Brgy. Holy Spirit, Quezon City Republic Avenue, Brgy. Holy Spirit, Quezon City
28-Feb-2018
DPWH-QC First Engineering District, Sta. Catalian St., Brgy. Holy Spirit, Quezon City
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-National Capital Region February 2018
Page 76 of 80
713 C & F Construction and Development Corp. #34 Inaman St., Masambong, Quezon City
18-OF0079- Road Improvement of Sta Monica St., and Sto. Niño St., Brgy. Holy Spirit, Quezon City Sta Monica St., and Sto. Niño St., Brgy. Holy Spirit, Quezon City
28-Feb-2018
DPWH-QC First Engineering District, Sta. Catalian St., Brgy. Holy Spirit, Quezon City
714 C & F Construction and Development Corp. #34 Inaman St., Masambong, Quezon City
18-OE0074- Organizational Outcome 1: Ensure Safe and Reliable National Road System-Asset Preservation Program-Preventive Maintenance-Tertiary Roads-Solis (SO2360LZ) chainage 725.0-Chainage 887.0, Tondo, Manila City Solis, Tondo, Manila City
28-Feb-2018
DPWH-North Manila Engineering District, Nagtahan, Sta. Mesa, Manila
715 C & F Construction and Development Corp. #34 Inaman St., Masambong, Quezon City
18-OE0088- Organizational Outcome 1: Ensure Safe and Reliable National Road System-Asset Preservation Program-Preventive Maintenance-Tertiary Roads-J. Rizal Avenue, -K0006+651.80-K006+509.10-K0006+337.73-K006+672.00 Tondo, Manila City J. rizal Ave., Tondo, Manila City
28-Feb-2018
DPWH-North Manila Engineering District, Nagtahan, Sta. Mesa, Manila
716 Eight J'S Construction Services Brgy. Quintong, San Carlos City, Pangasinan
18-OE0094- Organizational Outcome 1: Ensure Safe and Reliable National Road System-Asset Preservation Program-Rehabilitation/Reconstruction/Upgrading of damaged Paved Roads-Tertiary Roads-J. Nepomuceno St. (SO2561LZ) Chainage 0 to Chainage 180 Manila City Manila City
28-Feb-2018 DPWH-North Manila DEO
717 Eight J'S Construction Services Brgy. Quintong, San Carlos City, Pangasinan
18-OE0096- Organizational Outcome 1: Ensure Safe and Reliable National Road System-Asset Preservation Program-Rehabilitation/Reconstruction/Upgrading of damaged Paved Roads-Tertiary Roads-Q. Paredes St., (SO2302LZ) Chainage 0 to Chainage 308, Sta. Cruz, M Manila City
28-Feb-2018 DPWH-North Manila DEO
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-National Capital Region February 2018
Page 77 of 80
718 Eight J'S Construction Services Brgy. Quintong, San Carlos City, Pangasinan
18-OE0086- Organizational Outcome 1: Ensure Safe and Reliable National Road System-Asset Preservation Program-Rehabilitation/Reconstruction/Upgrading of damaged Paved Roads-Secondary Roads-Dasmariñas St., (SO2404LZ) Chainage 088.20-Chainage 499.00 Binondo Manila
28-Feb-2018 DPWH-North Manila DEO
719 Victoria Development and Construction Supply Corp. 103 Lopez Jaena St., Tacloban City
18OE0104 - Organizational Outcome 2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/Maintenance of Flood Mitigation Structures and Drainage System-Construction of Valencia Pumping Station Retarding Basin, Manil Manila City
28-Feb-2018 DPWH-North Manila DEO
720 Victoria Development and Construction Supply Corp. 103 Lopez Jaena St., Tacloban City
18OE0105 - Organizational Outcome 2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/Maintenance of Flood Mitigation Structures and Drainage System-Construction of Valencia Pumping Station Retarding Basin, Manil Manila City
28-Feb-2018 DPWH-North Manila DEO
721 Victoria Development and Construction Supply Corp. 103 Lopez Jaena St., Tacloban City
18OE0107 - Organizational Outcome 2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/Maintenance of Flood Mitigation Structures and Drainage System-Construction of Valencia Pumping Station Retarding Basin, Manil Manila City
28-Feb-2018 DPWH-North Manila DEO
722 Victoria Development and Construction Supply Corp./G.F. Fabian Construction (JV) 103 Lopez Jaena St., Tacloban City
18OE0106 - Organizational Outcome 2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/Maintenance of Flood Mitigation Structures and Drainage System-Construction of Valencia Pumping Station Retarding Basin, Manil Manila City
28-Feb-2018 DPWH-North Manila DEO
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-National Capital Region February 2018
Page 78 of 80
723 Sto. Cristo Construction and Trading Sto. Cristo Hermosa, Bataan
17OE0180 Construction of Two (2) Storey Six (6) Classroom School Building (Revised 3-24-17), Emilio Jacinto Elementary School, Manila City Manila City
28-Feb-2018 DPWH-North Manila DEO
724 Hexamindz Corporation Pearl St., Marifori Heights Subd., Davao City
17OE0176 Construction of Four (4) Storey Twenty (20) Classroom School Building, A.V. Hernandez Elementary School, Tondo, Manila City Manila City
28-Feb-2018 DPWH-North Manila DEO
725 Hexamindz Corporation Pearl St., Marifori Heights Subd., Davao City
17OE0174 Construction of Four (4) Storey Twenty (20) Classroom School Building, (Revised 3-24-17) Timoteo Paez Integrated School, Tondo, Manila City Manila City
28-Feb-2018 DPWH-North Manila DEO
726 Aarcon Builders Unit 206 FSS Bldg., #18 Scout Tuason Castor, Quezon City
18OE0038- Organizational Outcome 2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/Maintenance of Flood Mitigation Structures and Drainage System-Bank Improvement (Steel Sheet Pile) Estero De Valencia, Sta. 1+0 Manila City
28-Feb-2018 DPWH-North Manila DEO
727 Aarcon Builders Unit 206 FSS Bldg., #18 Scout Tuason Castor, Quezon City
18OE0047- Organizational Outcome 2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/Maintenance of Flood Mitigation Structures and Drainage System-Bank Improvement (Steel Sheet Pile) Estero De Calubcob, Sta. 0+0 Manila City
28-Feb-2018 DPWH-North Manila DEO
728 Aarcon Builders Unit 206 FSS Bldg., #18 Scout Tuason Castor, Quezon City
18OE0028- Organizational Outcome 2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/Maintenance of Flood Mitigation Structures and Drainage System-Bank Improvement (Steel Sheet Pile) Estero De Calubcob, Sta. 0+1 Manila City
28-Feb-2018 DPWH-North Manila DEO
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-National Capital Region February 2018
Page 79 of 80
729 Summit Meridien Const. Group., Inc. 12 Mindanao Ave., PH 4 Britanny Subd., Sta. Monica, Quezon City
Contract ID 18OD0092- Improvement of Roads and Drainage System along A. Francisco St. and De Guzman St., Brgy. Paso De Blas, valenzuela City Paso De Blas, Valenzuela City
28-Feb-2018 DPWH MM 3rd DEO, Marulas, Valenzuela City
730 Summit Meridien Const. Group., Inc. 12 Mindanao Ave., PH 4 Britanny Subd., Sta. Monica, Quezon City
Contract ID 18OD0089- Improvement of Roads and Drainage System along Ilang-Ilang St., Brgy. Karuhatan, Valenzuela City Karuhatan, Valenzuela City
28-Feb-2018 DPWH MM 3rd DEO, Marulas, Valenzuela City
731 Summit Meridien Const. Group., Inc. 12 Mindanao Ave., PH 4 Britanny Subd., Sta. Monica, Quezon City
Contract ID 18OD0084- Construction of Flood Control Wall/Riprapping along the Bank of Creeks in Brgy. 176, Phase 3, Package III, Caloocan City Caloocan City
28-Feb-2018 DPWH MM 3rd DEO, Marulas, Valenzuela City
732 Diadema Enterprises 140 Matulungin St., Diliman, Quezon City
Contract ID 18OD0062- Improvement of Roads and Drainage along F. Alarcon St., Brgy. Maysan, Valenzuela City Maysan, Valenzuela City
28-Feb-2018 DPWH MM 3rd DEO, Marulas, Valenzuela City
733 Diadema Enterprises 140 Matulungin St., Diliman, Quezon City
Contract ID 18OD0120- Upgrading of Sapang Bakaw St., Valenzuela City Valenzuela City
28-Feb-2018 DPWH MM 3rd DEO, Marulas, Valenzuela City
734 Diadema Enterprises 140 Matulungin St., Diliman, Quezon City
Contract ID 18OD0067- Improvement of Drainage System along Happy Site (Phase II), Brgy. Marulas, Valenzuela City Marulas, Valenzuela City
28-Feb-2018 DPWH MM 3rd DEO, Marulas, Valenzuela City
735 Diadema Enterprises 140 Matulungin St., Diliman, Quezon City
Contract ID 18OD0065- Rehabilitation of Road along Degula St. and Fe St. Don Pedro Subdivision, Brgy. Marulas, Valenzuela Marulas, Valenzuela City
28-Feb-2018 DPWH MM 3rd DEO, Marulas, Valenzuela City
736 Diadema Enterprises 140 Matulungin St., Diliman, Quezon City
Contract ID 18OD0119- Improvement of Roads and Drainage System Sapang Bakaw St., Brgy. Lawang Bato (From Canumay-Bignay Road to East Service Road, Brgy. Canumay, East to T. Santiago St.) Brgy. Lingunan, Valenzuela City Valenzuela City
28-Feb-2018 DPWH MM 3rd DEO, Marulas, Valenzuela City
REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)
DOLE-National Capital Region February 2018
Page 80 of 80
737 Henscha Phils., Inc. 107 Carmay West, Rosales, Pangasinan
17OB0435 Construction of Four (4) Storey, Eight (8) Classroom, Ricardo P. Cruz Sr. Elementary School., New Lower Bicutan Taguig City
28-Feb-2018 DPWH
738 Henscha Phils., Inc. 107 Carmay West, Rosales, Pangasinan
17OB0448 Construction of Four (4) Storey, Twelve (12) Classroom, Ciriaco P. Tinga, Elementary School Taguig City
28-Feb-2018 DPWH
739 Henscha Phils., Inc. 107 Carmay West, Rosales, Pangasinan
17OB0463 Construction of Four (4) Storey, Twenty Four (24) Classroom, Cipriano P. Sta. Teresa Elementary School Taguig City
28-Feb-2018 DPWH
740 Henscha Phils., Inc. 107 Carmay West, Rosales, Pangasinan
17OB0437 Construction of Four (4) Storey Seven (7) Classroom, Bagumbayan national High School Taguig City
28-Feb-2018 DPWH