The continual increase in road transport produces an inevitable process of degradation of road pavements. As a result, the considerable maintenance problems arising from this degradation assume the proportions of a real emergency because of their repercussions both in economic terms and with regard to road safety. Italian legislation assigns precise personal, civil and penal liability to managers at provincial, municipal and autostrada company level, for accidents which occur through poor or nonexistent maintenance of the roads under their control. This gives rise to a large increase in the insurance costs of the responsible bodies and an incentive to reduce maintenance costs in the longer term. In the last ten years, since Judgement no. 156 of 10 May 1999 by the Constitutional Court, the direction taken by magistrates has changed, with decisions establishing, for example, that roads forming part of urban territory are "under the custody" of the owner of the road, implying that, in the event of an accident, the onus of proving unlawful conduct on the part of the municipal administration is no longer on the injured party: civil liability is now assigned to municipalities, and penal liability to the mayor and technical staff of the competent department, who must demonstrate that they have taken all necessary measures to avoid damage. 6 th DIVISION Technical specification REINFORCING AND WATERPROOFING ROAD PAVEMENTS

Upload: lytram

Post on 30-Jan-2018

223 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: REINFORCING AND WATERPROOFING ROAD · PDF fileTechnical specification REINFORCING AND WATERPROOFING ROAD PAVEMENTS 1 ... 2 REINFORCING AND WATERPROOFING ROAD PAVEMENTS Technical specification

1REINFORCING AND WATERPROOFING ROAD PAVEMENTSTechnical specification

The continual increase in road transport produces an inevitable process of degradation of road pavements. As a result, the considerable maintenance problems arising from this degradation assume the proportions of a real emergency because of their repercussions both in economic terms and with regard to road safety.Italian legislation assigns precise personal, civil and penal liability to managers at provincial, municipal and autostrada company level, for accidents which occur through poor or nonexistent maintenance of the roads under their control. This gives rise to a large increase in the insurance costs of the responsible bodies and an incentive to reduce maintenance costs in the longer term.In the last ten years, since Judgement no. 156 of 10 May 1999 by the Constitutional Court, the direction taken by magistrates has changed, with decisions establishing, for example, that roads forming part of urban territory are "under the custody" of the owner of the road, implying that, in the event of an accident, the onus of proving unlawful conduct on the part of the municipal administration is no longer on the injured party: civil liability is now assigned to municipalities, and penal liability to the mayor and technical staff of the competent department, who must demonstrate that they have taken all necessary measures to avoid damage.

6th DIVISION

Technical specificationREINFORCING AND WATERPROOFING

ROAD PAVEMENTS

Page 2: REINFORCING AND WATERPROOFING ROAD · PDF fileTechnical specification REINFORCING AND WATERPROOFING ROAD PAVEMENTS 1 ... 2 REINFORCING AND WATERPROOFING ROAD PAVEMENTS Technical specification

2 REINFORCING AND WATERPROOFING ROAD PAVEMENTS Technical specification

INTRODUCTIONThe continual increase in road transport pro-duces an inevitable process of degradation of road pavements. As a result, the consider-able maintenance problems arising from this degradation assume the proportions of a real emergency because of their repercussions both in economic terms and with regard to road safety.

Mechanisms causing degradation of the road pavementThe principal mechanisms causing degrada-tion of the road pavement can be summed up under the following headings:• fatigue cracking• rutting• reflection cracking.Fatigue cracking is indicated by an extensive web of cracks affecting the road surface, and is manifested when the pavement is subjected to repeated cycles of loading.Rutting consists of longitudinal furrows along the lines most travelled by the wheels, and is due to an accumulation of permanent deformations which can be initiated by plas-tic deformation of the bonded layers or by subsidence of the unbonded layers.A typical example of reflection cracking is the cracks which appear in the bituminous conglomerate pavement of airport runways

at the joints between the underlying concrete slabs, caused by differential subsidence of the latter under the heavy load of aircraft wheels.

Restoration of the carrying capacityRestoration of the carrying capacity of road superstructures is the commonest reason for intervention at all levels, from autostradas to urban streets managed by local authorities. Maintenance of a road pavement normally consists of laying one or more layers (gener-ally of bituminous conglomerate) after re-moving the damaged existing material by milling. The need to optimise intervention costs, combined with the difficulties usually en-countered in completely removing the super-structure and the necessity of not damaging the existing levels of drivable surface, have given rise over time to a growing interest in and consensus in favour of the application of reinforcement systems in the form of various kinds of mesh.This is confirmed by the numerous interna-tional research projects (e.g. RILEM TC SIB-237/TG4) which are currently in progress. These initiatives are all directed at providing responses, from a scientific point of view, on the potential and benefits deriving from the application of reinforcing elements to combat the principal mechanisms caus-ing degradation of road pavements. There is in fact a unanimous consensus for the belief that, through the correct use of rein-forcement systems, it is possible to obtain a reduction in costs as a result of pro-longing the useful life of road pavements.

The pumping effectOn the basis of past experience and an anal-ysis of the problems encountered, it was decided to design a high-performance ge-ocomposite, capable of combining the rein-forcing function conferred by a glass fibre mesh with the (anti-pumping) waterproof-ing function performed by a geomembrane. In practice, it had been observed that cracks in the bonded layers produce accelerated deterioration of the pavement because of the infiltration of water into the unbonded layers below. The passage of vehicles, in particu-lar, makes the water and fine-grained mate-rial rise (pumping effect – Fig. 1), causing the progressive collapse of the loadbearing structure and the consequent subsidence of the road surface.The use of this new generation of high-performance geocomposites achieves the objective of making it possible to design a new stratigraphy for road pavements whose purpose is to allow both a saving in the thickness of the bonded layers and the creation of a structure with better per-formance and greater durability.

PRINCIPAL DISRUPTING MECHANISMS IN FLEXIBLE PAVEMENTS

Fatigue cracking

Rutting

Reflection cracking

1

2

3

Figure 1. PUMPING EFFECT

1. Unbonded layer2. Bituminous conglomerate3. Damaged wear layer

1

2

3

Water

Water

Page 3: REINFORCING AND WATERPROOFING ROAD · PDF fileTechnical specification REINFORCING AND WATERPROOFING ROAD PAVEMENTS 1 ... 2 REINFORCING AND WATERPROOFING ROAD PAVEMENTS Technical specification

3REINFORCING AND WATERPROOFING ROAD PAVEMENTSTechnical specification

ResearchIn order to optimise the characteristics of a high-performance geocomposite, the company INDEX has financed a programme of experi-mental research conducted under the guidance of Prof. Francesco Canestrari of the Marche Polytechnic University at Ancona, Italy.This study investigated the composition, among various available alternatives, of the bitumen-polymer mix of the geomembrane, and the type and position of the glass fibre reinforcing mesh. In particular, the laboratory investigation had as its object the characterisation of the perform-ance of various geocomposites through the performance analysis of a double-layer system, with the membrane embedded in a traditional closed bituminous conglomerate characterised by the presence of different types of interface. The variables analysed made it possible to eval-uate the influence of different types of interface (varying with the physical, geometrical and di-mensional properties of the glass fibre mesh, the geomembrane and the laying method used), by the use of advanced test protocols capable of investigating the behaviour in shear (Fig. 2), under dynamic bending (Fig. 3) and under static bending (Fig. 4) of the double-layer bituminous system.The experiment, which was conducted using the above-mentioned latest-generation equip-ment, was designed with the objective of eval-uating the benefit deriving from the use of a geocomposite in a pavement, through the joint evaluation of the following performances:• resistance to reflection cracking and to trac-

tion stresses induced by bending in the su-perstructure;

• verification of the maintenance of adequate levels of shear continuity at the interface.

On the basis of the results obtained in the course of the experiments, it was possible to predict the performance level for the products investigated in the case of road applications at real size.

Summary of the main results of the experimentThe geocomposite which emerged from the re-search, called AUTOTENE ASFALTICO AN-TIPUMPING HE/TVP can be thought of for all practical purposes as the synergistic union between a geogrille and a SAMI (Stress Ab-sorbing Membrane Interlayer) geomembrane.The waterproofing geomembrane protects the lower layers from water penetration and the upper layers from the phenomenon of pumping, preventing the water and fine material from ris-ing as a result of the "pumping" due to vehicular traffic. It also prevents the phenomenon of re-flection of cracks and thermal cracking.As regards the function of the SAMI, note that field research conducted by Carl L. Monismith, one of the greatest world experts on roads, led to the conclusion that a 5 cm wear layer laid over a SAMI elastomeric membrane of 2.5 mm thickness (which coincides with the thickness of AUTOTENE ASFALTICO ANTIPUMPING HE/TVP), spread over an old cracked pavement, corresponds to a wear layer of 19 cm. It has been established that a 5 cm wear layer, laid without SAMI on an old cracked pavement, reflects the surface cracks after less than two years, whereas the same layer with SAMI has a life expectancy of more than ten years. The reinforcing geogrille contributes to the absorption of the tensions and deformations induced inside the pavement by the vehicular

and environmental loads, reducing the tension/deformation state of the individual layers that make up the superstructure and consequently prolonging the useful life of the pavement.In the course of the research, the type of rein-forcement was the subject of particular atten-tion, in order to identify, for a given mechanical strength, the best geometry for the reinforce-ment. The image below (Fig. 5) demonstrates that the resistance to repeated mechanical loads of the 12.5.5×12.5 mm geogrille of AU-TOTENE ASFALTICO ANTIPUMPING HE/TVP is considerably superior to that of a com-parable geocomposite, of equal strength but reinforced with a geogrille with a 5×5 mm mesh.

Application method and fields of useExperimental research and on-site experi-ence have confirmed that the geocomposite AUTOTENE ASFALTICO ANTIPUMPING HE/TVP, acting as reinforcement, contributes to slowing down the formation of holes and su-perficial cracks in bituminous conglomerate pavements, at the same time waterproofing the underlying layers in order to avoid water and fine-grained material rising (pumping effect).The materials, experimentally optimised, used for the manufacture of the geocomposite consist

of a geomembrane made up of a continuous-phase elastomer and distilled bitumen. The membrane is durable and resistant to the heat of the hot-spread bituminous conglomerate, and is reinforced with a non-woven polyester fabric coupled to a special composite reinforce-ment consisting of a glass fibre mesh. The cou-pling of this mesh with the geomembrane, which performs the waterproofing function, endows the pavement with high resistance to reflection cracking, and in addition enables it to reduce the stresses induced by traffic, consequently prolonging its useful life. To facilitate perfect laying, AUTOTENE ASFALTICO ANTIPUMPING HE/TVP is provided with a heat-self-adhesive treatment to increase its adhesion as a result of the heat of the bituminous conglomerate during laying, and of the action of traffic in operation and solar radiation. Operationally, the geocom-posite is applied dry to the road pavement (with 60 mm overlaps between contiguous elements), after removal of the siliconised protective sheet resulting from the auto-thermo-adhesive treat-ment. The upper surface of the geocomposite is protected by a thin mineral layer which means that during work on site it can be driven over by site vehicles. This layer is later incorporated into the upper layer by the hot-spread bituminous conglomerate. Final adhesion to the laying sur-face is effected by the subsequent operations of hot-spreading the bituminous conglomerate layer.AUTOTENE ASFALTICO ANTIPUMPING HE/TVP is compatible with all types of bituminous conglomerate, it is totally recyclable within the processing cycle of the bituminous conglom-erate itself, and is easily removed during the operation of milling the wear surface. It has been demonstrated by experimental studies and by application on site that the use of this geocomposite is effective both in repair work to existing roads (e.g. reinforcing or widen-ing the carriageway), and in the construction of new pavements which will be subject-ed to high volumes of commercial vehicles.

5 000

10 000

15 000

20 000

25 000

30 000

Num

ber

of c

ycle

s pe

r fle

xion 4PB test - 1.6 kN

0EM PR5.0 PR12.5 PR12.5inf

Figure 2. DOUBLE-LAYER SLABS PREPARED WITH ROLLER COMPACTOR AND ASTRA DEVICE (UNI/TS 11214)

Figure 3. DYNAMIC FLEXIONAL SYSTEM

Figure 5. RESISTANCE TO DYNAMIC FLEXION

Figure 4. STATIC FLEXIONAL SYSTEM

Shear box Unconfined area

Vertical load

Vertical displacement

Mobile device

Engin

e

Horizontal force(load cell)

Jointed arm

Upper layer of sample

Lower layer of sample

Horizontal displacement

EM: unreinforced conglomeratePR5.0: conglomerate with geocomposite reinforced with 5×5 mm geogrillePR12.5 - PR12.5inf: conglomerate with geocomposite reinforced with 12.5×12.5 mm geogrille

Page 4: REINFORCING AND WATERPROOFING ROAD · PDF fileTechnical specification REINFORCING AND WATERPROOFING ROAD PAVEMENTS 1 ... 2 REINFORCING AND WATERPROOFING ROAD PAVEMENTS Technical specification

4 REINFORCING AND WATERPROOFING ROAD PAVEMENTS Technical specification

Repairs to existing cracked pavementTypical repair applications include laying AUTOTENE ASFALTICO ANTIPUMPING HE/TVP under a layer of bituminous conglomerate (draining or otherwise) of a minimum thickness of 4 cm (case D - page 8).

Repairs to existing cracked pavement (milled)In the case of repairing existing pavements, the geocomposite can also be laid over a surface of milled bituminous conglomerate. This requires the application of a special primer ECOVER ANTIPUMPING (case B - page 6).

Repairs to pavement with reprofilingIf, after milling, the remaining thickness of the bonded layers is insufficient or too irregular, it will be necessary to perform a reprofiling with bituminous conglomerate with a maximum particle diameter of 10 mm for at least 2 cm of thickness (case C - page 7).

Repairs to pavement (with total milling)When the geocomposite forms part of a new stratigraphy, or in the case of resurfacing with complete demolition of the bonded layers, it should be positioned below a layer of bituminous conglomerate at least 4 cm in thickness, or ideally of greater thickness, in order to protect it from subsequent milling of the wear surface, and in any event it should be positioned above a layer of conglomerate (case E - page 9).

AUTOTENE ASFALTICO ANTIPUMPING HE/TVP can also be used to advantage for protecting joints in the case of widening the carriageway, and for reinstating the carriageway over trenches cut for repairing underground services (case E - page 9; case F - page 10; case G - page 12).

New bituminous conglomerate

New bituminous conglomerate

New bituminous conglomerate

New bituminous conglomerate

New bituminous conglomerate

Reprofiling layer in bituminous conglomerate

AUTOTENE ASFALTICO ANTIPUMPING HE/TVP

AUTOTENE ASFALTICO ANTIPUMPING HE/TVP

AUTOTENE ASFALTICO ANTIPUMPING HE/TVP

AUTOTENE ASFALTICO ANTIPUMPING HE/TVP

Existing bituminous conglomerate

Milled existing bituminous conglomerate

Milled existing bituminous conglomerate

Bituminous conglomerate

hCB≥4 cm

hCB≥4 cm

hCB≥4 cm

h<4 cm

ECOVER ANTIPUMPING

ECOVER ANTIPUMPING

Page 5: REINFORCING AND WATERPROOFING ROAD · PDF fileTechnical specification REINFORCING AND WATERPROOFING ROAD PAVEMENTS 1 ... 2 REINFORCING AND WATERPROOFING ROAD PAVEMENTS Technical specification

5REINFORCING AND WATERPROOFING ROAD PAVEMENTSTechnical specification

Reinforcing and waterproofing new road pavementA

Reinforcing and waterproofing a new road pavement by laying, at the interface between layers of hot-spread bituminous conglomerate, a reinforced geocomposite of type AUTOTENE ASFALTICO ANTIPUMPING HE/TVP. This geocomposite consists of a prefabricated elastomeric heat-self-adhesive antipumping geomembrane, whose adhesion is activated by the heat of the upper layer of hot-spread bituminous conglomerate, based on distilled bitumen and elastomeric polymers, with composite reinforcement consisting of a geogrille woven in glass fibre (mesh size 12.5 x 12.5 mm) and high-strength non-woven polyester fabric, with its lower face heat-self-adhesive, protected by a siliconised film and its upper face covered with a fine mineral layer. The geocomposite has the following characteristics: thickness 2.5 mm (EN 1849-1); resistance to compaction of the bituminous conglomerate (EN 14692); impermeability to a pressure of 500 kPa (EN 14694); resistance to traction L/T of 40 kN/m (EN12311-1); elongation to break L/T of 4% (EN12311-1); shear resistance ≥0.30 N/mm2 (EN 13653).The double-layer system in bituminous conglomerate reinforced with this geocomposite is characterised, finally, by a peak shear resistance at the interface measured by the ASTRA (UNI/TS 11214/2007) test as ≥0.30 MPa (T = 20°C; normal force = 0.2 MPa).The geocomposite is laid directly on the new layer of bituminous conglomerate without a binding coat, with the sheets arranged along the direction of travel in the case of reinforcement of a standard road carriageway, or in a radial direction in the case of reinforcement of roundabout intersections. The sheets are laid with a longitudinal overlap of 6 cm along the overlap strip provided on the upper face, and a transverse overlap of 10 cm at the ends of the sheets. After laying, the siliconised film protecting the lower face and the siliconised strip protecting the longitudinal overlap zone of the upper face are removed, and the geocomposite is pressed together sufficiently to promote adhesion. Subsequently the material is covered with layers of hot-spread bituminous conglomerate to a total thickness of at least 4 cm; the wear layer can be of closed or draining type.

1. New bituminous conglomerate

3. New bituminous conglomerate ≥4 cm

2. AUTOTENE ASFALTICO ANTIPUMPING HE/TVP

STRATIGRAPHY1. New bituminous conglomerate2. AUTOTENE ASFALTICO ANTIPUMPING HE/TVP3. New bituminous conglomerate ≥4 cm

UNBONDED LAYER

hCB≥4 cm

Page 6: REINFORCING AND WATERPROOFING ROAD · PDF fileTechnical specification REINFORCING AND WATERPROOFING ROAD PAVEMENTS 1 ... 2 REINFORCING AND WATERPROOFING ROAD PAVEMENTS Technical specification

6 REINFORCING AND WATERPROOFING ROAD PAVEMENTS Technical specification

Reinforcing and waterproofing road pavement repair: application to milled surfaceB

Reinforcing and waterproofing an old road pavement by applying to the milled surface a reinforced geocomposite of type AUTOTENE ASFALTICO ANTIPUMPING HE/TVP. This geocomposite consists of a prefabricated elastomeric heat-self-adhesive antipumping geomembrane, whose adhesion is activated by the heat of the upper layer of hot-spread bituminous conglomerate, based on distilled bitumen and elastomeric polymers, with composite reinforcement consisting of a geogrille woven in glass fibre (mesh size 12.5 x 12.5 mm) and high-strength non-woven polyester fabric, with its lower face heat-self-adhesive, protected by a siliconised film and its upper face covered with a fine mineral layer. The geocomposite has the following characteristics: thickness 2.5 mm (EN 1849-1); resistance to compaction of the bituminous conglomerate (EN 14692); impermeability to a pressure of 500 kPa (EN 14694); resistance to traction L/T of 40 kN/m (EN12311-1); elongation to break L/T of 4% (EN12311-1); shear resistance ≥0.30 N/mm2 (EN 13653).The double-layer system in bituminous conglomerate reinforced with this geocomposite is characterised, finally, by a peak shear resistance at the interface measured by the ASTRA (UNI/TS 11214/2007) test as ≥0.30 MPa (T = 20°C; normal force = 0.2 MPa).In the case of reinstatement of the milled pavement the geocomposite may be laid directly on the milled layer if the residual thickness of the underlying bituminous conglomerate is at least 4 cm. After reinstating, where necessary, the flatness of the milled surface (e.g. by filling holes with bituminous conglomerate, partial reprofiling etc.) and after cleaning with mechanical brushes, a binding coat is laid consisting of a bituminous emulsion of type ECOVER ANTIPUMPING, containing elastomeric resins and additives, suitable for laying the antipumping geocomposite. This bituminous emulsion is characterised by a dry residue (UNI EN ISO 3251) of 35% and a DIN 4 cup viscosity at 20°C (UNI EN ISO 2431) of 20-30 s. The binding coat is applied by spreading this bituminous emulsion over the dry surface at the rate of 0.5 kg/m2.The next step is to apply the geocomposite, after the binding coat has had time to dry as per the product specification. The geocomposite is applied to the milled surface which has been treated with bituminous emulsion, with the sheets arranged along the direction of travel in the case of reinforcement of a standard road carriageway, or in a radial direction in the case of reinforcement of roundabout intersections. The sheets are laid with a longitudinal overlap of 6 cm along the overlap strip provided on the upper face, and a transverse overlap of 10 cm at the ends of the sheets. After laying, the siliconised film protecting the lower face and the siliconised strip protecting the longitudinal overlap zone of the upper face are removed, and the geocomposite is pressed together sufficiently to promote adhesion. Subsequently the material is covered with layers of hot-spread bituminous conglomerate to a total thickness of at least 4 cm; the wear layer can be of closed or draining type.

1. Existing bituminous conglomerate

5. New bituminous conglomerate ≥4 cm

4. AUTOTENE ASFALTICO ANTIPUMPING HE/TVP

3. ECOVER ANTIPUMPING

2. Milled area

STRATIGRAPHY1. Existing bituminous conglomerate2. Milled area3. ECOVER ANTIPUMPING4. AUTOTENE ASFALTICO ANTIPUMPING HE/TVP5. New bituminous conglomerate ≥4 cm

UNBONDED LAYER

hCB≥4 cm

Page 7: REINFORCING AND WATERPROOFING ROAD · PDF fileTechnical specification REINFORCING AND WATERPROOFING ROAD PAVEMENTS 1 ... 2 REINFORCING AND WATERPROOFING ROAD PAVEMENTS Technical specification

7REINFORCING AND WATERPROOFING ROAD PAVEMENTSTechnical specification

Reinforcing and waterproofing old road pavement: application to reprofiled surfaceC

Reinforcing and waterproofing an old road pavement by applying, to the reprofiling layer in hot bituminous conglomerate, a reinforced geocomposite of type AUTOTENE ASFALTICO ANTIPUMPING HE/TVP. This geocomposite consists of a prefabricated elastomeric heat-self-adhesive antipumping geomembrane, whose adhesion is activated by the heat of the upper layer of hot-spread bituminous conglomerate, based on distilled bitumen and elastomeric polymers, with composite reinforcement consisting of a geogrille woven in glass fibre (mesh size 12.5 x 12.5 mm) and high-strength non-woven polyester fabric, with its lower face heat-self-adhesive, protected by a siliconised film and its upper face covered with a fine mineral layer. The geocomposite has the following characteristics: thickness 2.5 mm (EN 1849-1); resistance to compaction of the bituminous conglomerate (EN 14692); impermeability to a pressure of 500 kPa (EN 14694); resistance to traction L/T of 40 kN/m (EN12311-1); elongation to break L/T of 4% (EN12311-1); shear resistance ≥0.30 N/mm2 (EN 13653).The double-layer system in bituminous conglomerate reinforced with this geocomposite is characterised, finally, by a peak shear resistance at the interface measured by the ASTRA (UNI/TS 11214/2007) test as ≥0.30 MPa (T = 20°C; normal force = 0.2 MPa).If, following milling of the old road pavement, the residual thickness of the existing milled bituminous conglomerate proves to be insufficient (< 4 cm), a reprofiling layer in hot bituminous conglomerate (Dmax = 10 mm) must be created, with a thickness of at least 2 cm. This reprofiling layer is laid after reinstating, where necessary, the flatness of the milled surface (e.g. by filling holes with bituminous conglomerate, partial reprofiling etc.), and after applying a binding coat consisting of a bituminous emulsion of type ECOVER ANTIPUMPING, containing elastomeric resins and additives. This bituminous emulsion is characterised by a dry residue (UNI EN ISO 3251) of 35% and a DIN 4 cup viscosity at 20°C (UNI EN ISO 2431) of 20-30 s. The binding coat is applied by spreading this bituminous emulsion over the dry surface at the rate of 0.5 kg/m2. The next step is to lay the reprofiling layer, after the binding coat has had time to dry as per the product specification. The geocomposite is laid directly onto the reprofiling layer without a binding coat, with the sheets arranged along the direction of travel in the case of reinforcement of a standard road carriageway, or in a radial direction in the case of reinforcement of roundabout intersections. The sheets are laid with a longitudinal overlap of 6 cm along the overlap strip provided on the upper face, and a transverse overlap of 10 cm at the ends of the sheets. After laying, the siliconised film protecting the lower face and the siliconised strip protecting the longitudinal overlap zone of the upper face are removed, and the geocomposite is pressed together sufficiently to promote adhesion. Subsequently the material is covered with layers of hot-spread bituminous conglomerate to a total thickness of at least 4 cm; the wear layer can be of closed or draining type.

1. Existing bituminous conglomerate

6. New bituminous conglomerate ≥4 cm

5. AUTOTENE ASFALTICO ANTIPUMPING HE/TVP

4. Reprofiling layer in bituminous conglomerate (Dmax = 10 mm)

3. ECOVER ANTIPUMPING

2. Milled area

STRATIGRAPHY1. Existing bituminous conglomerate2. Milled area3. ECOVER ANTIPUMPING4. Reprofiling layer in bituminous conglomerate

(Dmax = 10 mm)5. AUTOTENE ASFALTICO ANTIPUMPING HE/TVP6. New bituminous conglomerate ≥4 cm

UNBONDED LAYER

hCB≥4 cm

Page 8: REINFORCING AND WATERPROOFING ROAD · PDF fileTechnical specification REINFORCING AND WATERPROOFING ROAD PAVEMENTS 1 ... 2 REINFORCING AND WATERPROOFING ROAD PAVEMENTS Technical specification

8 REINFORCING AND WATERPROOFING ROAD PAVEMENTS Technical specification

Reinforcing and waterproofing an old road pavement by applying to the existing cracked surface a reinforced geocomposite of type AUTOTENE ASFALTICO ANTIPUMPING HE/TVP. This geocomposite consists of a prefabricated elastomeric heat-self-adhesive antipumping geomembrane, whose adhesion is activated by the heat of the upper layer of hot-spread bituminous conglomerate, based on distilled bitumen and elastomeric polymers, with composite reinforcement consisting of a geogrille woven in glass fibre (mesh size 12.5 x 12.5 mm) and high-strength non-woven polyester fabric, with its lower face heat-self-adhesive, protected by a siliconised film and its upper face covered with a fine mineral layer. The geocomposite has the following characteristics: thickness 2.5 mm (EN 1849-1); resistance to compaction of the bituminous conglomerate (EN 14692); impermeability to a pressure of 500 kPa (EN 14694); resistance to traction L/T of 40 kN/m (EN12311-1); elongation to break L/T of 4% (EN12311-1); shear resistance ≥0.30 N/mm2 (EN 13653).The double-layer system in bituminous conglomerate reinforced with this geocomposite is characterised, finally, by a peak shear resistance at the interface measured by the ASTRA (UNI/TS 11214/2007) test as ≥0.30 MPa (T = 20°C; normal force = 0.2 MPa).If the road surface is in fair condition, such as not to require removal of the layer, and there are no height restrictions for the new carriageway surface, the geocomposite can be laid directly on the old road surface provided that the thickness of the underlying bituminous conglomerate is at least 4 cm. After reinstating, where necessary, the flatness of the existing surface (e.g. by filling holes with bituminous conglomerate, partial reprofiling etc.) and after cleaning with mechanical brushes, the geocomposite is laid on the cleaned and dry old pavement, an assessment being made in each case of the need to apply a binding coat. The geocomposite is applied to the existing surface with the sheets arranged along the direction of travel, in the case of reinforcement of a standard road carriageway, or in a radial direction in the case of reinforcement of roundabout intersections. The sheets are laid with a longitudinal overlap of 6 cm along the overlap strip provided on the upper face, and a transverse overlap of 10 cm at the ends of the sheets. After laying, the siliconised film protecting the lower face and the siliconised strip protecting the longitudinal overlap zone of the upper face are removed, and the geocomposite is pressed together sufficiently to promote adhesion. Subsequently the material is covered with layers of hot-spread bituminous conglomerate to a total thickness of at least 4 cm; the wear layer can be of closed or draining type.

4. New bituminous conglomerate ≥4 cm

3. AUTOTENE ASFALTICO ANTIPUMPING HE/TVP(plus possible ECOVER ANTIPUMPING)

STRATIGRAPHY1. Existing bituminous conglomerate2. Existing wear layer3. AUTOTENE ASFALTICO ANTIPUMPING HE/TVP

(plus possible ECOVER ANTIPUMPING)4. New bituminous conglomerate ≥4 cm

1. Existing bituminous conglomerate

2. Existing wear layer

UNBONDED LAYER

hCB≥4 cm

Reinforcing and waterproofing old road pavement: application to existing surfaceD

Page 9: REINFORCING AND WATERPROOFING ROAD · PDF fileTechnical specification REINFORCING AND WATERPROOFING ROAD PAVEMENTS 1 ... 2 REINFORCING AND WATERPROOFING ROAD PAVEMENTS Technical specification

9REINFORCING AND WATERPROOFING ROAD PAVEMENTSTechnical specification

Reinforcing and waterproofing a road pavement affected by excavations for repairing/installing underground services, by laying at the interface between layers of bituminous conglomerate a reinforced geocomposite of type AUTOTENE ASFALTICO ANTIPUMPING HE/TVP. This geocomposite consists of a prefabricated elastomeric heat-self-adhesive antipumping geomembrane, whose adhesion is activated by the heat of the upper layer of hot-spread bituminous conglomerate, based on distilled bitumen and elastomeric polymers, with composite reinforcement consisting of a geogrille woven in glass fibre (mesh size 12.5 x 12.5 mm) and high-strength non-woven polyester fabric, with its lower face heat-self-adhesive, protected by a siliconised film and its upper face covered with a fine mineral layer. The geocomposite has the following characteristics: thickness 2.5 mm (EN 1849-1); resistance to compaction of the bituminous conglomerate (EN 14692); impermeability to a pressure of 500 kPa (EN 14694); resistance to traction L/T of 40 kN/m (EN12311-1); elongation to break L/T of 4% (EN12311-1); shear resistance ≥0.30 N/mm2 (EN 13653). The double-layer system in bituminous conglomerate reinforced with this geocomposite is characterised, finally, by a peak shear resistance at the interface measured by the ASTRA (UNI/TS 11214/2007) test as ≥0.30 MPa (T = 20°C; normal force = 0.2 MPa). The pavement over the trench must be milled over a surface area 50 cm wider (25 cm per side) than the zone affected by the excavation, and to a depth equal to the thickness of the layers of bituminous conglomerate which will be constructed over the geocomposite. In this way the site is constructed for the subsequent application of the geocomposite. Following the work to repair/install the underground services, a layer of bituminous conglomerate is laid over the zone affected by the excavations with, a minimum thickness of 4 cm. Subsequently the geocomposite is positioned in such a way that it overflows onto the existing milled bituminous conglomerate surface in order to discourage reflection of the crack at the joint between the old and new layers of bituminous conglomerate. After cleaning with mechanical brushes, the milled perimeter strip will be treated with a binding coat consisting of a bituminous emulsion of type ECOVER ANTIPUMPING, containing elastomeric resins and additives. This bituminous emulsion is characterised by a dry residue (UNI EN ISO 3251) of 35% and a DIN 4 cup viscosity at 20°C (UNI EN ISO 2431) of 20-30 s. The binding coat is applied by spreading this bituminous emulsion over the dry surface at the rate of 0.5 kg/m2. The next step is to spread the geocomposite, after the binding coat has had time to dry as per the product specification. The geocomposite therefore ends up being applied to the new layer of bituminous conglomerate over the area of the excavation without a binding coat, and overflows onto the prepared site around the perimeter which has been pretreated with a binding coat. The sheets are laid with a longitudinal overlap of 6 cm along the overlap strip provided on the upper face, and a transverse overlap of 10 cm at the ends of the sheets. After laying, the siliconised film protecting the lower face and the siliconised strip protecting the longitudinal overlap zone of the upper face are removed, and the geocomposite is pressed together sufficiently to promote adhesion. Subsequently the material is covered with layers of hot-spread bituminous conglomerate to a total thickness of at least 4 cm; the wear layer can be of closed or draining type.

TRENCH AREA

5. New bituminous conglomerate ≥4 cm

4. AUTOTENE ASFALTICO ANTIPUMPING HE/TVP

STRATIGRAPHY1. New bituminous conglomerate ≥4 cm2. Milling existing bituminous conglomerate over an area ≥25 cm

3. ECOVER ANTIPUMPING4. AUTOTENE ASFALTICO ANTIPUMPING HE/TVP5. New bituminous conglomerate ≥4 cm

2. New bituminous conglomerate ≥4 cm

2. Milling existing bituminous conglomerate over an area ≥25 cm

3. ECOVER ANTIPUMPING

Treat the scarified edge with primer

Backfilling

Bituminous conglomerate for a thickness of at least 4 cm

Reinterro Reinterro

UNBONDED LAYER

Reinforcing and waterproofing road pavement affected by excavations for repair/installation of

underground servicesE

Scarification 25 cm wider than trench

Page 10: REINFORCING AND WATERPROOFING ROAD · PDF fileTechnical specification REINFORCING AND WATERPROOFING ROAD PAVEMENTS 1 ... 2 REINFORCING AND WATERPROOFING ROAD PAVEMENTS Technical specification

10 REINFORCING AND WATERPROOFING ROAD PAVEMENTS Technical specification

SUB-BASE

SUB-BASE

FOUNDATION LAYER

BONDED BASE LAYER

EXISTING CARRIAGEWAY WIDENING - NEW CARRIAGEWAY≥25 cm

FOUNDATION LAYER

BONDED BASE LAYER

When widening the roadbase, it is advisable to make provision for the reinforcement and waterproofing of the pavement of the new carriageway, which is destined to take heavy traffic, and of the joint which is created with the old adjacent pavement. This function is performed by laying at the interface between layers of bituminous conglomerate a reinforced geocomposite of type AUTOTENE ASFALTICO ANTIPUMPING HE/TVP. This geocomposite consists of a prefabricated elastomeric heat-self-adhesive antipumping geomembrane, whose adhesion is activated by the heat of the upper layer of hot-spread bituminous conglomerate, based on distilled bitumen and elastomeric polymers, with composite reinforcement consisting of a geogrille woven in glass fibre (mesh size 12.5 x 12.5 mm) and high-strength non-woven polyester fabric, with its lower face heat-self-adhesive, protected by a siliconised film and its upper face covered with a fine mineral layer. The geocomposite has the following characteristics: thickness 2.5 mm (EN 1849-1); resistance to compaction of the bituminous conglomerate (EN 14692); impermeability to a pressure of 500 kPa (EN 14694); resistance to traction L/T of 40 kN/m (EN12311-1); elongation to break L/T of 4% (EN12311-1); shear

1. Binder layerexisting

6. New bituminous conglomerate

2. Milling ≥25 cm

3. ECOVER ANTIPUMPING

7. New wear layer

4. AUTOTENE ASFALTICO ANTIPUMPING HE/TVP

STRATIGRAPHY1. Existing binder layer2. Milling ≥25 cm3. ECOVER ANTIPUMPING4. AUTOTENE ASFALTICO ANTIPUMPING HE/TVP5. New bituminous conglomerate6. New bituminous conglomerate7. New wear layer

CUT IN EXISTING PAVEMENT

6. New bituminous conglomerate

5. New bituminous conglomerate

Reinforcing and waterproofing road pavement of new roadbase in case of widening the carriageway:

reinforcing the jointF

Page 11: REINFORCING AND WATERPROOFING ROAD · PDF fileTechnical specification REINFORCING AND WATERPROOFING ROAD PAVEMENTS 1 ... 2 REINFORCING AND WATERPROOFING ROAD PAVEMENTS Technical specification

11REINFORCING AND WATERPROOFING ROAD PAVEMENTSTechnical specification

resistance ≥0.30 N/mm2 (EN 13653). The double-layer system in bituminous conglomerate reinforced with this geocomposite is characterised, finally, by a peak shear resistance at the interface measured by the ASTRA (UNI/TS 11214/2007) test as ≥0.30 MPa (T = 20°C; normal force = 0.2 MPa).In order to provide a site for laying the geocomposite along the joint between old and new pavement, an area of the old pavement should be milled at the preparatory stage, at least 25 cm wide, to a depth which equates to the correct height for positioning the geocomposite. After cleaning with mechanical brushes, the milled area will be treated with a binding coat consisting of a bituminous emulsion of type ECOVER ANTIPUMPING, containing elastomeric resins and additives. This bituminous emulsion is characterised by a dry residue (UNI EN ISO 3251) of 35% and a DIN 4 cup viscosity at 20°C (UNI EN ISO 2431) of 20-30 s. The binding coat is applied by spreading this bituminous emulsion over the dry surface at the rate of 0.5 kg/m2. The next step is to spread the geocomposite on the new pavement and on the old milled surface, after the binding coat has had time to dry as per the product specification.On the bitumen-bonded base layer of the new carriageway, the geocomposite is applied directly without a binding coat, with the sheets arranged along the direction of travel so that they overflow onto the joint area, pretreated with the binding coat, formed in the old adjacent pavement. The sheets are laid with a longitudinal overlap of 6 cm along the overlap strip provided on the upper face, and a transverse overlap of 10 cm at the ends of the sheets. After laying, the siliconised film protecting the lower face and the siliconised strip protecting the longitudinal overlap zone of the upper face are removed, and the geocomposite is pressed together sufficiently to promote adhesion. Subsequently the material is covered with layers of hot-spread bituminous conglomerate to a total thickness of at least 4 cm; the wear layer can be of closed or draining type.

1. MILLING OLD PAVEMENT FOR A WIDTH OF AT LEAST 25 cm, TO A DEPTH EQUAL TO THE HEIGHT OF THE BASE LAYER OF THE NEW CARRIAGEWAY

3. LAYING AUTOTENE ASFALTICO ANTIPUMPING HE/TVP

5. SPREADING NEW LAYER OF BINDER TO COVER THE ENTIRE SURFACE

2. TREATING THE MILLED SURFACE WITH ECOVER ANTIPUMPING AFTER CLEANING WITH MECHANICAL BRUSHES

4. SPREADING THE BINDER FOR THE NEW CARRIAGEWAY UP TO THE LEVEL OF THE EXISTING CARRIAGEWAY

6. SPREADING THE NEW WEAR LAYER

ECOVER ANTIPUMPINGMilling the old road pavement

New bituminous conglomerateAUTOTENE ASFALTICO

ANTIPUMPING HE/TVP

New wear layerNew bituminous conglomerate

BONDED BASE LAYER

BONDED BASE LAYER

BONDED BASE LAYER

BONDED BASE LAYER

BONDED BASE LAYERBONDED BASE LAYER

Page 12: REINFORCING AND WATERPROOFING ROAD · PDF fileTechnical specification REINFORCING AND WATERPROOFING ROAD PAVEMENTS 1 ... 2 REINFORCING AND WATERPROOFING ROAD PAVEMENTS Technical specification

12 REINFORCING AND WATERPROOFING ROAD PAVEMENTS Technical specification

When widening the roadbase, provision can be made for reinforcing and waterproofing both the pavement of the new carriageway and the adjacent old pavement by laying reinforced geocomposite of type AUTOTENE ASFALTICO ANTIPUMPING HE/TVP.This geocomposite consists of a prefabricated elastomeric heat-self-adhesive antipumping geomembrane, whose adhesion is activated by the heat of the upper layer of hot-spread bituminous conglomerate, based on distilled bitumen and elastomeric polymers, with composite reinforcement consisting of a geogrille woven in glass fibre (mesh size 12.5 x 12.5 mm) and high-strength non-woven polyester fabric, with its lower face heat-self-adhesive, protected by a siliconised film and its upper face covered with a fine mineral layer. The geocomposite has the following characteristics: thickness 2.5 mm (EN 1849-1); resistance to compaction of the bituminous conglomerate (EN 14692); impermeability to a pressure of 500 kPa (EN 14694); resistance to traction L/T of 40 kN/m (EN12311-1); elongation to break L/T of 4% (EN12311-1); shear resistance ≥0.30 N/mm2 (EN 13653).

SUB-BASE

FOUNDATION LAYER

BASE LAYER

EXISTING CARRIAGEWAY WIDENING - NEW CARRIAGEWAY

SUB-BASE

FOUNDATION LAYER

BASE LAYER IN CEMENT AND MIXED

AGGREGATE

2. Existing wear layer

5. New bituminous conglomerate

3. ECOVER ANTIPUMPING

6. New wear layer

4. AUTOTENE ASFALTICO ANTIPUMPING HE/TVP

STRATIGRAPHY1. Existing binder layer2. Existing wear layer3. ECOVER ANTIPUMPING4. AUTOTENE ASFALTICO ANTIPUMPING HE/TVP5. New binder6. New wear layer

HEIGHT OF OLD ROAD PAVEMENT

1. Existing binder layer

Reinforcing and waterproofing road pavement in case of widening the carriageway:

reinforcing the entire carriagewayG

Page 13: REINFORCING AND WATERPROOFING ROAD · PDF fileTechnical specification REINFORCING AND WATERPROOFING ROAD PAVEMENTS 1 ... 2 REINFORCING AND WATERPROOFING ROAD PAVEMENTS Technical specification

13REINFORCING AND WATERPROOFING ROAD PAVEMENTSTechnical specification

The double-layer system in bituminous conglomerate reinforced with this geocomposite is characterised, finally, by a peak shear resistance at the interface measured by the ASTRA (UNI/TS 11214/2007) test as ≥0.30 MPa (T = 20°C; normal force = 0.2 MPa).One possible process specifies that the base layer of the new carriageway should be executed in a lean concrete mix, and that it should terminate at the height of the road surface of the old pavement. In this way, the geocomposite can be applied simultaneously on the new base layer and on the adjacent old pavement, and is covered with layers of hot bituminous conglomerate with a total minimum thickness of 4 cm. The base layer of the new carriageway in a lean concrete mix must be treated in advance with a binding coat consisting of a bitumen emulsion of type Ecover Antipumping, containing elastomeric resins and additives. This bituminous emulsion is characterised by a dry residue (UNI EN ISO 3251) of 35% and a DIN 4 cup viscosity at 20°C (UNI EN ISO 2431) of 20-30 s. The binding coat is applied by spreading this bituminous emulsion over the dry surface at the rate of 0.5 kg/m2. The next step is to spread the geocomposite, after the binding coat has had time to dry as per the product specification.On the road surface of the adjacent old pavement, after reinstating, where necessary, the flatness of the existing surface (e.g. by filling holes with bituminous conglomerate, partial reprofiling etc.) and after cleaning with mechanical brushes, the geocomposite can be laid without the application of a binding coat.When laying the geocomposite on the existing pavement, cleaned and dry, and on the adjacent new base layer, the sheets are arranged along the direction of travel. The sheets are laid with a longitudinal overlap of 6 cm along the overlap strip provided on the upper face, and a transverse overlap of 10 cm at the ends of the sheets. After laying, the siliconised film protecting the lower face and the siliconised strip protecting the longitudinal overlap zone of the upper face are removed, and the geocomposite is pressed together sufficiently to promote adhesion. Subsequently the material is covered with layers of hot-spread bituminous conglomerate to a total thickness of at least 4 cm; the wear layer can be of closed or draining type.

1. SPREADING ECOVER ANTIPUMPING ON THE LEAN CONCRETE BASE LAYER OF THE NEW ROADBASE

3. SPREADING NEW LAYER OF BINDER TO COVER THE ENTIRE SURFACE

2. LAYING AUTOTENE ASFALTICO ANTIPUMPING HE/TVP

4. SPREADING THE NEW WEAR LAYER

ECOVER ANTIPUMPING

New bituminous conglomerate

AUTOTENE ASFALTICO ANTIPUMPING HE/TVP

New wear layer

Page 14: REINFORCING AND WATERPROOFING ROAD · PDF fileTechnical specification REINFORCING AND WATERPROOFING ROAD PAVEMENTS 1 ... 2 REINFORCING AND WATERPROOFING ROAD PAVEMENTS Technical specification

14 REINFORCING AND WATERPROOFING ROAD PAVEMENTS Technical specification

ROAD PAVEMENTSAUTOTENE ASFALTICO ANTIPUMPING HE/TVPReinforcing and waterproofing a road pavement by laying, at the interface between layers of bituminous conglomerate, a reinforced geocomposite consisting of a prefabricated elastomeric heat-self-adhesive antipumping geomembrane, whose adhesion is activated by the heat of the upper layer of hot-spread bituminous conglomerate, based on distilled bitumen and elastomeric polymers, with composite reinforcement consisting of a geogrille woven in glass fibre (mesh size 12.5×12.5 mm) and high-strength non-woven polyester fabric, with its lower face heat-self-adhesive, protected by a siliconised film and its upper face covered with a fine mineral layer. The geocomposite has the following characteristics: thickness 2.5 mm (EN 1849-1); resistance to compaction of the bituminous conglomerate (EN 14692); impermeability to a pressure of 500 kPa (EN 14694); resistance to traction L/T of 40 kN/m (EN12311-1); elongation to break L/T of 4% (EN12311-1); shear resistance ≥0.30 N/mm2 (EN 13653) and peak shear resistance at the interface measured by the ASTRA (UNI/TS 11214/2007) test as ≥0.30 MPa (T = 20°C; normal force = 0.2 MPa).

ECOVER ANTIPUMPING Binding coat in the case of laying the reinforcing geocomposite on milled surface, consisting of a bituminous emulsion, containing elastomeric resins and additives, suitable for laying the antipumping membrane, with dry residue (UNI EN ISO 3251) of 35% and a DIN 4 cup viscosity at 20°C (UNI EN ISO 2431) of 20-30 s, spread over a dry surface at the rate of 0.5 kg/m2, following cleaning with mechanical brushes.

speCIfICaTION eNTRIes

TEMP. MIN.APPLICAZ.

TEMPERATURA MIN.DI APPLICAZIONE

+ 5°C

• APPLICATIONS.is recommended to waterproof foundations walls made in concrete.• DIRECTIONS.The surface to be treated has to be dry, clean and with no detaching parts. Weakparts have to be eliminated and replaced with new material. In order to improvethe adhesive onto porous and dry surfaces, it is recommended to previously spreada first layer consisting in a 30% water-diluted . has to be mixed before use withmechanic drills. Application can be made with brushes, rollers or spraying devices.• CONSUMPTION.0.5 kg/square metre/year.

NL

• APPLICATIONS.is recommended to waterproof foundations walls made in concrete.• DIRECTIONS.The surface to be treated has to be dry, clean and with no detaching parts. Weakparts have to be eliminated and replaced with new material. In order to improvethe adhesive onto porous and dry surfaces, it is recommended to previously spreada first layer consisting in a 30% water-diluted . has to be mixed before use withmechanic drills. Application can be made with brushes, rollers or spraying devices.• CONSUMPTION.0.5 kg/square metre/year.

D

• APPLICATIONS.is recommended to waterproof foundations walls made in concrete.• DIRECTIONS.The surface to be treated has to be dry, clean and with no detaching parts. Weakparts have to be eliminated and replaced with new material. In order to improvethe adhesive onto porous and dry surfaces, it is recommended to previously spreada first layer consisting in a 30% water-diluted . has to be mixed before use withmechanic drills. Application can be made with brushes, rollers or spraying devices.• CONSUMPTION.0.5 kg/square metre/year.

F

ECOVER ANTIPUMPING

Partita kg e

WATER-BASED ELASTOMER/BITUMINOUS COATINGGB

RIVESTIMENTO ELASTOMOERO-BITUMINOSO ALL’ACQUAI

37060 Castel d’Azzano - Verona - ITALY

USO PROFESSIONALE • FOR PROFESSIONALE USE ONLY

• CAMPI D’IMPIEGO.è consigliato per impermeabilizzare muri di fondazione in calcestruzzo.• MODALITÁ D’IMPIEGO.La superficie da trattare deve essere asciutta, pulita e priva di parti di distacco. Leparti friabili vanno eliminate e ricostruite. Per l’adesività sulle superfici porose esecche, è consigliabile la stesura una mano di diluita al 30% con acqua. vamescolato prima dell’uso con trapani mmani di prodotto. Non eccedere nel consumoper mano per non l’evaporazione dell’acqua contenuta nel prodotto applicato.• CONSUMI.0,500 kg/m2 per mano.

I

• APPLICATIONS.is recommended to waterproof foundations walls made in concrete.• DIRECTIONS.The surface to be treated has to be dry, clean and with no detaching parts. Weakparts have to be eliminated and replaced with new material. In order to improvethe adhesive onto porous and dry surfaces, it is recommended to previously spreada first layer consisting in a 30% water-diluted . has to be mixed before use withmechanic drills. Application can be made with brushes, rollers or spraying devices.• CONSUMPTION.0.5 kg/square metre/year.

GB

APPLICARE CONPENNELLO

TO BE APPLIEDBY BRUSH

APPLICARE CONRULLO

TO BE APPLIEDBY ROLLER

TEMPERATURA MIN.DI APPLICAZIONE

+ 5°C

MINIMUM APPLICATIONTEMPERATURE

STOCCAGGIO:TEME IL GELO

KEEP AWAYFROM FROST

UTILIZZARE DISPOSITIVIDI PROTEZIONE INDIVIDUALI

USE SUITABLEPROTECTION

MONOCOMPONENTE

AONE-COMPONENT

VEICOLO ACQUA

H O2

WATER BASED

MESCOLAREMECCANICAMENTE

TO BE MEHANICALLYMIXED

APPLICARE ASPRUZZO

SPRAYAPPLICATION

APPLICARE CONFRATTAZZO

TO BE APPLIED BYPLASTERING TROWEL

WATER-BASED ELASTOMER/BITUMINOUS COATINGF

RIVESTIMENTO ELASTOMOERO-BITUMINOSO ALL’ACQUAD

WATER-BASED ELASTOMER/BITUMINOUS COATINGNL

Page 15: REINFORCING AND WATERPROOFING ROAD · PDF fileTechnical specification REINFORCING AND WATERPROOFING ROAD PAVEMENTS 1 ... 2 REINFORCING AND WATERPROOFING ROAD PAVEMENTS Technical specification

15REINFORCING AND WATERPROOFING ROAD PAVEMENTSTechnical specification

Page 16: REINFORCING AND WATERPROOFING ROAD · PDF fileTechnical specification REINFORCING AND WATERPROOFING ROAD PAVEMENTS 1 ... 2 REINFORCING AND WATERPROOFING ROAD PAVEMENTS Technical specification

16 REINFORCING AND WATERPROOFING ROAD PAVEMENTS Technical specification

Technical Specifications

7/20

12in

g

© INDEX

• for correct use of our products, see index technical specifications • for further inforMation or special uses, consult our technical office •

socio del GBC Italia

Internet: www.indexspa.ite-mail Inform. Technical & Sales: [email protected]

e-mail Administrative Offices: [email protected] e-mail Index Export Dept.: [email protected]

Via G. Rossini, 22 - 37060 Castel D’Azzano (VR) - Italy - C.P.67 - Tel. (+39)045.8546201 - Fax (+39)045.512444

The

data

gi

ven

here

ar

e in

dica

tive

aver

age

data

on

cu

rrent

pr

oduc

-tio

n, a

nd m

ay b

e ch

ange

d an

d up

date

d by

IN

DEX

S.p

.A.

at a

ny t

ime

with

out

prio

r no

tice.

The

tec

hnic

al i

nfor

mat

ion

and

sugg

estio

ns p

rovi

ded

repr

esen

t ou

r be

st k

now

ledg

e of

the

pro

perti

es o

f th

e pr

oduc

t in

use

.

. Con

side

ring

the

man

y pos

sibl

e us

es an

d th

e po

ssib

le in

terfe

renc

e of

ele

men

ts

not u

nder

our

con

trol,

we

take

no

resp

onsi

bilit

y fo

r the

resu

lts. T

he P

urch

aser

is

resp

onsi

ble

for e

stab

lishi

ng th

e su

itabi

lity o

f the

prod

uct fo

r the

use

env

isag

ed.