rekapitulasi.pdf

1
BILL OF QUANTITIES GRAND SUMMARY Project : ACEH RECONSTRUCTION PROJECT, ROAD SUB - PROJECT (JICA LOAN IP - 545) Contract Package : No. 3 (Three) Package Name : KABAYAKAN - SP. KRAFT (STA. 3 + 850 - STA. 56 + 032) Location : KABUPATEN ACEH TENGAH ¥ 1.00 $ 1.00 Rp. 113.80 Rp. 9,091.00 change ra Division Description BID PRICE Equivalent (Rupiah) 1 GENERAL Rp. 2,433,050,000.00 2 DRAINAGE Rp. 2,709,951,552.53 3 EARTH WORKS Rp. 8,699,982,654.03 4 PAVEMENT WIDENING AND SHOULDERS Rp. 3,792,165,731.84 5 GRANULAR RIGID PAVEMENT Rp. 24,161,577,278.40 Equivalent 6 ASPHALT PAVEMENT Rp. 70,001,007,481.25 7 STRUCTURES Rp. 53,406,554,239.54 8 MISCELLANEOUS Rp. 6,046,018,542.51 9 DAYWORK (NOT USED) Rp. - 10 ROUTINE MAINTENANCE Rp. 900,000,000.00 (A) Sub Total (Termasuk Keuntungan) Rp. 172,150,307,480.10 (A) Sub Total (Termasuk Keuntungan) Rp. 172,150,307,480.10 (B) Be Rounded Rp. 172,150,307,000.00 PPn 10% Rp. 17,215,030,700.00 TOTAL Rp. 189,365,338,180.10 (D) DIBULATKAN Rp. 189,365,338,000.00 TERBILANG : Seratus Delapan Puluh Sembilan Milyar Tiga Ratus Enam Puluh Lima Juta Tiga Ratus Tiga Puluh Delapan Ribu Rupiah Signature : Banda Aceh, 20 Juni 2012 : PT. Perapen Prima Mandiri Title : Date : Corporate Seal Ir. Mawardi Direktur Utama

Upload: na-ja-ma

Post on 09-Sep-2015

8 views

Category:

Documents


0 download

TRANSCRIPT

  • BILL OF QUANTITIES

    GRAND SUMMARY

    Project : ACEH RECONSTRUCTION PROJECT, ROAD SUB - PROJECT (JICA LOAN IP - 545)

    Contract Package : No. 3 (Three)

    Package Name : KABAYAKAN - SP. KRAFT (STA. 3 + 850 - STA. 56 + 032)

    Location : KABUPATEN ACEH TENGAH

    1.00 $ 1.00

    Rp. 113.80 Rp. 9,091.00 Exchange rates

    Division Description

    BID PRICE

    Equivalent

    (Rupiah)

    1 GENERAL Rp. 2,433,050,000.00

    2 DRAINAGE Rp. 2,709,951,552.53

    3 EARTH WORKS Rp. 8,699,982,654.03

    4 PAVEMENT WIDENING AND SHOULDERS Rp. 3,792,165,731.84

    5 GRANULAR RIGID PAVEMENT Rp. 24,161,577,278.40

    Equivalent

    6 ASPHALT PAVEMENT Rp. 70,001,007,481.25

    7 STRUCTURES Rp. 53,406,554,239.54

    8 MISCELLANEOUS Rp. 6,046,018,542.51

    9 DAYWORK (NOT USED) Rp. -

    10 ROUTINE MAINTENANCE Rp. 900,000,000.00

    (A) Sub Total (Termasuk Keuntungan) Rp. 172,150,307,480.10 (A) Sub Total (Termasuk Keuntungan) Rp. 172,150,307,480.10

    (B) Be Rounded Rp. 172,150,307,000.00

    PPn 10% Rp. 17,215,030,700.00

    TOTAL Rp. 189,365,338,180.10

    (D) DIBULATKAN Rp. 189,365,338,000.00

    TERBILANG : Seratus Delapan Puluh Sembilan Milyar Tiga Ratus Enam Puluh Lima Juta Tiga Ratus Tiga Puluh Delapan Ribu Rupiah

    Signature : Banda Aceh, 20 Juni 2012

    : PT. Perapen Prima Mandiri

    Title : DateTitle : Date

    : Corporate Seal

    Ir. Mawardi

    Direktur Utama