relay relay/equipment location … grid alstom grid supplier mcb/1 ep102ucc10 pmu dc supply mcb ge...

26
SIZE GROOTTE A1J M L K J H F E G D C B F F E G D C B A 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 3 1 2 4 5 6 7 8 A 10 1 LEVELS 2 31 TITLE COVER SHEET 0 1 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 SHEET NUMBER 0 DESIGN REV NO. PROJECT REV NO. DESIGN REV DATE PROJECT REV DATE LEVEL DESCRIPTION 1 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 LEVEL DESCRIPTION 2 3 4 5 6 7 8 9 10 11 12 13 14 15 31 32 33 34 REVISION TO MASTER DRAWING SHEET BORDER & TITLE BLOCK 0 0 0 0 0 0 0 0 0 STANDARD DESIGN DRAWING 0 0 0 0 0 0 0 0 0 0 0 0 0 05/2012 05/2012 05/2012 05/2012 05/2012 05/2012 05/2012 05/2012 05/2012 05/2012 05/2012 05/2012 05/2012 05/2012 05/2012 05/2012 05/2012 05/2012 05/2012 05/2012 05/2012 05/2012 05/2012 AC KEY DIAGRAM PROTECTION NOT HEALTHY AC DIAGRAM PROTECTION NOT HEALTHY AC DIAGRAM CT CIRCUIT AC KEY DIAGRAM CT CIRCUIT AC KEY DIAGRAM CT CIRCUIT AC KEY DIAGRAM VT SELECTION AC KEY DIAGRAM VT SELECTION AC KEY DIAGRAM VT SELECTION AC KEY DIAGRAM MAIN 1 AND MAIN 2 DC KEY DIAGRAM SPDC INPUTS AND OUTPUTS DC KEY DIAGRAM GPS TIME SIGNAL DISTRIBUTION DC KEY DIAGRAM DC KEY DIAGRAM DC KEY DIAGRAM DC KEY DIAGRAM REFERENCE DIAGRAM REFERENCE DIAGRAM REFERENCE DIAGRAM PANEL CABLING DIAGRAM PANEL CABLING DIAGRAM PANEL TYPE DESIGNATION 1PMU-1100 SHEET 00 OF 24 MASTER TRACING FILED UNDER 0.54/8355 REVISION 0 REVISION TO MASTER DATE AUTH CHKD BY REV REV ALARMS CONTROL DC KEY DIAGRAM 2 FRONT PANEL EQUIPMENT LAYOUT REAR PANEL EQUIPMENT LAYOUT 0 05/2012 0 05/2012 23 24 REFERENCE DIAGRAM 0 05/2012 REVISION SHEET NUMBER COVER SHEET c HYDRA WEST CONTROL ROOM PHASOR MEASUREMENT UNIT 0.37/5438 ESKOM HOLDINGS LIMITED REG NO. 2002/015527/06 PROJECT DRAWN BY 17/06/2014 DATE DATE DATE DATE PROJECT APPROVED SCHEME APPROVED PROJECT CHECKED DATE 05/2012 DATE 11/07/2012 DATE 11/07/2012 DESIGN APPROVED DESIGN CHECKED SCALE T BOWER BUYLE MAWENI SNKOMO D VAN ASWEGEN DESIGN DRAWN BY 0 0 BY REVISION DESCRIPTION REV DATE AUTH CHKD 25 CABLE BLOCK DIAGRAM U.N. L.T. 07/2015 07/2015

Upload: trannhan

Post on 17-May-2018

214 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: RELAY RELAY/EQUIPMENT LOCATION … GRID ALSTOM GRID SUPPLIER MCB/1 EP102UCC10 PMU DC SUPPLY MCB GE (REDLINE) G103C02 & CAH 3 4 5 6 3 PNH ND22 (230V AC) 1 PANEL LABEL MCB/1 MICOM P847B

SIZE

GROOTTE A1J

M

L

K

J

H

F

E

G

D

C

B

FF

E

G

D

C

B

A

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

31 2 4 5 6 7 8

A

101LEVELS 2 31

TITLE

COVER SHEET0

1

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

SHEET

NUMBER

0

DESIGN

REV NO.

PROJECT

REV NO.

DESIGN REV

DATE

PROJECT REV

DATELEVEL DESCRIPTION

1

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

LEVEL DESCRIPTION

2

3

4

5

6

7

8

9

10

11

12

13

14

15

31

32

33

34

REVISION TO MASTER

DRAWING SHEET BORDER & TITLE BLOCK

0

0

0

0

0

0

0

0

0 STANDARD DESIGN DRAWING

0

0

0

0

0

0

0

0

0

0

0

0

0

05/2012

05/2012

05/2012

05/2012

05/2012

05/2012

05/2012

05/2012

05/2012

05/2012

05/2012

05/2012

05/2012

05/2012

05/2012

05/2012

05/2012

05/2012

05/2012

05/2012

05/2012

05/2012

05/2012

AC KEY DIAGRAM

PROTECTION NOT HEALTHY AC DIAGRAM

PROTECTION NOT HEALTHY AC DIAGRAM

CT CIRCUIT AC KEY DIAGRAM

CT CIRCUIT AC KEY DIAGRAM

CT CIRCUIT AC KEY DIAGRAM

VT SELECTION AC KEY DIAGRAM

VT SELECTION AC KEY DIAGRAM

VT SELECTION AC KEY DIAGRAM

MAIN 1 AND MAIN 2 DC KEY DIAGRAM

SPDC INPUTS AND OUTPUTS DC KEY DIAGRAM

GPS TIME SIGNAL DISTRIBUTION DC KEY DIAGRAM

DC KEY DIAGRAM

DC KEY DIAGRAM

DC KEY DIAGRAM

REFERENCE DIAGRAM

REFERENCE DIAGRAM

REFERENCE DIAGRAM

PANEL CABLING DIAGRAM

PANEL CABLING DIAGRAM

PANEL TYPE DESIGNATION 1PMU-1100

SH

EE

T 0

0 O

F 2

4M

AS

TE

R T

RA

CIN

G F

ILE

D U

ND

ER

0.5

4/8

355

RE

VIS

ION

0

REVISION TO MASTER DATEAUTHCHKDBYREVREV

ALARMS CONTROL DC KEY DIAGRAM

2

FRONT PANEL EQUIPMENT LAYOUT

REAR PANEL EQUIPMENT LAYOUT 0 05/2012

0 05/2012

23

24

REFERENCE DIAGRAM

0 05/2012

REVISIONSHEET NUMBER

COVER SHEETc

HYDRAWEST CONTROL ROOM

PHASOR MEASUREMENT UNIT

0.37/5438

ESKOM HOLDINGS LIMITED

REG NO.

2002/015527/06

PROJECT DRAWN BY

17/06/2014DATE

DATE

DATE

DATE

PROJECT APPROVED

SCHEME APPROVED

PROJECT CHECKED

DATE 05/2012

DATE 11/07/2012

DATE 11/07/2012

DESIGN APPROVED

DESIGN CHECKED

SCALE

T BOWER

BUYLE MAWENI

SNKOMO

D VAN ASWEGEN

DESIGN DRAWN BY

0 0

BYREVISION DESCRIPTIONREV DATEAUTHCHKD

25 CABLE BLOCK DIAGRAM

U.N.

L.T.

07/2015

07/2015

Page 2: RELAY RELAY/EQUIPMENT LOCATION … GRID ALSTOM GRID SUPPLIER MCB/1 EP102UCC10 PMU DC SUPPLY MCB GE (REDLINE) G103C02 & CAH 3 4 5 6 3 PNH ND22 (230V AC) 1 PANEL LABEL MCB/1 MICOM P847B

F

M

L

K

J

H

E

G

D

C

B

A

F

E

G

D

C

B

A

6 7 8 9 10 11 12 13 14 15 16

31 2 4 5 6 7 8

54321

SIZE

GROOTTE A1L101LEVELS 2 31

H

SH

EE

T 0

1 O

F 2

4M

AS

TE

R T

RA

CIN

G F

ILE

D U

ND

ER

0.5

4/8

355

RE

VIS

ION

0

PANEL TYPE DESIGNATION 1PMU-1100

REVISION TO MASTER DATEAUTHCHKDBYREVREV

LOCATION

PMU 1

2 1

2

1

2

3

4

5

6

7

4

PMU-2 MICOM P847B

MICOM P847B

PHASOR MEASUREMENTS UNIT

PHASOR MEASUREMENTS UNIT

ALSTOM GRID

ALSTOM GRID

SUPPLIER

MCB/1 EP102UCC10 PMU DC SUPPLY MCB

GE (REDLINE)

G103C02 & CAH

3

4

5

6

3

PNH ND22 (230V AC)

1 PANEL LABEL

MCB/1

MICOM P847B

EP102UCC10

G103C02 & CAH

RSG-2100-NC RUGGEDCOM

PHASOR MEASUREMENT UNIT

PMU DC SUPPLY MCB

VT SUPPLY INPUT MCBs AND AUXILIARY CONTACTS

RUGGEDISED ETHERNET SWITCH

51

VT-MCB/12

3

4

5

6

7

8

9

10

11

12

13

VT-MCB/2 G103C02 & CAH

G103C02 & CAH

VT SUPPLY INPUT MCBs AND AUXILIARY CONTACTS

VT SUPPLY INPUT MCBs AND AUXILIARY CONTACTS

G103C02 & CAH VT SUPPLY INPUT MCBs AND AUXILIARY CONTACTS

PK-2

PK-2

PK-2

PK-2

PK-2

PK-2

PK-2

PK-2

PMU CT INPUT x TEST BLOCKS

PMU CT INPUT x TEST BLOCKS

PMU CT INPUT x TEST BLOCKS

PMU CT INPUT x TEST BLOCKS

VT SUPPLY INPUT y TEST BLOCKS

VT SUPPLY INPUT y TEST BLOCKS

VT SUPPLY INPUT y TEST BLOCKS

VT SUPPLY INPUT y TEST BLOCKS

6

7

8 GE (REDLINE)

GE (REDLINE)

GE (REDLINE)

XJ-1

XJ-2

XJ-3

XJ-4

XU-1

XU-2

XU-3

XU-4

PK-2

PK-2

PK-2

PK-2

PK-2

PK-2

PK-2

PK-2

PMU CT INPUT x TEST BLOCKS

PMU CT INPUT x TEST BLOCKS

PMU CT INPUT x TEST BLOCKS

PMU CT INPUT x TEST BLOCKS

VT SUPPLY INPUT y TEST BLOCKS

VT SUPPLY INPUT y TEST BLOCKS

VT SUPPLY INPUT y TEST BLOCKS

VT SUPPLY INPUT y TEST BLOCKS

9 BLANK

10 PMU-3

IST

IST

IST

IST

IST

IST

IST

11 MCB/1 EP102UCC10 PMU DC SUPPLY MCB GE (REDLINE)

VT-MCB/1

VT-MCB/2

VT-MCB/3

VT-MCB/4

G103C02 & CAH

G103C02 & CAH

G103C02 & CAH

G103C02 & CAH

VT SUPPLY INPUT MCBs AND AUXILIARY CONTACTS

VT SUPPLY INPUT MCBs AND AUXILIARY CONTACTS

VT SUPPLY INPUT MCBs AND AUXILIARY CONTACTS

VT SUPPLY INPUT MCBs AND AUXILIARY CONTACTS GE (REDLINE)

VT-MCB/1

VT-MCB/2

VT-MCB/3

VT-MCB/4

G103C02 & CAH

G103C02 & CAH

G103C02 & CAH

VT SUPPLY INPUT MCBs AND AUXILIARY CONTACTS

VT SUPPLY INPUT MCBs AND AUXILIARY CONTACTS

VT SUPPLY INPUT MCBs AND AUXILIARY CONTACTS

VT SUPPLY INPUT MCBs AND AUXILIARY CONTACTS

XJ-1

XJ-2

XJ-3

XJ-4

XU-1

XU-2

XU-3

XU-4

PK-2

PK-2

PK-2

PK-2

PK-2

PK-2

PK-2

PK-2

PMU CT INPUT x TEST BLOCKS

PMU CT INPUT x TEST BLOCKS

PMU CT INPUT x TEST BLOCKS

PMU CT INPUT x TEST BLOCKS

VT SUPPLY INPUT y TEST BLOCKS

VT SUPPLY INPUT y TEST BLOCKS

VT SUPPLY INPUT y TEST BLOCKS

VT SUPPLY INPUT y TEST BLOCKS

1

2

3

4

5

6

7

8

9

10

11

12

13

GE (REDLINE)

GE (REDLINE)

GE (REDLINE)

GE (REDLINE)

GE (REDLINE)

GE (REDLINE)

GE (REDLINE)

GE (REDLINE)

GE (REDLINE)

GE (REDLINE)

GE (REDLINE)

GE (REDLINE)

ALSTOM GRID

GE (REDLINE)

GE (REDLINE)

GE (REDLINE)

GE (REDLINE)

IST

IST

IST

IST

IST

IST

IST

IST

GE (REDLINE)

1

2

3

4

5

6

7

8

9

10

11

12

13

1

1

1

1

1

PROTECTION NOT HEALTHY INDICATION CLUSTER LED (RED) MIMIC GROUP2

1

SS-M1

SS-M2

GPS

sPDC-X0

sPDC-X1

sPDC

MCB/1

MCB/2

MCB/3

MCB/4

MCB/5

MCB/6

MCB/7

VT-MCB/3

VT-MCB/4

XJ-1

XJ-2

XJ-3

XJ-4

XU-1

XU-2

XU-3

XU-4

ETHERNET SWITCH

DESIGNATIONRELAY

REFERENCE

RELAY/EQUIPMENT/

DESCRIPTION/FUNCTION

MVAA21-1 (110/220V DC)

MVAA21-2 (110/220V DC)

MICOM P594

MVAA21-1 (24V DC)

MVAA21-2 (24V DC)

UNO 3084

EP102UCC16

EP102UCC16

EP102UCC16

EP102UCC16

EP102UCC16

G101NC02

G101NC16 & CAH

SECURE SUPPLY AUXILIARY RELAY ( MAIN 1)

SECURE SUPPLY AUXILIARY RELAY ( MAIN 2)

GPS TIME RECEIVER/SERVER

sPDC DIGITAL OUTPUT 0 INTERPOSING RELAY

sPDC DIGITAL OUTPUT 0 INTERPOSING RELAY

SUBSTATION PHASOR DATA CONDENTRATOR

MAIN 1 DC SUPPLY MCB

MAIN 2 DC SUPPLY MCB

ETHERNET SWITCH MAIN 1 DC SUPPLY MCB

ETHERNET SWITCH MAIN 2 DC SUPPLY MCB

U24 DC-DC CONVERTER INPUT MCB (sPDC SUPPLY)

230V AC PNH SUPPLY MCB

230V AC PLUG/LAMP SUPPLY MCB AND AUXILIARY CONTACT

ALSTOM GRID

ALSTOM GRID

ALSTOM GRID

ALSTOM GRID

ALSTOM GRID

ADVANTECH

GE (REDLINE)

GE (REDLINE)

GE (REDLINE)

GE (REDLINE)

GE (REDLINE)

GE (REDLINE)

GE (REDLINE)

REVISIONSHEET NUMBER

FRONT PANEL EQUIPMENT LAYOUTc

HYDRAWEST CONTROL ROOM

PHASOR MEASUREMENT UNIT

0.37/5438

ESKOM HOLDINGS LIMITED

REG NO.

2002/015527/06

PROJECT DRAWN BY

17/06/2014DATE

DATE

DATE

DATE

PROJECT APPROVED

SCHEME APPROVED

PROJECT CHECKED

DATE 05/2012

DATE 11/07/2012

DATE 11/07/2012

DESIGN APPROVED

DESIGN CHECKED

SCALE

T BOWER

BUYLE MAWENI

SNKOMO

D VAN ASWEGEN

DESIGN DRAWN BY

1 0

BYREVISION DESCRIPTIONREV DATEAUTHCHKD

7

1

FRONT VIEW RP1

1 2 3 4 5

XJ-1 XJ-2 XJ-3

XJ-4 XU-1

XU-2 XU-3 XU-4

6 7 8

9 10

11 12 13

PMU-3

1 2 3 4 5

XJ-1 XJ-2 XJ-3

XJ-4 XU-1

XU-2 XU-3 XU-4

6 7 8

9 10

11 12 13

PMU-2

ETHERNET SWITCH

1

1 2 3 4 5

XJ-1 XJ-2 XJ-3

XJ-4 XU-1

XU-2 XU-3 XU-4

6 7 8

9 10

11 12 13

PMU-1

1 2 3 4 5 6 7

MCB/..

GPS1 sPDC

PMU PANEL RP1

414

800

1

2

3

4

5

6

7

8

9

10

11

(F)FRONT

L.T.

U.N.

07/2015

07/2015

Page 3: RELAY RELAY/EQUIPMENT LOCATION … GRID ALSTOM GRID SUPPLIER MCB/1 EP102UCC10 PMU DC SUPPLY MCB GE (REDLINE) G103C02 & CAH 3 4 5 6 3 PNH ND22 (230V AC) 1 PANEL LABEL MCB/1 MICOM P847B

F

M

L

K

J

H

E

G

D

C

B

A

F

E

G

D

C

B

A

6 7 8 9 10 11 12 13 14 15 16

31 2 4 5 6 7 8

54321

SIZE

GROOTTE A1L101LEVELS 2 31

H

SH

EE

T 0

2 O

F 2

4M

AS

TE

R T

RA

CIN

G F

ILE

D U

ND

ER

0.5

4/8

355

RE

VIS

ION

0

PANEL TYPE DESIGNATION 1PMU-1100

X1

X2

1

1

2

3

4

5

PMU 1

PMU-3

X4 1

2

X6

X8 1

1

RELE ITALIANA (ACDC DYN.)

RELE ITALIANA (ACDC DYN.)

RELE ITALIANA (ACDC DYN.)

RELE ITALIANA (ACDC DYN.)

RELE ITALIANA (ACDC DYN.)

REVISION TO MASTER DATEAUTHCHKDBYREVREV

M10/10.RS

M10/10.RS

PMU MODULE 2 TERMINALS

PMU MODULE 3 TERMINALS

ENTRELEC

ENTRELEC

ARTECHE

ARTECHE

X20, S20, H20 STD PANEL ANCILLARIES: PLUG, DOOR SWITCH, LAMP POLYAMP

M10/10RS/D2./.S.ADO SPRING-LOADED & KNIFE-SWITCH TERMINALS

(R) REAR

2 3

1

1

PANEL LABEL

X1.2

X1.3

ENTRELEC

ARTECHE

ARTECHE

ARTECHE

3

4

PMU 2

1

X2.1

X2.2

X2.3

2

3

ARTECHE

ARTECHE

4

2

3

4

X3.1

X3.2

X3.3

ARTECHE

ARTECHE

1 ENTRELEC

M10/10.RS PMU MODULE 1 TERMINALS

U24 110/220V DC IN:24V DC OUT

C4-3 (24V DC)

C4-3 (24V DC)

C4-3 (230V AC)

C4-3 (110/220V DC)

C4-3 (230V AC)

SUBSTATION CLASS DC-DC CONVERTER (sPDC POWER SUPPLY)

sPDC DIGITAL OUTPUT 2 INTERPOSING RELAY

sPDC DIGITAL OUTPUT 3 INTERPOSING RELAY

PROTECTION NOT HEALTHY AUXILIARY RELAY

230V AC SUPPLY FAIL AUXILIARY RELAY

MAIN 2 DC FAIL RELAY

ENTRELEC

ACTOM

OTHER/INTERNAL EQUIPMENT

LOCATION DESIGNATIONRELAY

REFERENCERELAY/EQUIPMENT

DESCRIPTION/FUNCTION SUPPLIER

1

X10

X9

sPDC-X2

sPDC-X3

PNH-X

ACF-X

DCF-M2

X3 X1.1-X1.42

X1.43-X1.54

1

X1.1 1VTS1

1VTS2

1VTS3

PMU MODULE 1 VT SELECTION RELAYS RF4

PMU MODULE 1 VT SELECTION RELAYS RF4

PMU MODULE 1 VT SELECTION RELAYS RF4

X5 1 X2.1-X2.42

X2.43-X2.54

2VTS1

2VTS2

2VTS3

PMU MODULE 2 VT SELECTION AUXILIARY RELAYS RF4

PMU MODULE 2 VT SELECTION AUXILIARY RELAYS RF4

PMU MODULE 2 VT SELECTION AUXILIARY RELAYS RF4

X7 1 X3.1-X3.42

X3.43-X3.54

3VTS1

3VTS2

3VTS3

PMU MODULE 3 VT SELECTION AUXILIARY RELAYS RF4

PMU MODULE 3 VT SELECTION AUXILIARY RELAYS RF4

PMU MODULE 3 VT SELECTION AUXILIARY RELAYS RF4

X9.1-X9.40

X1

X2

X3

X4

X5

X6

X7

X8

X9

X10

X1

1 42

X1

43 54

X2

42

1

1

X2

X3

1 42

X3

X9 1

1 40

M10/10.RS PMU MODULE 3 TERMINALS

M10/10.RS PMU MODULE 1 TERMINALS

M10/10.RS PMU MODULE 2 TERMINALS

ENTRELEC

ENTRELEC

ENTRELEC

1

1

1

1

2

1 2 3 4 5 6

2

2

2

6 ET10 EARTH TERMINAL

4

1 2 3

5 6 7

43 54 1 2 3

23

43 54 1 2 3

24 5 63

4 5 6

2 ET10 EARTH TERMINAL

5

6

ET10 EARTH TERMINAL

2 ET10 EARTH TERMINAL

5

6

2 ET10 EARTH TERMINAL

5

6

2

ET10 EARTH TERMINAL

ET10 EARTH TERMINAL

ENTRELEC

ENTRELEC

ENTRELEC

ENTRELEC

ENTRELEC

ET10 EARTH TERMINAL ENTRELEC

ET10 EARTH TERMINAL ENTRELEC

ET10 EARTH TERMINAL

ENTRELEC

ET10 EARTH TERMINAL ENTRELEC

PATCH PANEL PANEL MOUNT 12 WAY FIBRE OPTIC SPLICE BOX IST

REVISIONSHEET NUMBER

REAR PANEL EQUIPMENT LAYOUTc

HYDRAWEST CONTROL ROOM

PHASOR MEASUREMENT UNIT

0.37/5438

ESKOM HOLDINGS LIMITED

REG NO.

2002/015527/06

PROJECT DRAWN BY

17/06/2014DATE

DATE

DATE

DATE

PROJECT APPROVED

SCHEME APPROVED

PROJECT CHECKED

DATE 05/2012

DATE 11/07/2012

DATE 11/07/2012

DESIGN APPROVED

DESIGN CHECKED

SCALE

T BOWER

BUYLE MAWENI

SNKOMO

D VAN ASWEGEN

DESIGN DRAWN BY

2 0

BYREVISION DESCRIPTIONREV DATEAUTHCHKD

L.T.

U.N.

07/2015

07/2015

Page 4: RELAY RELAY/EQUIPMENT LOCATION … GRID ALSTOM GRID SUPPLIER MCB/1 EP102UCC10 PMU DC SUPPLY MCB GE (REDLINE) G103C02 & CAH 3 4 5 6 3 PNH ND22 (230V AC) 1 PANEL LABEL MCB/1 MICOM P847B

F

M

L

K

J

H

E

G

D

C

B

A

F

E

G

D

C

B

A

6 7 8 9 10 11 12 13 14 15 16

31 2 4 5 6 7 8

54321

SIZE

GROOTTE A1L101LEVELS 2 31

H

SH

EE

T 0

3 O

F 2

4M

AS

TE

R T

RA

CIN

G F

ILE

D U

ND

ER

0.5

4/8

355

RE

VIS

ION

0

PANEL TYPE DESIGNATION 1PMU-1100

SE

E S

HE

ET

4

SE

E S

HE

ET

5

REVISION TO MASTER DATEAUTHCHKDBYREVREV

20

22

24

RP

1 F

3.7

X20

RP

1 F

3.7

AC

F-X

RP

1 X

2.4

PN

H-X

RP

1 X

2.3

RP

1 F

3.6

SS

-M2

RP

1 F

2.1

DC

F-M

2R

P1

R3

.5

sPD

C-X

OR

P1 F

2.4

GP

SR

P1 F

2.3

RP

1 F

6.1

RP

1 F

3.7

PN

H-X

RP

1 X

2.3

RP

1 F

3.6

MC

B/7

RP

1 F

1.2

RP

1 X

10.1

RP

1 X

10.1

WD

WD

FS

SE

E S

HE

ET

4 A

4-8

SE

E S

HE

ET

4 E

4-8

SE

E S

HE

ET

5 B

4-8

REVISIONSHEET NUMBER

AC KEY DIAGRAMc

HYDRAWEST CONTROL ROOM

PHASOR MEASUREMENT UNIT

0.37/5438

ESKOM HOLDINGS LIMITED

REG NO.

2002/015527/06

PROJECT DRAWN BY

17/06/2014DATE

DATE

DATE

DATE

PROJECT APPROVED

SCHEME APPROVED

PROJECT CHECKED

DATE 05/2012

DATE 11/07/2012

DATE 11/07/2012

DESIGN APPROVED

DESIGN CHECKED

SCALE

T BOWER

BUYLE MAWENI

J A MYBURGH

D VAN ASWEGEN

DESIGN DRAWN BY

3 0

BYREVISION DESCRIPTIONREV DATEAUTHCHKD

EA

RT

H L

EA

KA

GE

-PR

OT

EC

TE

D

230V

AC

SU

PP

LY

(FR

OM

AC

BO

AR

D)

230V

AC

SU

PP

LY

(FR

OM

AC

BO

AR

D)

L.T.

U.N.

07/2015

07/2015

Page 5: RELAY RELAY/EQUIPMENT LOCATION … GRID ALSTOM GRID SUPPLIER MCB/1 EP102UCC10 PMU DC SUPPLY MCB GE (REDLINE) G103C02 & CAH 3 4 5 6 3 PNH ND22 (230V AC) 1 PANEL LABEL MCB/1 MICOM P847B

F

M

L

K

J

H

E

G

D

C

B

A

F

E

G

D

C

B

A

6 7 8 9 10 11 12 13 14 15 16

31 2 4 5 6 7 8

54321

SIZE

GROOTTE A1L101LEVELS 2 31

H

SH

EE

T 0

4 O

F 2

3M

AS

TE

R T

RA

CIN

G F

ILE

D U

ND

ER

0.5

4/8

355

RE

VIS

ION

0

PANEL TYPE DESIGNATION 1PMU-1100

RP1

X1.47

X1.49

RP1

1K141

2K145

PMU-1

1K143

1K147

RP1

RP1

X1.48

X1.50

1H13

1H13

1H13

1H13

1H13

1H13

H13RP1

X1.44

1H12

1H12

1H12

1H12

1H12

1H12

H12 RP1

X1.43

1

1

1

1

1

1

REVISION TO MASTER DATEAUTHCHKDBYREVREV

RP1 F4.1

RP1 F5.2

RP1 F5.3

RP1 F5.4

RP1 F5.5

PMU-1

2H13

2H13

2H13

2H13

2H13

2H13

2H13RP1

X2.44

2H12

2H12

2H12

2H12

2H12

2H12

2H12 RP1

X2.43

2

2

2

2

2

2

RP1 F7.1

RP1 F8.2

RP1 F8.3

RP1 F8.4

RP1 F8.5

PMU-2

RP1

X2.47

X2.49

RP1

2K141

2K145

PMU-2

2K143

2K147

RP1

RP1

X2.48

X2.50

RP1 F4.1

RP1 F7.1

WD CONTINUED

FROM SHEET 3

CONTINUED

FROM SHEET 3

WDCONTINUED

FROM SHEET 3

CONTINUED

FROM SHEET 3

REVISIONSHEET NUMBER

PROTECTION NOT HEALTHY DIAGRAMc

HYDRAWEST CONTROL ROOM

PHASOR MEASUREMENT UNIT MODULE 1 AND 2

0.37/5438

ESKOM HOLDINGS LIMITED

REG NO.

2002/015527/06

PROJECT DRAWN BY

17/06/2014DATE

DATE

DATE

DATE

PROJECT APPROVED

SCHEME APPROVED

PROJECT CHECKED

DATE 02/05/2012

DATE

DATE

DESIGN APPROVED

DESIGN CHECKED

SCALE

SNKOMO

D VAN ASWEGEN

DESIGN DRAWN BY

4 0

BYREVISION DESCRIPTIONREV DATEAUTHCHKD

L.T.

U.N.

07/2015

07/2015

Page 6: RELAY RELAY/EQUIPMENT LOCATION … GRID ALSTOM GRID SUPPLIER MCB/1 EP102UCC10 PMU DC SUPPLY MCB GE (REDLINE) G103C02 & CAH 3 4 5 6 3 PNH ND22 (230V AC) 1 PANEL LABEL MCB/1 MICOM P847B

F

M

L

K

J

H

E

G

D

C

B

A

F

E

G

D

C

B

A

6 7 8 9 10 11 12 13 14 15 16

31 2 4 5 6 7 8

54321

SIZE

GROOTTE A1L13 16 17 1815 19 2012101LEVELS 2 31

H

SH

EE

T 0

5 O

F 2

4M

AS

TE

R T

RA

CIN

G F

ILE

D U

ND

ER

0.5

4/8

355

RE

VIS

ION

0

PANEL TYPE DESIGNATION 1PMU-1100

PMU-3

3H12

3H12

3H12 3H13

3H13

3H13 RP1

X3.44

3H13RP1

X3.43

3H12

RP1

PMU-3

3K141

3K145

3K143

3K147

X3.47

X3.49

X3.48

X3.50

REVISION TO MASTER DATEAUTHCHKDBYREVREV

RP1 F10.1

RP1 F11.2

RP1 F11.3

RP1 F11.4

RP1 F11.5

RP1 F10.1

CONTINUED

FROM SHT.3

CONTINUED

FROM SHT.3

REVISIONSHEET NUMBER

PROTECTION NOT HEALTHY DIAGRAMc

HYDRAWEST CONTROL ROOM

PHASOR MEASUREMENT UNIT MODULE 3

0.37/5438

ESKOM HOLDINGS LIMITED

REG NO.

2002/015527/06

PROJECT DRAWN BY

17/06/2014DATE

DATE

DATE

DATE

PROJECT APPROVED

SCHEME APPROVED

PROJECT CHECKED

DATE 05/2012

DATE 11/07/2012

DATE 11/07/2012

DESIGN APPROVED

DESIGN CHECKED

SCALE

T BOWER

BUYLE MAWENI

SNKOMO

D VAN ASWEGEN

DESIGN DRAWN BY

5 0

BYREVISION DESCRIPTIONREV DATEAUTHCHKD

PROTECTION NOT HEALTY

PHASOR MEASUREMENTS UNIT WATCHDOG/

PMU-3 DC FAIL

PMU MODULE 3 OPTO 9 REPEAT

ANY VT SELECTION AUX ABNORMAL

PMU MODULE 3

VT SUPPLY 1 MCB TRIP

PMU MODULE 3

VT SUPPLY 2 MCB TRIP

PMU MODULE 3

VT SUPPLY 3 MCB TRIP

PMU MODULE 3

VT SUPPLY 4 MCB TRIP

M11 M12

WDP847B

L1 L2

RL-1

11 12

CAH

3H12 3H13

11 12

CAH

3H12 3H13

11 12

CAH

3H12 3H13

11 12

CAH

P847B

RL-2

RL-3

L3 L4

L6L5

RP1RP1

RP1

L.T.

U.N.

07/2015

07/2015

Page 7: RELAY RELAY/EQUIPMENT LOCATION … GRID ALSTOM GRID SUPPLIER MCB/1 EP102UCC10 PMU DC SUPPLY MCB GE (REDLINE) G103C02 & CAH 3 4 5 6 3 PNH ND22 (230V AC) 1 PANEL LABEL MCB/1 MICOM P847B

F

M

L

K

J

H

E

G

D

C

B

A

F

E

G

D

C

B

A

6 7 8 9 10 11 12 13 14 15 16

31 2 4 5 6 7 8

54321

SIZE

GROOTTE A1L101LEVELS 2 31

H

SH

EE

T 0

6 O

F 2

4M

AS

TE

R T

RA

CIN

G F

ILE

D U

ND

ER

0.5

4/8

355

RE

VIS

ION

0

PANEL TYPE DESIGNATION 1PMU-1100

PMU-1

RP1

REVISION TO MASTER DATEAUTHCHKDBYREVREV

XJ-4RP1 F5.9 RP1 F4.1

X1.13

X1.14

X1.15

X1.16

4C113

4C133

4C153

4C172

2 1

4

6

8

3

5

7

PK-2

F24 F23

F26

F28

F25

F27

4A

4B

4C

P847B

CTJB4C113

4C133

4C153

4C172

4C114

4C134

4C154

4C173

4C173

4C173

4C173

PMU 1 CT CIRCUIT 4

FEEDER NAME - KRONOS

PMU-1

RP1

XJ-3RP1 F5.8 RP1 F4.1

3C113

3C133

3C153

3C172

2 1

4

6

8

3

5

7

PK-2

D24 D23

D26

D28

D25

D27

4A

4B

4C

P847B

3C113

3C133

3C153

3C172

3C114

3C134

3C154

X1.9

X1.10

X1.11

X1.12

JBA111

A131

A151

RP2

PMU-1

RP1

XJ-2RP1 F5.7 RP1 F4.1

2C113

2C133

2C153

2C172

2 1

4

6

8

3

5

7

PK-2

D18 D17

4A

4B

4C

P847B

2C113

2C133

2C153

2C172

2C114

2C134

2C154

X1.5

JBC11

C31

C51

RP2

PMU 1 CT CIRCUIT 2

FEEDER NAME - PERSEUS 3

X1.6

X1.7

X1.8

D20

D22

D19

D21

A171

C70

PMU-1

RP1

XJ-1RP1 F5.6 RP1 F4.1

1C113

1C133

1C153

1C172

2 1

4

6

8

3

5

7

PK-2

D12 D11

4A

4B

4C

P847B

1C113

1C133

1C153

1C172

1C114

1C134

1C154

X1.1

JBA111

A131

A151

RP2

X1.2

X1.3

X1.4

A171

D14

D16

D13

D15

PMU 1 CT CIRCUIT 1

FEEDER NAME - BETA 1

TO 400kV FEEDER 5

SEE 0.37/3626 SHEET 3

TO 400kV FEEDER 9

SEE 0.37/3230 SHEET 2

REVISIONSHEET NUMBER

CT CIRCUIT AC KEY DIAGRAMc

HYDRAWEST CONTROL ROOM

PHASOR MEASUREMENT UNIT MODULE 1

0.37/5438

ESKOM HOLDINGS LIMITED

REG NO.

2002/015527/06

PROJECT DRAWN BY

20/06/2014DATE

DATE

DATE

DATE

PROJECT APPROVED

SCHEME APPROVED

PROJECT CHECKED

DATE 05/2012

DATE 11/07/2012

DATE 11/07/2012

DESIGN APPROVED

DESIGN CHECKED

SCALE

T BOWER

BUYLE MAWENI

SNKOMO

D VAN ASWEGEN

DESIGN DRAWN BY

6 0

BYREVISION DESCRIPTIONREV DATEAUTHCHKD

400kV FEEDER 5

(SEE: 0.37/3626 SHEET 3)

400kV FEEDER 9

(SEE: 0.37/3230 SHEET 2)

400kV FEEDER 10

(SEE: 0.37/3697 SHEET 3)

400kV FEEDER 16

(SEE: 0.72/00015 SHEET 10)

PMU 1 CT CIRCUIT 3

FEEDER NAME - DROERIVIER 2

TO 400kV FEEDER 10

(SEE 0.37/3697 SHEET 3)

RP

*

RP

*

RP

*

*

NOTE:

1. UNKNOWN TERMINALS TO BE ADDED ON SITE.

L.T.

U.N.

07/2015

07/2015

Page 8: RELAY RELAY/EQUIPMENT LOCATION … GRID ALSTOM GRID SUPPLIER MCB/1 EP102UCC10 PMU DC SUPPLY MCB GE (REDLINE) G103C02 & CAH 3 4 5 6 3 PNH ND22 (230V AC) 1 PANEL LABEL MCB/1 MICOM P847B

F

M

L

K

J

H

E

G

D

C

B

A

F

E

G

D

C

B

A

6 7 8 9 10 11 12 13 14 15 16

31 2 4 5 6 7 8

54321

SIZE

GROOTTE A1L101LEVELS 2 31

H

SH

EE

T 0

7 O

F 2

4M

AS

TE

R T

RA

CIN

G F

ILE

D U

ND

ER

0.5

4/8

355

RE

VIS

ION

0

PANEL TYPE DESIGNATION 1PMU-1100

RP1

X2.1

X2.2

X2.3

X2.4

RP1

RP1

RP1

PMU-2

PMU-2

PMU-2

PMU-2

REVISION TO MASTER DATEAUTHCHKDBYREVREV

1C213

1C233

1C253

1C272

1C214

1C234

1C254

2C273

2C273

2C273

2C273

2C214

2C254

2C234

RP1 F7.1

RP1 F7.1

RP1 F7.1

RP1 F7.1

2C213

2C233

2C253

2C272

3C213

3C233

3C253

3C272

3C214

3C234

3C254

3C273

3C273

3C273

3C273

4C213

4C233

4C253

4C272

4C214

4C234

4C254

4C273

4C273

4C273

4C273

XJ-4RP1 F8.9

RP1 F8.8 XJ-3

RP1 F8.6 XJ-1

XJ-2RP1 F8.7

PMU 2 CT CIRCUIT 2

FEEDER NAME

PMU 2 CT CIRCUIT 3

FEEDER NAME

PMU 2 CT CIRCUIT 4

FEEDER NAME

X2.5

X2.6

X2.7

X2.8

X2.9

X2.10

X2.11

X2.12

X2.13

X2.14

X2.15

X2.16

REVISIONSHEET NUMBER

CT CIRCUIT AC KEY DIAGRAMc

HYDRAWEST CONTROL ROOM

PHASOR MEASUREMENT UNIT MODULE 2

0.37/5438

ESKOM HOLDINGS LIMITED

REG NO.

2002/015527/06

PROJECT DRAWN BY

20/06/2014DATE

DATE

DATE

DATE

PROJECT APPROVED

SCHEME APPROVED

PROJECT CHECKED

DATE 05/2012

DATE 11/07/2012

DATE 11/07/2012

DESIGN APPROVED

DESIGN CHECKED

SCALE

T BOWER

BUYLE MAWENI

SNKOMO

D VAN ASWEGEN

DESIGN DRAWN BY

7 0

BYREVISION DESCRIPTIONREV DATEAUTHCHKD

NOT USED

NOT USED

NOT USED

JBMV

1C213

1C233

1C253

1C272

A311

A331

A351

A371

X4.7

X4.8

X4.9

X4.10

A311

A331

A351

A371

X2.52

X2.49

X2.50

X2.51

PMU 2 CT CIRCUIT 1

FEEDER NAME

RP

TO TRANSFORMER 31

(SEE 19.37/5288

SHEET 7)

765/400kV TRANSFORMER 31

(SEE 19.37/5288 SHEET 7)

*

NOTE:

1. UNKNOWN TERMINALS TO BE ADDED ON SITE.

RP

*

L.T.

U.N.

07/2015

07/2015

Page 9: RELAY RELAY/EQUIPMENT LOCATION … GRID ALSTOM GRID SUPPLIER MCB/1 EP102UCC10 PMU DC SUPPLY MCB GE (REDLINE) G103C02 & CAH 3 4 5 6 3 PNH ND22 (230V AC) 1 PANEL LABEL MCB/1 MICOM P847B

F

M

L

K

J

H

E

G

D

C

B

A

F

E

G

D

C

B

A

6 7 8 9 10 11 12 13 14 15 16

31 2 4 5 6 7 8

54321

SIZE

GROOTTE A1L101LEVELS 2 31

H

PANEL TYPE DESIGNATION 1PMU-1100

SH

EE

T 0

8 O

F 2

4M

AS

TE

R T

RA

CIN

G F

ILE

D U

ND

ER

0.5

4/8

355

RE

VIS

ION

0

RP1

X3.1

X3.2

X3.3

X3.4

RP1

RP1

RP1

PMU-3

PMU-3

PMU-3

PMU-3

REVISION TO MASTER DATEAUTHCHKDBYREVREV

BAY NAME

BAY NAME

BAY NAME

BAY NAME

1C313

1C333

1C353

1C372

1C314

1C334

1C354

1C373

1C373

1C373

1C373

XJ-1

XJ-2

2C313

2C333

2C353

2C372

2C314

2C334

2C354

2C373

2C373

2C373

2C373

3C313

3C333

3C353

3C372

3C314

3C334

3C354

3C373

3C373

3C373

3C373

XJ-3

4C313

XJ-4

4C333

4C353

4C372

4C314

4C334

4C354

4C373

4C373

4C373

4C373

RP1 F11.6 RP1 F10.1

RP1 F11.7 RP1 F10.1

RP1 F11.8 RP1 F10.1

RP1 F11.9 RP1 F10.1

PMU 3 CIRCUIT 1

FEEDER NAME

PMU 3 CIRCUIT 2

FEEDER NAME

PMU 3 CIRCUIT 3

FEEDER NAME

PMU 3 CIRCUIT 4

FEEDER NAME

X3.5

X3.6

X3.7

X3.8

X3.9

X3.10

X3.11

X3.12

X3.13

X3.14

X3.15

X3.16

L.T.

07/2015

07/2015

U.N.

REVISIONSHEET NUMBER

CT CIRCUIT AC KEY DIAGRAMc

HYDRAWEST CONTROL ROOM

PHASOR MEASUREMENT UNIT MODULE 3

0.37/5438

ESKOM HOLDINGS LIMITED

REG NO.

2002/015527/06

PROJECT DRAWN BY

17/06/2014DATE

DATE

DATE

DATE

PROJECT APPROVED

SCHEME APPROVED

PROJECT CHECKED

DATE 05/2012

DATE 11/07/2012

DATE 11/07/2012

DESIGN APPROVED

DESIGN CHECKED

SCALE

T BOWER

BUYLE MAWENI

J A MYBURGH

D VAN ASWEGEN

DESIGN DRAWN BY

8 0

BYREVISION DESCRIPTIONREV DATEAUTHCHKD

Page 10: RELAY RELAY/EQUIPMENT LOCATION … GRID ALSTOM GRID SUPPLIER MCB/1 EP102UCC10 PMU DC SUPPLY MCB GE (REDLINE) G103C02 & CAH 3 4 5 6 3 PNH ND22 (230V AC) 1 PANEL LABEL MCB/1 MICOM P847B

F

M

L

K

J

H

E

G

D

C

B

A

F

E

G

D

C

B

A

6 7 8 9 10 11 12 13 14 15 16

31 2 4 5 6 7 8

54321

SIZE

GROOTTE A1L101LEVELS 2 31

H

PANEL TYPE DESIGNATION 1PMU-1100

SH

EE

T 0

9 O

F 2

4M

AS

TE

R T

RA

CIN

G F

ILE

D U

ND

ER

0.5

4/8

355

RE

VIS

ION

0

RP1

X1.17

X1.18

X1.19

X1.20

X1.21

X1.22

X1.23

X1.24

X1.25

X1.26

X1.27

X1.28

X1.29

X1.30

X1.31

X1.32

RP1

RP1

RP1

REVISION TO MASTER DATEAUTHCHKDBYREVREV

RP1 F5.2XU-1

RP1 X4.4 1VTS1

1VTS1

1VTS2

RP1 X4.4

RP1 X4.5

RP1 X4.5 1VTS2 RP1 F4.1 PMU-1

RP1 F5.3XU-2

RP1 F5.4XU-3

RP1 X4.6 1VTS3

RP1 X4.6 1VTS3

RP1 F5.5XU-4

RP1 F5.10

RP1 F5.11

RP1 F5.12

RP1 F5.13

PMU 1

VT CIRCUIT

E171

E155

E135

E115RP1

X1.51

X1.52

X1.53

X1.54

SELECTED VOLTAGE OUTPUT

5A

5A

5A

5A

L.T.

07/2015

07/2015

U.N.

REVISIONSHEET NUMBER

VT SELECTION AC KEY DIAGRAMc

HYDRAWEST CONTROL ROOM

PHASOR MEASUREMENT UNIT MODULE 1

0.37/5438

ESKOM HOLDINGS LIMITED

REG NO.

2002/015527/06

PROJECT DRAWN BY

17/06/2014DATE

DATE

DATE

DATE

PROJECT APPROVED

SCHEME APPROVED

PROJECT CHECKED

DATE 05/2012

DATE 11/07/2012

DATE 11/07/2012

DESIGN APPROVED

DESIGN CHECKED

SCALE

T BOWER

BUYLE MAWENI

J A MYBURGH

D VAN ASWEGEN

DESIGN DRAWN BY

9 0

BYREVISION DESCRIPTIONREV DATEAUTHCHKD

Page 11: RELAY RELAY/EQUIPMENT LOCATION … GRID ALSTOM GRID SUPPLIER MCB/1 EP102UCC10 PMU DC SUPPLY MCB GE (REDLINE) G103C02 & CAH 3 4 5 6 3 PNH ND22 (230V AC) 1 PANEL LABEL MCB/1 MICOM P847B

F

E

G

RP1

PMU-2

RP1

X2.17

X2.18

X2.19

X2.20

X2.21

X2.22

X2.23

X2.24

X2.25

X2.26

X2.27

X2.28

X2.29

X2.30

X2.31

X2.32

RP1

RP1

RP1

E215 E215 E271

E271

E271

E271

E235 E235

E255E255

E271

RP1 F7.12VTS2

2VTS2

RP1 X6.4

RP1 X6.4

E234

E234

E214

E214

E254

2VTS1RP1 X6.3

1E211

1E231

1E251

1E270

1E212

1E232

1E252

1E213

1E233

1E253

1E2331E213

RP1 X6.3

XU-1

2VTS1

RP1 F8.2

RP1 F8.3

RP1 F8.4

XU-2

2E211

2E231

2E251

2E270

2E212

2E232

2E252

2E213

2E233

2E253

XU-3

RP1 X6.5 2VTS3

3E211

3E231

3E251

3E270

3E212

3E232

3E252

3E213

3E233

3E253

3E213 3E233

RP1 X6.5 2VTS3

3E214

3E234

3E254

E271E271

E271 E271

RP1 F8.5XU-4

4E211

4E231

4E251

4E270 E271

4E212

4E232

4E252

4E213

4E233

4E253

E271

RP1 F8.10

RP1 F8.11

RP1 F8.12

RP1 F8.13

PMU 2

VT CIRCUIT

E271

E255

E235

E215

X2.51

X2.52

X2.53

X2.54

SELECTED VOLTAGE OUTPUT

5A

5A

5A

5A

VT

SO

UR

CE

4

(NO

T U

SE

D)

VT

SO

UR

CE

3

(NO

T U

SE

D)

VT

SO

UR

CE

2

(NO

T U

SE

D)

M

L

K

J

H

1 32 4 5 6 7 8 SIZE101LEVELS 2 31 PANEL TYPE DESIGNATION 1PMU-1100 GROOTTE A1L

REVISION TO MASTER DATEAUTHCHKDBYREVREV

REVISIONSHEET NUMBER

VT SELECTION AC KEY DIAGRAMc

HYDRAWEST CONTROL ROOM

PHASOR MEASUREMENT UNIT MODULE 2

0.37/5438

ESKOM HOLDINGS LIMITED

REG NO.

2002/015527/06

PROJECT DRAWN BY

20/06/2014DATE

DATE

DATE

DATE

PROJECT APPROVED

SCHEME APPROVED

PROJECT CHECKED

DATE 05/2012

DATE 11/07/2012

DATE 11/07/2012

DESIGN APPROVED

DESIGN CHECKED

SCALE

T BOWER

BUYLE MAWENI

SNKOMO

D VAN ASWEGEN

DESIGN DRAWN BY

10 0

BYREVISION DESCRIPTIONREV DATEAUTHCHKD

F

E

G

D

C

B

A

H

SH

EE

T 1

0 O

F 2

4M

AS

TE

R T

RA

CIN

G F

ILE

D U

ND

ER

0.5

4/8

35

5

RE

VIS

ION

0

6 7 8 9 10 11 12 13 14 15 165432

D

C

B

A

1

1E211

1E231

1E251

1E270

X1.67

X1.68

X1.69

X1.70765/4

00kV

TR

AN

SF

OR

ME

R 3

1

(SE

E 1

9.3

7/5

288 S

HE

ET

15)

VT

SO

UR

CE

1TRFR 31

RP

L.T

U.N

07/2015

07/2015

Page 12: RELAY RELAY/EQUIPMENT LOCATION … GRID ALSTOM GRID SUPPLIER MCB/1 EP102UCC10 PMU DC SUPPLY MCB GE (REDLINE) G103C02 & CAH 3 4 5 6 3 PNH ND22 (230V AC) 1 PANEL LABEL MCB/1 MICOM P847B

F

M

L

K

J

H

E

G

D

C

B

A

F

E

G

D

C

B

A

6 7 8 9 10 11 12 13 14 15 16

31 2 4 5 6 7 8

54321

SIZE

GROOTTE A1L101LEVELS 2 31

H

PANEL TYPE DESIGNATION 1PMU-1100

SH

EE

T 1

1 O

F 2

4M

AS

TE

R T

RA

CIN

G F

ILE

D U

ND

ER

0.5

4/8

355

RE

VIS

ION

0

RP1

X3.51

X3.52

X3.53

X3.54

RP1

X3.17

X3.18

X3.19

X3.20

X3.21

X3.22

X3.23

X3.24

RP1

X3.25

X3.26

X3.27

X3.28

RP1

X3.29

X3.30

X3.31

X3.32

RP1

REVISION TO MASTER DATEAUTHCHKDBYREVREV

1E311

1E331

1E351

1E370

1E312

1E332

1E352

1E313

1E333

1E353

E371

1E313 1E333

RP1 F11.10 XU-1

RP1 X8.3

RP1 X8.3

RP1 X8.4

RP1 X8.4

E371

E314 E334

E314

E334

E354

E315

E335

E355

E371

E315

E335

E355

E371

E371

E371

E371

PMU-3

RP1 X8.5

RP1 X8.5

RP1 F11.12 XU-3

3E314

3E334

3E354

E371

3E313

3E333

3E353

E371

3E3333E313

3E311

3E331

3E351

3E370

3E312

3E332

3E352

2E311

2E331

2E351

2E370

2E312

2E332

2E352

2E313

2E333

2E353

E371

RP1 F11.13 XU-4

4E311

4E331

4E351

4E370

4E312

4E332

4E352

4E313

4E333

4E353

E371

RP1 F10.1RP1 F11.2

RP1 F11.3RP1 F11.11 XU-2

RP1 F11.4

RP1 F11.5

VTS3

VTS3

E371

E355

E335

E315

3VTS1

3VTS1

3VTS2

3VTS2

PMU 3

VT CIRCUIT

SELECTED VOLTAGE OUTPUT

5A

5A

5A

5A

L.T.

07/2015

07/2015

U.N.

REVISIONSHEET NUMBER

VT SELECTION AC KEY DIAGRAMc

HYDRAWEST CONTROL ROOM

PHASOR MEASUREMENT UNIT MODULE 3

0.37/5438

ESKOM HOLDINGS LIMITED

REG NO.

2002/015527/06

PROJECT DRAWN BY

17/06/2014DATE

DATE

DATE

DATE

PROJECT APPROVED

SCHEME APPROVED

PROJECT CHECKED

DATE 05/2012

DATE 11/07/2012

DATE 11/07/2012

DESIGN APPROVED

DESIGN CHECKED

SCALE

T BOWER

BUYLE MAWENI

J A MYBURGH

D VAN ASWEGEN

DESIGN DRAWN BY

11 0

BYREVISION DESCRIPTIONREV DATEAUTHCHKD

Page 13: RELAY RELAY/EQUIPMENT LOCATION … GRID ALSTOM GRID SUPPLIER MCB/1 EP102UCC10 PMU DC SUPPLY MCB GE (REDLINE) G103C02 & CAH 3 4 5 6 3 PNH ND22 (230V AC) 1 PANEL LABEL MCB/1 MICOM P847B

F

M

L

K

J

H

E

G

D

C

B

A

F

E

G

D

C

B

A

6 7 8 9 10 11 12 13 14 15 16

31 2 4 5 6 7 8

54321

SIZE

GROOTTE A1L101LEVELS 2 31

H

PANEL TYPE DESIGNATION 1PMU-1100

SH

EE

T 1

2 O

F 2

4M

AS

TE

R T

RA

CIN

G F

ILE

D U

ND

ER

0.5

4/8

355

RE

VIS

ION

0

SHEET 13 (PMU-1)

SHEET 14 (PMU-2)

SHEET 15 (PMU-3)

REVISION TO MASTER DATEAUTHCHKDBYREVREV

5 7

19 21

3 1

11 9

25 23

RP1 F3.1

RP1 F3.2

SS-M1

SS-M1

SS-M2

RP1 F2.1

RP1 F2.1

RP1 F2.2

RP1 F3.5

GPS

U24

RP1 F2.3

RP1 R2.1

sPDCRP1 F2.6

RP1 F3.5

SS-M1

SS-M1

SS-M2

RP1 F2.1

RP1 F2.1

RP1 F2.2

RP1 F3.1

RP1 F3.2

RP1 F3.3

SS-M1RP1 F2.1

RP1 R3.5

RP1 F2.2 SS-M2

RP1 F6.1

RP1 F6.1

DCF-M2

RP1 F3.4

RP1 F3.3

RP1 F3.4

J13

J13

J15

J15

J15

J15

J13

J17

J16J16

J16

J16

J16

J14J14

J14

CONTINUED ON SHEET 16 24V DC (sPDC I/O)

J14

J18

RSG2100NC

5 7

+ -

UNO-3084

RSG2100NC

1 3

PSU

PSU

PSU

4 3 1 2

L.T.

07/2015

07/2015

U.N.

REVISIONSHEET NUMBER

DC KEY DIAGRAMc

HYDRAWEST CONTROL ROOM

PHASOR MEASUREMENT UNIT MAIN 1 & MAIN 2

0.37/5438

ESKOM HOLDINGS LIMITED

REG NO.

2002/015527/06

PROJECT DRAWN BY

17/06/2014DATE

DATE

DATE

DATE

PROJECT APPROVED

SCHEME APPROVED

PROJECT CHECKED

DATE 05/2012

DATE 11/07/2012

DATE 11/07/2012

DESIGN APPROVED

DESIGN CHECKED

SCALE

T BOWER

BUYLE MAWENI

J A MYBURGH

D VAN ASWEGEN

DESIGN DRAWN BY

12 0

BYREVISION DESCRIPTIONREV DATEAUTHCHKD

Page 14: RELAY RELAY/EQUIPMENT LOCATION … GRID ALSTOM GRID SUPPLIER MCB/1 EP102UCC10 PMU DC SUPPLY MCB GE (REDLINE) G103C02 & CAH 3 4 5 6 3 PNH ND22 (230V AC) 1 PANEL LABEL MCB/1 MICOM P847B

F

M

L

K

J

H

E

G

D

C

B

A

F

E

G

D

C

B

A

6 7 8 9 10 11 12 13 14 15 16

31 2 4 5 6 7 8

54321

SIZE

GROOTTE A1L101LEVELS 2 31

H

PANEL TYPE DESIGNATION 1PMU-1100

SH

EE

T 1

3 O

F 2

4M

AS

TE

R T

RA

CIN

G F

ILE

D U

ND

ER

0.5

4/8

355

RE

VIS

ION

0

REVISION TO MASTER DATEAUTHCHKDBYREVREV

24 26

J6

RP1 F5.1

PMU-1RP1 F4.1

J5

RP1 F5.1

RP1 X4.2

RP1 X4.3

RP1 X4.4

RP1 F2.2

RP1 X2.5

RP1 X2.3

1VTS1

1VTS2

1VTS3

SS-M2

DCF-M2

PNH-X

ACF-XRP1 X2.4

1K102

P847B

PMU POWER SUPPLY

1K101

110/220V DC SECURE SUPPLY

FROM SHEET 12

1K102

PSU

1K1011K101

OPT01

OPT02

OPT03

OPT04

OPT05

OPT06

OPT07

OPT08

E2

M2 M1

E1

E4

E6

E3

E5

E7E8

E10

E12

E14

E9

E11

E13

E15E16

1K102

1K102

1K102

1K102

1K102

1K102

1K102

1K102

1K103

1K105

1K107

1K109

1K111

1K113

1K115

1K117

PMU BINARY INPUT 1

PMU BINARY INPUT 2

PMU BINARY INPUT 3

PMU BINARY INPUT 4

PMU BINARY INPUT 5

PMU BINARY INPUT 6

PMU BINARY INPUT 7

PMU BINARY INPUT 8

RP1

X1.34

X1.35

X1.36

X1.37

X1.39

X1.40

X1.41

X1.42

L.T.

07/2015

07/2015

U.N.

REVISIONSHEET NUMBER

DC KEY DIAGRAMc

HYDRAWEST CONTROL ROOM

PHASOR MEASUREMENT UNIT MODULE 1

0.37/5438

ESKOM HOLDINGS LIMITED

REG NO.

2002/015527/06

PROJECT DRAWN BY

17/06/2014DATE

DATE

DATE

DATE

PROJECT APPROVED

SCHEME APPROVED

PROJECT CHECKED

DATE 05/2012

DATE 11/07/2012

DATE 11/07/2012

DESIGN APPROVED

DESIGN CHECKED

SCALE

T BOWER

BUYLE MAWENI

J A MYBURGH

D VAN ASWEGEN

DESIGN DRAWN BY

13 0

BYREVISION DESCRIPTIONREV DATEAUTHCHKD

Page 15: RELAY RELAY/EQUIPMENT LOCATION … GRID ALSTOM GRID SUPPLIER MCB/1 EP102UCC10 PMU DC SUPPLY MCB GE (REDLINE) G103C02 & CAH 3 4 5 6 3 PNH ND22 (230V AC) 1 PANEL LABEL MCB/1 MICOM P847B

F

M

L

K

J

H

E

G

D

C

B

A

F

E

G

D

C

B

A

6 7 8 9 10 11 12 13 14 15 16

31 2 4 5 6 7 8

54321

SIZE

GROOTTE A1L101LEVELS 2 31

H

PANEL TYPE DESIGNATION 1PMU-1100

SH

EE

T 1

4 O

F 2

4M

AS

TE

R T

RA

CIN

G F

ILE

D U

ND

ER

0.5

4/8

355

RE

VIS

ION

0

2K102

X2.46RP1

2J6

2K1192K119

2K119

2K119

FROM SHEET 12

RP1 X2.45

2J5 2K101

2K101

2K101

2K101

2K101

RP1

X2.38

REVISION TO MASTER DATEAUTHCHKDBYREVREV

RP1

X2.33

J5

RP1 F8.1 RP1 F8.1

J6

RP1 X6.2

RP1 X6.3

RP1 X6.4

2VTS1

2VTS2

2VTS3

P847B

M2 M1

2K102

RP1 F7.1 PMU-2

2K101PMU POWER SUPPLY 2K101

2K102

110/220V DC SECURE SUPPLY

OPT01

E2 E1

E2 E1

E2 E1

E2 E1

E2 E1

E2 E1

E2 E1

E2 E1

OPT02

OPT03

OPT04

OPT05

OPT06

OPT07

OPT08

2K102

2K102

2K102

2K102

2K102

2K102

2K102

2K1022K103

2K105

2K107

2K109

2K111

2K113

2K115

2K117

PMU BINARY INPUT 1

PMU BINARY INPUT 2

PMU BINARY INPUT 3

PMU BINARY INPUT 4

PMU BINARY INPUT 5

PMU BINARY INPUT 6

PMU BINARY INPUT 7

PMU BINARY INPUT 8

X2.34

RP1

X2.35

X2.36

X2.37

X2.39

X2.40

X2.41

X2.42

L.T.

07/2015

07/2015

U.N.

REVISIONSHEET NUMBER

DC KEY DIAGRAMc

HYDRAWEST CONTROL ROOM

PHASOR MEASUREMENT UNIT MODULE 2

0.37/5438

ESKOM HOLDINGS LIMITED

REG NO.

2002/015527/06

PROJECT DRAWN BY

17/06/2014DATE

DATE

DATE

DATE

PROJECT APPROVED

SCHEME APPROVED

PROJECT CHECKED

DATE 05/2012

DATE 11/07/2012

DATE 11/07/2012

DESIGN APPROVED

DESIGN CHECKED

SCALE

T BOWER

BUYLE MAWENI

J A MYBURGH

D VAN ASWEGEN

DESIGN DRAWN BY

14 0

BYREVISION DESCRIPTIONREV DATEAUTHCHKD

Page 16: RELAY RELAY/EQUIPMENT LOCATION … GRID ALSTOM GRID SUPPLIER MCB/1 EP102UCC10 PMU DC SUPPLY MCB GE (REDLINE) G103C02 & CAH 3 4 5 6 3 PNH ND22 (230V AC) 1 PANEL LABEL MCB/1 MICOM P847B

F

M

L

K

J

H

E

G

D

C

B

A

F

E

G

D

C

B

A

6 7 8 9 10 11 12 13 14 15 16

31 2 4 5 6 7 8

54321

SIZE

GROOTTE A1L101LEVELS 2 31

H

PANEL TYPE DESIGNATION 1PMU-1100

SH

EE

T 1

5 O

F 2

4M

AS

TE

R T

RA

CIN

G F

ILE

D U

ND

ER

0.5

4/8

355

RE

VIS

ION

0

3K102

X3.46RP1

3J6

3K1193K119

3K119

3K119

FROM SHEET 12

RP1 X3.45

3J5 3K101

3K101

3K101

3K101

2K101

RP1

X3.38

REVISION TO MASTER DATEAUTHCHKDBYREVREV

RP1

X3.33

J5 J6

RP1 X8.2

RP1 X8.3

RP1 X8.4

3VTS1

3VTS2

3VTS3

P847B

M2 M1

3K102

RP1 F7.1 PMU-3

3K101PMU POWER SUPPLY 3K101

3K102

OPT01

E2 E1

E2 E1

E2 E1

E2 E1

E2 E1

E2 E1

E2 E1

E2 E1

OPT02

OPT03

OPT04

OPT05

OPT06

OPT07

OPT08

3K102

3K102

3K102

3K102

3K102

3K102

3K102

3K1023K103

3K105

3K107

3K109

3K111

3K113

3K115

3K117

PMU BINARY INPUT 1

PMU BINARY INPUT 2

PMU BINARY INPUT 3

PMU BINARY INPUT 4

PMU BINARY INPUT 5

PMU BINARY INPUT 6

PMU BINARY INPUT 7

PMU BINARY INPUT 8

RP1

X3.34

X3.35

X3.36

X3.37

X3.39

X3.40

X3.41

X3.42

RP1 F11.1 RP1 F11.1

L.T.

07/2015

07/2015

U.N.

REVISIONSHEET NUMBER

DC KEY DIAGRAMc

HYDRAWEST CONTROL ROOM

PHASOR MEASUREMENT UNIT MODULE 3

0.37/5438

ESKOM HOLDINGS LIMITED

REG NO.

2002/015527/06

PROJECT DRAWN BY

17/06/2014DATE

DATE

DATE

DATE

PROJECT APPROVED

SCHEME APPROVED

PROJECT CHECKED

DATE 05/2012

DATE 11/07/2012

DATE 11/07/2012

DESIGN APPROVED

DESIGN CHECKED

SCALE

T BOWER

BUYLE MAWENI

J A MYBURGH

D VAN ASWEGEN

DESIGN DRAWN BY

15 0

BYREVISION DESCRIPTIONREV DATEAUTHCHKD

Page 17: RELAY RELAY/EQUIPMENT LOCATION … GRID ALSTOM GRID SUPPLIER MCB/1 EP102UCC10 PMU DC SUPPLY MCB GE (REDLINE) G103C02 & CAH 3 4 5 6 3 PNH ND22 (230V AC) 1 PANEL LABEL MCB/1 MICOM P847B

F

M

L

K

J

H

E

G

D

C

B

A

F

E

G

D

C

B

A

6 7 8 9 10 11 12 13 14 15 16

31 2 4 5 6 7 8

54321

SIZE

GROOTTE A1L101LEVELS 2 31

H

PANEL TYPE DESIGNATION 1PMU-1100

SH

EE

T 1

6 O

F 2

4M

AS

TE

R T

RA

CIN

G F

ILE

D U

ND

ER

0.5

4/8

355

RE

VIS

ION

0

REVISION TO MASTER DATEAUTHCHKDBYREVREV

1

2

3

4

5

6

7

8

15

16

17

18

19

20

21

22

D11

D12

D13

sPDC-XO

sPDC-X1

RP1 F2.4

RP1 F2.5

sPDC-X2

sPDC-X3

RP1 R3.1

RP1 R3.2

sPDCRP1 F2.6

FROM SHEET 12

3

L.T.

07/2015

07/2015

U.N.

REVISIONSHEET NUMBER

SPDC INPUTS/OUTPUTSc

HYDRAWEST CONTROL ROOM

PHASOR MEASUREMENT UNIT

0.37/5438

ESKOM HOLDINGS LIMITED

REG NO.

2002/015527/06

PROJECT DRAWN BY

17/06/2014DATE

DATE

DATE

DATE

PROJECT APPROVED

SCHEME APPROVED

PROJECT CHECKED

DATE 05/2012

DATE 11/07/2012

DATE 11/07/2012

DESIGN APPROVED

DESIGN CHECKED

SCALE

T BOWER

BUYLE MAWENI

J A MYBURGH

D VAN ASWEGEN

DESIGN DRAWN BY

16 0

BYREVISION DESCRIPTIONREV DATEAUTHCHKD

Page 18: RELAY RELAY/EQUIPMENT LOCATION … GRID ALSTOM GRID SUPPLIER MCB/1 EP102UCC10 PMU DC SUPPLY MCB GE (REDLINE) G103C02 & CAH 3 4 5 6 3 PNH ND22 (230V AC) 1 PANEL LABEL MCB/1 MICOM P847B

F

M

L

K

J

H

E

G

D

C

B

A

F

E

G

D

C

B

A

6 7 8 9 10 11 12 13 14 15 16

31 2 4 5 6 7 8

54321

SIZE

GROOTTE A1L101LEVELS 2 31

H

PANEL TYPE DESIGNATION 1PMU-1100

SH

EE

T 1

7 O

F 2

4M

AS

TE

R T

RA

CIN

G F

ILE

D U

ND

ER

0.5

4/8

355

RE

VIS

ION

0

REVISION TO MASTER DATEAUTHCHKDBYREVREV

GPSRP1 F2.3 PMU-1

PMU-2

PMU-3

RP1 F4.1

RP1 F7.1

RP1 F10.1

L.T.

07/2015

07/2015

U.N.

REVISIONSHEET NUMBER

GPS TIME SIGNAL DISTRIBUTIONc

HYDRAWEST CONTROL ROOM

PHASOR MEASUREMENT UNIT

0.37/5438

ESKOM HOLDINGS LIMITED

REG NO.

2002/015527/06

PROJECT DRAWN BY

17/06/2014DATE

DATE

DATE

DATE

PROJECT APPROVED

SCHEME APPROVED

PROJECT CHECKED

DATE 05/2012

DATE 11/07/2012

DATE 11/07/2012

DESIGN APPROVED

DESIGN CHECKED

SCALE

T BOWER

BUYLE MAWENI

J A MYBURGH

D VAN ASWEGEN

DESIGN DRAWN BY

17 0

BYREVISION DESCRIPTIONREV DATEAUTHCHKD

Page 19: RELAY RELAY/EQUIPMENT LOCATION … GRID ALSTOM GRID SUPPLIER MCB/1 EP102UCC10 PMU DC SUPPLY MCB GE (REDLINE) G103C02 & CAH 3 4 5 6 3 PNH ND22 (230V AC) 1 PANEL LABEL MCB/1 MICOM P847B

F

M

L

K

J

H

E

G

D

C

B

A

F

E

G

D

C

B

A

6 7 8 9 10 11 12 13 14 15 16

31 2 4 5 6 7 8

54321

SIZE

GROOTTE A1L101LEVELS 2 31

H

PANEL TYPE DESIGNATION 1PMU-1100

SH

EE

T 1

8 O

F 2

4M

AS

TE

R T

RA

CIN

G F

ILE

D U

ND

ER

0.5

4/8

355

RE

VIS

ION

0

REVISION TO MASTER DATEAUTHCHKDBYREVREV

PMU-1 PMU-2 PMU-3RP1 F4.1 RP1 F7.1

RP1 F2.6

PNH-X

ACF-X

RP1 X2.3

RP1 X2.4

RP1 F10.1

IDF INTERFACE

X107

X9.29

X105

X9.30

PATCH

PANEL

LC

L.T.

07/2015

07/2015

U.N.

REVISIONSHEET NUMBER

ALARMS CONTROL DC KEY DIAGRAMc

HYDRAWEST CONTROL ROOM

PHASOR MEASUREMENT UNIT

0.37/5438

ESKOM HOLDINGS LIMITED

REG NO.

2002/015527/06

PROJECT DRAWN BY

17/06/2014DATE

DATE

DATE

DATE

PROJECT APPROVED

SCHEME APPROVED

PROJECT CHECKED

DATE 05/2012

DATE 11/07/2012

DATE 11/07/2012

DESIGN APPROVED

DESIGN CHECKED

SCALE

T BOWER

BUYLE MAWENI

J A MYBURGH

D VAN ASWEGEN

DESIGN DRAWN BY

18 0

BYREVISION DESCRIPTIONREV DATEAUTHCHKD

Page 20: RELAY RELAY/EQUIPMENT LOCATION … GRID ALSTOM GRID SUPPLIER MCB/1 EP102UCC10 PMU DC SUPPLY MCB GE (REDLINE) G103C02 & CAH 3 4 5 6 3 PNH ND22 (230V AC) 1 PANEL LABEL MCB/1 MICOM P847B

F

M

L

K

J

H

E

G

D

C

B

A

F

E

G

D

C

B

A

6 7 8 9 10 11 12 13 14 15 16

31 2 4 5 6 7 8

54321

SIZE

GROOTTE A1L101LEVELS 2 31

H

PANEL TYPE DESIGNATION 1PMU-1100

SH

EE

T 1

9 O

F 2

4M

AS

TE

R T

RA

CIN

G F

ILE

D U

ND

ER

0.5

4/8

355

RE

VIS

ION

0

REVISION TO MASTER DATEAUTHCHKDBYREVREV

5 7

11 9

1 3

24 26

25 23

20 22

19 21

SPARE

SHEET 12, B9

SHEET 12, E6

SHEET 12, C6

SHEET 12, E11

SHEET 12, C11

SHEET 12, C8

SHEET 12, E6

SHEET 3, F2

SHEET 12, E11

SHEET 13, H7

SHEET 16, B5

SHEET 16 F5

SHEET 16, G5

SHEET 16, G5

SHEET 16, H5

SHEET 16, H5

SHEET 16, H5

SHEET 3, C2

SHEET 3, G11

SHEET 18, K7

SHEET 13, J7

SHEET 3, E12

SHEET 18, L7

SHEET 13, K7

SHEET 12, C9

SHEET 3, E2

SHEET 13, J6

SHEET 12, G9

SHEET 16, B12

SHEET 16, D12

SHEET 16, F12

SHEET 16, G12

SHEET 16, J12

SHEET 16, J12

SHEET 16, K12

SHEET 16, L12

SHEET 12, B9

SHEET 12, D9

SHEET 12, F9

SHEET 18,

SHEET 12, F9

SHEET 3, E4

SHEET 17, B7

SHEET 17, C7

SHEET 17, C7

SHEET 17, C6

SHEET 17, B7

SHEET 3, F3/SHEET 16, B5

SHEET 3, D5

sPDC-X0

1413

1 3

2 4

5 7

6 8

27 28

15 17

16 18

19 21

20 22

MVAA21-2

MVAA21-1

sPDC-X1

SHEET 16, G5

SS-M1

SS-M2

RP1 F2.1

RP1 F2.2

RP1 F2.4

RP1 F2.5

sPDC-X2RP1 R3.1

GPSRP1 F3.3sPDCRP1 F2.6

RP1 F6.1

PNH-XRP1 R3.3

sPDC-X3RP1 R3.2

ACF-XRP1 R3.4

RP1 R3.5 DCF-M2

+ -

PSU PSU

B2 B1

1 3

5 7

PSU

PSU

L.T.

07/2015

07/2015

U.N.

REVISIONSHEET NUMBER

REFERENCE DIAGRAMc

HYDRAWEST CONTROL ROOM

PHASOR MEASUREMENT UNIT

0.37/5438

ESKOM HOLDINGS LIMITED

REG NO.

2002/015527/06

PROJECT DRAWN BY

17/06/2014DATE

DATE

DATE

DATE

PROJECT APPROVED

SCHEME APPROVED

PROJECT CHECKED

DATE 05/2012

DATE 11/07/2012

DATE 11/07/2012

DESIGN APPROVED

DESIGN CHECKED

SCALE

T BOWER

BUYLE MAWENI

J A MYBURGH

D VAN ASWEGEN

DESIGN DRAWN BY

19 0

BYREVISION DESCRIPTIONREV DATEAUTHCHKD

Page 21: RELAY RELAY/EQUIPMENT LOCATION … GRID ALSTOM GRID SUPPLIER MCB/1 EP102UCC10 PMU DC SUPPLY MCB GE (REDLINE) G103C02 & CAH 3 4 5 6 3 PNH ND22 (230V AC) 1 PANEL LABEL MCB/1 MICOM P847B

F

M

L

K

J

H

E

G

D

C

B

A

F

E

G

D

C

B

A

6 7 8 9 10 11 12 13 14 15 16

31 2 4 5 6 7 8

54321

SIZE

GROOTTE A1L101LEVELS 2 31

H

PANEL TYPE DESIGNATION 1PMU-1100

SH

EE

T 2

0 O

F 2

4M

AS

TE

R T

RA

CIN

G F

ILE

D U

ND

ER

0.5

4/8

355

RE

VIS

ION

0

SHEET 13, H11

SHEET 13, H11

SHEET 13, J11

SHEET 13, K11

6,

6,

6,

6,

9,

SHEET 17, B10

SHEET 17, B10

REVISION TO MASTER DATEAUTHCHKDBYREVREV

B13

E13

G13

J13

B14

SHEET 18, B7

RP1 F4.1 PMU-1

SPARE/NOT USED

SPARE/NOT USED

SPARE/NOT USED

SPARE/NOT USED

SPARE/NOT USED

SPARE/NOT USED

SPARE/NOT USED

SPARE/NOT USED

SHEET 13, F11

SHEET 4, B6

SHEET 4, J6

SHEET 4, K6

1VTS1

VT SUPPLY 1 AUX. RELAY

SHEET 9, B5

VT SUPPLY 1 FAIL TO PMU

SHEET 13, F6

VT SUPPLY 1 & 2 AUX. RELAY

SHEET 9, B8

VT SUPPLY 1-3 CONTACTS

SHEET 9, B11

VT SUPPLY 1 & 2 FAIL TO PMU

SHEET 13, G7

VT SUPPLY 3 AUX. RELAY

SHEET 9, G5

VT SUPPLY 3 & 4 CONTACTS

SHEET 9, G7

VT SUPPLY 3 FAIL TO PMU

SHEET 13, H6

VT SUPPLY 1 & 2 CONTACTS

SHEET 9, B7

RP1 X4.4

RP1 X4.5 1VTS2

RP1 X4.6 1VTS3

PMU-1

SHEET 4, B7

M2 M1 SHEET 13, C11

L.T.

07/2015

07/2015

U.N.

REVISIONSHEET NUMBER

REFERENCE DIAGRAMc

HYDRAWEST CONTROL ROOM

PHASOR MEASUREMENT UNIT MODULE 1

0.37/5438

ESKOM HOLDINGS LIMITED

REG NO.

2002/015527/06

PROJECT DRAWN BY

17/06/2014DATE

DATE

DATE

DATE

PROJECT APPROVED

SCHEME APPROVED

PROJECT CHECKED

DATE 05/2012

DATE 11/07/2012

DATE 11/07/2012

DESIGN APPROVED

DESIGN CHECKED

SCALE

T BOWER

BUYLE MAWENI

J A MYBURGH

D VAN ASWEGEN

DESIGN DRAWN BY

20 0

BYREVISION DESCRIPTIONREV DATEAUTHCHKD

Page 22: RELAY RELAY/EQUIPMENT LOCATION … GRID ALSTOM GRID SUPPLIER MCB/1 EP102UCC10 PMU DC SUPPLY MCB GE (REDLINE) G103C02 & CAH 3 4 5 6 3 PNH ND22 (230V AC) 1 PANEL LABEL MCB/1 MICOM P847B

F

M

L

K

J

H

E

G

D

C

B

A

F

E

G

D

C

B

A

6 7 8 9 10 11 12 13 14 15 16

31 2 4 5 6 7 8

54321

SIZE

GROOTTE A1L101LEVELS 2 31

H

PANEL TYPE DESIGNATION 1PMU-1100

SH

EE

T 2

1 O

F 2

4M

AS

TE

R T

RA

CIN

G F

ILE

D U

ND

ER

0.5

4/8

355

RE

VIS

ION

0

7,

7,

7,

7,

SHEET 17, D10

SHEET 17, D10

REVISION TO MASTER DATEAUTHCHKDBYREVREV

B13

E13

G13

J13

B14

SHEET 18, B9

RP1 F7.1 PMU-2

SPARE/NOT USED

SPARE/NOT USED

SPARE/NOT USED

SPARE/NOT USED

SPARE/NOT USED

SPARE/NOT USED

SPARE/NOT USED

SPARE/NOT USED

SHEET 4, F6

SHEET 4, K6

SHEET 4, L6

2VTS1

VT SUPPLY 1 FAIL TO PMU

SHEET 14, F6

VT SUPPLY 1 & 2 AUX. RELAY

SHEET 10, B8

VT SUPPLY 1 & 2 FAIL TO PMU

SHEET 14, G7

VT SUPPLY 3 AUX. RELAY

SHEET 10, G5

VT SUPPLY 3 FAIL TO PMU

SHEET 14, H6

VT SUPPLY 1 & 2 CONTACTS

SHEET 10, B7

VT SUPPLY 1 AUX. RELAY

SHEET 10, B5

PMU-2

VT SUPPLY 1-3 CONTACTS

SHEET 10, B11

VT SUPPLY 3 & 4 CONTACTS

SHEET 10, G7

RP1 X6.4 2VTS2

10,

M2 M1

SHEET 4, E7

SHEET 14, F11

SPARE/NOT USED

SPARE/NOT USED

SPARE/NOT USED

SPARE/NOT USED

SHEET 14, C11

RP1 X6.3

RP1 X6.5 2VTS3

L.T.

07/2015

07/2015

U.N.

REVISIONSHEET NUMBER

REFERENCE DIAGRAMc

HYDRAWEST CONTROL ROOM

PHASOR MEASUREMENT UNIT MODULE 2

0.37/5438

ESKOM HOLDINGS LIMITED

REG NO.

2002/015527/06

PROJECT DRAWN BY

17/06/2014DATE

DATE

DATE

DATE

PROJECT APPROVED

SCHEME APPROVED

PROJECT CHECKED

DATE 05/2012

DATE 11/07/2012

DATE 11/07/2012

DESIGN APPROVED

DESIGN CHECKED

SCALE

T BOWER

BUYLE MAWENI

J A MYBURGH

D VAN ASWEGEN

DESIGN DRAWN BY

21 0

BYREVISION DESCRIPTIONREV DATEAUTHCHKD

Page 23: RELAY RELAY/EQUIPMENT LOCATION … GRID ALSTOM GRID SUPPLIER MCB/1 EP102UCC10 PMU DC SUPPLY MCB GE (REDLINE) G103C02 & CAH 3 4 5 6 3 PNH ND22 (230V AC) 1 PANEL LABEL MCB/1 MICOM P847B

F

M

L

K

J

H

E

G

D

C

B

A

F

E

G

D

C

B

A

6 7 8 9 10 11 12 13 14 15 16

31 2 4 5 6 7 8

54321

SIZE

GROOTTE A1L101LEVELS 2 31

H

PANEL TYPE DESIGNATION 1PMU-1100

SH

EE

T 2

2 O

F 2

4M

AS

TE

R T

RA

CIN

G F

ILE

D U

ND

ER

0.5

4/8

355

RE

VIS

ION

0

8,

8,

8,

8,

SHEET 17, B10

SHEET 17, E10

REVISION TO MASTER DATEAUTHCHKDBYREVREV

B13

E13

G13

J13

B14

SHEET 18, C1

RP1 F10.1 PMU-3

SPARE/NOT USED

SPARE/NOT USED

SPARE/NOT USED

SPARE/NOT USED

SPARE/NOT USED

SPARE/NOT USED

SPARE/NOT USED

SPARE/NOT USED

SHEET 14, F11

SHEET 5, C6

SHEET 5, G6

SHEET 4, G7

VT SUPPLY 1 AUX. RELAY

SHEET 11, B5

VT SUPPLY 1 FAIL TO PMU

SHEET 15, F6

VT SUPPLY 1 & 2 AUX. RELAY

SHEET 11, B3

VT SUPPLY 1 & 2 FAIL TO PMU

SHEET 15, G7

VT SUPPLY 3 AUX. RELAY

SHEET 11, G5

VT SUPPLY 3 & 4 CONTACTS

SHEET 11, G7

VT SUPPLY 3 FAIL TO PMU

SHEET 15, H6

3VTS1

VT SUPPLY 1 & 2 CONTACTS

SHEET 11, B7

VT SUPPLY 1-3 CONTACTS

SHEET 11, B11

PMU-3

11,

SHEET 15, C11

SHEET 5, B7

M2 M1

SPARE/NOT USED

SPARE/NOT USED

SPARE/NOT USED

SPARE/NOT USED

RP1 X8.3

RP1 X8.4 3VTS2

RP1 X8.5 3VTS3

L.T.

07/2015

07/2015

U.N.

REVISIONSHEET NUMBER

REFERENCE DIAGRAMc

HYDRAWEST CONTROL ROOM

PHASOR MEASUREMENT UNIT MODULE 3

0.37/5438

ESKOM HOLDINGS LIMITED

REG NO.

2002/015527/06

PROJECT DRAWN BY

17/06/2014DATE

DATE

DATE

DATE

PROJECT APPROVED

SCHEME APPROVED

PROJECT CHECKED

DATE 05/2012

DATE 11/07/2012

DATE 11/07/2012

DESIGN APPROVED

DESIGN CHECKED

SCALE

T BOWER

BUYLE MAWENI

J A MYBURGH

D VAN ASWEGEN

DESIGN DRAWN BY

22 0

BYREVISION DESCRIPTIONREV DATEAUTHCHKD

Page 24: RELAY RELAY/EQUIPMENT LOCATION … GRID ALSTOM GRID SUPPLIER MCB/1 EP102UCC10 PMU DC SUPPLY MCB GE (REDLINE) G103C02 & CAH 3 4 5 6 3 PNH ND22 (230V AC) 1 PANEL LABEL MCB/1 MICOM P847B

12

11

10

9

8

7

6

5

4

3

2

1

22

21

20

19

18

17

16

15

14

13

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52

53

54

F

M

L

K

J

H

F

E

G

D

C

B

A

F

E

G

D

C

B

A

6 7 8 9 10 11 12 13 14 15 16

31 2 4 5 6 7 8

54321

SIZE

GROOTTE A1L101LEVELS 2 31 PANEL TYPE DESIGNATION 1PMU-1100

MA

ST

ER

TR

AC

ING

FIL

ED

UN

DE

R 0

.54/8

355

RE

VIS

ION

2

SH

EE

T 2

3 O

F 2

4

REVISION TO MASTER DATEAUTHCHKDBYREVREV

12

11

10

9

8

7

6

5

4

3

2

1

22

21

20

19

18

17

16

15

14

13

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52

53

54

12

11

10

9

8

7

6

5

4

3

2

1

22

21

20

19

18

17

16

15

14

13

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52

53

54E171

E155

E135

E115

1K147

1K145

1K143

1K141

1J6

1J5

1H13

1H12

1K101

4E170

4E151

4E131

4E111

3E170

3E151

3E131

3E111

2E170

2E151

2E131

2E111

1E170

1E151

1E131

1E111

4C172

4C153

4C133

4C113

3C172

3C153

3C133

3C113

2C172

2C153

2C133

2C113

1C172

1C153

1C133

1C113

E271

E255

E235

E215

2K247

2K245

2K243

2K241

2J6

2J5

2H13

2H12

2K201

4E270

4E251

4E231

4E211

3E270

3E251

3E231

3E211

2E270

2E251

2E231

2E211

1E270

1E251

1E231

1E211

4C272

4C253

4C233

4C213

3C272

3C253

3C233

3C213

2C272

2C253

2C233

2C213

1C272

1C253

1C233

1C213

E371

E355

E335

E315

3K347

3K345

3K343

3K341

3J6

3J5

3H13

3H12

3K301

4E370

4E351

4E331

4E311

3E370

3E351

3E331

3E311

2E370

2E351

2E331

2E311

1E370

1E351

1E331

1E311

4C372

4C353

4C333

4C313

3C372

3C353

3C333

3C313

2C372

2C353

2C333

2C313

1C372

1C353

1C333

1C313

DC INPUT

PNH

VT INPUT

CT INPUT

DC INPUT

PNH

VT INPUT

CT INPUT

DC INPUT

PNH

VT INPUT

CT INPUT

1K117

1K115

1K113

1K111

1K101

1K109

1K107

1K105

1K103

2K117

2K115

2K113

2K111

2K101

2K109

2K107

2K105

2K103

3K117

3K115

3K113

3K111

3K101

3K109

3K107

3K105

3K103

J6

J5

1H13

1H12

J6

J5

2H13

2H12

J6

J5

3H13

3H12

L.T.

07/2015

07/2015

U.N.

REVISIONSHEET NUMBER

PANEL CABLING DIAGRAMc

HYDRAWEST CONTROL ROOM

PHASOR MEASUREMENT UNIT

0.37/5438

ESKOM HOLDINGS LIMITED

REG NO.

2002/015527/06

PROJECT DRAWN BY

17/06/2014DATE

DATE

DATE

DATE

PROJECT APPROVED

SCHEME APPROVED

PROJECT CHECKED

DATE 05/2012

DATE 11/07/2012

DATE 11/07/2012

DESIGN APPROVED

DESIGN CHECKED

SCALE

T BOWER

BUYLE MAWENI

J A MYBURGH

D VAN ASWEGEN

DESIGN DRAWN BY

23 0

BYREVISION DESCRIPTIONREV DATEAUTHCHKD

Page 25: RELAY RELAY/EQUIPMENT LOCATION … GRID ALSTOM GRID SUPPLIER MCB/1 EP102UCC10 PMU DC SUPPLY MCB GE (REDLINE) G103C02 & CAH 3 4 5 6 3 PNH ND22 (230V AC) 1 PANEL LABEL MCB/1 MICOM P847B

NOTES

( 2 ) INDICATES TWO LEADS IN PARALLEL.

LEAD NUMBERS SHOWN THUS

INDICATES CHANGE IN LEAD NUMBER.

INDICATES NO CHANGE IN LEAD NUMBER.

THE FURTHEST TERMINAL.

F

M

L

K

J

H

F

E

G

D

C

B

A

F

E

G

D

C

B

A

6 7 8 9 10 11 12 13 14 15 16

31 2 4 5 6 7 8

54321

SIZE

GROOTTE A1L101LEVELS 2 31 PANEL TYPE DESIGNATION 1PMU-1100

MA

ST

ER

TR

AC

ING

FIL

ED

UN

DE

R 0

.54/8

355

RE

VIS

ION

1

SH

EE

T 2

4 O

F 2

4

REVISION TO MASTER DATEAUTHCHKDBYREVREV

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

NUMBER OF SPARES

CABLE SIZE

CABLE NUMBER

DESTINATION

31

32

33

34

35

36

37

38

39

40

DC TO PMU

AC SUPPLY

BACKUP DC SUPPLY

MAIN DC SUPPLY

4.

SPARE CABLE LEADS TO BE LEFT LONG ENOUGH TO REACH

3.

2.

1.

TERMINALS X9.1-X9.26 AND X9.31-X9.40 ARE M10/10RS

DENOTES KNIFE-SWITCH TERMINAL TYPE ENTRELEC D2.5/5.5 ADO

X9

AC E/L SUPPLY

PNH

sPDC

X107

X105

X103

X101

IDF

H13(2)

H12(2)

H13(2)

H12(2)

H13(2)

H12(2)

H13(2)

H12(2)

KK109

KK107

KK105

KK103

KK101

KK101

J6(2)

J6(2)

J5(2)

J5(2)

H171

H111

H71

H11

J4

J3

J2

J1

J6

J6

J5

J5

2H13

2H12

1H13

1H12

L.T.

07/2015

07/2015

U.N.

REVISIONSHEET NUMBER

PANEL CABLING DIAGRAMc

HYDRAWEST CONTROL ROOM

PHASOR MEASUREMENT UNIT

0.37/5438

ESKOM HOLDINGS LIMITED

REG NO.

2002/015527/06

PROJECT DRAWN BY

17/06/2014DATE

DATE

DATE

DATE

PROJECT APPROVED

SCHEME APPROVED

PROJECT CHECKED

DATE 05/2012

DATE 11/07/2012

DATE 11/07/2012

DESIGN APPROVED

DESIGN CHECKED

SCALE

T BOWER

BUYLE MAWENI

SNKOMO

D VAN ASWEGEN

DESIGN DRAWN BY

24 0

BYREVISION DESCRIPTIONREV DATEAUTHCHKD

Page 26: RELAY RELAY/EQUIPMENT LOCATION … GRID ALSTOM GRID SUPPLIER MCB/1 EP102UCC10 PMU DC SUPPLY MCB GE (REDLINE) G103C02 & CAH 3 4 5 6 3 PNH ND22 (230V AC) 1 PANEL LABEL MCB/1 MICOM P847B

F

M

L

K

J

H

E

G

D

C

B

A

F

E

G

D

C

B

A

6 7 8 9 10 11 12 13 14 15 16

31 2 4 5 6 7 8

54321

SIZE

GROOTTE A1L

H

J

K

L

101LEVELS 2 31

DC

SU

PP

LY

1

BV

X4

DC

V

BV

X4

DC

V

BV

X4

DC

V

BV

X4

DC

V

BV

X4

DC

V

BV

X4

DC

V

BV

X2E

CV

BV

X2E

CV

BV

X2E

CV

BV

X2E

CV

TP

H1

0A

X

AC

E/L

AC

BO

AR

D

AC

SU

PP

LY

FR

OM

AC

BO

AR

D

DC

SU

PP

LY

2

TO

ID

F

BM

E P

AN

EL

GP

S U

NIT

FIB

RE

OP

TIC

CO

-AX

400kV

FE

ED

ER

5

(S

EE

0.3

7/3

62

6)

400kV

FE

ED

ER

9

(S

EE

0.3

7/3

23

0)

JB RP

RP

1

RP

2

PM

.2.M

1

PM

.2.M

2

PMU PANEL

B.P

M.1

36

B.P

M.1

34

PM

-293

PM

-296

PM

-270

PM

-280

PM

-28

1

REVISIONSHEET NUMBER

CABLE BLOCK DIAGRAMc

HYDRAWEST CONTROL ROOM

PHASOR MEASUREMENT UNIT

0.37/5438

ESKOM HOLDINGS LIMITED

REG NO.

2002/015527/06

PROJECT DRAWN BY

23/06/2014DATE

DATE

DATE

DATE

PROJECT APPROVED

SCHEME APPROVED

PROJECT CHECKED

DATE

DATE

DATE

DESIGN APPROVED

DESIGN CHECKED

SCALE

D VAN ASWEGEN

DESIGN DRAWN BY

25 0

BYREVISION DESCRIPTIONREV DATEAUTHCHKD

J. Calitz

10/2012

D. Siboiboi

10/2012

owmanLMB

10/2012

RP

1

RP

2

PM

137

ISO

BV

X4

DC

VJB

PM

133

PM

134

PM

138

BV

X4

DC

V

B.P

M.1

35

JB

400kV

FE

ED

ER

10

(S

EE

0.3

7/3

69

7)

BV

X4

DC

V

BV

X4

DC

V

BV

X4

DC

VR

P

PM

141

MV

JB

PM

142

RP

PM

143

765/4

00kV

TR

AN

SF

OR

ME

R 3

1

(S

EE

19.3

7/5

288)

BV

X4

DC

V

PM

13

0

BV

X4

DC

V

PM

13

1

BV

X4

DC

V

B.P

M.1

32

RP

RP

RP

L.T.

U.N.

07/2015

07/2015