    I N S T R U C T I O N M A N U A L O F

    RELIABILITY & MAINTAINABILITY

    FOR TRANSFORMER PRODUCTSI N C L U D I N G P O W E R & A U T O

    TRANSFORMERS, REACTORS AND

    S P E C I A L T R A N S F O R M E R S .

    TBEA SHENYANG TRANSFORMERS GROUP CO. LTD.

  • 8/7/2019 Reliability & Maintainability Manual of TBEA Shenyang Transformer Products

    2/67

    TABLE OF CONTENTS

    1.0 INTRODUCTION 31.1 The core value 41.2 The Mission 4

    1.3 The Purpose 41.4 Management Structure 41.5 ISO Certificates and other approvals . 5

    2.0 SCOPE ... 5

    2.1 Procurement and purchasing 5

    2.2 Design and Development . 6

    2.3 Manufacturing Process 6-14

    2.4 Inspection and Testing . 14-17

    2.5 Coating and Painting Systems . 18-20

    2.6 Transportation of products 20

    2.7 Acceptance and Storage of products . 20-222.8 Assembly and Installation . 22-26

    2.9 Operation and Maintenance .. 26-27

    3.0 TRANSFORMER MAINTENANCE RECORD . 27-29

    4.0 EXPORT REFERENCE LIST . 29

    5.0 CUSTOEMRS ACKNOWLEDGEMENT LETTERS 29

    6.0 APPENDICES

    1. Appendix 1: ISO certification and other approvals . 30-31

    2. Appendix 2: Procurement and Purchasing .. 32-38

    3. Appendix 3: Design and Development of Products 39-41

    4. Appendix 4: Painting Systems of TBEA Shenyang 42-43

    5. Appendix 5: Product Transportation System .. 44-49

    6. Appendix 6: Export Reference List 50-61

    7. Appendix 7: Customers Acknowledgement Letters . 62-65

  • 8/7/2019 Reliability & Maintainability Manual of TBEA Shenyang Transformer Products

    3/67

  • 8/7/2019 Reliability & Maintainability Manual of TBEA Shenyang Transformer Products

    4/67

    1.1 THE CORE VALUE

    The core value of TBEA is Always Reliable. With this core value as a flat form, TBEA

    Shenyang has been growing from strength to strength to provide reliable and satisfactory

    services to customers in countries like Canada, United States, India, Pakistan and Philippines

    to name a few. To live up to the core value that TBEA stands on, the employees have beenreminded often of Always Reliable and the entire workmanship is working vigorously to

    manufacture transformer products are considered reliable, high quality and of competitive

    prices.

    TBEA Shenyang makes sure that its core value Always Reliable to be the objective to be

    targeted on every transformer product it manufactures. To achieve the reliability of

    transformers, TBEA Shenyang seriously considers various programs it utilizes in the process

    of manufacturing transformer products and apply Always Reliable motto in the programs

    ranging from procurement and purchasing of accessories, welding, painting, testing,

    transportation, commissioning, operation and maintainability.

    1.2 THE MISSION

    The mission of TBEA Shenyang is to provide reliable and satisfying services to its clients by

    meeting their requirements to establish a lasting business relationship with them.

    1.3 THE PURPOSE

    The purpose of TBEA Shenyang is to serve governments, their people and businesses

    throughout the countries of the world through technology innovation and committing

    enormous effort to provide quality and affordable products that will be operated in power

    turn-key and EPC projects to improve peoples life, economically efficient and effective, and

    environmental friendly.

    2.1 MANAGEMENT STRUCTURE

    To achieve and accomplish the core values, mission and purpose it stands for, TBEA Shenyang

    Transformer Group Co. Ltd has a well organized and structured management. Figure 2

    summarizes the management and organization of the Company.

    -4-

  • 8/7/2019 Reliability & Maintainability Manual of TBEA Shenyang Transformer Products

    5/67

    Fig.2: Management Structure of TBEA Shenyang Transformers Group Co. Ltd

    1.5 ISO CERTIFICATES AND OTHER APPROVALS

    TBEA Shenyang has been in the power industry for more than 70 years of vast experience.

    Appendix 1 shows several ISO certification and other approvals from the well known

    inspection and testing team around the globe.

    2.0 SCOPE OF WORK

    This specification generally applies to all transformer products manufactured by TBEA

    Shenyang. This includes power equipment in operation, production and at design stage. The

    scope of major work and engineering programs it considers being important to apply

    Always Reliable value from the start to the commissioning, operation and maintainability.

    2.1 PROCUREMENT AND PURCHASING

    Procurement and Purchasing of accessories from sub-suppliers are done accordingly in

    orderly manner. Sub-suppliers of accessories are screened carefully and make sure they have

    qualification and ISO approvals. All of our sub-suppliers are to go through a process of

    TBEA products sub-supplier qualification process. Qualified suppliers like Micafil, MR,

    Qualitrol, EMB, Shell and Nynas are some of the accessory suppliers on our suppliers list.

    Please see Appendix 2 for further information on Procurement and Purchasing. Chart 1 of

    Appendix 2 illustrates the process involve for purchasing assessment for suppliers

    qualification. Also of appendix 2, the table 1 illustrates the methods in a table form used for

    approval of suppliers including evaluation, suggestions and comments.

    -5-

  • 8/7/2019 Reliability & Maintainability Manual of TBEA Shenyang Transformer Products

    6/67

    2.2 DESIGN AND DEVELOPMENT

    Design and Development is the integral part of the operation of TBEA Shenyang. This comes

    under Design Department and it basically focuses on research, development and designing of

    transformer products. As soon as a client submits his/her transformer technical and design

    requirements, the team from International Department Project Management analyses andprepare documents for approval from superiors for book keeping. After the approval, the

    technical specifications are passed on the Design Department. The design engineers carefully

    study the clients technical specifications. The engineers then put a lot of effort to do research

    and proceed with designing of the transformer following the technical specified with the

    required Standards. Some of the standards applied in designing according to technical

    specification are IEC, IEEE, AS, ANSI, NEMA among others.

    The design is done within the time limit the client sets. The design process goes through

    stages of being designed by the engineer, checked by senior engineer and then approved chief

    engineer. Should there be clarification needed, our technical consultants and experts are

    asked to give input to the design. During the design, the design engineers also take intoconsideration the technical specification of suitable transformer accessories. These are then

    put forward to the purchasing department to for technical clarification and purchasing process

    as outlined in Appendix 2. In the process of designing, the design engineers with the project

    management team from the international department also liaise with relevant departments for

    R&D and secure relevant information. The appendix 3 gives further information on design

    and development procedures.

    2.3 MANUFACTURING PROCESS

    Manufacturing process involves a lot of effort from not only Manufacturing department but also

    required departments like design, purchasing, quality control and technical center. After the

    contract agreement is signed between TBEA Shenyang and the client, the production schedule is

    sighted upon by both parties. TBEA Shenyang can work vigorously to finish manufacture the

    product on time according to the schedule.

    The manufacturing department makes sure that it is following strictly the right design patterns,

    standards, materials and all available information from relevant departments are being executed

    during the manufacturing period. The scopes of work to be done are ranging from determination

    of core winding (steel plates and copper) including shape, size and vertical and horizontal

    windings. The insulation and assembling of active parts are also important matter to take into

    serious consideration. The following pictures summarizes the details of manufacturing process

    involve.

    2.3.1. Automatic Step-lap stacking

    Features:CNC Cut-to-length Line (German made) with automatic step-lap stacking

    -6-

  • 8/7/2019 Reliability & Maintainability Manual of TBEA Shenyang Transformer Products

    7/67

    Step-lap stacking

    high dimensional accuracy

    automatic step-lap stacking

    Precise size insuring close fitting joints

    Advantages:

    Better distribution of the magnetic field at the joints of core

    No load loss can be reduced by up to 6% which compared with alternative lap core

    Reduced the noise level up to 5dB

    2.3.2. Hydraulic Core Stacking and Erection

    Advantage:

    Ensuring the quality of core manufacturing

    2.3.3. Gap Core of Reactor Step-lap Paramagnetic Core Disc Cutting

    r

    Features:

    Straight Core Lamination, Hydraulic core erection to prevent

    fitting joints from displacement

    Core lamination station to ensure effective levels of core degree

    of stacking

    Core rose steadily

    Automatic cutting machine

    for gapped core of reactor

    Three-dimensional map of Reactor

    Paramagnetic Core Disc

    -7-

  • 8/7/2019 Reliability & Maintainability Manual of TBEA Shenyang Transformer Products

    8/67

    Features:

    Automatic step-lap stacking of silicon steel

    The direction of silicon for core disc is as same as the main magnetic flux

    Steel Sheet slot can be completely cut in required bevel at once

    Advantages:

    Improve effectively the magnetic line edge of core disc

    Low electromagnetic noise and low overheating

    Improve the mechanical strength of core disc

    Low core loss

    2.3.4. Vacuum-Pressure Resin Impregnated Oven for Core Disc

    Functions and Features:

    It pumps vacuum from the tank with glue in order to remove air bubbles.

    Vacuum-pressure resin impregnated inside the tank.

    Advantages:

    Ensure mechanical strength of core disc firm

    Low noise and low vibration

    Passed the 5g core disc vibration test of resonance frequencies successfully

    Vacuum-pressure resin impregnatedoven for gapped core

    Core Disc

    -8-

  • 8/7/2019 Reliability & Maintainability Manual of TBEA Shenyang Transformer Products

    9/67

  • 8/7/2019 Reliability & Maintainability Manual of TBEA Shenyang Transformer Products

    10/67

    Feature:

    Winding coil with pre-set tension devices offering horizontal pre-set tension and axial

    pre-set tension

    Advantage:

    Improve short circuit withstanding.

    2.3.8. Hydraulic Transposition

    Hydraulic transposition

    2.3.9 Winding Block Assembly

    Standard transposition shape

    Transposition does not damage outsourcing

    insulation of conductor

    Procedure:

    All windings and insulation parts areassembled at required positions

    accurately on the platform.

    Before the assembling of the windings,each winding is compressed firmly and

    after the assembly of the windings, the

    overall windings are compressed firmly.

    The assembled windings are desiccatedby kerosene vapor and compressed again

    the entire winding firmly.

    Winding Block Assembly

    Advantages:

    To ensure accurate axial winding size and accurate distance between thewindings

    To improve short circuit withstanding

    -10-

  • 8/7/2019 Reliability & Maintainability Manual of TBEA Shenyang Transformer Products

    11/67

    2.3.10 CNC Plasma Cutting

    2.3.11 Plate Bending Forming

    Feature:

    No welding stress

    No potential leak

    Increasing the overall structural quality

    2.3.12 Surface Sand-blasted

    CNC plasma cutting machine

    Little distortion during cutting

    High dimensional cutting

    1000 tons Hydraulic machine Cover bending chart

    Sand Blast Room

    The grade of removing rust is Sa 2

    Ensuring paint adhesion firmly

    Improving the corrosion resistance of products

    -11-

  • 8/7/2019 Reliability & Maintainability Manual of TBEA Shenyang Transformer Products

    12/67

    2.3.13 Special Paint Room

    2.3.14 Lead Shield and Cold Welding

    2.3.15 Vapor Phase Drying

    Dry winding, phase assembly and active part.

    Below 10Pa, the vacuum heating temperature can reach up to 125. Under this

    condition, the vapor inside the insulation are dried thoroughly and heated evenly. Further

    more, the insulation parts are not easily aging, and insulation contains water level that

    can be controlled under 0.3%, 0.2% and 0.1% respectively as per different voltage

    ratings.

    Computer automatic controls the whole process.

    Large sized paint room

    Three-dimensional walking down structure which

    ensures all surface spray in place Film uniform and magnificent, well adhered

    Environmental Safety and protection

    Leads connection adapts to the method of coldwelding and mechanical connections and the active

    part tidiness reaches the requirement of high-voltage

    and large-capacity.

    The wrapping of leads shield insulation and theelectrode shape can meet the requirement of the high

    electric field.

    Vapor phase drying plant (MICAFIL)

    -12-

  • 8/7/2019 Reliability & Maintainability Manual of TBEA Shenyang Transformer Products

    13/67

    Detecting the water percent of insulation for adjusting the insulation quality by Moisture

    Meter.

    Reduce dielectric loss, enhance insulation strength and extend the service life.

    2.3.16 Oil Processing and Preservation

    Vacuum oil system is used for oil purification and storage. After the purification process, the

    quality standard of oil can reach with: voltage withstanding >70kV, water content

  • 8/7/2019 Reliability & Maintainability Manual of TBEA Shenyang Transformer Products

    14/67

    2.3.18 Active Part Moisture Proof

    2.3.19 Air Cushion Vehicle

    The maximum load capacity of air cushion vehicle is 350 tons. The maximum load capacity of

    560 tons or 630 tons can be loaded while using two air cushion vehicles in parallel.

    2.4 INSPECTION AND TESTTING

    The transformer products shall be subjected to the following type, routine, and special tests at

    TBEA Shenyang Transformers Group Co. Ltd (hereafter TBEA Shenyang). The test shall be

    carried out in the presences of the Purchasers representatives and all expenses will be

    included in the quotation. If the test methods are not prescribed in IEC 60076 or other

    standards, we agree that those test methods shall be subject to the agreement before the

    contract between manufacturer and purchaser.

    Dry air generator

    Strictly control the dew point of compressing airat the outlet.

    During assembling, the tank will be filled by dryair to prevent moisture on insulation surface of

    active part.

    Air cushion vehicle transporting productsAir cushion

    1000kV ultra high voltage testing hall Product under test monitoring and control

    room

    -14-

  • 8/7/2019 Reliability & Maintainability Manual of TBEA Shenyang Transformer Products

    15/67

    2.4.1 Radiographic Test

    TBEA Shenyang can perform radiographic test on welded joints of the transformer according

    to ASME Code Section V, clause 2. We are able perform radio graphic inspection for butt

    welds joints including horizontal and vertical joints

    2.4.2 Type Test

    TBEA Shenyang can able to do Type Tests in the areas outlined below. We may not be able

    to do the transportation test at acceleration equal to 2g however our design value is greater

    than 3g. The following type tests can be done as per standard specified.

    a. Temperature Rise Test IEC 60076-2/1993b. Gas in oil analysis (chromatographic analysis) (IEC 60076-2/1993, Gas in Oil

    Analysis IEC61181/2007

    c. Radio Influence Voltage Measurementd. Checking of the effectiveness of the Control Stray Flux Systeme. External Infrared Thermography of the tank.

    2.4.3 Routine Test

    TBEA Shenyang can able to perform routine test outlined from below. For PD detection

    using UHF technique, we sometimes ask the manufacturers of PD monitoring systems and

    UHF sensors to carryout the detection and cost of these are included in quotation if and only

    if our client wants PD detection analysis. TBEA Shenyang can also be able to do seismic

    withstand test standards like America standard IEEE 693/2005.

    a. Core Insulation testb. Measurement of winding resistancec. Measurement of the voltage ratio and check of the voltage vector relationshipd. Measurement of short circuit impedancee. Measurement of load lossesf. Induced voltage test with internal partial discharge measurement

    g. Measurement of no load loss and no load current (10 %, 90%110%) of the rated

    voltage

    h. Oil leak test,

    i. Test on OLTC (On-load tap-changers)j. Dielectric testk. Tightness Testl. Insulation oil testm. SFRA Fingerprint testn. Measurement of power taken by fan and oil pump motors

    2.4.4 Special Test

    TBEA Shenyang can do special tests and some of them are:

    a). Measurement of zero-sequence impedance

    b). Measurement of no-load losses and exciting current at low voltagec). Measurement of the harmonic of the no load current

    -15-

  • 8/7/2019 Reliability & Maintainability Manual of TBEA Shenyang Transformer Products

    16/67

    d). Measurement of sound pressure, intensity and power level

    e). Performance test

    2.4.5 TBEA Shenyang can able to perform Insulation levels and Dielectric Tests

    a). Applied potential test corresponding to insulation level of neutral

    b). Lightening Impulse Test

    c). Switching Impulse test for line terminals

    d). Long Duration AC voltage test with partial discharge measurement

    e). Measurement of the dielectric dissipation factor and the capacitance (at rated

    frequency).

    f). Measurement of insulation resistance and polarization index of all possible

    elementary insulating zones of auto transformer

    g). TBEA Shenyang can provide transformer capacitance equivalent circuit including the

    capacitance value.

    2.4.6 Lightening Impulse Test,

    TBEA Shenyang can be able to perform Lightening Impulse test:

    a). Rated lightening impulse withstand voltage 1.2/50 /sec.

    b). The lightening impulse test, full wave according to IEC 60076-3/2000, clause 13.

    c). The test with lightening impulse test chopped on the tail according to IEC 60076-3/2000clause 14.

    d). The reduced full wave test for the crest value of the voltage

    2.4.7 Rated switching impulse withstand voltage

    2.4.8 Applied Potential test according to IEC 60076-3/2000 clause 11

    2.4.9 Long Duration Induced AC voltage test with Partial Discharge measurement

    a). The partial discharge measurement on maximum voltage which is according to IEC

    publication 60270/2000

    2.4.10 Test Plan

    The table 1 below shows the schedule for test and measurement that can be done is sequential

    order.

    -16-

  • 8/7/2019 Reliability & Maintainability Manual of TBEA Shenyang Transformer Products

    17/67

    Sequential

    Order

    Test Type

    1 Radiographic Test

    2 Check the effective of Control Stray Flux System

    3 Oil Leak test

    4 Tightness Test

    5 Insulation oil Test

    6 Measurement of winding resistance

    7 Measurement of voltage ratio and check of voltage vector relationship

    8 Measurement of insulation resistance and polarization index for all possible insulating zones of theauto-transformer

    9 Core Insulation test

    10 Long Duration Induced AC voltage test with partial discharge measurement and measurement ofdielectric dissipation factor and the capacitance

    11 Measurement of no-load loss and no-load current

    12 Lightening Impulse test

    13 Switching Impulse test for the HV (400kV) line terminal

    14 Performance Test and Applied Potential test corresponding to insulation level of neutral

    15 Induced voltage Test with internal partial discharge measurement and Long Duration induced ACvoltage test with partial discharge measurements.

    16 Measurement of no-load loss and no-load current again

    17 Measurement of the harmonics of the no-load current

    18 Measurement of Short Circuit Impedance

    19 Measurement of Load Losses

    20 Measurement of Zero-Sequence Impedance

    21 Temperature Rise Test

    22 Gas in oil analysis

    23 Check the External Infrared Thermography of the tank

    24 Test on On-Load Tap-Changers

    25 Measurement of Sound Pressure/ intensity and power levels

    26 Measurement of the radio influence voltage

    27 Measurement of power taken by fan and oil pump motors

    28 SFRA Fingerprint Test

    29 Measurement of No Load Loss and exciting current at low voltage

    30 All other Tests and Measurements shall be done as necessary and according to the requirementsand standards

    Table 1: Schedule for Tests and Measurements

    -17-

  • 8/7/2019 Reliability & Maintainability Manual of TBEA Shenyang Transformer Products

    18/67

    2.5 COATING AND PAINTING SYSTEMS OF TBEA SHENYANG

    Specification for Coating Requirements of Load Transformers. See Appendix 4 for detail

    information of the coating and painting system of TBEA Shenyang.

    TBEA Shenyang can able to provide the coating system to supply protection against any

    atmospheric corrosion however we can not specify how long it can last without need for

    maintenance. From our experience, the painting can last for about 4 to 5 years but paint

    maintenance can be done when realized that the products need paint maintenance.

    TBEA Shenyang can design anti-corrosion coating as per clients requirement according to

    the transformer installation site environment. Paints shall be applied in the shop in the frame

    of SSPC PA1 and cannot apply field painting. Internal surfaces shall be painted as TBEA

    Shenyang applies in some of its products.

    TBEA Shenyang makes sure that all external and internal paints of any transformer product

    are to be compatible with the transformer oil we supply. TBEA Shenyang has been in the

    transformer industry for more than 70 years of experience with proven record to make sure

    painting does not affect or deviate the quality of the transformer oil.

    The cover painting for the transformer will be thicker and it can include anti skid solution.

    Since we have so much experience for coating systems, we are able to do anti skid coating

    system on the cover.

    The outer top-layer shade shall be by RAL 7038 and internal shade is fair.

    TBEA Shenyang will make sure the final product will be good looking, homogeneous, free

    from leaks and the product will have a good adhesion to the transformer matrix.

    For maintenance for the damages from shipment, it is recommended that the paint can be

    taken to the site to repair the damaged part.

    2.5.1 Coating Procedure DescriptionThis may include surface preparation and treatment for problematic areas.

    2.5.1.1 Preparation before coating

    Before the coating of metal surface, it must be thoroughly degreased, remove oxidizing and

    other contaminating materials attached on the surface, so that the coating can adhere to stick

    cohere reliably on the metal surface.

    -18-

  • 8/7/2019 Reliability & Maintainability Manual of TBEA Shenyang Transformer Products

    19/67

    (a). Removing Oil

    Should there be any greasy dirt discovered on the surface before the treatment of steel and

    iron along with the painting of the product, we should proceed with oil removing process

    immediately by dipping the cleaning rags in the toluene then wipe off thoroughly the greasy

    dirt on the surface with the rags.

    .

    (b). Sand (Dirt) Blasting

    (i). The transformer tank with all the accessories are kept in a closed door area and start

    blasting the sand/dirt off.

    (ii). After the blasting of steel and iron surfaces of the transformer and accessories, the steel

    and iron are grayish white color that reaches the level Sa2.5.

    (iii). Within 8 hours after the blasting of accessories, the coating process is applied to both

    top and below of the surface.

    (c). Pre-treatment of steel products

    (i). Any product that uses steel should undergo the pretreatment process.

    (ii). Pre treatment is applied to the welded parts of the tank that includes the welded joints.

    The non homogeneous surfaces of welded joint parts, the greasy parts, and welded dregs are

    thoroughly eliminated, thus revealing the true colors of steel and iron.

    (d). Treatment of Acidic Phosphorization Cleaning

    (i). Small and medium accessories along with long and large components are treated by the

    use of acid cleaning Phosphorization process for treatment.

    (ii). The coating process is applied to top and bottom surfaces within 48 hours of acidic

    treatment on all the accessories (Besides the treatment of spare parts).

    (e). The edge of tank and accessories - edge, joints and corners polishing process

    (i). The top and bottom sections of the tank along with any elevated enclosure and any

    similar surfaces are placed on gas cutting surface process to shear any plane that has exposed

    edges and corners. This edging process must be done before the coating. The bevel edge

    requirement is R3.

    (ii). The top and bottom sections of tank are treated with any material that has not been

    treated. After the treatment of the bottom material, there must be an abrade stain removal

    processing. After the abrade processing surface condition, the colors of steel and iron

    become real grayish white that can reach the Sa2.5 level.

    -19-

  • 8/7/2019 Reliability & Maintainability Manual of TBEA Shenyang Transformer Products

    20/67

    2.5.1.2 Brush Painting

    (a). For painting, firstly dip the paint brush in the paint then carry on with brush painting. It

    must guarantee the paint film evenly and required thickness.

    (b). On every product edge, bend angle, flange and the back of the flange border with otheredge spots on the surface are to be brush painted before the spray painting is applied to all the

    surfaces including top, bottom, edges, joints and corners. The required width of the brush

    painting is 150mm from edges and corner lines within the scope of the whole surface for

    brush painting. The brush paint is not only applied to the flat surfaces but also edges, corner

    lines and narrow spot of the scope.

    (c). For Anti Corrosion Requirement of paint, the brush painting is applied to the whole

    flange surface by using a method called brush coating. This creates the coating corrugation.

    (d). After the brush and spray paintings of edges and corners, it is a must that all the sections

    are painted thoroughly as line upon line. The spray and brush painting thickness control isapproximately about 40m. This can protect the edges and corners from rust.

    2.6 TRANSPORTATION OF PRODUCTS

    TBEA Shenyang has well organized and arranged equipment that can able to lift, move, load,

    unload and transport transformer products. It makes sure that the products are handled with care

    when lifting and loading. After the loading, the products are loaded on carriers according to their

    sizes and transported to the port to be exported to the clients destination. Appendix 5 covers theTransportation System in detail from one point to another for delivery.

    2.7 ACCEPTANCE AND STORAGE OF PRODUCTS

    2.7.1 Acceptance and inspection

    When a transformer product arrives at the designated site, immediate inspection and

    acceptance are required. Acceptance items are as follows:

    (i). Check the position of the main body on transport vehicle and record impact (if any) on

    the body. Should a visible displacement or impact is found, record the specified area,

    picture shall be taken and contact the concerned transportation company at once. If

    necessary, internal inspection shall be carried out by concerned people.

    -20-

  • 8/7/2019 Reliability & Maintainability Manual of TBEA Shenyang Transformer Products

    21/67

    (ii). Check rating plate, drawing of rating plate and some other documents, see whether the

    products are in accordance with the contract.

    (iii). Check if there is any document absent according to a documentation called List of

    Transformer Documents.

    (iv). Check if all accessories are at arrival site according to Packing List and inspect damages,

    if so record and report accordingly.

    2.7.2 Storage

    (i). For transformer transported with nitrogen

    a). First check the nitrogen pressure. It shall be positive pressure at normal temperature. If the

    pressure is zero, the product is probably moistened. Further

    inspection shall be made.

    b). Test oil residual at the bottom of the tank. If the value of U is according to specific value

    given in product instruction manual (generally is about U35 to 40 KV), water content(generally 25 to 30 mg/L) and the nitrogen pressure is positive, the transformer can be storedwith nitrogen for 3 months. Otherwise, the transformer shall be stored with oil and not with

    nitrogen.

    c). Nitrogen pressure shall be kept at 10-30kPa (refer to product manual for exact value)

    during storage with nitrogen. If lower than 10kPa, its necessary to add nitrogen with purity

    more than 99.99%, and with dew point lower than -40 C.

    d). Checking of nitrogen pressure is done every week. If nitrogen pressure decreases rapidly

    (even lower than 10kPa), there is leakage. Find out leakage point and take necessary actions

    to fix it.

    -21-

  • 8/7/2019 Reliability & Maintainability Manual of TBEA Shenyang Transformer Products

    22/67

    c). If transformer is to be stored for more than 3 months or residual oil doesnt conform to

    requirement of sub clause (b), the transformer shall be filled with oil for storage. In this case

    conservator shall be mounted. Open blind flanges on tank cover, fill oil from valve at the

    bottom of the tank to let nitrogen escape. Fill in oil to the required level. The oil filling

    requirement is as follows:

    U50KV, (generally, please refer to the product manual), water content to 20 mg/ L, (referto manual), tg

  • 8/7/2019 Reliability & Maintainability Manual of TBEA Shenyang Transformer Products

    23/67

    2.8.1 Check before operation

    (i). Check if all the components are mounted according to their instructions. For example,

    whether thermometer socket is filled with oil, whether earthing terminals on mounting

    flanges of bushings and check whether dehydrating breather and the absorbent are in good

    condition.

    (ii). Check whether all the butterfly valves are in open condition

    (iii). Check the indication and rotation of tap-changer to see if phase contacts are in step and

    if oil compartment is filled with oil.

    (iv). Check whether the terminals of bushing CT are connected well. The transformer is not

    permitted to operate with secondary open-circuited.

    (v). Check whether main body and earthing bushing of core are earthed.

    (vi). Check if oil in conservator and in bushing is in required level.

    (vii). Check the wiring of all kinds of protective, control and measuring devices. Check their

    signal and actuation. Check fan-motor and controlling system of cooler (radiator).Check

    rotation, oil flow direction of oil pump.

    (viii). Check whether oil, water (in case of water cooler ) pipes of cooler are correctly

    connected. Check whether they are blocked or whether there is leakage somewhere.

    (ix). Check ratios at all tap-positions (pay attention to indicating position of driving units).

    (x). Measure DC resistance at each tap position and compare them with the factory routine

    test.

    (xi). Check polarity of transformer, polarity and current ratio of bushing CT (polarity of CT

    can be checked before mounting).

    -23-

  • 8/7/2019 Reliability & Maintainability Manual of TBEA Shenyang Transformer Products

    24/67

    (xii). Test oil according to the requirement (please refer to product manual).

    Process of Acceptance to Operation of Product

    LIFTING AND TRANSPORTATION

    ACCEPTANCENOT MOIST IN TRANSPROTATION MOIST IN TRANSPORTATION

    STORE TRANSFORMER WITH OIL

    FILL OIL ESCAPE NITROGENSTORAGE WITH NITROGEN

    INSPECTION BEFORE ASSEMBLY INNER INSPECTIONAND INSTALL BUSHINGFILL OIL ESCAPE NITROGEN

    MAIN BODY DRYING TREATEDTRANSPORTED WITH NITROGEN

    FINAL ASSEMBLY

    RELEASE VACUUM

    VACUUM PUMPING

    OIL FILLING UNDER VACUUM

    INSTALL CONTROL CIRCUIT

    OILNESS DONT ACHIEVE STANDARD OR MOISTENEDHOT OIL CIRCULATION

    TIGHTNESS TEST FOR TRANSFORMER

    TEST AND INSPECTION BEFORE OPERATION

    FILL OIL AND PLACE FOR 48HOURS

    OILNESS U50Kv, WATER CONTENT15ppM, GAS CONTENT15%, tg0.5%

    OPERATIONDISMANTLE SUPPORT FOR INSTALLATION ETC.

    PATCH PAINT ON

    SURFACE

    Fig. 3 The process of acceptance and operation of products

    -24-

  • 8/7/2019 Reliability & Maintainability Manual of TBEA Shenyang Transformer Products

    25/67

    2.8.2 Test Before Operation

    (i). No-load test

    Before test, connect the signal contact of Bucholz relay to the trip circuit of transformer.

    Over current protection shall react instantaneously. The source side of transformer is

    provided with the protecting device. Connect source to that side of Transformer in order to

    cut off the source in abnormal condition. Then raise the voltage slowly to the rated voltage.

    Remain it for 30 minutes. Measure on-load loss and on-load current and compare them with

    factory routine test.

    (ii). No-load impulse test

    First, reset the over current protection of Buchholz relay. When the protecting breaker is

    switched on, phase timing difference is less than 0.01s. Impulse voltage is the rated system

    voltage and is applied on HV side. The switching time of the breaker is not more than 5

    times, During the impulse, voltage (including the first time impulse) once reaches the peak

    value and the test is regarded as passed. If no peak value appears during the 5 impulse tests,

    the impulse test is passed too. Neutral point shall be earthed for neutral point earthing

    transformer.

    (iii). If top oil temperature rise does not exceed 50k when the transformer is operated under

    rated voltage for 6 hours at no-load, its not necessary to start coolers.

    -25-

  • 8/7/2019 Reliability & Maintainability Manual of TBEA Shenyang Transformer Products

    26/67

    (iv). On-load tap-changer test shall be done according to its instruction. Cooling system and

    control circuit shall be tested.

    (v). Do the other routine tests according to requirements.

    (vi). After the test, connect the signal contacts of Buchholz relay to the alarm circuit and the

    trip contacts to the trip circuit. Set the value of over current protection.

    (vii). After the tests, make chromatogram analysis of oil, compare the values with those got

    before the tests.

    2.9 OPERATION AND MAINTENANCE

    2.9.1 First, start cooling system (for OFWF system, start oil pump first and then water pump).

    If the coolers operate well (operate for more than 1 hour), put transformer into operation.

    2.8.2 If a part of coolers operate, the burden can be calculated according to the following

    formula:

    KVA,Sp

    pnpSn H

    k

    0

    =

    Where:

    Snburden carried by n coolers, KVA

    Pthe heat burden of each cooler under the full burden operation of transformer, KW

    P=(P0+Pk)/(N1)KW

    Nthe number of the mounted coolers

    P0no-load loss under the rated voltage and rated frequency, KW

    Pkload loss at appropriate tap at full load, KW

    SHrated capacity of transformer, KVA

    nthe number of the operated coolers (nN1)

    2.9.3 During operation, inspect the core by the core earthing bushing. Connect the meter

    before cutting off the earthing bushing. Pay attention to the high voltage caused by

    instantaneous open circuit. The earthing bushing shall be reliably earthed again aftermeasurement.

    -26-

  • 8/7/2019 Reliability & Maintainability Manual of TBEA Shenyang Transformer Products

    27/67

    2.9.4 Oil adding during operation

    Extended from gas sampling device of conservator are two pipes, one is oil adding pipe with

    butterfly valve at end, the other is oil draining valve. Add oil from oil filling pipe, meanwhile

    open gas release plug on butterfly valve. Close plug and open butterfly valve (exhaust gasfrom pipe) after oil overflow from plug, and then add oil till normal level, close butterfly

    valve and cover plate.

    2.9.5 If oil can be seen from the inspection window on gas sampling device, its necessary to

    open the valve on gas exhausting pipe to release gas. Close the valve when oil level rises

    above inspection window.

    2.9.6 In the first operating month of transformer, take oil sample for test and chromatogram

    analysis every week.

    2.9.7 During operation, transformer oil shall conform to the following requirements at least:

    U40KV, water content25mg/L, tg4% (at 90.) Please refer to the product manual.

    2.9.8 Maintenance and periodical inspection of components are stated in their instructions.

    2.9.9 For OFAF transformer, when the fan of coolers stop, oil pump is still running,

    transformer can continue to operate as long as top oil temperature doesnt exceed 53K.

    2.9.10 For OFWF transformer, if ambient temperature for cooling system is lower than 0,

    cold-proof measures shall be taken. When water-cooled coolers are stopped, water inside the

    cooler shall be drained off.

    3.0 TRANSFORMER MAINTENANCE RECORD

    TBEA Shenyang has been and continues to provide liable service even after sales through our

    After Sales Service department. We continue to communicate with our clients on the status ofour products to make sure they are in good operational conditions.

    Should there be any failure; the necessary measures are taken immediately to rectify the

    failure. TBEA Shenyang is not only reliable in designing, manufacturing and other areas of

    concern but also reliable in providing after sale service to the satisfactorily of our valuable

    clients. TBEA Shenyang longs to maintain a good and reputable relationship with its clients

    even to act swiftly to meet the requirements and urgent needs of its clients. Table 2 and Table

    3 show the major test and field failures respectively which have been recorded and rectified

    to the satisfactorily.

    -27-

  • 8/7/2019 Reliability & Maintainability Manual of TBEA Shenyang Transformer Products

    28/67

    3.1 Test Failure Rate (69kV and above transformers)

    Year 2004 2005 2006 2007 2008 2009 Total

    Total

    Units

    Tested

    150 195 204 247 259 201 1256

    Major

    Test

    Failure

    0 1 3 1 1 2 8

    Test

    failure

    rate (%)

    0.0 0.5 1.5 0.4 0.4 1 0.6

    Industry

    Standard

    Failure

    Rate (%)

    2.0 2.0 2.0 2.0 2.0 2.0 2.0

    Table 2: The major test failure of transformer products from 2004 to 2009.

    According to Table 2, the major test failure means any test failure that requires to un-tank the

    C&C assembly for repairing. HVDC and Shunt Reactor units are not included on the list.

    3.1.1 Major highlights as per table 2.

    (i). The products of TBEA Shenyang were in operation performing outstanding performance

    (ii). More than 1000 units were tested over the last 6 years with only 8 major failure tests.

    (iii). Yearly and total rates are much lower than industry standard failure rate (2%)

    (iv). Root causes of failures;

    (a). Five failures were related to manufacturing processes

    (b). Two due to defective materials

    (c). One related to design practices

    3.2 Field Failure Rate (69 kV and above Transformers)

    3.2.1 Major highlights as per table 3.

    (i). The products of TBEA Shenyang were in operation performing outstanding performance

    (ii). More than 1200 units were installed over the last 10 years with only 2 major failure.

    -28-

  • 8/7/2019 Reliability & Maintainability Manual of TBEA Shenyang Transformer Products

    29/67

    (iii). Root causes of failures;

    (a). One failure was related to defective material (conductor)

    (b). Another failure was due to defective accessories (bushing)

    Year 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 Total

    Units

    installedeachyear

    83 92 97 78 85 120 135 162 187 221 118 1378

    Units

    withmajorfailure

    during

    service

    0 0 0 1 0 0 0 0 1 0 0 2

    Table 3: The major field failure of transformer products from 1999 to 2009.

    (iv). Solution of each failures;

    (a). Product was sent back to the factory and replaced the defective material

    (b). The product was sent back to the factory and replaced the bushing

    (v). Current Status of these products.

    (a). They have been installed back on time and are currently operating smoothly.

    4.0 EXPORT REFERENCE LIST

    TBEA Shenyang has been manufacturing transformer products for over 70 years. With its

    corporate vision to expands and provide reliable services at the global stage, TBEA Shenyang

    has been working with various clients of the around the world. We have our office for North

    American market is located in Pasadena, US. We also have offices in Philippines, Pakistan,

    India, and South Africa to name a few. Please refer to Appendix 6to see export references of

    TBEA Shenyang since 1987 to North America, Gulf Region and General Reference.

    5.0 CUSTOMERS ACKNOWLEDGEMENT LETTERS

    During the years of its production, TBEA Shenyang has been working with its clients with

    respect and understanding. Many of these have valued the liable service provided by TBEA

    Shenyang. Appendix 7 shows acknowledgment letters from various customers to express

    their honest view about the products.

    -29-

  • 8/7/2019 Reliability & Maintainability Manual of TBEA Shenyang Transformer Products

    30/67

    APPENDICES

    Appendix 1: ISO Certification and other approvals

    ISO 9001:2008 FM CertificateISO 14001:2004 Certificate

    -30-

  • 8/7/2019 Reliability & Maintainability Manual of TBEA Shenyang Transformer Products

    31/67

  • 8/7/2019 Reliability & Maintainability Manual of TBEA Shenyang Transformer Products

    32/67

    Appendix 2: Procurement and Purchasing

    1. Aim and Scope

    This procedure applies to the purchase control of raw materials and parts required by transformers and reactors a

    2. Standard cited

    GB/T 190002000 Quality Management Systemfoundations and terms

    GB/T 190012000 Quality Management Systemrequirements

    3 Responsibilities

    The Purchasing Department is in charge of applying for investigating supplier. The Management Information D

    assessment. The Management Information Department, Quality Control Department, Technological Center, P

    Department will participate in the assessment of the supplier. The Technological Center and Process Depa

    standard and requirements for process. The Quality Control Department is in charge of inspection.

    4. Assessment of the supplier

    4.1 Input

    4.1.1 Prerequisites for qualified suppliers

    a). Products of the supplier must have a Production License (within the term of validity) and observe the prstandard during the production and inspection.

    b). Supplier must have the capability of examining and testing its products. Examination and test records as wel

    If some particular items can not be examined or tested, the examination and test must be done in a test unit w

    qualified report should be offered.

    -32-

  • 8/7/2019 Reliability & Maintainability Manual of TBEA Shenyang Transformer Products

    33/67

    c). Suppliers products must meet our companys requirements for design, process, test and other relevant condit

    d). Suppliers products must pass the test of our company with a year of trial use.

    e). Its production capability, production conditions, equipment and production process must meet the requiremen

    4.1.2 Material Grading

    The Purchasing Department classifies the suppliers products into three grades, A, B and C in accordance with

    Features of Main Common Materials for Transformers (Q/TT J31.02.2-2005) of TBEA Shenyang Transformer G

    4.2 Assessment of the supplier

    4.2.1 Evaluation of new suppliers raw materials and parts of A and B grades

    According to the prerequisites for designated manufacturers proposed by the Purchasing Department, the Head oDepartment develops the inspection plan, method of investigation and form of evaluation, reports it to the chief e

    after obtaining approval. Specific steps are listed as below:

    a). If it is necessary to make an inspection of the suppliers factory, the Management Information Depart

    supervisor of the Technological Center, Process Department, Quality Control Department and the Purcha

    inspection.

    b). In accordance with their respective duties and powers, personnel participating in on-site inspection define th

    every department participating in the assessment of suppliers must make strict examination and evaluation of

    item-by-item inspection according to each departments requirements for products, carefully complete the recsubmit it to the supervisor of the Management Information Department after signing their names;

    c). Supervisors of the Management Information Department shall organize relevant personnel to complete the

    and Raw Materials of Transformers according to the on-site inspection record. After signed by the inspectors, it

    of the company for approval. He/she will decide whether to purchase the products for trial use. If approved, the

    -33-

  • 8/7/2019 Reliability & Maintainability Manual of TBEA Shenyang Transformer Products

    34/67

  • 8/7/2019 Reliability & Maintainability Manual of TBEA Shenyang Transformer Products

    35/67

    5.2 Contract signing

    The purchaser will sign a contract or an agreement with the qualified supplier according to the purchase plan. A

    approval of the planner, head of the department, supervisor of the company and project manager by signing thei

    the company in quadruplicate. The contract will be kept by the supplier and the company.

    5.3 Product verification

    After the raw materials and parts enter the factory, the purchaser will complete the Material Acceptance List, m

    Logistics Center the next day. At the same time, necessary quality certificates of the items sent for verification

    who will inform the Quality Control Department to check the materials according to the practice and dispose them

    a). If Qualified, the materials will be stored in the warehouse following the Warehouse Management Procedur

    b). If Substandard, the materials will be returned or be viewed as inconsistent with the certificate (substitut

    Control Procedure. The keeper can also apply for concession.

    5.4 Reimbursement

    The purchaser goes to the Finance Department with the list of materials received signed by the examiner to r

    Finance Department will check if it is the product offered by the Qualified Supplier List. If it is, the payment w

    reimbursed only if relevant purchase approval formalities are available.

    5.5 Emergency clearance

    Follow the Emergency Clearance ProcessQG/SB35.952004.

    -35-

  • 8/7/2019 Reliability & Maintainability Manual of TBEA Shenyang Transformer Products

    36/67

  • 8/7/2019 Reliability & Maintainability Manual of TBEA Shenyang Transformer Products

    37/67

    6.5 The Purchasing Department shall evaluate periodically the quality performance of the supplier and mak

    disposal according to its qualifications. If the supplier has many problems with quality or the problem is very

    (following Article 4 of this procedure).

    6.6 The Management Information Department, Purchasing Department and Quality Control Department

    evaluation of the supplier (1-2 years).

    7. Supplier Assessing Process Chart

    Chart 1: (i). Purchase Control Procedure QG / TB35.38.36 2001

    -37-

  • 8/7/2019 Reliability & Maintainability Manual of TBEA Shenyang Transformer Products

    38/67

    (ii). Form of Investigation on Trial Use of the Transformer Parts and Raw Materials, Form of investigation on the

    Approval Form of Suppliers of Parts and Raw Materials of Transformers which is shown in table 1 of this appendix.

    Approval Form of Qualified Suppliers of Parts and Raw Materials of Transformers

    Serial No.: Date:

    1. State of Trial Use

    Supplier

    Goods supplied

    Result of incoming testing

    State of in-house trial use

    State of installation and trial use

    2. State of Production and Ex-factory Inspection

    Productivity

    Testing equipment

    Result of periodic apparatus and instruments testing

    Testing standard and relevant systems

    Testing record

    Result of sample testing

    3. State of Raw Materials, Measuring instruments and after sale service

    Result of raw materials and parts testingResult of measurement testing

    State of after sale service

    4. Technical Documents

    Process documents and national standard

  • 8/7/2019 Reliability & Maintainability Manual of TBEA Shenyang Transformer Products

    39/67

    Product instructions

    Ex-factory testing record

    Product quality inspection report

    5. Suggestions on rectification and reform & assessment conclusion

    Quality Control Department Technical Center ProcessDepart

    Management Info. System Purchasing Dept

    Approved: Date

    Table 1: Approval Form for Qualified Suppliers

    -38-

  • 8/7/2019 Reliability & Maintainability Manual of TBEA Shenyang Transformer Products

    40/67

    Appendix 3: Design and Development of Products

    Designing process is the integral part of the entire process. TBEA Shenyang invests much effort and time to meet

    during the designing process. Chart 2 shows the design & development process.

    K

    Customers Technical

    Specification & Requirement

    Consideration & approval by

    International Department

    Project Management

    Design and Development

    Planning, R&D, Analyze Technical

    Specification Satisfactory

    Yes

    No

    Further information

    and/or clarification

    Design and Development Process

    (application of technical

    specification & required

    standards) and Design approval

    No

    Ask for

    clarification

    Yes

    Liaise and agreement with

    Purchasing department and

    other relevant departments

    Review, approval

    and comments by

    senior/chief

    engineers and

    consultants

    International Department

    Project Management

    Customers

    comments, design

    and technical review

    A rove

    Design and Technical Review

    Questions and Answers

    Is customer

    satisfied?

    Quotation Process and

    Contract Agreement

    ProcessesNo

    Yes

    Clarification

    Char

    -39-

  • 8/7/2019 Reliability & Maintainability Manual of TBEA Shenyang Transformer Products

    41/67

    1. Design and development planning

    To meet quality characteristics, statutory and regulatory requirements, contract requirements and to avoid errors

    our company controls the processes of design and development strictly.

    The Technical or Design Center organizes the design and development planning, reviewing, verification and val

    stages to ensure effective communication and clear assignment of responsibility.

    2. Design and development inputs

    The design and development department determines the inputs relating to products and maintains records

    performance requirements of contracts, statutory and regulatory requirements, information derived from previous

    essential for design and development. These inputs are reviewed for adequacy.

    3 Design and Development Output

    The outputs of design and development are in a form suitable for verification against the design and developme

    drawings. Design and development outputs shall provide appropriate information for purchasing, production and

    product acceptance criteria, and specify the characteristics of the product that are essential for its safe and proper

    4 Design and development review

    Systematic reviews of design and development shall be performed to evaluate the ability of the results of design

    and to identify any problems and propose necessary actions. Records of the results of the reviews and any

    Manufacturing Engineering Department approves the drawings or changes drawings and chooses the optimal

    quality products with economical and reasonable manufacturing methods. Records of the results of the app

    maintained.

    -40-

  • 8/7/2019 Reliability & Maintainability Manual of TBEA Shenyang Transformer Products

    42/67

    5 Design and development verification

    Verification is performed by Technical Center in accordance with planned arrangements to ensure that design a

    design and development input requirements, the input of design stage includes contract, technical agreement anresults of the reviews and any necessary actions are maintained.

    Manufacturing Engineering Department performs the verification to ensure reasonableness and applicability o

    manufacturing procedures, materials and equipment, and to ensure the product quality stability, low cost, etc. in

    Records of the results of the reviews and any necessary actions shall be maintained.

    6 Design and development validation

    Validation is performed by Technical Center in accordance with arranged plan to ensure that the resultin

    requirements for the specified application or intended use. When required the Service Center asks for a "p

    customer. The relevant departments provide verification information. Quality Assurance Department provides

    Technical Center conducts the verification for new products. It maintains the records of the validation and verific

    7 Control of design and development changes

    Design and development changes are identified and records maintained by Technical Center, the changes ar

    appropriate, and approved before implementation. Technical Centre and Manufacturing Engineering Departm

    development changes and maintain records of the results of the reviews of changes and any necessary actions.

    -41-

  • 8/7/2019 Reliability & Maintainability Manual of TBEA Shenyang Transformer Products

    43/67

    Appendix 4: Painting System of TBEA Shenyang

    TBEA Shenyang has a lot of experience with the following painting systems.

    A. Epoxy zinc-rich primer + Epoxy micaceous iron oxide primer + Polyurethane

    1. The inner surface painting requirement:- Epoxy Primer (white) once- The thickness of the Paint Film is about 40-50m

    2. The requirement of the outer surface painting- First painting: Epoxy zinc-rich primer twice. The thickness of the Paint Film is about 40-50m.- Second Painting: Epoxy micaceous iron oxide primer twice. The thickness of the paint film is about 1- Third Painting: Acrylic polyurethane enamel twice. The paint thickness is about 50m

    The total thickness of the outer surface paint film is not less than 250m

    3. The brush and spray painting of tank cover for Anti skid

    The routine process of fully painting the top surface of the tank. Brush painting the top cover of the tank for Anti

    tank cover is greater than 350m.

    B. Epoxy primer + epoxy paints + Polyurethane series

    1. The inner surface painting requirement- Thick epoxy primer (white) once- The thickness of the Paint Film is about 40-50m

    2. The requirement of the outer surface paintinga) First painting: Thick Epoxy primer (white) twice. The thickness of the Paint Film is about 60-80m.

    -42-

  • 8/7/2019 Reliability & Maintainability Manual of TBEA Shenyang Transformer Products

    44/67

    b) Second Painting: Epoxy micaceous iron oxide primer once. The thickness of the paint film is about 4c) Third Painting: Thick epoxy intermediate coating twice. The paint thickness is about 160 -200m.d) Acrylic polyurethane enamel twice. The paint thickness is about 50m

    The total thickness of the outer surface paint film is not less than 350m

    3. The brush and spray painting of tank cover for Anti skid

    The routine process of fully painting the top surface of the tank. Brush painting the top cover of the tank for Anti

    tank cover is greater than 450m.

    -43-

  • 8/7/2019 Reliability & Maintainability Manual of TBEA Shenyang Transformer Products

    45/67

    Appendix 5: Product Transportation System

    The transportation system of TBEA Shenyang to lift, load and transport transformer products at various points.

    Starting Point: TBEA Shenyang Transformer Group Co.,Ltd. No. 32 Kaifa Avenue Tiexi District Shenyang 1

    Destination: Customers approved port

    Transportation MethodIntermodal

    1. TBEA Shenyang Transformers Factory Port of China (Dalian or Tianjin, here we choose Dalian Port for ill

    2. Port of China Customer Designated Port: By sea

    3. Customer Designated Port Transformer installation site : By Truck, Jack and Roll

    4. TBEA Shenyang Transformer Factory Dalian, China : By Truck

    Routine: From Factory to Port

    Distance: 356 Km, Freeway, Bridge, Road available for truck, no obstacle.

    5. Options for available trucks

    5.1. Heavy Transaction Engine

    a. WILLEME TG300

    -44-

  • 8/7/2019 Reliability & Maintainability Manual of TBEA Shenyang Transformer Products

    46/67

    b. Yiweike EZ250

    Type EZ250

    Rated Power525Horse

    c. MAN FE600A

    Rated Power600Horse

    2350

    3350

    3740

    9270

    3500

    1625 1625

    TypeTG300

    Made in: France

    Drive Model: 8x 8 Transactions, Hustle

    Rated Power: 600 horse

    -45-

  • 8/7/2019 Reliability & Maintainability Manual of TBEA Shenyang Transformer Products

    47/67

    5.2. Heavy Smooth Trailer

    Nicolas Heavy Rigger

    Made byNicolas, France

    Type: NICOLAS STG17.15

    Single Axial3 Ton

    Max. Loading Weight per Axial29 Ton

    Axial Distance1.6M

    Width: 3.63M

    Trailer Height: 1.080.27M

    6. Transportation Arrangement - The following procedures are followed

    6.1 Truck Preparation and Coordination

    Check details of the truck after Notification of Loading the Goods.

    Check Truck as per Operation and Maintenance Manual

    Function Test of Trailer on Brake, Transaction for : Emergency &Positive Brake

    Trailers Hydraulic Device Leakage Checking

    Tyre Pressure Checking

    Commissioning of Truck

    -46-

  • 8/7/2019 Reliability & Maintainability Manual of TBEA Shenyang Transformer Products

    48/67

    Hydraulic 300MP Min.

    Hydraulic Meter Margin: 20% Max.

    6.2 Loading of Transformer

    Before Loading: Physical Inspection, Measurement checking will be performed and record measurement

    Smoothing Trailer Parked on the dedicated place.

    Remark will be taken on the loading position, gasket for increasing the friction.

    Gravity Checking

    13mm Steel Rope, 5 Tons Steel Ring Rope20mm Screw Device for safety banding the transformer d

    Timely inspection for impact recorder and Automatic Nitrogen Filling Device.

    6.3 Road Arrangement

    Constant Communication Walkie-talkie, Mobile phone, Navigator,

    SpeedBend Pass 2Km/h Bridge Pass: 5Km/hMax: 15Km/h

    Bridge PassConstant SpeedShift, Brake, Acceleration Not Allowed.

    Cross Roads and Other High Obstacle: Min Speed, Person Inspection

    Unsmooth Road Pass: Radial and Axial Smoothing Adjustment, Trailer Smooth, 3g Max.

    -47-

  • 8/7/2019 Reliability & Maintainability Manual of TBEA Shenyang Transformer Products

    49/67

    Rest During NightMain Hydraulic to Min, Shut Down All Hydraulic Handle

    Check Safe of Goods for Each Parking

    6.4 Number of required days: Truck Available = 3 Days, Loading = 1 Day, Road Transportation = 3 Days

    7. Port of China - Customer approved destination port: By sea

    a) Stowage and Calculation (by loading instrument)

    Calibration of initial stability height at ships departure

    After correction of free water Gmo=1.69m

    Rolling period T=13.9 seconds

    Conforming to navigation requirements

    b) Dunning of Heavy Lift

    To be decided in accordance with the strength surface of bottom of heavy lift. Taking the TURBINE PAC

    Cargo given: Dunnaging materials: Log: 10*10*200cm, Dunnaging surface: (4 supporting beams) 49m2

    Dunnaging method (See sketch)

    -48-

  • 8/7/2019 Reliability & Maintainability Manual of TBEA Shenyang Transformer Products

    50/67

    Transformer Load below Deck

    Transformer Safety Position at Sea

    2x300MT MF Crane of Heavy Vessel

    -49-

  • 8/7/2019 Reliability & Maintainability Manual of TBEA Shenyang Transformer Products

    51/67

    Appendix 6: Export Reference List

    1. The export reference for North America

    Voltage (kV)

    Countr

    y

    Name

    of

    Client

    Client Contact

    Name

    and Ph #

    Qt

    y

    Capacit

    y

    (MVA)

    No. of

    windin

    g

    Freq

    .

    (Hz)Primar

    y

    Secondary

    Tertiary

    Coolin

    USALADW

    P

    Mr .Bina

    Vatanpour

    ( 213 )3672212

    1 900 three 60 235 225 buried OA/FA

    USA LADW

    P

    Mr. BinaVatanpour

    ( 213 )3672212

    1 533 three 60 525 230 13.8 FOA

    USALADW

    PMr. Bina

    Vatanpour( 213 )3672212

    4 133 three 60 525/3 230/3 13.8 OA/FA

    USALADW

    PMr. Bina

    Vatanpour 3 16 three 60 34.4 5040V ONAN

    USALADW

    P

    Mr. Bina

    Vatanpour( 213 )3672212

    8 160 three 60 287.5 138 13.8 OA/FA

    USASDG&

    EMr. Carlos Cuevas

    (626) 79599551 224 three 60 230 69

    ONAN/ONAF

    Canada

    Hydro

    NEE

    PAWA

    Mr. Ross Lowry(204) 4743834

    1 95 three 60 230 132.8 66ONAN/ONA

    F

    USA

    AES

    Corp.Mr.Vijai

    (703) 522 13151

    632MVA

    three

    50 500 15 15 OFA

    -50-

  • 8/7/2019 Reliability & Maintainability Manual of TBEA Shenyang Transformer Products

    52/67

    Voltage (kV)

    Country

    Name

    ofClient

    Client Contact

    Nameand Ph #

    Qt

    y

    Capacit

    y(MVA)

    No. of

    winding

    Freq

    .(Hz)

    Primary

    Secondary

    Tertiary

    Coolin

    USA

    AES

    Corp.Mr.Vijai

    (703) 522 1315 1377MV

    A three 50 500 20 ODA

    USA

    AES

    Corp. Mr.Vijai(703) 522 1315

    1300MV

    Athree 50 220 132 13.2 OFA

    2. The export reference list for Gulf Region

    No Time CountryProduct

    Specification

    Quantity

    (Set)

    Clients Name and

    Contact person

    1 1992 Turkey 63MVA, 141/11kV 2

    2 1994 Syria 125MVA, 242/13.8kV 6

    3 1998 Iran 63MVA, 230/6.9kV 63

    4 Nov. 1998

    United Arab

    Emirates

    (UAE)

    1001000kVA,

    11/0.433kV

    615

    5 1999 Iraq 95kVA, 132/10.5kV 2

    6 1999 Iraq 8MVA, 135/6.6kV 2

    7 Oct. 1999 UAE 90MVA, 220/132kV 2

    -51-

  • 8/7/2019 Reliability & Maintainability Manual of TBEA Shenyang Transformer Products

    53/67

    No Time CountryProduct

    Specification

    Quantity

    (Set)

    Clients Name and

    Contact person

    8 2000 Syria 20MVA, 66/20kV 2

    9 2000 Egypt 125MVA, 220/66kV 3

    10 May 2000 UAE 11/0.433kV, 500kVA 20

    11/0.433kV, 100KVA 200 11 April 2001 UAE

    11/0.433kV, 250KVA 100

    12 2001 Iran 125MVA 230/10.5kV 3

    13 2001 Iran 125kVA, 132/10.5kV 2

    14February,

    2002

    UAE11-6/0.415kV,

    1500kVA

    50

    2002 Iran50MVA

    154/132/20kV1

    2002 Iran 50MVA 154/10.5kV 1 15

    2003 Iran160MVA

    230/154/20kV1

    Sep, 2003 UAE 100KVA11/0.433KV 250

    16

    Sep, 2004 Turkey 160MVA400/36/13.8kV

    1

    250KVA11/0.433KV 100 17 Nov, 2004 UAE

    500KVA11/0.433KV 200

    -52-

  • 8/7/2019 Reliability & Maintainability Manual of TBEA Shenyang Transformer Products

    54/67

    No Time CountryProduct

    Specification

    Quantity

    (Set)

    Clients Name and

    Contact person

    1500KVA11/0.433KV 100

    18 Oct, 2005 Iran 75MVA 66/10.5kV 2

    2000KVA11/0.433KV 80 19 Oct, 2005

    United Arab

    Emirates 100KVA11/0.433KV 249

    20 Jan, 2005United Arab

    Emirates100KVA11/0.433KV 200

    5750KVA33/0.415KV 2 21 Dec, 2005 UAE

    2000KVA33/0.415KV

    160MVA 400/13.8kV 1

    22 April, 2008 Turkey 160MVA

    400/36/13.8kV

    240MVA 400/20kV 4

    80MVA 33/20kV 1

    40MVA 20/6.3kV 1 23 Dec, 2008 Turkey

    25MVA 20/6.3kV 1

    240MVA 400/20kV 3

    80MVA 33/20kV 1

    40MVA 20/6.3kV 1 24 April, 2009 Turkey

    25MVA 20/6.3kV 1

    -53-

  • 8/7/2019 Reliability & Maintainability Manual of TBEA Shenyang Transformer Products

    55/67

    No Time CountryProduct

    Specification

    Quantity

    (Set)

    Clients Name and

    Contact person

    25 Feb., 2009Saudi

    Arabia

    SFZ-133000/115 1

    United International Trading C

    CrissyRubrico P.O.Box75599AlKhobaKSAT+96638812227 F+966388122www.uitc.com.sa [email protected]

    26 June, 2009 Iraq SF-75000/132 2

    27 30-Sep-09 Turkey 720MVA 400/20kV 1

    28 30-Apr-10 Turkey 720MVA 400/20kV 2

    29 August, 2010 Iraq SFF-31500/20 4

    30 August, 2010 Iraq SFFZ-50000/110 2

    3. General Export Reference List from 1987-2008

    The transformers & reactor exported by TBEA Shenyang Transformer Group Co., Ltd (Former: SHENYANG TR1987 are as follows:

    Voltage (kV) Capacity(MVA)

    Country Qty No. ofwinding

    Freq.(Hz)

    Primary SecondaryTertiary

    Cooling

    Si

    180 China * 1 three 50 242 121 11 OFAF

    250 Pakistan 2 two 50 220 15.75 OFAF

    40 China * 2 two 50 110 27.5 ONAN

    25 China * 6 two 50 110 27.5 ONAN

    25 Pakistan 1 two 50 220 6.9 OFAF

    25 Pakistan 1 two 50 130 6.6 ONAF

  • 8/7/2019 Reliability & Maintainability Manual of TBEA Shenyang Transformer Products

    56/67

    25 Pakistan 2 two 50 15.75 6.6 ONAN

    250 Pakistan 1 two 50 220 15.75 OFAF

    167 China * 4 three 50 550 220 34.5 OFAF

    52.7 China * 1 two 50 220 22 OFAF

    25 Pakistan 1 two 50 15.75 6.6 ONAN

    160 Pakistan 6 three 50 220 132 11 OFAF

    60 Thailand 2 two 50 112 24 ONAN/ONAF

    60 Thailand 2 two 50 112 24 ONAN/ONAF

    40 Thailand 2 two 50 67 12-24 ONAN/ONAF

    160 Pakistan 4 three 50 220 132 11 OFAF

    150 Bengal 2 two 50 242 15.75 OFAF

    150 Bengal 2 three 50 230 135 34 OFAF

    150 Vietnam 1 two 50 20 11 OFAF

    63 Turkey 2 two 50 141 11 OFAF

    62.5 Indonesia 1 two 50 150 20 OFAF

    60 Thailand 2 two 50 112 24 ONAN/ONAF

    60 Thailand 3 two 50 67 12-24 ONAN/ONAF

    60 Thailand 9 two 50 67 12-24 ONAN/ONAF

    50 Thailand 1 two 50 112 22 ONAN/ONAF

    44 Indonesia 5 two 50 20 11 OFAF

    37.5 Philippines 1 two 60 115 13.8-13.8 ONAN/ONAF

    10.7 Pakistan 1 three 50 132 11.5 3.45 ONAF

    10 Indonesia 2 two 50 20 3.45 ONAF

    10 Indonesia 5 two 50 11 3.45 ONAF

    13 Pakistan 2 two 50 132 11.5 ONAN/ONAF

  • 8/7/2019 Reliability & Maintainability Manual of TBEA Shenyang Transformer Products

    57/67

    250 Pakistan 2 two 50 235 15.75 ONAF

    160 Pakistan 2 three 50 220 132 11 ONAN/ONAF

    90 Malaysia 4 two 50 132 33 ONAN/ONAF

    60 Thailand 7 two 50 67 12-24 ONAN/ONAF

    45 Malaysia 2 two 50 132 33 ONAN/ONAF

    30 Malaysia 10 two 50 132 11 ONAN/ONAF

    30 Malaysia 10 three 50 132 11 10 ONAN/ONAF

    26 Pakistan 22 two 50 132 11.5 ONAN/ONAF

    25 Pakistan 2 two 50 15.75 6.9 ONAN

    25 Pakistan 1 two 50 230 69 ONAN/ONAF

    15 Malaysia 2 two 50 132 11 ONAN/ONAF

    15 Malaysia 7 three 50 132 11 10 ONAN/ONAF

    7.5

    Malaysia

    2

    two

    50

    132

    11

    ONAN/ONAF

    380 Pakistan 1 two 50 235 20 ODAF

    300 China 5 two 50 550 15.75 OWAF

    125 Syria 6 two 50 242 13.8 OWAF

    90 Malaysia 6 two 50 132 33 ONAN/ONAF

    60 Malaysia 2 three 50 132 22 10 ONAN/ONAF

    45 Malaysia 2 two 50 132 33 ONAN/ONAF

    40 Pakistan 2 two 50 20 6.6-6.6 ONAN/ONAF

    30 Malaysia 2 three 50 132 11 10 ONAN/ONAF

    12.5 Pakistan 2 two 50 132 6.3 ONAN/ONAF

    8 Viet Nam 3 two 50 13.8 3.3 ONAN

    150 Bangladosh 2 two 50 242 15.75 ODAF

    63 Malaysia 2 two 50 132 10.5 ONAN/ONAF

  • 8/7/2019 Reliability & Maintainability Manual of TBEA Shenyang Transformer Products

    58/67

    25 Bangladesh 1 two 50 20 6.3-6.3 ONAN/ONAF

    15 Antigua 1 two 50 69 11 ONAN

    10 Malaysia 1 three 50 132 6.3 ONAN

    10 Malaysia 2 two 50 10.5 6.3 ONAN

    41.7 Bangladesh 1 two 50 132 34.5 ONAN/ONAF

    8 Viet Nam 3 two 50 13.8 3.3 ONAN

    150 Bangladosh 2 two 50 242 15.75 ODAF

    63 Malaysia 2 two 50 132 10.5 ONAN/ONAF

    25 Bangladesh 1 two 50 20 6.3-6.3 ONAN/ONAF

    15 Antigua 1 two 50 69 11 ONAN

    10 Malaysia 1 three 50 132 6.3 ONAN

    10 Malaysia 2 two 50 10.5 6.3 ONAN

    41.7

    Bangladesh

    1

    two

    50

    132

    34.5

    ONAN/ONAF

    40 Vietnam 3 two 50 110 1.5 ONAN/ONAF

    50 Philippines 1 two 60 115 34.5 OFAF

    50 Thailand 10 two 50 115 23.1 ONAN/ONAF

    25 Philippines 2 two 60 34.5 3.45 ONAN/ONAF

    4.3 China* 2 two 50 66 6.3 ONAN

    2 China* 2 two 50 66 6.3 ONAN

    300 Pakistan 1 two 50 230 15 ODAF

    190 Pakistan 3 two 50 230 11.5 ODAF

    160 Pakistan 2 three 50 220 132 11 ONAN/ONAF

    25 Pakistan 2 two 50 11.5 6.3 ONAN/ONAF

    50 kVA Indonesia 6252 two 50 20 0.4 ONAN

  • 8/7/2019 Reliability & Maintainability Manual of TBEA Shenyang Transformer Products

    59/67

    63 Iran 2 two 50 230 6.9-6.9 ONAN/ONAF

    40 Iran 4 two 50 20 6.9-6.9 ONAN/ONAF

    15 Malaysia 20 two 50 132 11 ONAN/ONAF

    5.2 Vietnam 2 two 50 15 0.38 ONAN

    125 Iran 6 two 50 400 10.5 ONAN/ONAF

    125 Iran 3 two 50 230 10.5 ONAN/ONAF

    125 Iran 2 two 50 132 10.5 ONAN/ONAF

    100 Philippines 2 three 60 138 69 13.8 OA/FA/FA

    10 Burma 2 two 50 66 11 ONAN

    60 Malaysia 6 three 50 132 22 11 ONAN/ONAF

    90 Malaysia 50 two 50 132 33 ONAN/ONAF

    26 Pakistan 18 two 50 132 11.5 ONAN/ONAF

    40 Pakistan 1 two 50 132 12 ONAN/ONAF

    20 Syria 2 two 50 66 20 ONAF

    125 Egypt 3 three 50 220 66 11 ONAN/ONAF

    95 Iraq 2 two 50 132 10.5 ONAN/ONAF

    8 Iraq 2 two 50 135 6.6 ONAN

    26 Pakistan 3 two 50 132 11.5 ONAN/ONAF

    400 Yugoslavia 2 three 50 400 231 10.5 OFAF

    40 China 8 two 50 116 10.5 ONAN/ONAF

    25 China 2 two 50 116 10.5 ONAN/ONAF

    120 China 3 three 50 550/ 3 242/ 3 35 OFAF

    720 China 1 two 50 550 20 ODAF

    840 China 2 two 50 550 20

    250 China 3 three 50 550/ 3 242/ 3 36 ODAF

  • 8/7/2019 Reliability & Maintainability Manual of TBEA Shenyang Transformer Products

    60/67

    160 Iran 1 three 50 230 154 20 ONAN/ONAF

    50 Iran 1 three 50 154 132 20 ONAN/ONAF

    250 China 7 two 50 550/ 3 22 FOA

    160 Pakistan 2 three 50 220 132 11 ONAN/ONAF

    71 Pakistan 1 two 50 550/ 3 13.2

    ODWF

    100 China 3 two 50 242 10.5 OFWF

    282 China 8 two 50 525/ 3 199/ 3 ODAF

    160 Pakistan 4 three 50 220 132 11 ONAN/ONAF

    100 China 3 two 50 242 13.8 OFWF

    900 America 1 three 60 235 225 buried OA/FA/FA

    250 China 6 two 50 500 22 FOA

    63 China 2 split 50 22 6.3-6.3 OA/FA1/FA2

    150 Pakistan 8 three 50 525/3 231/3 23 ONAN/ONAF1 /ONAF2

    370 Indonesia 2 two 50 150 20 OFAF 533 America 1 three 60 525 230 13.8 FOA

    10Mvar America 4 one 60 230/3 OA

    200 Pakistan 4 three 50 525/V3 231/V3 23 ONAn/ONAF1 /ONAF2

    160 Pakistan 6 three 50 220 132 11 ONAN/ONAF

    40 Congo 4 two 50 242 10.5 ONAN

    133 America 4 three 60 525/V3 230/V3 13.8 OA/FA/FA

    200 Pakistan 4 three 50 525/3 231/3 23 ONAN/ONAF1 /ONAF2

    300 Philippine 1 three 60 230 115 13.8 ONAN/OFAF/OFAF

    167 Tadzhikistan 1 three 50 525/V3 230/V3 11 ONAN/OFAF

    120 Vietnam 3 two 50 525/V3 20 ODAF

    360 Vietnam 1 two 50 242 20 ODAF

    50 Vietnam 1 three 50 115 6.8 ONAN

    50 Vietnam 2 three 50 20 6.8 ONAN

  • 8/7/2019 Reliability & Maintainability Manual of TBEA Shenyang Transformer Products

    61/67

    71 Pakistan 2 two 50 550/ 3 13.2 ODWF

    120 China 5 (Smoothing Reactor) 50

    200 Pakistan 4 three 50 500/3 220/ 3 22 ONAN/ONAF1/ONAF2

    150 Pakistan 4 three 50 500/3 220/ 3 11 ONAN/ONAF1/ONAF2

    250 Pakistan 5 three 50 220 132 11 ONAN/ONAF1/ONAF2

    125 Vietnam 5 three 50 225 115 23 ONAN/ONAF1/ONAF2

    250 Vietnam 1 three 50 225 115 23 ONAN/ONAF1/ONAF2

    16 America 3 three 60 34.4 5040V ONAN

    125 Vietnam 5 three 50 215 115 10.5 ONAN/ONAF1/ONAF2

    24.65 India 7 seven 50 11 132 3 OFWF

    -60-

  • 8/7/2019 Reliability & Maintainability Manual of TBEA Shenyang Transformer Products

    62/67

    N0TE:

    1. Abbreviation for cooling system

    ONAN..............Oil-immersed self-cooled ONWF ............. Oil-immersed forced-water cooledONAF ............. Oil-immersed forced-air cooled OFWF.............. Forced-oil

    forced-water cooled

    OFAF .............. Forced-oil forced-air cooled ODAF...............Forced directed-oil forced-air cooled

    * .......... With on-load tap-changer ii.......... Auto-transformer

    * ................With international loan

    * with Siemens technology

    -61-

  • 8/7/2019 Reliability & Maintainability Manual of TBEA Shenyang Transformer Products

    63/67

    Appendix 7: Customers Acknowledgement Letters

    1. Pakistan National Transmission & Dispatch Company

    -62-

  • 8/7/2019 Reliability & Maintainability Manual of TBEA Shenyang Transformer Products

    64/67

    2. Malaysia State Power

    -63-

  • 8/7/2019 Reliability & Maintainability Manual of TBEA Shenyang Transformer Products

    65/67

    3. Serbia Power Transmission Company

    -64-

  • 8/7/2019 Reliability & Maintainability Manual of TBEA Shenyang Transformer Products

    66/67

    4. China Shajiao Electric Power

    -65-

  • 8/7/2019 Reliability & Maintainability Manual of TBEA Shenyang Transformer Products

    67/67

    Prepared by:

    Jeffers Teargun Heptol

    International Business Department