Reliability Maintenance Engineering Day 2 session 2 Reliability Techniques day live course focused on reliability engineering for maintenance programs. Introductory material and discussion ranging from basic tools and techniques for data analysis to considerations when building or improving a program.TRANSCRIPT
![Page 2: Reliability Maintenance Engineering 2 - 2 Reliability Techniques](https://reader033.vdocument.in/reader033/viewer/2022061223/54c470c94a79593d0b8b4604/html5/thumbnails/2.jpg)
RELIABILITY TECHNIQUES TO IMPROVE PERFORMANCE
Day 2 Session 2
![Page 3: Reliability Maintenance Engineering 2 - 2 Reliability Techniques](https://reader033.vdocument.in/reader033/viewer/2022061223/54c470c94a79593d0b8b4604/html5/thumbnails/3.jpg)
Objectives
• Examining opportunities and reliability improvement techniques for robust design– RCM, FMEA, RCA, 6 step and FRETT
• Developing corrective actions and determining effectiveness
• Implementing the growth curve technique• Fault and failure forecasting
![Page 4: Reliability Maintenance Engineering 2 - 2 Reliability Techniques](https://reader033.vdocument.in/reader033/viewer/2022061223/54c470c94a79593d0b8b4604/html5/thumbnails/4.jpg)
![Page 5: Reliability Maintenance Engineering 2 - 2 Reliability Techniques](https://reader033.vdocument.in/reader033/viewer/2022061223/54c470c94a79593d0b8b4604/html5/thumbnails/5.jpg)
FMEA
• Organized risk analysis– Severity– Occurrence– Detection
• Use in Design process
![Page 6: Reliability Maintenance Engineering 2 - 2 Reliability Techniques](https://reader033.vdocument.in/reader033/viewer/2022061223/54c470c94a79593d0b8b4604/html5/thumbnails/6.jpg)
RCA
• Root Cause Analysis– Determine fundamentals– Initiating event– Contributing events
• Use in design process
![Page 7: Reliability Maintenance Engineering 2 - 2 Reliability Techniques](https://reader033.vdocument.in/reader033/viewer/2022061223/54c470c94a79593d0b8b4604/html5/thumbnails/7.jpg)
6 Steps+1
![Page 8: Reliability Maintenance Engineering 2 - 2 Reliability Techniques](https://reader033.vdocument.in/reader033/viewer/2022061223/54c470c94a79593d0b8b4604/html5/thumbnails/8.jpg)
FRETT
Cause categories• design errors• material defects• fabrication and processing
errors• assembly and installation
deficiencies• maintenance-related or
procedural errors• unintended operating
conditions• operator error
Failure mode sets
• Force
• Reactive environment
• Temperature
• Time
![Page 9: Reliability Maintenance Engineering 2 - 2 Reliability Techniques](https://reader033.vdocument.in/reader033/viewer/2022061223/54c470c94a79593d0b8b4604/html5/thumbnails/9.jpg)
Discussion & Questions
![Page 10: Reliability Maintenance Engineering 2 - 2 Reliability Techniques](https://reader033.vdocument.in/reader033/viewer/2022061223/54c470c94a79593d0b8b4604/html5/thumbnails/10.jpg)
![Page 11: Reliability Maintenance Engineering 2 - 2 Reliability Techniques](https://reader033.vdocument.in/reader033/viewer/2022061223/54c470c94a79593d0b8b4604/html5/thumbnails/11.jpg)
Corrective Action
• Plan Do Check Act process
• Experiments and measures
• Verify results
• Document results
Plan
Do
Check
Act
![Page 12: Reliability Maintenance Engineering 2 - 2 Reliability Techniques](https://reader033.vdocument.in/reader033/viewer/2022061223/54c470c94a79593d0b8b4604/html5/thumbnails/12.jpg)
An Example
• Define problem
• Plan response
• Do experiment
• Monitor results
• Implement fix
![Page 13: Reliability Maintenance Engineering 2 - 2 Reliability Techniques](https://reader033.vdocument.in/reader033/viewer/2022061223/54c470c94a79593d0b8b4604/html5/thumbnails/13.jpg)
Monitor Effectiveness
• What do you measure?
• What can you measure?
• Does absence of failure mean it’s fixed?– What is expected failure
rate?– What is probability of
failure?
![Page 14: Reliability Maintenance Engineering 2 - 2 Reliability Techniques](https://reader033.vdocument.in/reader033/viewer/2022061223/54c470c94a79593d0b8b4604/html5/thumbnails/14.jpg)
Monitoring
• How to determine monitoring plan?
• Sample size?
• Duration?
• Focus on failure mechanism
![Page 15: Reliability Maintenance Engineering 2 - 2 Reliability Techniques](https://reader033.vdocument.in/reader033/viewer/2022061223/54c470c94a79593d0b8b4604/html5/thumbnails/15.jpg)
Discussion & Questions
![Page 16: Reliability Maintenance Engineering 2 - 2 Reliability Techniques](https://reader033.vdocument.in/reader033/viewer/2022061223/54c470c94a79593d0b8b4604/html5/thumbnails/16.jpg)
Example
![Page 17: Reliability Maintenance Engineering 2 - 2 Reliability Techniques](https://reader033.vdocument.in/reader033/viewer/2022061223/54c470c94a79593d0b8b4604/html5/thumbnails/17.jpg)
Repair rate over time
• Trend plots– MCF – cumulative
failures over time– Inter arrival times– Reciprocals of inter
arrival times
• Duane Plot
• Sample Data• 1500 hour test• With each failure RCA
and improvements implemented
Observed failure times5, 40, 43, 175, 389, 712, 747, 795, 1299, 1478 hrs
![Page 18: Reliability Maintenance Engineering 2 - 2 Reliability Techniques](https://reader033.vdocument.in/reader033/viewer/2022061223/54c470c94a79593d0b8b4604/html5/thumbnails/18.jpg)
Cumulative failure vs. time (MCF)
• Failure count vs time
• Straight line (roughly) means steady failure rate.
• Curve down – improvement over time
• Curve up – increasing problems over time
NIST Engineering Statistics Handbook 8.2.2.3
![Page 19: Reliability Maintenance Engineering 2 - 2 Reliability Techniques](https://reader033.vdocument.in/reader033/viewer/2022061223/54c470c94a79593d0b8b4604/html5/thumbnails/19.jpg)
Inter arrival failure times
• Plot waiting time between failures
• Trend up – improvement
• Trend down – degradation
• Straight – no change over time
![Page 20: Reliability Maintenance Engineering 2 - 2 Reliability Techniques](https://reader033.vdocument.in/reader033/viewer/2022061223/54c470c94a79593d0b8b4604/html5/thumbnails/20.jpg)
Reciprocal Inter arrival times
• Plot failure rate estimates since last failure
• Trend up – • degradation• Trend down –
improvement• Straight – no change
over time
![Page 21: Reliability Maintenance Engineering 2 - 2 Reliability Techniques](https://reader033.vdocument.in/reader033/viewer/2022061223/54c470c94a79593d0b8b4604/html5/thumbnails/21.jpg)
Duane Plot
Time Cum MTBF
5 5
40 20
43 14.3
175 43.75
389 77.8
712 118.67
747 106.7
795 99.4
1299 144.3
1478 147.8
![Page 22: Reliability Maintenance Engineering 2 - 2 Reliability Techniques](https://reader033.vdocument.in/reader033/viewer/2022061223/54c470c94a79593d0b8b4604/html5/thumbnails/22.jpg)
Discussion & Questions
![Page 23: Reliability Maintenance Engineering 2 - 2 Reliability Techniques](https://reader033.vdocument.in/reader033/viewer/2022061223/54c470c94a79593d0b8b4604/html5/thumbnails/23.jpg)
![Page 24: Reliability Maintenance Engineering 2 - 2 Reliability Techniques](https://reader033.vdocument.in/reader033/viewer/2022061223/54c470c94a79593d0b8b4604/html5/thumbnails/24.jpg)
Predictions & Forecasts
Risks
• Might just be wrong
• May miss failure mechanisms due to masking
• Unable to predict everything
Benefits
• Awareness of probability of failure
• Awareness of what to expect to fail
• Maintenance and logistics planning
![Page 25: Reliability Maintenance Engineering 2 - 2 Reliability Techniques](https://reader033.vdocument.in/reader033/viewer/2022061223/54c470c94a79593d0b8b4604/html5/thumbnails/25.jpg)
Predictions & Forecasts
• Empirical models– Extension of field data– Extensions of
experiments– Extensions of vendor
data
• First principle models– Difficult to create– Does it apply in this
situation
![Page 26: Reliability Maintenance Engineering 2 - 2 Reliability Techniques](https://reader033.vdocument.in/reader033/viewer/2022061223/54c470c94a79593d0b8b4604/html5/thumbnails/26.jpg)
Cautions
• Check assumptions• Check sensitivity
• Verify models and fits• Be conservative
The further from reality the more risk of being
wrong exists
![Page 27: Reliability Maintenance Engineering 2 - 2 Reliability Techniques](https://reader033.vdocument.in/reader033/viewer/2022061223/54c470c94a79593d0b8b4604/html5/thumbnails/27.jpg)
Monitor and Adjust
• All models are wrong, some are useful
• Continue to refine and challenge any model
• RCA with focus on failure mechanisms is key to success
![Page 28: Reliability Maintenance Engineering 2 - 2 Reliability Techniques](https://reader033.vdocument.in/reader033/viewer/2022061223/54c470c94a79593d0b8b4604/html5/thumbnails/28.jpg)
Discussion & Questions
![Page 29: Reliability Maintenance Engineering 2 - 2 Reliability Techniques](https://reader033.vdocument.in/reader033/viewer/2022061223/54c470c94a79593d0b8b4604/html5/thumbnails/29.jpg)
Summary
• Examining opportunities and reliability improvement techniques for robust design– RCM, FMEA, RCA, 6 step and
FRETT• Developing corrective
actions and determining effectiveness
• Implementing the growth curve technique
• Fault and failure forecasting
Reliability techniques to improve performance