relic - r40t sprocket installation steps · 2017. 9. 20. · dura-ace-9000 (11-28) dura-ace-9100...
TRANSCRIPT
-
R40T Sprocket Installation Steps1. Shimano 10 spd & 11 spd ONLY
2. Take off 15T and 17T 3. Replace 16T sprocket and
sprocket R40T sprocket
4. Put all cluster installation together
10 spd105-5700 (11-28) Ultegra-6700 (11-28, 12-30) Dura-ace-7900 (11-28) 11 spd105-5800 (11-28, 11-32) Ultegra-6800 (11-28, 11-32) Dura-ace-9000 (11-28) Dura-ace-9100 (11-28, 11-30)
**You’re looking at 11-12-13-14-16-19-21-23-25-28-R40T sprocket array with a 11-32t option also available.
-
5. Before building, everything should get ready as below
a. 2-4 link chains
for extent chain
length
b. frame hanger
6. Lock the Rear Derailleur 7. Bolt the frame hanger
and extent hanger and extend hanger
-
8. All the actions are done, then adjust B tension, Hi and Lo limited till shifting well.
9. R40T sprocket install completion.
Relic Your Ride Relic bike Components