REMEDIAL ACTION PLAN Asbestos and Household Hazardous Waste Chouteau Courts 1220 Independence Avenue Kansas City, Missouri 64106 Prepared for: Housing Authority of Kansas City, Missouri 920 Main Street, Suite 701 Kansas City, Missouri 64105 Prepared By: New Horizons Enterprises, LLC PO Box 681183 Kansas City, Missouri 64168-1183 December 20, 2017 APPROVED BY: __________________________________________________ ____________ Housing Authority of Kansas City, Missouri Date __________________________________________________ ____________ City of Kansas City, Missouri Date ___________________________________________________ ____________ Housing and Urban Development Date

Upload: others

Post on 01-Feb-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

REMEDIAL ACTION PLAN Asbestos and Household Hazardous Waste

Chouteau Courts 1220 Independence Avenue Kansas City, Missouri 64106

Prepared for:

Housing Authority of Kansas City, Missouri 920 Main Street, Suite 701

Kansas City, Missouri 64105

Prepared By: New Horizons Enterprises, LLC

PO Box 681183 Kansas City, Missouri 64168-1183

December 20, 2017

APPROVED BY: __________________________________________________ ____________ Housing Authority of Kansas City, Missouri Date __________________________________________________ ____________ City of Kansas City, Missouri Date ___________________________________________________ ____________ Housing and Urban Development Date

Page 2: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

i

TABLE OF CONTENTS

Section

Page

1.0 INTRODUCTION ................................................................................................................................ 1 1.1 SITE LOCATION AND DESCRIPTION ..................................................................................... 1 1.2 REGULATORY HISTORY AND PREVIOUS ASSESSMENTS ...................................................... 1

2.0 PROJECT OBJECTIVES ....................................................................................................................... 1 3.0 ASBESTOS INSPECTION RESULTS ..................................................................................................... 2 4.0 ASBESTOS ABATEMENT ACTIVITIES ................................................................................................. 3

4.1 ASBESTOS ABATEMENT TECHNIQUES ................................................................................ 3 4.2 ASBESTOS PERSONAL AIR MONITORING ............................................................................ 4 4.3 FINAL VISUAL INSPECTION .................................................................................................. 5

5.0 HOUSEHOLD HAZARDOUS WASTE ................................................................................................... 5 6.0 HOUSEHOLD HAZARDOUS WASTE REMOVAL ................................................................................. 6 7.0 FINAL REPORT .................................................................................................................................. 6 8.0 REFERENCES ..................................................................................................................................... 6

Appendix

A FIGURES B ASBESTOS SUMMARY TABLES AND MAPS C HOUSEHOLD HAZARDOUS INVENTORY TABLE

Page 3: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

1

1.0 INTRODUCTION

This project concerns the abatement of asbestos containing materials (ACM) and removal and proper disposal of hazardous materials at Chouteau Courts, 1220 Independence Avenue, Kansas City, Missouri. This remediation plan has been prepared for the Housing Authority of Kansas City, Missouri in preparation for the demolition of the Chouteau Courts apartment complex. 1.1 Site Location and Description

Chouteau Courts, located at 1220 Independence Avenue, Kansas City, Missouri, is in an area of Kansas City, Missouri, that is developed with primarily residential properties along the Independence Avenue corridor. The property consists of 20 apartment buildings: 1200-1202-1204-1206 Independence Avenue, 1208 Independence Avenue, 1210 Independence Avenue, 1212-1214 Independence Avenue, 1216 Independence Avenue, 1218 Independence Avenue, 1300-1302-1304-1306 Independence Avenue, 1308-1310-1312-1314 Independence Avenue, 1316-1322 Independence Avenue, 1324-1326 Independence Avenue, 1328-1330-1332-1334 Independence Avenue, 560-562-564-566 Tracy Avenue, 561-563 Tracy Avenue, 565-567 Tracy Avenue, 568-570 Tracy Avenue, 569-571 Tracy Avenue, 572-574-576-578 Tracy Avenue, 573-579 Tracy Avenue 580-582 Tracy Avenue, 581-583-585-587 Tracy Avenue, one community center, and one manager’s office (1220 Independence Avenue). The buildings are constructed primarily of brick, wood, and plaster. The buildings are located in the urban core of Kansas City and are bound by The Paseo Boulevard to the east, Independence Avenue to the south, and Interstate 29/35 to the west and north beyond vacant land. 1.2 Regulatory History and Previous Assessments

Previous asbestos inspection reports, dated September 30, 1997, and January 1, 1998, were prepared for the property by Housing Environmental Services of Cambridge, Massachusetts. These reports revealed various materials, such as pipe fitting insulation, floor tile with mastic, and duct wrap were positive for asbestos. On April 30, 1998, Bristol Environmental Services of Overland Park, Kansas prepared technical specifications for asbestos and lead-based paint. This document outlined what materials were to be removed and by what methods. Materials outlined in this report included pipe fittings, runs of pipe insulation, vibration joint cloth, heating register insulation, and sink undercoating. New Horizons conducted an asbestos inspection of the building in November and December 2017. The inspection confirmed that there is ACM located in the interior and exterior of the apartment buildings. New Horizons noted that not all pipe fittings outlined in the April 1998 abatement specifications were removed. All previous reports for the property are on file with the Housing Authority. 2.0 PROJECT OBJECTIVES

The information provided in this RAP is based on information from the New Horizons’ Asbestos Inspection Report dated December 20, 2017, and New Horizons’ Household Hazardous Waste Inventory

Page 4: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

2

Report dated December 20, 2017. The purpose of this RAP is to outline the specific field, laboratory, and quality control procedures that will be applied to address remedial activities planned for the site. Previous assessments have determined that ACM and household hazardous waste is present at the site. Future plans for the site involve demolition. The primary objective of the remedial action is to remove and properly dispose of materials prior to demolition activities. 3.0 ASBESTOS INSPECTION RESULTS

In November and December 2017, New Horizons collected samples of building materials suspected to contain asbestos for laboratory analysis. Some of those materials were determined to contain asbestos. Specifically, the materials were pipe joint fittings, floor tile and mastic, and caulking. In those materials, asbestos (chrysotile, amosite) was detected at concentrations that ranged from 3 to 10 percent (New Horizons 2017). Table 1 summarizes the ACM identified at the site.

TABLE 1 ASBESTOS CONTAINING MATERIALS

CHOUTEAU COURTS 1220 INDEPENDENCE AVENUE, KANSAS CITY, MISSOURI

Material Description Locations

Asbestos Result Estimated Quantity

Tan Pipe Insulation Fittings All Apartment Buildings: In Walls

Behind Sinks, Toilets, Showers and in Floors/Ceilings in Kitchens

5%-10% Amosite

1,210 Fittings at 1 Square

Foot (SF) Each (2,280

SF Total)

White Window Caulking All Exterior Windows of 1212-

1214 Independence Avenue and 580-582 Tracy Avenue

8% Chrysotile

130 Windows @

15 Linear Feet (LF)Each

(1,950 LF Total)

White Door Caulking All Exterior Doors of 580-582 Tracy Avenue

4% Chrysotile

4 Doors @ 25 LF Each (100

LF Total)

9”x9” Brown Mottled Floor Tile with Black Mastic

1316-1322 Independence Avenue (Room 77)

5% Chrysotile

1,700 Square Feet (SF)

(Under Non Asbestos-Containing Floor Tile)

Black Mastic 1220 Independence Avenue (Room 6, 7, 8, 9, and 14

5% Chrysotile

1,615 SF Under Non-ACM Floor

Tile

Page 5: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

3

4.0 ASBESTOS ABATEMENT ACTIVITIES

The asbestos abatement contractor should be a Missouri licensed asbestos abatement contractor and meet all the required certifications. General descriptions of abatement techniques to be used on ACM identified at the site are listed below. Abatement activities will follow all applicable federal, state, and local regulations. The first activity will be to secure permits and provide required notifications. The abatement contractor should submit Kansas City Air Quality (KCAQ) required notifications for asbestos abatement. The KCAQ requires a 20-day waiting period prior to any friable asbestos abatement occurring. 4.1 Asbestos Abatement Techniques

Prior to ACM abatement, pre-cleaning of disturbed/damaged asbestos that may be located on floors throughout the apartment buildings will be conducted. Damaged asbestos shall be removed in accordance with applicable federal, state, and local regulations. The contractor should begin the asbestos abatement after the permit notification period of 20 calendar days expires. Removal will include 1,210 square feet of pipe fittings, 1,950 linear feet of window caulking, 100 linear feet of door caulking, and 1,700 square feet of floor tile with mastic that were confirmed to contain asbestos. Materials to be removed are included on the summary sheets and diagrams in Appendix B. Interior demolition will need to occur to properly access all asbestos. All asbestos materials removed from the site will be bagged or wrapped and properly labeled prior to being placed into a sealed disposal bin for transport to an authorized disposal site. The following general activities will be included for pipe insulation:

• A regulated area will be established. A competent person will be on site during the abatement.

• The removal of pipe insulation will take place via glovebag or wrap and cut. As the pipe insulation is removed, the material will be properly labeled for disposal.

• All other industry standards (wet methods, etc.) and Occupational Safety and Health

Administration (OSHA), National Emission Standards for Hazardous Air Pollutants (NESHAP), state, and local regulations will be followed during the abatement.

Floor tile with mastic was also determined to be ACM. This flooring material will be removed and properly disposed of. General industry standard abatement techniques for removal of the floor tile and mastic are described below. The floor tile and mastic abatement is considered Class II removal; the following will occur for abatement of floor tile and mastic:

• A regulated area will be established. A competent person will be on site during the abatement.

Page 6: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

4

• Removal of floor tiles will proceed with attempts to remove individual tiles as complete units,

thus limiting fiber release from broken tiles/materials. Misting of the work area with water will help prevent exposure to asbestos fibers released during removal of the tiles.

• As the floor tiles are removed, they will be placed for disposal without additional breakage in a 6-mil poly bag, properly labeled as contaminated waste.

• All other industry standards (wet methods, HEPA vacuums, etc) and OSHA, NESHAP, state, and local regulations will be followed during the abatement.

Window and Door Caulking located on the exterior of 1212-1214 Independence Avenue and 580-582 Tracy Avenue was determined to be ACM. This material will be removed and properly disposed of. General industry standard abatement techniques for removal of the caulking are described below. The caulking abatement is considered Class II removal; the following will occur for abatement of caulking:

• A regulated area will be established.

• Removal of caulking will proceed with attempts to remove component as a complete unit, thus limiting fiber release. Misting of the work area with water will help prevent exposure to asbestos fibers released during removal of the caulking or component.

• As the caulking or components are removed, it will be placed for disposal in a 6-mil poly bag, properly labeled as contaminated waste.

• All other industry standards (wet methods, HEPA vacuums, etc) and OSHA, NESHAP, state, and local regulations will be followed during the abatement.

For this project, workers will utilize half-face HEPA/APR protection. Higher levels of protection will be utilized if necessary based upon sampling levels. Additionally, all personnel on site will be required to wear proper protective clothing, including hooded Tyvek® suits, gloves, and boots. 4.2 Asbestos Personal Air Monitoring

Personal air monitoring of abatement workers should be conducted as required by OSHA for the abatement activities conducted at the site. Abatement work will include removal of 1,210 square feet of pipe fittings, 1,950 linear feet of window caulking, 100 linear feet of door caulking, and 1,700 square feet of floor tile with mastic that were confirmed to contain asbestos. The ACM will be removed from the site and disposed of as both friable and nonfriable asbestos-containing waste.

Page 7: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

5

Representative daily personal air monitoring for asbestos shall be conducted during abatement, as required by OSHA’s Asbestos Standard (29 CFR 1926.1101). Moreover, every worker shall have the right to know the asbestos concentrations to which he/she is exposed and what measures are in place to protect the abatement worker. Data from personal air monitoring will be used to verify effectiveness of removal engineering techniques for achieving minimal employee exposure. Air samples will be analyzed by Phase Contract Microscopy (PCM) by National Institute of Occupational Safety and Health (NIOSH) Method 7400. Per OSHA 29 CFR Standard 1926.62, each employer with a workplace covered by the standard shall determine if any employee may be exposed to asbestos at or above the action level. The standard defines the action level as employee exposure, without regard to use of respirators, to an airborne concentration of asbestos of 0.1 f/cc of air calculated as an 8-hour, time-weighted average. The abatement contractor is responsible for implementing safe work practices under OSHA 1926.62. 4.3 Final Visual Inspection

A final visual inspection shall be conducted. The inspection will include visual confirmation of complete removal of ACM. Final visual inspection will be conducted to verify project completion. 5.0 HOUSEHOLD HAZARDOUS WASTE

Various household hazardous waste materials were observed throughout the buildings. Table 2 summarizes the household hazardous waste located throughout the complex and the quantities for each type.

TABLE 2

HOUSEHOLD HAZARDOUS WASTE CHOUTEAU COURTS, KANSAS CITY, MISSOURI

Type Quantity

Location

Mercury Ampules 12

1200-1202-1204-1206 Independence Avenue-Unit 1204 and 1206 A; 1212-1214

Independence Avenue-Unit 1214 1/2, 1214 1/2 A, and 1212 1/2 B; 1328-1330-1332-1334 Independence Avenue-Unit 1332 B and 1334

B; 1300-1302-1304-1306 Independence Avenue-Unit 1302 and 1304 B; 561-563 Tracy Avenue-Unit 563 A; 565-567 Tracy Avenue-

Unit 567 A and 565 B 4-foot Silver Fluorescent

Bulbs 132 1200-1202-1204-1206 Independence Avenue-Basement, Community Center; 1200 Independence Avenue-Throughout Non-PCB Ballasts 114

Page 8: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

6

4-inch Fluorescent Bulbs 868 Throughout Apartments

**Ballasts for 4-inch Fluorescent Bulbs 868 Throughout Apartments

**Ballasts were not marked as “Non-PCB, so they should be treated as containing PCBs for the purpose of this inventory. Various materials used in maintenance, located in the basement maintenance shop of 560-562-564-566 Tracy Avenue, and in storage at 1220 Independence Avenue (Manager’s Office), are not included in this inventory as they will be removed by the Housing Authority of Kansas City, Missouri, prior to demolition. Also, many appliances, such as refrigerators, stoves, and water heaters located throughout the units will be removed by the Housing Authority prior to demolition. Similar items located on the exterior of the buildings, such as air conditioning units and telecommunication boxes, will also be removed prior to demolition. 6.0 HOUSEHOLD HAZARDOUS WASTE REMOVAL

New Horizons conducted a hazardous materials survey of the buildings at 1220 Independence Avenue, Kansas City, Missouri, and prepared an inventory of items that could create a hazardous environment during demolition and should be removed and disposed of properly. Container labels and Safety Data Sheets (SDS) for the identified materials should be used to determine the proper handling of the materials as hazardous or non-hazardous for disposal. These materials should be properly disposed of at a licensed recycling center or at a licensed hazardous waste Treatment, Storage, and Disposal Facility (TSDF). Silver, 4 foot fluorescent bulbs and non-PCB ballasts were observed in various locations throughout the property. Also observed were 4 inch fluorescent bulbs with ballasts located in each apartment unit. Mercury ampules were noted in twelve apartments. All materials noted above should be removed in accordance with federal, state and local regulations. 7.0 FINAL REPORT

When the ACM abatement and household hazardous material removal and disposal work is complete, a final report will be submitted to the Housing Authority of Kansas City, Missouri. The report will present any applicable air monitoring results, waste disposal documentation; any field notes, and applicable waste manifests. . 8.0 REFERENCES

New Horizons Enterprises, LLC (New Horizons). 2017a. Asbestos Inspection Report, 1220 Independence Avenue. December 20. 2017b. Household Hazardous Waste Inventory, 1220 Independence Avenue. December 20.

Page 9: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

APPENDIX A

FIGURE

(ONE PAGE)

Page 10: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial
Page 11: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

APPENDIX B

ASBESTOS SUMMARY TABLES AND MAPS

(133 MAPS PAGES)

Page 12: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

Table 1: Summary of Asbestos Samples and Results

1220 Independence Avenue

Kansas City, Missouri 64106

Sample Number Material Description Floor Location(s) Condition Friable Sample AnalysisLocation(s) of Asbestos Containing

MaterialsQuantities

FTM-H1-112"x12" White Mottled Floor Tile with

Yellow Mastic1 Room 4 G N Floor Tile-ND, Mastic-ND

FTM-H1-212"x12" White Mottled Floor Tile with

Yellow Mastic2 Room 11 G N Floor Tile-ND, Mastic-ND

FTM-H1-312"x12" White Mottled Floor Tile with

Yellow Mastic3 Room 34 G N Floor Tile-ND, Mastic-ND

FTM-H2-112"x12" Red Mottled Floor Tile with

Yellow Mastic1 Room 4 G N Floor Tile-ND, Mastic-ND

FTM-H2-212"x12" Red Mottled Floor Tile with

Yellow Mastic2 Room 11 G N Floor Tile-ND, Mastic-ND

FTM-H2-312"x12" Red Mottled Floor Tile with

Yellow Mastic3 Room 34 G N Floor Tile-ND, Mastic-ND

FTM-H3-112"x12" Blue Mottled Floor Tile with

Yellow Mastic1 Room 4 G N Floor Tile-ND, Mastic-ND

FTM-H3-212"x12" Blue Mottled Floor Tile with

Yellow Mastic2 Room 11 G N Floor Tile-ND, Mastic-ND

FTM-H3-312"x12" Blue Mottled Floor Tile with

Yellow Mastic3 Room 34 G N Floor Tile-ND, Mastic-ND

CBM-H1-14" White Cove Base with Tan Mastic and

White Joint Compound1 Room 4 G N

Cove Base-ND, Mastic-ND, Joint

Compound-ND

CBM-H1-24" White Cove Base with Tan Mastic and

White Joint Compound2 Room 11 G N

Cove Base-ND, Mastic-ND, Joint

Compound-ND

CBM-H1-34" White Cove Base with Tan Mastic and

White Joint Compound3 Room 34 G N

Cove Base-ND, Mastic-ND, Joint

Compound-ND

Sink-H1-1 Tan Sink Undercoat 1 Room 4 G N Sink Undercoat-ND

Sink-H1-2 Tan Sink Undercoat 2 Room 11 G N Sink Undercoat-ND

Sink-H1-3 Tan Sink Undercoat 3 Room 34 G N Sink Undercoat-ND

Tex-H1-1 White Ceiling Texture 1 Room 3 G Y Ceiling Texture-ND

Tex-H1-2 White Ceiling Texture 1 Room 12 G Y Ceiling Texture-ND

1218 Independence Avenue

ND - NONE DETECTED

G - Good, F - Fair, P - Poor

Y- Yes, N - NoPage 1 of 57

B - Basement

Ext - Exterior

*Approximate fitting locations are included on floor plans

Page 13: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

Table 1: Summary of Asbestos Samples and Results

1220 Independence Avenue

Kansas City, Missouri 64106

Sample Number Material Description Floor Location(s) Condition Friable Sample AnalysisLocation(s) of Asbestos Containing

MaterialsQuantities

Tex-H1-3 White Ceiling Texture 2 Room 25 G Y Ceiling Texture-ND

Tex-H1-4 White Ceiling Texture 3 Room 35 G Y Ceiling Texture-ND

Tex-H1-5 White Ceiling Texture 3 Room 42 G Y Ceiling Texture-ND

SC-H1-1 White Skim Coat 1 Room 3 G Y Skim Coat-ND

SC-H1-2 White Skim Coat 2 Room 12 G Y Skim Coat-ND

SC-H1-3 White Skim Coat 2 Room 25 G Y Skim Coat-ND

SC-H1-4 White Skim Coat 3 Room 35 G Y Skim Coat-ND

SC-H1-5 White Skim Coat 3 Room 42 G Y Skim Coat-ND

C-H1-1White Bathtub Caulking with White Joint

Compound1 Room 5 G N Caulking-ND, Joint Compound-ND

C-H1-2White Bathtub Caulking with White Joint

Compound2 Room 20 G N Caulking-ND, Joint Compound-ND

C-H1-3White Bathtub Caulking with White Joint

Compound3 Room 27 G N Caulking-ND, Joint Compound-ND

M-H1-1Tan Ceramic Tile Mastic with White Joint

Compound1 Room 5 G N Mastic-ND, Joint Compound-ND

M-H1-2Tan Ceramic Tile Mastic with White Joint

Compound2 Room 20 G N Mastic-ND, Joint Compound-ND

M-H1-3Tan Ceramic Tile Mastic with White Joint

Compound3 Room 27 G N Mastic-ND, Joint Compound-ND

P-H1-1 Gray Plaster with White Skim Coat 1 Room 3 G Y Plaster-ND, Skim Coat-ND

P-H1-2 Gray Plaster with White Skim Coat 1 Room 12 G Y Plaster-ND, Skim Coat-ND

P-H1-3 Gray Plaster with White Skim Coat 2 Room 25 G Y Plaster-ND, Skim Coat-ND

P-H1-4 Gray Plaster with White Skim Coat 2 Room 35 G Y Plaster-ND, Skim Coat-ND

ND - NONE DETECTED

G - Good, F - Fair, P - Poor

Y- Yes, N - NoPage 2 of 57

B - Basement

Ext - Exterior

*Approximate fitting locations are included on floor plans

Page 14: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

Table 1: Summary of Asbestos Samples and Results

1220 Independence Avenue

Kansas City, Missouri 64106

Sample Number Material Description Floor Location(s) Condition Friable Sample AnalysisLocation(s) of Asbestos Containing

MaterialsQuantities

P-H1-5 Gray Plaster with White Skim Coat 3 Room 42 G Y Plaster-ND, Skim Coat-ND

C-H2-1 White Window Caulking Ext West Side Window G N Caulking-ND

C-H2-2 White Window Caulking Ext East Side Window G N Caulking-ND

C-H2-3 White Window Caulking Ext North Side Window G N Caulking-ND

Stuc-H1-1 White Stucco Ext Room 1 G N Stucco-ND

Stuc-H1-2 White Stucco Ext Room 2 G N Stucco-ND

Stuc-H1-3 White Stucco Ext Room 2 G N Stucco-ND

C-H3-1 White Door Caulking Ext 1218 Door G N Caulking-ND

C-H3-2 White Door Caulking Ext 1218 1/2 A Door G N Caulking-ND

C-H3-3 White Door Caulking Ext 1218 B Door G N Caulking-ND

Roof-H1-1 Black Roof Shingle Roof North End of Roof G N Shingle-ND

Roof-H1-2 Black Roof Shingle Roof South End of Roof G N Shingle-ND

Stuc-H1-1 White Stucco 1 Room 1 G N Stucco-ND

Stuc-H1-2 White Stucco 2 Room 37 G N Stucco-ND

Stuc-H1-3 White Stucco 3 Room 74 G N Stucco-ND

1200-PI-H1-1 Tan Pipe Insulation 1 Room 5 G Y Insulation-5% Amosite

1200-PI-H1-2 Tan Pipe Insulation 3 Room 40 G Y Insulation-5% Amosite

1200-1202-1204-1206 Independence Avenue

1,210 Fittings at 1 Square Foot (SF) Each (1,210 SF Total)*

All Apartment Buildings: In Walls

Behind Sinks, Toilets, Showers and in

Floors/Ceilings in Kitchens

ND - NONE DETECTED

G - Good, F - Fair, P - Poor

Y- Yes, N - NoPage 3 of 57

B - Basement

Ext - Exterior

*Approximate fitting locations are included on floor plans

Page 15: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

Table 1: Summary of Asbestos Samples and Results

1220 Independence Avenue

Kansas City, Missouri 64106

Sample Number Material Description Floor Location(s) Condition Friable Sample AnalysisLocation(s) of Asbestos Containing

MaterialsQuantities

FTM-H1-412"x12" White Mottled Floor Tile with

Yellow Mastic1 Room 3 G N Floor Tile-ND, Mastic-ND

FTM-H3-412"x12" Blue Mottled Floor Tile with

Yellow Mastic1 Room 3 G N Floor Tile-ND, Mastic-ND

CBM-H1-4 4" White Cove Base with Tan Mastic 1 Room 3 G N Cove Base-ND, Mastic-ND

CBM-H2-1 4" Gray Cove Base with Yellow Mastic 1 Room 5 G N Cove Base-ND, Mastic-ND

C-H1-4 White Bathtub Caulking 1 Room 5 G N Caulking-ND

M-H1-4 Tan Ceramic Tile Mastic 1 Room 5 G N Mastic-ND

SC-H1-1 White Ceiling Skim Coat 1 Room 1 G Y Skim Coat-ND

SC-H1-2 White Ceiling Skim Coat 1 Room 37 G Y Skim Coat-ND

SC-H1-3 White Ceiling Skim Coat 1 Room 74 G Y Skim Coat-ND

Sink-H1-1 Tan Sink Undercoat 1 Room 3 G Y Sink Undercoat-ND

SC-H2-1 White Ceiling Skim Coat 1 Room 2 G Y Skim Coat-ND

SC-H2-2 White Ceiling Skim Coat 1 Room 5 G Y Skim Coat-ND

P-H1-1 Gray Plaster with White Skim Coat 1 Room 2 G Y Plaster-ND, Skim Coat-ND

P-H1-2 Gray Plaster with White Skim Coat 1 Room 10 G Y Plaster-ND, Skim Coat-ND

P-H1-3 Gray Plaster with White Skim Coat 2 Room 38 G Y Plaster-ND, Skim Coat-ND

P-H1-4 Gray Plaster with White Skim Coat 2 Room 56 G Y Plaster-ND, Skim Coat-ND

P-H1-5 Gray Plaster with White Skim Coat 3 Room 74 G Y Plaster-ND, Skim Coat-ND

SC-H3-1 White Ceiling Skim Coat 1 Room 10 G Y Skim Coat-ND

ND - NONE DETECTED

G - Good, F - Fair, P - Poor

Y- Yes, N - NoPage 4 of 57

B - Basement

Ext - Exterior

*Approximate fitting locations are included on floor plans

Page 16: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

Table 1: Summary of Asbestos Samples and Results

1220 Independence Avenue

Kansas City, Missouri 64106

Sample Number Material Description Floor Location(s) Condition Friable Sample AnalysisLocation(s) of Asbestos Containing

MaterialsQuantities

SC-H3-2 White Ceiling Skim Coat 1 Room 15 G Y Skim Coat-ND

SC-H3-3 White Ceiling Skim Coat 1 Room 18 G Y Skim Coat-ND

WC-H1-1 White Window Caulking Ext North Side Window G N Caulking-ND

WC-H1-2 White Window Caulking Ext South Side Window G N Caulking-ND

WC-H1-3 White Window Caulking Ext West Side Window G N Caulking-ND

SC-H4-1 White Ceiling Skim Coat 1 Room 19 G Y Skim Coat-ND

SC-H4-2 White Ceiling Skim Coat 1 Room 22 G Y Skim Coat-ND

SC-H4-3 White Ceiling Skim Coat 1 Room 25 G Y Skim Coat-ND

SC-H5-1 White Ceiling Skim Coat 1 Room 28 G Y Skim Coat-ND

SC-H5-2 White Ceiling Skim Coat 1 Room 32 G Y Skim Coat-ND

SC-H5-3 White Ceiling Skim Coat 1 Room 36 G Y Skim Coat-ND

DC-H1-1 White Door Caulking Ext 1206 Door G N Caulking-ND

DC-H1-2 White Door Caulking Ext 1204 A Door G N Caulking-ND

DC-H1-3 White Door Caulking Ext 1200 B Door G N Caulking-ND

Roof-H1-1 Black Roof Shingle Roof North End of Roof G N Shingle-ND

Roof-H1-2 Black Roof Shingle Roof South End of Roof G N Shingle-ND

SC-H6-1 White Ceiling Skim Coat 2 Room 38 G Y Skim Coat-ND

SC-H6-2 White Ceiling Skim Coat 2 Room 42 G Y Skim Coat-ND

ND - NONE DETECTED

G - Good, F - Fair, P - Poor

Y- Yes, N - NoPage 5 of 57

B - Basement

Ext - Exterior

*Approximate fitting locations are included on floor plans

Page 17: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

Table 1: Summary of Asbestos Samples and Results

1220 Independence Avenue

Kansas City, Missouri 64106

Sample Number Material Description Floor Location(s) Condition Friable Sample AnalysisLocation(s) of Asbestos Containing

MaterialsQuantities

SC-H6-3 White Ceiling Skim Coat 2 Room 46 G Y Skim Coat-ND

SC-H7-1 White Ceiling Skim Coat 2 Room 47 G Y Skim Coat-ND

SC-H7-2 White Ceiling Skim Coat 2 Room 52 G Y Skim Coat-ND

SC-H7-3 White Ceiling Skim Coat 2 Room 55 G Y Skim Coat-ND

SC-H8-1White Ceiling Skim Coat with White

Drywall2 Room 56 G Y Skim Coat-ND, Drywall-ND

SC-H8-2 White Ceiling Skim Coat 2 Room 58 G Y Skim Coat-ND

SC-H8-3 White Ceiling Skim Coat 2 Room 62 G Y Skim Coat-ND

SC-H9-1 White Ceiling Skim Coat 2 Room 65 G Y Skim Coat-ND

SC-H9-2 White Ceiling Skim Coat 2 Room 69 G Y Skim Coat-ND

SC-H9-3 White Ceiling Skim Coat 2 Room 72 G Y Skim Coat-ND

SC-H10-1 White Ceiling Skim Coat 3 Room 75 G Y Skim Coat-ND

SC-H10-2 White Ceiling Skim Coat 3 Room 79 G Y Skim Coat-ND

SC-H10-3 White Ceiling Skim Coat 3 Room 82 G Y Skim Coat-ND

SC-H11-1 White Ceiling Skim Coat 3 Room 83 G Y Skim Coat-ND

SC-H11-2 White Ceiling Skim Coat 3 Room 86 G Y Skim Coat-ND

SC-H11-3 White Ceiling Skim Coat 3 Room 90 G Y Skim Coat-ND

SC-H12-2 White Ceiling Skim Coat 3 Room 95 G Y Skim Coat-ND

SC-H12-3 White Ceiling Skim Coat 3 Room 100 G Y Skim Coat-ND

ND - NONE DETECTED

G - Good, F - Fair, P - Poor

Y- Yes, N - NoPage 6 of 57

B - Basement

Ext - Exterior

*Approximate fitting locations are included on floor plans

Page 18: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

Table 1: Summary of Asbestos Samples and Results

1220 Independence Avenue

Kansas City, Missouri 64106

Sample Number Material Description Floor Location(s) Condition Friable Sample AnalysisLocation(s) of Asbestos Containing

MaterialsQuantities

SC-H13-1 White Ceiling Skim Coat 3 Room 101 G Y Skim Coat-ND

SC-H13-2 White Paint 3 Room 105 G Y Paint - ND

SC-H13-3 White Ceiling Skim Coat 3 Room 109 G Y Skim Coat-ND

DWJC-H1-1 Drywall with White Joint Compound B Room 110 F N

Drywall-ND, Joint Compound- Point

Count - 2.30% Chrysotile (Composite-

Point Count <0.25% Chrysotile)

DWJC-H1-2 Drywall with White Joint Compound B Room 110 F N

Drywall-ND, Joint Compound- Point

Count - 2.25% Chrysotile (Composite-

Point Count <0.25% Chrysotile)

DWJC-H1-3 Drywall with White Joint Compound B Room 110 F N

Drywall-ND, Joint Compound- Point

Count - 3.50% Chrysotile (Composite-

Point Count <0.75% Chrysotile)

Stuc-H1-1 White Stucco 1 Room 1 G N Stucco-ND

Stuc-H1-2 White Stucco 2 Room 21 G N Stucco-ND

1208-PI-H1-1 Tan Pipe Insulation 1 Room 12 G Y Insulation-5% Amosite

1208-PI-H1-2 Tan Pipe Insulation 2 Room 19 G Y Insulation-5% Amosite

SC-H1-1 White Ceiling Skim Coat 1 Room 3 G Y Skim Coat-ND

SC-H1-2 White Ceiling Skim Coat 1 Room 7 G Y Skim Coat-ND

SC-H1-3 White Ceiling Skim Coat 1 Room 9 G Y Skim Coat-ND

Sink-H1-1 Tan Sink Undercoat 1 Room 4 G N Sink Undercoat-ND

P-H1-1 Gray Plaster with White Skim Coat 1 Room 4 G Y Plaster-ND, Skim Coat-ND

P-H1-2 Gray Plaster with White Skim Coat 1 Room 9 G Y Plaster-ND, Skim Coat-ND

1208 Independence Avenue

See 1200-PI-H1-1

ND - NONE DETECTED

G - Good, F - Fair, P - Poor

Y- Yes, N - NoPage 7 of 57

B - Basement

Ext - Exterior

*Approximate fitting locations are included on floor plans

Page 19: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

Table 1: Summary of Asbestos Samples and Results

1220 Independence Avenue

Kansas City, Missouri 64106

Sample Number Material Description Floor Location(s) Condition Friable Sample AnalysisLocation(s) of Asbestos Containing

MaterialsQuantities

P-H1-3 Gray Plaster with White Skim Coat 2 Room 22 G Y Plaster-ND, Skim Coat-ND

P-H1-4 Gray Plaster with White Skim Coat 2 Room 35 G Y Plaster-ND, Skim Coat-ND

P-H1-5 Gray Plaster with White Skim Coat 3 Room 50 G Y Plaster-ND, Skim Coat-ND

FTM-H1-512"x12" White Mottled Floor Tile with

Yellow Mastic1 Room 4 G N Floor Tile-ND, Mastic-ND

FTM-H3-512"x12" Blue Mottled Floor Tile with

Yellow Mastic1 Room 4 G N Floor Tile-ND, Mastic-ND

CBM-H1-5 4" White Cove Base with Tan Mastic 1 Room 4 G N Cove Base-ND, Mastic-ND

M-H1-5Tan Ceramic Tile Mastic with White Joint

Compound1 Room 5 G N Mastic-ND, Joint Compound-ND

SC-H2-1 White Ceiling Skim Coat 1 Room 10 G Y Skim Coat-ND

SC-H2-2 White Ceiling Skim Coat 1 Room 15 G Y Skim Coat-ND

SC-H2-3 White Ceiling Skim Coat 1 Room 19 G Y Skim Coat-ND

SC-H3-1 White Ceiling Skim Coat 2 Room 22 G Y Skim Coat-ND

SC-H3-2 White Ceiling Skim Coat 2 Room 27 G Y Skim Coat-ND

SC-H3-3 White Ceiling Skim Coat 2 Room 30 G Y Skim Coat-ND

SC-H4-1 White Ceiling Skim Coat 2 Room 33 G Y Skim Coat-ND

SC-H4-2 White Ceiling Skim Coat 2 Room 35 G Y Skim Coat-ND

SC-H4-3 White Ceiling Skim Coat 2 Room 38 G Y Skim Coat-ND

SC-H5-1 White Ceiling Skim Coat 3 Room 41 G Y Skim Coat-ND

SC-H5-2 White Ceiling Skim Coat 3 Room 43 G Y Skim Coat-ND

ND - NONE DETECTED

G - Good, F - Fair, P - Poor

Y- Yes, N - NoPage 8 of 57

B - Basement

Ext - Exterior

*Approximate fitting locations are included on floor plans

Page 20: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

Table 1: Summary of Asbestos Samples and Results

1220 Independence Avenue

Kansas City, Missouri 64106

Sample Number Material Description Floor Location(s) Condition Friable Sample AnalysisLocation(s) of Asbestos Containing

MaterialsQuantities

SC-H5-3 White Ceiling Skim Coat 3 Room 45 G Y Skim Coat-ND

SC-H6-1 White Ceiling Skim Coat 3 Room 50 G Y Skim Coat-ND

SC-H6-2 White Ceiling Skim Coat 3 Room 54 G Y Skim Coat-ND

SC-H6-3 White Ceiling Skim Coat 3 Room 58 G Y Skim Coat-ND

Roof-H1-1 Black Roof Shingle Roof North End of Roof G N Shingle-ND

Roof-H1-2 Black Roof Shingle Roof South End of Roof G N Shingle-ND

WC-H1-1 White Window Caulking Ext 1208 Door G N Caulking-ND

WC-H1-2 White Window Caulking Ext 1208 A Door G N Caulking-ND

WC-H1-3 White Window Caulking Ext 1208 B Door G N Caulking-ND

WC-H1-1 White Window Caulking Ext North Side Window G N Caulking-ND

WC-H1-2 White Window Caulking Ext South Side Window G N Caulking-ND

WC-H1-3 White Window Caulking Ext East Side Window G N Caulking-ND

DC-H1-1 White Door Caulking Ext 1216 Door G N Caulking-ND

DC-H1-2 White Door Caulking Ext 1216 1/2 A Door G N Caulking-ND

DC-H1-3 White Door Caulking Ext 1216 B Door G N Caulking-ND

Stuc-H1-1 Tan Stucco Ext Room 2 G N Stucco-ND

Stuc-H1-2 Tan Stucco Ext Room 2 G N Stucco-ND

1216 Independence Avenue

ND - NONE DETECTED

G - Good, F - Fair, P - Poor

Y- Yes, N - NoPage 9 of 57

B - Basement

Ext - Exterior

*Approximate fitting locations are included on floor plans

Page 21: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

Table 1: Summary of Asbestos Samples and Results

1220 Independence Avenue

Kansas City, Missouri 64106

Sample Number Material Description Floor Location(s) Condition Friable Sample AnalysisLocation(s) of Asbestos Containing

MaterialsQuantities

SC-H1-1 White Ceiling Skim Coat 1 Room 1 G N Skim Coat-ND

SC-H1-2 White Ceiling Skim Coat 1 Room 2 G N Skim Coat-ND

Roof-H1-1 Black Roof Shingle Roof East End of Rood G N Shingle-ND

Roof-H1-2 Black Roof Shingle Roof West End of Roof G N Shingle-ND

SC-H2-1 White Ceiling Skim Coat 1 Room 2 G Y Skim Coat-ND

SC-H2-2 White Ceiling Skim Coat 1 Room 7 G Y Skim Coat-ND

SC-H2-3 White Ceiling Skim Coat 1 Room 9 G Y Skim Coat-ND

Sink-H1-1 Tank Sink Undercoat 1 Room 4 G N Sink Undercoat-ND

1216-PI-H1-1 Tan Pipe Insulation 2 Room 26 G Y Insulation-5% Amosite

1216-PI-H1-2 Tan Pipe Insulation 3 Room 33 G Y Insulation-5% Amosite

P-H1-1Gray Plaster with White Skim Coat and

White Wall Texture1 Room 9 G Y

Plaster-ND, Skim Coat-ND, Wall

Texture-ND

P-H1-2 Gray Plaster with White Skim Coat 1 Room 16 G Y Plaster-ND, Skim Coat-ND

P-H1-3 Gray Plaster with White Skim Coat 2 Room 24 G Y Plaster-ND, Skim Coat-ND

P-H1-4 Gray Plaster with White Skim Coat 2 Room 31 G Y Plaster-ND, Skim Coat-ND

P-H1-5 Gray Plaster with White Skim Coat 3 Room 38 G Y Plaster-ND, Skim Coat-ND

FTM-H1-612"x12" White Mottled Floor Tile with

Yellow Mastic1 Room 4 G N Floor Tile-ND, Mastic-ND

CBM-H1-6 4" White Cove Base with Yellow Mastic 1 Room 4 G N Cove Base-ND, Mastic-ND

CBM-H2-2 4" Gray Cove Base with Yellow Mastic 1 Room 5 G N Cove Base-ND, Mastic-ND

See 1200-PI-H1-1

ND - NONE DETECTED

G - Good, F - Fair, P - Poor

Y- Yes, N - NoPage 10 of 57

B - Basement

Ext - Exterior

*Approximate fitting locations are included on floor plans

Page 22: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

Table 1: Summary of Asbestos Samples and Results

1220 Independence Avenue

Kansas City, Missouri 64106

Sample Number Material Description Floor Location(s) Condition Friable Sample AnalysisLocation(s) of Asbestos Containing

MaterialsQuantities

FTM-H2-412"x12" Red Mottled Floor Tile with

Yellow Mastic1 Room 5 G N Floor Tile-ND, Mastic-ND

C-H1-6 White Bathtub Caulking 1 Room 5 G N Caulking-ND

M-H1-6 Tan Ceramic Tile Mastic 1 Room 5 G N Mastic-ND

SC-H3-1 White Ceiling Skim Coat 1 Room 10 G Y Skim Coat-ND

SC-H3-2 White Ceiling Skim Coat 1 Room 12 G Y Skim Coat-ND

SC-H3-3 White Ceiling Skim Coat 1 Room 16 G Y Skim Coat-ND

PW-H1-1 Tan Pipe Wrap 1 Room 5 G Y Pipe Wrap-ND

PW-H1-2 Tan Pipe Wrap 2 Room 27 G Y Pipe Wrap-ND

PW-H1-3 Tan Pipe Wrap 3 Room 34 G Y Pipe Wrap-ND

GD-H1-6 Brown Glue Dot 1 Room 5 G N Glue Dot - ND

DWJC-H1-1 White Drywall 1 Room 5 G N Drywall-ND

DWJC-H1-2 White Drywall 2 Room 27 G N Drywall-ND

DWJC-H1-3 White Drywall 3 Room 34 G N Drywall-ND

WC-H1-1 White Window Caulking Ext North Side Window G N Caulking-ND

WC-H1-2 White Window Caulking Ext East Side Window G N Caulking-ND

WC-H1-3 White Window Caulking Ext West Side Window G N Caulking-ND

DC-H1-1 White Door Caulking Ext 1210 Door G N Caulking-ND

1210 Independence Avenue

ND - NONE DETECTED

G - Good, F - Fair, P - Poor

Y- Yes, N - NoPage 11 of 57

B - Basement

Ext - Exterior

*Approximate fitting locations are included on floor plans

Page 23: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

Table 1: Summary of Asbestos Samples and Results

1220 Independence Avenue

Kansas City, Missouri 64106

Sample Number Material Description Floor Location(s) Condition Friable Sample AnalysisLocation(s) of Asbestos Containing

MaterialsQuantities

DC-H1-2 White Door Caulking Ext 1210 A Door G N Caulking-ND

DC-H1-3 White Door Caulking Ext 1210 1/2 B Door G N Caulking-ND

Stuc-H1-1 Tan Stucco Ext Room 1 G N Stucco-ND

Stuc-H1-2 Tan Stucco Ext Room 2 G N Stucco-ND

Roof-H1-1 Black Roof Shingle Roof South End of Roof G N Shingle-ND

Roof-H1-2 Black Roof Shingle Roof North End of Roof G N Shingle-ND

PW-H1-1 Tan Pipe Wrap 1 Room 5 G Y Pipe Wrap-ND

PW-H1-2 Tan Pipe Wrap 2 Room 27 G Y Pipe Wrap-ND

PW-H1-3 Tan Pipe Wrap 3 Room 34 G Y Pipe Wrap-ND

Sink-H1-1 Tan Sink Undercoat 1 Room 4 G N Sink Undercoat-ND

FTM-H1-7

12"x12" White Mottled Floor Tile with

Yellow Mastic and Gray Leveling

Compound

1 Room 4 G NFloor Tile-ND, Mastic-ND, Leveling

Compound-ND

FTM-H3-6

12"x12" Blue Mottled Floor Tile with

Yellow Mastic and Gray Leveling

Compound

1 Room 4 G NFloor Tile-ND, Mastic-ND, Leveling

Compound-ND

P-H1-1 Gray Plaster with White Skim Coat 1 Room 9 G Y Plaster-ND, Skim Coat-ND

P-H1-2 Gray Plaster with White Skim Coat 1 Room 16 G Y Plaster-ND, Skim Coat-ND

P-H1-3Gray Plaster with White Skim Coat and

White Wall Texture2 Room 24 G Y

Plaster-ND, Skim Coat-ND, Wall

Texture-ND

P-H1-4Gray Plaster with White Skim Coat and

White Wall Texture3 Room 31 G Y

Plaster-ND, Skim Coat-ND, Wall

Texture-ND

P-H1-5Gray Plaster with White Skim Coat and

White Wall Texture3 Room 38 G Y

Plaster-ND, Skim Coat-ND, Wall

Texture-ND

CBM-H1-7 4" White Cove Base with Yellow Mastic 1 Room 4 G N Cove Base-ND, Mastic-ND

ND - NONE DETECTED

G - Good, F - Fair, P - Poor

Y- Yes, N - NoPage 12 of 57

B - Basement

Ext - Exterior

*Approximate fitting locations are included on floor plans

Page 24: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

Table 1: Summary of Asbestos Samples and Results

1220 Independence Avenue

Kansas City, Missouri 64106

Sample Number Material Description Floor Location(s) Condition Friable Sample AnalysisLocation(s) of Asbestos Containing

MaterialsQuantities

C-H1-7 White Bathtub Caulking 1 Room 5 G N Caulking-ND

M-H1-7 Tan Ceramic Tile Mastic 1 Room 5 G N Mastic-ND

SC-H1-1 White Ceiling Skim Coat 1 Room 4 G Y Skim Coat-ND

SC-H1-2 White Ceiling Skim Coat 1 Room 7 G Y Skim Coat-ND

SC-H1-3 White Ceiling Skim Coat 1 Room 9 G Y Skim Coat-ND

SC-H2-1 White Ceiling Skim Coat 1 Room 10 G Y Skim Coat-ND

SC-H2-2 White Ceiling Skim Coat 1 Room 12 G Y Skim Coat-ND

SC-H2-3 White Ceiling Skim Coat 1 Room 16 G Y Skim Coat-ND

SC-H3-1 White Ceiling Skim Coat 2 Room 17 G Y Skim Coat-ND

SC-H3-2 White Ceiling Skim Coat 2 Room 20 G Y Skim Coat-ND

SC-H3-3 White Ceiling Skim Coat 2 Room 24 G Y Skim Coat-ND

SC-H4-1 White Ceiling Skim Coat 2 Room 25 G Y Skim Coat-ND

SC-H4-2 White Ceiling Skim Coat 2 Room 27 G Y Skim Coat-ND

SC-H4-3 White Ceiling Skim Coat 2 Room 30 G Y Skim Coat-ND

SC-H5-1 White Ceiling Skim Coat 3 Room 32 G Y Skim Coat-ND

SC-H5-2 White Ceiling Skim Coat 3 Room 37 G Y Skim Coat-ND

SC-H5-3 White Ceiling Skim Coat 3 Room 38 G Y Skim Coat-ND

SC-H6-1 White Ceiling Skim Coat 3 Room 39 G Y Skim Coat-ND

ND - NONE DETECTED

G - Good, F - Fair, P - Poor

Y- Yes, N - NoPage 13 of 57

B - Basement

Ext - Exterior

*Approximate fitting locations are included on floor plans

Page 25: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

Table 1: Summary of Asbestos Samples and Results

1220 Independence Avenue

Kansas City, Missouri 64106

Sample Number Material Description Floor Location(s) Condition Friable Sample AnalysisLocation(s) of Asbestos Containing

MaterialsQuantities

SC-H6-2 White Ceiling Skim Coat 3 Room 41 G Y Skim Coat-ND

SC-H6-3 White Ceiling Skim Coat 3 Room 45 G Y Skim Coat-ND

GD-H1-7 Brown Glue Dot 1 Room 5 G N Glue Dot - ND

DWJC-H1-1 White Drywall 1 Room 5 G N Drywall-ND

DWJC-H1-2 White Drywall 2 Room 27 G N Drywall-ND

DWJC-H1-3 White Drywall 3 Room 34 G N Drywall-ND

Stuc-H1-1 White Stucco Ext Room 1 G N Stucco-ND

Stuc-H1-2 White Stucco Ext Room 26 G N Stucco-ND

WC-H1-1 White Window Caulking Ext East Side Window G N

WC-H1-2 White Window Caulking Ext South Side Window G N

DC-H1-1 White Door Caulking Ext 1214 Door G N Caulking-ND

DC-H1-2 White Door Caulking Ext 1212 B Door G N Caulking-ND

1212-PI-H1-1 Tan Pipe Insulation 1 Room 25 G Y Insulation-10% Amosite

1212-PI-H1-2 Tan Pipe Insulation 2 Room 47 G Y Insulation-5% Amosite

PW-H1-1 Tan Pipe Wrap 1 Room 15 G Y Pipe Wrap-ND

PW-H1-2 Tan Pipe Wrap 2 Room 47 G Y Pipe Wrap-ND

PW-H1-3 Tan Pipe Wrap 3 Room 60 G Y Pipe Wrap-ND

1212-1214 Independence Avenue

All Exterior Windows 96 Windows @ 15 Linear Feet (LF) Each (1,440 LF Total)

See 1200-PI-H1-1

Caulking-8% Chrysotile

ND - NONE DETECTED

G - Good, F - Fair, P - Poor

Y- Yes, N - NoPage 14 of 57

B - Basement

Ext - Exterior

*Approximate fitting locations are included on floor plans

Page 26: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

Table 1: Summary of Asbestos Samples and Results

1220 Independence Avenue

Kansas City, Missouri 64106

Sample Number Material Description Floor Location(s) Condition Friable Sample AnalysisLocation(s) of Asbestos Containing

MaterialsQuantities

P-H1-1Gray Plaster with White Skim Coat and

White Wall Texture1 Room 4 G Y

Plaster-ND, Skim Coat-ND, Wall

Texture-ND

P-H1-2Gray Plaster with White Skim Coat and

White Wall Texture1 Room 15 G Y

Plaster-ND, Skim Coat-ND, Wall

Texture-ND

P-H1-3Gray Plaster with White Skim Coat and

White Wall Texture2 Room 34 G Y

Plaster-ND, Skim Coat-ND, Wall

Texture-ND

P-H1-4Gray Plaster with White Skim Coat and

White Wall Texture3 Room 52 G Y

Plaster-ND, Skim Coat-ND, Wall

Texture-ND

P-H1-5Gray Plaster with White Skim Coat and

White Wall Texture3 Room 61 G Y

Plaster-ND, Skim Coat-ND, Wall

Texture-ND

FTM-H1-812"x12" White Mottled Floor Tile with

Yellow Mastic1 Room 5 G N Floor Tile-ND, Mastic-ND

FTM-H2-512"x12" Red Mottled Floor Tile with

Yellow Mastic1 Room 5 G N Floor Tile-ND, Mastic-ND

Sink-H1-1 Tan Sink Undercoat 1 Room 7 G N Sink Undercoat-ND

CBM-H1-8 4" White Cove Base with Yellow Mastic 1 Room 5 G N Cove Base-ND, Mastic-ND

M-H1-8 Tan Ceramic Tile Mastic 1 Room 7 G N Mastic-ND

C-H1-8White Bathtub Caulking with White Skim

Coat1 Room 7 G N Caulking-ND, Skim Coat-ND

SC-H1-1White Ceiling Skim Coat with White

Texture1 Room 6 G Y Texture-ND, Skim Coat-ND

SC-H1-2White Ceiling Skim Coat with White

Texture1 Room 2 G Y Texture-ND, Skim Coat-ND

SC-H1-3White Ceiling Skim Coat with White

Texture1 Room 3 G Y Texture-ND, Skim Coat-ND

DWJC-H1-1 Drywall with White Joint Compound 1 Room 3 G N

Drywall-ND, Joint Compound-4%

Chrysotile (Composite-<1.0%

Chrysotile)

DWJC-H1-2 Drywall with White Joint Compound 2 Room 47 G N

Drywall-ND, Joint Compound-4%

Chrysotile (Composite-<0.75%

Chrysotile)

DWJC-H1-3 Drywall with White Joint Compound 3 Room 55 G N

Drywall-ND, Joint Compound-4%

Chrysotile (Composite-<0.75%

Chrysotile)

SC-H2-1 White Ceiling Skim Coat 1 Room 8 G Y Skim Coat-ND

ND - NONE DETECTED

G - Good, F - Fair, P - Poor

Y- Yes, N - NoPage 15 of 57

B - Basement

Ext - Exterior

*Approximate fitting locations are included on floor plans

Page 27: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

Table 1: Summary of Asbestos Samples and Results

1220 Independence Avenue

Kansas City, Missouri 64106

Sample Number Material Description Floor Location(s) Condition Friable Sample AnalysisLocation(s) of Asbestos Containing

MaterialsQuantities

SC-H2-2 White Ceiling Skim Coat 1 Room 10 G Y Skim Coat-ND

SC-H2-3 White Ceiling Skim Coat 1 Room 11 G Y Skim Coat-ND

SC-H3-1 White Ceiling Skim Coat 1 Room 15 G Y Skim Coat-ND

SC-H3-2 White Ceiling Skim Coat 1 Room 17 G Y Skim Coat-ND

SC-H3-3 White Ceiling Skim Coat 1 Room 18 G Y Skim Coat-ND

SC-H4-1 White Ceiling Skim Coat 1 Room 21 G Y Skim Coat-ND

SC-H4-2 White Ceiling Skim Coat 1 Room 22 G Y Skim Coat-ND

SC-H4-3 White Ceiling Skim Coat 1 Room 25 G Y Skim Coat-ND

SC-H5-1 White Ceiling Skim Coat 2 Room 28 G Y Skim Coat-ND

SC-H5-2 White Ceiling Skim Coat 2 Room 29 G Y Skim Coat-ND

SC-H5-3 White Ceiling Skim Coat 2 Room 32 G Y Skim Coat-ND

SC-H6-1 White Ceiling Skim Coat 2 Room 34 G Y Skim Coat-ND

SC-H6-2 White Ceiling Skim Coat 2 Room 35 G Y Skim Coat-ND

SC-H6-3 White Ceiling Skim Coat 2 Room 37 G Y Skim Coat-ND

SC-H7-1 White Ceiling Skim Coat 2 Room 40 G Y Skim Coat-ND

SC-H7-2 White Ceiling Skim Coat 2 Room 42 G Y Skim Coat-ND

SC-H7-3 White Ceiling Skim Coat 2 Room 44 G Y Skim Coat-ND

SC-H8-1 White Ceiling Skim Coat 2 Room 46 G Y Skim Coat-ND

ND - NONE DETECTED

G - Good, F - Fair, P - Poor

Y- Yes, N - NoPage 16 of 57

B - Basement

Ext - Exterior

*Approximate fitting locations are included on floor plans

Page 28: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

Table 1: Summary of Asbestos Samples and Results

1220 Independence Avenue

Kansas City, Missouri 64106

Sample Number Material Description Floor Location(s) Condition Friable Sample AnalysisLocation(s) of Asbestos Containing

MaterialsQuantities

SC-H8-2 White Ceiling Skim Coat 2 Room 48 G Y Skim Coat-ND

SC-H8-3 White Ceiling Skim Coat 2 Room 49 G Y Skim Coat-ND

SC-H9-1 White Ceiling Skim Coat 3 Room 53 G Y Skim Coat-ND

SC-H9-2 White Ceiling Skim Coat 3 Room 55 G Y Skim Coat-ND

SC-H9-3 White Ceiling Skim Coat 3 Room 57 G Y Skim Coat-ND

SC-H10-1 White Ceiling Skim Coat 3 Room 59 G Y Skim Coat-ND

SC-H10-2 White Ceiling Skim Coat 3 Room 61 G Y Skim Coat-ND

SC-H10-3 White Ceiling Skim Coat 3 Room 62 G Y Skim Coat-ND

SC-H11-1 White Ceiling Skim Coat 3 Room 64 G Y Skim Coat-ND

SC-H11-2 White Ceiling Skim Coat 3 Room 65 G Y Skim Coat-ND

SC-H11-3 White Ceiling Skim Coat 3 Room 67 G Y Skim Coat-ND

SC-H12-1 White Ceiling Skim Coat 3 Room 70 G Y Skim Coat-ND

SC-H12-2 White Ceiling Skim Coat 3 Room 72 G Y Skim Coat-ND

SC-H12-3 White Ceiling Skim Coat 3 Room 74 G Y Skim Coat-ND

Roof-H1-1 Black Roof Shingle Roof South End of Roof G N Shingle-ND

Roof-H1-2 Black Roof Shingle Roof North End of Roof G N Shingle-ND

GD-H1-8Brown Shower Glue Dot with White Joint

Compound1 Room 7 G N Glue Dot-ND, Joint Compound-ND

1324-1326 Independence Avenue

ND - NONE DETECTED

G - Good, F - Fair, P - Poor

Y- Yes, N - NoPage 17 of 57

B - Basement

Ext - Exterior

*Approximate fitting locations are included on floor plans

Page 29: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

Table 1: Summary of Asbestos Samples and Results

1220 Independence Avenue

Kansas City, Missouri 64106

Sample Number Material Description Floor Location(s) Condition Friable Sample AnalysisLocation(s) of Asbestos Containing

MaterialsQuantities

WC-H1-1 White Window Caulking Ext North Side Window G N Caulking-ND

WC-H1-2 White Window Caulking Ext South Side Window G N Caulking-ND

DC-H1-1 White Door Caulking Ext 1324 Door G N Caulking-ND

DC-H1-2 White Door Caulking Ext 1326 B Door G N Caulking-ND

Stuc-H1-1 White Stucco Ext Room 1 G N Stucco-ND

Stuc-H1-2 White Stucco Ext Room 2 G N Stucco-ND

Roof-H1-1 Black Roof Shingle Roof South End of Roof G N Shingle-ND

Roof-H1-2 Black Roof Shingle Roof North End of Roof G N Shingle-ND

Sink-H1-1 Tan Sink Undercoat 1 Room 4 G N Sink Undercoat-ND

FTM-H1-912"x12" White Mottled Floor Tile with

Yellow Mastic1 Room 3 G N Floor Tile-ND, Mastic-ND

FTM-H3-512"x12" Blue Mottled Floor Tile with

Yellow Mastic1 Room 3 G N Floor Tile-ND, Mastic-ND

CBM-H1-9 4" White Cove Base with Yellow Mastic 1 Room 3 G N Cove Base-ND, Mastic-ND

M-H1-9 Tan Ceramic Tile Mastic 1 Room 4 G N Mastic-ND

C-H1-9 White Bathtub Caulking 1 Room 4 G N Caulking-ND

P-H1-1 Tan Plaster with White Skim Coat 1 Room 9 G Y Plaster-ND, Skim Coat-ND

P-H1-2 Tan Plaster with White Skim Coat 1 Room 12 G Y Plaster-ND, Skim Coat-ND

P-H1-3 Tan Plaster with White Skim Coat 2 Room 18 G Y Plaster-ND, Skim Coat-ND

P-H1-4 Tan Plaster with White Skim Coat 2 Room 29 G Y Plaster-ND, Skim Coat-ND

ND - NONE DETECTED

G - Good, F - Fair, P - Poor

Y- Yes, N - NoPage 18 of 57

B - Basement

Ext - Exterior

*Approximate fitting locations are included on floor plans

Page 30: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

Table 1: Summary of Asbestos Samples and Results

1220 Independence Avenue

Kansas City, Missouri 64106

Sample Number Material Description Floor Location(s) Condition Friable Sample AnalysisLocation(s) of Asbestos Containing

MaterialsQuantities

P-H1-5 Tan Plaster with White Skim Coat 3 Room 32 G Y Plaster-ND, Skim Coat-ND

DWJC-H1-1White Drywall with White Joint

Compound1 Room 7 G N

Drywall-ND, Joint Compound-4%

Chrysotile (Composite-<1% Chrysotile)

DWJC-H1-2 White Drywall 2 Room 21 G N Drywall-ND

DWJC-H1-3White Drywall with White Joint

Compound3 Room 42 G N

Drywall-ND, Joint Compound-4%

Chrysotile (Composite-<1% Chrysotile)

SC-H1-1 White Ceiling Skim Coat 1 Room 6 G Y Skim Coat-ND

SC-H1-2 White Ceiling Skim Coat 1 Room 8 G Y Skim Coat-ND

SC-H1-3 White Ceiling Skim Coat 1 Room 9 G Y Skim Coat-ND

SC-H2-1 White Ceiling Skim Coat 1 Room 11 G Y Skim Coat-ND

SC-H2-2 White Ceiling Skim Coat 1 Room 13 G Y Skim Coat-ND

SC-H2-3 White Ceiling Skim Coat 1 Room 16 G Y Skim Coat-ND

SC-H3-1 White Ceiling Skim Coat 2 Room 18 G Y Skim Coat-ND

SC-H3-2 White Ceiling Skim Coat 2 Room 20 G Y Skim Coat-ND

SC-H3-3 White Ceiling Skim Coat 2 Room 21 G Y Skim Coat-ND

SC-H4-1 White Ceiling Skim Coat 2 Room 25 G Y Skim Coat-ND

SC-H4-2 White Ceiling Skim Coat 2 Room 29 G Y Skim Coat-ND

SC-H4-3 White Ceiling Skim Coat 2 Room 30 G Y Skim Coat-ND

SC-H5-1 White Ceiling Skim Coat 3 Room 32 G Y Skim Coat-ND

SC-H5-2 White Ceiling Skim Coat 3 Room 35 G Y Skim Coat-ND

ND - NONE DETECTED

G - Good, F - Fair, P - Poor

Y- Yes, N - NoPage 19 of 57

B - Basement

Ext - Exterior

*Approximate fitting locations are included on floor plans

Page 31: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

Table 1: Summary of Asbestos Samples and Results

1220 Independence Avenue

Kansas City, Missouri 64106

Sample Number Material Description Floor Location(s) Condition Friable Sample AnalysisLocation(s) of Asbestos Containing

MaterialsQuantities

SC-H5-3 White Ceiling Skim Coat 3 Room 36 G Y Skim Coat-ND

SC-H6-1 White Ceiling Skim Coat 3 Room 38 G Y Skim Coat-ND

SC-H6-2 White Ceiling Skim Coat 3 Room 40 G Y Skim Coat-ND

SC-H6-3 White Ceiling Skim Coat 3 Room 43 G Y Skim Coat-ND

GD-H1-9 Brown Shower Glue Dot 1 Room 4 G N Glue Dot-ND

FTM-H1-1012"x12" White Mottled Floor Tile with

Yellow Mastic1 Room 7 G N Floor Tile-ND, Mastic-ND

FTM-H4-1 12"x12" Gray Mottled Floor Tile 1 Room 7 G N Floor Tile-ND

FTM-H3-712"x12" Blue Mottled Floor Tile with

Yellow Mastic1 Room 7 G N Floor Tile-ND, Mastic-ND

Sink-H1-1 Tan Sink Undercoat 1 Room 4 G N Sink Undercoat-ND

SC-H1-1 White Paint 1 Room 5 G Y White Paint-ND

SC-H1-2 White Paint 1 Room 6 G Y White Paint-ND

SC-H1-3 White Texture 1 Room 8 G Y White Texture-ND

PW-H1-1 Black Pipe Wrap with Tan Pipe Wrap 1 Room 4 G Y Pipe Wrap-ND

PW-H1-2 Black Pipe Wrap with Tan Pipe Wrap 2 Room 39 G Y Pipe Wrap-ND

PW-H1-3 Black Pipe Wrap with Tan Pipe Wrap 3 Rom 82 G Y Pipe Wrap-ND

CBM-H1-104" White Cove Base with Tan Mastic and

Yellow Mastic1 Room 8 G N Cove Base-ND, Mastic-ND

C-H1-1 White Bathtub Caulking 1 Room 4 G N Caulking-ND

1328-1330-1332-1334 Independence Avenue

ND - NONE DETECTED

G - Good, F - Fair, P - Poor

Y- Yes, N - NoPage 20 of 57

B - Basement

Ext - Exterior

*Approximate fitting locations are included on floor plans

Page 32: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

Table 1: Summary of Asbestos Samples and Results

1220 Independence Avenue

Kansas City, Missouri 64106

Sample Number Material Description Floor Location(s) Condition Friable Sample AnalysisLocation(s) of Asbestos Containing

MaterialsQuantities

SC-H2-1 White Paint 1 Room 9 G Y White Paint-ND

SC-H2-2 White Texture 1 Room 11 G Y White Texture-ND

SC-H2-3 White Paint 1 Room 14 G Y White Paint-ND

SC-H3-1 White Texture 1 Room 17 G Y White Texture-ND

SC-H3-2 White Texture 1 Room 20 G Y White Texture-ND

SC-H3-3 White Paint 1 Room 22 G Y White Paint-ND

SC-H4-1 White Texture 1 Room 23 G Y White Texture-ND

SC-H4-2 White Texture 1 Room 25 G Y White Texture-ND

SC-H4-3 White Texture 1 Room 29 G Y White Texture-ND

SC-H5-1 White Paint 2 Room 32 G Y White Paint-ND

SC-H5-2 White Texture 2 Room 35 G Y White Texture-ND

SC-H5-3 White Texture 2 Room 37 G Y White Texture-ND

SC-H6-1 White Texture 2 Room 39 G Y White Texture-ND

SC-H6-2 White Paint 2 Room 40 G Y White Paint-ND

SC-H6-3 White Paint 2 Room 41 G Y White Paint-ND

SC-H7-1 White Paint 2 Room 52 G Y White Paint-ND

SC-H7-2 White Paint 2 Room 54 G Y White Paint-ND

SC-H7-3 White Paint 2 Room 56 G Y White Paint-ND

ND - NONE DETECTED

G - Good, F - Fair, P - Poor

Y- Yes, N - NoPage 21 of 57

B - Basement

Ext - Exterior

*Approximate fitting locations are included on floor plans

Page 33: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

Table 1: Summary of Asbestos Samples and Results

1220 Independence Avenue

Kansas City, Missouri 64106

Sample Number Material Description Floor Location(s) Condition Friable Sample AnalysisLocation(s) of Asbestos Containing

MaterialsQuantities

SC-H8-1 White Paint 2 Room 46 G Y White Paint-ND

SC-H8-2 White Texture 2 Room 47 G Y White Texture-ND

SC-H8-3 White Paint 2 Room 50 G Y White Paint-ND

SC-H9-1 White Texture 3 Room 60 G Y White Texture-ND

SC-H9-2 White Texture 3 Room 62 G Y White Texture-ND

SC-H9-3 White Paint 3 Room 65 G Y White Paint-ND

SC-H10-1 White Paint 3 Room 68 G Y White Paint-ND

SC-H10-2 White Paint 3 Room 70 G Y White Paint-ND

SC-H10-3 White Paint 3 Room 73 G Y White Paint-ND

SC-H11-1 White Texture 3 Room 75 G Y White Texture-ND

SC-H11-2 White Paint 3 Room 76 G Y White Paint-ND

SC-H11-3 White Texture 3 Room 79 G Y White Texture-ND

SC-H12-1 White Texture 3 Room 82 G Y White Texture-ND

SC-H12-2 White Texture 3 Room 85 G Y White Texture-ND

SC-H12-3 White Texture 3 Room 87 G Y White Texture-ND

WC-H1-1 White Window Caulking Ext West Side Window G N Caulking-ND

WC-H1-2 White Window Caulking Ext North Side Window G N Caulking-ND

DC-H1-1 White Door Caulking Ext 1328 Door G N Caulking-ND

ND - NONE DETECTED

G - Good, F - Fair, P - Poor

Y- Yes, N - NoPage 22 of 57

B - Basement

Ext - Exterior

*Approximate fitting locations are included on floor plans

Page 34: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

Table 1: Summary of Asbestos Samples and Results

1220 Independence Avenue

Kansas City, Missouri 64106

Sample Number Material Description Floor Location(s) Condition Friable Sample AnalysisLocation(s) of Asbestos Containing

MaterialsQuantities

DC-H1-2 White Door Caulking Ext 1334 Door G N Caulking-ND

Roof-H1-1 Black Roof Shingle Ext South End of Roof G N Shingle-ND

Roof-H1-2 Black Roof Shingle Ext North End of Roof G N Shingle-ND

P-H1-1 White Texture with Tan Skim Coat 1 Room 24 G Y Texture-ND, Skim Coat-ND

P-H1-2 Tan Skim Coat 2 Room 32 G Y Skim Coat-ND

P-H1-3Gray Plaster with White Texture and Tan

Skim Coat2 Room 55 G Y Plaster-ND, Texture-ND, Skim Coat-ND

P-H1-4 Tan Skim Coat 3 Room 61 G Y Skim Coat-ND

P-H1-5 Tan Skim Coat 3 Room 71 G Y Skim Coat-ND

Stuc-H1-1 White Stucco Ext Room 1 G N Stucco-ND

Stuc-H1-2 White Stucco Ext Room 30 G N Stucco-ND

GD-H1-10 Brown Shower Glue Dot 1 Room 4 G N Glue Dot-ND

DWJC-H1-1 White Drywall with Green Paint 1 Room 21 G N Drywall-ND, Paint-ND

DWJC-H1-2 White Drywall with Green Paint 2 Room 45 G N Drywall-ND, Paint-ND

DWJC-H1-3 White Drywall with Green Paint 3 Room 80 G N Drywall-ND, Paint-ND

FTM-H1-1112"x12" White Mottled Floor Tile with

Yellow Mastic1 Room 5 G N Floor Tile-ND, Mastic-ND

FTM-H2-612"x12" Red Mottled Floor Tile with

Yellow Mastic1 Room 5 G N Floor Tile-ND, Mastic-ND

FTM-H3-812"x12" Blue Mottled Floor Tile with

Yellow Mastic1 Room 5 G N Floor Tile-ND, Mastic-ND

1316-1322 Independence Avenue

ND - NONE DETECTED

G - Good, F - Fair, P - Poor

Y- Yes, N - NoPage 23 of 57

B - Basement

Ext - Exterior

*Approximate fitting locations are included on floor plans

Page 35: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

Table 1: Summary of Asbestos Samples and Results

1220 Independence Avenue

Kansas City, Missouri 64106

Sample Number Material Description Floor Location(s) Condition Friable Sample AnalysisLocation(s) of Asbestos Containing

MaterialsQuantities

C-H1-11 White Bathtub Caulking 1 Room 6 G N Caulking-ND

M-H1-11 Tan Ceramic Tile Mastic 1 Room 6 G N Mastic-ND

CBM-H1-114" White Cove Base with Tan Mastic with

Yellow Mastic and White Joint Compound1 Room 5 G N

Cove Base-ND, Mastic-ND, Joint

Compound-ND

CBM-H2-3 4" Gray Cove Base with Yellow Mastic 1 Room 6 G N Cove Base-ND, Mastic-ND

Sink-H1-1 Tan Sink Undercoat 1 Room 6 G N Sink Undercoat-ND

DWJC-H1-1 Drywall with White Joint Compound 1 Room 10 G N Drywall-ND, Joint Compound-ND

DWJC-H1-2 Drywall 2 Room 41 G N Drywall-ND

DWJC-H1-3 Drywall with White Joint Compound 3 Room 54 G N Drywall-ND, Joint Compound-ND

GD-H1-11 Brown Shower Glue Dot 1 Room 6 G N Glue Dot-ND

SC-H1-1 White Wall Skim Coat 1 Room 4 G Y Skim Coat-ND

SC-H1-2 White Wall Skim Coat 1 Room 15 G Y Skim Coat-ND

SC-H1-3 White Wall Skim Coat 2 Room 30 G Y Skim Coat-ND

SC-H1-4 White Wall Skim Coat 3 Room 52 G Y Skim Coat-ND

SC-H1-5 White Wall Skim Coat 3 Room 66 G Y Skim Coat-ND

SC-H2-1 White Ceiling Skim Coat 1 Room 8 G Y Skim Coat-ND

SC-H2-2 White Ceiling Skim Coat 1 Room 11 G Y Skim Coat-ND

SC-H2-3 White Ceiling Skim Coat 1 Room 12 G Y Skim Coat-ND

SC-H3-1 White Ceiling Skim Coat 1 Room 15 G Y Skim Coat-ND

ND - NONE DETECTED

G - Good, F - Fair, P - Poor

Y- Yes, N - NoPage 24 of 57

B - Basement

Ext - Exterior

*Approximate fitting locations are included on floor plans

Page 36: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

Table 1: Summary of Asbestos Samples and Results

1220 Independence Avenue

Kansas City, Missouri 64106

Sample Number Material Description Floor Location(s) Condition Friable Sample AnalysisLocation(s) of Asbestos Containing

MaterialsQuantities

SC-H3-2 White Ceiling Skim Coat 1 Room 17 G Y Skim Coat-ND

SC-H3-3 White Ceiling Skim Coat 1 Room 21 G Y Skim Coat-ND

SC-H4-1 White Ceiling Skim Coat 2 Room 29 G Y Skim Coat-ND

SC-H4-2 White Ceiling Skim Coat 2 Room 31 G Y Skim Coat-ND

SC-H4-3 White Ceiling Skim Coat 2 Room 35 G Y Skim Coat-ND

SC-H5-1 White Ceiling Skim Coat 2 Room 43 G Y Skim Coat-ND

SC-H5-2 White Ceiling Skim Coat 2 Room 45 G Y Skim Coat-ND

SC-H5-3 White Ceiling Skim Coat 2 Room 49 G Y Skim Coat-ND

SC-H6-1 White Ceiling Skim Coat 3 Room 54 G Y Skim Coat-ND

SC-H6-2 White Ceiling Skim Coat 3 Room 57 G Y Skim Coat-ND

SC-H6-3 White Ceiling Skim Coat 3 Room 63 G Y Skim Coat-ND

SC-H7-1 White Ceiling Skim Coat 3 Room 66 G Y Skim Coat-ND

SC-H7-2 White Ceiling Skim Coat 3 Room 69 G Y Skim Coat-ND

SC-H7-3 White Ceiling Skim Coat 3 Room 75 G Y Skim Coat-ND

SC-H8-1 White Ceiling Skim Coat Ext Room 1 G Y Skim Coat-ND

SC-H8-2 White Ceiling Skim Coat Ext Room 27 G Y Skim Coat-ND

SC-H8-3 White Ceiling Skim Coat Ext Room 52 G Y Skim Coat-ND

WC-H1-1 White Window Caulking Ext North Side Window G N Caulking-ND

ND - NONE DETECTED

G - Good, F - Fair, P - Poor

Y- Yes, N - NoPage 25 of 57

B - Basement

Ext - Exterior

*Approximate fitting locations are included on floor plans

Page 37: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

Table 1: Summary of Asbestos Samples and Results

1220 Independence Avenue

Kansas City, Missouri 64106

Sample Number Material Description Floor Location(s) Condition Friable Sample AnalysisLocation(s) of Asbestos Containing

MaterialsQuantities

WC-H1-2 White Window Caulking Ext East Side Window G N Caulking-ND

DC-H1-1 White Door Caulking Ext 1316 Door G N Caulking-ND

DC-H1-2 White Door Caulking Ext 1322 B Door G N Caulking-ND

Roof-H1-1 Black Roof Shingle Roof South End of Roof G N Shingle-ND

Roof-H1-2 Black Roof Shingle Roof North End of Roof G N Shingle-ND

CT-H1-12'x4' White Ceiling Tile with Medium

FissuresB Room 77 G Y Ceiling Tile-ND

CT-H1-22'x4' White Ceiling Tile with Medium

FissuresB Room 79 G Y Ceiling Tile-ND

CT-H1-32'x4' White Ceiling Tile with Medium

FissuresB Room 83 G Y Ceiling Tile-ND

CBM-H3-1 4" Black Cove Base with Tan Mastic B Room 77 G N Cove Base-ND, Mastic-ND

CBM-H3-2 4" Black Cove Base with Tan Mastic B Room 79 G N Cove Base-ND, Mastic-ND

CBM-H3-3 4" Black Cove Base with Tan Mastic B Room 80 G N Cove Base-ND, Mastic-ND

FTM-H5-112"x12" Gray Mottled Floor Tile with

Yellow MasticB Room 77 G N Floor Tile-ND, Mastic-ND

FTM-H5-212"x12" Gray Mottled Floor Tile with

Yellow MasticB Room 81 G N Floor Tile-ND, Mastic-ND

FTM-H5-312"x12" Gray Mottled Floor Tile with

Yellow MasticB Room 83 G N Floor Tile-ND, Mastic-ND

FTM-H6-19"x9" Brown Mottled Floor Tile with

Black MasticB Room 77 G N

FTM-H6-29"x9" Brown Mottled Floor Tile with

Black MasticB Room 77 G N

FTM-H6-39"x9" Brown Mottled Floor Tile with

Black MasticB Room 77 G N

DWJC-H2-1 Drywall with White Joint Compound B Room 77 G N Drywall-ND, Joint Compound-ND

Floor Tile-5% Chrysotile, Mastic-ND Room 77 1,700 Square Feet (SF) (Under FTM-H5-1)

ND - NONE DETECTED

G - Good, F - Fair, P - Poor

Y- Yes, N - NoPage 26 of 57

B - Basement

Ext - Exterior

*Approximate fitting locations are included on floor plans

Page 38: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

Table 1: Summary of Asbestos Samples and Results

1220 Independence Avenue

Kansas City, Missouri 64106

Sample Number Material Description Floor Location(s) Condition Friable Sample AnalysisLocation(s) of Asbestos Containing

MaterialsQuantities

DWJC-H2-2 Drywall B Room 80 G N Drywall-ND

DWJC-H2-3 Drywall B Room 83 G N Drywall-ND

1316-PI-H1-1 Tan Pipe Insulation 1 Room 5 G Y Insulation-5% Amosite

1316-PI-H1-2 Tan Pipe Insulation 2 Room 43 G Y Insulation-10% Amosite

1316-PI-H1-3 Tan Pipe Insulation B Room 77 G Y Insulation-5% Amosite

PW-H1-1 Black Insulation with Brown Insulation B Room 77 G YBlack Insulation-ND, Brown Insulation-

ND

PW-H1-2 Black Insulation with Brown Insulation B Room 77 G YBlack Insulation-ND, Brown Insulation-

ND

PW-H1-3 Black Insulation with Brown Insulation B Room 77 G YBlack Insulation-ND, Brown Insulation-

ND

FTM-H1-1212"x12" White Mottled Floor Tile with

Yellow Mastic1 Room 3 G N Floor Tile-ND, Mastic-ND

FTM-H2-712"x12" Red Mottled Floor Tile with

Yellow Mastic1 Room 3 G N Floor Tile-ND, Mastic-ND

FTM-H3-912"x12" Blue Mottled Floor Tile with

Yellow Mastic1 Room 3 G N Floor Tile-ND, Mastic-ND

Sink-H1-1 Tan Sink Undercoat 1 Room 5 G N Sink Undercoat-ND

CBM-H2-4 4" Gray Cove Base with Yellow Mastic 1 Room 3 G N Cove Base-ND, Mastic-ND

M-H1-12 Tan Ceramic Tile Mastic 1 Room 5 G N Mastic-ND

C-H1-12 White Bathtub Caulking 1 Room 5 G N Caulking-ND

GD-H1-12 Brown Shower Glue Dot 1 Room 5 G N Glue Dot-ND

P-H1-1 Gray Plaster with White Skim Coat 1 Room 7 G Y Plaster-ND, Skim Coat-ND

573-575-577-579 Tracy Avenue

See 1200-PI-H1-1

ND - NONE DETECTED

G - Good, F - Fair, P - Poor

Y- Yes, N - NoPage 27 of 57

B - Basement

Ext - Exterior

*Approximate fitting locations are included on floor plans

Page 39: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

Table 1: Summary of Asbestos Samples and Results

1220 Independence Avenue

Kansas City, Missouri 64106

Sample Number Material Description Floor Location(s) Condition Friable Sample AnalysisLocation(s) of Asbestos Containing

MaterialsQuantities

P-H1-2Gray Plaster with White Texture and

White Skim Coat2 Room 40 G Y Plaster-ND, Texture-ND, Skim Coat-ND

P-H1-3 Gray Plaster with White Skim Coat 2 Room 49 G Y Plaster-ND, Skim Coat-ND

P-H1-4 Gray Plaster with White Skim Coat 3 Room 53 G Y Plaster-ND, Skim Coat-ND

P-H1-5Gray Plaster with White Texture and

White Skim Coat3 Room 61 G Y Plaster-ND, Texture-ND, Skim Coat-ND

PW-H1-1 Tan Pipe Wrap 1 Room 5 G Y Pipe Wrap-ND

PW-H1-2 Tan Pipe Wrap 2 Room 35 G Y Pipe Wrap-ND

PW-H1-3 Tan Pipe Wrap 3 Room 71 G Y Pipe Wrap-ND

WC-H1-1 White Window Caulking Ext East Side Window G N Caulking-ND

WC-H1-2 White Window Caulking Ext North Side Window G N Caulking-ND

DC-H1-1 White Door Caulking Ext 573 Door G N Caulking-ND

DC-H1-2 White Door Caulking Ext 579 B Door G N Caulking-ND

SC-H1-1 White Wall Skim Coat 1 Room 1 G Y Skim Coat-ND

SC-H1-2 White Wall Skim Coat 2 Room 26 G Y Skim Coat-ND

SC-H1-3 White Wall Skim Coat 3 Room 51 G Y Skim Coat-ND

SC-H2-1 White Wall Skim Coat 1 Room 3 G Y Skim Coat-ND

SC-H2-2 White Wall Skim Coat 1 Room 6 G Y Skim Coat-ND

SC-H2-3 White Wall Skim Coat 1 Room 7 G Y Skim Coat-ND

SC-H3-1 White Wall Skim Coat 1 Room 9 G Y Skim Coat-ND

ND - NONE DETECTED

G - Good, F - Fair, P - Poor

Y- Yes, N - NoPage 28 of 57

B - Basement

Ext - Exterior

*Approximate fitting locations are included on floor plans

Page 40: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

Table 1: Summary of Asbestos Samples and Results

1220 Independence Avenue

Kansas City, Missouri 64106

Sample Number Material Description Floor Location(s) Condition Friable Sample AnalysisLocation(s) of Asbestos Containing

MaterialsQuantities

SC-H3-2 White Wall Skim Coat 1 Room 11 G Y Skim Coat-ND

SC-H3-3 White Wall Skim Coat 1 Room 12 G Y Skim Coat-ND

SC-H4-1 White Wall Skim Coat 1 Room 14 G Y Skim Coat-ND

SC-H4-2 White Wall Skim Coat 1 Room 16 G Y Skim Coat-ND

SC-H4-3 White Wall Skim Coat 1 Room 19 G Y Skim Coat-ND

SC-H5-1 White Ceiling Skim Coat 1 Room 20 G Y Skim Coat-ND

SC-H5-2 White Ceiling Skim Coat 1 Room 23 G Y Skim Coat-ND

SC-H5-3 White Ceiling Skim Coat 1 Room 24 G Y Skim Coat-ND

SC-H6-1 White Ceiling Skim Coat 2 Room 27 G Y Skim Coat-ND

SC-H6-2 White Ceiling Skim Coat 2 Room 29 G Y Skim Coat-ND

SC-H6-3 White Ceiling Skim Coat 2 Room 30 G Y Skim Coat-ND

SC-H7-1 White Ceiling Skim Coat 2 Room 34 G Y Skim Coat-ND

SC-H7-2 White Ceiling Skim Coat 2 Room 35 G Y Skim Coat-ND

SC-H7-3 White Ceiling Skim Coat 2 Room 38 G Y Skim Coat-ND

SC-H8-1 White Ceiling Skim Coat 2 Room 40 G Y Skim Coat-ND

SC-H8-2 White Ceiling Skim Coat 2 Room 42 G Y Skim Coat-ND

SC-H8-3 White Ceiling Skim Coat 2 Room 43 G Y Skim Coat-ND

SC-H9-1 White Ceiling Skim Coat 2 Room 46 G Y Skim Coat-ND

ND - NONE DETECTED

G - Good, F - Fair, P - Poor

Y- Yes, N - NoPage 29 of 57

B - Basement

Ext - Exterior

*Approximate fitting locations are included on floor plans

Page 41: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

Table 1: Summary of Asbestos Samples and Results

1220 Independence Avenue

Kansas City, Missouri 64106

Sample Number Material Description Floor Location(s) Condition Friable Sample AnalysisLocation(s) of Asbestos Containing

MaterialsQuantities

SC-H9-2 White Ceiling Skim Coat 2 Room 48 G Y Skim Coat-ND

SC-H9-3 White Ceiling Skim Coat 2 Room 49 G Y Skim Coat-ND

SC-H10-1 White Ceiling Skim Coat 3 Room 52 G Y Skim Coat-ND

SC-H10-2 White Ceiling Skim Coat 3 Room 53 G Y Skim Coat-ND

SC-H10-3 White Ceiling Skim Coat 3 Room 54 G Y Skim Coat-ND

SC-H11-1 White Ceiling Skim Coat 3 Room 59 G Y Skim Coat-ND

SC-H11-2 White Ceiling Skim Coat 3 Room 60 G Y Skim Coat-ND

SC-H11-3 White Ceiling Skim Coat 3 Room 63 G Y Skim Coat-ND

SC-H12-1 White Ceiling Skim Coat 3 Room 64 G Y Skim Coat-ND

SC-H12-2 White Ceiling Skim Coat 3 Room 66 G Y Skim Coat-ND

SC-H12-3 White Ceiling Skim Coat 3 Room 69 G Y Skim Coat-ND

SC-H13-1 White Ceiling Skim Coat 3 Room 71 G Y Skim Coat-ND

SC-H13-2 White Ceiling Skim Coat 3 Room 72 G Y Skim Coat-ND

SC-H13-3 White Ceiling Skim Coat 3 Room 75 G Y Skim Coat-ND

Roof-H1-1 Black Roof Shingle Roof West End of Roof G N Shingle-ND

Roof-H1-2 Black Roof Shingle Roof East End of Roof G N Shingle-ND

DWJC-H1-1 Drywall 1 Room 6 G N Drywall-ND

DWJC-H1-2 Drywall with White Joint Compound 2 Room 47 G NDrywall-ND, Joint Compound-4%

Chrysotile (Composite-<1% Chrysotile)

ND - NONE DETECTED

G - Good, F - Fair, P - Poor

Y- Yes, N - NoPage 30 of 57

B - Basement

Ext - Exterior

*Approximate fitting locations are included on floor plans

Page 42: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

Table 1: Summary of Asbestos Samples and Results

1220 Independence Avenue

Kansas City, Missouri 64106

Sample Number Material Description Floor Location(s) Condition Friable Sample AnalysisLocation(s) of Asbestos Containing

MaterialsQuantities

DWJC-H1-3 Drywall 3 Room 60 G N Drywall-ND

FTM-H1-1312"x12" White Mottled Floor Tile with

Yellow Mastic1 Room 3 G N Floor Tile-ND, Mastic-ND

FTM-H3-912"x12" Blue Mottled Floor Tile with

Yellow Mastic1 Room 3 G N Floor Tile-ND, Mastic-ND

CBM-H1-12

4" White Cove Base with Yellow Mastic,

White Wall Texture, Tan Skim Coat, and

Brown Mastic

1 Room 3 G N

Cove Base-ND, Yellow Mastic-ND,

Brown Mastic-ND, Wall Texture-ND,

Skim Coat-ND

Sink-H1-1 Tan Sink Undercoat 1 Room 3 G N Sink Undercoat-ND

GD-H1-13Brown Shower Glue Dot with White Wall

Texture1 Room 5 G N Glue Dot-ND, Wall Texture-ND

M-H1-13 Tan Ceramic Tile Mastic 1 Room 5 G N Mastic-ND

C-H1-13 White Bathtub Caulking 1 Room 5 G N Caulking-ND

DWJC-H1-1 Drywall 1 Room 2 G N Drywall-ND

DWJC-H1-2 Drywall 2 Room 52 G N Drywall-ND

DWJC-H1-3 Drywall 3 Room 75 G N Drywall-ND

P-H1-1 Gray Plaster with White Skim Coat 1 Room 3 G Y Drywall-ND

P-H1-2 Gray Plaster with White Skim Coat 1 Room 16 G Y Plaster-ND, Skim Coat-ND

P-H1-3 Gray Plaster with White Skim Coat 2 Room 31 G Y Plaster-ND, Skim Coat-ND

P-H1-4 Gray Plaster with White Skim Coat 3 Room 60 G Y Plaster-ND, Skim Coat-ND

P-H1-5 Gray Plaster with White Skim Coat 3 Room 80 G Y Plaster-ND, Skim Coat-ND

SC-H1-1 White Ceiling Skim Coat 1 Room 2 G Y Skim Coat-ND

1300-1302-1304-1306 Independence Avenue

ND - NONE DETECTED

G - Good, F - Fair, P - Poor

Y- Yes, N - NoPage 31 of 57

B - Basement

Ext - Exterior

*Approximate fitting locations are included on floor plans

Page 43: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

Table 1: Summary of Asbestos Samples and Results

1220 Independence Avenue

Kansas City, Missouri 64106

Sample Number Material Description Floor Location(s) Condition Friable Sample AnalysisLocation(s) of Asbestos Containing

MaterialsQuantities

SC-H1-2 White Ceiling Skim Coat 1 Room 5 G Y Skim Coat-ND

SC-H1-3 White Ceiling Skim Coat 1 Room 8 G Y Skim Coat-ND

SC-H2-1 White Ceiling Skim Coat 1 Room 9 G Y Skim Coat-ND

SC-H2-2 White Ceiling Skim Coat 1 Room 11 G Y Skim Coat-ND

SC-H2-3 White Ceiling Skim Coat 1 Room 14 G Y Skim Coat-ND

SC-H3-1 White Ceiling Skim Coat 1 Room 16 G Y Skim Coat-ND

SC-H3-2 White Ceiling Skim Coat 1 Room 20 G Y Skim Coat-ND

SC-H3-3 White Ceiling Skim Coat 1 Room 22 G Y Skim Coat-ND

SC-H4-1 White Ceiling Skim Coat 1 Room 23 G Y Skim Coat-ND

SC-H4-2 White Ceiling Skim Coat 1 Room 25 G Y Skim Coat-ND

SC-H4-3 White Ceiling Skim Coat 1 Room 29 G Y Skim Coat-ND

SC-H5-1 White Ceiling Skim Coat 2 Room 31 G Y Skim Coat-ND

SC-H5-2 White Ceiling Skim Coat 2 Room 33 G Y Skim Coat-ND

SC-H5-3 White Ceiling Skim Coat 2 Room 37 G Y Skim Coat-ND

SC-H6-1 White Ceiling Skim Coat 2 Room 38 G Y Skim Coat-ND

SC-H6-2 White Ceiling Skim Coat 2 Room 40 G Y Skim Coat-ND

SC-H6-3 White Ceiling Skim Coat 2 Room 43 G Y Skim Coat-ND

SC-H7-1 White Ceiling Skim Coat 2 Room 46 G Y Skim Coat-ND

ND - NONE DETECTED

G - Good, F - Fair, P - Poor

Y- Yes, N - NoPage 32 of 57

B - Basement

Ext - Exterior

*Approximate fitting locations are included on floor plans

Page 44: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

Table 1: Summary of Asbestos Samples and Results

1220 Independence Avenue

Kansas City, Missouri 64106

Sample Number Material Description Floor Location(s) Condition Friable Sample AnalysisLocation(s) of Asbestos Containing

MaterialsQuantities

SC-H7-2 White Ceiling Skim Coat 2 Room 49 G Y Skim Coat-ND

SC-H7-3 White Ceiling Skim Coat 2 Room 51 G Y Skim Coat-ND

SC-H8-1 White Ceiling Skim Coat 2 Room 60 G Y Skim Coat-ND

SC-H8-2 White Ceiling Skim Coat 2 Room 63 G Y Skim Coat-ND

SC-H8-3 White Ceiling Skim Coat 2 Room 65 G Y Skim Coat-ND

SC-H9-1 White Ceiling Skim Coat 3 Room 67 G Y Skim Coat-ND

SC-H9-2 White Ceiling Skim Coat 3 Room 69 G Y Skim Coat-ND

SC-H9-3 White Ceiling Skim Coat 3 Room 73 G Y Skim Coat-ND

SC-H10-1 White Ceiling Skim Coat 3 Room 75 G Y Skim Coat-ND

SC-H10-2 White Ceiling Skim Coat 3 Room 78 G Y Skim Coat-ND

SC-H10-3 White Ceiling Skim Coat 3 Room 80 G Y Skim Coat-ND

SC-H11-1 White Ceiling Skim Coat 3 Room 81 G Y Skim Coat-ND

SC-H11-2 White Ceiling Skim Coat 3 Room 83 G Y Skim Coat-ND

SC-H11-3 White Ceiling Skim Coat 3 Room 85 G Y Skim Coat-ND

SC-H12-1 White Ceiling Skim Coat 3 Room 75 G Y Skim Coat-ND

SC-H12-2 White Ceiling Skim Coat 3 Room 78 G Y Skim Coat-ND

SC-H12-3 White Ceiling Skim Coat 3 Room 80 G Y Skim Coat-ND

Roof-H1-1 Black Roof Shingle Roof North End of Roof G N Shingle-ND

ND - NONE DETECTED

G - Good, F - Fair, P - Poor

Y- Yes, N - NoPage 33 of 57

B - Basement

Ext - Exterior

*Approximate fitting locations are included on floor plans

Page 45: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

Table 1: Summary of Asbestos Samples and Results

1220 Independence Avenue

Kansas City, Missouri 64106

Sample Number Material Description Floor Location(s) Condition Friable Sample AnalysisLocation(s) of Asbestos Containing

MaterialsQuantities

Roof-H1-2 Black Roof Shingle Roof South End of Roof G N Shingle-ND

Stuc-H1-1 Tan Stucco 1 Room 1 G N Stucco-ND

Stuc-H1-2 Tan Stucco 3 Room 59 G N Stucco-ND

DC-H1-1 White Door Caulking Ext 1300 Door G N Caulking-ND

DC-H1-2 White Door Caulking Ext 1300 A Door G N Caulking-ND

WC-H1-1 White Window Caulking Ext North Side Window G N Caulking-ND

WC-H1-2 White Window Caulking Ext East Side Window G N Caulking-ND

PW-H1-1 Tan Pipe Wrap 1 Room 5 G Y Pipe Wrap-ND

PW-H1-2 Tan Pipe Wrap 2 Room 34 G Y Pipe Wrap-ND

PW-H1-3 Tan Pipe Wrap 3 Room 63 G Y Pipe Wrap-ND

FTM-H1-1412"x12" White Mottled Floor Tile with

Yellow Mastic1 Room 4 G N Floor Tile-ND, Mastic-ND

FTM-H3-1012"x12" Blue Mottled Floor Tile with

Yellow Mastic1 Room 4 G N Floor Tile-ND, Mastic-ND

CBM-H1-124" White Cove Base with Yellow Mastic

and White Wall Texture1 Room 4 G N Cove Base-ND, Mastic-ND, Texture-ND

CBM-H3-54" Gray Cove Base with Yellow Mastic

and White Wall Texture1 Room 5 G N Cove Base-ND, Mastic-ND, Texture-ND

561-PI-H1-1 Tan Pipe Insulation 2 Room 25 G YInsulation-10% Chrysotile, 15%

Amosite

561-PI-H1-2 Tan Pipe Insulation 3 Room 32 G Y Insulation-5% Amosite

C-H1-14 White Bathtub Caulking 1 Room 5 G N Caulking-ND

561-563 Tracy Avenue

See 1200-PI-H1-1

ND - NONE DETECTED

G - Good, F - Fair, P - Poor

Y- Yes, N - NoPage 34 of 57

B - Basement

Ext - Exterior

*Approximate fitting locations are included on floor plans

Page 46: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

Table 1: Summary of Asbestos Samples and Results

1220 Independence Avenue

Kansas City, Missouri 64106

Sample Number Material Description Floor Location(s) Condition Friable Sample AnalysisLocation(s) of Asbestos Containing

MaterialsQuantities

Sink-H1-1 Tan Sink Undercoat 1 Room 4 G N Sink Undercoat-ND

M-H1-14Tan Ceramic Tile Mastic with White Wall

Texture1 Room 5 G N Mastic-ND, Texture-ND

P-H1-1Gray Plaster with White Skim Coat and

White Wall Texture1 Room 3 G Y

Plaster-ND, Skim Coat-ND, Wall

Texture-ND

P-H1-2Gray Plaster with White Skim Coat and

White Wall Texture1 Room 11 G Y

Plaster-ND, Skim Coat-ND, Wall

Texture-ND

P-H1-3Gray Plaster with White Skim Coat and

White Wall Texture2 Room 19 G Y

Plaster-ND, Skim Coat-ND, Wall

Texture-ND

P-H1-4Gray Plaster with White Skim Coat and

White Wall Texture3 Room 32 G Y

Plaster-ND, Skim Coat-ND, Wall

Texture-ND

P-H1-5Gray Plaster with White Skim Coat and

White Wall Texture3 Room 40 G Y

Plaster-ND, Skim Coat-ND, Wall

Texture-ND

DWJC-H1-1 Drywall 1 Room 10 G N Drywall-ND

DWJC-H1-2 Drywall 2 Room 35 G N Drywall-ND

DWJC-H1-3 Drywall with White Joint Compound 3 Room 45 G N

Drywall-ND, Joint Compound-Point

Count-2% Chrysotile. Composite-<1%

Chrysotile

GD-H1-14 Brown Shower Glue Dot 1 Room 5 G N Glue Dot-ND

SC-H1-1 White Ceiling Skim Coat 1 Room 3 G Y Skim Coat-ND

SC-H1-2 White Ceiling Skim Coat 1 Room 5 G Y Skim Coat-ND

SC-H1-3 White Ceiling Skim Coat 1 Room 9 G Y Skim Coat-ND

SC-H2-1 White Ceiling Skim Coat 1 Room 10 G Y Skim Coat-ND

SC-H2-2 White Ceiling Skim Coat 1 Room 13 G Y Skim Coat-ND

SC-H2-3 White Ceiling Skim Coat 1 Room 15 G Y Skim Coat-ND

SC-H3-1 White Ceiling Skim Coat 2 Room 17 G Y Skim Coat-ND

ND - NONE DETECTED

G - Good, F - Fair, P - Poor

Y- Yes, N - NoPage 35 of 57

B - Basement

Ext - Exterior

*Approximate fitting locations are included on floor plans

Page 47: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

Table 1: Summary of Asbestos Samples and Results

1220 Independence Avenue

Kansas City, Missouri 64106

Sample Number Material Description Floor Location(s) Condition Friable Sample AnalysisLocation(s) of Asbestos Containing

MaterialsQuantities

SC-H3-2 White Ceiling Skim Coat 2 Room 20 G Y Skim Coat-ND

SC-H3-3 White Ceiling Skim Coat 2 Room 23 G Y Skim Coat-ND

SC-H4-1 White Ceiling Skim Coat 2 Room 25 G Y Skim Coat-ND

SC-H4-2 White Ceiling Skim Coat 2 Room 28 G Y Skim Coat-ND

SC-H4-3 White Ceiling Skim Coat 2 Room 30 G Y Skim Coat-ND

SC-H5-1 White Ceiling Skim Coat 3 Room 31 G Y Skim Coat-ND

SC-H5-2 White Ceiling Skim Coat 3 Room 33 G Y Skim Coat-ND

SC-H5-3 White Ceiling Skim Coat 3 Room 36 G Y Skim Coat-ND

SC-H6-1 White Ceiling Skim Coat 3 Room 38 G Y Skim Coat-ND

SC-H6-2 White Ceiling Skim Coat 3 Room 40 G Y Skim Coat-ND

SC-H6-3 White Ceiling Skim Coat 3 Room 43 G Y Skim Coat-ND

PW-H1-1 Tan Pipe Wrap 1 Room 5 G Y Pipe Wrap-ND

PW-H1-2 Tan Pipe Wrap 2 Room 26 G YPipe Wrap-400 Point Count-1.75%

Amosite

PW-H1-3 Tan and Black Pipe Wrap 3 Room 33 G Y Pipe Wrap-ND

DC-H1-1 White Door Caulking Ext 561 Door G N Caulking-ND

DC-H1-2 White Door Caulking Ext 561 A Door G N Caulking-ND

WC-H1-1 White Window Caulking Ext East Side Window G N Caulking-ND

WC-H1-2 White Window Caulking Ext West Side Window G N Caulking-ND

See 1200-PI-H1-1

ND - NONE DETECTED

G - Good, F - Fair, P - Poor

Y- Yes, N - NoPage 36 of 57

B - Basement

Ext - Exterior

*Approximate fitting locations are included on floor plans

Page 48: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

Table 1: Summary of Asbestos Samples and Results

1220 Independence Avenue

Kansas City, Missouri 64106

Sample Number Material Description Floor Location(s) Condition Friable Sample AnalysisLocation(s) of Asbestos Containing

MaterialsQuantities

Roof-H1-1 Black Roof Shingle with Black Tar Roof North End of Roof G N Shingle-ND, Tar-ND

Roof-H1-2 Black Roof Shingle with Black Tar Roof South End of Roof G N Shingle-ND, Tar-ND

Stuc-H1-1 White Stucco Ext Room 1 G N Stucco-ND

Stuc-H1-2 White Stucco Ext Room 2 G N Stucco-ND

PW-H1-1 Tan Pipe Wrap 1 Room 5 G Y Pipe Wrap-ND

PW-H1-2 Tan Pipe Wrap 2 Room 26 G Y Pipe Wrap-ND

PW-H1-3 Tan Pipe Wrap 3 Room 33 G Y Pipe Wrap-ND

FTM-H1-1512"x12" White Mottled Floor Tile with

Yellow Mastic1 Room 4 G N Floor Tile-ND, Mastic-ND

FTM-H3-1112"x12" Blue Mottled Floor Tile with

Yellow Mastic1 Room 4 G N Floor Tile-ND, Mastic-ND

CBM-H1-134" White Cove Base with Yellow and

Brown Mastic and White Wall Texture1 Room 4 G N Cove Base-ND, Mastic-ND, Texture-ND

M-H1-15Tan Ceramic Tile Mastic with White Wall

Texture1 Room 5 G N Mastic-ND, Texture-ND

P-H1-1 Gray Plaster with White Skim Coat 1 Room 3 G Y Plaster-ND, Skim Coat-ND

P-H1-2 Gray Plaster with White Skim Coat 1 Room 11 G Y Plaster-ND, Skim Coat-ND

P-H1-3 Gray Plaster with White Skim Coat 2 Room 19 G Y Plaster-ND, Skim Coat-ND

P-H1-4 Gray Plaster with White Skim Coat 2 Room 32 G Y Plaster-ND, Skim Coat-ND

P-H1-5 Gray Plaster with White Skim Coat 3 Room 40 G Y Plaster-ND, Skim Coat-ND

GD-H1-15Brown Shower Glue Dot with White Wall

Texture1 Room 5 G N Glue Dot-ND, Wall Texture-ND

569-571 Tracy Avenue

ND - NONE DETECTED

G - Good, F - Fair, P - Poor

Y- Yes, N - NoPage 37 of 57

B - Basement

Ext - Exterior

*Approximate fitting locations are included on floor plans

Page 49: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

Table 1: Summary of Asbestos Samples and Results

1220 Independence Avenue

Kansas City, Missouri 64106

Sample Number Material Description Floor Location(s) Condition Friable Sample AnalysisLocation(s) of Asbestos Containing

MaterialsQuantities

C-H1-15 White Bathtub Caulking 1 Room 5 G N Caulking-ND

DWJC-H1-1 Drywall with White Joint Compound 1 Room 10 G N

Drywall-ND, Joint Compound-3%

Chrysotile, Composite- Point Count

<0.25% Chrysotile

DWJC-H1-2 Drywall 2 Room 35 G N Drywall-ND

DWJC-H1-3 Drywall 2 Room 45 G N Drywall-ND

Sink-H1-1 Tan Sink Undercoat 1 Room 5 G N Sink Undercoat-ND

SC-H1-1 White Ceiling Skim Coat 1 Room 3 G Y Skim Coat-ND

SC-H1-2 White Ceiling Skim Coat 1 Room 5 G Y Skim Coat-ND

SC-H1-3 White Ceiling Skim Coat 1 Room 9 G Y Skim Coat-ND

SC-H2-1 White Ceiling Skim Coat 2 Room 10 G Y Skim Coat-ND

SC-H2-2 White Ceiling Skim Coat 2 Room 13 G Y Skim Coat-ND

SC-H2-3 White Ceiling Skim Coat 2 Room 15 G Y Skim Coat-ND

SC-H3-1 White Ceiling Skim Coat 2 Room 17 G Y Skim Coat-ND

SC-H3-2 White Ceiling Skim Coat 2 Room 22 G Y Skim Coat-ND

SC-H3-3 White Ceiling Skim Coat 2 Room 23 G Y Skim Coat-ND

SC-H4-1 White Ceiling Skim Coat 2 Room 25 G Y Skim Coat-ND

SC-H4-2 White Ceiling Skim Coat 2 Room 28 G Y Skim Coat-ND

SC-H4-3 White Ceiling Skim Coat 2 Room 30 G Y Skim Coat-ND

SC-H5-1 White Ceiling Skim Coat 3 Room 31 G Y Skim Coat-ND

ND - NONE DETECTED

G - Good, F - Fair, P - Poor

Y- Yes, N - NoPage 38 of 57

B - Basement

Ext - Exterior

*Approximate fitting locations are included on floor plans

Page 50: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

Table 1: Summary of Asbestos Samples and Results

1220 Independence Avenue

Kansas City, Missouri 64106

Sample Number Material Description Floor Location(s) Condition Friable Sample AnalysisLocation(s) of Asbestos Containing

MaterialsQuantities

SC-H5-2 White Ceiling Skim Coat 3 Room 33 G Y Skim Coat-ND

SC-H5-3 White Ceiling Skim Coat 3 Room 36 G Y Skim Coat-ND

SC-H6-1 White Ceiling Skim Coat 3 Room 38 G Y Skim Coat-ND

SC-H6-2 White Ceiling Skim Coat 3 Room 40 G Y Skim Coat-ND

SC-H6-3 White Ceiling Skim Coat 3 Room 43 G Y Skim Coat-ND

DC-H1-1 White Door Caulking Ext 569 Door G N Caulking-ND

DC-H1-2 White Door Caulking Ext 571 B Door G N Caulking-ND

WC-H1-1 White Window Caulking Ext East Side Window G N Caulking-ND

WC-H1-2 White Window Caulking Ext West Side Window G N Caulking-ND

Stuc-H1-1 White Stucco Ext Room 1 G N Stucco-ND

Stuc-H1-2 White Stucco Ext Room 2 G N Stucco-ND

Roof-H1-1 Black Roof Shingle with Black Tar Roof North End of Roof G N Shingle-ND, Tar-ND

Roof-H1-2 Black Roof Shingle with Black Tar Roof South End of Roof G N Shingle-ND, Tar-ND

FTM-H1-1612"x12" White Mottled Floor Tile with

Yellow Mastic1 Room 4 G N Floor Tile-ND, Mastic-ND

FTM-H3-1212"x12" Blue Mottled Floor Tile with

Yellow Mastic1 Room 4 G N Floor Tile-ND, Mastic-ND

CBM-H1-144" White Cove Base with Yellow Mastic

and White Wall Texture1 Room 4 G N Cove Base-ND, Mastic-ND, Texture-ND

M-H1-16Tan Ceramic Tile Mastic with White Wall

Texture1 Room 5 G N Mastic-ND, Texture-ND

565-567 Tracy Avenue

ND - NONE DETECTED

G - Good, F - Fair, P - Poor

Y- Yes, N - NoPage 39 of 57

B - Basement

Ext - Exterior

*Approximate fitting locations are included on floor plans

Page 51: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

Table 1: Summary of Asbestos Samples and Results

1220 Independence Avenue

Kansas City, Missouri 64106

Sample Number Material Description Floor Location(s) Condition Friable Sample AnalysisLocation(s) of Asbestos Containing

MaterialsQuantities

GD-H1-16Brown Shower Glue Dot with White Wall

Texture1 Room 5 G N Glue Dot-ND, Wall Texture-ND

C-H1-16 White Bathtub Caulking 1 Room 5 G N Caulking-ND

DWJC-H1-1 Drywall with White Joint Compound 1 Room 10 G NDrywall-ND, Joint Compound-4%

Chrysotile, Composite-<1% Chrysotile

DWJC-H1-2 Drywall 2 Room 35 G N Drywall-ND

DWJC-H1-3 Drywall with White Joint Compound 3 Room 45 G NDrywall-ND, Joint Compound-4%

Chrysotile, Composite-<1% Chrysotile

PW-H1-1 Tan Pipe Wrap 1 Room 5 G Y Pipe Wrap-ND

PW-H1-2 Tan Pipe Wrap 2 Room 26 G Y

PW-H1-3 Tan Pipe Wrap 3 Room 33 G Y

Sink-H1-1 Tan Sink Undercoat 1 Room 4 G N Sink Undercoat-ND

SC-H1-1 White Ceiling Skim Coat 1 Room 3 G Y Skim Coat-ND

SC-H1-2 White Ceiling Skim Coat 1 Room 5 G Y Skim Coat-ND

SC-H1-3 White Ceiling Skim Coat 1 Room 9 G Y Skim Coat-ND

SC-H2-1 White Ceiling Skim Coat 1 Room 10 G Y Skim Coat-ND

SC-H2-2 White Ceiling Skim Coat 1 Room 13 G Y Skim Coat-ND

SC-H2-3 White Ceiling Skim Coat 1 Room 15 G Y Skim Coat-ND

SC-H3-1 White Ceiling Skim Coat 2 Room 17 G Y Skim Coat-ND

SC-H3-2 White Ceiling Skim Coat 2 Room 22 G Y Skim Coat-ND

SC-H3-3 White Ceiling Skim Coat 2 Room 23 G Y Skim Coat-ND

Pipe Wrap-5% Amosite See 1200-PI-H1-1

ND - NONE DETECTED

G - Good, F - Fair, P - Poor

Y- Yes, N - NoPage 40 of 57

B - Basement

Ext - Exterior

*Approximate fitting locations are included on floor plans

Page 52: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

Table 1: Summary of Asbestos Samples and Results

1220 Independence Avenue

Kansas City, Missouri 64106

Sample Number Material Description Floor Location(s) Condition Friable Sample AnalysisLocation(s) of Asbestos Containing

MaterialsQuantities

SC-H4-1 White Ceiling Skim Coat 2 Room 25 G Y Skim Coat-ND

SC-H4-2 White Ceiling Skim Coat 2 Room 28 G Y Skim Coat-ND

SC-H4-3 White Ceiling Skim Coat 2 Room 30 G Y Skim Coat-ND

SC-H5-1 White Ceiling Skim Coat 3 Room 31 G Y Skim Coat-ND

SC-H5-2 White Ceiling Skim Coat 3 Room 33 G Y Skim Coat-ND

SC-H5-3 White Ceiling Skim Coat 3 Room 36 G Y Skim Coat-ND

SC-H6-1 White Ceiling Skim Coat 3 Room 38 G Y Skim Coat-ND

SC-H6-2 White Ceiling Skim Coat 3 Room 40 G Y Skim Coat-ND

SC-H6-3 White Ceiling Skim Coat 3 Room 43 G Y Skim Coat-ND

P-H1-1 Gray Plaster with White Skim Coat 1 Room 3 G Y Plaster-ND, Skim Coat-ND

P-H1-2 Gray Plaster with White Skim Coat 1 Room 11 G Y Plaster-ND, Skim Coat-ND

P-H1-3Gray Plaster with White Skim Coat and

White Wall Texture2 Room 19 G Y

Plaster-ND, Skim Coat-ND, Wall

Texture-ND

P-H1-4Gray Plaster with White Skim Coat and

White Wall Texture3 Room 32 G Y

Plaster-ND, Skim Coat-ND, Wall

Texture-ND

P-H1-5Gray Plaster with White Skim Coat and

White Wall Texture3 Room 40 G Y

Plaster-ND, Skim Coat-ND, Wall

Texture-ND

Stuc-H1-1 White Stucco Ext Room 1 G N Stucco-ND

Stuc-H1-2 White Stucco Ext Room 2 G N Stucco-ND

DC-H1-1 White Door Caulking Ext 565 Door G N Caulking-ND

DC-H1-2 White Door Caulking Ext 567 A Door G N Caulking-ND

ND - NONE DETECTED

G - Good, F - Fair, P - Poor

Y- Yes, N - NoPage 41 of 57

B - Basement

Ext - Exterior

*Approximate fitting locations are included on floor plans

Page 53: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

Table 1: Summary of Asbestos Samples and Results

1220 Independence Avenue

Kansas City, Missouri 64106

Sample Number Material Description Floor Location(s) Condition Friable Sample AnalysisLocation(s) of Asbestos Containing

MaterialsQuantities

WC-H1-1 White Window Caulking Ext East Side Window G N Caulking-ND

WC-H1-2 White Window Caulking Ext West Side Window G N Caulking-ND

Roof-H1-1 Black Shingle Roof North End of Roof G N Shingle-ND

Roof-H1-2 Black Roof Shingle with Black Tar Roof South End of Roof G N Shingle-ND, Tar-ND

FTM-H1-1712"x12" White Mottled Floor Tile with

Yellow Mastic1 Room 3 G N Floor Tile-ND, Mastic-ND

FTM-H2-812"x12" Red Mottled Floor Tile with

Yellow Mastic1 Room 1 G N Floor Tile-ND, Mastic-ND

CBM-H1-15 4" White Cove Base with Yellow Mastic 1 Room 3 G N Cove Base-ND, Mastic-ND

CBM-H3-1 2" White Cove Base with Yellow Mastic 2 Room 6 G N Cove Base-ND, Mastic-ND

C-H1-17 White Bathtub Caulking 2 Room 11 G N Caulking-ND

GD-H1-17 Brown Shower Glue Dot 2 Room 11 G N Glue Dot-ND

M-H1-17 Tan Ceramic Tile Mastic 2 Room 10 G N Mastic-ND

Sink-H1-1 Tan Sink Undercoat 1 Room 2 G N Sink Undercoat-ND

P-H1-1 Gray Plaster with White Skim Coat 1 Room 2 G Y Plaster-ND, Skim Coat-ND

P-H1-2 Gray Plaster with White Skim Coat 1 Room 15 G Y Plaster-ND, Skim Coat-ND

P-H1-3 Gray Plaster with White Skim Coat 2 Room 33 G Y Plaster-ND, Skim Coat-ND

P-H1-4 Gray Plaster with White Skim Coat 1 Room 37 G Y Plaster-ND, Skim Coat-ND

Tex-H1-1 White Ceiling Texture 1 Room 2 G Y Texture-ND

1308-1310-1312-1314 Independence Avenue

ND - NONE DETECTED

G - Good, F - Fair, P - Poor

Y- Yes, N - NoPage 42 of 57

B - Basement

Ext - Exterior

*Approximate fitting locations are included on floor plans

Page 54: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

Table 1: Summary of Asbestos Samples and Results

1220 Independence Avenue

Kansas City, Missouri 64106

Sample Number Material Description Floor Location(s) Condition Friable Sample AnalysisLocation(s) of Asbestos Containing

MaterialsQuantities

Tex-H1-2 White Ceiling Texture 1 Room 5 G Y Texture-ND

Tex-H1-3 White Ceiling Texture 2 Room 8 G Y Texture-ND

Tex-H2-1 White Ceiling Texture 1 Room 13 G Y Texture-ND

Tex-H2-2 White Ceiling Texture 2 Room 21 G Y Texture-ND

Tex-H2-3 White Ceiling Texture 2 Room 25 G Y Texture-ND

Tex-H3-1 White Ceiling Texture 1 Room 24 G Y Texture-ND

Tex-H3-2 White Ceiling Texture 2 Room 30 G Y Texture-ND

Tex-H3-3 White Ceiling Texture 2 Room 36 G Y Texture-ND

Tex-H4-1 White Ceiling Texture 1 Room 37 G Y Texture-ND

Tex-H4-2 White Ceiling Texture 1 Room 42 G Y Texture-ND

Tex-H4-3 White Ceiling Texture 2 Room 48 G Y Texture-ND

DWJC-H1-1 Drywall 1 Room 24 G N Drywall-ND

DWJC-H1-2 Drywall with White Joint Compound 1 Room 25 G NDrywall-ND, Joint Compound-3%

Chrysotile, Composite-<1% Chrysotile

DWJC-H1-3 Drywall 2 Room 36 G N Drywall-ND

DWJC-H1-4 Drywall 2 Room 33 G N Drywall-ND

WC-H1-1 White Window Caulking Ext South Side Window G N Caulking-ND

WC-H1-2 White Window Caulking Ext North Side Window G N Caulking-ND

DC-H1-1 White Door Caulking Ext 1308 Door G N Caulking-ND

ND - NONE DETECTED

G - Good, F - Fair, P - Poor

Y- Yes, N - NoPage 43 of 57

B - Basement

Ext - Exterior

*Approximate fitting locations are included on floor plans

Page 55: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

Table 1: Summary of Asbestos Samples and Results

1220 Independence Avenue

Kansas City, Missouri 64106

Sample Number Material Description Floor Location(s) Condition Friable Sample AnalysisLocation(s) of Asbestos Containing

MaterialsQuantities

DC-H1-2 White Door Caulking Ext 1314 Door G N Caulking-ND

Roof-H1-1 Black Roof Shingle with Black Tar Roof North End of Roof G N Shingle-ND, Tar-ND

Roof-H1-2 Black Roof Shingle Roof South End of Roof G N Shingle-ND

PW-H1-1 Tan and Black Pipe Wrap 2 Room 10 G Y Pipe Wrap-ND

PW-H1-2 Tan Pipe Wrap 2 Room 22 G Y Pipe Wrap-ND

PW-H1-3 Tan Pipe Wrap 2 Room 46 G Y Pipe Wrap-ND

FTM-H1-1812"x12" White Mottled Floor Tile with

Yellow Mastic1 Room 1 G N Floor Tile-ND, Mastic-ND

CBM-H1-16 4" White Cove Base with Yellow Mastic 1 Room 1 G N Cove Base-ND, Mastic-ND

C-H1-18 White Bathtub Caulking 2 Room 8 G N Caulking-ND

M-H1-18 Tan Ceramic Tile Mastic 2 Room 8 G N Mastic-ND

Sink-H1-1 Tan Sink Undercoat 1 Room 2 G N Sink Undercoat-ND

GD-H1-1 Brown Shower Glue Dot 2 Room 8 G N Glue Dot-ND

P-H1-1Gray Plaster with White Skim Coat and

White Wall Texture1 Room 3 G Y

Plaster-ND, Skim Coat-ND, Wall

Texture-ND

P-H1-2Gray Plaster with White Skim Coat and

White Wall Texture2 Room 7 G Y

Plaster-ND, Skim Coat-ND, Wall

Texture-ND

P-H1-3Gray Plaster with White Skim Coat and

White Wall Texture1 Room 15 G Y

Plaster-ND, Skim Coat-ND, Wall

Texture-ND

P-H1-4Gray Plaster with White Skim Coat and

White Wall Texture2 Room 19 G Y

Plaster-ND, Skim Coat-ND, Wall

Texture-ND

Tex-H1-1 White Ceiling Texture 1 Room 1 G Y Ceiling Texture-ND

580-582 Tracy Avenue

ND - NONE DETECTED

G - Good, F - Fair, P - Poor

Y- Yes, N - NoPage 44 of 57

B - Basement

Ext - Exterior

*Approximate fitting locations are included on floor plans

Page 56: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

Table 1: Summary of Asbestos Samples and Results

1220 Independence Avenue

Kansas City, Missouri 64106

Sample Number Material Description Floor Location(s) Condition Friable Sample AnalysisLocation(s) of Asbestos Containing

MaterialsQuantities

Tex-H1-2 White Ceiling Texture 1 Room 6 G Y Ceiling Texture-ND

Tex-H1-3 White Ceiling Texture 2 Room 10 G Y Ceiling Texture-ND

SC-H1-1 White Ceiling Skim Coat 1 Room 15 G Y Skim Coat-ND

SC-H1-2 White Ceiling Skim Coat 2 Room 19 G Y Skim Coat-ND

SC-H1-3 White Ceiling Skim Coat 2 Room 23 G Y Skim Coat-ND

DWJC-H1-1 Drywall 1 Room 3 G N Drywall-ND

DWJC-H1-2 Drywall 2 Room 7 G N Drywall-ND

DWJC-H1-3 Drywall with White Joint Compound 1 Room 15 G NDrywall-ND, Joint Compound 4%

Chrysotile. Composite-<1% Chrysotile

DWJC-H1-4 Drywall 2 Room 19 G N Drywall-ND

PW-H1-1 Tan Pipe Wrap 2 Room 8 G Y Pipe Wrap-ND

PW-H1-2 Tan and Black Pipe Wrap 2 Room 8 G Y Pipe Wrap-ND

PW-H1-3 Tan Pipe Wrap 2 Room 16 G Y Pipe Wrap-ND

DC-H1-1 White Door Caulking Ext 580 Door G N

DC-H1-2 White Door Caulking Ext 582 Door G N

WC-H1-1 White Window Caulking Ext North Side Window G N

WC-H1-2 White Window Caulking Ext East Side Window G N

Roof-H1-1 Black Roof Shingle Roof North End of Roof G N Shingle-ND

Roof-H1-2 Black Roof Shingle Roof South End of Roof G N Shingle-ND

Caulking-4% Chrysotile

Caulking-4% Chrysotile

All Exterior Doors 4 Doors @ 25 LF Each (100 LF Total)

All Exterior Windows 34 Windows @ 15 LF Each (510 LF Total)

ND - NONE DETECTED

G - Good, F - Fair, P - Poor

Y- Yes, N - NoPage 45 of 57

B - Basement

Ext - Exterior

*Approximate fitting locations are included on floor plans

Page 57: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

Table 1: Summary of Asbestos Samples and Results

1220 Independence Avenue

Kansas City, Missouri 64106

Sample Number Material Description Floor Location(s) Condition Friable Sample AnalysisLocation(s) of Asbestos Containing

MaterialsQuantities

FTM-H1-19

12"x12" White Mottled Floor Tile with

Yellow Mastic and White Leveling

Compound

1 Room 2 G NFloor Tile-ND, Mastic-ND, Leveling

Compound-ND

FTM-H3-13

12"x12" Blue Mottled Floor Tile with

Yellow Mastic and White Leveling

Compound

1 Room 2 G NFloor Tile-ND, Mastic-ND, Leveling

Compound-ND

CBM-H1-17 4" White Cove Base with Yellow Mastic 1 Room 2 G N Cove Base-ND, Mastic-ND

M-H1-19 Tan Ceramic Tile Mastic 2 Room 11 G N Cove Base-ND, Mastic-ND

C-H1-19 White Bathtub Caulking 2 Room 11 G N Caulking-ND

Sink-H1-1 Tan Sink Undercoat 11 Room 2 G N Sink Undercoat-ND

GD-H1-19 Brown Shower Glue Dot 2 Room 11 G N Glue Dot-ND

P-H1-1 Gray Plaster with White Skim Coat 1 Room 4 G Y Plaster-ND, Skim Coat-ND

P-H1-2 Gray Plaster with White Skim Coat 2 Room 23 G Y Plaster-ND, Skim Coat-ND

P-H1-3 Gray Plaster with White Skim Coat 2 Room 27 G Y Plaster-ND, Skim Coat-ND

P-H1-4 Gray Plaster with White Skim Coat 2 Room 46 G Y Plaster-ND, Skim Coat-ND

SC-H1-1 White Ceiling Skim Coat 1 Room 2 G Y Skim Coat-ND

SC-H1-2 White Ceiling Skim Coat 1 Room 4 G Y Skim Coat-ND

SC-H1-3 White Ceiling Skim Coat 2 Room 9 G Y Skim Coat-ND

SC-H2-1 White Ceiling Skim Coat 1 Room 14 G Y Skim Coat-ND

SC-H2-2 White Ceiling Skim Coat 2 Room 23 G Y Skim Coat-ND

SC-H2-3 White Ceiling Skim Coat 2 Room 24 G Y Skim Coat-ND

572-574-576-578 Tracy Avenue

ND - NONE DETECTED

G - Good, F - Fair, P - Poor

Y- Yes, N - NoPage 46 of 57

B - Basement

Ext - Exterior

*Approximate fitting locations are included on floor plans

Page 58: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

Table 1: Summary of Asbestos Samples and Results

1220 Independence Avenue

Kansas City, Missouri 64106

Sample Number Material Description Floor Location(s) Condition Friable Sample AnalysisLocation(s) of Asbestos Containing

MaterialsQuantities

SC-H3-1 White Ceiling Skim Coat 1 Room 27 G Y Skim Coat-ND

SC-H3-2 White Ceiling Skim Coat 1 Room 32 G Y Skim Coat-ND

SC-H3-3 White Ceiling Skim Coat 2 Room 35 G Y Skim Coat-ND

SC-H4-1 White Ceiling Skim Coat 1 Room 37 G Y Skim Coat-ND

SC-H4-2 White Ceiling Skim Coat 1 Room 41 G Y Skim Coat-ND

SC-H4-3 White Ceiling Skim Coat 2 Room 48 G Y Skim Coat-ND

DWJC-H1-1 Drywall 1 Room 2 G N Drywall-ND

DWJC-H1-2 Drywall 1 Room 17 G N Drywall-ND

DWJC-H1-3 Drywall 1 Room 33 G N Drywall-ND

DWJC-H1-4 Drywall 1 Room 47 G N Drywall-ND

PW-H1-1 Tan Pipe Wrap 2 Room 10 G Y Pipe Wrap-ND

PW-H1-2 Tan Pipe Wrap 2 Room 22 G Y Pipe Wrap-ND

PW-H1-3 Tan and Black Pipe Wrap 2 Room 46 G Y Pipe Wrap-ND

DC-H1-1 White Door Caulking Ext 561 Door G N Caulking-ND

DC-H1-2 White Door Caulking Ext 657 Door G N Caulking-ND

WC-H1-1 White Window Caulking Ext North Side Window G N Caulking-ND

WC-H1-2 White Window Caulking Ext West Side Window G N Caulking-ND

Roof-H1-1 Black Roof Shingle Roof North End of Roof G N Shingle-ND

ND - NONE DETECTED

G - Good, F - Fair, P - Poor

Y- Yes, N - NoPage 47 of 57

B - Basement

Ext - Exterior

*Approximate fitting locations are included on floor plans

Page 59: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

Table 1: Summary of Asbestos Samples and Results

1220 Independence Avenue

Kansas City, Missouri 64106

Sample Number Material Description Floor Location(s) Condition Friable Sample AnalysisLocation(s) of Asbestos Containing

MaterialsQuantities

Roof-H1-2 Black Roof Shingle Roof South End of Roof G N Shingle-ND

FTM-H1-2012"x12" White Mottled Floor Tile with

Yellow Mastic1 Room 2 G N Floor Tile-ND, Mastic-ND

CBM-H1-17 4" White Cove Base with Yellow Mastic 1 Room 2 G N Cove Base-ND, Mastic-ND

M-H1-20 Tan Ceramic Tile Mastic 2 Room 8 G N Mastic-ND

C-H1-20 White Bathtub Caulking 2 Room 8 G N Caulking-ND

Sink-H1-1 Tan Sink Undercoat 1 Room 2 G N Sink Undercoat-ND

P-H1-1 Gray Plaster 1 Room 3 G Y Plaster-ND

P-H1-2 Gray Plaster 2 Room 7 G Y Plaster-ND

P-H1-3 Gray Plaster 1 Room 15 G Y Plaster-ND

P-H1-4 Gray Plaster 2 Room 19 G Y Plaster-ND

568-PW-H1-1 Tan Pipe Wrap with Tan Insulation 2 Room 7 G Y Pipe Wrap-ND, Insulation-3% Amosite

568-PW-H1-2 Tan Pipe Wrap with Tan Insulation 2 Room 15 G Y Pipe Wrap-ND, Insulation-3% Amosite

568-PW-H1-3 Tan Pipe Wrap with Tan Insulation 2 Room 19 G Y Pipe Wrap-ND, Insulation-3% Amosite

DWJC-H1-1 Drywall 1 Room 8 G N Drywall-ND

DWJC-H1-2 Drywall 2 Room 7 G N Drywall-ND

DWJC-H1-3 Drywall 1 Room 15 G N Drywall-ND

DWJC-H1-4 Drywall with White Joint Compound 2 Room 2 G NDrywall-ND, Joint Compound-3%

Chrysotile, Composite-<1% Chrysotile

568-570 Tracy Avenue

See 1200-PI-H1-1

ND - NONE DETECTED

G - Good, F - Fair, P - Poor

Y- Yes, N - NoPage 48 of 57

B - Basement

Ext - Exterior

*Approximate fitting locations are included on floor plans

Page 60: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

Table 1: Summary of Asbestos Samples and Results

1220 Independence Avenue

Kansas City, Missouri 64106

Sample Number Material Description Floor Location(s) Condition Friable Sample AnalysisLocation(s) of Asbestos Containing

MaterialsQuantities

SC-H1-1 White Ceiling Skim Coat 1 Room 2 G Y Skim Coat-ND

SC-H1-2 White Ceiling Skim Coat 1 Room 3 G Y Skim Coat-ND

SC-H1-3 White Ceiling Skim Coat 2 Room 9 G Y Skim Coat-ND

SC-H2-1 White Ceiling Skim Coat 1 Room 17 G Y Skim Coat-ND

SC-H2-2 White Ceiling Skim Coat 1 Room 20 G Y Skim Coat-ND

SC-H2-3 White Ceiling Skim Coat 2 Room 24 G Y Skim Coat-ND

DC-H1-1 White Door Caulking Ext 568 Door G N Caulking-ND

DC-H1-2 White Door Caulking Ext 570 Door G N Caulking-ND

WC-H1-1 White Window Caulking Ext East Side Window G N Caulking-ND

WC-H1-2 White Window Caulking Ext West Side Window G N Caulking-ND

Roof-H1-1 Black Roof Shingle Roof North End of Roof G N Shingle-ND

Roof-H1-2 Black Roof Shingle Roof South End of Roof G N Shingle-ND

FTM-H1-2112"x12" White Mottled Floor Tile with

Yellow Mastic1 Room 2 G N Floor Tile-ND, Mastic-ND

FTM-H3-1412"x12" Blue Mottled Floor Tile with

Yellow Mastic1 Room 2 G N Floor Tile-ND, Mastic-ND

CBM-H1-184" White Cove Base with Yellow Mastic

and White Wall Texture1 Room 2 G N

Cove Base-ND, Mastic-ND, Wall

Texture-ND

CBM-H3-3 2" White Cove Base with Yellow Mastic 1 Room 5 G N Cove Base-ND, Mastic-ND

Sink-H1-1 Tan Sink Undercoat 1 Room 2 G N Sink Undercoat-ND

581-583-585-587 Tracy Avenue

ND - NONE DETECTED

G - Good, F - Fair, P - Poor

Y- Yes, N - NoPage 49 of 57

B - Basement

Ext - Exterior

*Approximate fitting locations are included on floor plans

Page 61: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

Table 1: Summary of Asbestos Samples and Results

1220 Independence Avenue

Kansas City, Missouri 64106

Sample Number Material Description Floor Location(s) Condition Friable Sample AnalysisLocation(s) of Asbestos Containing

MaterialsQuantities

DWJC-H1-1 Drywall with White Joint Compound 1 Room 2 G NDrywall-ND, Joint Compound-<1%

Chrysotile, Composite - <1% Chrysotile

DWJC-H1-2 Drywall 1 Room 5 G N Drywall-ND

DWJC-H1-3 Drywall 2 Room 23 G N Drywall-ND

DWJC-H1-4 Drywall with White Joint Compound 2 Room 47 G NDrywall-ND, Joint Compound-2%

Chrysotile, Composite-<1% Chrysotile

GD-H1-21 Brown Shower Glue Dot 2 Room 11 G N Glue Dot-ND

PW-H1-1 Tan Pipe Wrap with Black Pipe Insulation 2 Room 11 G Y Pipe Wrap-ND, Pipe Insulation-ND

PW-H1-2 Tan Pipe Wrap 2 Room 23 G Y Pipe Wrap-ND

PW-H1-3 Tan Pipe Wrap 2 Room 47 G Y Pipe Wrap-ND

M-H1-21Tan Ceramic Tile Mastic with White Wall

Texture2 Room 11 G N Mastic-ND, Wall Texture-ND

C-H1-21 White Bathtub Caulking 2 Room 11 G N Caulking-ND

P-H1-1 Gray Plaster with White Skim Coat 1 Room 4 G Y Plaster-ND, Skim Coat-ND

P-H1-2 Gray Plaster with White Wall Texture 1 Room 17 G Y Plaster-ND, Wall Texture-ND

P-H1-3 Gray Plaster with White Skim Coat 1 Room 33 G Y Plaster-ND, Skim Coat-ND

P-H1-4 Gray Plaster with White Wall Texture 1 Room 41 G Y Plaster-ND, Wall Texture-ND

SC-H1-1 White Ceiling Skim Coat 1 Room 2 G Y Skim Coat-ND

SC-H1-2 White Ceiling Skim Coat 2 Room 6 G Y Skim Coat-ND

SC-H1-3 White Ceiling Skim Coat 2 Room 11 G Y Skim Coat-ND

SC-H2-1 White Ceiling Skim Coat 1 Room 15 G Y Skim Coat-ND

ND - NONE DETECTED

G - Good, F - Fair, P - Poor

Y- Yes, N - NoPage 50 of 57

B - Basement

Ext - Exterior

*Approximate fitting locations are included on floor plans

Page 62: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

Table 1: Summary of Asbestos Samples and Results

1220 Independence Avenue

Kansas City, Missouri 64106

Sample Number Material Description Floor Location(s) Condition Friable Sample AnalysisLocation(s) of Asbestos Containing

MaterialsQuantities

SC-H2-2 White Ceiling Skim Coat 1 Room 20 G Y Skim Coat-ND

SC-H2-3 White Ceiling Skim Coat 2 Room 24 G Y Skim Coat-ND

SC-H3-1 White Ceiling Skim Coat 1 Room 25 G Y Skim Coat-ND

SC-H3-2 White Ceiling Skim Coat 1 Room 27 G Y Skim Coat-ND

SC-H3-3 White Ceiling Skim Coat 1 Room 29 G Y Skim Coat-ND

SC-H4-1 White Ceiling Skim Coat 2 Room 44 G Y Skim Coat-ND

SC-H4-2 White Ceiling Skim Coat 2 Room 47 G Y Skim Coat-ND

SC-H4-3 White Ceiling Skim Coat 2 Room 48 G Y Skim Coat-ND

DC-H1-1 White Door Caulking Ext 581 Door G N Caulking-ND

DC-H1-2 White Door Caulking Ext 587 Door G N Caulking-ND

WC-H1-1 White Window Caulking Ext East Side Window G N Caulking-ND

WC-H1-2 White Window Caulking Ext West Side Window G N Caulking-ND

Roof-H1-1 Black Roof Shingle Roof North End of Roof G N Shingle-ND

Roof-H1-2 Black Roof Shingle Roof South End of Roof G N Shingle-ND

FTM-H1-2212"x12" White Mottled Floor Tile with

Yellow Mastic1 Room 2 G N Floor Tile-ND, Mastic-ND

FTM-H3-1512"x12" Blue Mottled Floor Tile with

Yellow Mastic1 Room 2 G N Floor Tile-ND, Mastic-ND

CBM-H1-194" White Cove Base with Yellow Mastic

and White Wall Texture1 Room 2 G N Cove Base-ND, Mastic-ND, Texture-ND

560-562-564-566 Tracy Avenue

ND - NONE DETECTED

G - Good, F - Fair, P - Poor

Y- Yes, N - NoPage 51 of 57

B - Basement

Ext - Exterior

*Approximate fitting locations are included on floor plans

Page 63: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

Table 1: Summary of Asbestos Samples and Results

1220 Independence Avenue

Kansas City, Missouri 64106

Sample Number Material Description Floor Location(s) Condition Friable Sample AnalysisLocation(s) of Asbestos Containing

MaterialsQuantities

CBM-H3-4 2" White Cove Base with Yellow Mastic 2 Room 12 G N Cove Base-ND, Mastic-ND

Sink-H1-1 Tan Sink Undercoat 1 Room 2 G N Sink Undercoat-ND

GD-H1-22 Brown Shower Glue Dot 2 Room 11 G N Glue Dot-ND

PW-H1-1

Tan Pipe Covering and Tan Pipe Wrap

with Light Gray Mastic, Black Tar Paper,

and Tan Insulation

2 Room 11 G Y

Covering-ND, Pipe Wrap-ND, Mastic-

ND, Tar Paper-ND, Insulation-3%

Amosite

PW-H1-2Tan Pipe Wrap with Light Gray Mastic,

Black Tar Paper, and Tan Insulation2 Room 22 G Y

Pipe Wrap-ND, Mastic-ND, Tar Paper-

ND, Insulation-3% Amosite

PW-H1-3 Tan Pipe Wrap with Light Gray Mastic 2 Room 46 G Y Pipe Wrap - ND, Mastic - ND

P-H1-1 Gray Plaster 1 Room 3 G Y Plaster-ND

P-H1-2 Gray Plaster 2 Room 21 G Y Plaster-ND

P-H1-3 Gray Plaster 1 Room 27 G Y Plaster-ND

P-H1-4 Gray Plaster 2 Room 47 G Y Plaster-ND

M-H1-22 Tan Ceramic Tile Mastic 2 Room 11 G N Mastic-ND

C-H1-22 White Bathtub Caulking 2 Room 11 G N Caulking-ND

SC-H1-1 White Ceiling Skim Coat 1 Room 2 G N Skim Coat-ND

SC-H1-2 White Ceiling Skim Coat 1 Room 5 G Y Skim Coat-ND

SC-H1-3 White Ceiling Skim Coat 2 Room 12 G Y Skim Coat-ND

SC-H2-1 White Ceiling Skim Coat 1 Room 14 G Y Skim Coat-ND

SC-H2-2 White Ceiling Skim Coat 2 Room 22 G Y Skim Coat-ND

SC-H2-3 White Ceiling Skim Coat 2 Room 24 G Y Skim Coat-ND

See 1200-PI-H1-1

ND - NONE DETECTED

G - Good, F - Fair, P - Poor

Y- Yes, N - NoPage 52 of 57

B - Basement

Ext - Exterior

*Approximate fitting locations are included on floor plans

Page 64: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

Table 1: Summary of Asbestos Samples and Results

1220 Independence Avenue

Kansas City, Missouri 64106

Sample Number Material Description Floor Location(s) Condition Friable Sample AnalysisLocation(s) of Asbestos Containing

MaterialsQuantities

SC-H3-1 White Ceiling Skim Coat 1 Room 25 G Y Skim Coat-ND

SC-H3-2 White Ceiling Skim Coat 1 Room 27 G Y Skim Coat-ND

SC-H3-3 White Ceiling Skim Coat 1 Room 28 G Y Skim Coat-ND

SC-H4-1 White Ceiling Skim Coat 1 Room 37 G Y Skim Coat-ND

SC-H4-2 White Ceiling Skim Coat 2 Room 45 G Y Skim Coat-ND

SC-H4-3 White Ceiling Skim Coat 2 Room 47 G Y Skim Coat-ND

DC-H1-1 White Door Caulking Ext 560 Door G N Caulking-ND

DC-H1-2 White Door Caulking Ext 564 Door G N Caulking-ND

WC-H1-1 White Window Caulking Ext East Side Window G N Caulking-ND

WC-H1-2 White Window Caulking Ext West Side Window G N Caulking-ND

Roof-H1-1 Black Roof Shingle Roof North End of Roof G N Shingle-ND

Roof-H1-2 Black Roof Shingle Roof South End of Roof G N Shingle-ND

DWJC-H1-1 Drywall with White Joint Compound 1 Room 2 G NDrywall-ND, Joint Compound-2%

Chrysotile, Composite-<1% Chrysotile

DWJC-H1-2 Drywall with White Joint Compound 1 Room 15 G NDrywall-ND, Joint Compound-<1%

Chrysotile

DWJC-H1-3 Drywall 1 Room 27 G N Drywall-ND

DWJC-H1-4 Drywall 2 Room 46 G N Drywall-ND

1220 Independence Avenue

ND - NONE DETECTED

G - Good, F - Fair, P - Poor

Y- Yes, N - NoPage 53 of 57

B - Basement

Ext - Exterior

*Approximate fitting locations are included on floor plans

Page 65: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

Table 1: Summary of Asbestos Samples and Results

1220 Independence Avenue

Kansas City, Missouri 64106

Sample Number Material Description Floor Location(s) Condition Friable Sample AnalysisLocation(s) of Asbestos Containing

MaterialsQuantities

FTM-H1-112"x12" Light Gray Mottled Floor Tile

with Black Mastic1 Room 6 G N Floor Tile-ND, Mastic-ND

FTM-H1-212"x12" Light Gray Mottled Floor Tile

with Black Mastic1 Room 9 G N Floor Tile-ND, Mastic-ND

FTM-H1-312"x12" Light Gray Mottled Floor Tile

with Black Mastic1 Room 7 G N Floor Tile-ND, Mastic ND

FTM-H2-112"x12" Dark Gray Mottled Floor Tile

with Black Mastic1 Room 6 G N Floor Tile-ND, Mastic-5% Chrysotile

FTM-H2-212"x12" Dark Gray Mottled Floor Tile

with Black Mastic1 Room 7 G N Floor Tile-ND, Mastic-5% Chrysotile

FTM-H2-312"x12" Dark Gray Mottled Floor Tile

with Black Mastic1 Room 9 G N Floor Tile-ND, Mastic-5% Chrysotile

CT-H1-1 2'x2' Plain White Ceiling Tile 1 Room 6 G Y Ceiling Tile-ND

CT-H1-2 2'x2' Plain White Ceiling Tile 1 Room 7 G Y Ceiling Tile-ND

CT-H1-3 2'x2' Plain White Ceiling Tile 1 Room 8 G Y Ceiling Tile-ND

CT-H2-12'x4' White Ceiling Tile with Medium

Fissures1 Room 1 G Y Ceiling Tile-ND

CT-H2-22'x4' White Ceiling Tile with Medium

Fissures1 Room 4 G Y Ceiling Tile-ND

CT-H2-32'x4' White Ceiling Tile with Medium

Fissures1 Room 9 G Y Ceiling Tile-ND

CT-H3-1 12"x12" White Ceiling Tile 1 Room 6 G Y Ceiling Tile-ND

CT-H3-2 12"x12" White Ceiling Tile 1 Room 7 G Y Ceiling Tile-ND

CT-H3-3 12"x12" White Ceiling Tile 1 Room 14 G Y Ceiling Tile-ND

CBM-H1-1 4" Tan Cove Base with Yellow Mastic 1 Room 1 G N Cove Base-ND, Mastic-ND

CBM-H1-2 4" Tan Cove Base with Yellow Mastic 1 Room 4 G N Cove Base-ND, Mastic-ND

CBM-H1-3 4" Tan Cove Base with Yellow Mastic 1 Room 9 G N Cove Base-ND, Mastic-ND

Room 6, 7, 8, 9, and 14 1,615 SF (FTM-H1-1 is Mixed with FTM-H2-1)

ND - NONE DETECTED

G - Good, F - Fair, P - Poor

Y- Yes, N - NoPage 54 of 57

B - Basement

Ext - Exterior

*Approximate fitting locations are included on floor plans

Page 66: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

Table 1: Summary of Asbestos Samples and Results

1220 Independence Avenue

Kansas City, Missouri 64106

Sample Number Material Description Floor Location(s) Condition Friable Sample AnalysisLocation(s) of Asbestos Containing

MaterialsQuantities

CBM-H2-1 4" Black Cove Base with Yellow Mastic 1 Room 2 G N Cove Base-ND, Mastic-ND

CBM-H2-2 4" Black Cove Base with Yellow Mastic 1 Room 4 G N Cove Base-ND, Mastic-ND

CBM-H2-3 4" Black Cove Base with Yellow Mastic 1 Room 5 G N Cove Base-ND, Mastic-ND

M-H1-1 Yellow Carpet Mastic 1 Room 1 G N Mastic-ND

M-H1-2 Yellow Carpet Mastic 1 Room 4 G N Mastic-ND

M-H1-3 Yellow Carpet Mastic 1 Room 5 G N Mastic-ND

DWJC-H1-1 Drywall with White Joint Compound 1 Room 3 G N Drywall-ND, Joint Compound-ND

DWJC-H1-2 Drywall 1 Room 8 G N Drywall-ND

DWJC-H1-3 Drywall 1 Room 11 G N Drywall-ND

P-H1-1 White Skim Coat 1 Room 1 G Y Skim Coat-ND

P-H1-2 Gray Plaster with White Skim Coat 1 Room 3 G Y Plaster-ND, Skim Coat-ND

P-H1-3 Gray Plaster with White Skim Coat 1 Room 5 G Y Plaster-ND, Skim Coat-ND

P-H1-4 Gray Plaster with White Skim Coat 1 Room 8 G Y Plaster-ND, Skim Coat-ND

P-H1-5 Gray Plaster with White Skim Coat 1 Room 13 G Y Plaster-ND, Skim Coat-ND

WC-H1-1 White Window Caulking Ext North Side Window G N Caulking-ND

WC-H1-2 White Window Caulking Ext West Side Window G N Caulking-ND

WC-H1-3 White Window Caulking Ext South Side Window G N Caulking-ND

DC-H1-1 White Door Caulking Ext North Side Door G N Caulking-ND

ND - NONE DETECTED

G - Good, F - Fair, P - Poor

Y- Yes, N - NoPage 55 of 57

B - Basement

Ext - Exterior

*Approximate fitting locations are included on floor plans

Page 67: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

Table 1: Summary of Asbestos Samples and Results

1220 Independence Avenue

Kansas City, Missouri 64106

Sample Number Material Description Floor Location(s) Condition Friable Sample AnalysisLocation(s) of Asbestos Containing

MaterialsQuantities

DC-H1-2 White Door Caulking Ext East Side Door G N Caulking-ND

DC-H1-3 White Door Caulking Ext South Side Door G N Caulking-ND

Core-H1-1 Roof Core Roof East End of Roof G N

Roofing-ND, Tar-ND, Tar Paper-ND,

Brown Insulation-ND, Yellow

Insulation-ND, Backing-ND

Core-H2-1 Roof Core Roof West End of Roof G N

Roofing-ND, Tar-ND, Tar Paper-ND,

Brown Insulation-ND, Yellow

Insulation-ND, Backing-ND

F-H1-1 Gray Flashing Roof Vent Caps/Pipes G N Flashing-ND

CT-H1-12'x4' White Ceiling Tile with Medium

Fissures1 Room 2 G Y Ceiling Tile-ND

CT-H1-22'x4' White Ceiling Tile with Medium

Fissures1 Room 5 G Y Ceiling Tile-ND

CT-H1-32'x4' White Ceiling Tile with Medium

Fissures1 Room 8 G Y Ceiling Tile-ND

DWJC-H1-1 Drywall 1 Room 1 G N Drywall-ND

DWJC-H1-2 Drywall 1 Room 4 G N Drywall-ND

DWJC-H1-3 Drywall 1 Room 6 G N Drywall-ND

Sink-H1-1 Tan Sink Undercoat 1 Room 1 G N Sink Undercoat-ND

DC-H1-1 White Door Caulking Ext East Side Door G N Caulking-ND

DC-H1-2 White Door Caulking Ext North Side Door G N Caulking-ND

DC-H1-3 White Door Caulking Ext North Side Door G N Caulking-ND

WC-H1-1 White Window Caulking Ext North Side Window G N Caulking-ND

WC-H1-2 White Window Caulking Ext North Side Window G N Caulking-ND

Community Center

ND - NONE DETECTED

G - Good, F - Fair, P - Poor

Y- Yes, N - NoPage 56 of 57

B - Basement

Ext - Exterior

*Approximate fitting locations are included on floor plans

Page 68: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

Table 1: Summary of Asbestos Samples and Results

1220 Independence Avenue

Kansas City, Missouri 64106

Sample Number Material Description Floor Location(s) Condition Friable Sample AnalysisLocation(s) of Asbestos Containing

MaterialsQuantities

WC-H1-3 White Window Caulking Ext South Side Window G N Caulking-ND

Core-H1-1 Brown Roofing Roof East End of Roof G N Roofing-ND

Core-H2-1 Brown Roofing Roof West End of Roof G N Roofing-ND

F-H1-1 Black Flashing Roof Vent Caps/Pipes G N Flashing-ND

ND - NONE DETECTED

G - Good, F - Fair, P - Poor

Y- Yes, N - NoPage 57 of 57

B - Basement

Ext - Exterior

*Approximate fitting locations are included on floor plans

Page 69: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

1

5

3

2

4

13

14

15

16

17

25

26

27

28

29

37

38

39

40

41

560-562-564-566 Tracy Avenue-First Floor

TSI Pipe Fitting

Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Page 70: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

6

78

9

10 11

12

18

1920

23 22

21

24

30

3132

33

34 35

36

42

4344

45

47 46

48

560-562-564-566 Tracy Avenue-Second Floor

TSI Pipe Fitting

Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Page 71: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

560-562-564-566 Tracy Avenue-Crawlspace/Basement

49

50

Brown
Polygon
Brown
Polygonal Line
Page 72: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

1

2

3

456

78

9

10

1112 13

1415

16

561-563 Tracy Avenue-First Floor

TSI Pipe Fitting

Brown
Line
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Page 73: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

17

181920

2122

23

24

2526 27

2829

30

(2)

(1)

561-563 Tracy Avenue-Second Floor

TSI Pipe Fitting

Brown
Line
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Page 74: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

31

323334

3536

37

38

3940 41

4243

44

(1)

(2)

561-563 Tracy Avenue-Third Floor

TSI Pipe Fitting

Brown
Line
Brown
Polygon
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Page 75: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

561-563 Tracy Avenue-Crawlspace

Brown
Polygon
Page 76: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

1

2

3

456

78

9

10

1112 13

1415

16

565-567 Tracy Avenue-First Floor

TSI Pipe Fitting

Brown
Line
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Page 77: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

17

181920

2122

23

24

2526 27

2829

30

(2)

(1)

565-567 Tracy Avenue-Second Floor

TSI Pipe Fitting

Brown
Line
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Page 78: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

31

323334

3536

37

38

3940 41

4243

44

(1)

(2)

565-567 Tracy Avenue-Third Floor

TSI Pipe Fitting

Brown
Line
Brown
Polygon
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Page 79: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

565-567 Tracy Avenue-Crawlspace

TSI Pipe Fitting

Brown
Polygon
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Page 80: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

1

2

3

4

56

1314

15

16

1718

568-570 Tracy Avenue-First Floor

TSI Pipe Fittings

Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Page 81: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

7

8910

11 12

19

2021

22

2324

568-570 Tracy Avenue-Second Floor

TSI Pipe Fittings

Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Page 82: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

568-570 Tracy Avenue-Crawlspace

Brown
Polygon
Page 83: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

1

2

3

456

78

9

10

1112 13

1415

16

569-571 Tracy Avenue-First Floor

TSI Pipe Fitting

Brown
Line
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Page 84: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

17

181920

2122

23

24

2526 27

2829

30

(2)

(1)

569-571 Tracy Avenue-Second Floor

TSI Pipe Fitting

Brown
Line
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Page 85: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

31

323334

3536

37

38

3940 41

4243

44

(1)

(2)

569-571 Tracy Avenue-Third Floor

TSI Pipe Fitting

Brown
Line
Brown
Polygon
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Page 86: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

569-571 Tracy Avenue-Crawlspace

Brown
Polygon
Page 87: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

1

5

3

2

4

13

14

15

16

17

25

26

27

28

29

37

38

39

40

41

572-574-576-578 Tracy Avenue-First Floor

TSI Pipe Fitting

Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Page 88: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

6

78

9

10 11

12

18

1920

23 22

21

24

30

3132

33

34 35

36

42

4344

45

47 46

48

572-574-576-578 Tracy Avenue-Second Floor

TSI Pipe Fitting

Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Page 89: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

572-574-576-578 Tracy Avenue-Crawlspace

TSI Pipe Fitting

Brown
Polygon
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Page 90: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

1

2

3

4

5

67

8

9

10

11

12

1314

1516

17

18

19

2021

22

23

24

25

26

2728

29

573-575-577-579 Tracy Avenue-First Floor

TSI Pipe Fitting

Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Page 91: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

30

31

32

33

34

3536

37

38

39

40

41

4243

44

45

46

47

48

4950

51

52

53

54

55

5657

58

573-575-577-579 Tracy Avenue-Second Floor

TSI Pipe Fitting

Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Page 92: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

59

60

61

62

63

6465

66

67

68

69

70

7172

73

74

75

76

77

7879

80

81

82

83

84

8576

87

573-575-577-579 Tracy Avenue-Third Floor

TSI Pipe Fitting

Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Polygon
Brown
Oval
Page 93: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

573-575-577-579 Tracy Avenue-Crawlspace

TSI Pipe Fitting

Brown
Polygon
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Page 94: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

1

2

3

4

56

1314

15

16

1718

580-582 Tracy Avenue-First Floor

TSI Pipe Fittings

Window Caulking

Door Caulking

Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Line
Brown
Line
Brown
Line
Brown
Line
Brown
Line
Brown
Line
Brown
Line
Brown
Line
Brown
Line
Brown
Line
Brown
Line
Brown
Line
Brown
Line
Brown
Line
Brown
Line
Brown
Line
Brown
Line
Brown
Line
Brown
Line
Brown
Line
Page 95: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

7

8910

11 12

19

2021

22

2324

580-582 Tracy Avenue-Second Floor

TSI Pipe Fittings

Window Caulking

Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Line
Brown
Line
Brown
Line
Brown
Line
Brown
Line
Brown
Line
Brown
Line
Brown
Line
Brown
Line
Brown
Line
Brown
Line
Brown
Line
Brown
Line
Brown
Line
Brown
Line
Page 96: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

580-582 Tracy Avenue-Crawlspace

Brown
Polygon
Page 97: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

1

5

3

2

4

13

14

15

16

17

25

26

27

28

29

37

38

39

40

41

581-583-585-587 Tracy Avenue-First Floor

TSI Pipe Fitting

Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Page 98: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

6

78

9

10 11

12

18

1920

23 22

21

24

30

3132

33

34 35

36

42

4344

45

47 46

48

581-583-585-587 Tracy Avenue-Second Floor

TSI Pipe Fitting

Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Page 99: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

581-583-585-587 Tracy Avenue-Crawlspace

Brown
Polygon
Page 100: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

1

2

34

5

6 7 8 9

10

11

1213

1415 16 17 18

19

20

21 22

23

27 26 25 24

28

29

30 31

3236 35 34 33

37

1200-1202-1204-1206 Independence Avenue-First Floor

TSI Pipe Fittings

Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Page 101: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

38

394041

42

43 44 45 46

47

48

4950

51

52 53 54 55

56

57 58

59

63 62 61 60

64

65

66 67

6872 71 70 69

73

1200-1202-1204-1206 Independence Avenue-Second Floor

TSI Pipe Fittings

Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Page 102: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

74

75

7677

78

79 80 81 82

83

84

8586

87

88 89 90 91

9293

94 95

96

100 99 98 97

101

102103 104

105109 108 107 106

110

1200-1202-1204-1206 Independence Avenue-Third Floor

TSI Pipe Fittings

Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Page 103: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

111

115

113

114112

1200-1202-1204-1206 Independence Avenue-Basement

Brown
Rectangle
Brown
Polygonal Line
Brown
Polygonal Line
Page 104: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

1

2

3

456

78

9

10

1112 13

1415

16

1208 Independence Avenue-First Floor

TSI Pipe Fitting

Brown
Line
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Page 105: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

17

181920

2122

23

24

2526 27

2829

30

(2)

(1)

1208 Independence Avenue-Second Floor

TSI Pipe Fitting

Brown
Line
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Page 106: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

31

323334

3536

37

38

3940 41

4243

44

(1)

(2)

1208 Independence Avenue-Third Floor

TSI Pipe Fitting

Brown
Line
Brown
Polygon
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Page 107: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

1208 Independence Avenue-Crawlspace

Brown
Polygon
Page 108: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

1

2

3

456

78

9

10

1112 13

1415

16

1210 Independence Avenue-First Floor

TSI Pipe Fitting

Brown
Line
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Page 109: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

17

181920

2122

23

24

2526 27

2829

30

(2)

(1)

1210 Independence Avenue-Second Floor

TSI Pipe Fitting

Brown
Line
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Page 110: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

31

323334

3536

37

38

3940 41

4243

44

(1)

(2)

1210 Independence Avenue-Third Floor

TSI Pipe Fitting

Brown
Line
Brown
Polygon
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Page 111: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

1210 Independence Avenue-Crawlspace

Brown
Polygon
Page 112: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

1

2

3

4

5

67

8

9

10

11

12

1314

1516

17

18

19

2021

22

23

24

25

26

2728

29

1212-1214 Independence Avenue-First Floor

TSI Pipe Fitting

Window Caulking

Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Line
Brown
Line
Brown
Line
Brown
Line
Brown
Line
Brown
Line
Brown
Line
Brown
Line
Brown
Line
Brown
Line
Brown
Line
Brown
Line
Brown
Line
Brown
Line
Brown
Line
Brown
Line
Brown
Line
Brown
Line
Brown
Line
Brown
Line
Brown
Line
Brown
Line
Brown
Line
Brown
Line
Brown
Line
Page 113: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

30

31

32

33

34

3536

37

38

39

40

41

4243

44

45

46

47

48

4950

51

52

53

54

55

5657

58

1212-1214 Independence Avenue-Second Floor

TSI Pipe Fitting

Window Caulking

Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Line
Brown
Line
Brown
Line
Brown
Line
Brown
Line
Brown
Line
Brown
Line
Brown
Line
Brown
Line
Brown
Line
Brown
Line
Brown
Line
Brown
Line
Brown
Line
Brown
Line
Brown
Line
Brown
Line
Brown
Line
Brown
Line
Brown
Line
Brown
Line
Brown
Line
Brown
Line
Brown
Line
Brown
Line
Page 114: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

59

60

61

62

63

6465

66

67

68

69

70

7172

73

74

75

76

77

7879

80

81

82

83

84

8576

87

1212-1214 Independence Avenue-Third Floor

TSI Pipe Fitting

Window Caulking

Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Line
Brown
Line
Brown
Line
Brown
Line
Brown
Line
Brown
Line
Brown
Line
Brown
Line
Brown
Line
Brown
Line
Brown
Line
Brown
Line
Brown
Line
Brown
Line
Brown
Line
Brown
Line
Brown
Line
Brown
Line
Brown
Line
Brown
Line
Brown
Line
Brown
Line
Brown
Line
Brown
Line
Brown
Line
Page 115: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

1212-1214 Independence Avenue-Crawlspace

TSI Pipe Fitting

Brown
Polygon
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Page 116: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

1

2

3

456

78

9

10

1112 13

1415

16

1216 Independence Avenue-First Floor

TSI Pipe Fitting

Brown
Line
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Page 117: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

17

181920

2122

23

24

2526 27

2829

30

(2)

(1)

1216 Independence Avenue-Second Floor

TSI Pipe Fitting

Brown
Line
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Page 118: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

31

323334

3536

37

38

3940 41

4243

44

(1)

(2)

1216 Independence Avenue-Third Floor

TSI Pipe Fitting

Brown
Line
Brown
Polygon
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Page 119: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

1216 Independence Avenue-Crawlspace

Brown
Polygon
Page 120: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

1

2

3

456

78

9

10

1112 13

1415

16

1218 Independence Avenue-First Floor

TSI Pipe Fitting

Brown
Line
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Page 121: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

17

181920

2122

23

24

2526 27

2829

30

(2)

(1)

1218 Independence Avenue-Second Floor

TSI Pipe Fitting

Brown
Line
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Page 122: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

31

323334

3536

37

38

3940 41

4243

44

(1)

(2)

1218 Independence Avenue-Third Floor

TSI Pipe Fitting

Brown
Line
Brown
Polygon
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Page 123: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

1218 Independence Avenue-Crawlspace

TSI Pipe Fitting

Brown
Polygon
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Page 124: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

34 5 14 13 12

2

1

6

7

8

9

10

11

Black Floor Tile Mastic Under Non-ACM Floor Tile

Brown
Rectangle
Brown
Polygonal Line
Brown
Polygonal Line
Brown
Polygonal Line
Brown
Line
Brown
Polygonal Line
Brown
Line
Brown
Line
Brown
Line
Brown
Line
Brown
Line
Brown
Polygon
Brown
Polygon
Brown
Rectangle
Page 125: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

1

2

3

4

5

67

8

9

10

11

12

1314

1516

17

18

19

2021

22

23

24

25

26

2728

29

1300-1302-1304-1306 Independence Avenue-First Floor

TSI Pipe Fitting

Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Page 126: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

30

31

32

33

34

3536

37

38

39

40

41

4243

44

45

46

47

48

4950

51

52

53

54

55

5657

58

1300-1302-1304-1306 Independence Avenue-Second Floor

TSI Pipe Fitting

Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Page 127: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

59

60

61

62

63

6465

66

67

68

69

70

7172

73

74

75

76

77

7879

80

81

82

83

84

8576

87

1300-1302-1304-1306 Independence Avenue-Third Floor

TSI Pipe Fitting

Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Polygon
Brown
Oval
Page 128: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

1300-1302-1304-1306 Independence Avenue-Crawlspace

TSI Pipe Fitting

Brown
Polygon
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Page 129: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

1

5

3

2

4

13

14

15

16

17

25

26

27

28

29

37

38

39

40

41

1308-1310-1312-1314 Independence Avenue-First Floor

TSI Pipe Fitting

Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Page 130: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

6

78

9

10 11

12

18

1920

23 22

21

24

30

3132

33

34 35

36

42

4344

45

47 46

48

1308-1310-1312-1314 Independence Avenue-Second Floor

TSI Pipe Fitting

Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Page 131: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

1308-1310-1312-1314 Independence Avenue-Crawlspace

TSI Pipe Fitting

Brown
Polygon
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Page 132: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

1

23

4

56

7

8

13

1211

10

1415

16

1718

19

20

22

2324

25

9 21

1316-1322 Independence Avenue-First Floor

TSI Pipe Fitting

Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Page 133: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

27

2829

30

3132

33

34

39

3837

36

4041

42

4344

45

46

48

4950

51

35 47

1316-1322 Independence Avenue-First Floor

TSI Pipe Fitting

Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Page 134: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

52

5354

55

5657

58

59

64

6362

61

6566

67

6869

70

71

73

7475

76

60 72

1316-1322 Independence Avenue-Third Floor

TSI Pipe Fitting

Brown
Polygon
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Page 135: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

77

78

79

808182

83

84

86

85

1316-1322 Independence Avenue-Basement

TSI Pipe Fitting

Floor Tile with Mastic Under Non-ACM Floor Tile with Mastic

Brown
Polygon
Brown
Polygonal Line
Brown
Polygonal Line
Brown
Polygonal Line
Brown
Polygonal Line
Brown
Polygonal Line
Brown
Polygonal Line
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Polygon
Brown
Oval
Brown
Rectangle
Page 136: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

1

2

3

456

78

9

10

1112 13

1415

16

1324-1326 Independence Avenue-First Floor

TSI Pipe Fitting

Brown
Line
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Page 137: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

17

181920

2122

23

24

2526 27

2829

30

(2)

(1)

1324-1326 Independence Avenue-Second Floor

TSI Pipe Fitting

Brown
Line
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Page 138: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

31

323334

3536

37

38

3940 41

4243

44

(1)

(2)

1324-1326 Independence Avenue-Third Floor

TSI Pipe Fitting

Brown
Line
Brown
Polygon
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Page 139: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

1324-1326 Independence Avenue-Crawlspace

TSI Pipe Fitting

Brown
Polygon
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Page 140: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

1

2

3

4

5

67

8

9

10

11

12

1314

1516

17

18

19

2021

22

23

24

25

26

2728

29

1328-1330-1332-1334 Independence Avenue-First Floor

TSI Pipe Fitting

Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Page 141: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

30

31

32

33

34

3536

37

38

39

40

41

4243

44

45

46

47

48

4950

51

52

53

54

55

5657

58

1328-1330-1332-1334 Independence Avenue-Second Floor

TSI Pipe Fitting

Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Page 142: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

59

60

61

62

63

6465

66

67

68

69

70

7172

73

74

75

76

77

7879

80

81

82

83

84

8576

87

1328-1330-1332-1334 Independence Avenue-Third Floor

TSI Pipe Fitting

Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Polygon
Brown
Oval
Page 143: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

1328-1330-1332-13341214 Independence Avenue-Crawlspace

TSI Pipe Fitting

Brown
Polygon
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Brown
Oval
Page 144: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

1

4 3 2

7

8

6 5

Brown
Rectangle
Brown
Polygonal Line
Brown
Polygonal Line
Brown
Polygonal Line
Brown
Line
Brown
Line
Brown
Line
Page 145: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

APPENDIX C

HOUSHOLD HAZARDOUS WASTE INVENTORY

(ONE PAGE)

Page 146: REMEDIAL ACTION PLAN - hakc.orghakc.org/sites/www/Uploads/Planning/Procurement/Exhibit 9 New Horizons... · and quality control procedures that will be applied to address remedial

Household Hazardous Waste and Hazardous Waste Inventory

1220 Independence Avenue

Kansas City, Missouri 64106

Household/Hazardous Waste

Mercury Ampules

4-foot Silver Fluorescent Bulbs

Non-PCB Ballasts

4-inch Fluorescent Bulbs

Ballasts for 4-inch Fluorescent Bulbs

868 Throughout Apartments

868 Throughout Apartments

Locations

1200-1202-1204-1206 Independence Avenue-Unit 1204

and 1206 A; 1212-1214 Independence Avenue-Unit

1214 1/2, 1214 1/2 A, and 1212 1/2 B; 1328-1330-1332-

1334 Independence Avenue-Unit 1332 B and 1334 B;

1300-1302-1304-1306 Independence Avenue-Unit 1302

and 1304 B; 561-563 Tracy Avenue-Unit 563 A; 565-

567 Tracy Avenue-Unit 567 A and 565 B

1200-1202-1204-1206 Independence Avenue-

Basement, Community Center; 1200 Independence

Avenue-Throughout

Quantity