18 July 2007 1 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 0 1000 2000 3000 4000 5000 6000 7000 p [GeV/c] I/Inom Reminder Dilution kicker system MKB is staged (2H, 2V) Limits extracted intensity at 7 TeV to 50% of nominal For 25ns spacing, this is a limit on single bunch intensity, NOT on total in LHC Not an issue for “Stage I” : could safely dump full beam intensity up to about 2 TeV – (no interlock - rather unlikely to be needed in first few months…) BTVDD trace – full dilution BTVDD trace – staged MKB Allowed dumped intensity (staged MKB)

Upload: manasa

Post on 18-Mar-2016

44 views

Category:

Documents


0 download

DESCRIPTION

Reminder. Dilution kicker system MKB is staged (2H, 2V) Limits extracted intensity at 7 TeV to 50% of nominal For 25ns spacing, this is a limit on single bunch intensity , NOT on total in LHC - PowerPoint PPT Presentation

TRANSCRIPT

18 July 2007 1

0.00

0.25

0.50

0.75

1.00

1.25

1.50

1.75

2.00

0 1000 2000 3000 4000 5000 6000 7000p [GeV/c]

I/Ino

m

Reminder• Dilution kicker system MKB is staged (2H, 2V)

– Limits extracted intensity at 7 TeV to 50% of nominal– For 25ns spacing, this is a limit on single bunch intensity, NOT on total in LHC– Not an issue for “Stage I” : could safely dump full beam intensity up to about 2

TeV – (no interlock - rather unlikely to be needed in first few months…)

BTVDD trace – full dilution BTVDD trace – staged MKB Allowed dumped intensity (staged MKB)

18 July 2007 2

Safety critical aspects of the LBDS

• Signal from beam interlock system (test in HWC/RR)– No trigger = no beam dump

• Energy tracking– Potentially catastrophic (whole beam at “any” amplitude)

• MKD retriggering (test in HWC/RR)– No retriggering could put whole 7 TeV beam at ~10

• TCDQ setting– Wrong w.r.t. orbit exposes LHC arc / triplets / collimators.

• System self-tests and post-mortem– Undetected ‘dead’ MKD severely reduces reliability

• Aperture, optics and orbit– Dump with bad orbit could damage extraction elements MSD, TCDS or MKB

• MKD – MKB connection and sweep form– Insufficient dilution could damage TDE, BTVDD and TDE entrance window

• Abort gap ‘protection’– Beam in the abort gaps risks quench, or TCT/LHC damage if TCDQ position error

• Fault tolerance with 14/15 MKD – The system is designed to operate safely with only 14 out of the 15 MKDs

Nearly all aspects need beam commissioning (validation or optimisation)

18 July 2007 3

Before first extraction…Circulating beam, 1 pilot at 450 GeV• Rough timing and revolution frequency

– Adjust RF synch MKD kick delay, signal from IR6 BPM (UA access for each delay trim!)

• Optics and other measurements in IR6– Beta, dispersion, orbit correction, stability

• Commission dedicated LBDS BDI for circulating beam – Synch BPM, BLMs (MKD, MSD, TCDS, TCDQ), check direct LBDS interlock BLM

• Aperture measurement with circulating beam– MSD, TCDS, MKD, TCDQM

-40

-30

-20

-10

0

10

20

30

40

50

60

150 160 170 180 190 200 210 220 230 240 250S (m)

x (m

m)

TCD

S MSDAMSDB

MSDC

15.3 mm (n1=6.5)

20.8 mm (n1=7.0)

Opening for circulating beam (H plane) at TCDS and MSD

18 July 2007 4

Before first pilot ramp…iExtracted beam: 1 pilot @ 450 GeV (inject & dump)• First extraction

– Into “Inject & Dump” mode

• Check of extraction timing with extracted beam

• Commission extraction line BDI– BTV (SE, D, DD), BPM (SE, D), BLMs, BCTs

Any major problems will be apparent at this stage!

18 July 2007 5

Before first pilot ramp…iiExtracted beam: 1 pilot @ 450 GeV (inject & dump)• Verification of extraction trajectory and aperture

– Vary orbit in IR6 and measure aperture at TCDS/MSD/TD line– Optimise extraction trajectory (orbit, MKD, MSD); define ‘reference’ (UA access for MKD trim!)

0

10

20

30

40

50

60

70

80

90

100

150 160 170 180 190 200 210 220 230 240 250S (m)

x (m

m)

TCD

S MSDAMSDB

MSDC

Opening for extracted beam (H plane) at TCDS and MSD

MK

D s

wee

p{

0

1

2

3

4

5

6

7

8

0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0

orbit [mm]

aper

ture

[sig

ma]

TCDS

MSDC

450 GeV/c, 3.75 mm emittance, 42% beta beatingExtracted beam aperture vs IR6 orbit

18 July 2007 6

Extracted beam: 1 pilot @ 450 GeV (inject & dump)

• Logging and fixed displays– Checks that the beam related data is being correctly acquired and displayed

• XPOC basic functionality (trajectory, BLMs, BCT, kickers, BTVDD, …)– Check that XPOC validation is working correctly for pilot setup

• Issue: safe change of configuration when changing beam. With MCS/SIS/sequencer?

• BDI Post-Mortem data– Check that all beam-dependant transient signals from the LBDS systems are being PM’d

Before first pilot ramp…iii

18 July 2007 7

Before first pilot ramp…ivExtracted beam: 1 pilot @ 450 GeV (inject & dump)

89 ms

MKD kicker waveforms (current signal) BTVDD ‘screenshot’

bunch 1300

MKB sweep measurements• Important for MKB and TD line aperture

• BPMD and BTVDD. inject & dump, vary injected bunch bucket (≈10 meas. points)

MKD kick waveform measurements• Important for aperture at TCDS/MSD

• BPMD, BTVDD and BLMs. inject & dump, vary injected bunch bucket (5 meas. points)

18 July 2007 8

During ramp with pilot…Extracted beam: 1 pilot @ 450-7000 GeV (dump in ramp)• MKD, MKB kicker and MSD septum energy tracking

– Extract single pilot at pre-defined energies in the ramp (calibrated points) – 1 TeV intervals.– Adjustment of kicker lookup tables means UA access– Time-consuming if done as dedicated measurement….need to organise in a quasi-parasitic way– Extraction with 2 pilots during the ramp is also needed to verify the abort gap timing…combine

0

5000

10000

15000

20000

25000

30000

35000

0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0momentum GeV/c

Mai

n/tri

gger

col

tage

(V)

0

50

100

150

200

250

300

com

pens

atio

n vo

ltage

(V)

Trigger voltageMain voltageCompensation voltage

MKD lookup table calibration data

18 July 2007 9

Before moving to unsafe beams…iExtracted beam: 2 pilots @ 450 GeV (inject & dump)MKD kicker “fine” timing adjustment• Inject 2 pilots into positions 1 and 2808 (3.0 ms spacing)

• Fine adjustment of MKD timing (IR6 synch BPMs and RF frequency)

• Acquire last turn of bunch 2808 in LHC to verify MKD kick (0.5 or 3 mrad)

bunch 1turn n

270 mrad kick

bunch 2808turn n-1

3 mrad kick

Note: this also needs to be checked through the ramp…

MKD kick waveform

3.0 ms

18 July 2007 10

Before moving to unsafe beams…iiCirculating beam: safe beam @ 450 GeV• Abort gap “watchdog”

– Fine timing between IR6 and injections needs to be adjusted with beam

• Abort gap monitoring and cleaning commissioning• Interlock BPMs for IR6 maximum orbit

– Interlocked to around ±3.6 mm. Threshold setting and tests

• SW interlock for beam position at TCDQ• Beam stability with orbit feedback at TCDQ and MSD

18 July 2007 11

Before moving to unsafe beams…TCDQCirculating beam: 1 pilot @ 450 GeV• Adjustment of TCDQ/TCS jaws to 450 GeV position (≈10 )

– Beam axis wrt jaw, adjustment of jaw tilt, movement cross-calibration – TCS – 2 jaws - more accurate movement - tighter setting (by ≈0.5 )– Needs BLMs and collimator controls

• Orbit at TCDQ– Measurement of beam axis

• Check that LHC aperture is protected……Circulating beam: safe beam @ 450-7000 GeV • Establish TCDQ movement function during ramp

– Interdependence with collimation system– Check of interlock functions and chain

Circulating beam: safe beam @ 7 TeV • Establish TCDQ movement function during squeeze• Accurate adjustment of TCDQ and TCS jaws in final position

– Establish reference settings for target * during next phase of commissioning– Interdependence with collimation system

Interdependency on collimation settings, and on orbit feedback Iterations (changes of orbit, -beat, *) to finalise TCDQ reference function

18 July 2007 12

Before first 43b ramp…Extracted beam: 43b @ 450 GeV (inject, fill & dump?)

– Start with 43 pilots, to keep below the damage threshold…..?– When this is OK, move to 43 bunches of 41010 for validation

• Losses in extraction channel and along the dump line– Reduced sweep with staged MKB means generous TD aperture

• Check BDI response – new gains etc. maybe needed• Logging, PM and XPOC validations

– Establish new reference data for XPOC…

• Check abort gap monitoring and cleaning

BTVDDBPMD

18 July 2007 13

Before first 156b ramp…Extracted beam: 156b @ 450 GeV (inject, fill & dump?)

• As per 43b activities…

• Plus…..– Specific check of TDE thermal behaviour (nominal 10 kW load)?

• Could load with ≈4 kW with repeated inject, fill & dump of 156 bunches…

18 July 2007 14

LBDS beam commissioning – pilot beamLBDS beam commissioning activity LHC mode Beam type Energy GeV

Things to do before first pilot extractionIR6 optics measurements Injection Circulating 1 pilot 450

Commission dedicated LBDS BDI in IR6 Injection Circulating 1 pilot 450

Extraction element aperture measurements Injection Circulating 1 pilot 450

… before first pilot rampFirst extractions: rough timing adjustment Inject & dump Extract 1 pilot 450

TD line BDI commissioning Inject & dump Extract 1 pilot 450

Extraction trajectory and aperture measurements Inject & dump Extract 1 pilot 450

Data diagnostics: IPOC, logging, FDs, PM, XPOC Inject & dump Extract 1 pilot 450

MKD waveform overshoot measurements Inject & dump Extract 1 pilot 450

MKB sweep measurements Inject & dump Extract 1 pilot 450

… with the pilot rampEnergy tracking measurements Ramp Extract 1 pilot 450-7000

…before moving to operation with potentially “unsafe” beamsFine timing adjustment Inject & dump Extract 2 pilots 450

Commission SW interlock on beam position at TCDQ Injection Circulating, safe beam 450

Commission IR6 orbit BPM interlock Injection Circulating, safe beam 450

Commission abort gap watchdog Injection Circulating, safe beam 450

TCDQ “injection setting” positioning Injection Circulating, safe beam 450

Fine timing in ramp Ramp Extract 2 pilots 450-7000

TCDQ positioning at 7 TeV Adjust/squeeze Circulating, 1 pilot 7000

18 July 2007 15

LBDS beam commissioning – 43b

LBDS beam commissioning activity LHC mode Beam type Energy GeV

Things to do before first 43b extractionOrbit feedback / stability checks at TCDQ Injection Circulating, 43b 450Abort gap monitor and cleaning Injection Circulating, 43b 450

… before first 43b rampExtraction trajectory checks Inject & dump Extract 43 pilots 450TD line BDI checks Inject & dump Extract 43b 450Data diagnostics: XPOC Inject & dump Extract 43b 450TDE thermal behaviour Inject & dump Extract, 43b 450

… with the 43b rampEnergy tracking and abort gap timing checks Ramp Extract 43b 450-7000

… with 43b at 7 TeVTCDQ positioning at 7 TeV Adjust/squeeze Circulating, 43b 7000

18 July 2007 16

LBDS beam commissioning – 156b

LBDS beam commissioning activity LHC mode Beam type Energy GeV

Things to do before first 156b extractionOrbit feedback / stability checks at TCDQ Injection Circulating, 156b 450Abort gap monitor and cleaning Injection Circulating, 156b 450

… before first 156b rampExtraction trajectory and BDI checks Inject & dump Extract, 156 pilots 450Extraction trajectory and BDI checks Inject & dump Extract, 156b 450Data diagnostics: XPOC Inject & dump Extract, 156b 450TDE thermal behaviour Inject & dump Extract, 156b 450

… with the 156b rampEnergy tracking and abort gap timing checks Inject & dump Extract, 156b 450-7000

…with 156b at 7 TeVTCDQ positioning at 7 TeV Adjust/squeeze Circulating, 156b 7000

This is the same list of activities as from pilot to 43b.

It will be essentially the same list for all major changes in LHC beam (filling pattern, significant intensity steps, optics, emittance, …)

It will also be repeated in detail when the full MKB kicker system installed

18 July 2007 17

Some issues/questions

• Presently difficult to make 1:1 mapping between full system commissioning, MP aspects commissioning and overall LHC commissioning….– Inconsistencies and different assumptions– Incomplete stages– Do NOT want to write and maintain 3 separate sets of procedures!!!

• How do we assure that only the ‘authorised’ beam is used– Operational states and allowed LHC beam conditions – MCS, SIS and

sequencer?

• Acceptance criteria need more explicit definition – but some of these are more ‘fuzzy’…– Will try to add these in the ‘test’ document