Reminiscences on My 40+ Years in the Oil & Gas Industry in Africa
‘Layi Fatona (Ph.D., D.Sc.. Honoris Causa)
Managing Director, Niger Delta Exploration & Production Plc
building together1
1
GENERAL INTRODUCTIONS
▪ Conversation, Format & Why The Geological Time Scale?
▪ Before the Beginning – A Basement Complex of Life (My Pre Cambrian Setting)
▪ The Cambrian Ordovician – Pioneer NYSC
▪ A Paleozoic Time Setting – 1st Shell BP Working Experience
▪ The Mezozoic Equivalent – IC Post Graduate Education
THE TERTIARY BUILD OUT (TRANSGRESSIVE)▪ The 2nd Employment @ SPDC (Paleocene)
▪ Geotrex Systems (Eocene)
▪ ND Phase 1 (Oligo-Miocene)
▪ ND Phase 2 (Piocene)
▪ Late Tertiary/Early Quaternary – ND Phase 3 (Pleistocene)
THE FUTURE CENE – ND Phase 4 and Beyond
▪ Appreciations For A Professionally Fulfilling Journey….
Outline
building together2
2The Topic - Restated will read……
Without Permission of our 3 Lovely Boys
‘Tenne, ‘Bade & ‘Tokunbo Fatona
“Extraless”
May 2019
The Geology….
building together3
3
The Geology, Stratigraphy…..
The Topic - Restated will read….
building together4
4
The Geology, Stratigraphy & Sedimentology of NDEP
Nigeria’s 1st Fully Integrated Energy Company
The Topic - Restated will read…..
building together5
5
The Presentation –
Metaphorically will
mimic Geology in its
basic set and simple
format
The Geological Time
Scale Approach. This
is what I opt to adopt
for Today and This
Presentation
building together6
6
The Basement Complex of Life
Life (Before & Up till end of UI) (‘49-’73)
B.Sc. Hons
The Geological Time Scale
building together7
7
Has it Really Been 40+ Years? (46 and still going..)
Removing the Doubts on LF – The Pre Cambrian (Basement Complex Life)
‘LAYI FATONA (LF)
A Student of Geology @ the University of Ibadan
The 300 Level Geology Department Shaping us for
the Professional Future
GL 101, 201 & 301
Prof Kevin Burke, Dr (Mrs.) Durotoye, M.O. Oyawoye and Oma Rahaman
GL 102/3, 202 & 302Prof Adeleye, Deseragie, Fayose
GL 104Prof Makanjuola –The Joshua Crowd
BORN 1ST
JUNE 1949
LAWRENCE OKUNADE FATONA
ILEWO, ABEOKUTA,
OGUN STATE,
NIGERIA
CHRISTIANAH ABIMBOLA
FATONA
The UI ‘73 Mafia was
Made!
(June 1973)
‘LAYI FATONA
IN TO &
building together8
8
Pioneer NYSC (Incubating the Geologist)
The Basement Complex of Life
Life (Before & Up till end of UI) (‘49-’73)
B.Sc. Hons
The Geological Time Scale
building together9
9
Pioneer Youth Corper(s) of Nigeria : July 1973 – June 1974
A Geologist is ready for his life pursuits and ambition
✓ The North Central State Water Board Experiment
✓ Project Managing – Old Zaria Town Water Distribution Network System
✓ Zoba Dam Project – Soil Investigation
The Young Explorer & Graduate
of the University of Ibadan, 1973
Removing the Doubts on LF (The Cambrian Age Equivalent Setting 1973 – 1974)
Reminiscences on My 40+ Years in The Oil & Gas Industry
Learning Statements
❖ Short Impactful Life
❖ Take and use of every opportunity that comes your way in Life
❖ Don’t force or change your destiny: Not the Story of today’s NYSC!!!
building together10
10
Multiple Post NYSC Employment Offers
The
Rewarding
World of the
Earth
Scientist
1. Geological Surveys Limited
2. Nigerian Mining Corporation
3. Baroid Nigeria Limited
4. Assistant Lecturer Research Position, Uni Ibadan
5. Joining A Best in Class International Oil Corporation – July 1974
Shell-BP
Development
Company of Nigeria
Removing the Doubts on LF – Ending the Cambrian Period
building together11
11
The 1st Shell BP outing and
working experience
Pioneer NYSC (Incubating the Geologist)
The Basement Complex of Life
Life (Before & Up till end of UI) (‘49-’73)
B.Sc. Hons
The Geological Time Scale
building together12
12
My Palaeozoic (Equivalent) Era
❖ 1st SHELL-BP Outing and Working Exposure
❖ Turning Engineers to Geologists and Vice Versa
❖ A Stunning 6 Month Training at the Shell Training Centre – WARRI
❖ You were Professionally Fully Cooked at the end of it!!!
Questions & Observations
❖ Where is Today’s Nigerian Oil & Gas Training Domain?........Is it FUPRE?
❖ R&D – still missing Sadly. No Nation or Industry develops without this
❖ The Nigerian Content Management Board to the Rescue
❖ There is space to compel emerging Nigerian Independents to be the regenerating arrow head –
Leading training and Human Capital Development for the Industry
Removing the Doubts on LF – Ending the Cambrian Period
building together13
13
The 1st Shell BP outing and
working experience
Pioneer NYSC (Incubating the Geologist)
The Basement Complex of Life
Life (Before & Up till end of UI) (‘49-’73)
B.Sc. Hons
IC Post Graduate Education
The Geological Time Scale
building together14
14
The Mesozonic Equivalent Era (1975 – 1980)
of
Further Incubation & Educational Development
The Imperial College of Science, Technology & Medicine
(Royal School of Mines)
PETROLEUM GEOLOGY – Properties of the Republic of Cameroon (M.Sc.. DIC.)
&
SEDIMENTOLOGY – Of the East Midlands Coal Field (Ph.D..)
The Post Graduate Student Days at
Memory Statements
Academically Expressive and Explosive
Intensely Focused (International Melting Pot)
Proudly Nigerian “in Context”
Alas! You were just as good as the next PG student. We never had any good Embassy Representation!!!
Connected with my life Partner – Toyin Fatona
building together15
15
The 1st Shell BP outing and
working experience
Pioneer NYSC (Incubating the Geologist)
The Basement Complex of Life
Life (Before & Up till end of UI) (‘49-’73)
B.Sc. Hons
IC Post Graduate Education
2nd Employment by SPDC (1980)
The Geological Time Scale
building together16
16
2nd Employment by and at Shell Petroleum Development Co. (SPDC) – May 1980
Removing the Doubts on LF: The Palaeocene (Equivalent)
Reminiscences on My 40+ Years in The Oil & Gas Industry
Founder & President, Geotrex Systems Limited
First Nigerian Exploration Manager
Shell Petroleum Development Co. Nigeria (SPDC)
The Late Mentor of Many of My Times and Peers
(Mr Edward Ekuyasi Iyamu)
I as the young Exploration Geologist at my 2nd round of Employment at Shell was discovered
by the one I once described as “The Explorer’s Explorer”…Edward Ekuyasi Iyamu
Memory Statements
Professionally as a Career Period; Distinctively short, but Inspirational and Fulfilling in Dimension
Multitasking Capabilities
My Western Study Team Position with Dr Ebi Omatsola - The Professional Slave Driver “Work & Expect No Reward”
I AM FOREVER GRATEFUL OF THIS MENTORSHIP
building together17
17
The 1st Shell BP outing and
working experience
Pioneer NYSC (Incubating the Geologist)
The Basement Complex of Life
Life (Before & Up till end of UI) (‘49-’73)
B.Sc. Hons
IC Post Graduate Education
2nd Employment by SPDC (1980)
Geotrex Systems Ltd
The Geological Time Scale
building together18
18
Taking a Leap of Faith (1986)
Resigned from SPDC to join the foremost Exploration & Production consulting Company in
Nigeria – Geotrex Systems Limited
Joined as Consulting Geologist – 1986
Appointed Senior Vice President – 1988
Appointed President, Geotrex Systems - 1990
Removing the Doubts on LF: The Eocene (Early Tertiary Time Equivalent)
Reminiscences on My 40+ Years in The Oil & Gas Industry
This is what I have severally described as the “Gbagada Connection”. The Entrepreneurial
Instincts were playing out…..
Observation Statements and Questions
❖ What led a young professional quitting an assured Professional life at Shell
❖ Ignorance (of the consequences of failure) was BLISS!!!
❖ Follow your Hunch in Life
building together19
19
The Marginal Oil
Field Conceptual
Thinking
The Early Tertiary Transgressive Time Equivalent Period Comes Fully Alive (1988 & Beyond)
Reminiscences on My 40+ Years in The Oil & Gas Industry
◼ The January 1988 & Beyond Memo
◼ The NAPE Presentation of April 1989
Was this an Oligo-Miocene
time type Transgressive
Event?
building together20
20
The 1st Shell BP outing and
working experience
Pioneer NYSC (Incubating the Geologist)
The Basement Complex of Life
Life (Before & Up till end of UI) (‘49-’73)
B.Sc. Hons
IC Post Graduate Education
2nd Employment by SPDC (1980)
Geotrex Systems Ltd
ND Phase I
The Geological Time Scale
building together21
21Reminiscences on My 40+ Years in The Oil & Gas Industry
◼THE GBAGADA CONNECTION
The Birth of an Idea (1991)
The Eocene Time Continued
THE NIGER DELTA EXPLORATION & PRODUCTION PLC.
A FINANCIAL INSTITUTION
(MIDAS BANK)
AN E&P SETUP
(GEOTREX SYSTEMS)
AN ARET
ADAMS
building together22
22
The Eocene Time Equivalent
Aret’s Conclave
Exploration & Production ManagementFinance
✓ Eddy Iyamu (Late)
✓ Dr. Imo Itsueli
✓ Alex Okoli (Late)
✓ David Richards
✓ Sammy Olagbaju (Late)
✓ Chief Aret Adams (Late)
Geotrex Systems Ltd Midas Drilling Fund Multinational Expertise Ltd
Late Chief Aret Adams
Uwaifo Jones Ltd
✓ John Jones “The Marketer”
The Pioneering Founding Team at NDEP
Reminiscences on My 40+ Years in The Oil & Gas Industry
✓ Dr. Imo Itsueli
✓ Dr. Layi Fatona
building together23
23
The Eocene Time Equivalent Continues
◼ A Start Up Conceived - The Marginal Oil Field Initiative
◼ Waiting for a Presidential Consent – AN ABACHA EXPERIENCE (It was like waiting for Death to come)
◼ Shareholders Funds to the rescue – The early birds came; Feyi Soluade George, J Familusi, Ladi
Jadesinmi , The Chemur Group – Led by Mr. Goodie Ibru
Surviving in between mishaps that could have brought ruin
Goodie Ibru
Reminiscences on My 40+ Years in The Oil & Gas Industry
building together24
24
The Eocene Time Equivalent Continues
◼Fund Raising Experiences (Untold and Unshared till Now)
✓ Raising capital from the public
✓ Selling ND shares by word of mouth
✓ Street canvassing – Dignified Hustling !!!
✓ The Midas Bank Bridge Loan
✓ Public Offering (IPO)
✓ $6M Loan from Erstwhile Intercontinental Bank Plc (The Push to 1st Oil)
✓ Engr. Enuha and his Cakasa Group Rescue Plan
Femi Akinsanya
(Financial Adviser)
Reminiscences on My 40+ Years in The Oil & Gas Industry
building together25
25
Eocene Time Equivalent: The Beginning of the End
Ogbueshi Ben Osuno. A seamless Board Transitioning – A strength
The Loss of an Icon (Late Chief Aret Adams)
Late Chief Aret Adams
Chairman of the Board
1993 – 2002
Ogbueshi Ben Osuno
Chairman of the Board
2002 – 2012
And No Void…….. Thanks to
Reminiscences on My 40+ Years in The Oil & Gas Industry
Could this have been the End Eocene times, like it was in the Geologic Time Scale
building together26
26
Our Strength, Our People
◼ Putting the Cart before the Horse (so it seemed to so many)
✓ Assembling our Production facilities before anything else
✓ Re-Entry of Ogbele – 1
◼ A Rig Collapse DWC 10 – Fatality & Survival (2004)
PREPARING FOR 1ST OIL
◼ Bouncing Back to Well Re-Entry (2005)
✓ DWC – 30
✓ A Successful 1st New Well Drilled – Ogbele 3 (2007)
✓ The Bumper Harvest Years (2008 – 2009)
Rig Collapse @ Ogbele Well 1 Location - 2005
DWC 30 on Well 3 - 2007
Reminiscences on My 40+ Years in The Oil & Gas Industry
Our Oligo-Miocene Equivalent (ND Phase I Years)
building together27
27
◼ 1st revenue on 31st December 2005 at $51/bbl. vs
economic model at $17/bbl.
◼ Paying Back our Debt @ 27% Interest
◼ Drilling for Failure (Broke)
✓ Our 1st Dry Hole – Ogbele 4.
✓ $20M Down the tube.
✓ Have since effectively converted the well for
Produced Water Disposal
◼ Coping with Militancy
✓ Concept of Self Preservation
✓ Shut-Ins, Shut-Downs & Production Maintenance
1ST Oil at Ogbele Flow
Station (2005)
1ST OIL – August 28th 2005
Our 1st Major Oil Price Crash - 2007Oil price in $
Year
Reminiscences on My 40+ Years in The Oil & Gas Industry
Our Oligo-Miocene Time Equivalent Continues
building together28
28
◼ Dealing with Gas Flaring – as a challenge
◼ Commercializing our Gas Resources
✓ Negotiated & Executed 1st GSPA with SPDC JV to deliver
gas to NLNG Train 6 - 2010
✓ Commenced 12”x20km gas pipeline to NLNG manifold at
Rumuji – 2010
✓ First Gas Delivery to NLNG Bonny Plant – November 27th
2012
◼ The Gas Challenge Turned an Opportunity
◼ Diversifying our Revenue Base
◼ Dealing with Insecurity
◼ A Gas curse turns the company
around
Ogbele Gas Processing Plant
Monetizing our Gas Resources (The Billy Agha Factor)
Cause & Effect: The Gas Flare Scare!!!
Reminiscences on My 40+ Years in The Oil & Gas Industry
◼ There is life beyond Oil Production – The Integrated
Field Development Concept comes alive at Ogbele
Preparing for our Pliocene Times
◼ Coping and Compliance with Gas Flare Penalty
building together29
29
The Tertiary Time Space..
“THE GEOLOGY, STRATIGRAPHY, SEDIMENTOLOGY
AND
PETROLEUM GEOLOGY OF NDEP”
ND Phase I - Our Oligocene to Early Miocene
ND Phase II - Our Pliocene
ND Phase III - Our Pleistocene
building together30
30
ND Phase I – Our Oligo Miocene Time Equivalent
Reminiscences on My 40+ Years in The Oil & Gas Industry
Beyond 1st Oil from Ogbele
◼Growing Ogbele Reserves Base – From 5MM STOIP @ Farm Out Agreement
◼ 1st Stage: Geotrex Systems (10.6MM AUR)
o Wells 3,4 & 5 New Reserves + Maps
◼ 2nd Stage: Wells 7, 8 & 9 New Reserves + Maps
o NDPR’s 3D Seismic Acquisition, Processing & Re-Interpretation
◼ 3rd Stage: Drilling Campaign
o Wells 10 & 11 New Reserves + Maps
building together31
31
The 1st Shell BP outing and
working experience
Pioneer NYSC (Incubating the Geologist)
The Basement Complex of Life
Life (Before & Up till end of UI) (‘49-’73)
B.Sc. Hons
IC Post Graduate Education
2nd Employment by SPDC (1980)
Geotrex Systems Ltd
ND Phase I
ND Phase II
The Geological Time Scale
building together32
32
ND Phase II – Our Pliocene End Tertiary Time Equivalent
Reminiscences on My 40+ Years in The Oil & Gas Industry
❖ Upscaling from Ogbele Marginal Oil Field Development
Growing our Asset
Base & Nigerian
Operating Footprint
❖ In a Strategic Partnership Acreage (OML-34) Acquisition With
Acquisition of the Divested 45% Interest of Shell/Total/Agip JV
OML 34 JV with NPDC
OML 34
Produce Oil and Gas with substantial
Daily Domestic Gas Supply to the
ELPS – Escravos Lagos Pipeline
WAGP – West African Gas Pipeline
The IOC Divestment Opportunities opened a New Horizon for Further Advancement
building together33
33
The 1st Shell BP outing and
working experience
Pioneer NYSC (Incubating the Geologist)
The Basement Complex of Life
Life (Before & Up till end of UI) (‘49-’73)
B.Sc. Hons
IC Post Graduate Education
2nd Employment by SPDC (1980)
Geotrex Systems Ltd
ND Phase I
ND Phase II
ND Phase IIIThe Geological Time Scale
building together34
34
ND Phase III – Our Pleistocene Holocene (Today) Time Equivalent (The Quaternary of our Existence)
Reminiscences on My 40+ Years in The Oil & Gas Industry
Oil & Gas Exploration & Production – NDPR, ND Western
Fully Commercialized our Gas Reserves & Resources – ND Gas
Refining part of its own Production Domestically for the Nigerian Economy
Growing refining capacity from a paltry 1kBPD 11kBPD – ND Refineries Ltd
Displaying Nigeria’s Domestic Capital through;
A. NDEP’s Cash Flow (Shareholders Equity & Capital)
B. BOI Funding, guaranteed by Access Bank
On behalf of itself and 2 other Indigenous Partners (Express Pet. & Petropros International Ltd),
Successfully drilled OMA Field Appraisal & New Discovery in OPL 227, its 1st shallow
offshore well. Adding for the first 1st time Oil & Gas Reserves in the Offshore Domain
Ultimate Metamorphosis into Nigeria 1st Fully Integrated Energy
Company
Stepping Up and Out – A Sub-Saharan Adventure
building together35
35
Pioneering Initiatives in the Midstream Space…..
ND Refineries Ltd
Diesel
(AGO)
1Marine
Diesel Oil
(MDO)
Aviation
Fuel
(ATK)
Heavy
Fuel Oil
(HFO)
Liquified
Petroleum
Gas (LPG)
Naptha
(PMS)
2 3
54
Growing Processing Capacity from
1,000 bopd to 11,000 bopd
Increasing Product streams from 1 to 6
Ogbele 1,000 bopd Refinery
(AGO, Naptha)
6
Reminiscences on My 40+ Years in The Oil & Gas Industry
ND Phase III – Our Pleistocene Holocene Time Equivalent Continues
building together36
36
ND Phase III – Our Pleistocene Time Equivalent Continues
Reminiscences on My 40+ Years in The Oil & Gas Industry
From the camera lens of an helicopter Pilot – April 2019
❖ Commissioning the Ogbele Refinery Expansion Project (1,000 > 6,000 > 11,000
bbls/day)
❖ Commissioning the development of our 2nd Marginal Oil Field – The Omerelu
Field Development
❖ Increasing our Gas delivery capabilities and meeting our DOM Gas Obligations
Ogbele Today
building together37
v
1992-2000
Incorporated on 25 March 1992 (as the Midas Drilling Fund)
• Acquired its current name in November 1996• 7 August 2000, signed the 1ST ever Farm-
Out Agreement (FOA) between the NNPC Chevron JV (an IOC) and NDPR (a Nigerian Independent).
2005-2010
28 August 2005, Achieved first oil production• 2010 - attained 1 million bbls of oil production• 2010 - Completed pioneering Gas Purchase
Agreement (GSPA) with the Shell/NNPC JV• 2010 - Successful installation of 1,000 bpd diesel
Topping Plant (The Ogbele Mini Refinery)
2012-2015
2012 - Commissioned the Ogbele Gas Processing Plant ,Lead acquisition of the 45% Interest of
Shell/Total/ Agip in OML 34• 2014 - Executed Omerelu Farm Out Agreement• 2015 – Nile Delta (SS) Ltd was established • August 2015 – Attained 10th year uninterrupted
continuous production
2016 - 2019
• June 2016, assumed Lead role in the Autonomous OML 34 JV Asset Management Team (AMT)
• Effective April 2017, NDPR was appointed the operator of OPL 227 with 51%* by other JV members
• September 2017, NDPR delivered the 50th Bscf measure of gas into the Bonny NLNG Export terminal.
• January 2019 - Commenced OPL 227 Offshore Operations
• January 2019 – Attained 1 Million Man hours LTI Free on the Ogbele Refinery Expansion Project
• April 2019, NDPR delivered the 70th Bscf measure of gas into the Bonny NLNG Export terminal.
Cumulative Production (As at 7th May 2019)• Total Oil+Condensate Produced - (15.8MMbbl)• Total Gas Produced - (81.5Bscf)• Total Diesel Produced - (133 Million Litres)
Our Corporate History
building together38
38
Geotrex 1995
Ogbele E6 Depth Map
The Vintage Geological Structures of Ogbele Field
5.0MM STOIIP
building together39
39
NDPR 2007
2D Seismic (Computer Generated)
The Vintage Geological Structures of Ogbele Field
Proposed
Location
Ogbele-1 assumes oil
field to the crest??
PVT Analysis???
Ogbele-2
Surface Location
building together40
40
NDPR 2008
2007 Seismic
Post 3, 4 & 4ST
The Vintage Geological Structures of Ogbele Field
Ogbele-4ST
Ogbele-2 Surface Location
Ogbele-3, 4
Surface
Location
building together41
41
NDPR 2010
2009 Seismic
Post 5 & 5ST
The Vintage Geological Structures of Ogbele Field
Ogbele-2
Surface Location
Ogbele-1
Ogbele-3, -4 & -5
Surface Location
building together42
42
NDPR 2011
2009 Seismic
Post 7 & 7ST
The Vintage Geological Structures of Ogbele Field
Ogbele-1, -7, & -7ST
Surface Location
building together43
43
NDPR 2013
2012 Seismic
Post 5ST2, 6 & 9
The Vintage Geological Structures of Ogbele Field
Ogbele-1, -7, -7ST
Surface Location
Ogbele-6 & -8
Surface Location
building together44
44
NDPR Current
2012 Seismic
Post 7ST2
The Vintage Geological Structures of Ogbele Field
Ogbele-7ST Surface
Location
building together45
45
NDPR Current
Top D8 Sand Map
The Bridge Between Now & Our FutureCene
>>2MM Production
As at May 2019
@3k bbl/day
0% BSW
building together46
46
NDPR Current
Top D7 Sand Map
The Bridge Between Now & Our FutureCene
Well 11 - New Producer
May 2019
building together47
47
Ogbele Reserves
Growth
Ogbele Reserves Growth (2005 – 2019)
Total Gas
Production of
81.5Bscf
Net Cumulative
Oil Production
of 15.8MMbbls
building together48
48
The Sad and Sour Phases of our Life
building together49
49
The Loss of an Icon
The Sad and Sour Phases of our Life
‘’I am a force for Good. I defy the odds. I go for New Standards, and I am
continuously stepping up’’ Godwin Aret Adams - Friday 2nd August 2002.
Reminiscences on My 40+ Years in The Oil & Gas Industry
building together50
50
The Rig Collapse – Before 1st Oil (2005)
The Sad and Sour Phases of our Life
Reminiscences on My 40+ Years in The Oil & Gas Industry
Rig Collapse @ Ogbele Well 1 Location - 2005
building together51
51
Drilling of a Duster Well – Ogbele 4
The Sad and Sour Phases of our Life
Reminiscences on My 40+ Years in The Oil & Gas Industry
Our 1st Dry Hole - 2008
Well 4 Spud Location - 2008
$20mm Down the drain
building together52
52
• Onyema Ubani
A Special Tribute For
October 16th 2017
The Abduction of OU (Onyema Ubani)
Reminiscences on My 40+ Years in The Oil & Gas Industry
The Sad and Sour Phases of our Life
Production Adviser
NDPR
building together53
53
Ongoing
Abduction of 1
Nigerian and 2
Expatriate Staff of
the Drilling
Contractor
The Sad and Sour Phases of our Life
Reminiscences on My 40+ Years in The Oil & Gas Industry
building together54
54
ND Phase III
ND Phase I
ND Phase II
Geotrex Systems Ltd
2nd Employment by SPDC (1980)
IC Post Graduate Education
• The 1st Shell BP outing and
working experience
Pioneer NYSC (Incubating the Geologist)
The Basement Complex of Life
Life (Before & Up till end of UI) (‘49-’73)
B.Sc. Hons
FutureCene
ND Phase IV & Beyond
The Geological Time Scale – The FutureCene
building together55
55Our Future-Cene (Future Scene) Time Space
a Truly Made in Nigeria, Pan African
Integrated Energy Company
▪ I cannot and should not end this Reminiscing experience without 1st putting NAPE as my political
constituency of natural calling, and allowing you all members without a strategic peep into NDEP’s
next geologic time space, and what this will look like.
▪ This is the time era I will call the FUTURE-CENE (Pronounced Future Scene) or NDEP Phase IV
◼ With Substantial Nigerian Producing Asset Base
◼ The Ogbele Central Processing Hub
◼ Omerelu Field – On Stream
◼ OML-34 JV Partnership with NPDC
◼ OPL 227 – Shallow Offshore Development
◼ Deeply entrenched O&M footprint in South Sudan
◼ Emerging Strong Asset Acquisition Potentials in Mozambique,
Zambia and Uganda
Allow Me to Introduce to you – The New and Future NDEP
A Stock Brokers Recommendation: Buy, Buy & Keep Buying!!!
ND
Nile Delta
SS (Ltd)
Mozambique
Uganda
Zambia
building together56
56Our People – We Must Celebrate
From Within
• Edirin Abamwa
• Tele Dokun
• Francis ILESANMI
• David Richards
• Femi Balogun
• Titi Omisore
• Our Operations, Drilling & Completions Personnel @ Ogbele
• The Entire ND Family
• Our Service Providers
• The Early Shareholders – The Believers
• Sam Dossou-Aworet
• Chemur Group – Led by Mr. Goodie Ibru
From Outside
• Our Security People (Sheidu/Alhaji Buba/ Col. Nickoro)
• Our Lagos Office Workforce
• Femi Olaniyan
OU
• PH Office• ND Western
• Kunle Osinuga/Taiwo Segun/Eze Dan-Ekeh
• Flowstation Staff
• Nuhu Adaji• Tobin Dickson
• Felix Abili
• Jide Aworanti
• Roland Mene-Ejegi
• Oshio Adams/Seun Dania
building together57
57My People – I Must Celebrate
From Within
• My Family
• Toyin – My Eternal Soul Mate
• Tenne
• Bade
• Toksy
• The Extraless Bunch
• Our 3 Sons
building together58
Special Thanks to our Sponsors
WalterSmith Petroman Oil Limited
building together59
Thank you NAPE for your
Audience and Honour
‘Layi Fatona Ph.D.. D.Sc..
May 15th 2019
The President of NAPE
The Executive and Members
Distinguished Ladies and Gentlemen
It will not be another 40 or even 70 years that I will have the opportunity of standing &
addressing an audience of this nature. However, these past 40+ years had been traumatic,
engaging, rewarding and above all professionally fulfilling