rendong nan national astronomical observatories chinese academy...
TRANSCRIPT
![Page 1: Rendong Nan National Astronomical Observatories Chinese Academy …159.226.88.6/sinous2008/talks/21Apr/NanRendong.pdf · 2008-04-28 · 21 0 20 40 60 80 100 120 140 160 0.4 0 0.4](https://reader030.vdocument.in/reader030/viewer/2022040921/5e993ebc556098798843d97a/html5/thumbnails/1.jpg)
1
Rendong Nan National Astronomical Observatories
Chinese Academy of Sciences
CHINA-US Bilateral Workshop, Beijing 20-25 April
![Page 2: Rendong Nan National Astronomical Observatories Chinese Academy …159.226.88.6/sinous2008/talks/21Apr/NanRendong.pdf · 2008-04-28 · 21 0 20 40 60 80 100 120 140 160 0.4 0 0.4](https://reader030.vdocument.in/reader030/viewer/2022040921/5e993ebc556098798843d97a/html5/thumbnails/2.jpg)
2
content
• FAST sciences
• General technical specifications
• Technical plan – critical technologies
• Feasibility study of critical technologies
• Current state of FAST project
- Project has been approved by the NDRC
- Report on feasibility studies has been reviewed
![Page 3: Rendong Nan National Astronomical Observatories Chinese Academy …159.226.88.6/sinous2008/talks/21Apr/NanRendong.pdf · 2008-04-28 · 21 0 20 40 60 80 100 120 140 160 0.4 0 0.4](https://reader030.vdocument.in/reader030/viewer/2022040921/5e993ebc556098798843d97a/html5/thumbnails/3.jpg)
3
Unique Karst depression as the siteActive main reflectorCable - parallel robot feed support
Five hundred meter Aperture Spherical Telescope
![Page 4: Rendong Nan National Astronomical Observatories Chinese Academy …159.226.88.6/sinous2008/talks/21Apr/NanRendong.pdf · 2008-04-28 · 21 0 20 40 60 80 100 120 140 160 0.4 0 0.4](https://reader030.vdocument.in/reader030/viewer/2022040921/5e993ebc556098798843d97a/html5/thumbnails/4.jpg)
4
1. FAST sciences
• Neutral Hydrogen line (HI) surveying
• Pulsar research
• Joining VLBI network
• Molecular lines
• Search for Extraterrestrial Intelligence (SETI)
• Possible early sciences with FAST
![Page 5: Rendong Nan National Astronomical Observatories Chinese Academy …159.226.88.6/sinous2008/talks/21Apr/NanRendong.pdf · 2008-04-28 · 21 0 20 40 60 80 100 120 140 160 0.4 0 0.4](https://reader030.vdocument.in/reader030/viewer/2022040921/5e993ebc556098798843d97a/html5/thumbnails/5.jpg)
5
Neutral hydrogen (HI) survey
Cosmic history is written in the characters of weak HI line emission. To read this encyclopaedia, a supersensitive telescope is required
Blind detection of HI clouds with an interference-free observing period of 1h, z~0.7
Warm HI shell around AGN, the detection range limit in a moderate integration time, z~3
![Page 6: Rendong Nan National Astronomical Observatories Chinese Academy …159.226.88.6/sinous2008/talks/21Apr/NanRendong.pdf · 2008-04-28 · 21 0 20 40 60 80 100 120 140 160 0.4 0 0.4](https://reader030.vdocument.in/reader030/viewer/2022040921/5e993ebc556098798843d97a/html5/thumbnails/6.jpg)
6
Kravtsov - Simulation on dark matter distribution in a normal galaxy
Xuelei Chen – Estimated FAST detection sensitivity of 1 min & 1 h Line width 30km/s,S/N -10
![Page 7: Rendong Nan National Astronomical Observatories Chinese Academy …159.226.88.6/sinous2008/talks/21Apr/NanRendong.pdf · 2008-04-28 · 21 0 20 40 60 80 100 120 140 160 0.4 0 0.4](https://reader030.vdocument.in/reader030/viewer/2022040921/5e993ebc556098798843d97a/html5/thumbnails/7.jpg)
7
Duffy et al Number of galaxies to be detected per day (18h) using FAST 19 beams with different san range---- 6 sec---- 60 sec---- 600 sec---- 6000 sec---- 60000 sec
![Page 8: Rendong Nan National Astronomical Observatories Chinese Academy …159.226.88.6/sinous2008/talks/21Apr/NanRendong.pdf · 2008-04-28 · 21 0 20 40 60 80 100 120 140 160 0.4 0 0.4](https://reader030.vdocument.in/reader030/viewer/2022040921/5e993ebc556098798843d97a/html5/thumbnails/8.jpg)
8
~ 104 pulsars
Rare objectsExotic stars – quark matterPulsar-BH binary….Stellar evolution before SNISM map of unprecedenteddetails
There are ~ 6 X 104 detectable pulsars in the Galaxy, half is in FAST sky
FAST Pulsar Survey
![Page 9: Rendong Nan National Astronomical Observatories Chinese Academy …159.226.88.6/sinous2008/talks/21Apr/NanRendong.pdf · 2008-04-28 · 21 0 20 40 60 80 100 120 140 160 0.4 0 0.4](https://reader030.vdocument.in/reader030/viewer/2022040921/5e993ebc556098798843d97a/html5/thumbnails/9.jpg)
9
A ‘master’ of VLBI network
FAST
Bonn100
Chinese station
If FAST joined VSOP-ground VLBI Equivalently a 100 m in space
VLBA 80 μJyHSA 5.5 μJyHSA+FAST 3.1 μJyMuch longer source on time
![Page 10: Rendong Nan National Astronomical Observatories Chinese Academy …159.226.88.6/sinous2008/talks/21Apr/NanRendong.pdf · 2008-04-28 · 21 0 20 40 60 80 100 120 140 160 0.4 0 0.4](https://reader030.vdocument.in/reader030/viewer/2022040921/5e993ebc556098798843d97a/html5/thumbnails/10.jpg)
10
Make use of the whole 500m aperture by adopting a long linear feed to achieve ?
HI – small scale deep survey of H-z
Pulsar – BH binary
M31 – extragalactic pulsars
Survey more pulsars in clusters, more about this by Scott
OH masers at z ~ 1
Lines in Orion e.g. C20H10 ? By Di
Follow-ups of LOFAR/ASKAP ….
Early sciences with FAST– bilateral meeting in JBO
![Page 11: Rendong Nan National Astronomical Observatories Chinese Academy …159.226.88.6/sinous2008/talks/21Apr/NanRendong.pdf · 2008-04-28 · 21 0 20 40 60 80 100 120 140 160 0.4 0 0.4](https://reader030.vdocument.in/reader030/viewer/2022040921/5e993ebc556098798843d97a/html5/thumbnails/11.jpg)
11
2. General Technical SpecificationSpherical reflector:Radius~300m, Aperture~500m, Opening angle 110~120°Illuminated aperture:Dill=300mFocal ratio:f/D =0.467 Sky coverage:zenith angle 40°(up to 60°with efficiency loss) tracking hours 0~6hFrequency:70M ~ 3 GHz(up to 8GHz in future upgrading)Sensitivity (L-Band) :A/T~2000, T~20 KResolution (L-Band) :2.9′Multi-beam (L-Band) :19, beam number of future FPA >100Slewing:<10minPointing accuracy:8″
![Page 12: Rendong Nan National Astronomical Observatories Chinese Academy …159.226.88.6/sinous2008/talks/21Apr/NanRendong.pdf · 2008-04-28 · 21 0 20 40 60 80 100 120 140 160 0.4 0 0.4](https://reader030.vdocument.in/reader030/viewer/2022040921/5e993ebc556098798843d97a/html5/thumbnails/12.jpg)
12
O
★ S1★ S2
Optical geometry
![Page 13: Rendong Nan National Astronomical Observatories Chinese Academy …159.226.88.6/sinous2008/talks/21Apr/NanRendong.pdf · 2008-04-28 · 21 0 20 40 60 80 100 120 140 160 0.4 0 0.4](https://reader030.vdocument.in/reader030/viewer/2022040921/5e993ebc556098798843d97a/html5/thumbnails/13.jpg)
13
Sky coverage
ZA 30 deg
ZA 40 deg
ZA 60 deg
FAST Zenith
Sky coverage FAST vs. Arecibo
ZA 56 deg
Opening angle - sky coverage
![Page 14: Rendong Nan National Astronomical Observatories Chinese Academy …159.226.88.6/sinous2008/talks/21Apr/NanRendong.pdf · 2008-04-28 · 21 0 20 40 60 80 100 120 140 160 0.4 0 0.4](https://reader030.vdocument.in/reader030/viewer/2022040921/5e993ebc556098798843d97a/html5/thumbnails/14.jpg)
14
ZA
30º 60º
205m
300m
Opening angle - sky coverage (cont.)
If FPA technology could form an irregular beam to fully match the desired portionWe can have a large single dish ~ 200m at zenith 60°We are interested to have the Roger’s talk on FPA
![Page 15: Rendong Nan National Astronomical Observatories Chinese Academy …159.226.88.6/sinous2008/talks/21Apr/NanRendong.pdf · 2008-04-28 · 21 0 20 40 60 80 100 120 140 160 0.4 0 0.4](https://reader030.vdocument.in/reader030/viewer/2022040921/5e993ebc556098798843d97a/html5/thumbnails/15.jpg)
15
In layout 2000
0.327 5
HI surveying
EoR
Pulsar
VLBI
17 Lines
SETI
30.13 1.42
z~20
OH(4) H2CO(6)
Water hole
S Band X Band Space science
First phase Second phase
(GHz)8
70MHz
4
HCOOH
CH3OH HC5N(4) CH(4) CH4
300MHz 5.2GHz
C Band
Frequency range
![Page 16: Rendong Nan National Astronomical Observatories Chinese Academy …159.226.88.6/sinous2008/talks/21Apr/NanRendong.pdf · 2008-04-28 · 21 0 20 40 60 80 100 120 140 160 0.4 0 0.4](https://reader030.vdocument.in/reader030/viewer/2022040921/5e993ebc556098798843d97a/html5/thumbnails/16.jpg)
16
SiteActive ReflectorFeed supportMeasurementsReceiversObservatory
Site
Exploration
Drainage
Earth work
Active Reflector
Disaster prevention
Main cable net
Elements
Winches
Tension monitoring
Tower
Capstan
AB-rotator & Stewart
Cables
Mark stone
Laser total station
Photogrammetry
Field bus
Optical fiber
Observatory building
Computing center
Observatory
Feed support
MeasurementsReceiversReceivers
Backend
3.Technical plan– critical technology
![Page 17: Rendong Nan National Astronomical Observatories Chinese Academy …159.226.88.6/sinous2008/talks/21Apr/NanRendong.pdf · 2008-04-28 · 21 0 20 40 60 80 100 120 140 160 0.4 0 0.4](https://reader030.vdocument.in/reader030/viewer/2022040921/5e993ebc556098798843d97a/html5/thumbnails/17.jpg)
17
Site
Active reflector
Feed support
Measurements
Receiver
3.Technical plan– critical technology
![Page 18: Rendong Nan National Astronomical Observatories Chinese Academy …159.226.88.6/sinous2008/talks/21Apr/NanRendong.pdf · 2008-04-28 · 21 0 20 40 60 80 100 120 140 160 0.4 0 0.4](https://reader030.vdocument.in/reader030/viewer/2022040921/5e993ebc556098798843d97a/html5/thumbnails/18.jpg)
18
Guiyang
Site: the Karst region in south Guizhou Province
Site Surveying in Guizhou
Location: N25.647222º E106.85583°
![Page 19: Rendong Nan National Astronomical Observatories Chinese Academy …159.226.88.6/sinous2008/talks/21Apr/NanRendong.pdf · 2008-04-28 · 21 0 20 40 60 80 100 120 140 160 0.4 0 0.4](https://reader030.vdocument.in/reader030/viewer/2022040921/5e993ebc556098798843d97a/html5/thumbnails/19.jpg)
19
Quick Bird Fly Oct. 6, 2005
![Page 20: Rendong Nan National Astronomical Observatories Chinese Academy …159.226.88.6/sinous2008/talks/21Apr/NanRendong.pdf · 2008-04-28 · 21 0 20 40 60 80 100 120 140 160 0.4 0 0.4](https://reader030.vdocument.in/reader030/viewer/2022040921/5e993ebc556098798843d97a/html5/thumbnails/20.jpg)
20
Site
Active reflector
Feed support
Measurements
Receiver
3.Technical plan– critical technology
![Page 21: Rendong Nan National Astronomical Observatories Chinese Academy …159.226.88.6/sinous2008/talks/21Apr/NanRendong.pdf · 2008-04-28 · 21 0 20 40 60 80 100 120 140 160 0.4 0 0.4](https://reader030.vdocument.in/reader030/viewer/2022040921/5e993ebc556098798843d97a/html5/thumbnails/21.jpg)
21
0 20 40 60 80 100 120 140 1600.4
0
0.4
0.8
1.2
1.6
distance from center of aperture (meter)
devi
atio
n al
ong
radi
al d
irect
ion
(met
er)
Central part of sphere is close to paraboloid as f/D is properMinimized deviation is 0.67m as f/D ~ 0.467 RMaximum slope of deviation curve gives maximum rate 0.7mm/s
F=0.467RF=0.477RF=o.450R
Main reflector is composed of small element units ~ 2000 hexagons of 15m – rms 4mm ~ 4600 triangles of 11m – rms 2.2mm
![Page 22: Rendong Nan National Astronomical Observatories Chinese Academy …159.226.88.6/sinous2008/talks/21Apr/NanRendong.pdf · 2008-04-28 · 21 0 20 40 60 80 100 120 140 160 0.4 0 0.4](https://reader030.vdocument.in/reader030/viewer/2022040921/5e993ebc556098798843d97a/html5/thumbnails/22.jpg)
22
Adaptive cable-mesh
Solid panel-actuator
Two realizations of main reflector
~2400 winches~4600 panels
~2000 panelsand
actuators
![Page 23: Rendong Nan National Astronomical Observatories Chinese Academy …159.226.88.6/sinous2008/talks/21Apr/NanRendong.pdf · 2008-04-28 · 21 0 20 40 60 80 100 120 140 160 0.4 0 0.4](https://reader030.vdocument.in/reader030/viewer/2022040921/5e993ebc556098798843d97a/html5/thumbnails/23.jpg)
23
Site
Active reflector
Feed support
Measurements
Receiver
3.Technical plan– critical technology
![Page 24: Rendong Nan National Astronomical Observatories Chinese Academy …159.226.88.6/sinous2008/talks/21Apr/NanRendong.pdf · 2008-04-28 · 21 0 20 40 60 80 100 120 140 160 0.4 0 0.4](https://reader030.vdocument.in/reader030/viewer/2022040921/5e993ebc556098798843d97a/html5/thumbnails/24.jpg)
24
Feed support mechanical-electronic-optical integrated design
Focal cap diameter 206m
Cabin in total ~30t
Load on lower plate ~3t
Maximum tracking 11.6mm/s
Slewing 400mm/s
Position error <10mm
Pointing accuracy 8’’
O
★ S1
![Page 25: Rendong Nan National Astronomical Observatories Chinese Academy …159.226.88.6/sinous2008/talks/21Apr/NanRendong.pdf · 2008-04-28 · 21 0 20 40 60 80 100 120 140 160 0.4 0 0.4](https://reader030.vdocument.in/reader030/viewer/2022040921/5e993ebc556098798843d97a/html5/thumbnails/25.jpg)
25
Three main parts of cabin suspensionCable network - first adjustable system Stewart - secondary adjustable systemClose loop control
![Page 26: Rendong Nan National Astronomical Observatories Chinese Academy …159.226.88.6/sinous2008/talks/21Apr/NanRendong.pdf · 2008-04-28 · 21 0 20 40 60 80 100 120 140 160 0.4 0 0.4](https://reader030.vdocument.in/reader030/viewer/2022040921/5e993ebc556098798843d97a/html5/thumbnails/26.jpg)
26
Site
Active reflector
Feed support
Measurements
Receiver
3.Technical plan– critical technology
![Page 27: Rendong Nan National Astronomical Observatories Chinese Academy …159.226.88.6/sinous2008/talks/21Apr/NanRendong.pdf · 2008-04-28 · 21 0 20 40 60 80 100 120 140 160 0.4 0 0.4](https://reader030.vdocument.in/reader030/viewer/2022040921/5e993ebc556098798843d97a/html5/thumbnails/27.jpg)
27
Measurement – precise, quick and in long distance
Task 1: 3-D spatial positions of focus cabinLarge working range up to 300 mErrors ~1 mmSampling rate > 10 Hz
Task 2: profiles of main reflectorNumber of targets ~2400~1000 in illuminated areaAccuracy 1~2mmSampling interval 10 sec ~ few min
![Page 28: Rendong Nan National Astronomical Observatories Chinese Academy …159.226.88.6/sinous2008/talks/21Apr/NanRendong.pdf · 2008-04-28 · 21 0 20 40 60 80 100 120 140 160 0.4 0 0.4](https://reader030.vdocument.in/reader030/viewer/2022040921/5e993ebc556098798843d97a/html5/thumbnails/28.jpg)
28
PhotogrammetrySurveying reflector profile
1000 nodes withinilluminated areato be scanned in real-timeperiod ~ 1 min
![Page 29: Rendong Nan National Astronomical Observatories Chinese Academy …159.226.88.6/sinous2008/talks/21Apr/NanRendong.pdf · 2008-04-28 · 21 0 20 40 60 80 100 120 140 160 0.4 0 0.4](https://reader030.vdocument.in/reader030/viewer/2022040921/5e993ebc556098798843d97a/html5/thumbnails/29.jpg)
29
Site
Active reflector
Feed support
Measurements
Receiver
3.Technical plan– critical technology
![Page 30: Rendong Nan National Astronomical Observatories Chinese Academy …159.226.88.6/sinous2008/talks/21Apr/NanRendong.pdf · 2008-04-28 · 21 0 20 40 60 80 100 120 140 160 0.4 0 0.4](https://reader030.vdocument.in/reader030/viewer/2022040921/5e993ebc556098798843d97a/html5/thumbnails/30.jpg)
30
No Band (GHz) Beams Pol. CryoTsys(K)
Science
1 0.07 – 0.14 1 RCP LCP
no1000
High-z HI(EoR),PSR, VLBI, Lines
2 0.14 – 0.28 1 RCP LCP
no400
High-z HI(EoR),PSR, VLBI, Lines
3 0.28 – 0.56 1 or multi RCP LCP
no150
High-z HI(EoR),PSR, VLBI, LinesSpace weather, Low frequency DSN
4 0.56 – 1.02 1 or multi RCP LCP
yes60
High-z HI(EoR),PSR, VLBI, LinesExo-planet science
5 0.320 – 0.334 1 RCP LCP
no200
HI,PSR,VLBIEarly sciences
6 0.55 – 0.64 1 RCP LCP
yes60
HI,PSR,VLBIEarly Sciences
7 1.15 – 1.72 1 L wide RCP LCP
yes25
HI,PSR,VLBI,SETI,Lines
8 1.23 – 1.53 19 Lnarrowmultibeam
RCP LCP
yes25
HI and PSR survey, Transients
9 2.00 – 3.00 1 RCP/LCP
yes25
PTA, DSN, VLBI, SETI
9 sets of FAST receivers NAOC - JBO
![Page 31: Rendong Nan National Astronomical Observatories Chinese Academy …159.226.88.6/sinous2008/talks/21Apr/NanRendong.pdf · 2008-04-28 · 21 0 20 40 60 80 100 120 140 160 0.4 0 0.4](https://reader030.vdocument.in/reader030/viewer/2022040921/5e993ebc556098798843d97a/html5/thumbnails/31.jpg)
31
ReceiverDiagnostics
Feed
+ polarizerLNA Mixer E/O
HI
line
Pulsar
VLBI
SETI
multi
O/E
Receiver -- Schematic Diagram
![Page 32: Rendong Nan National Astronomical Observatories Chinese Academy …159.226.88.6/sinous2008/talks/21Apr/NanRendong.pdf · 2008-04-28 · 21 0 20 40 60 80 100 120 140 160 0.4 0 0.4](https://reader030.vdocument.in/reader030/viewer/2022040921/5e993ebc556098798843d97a/html5/thumbnails/32.jpg)
32
4. Feasibility study of critical technologiesFeasibility study of critical technologies started since 1994. More than a hundred scientists and engineers from 20 institutions The project is ready to move on to actual programming.
Fast sciencesSite surveying Active main reflector -
- Solid panel-actuator design - Adaptive cable-mesh design
Feed support - Cables + stabilizer - Cables + rotation mechanism + stabilizer
Measurement Receiver
![Page 33: Rendong Nan National Astronomical Observatories Chinese Academy …159.226.88.6/sinous2008/talks/21Apr/NanRendong.pdf · 2008-04-28 · 21 0 20 40 60 80 100 120 140 160 0.4 0 0.4](https://reader030.vdocument.in/reader030/viewer/2022040921/5e993ebc556098798843d97a/html5/thumbnails/33.jpg)
33
Exploration in depression site and the rock-soil samples from ground
![Page 34: Rendong Nan National Astronomical Observatories Chinese Academy …159.226.88.6/sinous2008/talks/21Apr/NanRendong.pdf · 2008-04-28 · 21 0 20 40 60 80 100 120 140 160 0.4 0 0.4](https://reader030.vdocument.in/reader030/viewer/2022040921/5e993ebc556098798843d97a/html5/thumbnails/34.jpg)
34
cables
nodes
breaking load experiment
![Page 35: Rendong Nan National Astronomical Observatories Chinese Academy …159.226.88.6/sinous2008/talks/21Apr/NanRendong.pdf · 2008-04-28 · 21 0 20 40 60 80 100 120 140 160 0.4 0 0.4](https://reader030.vdocument.in/reader030/viewer/2022040921/5e993ebc556098798843d97a/html5/thumbnails/35.jpg)
35
刚性构件
边缘构件
Prototyping the back-structure of reflector elementSimple, enable mass production, strong weather resistance. 10kg/m2 is a up-limit
Rear rib: hollow rectangular tube, Z-shaped …
Spatial truss backup (costly)
bowstring
![Page 36: Rendong Nan National Astronomical Observatories Chinese Academy …159.226.88.6/sinous2008/talks/21Apr/NanRendong.pdf · 2008-04-28 · 21 0 20 40 60 80 100 120 140 160 0.4 0 0.4](https://reader030.vdocument.in/reader030/viewer/2022040921/5e993ebc556098798843d97a/html5/thumbnails/36.jpg)
36
Single rear rib
joint Adjust screw Bow-string
Prototyping rear rib Less than 1mm curved, gravity – no gravity
Single rear rib with bow-string
![Page 37: Rendong Nan National Astronomical Observatories Chinese Academy …159.226.88.6/sinous2008/talks/21Apr/NanRendong.pdf · 2008-04-28 · 21 0 20 40 60 80 100 120 140 160 0.4 0 0.4](https://reader030.vdocument.in/reader030/viewer/2022040921/5e993ebc556098798843d97a/html5/thumbnails/37.jpg)
37
Spacial truss back structure
Adjust screw joint
Expanded aluminum mesh
Perforated aluminum sheet
Deformation 2.5mm by gravitySpatial truss backup (costly)
![Page 38: Rendong Nan National Astronomical Observatories Chinese Academy …159.226.88.6/sinous2008/talks/21Apr/NanRendong.pdf · 2008-04-28 · 21 0 20 40 60 80 100 120 140 160 0.4 0 0.4](https://reader030.vdocument.in/reader030/viewer/2022040921/5e993ebc556098798843d97a/html5/thumbnails/38.jpg)
38
接近
开关
接近
开关
护罩
尾销端 联接
法兰
日本减
速电
机
编码器
护罩
编码器
出线
口
行程
830=
830
拉伸长
=1215
收缩长
=385
Prototyping the winches
worm-wheel/ball screw
cycloidal-pin wheel /sliding screw
serial worm wheel/ball screw
cycloidal-pin wheel /worm wheel /sliding screw
![Page 39: Rendong Nan National Astronomical Observatories Chinese Academy …159.226.88.6/sinous2008/talks/21Apr/NanRendong.pdf · 2008-04-28 · 21 0 20 40 60 80 100 120 140 160 0.4 0 0.4](https://reader030.vdocument.in/reader030/viewer/2022040921/5e993ebc556098798843d97a/html5/thumbnails/39.jpg)
39Experiment on the cable supporting system, Dec. 2001
Prime focus position control
![Page 40: Rendong Nan National Astronomical Observatories Chinese Academy …159.226.88.6/sinous2008/talks/21Apr/NanRendong.pdf · 2008-04-28 · 21 0 20 40 60 80 100 120 140 160 0.4 0 0.4](https://reader030.vdocument.in/reader030/viewer/2022040921/5e993ebc556098798843d97a/html5/thumbnails/40.jpg)
40
Dynamic experiment on Stewart stabilizer, Sept. 2002
![Page 41: Rendong Nan National Astronomical Observatories Chinese Academy …159.226.88.6/sinous2008/talks/21Apr/NanRendong.pdf · 2008-04-28 · 21 0 20 40 60 80 100 120 140 160 0.4 0 0.4](https://reader030.vdocument.in/reader030/viewer/2022040921/5e993ebc556098798843d97a/html5/thumbnails/41.jpg)
41
Collaboration with MT and TUDOptimization of cable tension force:Max.: 220KN;Min.: 100KNDesign of counter-weights:travel range reduction: R=2rcounter-weight=[(220+100)/2]*2=320KN
Capstan drum (R)
(100KN)
Counterweight drum(r)
motor gearbox bearing
N
![Page 42: Rendong Nan National Astronomical Observatories Chinese Academy …159.226.88.6/sinous2008/talks/21Apr/NanRendong.pdf · 2008-04-28 · 21 0 20 40 60 80 100 120 140 160 0.4 0 0.4](https://reader030.vdocument.in/reader030/viewer/2022040921/5e993ebc556098798843d97a/html5/thumbnails/42.jpg)
42
Vibration modes and Bode diagram of suspension cables
2nd harmonic (0.4247Hz)
1st harmonic (0.182455Hz)
![Page 43: Rendong Nan National Astronomical Observatories Chinese Academy …159.226.88.6/sinous2008/talks/21Apr/NanRendong.pdf · 2008-04-28 · 21 0 20 40 60 80 100 120 140 160 0.4 0 0.4](https://reader030.vdocument.in/reader030/viewer/2022040921/5e993ebc556098798843d97a/html5/thumbnails/43.jpg)
43
under the wind 8m/s, 1st adjustmentreaches control accuracy 8mmas the stabilizer is switched onaccuracy 4mmspectra - 0.18Hz
Total weight of cabin ~ 30t
receivers 4Stabilized platform 2actuators 1,5X-Y Frames 4Y- positioner base 4cladding 8Top frame – star truss 4
total 27,5
![Page 44: Rendong Nan National Astronomical Observatories Chinese Academy …159.226.88.6/sinous2008/talks/21Apr/NanRendong.pdf · 2008-04-28 · 21 0 20 40 60 80 100 120 140 160 0.4 0 0.4](https://reader030.vdocument.in/reader030/viewer/2022040921/5e993ebc556098798843d97a/html5/thumbnails/44.jpg)
44
-0.500
-0.400
-0.300
-0.200
-0.100
0.000
0.100
0.200
0.300
0.400
0.500
0 10000 20000 30000 40000 50000 60000 70000 80000 90000 100000 110000
ADM distance (mm)
ADM
-IFM
err
or (m
m
ADM spec
ADM spec
average
Most precise laser rangerAPI
Maximum ranging distance – 120mTCRA2003: 1+1ppmAPI: 0+5ppm
#3449 Tracking ADM intensity
0.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
1.1
0 10000 20000 30000 40000 50000 60000 70000 80000 90000 100000 110000
ADM Distance (mm)
AD
M In
tens
ity (V
) To expand the ranging Reshape the beamNew detector – 150VAvalanche breakdown voltage
![Page 45: Rendong Nan National Astronomical Observatories Chinese Academy …159.226.88.6/sinous2008/talks/21Apr/NanRendong.pdf · 2008-04-28 · 21 0 20 40 60 80 100 120 140 160 0.4 0 0.4](https://reader030.vdocument.in/reader030/viewer/2022040921/5e993ebc556098798843d97a/html5/thumbnails/45.jpg)
45
CCD:20Hz;0.5cmDGPS:10Hz;1cm
Laser Tracker:1KHz;0.05mm
IMU:0.1°
Measuring Total station
![Page 46: Rendong Nan National Astronomical Observatories Chinese Academy …159.226.88.6/sinous2008/talks/21Apr/NanRendong.pdf · 2008-04-28 · 21 0 20 40 60 80 100 120 140 160 0.4 0 0.4](https://reader030.vdocument.in/reader030/viewer/2022040921/5e993ebc556098798843d97a/html5/thumbnails/46.jpg)
46
f - range :1.23-1.53 GHzfeed:19 coaxial hornsf/D: 0.46, less curved than ParkesLNA: HEMT cooledIF:optical fiber cabin - groundBackend:HI
PulsarTransients
1.23-1.53 GHz multi-beam
Main focus, -13dB, G/T ~ 2000 m2/K70MHz - 1GHz,4sets 1-octave band L – one wide band receiver
19 multi-beam receivers2 - 3GHz scaled JBO C - band
Receiver layout
ATA 0.5 – 11GHz
LOFAR 120 – 240MHz
WSRT 115 – 180MHz
![Page 47: Rendong Nan National Astronomical Observatories Chinese Academy …159.226.88.6/sinous2008/talks/21Apr/NanRendong.pdf · 2008-04-28 · 21 0 20 40 60 80 100 120 140 160 0.4 0 0.4](https://reader030.vdocument.in/reader030/viewer/2022040921/5e993ebc556098798843d97a/html5/thumbnails/47.jpg)
FAST model construction process
1. tower
2. girder ring
3. cementdepression
4. cable & node
5. actuator
![Page 48: Rendong Nan National Astronomical Observatories Chinese Academy …159.226.88.6/sinous2008/talks/21Apr/NanRendong.pdf · 2008-04-28 · 21 0 20 40 60 80 100 120 140 160 0.4 0 0.4](https://reader030.vdocument.in/reader030/viewer/2022040921/5e993ebc556098798843d97a/html5/thumbnails/48.jpg)
48
HI was observed using 50m model in Sept 2006.
![Page 49: Rendong Nan National Astronomical Observatories Chinese Academy …159.226.88.6/sinous2008/talks/21Apr/NanRendong.pdf · 2008-04-28 · 21 0 20 40 60 80 100 120 140 160 0.4 0 0.4](https://reader030.vdocument.in/reader030/viewer/2022040921/5e993ebc556098798843d97a/html5/thumbnails/49.jpg)
49
- Main reflector- Earthwork - Feed support- Receivers- Measurement and control- Infrastructures- Design- Observatory and facilities- Site investigation- Unexpected
41%
11%10%
10%
7%
6%5%4%1%5%
5. Current state of FAST projectTotal budget ~ 688 millions ¥ (600 millions admitted)Budget in feasibility report is ~ 700 millions ¥Project time 5.5yrs from foundation
Budget pie
![Page 50: Rendong Nan National Astronomical Observatories Chinese Academy …159.226.88.6/sinous2008/talks/21Apr/NanRendong.pdf · 2008-04-28 · 21 0 20 40 60 80 100 120 140 160 0.4 0 0.4](https://reader030.vdocument.in/reader030/viewer/2022040921/5e993ebc556098798843d97a/html5/thumbnails/50.jpg)
50Approval appears on SKA webpagehttp://www.skatelescope.org/pages/page_newfront11.htm
![Page 51: Rendong Nan National Astronomical Observatories Chinese Academy …159.226.88.6/sinous2008/talks/21Apr/NanRendong.pdf · 2008-04-28 · 21 0 20 40 60 80 100 120 140 160 0.4 0 0.4](https://reader030.vdocument.in/reader030/viewer/2022040921/5e993ebc556098798843d97a/html5/thumbnails/51.jpg)
51