Page 1: Renewable Energy Incentive Program (REIP) 2010 Application ... application... · letter is received. – Local inspections cannot be done prior to date of approval letter. • NOTE:

Renewable Energy Incentive Program (REIP) 2010 Application and Payment Process

Tammy GraySenior Operations Specialist

Page 2: Renewable Energy Incentive Program (REIP) 2010 Application ... application... · letter is received. – Local inspections cannot be done prior to date of approval letter. • NOTE:

Rebate Application Process

Page 3: Renewable Energy Incentive Program (REIP) 2010 Application ... application... · letter is received. – Local inspections cannot be done prior to date of approval letter. • NOTE:

REIP Program and SREC Registration Program

• REIP offers incentives and access to the REC market for New Jersey customers investing in eligible renewable energy technologies (Wind, Biomass, Solar Photovoltaic). The REIP market development tools focus on the on-site, behind- the-meter, renewable energy market.

• SRP offers access to the REC market for larger projects that are not eligible for rebates

Rebate Application Process

Page 4: Renewable Energy Incentive Program (REIP) 2010 Application ... application... · letter is received. – Local inspections cannot be done prior to date of approval letter. • NOTE:

REIP Participation

• Who is eligible for the REIP Program?– New Jersey applicants who contribute to the Societal

Benefits Charge (SBC), a small payment made through your utility bill.

– Systems cannot be sized to produce more than 100% of historical or expected electric consumption at the site of installation.

– System must be installed in New Jersey.– All new construction projects must be in a Smart

Growth region.– Installers must attend mandatory program training.– Each Application based on meter

Rebate Application Process

Page 5: Renewable Energy Incentive Program (REIP) 2010 Application ... application... · letter is received. – Local inspections cannot be done prior to date of approval letter. • NOTE:

• What are the requirements?• If paperwork submitted is incomplete, what are the next steps,

including timeframes?• If paperwork submitted is complete, what are the next steps,

including timeframes?• Who should I contact once I have waited the appropriate timeframe?

Initial Application

As Built Checklist

Initial Application

Final Paperwork

NJ Cert.No.

RebateCheck

Rebate Application Process

Page 6: Renewable Energy Incentive Program (REIP) 2010 Application ... application... · letter is received. – Local inspections cannot be done prior to date of approval letter. • NOTE:

Application Checklist

What determines whether an application is complete?• Completed REIP Rebate Application• Completed REIP Technical Worksheet• Site Map• Information on last 12 months electric usage

– Recent electric bill with yearly usage– Copies of all 12 months bills– List of Loads:

• Residential Consumption Calculator signed by customer and contractor• PE signed and sealed for non-residential

• Signatures, Federal Tax IDs, and phone numbers• Warranty information• Signed 10 year certification• Copy of signed contract• PVWATTS production estimates for designed and ideal (Version 1)

Initial Application

Page 7: Renewable Energy Incentive Program (REIP) 2010 Application ... application... · letter is received. – Local inspections cannot be done prior to date of approval letter. • NOTE:

Common Mistakes

• Not using the correct application forms• Missing signatures • System estimated production is greater than consumption• Electric bills are not included or do not show 12 months of consumption• Residential consumption calculator is not filled out correctly or the size of

the home or business does not justify the calculation• If the residential consumption calculator is used to show an increase in

consumption, you must supply an explanation for the addition and a copy of the existing bills. This does not include upgrades or additional appliances/products

• Missing items from Application Checklist• Site maps need more detail • Documents must be mailed or hand delivered - faxes and emails are not

accepted• Incomplete applications will be returned to the customer without exception

and resubmitted applications will be based on the new date received

Initial Application

Page 8: Renewable Energy Incentive Program (REIP) 2010 Application ... application... · letter is received. – Local inspections cannot be done prior to date of approval letter. • NOTE:

Initial Application

Page 9: Renewable Energy Incentive Program (REIP) 2010 Application ... application... · letter is received. – Local inspections cannot be done prior to date of approval letter. • NOTE:

Applicant Name:

Installation Address:

Current Electric Utility Account Number:

Installer Contact Name and Telephone Number:

Initial Application

Page 10: Renewable Energy Incentive Program (REIP) 2010 Application ... application... · letter is received. – Local inspections cannot be done prior to date of approval letter. • NOTE:

Timeframes

• Completed rebated applications take 5 – 7 weeks to approve depending on application volume.

• Completed Non-rebated applications take 4 weeks to approve.– We do not encourage projects to begin installation until the approval

letter is received.– Local inspections cannot be done prior to date of approval letter.

• NOTE: – Approval letters are not an approval of the project as submitted. The

approval letter is an authorization to commence work and a commitment that funds have been reserved.

– All projects must meet program guidelines in order to receive rebate payment despite a commitment letter.

Questions on Applications: Theresa [email protected]

Initial Application

Page 11: Renewable Energy Incentive Program (REIP) 2010 Application ... application... · letter is received. – Local inspections cannot be done prior to date of approval letter. • NOTE:

As Built Checklist

Initial Application

Final Paperwork

NJ Cert.No.

RebateCheck

As Built Checklist

As Built Checklist

Page 12: Renewable Energy Incentive Program (REIP) 2010 Application ... application... · letter is received. – Local inspections cannot be done prior to date of approval letter. • NOTE:

As Built Checklist

What do I do when my system has been installed, is capable of operation and is ready for program inspection?

• Submit the As Built Paperwork prior to the approval expiration date.• Include a signed copy of Rebate Confirmation and Final Application form signed by

both the customer and installer. • The As Built Technical Worksheet also must be signed by both the customer and

installer.• If the system size changes from the initial application, submit a revised Technical

Worksheet.• Include a digital photograph(s) – with a minimum size of 5” x 7” at 300 dpi which must

include inverters and modules.• Provide a shading analysis for installations using either Solar Pathfinder or Solmetric

SunEye as the shade analysis tool. Projects with no shading can provide a satellite view of the system.

• PV Watts (Version1 preferred)• ANSI C12 Certified Meter Worksheet must be submitted for larger than 10 kW

system.

As-Built Application

Page 13: Renewable Energy Incentive Program (REIP) 2010 Application ... application... · letter is received. – Local inspections cannot be done prior to date of approval letter. • NOTE:

Common Mistakes

• Missing signatures • Missing items from As Built Application Checklist• Incorrect REIP forms• All documents must be mailed or hand delivered. Faxes

and emails will not be accepted.• The installer will be contacted via email or phone

regarding any information missing from the As Built Packet.

Questions on As Built Paperwork: Cynthia [email protected]

As-Built Application

Page 14: Renewable Energy Incentive Program (REIP) 2010 Application ... application... · letter is received. – Local inspections cannot be done prior to date of approval letter. • NOTE:

As-Built Application

Page 15: Renewable Energy Incentive Program (REIP) 2010 Application ... application... · letter is received. – Local inspections cannot be done prior to date of approval letter. • NOTE:

When will my inspection be scheduled?

• Once As Built paperwork is deemed complete the project will go into the Quality Assurance (QA) or Quality Control (QC) Process.

• If the installer is in the QA process, and the inspection is waived, the installer and applicant will receive a letter postmarked within 2 weeks of receipt.

• If the installer is in the QC process, customers will be called within 2 week to schedule their inspection. Installers will be notified by email of the inspection date.

• All self installed projects will be inspected.• All utility program participating projects will be inspected.

Questions on Inspections or QA/QC: Melissa Smith [email protected]

As-Built Application

Page 16: Renewable Energy Incentive Program (REIP) 2010 Application ... application... · letter is received. – Local inspections cannot be done prior to date of approval letter. • NOTE:

When will I be notified of my inspection status (pass, fail, waive)?

• Installers are notified via email of inspection within 2 weeks of date of inspection.

• If the inspection passed, the email will include a passed inspection report.

• If the inspection failed, the email will include a failed inspection report. The installer must correct the deficiencies or supply the missing information and request a re-inspection. (3rd inspection $400)

• The customer and the installer will receive a letter in the mail for all waived projects.

Questions on Inspections: Melissa Smith [email protected]

As-Built Application

Page 17: Renewable Energy Incentive Program (REIP) 2010 Application ... application... · letter is received. – Local inspections cannot be done prior to date of approval letter. • NOTE:

As Built Checklist

Initial Application

Final Paperwork

NJ Cert.No.

RebateCheck

Final Paperwork

Final Paperwork

Page 18: Renewable Energy Incentive Program (REIP) 2010 Application ... application... · letter is received. – Local inspections cannot be done prior to date of approval letter. • NOTE:

Final Paperwork Checklist

• A copy of the Electrical Code Inspection (UCC) Certificate and other applicable permits.

• A copy of the Utility Interconnection Application available at www.NJCleanEnergy.com.

• A copy of the New Jersey Tax Clearance Certificate (Residential and Public projects excluded from this requirement).

• Energy Efficiency documents (detail on the next slide), or

• Notification that you are NOT completing the energy efficiency requirements.

Final Paperwork

Page 19: Renewable Energy Incentive Program (REIP) 2010 Application ... application... · letter is received. – Local inspections cannot be done prior to date of approval letter. • NOTE:

Energy Efficiency-2010 Applications FC1

Market Segment Program Rebate with EE Rebate without EE Required Documents

Residential =<10 kW HPwES Step 2 Air Sealing

$1.75 $1.55 Copy of Air Sealing Report

Residential >10 kW HPwES Step 3 $1.75 No Rebate Copy of Certificate of Completion-Must complete 2 major measures

Non Residential =< 50 kW

Government Local Government Audit

$1.00 $.90 Copy of Audit Approval Notice

Commercial and Non Governmental with peak demand <200 kW

Direct Install Audit $1.00 $.90 Copy of Work Order with recommended EE improvements

Commercial and Non Governmental with peak demand >200 kW

Pay For Performance

$1.00 $.90 Copy of Energy Reduction Plan

New Construction

Residential Energy Star Homes, Step 1, Step 2, Step 3

Step 1 $1.25 Step 2 $1.50Step 3 $1.75

$1.00 A copy of the Energy Star Home Verification Summary or RemRate Report

Non Residential No EE Requirements

N/A $1.00 N/A

Final Paperwork

Page 20: Renewable Energy Incentive Program (REIP) 2010 Application ... application... · letter is received. – Local inspections cannot be done prior to date of approval letter. • NOTE:

Energy Efficiency-2010 Applications received in FC2

Market Segment Program Rebate with

EERebate without EE

Required Documents

Residential =<10 kW

No EE Requirement

$1.35 $1.35 N/A

Residential >10 kW

HPwES Step 3

$1.35 up to 10 kW

No Rebate Copy of Certificate of Completion- Must complete 2 major measures

Non Residential =<50 kW

No EE Requirement

$.80 $.80 N/A

Final Paperwork

Page 21: Renewable Energy Incentive Program (REIP) 2010 Application ... application... · letter is received. – Local inspections cannot be done prior to date of approval letter. • NOTE:

Common Mistakes

• Missing signatures• Missing items from final checklist• Be sure to complete the correct REIP forms• Letter from taxation department, not application.• All documents must be mailed or hand delivered. Faxes

and emails will NOT be accepted.• The installer will be contacted via email or phone

regarding any information missing for the Final Paperwork Packet

Questions about Final Paperwork: Cynthia [email protected]

Final Paperwork

Page 22: Renewable Energy Incentive Program (REIP) 2010 Application ... application... · letter is received. – Local inspections cannot be done prior to date of approval letter. • NOTE:

As Built Checklist

Initial Application

Final Paperwork

NJ Cert.No.

RebateCheck

NJ Cert No. and Rebate Check

Page 23: Renewable Energy Incentive Program (REIP) 2010 Application ... application... · letter is received. – Local inspections cannot be done prior to date of approval letter. • NOTE:

If paperwork is deemed complete, what are the next steps?• Check batches are processed within 6-8 weeks of passed

inspection date• Once a check batch is created, the NJ Certification Number will be

assigned and the applicants facility information will be sent to the SREC tracking system administrator, PJM-GATS

• Letters including instructions on how to register with the SREC tracking system and the NJ Certification Number will be mailed to the applicant within 2 days of check batch creation.

• Checks are typically sent out within 60 days of this letter.• NJ Certification Numbers will only be released to the system owner

as listed on the rebate application.

Please do not contact NJCEP until the 60 days have expired.GATS Administrator: (610) 666-2245

Page 24: Renewable Energy Incentive Program (REIP) 2010 Application ... application... · letter is received. – Local inspections cannot be done prior to date of approval letter. • NOTE:

REIP Application & Payment Process

Customer Milestone

Required Documents

Incomplete/Next Steps/ Timeframe

Complete/Next Steps/Timeframe

Contact

I want to submit an application.

Initial Application Checklist

Application returned within 4-6 weeks.

REIP Approval letter generated within 5-7 weeks. SRP 4 weeks Begin project installation.

Theresa Heller

I am ready for program/state inspection.

“As Built” Checklist

Installer receives e-mail to submit incomplete /missing documents within 2 week.

Inspection is scheduled or waived within 2 week of receiving documents.

Melissa Smith

Where is my NJ certification number & rebate check?

Final Paperwork Checklist

Installer receives e-mail to submit incomplete /missing documents within 1 week.

Letter generated with NJ Cert number within 6-8 weeks. Rebate check mailed within 60 days after NJ cert number issued.

Cynthia Surman Tammy Gray

Page 25: Renewable Energy Incentive Program (REIP) 2010 Application ... application... · letter is received. – Local inspections cannot be done prior to date of approval letter. • NOTE:

Funding Cycles2010 Funding Cycle Timeframes:

• Start – Jan 1, May 1, and Sep 1• End – Completion of four month cycle • Each funding cycle has its own budget• Funding not used in a previous FC is carried over• Once FC budget is expended no further applications

are accepted

Funding Cycles

Page 26: Renewable Energy Incentive Program (REIP) 2010 Application ... application... · letter is received. – Local inspections cannot be done prior to date of approval letter. • NOTE:

Funding Cycle 1

Funding Cycle 2 Budget

Funding Cycle 3 Budget

2010 Total Budget

Residential@ $1.35

$10 M $6.0 M 5.15M $21.15 M

Non Residential@ $.80

$4.5 M $1.5 M $1.5 M $7.5

2010 Funding Cycles

Budget could be increased by cancelled projects

Page 27: Renewable Energy Incentive Program (REIP) 2010 Application ... application... · letter is received. – Local inspections cannot be done prior to date of approval letter. • NOTE:

Board Order Revisions for FC3

• Reduce incentives FC3 $.75• Single budget that includes residential,

residential new construction, residential PPA and public/non profits

• Residential Cap 7.5 kW (up to 10 kW)• Non Residential Cap 30 kW (up to 50 kW)• Removed intent to bid for public projects• $200 inspection fee beyond first inspection• FC3 opens Sept 1st

Application submission process not determined

Page 28: Renewable Energy Incentive Program (REIP) 2010 Application ... application... · letter is received. – Local inspections cannot be done prior to date of approval letter. • NOTE:

Applications Not Funded

• Commercial Applications:• SRP Conversion Acknowledgement mailed to

applicant

• Applicant and Contractor sign and return form by August 9th If interested

• If form is returned, Applicant is converted to Registration and entered in SRP

• If no form is returned, Application is mailed back to applicant

Page 29: Renewable Energy Incentive Program (REIP) 2010 Application ... application... · letter is received. – Local inspections cannot be done prior to date of approval letter. • NOTE:
Page 30: Renewable Energy Incentive Program (REIP) 2010 Application ... application... · letter is received. – Local inspections cannot be done prior to date of approval letter. • NOTE:

Applications Not Funded

• Residential, Public & Non-Profit Applications:– Returning Applications, offering Two Options:

• Convert application to SRP by providing a complete SRP registration

• Re-apply for REIP rebate in Funding Cycle 3

Page 31: Renewable Energy Incentive Program (REIP) 2010 Application ... application... · letter is received. – Local inspections cannot be done prior to date of approval letter. • NOTE:
Page 32: Renewable Energy Incentive Program (REIP) 2010 Application ... application... · letter is received. – Local inspections cannot be done prior to date of approval letter. • NOTE:

Contact Info: Tammy Gray

Senior Operations Specialist [email protected]