RENO CONSOLIDATED20-01 PROJECTCalifornia Ave.: Booth St. to Hunter Lake Dr.Mayberry Dr.: Memory Ln. to California Ave. First St.: Sierra St. to Virginia St.Virtual Project Presentation| May 27, 2020
In Partnership with
Consultant
PROJECT PURPOSE AND GOALS
Pavement Preservation Generally Deficient
Roadway SurfacesMulti Modal Access New and Improved
Connectivity Inclusive Transport
Modes
Mem
ory
Ln.
LegendProject Limits
California Avenue and Mayberry Drive Roadway Rehabilitation ADA Improvements Bicycle and Pedestrian
Connectivity Improved Safety
PROJECT AREA
Before: Free right-turn
encourages speeding No Crosswalks Eastbound-thru
challenging sight distance
Northbound-thru & eastbound left-turn movements prohibited
PROJECT SCOPECalifornia Avenue and Mayberry Drive Intersection
PROJECT SCOPECalifornia Avenue and Mayberry Drive Intersection
After: Reconfigure to 4-way
intersection with crosswalks
Reduced speeds entering neighborhood
Less conflict points between pedestrians, bicycles, & vehicles
Safer Roadway
RTC RIDE Route 16 - Idlewild Westbound Route Stripe wider travel lane
Bus Stop on California Avenue Relocate 200’ east to Arbutus Street/Forson Drive Intersection Widen sidewalk for ADA Compliance Add Street Lighting
Bus Stop on Hunter Lake Drive at California Avenue Widen sidewalk for ADA Compliance
PROJECT SCOPETransit Improvements
Bus Stop Improvements
Tie-In to Recently Constructed sidewalk & street improvements at
Booth Street
Adjustment to Width of Westbound Travel Lane to Better Accommodate
BusesVarying Sidewalk Widths
to Minimize Impact to Existing Utility Poles
Adding Sidewalk and Bike Facilities along both
sides of California Avenue for connectivity from Hunter Lake Drive
to Booth Street
PROJECT SCOPE
HUN
TER
LAKE
DR
WES
TFIE
LD A
VE
CONCEPTUAL DESIGNCalifornia Avenue: Hunter Lake Drive to Arbutus Street/Forson Drive IntersectionMayberry Drive: Memory Lane to California Avenue
CONCEPTUAL DESIGNCalifornia Avenue: Forson Drive to Booth Street
Village Shopping Center
California Ave.H
unte
r Lak
e D
r.
Boot
h St
.
Hunter LakeElementary
Raley’sM
emor
y Ln
.
West First Street Roadway Rehabilitation ADA Improvements Sidewalk Replacement
PROJECT AREALegend
Project Limits
PROJECT SCOPEWest First Street
Sidewalks & Ramps: ADA Improvements
Sierra Street Intersection: Full Reconstruct
Sierra Street to Virginia Street: Grind and Overlay
2020 February – Preliminary Design
2020 May – Virtual Project Presentation
2020 December – Final Design
2021 Construction – Late Summer
SCHEDULE 2020 - 2021
Total Project Budget $4.4 Million Investment in our Community
Funded with RTC-5 Fuel Tax
Next Steps Preliminary and Final Design Right-of-Way Utilities Construction!
BUDGET AND NEXT STEPS
Complete a comment/question form and mail to:Judy Tortelli, RTC Project Manager1105 Terminal Way, Suite #108Reno, NV 89502
Email: [email protected] Phone: (775) 335-1824 Visit our website at rtcwashoe.com and search Reno
Consolidated 20-01 Project ***Comments Due by June 30, 2020*** Comment Matrix Posted on Website Follow RTC on Social Media
COMMENTS OR QUESTIONS?
Thank you forWatching!Judy Tortelli – RTC Project Manager
Your RTC. Our Community.rtcwashoe.com