RENO CONSOLIDATED 20-01 PROJECT California Ave.: Booth St. to Hunter Lake Dr. Mayberry Dr.: Memory Ln. to California Ave. First St.: Sierra St. to Virginia St. Virtual Project Presentation| May 27, 2020 In Partnership with Consultant

Upload: others

Post on 17-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: RENO CONSOLIDATED 20-01 PROJECT...May – Virtual Project Presentation 2020 December – Final Design 2021 Construction – Late Summer SCHEDULE 2020 - 2021 Total Project Budget $4.4

RENO CONSOLIDATED20-01 PROJECTCalifornia Ave.: Booth St. to Hunter Lake Dr.Mayberry Dr.: Memory Ln. to California Ave. First St.: Sierra St. to Virginia St.Virtual Project Presentation| May 27, 2020

In Partnership with

Consultant

Page 2: RENO CONSOLIDATED 20-01 PROJECT...May – Virtual Project Presentation 2020 December – Final Design 2021 Construction – Late Summer SCHEDULE 2020 - 2021 Total Project Budget $4.4

PROJECT PURPOSE AND GOALS

Pavement Preservation Generally Deficient

Roadway SurfacesMulti Modal Access New and Improved

Connectivity Inclusive Transport

Modes

Page 3: RENO CONSOLIDATED 20-01 PROJECT...May – Virtual Project Presentation 2020 December – Final Design 2021 Construction – Late Summer SCHEDULE 2020 - 2021 Total Project Budget $4.4

Mem

ory

Ln.

LegendProject Limits

California Avenue and Mayberry Drive Roadway Rehabilitation ADA Improvements Bicycle and Pedestrian

Connectivity Improved Safety

PROJECT AREA

Page 4: RENO CONSOLIDATED 20-01 PROJECT...May – Virtual Project Presentation 2020 December – Final Design 2021 Construction – Late Summer SCHEDULE 2020 - 2021 Total Project Budget $4.4

Before: Free right-turn

encourages speeding No Crosswalks Eastbound-thru

challenging sight distance

Northbound-thru & eastbound left-turn movements prohibited

PROJECT SCOPECalifornia Avenue and Mayberry Drive Intersection

Page 5: RENO CONSOLIDATED 20-01 PROJECT...May – Virtual Project Presentation 2020 December – Final Design 2021 Construction – Late Summer SCHEDULE 2020 - 2021 Total Project Budget $4.4

PROJECT SCOPECalifornia Avenue and Mayberry Drive Intersection

After: Reconfigure to 4-way

intersection with crosswalks

Reduced speeds entering neighborhood

Less conflict points between pedestrians, bicycles, & vehicles

Safer Roadway

Page 6: RENO CONSOLIDATED 20-01 PROJECT...May – Virtual Project Presentation 2020 December – Final Design 2021 Construction – Late Summer SCHEDULE 2020 - 2021 Total Project Budget $4.4

RTC RIDE Route 16 - Idlewild Westbound Route Stripe wider travel lane

Bus Stop on California Avenue Relocate 200’ east to Arbutus Street/Forson Drive Intersection Widen sidewalk for ADA Compliance Add Street Lighting

Bus Stop on Hunter Lake Drive at California Avenue Widen sidewalk for ADA Compliance

PROJECT SCOPETransit Improvements

Page 7: RENO CONSOLIDATED 20-01 PROJECT...May – Virtual Project Presentation 2020 December – Final Design 2021 Construction – Late Summer SCHEDULE 2020 - 2021 Total Project Budget $4.4

Bus Stop Improvements

Tie-In to Recently Constructed sidewalk & street improvements at

Booth Street

Adjustment to Width of Westbound Travel Lane to Better Accommodate

BusesVarying Sidewalk Widths

to Minimize Impact to Existing Utility Poles

Adding Sidewalk and Bike Facilities along both

sides of California Avenue for connectivity from Hunter Lake Drive

to Booth Street

PROJECT SCOPE

Page 8: RENO CONSOLIDATED 20-01 PROJECT...May – Virtual Project Presentation 2020 December – Final Design 2021 Construction – Late Summer SCHEDULE 2020 - 2021 Total Project Budget $4.4

HUN

TER

LAKE

DR

WES

TFIE

LD A

VE

CONCEPTUAL DESIGNCalifornia Avenue: Hunter Lake Drive to Arbutus Street/Forson Drive IntersectionMayberry Drive: Memory Lane to California Avenue

Page 9: RENO CONSOLIDATED 20-01 PROJECT...May – Virtual Project Presentation 2020 December – Final Design 2021 Construction – Late Summer SCHEDULE 2020 - 2021 Total Project Budget $4.4

CONCEPTUAL DESIGNCalifornia Avenue: Forson Drive to Booth Street

Page 10: RENO CONSOLIDATED 20-01 PROJECT...May – Virtual Project Presentation 2020 December – Final Design 2021 Construction – Late Summer SCHEDULE 2020 - 2021 Total Project Budget $4.4

Village Shopping Center

California Ave.H

unte

r Lak

e D

r.

Boot

h St

.

Hunter LakeElementary

Raley’sM

emor

y Ln

.

Page 11: RENO CONSOLIDATED 20-01 PROJECT...May – Virtual Project Presentation 2020 December – Final Design 2021 Construction – Late Summer SCHEDULE 2020 - 2021 Total Project Budget $4.4

West First Street Roadway Rehabilitation ADA Improvements Sidewalk Replacement

PROJECT AREALegend

Project Limits

Page 12: RENO CONSOLIDATED 20-01 PROJECT...May – Virtual Project Presentation 2020 December – Final Design 2021 Construction – Late Summer SCHEDULE 2020 - 2021 Total Project Budget $4.4

PROJECT SCOPEWest First Street

Sidewalks & Ramps: ADA Improvements

Sierra Street Intersection: Full Reconstruct

Sierra Street to Virginia Street: Grind and Overlay

Page 13: RENO CONSOLIDATED 20-01 PROJECT...May – Virtual Project Presentation 2020 December – Final Design 2021 Construction – Late Summer SCHEDULE 2020 - 2021 Total Project Budget $4.4

2020 February – Preliminary Design

2020 May – Virtual Project Presentation

2020 December – Final Design

2021 Construction – Late Summer

SCHEDULE 2020 - 2021

Page 14: RENO CONSOLIDATED 20-01 PROJECT...May – Virtual Project Presentation 2020 December – Final Design 2021 Construction – Late Summer SCHEDULE 2020 - 2021 Total Project Budget $4.4

Total Project Budget $4.4 Million Investment in our Community

Funded with RTC-5 Fuel Tax

Next Steps Preliminary and Final Design Right-of-Way Utilities Construction!

BUDGET AND NEXT STEPS

Page 15: RENO CONSOLIDATED 20-01 PROJECT...May – Virtual Project Presentation 2020 December – Final Design 2021 Construction – Late Summer SCHEDULE 2020 - 2021 Total Project Budget $4.4

Complete a comment/question form and mail to:Judy Tortelli, RTC Project Manager1105 Terminal Way, Suite #108Reno, NV 89502

Email: [email protected] Phone: (775) 335-1824 Visit our website at rtcwashoe.com and search Reno

Consolidated 20-01 Project ***Comments Due by June 30, 2020*** Comment Matrix Posted on Website Follow RTC on Social Media

COMMENTS OR QUESTIONS?

Page 16: RENO CONSOLIDATED 20-01 PROJECT...May – Virtual Project Presentation 2020 December – Final Design 2021 Construction – Late Summer SCHEDULE 2020 - 2021 Total Project Budget $4.4

Thank you forWatching!Judy Tortelli – RTC Project Manager