renovation has begun!
TRANSCRIPT
CHURCH FLOOR PLAN
5/5/2013
NARTHEX / CHURCH ENTRY
5/5/2013
5/5/2013
BAPTISMAL FONT 5/5/2013
REAR NAVE FROM SIDE
5/5/2013
SANCTUARY 1 5/5/2013
SANCTUARY 2 5/5/2013
SANCTUARY from behind MUSIC 5/5/2013
REAR NAVE 5/5/2013
Worship Space Enhancement
Removal / Repair of exterior walls
New Reredos, ERC, and Tabernacle
wall with new Cross and Corpus
New porcelain tile Sanctuary floor
Clerestory window shades
Music Area improvements and
enlargement
New A/V equipment
Flooring replacement throughout
5/5/2013
Worship Space Enhancement-cont. Hearing -impaired loop system and
Sound improvements
South wall video screens for Priest,
Choir and Cantor
Kneelers on respaced Pews
Cleaning and refinishing of Pews
New HVAC system
New energy-efficient Lighting with
“theatrical” controls
New Liturgical Furnishings
Electronic Organ 5/5/2013
Project Scope - WORSHIP SPACE ENHANCEMENTS
•Design Modification to
Nave Doors
•New Baptismal Font
•Relocation of A/V control
console
•Replace floor tile at Narthex
and Lobby Vestibule
•Creation of Family Area
•Backlight relocated Mary-
Child Window
•New rear acoustic wall with
seasonal art work
•New acoustic ceiling
treatment
5/5/2013
Existing
Playfield
Electronic Carillon
Landscape Improvements
New Exterior Signage
Existing
Playground
Church School
Gym
111
111 Existing
Playfield
896 ft.
111 New
Bathrooms 111
414.5
ft.
111 New Sign
New Sign
Exterior
Enhancement
McDonald St.
Pau
lin
e S
t.
Gle
nd
ale
St.
5/5/2013
Project Scope Other Renovations
Lower Level Bathroom
Addition
Security System
Improvements
Main (School) entrance
Reception/Hospitality Office and Security Area
5/5/2013