renovation to building 904 keesler air force base, …

11
1091 Tommy Munro Dr. Biloxi, Mississippi 39532 228.594.2323 BILOXI OFFICE SET NUMBER RENOVATION TO BUILDING 904 KEESLER AIR FORCE BASE, BILOXI, MISSISSIPPI MAHG 089004 EGH PROJECT # 12-030 FINAL DESIGN SUBMITTAL 05.01.2013

Upload: others

Post on 14-Apr-2022

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: RENOVATION TO BUILDING 904 KEESLER AIR FORCE BASE, …

1091 Tommy Munro Dr. Biloxi, Mississippi 39532 228.594.2323

BILOXI OFFICE

SET NUMBER

RENOVATION TO BUILDING 904KEESLER AIR FORCE BASE, BILOXI, MISSISSIPPIMAHG 089004

EGH PROJECT # 12-030

FINAL DESIGN SUBMITTAL05.01.2013

Page 2: RENOVATION TO BUILDING 904 KEESLER AIR FORCE BASE, …

&

ACT

A/C

@

ADJ

AFD

AFF

ALUM

AF

ALT

BLDG

BJ

BIT

BET

ARCH

BLK'G

BOT

BO

B.R.

BM

BLT

CB

CCTV

C/C

CFH

CAP

CFM

CLG

CL

CI

C.J.

CLO

CMU

CONC

COMP

COL

CLR

CPT

CTB

CT

CONT

CTR

D/DIA

DB

LC.W.

DBL

DEFL

DEPT.

DK

DISP.

D.P.

DS

DN

COND

BLK

ADDT'L

CONST

CONTR.

CPLNG

DET/DTL

DWG(S)

C

NARROW RIB

NOT SHOWN

OUTSIDE AIR

ON CENTER

POWER POLE

PROJECTION

QUARRY TILE

MOISTURE RELEASE VENT

NOT APPLICABLE

NATURAL FINISH

NOT TO SCALE

PLUS OR MINUS

PREFINISH(ED)

PROPERTY LINE

PREFABRICATED

WATER HAMMER ARRESTOR

ON CENTER EACH WAY

NOT IN CONTRACT

POLYVINYL CHLORIDE

POUNDS/SQUARE FOOT

POUNDS/SQUARE INCH

QUARRY TILE BASE

PLASTIC LAMINATE

METAL THRESHOLD

PAPER TOWEL DISPENSER

PDIHBCONSTRUCTION HOSE BIBB

DAMPPROOFING

DRAWING(S)

DOWNSPOUT

DARK

DETAIL

DEFLECTION

DISPENSER

DEPARTMENT

DOWN

JT

JST

IC

INT

INV

INSUL

JAN

DIAMETER

DRY BULB

COLD WATER

CENTER LINE

DOUBLE

CARPET

CONTINUOUS

COUPLING

CERAMIC TILE BASE

CERAMIC TILE

CENTERS HORIZ.

HR

HT

H.W.

HVAC.

HC

HM

HND.

HDWR

HP

JOINT

JOIST

INVERT

JANITOR

INSULATION

INTERIOR

INTERCOMPVC

QTB

QT

P.T.D.

QTY QUANTITY

HORIZONTAL

HEATING, VENTILATION,

AIR CONDITIONING

HOUR

HEIGHT

HOT WATER

HANDICAP

HAND

HOLLOW METAL

HIGH POINT

HARDWARE

PRE FAB

PSF

PP

PR

PROJ

PSI

PAIR

PLAS.

PLYWD.

PF

PL

PL

PNL

PLYWOOD

PLATE

PANEL

FRCUBIC FEET/MINUTE

CONCRETE MASONRY UNIT

COMPRESSION/COMPRESSED

COLUMN

CONCRETE

CONTRACTOR

CONDENSATE

CEILING

CLEAR

CLOSET

CAST IRON

CONTROL JOINT

COLOR

G.F. CMU

G.C.

GL

GPM

GYP.BD.

FS

GA

FT

FTG

GALV

CLOSED CIRCUIT TELEVISION

CAPACITY

CENTER TO CENTER

CATCH BASIN

CUBIC FEET/HOUR

BOTTOM

BEAM

BUILT

BLOCKING

BOTTOM OF

BACKER ROD

FFE

FH

FLR

FIN

F.O.C.

F.O.B.

FA

FAC

FAR

FEC

FD

FE

NTSFRAME

GROUND FACE CMU

GENERAL CONTRACTOR

GALLONS PER MINUTE

GYPSUM BOARD

GLASS

GAUGE

GALVANIZED

FLOW SWITCH

FOOTING

FOOT/FEET

+/-, ±

OPP.

P/PT

OZ.

PART'N

OPPOSITE

PAINT

OUNCE

PARTITION

OCEW

OH

O.C.

OA

OPN'G

OVERHEAD

OPENING

FINISH FLOOR ELEVATION

FACE OF CONCRETE

FACE OF BRICK

FLOOR

FINISH

FIRE HYDRANT

FIRE EXTINGUISHER CABINET

FIRE ALARM REMOTE

FIRE ALARM CABINET

FIRE EXTINGUISHER

FIRE ALARM

FLOOR DRAIN

NF

NR

NS

NIC

NO./#

NOM

NUMBER

NOMINAL

MRV

MTD

MTL

M.T.

N/A

METAL

MOUNTED

TYPICAL ALL SIMILARTYP

WELDED WIRE FABRIC

VINYL WALL COVERING

VINYL COMPOSITION TILE

WIRE GLASS VISION PANEL

UNDERWRITER'S LABORATORY

UNLESS NOTED OTHERWISE

WCO

WD

WG

W/

W.

WH

WP

WWF

WV

WGVP

WATER HEATER

WATERPROOFING

WATER VALVE

WOOD

WIDE, WIDTH

WALL CLEANOUT

WATER GAUGE

WITH

UNO

U.L.

U.C.

VAR

VD

VTR

V.C.T.

VERT

V.W.C.

VARIES

VERTICAL

VOLUME DAMPER

VENT-THRU-ROOF

CONDITIONS

UNDER COUNTER

TOUNGE AND GROOVE

TOILET PAPER HOLDER

SPECIFIED/SPECIFICATIONS

TEMPORARY BENCH MARKTBM

T&B

TEL

T&G

TLT

TOS

TP

T.O.

TH/THK

T.O.B.

THRESH.

TRTD

TOILET

TOP OF

TOP OF STRUCTURE

TOP OF BEAM

TREATED

THICK

TOP AND BOTTOM

TELEPHONE

THRESHOLD

SIM

SL

SP

SQ

SS

STD

SUP

SYN

STL

SPEC

SUSP

STRUCT.

STANDARD

STEEL

SUPPLY

SYNTHETIC

SUSPENDED

STRUCTURAL

SIMILAR

SLOPE

SPACING

SQUARE

STAINLESS STEEL

LINEAR FEET

LAMINATE(D)

LIGHT POLE

MECHANICAL

LENGTH, LONG

MANUFACTURER

MISCELLANEOUS

MASONRY OPENING

LAY-IN ACOUSTICAL CEILING

EL/ELEVADJUSTABLE

ABOVE FINISH FLOOR

AUTOMATIC FIRE DAMPER

ARCHITECT

BUILDING

BITUMEN

BETWEEN

BAR JOIST

BLOCK

ALUMINUM

ALTERNATE

ACCESS FLOORING

EQUIP.

ES

EXT

ESP

EXH

EXPAN

ENT

EQ

EOP

EMBED

ENGR.

ACOUSTICAL CEILING TILE

ANGLE

ADDITIONAL

AIR CONDITIONING

AND

AT

EA

EF

EFC

EJ

ELEC.

EDF

LPELEVATION

EQUIPMENT

EXTERNAL STATIC PRESSURE

EXPOSED STRUCTURE

EXHAUST

EXTERIOR

EXPANSION

ENTERING/ENTRY

EXISTING OVERHEAD PRIMARY

EQUAL

EMBEDDED

ENGINEER

MECH

MFR/MFGR

MIN

MISC

M.O.

MH

MOD.

MINIMUM

MANHOLE

MODIFIED

MA

MAS.

MAX

MAT'L

MIXED AIR

MAXIMUM

MASONRY

MATERIAL

EXPANSION JOINT

ELECTRIC DRINKING FOUNTAIN

EACH

EXHAUST FAN

EACH FACE

ELECTRICAL

L

LAV

LF

LG

LAM

L.A.T.

LEG

LAVATORY

STOREFRONT/SQUARE FEET

REVOLUTIONS PER MINUTE

REQUIREDREQ'D

RET

RPM

RM

RTU

SAN

SD

SF

SA

SCWD

SECT

SHT

SUPPLY AIR

SANITARY

SECTION

SOLID CORE WOOD

SPLITTER DAMPER

SHEET

ROOM

RETURN

ROOF-TOP UNIT

RA

RB

REF

RD

R/RAD

REINF

RADIUS

RETURN AIR

RUBBER BASE

REFERENCE

REINFORCED

ROOF DRAIN

REF.REF.

GULFPORT

BILOXI

KEESLER AIR FORCE BASE OCEANSPRINGS

BAY ST. LOUIS 20 MI.

NEW ORLEANS LA. 100 MI.

INTERSTATE 10

INTERSTATE 110

US ROUTE 90

MISSISSIPPI SOUND

BILOXI BACK BAY

PASS ROAD

PASCAGOULA 20 MI.

MOBILE AL. 50 MI.

US ROUTE 90

INTERSTATE 10

US

ROUTE

49

Parking

Parking

Parking Parking

Parking

Parking

Parking

"L" ST.

"I" ST

GATE 7

GATE 8

GATE 2

GATE 3

GATE 9

GATE 1

INS

TRU

MEN

T R

UN

WA

Y

Parking"H

" ST

Parking

MEADOWS DRIVE

HANGAR ROAD

Gas MeteringStation

RODENBERG AVENUE

GALAXY STREET

Dia. #4

PLOESTI DRIVE

PHANTOM STREET

THUNDERBOLT STREET

EAGLE STREET

ILS

SoftballDia. #5 Softball

7504

Auto WashRack

OVE

R R

UN

03

FALCON STREET

B

A#5

Tank

Parking

Troop Walk

HERCULES STREET

ReviewStand

NW-SE RUNW

AY (DISUSED)

TAX

IWAY

# 2

Parking

TAXIWAY # 3

AIRCRAFT PARKING APRON #1

TAXIWAY #

1

BAY RIDGE

CAPEHARTHOUSING

CURTIS DRIVE

ARNOLD

Gas Reg. &Metering Sta.

CABELL STREET

SHADYLA

WNSHADOWLAWN

WHERRY HOUSING

MITCHELL CIRCLE

PINELAWN

POWER CIRCLE

GRASSLAWN

ORVILLE WRIGHT

Substation

PATRICK DRIVE

PATTON AVEHARMON CIRCLE

HARMON CIRCLE

FECHET DRIVE

FECHET DRIVE

VANDEN

BERG

DRIVE

CHANNEL

CIRCLE

Measuring SetTemp. & Humidity

Tower

Parking

NE

-SW

RU

NW

AY 1

50' X

763

0'

TAXIWAY # 4

TAX

IWAY

# 6

AIR

CR

AFT

PAR

KIN

G A

PRO

N #

2

TAXIWAY # 5

AREASTORAGEAMMO

Fire

AreaTraining

PLAYGROUND

MARINAPARK

SIXTH ST

"D" ST

HOUSING

PINEHAVEN

"B" STREET

"C" STREET

"A" STREET

"M" ST

MS PowerEasement

"C" ST

Parking

Tennis Courts

TrackCinder

"Z"

ST

"Z"

ST

"X" ST

"E" S

T

SubstationPower

"D" ST

Parking

SECOND ST

FIF

TH

ST

CHAPPIE JAMES AVE

Parking

Parking

"L" STParking

Parking

15

16 14

Parking

Rec Pad

Parking

02

01

Rec Pad

Parking

03 05

04

Monument

Parking

Parking

Parking

"C" Street Ditch

SIXTH STREET

"D" STREET

S COURT ST SOUTH

DEVON WAY

"G" ST

MEADOWS DR

SERVICE DR

"H" ST

Parking

FIRST STREET

Parking

Parking

Water Tower

Parking

TAX

IWAY

# 6

AIR

CR

AFT

PAR

KIN

G A

PRO

N #

2

Parking

Parking

FIF

TH

ST

LARCHER BLVD

Parking

Parking

Monument

THIRD ST

Parking

"E" STParking

Parking

BAYVIEW STREET

YORKSHIRE ROAD

BAUGHMAN BLVD

Parking

Water Tank #6

Parking

BENAVON ROAD

MINDEN ROAD

KENSINGTON DRIVE CONCORD CIRCLE

Parking

Tennis Courts

S COURT ST NORTH

N COURT ST

StorageBoat

TowerWater

XX

X

X

X

X

X

X

X

X

X

X

X

XX

XX

X

X

X

X

X

XX

XX

XX

X

XX

X

XX XX

X

X

X

X

X

X

XX X

X

XX

X

X

X

X

XX

XX

XX

X

XX

XXX

X

X

X

X

X

X

X X

X

X

X

XX

XX

X

X

X X

X

X

X

X

X X

X

X

X

XX

XX

XX

XX

XX

XX

X

XXXXXXXX

XX

XXXX

XXXXXX

XXXX

XXXXXX

XX

X

XXX

"Z"

ST

XXXXXXX

XXXX

XXX

XXXX

XXXX

XX

XXXX

X

XXXX

XX

XX

X

X

XXXX

XX

XXXX

XX

X

"E" S

T

RecPad

X

XX

Parking

ZERO STREET

X X

XX

XXXX

XXXX

XX XX

ZERO STREET

X X

XX

XX

XX

XX

XX

XX

XX

XX

XX XX

XXXX

XX

21

XX

XXX

XX

XX

X

DRAWING INDEXDESIGN TEAM

ARCHITECTELEY GUILD HARDY ARCHITECTS, PA1091 TOMMY MUNRO DRIVEBILOXI, MS 39532228.594.2323228.594.2223 FAX

MARK LISHEN, AIA, LEED APPRINCIPAL-IN-CHARGE

KYLE KISH, AIA, LEED APPROJECT ARCHITECTEMAIL: [email protected]

MECHANICAL ENGINEERDELL CONSULTING129 E. GOVERNMENT ST.PENSACOLA, FL 32502850.332.5687850.332.6629 FAX

JASON MAJERUS, PEEMAIL: [email protected]

ELECTRICAL ENGINEERDELL CONSULTING129 E. GOVERNMENT ST.PENSACOLA, FL 32502850.332.5687850.332.6629 FAX

HAL DELL, PEEMAIL: [email protected]

ABBREVIATIONS VICINITY MAP

KEESLER AIR FORCE BASE MAP

GRAPHIC LEGEND

WOOD BLOCKING

CONT BATT INSULATION/ ACOUSTICAL BATTS

GYPSUM BOARD

FLOOR DRAIN

ROOM DESIGNATION

NEW DOOR OPENING

EXISTING WINDOW /DOOR TYPE

COLUMN GRID LINE

DETAIL

ELEVATION/PHOTOGRAPH

BUILDINGSECTION / DETAIL

012B

ROOM NAME000

A3001

A201

A

6.2

A1301

WALL PARTITION TYPE

PHASE 1

PHASE 2

PH

AS

E 3

1. PHASE 1 - CONTRACTOR TO PROVIDE TEMPORARY STORAGE UNIT FOR EXISTING GOVERNMENT FURNISHINGS.GOVERNMENT TO RELOCATE, STORE, & REINSTALL FURNISHINGS. SITE WORK FOR DEMO AND NEW SIDEWALK ONSOUTH SIDE OF BUILDING AND DEMO AND NEW RAMP ON NORTH SIDE OF BUILDING TO OCCUR. PROVIDE TEMPORARYRESTROOM PRIOR TO PROVIDING NEW CONDENSATE DRAIN IN THE NEW MECHANICAL ROOM. REFER TOMECHANICAL, ELECTRICAL AND TELECOM SHEETS FOR ADDITIONAL INFORMATION.

2. PHASE 2 - CONTRACTOR TO PROVIDE TEMPORARY STORAGE UNIT FOR EXISTING GOVERNMENT FURNISHINGS.GOVERNMENT TO RELOCATE, STORE, & REINSTALL FURNISHINGS. PROVIDE TEMPORARY RESTROOM PRIOR TOCOMMENCING PHASE 2 AND CONNECTION OF NEW CONDENSATE DRAIN FOR NEW MECHANICAL ROOM IN PHASE 1.COORDINATE NEW ELECTRICAL SERVICE INSTALLATION AND BUILDING DOWNTIME WITH CONTRACTING OFFICER;CHANGEOVER SHALL BE LIMITED IN TIME AND SHALL OCCUR DURING NON-WORKING HOURS. COORDINATE NEWCHILLER AND BOILER INSTALLATION WITH CONTRACTING OFFICER; THE CHANGEOVER OF THE SYSTEM SHALL BELIMITED IN TIME AND TEMPORARY HVAC SYSTEMS SHALL BE PROVIDED. REFER TO MECHANICAL, ELECTRICAL ANDTELECOM SHEETS FOR ADDITIONAL INFORMATION.

3. PHASE 3 - CONTRACTOR TO PROVIDE TEMPORARY STORAGE UNIT FOR EXISTING GOVERNMENT FURNISHINGS.GOVERNMENT TO RELOCATE, STORE, & REINSTALL FURNISHINGS. CONTRACTOR TO RELOCATE EXISTING CAGEDSHELVING UNITS TO COMPLETE THE WORK; REINSTALL AFTER COMPLETION OF PHASE. REFER TO MECHANICAL,ELECTRICAL AND TELECOM SHEETS FOR ADDITIONAL INFORMATION.

4. PHASE 4 - REMOVAL AND REAPPLICATION OF SEALANT AND SEALANT & BACKERRODS ON EXTERIOR OFBUILDING.

5. BUILDING TO REMAIN OCCUPIED AND IN USE DURING ALL PHASES OF WORK. OWNER WILL RELOCATE TO PHASESNOT BEING WORKED ON AT THAT TIME. POWER AND HVAC SHALL REMAIN OPERATIONAL DURING HOURS OFOPERATION (6 AM-5 PM) IN ALL PHASES NOT BEING WORKED ON. CONTRACTOR TO ENSURE EGRESS PATHS AREMAINTAINED DURING THE WORK.

7. PHASE 1 AND 2 SHALL NOT RUN CONCURRENTLY.

8. PHASE 2 AND 3 SHALL NOT RUN CONCURRENTLY.

8. PHASE 4 CAN OCCUR WITH PHASE 1, 2, 3, OR SEPARATELY.

9. CONTRACTOR PROVIDED ON-SITE STORAGE CONTAINER SHALL BE (2) TWO 8'x40'x8' CONEX TYPE STORAGEUNITS. LOCATION TO BE VERIFIED WITH CONTRACTING OFFICER. CONTRACTOR TO RELOCATEDFURNITURE/EQUIPMENT FROM BUILDING BEFORE EACH PHASE AND REINSTALL AFTER EACH PHASE. LIST OFEQUIPEMENT/FURNITURE TO BE MOVED IS PROVIDED IN THE SPECIFICATIONS.

10. TEMPORARY RESTROOM TO BE WELLS CARGO ULTRA LAV MODEL WC201-ADA OR WC6181-ADA OR EQUAL,WITH A/C, WATER HEATER AND HAND DRYER. FINAL LOCATION TO BE VERIFIED WITH CONTRACTING OFFICER.

GENERAL NOTES -PHASING PLAN

ALL DRAWINGS ARE DIAGRAMMATIC AND ARE INTENDED TO QUANTIFY THE MATERIALS SPECIFIED AND INDICATEDTHEIR INTENDED RELATIONSHIP TO EACH OTHER. THE DRAWINGS ARE NOT TO BE SCALED. THE VARIOUS SCALESUSED ON THE DRAWINGS MAY NOT ALLOW FOR ALL THE FITTINGS, OFFSETS, AND ACCESSORIES THAT MAY BEREQUIRED TO COMPLETE THE WORK. THE CONTRACTOR SHALL CAREFULLY INVESTIGATE THE CONDITIONS THATWOULD AFFECT THE WORK TO BE PREFORMED AND SHALL ARRANGE SUCH WORK AS NECESSARY TO COMPLYWITH THE INTENT OF THE CONSTRUCTION CONDITIONS.

THIS PROJECT DOES NOT CONTAIN ASBESTOS MATERIAL IN THE CONSTRUCTION AREA.

THIS PROJECT DOES NOT CONTAIN LEAD BASED PAINT MATERIAL IN THE CONSTRUCTION AREA.

KEESLER AIR FORCE BASE

BASE CONTRACTINGBLDG 4605

CSC APPLIED TECHNOLOGIESBLDG 4705

MAIN GATE / VISITORS CENTER(WHITE AVE VIA HWY 90)

SECURITYPOLICEBLDG 3524

PROJECTLOCATIONBLDG 904

CONTRACTOR'STRUCK ROUTE

SEE SPECIFICATIONS FOR ADDITIONAL INFORMATION

CHECKED:DRAWN:

NUMBER:DATE:

DA

TE

/ D

ES

CR

IPT

ION

:R

EV

:

1091

TO

MM

Y M

UN

RO

DR

IVE

, BIL

OX

I, M

S 3

9532

228.

594.

2323

P...

..228

.594

.222

3 F

A R C H I T E C T S

eleyguildhardy.com

A R

C H

I T

E C

T S

KLKKLK

05.01.201312-030

RE

NO

VA

TIO

NS

TO

BU

ILD

ING

904

KA

FB

DR

AW

ING

IND

EX

& P

RO

JEC

T IN

FO

RM

AT

ION

G001 12-0

30R

ENO

VATI

ON

S TO

BU

ILD

ING

904

KAF

B

GENERALG000 TITLE SHEETG001 DRAWING INDEX & PROJECT INFORMATIONG102 LIFE SAFETY PLAN

ARCHITECTURALD100 SITE PLAN - EXISTING / DEMOLITIOND110 FLOOR PLAN - DEMOLITIOND111 DEMOLITION PHOTOGRAPHS & DETAILSD120 REFLECTED CEILING PLAN - DEMOLITIOND130 EXIST BUILDING ELEVATIONS - DEMOLITION /

NEW WORK

D131 EXIST PANEL ELEVATIONS - DEMOLITION / NEWWORK

D132 EXIST JOINT DETAILS - DEMOLITION / NEWWORK

D140 SECTIONS AND DETAILS - DEMO

A100 SITE PLAN - NEW WORKA101 HANDICAP RAMP - DEMOLITION / NEW WORKA110 FLOOR PLAN - NEW WORKA120 REFLECTED CEILING PLAN - NEW WORKA140 WALL SECTIONS & DETAILS - NEW WORKA600 DETAILS & SCHEDULESA601 DETAILS

MECHANICALM010 LEGEND, NOTES, AND ABBREVIATIONSM101 GROUND FLOOR PLAN - DEMOLITIONM111 GROUND FLOOR PLAN - HVACM112 GROUND FLOOR PIPING PLAN - HVACM113 ENLARGED PLANS - HVACM114 ENLARGED PLANS - HVACM200 SCHEDULES-HVACM201 SCHEDULES-HVACM300 DETAILS-HVACM400 HYDRONIC SYSTEMS & PIPING SCHEMATICSM401 HYDRONIC SYSTEMS & PIPING SCHEMATICSM500 CONTROLS-HVACM501 CONTROLS-HVACM502 CONTROLS-HVAC

ELECTRICALE010 LEGEND, NOTES, & ABBREVIATIONSE020 SITE PLAN - ELECTRICALE101 FIRST FLOOR PLAN - DEMOLITIONE111 FIRST FLOOR - LIGHTINGE121 FIRST FLOOR PLAN - POWERE122 ENLARGED POWER PLANSE123 FIRST FLOOR PLAN - MECHANICAL POWERE131 FIRST FLOOR PLAN - FIRE ALARME200 DETAILSE201 DETAILSE202 DETAILSE300 RISER DIAGRAMSE400 SCHEDULESE401 SCHEDULESE402 SCHEDULES

1" = 30'-0"G0011 PHASING PLAN

INTERIORSI500 PROPOSED FURNITURE PLANI600 FINISH SCHEDULES

TELECOMMT010 LEGEND, NOTES, ABBREVIATIONST101 FIRST FLOOR PLAN - DEMOLITIONT110 FIRST FLOOR PLAN - TELECOMMUNICATIONST200 DETAILST201 DETAILST202 DETAILST301 SINGLE LINE DIAGRAMST401 ENLARGED FLOOR PLAN & RACK ELEVATIONS

NOT TO SCALEG0014

CONSTRUCTIONSITE SIGN

FIRE PROTECTIONFP111 GROUND FLOOR PLAN - FIRE PROTECTION

Page 3: RENOVATION TO BUILDING 904 KEESLER AIR FORCE BASE, …

REF.REF.

30.6"33"

2HR

2HR

2HR

2HR

2HR

2HR

1HR 1HR 1HR

1HR 1HR 1HR

1HR

1HR

1HR

44620

22A

110420

54A

130020

65A

30325006

S

14442100

144B

FOR ALL AREASNOT NOTED ONPLAN

30.6"33"

336.6"33"

6012"33"

6012"33"

6012"33"

6012"33"

CODE ANALYSISAPPLICABLE CODES

INTERNATIONAL BUILDING CODE, 2012INTERNATIONAL FIRE CODE, 2012NFPA 101, LIFE SAFETY CODE, 2012

BUILDING SUMMARY

BUILDING CONSTRUCTION-PRIMARY OCCUPANCY CLASSIFICATION:

GROUP B: BUSINESSINCIDENTAL-USE AREAS, GROUP A: ASSEMBLY, AND GROUP S: STORAGE

-CONSTRUCTION TYPE: IBC TYPE IIB-NONCOMBUSTIBLE MATERIALS EXT WALLS, INTERIOR WALLS BY CODE-SPRINKLERED

ACTUAL GROSS FLOOR AREA: 20,510 SF

ACTUAL NET FLOOR AREA:BUSINESS & ASSEMBLY 17,342 SFSTORAGE (MOBILITY STORAGE) 3,042 SFCOVERED AREA(@ 1/2) 126 SF

TOTAL: 20,510 SF

ACTUAL HEIGHT: 27'-6" (1 STORY)

OCCUPANT LOAD: 276

NUMBER OF EXITSREQUIRED: MORE THAN 1000 OCCUPANTS = 4

(2 EXITS REQUIRED WHERE THE OCCUPANT LOAD OF A SPACE EXCEEDS 50OCCUPANTS)

PROVIDED: 7

OCCUPANCY LOAD FACTORS

(IBC TABLE 1004.1.2)

1. ASSEMBLY 20 NET/ PERSON2. BUSINESS 100 GROSS/ PERSON4. WAREHOUSE 500 GROSS/ PERSON

OCCUPANCY CALCA........................................ 2,850 SF/ 20= 141B........................................ 14,492 SF/ 100 = 144S.........................................3,042 SF/ 500 = 6

TOTAL OCCUPANTS = 291

MEANS OF EGRESS REQUIREMENTS

(WITH AUTOMATIC FIRE SPRINKLER SYSTEM)

A: ASSEMBLY OCCUPANCY- MAXIMUM ALLOWABLE TRAVEL DISTANCE: 250 FT (IBC TABLE 1016.1)- MAXIMUM ALLOWABLE DEAD END: 20 FT (IBC 1017.3)- MAXIMUM ALLOWABLE COMMON PATH OF TRAVEL: 75 FT (IBC 1014.3)

B: BUSINESS OCCUPANCY- MAXIMUM ALLOWABLE TRAVEL DISTANCE: 300 FT (IBC TABLE 1016.1)- MAXIMUM ALLOWABLE DEAD END: 50 FT (IBC 1017.3)- MAXIMUM ALLOWABLE COMMON PATH OF TRAVEL: 100 FT (IBC 1014.3)

S: STORAGE- MAXIMUM ALLOWABLE TRAVEL DISTANCE: 400 FT (IBC TABLE 1016.1)- MAXIMUM ALLOWABLE DEAD END: 20 FT (IBC 1017.3)- MAXIMUM ALLOWABLE COMMON PATH OF TRAVEL: 100 FT (IBC 1014.3)

REQ'D EGRESS WIDTH

PER TABLE 1005.1291 OCCUPANTS X .2 (SPRINKLERED) = 58.2" = 4'-10"

PROVIDED: 4 DOOR(S) @ 33"1 DOOR(S) @ 66"

198" = 16'-6"

OCCUPANCY SEPARATION

MIXED USE - NONSEPARATED PER SECTION 302.3.1 (B & A)SEPERATED - 2 HR (S & B)

INCIDENTAL USE: STORAGE ROOMS OVER 100 SF = 1HR

CORRIDOR RATINGSW/ SPRINKLERS = 0 (IBC 1016.1)WIDTH NO LESS THAN 44" (IBC 1016.2)

ALLOWABLE BUILDING HEIGHTS & AREAS

(IBC TABLE 503, SECTION 504.2, SECTION 506)

A-3: ASSEMBLYMAXIMUM ALLOWABLE BUILDING AREA: 9,500 SFMAXIMUM ALLOWABLE BUILDING HEIGHT: 55FTMAXIMUM ALLOWABLE NUMBER OF STORIES: 2

B: BUSINESSMAXIMUM ALLOWABLE BUILDING AREA: 76,000 SFMAXIMUM ALLOWABLE BUILDING HEIGHT: 55 FTMAXIMUM ALLOWABLE NUMBER OF STORIES: 4 STORIES

S: STORAGEMAXIMUM ALLOWABLE BUILDING AREA: 26,000 SFMAXIMUM ALLOWABLE BUILDING HEIGHT: 55 FTMAXIMUM ALLOWABLE NUMBER OF STORIES: 4 STORIES

EXCEPTION ALLOWABLE BUILDING AREA:

507 - UNLIMITED AREA BUILDINGS: 507.2 Sprinklered, one story.The area of a one-story, Group B, F, M or S building or a one-story Group A-4 building of other thanType V construction shall not be limited when the building is provided with an automatic sprinklersystem throughout in accordance with Section 903.3.1.1, and is surrounded and adjoined by publicways or yards not less than 60 feet (18 288 mm) in width.

LIFE SAFETY LEGEND

3201004

B

ROOM AREA(SQ. FT.)

OCCUPANCYGROUP

OCCUPANT LOAD(PERSONS)

OCCUPANTLOAD FACTOR 11

1.7"32"

OCCUPANTLOAD

REQUIREDEXIT WIDTH(INCHES)

PROVIDED EXIT WIDTH(INCHES)

CHECKED:DRAWN:

NUMBER:DATE:

DA

TE

/ D

ES

CR

IPT

ION

:R

EV

:

1091

TO

MM

Y M

UN

RO

DR

IVE

, BIL

OX

I, M

S 3

9532

228.

594.

2323

P...

..228

.594

.222

3 F

A R C H I T E C T S

eleyguildhardy.com

A R

C H

I T

E C

T S

KLKKLK

05.01.201312-030

RE

NO

VA

TIO

NS

TO

BU

ILD

ING

904

KA

FB

LIF

E S

AF

ET

Y P

LA

N

G102 12-0

30R

ENO

VATI

ON

S TO

BU

ILD

ING

904

KAF

B

1" = 10'-0"G1021 LIFE SAFETY PLAN

Page 4: RENOVATION TO BUILDING 904 KEESLER AIR FORCE BASE, …

BUILDING 904

MECHANICAL YARD - SEEMECH & ELEC FOR DEMOWORK THIS AREA

OUTLINE OF EXISTINGMECHANICAL ROOM - SEEMECH & ELEC FORLOCATION OF TEMPPOWER FOR JOB TRAILER

LAYDOWN AREA

CONTRACTOR SHALLALLOW CLEARSPACE FOR EGRESSROUTES (4'-0" WIDEMIN BTWN CURBAND FENCING)WHEN WORK IS NOTBEING COMPLETEDIN THIS AREA. SEEPHASING PLAN FORSTAGING OF WORK.

LOCATION OFTEMPORARY TOILETFACILITIES

30'-6

" +

/-

REMOVE 6' WIDESIDEWALK TO NEARESTEXPANSION JOINT.PREPARE FOR NEWSIDEWALK. SEE PHASINGPLAN.

PARKING , DRIVINGLANE, ANDLOADING AREA TOREMAINOPERATIONALDURING ALLPHASES OF WORK

SEE MECHANICAL FORREMOVAL OF HVAC LINES

TRANSFORMER -SEE ELECTRICAL

TRANSFORMER -SEE ELECTRICAL

REMOVE PORTIONOF CURB,LANDSCAPING ANDCONCRETE PADS.SEE PHASING PLANFOR STAGING OFWORK.

A1011

DEMOLISH EXISTINGCONCRETE WALK TOEXPANSION JOINT -EXISITING 4" WALK HAS6x6 WWF; COORDINATEWITH BASE ARBORIST ONEXENT OF TREE ROOTTHAT CAN BE REMOVED.

30'-6" +/-

REMOVE PIPING &ACCESSORIES - SEEMECHANICAL; PREPEAREBUILDING WALLPENETRATION FOR NEWCOVER

1. LAY-DOWN AND WORK AREAS SHALL BE RETURNED TO PRE-CONSTRUCTION CONDITIONS ATTHE COMPLETION OF THE WORK. REPLACE TURF, FILL DIVOTS, PATCH/REPLACE DAMAGEDCONCRETE WALKS AND CURBS, ETC.

2. LAY-DOWN AREA SHOWN IS PROPOSED. FINAL LOCATION TO BE COORDINATED WITHCONTRACTING OFFICER.

3. SEE PHASING PLAN FOR STORAGE AND RESTROOM REQUIREMENTS DURING ALL PHASES OFWORK.

4. CONTRACTOR TO PROVIDE 6'-0" HIGH CHAIN LINK FENCING WITH INSERTS AROUND LAY-DOWNAREA, AS A MINIMUM.

5. SEE ELECTRICAL AND MECHANICAL FOR ADDITIONAL SITE WORK.

6. SEE THE EXISTING/DEMOLITION FLOOR PLAN FOR DEMOLITION WORK AT WINDOWS AND DOORS.

GENERAL NOTES - SITE DEMOLITION

EXISTING WALKS/CURBS/ETC

LEGEND - SITE DEMOLITION

BUILDING OUTLINE

LAY-DOWN AREA PERIMETER

TREES/PLANTINGS TO REMAIN

WORK TO BEDEMOLISHED

LOCATION/DIRECTION OF PHOTOGRAPH

CHECKED:DRAWN:

NUMBER:DATE:

DA

TE

/ D

ES

CR

IPT

ION

:R

EV

:

1091

TO

MM

Y M

UN

RO

DR

IVE

, BIL

OX

I, M

S 3

9532

228.

594.

2323

P...

..228

.594

.222

3 F

A R C H I T E C T S

eleyguildhardy.com

A R

C H

I T

E C

T S

KLKKLK

05.01.201312-030

RE

NO

VA

TIO

NS

TO

BU

ILD

ING

904

KA

FB

SIT

E P

LA

N -

EX

IST

ING

/ D

EM

OL

ITIO

N

D100 12-0

30R

ENO

VATI

ON

S TO

BU

ILD

ING

904

KAF

B

1" = 20'-0"D1001

Architectural Site Plan- Existing/Demolition

1/8" = 1'-0"D1002

PHOTOGRAPH -EXISTING SIDEWALK

1/8" = 1'-0"D1003

PHOTOGRAPH -MECHANICALPENETRATION

NO

RTH

0' 10' 20' 40'

3D100

2D100

Page 5: RENOVATION TO BUILDING 904 KEESLER AIR FORCE BASE, …

77'-8

"

126'-8"

69'-8

"

21'-4"

154'-0" 56'-8"

37'-6 7/8" 59'-7" 15'-0" 12'-0" 14'-6 3/4" 13'-0"

6'-2

"9'

-9 1

/2"

13'-0

"12

'-9 5

/8"

10'-9 1/8"

26'-5

5/8

"

12'-8

"

27'-9 1/2"

11'-0" 10'-0" 10'-0" 10'-0" 10'-0" 10'-0" 10'-1 1/8"

75'-4

5/8

"

11'-0

"

11'-0

"

5'-6

"

29'-5

1/4

"13

'-11

1/8"

5'-6

"

8'-8

"

12'-2" 15'-3 1/2"

17'-11 1/2" 9'-8"

10'-0

"

11'-7 1/2" 4'-6" 11'-4"

7'-2

"10

'-4 3

/4"

8'-2

"8'

-4"

16'-6

"

16'-6

"16

'-6"

24'-4

"4'

-6"

11'-3

1/4

"

7'-3

1/4

"16

'-8"

6'-0

"10

'-4"

7'-8 1/2" 10'-9 1/2" 10'-10" 11'-4" 16'-0"

5'-6"

27'-2 1/2"

5'-4"17'-10 1/2" 4'-0"

13'-1

"15

'-6 1

/2"

16'-0

"20

'-10"

7'-5

1/2

"8'

-1"

21'-2"

27'-7 1/2"

6'-11"

20'-11"1'-0" 23'-2 7/8"

10'-4"4'-4 1/8" 23'-6" 6'-0 7/8"

11'-5 5/16" 11'-2 11/16"

W1 W1 W1D2

1

4

4

7 8

5

9

4

5

10

2-HOUR CMU WALL

1-HR GYP BDPARTITION TIGHTTO DECK W/ MTLSECURITY LATHE

1-HR GYP BDPARTITION

W1

W1

W1

W1

W1

W1

W1

W1

W1

W1W1W1W1

W1

W1W1W1W1W1W1W1W1D1

D1

D1

D1

D3

D4 D4

D2

W1

1-HR GYP BDPARTITION

W2

ABOVE

W2

ABOVE

LINE OFPLATFORMTO BEREMOVED

LINE OFPLATFORMTO BEREMOVED

23'-0

"54

'-8"

2-LEVEL CAGEDMETAL STORAGERACK - TYP

D5

D5

7D111

8D111

9D111

7

EQ

UA

L3'

-8"

EQ

UA

L

14'-0"6'-0"

Breakroom172

Open Office167

Open Office168

Mechanical169

Telecomm170

Electrical171

Women173

Men176

Open Office109

Vestibule112

Jan175

Vestibule162

Mobility Storage377

Mobility Storage378

5'-8"

MOVABLE PARTITIONABOVE TO REMAIN,PROTECT DURINGRENOVATION.

2

2

11

11

10'-3 1/8"

21'-1 9/16"

6'-7 17/64"

14'-4

"

4

4

4

4

4

8

8

8

6'-1

0 7/

8"

9

3

3

10D111

12

12

12

12

12

12

12

12

12

12

1

D140

2

D140

12

6

W1

ACCESSPANEL TOREMAIN

28'-0

"8'

-0"

17'-0" 28'-8" 17'-0"

10'-0"

15'-6" 10'-6"

15'-6

"10

'-2"

3'-2" 3'-2"

62'-8"

W1

W1

W1

W1 W1 W1

W1

W1

D4 D4

W1

Vestibule162

Reception163

Storage164

Office165

Office166

BRACE WALLDURING DEMOANDINSTALLATION OFNEW WALLS.

1. INFORMATION GIVEN WAS TAKEN FROM ORIGINAL DRAWINGS AND ON-SITE MEASUREMENTS. CONTRACTOR TO FIELD VERIFY ALL DIMENSIONSAND CONDITIONS.

2. UPON DISCOVERY OF ANY DISCREPANCIES BETWEEN THE DRAWINGAND DEPICTING EXISTING CONDITIONS OR UPON DISCOVERY OFUNKNOWN CONDITIONS DETRIMENTAL TO THE COMPLETION OF THEWORK AS INDICATED IN THESE DOCUMENTS, THE CONTRACTOR SHALLIMMEDIATELY NOTIFY THE ARCHITECT, IN WRITING, OF THE CONDITION INQUESTION BEFORE PROCEEDING WITH WORK IN THAT AREA.

3. DASHED LINES INDICATE ITEMS TO BE DEMOLISHED.

4. SEE MECHANICAL, ELECTRICAL, TELECOM, AND FIRE ALARM ANDPROTECTION DRAWINGS FOR FURTHER ITEMS TO BE REMOVED ANDDEMOLISHED AND FOR COORDINATION.

5. PATCH AND REPAIR ALL SURFACES AND ABUTTING SURFACES OFDEMO ITEMS. PREPARE EACH SURFACE TO RECEIVE NEW CONSTRUCTIONFINISH.

6. ALL MATERIALS TO BE DEMOLISHED SHALL BE REMOVED FROM THESITE AND DISPOSED OF OFF SITE IN A LEGAL LANDFILL. CONTRACTOR ISNOT ALLOWED TO STOCKPILE DEMOLITION MATERIALS ON SITE: ALLMATERIALS TO BE REMOVED IN A TIMELY FASHION.

7. REMOVE FLOOR FINISHES IN ALL LOCATIONS EXCEPT THE ROOMSFOLLOWING FROM THIS PLAN: 162, 170, 171, 172, 173,175,176. SAW CUTTILE AT DOOR OPENINGS. PREP FLOOR SUFRACE FOR NEW FINISH.

8. REMOVE WALL AND BASE FINISHES, UP TO 10'-6" AFF, IN ALLLOCATIONS EXCEPT ROOMS: 162, 170, 171, 173, 175, 176. PREPSURFACES FOR NEW FINISHES.

9. REMOVE ALL SEALANT AND SEALANT & BACKER RODS ON EXTERIOROF BUILDING. SEE D130, D131, & D132 FOR EXISTING LOCATIONS ANDDETAILS. CONTRACTOR TO FIELD VERIFY ALL CONDITIONS.

10. THE SEALANT AND BACKER ROD, INTERIOR AND EXTERIOR, ARE TO BEREMOVED AND THE SURFACE IS TO BE PREPARED FOR NEW SEALANTAND BACK ROD FOR THE FOLLOWING OPENINGS. REPAIR ANYSURFACES IF DAMAGE OCCURS DURING REMOVAL AND REINSTALLATIONOF SEALANTS AND BACKER RODS.

W1: SEE IMAGE 1/D111 W2: SEE IMAGE 2/D111D1: SEE IMAGE 3/D111 D2: SEE IMAGE 4/D111D3: SEE IMAGE 5/D111 D4: SEE IMAGE 6/D111D5: 17'-8" X 20'-0" COILING DOOR

11. SEE SHEET A600 OPENING SCHEDULE FOR DOORS, FRAMES,HARDWARE TO REMAIN.

GENERAL NOTES -BUILDING DEMOLITION SAW CUT BRICK AND BLOCK FOR NEW LOUVER

AND SUPPORTING ANGLES.

REMOVED STEEL CAGE AND SHELVING. ADJUSTREMAINING CAGES TO COMPLETE WORK.REINSTALL CAGES/SHELVING ON WORKCOMPLETION IN THAT PHASE.

REMOVE DOOR AND FRAME. PREP WALL FORMETAL STUD AND GYPSUM BOARD INFILL.

REMOVE EXISTING CORRIDOR FLOOR. SAWCUT TILE AT RESTROOM DOORS. PREP AREAFOR NEW FLOOR FINISH.

REMOVE MECHANICAL EQUIPMENT ANDACCESSORIES; REMOVE SERVICE FOREQUIPMENT BEING REMOVED - SEEMECHANICAL AND ELECTRICAL. CONTACTGOVERNMENT FOR FIRST RIGHT OF REFUSALON ALL EQUIPMENT.

REMOVE MILLWORK.

SAWCUT OPENING FOR NEW CONDENSATEDRAIN IN EXTERIOR WALL - SEE MECHANICALFOR NEW DRAIN LOCATION & ROUTING.

REMOVE BUILDING EXPANSION JOINT FROMWALL AND FLOOR; PREP FOR NEW EXPANSIONJOINT. SEE DTL 4/D140.

REMOVE/ADJUST EXISTING HOUSEKEEPINGPADS FOR EQUIPMENT BEING REMOVED - SEEMECHANICAL

REMOVE MOVABLE PARTITION ANDACCESSORIES; SEE 12/D111.

SCRAPE LOOSE PAINT FROM WALLS, ANDROOF STRUCTURE AND DECK; PREP FOR NEWPAINT.

REMOVE DOOR; FRAME TO REMAIN. INSERTPANEL TO REMAIN, PREP FOR NEW LAMINATE.

KEYNOTES -BLDG DEMO

1

2

3

4

5

6

7

8

9

10

11

12

GYP BD W/ MTL STUDSPARTITION THRUCEILING

LEGEND - BLDG DEMO

DEMOUNTABLEPARTITIONS TOUNDERSIDE OFCEILING

SYSTEMSFURNITURE/DEMOUNTABLEPARTITIONS TO 7'-0" +/- AFF

WORK TO BEDEMOLISHED

CHECKED:DRAWN:

NUMBER:DATE:

DA

TE

/ D

ES

CR

IPT

ION

:R

EV

:

1091

TO

MM

Y M

UN

RO

DR

IVE

, BIL

OX

I, M

S 3

9532

228.

594.

2323

P...

..228

.594

.222

3 F

A R C H I T E C T S

eleyguildhardy.com

A R

C H

I T

E C

T S

KLKKLK

05.01.201312-030

RE

NO

VA

TIO

NS

TO

BU

ILD

ING

904

KA

FB

FL

OO

R P

LA

N -

DE

MO

LIT

ION

D110 12-0

30R

ENO

VATI

ON

S TO

BU

ILD

ING

904

KAF

B

NO

RTH

0' 4' 8' 16' 1/8" = 1'-0"D1101

PARTIAL FLOORPLAN - AREA A

1/8" = 1'-0"D1102

PARTIAL FLOORPLAN - AREA B N

OR

TH

0' 4' 8' 16'

MATCHLINE

MATCHLINE

Page 6: RENOVATION TO BUILDING 904 KEESLER AIR FORCE BASE, …

3'-4" +/-

6'-0" +/-

16'-0" +/-

2'-6

" +

/-

8'-8" +/-

3'-4" +/-

10' -

1"

+/-

5'-0" +/-

6'-4" +/-

8'-8

" +

/-

EQUIPMENT TO BEREMOVED - SEE MECH

REMOVE DOORS; FRAME TO REMAIN

DOOR AND SLABREMOVED AT SOMELOCATIONS

SLAB REMOVED ATSOME LOCATIONS

6'-4" +/-

10'-0

" +

/- 4'-8

" +

/-

4'-8" +/-

12'-0

" +

/- A

FF

EQUAL

EQUAL

SAW CUT BRICK ANDBLOCK BACKUP;PREPARE FORLOUVER

REROUTE CONDUITFOR LIGHT FIXTURE -SEE ELECTRICAL

CONTRACTOR TOTEMPORARYRELOCATE 2-LEVELCAGED OPEN METALSHELVING UNIT ASREQ'D TO COMPLETEWORK IN AREA; UNITAPPROX 8'-4" W x 7'-4"D x 20'-0" T EACH, SEEDEMO PLAN FOREXISTING LOCATIONS

REMOVEMECHANICAL UNITAND ACCESSORIES;PATCH SURFACEFOR NEW FINISH -SEE MECHANICAL

REMOVE VINYLWALLCOVERING;PREP SURFACEFOR NEW FINISH

REMOVE FLOORCOVERING TOCONCRETE SLAB;PREP FOR NEWFINISH

REMOVE MOVABLEPARTITION, END SEAL, ANDCEILING TRACK; PREPAREWALL FOR NEW FINISH.CEILING TRACKACCESORIES/STRUCTURETO BE REMOVED TOALLOW NEW CEILING TOPASS CONTINUOUSLY .

EXISTING W16x26STL BEAM

1'-2

" +

/-4'

-8"

12'-0

" +

/-

5'-10" 5'-10"

EXISTING 8x8TUBE STLCOLUMN - TYPBOTH SIDES

EXISTING 1" DIAROD CROSS-BRACING - TYPBOTH SIDES

PROPOSEDLOUVER OPENINGLOCATION, CUTALONG MORTARJOINTS FOR TOPAND BTM

FINISHED FLOORELEVATION

TO

P O

F B

EA

M

19'-2

"

4'-8"

CHECKED:DRAWN:

NUMBER:DATE:

DA

TE

/ D

ES

CR

IPT

ION

:R

EV

:

1091

TO

MM

Y M

UN

RO

DR

IVE

, BIL

OX

I, M

S 3

9532

228.

594.

2323

P...

..228

.594

.222

3 F

A R C H I T E C T S

eleyguildhardy.com

A R

C H

I T

E C

T S

KLKKLK

05.01.201312-030

RE

NO

VA

TIO

NS

TO

BU

ILD

ING

904

KA

FB

DE

MO

LIT

ION

PH

OT

OG

RA

PH

S &

DE

TA

ILS

D111 12-0

30R

ENO

VATI

ON

S TO

BU

ILD

ING

904

KAF

B

1/8" = 1'-0"D1111 WINDOW 1

1/8" = 1'-0"D1112 WINDOW 2

1/8" = 1'-0"D1113 DOOR 1

1/8" = 1'-0"D1114 DOOR 2

1/8" = 1'-0"D1115 DOOR 3

1/8" = 1'-0"D1116 DOOR 4

1/8" = 1'-0"D1117 PHOTOGRAPH - LOUVER LOCATION

1/8" = 1'-0"D1118 PHOTOGRAPH - SHELVING

1/8" = 1'-0"D1119 PHOTOGRAPH - HVAC UNIT

1/8" = 1'-0"D11112 PHOTOGRAPH -MOVABLE PARTITION 2

1/4" = 1'-0"D11110

HIGH BAY CROSSBRACING LOCATION

Page 7: RENOVATION TO BUILDING 904 KEESLER AIR FORCE BASE, …

1

2

5

5

5

5

2

3

4

4

4

.

5

2

1. INFORMATION GIVEN WAS TAKEN FROM ORIGINAL DRAWINGS AND ON-SITE MEASUREMENTS. CONTRACTOR TO FIELD VERIFY ALL DIMENSIONSAND CONDITIONS.

2. UPON DISCOVERY OF ANY DISCREPANCIES BETWEEN THE DRAWINGAND DEPICTING EXISTING CONDITIONS OR UPON DISCOVERY OFUNKNOWN CONDITIONS DETRIMENTAL TO THE COMPLETION OF THEWORK AS INDICATED IN THESE DOCUMENTS, THE CONTRACTOR SHALLIMMEDIATELY NOTIFY THE ARCHITECT, IN WRITING, OF THE CONDITION INQUESTION BEFORE PROCEEDING WITH WORK IN THAT AREA.

3. ALL ACOUSTICAL CEILING TILE, GRID, ACCESSORIES, LIGHTFIXTURES, EXIT LIGHTS, AND MECHANICAL DEVICES ARE TO BEREMOVED AND REPLACED U.N.O. WIRELESS ACCESS POINTS,SPEAKERS, AND FIRE PROTECTION DEVICES ARE TO REMAIN U.N.O. SEEMECHANICAL AND ELECTRICAL FOR ADDITIONAL INFORMATION.CONTRACTOR TO SUSPEND EXISTING FIXTURES TO REMAIN FROMSTRUCTURE TO ENABLE REMOVAL OF CEILING, MECHANICAL ANDELECTRICAL DEVICES. AFTER CEILING IS REPLACED FIXTURES TO BEREINSTALLED.

4. SEE DEMOLITION PLAN, D110, FOR LOCATION OF WALLS THATINTERRUPT CEILING, RUN TIGHT TO CEILING, AND STOP 7'-0" AFF.

5. DASHED LINES INDICATE FIXTURES TO BE REMOVED.

6. SEE MECHANICAL, ELECTRICAL, TELECOM, AND FIRE ALARM ANDPROTECTION DRAWINGS FOR FURTHER ITEMS TO BE REMOVED ANDDEMOLISHED AND FOR COORDINATION.

7. ALL MATERIALS TO BE DEMOLISHED SHALL BE REMOVED FROM THESITE AND DISPOSED OF OFF SITE IN A LEGAL LANDFILL. CONTRACTOR ISNOT ALLOWED TO STOCKPILE DEMOLITION MATERIALS ON SITE: ALLMATERIALS TO BE REMOVED IN A TIMELY FASHION.

8. SEE SHEET FP111 FOR REQUIREMNTS OF THE FIRE SPRINKLERSYSTEM.

GENERAL NOTES -RCP DEMOLITION

MOVABLE PARTITION TOP TRACKTO REMAIN; PROTECT DURINGDEMO AND CONSTRUCTION.

REMOVED CEILING EXPANSIONJOINT

REMOVE MOVABLE PARTITIONTOP TRACK TO ALLOW NEWCEILING TO RUNUNINTERRUPTED ACROSSSPACE.

SEE MECHANICAL ANDELECTRICAL FOR REMOVAL OFACCESSORIES IN THIS SPACE.

HARD CEILING TO REMAIN,REMOVE FIXTURES AND PATCHAND PREPARE FOR NEW FINISH.

KEYNOTES -RCP DEMO

1

2

3

4

5

2X2 LAY IN TILE - ALLTO BE REMOVED

RCP LEGEND - DEMOLITION

GYP BOARD - ALLTO REMAIN

EXP STRUCT

MECHANICAL/FIREPROTECTIONACCESSORIES TOREMAIN/RELOCATE - SEEFP111 FOR FPREQUIREMENTS

ELECTRICALACCESSORIES TOREMAIN/RELOCATE

ACCESSORIES TOBE REMOVED - SEEMECH & ELEC

CHECKED:DRAWN:

NUMBER:DATE:

DA

TE

/ D

ES

CR

IPT

ION

:R

EV

:

1091

TO

MM

Y M

UN

RO

DR

IVE

, BIL

OX

I, M

S 3

9532

228.

594.

2323

P...

..228

.594

.222

3 F

A R C H I T E C T S

eleyguildhardy.com

A R

C H

I T

E C

T S

KLKKLK

05.01.201312-030

RE

NO

VA

TIO

NS

TO

BU

ILD

ING

904

KA

FB

RE

FL

EC

TE

D C

EIL

ING

PL

AN

- D

EM

OL

ITIO

N

D120 12-0

30R

ENO

VATI

ON

S TO

BU

ILD

ING

904

KAF

B

1/8" = 1'-0"D1201 PARTIAL DEMO RCP - AREA B

1/8" = 1'-0"D1202 PARTIAL DEMO RCP - AREA A

MATCHLINE

MATCHLINE

NO

RTH

0' 8' 16' 32'

NO

RTH

0' 8' 16' 32'

Page 8: RENOVATION TO BUILDING 904 KEESLER AIR FORCE BASE, …

CHECKED:DRAWN:

NUMBER:DATE:

DA

TE

/ D

ES

CR

IPT

ION

:R

EV

:

1091

TO

MM

Y M

UN

RO

DR

IVE

, BIL

OX

I, M

S 3

9532

228.

594.

2323

P...

..228

.594

.222

3 F

A R C H I T E C T S

eleyguildhardy.com

A R

C H

I T

E C

T S

KLKKLK

05.01.201312-030

RE

NO

VA

TIO

NS

TO

BU

ILD

ING

904

KA

FB

EX

IST

BU

ILD

ING

EL

EV

AT

ION

S -

DE

MO

LIT

ION

/ N

EW

WO

RK

D130 12-0

30R

ENO

VATI

ON

S TO

BU

ILD

ING

904

KAF

B

NOTES:1. EXIST ELEVATIONS FORREFERENCE ONLY. SEE SHEET D131FOR PANELS LAYOUTS. CONTRACTORTO FIELD VERIFY ALL CONDITIONS.2. REMOVE DOWNSPOUTS FORACCESS TO CJ / EJ. STORE ANDREINSTALL.

Page 9: RENOVATION TO BUILDING 904 KEESLER AIR FORCE BASE, …

CHECKED:DRAWN:

NUMBER:DATE:

DA

TE

/ D

ES

CR

IPT

ION

:R

EV

:

1091

TO

MM

Y M

UN

RO

DR

IVE

, BIL

OX

I, M

S 3

9532

228.

594.

2323

P...

..228

.594

.222

3 F

A R C H I T E C T S

eleyguildhardy.com

A R

C H

I T

E C

T S

AuthorKLK

05.01.201312-030

RE

NO

VA

TIO

NS

TO

BU

ILD

ING

904

KA

FB

EX

IST

PA

NE

L E

LE

VA

TIO

NS

- D

EM

OL

ITIO

N /

NE

W W

OR

K

D131 12-0

30R

ENO

VATI

ON

S TO

BU

ILD

ING

904

KAF

B

NOTES:1. CONTRACTOR TO FIELDVERIFY ALL CONDITIONS.2. REFER TO SHEET D132 FORALL REFERENCES TO EXISTINGSHEET A17.

Page 10: RENOVATION TO BUILDING 904 KEESLER AIR FORCE BASE, …

CHECKED:DRAWN:

NUMBER:DATE:

DA

TE

/ D

ES

CR

IPT

ION

:R

EV

:

1091

TO

MM

Y M

UN

RO

DR

IVE

, BIL

OX

I, M

S 3

9532

228.

594.

2323

P...

..228

.594

.222

3 F

A R C H I T E C T S

eleyguildhardy.com

A R

C H

I T

E C

T S

KLKKLK

05.01.201312-030

RE

NO

VA

TIO

NS

TO

BU

ILD

ING

904

KA

FB

EX

IST

JO

INT

DE

TA

ILS

- D

EM

OL

ITIO

N /

NE

W W

OR

K

D132 12-0

30R

ENO

VATI

ON

S TO

BU

ILD

ING

904

KAF

B

NOTES:1. CONTRACTOR TO FIELD VERIFYALL CONDITIONS.2. REMOVE EXISTING SEALANT ANDBACKER RODS. PREPARE FOR NEWSEALANT AND BACKER RODS.3. NEW SEALANT TO BE URETHANEBASED.

Page 11: RENOVATION TO BUILDING 904 KEESLER AIR FORCE BASE, …

CAST STONECOPING

CAST STONE WALLPANEL

CMU PARAPETBACK-UP

W16x31 STL BEAM

15# FELT OVER 1/2"EXTERIOR GYPSUMBOARD

FACE BRICK

MASONRY TIES 16"OC EW

1/2" SEALANT AND15# FELT OVER 1/2"EXTERIOR GYPSUMBOARD

8" METAL STUDS @16" OC

SOLDIER COURSEFACE BRICK W/WEEPS @ 24" OC

MODIFIED BITUMENROOF ASSEMBLY

METAL ROOF DECK W/16 H5 STL ROOF JOISTS@ 4'-0" OC MAX

REMOVE ACT CEILINGASSEMBLY

REMOVE RUBBER BASE

4" CONCRETE SLAB W/ 6x6-W2.9xW2.9 WWF - REMOVEFLOOR FINISH MATERIAL

COMPACTED FILL W/ 6 MILVAPOR BARRIER

1'-2"

2 5/

8"6"

6'-5

1/8

"11

'-6 5

/8"

5 3/

8"

THRU-WALLFLASHING

18'-1

1 1/

4" +

/-

REMOVE VINYL WALLCOVERING ALL AROUNDAND REMOVE 5/8" GYPSUMBOARD W/ FOIL BACKINGFLOOR TO CEILING THEWIDTH OF THE NEWLOUVER PLUS TWO (2) STUDWIDTHS EA SIDE

10'-2 5/8" AFG

12'-2 5/8" AFG

9 B

RIC

K C

OU

RS

ES

2'-0

"

0'-0"

0'-2 5/8" AFG

FINISH GRADE

FINISH FLOOR

6" 8"

BTM OF PANEL/TOP OF OPNG

REMOVE R-19 BATTINSUL @ LOCATIONOF NEW STUDS

REMOVE FACE BRICK ,EXTERIOR GYPSUMBOARD, FELT, AND MISCACCESSORIES.

BTM OF OPNG

6" CAST STONEWALL PANEL

W16x26 STL BEAM

FACE BRICK

HORZ JOINT REINFW/ MASONRY TIES16" OC EW

SOLDIER COURSEFACE BRICK W/WEEPS @ 24" OC 8" CONCRETE SLAB W/ #3

REBAR @ 12" OC EWCOMPACTED FILL W/ 6 MILVAPOR BARRIER

75 C

OU

RS

ES

OF

BR

ICK

16'-8

"5

3/8"

2 5/

8"

THRU-WALLFLASHING 8" CMU W/ 1" DIA

CROSSBRACING RODSEMBEDDED

16'-8" AFF

6" 8"

0'-0" FFE

REMOVE BACKERROD & SEALANT

BITUMINOUSDAMPPROOFING

8" CMU BOND BEAMW/ 2 #5 REBARCONT

BTM OF BOND BEAM/

12'-0" AFF

BTM OF OPNG

19'-2" AFF

TOP OF STL

REMOVE 8" CMU,FACE BRICK &ACCESSORIES

21 B

RIC

K /

7 C

MU

CO

UR

SE

S

4'-8

"

TOP OF OPNG

19'-1

63/

64"

1'-2

9/3

2"1'

-3 4

5/64

"

REMOVE AND PREP FOR NEW PRE-MOLDED JOINT

(@ WALL LOCATIONS )

(SIMILAR @ COPING)

REMOVE JOINT ANDCONCRETE - AND PREP FORNEW

2" +

/-

CHECKED:DRAWN:

NUMBER:DATE:

DA

TE

/ D

ES

CR

IPT

ION

:R

EV

:

1091

TO

MM

Y M

UN

RO

DR

IVE

, BIL

OX

I, M

S 3

9532

228.

594.

2323

P...

..228

.594

.222

3 F

A R C H I T E C T S

eleyguildhardy.com

A R

C H

I T

E C

T S

KLKKLK

05.01.201312-030

RE

NO

VA

TIO

NS

TO

BU

ILD

ING

904

KA

FB

SE

CT

ION

S A

ND

DE

TA

ILS

- D

EM

O

D140 12-0

30R

ENO

VATI

ON

S TO

BU

ILD

ING

904

KAF

B

3/4" = 1'-0"D1401 Mech Room Wall Section - Demo

3/4" = 1'-0"D1402 High Bay Storage Wall Section - Demo

NOT TO SCALED1403

EXISTING TYPEXTERIOR EXP JT -DEMO

NOT TO SCALED1404

EXISTING TYPFLOOR EXP JT -DEMO