Page 1: Repair of Traffic-Impacted Box Beam Bridge Hawkins Road Crossing Interstate 94 in Michigan

Repair of Traffic-Impacted Box Beam Bridge

Hawkins Road Crossing Interstate 94 in Michigan

Page 2: Repair of Traffic-Impacted Box Beam Bridge Hawkins Road Crossing Interstate 94 in Michigan

January 1983:Impact Breaks 7 Strands

Page 3: Repair of Traffic-Impacted Box Beam Bridge Hawkins Road Crossing Interstate 94 in Michigan

March 1983:Second Impact Breaks 2 More Strands

Page 4: Repair of Traffic-Impacted Box Beam Bridge Hawkins Road Crossing Interstate 94 in Michigan

The Original Shop Drawings

Page 5: Repair of Traffic-Impacted Box Beam Bridge Hawkins Road Crossing Interstate 94 in Michigan

Repair Approach

Use District Maintenance Crew Repair Each Strand Using

Splice Chuck Coupler Hex Splice Sleeve and Two ¾ inch Diameter A449 Rods (one

right hand thread and left hand thread on the other to allow tensioning)

Hardware cost is about $175 per strand but delivery is a long five months

Page 6: Repair of Traffic-Impacted Box Beam Bridge Hawkins Road Crossing Interstate 94 in Michigan

Splice Chucks

Page 7: Repair of Traffic-Impacted Box Beam Bridge Hawkins Road Crossing Interstate 94 in Michigan

Cutting Damaged Strands

Page 8: Repair of Traffic-Impacted Box Beam Bridge Hawkins Road Crossing Interstate 94 in Michigan

Installing Splice Chucks

Page 9: Repair of Traffic-Impacted Box Beam Bridge Hawkins Road Crossing Interstate 94 in Michigan

Installing Splice Chucks

Page 10: Repair of Traffic-Impacted Box Beam Bridge Hawkins Road Crossing Interstate 94 in Michigan

Drilling for Void Form Attachment

Page 11: Repair of Traffic-Impacted Box Beam Bridge Hawkins Road Crossing Interstate 94 in Michigan

Installing Turnbuckles

Page 12: Repair of Traffic-Impacted Box Beam Bridge Hawkins Road Crossing Interstate 94 in Michigan

Tensioning Rods with Stain Gauges

Page 13: Repair of Traffic-Impacted Box Beam Bridge Hawkins Road Crossing Interstate 94 in Michigan

Installing Tensioning Rods

Page 14: Repair of Traffic-Impacted Box Beam Bridge Hawkins Road Crossing Interstate 94 in Michigan

Strain Gauge

Page 15: Repair of Traffic-Impacted Box Beam Bridge Hawkins Road Crossing Interstate 94 in Michigan

Tensioning Computation

Tensioning allowed for losses that had occurred during the 25 year life of the bridge

Page 16: Repair of Traffic-Impacted Box Beam Bridge Hawkins Road Crossing Interstate 94 in Michigan

Tensioning

Page 17: Repair of Traffic-Impacted Box Beam Bridge Hawkins Road Crossing Interstate 94 in Michigan

Tensioning was accomplished in 4 passes from the inside to the outside of the beam

Page 18: Repair of Traffic-Impacted Box Beam Bridge Hawkins Road Crossing Interstate 94 in Michigan
Page 19: Repair of Traffic-Impacted Box Beam Bridge Hawkins Road Crossing Interstate 94 in Michigan

All Strands Repaired

Page 20: Repair of Traffic-Impacted Box Beam Bridge Hawkins Road Crossing Interstate 94 in Michigan

Deflecting Beams

A preload was used so that the repair-concrete would be in compression after the preload removal

Page 21: Repair of Traffic-Impacted Box Beam Bridge Hawkins Road Crossing Interstate 94 in Michigan

A New Bridge Opening Height

Page 22: Repair of Traffic-Impacted Box Beam Bridge Hawkins Road Crossing Interstate 94 in Michigan

Preparation for Form Attachment

Page 23: Repair of Traffic-Impacted Box Beam Bridge Hawkins Road Crossing Interstate 94 in Michigan

Preparation of Form

Page 24: Repair of Traffic-Impacted Box Beam Bridge Hawkins Road Crossing Interstate 94 in Michigan

Form Release Agent Applied

Page 25: Repair of Traffic-Impacted Box Beam Bridge Hawkins Road Crossing Interstate 94 in Michigan

Form Installation

Page 26: Repair of Traffic-Impacted Box Beam Bridge Hawkins Road Crossing Interstate 94 in Michigan
Page 27: Repair of Traffic-Impacted Box Beam Bridge Hawkins Road Crossing Interstate 94 in Michigan

Creating Vibration Access

Page 28: Repair of Traffic-Impacted Box Beam Bridge Hawkins Road Crossing Interstate 94 in Michigan

Final Deflection Verification

Page 29: Repair of Traffic-Impacted Box Beam Bridge Hawkins Road Crossing Interstate 94 in Michigan

Concrete Delivery

Page 30: Repair of Traffic-Impacted Box Beam Bridge Hawkins Road Crossing Interstate 94 in Michigan

Concrete Quality Control

Page 31: Repair of Traffic-Impacted Box Beam Bridge Hawkins Road Crossing Interstate 94 in Michigan

Concrete Quality Control

Page 32: Repair of Traffic-Impacted Box Beam Bridge Hawkins Road Crossing Interstate 94 in Michigan

Placing of Concrete

Page 33: Repair of Traffic-Impacted Box Beam Bridge Hawkins Road Crossing Interstate 94 in Michigan
Page 34: Repair of Traffic-Impacted Box Beam Bridge Hawkins Road Crossing Interstate 94 in Michigan

Vibration of Concrete

Page 35: Repair of Traffic-Impacted Box Beam Bridge Hawkins Road Crossing Interstate 94 in Michigan

Repair Completed!

Page 36: Repair of Traffic-Impacted Box Beam Bridge Hawkins Road Crossing Interstate 94 in Michigan

Four Months After Completion of First Repair:

Bridge was hit for the third time

Page 37: Repair of Traffic-Impacted Box Beam Bridge Hawkins Road Crossing Interstate 94 in Michigan

Most of the splices done earlier were intact, indicating a durable repair

Page 38: Repair of Traffic-Impacted Box Beam Bridge Hawkins Road Crossing Interstate 94 in Michigan

The damage this time was 19 of the 25 strands of the fascia beam, 7 strands of the first interior beam and 4 strands of the second interior beam.

The repair involved replacement of the fascia beam with a solid concrete beam and repair of the interior beam using the successful approach of the earlier repair.

Page 39: Repair of Traffic-Impacted Box Beam Bridge Hawkins Road Crossing Interstate 94 in Michigan

Post Script

Shortly after the second repair was completed the bridge was hit a fourth time. This time it only suffered a nick in the solid fascia beam.