Vidhan Sabha Question Name of Department: Public Works Question No. Un-Starred: 367 Date of Reply: 22 -08-2019 Subject: Damaged Road Asked by: Sh. Ram Lal Thakur (Sri Naina Deviji): Concerned Minister: Chief Minister Question Answer a) how many roads have been damaged by JIO Company for cable laying; Division – wise details be given; b) is it a fact that Draman- Sihunta road constructed under World Bank has also been badly damaged; and c) if yes, how much amount has been deposited by the said Company with Public Works Department ? (a), (b) & (c) The information is laid on the Table of the House.

Upload: others

Post on 25-Apr-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Reply Un-Starred Q.N. 367 · gr %kdool wr %kdq\dul urdg np wr gr *dudq %dvwl wr +dul]dq %dvwl np wr gr 071 urdg wr yloodjh 6rkdu np wr 7rwdo -dzdol 'lylvlrq

Vidhan Sabha Question

Name of Department: Public Works

Question No. Un-Starred: 367

Date of Reply: 22 -08-2019

Subject: Damaged Road

Asked by: Sh. Ram Lal Thakur

(Sri Naina Deviji):

Concerned Minister: Chief Minister

Question Answer

a) how many roads have been

damaged by JIO Company

for cable laying; Division –

wise details be given;

b) is it a fact that Draman-

Sihunta road constructed

under World Bank has also

been badly damaged; and

c) if yes, how much amount has

been deposited by the said

Company with Public Works

Department ?

(a), (b) & (c)

The information is laid on the

Table of the House.

Page 2: Reply Un-Starred Q.N. 367 · gr %kdool wr %kdq\dul urdg np wr gr *dudq %dvwl wr +dul]dq %dvwl np wr gr 071 urdg wr yloodjh 6rkdu np wr 7rwdo -dzdol 'lylvlrq

Reply of Un-Starred Assembly Question No.367 asked by Sh.

Ram Lal Thakur (Sri Naina Deviji):-

(a) JIO Company has carried out the work of laying of cable on 343

Nos roads under Public Works Department. The Division wise

detail is given as per Annexure-“A”

(b) The total length of this road between Draman and Sihunta

constructed under State Road Project (WB funded) is 24.00 Km.

The pavement has not been damaged and the same is in good

condition as the optical fiber cable has been laid by the JIO

company in approximately 12.00 Km stretch and the same has

been laid on the shoulder on the hill side for which permission

has been granted to the company.

(c) A sum of Rs. 8336.25 Lacs has been deposited by JIO Company

with the Public Works Department.

Page 3: Reply Un-Starred Q.N. 367 · gr %kdool wr %kdq\dul urdg np wr gr *dudq %dvwl wr +dul]dq %dvwl np wr gr 071 urdg wr yloodjh 6rkdu np wr 7rwdo -dzdol 'lylvlrq

.

Annexure-A

The Division –wise detail of amount deposited by the JIO Company for restoration of Damaged roads with Public Works Department is given as under:-

Sr. No.

Name of Division

Name of Work Amount Deposited

KANGRA ZONE

5th Circle HPPWD Palampur

1 Kangra Restoration charges for laying of OFC Cable on Garoh to Gahar Matti road 1311336

2 -do- Restoration charges for laying of OFC Cable on NH Daulatpur Kulthi road upto Dinnu Tower

2661084

3 -do- Restoration charges for laying of OFC Cable from Darman to Dadaman road (SH:- Metalled portion 0/0 to 0/250 ii) Katcha road 0/0 to 0/340.

361200

4 -do- Restoration charges for link road Bhanala Pucca Tiyala road Metalled portion 0/0 to 0/415 ii) Katcha road 0/0 to 0/665

623500

5 -do- Restoration charges for laying of OFC Cable from Puhara to Jharer road km 0/0 to 4/500 on the portion 0/0 to 1/700

2072300

Page 4: Reply Un-Starred Q.N. 367 · gr %kdool wr %kdq\dul urdg np wr gr *dudq %dvwl wr +dul]dq %dvwl np wr gr 071 urdg wr yloodjh 6rkdu np wr 7rwdo -dzdol 'lylvlrq

6 -do- Restoration charges for laying of OFC Cable from Earth quake memories Old kangra road to NH Shimla Kangra road

2200000

Total Kangra Division 9229420

7 Dharamshala Malan Chowk to PWD rest house Dadh raod Km 0/0 to 4/450 292687

8 -do- Glory Tiles Shop to Kawar Reliance Tower km 0/0 to 0/512 on Nagrota to Kawar road & Nagrota Ghorab Bhadhrer Bhatti road From Bhadrehar Chowk to Ghorab kn 0/0 to 0/850.

1526802

9 -do- Nagrota to Buner road 616550

10 -do- Gaggal Chetru Dharamshala Meclodganj Bhagsu Nag road Km 0/0 to 22/910 (Portion Chetru to Gaggal chowk road km 0/00 to 2/350

2436930

Total Dharamshala Division 4872969

11 Bhawarna Laying OFC on Feta Bazar Chowk (Bhawrna) to Arla Road (Near toward at Tila Village)

807120

12 -do- Laying of OFC on HSTM and Arla Mandir Gugga road between KM 5/50 to 6/200

42038

13 -do- Laying of optical fibre cables on HSTM (SW : Digging of road side tranche for laying of under ground OFC by in KM 57/250 to 58/00 Reliance Jio

309068

14 -do- Laying of optical fibre cables on HSTM (SW : Digging of road side pits for fixing of poles for erecting of OFC arial Mode in between Km 54/815 to 55/565 by M/S Reliance Jia Infocomn

36550

Page 5: Reply Un-Starred Q.N. 367 · gr %kdool wr %kdq\dul urdg np wr gr *dudq %dvwl wr +dul]dq %dvwl np wr gr 071 urdg wr yloodjh 6rkdu np wr 7rwdo -dzdol 'lylvlrq

15 -do- Laying of OFC on HSTM road between KM 54/390 to 55/090 and Arla Guga Mandir road between KM 5/50 to 6/200

5045

16 -do- Laying of OFC on Feta Bazar Chowk (Bhawarna) to Arla road Near Tower at Tiala Village

96854

17 -do- Restoration charges for laying of OFC from HSTM road 466700

18 -do- Restoration Charges for laying of OFC from Bhawarna to Bhadgwar road upto Kuli via Badian

1232500

19 -do- Restoration charges for laying of OFC from Bhattu Nanoan road to Kathyar 1035100

20 -do- Restoration charges for laying of OFC from HSTM road 18497

Total Bhawarna Division 4049472

21 Palampur Restoration charge for laying of OFC on Upper Menha to Lower Menjha KM 0/00 to 4/200

1126000

22 -do- Restoration charges for laying of OFC cable Bandla Ghugar Thakurdawara road 2522000

Total Palampur Division 3648000

23 Tanda at Nagrota Bagwan

Sunehar Mundla road 1799560

Total Tanda Tanda at Nagrota Bagwan 1799560

24 Jaisinghpur Lambagaon to Chapred (Koshri) 1793128

Page 6: Reply Un-Starred Q.N. 367 · gr %kdool wr %kdq\dul urdg np wr gr *dudq %dvwl wr +dul]dq %dvwl np wr gr 071 urdg wr yloodjh 6rkdu np wr 7rwdo -dzdol 'lylvlrq

25 -do- Alampur to Thakurdwara and Thakudwara to Jaisinghpur 1924712

26 -do- Banuri to Saliyana road 3747406

27 -do- Daroh Garh Jamula road 542100

28 -do- Kangain Garh Jamula road 500400

29 -do- Sakoh to Kangain road 250200

30 -do- Thural to Bhatti Lahar Panga road 2309260

31 -do- Alampur to Bagh 145400

Total Jaisinghpur Division 11212606

32 Baijnath R/O Laying of OFC cable from Km 0/0 to 3/300 on Baijnath Pantehar Ghirtholi road and link road to village Gankhetar Km 0/0 to 1/0

2911000

33 -do- Restoration charge of laying of OFC cable from Khadi Garmodyog to Rajesh Shop near Kali Mata Temple W.No. 8

82000

34 -do- Laying of OFC from Paprola Kharanal vis Nagan road (Portion Paprola to JNV School)

392000

35 -do- R/o for the route from Multhan to Badagaon 5806000

36 -do- Restoration Charges from DCP chowk Gandhi Gram Bhurla Km 0/0 to 5/700 along Baijnath Gandhi Gram road

4133000

37 -do- Restoration Charges from Baijnath to bhiot road from DSP Chowk to Pandit Sant Ram Degree Collage Baijnath

195000

Page 7: Reply Un-Starred Q.N. 367 · gr %kdool wr %kdq\dul urdg np wr gr *dudq %dvwl wr +dul]dq %dvwl np wr gr 071 urdg wr yloodjh 6rkdu np wr 7rwdo -dzdol 'lylvlrq

38 -do- Restoration Charges from Ahju Bir Gunehar road and Tibteen Colony Keori road 2709000

Total Baijnath Division 16228000

Total Palampur Circle 51040027

7th Circle Dalhousie

1 Tissa Chamba Tissa road Km 32/250 to 62/0 48502834

2 -do- Tissa Satyas road Km. 0/0 to 26/650

Total Tissa Division 48502834

3 Chamba Baloo to Behond road (2.000 Km) 15058000

4 -do- Chamba Sahoo road (Portion Fulmu Tala to Ludera 1.500 Km)

5 -do- Ludera Suri Kaila road upto Sehi (9.800 KM)

Total Chamba Division 15058000

6 Dalhousie Shahpur Sihunta Lahru road Km. 0/0 to 47/050 37047838

7 -do- Nurpur Sanjha Nallah Lahru Tunnuhatti road Km. 15/390 to 20/850 (Portion Sanjha Nallah to Lahru).

Total Dalhousie Division 37047838

8 Bharmour Lunna Chattarari road 6668045

Page 8: Reply Un-Starred Q.N. 367 · gr %kdool wr %kdq\dul urdg np wr gr *dudq %dvwl wr +dul]dq %dvwl np wr gr 071 urdg wr yloodjh 6rkdu np wr 7rwdo -dzdol 'lylvlrq

9 -do- Kharamukh Nayagram road 26539531

10 -do- i) Kharamukh to Garola and 10943088

11 -do- ii) Garola to Bhujhneli road

Total Bharmour Division 44150664

12

Salooni i) Pathankot Banikhet Chamba Tissa Alwas road (Portion Folagt to Koti KM 121/0 to 134/870

43876000

13 -do- ii) Koti Junction to Koti bridge Km 0/0 to 1/640

14 -do- iii) BSLJ&K Boundary road (Portion Koti bridge to Salooni Chowk at Km 25/0 to 48/500)

15 -do- Laying of OFC cable on Sundla Salooni road 853081

16 -do- Laying of OFC cable on Chamba Tissa road (Portion Koti to Baroh) 10875200

17 -do- Laying of OFC cable on BSLJ&K road Km 34/860 to 35/050 148960

18 -do- i) Laying of OFC cable onMohri to Kuthar Km 0/0 to2/900 2665945

19 -do- ii) Kuthar to Mowa road Km 0/0 0/500 35/050

Total Salooni Division 58419186

Total Dalhousie Circle 203178522

1 Dehra Link road Rest house to JHD road Km. 0/725-1/825 TNC Chowk to Dehra telephone exchange

1773300

Page 9: Reply Un-Starred Q.N. 367 · gr %kdool wr %kdq\dul urdg np wr gr *dudq %dvwl wr +dul]dq %dvwl np wr gr 071 urdg wr yloodjh 6rkdu np wr 7rwdo -dzdol 'lylvlrq

2 -do- Restoration damages dug portion due to laying OFC cable from Khabli Dosarka to HLB Nadaun road Km 18/900 to 19/300

9723

3 -do- Restoration charges for laying OFC cable from Chamukha Bangana road 17/700 to 20/00

56300

4 -do- Restoration charges for laying OFC cable from Talwara road Km 15/310 and Kaloha Pragpur Dhaliara Dadasiba Sansarpur Terrace road Km 58/450 to 60/920.

15050000

5 -do- Restoration charges for laying of OFC cable from Km 0/0 to 0/500 on Kutiara Majhin Seorabala road and Kotia Sudhangal road Km 0/0 to 1/800

961565

6 -do- Restoration charges on Kotla Behar ghatti Bilwan road km 0/0 to 1/500 and Drub Jakhuni road Km 0/0 to 0/400

792300

7 -do- Restoration of Charges for laying of OFC cable from Km 56/200 to 58/200 on Kaloha Pragpur Dhaliara Dadasiba Sansarpur Terrace road, Km 8/265 to 9/165 on Kotla Behar Ghatti Bilwan road and Riri Kut to Talpain di Sarayan Km 2/250 to 2/600

838800

8 -do- Restoration of rain damages due to laying of under ground telephone Cable/Optical Fiber Cable on Jawalamukhi Khundian Thural Palampur road Km 7/0 to 20/500

5649120

9 -do- Restoration of rain damages due to laying of under ground telephone Cable/Optical Fiber Cable on Jawalamukhi Khundian Thural Palampur road Km 0/0 to 7/0

2930770

10 -do- Restoration charges for laying of OFC cable from Chamukha Bangana road Km 17/700 to 20/0.

28900

Page 10: Reply Un-Starred Q.N. 367 · gr %kdool wr %kdq\dul urdg np wr gr *dudq %dvwl wr +dul]dq %dvwl np wr gr 071 urdg wr yloodjh 6rkdu np wr 7rwdo -dzdol 'lylvlrq

11 -do- Restoration charges for laying of OFC cable from Chanour Timay Sheetla Mandir road Km 7/0 to 10/500

840900

12 -do- C/O Link road Amb to Balarad Pathiar road 591200

13 -do- Restoration charges for laying of OFC cable from Pucca Tiala to Didian road Km 0/0 to 3/460

1442800

14 -do- Khundian Chowk to Khundian Market km 0/0 to 24/0 271000

15 -do- Surani Chowk to Surani Baggi road km 0/0 to 0/650 187650

Total Dehra Division 31424328

16 Nurpur Garan to Daman Tower site Road km 0/0 to 3/220 3146000

17 -do- Brij raj Swami Temple road from NH upto Tower sitekm 0/0 to 1/0. 977000

18 -do- Pong Dam Fatehpur Jassur road km 44/520 to 44/920,48/690 to 48/750 i/c. crossing at 48/750.

690000

19 -do- Pong Dam Fatehpur Jassur road (Barot Rehan Dehri to Raja ka Talab km 33/0 to 43/0)

14290000

20 -do- Nurpur Lahru tunnu Hatti road km 4/0 to 4/110 and 7/400 to 7/600. 443000

21 -do- Nupur Sadwan Malikwal road to Khajjan-11 road km 0/0 to 0/750 733000

22 -do- Pong Dam Fatehpur Jassur road =315 mtr and Ganoh to Dhumal road.=320 mtrs. 261000

23 -do- Pong Dam Fatehpur Jassur road =350 mtr and Bharmoli to Kathal near Hanuman Mandir =2610 mtrs.

1166000

Page 11: Reply Un-Starred Q.N. 367 · gr %kdool wr %kdq\dul urdg np wr gr *dudq %dvwl wr +dul]dq %dvwl np wr gr 071 urdg wr yloodjh 6rkdu np wr 7rwdo -dzdol 'lylvlrq

24 -do- Khushinagar Minjgran road 0/0 to 1/800 759000

25 -do- Bodh to Ganoh road 0/0 to 0/450 i/c. crossing. 188000

26 -do- MTN to Lehroon Road i/c.crossing.kms.0/0 to 1/0. 731000

27 -do- Bharal to jio Tower near Angan Bari bhral along PWD road km 0/0 to 0/305. 99000

28 -do- Rehan to Chhatar road.Km 0/0 to 6/0 and link road to village Pandora km. 0/0 to 0/100.

2514000

29 -do- Bansa da More to village Golwan km 0/0 to 2/230and Golwan to Nawanshehar via Chounka road km 0/0 to 1/600.

1702000

30 -do- Nurpur Malikwal road to Sanjha Nallah road km 10/200 to 15/390 i/c crossing. 2932000

31 -do- Bodh Ganoh road Km.4/200 to 6/0 i/c crossing. 939000

32 -do- Pong Dam Fatehpur Jassur Road km. 52/700 to 52/960. 142000

Total Nurpur Division 31712000

33 Jawali Ranital Kotla Road km 0/0 to 3/0 3659470

34 -do- Bhalli to Bhanyari road km 0/0 to 0/550 412830

35 -do- Garan Basti to Harizan Basti km 0/0 to 0/450 439650

36 -do- MTN road to village Sohar km 0/0 to 0/300. 293100

Total Jawali Division 4805050

Page 12: Reply Un-Starred Q.N. 367 · gr %kdool wr %kdq\dul urdg np wr gr *dudq %dvwl wr +dul]dq %dvwl np wr gr 071 urdg wr yloodjh 6rkdu np wr 7rwdo -dzdol 'lylvlrq

37 Fatehpur .Rey Khas to Beh road km.0/0 to 1/800

38 -do- Palakhi Chowk to Bandiyal km.0/0 to 0/650 689000

39 -do- Mukerian Talwara nurpur road km.19/510 to 19/650

40 -do- Hadwal Badwal Chandbeh road km.0/0 to 1/200 1518350

Total Fatehpur Division 2207350

Total Nurpur Circle 70148728

Total Kangra Zone 324367277

Hamirpur Zone

1 Hamirpur Division

Hamirpur Sujanpur road from Rd. 22/500 to 23.165 8,78,900.00

2 Karot Market to Dosrka towars Hamirpur. 30,08,100.00

3 Hamirpur Sujanpur road at Rd. 11/100 to 11/430. 17,70,600.00

4 Chabutra Amroh road at Rd. 0/0 to 1/0.

5 Mattan Sidth to Hamirpur Km. 0/0 to 5/400. 12,861.00

Total Hamirpur Division 56,70,461.00

1 Barsar Division

Restoration charges for laying of OFC cable from Jalari Galore Salauni roaod Km. 0/0 to 0/250

7,523.00

Page 13: Reply Un-Starred Q.N. 367 · gr %kdool wr %kdq\dul urdg np wr gr *dudq %dvwl wr +dul]dq %dvwl np wr gr 071 urdg wr yloodjh 6rkdu np wr 7rwdo -dzdol 'lylvlrq

2 Restoration Cgharges fir the route from Barsar to Deotsidh via Garli Bijhari Kotla Chakmoh road Km. 0/0 to 23/0

6,56,250.00

3 Restoration charges for the route from Garli Market to Gata Panga on Harsour Garli road Km. 2/400 to 6/200

29,92,100.00

4 Restoration charges for the route from Bijhari to Ghori Dhabiiri road Km. 5/300 to 9/300

29,39,800.00

5 Restoration Charges for the route from Chakmoh Raily Jajri road Km. 6/00 to 10/900

34,17,300.00

6 Restoration Charges for laying of OFC cable from Jalari Galore Dalauni Bijhari D/Siidh road

35,64,475.00

7 Restoration charges for laying of OFC cable from Badaran Garli roaod via Gallian Jole Km. 18/700 to 22/500

36,57,880.00

Total Barsar Division 1,72,35,328.00

G.Total 2,29,05,789.00

1 Bilaspur Divison No. I

Laying of OFC on Beri Rajandia to Salnoo via Jamla road Km 0/0 to 0/780. 11.237

2 laying of OFC by Reliance Jio Info-comm limited on Dandrour Bamta road km 4/590 to 6/690

33.671

3 Laying Optical Fiber along the root from DC Office Bilaspur main gate to Reliance Jio Chamber towards Cinema Colony length Approximately 500 Km

8.32

Page 14: Reply Un-Starred Q.N. 367 · gr %kdool wr %kdq\dul urdg np wr gr *dudq %dvwl wr +dul]dq %dvwl np wr gr 071 urdg wr yloodjh 6rkdu np wr 7rwdo -dzdol 'lylvlrq

4 Vicky Bike Repair shop to Laghat at RD 151/465 to 151/715 on Chandigarh Mandi Manali Road

1.80

Total Bilaspur Divison No. I Division 55.028

1 Bilaspur Divison No. II

Laying of OFC Cable on Route Naina Devi Jee to Toba Road

2 Laying of OFC Cable on Nauni Brampukhar Road 210.18

3 Laying of OFC Cable onNamhol Chowk to Ashamajari Road. 111.13

4 Laying of OFC Cable from Rain Shelter near SNDJI to Nauni Chowk. 13.77

5 Laying of OFC Cable from NH Kothipura on Rajpura Road upto Deoth Km.0/0 to 2/300 .

748.79

6 R/R/D of laying OFC cable Route from Dhara Taower to Rain Sheltter at Dhara 24.36

7 Reg. Digging Charges on Toba & Ghawandal to Bassi Road 16.91

8 Reg. Digging Charges on Meoth from SNB Road 0.3

9 Reg. Digging Charges on Pullacher to Bhuwai Road 15.69

10 Reg. Digging charges on Chandigarh Manali road to Baner Zakathkhana Road 20.56

Total Bilaspur Divison No. II Division 1175.37

1 Ghumarwain Bhager Barthin Seo road Km. 0/0 to 34/0 10.51

Page 15: Reply Un-Starred Q.N. 367 · gr %kdool wr %kdq\dul urdg np wr gr *dudq %dvwl wr +dul]dq %dvwl np wr gr 071 urdg wr yloodjh 6rkdu np wr 7rwdo -dzdol 'lylvlrq

Division

2 Malari Kallar road 0/0 to 1/800 20.178

3 Dadhol Gahar Padhyana road 0/0 to 1/800 29.341

4 Nihari Dadhol Kallan Maryani road Km. 0/0 to 3/500 25.323

5 Barthin Chhat Dabhiri road Km. 0/0 to & Doon Chhat Kaloti road Km. 2/820 to 3/320

39.235

6 Jogindernagar Sarkaghat Ghumarwing road Km. 101/500 to 103/380 21.712

7 Kandrour Panoh Takrera road Km. 0/0 to 0/500 3.590

8 Ghumarwin Talai Bhakhra road Km. 0/0 to 2/200 15.796

Total Ghumarwain Division 1396.08 lacs

1 Una Division Permission for laying OFC along the route from Manhole at NMT road along towards PWD Quarters RD 13/780 from Rakkar Colony

1,78,625/-

2 Permission for laying OFC from Chadda Shop to Reliance Jio Centre 2,80,084/-

3 Permission for laying OFC from link road to Village Bharolian Khurd 1/315 to 1/675

3,51,720/-

4 Permission for laying OFC Areal Mode from Basal to Manohar Markit 0/0 to 3/750

95741/-

5 Permission for laying OFC from Link road Jalgran to Chattara road. 12,20,600/-

Page 16: Reply Un-Starred Q.N. 367 · gr %kdool wr %kdq\dul urdg np wr gr *dudq %dvwl wr +dul]dq %dvwl np wr gr 071 urdg wr yloodjh 6rkdu np wr 7rwdo -dzdol 'lylvlrq

6 Permission for laying OFC from Link Dehlan to Jhakera 0/0 to 1/700 3,75,066/-

7 Permission for laying OFC link road Behdala Chattara Peernigah road 0/0 to 1/270 & link road Behdala to Mohalla Khindrian and pleaser 0/0 to 0.080

3,35,000/-

Total Una Division 25,20,288/-

Bangana Division

Baduhi Dumkhar road in Km.1/500 to 4/485 22,78,784-00

Total Bangana Division 22,78,784-00

1 Bharwain Division

Restoration charges for laying of OFC Cable from Jallo Di Bar to Badhwana on Chintpurni to Daulatpur road

15,63,850/-

2 Restoration charges for laying of OFC Cable from NMT road km 57/480 to 57/780, link road lower Bhanjal bus stop to Upper Bhanjal RD 0/0 to 0/400

5,02,600/-

3 Restoration charges for laying of OFC Cable from NMT road Chalet to Govt. Degree College Daulatpur Chowk.

2,01,040/-

4 Restoration charges for laying of OFC Cable from NH-503 extn. To link kroad Bhera.

8,61,600/-

5 Restoration charges for laying of OFC Cable from Lambasel to Mairi Gurudwara 15,65,165/-

6 Restoration charges for laying of OFC Cable from Daulatpur Chowk to Bhader Kali road upto Dangoh Khas (Bijli Ghar Tower)

12,70,975/-

7 Restoration charges for laying of OFC Cable from Takarla Mor to villae Dhandri 17,24,210/-

Page 17: Reply Un-Starred Q.N. 367 · gr %kdool wr %kdq\dul urdg np wr gr *dudq %dvwl wr +dul]dq %dvwl np wr gr 071 urdg wr yloodjh 6rkdu np wr 7rwdo -dzdol 'lylvlrq

8 Restoration charges for laying of OFC Cable from NH- (Zero Point) to Dhussara km 0/0 to 1/900

13,64,200/-

9 Restoration charges for laying of OFC Cable from Kalruhi Athman road 0/0 to 0/700

5,42,900/-

10 Restoration charges for laying of OFC Cable from Andora to Lower Mubarik pur section

10,73,850/-

11 Restoration charges for laying of OFC Cable from Babehar Daulatpur Dangoh routes

25,97,562/-

12 Restoration charges for laying of OFC Cable from Raipur Marwari road 200 mtrs with 10 mtrs road crossing.

1,59,780/-

Total Bharwain Division 1,34,27,732.00

G.Total:- 1,82,26,804.00

Mandi Zone

1 Mandi Division No. II

OFC on Ratti Kalkhar road Km. 2/540 to 3/640. 14.84

2 OFC on Pathankot Nurpur Palampur J/Nagar Mandi Sundernagar Bilaspur Nauni road Km. 210/0 to 215/400.

1.83

3 OFC on Kummi to tawan road Km. 0/0 to 0/900. 6.46

Page 18: Reply Un-Starred Q.N. 367 · gr %kdool wr %kdq\dul urdg np wr gr *dudq %dvwl wr +dul]dq %dvwl np wr gr 071 urdg wr yloodjh 6rkdu np wr 7rwdo -dzdol 'lylvlrq

4 OFC on Chanoungalu to Sadyana road Km. 0/0 to 2/200. 15.23

Total Mandi Division No. II Division 38.36

1 Sunder Nagar

Division

OFC on Sundernagar Circular road km 0/0 to 7/630 and Sundernagar Maloh road km 0/0 to 0/800.

35.77

2 OFC on BBMB Control gate to Dhaneshwary km 0/0 to 0/500 1.97

3 OFC on Pungh Patsal road via Kapahi km 0/0 to 0/300 1.15

4 OFC on SNR jaidevi Rohangalu km 5/600 to 6/120 2.04

5 OFC on SNR jaidevi Rohangalu km 3/0 to 4/200 4.72

6 OFC on Kangu to Deher km 0/0 to 7/345 ( portion 0/0 to 0/450) 1.77

7 OFC on Sundernagar circle road ( Humsafer chowk to Mahamaya Temple via Bari road km 0/0 to 8/00

71.85

8 OFC on CMM road km 164/200 to 165/000 6.62

9 OFC on CMM road km 177/400 to 177/700 3.18

10 OFC on Slapper bridge to Slapper colony NH-21 km 156/760 to 156/830 CMM

1.00

11 OFC on NH-21 road km 173/770 to 174/170 and NH-21 to JLN Engg. Km 0/0 to 0/900

14.51

12 OFC on HDFC bank Bhojpur to old bus stand Sundernagar 5.22

Page 19: Reply Un-Starred Q.N. 367 · gr %kdool wr %kdq\dul urdg np wr gr *dudq %dvwl wr +dul]dq %dvwl np wr gr 071 urdg wr yloodjh 6rkdu np wr 7rwdo -dzdol 'lylvlrq

13 OFC on St. Marry school to Mahamaya Temple km 0/195 1.77

14 OFC on Bhanwar to Patyora road 7.26

15 OFC on NH-21 km 177/940to178/010 , on Chandigarh Mandi Manali road 1.13

Total Sunder Nagar Division 159.95

1 Gohar Division

OFC on SNR jaidevi Rohangalu road km 4/00 to 14/00 . 57.40

Total Gohar Division 57.40

1 Sarkaghat Division

OFC on route JNSG road Km. 78/150 to 79/100. 10.65

2 OFC on Ratti Kalkhar Bhambla Una road Km. 38/665 to 40/0 15.21

3 OFC on Sarkaghat Maseran Rakhota Durgapur road in Km. 6/965 to 7/405. 3.23

4 OFC near Durgapur Market via Kufri road to GTL Tower site. 0.26

5 OFC on route from SarkaghatTaxi Stand to Govt. Degree College Sarkaghat (Barchwar) in Km. 61/900 to 64/360.

15.92

6 OFC link road to Civil Hospital Sarkaghat at Km. 0/0 to 0/035. 0.34

Total Sarkaghat Division 45.61

1 Seraj Division

OFC on Thunag Banyad Mandyad Mandolu road Km. 0/0 to 1/800. 13.53

Page 20: Reply Un-Starred Q.N. 367 · gr %kdool wr %kdq\dul urdg np wr gr *dudq %dvwl wr +dul]dq %dvwl np wr gr 071 urdg wr yloodjh 6rkdu np wr 7rwdo -dzdol 'lylvlrq

Tota Seraj Division 13.53

Total Mandi Division 314.85

1 Banjar Division

Saink Chowk Bhutar to Ramshilla road Portion near ITI Shamshi alongwith crossing (62.00 metres)

1.00

2 Routes Khokhan road and Sari Bhar road total length 180.00 mtr. 1.30

3 Upper Badah at RD.0/0 to 0/410 and 1road crossing at one place at RD.0/410 and MDR-29 km.5/300 to 5/500 7.89

4 Badah Pahnallah to Shillihar (Rajgiri) road at RD.0/750 to 1/750 and road crossing at Km.1/110 to 1/650 7.26

5 Bhiun Diyar road Km.0/0 to 13/0 (Portion Diyar Chowk to Diyar) 93.47

6 Saink Chowk Bhuntar Ramshilla road and Shamshi Khokhan road 8.51

Total Banjar Division 119.43

1 Kullu Division

Laying of OFC Across Ramshilla Bridge to Manali on Kullu Manali Left Bank Road

298.97

2 Laying of OFC on Kullu Karon Road 1.15

3 Restoration Charges for Laying OFC on Kais Kotadhar Road 15.72

4 Route at Sianik Chowk Bhunter to Sabzi Market chowk Bhunter 3.25

5 C/O OFC Cable from Dhalpur Chowk to Shobhla Hotel 0.66

Page 21: Reply Un-Starred Q.N. 367 · gr %kdool wr %kdq\dul urdg np wr gr *dudq %dvwl wr +dul]dq %dvwl np wr gr 071 urdg wr yloodjh 6rkdu np wr 7rwdo -dzdol 'lylvlrq

6 OFC on Route from Bhunter to Ramshilla Road 0.83

7 Laying of OFC from Baily ridge to NH-21 4.24

8 C/O OFC Cable from Dhalpur Chowk to Shobhla Hotel 0.66

9 OFC Cable from Seobag Gahar Road Km 0/0 to 1/450 and Link Road to Village Hwai at RD 0/0 to 0/250 12.76

10 OFC Cable vide Demand Note No.2619899 dt. 12.2.16 on Bye Pass Road to Old Bridge Manali 0/0 to 0/330 3.49

11 OFC on Kullu Manali Left Bank Road to Village Prini Manali Distt. Kullu 8.00

12 Laying of OFC from Bhunter Sainik Chowk to College Gate 2.44

13 Laying of OFC from K.M.L.B. Road to Haripur College 3.91

14 Restoration Charges for Route from College Entrance Point on MDR-29-Towards Manali at RD 27/100 to 27/200 0.98

15 Restoration Charges for Route from Mahindra club gate to Relince Chamber at RD 40/1100 to 40/200 0.98

16 Restoration charges from laying of OFC cable for Route from Kulu Manali Left Bank Road and Marhi Chhnati Road 0.15

17 Restoration Charges for laying of OFC Cable from Road Crossing on Bhunter Manikaran Road Km 0/0 to 35/110 2.56

18 Restoration charges for laying of OFC Cable on Kullu Manali via Naggar Road 10.77

Page 22: Reply Un-Starred Q.N. 367 · gr %kdool wr %kdq\dul urdg np wr gr *dudq %dvwl wr +dul]dq %dvwl np wr gr 071 urdg wr yloodjh 6rkdu np wr 7rwdo -dzdol 'lylvlrq

19 Restoration charges for laying of OFC Cable on Kullu Manali via Naggar Road 3.59

20 Restoration charges for laying of OFC Cable on Kullu Manali Left Bank Road 2.71

21 Restoration charges for laying of OFC Cable on Kullu Manali Left Bank Road at Km 2/900 to 3/250 2.51

22 On account of Restoration Charges of the Road for the Kullu Manali Left Bank Road 2.69

23 On account of Restoration Charges of the Road for Sainik Chowk Bhunter to Mohal Ramshilla Naggar Road manali Road 3.22

24 Restoration charges for laying of OFC Cable on Kullu Manali Left Bank Road 2.65

25 Restoration charges for laying of OFC Cable on Kullu Manali Left Bank Roadat RD 22/380 to 22/850 5.26

26 On account of Restoration Charges of the OFC Cable from Dhalpur Chowk to Court Gate 1.46

27 C/O Restoration Charges of OFC Cable Kullu Manali Left Bank Road 11.01

28 C/O Restoration of Rain Damaged on Manali Kanyal Road 10.00

29 C/O Restoration of Rain Damaged on Link Road to Deodhar 5.00

30 C/O Restoration of Rain Damaged onAlu Ground to Kalath Chiyal Road 7.50

31 C/O Jeepable Road from Siyal to Balsari 5.00

Total Kullu Division 434.12

Page 23: Reply Un-Starred Q.N. 367 · gr %kdool wr %kdq\dul urdg np wr gr *dudq %dvwl wr +dul]dq %dvwl np wr gr 071 urdg wr yloodjh 6rkdu np wr 7rwdo -dzdol 'lylvlrq

Udaipur Division

C/O Miyar Valley road 197.45

Total Udaipur Division 197.45

Joginder Nagar Circle

1 Restoration Charges for rout from Hotal Anshdeep to Reliance Tower to Dhelu Chowki Chauntra road

0.99

2 Ladruhin to Dohag road join with Dhelu Chowki Chountra road 0.22

3 Bridge Mandi to Dug road and Dug to Panjangna 0.27

4 Ladruhin to Dohag road join with Dhelu Chowki Chountra road 0/0 to 1/0 7.07

5 Restoration Charges for laying of OFC cable from Chauntra to Tikri Khaj Km. 0/0 to 1/300

9.33

6 Laying of OFC cable from Joginder Nagar Arthi road Km. 0/0 to 0/250 2.72

7 Laying of OFC cable Dhelu Yora, Dhelu Har and Dhelu Bagicha road 25.68

Total Joginder Nagar Circle 46.28

G. Total Mandi Zone 1112.13

National Highway

--NIL--

Shimla Zone

Page 24: Reply Un-Starred Q.N. 367 · gr %kdool wr %kdq\dul urdg np wr gr *dudq %dvwl wr +dul]dq %dvwl np wr gr 071 urdg wr yloodjh 6rkdu np wr 7rwdo -dzdol 'lylvlrq

3rd Circle Solan

1 Solan Solan menus road (Portion Sura Vihar to PC College Solan. 2,21,676/-

2 Chhailla Neripul Yashwant Nagar Oachghat Kumarhatti road (Portion Oachghat to Nauni).

61,97,100/-

3 Chambaghat Kandaghat via Salumna road (Portion Panchayat Bhawan Bassal to Pipal tree).

1,27,120/-

4 Solan Meenus road (Portion Cheaf Planet to PNB Rajgharh road Solan). 64,305/-

5 Oachghat to Kalaghat. 6,07,940/-

6 Solan Hospital road (Portion Hospital to Kotla Nallah Bazar). 2,00,060/-

7 Waknaghat Subathu road (Portion Waknaghat to JP University). 12,31,300/-

8 Kufri Chail Kandaghat road (Portion Sadhupul to Janedghat) 1,29,16,000/-

9 Solan Meenus road (Portion Circular road to Dang Complex). 64,720/-

Total Solan Division 2,16,30,221

1 Kasauli Division

Dharampur Kasauli road at RD.8/650 to 8/710. 69,926/-

2 Dharampur Kasauli road at RD. 7/255 to 7/490 & Garkhal Shaktighat Shamaghat road portion K.M. 0/0 to 2/0.

24,43,400/-

3 Kainchimod subathu to Tower Kundla at RD 34/020 to 34/350. 4,71,570/-

Page 25: Reply Un-Starred Q.N. 367 · gr %kdool wr %kdq\dul urdg np wr gr *dudq %dvwl wr +dul]dq %dvwl np wr gr 071 urdg wr yloodjh 6rkdu np wr 7rwdo -dzdol 'lylvlrq

4 Old NH Parwano to TTR at RD 62/600 to 63/525. 37,050/-

5 Chaila Neripul Yashwant Nagar oachghat Sultanpur Kumarhatti road starting point Majholi at RD 75/375 to 76/450.

4,10,500/-

6 Joharji Kaba Kalan road link road on Nahan Kumarhatti road damage done in one pit length 2800 mtr.

76,300/-

7 Link road to TV Santorium Hospital Dharampur RD. 0/0 to 0/550. 6,16,000/-

8 Garkhal Shaktighat road link road to jagjit nagar toatal length 8/150 mtrs. 2,19,750/-

9 Dharmapur Sukhijohri Kanda Katal Ka Bag road 0/0 to 2/0. 20,67,500/-

10 Joharji Bhojnagar road total length 2000 mtr. 58,150/-

11 Bhatt ki Hatti road RD 0/0 to 0/300. 3,36,300/-

12 Link road to Village Nahri Rd. 19/300 to 19/640/ 28,02,500/-

13 Deothi Bara Koon road RD 0/0 to 0/200 & Solan Subathu road Rd. 9/200 to 9/750.

8,40,750/-

14 Old NH-22 road at RD 66/210 to 67/200. 16,01, 820/-

Total Kasauli Division 1,20,51,516/-

1 Arki Division R/R damages caused by laying optical fiber cable in Shimla Kunihar Ramshehar Nalagarh road K.M. 22/0 to 42/300.

80,93,000/-

2 R/R damages caused by laying optical fiber cable in Shimla Kunihar Ramshehar Nalagarh road K.M. 22/0 to 42/300.

78, 03,000/-

Page 26: Reply Un-Starred Q.N. 367 · gr %kdool wr %kdq\dul urdg np wr gr *dudq %dvwl wr +dul]dq %dvwl np wr gr 071 urdg wr yloodjh 6rkdu np wr 7rwdo -dzdol 'lylvlrq

3 R/R damages caused by laying optical fiber cable in Karagully to Ghangughat. 2,75,000/-

4 R/R damages caused by laying optical fiber cable in SAKB road 23/300 to 23/800 KOtho Chowk to Thakur Dhaba.

2,12,000/-

5 R/R damages caused by laying optical fiber cable on Shimla Kunihar Ramshehar Nalagarh road.

28,45,000/-

6 OFC charges near Shiv Nagar to Rachhakra Chowk K.M. 1/0 to 5/0. 39,08,000/-

7 OFC charges road crossing at Kararaghat on Kararaghat Kashlog road. 10,000/-

8 OFC charges Kunihar Ramshehar Nalagarh road K.M. 55/00 to 55/380 and corssing of road 40/800 to 40/812.

1,31,000/-

9 OFC charges Kunihar Ramshehar Nalagarh road K.M. 55/00 to 55/380 and corssing of road 40/800 to 40/812.

11,000/-

10 OFC charges Kararagulli to Barsanoo road K.M. 0/0 to 1/150. 11,77,000/-

11 OFC charges Sayri Kaithlighat road K.M. 0/0 to 0/800. 6,21,000/-

12 OFC charges Navgaon beri road K.M. 0/0 to 4/0 & Jabal Badhal ropari Nanallaha road.

2,65,000/-

Total Arki Division 2,53,51,000/-

1 Nalagarh Division

S.K.R.N road K.M. 60/500 to 112/285 Diggal Bus Stop to Tower. 23,28,240/-

2 Link road Nichla Khera K.M. 0/00 to 0/250. 1,86,000/-

Page 27: Reply Un-Starred Q.N. 367 · gr %kdool wr %kdq\dul urdg np wr gr *dudq %dvwl wr +dul]dq %dvwl np wr gr 071 urdg wr yloodjh 6rkdu np wr 7rwdo -dzdol 'lylvlrq

3 Manpura Dharampur road K.M. 0/00 to 7/700. 1,17,705/-

4 Barotiwala Baddi Sai Ramshehar road K.M. 1/200 to 3/800. 24,270/-

5 Barotiwala Baddi Sai Ramshehar road K.M. 7/400 to 7/440. 69,574/-

6 Barotiwala Baddi Sai Ramshehar road K.M. 3/900 to 4/400. 6,861/-

7 S.K.R.N. road K.M. 103/500 to 105/500.` 80,900/-

8 Barotiwala Baddi Sai Ramshehar road K.M. 3/600 to 3/800. 1 ,45,000/-

9 SAKB road from Hotel Wood to NPP Printing Press Gate K.M. 77/500 to 77/650. 1,42,250/-

10 Barotiwala Baddi Sai Ramshehar road K.M. 7/400 to 7/850. 5,27,175/-

11 Barotiwala Baddi Sai Ramshehar road K.M. 8/700 to 10/600. 19,77,366/-

12 Barotiwala Baddi Sai Ramshehar road K.M. 8/600 to 9/700. 9,50,866/-

13 Alpha Industries to Nichla Thana K.M. 0/00 to 0/400. 40,50,000/-

Total Nalagarh Division 1,06,06,207/-

G.Total of Solan Circle 6,96,38,944/-

4th Circle Shimla

1 Shimla Division No. I

Restoration of road damages due to laying of optical Fiber cable on Aerial Mode along the Fagu to Dharech Road km 0/00 to 14/00 ( Portion from Fagu to Bagri Km.0/00 to 5/600)

0.79

Page 28: Reply Un-Starred Q.N. 367 · gr %kdool wr %kdq\dul urdg np wr gr *dudq %dvwl wr +dul]dq %dvwl np wr gr 071 urdg wr yloodjh 6rkdu np wr 7rwdo -dzdol 'lylvlrq

2 Permission of laying optical fiber cable along the Routes from Kufri to Janedghatg road at RD.0/00 to 25/00 and Kufri Bazar 500 Rmt. (Total length 25500 Rmt.).

192.77

3 Restoration of road digging of pits on KSC and MRR Road from Tuti Kandi to Sanjauli for rectify optical fiber. (16 Rmt.).

0.26

4 Restoration of road damages due to laying of optical Fiber Cable along route from Relience JIO chamber (in front of IT Bhawan )to IT Bhawan Mehli at RD.22/120 to 22/175( length 55.00 mtr.and 6.50 mtr crossing Total = 61.50 mtr).

0.50

5 Restoration of road damages due to laying of optical Fiber Cable on Airal Mode along the routes from Durgapur road RD. between RD.0/00 to 4/485(Total length 157.00 Rmt).

2.54

6 Proposal for grant of permission for laying Optical Fiber Cable along the routes. From By Junction Janedghat to Jeetnagar.

13.42

7 Restoration of damage due to laying of Arial mode O.F.C. along the Rute from Mr. Harsh Mahajan House to APG University length = 5700 Rmt. by the M/S Reliance, Jio infocomm Ltd..

7.38

Total Shimla Division No. I 217.66

1 Shimla Rural Division Dhami

Shimla Mandi Road Dhalli, Kufri - Mashobra Diversion point to Tattapani Bridge Km. 6/00 to 33/300 & 39/200 to 52/300) ( By pit Construction)

31.44

2 Palyar Main road to Jamog km. 0/00 to 1/400 ( By pit Construction) 0.48

Page 29: Reply Un-Starred Q.N. 367 · gr %kdool wr %kdq\dul urdg np wr gr *dudq %dvwl wr +dul]dq %dvwl np wr gr 071 urdg wr yloodjh 6rkdu np wr 7rwdo -dzdol 'lylvlrq

3 Shimla Mandi Road to Mandap via link road to village Ambri km. 0/00 to0/600 ( By pit Construction)

0.47

4 Summerhill railway station up to Co-operative bank Sangti Road ( By Road Digging)

10.65

5 Link road to Airport km. 0/00 to 1/150 (By Road Digging) 12.50

6 Kanda Ladvi Kunihar Road (By Road Digging) 10.48

Total Shimla Rural Division Dhami 66.00

1 Theog Division

NH. to Fagu Rest House Km. 0/0 to 0/115 1.12

2 Charabra to Himalayan International School 6.34

3 Chhalla Mod to Deha Km. 0/0 to 26/700. 5.56

4 Sainj to Hotti km. 0/0 4/0 0.71

5 Faug to Sainj Km. 5/600 to 24/00 2.60

6 Sarion to Gawai Via Bhalech Km. 0/0 to 2/030 5.48

7 Total : 21.80

G.Total of 4th Circle : 305.46

11th Circle Rampur

1 Nirmand Nagan Chheora Chhatri Road Km. 0/00 to 12/240 4.00

Page 30: Reply Un-Starred Q.N. 367 · gr %kdool wr %kdq\dul urdg np wr gr *dudq %dvwl wr +dul]dq %dvwl np wr gr 071 urdg wr yloodjh 6rkdu np wr 7rwdo -dzdol 'lylvlrq

Division

2 Anni Basta Road Km. 0/00 to 2/045 1.09

Total Nirmand Division 5.09

1 Kalpa Division

Peo Bye Pass road Km. 0/470 to 1/220

Total Kalpa Division

7.02

7.02

1 Karchham Division

Link road to Village Barda Km. 0/00 to 0/330 1.72

2 Karchham Sangla Chhitkul Road Km. 0/00 to 41/500 205.13

3 Link road to Village Ralli Km. 0/00 to 5/500 1.15

4 Palingi Nichar road portion 0/00 to 8/500 103.8

5 Tapri Punang road Km. 0/00 to 5/00 37.61

Total Karchham Division 349.42

1 Rampur Division

Rohru Sungri Bhali Nogli road Km. 27/00 to 82/00 58.82

2 Kumsu Kamlahu Kareri road Km. 0/00 to 3/00 3.33

3 Kinoo Bhagawat road Km. 0/00 to 1/840 14.56

Total Rampur Division 76.70

Page 31: Reply Un-Starred Q.N. 367 · gr %kdool wr %kdq\dul urdg np wr gr *dudq %dvwl wr +dul]dq %dvwl np wr gr 071 urdg wr yloodjh 6rkdu np wr 7rwdo -dzdol 'lylvlrq

1 Kumarsain Division

Kumarsain to Jogsha Km. 0/00 to 1/260 13.38

2 Oddi to Kacheri road Km. 0/00 to 0/380 4.00

3 Oddi Kingal road Km. 20/230 to 21/405 13.44

Total Kumarsain Division 30.82

Kaza Division

Nil 0.00

Total Kaza Division 0.00

G.Total of 11th Circle : 469.05

1 12th Circle Nahan

2 Paonta Division

Paonta Rampurghat to Mankind Pharma 56640

3 Mankind Pharma Main gate to Block A 90mtr. 65250

4 Puruwala tManpurdeora via Shaheed Smarak

5634578

5 NH07 to Misserwala 729750

6 Kunja Mandir to Tower Rampurghat 86160

7 E.S.I. Office to Vabhavi Beauty care on Rampurghat road 80800

Page 32: Reply Un-Starred Q.N. 367 · gr %kdool wr %kdq\dul urdg np wr gr *dudq %dvwl wr +dul]dq %dvwl np wr gr 071 urdg wr yloodjh 6rkdu np wr 7rwdo -dzdol 'lylvlrq

Total Paonta Division 6832678

1 Shillai Division

Shillai Pashmi Bali Koti road km. 0/0 to 0/430 424995

2 Link road Ajroli to Panog km. 0/0 to 1/500 650254

3 Link road Ambota to Kharkhan 81091

4 C/O Link road from Naya Panjor road 223691

5 C/O Puruwala to Dighali road 144554

6 Sataun Pocca Kando Kotga road 83094

7 Bangran Rajpur Dhigali Taru road 294263

8 Shimol Dhar to Tatiyana 316600

Total Shillai Division 2218542

1 Nahan Division

Yashwant Chowk to Bus Stand

1765110

2 Jamta to Jaitak

3 Dadahu Market to Toward Dhaulakaun

4 HDFC Bank Nahan to Nirmal Hospital

Total Nahan Division 1765110

1 Sangarh Nohra Bogdhar Mehtli road 2292694

Page 33: Reply Un-Starred Q.N. 367 · gr %kdool wr %kdq\dul urdg np wr gr *dudq %dvwl wr +dul]dq %dvwl np wr gr 071 urdg wr yloodjh 6rkdu np wr 7rwdo -dzdol 'lylvlrq

Division

2 Kharkholi to upper Rajana

Total Sangarh Division 2292694

G.Total of 12th Circle : 13109024

14th Circle Rohru

1 Rohru Division

Chirgaon to Sindasli, Sandasu to Pali, Pali Kainchi to Peja road.

2 Bhaloon to Kachha road.

3 Tikkar to Sungri road.

4 Mehandli to Tikkar road.

5 Jogothi Nallah to Andreothi road

6 Badiyara Jangla Thali road.

7 Rohru Chirgaon Dodra Kawar road.

8 Badiyar to Jhalwari road.

9 Rohru to Chirgaon road.

10 Rohru to Sungri road

Page 34: Reply Un-Starred Q.N. 367 · gr %kdool wr %kdq\dul urdg np wr gr *dudq %dvwl wr +dul]dq %dvwl np wr gr 071 urdg wr yloodjh 6rkdu np wr 7rwdo -dzdol 'lylvlrq

11 Khadrala to Sungri road.

12 Bhollon Kainchi to Bajaindhar road.

Total Rohru Division 4086397

1 Jubbal Division

Patsari to Sari road.

2 Khrapather to Jhalri

3 Jubbal Kainchi to PWD colony

Total Jubbal Division 553755

1 Kotkhai Division

Gumma Junction to Atal Bihari Inst.of Engineering Pragati Nagar. 68522

68522

1 Dodra Kawar R.C.D Road potion Tikkari to Larot. 201405

Total Dodra Kawar Division 201405

G.Total of 14th Circle : 13109024