report 12-10-29

2
Contract : DOT/C/LT/148/10 DATE: No. No. No. No. 1 Project Manager 17 Surveyor WEATHER: Sunny Cloudy Rainy Windy Dusty 1 Pump 12" (SOP) 17 Compactor Roller 2 Dy. Project Manager 18 Chainman P 2 Pump 13" (SOP) 18 Compactor Plate 3 Site Engineer 19 Mechanic 3 Pump 6" (SOP) 19 Asphalt Cutter 4 Superintendent 20 Steel Fixer 4 Pump 20 Jack Hammer 5 PRO 21 Mason 5 225 WM excavate. 21 Water Tanker 6 QA/QC 22 Laminator 6 22 Jetting Tanker 7 Planning Eng. 23 Carpenter 7 23 2XL Truck  8 Material Eng. 24 Pipe wrapper No. Qty Unit 8 Excavator 24 Rock breaker 9 Secretary 25 Welder 1 9 Shovel 25 Vibrator 10 Timekeeper 26 Diver 2 10 JCB 26 Welding Machine 11 CAD Technician 27 Watchman 3 11 Crane 27 Low Bed 12 Foreman 28 Charge hand 4 12 Compressor 28 Bus (55 seat) 13 Technician 29 Operator 5 13 Generator 29 Drill Excavator 14 Supervisor 30 Office-Boy 6 14 30 Bob-cat 15 Safety Officer 31 Driver 7 15 31 Mini-bus 16 Store keeper 32 Labourers 8 16 32 Geo Pump 6" 1 1 2 2 3 3 4 4 5 5 6 6 7 7 8 8 9 29/10/2012 ON SITE STAFF & LABOUR RECORD ON SITE PLANT & EQUIPMENT RECORD 0 CATEGORY No. 1 1 0 DELIVERY OF MATERIALS 1 1 2 1 8 Pick-up(3 -ton) 0 Jetting Pump 4" MH F91A/2 to MH F91A/2/1 pipe line completed. 0 TBM ACTIVITY OF 28 October 2012 MH 726A & MH 727. On hold by ANNCG. 0 Crane & TBM Operator Break MH F121/12A done. On hold by ANNCG. MH F91A completed. MH F91A to MH F91A/1 Pipe line completed. Backfilling completed. Break MH 727 & MH 726A done. On hold by ANNCG. Engineer Manpower & Equipment  ACTIVITY OF 29 October 2012 lamination complected mh F/80/8/11 ready for handing over 1 1 1 1 Working Hours - 7:00am - 5: 00pm Parsons International Ltd. DAILY SITE DIARY SUB-Consultant & PROGRESS REPORT Project :. AL Ras Al Akhdar and Baynoonah Street upgrading and Traffic Improvement - Package 1 & 2 Trade No. 0 1 1 1 MATERIAL (29-10-2012) 1 REF :-0456 Form No. 0181 MACE Contractor Co. Ltd. No. Trade No. 1 1 2 CATEGORY 1 0 0 2 0 Electric pump 6" Pick-up(Double Cabin) 1 1 0 1 Car(Salon) 5 0 1 LOCATION Welder 0 Safety Officer 0 lamination complected mh F/80/8/10ready for handing over 0 MH F91A/2 to MH F91A/2/1 pipe line completed. Backfilling in progress. Welding Machine 0 Excavator shifted to excavation F91A MH F91A EXCAVATION AND EXISTING MANHOLE REMOVEING FOR DIRECT CONNECTION Preparation for handing over of NDM Li ne. MH F92 - MH F80/8/11 - MH F80/8/10 Existing manhole rebenching and lamination on goingF/92&lamination complected sealing plate placeing Manhole relocation as per Drawing ANNCG/DOT/GEN/0955. Blinded on 26 Sep 2012. Base casted on 27 Sep 2012. Wall casted. Connection done. Drawing Anncg/dot/gen/0955 complected upto wall , cover slab remains Crane 0 MH F91A/2/1 to Existing Line - Excavation and pipe laying completed. Backfilling 6th layer completed. manhole cover adjusting as per new level Gas Cutting set MACE Noted:- Signed by Project Manager Signature

Upload: burerey

Post on 03-Apr-2018

213 views

Category:

Documents


0 download

TRANSCRIPT

 

Contract : DOT/C/LT/148/10

DATE:

No. No. No. No.

1 Project Manager 17 Surveyor WEATHER: Sunny Cloudy Rainy Windy Dusty 1 Pump 12" (SOP) 17 Compactor Roller

2 Dy. Project Manager 18 ChainmanP

2 Pump 13" (SOP) 18 Compactor Plate

3 Site Engineer 19 Mechanic 3 Pump 6" (SOP) 19 Asphalt Cutter

4 Superintendent 20 Steel Fixer 4 Pump 20 Jack Hammer

5 PRO 21 Mason 5 225 WM excavate. 21 Water Tanker

6 QA/QC 22 Laminator 6 22 Jetting Tanker

7 Planning Eng. 23 Carpenter 7 23 2XL Truck  

8 Material Eng. 24 Pipe wrapper No. Qty Unit 8 Excavator 24 Rock breaker

9 Secretary 25 Welder 1 9 Shovel 25 Vibrator

10 Timekeeper 26 Diver 2 10 JCB 26 Welding Machine

11 CAD Technician 27 Watchman 3 11 Crane 27 Low Bed

12 Foreman 28 Charge hand 4 12 Compressor 28 Bus (55 seat)

13 Technician 29 Operator 5 13 Generator 29 Drill Excavator

14 Supervisor 30 Office-Boy 6 14 30 Bob-cat

15 Safety Officer 31 Driver 7 15 31 Mini-bus

16 Store keeper 32 Labourers 8 16 32 Geo Pump 6"

1 1

2 2

3 3

4 4

5 5

6 6

7 7

8 8

9

29/10/2012ON SITE STAFF & LABOUR RECORD ON SITE PLANT & EQUIPMENT RECORD

0

CATEGORY No.

1 1

0

DELIVERY OF MATERIALS

1 1

2

1 8 Pick-up(3 -ton)

0

Jetting Pump 4"

MH F91A/2 to MH F91A/2/1 pipe line completed. 0TBM

ACTIVITY OF 28 October 2012

MH 726A & MH 727. On hold by ANNCG.

0

Crane & TBM Operator

Break MH F121/12A done. On hold by ANNCG.

MH F91A completed. MH F91A to MH F91A/1 Pipe line completed. Backfilling

completed.

Break MH 727 & MH 726A done. On hold by ANNCG. Engineer

Manpower & Equipment ACTIVITY OF 29 October 2012

lamination complected mh F/80/8/11 ready for handing over

1

1

1 1

Working Hours - 7:00am - 5:00pm

Parsons International Ltd.DAILY SITE DIARY

SUB-Consultant

& PROGRESS REPORT

Project :. AL Ras Al Akhdar and Baynoonah Street upgrading and

Traffic Improvement - Package 1 & 2

Trade No.

0

1 1

1 MATERIAL (29-10-2012) 1

REF :-0456

Form No. 0181MACE Contractor Co. Ltd.

No.Trade No.

1

1 2

CATEGORY 

1

0

0

2

0

Electric pump 6"

Pick-up(Double Cabin)

1

1 0

1 Car(Salon) 5

0

1

LOCATION

Welder 0

Safety Officer 0

lamination complected mh F/80/8/10ready for handing over

0

MH F91A/2 to MH F91A/2/1 pipe line completed. Backfilling in progress.

Welding Machine 0Excavator shifted to excavation F91A MH F91A EXCAVATION AND EXISTING MANHOLE REMOVEING FOR DIRECT

CONNECTION

Preparation for handing over of NDM Line. MH F92 - MH F80/8/11 - MH

F80/8/10

Existing manhole rebenching and lamination on goingF/92&lamination complected

sealing plate placeing

Manhole relocation as per Drawing ANNCG/DOT/GEN/0955. Blinded on 26

Sep 2012. Base casted on 27 Sep 2012. Wall casted. Connection done.Drawing Anncg/dot/gen/0955 complected upto wall , cover slab remains Crane 0

MH F91A/2/1 to Existing Line - Excavation and pipe laying completed.

Backfilling 6th layer completed.manhole cover adjusting as per new level Gas Cutting set

 

MACE

Noted:- Signed by Project Manager Signature