Contract : DOT/C/LT/148/10
DATE:
No. No. No. No.
1 Project Manager 17 Surveyor WEATHER: Sunny Cloudy Rainy Windy Dusty 1 Pump 12" (SOP) 17 Compactor Roller
2 Dy. Project Manager 18 ChainmanP
2 Pump 13" (SOP) 18 Compactor Plate
3 Site Engineer 19 Mechanic 3 Pump 6" (SOP) 19 Asphalt Cutter
4 Superintendent 20 Steel Fixer 4 Pump 20 Jack Hammer
5 PRO 21 Mason 5 225 WM excavate. 21 Water Tanker
6 QA/QC 22 Laminator 6 22 Jetting Tanker
7 Planning Eng. 23 Carpenter 7 23 2XL Truck
8 Material Eng. 24 Pipe wrapper No. Qty Unit 8 Excavator 24 Rock breaker
9 Secretary 25 Welder 1 9 Shovel 25 Vibrator
10 Timekeeper 26 Diver 2 10 JCB 26 Welding Machine
11 CAD Technician 27 Watchman 3 11 Crane 27 Low Bed
12 Foreman 28 Charge hand 4 12 Compressor 28 Bus (55 seat)
13 Technician 29 Operator 5 13 Generator 29 Drill Excavator
14 Supervisor 30 Office-Boy 6 14 30 Bob-cat
15 Safety Officer 31 Driver 7 15 31 Mini-bus
16 Store keeper 32 Labourers 8 16 32 Geo Pump 6"
1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9
29/10/2012ON SITE STAFF & LABOUR RECORD ON SITE PLANT & EQUIPMENT RECORD
0
CATEGORY No.
1 1
0
DELIVERY OF MATERIALS
1 1
2
1 8 Pick-up(3 -ton)
0
Jetting Pump 4"
MH F91A/2 to MH F91A/2/1 pipe line completed. 0TBM
ACTIVITY OF 28 October 2012
MH 726A & MH 727. On hold by ANNCG.
0
Crane & TBM Operator
Break MH F121/12A done. On hold by ANNCG.
MH F91A completed. MH F91A to MH F91A/1 Pipe line completed. Backfilling
completed.
Break MH 727 & MH 726A done. On hold by ANNCG. Engineer
Manpower & Equipment ACTIVITY OF 29 October 2012
lamination complected mh F/80/8/11 ready for handing over
1
1
1 1
Working Hours - 7:00am - 5:00pm
Parsons International Ltd.DAILY SITE DIARY
SUB-Consultant
& PROGRESS REPORT
Project :. AL Ras Al Akhdar and Baynoonah Street upgrading and
Traffic Improvement - Package 1 & 2
Trade No.
0
1 1
1 MATERIAL (29-10-2012) 1
REF :-0456
Form No. 0181MACE Contractor Co. Ltd.
No.Trade No.
1
1 2
CATEGORY
1
0
0
2
0
Electric pump 6"
Pick-up(Double Cabin)
1
1 0
1 Car(Salon) 5
0
1
LOCATION
Welder 0
Safety Officer 0
lamination complected mh F/80/8/10ready for handing over
0
MH F91A/2 to MH F91A/2/1 pipe line completed. Backfilling in progress.
Welding Machine 0Excavator shifted to excavation F91A MH F91A EXCAVATION AND EXISTING MANHOLE REMOVEING FOR DIRECT
CONNECTION
Preparation for handing over of NDM Line. MH F92 - MH F80/8/11 - MH
F80/8/10
Existing manhole rebenching and lamination on goingF/92&lamination complected
sealing plate placeing
Manhole relocation as per Drawing ANNCG/DOT/GEN/0955. Blinded on 26
Sep 2012. Base casted on 27 Sep 2012. Wall casted. Connection done.Drawing Anncg/dot/gen/0955 complected upto wall , cover slab remains Crane 0
MH F91A/2/1 to Existing Line - Excavation and pipe laying completed.
Backfilling 6th layer completed.manhole cover adjusting as per new level Gas Cutting set
MACE
Noted:- Signed by Project Manager Signature