Well WaterStrikes Depth (m)

Depth Level Legend(m) (m AOD) Stratum Description

Project Name

Location:

Client: Dates:

Level:

Co­ords:Project No.

Borehole No

Scale

Logged By

Remarks:

Hole Type

Samples & In Situ TestingPID Results

Barking Power Station Extension

Location hand dug to 1.2mbgl. Drilled by 219mm / 178mm cased solid stem auger followedby cable percussion in sand and gravels. Monitoring wells constructed with 63mm HDPEpipe. Strength from field tests only.

1.

2. Groundwater strikes at 2.6mbgl and 9.6mbgl.

Barking Power Station

Barking Power Ltd

BH1

9W7986

Royal HaskoningTel: 01733334455email: [email protected]

­

3.58 m AOD

20/06/2011 TA

BH1

CP+RC

BH

1

0.50

1.00

1.70

3.60

4.70

6.20

8.80

9.80

0

0

0

0

0

0

0.05

4.50

6.00

8.60

9.409.60

3.53

­0.92

­2.42

­5.02

­5.82­6.02

Tarmac

Yellow and red brick and brick fragments with cobble sized chalkand concrete fragments in a sandy CLAY matrix. Occasional slate,clinker, tarmac and glass (MADE GROUND)

Proportion of clay increasing with depth

Firm grey mottled black CLAY (ALLUVIUM)

mottled brown from 5mbgl.

Plastic dark brown to black clayey fiberous PEAT (ALLUVIUM)

Hydrogen sulphide odour

Grey silty clayey PEAT band (ALLUVIUM)

Soft grey clayey SILT with occasional wood and plant fragments(ALLUVIUM)

Hydrogen sulphide odour

Plastic dark brown to black clayey fiberous PEAT (ALLUVIUM)

Grey clayey silty fine SAND 

Continued next sheet

1

2

3

4

5

6

7

8

9

10

1:50

Sheet 1 of 2

Page 6: Report - LBBD

Well WaterStrikes Depth (m)

Depth Level Legend(m) (m AOD) Stratum Description

Project Name

Location:

Client: Dates:

Level:

Co­ords:Project No.

Borehole No

Scale

Logged By

Remarks:

Hole Type

Samples & In Situ TestingPID Results

Barking Power Station Extension

Location hand dug to 1.2mbgl. Drilled by 219mm / 178mm cased solid stem auger followedby cable percussion in sand and gravels. Monitoring wells constructed with 63mm HDPEpipe. Strength from field tests only.

1.

2. Groundwater strikes at 2.6mbgl and 9.6mbgl.

Barking Power Station

Barking Power Ltd

BH1

9W7986

Royal HaskoningTel: 01733334455email: [email protected]

­

3.58 m AOD

20/06/2011 TA

BH1

CP+RC

BH

1

10.00

11.50

­6.42

­7.92

Grey sandy GRAVEL. Sand is coarse. Gravels are fine to medium,sub­angular to sub­rounded of flint. Gravel size increasing withdepth, coarse gravels and occasional cobble from 11mbgl 

End of Borehole at 11.50 m

11

12

13

14

15

16

17

18

19

20

1:50

Sheet 2 of 2

Page 7: Report - LBBD

Well WaterStrikes Depth (m)

Depth Level Legend(m) (m AOD) Stratum Description

Project Name

Location:

Client: Dates:

Level:

Co­ords:Project No.

Borehole No

Scale

Logged By

Remarks:

Hole Type

Samples & In Situ TestingPID Results

Barking Power Station Extension

Location hand dug to 1.2mbgl. Drilled by 219mm / 178mm cased solid stem auger followedby cable percussion in sand and gravels. Monitoring wells constructed with 63mm HDPEpipe. Strength from field tests only.

1.

2. Groundwater strikes at 1.6mbgl and 8.7mbgl. Deeper strike rose to approximately 5mbglafter 20 minutes.

Barking Power Station

Barking Power Ltd

BH2

9W7986

Royal HaskoningTel: 01733334455email: [email protected]

­

2.20 m AOD

16/06/2011 TA

BH2

CP+RC

BH

2

0.50

1.00

1.50

2.70

3.70

4.90

7.60

8.60

0

0

0

0

0

0

0

0

0.200.40

2.50

4.80

6.00

6.50

8.70

2.001.80

­0.30

­2.60

­3.80

­4.30

­6.50

CONCRETE

White to brown to black brick, stone and glass fragments in asand and CLAY matrix (MADE GROUND)

Black gravelly SAND with frequent brick and slate fragments andclinker (MADE GROUND)

Firm grey mottled black CLAY (ALLUVIUM)

Mottled light brown from approximately 3mbgl

Plastic dark brown clayey fiberous PEAT with frequent woodfragments (ALLUVIUM)

Hydrogen sulphide odour

Very soft dark grey clayey peaty SILT (ALLUVIUM)

Soft light grey peaty silty CLAY with wood fragments (ALLUVIUM)

Becoming firmer and gravelly with depth

Yellowish grey sandy GRAVEL. Gravels are fine to medium offlint, becoming coarse with depth 

Continued next sheet

1

2

3

4

5

6

7

8

9

10

1:50

Sheet 1 of 2

Page 8: Report - LBBD

Well WaterStrikes Depth (m)

Depth Level Legend(m) (m AOD) Stratum Description

Project Name

Location:

Client: Dates:

Level:

Co­ords:Project No.

Borehole No

Scale

Logged By

Remarks:

Hole Type

Samples & In Situ TestingPID Results

Barking Power Station Extension

Location hand dug to 1.2mbgl. Drilled by 219mm / 178mm cased solid stem auger followedby cable percussion in sand and gravels. Monitoring wells constructed with 63mm HDPEpipe. Strength from field tests only.

1.

2. Groundwater strikes at 1.6mbgl and 8.7mbgl. Deeper strike rose to approximately 5mbglafter 20 minutes.

Barking Power Station

Barking Power Ltd

BH2

9W7986

Royal HaskoningTel: 01733334455email: [email protected]

­

2.20 m AOD

16/06/2011 TA

BH2

CP+RC

BH

2

10.50 ­8.30

Yellowish grey sandy GRAVEL. Gravels are fine to medium offlint, becoming coarse with depth 

Grey clayey lens from 10 to 10.1m

End of Borehole at 10.50 m

11

12

13

14

15

16

17

18

19

20

1:50

Sheet 2 of 2

Page 9: Report - LBBD

Well WaterStrikes Depth (m)

Depth Level Legend(m) (m AOD) Stratum Description

Project Name

Location:

Client: Dates:

Level:

Co­ords:Project No.

Borehole No

Scale

Logged By

Remarks:

Hole Type

Samples & In Situ TestingPID Results

Barking Power Station Extension

Location excavated by JCB to 1.2mbgl. Drilled by 219mm / 178mm cased solid stem augerfollowed by cable percussion in sand and gravels. Monitoring wells constructed with 63mmHDPE pipe. Strength from field tests only.

1.

2. Groundwater strikes at 1.4mbgl and 9.9mbgl. Deeper strike rose to approximately 5mbglafter 20 minutes.

Barking Power Station

Barking Power Ltd

BH3

9W7986

Royal HaskoningTel: 01733334455email: [email protected]

­

2.08 m AOD

15/06/2011 TA

BH3

CP+RC

BH

3

0.50

1.00

1.30

1.90

3.30

4.40

5.40

6.60

8.70

9.70

0

0

0

0

0

0

1

0

0

0

0.100.200.40

1.50

3.203.40

4.70

5.50

6.00

6.30

8.408.50

9.20

9.60

9.90

1.981.881.68

0.58

­1.12­1.32

­2.62

­3.42

­3.92

­4.22

­6.32­6.42

­7.12

­7.52

­7.82

Grass and scrub overlying brown silty SAND (TOPSOIL)

Yellowish white gravel and cobble sized CHALK fragments (MADEGROUND)

Brown to black sandy GRAVEL with clinker and ash, occasionalconcrete, stone and brick fragments, clay pockets and yellowishwhite gravel and cobble sized chalk fragments (MADE GROUND)

Brown to black sandy GRAVEL with clinker and ash, occasionalconcrete, stone and brick fragments and clay pockets  (MADEGROUND)

Firm grey mottled black CLAY (ALLUVIUM)

mottled brown from 2.6mbgl

Plastic dark brownish black clayey fiberous PEAT with frequentwood and plant fragments (ALLUVIUM)

Very soft grey silty peaty CLAY with frequent wood and plantfragments (ALLUVIUM)

Plastic dark brownish black clayey fiberous PEAT with frequentwood and plant fragments (ALLUVIUM)

Very soft blueish grey clayey SILT (ALLUVIUM)

Plastic dark brownish black clayey fiberous PEAT with frequentwood and plant fragments (ALLUVIUM)

Very soft blueish grey clayey SILT with occasional plant andwood fragments (ALLUVIUM)

Black clayey PEAT (ALLUVIUM)

Very soft blueish grey clayey SILT with occasional plant andwood fragments (ALLUVIUM)

Plastic brownish black PEAT with occasional plant and woodfibres (ALLUVIUM)

Dark blueish grey silty sandy CLAY (ALLUVIUM)

Continued next sheet

1

2

3

4

5

6

7

8

9

10

1:50

Sheet 1 of 2

Page 10: Report - LBBD

Well WaterStrikes Depth (m)

Depth Level Legend(m) (m AOD) Stratum Description

Project Name

Location:

Client: Dates:

Level:

Co­ords:Project No.

Borehole No

Scale

Logged By

Remarks:

Hole Type

Samples & In Situ TestingPID Results

Barking Power Station Extension

Location excavated by JCB to 1.2mbgl. Drilled by 219mm / 178mm cased solid stem augerfollowed by cable percussion in sand and gravels. Monitoring wells constructed with 63mmHDPE pipe. Strength from field tests only.

1.

2. Groundwater strikes at 1.4mbgl and 9.9mbgl. Deeper strike rose to approximately 5mbglafter 20 minutes.

Barking Power Station

Barking Power Ltd

BH3

9W7986

Royal HaskoningTel: 01733334455email: [email protected]

­

2.08 m AOD

15/06/2011 TA

BH3

CP+RC

BH

3

11.50 ­9.42

Yellowish grey coarse sandy GRAVEL with frequent shellfragments. Gravel is fine to coarse sub­angular to sub­roundedof flint 

End of Borehole at 11.50 m

11

12

13

14

15

16

17

18

19

20

1:50

Sheet 2 of 2

Page 11: Report - LBBD

Well WaterStrikes Depth (m)

Depth Level Legend(m) (m AOD) Stratum Description

Project Name

Location:

Client: Dates:

Level:

Co­ords:Project No.

Borehole No

Scale

Logged By

Remarks:

Hole Type

Samples & In Situ TestingPID Results

Barking Power Station Extension

Location hand dug to 1.2mbgl. Drilled by 219mm / 178mm cased solid stem aguer followedby cable percussion in sand and gravels. Monitoring wells constructed with 63mm HDPEpipe. Strength from field tests only.

1.

2. Groundwater strike at 8.5mbgl

Barking Power Station

Barking Power Ltd

BH4

9W7986

Royal HaskoningTel: 01733334455email: [email protected]

­

1.19 m AOD

22/06/2011 TA

BH4

CP+RC

BH

4

0.30

1.00

1.30

3.20

4.30

5.40

7.50

8.30

0

0

0

0

0

0

0.200.35

0.60

2.40

3.30

3.70

4.00

4.50

6.80

8.50

8.90

0.990.84

0.59

­1.21

­2.11

­2.51

­2.81

­3.31

­5.61

­7.31

­7.71

CONCRETE

Greyish black sandy GRAVEL with occasional metal sheetfragments, brick fragments and clay pockets (MADE GROUND)

Greyish brown mottled black CLAY (ALLUVIUM)

Soft greyish brown mottled brown CLAY (ALLUVIUM)

Plastic dark brown clayey fiberous PEAT (ALLUVIUM)

Soft dark grey silty CLAY with frequent wood fragments(ALLUVIUM)

Plastic dark brown clayey fiberous PEAT (ALLUVIUM)

Soft grey clayey peaty SILT with frequent wood and plantfragments (ALLUVIUM)

Plastic dark brown clayey fiberous PEAT (ALLUVIUM)

Soft grey to brown clayey peaty SILT with frequent wood andplant fragments (ALLUVIUM)

Becoming darker with depth

Yellowish grey coarse SAND 

Yellowish grey sandy GRAVEL. Sand is coarse. Gravels are fine tocoarse, sub­angular to sub­rounded of flint. Size increasingwith depth 

Continued next sheet

1

2

3

4

5

6

7

8

9

10

1:50

Sheet 1 of 2

Page 12: Report - LBBD

Well WaterStrikes Depth (m)

Depth Level Legend(m) (m AOD) Stratum Description

Project Name

Location:

Client: Dates:

Level:

Co­ords:Project No.

Borehole No

Scale

Logged By

Remarks:

Hole Type

Samples & In Situ TestingPID Results

Barking Power Station Extension

Location hand dug to 1.2mbgl. Drilled by 219mm / 178mm cased solid stem aguer followedby cable percussion in sand and gravels. Monitoring wells constructed with 63mm HDPEpipe. Strength from field tests only.

1.

2. Groundwater strike at 8.5mbgl

Barking Power Station

Barking Power Ltd

BH4

9W7986

Royal HaskoningTel: 01733334455email: [email protected]

­

1.19 m AOD

22/06/2011 TA

BH4

CP+RC

BH

4

10.50 ­9.31

Yellowish grey sandy GRAVEL. Sand is coarse. Gravels are fine tocoarse, sub­angular to sub­rounded of flint. Size increasingwith depth 

End of Borehole at 10.50 m

11

12

13

14

15

16

17

18

19

20

1:50

Sheet 2 of 2

Page 13: Report - LBBD

Well WaterStrikes Depth (m)

Depth Level Legend(m) (m AOD) Stratum Description

Project Name

Location:

Client: Dates:

Level:

Co­ords:Project No.

Borehole No

Scale

Logged By

Remarks:

Hole Type

Samples & In Situ TestingPID Results

Barking Power Station Extension

Location machine excavated to 1.2mbgl. Drilled by 219mm / 178mm cased solid stem augerfollowed by cable percussion in sand and gravels. Monitoring wells constructed with 63mmHDPE pipe. Strength from field tests only.

1.

2. Groundwater strikes at 2.5mbgl and 10.6mbgl. Deeper strike rose to approximately 5mbglafter 20 minutes.

Barking Power Station

Barking Power Ltd

BH5

9W7986

Royal HaskoningTel: 01733334455email: [email protected]

­

2.89 m AOD

14/06/2011 TA

BH5

CP+RC

BH

5

0.50

1.00

1.80

2.40

3.30

4.60

5.50

7.40

9.40

0

0

0

0

0

0

0

0

2

2.80

4.90

7.10

7.60

9.309.50

0.09

­2.01

­4.21

­4.71

­6.41­6.61

Grass, scrub and gravel overlying dark brownish black gravellySAND with frequent clinker and brick fragments (MADE GROUND)

Soft light grey peaty CLAY with occasional wood fragments andplant remains (ALLUVIUM)

Plastic dark brown clayey fiberous PEAT with frequent plantremains and wood fragments (ALLUVIUM)

Hydrogen sulphide odour

Very soft light grey clayey SILT (ALLUVIUM)

Hydrogen sulphide odour

Very soft light grey mottled black clayey peaty SILT with woodfragments (ALLUVIUM)

Hydrogen sulphide odour

Plastic dark brown clayey fiberous PEAT with frequent plantremains and wood fragments (ALLUVIUM)

Firm blueish light grey CLAY with occasional plant fragments

Continued next sheet

1

2

3

4

5

6

7

8

9

10

1:50

Sheet 1 of 2

Page 14: Report - LBBD

Well WaterStrikes Depth (m)

Depth Level Legend(m) (m AOD) Stratum Description

Project Name

Location:

Client: Dates:

Level:

Co­ords:Project No.

Borehole No

Scale

Logged By

Remarks:

Hole Type

Samples & In Situ TestingPID Results

Barking Power Station Extension

Location machine excavated to 1.2mbgl. Drilled by 219mm / 178mm cased solid stem augerfollowed by cable percussion in sand and gravels. Monitoring wells constructed with 63mmHDPE pipe. Strength from field tests only.

1.

2. Groundwater strikes at 2.5mbgl and 10.6mbgl. Deeper strike rose to approximately 5mbglafter 20 minutes.

Barking Power Station

Barking Power Ltd

BH5

9W7986

Royal HaskoningTel: 01733334455email: [email protected]

­

2.89 m AOD

14/06/2011 TA

BH5

CP+RC

BH

5

10.50 010.60

12.50

­7.71

­9.61

(ALLUVIUM)  Becoming sandy with depth

Yellowish grey coarse slightly gravelly SAND with frequent shellfragments. Gravels are fine sub­angular of flint 

End of Borehole at 12.50 m

11

12

13

14

15

16

17

18

19

20

1:50

Sheet 2 of 2

Page 15: Report - LBBD

Well WaterStrikes Depth (m)

Depth Level Legend(m) (m AOD) Stratum Description

Project Name

Location:

Client: Dates:

Level:

Co­ords:Project No.

Borehole No

Scale

Logged By

Remarks:

Hole Type

Samples & In Situ TestingPID Results

Barking Power Station Extension

Location hand dug to 1.2mbgl. Drilled by 219mm / 178mm cased solid stem auger followedby cable percussion in sand and gravels. Monitoring wells constructed with 63mm HDPEpipe. Strength from field tests only.

1.

2. Groundwater strike at 9.1mbgl. standing water at 0.9mbgl, possiby rainfall.

Barking Power Station

Barking Power Ltd

BH6

9W7986

Royal HaskoningTel: 01733334455email: [email protected]

­

1.61 m AOD

20/06/2011 TA

BH6

CP+RC

BH

6

0.50

1.00

1.50

2.40

4.00

5.30

6.80

7.80

8.90

0

2

0

1

0

0

0

0.15

0.40

2.00

2.90

6.60

8.508.70

9.10

1.46

1.21

­0.39

­1.29

­4.99

­6.89­7.09

­7.49

Cobbles overlying dark brownish black gravelly SAND. Gravels arefine to medium and rounded (MADE GROUND)

Brown slightly sandy clayey GRAVEL with frequent read and yellowbricks and brick fragemnts and occasional metal wire (MADEGROUND)

Dark brownish black slightly clayey gravely SAND with coal andclinker. Becoming more gravelly with depth (MADE GROUND)

Hydorcarbon odour and staining, particluarly at 1.6 to 2mbgl

Firm dark grey mottled black CLAY (ALLUVIUM)

Soft and brown mottled from 2.5mbgl

Plastic dark brown clayey fiberous PEAT (ALLUVIUM)

Less clayey from 4.5mbgl

Grey clayey SILT with frequent wood and plant fragments(ALLUVIUM)

Plastic dark brown clayey fiberous PEAT (ALLUVIUM)

Grey silty sandy CLAY with occasional wood and plant fragments(ALLUVIUM)

Yellowish grey sandy GRAVEL. Sand is coarse. Gravels are fine tomedium becoming coarse with depth, sub­angular to sub­rounded offlint. Rare cobble 

Continued next sheet

1

2

3

4

5

6

7

8

9

10

1:50

Sheet 1 of 2

Page 16: Report - LBBD

Well WaterStrikes Depth (m)

Depth Level Legend(m) (m AOD) Stratum Description

Project Name

Location:

Client: Dates:

Level:

Co­ords:Project No.

Borehole No

Scale

Logged By

Remarks:

Hole Type

Samples & In Situ TestingPID Results

Barking Power Station Extension

Location hand dug to 1.2mbgl. Drilled by 219mm / 178mm cased solid stem auger followedby cable percussion in sand and gravels. Monitoring wells constructed with 63mm HDPEpipe. Strength from field tests only.

1.

2. Groundwater strike at 9.1mbgl. standing water at 0.9mbgl, possiby rainfall.

Barking Power Station

Barking Power Ltd

BH6

9W7986

Royal HaskoningTel: 01733334455email: [email protected]

­

1.61 m AOD

20/06/2011 TA

BH6

CP+RC

BH

6

11.00 ­9.39

Yellowish grey sandy GRAVEL. Sand is coarse. Gravels are fine tomedium becoming coarse with depth, sub­angular to sub­rounded offlint. Rare cobble 

End of Borehole at 11.00 m11

12

13

14

15

16

17

18

19

20

1:50

Sheet 2 of 2

Page 17: Report - LBBD

Well WaterStrikes Depth (m)

Depth Level Legend(m) (m AOD) Stratum Description

Project Name

Location:

Client: Dates:

Level:

Co­ords:Project No.

Borehole No

Scale

Logged By

Remarks:

Hole Type

Samples & In Situ TestingPID Results

Barking Power Station Extension

Location hand dug to 1.2mbgl. Drilled by 219mm / 178mm cased solid stem auger followedby cable percussion in sand and gravels. Monitoring wells constructed with 63mm HDPEpipe. Strength from field tests only.

1.

2. Groundwater strikes at 1.6mbgl and 8.95mbgl. Deeper strike rose to approximately 1mbglafter 20 minutes.

Barking Power Station

Barking Power Ltd

BH7

9W7986

Royal HaskoningTel: 01733334455email: [email protected]

­

2.21 m AOD

16/06/2011­20/06/2011 TA

BH7

CP+RC

BH

7

0.50

1.00

1.50

2.30

4.20

6.85

7.70

8.80

0

0

0

0

0

0

0.200.40

1.00

1.90

3.40

6.70

8.50

8.95

2.011.81

1.21

0.31

­1.19

­4.49

­6.29

­6.74

CONCRETE

Black sandy GRAVEL with ash and pipe, brick and concretefragments (MADE GROUND)

Black to white to brown slightly clayey sandy GRAVEL with ashand chalk, pipe, brick and concrete fragments and occasionalclinker (MADE GROUND)

Firm brown reworked CLAY with brick and stone fragments (MADEGROUND)

Firm dark grey mottled black CLAY (ALLUVIUM)

mottled brown from 3mbgl

Plastic brown clayey fiberous PEAT with frequent wood and plantfragments (ALLUVIUM)

Becoming softer and silty from 5.7mbgl

Hydrogen sulphide odour

Soft bluish grey clayey peaty SILT with wood and plant fragments(ALLUVIUM)

Greyish brown silty slightly gravelly PEAT (ALLUVIUM)

Yellow gravelly coarse gravelly SAND. Gravels are coarsesub­rounded of flint becoming fine to medium sub­angular tosub­rounded with depth 

Continued next sheet

1

2

3

4

5

6

7

8

9

10

1:50

Sheet 1 of 2

Page 18: Report - LBBD

Well WaterStrikes Depth (m)

Depth Level Legend(m) (m AOD) Stratum Description

Project Name

Location:

Client: Dates:

Level:

Co­ords:Project No.

Borehole No

Scale

Logged By

Remarks:

Hole Type

Samples & In Situ TestingPID Results

Barking Power Station Extension

Location hand dug to 1.2mbgl. Drilled by 219mm / 178mm cased solid stem auger followedby cable percussion in sand and gravels. Monitoring wells constructed with 63mm HDPEpipe. Strength from field tests only.

1.

2. Groundwater strikes at 1.6mbgl and 8.95mbgl. Deeper strike rose to approximately 1mbglafter 20 minutes.

Barking Power Station

Barking Power Ltd

BH7

9W7986

Royal HaskoningTel: 01733334455email: [email protected]

­

2.21 m AOD

16/06/2011­20/06/2011 TA

BH7

CP+RC

BH

7

10.00

11.00

­7.79

­8.79

Yellow gravelly coarse sandy GRAVEL. Gravels are fine to coarsesub­angluar to sub­rounded of flint. Size increasing with depthwith occasional cobbles 

End of Borehole at 11.00 m11

12

13

14

15

16

17

18

19

20

1:50

Sheet 2 of 2

Page 19: Report - LBBD

Well WaterStrikes Depth (m)

Depth Level Legend(m) (m AOD) Stratum Description

Project Name

Location:

Client: Dates:

Level:

Co­ords:Project No.

Borehole No

Scale

Logged By

Remarks:

Hole Type

Samples & In Situ TestingPID Results

Barking Power Station Extension

Location hand dug to 1.2mbgl. Drilled by 219mm / 178mm cased solid stem aguer followedby cable percussion in sand and gravels. Monitoring wells constructed with 63mm HDPEpipe. Strength from field tests only.

1.

2. Groundwater strikes at 10.7mbgl. Rose to approximately 1mbgl after 20 minutes.

Barking Power Station

Barking Power Ltd

BH8

9W7986

Royal HaskoningTel: 01733334455email: [email protected]

­

1.75 m AOD

13/06/2011 TA

BH8

CP+RC

BH

8

0.50

1.00

1.60

1.902.10

2.60

3.60

4.60

5.50

7.20

9.30

0

0

0

00

0

0

0

0

0

1

1.70

2.00

2.30

3.40

3.80

4.70

6.90

8.70

0.05

­0.25

­0.55

­1.65

­2.05

­2.95

­5.15

­6.95

Grass, scrub and gravel overlying dark brownish black gravellySAND with clay pockets and frequent cobbles sized angular brickand concrete fragments and occasional glass fragments (MADEGROUND)

Soft dark grey mottled black reworked CLAY (MADE GROUND)

Dark brownish black gravelly SAND with clay pockets and frequentcobbles sized angular brick and concrete fragments andoccasional glass fragments (MADE GROUND)

Soft dark grey mottled black CLAY (ALLUVIUM)

Plastic dark brown clayey fiberous PEAT (ALLUVIUM)

Very soft light grey silty peaty CLAY with wood and plantfragments (ALLUVIUM)

Hydrogen sulphide odour

Plastic dark brown clayey fiberous PEAT with wood and plantfragments (ALLUVIUM)

Hydrogen sulphide odour

Very soft light grey silty peaty CLAY with wood and plantfragments (ALLUVIUM)

Hydrogen sulphide odour

Plastic dark brown clayey fiberous PEAT with wood and plantfragments (ALLUVIUM)

Soft brownish grey CLAY with wood and plant remains

Continued next sheet

1

2

3

4

5

6

7

8

9

10

1:50

Sheet 1 of 2

Page 20: Report - LBBD

Well WaterStrikes Depth (m)

Depth Level Legend(m) (m AOD) Stratum Description

Project Name

Location:

Client: Dates:

Level:

Co­ords:Project No.

Borehole No

Scale

Logged By

Remarks:

Hole Type

Samples & In Situ TestingPID Results

Barking Power Station Extension

Location hand dug to 1.2mbgl. Drilled by 219mm / 178mm cased solid stem aguer followedby cable percussion in sand and gravels. Monitoring wells constructed with 63mm HDPEpipe. Strength from field tests only.

1.

2. Groundwater strikes at 10.7mbgl. Rose to approximately 1mbgl after 20 minutes.

Barking Power Station

Barking Power Ltd

BH8

9W7986

Royal HaskoningTel: 01733334455email: [email protected]

­

1.75 m AOD

13/06/2011 TA

BH8

CP+RC

BH

8

10.90 110.70

11.00

12.00

­8.95

­9.25

­10.25

Remaining Detail : 9.60m ­ 9.80m : (ALLUVIUM)

Greyish yellow clayey SAND. Sand is coarse 

Grey slightly sandy GRAVEL. Gravel is white to red to yellowfine to medium sub­angular to sub rounded of flint 

End of Borehole at 12.00 m

11

12

13

14

15

16

17

18

19

20

1:50

Sheet 2 of 2

Page 21: Report - LBBD

Samples & In Situ TestingDepth (m)

Depth Level Legend(m) (m AOD) Stratum Description

Project Name

Location:

Client:

Dimensions:Level:Co­ords:Project No.

Trialpit No

Scale

Logged By

Remarks:

Date

Type PID Results

Groundwater:

Depth

Barking Power Station Extension

Excavated using CAT 432e wheeled excavator.1.2. Trial pit backfilled with arisings.

Barking Power Station

Barking Power Ltd

None encountered

9W7986

Royal HaskoningTel: 01733334455email: [email protected]

4.00m

­­

1.00

m

3.00m

DF

TP01

14/06/2011

Hol

eBA

SE

 III (

Bld

 390

) Sta

ndar

d Tr

ialp

it Lo

g v2

 dat

ed 2

7th 

Nov

 03

0.60

1.20

2.70

3.40

4.00

D

D

D

D

D

0.00

0.00

0.00

0.00

0.00

0.30

1.20

2.00

2.50

3.00

3.40

4.00

CONCRETE (Floor Slab)

Black ashy sandy CLAY matrix with occasional brick, glass and clinkerCONCRETE (Floor Beam)

Brown mottled grey CLAY

Grey mottled black CLAY

Plastic black fibrous slightly clayey PEAT

Grey mottled black CLAY

Plastic brown fibrous PEAT

Trialpit Complete at 4.00 m

1

2

3

4

5

1:25

Sheet 1 of 1

Page 22: Report - LBBD

Samples & In Situ TestingDepth (m)

Depth Level Legend(m) (m AOD) Stratum Description

Project Name

Location:

Client:

Dimensions:Level:Co­ords:Project No.

Trialpit No

Scale

Logged By

Remarks:

Date

Type PID Results

Groundwater:

Depth

Barking Power Station Extension

Excavated using CAT 432e wheeled excavator.1.2. Trial pit backfilled with arisings.

Barking Power Station

Barking Power Ltd

Seepage at 1.5mbgl

9W7986

Royal HaskoningTel: 01733334455email: [email protected]

4.50m

­­

1.00

m

3.00m

DF

TP02

15/06/2011

Hol

eBA

SE

 III (

Bld

 390

) Sta

ndar

d Tr

ialp

it Lo

g v2

 dat

ed 2

7th 

Nov

 03

0.00­0.200.20

0.80

2.00

3.10

4.50

DD

D

D

D

D

0.00

0.10

0.20

0.20

0.50

0.00

0.10

0.60

1.10

3.00

4.50

Grass over slightly clayey SAND with frequent ash

Very sandy fly ash with occasional ash and clinker fragements

Very gravelly SAND angular to rounded with frequent brick fragments

Firm grey mottled black CLAY

Reddish brown plastic fibrous PEAT with occasional wood fragments

Trialpit Complete at 4.50 m

1

2

3

4

5

1:25

Sheet 1 of 1

Page 23: Report - LBBD

Samples & In Situ TestingDepth (m)

Depth Level Legend(m) (m AOD) Stratum Description

Project Name

Location:

Client:

Dimensions:Level:Co­ords:Project No.

Trialpit No

Scale

Logged By

Remarks:

Date

Type PID Results

Groundwater:

Depth

Barking Power Station Extension

Excavated using CAT 432e wheeled excavator.1.2. Trial pit backfilled with arisings.3. Hole terminated due to water at collapsing trench and proximity to sensitive utilities.

Barking Power Station

Barking Power Ltd

Strike at 1.8mbgl

9W7986

Royal HaskoningTel: 01733334455email: [email protected]

2.00m

­­

0.50

m

3.00m

DF

TP03

14/06/2011

Hol

eBA

SE

 III (

Bld

 390

) Sta

ndar

d Tr

ialp

it Lo

g v2

 dat

ed 2

7th 

Nov

 03

0.20

0.60

1.20

2.00

D

D

D

D

0.00

0.00

0.10

0.00

0.30

0.90

1.80

2.00

Black very sandy CLAY

Black sandy CLAY with frequent ash and glass fragments

Brownish black sandy gravelly CLAY

Streaks of oily blue substance at 1.2mbgl

Firm grey mottled black CLAY

Trialpit Complete at 2.00 m

1

2

3

4

5

1:25

Sheet 1 of 1

Page 24: Report - LBBD

Samples & In Situ TestingDepth (m)

Depth Level Legend(m) (m AOD) Stratum Description

Project Name

Location:

Client:

Dimensions:Level:Co­ords:Project No.

Trialpit No

Scale

Logged By

Remarks:

Date

Type PID Results

Groundwater:

Depth

Barking Power Station Extension

Excavated using CAT 432e wheeled excavator.1.2. Trial pit backfilled with arisings.3.Trial pit terminated due to instability of pit and proximity to sensitive utilities

Barking Power Station

Barking Power Ltd

Strike at 1.2mbgl. Hydrocarbon sheen noted.

9W7986

Royal HaskoningTel: 01733334455email: [email protected]

1.50m

­­

0.50

m

3.00m

DF

TP04

15/06/2011

Hol

eBA

SE

 III (

Bld

 390

) Sta

ndar

d Tr

ialp

it Lo

g v2

 dat

ed 2

7th 

Nov

 03

0.35

0.80

1.00

D

D

D

0.10

0.00

0.10

0.20

0.90

1.50

Grass over brownish black sandy CLAY

Black sandy gravelly CLAY with frequent ash and occasional brick and woodfragments

Dark grey gravelly CLAY. Gravels are rounded and subrounded

Trialpit Complete at 1.50 m

1

2

3

4

5

1:25

Sheet 1 of 1

Page 25: Report - LBBD

Samples & In Situ TestingDepth (m)

Depth Level Legend(m) (m AOD) Stratum Description

Project Name

Location:

Client:

Dimensions:Level:Co­ords:Project No.

Trialpit No

Scale

Logged By

Remarks:

Date

Type PID Results

Groundwater:

Depth

Barking Power Station Extension

Excavated using CAT 432e wheeled excavator.1.2. Trial pit backfilled with arisings.3. Trial pit terminated due to instability and proximity to services.

Barking Power Station

Barking Power Ltd

Slight seepage at 2.0mbgl

9W7986

Royal HaskoningTel: 01733334455email: [email protected]

2.50m

­­

1.00

m

3.00m

DF

TP05

14/06/2011

Hol

eBA

SE

 III (

Bld

 390

) Sta

ndar

d Tr

ialp

it Lo

g v2

 dat

ed 2

7th 

Nov

 03

0.30

0.50

1.00

2.00

2.50

D

D

D

D

D

0.00

0.00

0.00

0.30

1.80

2.20

2.50

Rounded cobbels overlying black clayey GRAVEL with frequent brick andcobbles

Grey mottled black CLAY with occasional red and yellow brick

Grey mottled brown and black CLAY

Plastic brown very fibrous PEAT with occasional wood fragments

Strong hydrogen sulphide odour

Trialpit Complete at 2.50 m

1

2

3

4

5

1:25

Sheet 1 of 1

Page 26: Report - LBBD

Samples & In Situ TestingDepth (m)

Depth Level Legend(m) (m AOD) Stratum Description

Project Name

Location:

Client:

Dimensions:Level:Co­ords:Project No.

Trialpit No

Scale

Logged By

Remarks:

Date

Type PID Results

Groundwater:

Depth

Barking Power Station Extension

Excavated using CAT 432e wheeled excavator.1.2. Trial pit backfilled with arisings.

Barking Power Station

Barking Power Ltd

Seepage at 1.5mbgl

9W7986

Royal HaskoningTel: 01733334455email: [email protected]

4.10m

­­

1.00

m

3.00m

DF

TP06

13/06/2011

Hol

eBA

SE

 III (

Bld

 390

) Sta

ndar

d Tr

ialp

it Lo

g v2

 dat

ed 2

7th 

Nov

 03

0.30

0.60

1.00

2.00

3.00

4.10

D

D

D

D

D

D

0.00

0.00

0.00

0.20

0.20

0.90

2.80

4.10

CONCRETE

Black coarse SAND with frequent ash, red and yellow brick and clinkerfragments

Becoming more gravelly with depth

Firm grey mottled black CLAY

Brown fibrous PEAT

Turning lighter brown with larger wood fragments

Trialpit Complete at 4.10 m

1

2

3

4

5

1:25

Sheet 1 of 1

Page 27: Report - LBBD

Samples & In Situ TestingDepth (m)

Depth Level Legend(m) (m AOD) Stratum Description

Project Name

Location:

Client:

Dimensions:Level:Co­ords:Project No.

Trialpit No

Scale

Logged By

Remarks:

Date

Type PID Results

Groundwater:

Depth

Barking Power Station Extension

Excavated using CAT 432e wheeled excavator.1.Trial pit backfilled with arisings.2.

Barking Power Station

Barking Power Ltd

Seeping strongly at 2.0mbgl

9W7986

Royal HaskoningTel: 01733334455email: [email protected]

3.00m

­­

1.00

m

3.00m

DF

TP07

14/06/2011

Hol

eBA

SE

 III (

Bld

 390

) Sta

ndar

d Tr

ialp

it Lo

g v2

 dat

ed 2

7th 

Nov

 03

0.30

1.00

1.50

2.00

2.50

3.00

D

D

D

W

D

D

0.00

0.00

0.00

0.00

0.00

0.08

0.70

1.20

2.00

2.30

3.00

Grass over light brown gravelly CLAY

Ash, glass, brick and clinker in a sandy CLAY matrix.

Brown gravelly CLAY with occasional brick, glass and ash fragments.

Blue staining at 1.00mbgl

Brown/Black slightly silty sandy CLAY

Black fibrous PEAT

Firm grey mottled black CLAY

Trialpit Complete at 3.00 m

1

2

3

4

5

1:25

Sheet 1 of 1

Page 28: Report - LBBD

Samples & In Situ TestingDepth (m)

Depth Level Legend(m) (m AOD) Stratum Description

Project Name

Location:

Client:

Dimensions:Level:Co­ords:Project No.

Trialpit No

Scale

Logged By

Remarks:

Date

Type PID Results

Groundwater:

Depth

Barking Power Station Extension

Excavated using CAT 432e wheeled excavator.1.2. Trial pit backfilled with arisings.3. Trial pit terminated at 4.4mbgl due to instability.

Barking Power Station

Barking Power Ltd

Wet from 1.4mbgl, seeping strongly at 2.0mbgl

9W7986

Royal HaskoningTel: 01733334455email: [email protected]

4.40m

­­

1.00

m

3.00m

DF

TP08

15/06/2011

Hol

eBA

SE

 III (

Bld

 390

) Sta

ndar

d Tr

ialp

it Lo

g v2

 dat

ed 2

7th 

Nov

 03

0.25

0.60

1.20

2.00

2.70

4.00

D

D

D

D

D

D

0.10

0.00

0.00

0.00

0.20

0.30

0.500.60

1.00

1.80

2.50

3.70

4.40

Sparce weeds over blackish sandy slightly gravelly CLAY with frequentbricks and red and yellow brick, chalk  and glass fragments

Becoming lighter brown

White CHALK

Black ASH (fly ash)

Brown very sandy CLAY with frequent brick, glass and tile fragments

Wet at 1.4mbgl, hydrocarbon sheen on water

Dark brown/black very sandy, slightly clayey GRAVEL with frequent ash,glass, wood, chalk and brick fragments

Firm grey mottled black CLAY

Plastic dark brown fibrous PEAT

Becoming lighter with depth

Trialpit Complete at 4.40 m

1

2

3

4

5

1:25

Sheet 1 of 1

Page 29: Report - LBBD

Samples & In Situ TestingDepth (m)

Depth Level Legend(m) (m AOD) Stratum Description

Project Name

Location:

Client:

Dimensions:Level:Co­ords:Project No.

Trialpit No

Scale

Logged By

Remarks:

Date

Type PID Results

Groundwater:

Depth

Barking Power Station Extension

Excavated using CAT 432e wheeled excavator.1.2. Trial pit backfilled with arisings.3. Hydrocarbon odour and oily sheen from 1mbgl, terminated to prevent spread of contamination.

Barking Power Station

Barking Power Ltd

Water standing at 1.0mbgl

9W7986

Royal HaskoningTel: 01733334455email: [email protected]

1.35m

­­

1.00

m

3.00m

DF

TP09

13/06/2011

Hol

eBA

SE

 III (

Bld

 390

) Sta

ndar

d Tr

ialp

it Lo

g v2

 dat

ed 2

7th 

Nov

 03

0.32

0.60

1.00

1.20

1.35

D

D

D

W

D

0.50

0.220.22

1.20

1.35

CONCRETE

GEOTEXTILE

Black slightly gravelly SAND with frequent ash and occasional brickfragments

Hydrocarbons noted from 1mbgl

Firm grey mottled black CLAY

Trialpit Complete at 1.35 m

1

2

3

4

5

1:25

Sheet 1 of 1

Page 30: Report - LBBD

Samples & In Situ TestingDepth (m)

Depth Level Legend(m) (m AOD) Stratum Description

Project Name

Location:

Client:

Dimensions:Level:Co­ords:Project No.

Trialpit No

Scale

Logged By

Remarks:

Date

Type PID Results

Groundwater:

Depth

Barking Power Station Extension

Excavated using CAT 432e wheeled excavator.1.2. Trial pit backfilled with arisings.3. Trial pit terminated due to instability.

Barking Power Station

Barking Power Ltd

Strong ingress from southern face of pit at 0.65mbgl, water standing at 1.0mbgl

9W7986

Royal HaskoningTel: 01733334455email: [email protected]

2.00m

­­

1.00

m

3.00m

DF

TP10

15/06/2011

Hol

eBA

SE

 III (

Bld

 390

) Sta

ndar

d Tr

ialp

it Lo

g v2

 dat

ed 2

7th 

Nov

 03

0.30

0.70

1.00

1.20

2.00

D

D

D

D

D

1.00

0.20

0.10

0.20

0.20

0.20

1.10

2.00

Weeds over light grey to brown sandy CLAY

Black ashy SAND with frequent brick fragments and occasional ash fragements

Metal sheet and white chalk at 0.6mbglSouthern end of pit consists of cobbles and some clinker ­ strongingress of water from this section

Firm grey mottled black CLAY

Trialpit Complete at 2.00 m

1

2

3

4

5

1:25

Sheet 1 of 1

Page 31: Report - LBBD

Samples & In Situ TestingDepth (m)

Depth Level Legend(m) (m AOD) Stratum Description

Project Name

Location:

Client:

Dimensions:Level:Co­ords:Project No.

Trialpit No

Scale

Logged By

Remarks:

Date

Type PID Results

Groundwater:

Depth

Barking Power Station Extension

Excavated using CAT 432e wheeled excavator.1.Trial pit backfilled with arisings.2.

Barking Power Station

Barking Power Ltd

Slight seepage at 1.0mbgl

9W7986

Royal HaskoningTel: 01733334455email: [email protected]

4.60m

­­

1.00

m

3.00m

DF

TP11

14/06/2011

Hol

eBA

SE

 III (

Bld

 390

) Sta

ndar

d Tr

ialp

it Lo

g v2

 dat

ed 2

7th 

Nov

 03

0.20

0.60

1.00

2.00

3.20

4.50

D

D

D

D

D

D

0.00

0.00

0.00

0.00

0.00

0.00

0.50

3.10

4.60

Grass over gravelly sandy CLAY with ash, glass and red and yellow brick

Firm grey mottled black CLAY

Plastic brown fibrous PEAT with frequent wood fragments

Trialpit Complete at 4.60 m

1

2

3

4

5

1:25

Sheet 1 of 1

Page 32: Report - LBBD

Samples & In Situ TestingDepth (m)

Depth Level Legend(m) (m AOD) Stratum Description

Project Name

Location:

Client:

Dimensions:Level:Co­ords:Project No.

Trialpit No

Scale

Logged By

Remarks:

Date

Type PID Results

Groundwater:

Depth

Barking Power Station Extension

Excavated using CAT 432e wheeled excavator.1.2. Trial pit backfilled with arisings.3. Hydrocarbon sheen and odour on water.

Barking Power Station

Barking Power Ltd

Standing water at 0.83mbgl

9W7986

Royal HaskoningTel: 01733334455email: [email protected]

1.80m

­­

1.00

m

3.00m

DF

TP12

13/06/2011

Hol

eBA

SE

 III (

Bld

 390

) Sta

ndar

d Tr

ialp

it Lo

g v2

 dat

ed 2

7th 

Nov

 03

0.30

0.60

1.00

1.20

1.50

1.80

D

D

D

D

W

D

0.00

0.80

2.20

0.20

0.00

0.170.17

1.10

1.80

CONCRETE

GEOTEXTILE

Black very ashy SAND

Possible Asbestos fragments at 0.6mbgl

Becoming slightly oily

Firm grey mottled black CLAY

Trialpit Complete at 1.80 m

1

2

3

4

5

1:25

Sheet 1 of 1

Page 33: Report - LBBD

| Issue | 4 September 2019

\\GLOBAL.ARUP.COM\LONDON\PTG\ICL-JOBS\268000\268591-00 BARKING POWER STATION REMEDIATION\4 INTERNAL PROJECT DATA\4-05 ARUP REPORTS\01. CONTAM PRA AND SIS\PRA\BPS GROUND CONTAMINATION PRA ISSUE 1_FINAL.DOCX

Page D3

D3 Historical groundwater data

Page 34: Report - LBBD

Borehole No. 5 1

Checked bv Date

Trme I Operator Depth to Water(m beicrv datum)

r.:l

:.:,

i.ci

COTITFICI l'lo: 1 q Li 5

FIGU?E: 231,

Datum: S:cpcock cc"'ei' ievel

Datum Eievaticn I.-r-

HECORD OF WATER LEVELS

Standpipe IPrezometer No:

-n.O.D

Standing WaterLe'rel

(m.O.D.)

-r 77

-t t!

iemarks and Samples iaxen

5l 12

6/12Q / 1^U,'I:

ll,ttL

-1 C 1

- 1 rl 7

-'-'. f,q

ar1 / 1 ^cJ I t a

lllt.

15:011i. )a

10 :0?

E1BI'NTDATTOH&LSSDerjIimNSERT/I6ES

BA.RTIIiG REACH DEVELOPMENT

Page 35: Report - LBBD

BECORD OF WATER LEVELS

Borehole No: 3'l Siandpipe iF,e:ometer No.

Daturn: S:cccock CC1/ei" lever ivpe: 1.t*;1 Cas:;:':::'J: l::

Datum Eievation ', .25 m.O.D. f ro Depth 1i . :,':I

I Checked b.i: Date

Date j

,,". cperator Depth io Water(m below datum)

Standing Water I Fern:rrrs and Samples TaxenLevel I

I(mOO) i:,="_. l.li.I.cl i_

I r/ r.:

lVl ta1t I ta

I 1(.:l| ,-.)'I ,) i:LI lo,tcI

I

* _.4;aD

-.,-lDiD

-C.rq

Approve<r byFor Contractor Oate For Engrneer Oate

FOTThTDtrTIOH& L#:DIfqRfiLiT r[3SER TICES

BARKIIIC REACii DEVELCPMEI.iTccr.,trP,Acr lro: I l{ 4 5

FrGUpE. 23i

Page 36: Report - LBBD

RECORO OF WATEH LEVELS

Borehole No: lr Standpipe iPrezometer No:

Datum: SLopccck cove: ie','e i

Datum Elevaticn _1. 1 i m.O.D.

Checkeci by: Date.

Date Time Operator Depth to Water(rn below datum)

Standing Water I Renrarks and Samples TakenLevel

I(m.O.D.) I

dl lt11112131 tz

161122A/ i2

t5;4212 i?0

i6:i413 t25

-! --1n 1,

-o ?n

Fa-Ii:; :.:?: --:s', :ar:r.a^r!-

:.^.sa '.5^ii1--

/.- l': r.-: ^5:t-: Les:ca:rieJ .ra =i:er :e:d:r

ApproYed byFor Contractor Oale For Enginacr Oato

FOIIHI}ATIOH6kffisEaxncEs

lcorrnrcrt,o 1q45BARKING REACH DEVELOPME}I? I-

1.,",,r. 231

Page 37: Report - LBBD

after

Water Level Observations.

Drgtb of-Bircholc

(m)

0rpth ofCaring

(m)

0rpth toWatar

(n)

Dcpth olEorcholo

(n)

0rptlu olCrcing

(n)

DrBth toWat!r

(m)

Borehole No.

Sheet of

rose

o 6.8

Contract Name

BARKING EAST

4. oo

5.80added

6.80t-0.5

added

10.5added

12. s

17.017.028.0

added

Notes water Strike-

I

3.5omi

llevelutes.

.40m

.80m

n

6

6

+

1

Wate21 m

from

from

00*

80

bor60

90

bor

bor20

80

70

00m

bor:

4.

2.

2.

t2.2.1

1.

,l0l

=j=,l5d

=,j=,i=:l=

I

4nl

j0l

;01

)01

Ir1s

I

0

S

4

5

5

0

S

7.0AS

1.O

10.as

2.9d5

L2.L6.16.

24.tasr

rl.oqI

18.001

w.t"Jo8.onl

rs.3ol*..".jo8.3olwaterl08.00i17.301

I

oe.3olr6.4slWaterl

m-

0m

{" 1n.sI

I

to 12.

0m

10 - 50m

17.00m

from

from to 28.

S heetI Appenoix Ii Report No.ferreseatch Limited

1) /1 I

i3c

L3 /t /8

t5/r/8

L5 /t /8

Le /L /8

('

Page 38: Report - LBBD

)

(

Borehole

Ground level (mOD)

Installation date

Tip of piezometer:

Level (mOD)

Stratum

861

1.49

3.12.89

-13.8

TerraceGravel

B54

L.26

B. 12. 89

-14 .0

TerraceGravel

P,57

4.4s

5.12.89

-14.6

TerraceGraveI

97r

3.11

8.t2.89

-9.9

MadeGround

PB.2

1.76

14. 1 .91

_40.7

UpperChaIk

PB5

2.48

L7.L.9t

-7.5

TerraceGravel

Date Water leve1 (mOD)

5.L2.895.L2.89B. 12. Bg

LL.t2.89t3.t2.8915.L2.89L6.L2.Bg20.L2.892L.L2.895.2.916.2.9L7.3.9L

-1-1-1-0

r29L0784

771083

-0-1-0

-0.34-0. 30-0.30

-1.09

-o.62-0. 10

-L,2L-o.L2

o.L7-0.30

-r9.75-L9.75

-o.70-o.55-0.53

GROUNDWATER LEVEL READINGS

TABLE 2

e-

60.01

Page 39: Report - LBBD
Page 40: Report - LBBD
Page 41: Report - LBBD
Page 42: Report - LBBD
Page 43: Report - LBBD
Page 44: Report - LBBD
Page 45: Report - LBBD
Page 46: Report - LBBD
Page 47: Report - LBBD
Page 48: Report - LBBD
Page 49: Report - LBBD
Page 50: Report - LBBD
Page 51: Report - LBBD
Page 52: Report - LBBD
Page 53: Report - LBBD
Page 54: Report - LBBD
Page 55: Report - LBBD
Page 56: Report - LBBD
Page 57: Report - LBBD

| Issue | 4 September 2019

\\GLOBAL.ARUP.COM\LONDON\PTG\ICL-JOBS\268000\268591-00 BARKING POWER STATION REMEDIATION\4 INTERNAL PROJECT DATA\4-05 ARUP REPORTS\01. CONTAM PRA AND SIS\PRA\BPS GROUND CONTAMINATION PRA ISSUE 1_FINAL.DOCX

Page D4

D4 Historical chemical data

Page 58: Report - LBBD

I

NCoc

!Fc)

a

tl-lHlat

I

ztHI

<l

=l

zlHI

aHI

=t

I

at-l-.:l=

lalE

JI4l

I

-latrrll'l2lolH

Itil<

lztH

I

<l

tst2.1olol

609.A!+

)c6O

tro!O

O.i

o o+)

!oooo,b00b0t

ET

{O!

l. b06

F

hON

.d6E

'EdFooE

C+

)oo0)ti!r)6E

OO

F<

O

ccv)d d*

U)

!!0)O

OL

!!i66'oodtiL0)bo 60 ,r

clolnleldl

.ilEI

dt!lot

3ololotrrlh0olal

Ei<

E

IJ\r-o\HdJUo

!trOar

r)e0)6'

E'

EH

o6r)

o>6-{!-o(,6

'.)tr

oooJo6b0O

rrh0I

9..tC

X!

, o.)b00)()3

C&

\oc)borHE

-{oool

ur9<2,

drtd.Aol

c,rzl

=r

t

ooaa6>

i60E.do

.ri O

JL

o\tl'r\

oooorn

lnntta\

ootc\OoO

oNoo

oOoN

oo

Oooooo

I

!UO

OC

'ri

!>O

+

)ooo

oho() o o <b0

0).dE

l L O

-l.

L O 6E

F

6 O

-{E

O

(h O

()6,CE

!O

O(-)O

tr O

)H

(t<

tlFts

oooIJ\

oooI

II

oooooN

|},toooN

ornNtn

rI

ooN

ooN

t-noe

tnNoolr\

NE

-itJ\O

O

-rc0 . O

nO

. d >

l&F

qF-

oo(nlJlo

o@\oN

@o

\o(f)o

nl^to\o

c!E

'-i

(\JLnOF

lC

D . O

'.rtu cn.>

EF

dcoo\(\

IJ\o

r.(a\o

oc!c\l(Y

)o\

qoo\oLN

Noc.)

Ei

ot--cr)

NE

F{

NLnO

-{cO

.

QF

{O

, N

>T

LF

qr-otnN

inotn\o

LN

Nd

o\@o

o@nlc\l

oo(Y

1o\o

Ned

N[nO

''{C

D . c).i

o, d >

lLF

o\t-oc!

tnoo(\l

(f)o

o\ota\

\ootnN

o\o

nlE

F{

O

OF

{(\l 6\

Orl

td .

>l&

oFr

o\F-

Io

\oNF

-o\

ionld

o\ot-

qrlo\oA

I

\o@

Na;

F-tn

O F

{O

r- O

!lo.

. >tL

OF

rnt-

Er

oo(\lnl

o\or-C

;

ooa\l

or-r.n

[nt'-@N

rjlca

oN\0d

olt\\oc\l

(\tE

Ft

lnOF

id

nl O

FI

() . >

lr.6.O

F{

ocooN

\otno

o\od

ooc!o

rnNF

-ooo

t-ocf)

r.l@

ocr)0U

2Bo..r{A

EU

ou o

E o.O

doo)|r')aa

o+)

.r{o

*Eo)

t-

6!oIoEo

Io.IE-{(JO

t{C

14o1,.c>

Lo0.

()

orlN

0).yonz

o0)ofr

!oG)

=0,)J

.Ha6o

..1a

o..to.-ao

o)r)6o-1a

o.dlioAo

oo+)o0)

-oo

Page 59: Report - LBBD

nl (f)

o0)N

-o6.)F

a

tl3lHI

alzlHI

<t

=l

zl=l

FI

Hl

3lalt<l

aldt:lFI

alEI

;totFI

<t

zl=l

<t

FI

ztolol

oLi!!0i!o!O

O'i

oor)LO

(aoo,h0060!EdO

Ltr

bO6

Er

bON

d6E

lrEaFooac.)oooJddt

!6E

O@

FO

BC

ct)6 rD

i

olil!iq4lE

I6lclol

C)l

..1ol0,0J{r.lb0oxol

oLLOO

O!

l)r)i66'0roctrr rr

0)b0b0t

F<

:trtr\c-o\C

)JUEo

Lt)olQ!o)6t

E

EH

0'6!

o>6i,!(,6.!Looq)o6UoL!0d9dc

,1, ta,o9b0(l)c)\O

(.)borHE

dooot

r/,a<z

0rrol

=.

A

=l

a

(,ooa.A

>d

6boE..{ o+

)cE

!..r oJq

o\orn

ooorn

or\a!tt\

ootr\ooo

ooNoO

oooN

oOrn

c)ooo

!OoO

C

'Fi

L>O

+

)ooo

obo() 0

(,, <h0

c)''i E

lr

O-

tr tr O 6'O

Fr 6

o.r=

out

oo6.cO

Otr

0)H

IH<

LF

I

oootn

oooooo

ooooN

'!toooc!

olr\N

tc\I

ooN

oooN

tndooo

ol'r1N

ooLT\

I

NE

'+\O

tnO-{

oN

O+

io. . >

r&dF

@@

t.(\

o\o

rlaF{

onlo\

oooc!

1oN

otr)

(\tE

'-'t

\o ul 0, -{

CJ . O

"{O

" O >

lLF

.

o\t-o

-itno

t-o[n

@AI

n,do

IcoNo

tn(\o\o

NE

'-{

rnul (l)d

d) . oi

o. N

>lL

E{

oa

@oo\

tnont

No\o

AI

ooco

(\c;o\a^

od

oc})oa+

Jo

O..d

-i.-Ct{

o.r) o

E oo

do0)|f)aa

or)rlao

aEq)

F

6r)oa)oEi6C)

IocoEFiOO

ncqO

E!>o.E

tro)o.ooc)N

o,lo2

(,o)@t

tofr0)

=

E60)J

EE6C)

EIo,C)

oEo.aU)

o!6qA@

0)

.r{troo

oor,oo-oo

Page 60: Report - LBBD

Id5-

oo)dd,!FO

)

a

&I

FI

HI

blI

zlt+l

<I

=lI

rdtolH

ItdF

IolI

alFI

JI=l

alEI

dtI

F{l

EI

F.l

=l

olrlE<

t<

tzlr<

l

=l

<t

F.l

2lolol

o+)c

60! .r{

l){jc6orro!O

O"{

oo!trO

ooo,!00bO

liE.'.r O

!t

b06F

60N+

{6E

L.C

,-{ tsct

ooo

c tr+

)rll

OO

rJl O

d'-{6l

trrrdcl

-coo.'rl

tr <

OE

t o

dl cco

+)l

d dd

cl .cE

!ool

r)!ol

tttI

lrtrOqil

OO

lrO

l +

)9nI

6d5o{

oo5O

l !it{o

t{l bO

b0 !b60,d

Ei <

:E

t0.r{E6oF

l

i.H6r.lr\F

- fr

O\O

:(!.o(.)

cJOg5

+.tO

rJLE

65

O

>+

),L

dC)

OIH

O

,+

) xtr

9(l) (l)t)

6' 6

rd E-.t

Ao

6 (l,0)

.) o>

o

h06F

.l 6

6+

)! l.

o6. E

O+

)! O

r)O

OO

!O

o6b0 (H

OLU

O

Fi+

)+{

OC

CX

! trO

ao/D

6eot00)C

) (D

>3

C&

O

tr.\O

() F

iEU

0rl-{ O

EF

{ E

tloo

6col

oElZ

o

dol

rj})l

'Fl

C) +

)ol

c *

&.A

zl >

. *

<

o.

oooa.a6>d

6boEA

l/.,{ oD

Ca. l

J(t

qo\Ioqrn

oooLN

otnnlo[n

otnooo

ooNoo

oooc!

oot-c\

oooooo

I

trOoO

tr 'r'l

L>O

a)

ooo. o

bo() o o <

b0 c)

'ri 'd ,r O-

! !

O (,€

tr 6

oH:E

6(n O

o64()O

! O

HtH

<

l.f{

ootn

oooOI

ooooooN

I

taooo(\or.nN

l.nI

ontoooN

tnoo

l'r\N

ooolr\I

\o oa

FI

I O

'-{o

on&

>

l&

o\F-

FoIJ\F

-(r1

F{

f\l\oc!

IJ\o

\oco

oo\ooad

(\o

o\oN

(r.\o

Fo@Nooocnc\l

rn(Y)

F{

I O

'-l()

Or{

&

>tr

Nco

Fooat-(f)

|,-rno

otnonlo\

o@\o

tnoo@(\,l

\oN\o

@rnooo(f)[nd

5aaF

iI

OF

.t()

O'ri

&>

E

cr)

@oo\

(f)F-

tnoo(\lo

o@F{

oN

ot-

C\I

oooC'\

(t) (n

I O

F{

o O

?i&

>

lLt-

F"

oF-

r.n

Focor-tno

otn\0o(\I

o\(\ocntn(Y

1

oo\oo\

t-c!

trrnrn(\tooor-tn

AF

1r oHo

O+

t&

>

tL

@\o

Eor-\.o

Fo6\

tnotr\rl

o(nr{Ncn

tnN\oo

\o(\o

o\Foo\(\,l

ooo@N

r-{ (n

Ar

OF

i()

ctil&

>

tr.4E

r

ot,-

Eo\o

tro\o

tnolnN

ot-d\o

tnoin

NciF

oooor-m

(\tE

Fl

@

OF

Ids

Ot{

El . >

tr.ot{

r-I-(r1tn

Nt-\oo

r-No

rnt\c\t

oln

F{

ooco@@

ocr)oa!

o,O

..t{A

E

34or)

c)E

OO

60)0)ulaa

oa)aq

rtEq)

F

F{6r)ot,o'1,EL)

IocoEF{o

Orl

o 'r,,c>

uooooc)

o'i{N

F{0),!loz

o0)ot

>),aoLro)

=

E6oJ

EEE6C)

EEotr()

oEoaa

o1)6oda

oE+lLo/EC)

oo])oo-o(rt

Page 61: Report - LBBD

lftBJ

mdH

F{l

6\l6\lF

.rl

-lt'iltEo/o4l-1Hm

lH8l'"].tzIHE

lsot!E

thtrt I It{&

loot,olE-l].1otoE

IEtt{ I trl

t&ztoottrlH

IF

-{lz*l-H

IAH

IHH

ltrlztF

r.otzulbtoE

{l()olEU

lIzltotH

ttrlE

r.tz8tH

Iol2ll-{

I

aI.-taoO{

oo+J

-rd.o-l

O{

lr}oQ

+J

o.Ft >

+J .QO

Ev]orJc(6..1 t{oocoocU

'.-ir+

.{ Oo.Qoo66Eorpl(n>

N]J IE

-r o)

.Fl E

l+{ '-l

oqO-{

raduo..r tr€(l)co..{ otr^ro14>v!q

ullol+

,rlolzt

U

o+Jtrotr6U.,4o+)o(,a

.io6U|

u<o

.-l t{

E o6

o-c >

U- co..r -o

lrO-r >-f

rd-

oE.-{ EdooU

O'-i -

-1E

UO

O'-l

-C

O.qtr

oU

d u'-l-

u'o.qlr .-i

Ql

o o !-rE

O

'H

-\(a u

U6ol{trlo+J

F{

..1iH.Fl

rttF-{

(nFl

+.,ooAI

o+J

.Fl

U)

t+{otrl

U'

.ntrl6ofidUfr(

EI

UI

idttrl

{ldt

:l+rl

olUI

ct.r{

Irtl..ll oU

ll+J

l.dN

M8l*F

{l O.r.l

I

dlB&

la

UI

ct..{l

C+

rl .Y

l o

()trl

t{l JLn

oldlooU

l O

JCr{

16l I

.-l 6

'r'{}{Gll

E C

>r

OIF

{I trl i

'-1 E'{l.ql6l

PI O

l | '-l -l

r+r

I llll ull -o o

oO

l trl Ol

+r o !

+rl gJtJl

EA

54

.r{l lUl

Ut

O O

UllE

l qil .-i 3 o

+r

Itrl I -r o o o

t+{l dl x

ad tr

Ol lt{l

-l o

-lEl f{l

(d (d-c oB

l Hl O

l -c +

r o' l6lF

{l E

a 3

I lr{l

!+JF

r o

tll.Yl O

l r+

r (0 tr Oldlr+

{l o .F

lol 6l

I +

r tr E

dlHl€l

rr5 roi

ol lol

(d 0o.-rt{l O

l ol o{E

F

5dl+

Jl ,l <

o cQ o

o+JA.FlI{t,ooa

F-t-l

ooo

EO

tr

E

.-1.-t dIA

E

Eq O

rOU

r{-t

C.-r

aadc

aadtru|

ctror{

OO

Eo

u'U',

o\\

-l F

IF{F

l-f O

O

+J

+J

F{

F4

-.1 Fl F

l -{ tr

tr .-i O

d o

o o o oE6-o

oU

E

E

E E

E >

>

O'-l

a A

aaa.q.qH

OE

Otr

O

r{ F

l F

{ J

Fl

tl-{ t+{

OE

d

-l 666dO

Of{

U

U

F{U

UU

U

, r+

r.-l

(U'-l .-l ..r 'F

l ! lr O

O O

o| E

E

EE

EE

AA

EA

C+

rO

oOO

OO

OO

OE

HO

,.q S

"C.q.q .l, €

'.1 Jrr O

O

-l O

U O

O O

O.!1 (a O

r.4 6

d oO(,0 ur+

r u urU

lloobnoilo !

oA

E

.-lqtrtrCC

q3>

ou| E

oooooo >

J4ll

!'-l O

lr f{ fr !

! tiE

Fr

dO

-q-{ .q+

J+J+

J+J+

r+r

C.-l

O>

rJ U

] U

OO

AA

A

O(d03

.-l.-tot+

rotr, >

>O

-l-{.c, .-t..rooo

(6F

{Ot,i5

-1 +

)t6

6^!

.-t O

>)

>

grdO

iF{

.o -1

(uO

-l

'Fl

d -U

tA

'?1J

C

lrco

._t ,$

c v

OU

t.-i

fr O

f.{

Ea

Ja o

oS

Not\

+JE

O

TE

O

'] Ut

.Fl

o N

c-q ']{

+r

IE .rl

+J

.-t cn -i

.qrr tr!

Clr

tr|5 d

5 0

(l)..r O

O

rO

ltEF

IE

f{iO

+J tr

oo oo

aa

dHo+J(0-

E^

rn J

cn coaocococnco fo

.Ft

-t a

.1 F

IF{F

{AA

-4 F

{-l

-l F

l -l

Fl

-{ -{

Fl

F{

F{

'-l -l

.-l .F

l .-l .F

l .Fl .F

l .F{

.-l

$NN

Fl

Fl

-lF

l F

l F

l.-l

.-l .rl

Br

lrr h

r')3 E

v .rt

.-l

Ja 5

-{ -l

-l.-l F

l -{

-{ -l

-l -l

.-l .-ltrr lq

$c4

E+lAoo

ro $

to\o$N$sflo

o!.-

@

u1coU1sr{tJl]$F

l -l

llllllllr-lFl

1 ''t q1111?+

J

$ F

$u1s{N

Frcn

sl \o

q.'l qN

rnsltt.omN

r-l

<so

$a <

iF

.{to \gO

-l

llFl

r{F

lsl I

I

u.cnNN

O\

\O

oIoHIr-t

N

oOdtnF

--l

rn <

$@

cocqa

!-ltdot*co

Page 62: Report - LBBD

Para-meter

Typical Maximum Values

UncontaninatedSoils

Sligh'-J-yContaminated

Contaminated HeavyContanination

UnusuallyHeavy

Conta:nination

pH (acid)pH (aIk)AntimonyArsenicCadniunChromiunCopper (avail)Lead (totaI)Lead (avail)tlercuryNickel (avail)Zinc (avail)Zinc equivBoron (avail)SeleniumBariumBerylliunManganeseVanadiunMagnesiunSulphateSulphur (free)SulphideCyanide (free)Cyanide totalFerricyanideThiocyanateCoal Tar'PhenoIToluene extractCyclohexane

extract

6830301100100500200L

2025025021

50055001005002000100101

510010500L

5000

2000

595050320020010005003505005005310001010002001000500050020525500501000510000

5000

4101001001050050020001000102001000200050102000202000500200010000100010050250100010020005050000

20000

2L2

5005005025OO25OO10000500o5010005000100002505010000501000025OO1000050000500o500100500500050010000250250000

100000

GLC Guidelines: Normal TipHazardous

TipSpecial

Tip

(

* mg/kg on air dried soils, except for pH.

GLC GUIDELINES FOR CONTAMINATED SOIL DISPOSAL

08.02

TABLE 5

Page 63: Report - LBBD

pH

CI

Tot SOo

wso4 Gn)

HzS

s.T

T.CN

PHOH

MPHOH

Tol X

PbT

cdr

HgT

Sb.T

AsT

CrT

CuT

NiT

Se.T

Z;til

wsB

Abbreviations used for Analytical Results

pH (on 2.5:l Water:Soil Extract)

Chloride expresed as Cl

Total Acid Soluble Sulphate expressed as SOo

Water Soluble Sulphate expressed as SOo in g/l in 2: I Water:Soil

Extract

Total Sulphide expressed as HrS

Total Sulphur expressed as S

Total Cyanide expressed as CN

Total Phenols expressed as C.II5OH

Monohydric Phenols expressed as C.H5OH

Toluene Extractable Material (ie Organic Material Soluble inToluene)

Total Lead expressed as Pb

Total Cadmium expressed as Cd

Total MercurY exDressed as Hg

Total Antimony expressc,C as Sb

Total Arsenic expressed as As

Total Chromium expressed as Cr

Total Copper expressed as Cu

Total Nickel expressed as Ni

Toul Selenium expressed a.s Se

Total Zinc expressed u Zn

Water Soluhle Boron

Page 64: Report - LBBD

R-

ocldloohv'*

qoIV&h3hnovoFclnoooarocl

rEL

-l{

:$r31;.E

>t E

:.99

c3 9,-9E

rlJ C

Eq3

3€<E

iEO

.=

eeoo4ILIL

VV

o:o'

€o

hONF

cro

nnoo96l6ooh6

oool G

l

oocl a:

t1sF,iFzFa(JFUF

Fx

o,or!V

VO

onoo€

d(t),'t

laE

oJF(nrd&ai---T

D

TJ

J, E

iA

EJA=

gxdE

.EE

c€)E

EE

(n.h=b!&iEA

)

!.22

EE

:&

'RF

:oo'trU

,.E

O.Y

La-ara

cqO

At^

s t 15

h s Ef

E3

€ A

6

€9LL-9=cL'!E-X

HE

:et=

k

FE

.S

E

5-€eoLqr:t

E fi

E=

3o.Eea

Eo

, t.E.QaE

iE

r=[!

, V

ll2o

t\ocin

,O

orol

o,cl

88o@

6i \o

arh

Es3

E$

3

gd

oal

ri.faC3

5Eco(JaC!

IE

a s'F!

6Ei

e gplrl3.6tE

.E 5

Edo

E... i:

ag o

4 Z

tL

ooE

5=:3

3H-i-Gto

9F;F

;

Y)

.Bni-:C

AF

h

oo\O€

d\o

hG\Og

cl a{

-.l6o--:

Ga6

eF-..!ir

=F

'dgn6!h

g;3; :c

o-;,d

-l F

G

a

O

6 G

al d

6 !t

iL O

!l

d 6

I

fiI 3 = Z

: : EI: : : :

EI g g E

IB E

E

Page 65: Report - LBBD

&-

lrloo'E

rr{:;.gFE

E!

:E E

.EE

r! ir

Est

r{tO

'LoaoctLt\

6t,Bt:s:i,tF2Ft,(JFI

Fqo\oF6l\oRo\

*€oor

d€iF

nv

NR

gE9R

\o9

hV'c

ooodar

cr

nvGl

h\o

93,,oh\D

O

Fo6vFgtt

\oo3oo\

Gddn6o.. ;5

FR

F

c,

cnEo'Fv3

.:Iv,v

.d

i\orrO

tl r?

rOO

VV

V'

-ooV

vl !.1

OO

rvv

h6vvaRo

d

VV

.t

vlelnoooV

VV

qaFst:!U

V)

F:]DaI{&aE(t)

JzJ-oU2

.EJEtIIUaEg

5s'FB

S6

i6 s

E€5

E6u

E.:i.l

9-Ogt

z, tL

EE

3 E

E

g gE

IRgT

3E

\Ot?=

FfG

.!

3pF

38 B

F

SeE

EE

tsE

G:C

.!q.qo!Ytnq-g?qIq

-F\O

F--O

\\O--3F

loi

.g9rnqqqtldltlqgnnq6tt({t(\lclatro-t

3E

E =

E1s I

Xle E

ls B x B

I B

Ht

IE

l I S

I E

l I I

El I

ElS

I

I I

I I

El8

I

EE€ax

C.E

E

oe)

# =z E

ElA

T}Eo-er.2zE

9qE

{F&

,EH

ao 'E

u)

.EO

1r-u,E

.i''o

s s$sh s IC.E

E

E'

69LLC

-C

LCE

rSE

B.E

5 !e€ F

{'g rX

.E=

o!tFGI

oGI

ocav

FaroGI

F

Page 66: Report - LBBD

go-lI]oo.E

B;l 31D

F

:a.Y

AT

E:

oca5-:trIJJCE

sl3€<E

iEO

=s

ooOcu.

lr

ongV.

Fdo8as=o-

a;

Et,'FsF,iF2t:EIFL)

FFoa

t:!,U

(t)Iri)ard&(nI(nJzJ-ov)

o\oottcroGT

o6l

o\o!t\oY)

F

E?e-9oI.lFT

B

3Eq,tr E

;o(l)

E 2

Eb-gar}Eo-e a:e' R

'-:

aa 'tr .a

-EO

4LU,

E:fo

s s$sE

s It'E

gE

7 0

-9=a6E-ai

ri E

E=

Et

E .E

}E

E E

}-

go

cIF.3lt

cr8

cl

d\c

t

dd

t1a

o88!tcrvv

8a

nnnooovvv

oi

o666l

Oho

NdEo

oooG

lG'C

TV

VV

o\O

da{tv-

-dd

tteGa=co(,,atEci".9;;.eI

99sled

E2cta=

.

E;O

e.'Le=

Odz&

oo6G'

o9dq-F-

FG

I

G6

ca ca

oo

oa=;

;r3

:Eq-o-qnCa

E H

tstsil8

Page 67: Report - LBBD

oCL

.El

oo.E

B

;qi;.8 >9 E

!noo-.! P

€E

III E

s!tsltar

reooc

trr ur

Eta=T.:

sFsF2

caF.3lt

FEL)

F(Jt:t:aqq0

t:!t(,t:fx?Fotrz(JFFt)cn

aFJ)E&2(nJ,EJ.h5.2(ocEoc)

F

5E(t)

u2

b!}EAJC.

u,a

al)

?g&,8

ao 'E

so4LL. .r

HLoco

ss-ahsE€

E8

LLoad!

{EbL

Y-v

-hEE

€6

..!o

t?oo

!t)

oooFl

?v)oo

oc)dG

l

o'F

rtorcr

orc{

tal

oo6loocr

aa

o\oGoo€ct9v

I5Tf

U= t,I3oLI=

OO

{.1EaIcoU3EEg

5 s'3E

U'E

a,Y

crvotcEa=

.'

E6Y

EJB

4alL

EsgE

FP

sHgE

oo:H

TH

Epss

Gao.vlorto\oi6?yr.'r

;F=

iiFr;iF

r;iJ

ntnn?gqa-:GJqnq

OO

GIh\ocrF

i6F

3sF:lF

FF

Frils=

lsBsB

Els8E

lS88S

8El8E

r88s8

Page 68: Report - LBBD

o-,t.loooorrt6

o

'v-:

_6h

, s86

a€

.og

o.\06

\o

o,cl

o

'6-€'d

eo.E

loo's

rtoE

O!a4a-

.:4-92I E

Eoo-.i 3€E

II] E

E.eI

Ef€

CL:,

Looo4tLt\

ot:sF,i

F

F2t:e()r:U.x

clo

vlnooV

V

n t"|

,oohh66ooooeV

VV

V

Io

t:aC

')F

tE-

B-E&2T(n

\J

J2 E

EJA=

gxY

=tt)E

It:oq)E

EE

(nu,=b

! &

t=e:.22rZ

q3fiF&

,Er:

ao 'E

t)

-A.=

H.lLt.c9..F

rEoA

0 A

t^

8 * 15

F

# E F

t'E

g€

e 6

a9t-L-9=E

LAlE

rSE

E,E

E .E

E3

E E

r€ fi l=

caF.3I

?,o

oo

Oq

O\O

oo.6lA

lVV

-c{g'vcr

o

=psE

E

VV

VV

\O

n€<>

e{cd

!J2ca= ,coUIcEtr

a ='3

r oE

e 90 trl

.Xc

o.v o

Cc!i

o=.

E?:U

e-. !

e=8

da'?cr-V

ooooatdN

d!tvvvvc{

c!\oF666r?(rt?rt-

gFF

doice;cFF

ed

a-?:ti-'qcr.-.qnhalcl-c

o.tCntc-{q"l

333.9.t8ordt,oC

<t

51 66F

O\olo\oN

a!FlQ

i<>

-l ?

!+

!t r'

.l *

F,

a, -.

h 6

rt <

>

-rldl

ooooldl ooooootil

ooO

n=gg!

888O

\h€(.t

66G

oo9oE

Et=

EI

ooH

F=

s3

Page 69: Report - LBBD

ao-

lrl90'E

r,,3ca-

r::.E

>X

E:

oo-.E

*€E

lIl c

Est

E{8

E5

Looo4lLIL

'o

:.:

sF,,F2F(JFIt:{

SgqG

{ooeP

ooE

IgRhhv;-;v

CIO

\6ht66ra

oeoooX

€olX

o

FF

-!thN

TsR

E

.rE\og

dlae-ooo

oeoo6Y

O6=

6\o

ooX)<

9gHT

\Or6\O

oVo-:

ErR

Booolol\otvvoa

6ldtf.avv\oF

o,cl

oo

.€,F

n),O.O

\

ooo\o

,!t€

oo,alN

oo'v)G

l

6h6vlqqoo

sFg

9e-o:38

s3g

€F\O

a{

o\Es:3

hooo

v-€

83E?x

oFQ

qocr

oooarcac{V

VV

(i (i

ctV

VV

.8ct3dcto

.o6!t'O

\icl

,nnv'8r^

.BR

g

,=vv

I \cr

Fl

VV

V

Fese

=€6o

E8E

trooooG

a (\t

Gt

clvvvvcto{G

lrOvvvF

,dcdyov

v)nnErO

OO

FV

VV

i.3lt

,==

8v

jH

sFF

Et:

sEF

E53E

Et

FB

sF

pB

988 E

RH

F

;qqgqg9-.!q-:G

lqq.gEO

\ E

G

-

- -

- G

-

G

- -

F

F

-- F

!e : q T

-l : :

r r : .'t e :

: ilE

d r ri +

o :

I -

.i 3

j i

U E

egE

!' E

liG

r 6

€ F

G

6r

Gr

6 ?

g G

\a

F

=l

G

6 o

E69

frl E E

g E E

l = =

= al =

= =

El =

= 3 5

gi,E

I:aat-Ji

E- (nrd&air-Ya\rJ2

EE

J..=

gxY

.-=(t)e,

IEoq)E

=5

(noEb

! a

=E

e..22.f,

? 9

EE

lF&

, E

r.:eO

.C

.r2

.EO

.ULa

i ?r

rcoap

o'+s * rE

.-F

A E

E

B'

E3

.:==

lr-0ua9t-L.9=C

LAE

-XriE

lI.Xa

.E .E

E3

€ Er

=a)=

€ fi ,l=

ocia.avyo

66tioooovv

6h6hY)ra

,orloo!do=c

VV

VV

V

Page 70: Report - LBBD

oo,F

!i:oo

.98!!t

.VV

.€o'ot

oo.<

'a\o€

a6'dd

-60d

,!r3

aho

,aan=rr

- ltl

;s;3

ct

: Ei

E E

:g *-9trt!

cE

e33€<E

f€or

eooo4

lJ. lr.

t:st1aF2F(JFC)

F

CF.:il

nvl.oo

,tg:E

Eoodlvv

tlat:a3

t:EIFPxzF&zqFFIAarEP8

ua5E3

C')

FJ-)E&9(r)

-]2EJ -v,

=g

6E'E€3S

E(A

.o

b!}EJ

d.t3n

Hfi

&,8

eoL.E

OX

LL. .-

g:o30

st,IEE1

Eg

.9=E

L'rT

EE

EL--v

-EEE

oxl*

trl

o,E

H

en\ooooo6ldalV

VV

aGtc{

Glvv

ooo-n6\06O

tse

9EE

EEaEdoUaEEc

e ='!

=

&c

E }!J

.,Y

Erv

oteBe=

.E

doa-'Lo.=

O

4 >

lL

qqqq2-A

-FF

Frtaaa

d:qr.di.ienS

ooq4O

GI

$.6!t=l

er=l

roFa

-l d

Gl

d -l

G

-l o

E

-LI

E!

EI

tdloooldl oLJl

ooo

i.tr=

Page 71: Report - LBBD

E-lll'is

it:i€Eoo-:3 E

.EE

UI

C

;sisi*at

!ooodtt

tt

,ttoo

r a-l

nooFhFo

ooca,aavv

o6loGI

!Y!-:q?g-2cq.,!e

oG610F

\OF

-!O€tO

: :

:: :::

:: ::

BIB

EIB

atBE

flEB

EH

BB

HB

E

aot2'T

.:

sF,,F2qE()F(Jt<

€clIqoo*+

rt

caFaa.3ll

qE3T.:

EL

3Iq,ax'5E

oo)E

E5

ln .n

!E

b !

&

}EL.gzE

A:

&,R

F:

co 'tr tn

.EA

4LU2

E:fcA

O

art^

s s 15'=

Et

E Id

Eg

€ A

tr

Eg

o*6E

E k

Ba

5EE E

{€ fi

.l 5

(aFJDg&C')

rn,1zJoU)

gnYln

OrO

tOV

VV

d\ood

€JEIdcooaIEcB

E.E

Tts6

;.etE

€5E

6qo.:

!tr.=

o

EZ

!&

ood!lG

ao

8ra

3Eo

XF

ooX

EE

oG'

!9cl

Page 72: Report - LBBD

Made Ground

Below GAC

Above GAC

Sample ID BH1 BH3 BH4 BH5 BH6 BH8 TP01 TP02 TP03 TP04 TP04 TP05 TP06

Sample Depth (m) 3.6 1 0.30- 1.80- 1.50- 1.6 0.6 0.2 1.2 0.35- 1.00- 0.5 0.3

Sample date 20-Jun-2011 15-Jun-2011 15/06/2011 14/06/2011 21/06/2011 13-Jun-2011 14-Jun-2011 14-Jun-2011 14-Jun-2011 15/06/2011 15/06/2011 14-Jun-2011 13-Apr-2011

Test Units

Fraction Organic Carbon (FOC) - - - - 0.0251

Ammoniacal Nitrogen as N mg/kg 6 45 <15 <15 <15 6 50 17 100 <15 <15 62 <5

pH pH Units 7.8 7.6 7.41 7.17 8.24 7.8 8.1 8 7.9 7.99 7.87 8 7.8

Cyanide, Total mg/kg <1 160 <1 3.5 <1 2 8 3 2300 7.45 <1 <1 2

Sulphate, Total mg/kg or g/l* 0.2* 1.4* 1470 14600 529 0.1* 0.6* 0.1* 0.3* 1270 833 <0.1* 0.8*

Arsenic mg/kg 22 27.2 178 17.5 14.2

Barium mg/kg 333 487 215 477 180

Beryllium mg/kg 2.24 2.57 2.98 1.83 0.812

Cadmium mg/kg 0.85 0.971 0.774 2.41 0.762

Chromium mg/kg 33 22.4 12.9 38.4 22.8

Copper mg/kg 290 183 215 122 76.2

Lead mg/kg 209 131 96.1 619 352

Mercury mg/kg <0.14 <0.14 <0.14 <0.14 0.976

Nickel mg/kg 51.7 55.3 32.2 37.3 18.8

Selenium mg/kg <1 1.65 <1 2.49 <1

Vanadium mg/kg 84.3 79.2 68.6 76.9 41.6

Zinc mg/kg 717 117 117 510 180

Boron, water soluble mg/kg 1.72 <1 1.31 <1 1.97

Phenols, Total Detected monohydric mg/kg <1 <1 none detected none detected none detected <1 <1 <1 <1 none detected none detected <1 <1

GRO >C5-C12 µg/kg 238 <44 <44 <44 3550Methyl tertiary butyl ether (MTBE) µg/kg <10 <10 <5 <5 <5 <10 <10 <10 <1 <5 <5 <1 <10

Benzene µg/kg <10 <10 <10 <10 <10 <10 <10 <10 <1 <10 <10 <1 <10

Toluene µg/kg <10 <10 6.05 <2 <2 <10 <10 <10 <1 <2 3.72 <1 <10

Ethylbenzene µg/kg <10 <10 41.1 3.72 <3 <10 <10 <10 <1 <3 11.2 <1 <10

m,p-Xylene µg/kg <10 <10 <6 <6 <6 <10 <10 <10 <1 <6 <6 <1 <10

o-Xylene µg/kg <10 <10 <3 <3 <3 <10 <10 <10 <1 <3 <3 <1 <10

m,p,o-Xylene µg/kg none detected none detected none detected 9 none detected

BTEX, Total µg/kg 47.2 3.72 none detected 24 14.9

Aliphatics >C5-C6 µg/kg <0.10 <0.10 18.2 <10 <10 <0.10 <0.10 <0.10 <0.010 <10 32.2 <0.010 <0.10

Aliphatics >C6-C8 µg/kg <0.10 <0.10 19.4 <10 <10 <0.10 <0.10 <0.10 <0.010 <10 26 <0.010 <0.10

Page 73: Report - LBBD

Made Ground

Below GAC

Above GAC

Sample ID BH1 BH3 BH4 BH5 BH6 BH8 TP01 TP02 TP03 TP04 TP04 TP05 TP06

Sample Depth (m) 3.6 1 0.30- 1.80- 1.50- 1.6 0.6 0.2 1.2 0.35- 1.00- 0.5 0.3

Sample date 20-Jun-2011 15-Jun-2011 15/06/2011 14/06/2011 21/06/2011 13-Jun-2011 14-Jun-2011 14-Jun-2011 14-Jun-2011 15/06/2011 15/06/2011 14-Jun-2011 13-Apr-2011

Test Units

Aliphatics >C8-C10 µg/kg <0.10 <0.10 38.7 <10 <10 <0.10 <0.10 <0.10 <0.010 <10 676 <0.010 <0.10

Aliphatics >C10-C12 µg/kg <1 <1 48.4 <10 <10 <1 <1 <1 <1 <10 1410 <1 <1

Aliphatics >C12-C16 µg/kg <1 <1 7260 7280 75800 <1 <1 <1 <1 24500 39600 <1 <1

Aliphatics >C16-C21 µg/kg <1 3 51500 10900 283000 4 4 10 4 174000 101000 <1 4

Aliphatics >C21-C35 µg/kg <1 11 129000 33500 540000 44 13 47 21 1010000 577000 <1 19

Aliphatics >C35-C44 µg/kg 34300 22500 162000 159000 65500Total Aliphatics >C12-C44 µg/kg 222000 74100 1060000 1370000 783000

Aromatics >EC7-EC8 µg/kg <0.10 <0.10 <10 <10 <10 <0.10 <0.10 <0.10 <0.010 <10 <10 <0.010 <0.10

Aromatics >EC5-EC7 µg/kg <0.10 <0.10 <10 <10 <10 <0.10 <0.10 <0.10 <0.010 <10 <10 <0.010 <0.10

Aromatics >EC8-EC10 µg/kg <0.10 <0.10 72.6 <10 <10 <0.10 <0.10 <0.10 <0.010 <10 461 <0.010 <0.10

Aromatics >EC10-EC12 µg/kg <1 <1 32.7 <10 <10 <1 <1 <1 <1 <10 937 <1 <1

Aromatics >EC12-EC16 µg/kg <1 <1 33600 32700 20000 <1 <1 <1 <1 20200 21000 <1 1

Aromatics >EC16-EC21 µg/kg <1 6 10000 19700 170000 2 4 4 <1 70900 56200 <1 5

Aromatics >EC21-EC35 µg/kg <1 17 144000 57200 743000 16 10 21 3 508000 201000 <1 29

Aromatics >EC35-EC44 µg/kg 65800 53900 311000 141000 39800

Aromatics >EC40-EC44 µg/kg 27500 29000 127000 50100 14200Total Aromatics >EC12-EC44 µg/kg 254000 163000 1240000 740000 318000Total Aliphatics & Aromatics >C5-C44 µg/kg 476000 238000 2310000 2110000 1100000

Total Aliphatics >C5-35 µg/kg 188000 51700 899000 1210000 720000

Total Aromatics >C5-35 µg/kg 188000 110000 933000 599000 280000Total Aliphatics & Aromatics >C5-35 µg/kg 376000 161000 1830000 1810000 999000

Naphthalene µg/kg 30 320 319 140 537 60 80 110 10 593 166 60 230

Acenaphthylene µg/kg <10 60 221 17.4 1200 10 60 30 20 70.6 19.7 130 60

Acenaphthene µg/kg 20 30 163 13.9 274 10 30 20 <10 30.2 17.3 30 50

Fluorene µg/kg 20 30 150 13.6 558 10 30 20 <10 54.9 32 30 40

Phenanthrene µg/kg 170 510 1560 331 8740 100 560 290 100 650 199 390 710

Anthracene µg/kg 60 170 294 45 3120 30 180 90 30 177 46.1 150 200

Fluoranthene µg/kg 150 690 2500 347 20400 90 1000 300 240 521 253 760 1000

Pyrene µg/kg 150 610 2320 285 16100 80 880 290 200 512 241 690 940

Benz(a)anthracene µg/kg 60 300 955 248 7070 40 500 180 90 378 118 320 530

Chrysene µg/kg 90 450 1050 289 5820 50 520 180 90 270 118 450 600

Benzo(b)fluoranthene µg/kg 90 590 1570 449 7450 60 650 270 120 580 169 560 720

Benzo(k)fluoranthene µg/kg 30 200 632 144 3050 20 220 90 40 152 63.6 190 240

Benzo(a)pyrene µg/kg 80 860 1160 307 6500 80 590 250 120 426 125 580 640

Page 74: Report - LBBD

Made Ground

Below GAC

Above GAC

Sample ID BH1 BH3 BH4 BH5 BH6 BH8 TP01 TP02 TP03 TP04 TP04 TP05 TP06

Sample Depth (m) 3.6 1 0.30- 1.80- 1.50- 1.6 0.6 0.2 1.2 0.35- 1.00- 0.5 0.3

Sample date 20-Jun-2011 15-Jun-2011 15/06/2011 14/06/2011 21/06/2011 13-Jun-2011 14-Jun-2011 14-Jun-2011 14-Jun-2011 15/06/2011 15/06/2011 14-Jun-2011 13-Apr-2011

Test Units

Indeno(1,2,3-cd)pyrene µg/kg 50 380 708 234 3380 30 290 120 60 395 75.5 380 330

Dibenzo(a,h)anthracene µg/kg 10 90 209 81.8 977 10 90 30 20 82.8 <23 70 110

Benzo(g,h,i)perylene µg/kg 40 320 935 335 4200 30 370 150 70 577 105 310 400PAH, Total Detected USEPA 16 µg/kg 1100 5600 14800 3280 89400 710 6100 2400 1200 5470 1750 5100 6800

Page 75: Report - LBBD

Made Ground

Below GAC

Above GAC

Sample ID

Sample Depth (m)

Sample date

Test Units

Fraction Organic Carbon (FOC) -

Ammoniacal Nitrogen as N mg/kg

pH pH Units

Cyanide, Total mg/kg

Sulphate, Total mg/kg or g/l*

Arsenic mg/kg

Barium mg/kg

Beryllium mg/kg

Cadmium mg/kg

Chromium mg/kg

Copper mg/kg

Lead mg/kg

Mercury mg/kg

Nickel mg/kg

Selenium mg/kg

Vanadium mg/kg

Zinc mg/kg

Boron, water soluble mg/kg

Phenols, Total Detected monohydric mg/kg

GRO >C5-C12 µg/kgMethyl tertiary butyl ether (MTBE) µg/kg

Benzene µg/kg

Toluene µg/kg

Ethylbenzene µg/kg

m,p-Xylene µg/kg

o-Xylene µg/kg

m,p,o-Xylene µg/kg

BTEX, Total µg/kg

Aliphatics >C5-C6 µg/kg

Aliphatics >C6-C8 µg/kg

TP07 TP07 TP08 TP9 TP11 TP12

0.3 1 0.6 1.00- 0.2 1

14-Jun-2011 14-Jun-2011 15-Jun-2011 13/06/2011 14-Jun-2011 13-Apr-2011 Minimum Maximum US95 GAC

0.373

6 62 11 <15 34 22 <5 100 -

8 8 8.1 6.87 8 7.9 6.87 8.24 -

5 1 <1 <1 2 <1 <1 2300 16248

<0.1* 0.1* <0.1* 344 <0.1* 0.1* <0.1* 14600 -

10.2 10.2 178 640

98.8 98.8 487 -

1.07 0.812 2.98 -

0.626 0.626 2.41 230

5.78 5.78 38.4 330

55.7 55.7 290 75267

825 96.1 825 7998

<0.14 0.14 0.976 26

27.4 18.8 55.3 1800

2.69 <1 2.69 13000

39.1 39.1 84.3 3764

124 117 717 1103814

<1 <1 1.97 181668

<1 <1 <1 none detected <1 <1 <1 1 3200

12100 44 12100 -

<10 <1 <10 <5 <10 <10 <1 10 -

<10 <1 <10 <10 <10 <10 <1 10 95000

<10 <1 <10 3.72 <10 <10 <1 10 4400000

<10 <1 <10 <3 <10 <10 <1 41.1 2800000

<10 <1 <10 <6 <10 <10 <1 10 -

<10 <1 <10 <3 <10 <10 <1 10 2600000

none detected 9 9 -

3.72 3.72 47.2 -

<0.10 <0.010 <0.10 <10 <0.10 <0.10 <0.01 32.2 4572530

<0.10 <0.010 <0.10 59.5 <0.10 1 <0.01 59.5 16089875

Page 76: Report - LBBD

Made Ground

Below GAC

Above GAC

Sample ID

Sample Depth (m)

Sample date

Test Units

Aliphatics >C8-C10 µg/kg

Aliphatics >C10-C12 µg/kg

Aliphatics >C12-C16 µg/kg

Aliphatics >C16-C21 µg/kg

Aliphatics >C21-C35 µg/kg

Aliphatics >C35-C44 µg/kgTotal Aliphatics >C12-C44 µg/kg

Aromatics >EC7-EC8 µg/kg

Aromatics >EC5-EC7 µg/kg

Aromatics >EC8-EC10 µg/kg

Aromatics >EC10-EC12 µg/kg

Aromatics >EC12-EC16 µg/kg

Aromatics >EC16-EC21 µg/kg

Aromatics >EC21-EC35 µg/kg

Aromatics >EC35-EC44 µg/kg

Aromatics >EC40-EC44 µg/kgTotal Aromatics >EC12-EC44 µg/kgTotal Aliphatics & Aromatics >C5-C44 µg/kg

Total Aliphatics >C5-35 µg/kg

Total Aromatics >C5-35 µg/kgTotal Aliphatics & Aromatics >C5-35 µg/kg

Naphthalene µg/kg

Acenaphthylene µg/kg

Acenaphthene µg/kg

Fluorene µg/kg

Phenanthrene µg/kg

Anthracene µg/kg

Fluoranthene µg/kg

Pyrene µg/kg

Benz(a)anthracene µg/kg

Chrysene µg/kg

Benzo(b)fluoranthene µg/kg

Benzo(k)fluoranthene µg/kg

Benzo(a)pyrene µg/kg

TP07 TP07 TP08 TP9 TP11 TP12

0.3 1 0.6 1.00- 0.2 1

14-Jun-2011 14-Jun-2011 15-Jun-2011 13/06/2011 14-Jun-2011 13-Apr-2011 Minimum Maximum US95 GAC

<0.10 <0.010 <0.10 2080 <0.10 28 <0.01 2080 4659873

<1 <1 <1 5110 <1 98 <1 5110 25185731

2 <1 2 919000 <1 1100 <1 919000 82752861

2 <1 3 1830000 4 1300 <1 1830000 547759 1445084326

2 13 7 767000 19 510 <1 1010000 473490 1445981494

40500 22500 162000 -

3560000 74100 3560000 -

<0.10 <0.010 <0.10 <10 <0.10 <0.10 <0.01 10 3980564

<0.10 <0.010 <0.10 <10 <0.10 <0.10 <0.01 10 1437536

<0.10 <0.010 <0.10 1390 <0.10 <0.10 <0.01 1390 7244634

<1 <1 <1 3410 <1 10 <1 3410 29973745

<1 <1 <1 669000 <1 340 <1 669000 59838849

3 <1 5 1150000 2 580 <1 1150000 340775 56279953

1 11 6 737000 16 270 <1 743000 374920 57031190

129000 39800 311000 -

56600 14200 127000 -

2680000 163000 2680000 -

6260000 238000 6260000 -

3530000 51700 3530000 -

2560000 110000 2560000 -

6090000 161000 6090000 -

430 30 180 639 50 700 10 700 474.5 1405112

10 10 20 <12 20 200 <10 1200 385 108564935

20 <10 20 1350 20 800 <10 1350 497.2 111281967

10 10 20 2160 20 1400 <10 2160 813 75262069

240 40 430 5390 200 900 40 8740 3325 56762475

50 10 110 2510 70 300 10 3120 1263 567815556

90 50 100 1230 280 600 50 20400 6198 75794709

90 40 110 1740 260 600 40 16100 4990 56844546

70 40 70 761 180 400 40 7070 2224 100008

80 60 90 569 210 300 50 5820 1885 145317

80 80 90 638 250 500 60 7450 2439 103736

30 30 30 192 80 200 20 3050 977.9 146652

80 60 80 516 230 400 60 6500 2128 14650

Page 77: Report - LBBD

Made Ground

Below GAC

Above GAC

Sample ID

Sample Depth (m)

Sample date

Test Units

Indeno(1,2,3-cd)pyrene µg/kg

Dibenzo(a,h)anthracene µg/kg

Benzo(g,h,i)perylene µg/kgPAH, Total Detected USEPA 16 µg/kg

TP07 TP07 TP08 TP9 TP11 TP12

0.3 1 0.6 1.00- 0.2 1

14-Jun-2011 14-Jun-2011 15-Jun-2011 13/06/2011 14-Jun-2011 13-Apr-2011 Minimum Maximum US95 GAC

40 50 40 213 130 500 30 3380 1138 63121

10 30 10 141 40 400 10 977 353.9 2937

50 60 60 499 160 400 30 4200 1409 56888847

1400 600 1500 18500 2200 8600 600 89400 -

Page 78: Report - LBBD

Natural Ground

Below GAC

Above GAC

Sample ID BH1 BH2 BH3 BH4 BH5 BH6 BH08 TP01 TP02 TP03 TP05 TP06

Sample Depth (m) 4.70- 4.90- 3.30- 1.30- 7.40- 2.40- 2.60- 2.70- 2.00- 2.00- 2.00- 3.00-

Sample date 20/06/2011 16/06/2011 15/06/2011 22/06/2011 14/06/2011 21/06/2011 13/06/2011 14/06/2011 15/06/2011 14/06/2011 14/06/2011 14/06/2011

Test Units

Fraction Organic Carbon (FOC) - - 0.00706 - - 0.0157 - - - - -

Ammoniacal Nitrogen as N mg/kg 89.6 155 132 60 155 69.7 75.8 206 77.6 116 62.1 71.6

pH pH Units 8.4 6.77 7.84 8.05 8.45 7.79 8.07 7.48 8.27 6.89 7.91 7.04

Cyanide, Total mg/kg <1 <1 <1 <1 <1 <1 <1 3.99 <1 2300 <1 <1

Sulphate, Total mg/kg 676 2470 2030 482 808 355 375 3460 568 239000 91.7 1320

Arsenic mg/kg 13.1 9.27 38.2 25.4 7.15 9.79 26.3 13.8 12.5 6.79 11.8 8.84

Barium mg/kg 53.1 32.5 81.9 43.4 41 51.3 68.4 59.3 70.6 318 49.8 16.4

Beryllium mg/kg 1.12 0.262 1.14 0.902 1.12 0.774 1.28 1.23 1.39 0.133 1.93 0.333

Cadmium mg/kg 0.633 0.771 0.567 0.802 0.379 0.472 0.412 0.677 0.719 0.329 0.241 0.463

Chromium mg/kg 40.4 9.03 46.6 30.5 34.3 48.2 31.2 35.6 47.8 7.5 46.6 7.61

Copper mg/kg 21.7 36.5 6.27 9.38 12.3 14.7 19.8 77.8 12.6 700 12.1 4.46

Lead mg/kg 41.5 54 18.1 16.7 15.3 25.7 29 102 21.6 354 23.1 2.81

Mercury mg/kg <0.14 <0.14 <0.14 <0.14 <0.14 <0.14 <0.14 <0.14 <0.14 2.21 <0.14 <0.14

Nickel mg/kg 28.2 15.1 31.8 20.3 30.1 18.9 27.3 26.9 31.3 4.16 29.6 23.5

Selenium mg/kg <1 2.29 1.68 <1 <1 1.18 <1 <1 <1 <1 <1 1.54

Vanadium mg/kg 62.3 14.4 71.9 55.7 55.2 81.8 60.1 64 79 9.53 79.4 16.7

Zinc mg/kg 105 29.2 52.3 61.9 80 51.8 78.5 120 82.1 105 91.8 31.8

Boron, water soluble mg/kg 3.71 11.7 7.15 2.54 1.31 4.28 1.19 2.75 1.96 6.56 1.13 9.14

Phenols, Total Detected monohydric mg/kg none detected 0.21 none detected none detected none detected none detected none detected none detected none detected 11.9 none detected none detected

GRO >C5-C12 µg/kg <44 <88 <44 <44 <44 898 <44 522 <44 536 <44 <88Methyl tertiary butyl ether (MTBE) µg/kg <5 <10 <5 <5 <5 <5 <5 <5 <5 <5 <5 <10

Benzene µg/kg <10 <20 <10 <10 <10 <10 <10 <10 <10 <10 <10 <20

Toluene µg/kg <2 <4 <2 <2 <2 <2 <2 <2 <2 8.1 <2 <4

Ethylbenzene µg/kg <3 24.5 <3 <3 <3 <3 <3 <3 <3 8.1 <3 <6

m,p-Xylene µg/kg <6 <12 <6 <6 <6 <6 <6 <6 <6 76.1 <6 <12

o-Xylene µg/kg <3 <6 <3 <3 <3 <3 <3 <3 <3 8.1 <3 <6

m,p,o-Xylene µg/kg none detected none detected 9 none detected 9 none detected none detected none detected 9 84.2 9 none detected

BTEX, Total µg/kg none detected 24.5 24 none detected 24 none detected none detected none detected 24 110 24 none detected

Aliphatics >C5-C6 µg/kg <10 <20 24 <10 <10 <10 <10 <10 <10 22.7 <10 25.3

Aliphatics >C6-C8 µg/kg <10 <20 <10 <10 <10 19 <10 12.3 <10 71.3 <10 <20

Aliphatics >C8-C10 µg/kg <10 <20 <10 <10 <10 96.9 <10 116 <10 82.6 <10 <20

Page 79: Report - LBBD

Natural Ground

Below GAC

Above GAC

Sample ID BH1 BH2 BH3 BH4 BH5 BH6 BH08 TP01 TP02 TP03 TP05 TP06

Sample Depth (m) 4.70- 4.90- 3.30- 1.30- 7.40- 2.40- 2.60- 2.70- 2.00- 2.00- 2.00- 3.00-

Sample date 20/06/2011 16/06/2011 15/06/2011 22/06/2011 14/06/2011 21/06/2011 13/06/2011 14/06/2011 15/06/2011 14/06/2011 14/06/2011 14/06/2011

Test Units

Aliphatics >C10-C12 µg/kg <10 <20 <10 <10 <10 424 <10 180 <10 122 <10 <20

Aliphatics >C12-C16 µg/kg 4630 7650 5800 2750 <100 13700 4840 3770 5530 6820 <100 <100

Aliphatics >C16-C21 µg/kg 1960 5190 7410 2730 <100 11400 4600 2670 10200 48500 <100 <100

Aliphatics >C21-C35 µg/kg 7030 35200 21100 7220 8900 36100 26100 15800 10100 392000 3450 37900

Aliphatics >C35-C44 µg/kg 552 1700 1900 <100 176 10300 3710 901 1440 83700 <100 2130

Total Aliphatics >C12-C44 µg/kg 14200 49700 36200 12700 9070 71500 39200 23100 27300 531000 3450 40000

Aromatics >EC7-EC8 µg/kg <10 <20 <10 <10 <10 <10 <10 <10 <10 <10 <10 <20

Aromatics >EC5-EC7 µg/kg <10 <20 <10 <10 <10 <10 <10 <10 <10 <10 <10 <20

Aromatics >EC8-EC10 µg/kg <10 38.5 <10 <10 <10 69.2 <10 84.7 <10 147 <10 <20

Aromatics >EC10-EC12 µg/kg <10 <20 <10 <10 <10 282 <10 120 <10 81 <10 <20

Aromatics >EC12-EC16 µg/kg 4840 13000 5120 <100 1510 35000 4830 5900 4310 9950 <100 14500

Aromatics >EC16-EC21 µg/kg 3520 11800 10100 <100 666 64500 6230 7640 11100 64600 <100 7510

Aromatics >EC21-EC35 µg/kg 24100 266000 111000 4370 23000 76800 27200 51900 15200 352000 23800 269000

Aromatics >EC35-EC44 µg/kg 7750 42500 27800 <100 4040 22900 7590 13300 7390 132000 5430 38900

Aromatics >EC40-EC44 µg/kg 3200 14000 9700 <100 491 8410 2150 3150 3540 58400 <100 6310Total Aromatics >EC12-EC44 µg/kg 40300 334000 154000 4370 29200 199000 45900 78800 38000 559000 29200 330000Total Aliphatics & Aromatics >C5-C44 µg/kg 54400 383000 191000 17100 38300 272000 85100 102000 65300 1090000 32700 370000

Total Aliphatics >C5-35 µg/kg 13600 48000 34400 12700 8900 61700 35500 22500 25800 448000 3450 38000

Total Aromatics >C5-35 µg/kg 32500 291000 127000 4370 25200 177000 38300 65600 30600 427000 23800 291000Total Aliphatics & Aromatics >C5-35 µg/kg 46100 339000 161000 17100 34100 238000 73800 88200 56400 875000 27300 329000

Naphthalene µg/kg 24.9 <9 830 17.1 <9 364 30.1 460 <9 2080 56.3 <9

Acenaphthylene µg/kg <12 <12 32.4 <12 <12 915 <12 17.8 <12 26.1 <12 <12

Acenaphthene µg/kg <8 <8 19.3 <8 <8 8200 <8 24.7 <8 202 <8 <8

Fluorene µg/kg <10 <10 21.6 <10 <10 4590 <10 30 <10 279 <10 <10

Phenanthrene µg/kg 21.2 <15 50 41.2 <15 13000 114 213 22.7 1720 30.8 <15

Anthracene µg/kg <16 <16 <16 <16 <16 2930 24.9 53.6 <16 357 <16 <16

Fluoranthene µg/kg <17 92.5 <17 <17 <17 6260 139 374 <17 1110 34.4 <17

Pyrene µg/kg <15 87.5 <15 <15 <15 4910 115 306 <15 911 31.3 <15

Benz(a)anthracene µg/kg <14 <14 <14 <14 <14 1590 68.4 158 <14 632 <14 <14

Chrysene µg/kg <10 <10 <10 <10 <10 1240 45.4 160 <10 498 <10 <10

Benzo(b)fluoranthene µg/kg <15 <15 <15 <15 <15 779 63.1 294 <15 736 <15 <15

Benzo(k)fluoranthene µg/kg <14 <14 <14 <14 <14 274 25.5 83.8 <14 250 <14 <14

Benzo(a)pyrene µg/kg <15 <15 <15 <15 <15 867 53.1 159 <15 538 <15 <15

Indeno(1,2,3-cd)pyrene µg/kg <18 <18 <18 <18 <18 268 25.9 118 <18 259 <18 <18

Dibenzo(a,h)anthracene µg/kg <23 <23 <23 <23 <23 106 <23 <23 <23 80 <23 <23

Page 80: Report - LBBD

Natural Ground

Below GAC

Above GAC

Sample ID BH1 BH2 BH3 BH4 BH5 BH6 BH08 TP01 TP02 TP03 TP05 TP06

Sample Depth (m) 4.70- 4.90- 3.30- 1.30- 7.40- 2.40- 2.60- 2.70- 2.00- 2.00- 2.00- 3.00-

Sample date 20/06/2011 16/06/2011 15/06/2011 22/06/2011 14/06/2011 21/06/2011 13/06/2011 14/06/2011 15/06/2011 14/06/2011 14/06/2011 14/06/2011

Test Units

Benzo(g,h,i)perylene µg/kg <24 <24 <24 <24 <24 322 37 161 <24 286 <24 <24PAH, Total Detected USEPA 16 µg/kg <118 180 953 <118 <118 46600 741 2610 <118 9970 153 <118

Page 81: Report - LBBD

Natural Ground

Below GAC

Above GAC

Sample ID

Sample Depth (m)

Sample date

Test Units

Fraction Organic Carbon (FOC) -

Ammoniacal Nitrogen as N mg/kg

pH pH Units

Cyanide, Total mg/kg

Sulphate, Total mg/kg

Arsenic mg/kg

Barium mg/kg

Beryllium mg/kg

Cadmium mg/kg

Chromium mg/kg

Copper mg/kg

Lead mg/kg

Mercury mg/kg

Nickel mg/kg

Selenium mg/kg

Vanadium mg/kg

Zinc mg/kg

Boron, water soluble mg/kg

Phenols, Total Detected monohydric mg/kg

GRO >C5-C12 µg/kgMethyl tertiary butyl ether (MTBE) µg/kg

Benzene µg/kg

Toluene µg/kg

Ethylbenzene µg/kg

m,p-Xylene µg/kg

o-Xylene µg/kg

m,p,o-Xylene µg/kg

BTEX, Total µg/kg

Aliphatics >C5-C6 µg/kg

Aliphatics >C6-C8 µg/kg

Aliphatics >C8-C10 µg/kg

TP07 TP08 TP9 TP10 TP11 TP12

2.50- 2.70- 1.35- 2.00- 1.00- 1.80-

14/06/2011 15/06/2011 13/06/2011 15/06/2011 14/06/2011 13/06/2011 Minimum Maximum US95 GAC

- 0.0142 - - - 0.00706 0.0157 -

254 153 128 235 102 64.6 60 254 184.7 -

8.24 8.41 8.12 9.42 8.02 8.27 6.77 9.42 -

<1 <1 <1 <1 <1 <1 <1 2300 16248

1380 505 2240 746 1190 190 91.7 239000 71942 -

15.7 41.8 17.4 272 10.5 27 6.79 272 94.09 640

67.6 52.1 57.9 44.3 48.5 35.3 16.4 318 132.7 -

1.24 1.04 1.16 0.77 1.42 0.917 0.133 1.93 1.19 -

0.704 0.655 0.457 2.07 0.715 0.376 0.241 2.07 1.041 230

41.9 33.5 33.9 153 50.1 28.5 7.5 153 72.44 330

22.9 27.8 31.7 26 17.7 9.5 4.46 700 224.3 75267

49.1 88.5 91 74.2 29.7 17.2 2.81 354 140.1 7998

<0.14 <0.14 <0.14 <0.14 <0.14 <0.14 0.14 2.21 26

29.5 23.6 26.4 20.8 33 24.4 4.16 33 31.98 1800

<1 <1 <1 <1 <1 <1 <1 2.29 13000

69.8 58.8 59.8 44 79 51.6 9.53 81.8 79.19 3764

83 89.3 99.4 4480 97.2 54.3 29.2 4480 2758 1103814

4.81 3.82 2.46 33.4 2.68 1.13 1.13 33.4 13.38 181668

none detected none detected none detected none detected none detected none detected 0.21 11.9 3200

<44 <44 113 <44 <44 <44 <44 898 -

<5 <5 <5 <5 <5 <5 <5 <10 -

<10 <10 <10 <10 <10 <10 <10 20 95000

<2 <2 8.1 6.75 <2 <2 <2 8.1 4400000

<3 <3 17.6 5.4 <3 <3 <3 24.5 2800000

<6 <6 <6 <6 <6 <6 <6 76.1 -

<3 <3 <3 <3 <3 <3 <3 8.1 2600000

9 none detected none detected 9 none detected none detected 9 84.2 -

24 none detected 25.7 31.2 none detected none detected 24 110 -

<10 <10 24.3 <10 <10 <10 <10 25.3 4572530

<10 <10 <10 <10 <10 <10 <10 71.3 16089875

<10 <10 18.9 10.8 <10 <10 <10 116 4659873

Page 82: Report - LBBD

Natural Ground

Below GAC

Above GAC

Sample ID

Sample Depth (m)

Sample date

Test Units

Aliphatics >C10-C12 µg/kg

Aliphatics >C12-C16 µg/kg

Aliphatics >C16-C21 µg/kg

Aliphatics >C21-C35 µg/kg

Aliphatics >C35-C44 µg/kg

Total Aliphatics >C12-C44 µg/kg

Aromatics >EC7-EC8 µg/kg

Aromatics >EC5-EC7 µg/kg

Aromatics >EC8-EC10 µg/kg

Aromatics >EC10-EC12 µg/kg

Aromatics >EC12-EC16 µg/kg

Aromatics >EC16-EC21 µg/kg

Aromatics >EC21-EC35 µg/kg

Aromatics >EC35-EC44 µg/kg

Aromatics >EC40-EC44 µg/kgTotal Aromatics >EC12-EC44 µg/kgTotal Aliphatics & Aromatics >C5-C44 µg/kg

Total Aliphatics >C5-35 µg/kg

Total Aromatics >C5-35 µg/kgTotal Aliphatics & Aromatics >C5-35 µg/kg

Naphthalene µg/kg

Acenaphthylene µg/kg

Acenaphthene µg/kg

Fluorene µg/kg

Phenanthrene µg/kg

Anthracene µg/kg

Fluoranthene µg/kg

Pyrene µg/kg

Benz(a)anthracene µg/kg

Chrysene µg/kg

Benzo(b)fluoranthene µg/kg

Benzo(k)fluoranthene µg/kg

Benzo(a)pyrene µg/kg

Indeno(1,2,3-cd)pyrene µg/kg

Dibenzo(a,h)anthracene µg/kg

TP07 TP08 TP9 TP10 TP11 TP12

2.50- 2.70- 1.35- 2.00- 1.00- 1.80-

14/06/2011 15/06/2011 13/06/2011 15/06/2011 14/06/2011 13/06/2011 Minimum Maximum US95 GAC

<10 <10 <10 <10 <10 <10 <10 424 25185731

3470 <100 105000 5660 3290 15400 <100 105000 82752861

3370 <100 9530 14700 2440 <100 <100 48500 1445084326

11200 4400 16900 72100 8040 <100 <100 392000 131781 1445981494

968 <100 1800 6860 832 <100 <100 83700 26496 -

19000 4400 133000 99300 14600 15400 3450 531000 -

<10 <10 <10 <10 <10 <10 <10 20 3980564

<10 <10 <10 <10 <10 <10 <10 20 1437536

<10 <10 35.1 13.5 <10 <10 <10 147 7244634

<10 <10 <10 <10 <10 <10 <10 282 29973745

4500 <100 57300 7130 4390 5920 <100 57300 59838849

13800 <100 59500 3940 12300 <100 <100 64600 38370 56279953

21200 14800 62000 34800 25100 13300 4370 352000 186053 57031190

8700 2390 9340 8190 8810 2900 <100 132000 50917 -

3810 <100 1500 3130 3540 <100 <100 58400 20557 -

48300 17200 188000 54100 50600 22100 4370 559000 -

67300 21700 321000 153000 65200 37500 17100 1090000 -

18100 4430 131000 92500 13800 15400 3450 448000 -

39600 14900 179000 45900 41800 19200 4370 427000 -

57600 19300 310000 138000 55600 34600 17100 875000 -

51.5 18.5 84.1 48.6 15.7 271 <9 2080 765.3 1405112

<12 <12 <12 <12 <12 21.1 <12 915 108564935

<8 <8 133 <8 <8 48.6 <8 8200 111281967

<10 <10 114 <10 <10 36.4 <10 4590 75262069

59.5 38.1 103 38 32.6 81 <15 13000 4004 56762475

<16 <16 106 <16 <16 23.2 <16 2930 567815556

41.6 <17 59.7 <17 24.4 25.9 <17 6260 75794709

34.5 <15 49.9 <15 22.6 <15 <15 4910 56844546

21.9 35.3 24.9 <14 <14 <14 <14 1590 100008

21.9 20.9 21.9 <10 <10 <10 <10 1240 145317

35.6 42.4 39.2 <15 <15 <15 <15 779 103736

<14 <14 <14 <14 <14 <14 <14 274 146652

21.9 25.2 25.5 <15 <15 <15 <15 867 14650

<18 <18 <18 <18 <18 <18 <18 268 63121

<23 <23 <23 <23 <23 <23 <23 106 2937

Page 83: Report - LBBD

Natural Ground

Below GAC

Above GAC

Sample ID

Sample Depth (m)

Sample date

Test Units

Benzo(g,h,i)perylene µg/kgPAH, Total Detected USEPA 16 µg/kg

TP07 TP08 TP9 TP10 TP11 TP12

2.50- 2.70- 1.35- 2.00- 1.00- 1.80-

14/06/2011 15/06/2011 13/06/2011 15/06/2011 14/06/2011 13/06/2011 Minimum Maximum US95 GAC

<24 <24 <24 <24 <24 <24 <24 322 56888847

288 180 762 <118 <118 507 118 46600 -

Page 84: Report - LBBD

Groundwater vs screening criteria

Result exceeds screening criteria

Borehole ID BH1d BH1D BH1D BH2d BH2D BH2D BH3d BH3D

Date 29/06/2011 06/07/2011 20/07/2011 29/06/2011 06/07/2011 20/07/2011 29/06/2011 06/07/2011

Test Units LOD Screening value

InorganicsAmmoniacal Nitrogen as N mg/l <0.2 - 5 5.6 5.53 12.1 13.4 14.1 8.52 8.65

Conductivity @ 20 deg.C mS/cm <0.005 - 2.98 2.5

Sulphate mg/l <2 250 315 329 361 198 215 237 483 465

Cyanide, Total mg/l <0.05 0.05 <0.05 <0.05 <0.05 0.079 0.087 0.095 <0.05 <0.05

pH pH Units <1 - 7.78 7.1 7.87 7.64 7.1 8.13 7.79 7.04

Filtered (Dissolved) MetalsArsenic (diss.filt) µg/l <0.12 25 2.15 3.42 2.58 154 226 34.5 8.79 9.07

Barium (diss.filt) µg/l <0.03 - 175 156 103 78.7 51 41.7 230 215

Beryllium (diss.filt) µg/l <0.07 - <0.07 <0.07 <0.07 <0.07 <0.07 <0.07 0.218 <0.07

Boron (diss.filt) µg/l <9.4 1000 323 488 546 636 742 797 886 907

Cadmium (diss.filt) µg/l <0.1 0.2 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 20 <0.1

Chromium (diss.filt) µg/l <0.22 50 48.6 31.9 21 55.3 31.1 23.9 20.3 21.4

Copper (diss.filt) µg/l <0.85 6 1.48 1.31 2.4 1.38 0.994 1.58 3.1 1.48

Lead (diss.filt) µg/l <0.02 7.2 0.064 <0.02 0.129 <0.02 0.03 0.088 4.73 0.043

Nickel (diss.filt) µg/l <0.15 20 9.52 9.51 9.33 7.27 6.34 5.26 4.04 7.15

Selenium (diss.filt) µg/l <0.39 10 6.52 4.59 3.43 8.51 7.58 5.71 30.9 25

Vanadium (diss.filt) µg/l <0.24 20 14 9.84 6.4 16.9 9.95 7.8 5.12 5.61

Zinc (diss.filt) µg/l <0.41 50 9.54 5.12 3.63 3.26 2.71 1.55 17.6 5.84

Mercury (diss.filt) µg/l <0.01 0.05 <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 <0.01

PhenolsPhenols, Total Detected monohydric mg/l 0.0005 none detected none detected none detected none detected none detected none detected none detected none detected

Speciated EPH CWGTotal Aliphatics & Aromatics >C12-C35 (Aqueous) µg/l <10 - <10 <10

GRO >C5-C12 µg/l <50 - <50 <50 <50 <50 <50 <50 <50 <50

Methyl tertiary butyl ether (MTBE) µg/l <3 - <3 <3 <3 <3 <3 <3 <3 <3

Benzene µg/l <7 1 <7 <7 <7 <7 <7 <7 <7 <7

Toluene µg/l <4 40 <4 <4 <4 <4 <4 <4 <4 <4

Ethylbenzene µg/l <5 20 <5 <5 <5 <5 <5 <5 <5 <5

m,p-Xylene µg/l <8 - <8 <8 <8 <8 <8 <8 <8 <8

o-Xylene µg/l <3 - <3 <3 <3 <3 <3 <3 <3 <3

m,p,o-Xylene µg/l - none detected none detected none detected none detected none detected none detected none detected none detected

BTEX, Total µg/l - none detected none detected none detected none detected none detected none detected none detected none detected

Aliphatics >C5-C6 µg/l <10 10 <10 <10 <10 <10 <10 <10 <10 <10

Aliphatics >C6-C8 µg/l <10 10 <10 <10 <10 <10 <10 <10 <10 <10

Aliphatics >C8-C10 µg/l <10 10 <10 <10 <10 <10 <10 <10 <10 <10

Aliphatics >C10-C12 µg/l <10 10 <10 <10 <10 <10 <10 <10 <10 <10

TPH Criteria Working Group (TPH

Page 85: Report - LBBD

Groundwater vs screening criteria

Result exceeds screening criteria

Borehole ID BH1d BH1D BH1D BH2d BH2D BH2D BH3d BH3D

Date 29/06/2011 06/07/2011 20/07/2011 29/06/2011 06/07/2011 20/07/2011 29/06/2011 06/07/2011

Test Units LOD Screening value

Aliphatics >C12-C16 (aq) µg/l <10 10 <10 <10 <10 <10 <10 <10 <10 <10

Aliphatics >C16-C21 (aq) µg/l <10 10 <10 <10 <10 <10 <10 <10 <10 <10

Aliphatics >C21-C35 (aq) µg/l <10 10 <10 <10 - <10 <10 - <10 <10

Total Aliphatics >C12-C35 (aq) µg/l <10 10 <10 <10 <10 <10 <10 <10 <10 <10

Aromatics >EC5-EC7 µg/l <10 10 <10 <10 <10 <10 <10 <10 <10 <10

Aromatics >EC7-EC8 µg/l <10 10 <10 <10 <10 <10 <10 <10 <10 <10

Aromatics >EC8-EC10 µg/l <10 10 <10 <10 <10 <10 <10 <10 <10 <10

Aromatics >EC10-EC12 µg/l <10 10 <10 <10 <10 <10 <10 <10 <10 <10

Aromatics >EC12-EC16 (aq) µg/l <10 10 <10 <10 <10 <10 <10 <10 <10 <10

Aromatics >EC16-EC21 (aq) µg/l <10 10 <10 <10 <10 <10 <10 <10 <10 <10

Aromatics >EC21-EC35 (aq) µg/l <10 10 <10 <10 <10 <10 <10 <10 <10 <10

Total Aromatics >EC12-EC35 (aq) µg/l <10 10 <10 <10 <10 <10 <10 <10 <10 <10Total Aliphatics & Aromatics >C5-35 (aq) µg/l <10 10 <10 <10 <10 <10 <10 <10 <10 <10

Polyaromatic Hydrocarbons (PAHs)Naphthalene (aq) µg/l <0.1 1.2 <0.1 0.11 <0.1 <0.1 0.101 <0.1 0.124 <0.1

Acenaphthene (aq) µg/l <0.015 - 0.0153 <0.015 <0.015 0.0223 0.0188 <0.015 <0.015 <0.015

Acenaphthylene (aq) µg/l <0.011 - <0.011 <0.011 <0.011 <0.011 <0.011 <0.011 <0.011 <0.011

Fluoranthene (aq) µg/l <0.017 0.1 <0.017 <0.017 <0.017 0.0188 0.026 0.0233 <0.017 <0.017

Anthracene (aq) µg/l <0.015 0.1 <0.015 <0.015 <0.015 <0.015 <0.015 <0.015 <0.015 <0.015

Phenanthrene (aq) µg/l <0.022 - <0.022 <0.022 <0.022 <0.022 <0.022 <0.022 <0.022 <0.022

Fluorene (aq) µg/l <0.014 - <0.014 <0.014 <0.014 <0.014 <0.014 <0.014 <0.014 <0.014

Chrysene (aq) µg/l <0.013 - <0.013 <0.013 <0.013 <0.013 0.0158 <0.013 <0.013 <0.013

Pyrene (aq) µg/l <0.015 - <0.015 <0.015 <0.015 0.0199 0.0285 0.0285 <0.015 <0.015

Benzo(a)anthracene (aq) µg/l <0.017 - <0.017 <0.017 <0.017 <0.017 0.0192 <0.017 <0.017 <0.017

Benzo(b)fluoranthene (aq) µg/l <0.023 - <0.023 <0.023 <0.023 <0.023 <0.023 <0.023 <0.023 <0.023

Benzo(k)fluoranthene (aq) µg/l <0.027 - <0.027 <0.027 <0.027 <0.027 <0.027 <0.027 <0.027 <0.027sum of benzo(b)fluoranthene & benzo(k)fluoranthene µg/l <0.05 0.03 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05

Benzo(a)pyrene (aq) µg/l <0.009 0.01 <0.009 <0.009 <0.009 <0.009 <0.009 <0.009 <0.009 <0.009

Dibenzo(a,h)anthracene (aq) µg/l <0.016 - <0.016 <0.016 <0.016 <0.016 <0.016 <0.016 <0.016 <0.016

Benzo(g,h,i)perylene (aq) µg/l <0.016 - <0.016 <0.016 <0.016 <0.016 <0.016 <0.016 <0.016 <0.016

Indeno(1,2,3-cd)pyrene (aq) µg/l <0.014 - <0.014 <0.014 <0.014 <0.014 <0.014 <0.014 <0.014 <0.014sum of benzo(ghi)perylene & indeno(123-cd)pyrene µg/l <0.03 0.002 <0.03 <0.03 <0.03 <0.03 <0.03 <0.03 <0.03 <0.03

PAH, Total Detected USEPA 16 (aq) µg/l - 0.0153 0.11 none detected 0.061 0.209 0.0518 0.124 none detected

Total DWS PAH µg/l 0.1 <0.08 <0.08 <0.08 <0.08 <0.08 <0.08 <0.08 <0.08

Page 86: Report - LBBD

Groundwater vs screening criteria

Result exceeds screening criteria

Borehole ID

Date

Test Units LOD Screening value

InorganicsAmmoniacal Nitrogen as N mg/l <0.2 -

Conductivity @ 20 deg.C mS/cm <0.005 -

Sulphate mg/l <2 250

Cyanide, Total mg/l <0.05 0.05

pH pH Units <1 -

Filtered (Dissolved) MetalsArsenic (diss.filt) µg/l <0.12 25

Barium (diss.filt) µg/l <0.03 -

Beryllium (diss.filt) µg/l <0.07 -

Boron (diss.filt) µg/l <9.4 1000

Cadmium (diss.filt) µg/l <0.1 0.2

Chromium (diss.filt) µg/l <0.22 50

Copper (diss.filt) µg/l <0.85 6

Lead (diss.filt) µg/l <0.02 7.2

Nickel (diss.filt) µg/l <0.15 20

Selenium (diss.filt) µg/l <0.39 10

Vanadium (diss.filt) µg/l <0.24 20

Zinc (diss.filt) µg/l <0.41 50

Mercury (diss.filt) µg/l <0.01 0.05

PhenolsPhenols, Total Detected monohydric mg/l 0.0005

Speciated EPH CWGTotal Aliphatics & Aromatics >C12-C35 (Aqueous) µg/l <10 -

GRO >C5-C12 µg/l <50 -

Methyl tertiary butyl ether (MTBE) µg/l <3 -

Benzene µg/l <7 1

Toluene µg/l <4 40

Ethylbenzene µg/l <5 20

m,p-Xylene µg/l <8 -

o-Xylene µg/l <3 -

m,p,o-Xylene µg/l -

BTEX, Total µg/l -

Aliphatics >C5-C6 µg/l <10 10

Aliphatics >C6-C8 µg/l <10 10

Aliphatics >C8-C10 µg/l <10 10

Aliphatics >C10-C12 µg/l <10 10

TPH Criteria Working Group (TPH

BH3D BH4d BH4D BH4D BH5d BH5D BH5D BH6d

20/07/2011 29/06/2011 06/07/2011 20/07/2011 29/06/2011 06/07/2011 20/07/2011 29/06/2011

8.91 5.42 7.81 9.19 9.87 12 10.9 -

8.66 2.4 4.77

464 10.7 <2 2.9 1150 1130 1110 -

<0.05 <0.05 <0.05 0.062 <0.05 <0.05 <0.05 -

8.25 7.4 7.1 8.17 7.31 6.98 7.63 7.51

5.86 5.77 8.83 7.37 6.48 5.87 5.32 16.1

203 290 490 457 55.9 48 49.8 192

<0.07 <0.07 <0.07 <0.07 <0.07 <0.07 <0.07 <0.07

917 481 668 833 812 795 842 815

<0.1 <0.1 <0.1 <0.1 6.36 0.254 0.318 16.8

17.8 55.1 33.9 25 29.7 26.5 20.5 21

2.3 1.47 1.21 10.8 6.4 8.41 12.5 0.892

0.038 <0.02 <0.02 0.093 0.477 0.08 0.182 2.47

7.23 7.24 8.23 7.31 19.6 25 25.1 4.31

17.3 10.4 7.51 5.54 14.2 11.6 9.96 28.3

4.49 17 11.1 8.15 11 11.8 10.1 5.1

4.6 7.21 7.19 6.64 124 139 142 16.9

<0.01 <0.01 <0.01 <0.01 0.011 0.012 0.0165 <0.01

none detected none detected none detected none detected none detected none detected none detected -

- - -

<50 <50 <50 <50 <50 <50 <50 <50

<3 <3 <3 <3 <3 <3 <3 <3

<7 <7 <7 <7 <7 <7 <7 <7

<4 <4 <4 <4 <4 <4 <4 <4

<5 <5 <5 <5 <5 <5 <5 <5

<8 <8 <8 <8 <8 <8 <8 <8

<3 <3 <3 <3 <3 <3 <3 <3

none detected none detected none detected none detected none detected none detected none detected none detected

none detected none detected none detected none detected none detected none detected none detected none detected

<10 <10 <10 <10 <10 <10 <10 <10

<10 <10 <10 <10 <10 <10 <10 <10

<10 <10 <10 <10 <10 <10 <10 <10

<10 <10 <10 <10 <10 <10 <10 <10

Page 87: Report - LBBD

Groundwater vs screening criteria

Result exceeds screening criteria

Borehole ID

Date

Test Units LOD Screening value

Aliphatics >C12-C16 (aq) µg/l <10 10

Aliphatics >C16-C21 (aq) µg/l <10 10

Aliphatics >C21-C35 (aq) µg/l <10 10

Total Aliphatics >C12-C35 (aq) µg/l <10 10

Aromatics >EC5-EC7 µg/l <10 10

Aromatics >EC7-EC8 µg/l <10 10

Aromatics >EC8-EC10 µg/l <10 10

Aromatics >EC10-EC12 µg/l <10 10

Aromatics >EC12-EC16 (aq) µg/l <10 10

Aromatics >EC16-EC21 (aq) µg/l <10 10

Aromatics >EC21-EC35 (aq) µg/l <10 10

Total Aromatics >EC12-EC35 (aq) µg/l <10 10Total Aliphatics & Aromatics >C5-35 (aq) µg/l <10 10

Polyaromatic Hydrocarbons (PAHs)Naphthalene (aq) µg/l <0.1 1.2

Acenaphthene (aq) µg/l <0.015 -

Acenaphthylene (aq) µg/l <0.011 -

Fluoranthene (aq) µg/l <0.017 0.1

Anthracene (aq) µg/l <0.015 0.1

Phenanthrene (aq) µg/l <0.022 -

Fluorene (aq) µg/l <0.014 -

Chrysene (aq) µg/l <0.013 -

Pyrene (aq) µg/l <0.015 -

Benzo(a)anthracene (aq) µg/l <0.017 -

Benzo(b)fluoranthene (aq) µg/l <0.023 -

Benzo(k)fluoranthene (aq) µg/l <0.027 -sum of benzo(b)fluoranthene & benzo(k)fluoranthene µg/l <0.05 0.03

Benzo(a)pyrene (aq) µg/l <0.009 0.01

Dibenzo(a,h)anthracene (aq) µg/l <0.016 -

Benzo(g,h,i)perylene (aq) µg/l <0.016 -

Indeno(1,2,3-cd)pyrene (aq) µg/l <0.014 -sum of benzo(ghi)perylene & indeno(123-cd)pyrene µg/l <0.03 0.002

PAH, Total Detected USEPA 16 (aq) µg/l -

Total DWS PAH µg/l 0.1

BH3D BH4d BH4D BH4D BH5d BH5D BH5D BH6d

20/07/2011 29/06/2011 06/07/2011 20/07/2011 29/06/2011 06/07/2011 20/07/2011 29/06/2011

<10 <10 <10 <10 <10 <10 <10 <10

<10 <10 <10 <10 <10 <10 <10 <10

<10 <10 <10 <10 <10 <10 <10 <10

<10 <10 <10 <10 <10 <10 <10 <10

<10 <10 <10 <10 <10 <10 <10 <10

<10 <10 <10 <10 <10 <10 <10 <10

<10 <10 <10 <10 <10 <10 <10 <10

<10 <10 <10 <10 <10 <10 <10 <10

<10 <10 <10 <10 <10 <10 <10 <10

<10 <10 <10 <10 <10 <10 <10 <10

<10 <10 <10 <10 <10 <10 <10 <10

<10 <10 <10 <10 <10 <10 <10 <10

<10 <10 <10 <10 <10 <10 <10 <10

<0.1 <0.1 0.115 <0.1 0.116 <0.1 <0.1 <0.1

<0.015 0.0942 0.0767 0.0393 <0.015 <0.015 <0.015 <0.015

<0.011 <0.011 <0.011 <0.011 <0.011 <0.011 <0.011 0.0624

<0.017 <0.017 <0.017 <0.017 <0.017 <0.017 <0.017 0.0681

<0.015 <0.015 <0.015 <0.015 <0.015 <0.015 <0.015 0.0267

<0.022 0.0783 0.09 0.0719 <0.022 <0.022 <0.022 <0.022

<0.014 0.0538 0.0496 0.0407 <0.014 <0.014 <0.014 0.0179

<0.013 <0.013 <0.013 <0.013 <0.013 <0.013 <0.013 <0.013

<0.015 <0.015 <0.015 <0.015 <0.015 <0.015 <0.015 0.0385

<0.017 <0.017 <0.017 <0.017 <0.017 <0.017 <0.017 <0.017

<0.023 <0.023 <0.023 <0.023 <0.023 <0.023 <0.023 <0.023

<0.027 <0.027 <0.027 <0.027 <0.027 <0.027 <0.027 <0.027

<0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05

<0.009 <0.009 <0.009 <0.009 <0.009 <0.009 <0.009 <0.009

<0.016 <0.016 <0.016 <0.016 <0.016 <0.016 <0.016 <0.016

<0.016 <0.016 <0.016 <0.016 <0.016 <0.016 <0.016 <0.016

<0.014 <0.014 <0.014 <0.014 <0.014 <0.014 <0.014 <0.014

<0.03 <0.03 <0.03 <0.03 <0.03 <0.03 <0.03 <0.03

none detected 0.226 0.331 0.152 0.116 none detected none detected 0.214

<0.08 <0.08 <0.08 <0.08 <0.08 <0.08 <0.08 <0.08

Page 88: Report - LBBD

Groundwater vs screening criteria

Result exceeds screening criteria

Borehole ID

Date

Test Units LOD Screening value

InorganicsAmmoniacal Nitrogen as N mg/l <0.2 -

Conductivity @ 20 deg.C mS/cm <0.005 -

Sulphate mg/l <2 250

Cyanide, Total mg/l <0.05 0.05

pH pH Units <1 -

Filtered (Dissolved) MetalsArsenic (diss.filt) µg/l <0.12 25

Barium (diss.filt) µg/l <0.03 -

Beryllium (diss.filt) µg/l <0.07 -

Boron (diss.filt) µg/l <9.4 1000

Cadmium (diss.filt) µg/l <0.1 0.2

Chromium (diss.filt) µg/l <0.22 50

Copper (diss.filt) µg/l <0.85 6

Lead (diss.filt) µg/l <0.02 7.2

Nickel (diss.filt) µg/l <0.15 20

Selenium (diss.filt) µg/l <0.39 10

Vanadium (diss.filt) µg/l <0.24 20

Zinc (diss.filt) µg/l <0.41 50

Mercury (diss.filt) µg/l <0.01 0.05

PhenolsPhenols, Total Detected monohydric mg/l 0.0005

Speciated EPH CWGTotal Aliphatics & Aromatics >C12-C35 (Aqueous) µg/l <10 -

GRO >C5-C12 µg/l <50 -

Methyl tertiary butyl ether (MTBE) µg/l <3 -

Benzene µg/l <7 1

Toluene µg/l <4 40

Ethylbenzene µg/l <5 20

m,p-Xylene µg/l <8 -

o-Xylene µg/l <3 -

m,p,o-Xylene µg/l -

BTEX, Total µg/l -

Aliphatics >C5-C6 µg/l <10 10

Aliphatics >C6-C8 µg/l <10 10

Aliphatics >C8-C10 µg/l <10 10

Aliphatics >C10-C12 µg/l <10 10

TPH Criteria Working Group (TPH

BH6D BH6D BH7d BH7D BH7D BH8d BH8D BH8D

06/07/2011 20/07/2011 29/06/2011 06/07/2011 20/07/2011 29/06/2011 06/07/2011 20/07/2011

- - 2.75 3.27 3.19 - - -

5.06 2.37 10.6

- - 986 1070 1060 - - -

- - 0.093 0.116 0.103 - - -

7.09 8.11 7.86 7.3 7.91 7.56 6.98 8.25

34.3 17 2.22 4.69 2.26 14.2 24.3 15.7

207 165 53.9 40.9 39.6 195 190 194

<0.07 <0.07 <0.07 <0.07 <0.07 <0.07 <0.07 <0.07

740 852 418 306 396 622 765 824

<0.1 <0.1 <0.1 <0.1 <0.1 3.08 <0.1 <0.1

22 16.2 21 14 11.4 37.1 23.4 17.9

1.33 2.28 4.09 1.94 15.1 1.1 1.48 2.16

0.024 0.811 <0.02 0.021 0.038 0.589 0.036 0.055

6.58 7.43 8.49 9.69 9.79 6.98 5.99 6.31

19 15.7 2.33 1.54 1.02 35.4 29.2 22.6

6.5 4.68 6.39 4.8 4.09 10.3 6.6 4.53

2.83 2.57 3.82 2.07 3.92 20.1 15.6 10

<0.01 <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 <0.01

- - none detected none detected none detected - - -

- - -

<50 <50 <50 <50 <50 <50 <50 <50

<3 <3 <3 <3 <3 <3 <3 <3

<7 <7 <7 <7 <7 <7 <7 <7

<4 <4 <4 <4 <4 <4 <4 <4

<5 <5 <5 <5 <5 <5 <5 <5

<8 <8 <8 <8 <8 <8 <8 <8

<3 <3 <3 <3 <3 <3 <3 <3

none detected none detected none detected none detected none detected none detected none detected none detected

none detected none detected none detected none detected none detected none detected none detected none detected

<10 <10 <10 <10 <10 <10 <10 <10

<10 <10 <10 <10 <10 <10 <10 <10

<10 <10 <10 <10 <10 <10 <10 <10

<10 <10 <10 <10 <10 <10 <10 <10

Page 89: Report - LBBD

Groundwater vs screening criteria

Result exceeds screening criteria

Borehole ID

Date

Test Units LOD Screening value

Aliphatics >C12-C16 (aq) µg/l <10 10

Aliphatics >C16-C21 (aq) µg/l <10 10

Aliphatics >C21-C35 (aq) µg/l <10 10

Total Aliphatics >C12-C35 (aq) µg/l <10 10

Aromatics >EC5-EC7 µg/l <10 10

Aromatics >EC7-EC8 µg/l <10 10

Aromatics >EC8-EC10 µg/l <10 10

Aromatics >EC10-EC12 µg/l <10 10

Aromatics >EC12-EC16 (aq) µg/l <10 10

Aromatics >EC16-EC21 (aq) µg/l <10 10

Aromatics >EC21-EC35 (aq) µg/l <10 10

Total Aromatics >EC12-EC35 (aq) µg/l <10 10Total Aliphatics & Aromatics >C5-35 (aq) µg/l <10 10

Polyaromatic Hydrocarbons (PAHs)Naphthalene (aq) µg/l <0.1 1.2

Acenaphthene (aq) µg/l <0.015 -

Acenaphthylene (aq) µg/l <0.011 -

Fluoranthene (aq) µg/l <0.017 0.1

Anthracene (aq) µg/l <0.015 0.1

Phenanthrene (aq) µg/l <0.022 -

Fluorene (aq) µg/l <0.014 -

Chrysene (aq) µg/l <0.013 -

Pyrene (aq) µg/l <0.015 -

Benzo(a)anthracene (aq) µg/l <0.017 -

Benzo(b)fluoranthene (aq) µg/l <0.023 -

Benzo(k)fluoranthene (aq) µg/l <0.027 -sum of benzo(b)fluoranthene & benzo(k)fluoranthene µg/l <0.05 0.03

Benzo(a)pyrene (aq) µg/l <0.009 0.01

Dibenzo(a,h)anthracene (aq) µg/l <0.016 -

Benzo(g,h,i)perylene (aq) µg/l <0.016 -

Indeno(1,2,3-cd)pyrene (aq) µg/l <0.014 -sum of benzo(ghi)perylene & indeno(123-cd)pyrene µg/l <0.03 0.002

PAH, Total Detected USEPA 16 (aq) µg/l -

Total DWS PAH µg/l 0.1

BH6D BH6D BH7d BH7D BH7D BH8d BH8D BH8D

06/07/2011 20/07/2011 29/06/2011 06/07/2011 20/07/2011 29/06/2011 06/07/2011 20/07/2011

<10 <10 <10 <10 <10 <10 <10 <10

<10 <10 <10 <10 <10 <10 <10 <10

<10 <10 <10 <10 <10 <10 <10 <10

<10 <10 <10 <10 <10 <10 <10 <10

<10 <10 <10 <10 <10 <10 <10 <10

<10 <10 <10 <10 <10 <10 <10 <10

<10 <10 <10 <10 <10 <10 <10 <10

<10 <10 <10 <10 <10 <10 <10 <10

<10 <10 <10 <10 <10 <10 <10 <10

<10 <10 <10 <10 <10 <10 <10 <10

<10 <10 <10 <10 <10 <10 <10 <10

<10 <10 <10 <10 <10 <10 <10 <10

<10 <10 <10 <10 <10 <10 <10 <10

<0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1

1.27 2.28 <0.015 <0.015 <0.015 <0.015 <0.015 <0.015

0.0501 0.0661 <0.011 <0.011 <0.011 <0.011 <0.011 <0.011

0.0889 0.0461 <0.017 <0.017 <0.017 <0.017 <0.017 <0.017

<0.015 0.0224 <0.015 <0.015 <0.015 <0.015 <0.015 <0.015

<0.022 <0.022 <0.022 <0.022 <0.022 <0.022 <0.022 <0.022

0.0185 0.0162 <0.014 <0.014 <0.014 <0.014 <0.014 <0.014

<0.013 <0.013 <0.013 <0.013 <0.013 <0.013 <0.013 <0.013

0.0571 0.0317 <0.015 <0.015 <0.015 <0.015 <0.015 <0.015

<0.017 <0.017 <0.017 <0.017 <0.017 <0.017 <0.017 <0.017

<0.023 <0.023 <0.023 <0.023 <0.023 <0.023 <0.023 <0.023

<0.027 <0.027 <0.027 <0.027 <0.027 <0.027 <0.027 <0.027

<0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05

<0.009 <0.009 <0.009 <0.009 <0.009 <0.009 <0.009 <0.009

<0.016 <0.016 <0.016 <0.016 <0.016 <0.016 <0.016 <0.016

<0.016 <0.016 <0.016 <0.016 <0.016 <0.016 <0.016 <0.016

<0.014 <0.014 <0.014 <0.014 <0.014 <0.014 <0.014 <0.014

<0.03 <0.03 <0.03 <0.03 <0.03 <0.03 <0.03 <0.03

1.49 2.46 none detected none detected none detected none detected none detected none detected

<0.08 <0.08 <0.08 <0.08 <0.08 <0.08 <0.08 <0.08

Page 90: Report - LBBD

Leachate data verses screening criteria

Result exceeds screening criteria

Location ID TP12 TP9 BH2 TP10

Sample Depth 1.80- 1.00- 4.90- 2.00-

Date 13/06/2011 13/06/2011 16/06/2011 15/06/2011

Test Units LOD Screening value

InorganicsNRA - Ammoniacal Nitrogen as N mg/l <0.2 - 2 0.304 3.28 1.63

NRA - Sulphate mg/l <2 250 <2 <2 80.4 <20

NRA - Cyanide, Total mg/l <0.05 0.05 <0.05 <0.05 <0.05 0.098

NRA - pH pH Units <1 - 8.3 7.86 8.19 9.49

Filtered (Dissolved) MetalsNRA - Arsenic (diss.filt) µg/l <0.12 25 5.32 4.7 2.99 1160

NRA - Barium (diss.filt) µg/l <0.03 - 3.69 73.6 6.59 13.9

NRA - Beryllium (diss.filt) µg/l <0.07 - <0.07 <0.07 <0.07 0.123

NRA - Boron (diss.filt) µg/l <9.4 1000 109 78 650 234

NRA - Cadmium (diss.filt) µg/l <0.1 0.2 <0.1 <0.1 <0.1 <0.1

NRA - Chromium (diss.filt) µg/l <0.22 50 2.23 2.16 4.5 16.1

NRA - Copper (diss.filt) µg/l <0.85 6 <0.85 <0.85 1.7 23.1

NRA - Lead (diss.filt) µg/l <0.02 7.2 1.1 2.87 25.3 21.9

NRA - Nickel (diss.filt) µg/l <0.15 20 1.31 4.27 1.21 51.7

NRA - Selenium (diss.filt) µg/l <0.39 10 0.413 <0.39 0.862 2.8

NRA - Vanadium (diss.filt) µg/l <0.24 20 1.83 0.943 2.3 98.7

NRA - Zinc (diss.filt) µg/l <0.41 50 1.31 10.1 1.97 9.59

NRA - Mercury (diss.filt) µg/l <0.01 0.05 <0.01 <0.01 <0.01 0.155

PhenolsNRA - Phenols, Total Detected monohydric mg/l 0.0005 0.01 0.03 none detected none detected

TPH Criteria Working Group

NRA - Total Aliphatics & Aromatics >C5-35 (aq) µg/l <10 - <10 47 <10 <10

TPH Criteria Working Group NRA - GRO >C5-C12 µg/l <50 - <50 <50 <50 <50

NRA - Methyl tertiary butyl ether (MTBE) µg/l <3 - <3 <3 <3 <3

NRA - Benzene µg/l <7 1 <7 <7 <7 <7

Page 91: Report - LBBD

Leachate data verses screening criteria

Result exceeds screening criteria

Location ID TP12 TP9 BH2 TP10

Sample Depth 1.80- 1.00- 4.90- 2.00-

Date 13/06/2011 13/06/2011 16/06/2011 15/06/2011

Test Units LOD Screening value

NRA - Toluene µg/l <4 40 <4 <4 <4 <4

NRA - Ethylbenzene µg/l <5 20 <5 <5 <5 <5

NRA - m,p-Xylene µg/l <8 - <8 <8 <8 <8

NRA - o-Xylene µg/l <3 - <3 <3 <3 <3

NRA - m,p,o-Xylene µg/l - none detected none detected none detected none detected

NRA - BTEX, Total µg/l - none detected none detected none detected none detected

NRA - Aliphatics >C5-C6 µg/l <10 10 <10 <10 <10 <10

NRA - Aliphatics >C6-C8 µg/l <10 10 <10 <10 <10 <10

NRA - Aliphatics >C8-C10 µg/l <10 10 <10 <10 <10 <10

NRA - Aliphatics >C10-C12 µg/l <10 10 <10 16 <10 <10

NRA - Aliphatics >C12-C16 (aq) µg/l <10 10 <10 <10 <10 <10

NRA - Aliphatics >C16-C21 (aq) µg/l <10 10 <10 <10 <10 <10

NRA - Aliphatics >C21-C35 (aq) µg/l <10 10 <10 <10 <10 <10

NRA - Total Aliphatics >C12-C35 (aq) µg/l <10 10 <10 <10 <10 <10

NRA - Aromatics >EC5-EC7 µg/l <10 10 <10 <10 <10 <10

NRA - Aromatics >EC7-EC8 µg/l <10 10 <10 <10 <10 <10

NRA - Aromatics >EC8-EC10 µg/l <10 10 <10 <10 <10 <10

NRA - Aromatics >EC10-EC12 µg/l <10 10 <10 11 <10 <10

NRA - Aromatics >EC12-EC16 (aq) µg/l <10 10 <10 <10 <10 <10

NRA - Aromatics >EC16-EC21 (aq) µg/l <10 10 <10 <10 <10 <10

NRA - Aromatics >EC21-EC35 (aq) µg/l <10 10 <10 <10 <10 <10

NRA - Total Aromatics >EC12-EC35 (aq) µg/l <10 10 <10 <10 <10 <10

Polyaromatic Hydrocarbons NRA - Naphthalene (aq) µg/l <0.1 1.2 <0.1 <0.1 <0.1 <0.1

NRA - Acenaphthene (aq) µg/l <0.015 - <0.015 0.26 <0.015 <0.015

NRA - Acenaphthylene (aq) µg/l <0.011 - <0.011 <0.011 <0.011 <0.011

NRA - Fluoranthene (aq) µg/l <0.017 0.1 <0.017 0.0449 0.0261 <0.017

NRA - Anthracene (aq) µg/l <0.015 0.1 <0.015 0.0489 <0.015 <0.015

Page 92: Report - LBBD

Leachate data verses screening criteria

Result exceeds screening criteria

Location ID TP12 TP9 BH2 TP10

Sample Depth 1.80- 1.00- 4.90- 2.00-

Date 13/06/2011 13/06/2011 16/06/2011 15/06/2011

Test Units LOD Screening value

NRA - Phenanthrene (aq) µg/l <0.022 - <0.022 <0.022 <0.022 <0.022

NRA - Fluorene (aq) µg/l <0.014 - <0.014 0.229 <0.014 <0.014

NRA - Chrysene (aq) µg/l <0.013 - <0.013 <0.013 <0.013 <0.013

NRA - Pyrene (aq) µg/l <0.015 - <0.015 0.0562 0.0343 <0.015

NRA - Benzo(a)anthracene (aq) µg/l <0.017 - <0.017 <0.017 <0.017 <0.017

NRA - Benzo(b)fluoranthene (aq) µg/l <0.023 - <0.023 <0.023 <0.023 <0.023

NRA - Benzo(k)fluoranthene (aq) µg/l <0.027 - <0.027 <0.027 <0.027 <0.027sum of benzo(b)fluoranthene & benzo(k)fluoranthene ug/l <0.03 0.03 0.05 0.05 0.05 0.05

NRA - Benzo(a)pyrene (aq) µg/l <0.009 0.01 <0.009 <0.009 <0.009 <0.009

NRA - Dibenzo(a,h)anthracene (aq) µg/l <0.016 - <0.016 <0.016 <0.016 <0.016

NRA - Benzo(g,h,i)perylene (aq) µg/l <0.016 - <0.016 <0.016 <0.016 <0.016

NRA - Indeno(1,2,3-cd)pyrene (aq) µg/l <0.014 - <0.014 <0.014 <0.014 <0.014sum of benzo(ghi)perylene & indeno(123-cd)pyrene ug/l <0.03 0.002 0.03 0.03 0.03 0.03

NRA - PAH, Total Detected USEPA 16 (aq) µg/l - none detected 0.639 0.0604 none detected

Total DWS PAH ug/l <0.08 0.1 <0.08 <0.08 <0.08 <0.08

Page 93: Report - LBBD

Perched water results verses screening criteriaResult exceeds screening criteria

Borehole ID BH1s BH1S BH1S BH2s BH2S BH2S BH5s BH5S

Date 29/06/2011 06/07/2011 20/07/2011 29/06/2011 06/07/2011 20/07/2011 29/06/2011 06/07/2011

Test Units LOD Screening value

InorganicsAmmoniacal Nitrogen as N mg/l <0.2 - 3.07 2.98 2.72 1.4 1.05 0.541 9.29 11.3

Conductivity @ 20 deg.C mS/cm <0.005 - 2.57 0.935

Sulphate mg/l <2 250 313 300 301 369 276 345 1140 1120

Cyanide, Total mg/l <0.05 0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05

pH pH Units <1 - 7.52 7.28 7.73 8.14 7.38 8.17 7.41 6.93

Filtered (Dissolved) MetalsArsenic (diss.filt) µg/l <0.12 25 6.87 9.71 3.56 2.44 2.46 1.18 5.16 5.3

Barium (diss.filt) µg/l <0.03 - 63.5 59.8 71.7 40.2 35.8 48.5 49.1 44.7

Beryllium (diss.filt) µg/l <0.07 - <0.07 <0.07 <0.07 0.093 <0.07 <0.07 <0.07 <0.07

Boron (diss.filt) µg/l <9.4 1000 532 552 548 173 115 143 801 796

Cadmium (diss.filt) µg/l <0.1 0.2 0.623 <0.1 <0.1 <0.1 <0.1 <0.1 5.95 0.371

Chromium (diss.filt) µg/l <0.22 50 25.5 27.8 20.7 6.85 7.66 5.23 28.5 25.9

Copper (diss.filt) µg/l <0.85 6 <0.85 3.12 4.94 1.36 1.88 13.9 24 25.6

Lead (diss.filt) µg/l <0.02 7.2 0.31 1.1 0.582 0.33 1.09 2.95 0.95 0.255

Nickel (diss.filt) µg/l <0.15 20 5.54 10.4 12.2 2.5 6.22 12.1 18 24.8

Selenium (diss.filt) µg/l <0.39 10 4.48 2.73 2.7 1.52 <0.39 <0.39 15.3 12.3

Vanadium (diss.filt) µg/l <0.24 20 8.43 11.4 9.15 1.22 2.69 2.22 7.72 8.75

Zinc (diss.filt) µg/l <0.41 50 4.07 9.3 13.1 3.6 5.8 25.9 204 191

Mercury (diss.filt) µg/l <0.01 0.05 <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 0.0118 0.0172

PhenolsPhenols, Total Detected monohydric mg/l 0.0005 none detected none detected none detected none detected none detected none detected none detected none detected

Speciated EPH CWGTotal Aliphatics & Aromatics >C12-C35 (Aqueous) µg/l <10 - - -

GRO >C5-C12 µg/l <50 - <50 <50 <50 <50 <50 <50 <50 <50

Methyl tertiary butyl ether (MTBE) µg/l <3 - <3 <3 <3 <3 <3 <3 <3 <3

Benzene µg/l <7 1 <7 <7 <7 <7 <7 <7 <7 <7

Toluene µg/l <4 40 <4 <4 <4 <4 <4 <4 <4 <4

Ethylbenzene µg/l <5 20 <5 <5 <5 <5 <5 <5 <5 <5

m,p-Xylene µg/l <8 - <8 <8 <8 <8 <8 <8 <8 <8

o-Xylene µg/l <3 - <3 <3 <3 <3 <3 <3 <3 <3

m,p,o-Xylene µg/l - none detected none detected none detected none detected none detected none detected none detected none detected

BTEX, Total µg/l - none detected none detected none detected none detected none detected none detected none detected none detected

Aliphatics >C5-C6 µg/l <10 10 <10 <10 <10 <10 <10 <10 <10 <10

Aliphatics >C6-C8 µg/l <10 10 <10 <10 <10 <10 <10 <10 <10 <10

Aliphatics >C8-C10 µg/l <10 10 <10 <10 <10 <10 <10 <10 <10 <10

TPH Criteria Working Group (TPH CWG)

Page 94: Report - LBBD

Perched water results verses screening criteriaResult exceeds screening criteria

Borehole ID BH1s BH1S BH1S BH2s BH2S BH2S BH5s BH5S

Date 29/06/2011 06/07/2011 20/07/2011 29/06/2011 06/07/2011 20/07/2011 29/06/2011 06/07/2011

Test Units LOD Screening value

Aliphatics >C10-C12 µg/l <10 10 <10 <10 <10 <10 <10 <10 <10 <10

Aliphatics >C12-C16 (aq) µg/l <10 10 <10 <10 <10 <10 <10 <10 <10 <10

Aliphatics >C16-C21 (aq) µg/l <10 10 <10 <10 <10 <10 15 <10 <10 <10

Aliphatics >C21-C35 (aq) µg/l <10 10 <10 <10 <10 <10 134 <10 <10 <10

Total Aliphatics >C12-C35 (aq) µg/l <10 10 <10 <10 <10 <10 149 <10 <10 <10

Aromatics >EC5-EC7 µg/l <10 10 <10 <10 <10 <10 <10 <10 <10 <10

Aromatics >EC7-EC8 µg/l <10 10 <10 <10 <10 <10 <10 <10 <10 <10

Aromatics >EC8-EC10 µg/l <10 10 <10 <10 <10 <10 <10 <10 <10 <10

Aromatics >EC10-EC12 µg/l <10 10 <10 <10 <10 <10 <10 <10 <10 <10

Aromatics >EC12-EC16 (aq) µg/l <10 10 <10 <10 <10 <10 <10 <10 <10 <10

Aromatics >EC16-EC21 (aq) µg/l <10 10 <10 <10 <10 <10 13 <10 <10 <10

Aromatics >EC21-EC35 (aq) µg/l <10 10 <10 <10 <10 <10 127 <10 <10 <10

Total Aromatics >EC12-EC35 (aq) µg/l <10 10 <10 <10 <10 <10 140 <10 <10 <10

Total Aliphatics & Aromatics >C5-35 (aq) µg/l <10 10 <10 <10 <10 <10 289 <10 <10 <10

Polyaromatic Hydrocarbons Naphthalene (aq) µg/l <0.1 1.2 <0.1 0.111 <0.1 <0.1 0.108 <0.1 0.105 <0.1

Acenaphthene (aq) µg/l <0.015 - 0.0321 0.041 <0.015 0.0331 0.156 <0.015 0.0191 <0.015

Acenaphthylene (aq) µg/l <0.011 - <0.011 <0.011 <0.011 0.027 0.129 <0.011 0.0111 0.0112

Fluoranthene (aq) µg/l <0.017 0.1 0.336 0.665 0.0898 0.966 6.81 0.185 0.115 0.258

Anthracene (aq) µg/l <0.015 0.1 0.0631 0.0963 <0.015 0.102 0.645 0.0187 0.0283 0.0273

Phenanthrene (aq) µg/l <0.022 - 0.27 0.485 0.0577 0.286 2.13 0.0449 0.102 0.122

Fluorene (aq) µg/l <0.014 - 0.029 0.0393 <0.014 0.0236 0.0987 <0.014 0.0141 <0.014

Chrysene (aq) µg/l <0.013 - 0.248 0.597 0.0519 0.587 4.52 0.114 0.0925 0.153

Pyrene (aq) µg/l <0.015 - 0.329 0.771 0.0796 1.09 6.73 0.205 0.1 0.246

Benzo(a)anthracene (aq) µg/l <0.017 - 0.205 0.463 0.0287 0.436 4.21 0.0993 0.0827 0.149

Benzo(b)fluoranthene (aq) µg/l <0.023 - 0.283 0.535 0.0547 0.261 2.53 0.096 0.0623 0.138Benzo(k)fluoranthene (aq) µg/l <0.027 - 0.314 0.72 0.0504 0.307 3.58 0.106 0.0618 0.138Sum of benzo(b)fluoranthene & benzo(k)fluoranthene µg/l <0.05 0.03 0.597 1.255 0.1051 0.568 6.11 0.202 0.1241 0.276

Benzo(a)pyrene (aq) µg/l <0.009 0.01 0.285 0.722 0.0475 0.328 5.21 0.106 0.0583 0.143

Dibenzo(a,h)anthracene (aq) µg/l <0.016 - 0.036 0.0835 <0.016 0.0424 0.477 <0.016 <0.016 <0.016

Benzo(g,h,i)perylene (aq) µg/l <0.016 - 0.183 0.413 0.0251 0.203 2.88 0.0642 0.0375 0.0918Indeno(1,2,3-cd)pyrene (aq) µg/l <0.014 - 0.157 0.41 0.018 0.161 1.8 0.043 0.0311 0.0858sum of benzo(ghi)perylene & indeno(123-cd)pyrene µg/l <0.03 0.002 0.34 0.823 0.0431 0.364 4.68 0.1072 0.0686 0.1776

PAH, Total Detected USEPA 16 (aq) µg/l - 2.77 6.15 0.503 4.86 42 1.08 0.921 1.56

Total DWS PAH µg/l 0.1 0.937 2.078 0.1482 0.932 10.79 0.3092 0.1927 0.4536

Page 95: Report - LBBD

Perched water results verses screening criteriaResult exceeds screening criteria

Borehole ID

Date

Test Units LOD Screening value

InorganicsAmmoniacal Nitrogen as N mg/l <0.2 -

Conductivity @ 20 deg.C mS/cm <0.005 -

Sulphate mg/l <2 250

Cyanide, Total mg/l <0.05 0.05

pH pH Units <1 -

Filtered (Dissolved) MetalsArsenic (diss.filt) µg/l <0.12 25

Barium (diss.filt) µg/l <0.03 -

Beryllium (diss.filt) µg/l <0.07 -

Boron (diss.filt) µg/l <9.4 1000

Cadmium (diss.filt) µg/l <0.1 0.2

Chromium (diss.filt) µg/l <0.22 50

Copper (diss.filt) µg/l <0.85 6

Lead (diss.filt) µg/l <0.02 7.2

Nickel (diss.filt) µg/l <0.15 20

Selenium (diss.filt) µg/l <0.39 10

Vanadium (diss.filt) µg/l <0.24 20

Zinc (diss.filt) µg/l <0.41 50

Mercury (diss.filt) µg/l <0.01 0.05

PhenolsPhenols, Total Detected monohydric mg/l 0.0005

Speciated EPH CWGTotal Aliphatics & Aromatics >C12-C35 (Aqueous) µg/l <10 -

GRO >C5-C12 µg/l <50 -

Methyl tertiary butyl ether (MTBE) µg/l <3 -

Benzene µg/l <7 1

Toluene µg/l <4 40

Ethylbenzene µg/l <5 20

m,p-Xylene µg/l <8 -

o-Xylene µg/l <3 -

m,p,o-Xylene µg/l -

BTEX, Total µg/l -

Aliphatics >C5-C6 µg/l <10 10

Aliphatics >C6-C8 µg/l <10 10

Aliphatics >C8-C10 µg/l <10 10

TPH Criteria Working Group (TPH CWG)

BH5S BH6s BH6S BH6S BH7s BH7S BH7S BH8s

20/07/2011 29/06/2011 06/07/2011 20/07/2011 29/06/2011 06/07/2011 20/07/2011 29/06/2011

3.63 - - - 1.92 2.27 1.27 -

4.14 1.06 1.75

1070 - - - 970 1050 1120 -

<0.05 - - - 0.093 0.115 0.106 -

7.71 7.62 7.42 8.26 7.73 7.42 7.95 7.4

5.03 2.81 3 1.86 2.17 2.93 1.68 2.92

49.6 129 120 105 28.5 24.1 24.7 106

<0.07 0.07 <0.07 <0.07 <0.07 <0.07 <0.07 <0.07

779 553 511 590 310 308 398 351

0.328 <0.1 <0.1 0.13 <0.1 <0.1 <0.1 <0.1

18.5 16.1 16.4 12 11.3 13.4 10.4 27.5

19.4 2 2.39 7.19 2.39 2.52 8.93 0.991

0.362 <0.02 0.101 0.391 <0.02 0.345 0.122 0.037

22.9 7.23 9.11 12.1 4.99 10 10.5 11.5

13.6 3.34 2.29 2.61 1.39 0.856 1.25 2.87

6.63 5.25 5.48 6.92 4.09 5 3.43 8.47

194 6.45 6.86 14.4 0.842 3.1 4.58 8.45

0.0254 <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 <0.01

none detected - - - none detected none detected none detected -

- - -

<50 <50 <50 <50 <50 <50 <50 <50

<3 <3 <3 <3 <3 <3 <3 <3

<7 <7 <7 <7 <7 <7 <7 <7

<4 <4 <4 <4 <4 <4 <4 <4

<5 <5 <5 <5 <5 <5 <5 <5

<8 <8 <8 <8 <8 <8 <8 <8

<3 <3 <3 <3 <3 <3 <3 <3

none detected none detected none detected none detected none detected none detected none detected none detected

none detected none detected none detected none detected none detected none detected none detected none detected

<10 <10 <10 <10 <10 <10 <10 <10

<10 <10 <10 <10 <10 <10 <10 <10

<10 <10 <10 <10 <10 <10 <10 <10

Page 96: Report - LBBD

Perched water results verses screening criteriaResult exceeds screening criteria

Borehole ID

Date

Test Units LOD Screening value

Aliphatics >C10-C12 µg/l <10 10

Aliphatics >C12-C16 (aq) µg/l <10 10

Aliphatics >C16-C21 (aq) µg/l <10 10

Aliphatics >C21-C35 (aq) µg/l <10 10

Total Aliphatics >C12-C35 (aq) µg/l <10 10

Aromatics >EC5-EC7 µg/l <10 10

Aromatics >EC7-EC8 µg/l <10 10

Aromatics >EC8-EC10 µg/l <10 10

Aromatics >EC10-EC12 µg/l <10 10

Aromatics >EC12-EC16 (aq) µg/l <10 10

Aromatics >EC16-EC21 (aq) µg/l <10 10

Aromatics >EC21-EC35 (aq) µg/l <10 10

Total Aromatics >EC12-EC35 (aq) µg/l <10 10

Total Aliphatics & Aromatics >C5-35 (aq) µg/l <10 10

Polyaromatic Hydrocarbons Naphthalene (aq) µg/l <0.1 1.2

Acenaphthene (aq) µg/l <0.015 -

Acenaphthylene (aq) µg/l <0.011 -

Fluoranthene (aq) µg/l <0.017 0.1

Anthracene (aq) µg/l <0.015 0.1

Phenanthrene (aq) µg/l <0.022 -

Fluorene (aq) µg/l <0.014 -

Chrysene (aq) µg/l <0.013 -

Pyrene (aq) µg/l <0.015 -

Benzo(a)anthracene (aq) µg/l <0.017 -

Benzo(b)fluoranthene (aq) µg/l <0.023 -Benzo(k)fluoranthene (aq) µg/l <0.027 -Sum of benzo(b)fluoranthene & benzo(k)fluoranthene µg/l <0.05 0.03

Benzo(a)pyrene (aq) µg/l <0.009 0.01

Dibenzo(a,h)anthracene (aq) µg/l <0.016 -

Benzo(g,h,i)perylene (aq) µg/l <0.016 -Indeno(1,2,3-cd)pyrene (aq) µg/l <0.014 -sum of benzo(ghi)perylene & indeno(123-cd)pyrene µg/l <0.03 0.002

PAH, Total Detected USEPA 16 (aq) µg/l -

Total DWS PAH µg/l 0.1

BH5S BH6s BH6S BH6S BH7s BH7S BH7S BH8s

20/07/2011 29/06/2011 06/07/2011 20/07/2011 29/06/2011 06/07/2011 20/07/2011 29/06/2011

<10 <10 <10 <10 <10 <10 <10 <10

<10 <10 16 60 <10 <10 <10 <10

<10 <10 74 155 <10 <10 <10 10

<10 <10 189 369 <10 <10 <10 268

<10 <10 279 584 <10 <10 <10 278

<10 <10 <10 <10 <10 <10 <10 <10

<10 <10 <10 <10 <10 <10 <10 <10

<10 <10 <10 <10 <10 <10 <10 <10

<10 <10 <10 <10 <10 <10 <10 <10

<10 <10 <10 24 <10 <10 <10 <10

<10 <10 32 92 <10 <10 <10 <10

<10 12 305 719 <10 <10 <10 122

<10 12 337 835 <10 <10 <10 122

<10 12 616 1420 <10 <10 <10 401

<0.1 <0.1 <0.1 0.111 <0.1 <0.1 <0.1 0.128

<0.015 1.54 0.586 0.694 0.032 <0.015 <0.015 0.0443

<0.011 0.325 0.706 1.12 0.0154 <0.011 <0.011 0.049

0.12 5.43 6.68 9.32 0.527 0.0487 0.137 1.64

<0.015 0.391 1.64 1.26 0.073 <0.015 0.0188 0.152

0.0562 0.711 1.95 3.4 0.245 <0.022 0.0509 0.66

<0.014 0.0878 0.416 0.669 0.0195 <0.014 <0.014 0.0466

0.0748 1.86 4.25 6.33 0.358 0.0259 0.0686 1.11

0.109 5.08 6.21 8.45 0.754 0.0637 0.169 1.55

0.0563 1.16 3.67 6.1 0.282 0.0278 0.0762 0.821

0.0653 0.981 2.54 6.55 0.356 <0.023 0.0771 0.707

0.0709 1.04 4.32 7.03 0.379 <0.027 0.085 0.877

0.1362 2.021 6.86 13.58 0.735 0 0.1621 1.584

0.069 1.07 5.14 8.73 0.361 0.0204 0.0932 1.17

<0.016 0.102 0.457 1.21 0.0372 <0.016 <0.016 0.147

0.041 0.55 2.39 6.49 0.231 <0.016 0.055 0.934

0.0289 0.426 1.56 4.32 0.192 <0.014 0.0473 0.806

0.0699 0.976 3.95 10.81 0.423 0 0.1023 1.74

0.692 20.8 42.5 71.8 3.86 0.187 0.878 10.8

0.2061 2.997 10.81 24.39 1.158 0 0.2644 3.324

Page 97: Report - LBBD

Perched water results verses screening criteriaResult exceeds screening criteria

Borehole ID

Date

Test Units LOD Screening value

InorganicsAmmoniacal Nitrogen as N mg/l <0.2 -

Conductivity @ 20 deg.C mS/cm <0.005 -

Sulphate mg/l <2 250

Cyanide, Total mg/l <0.05 0.05

pH pH Units <1 -

Filtered (Dissolved) MetalsArsenic (diss.filt) µg/l <0.12 25

Barium (diss.filt) µg/l <0.03 -

Beryllium (diss.filt) µg/l <0.07 -

Boron (diss.filt) µg/l <9.4 1000

Cadmium (diss.filt) µg/l <0.1 0.2

Chromium (diss.filt) µg/l <0.22 50

Copper (diss.filt) µg/l <0.85 6

Lead (diss.filt) µg/l <0.02 7.2

Nickel (diss.filt) µg/l <0.15 20

Selenium (diss.filt) µg/l <0.39 10

Vanadium (diss.filt) µg/l <0.24 20

Zinc (diss.filt) µg/l <0.41 50

Mercury (diss.filt) µg/l <0.01 0.05

PhenolsPhenols, Total Detected monohydric mg/l 0.0005

Speciated EPH CWGTotal Aliphatics & Aromatics >C12-C35 (Aqueous) µg/l <10 -

GRO >C5-C12 µg/l <50 -

Methyl tertiary butyl ether (MTBE) µg/l <3 -

Benzene µg/l <7 1

Toluene µg/l <4 40

Ethylbenzene µg/l <5 20

m,p-Xylene µg/l <8 -

o-Xylene µg/l <3 -

m,p,o-Xylene µg/l -

BTEX, Total µg/l -

Aliphatics >C5-C6 µg/l <10 10

Aliphatics >C6-C8 µg/l <10 10

Aliphatics >C8-C10 µg/l <10 10

TPH Criteria Working Group (TPH CWG)

BH8S BH8S

06/07/2011 20/07/2011

- -

1.14

- -

- -

7.1 7.78

4.58 3.17

101 96.7

<0.07 <0.07

434 475

<0.1 <0.1

17.5 15.2

3.42 8.12

0.369 0.309

11.6 12.7

2.93 2.73

6.53 5.57

16.1 19

<0.01 <0.01

- -

-

<50 <50

<3 <3

<7 <7

<4 <4

<5 <5

<8 <8

<3 <3

none detected none detected

none detected none detected

<10 <10

<10 <10

<10 <10

Page 98: Report - LBBD

Perched water results verses screening criteriaResult exceeds screening criteria

Borehole ID

Date

Test Units LOD Screening value

Aliphatics >C10-C12 µg/l <10 10

Aliphatics >C12-C16 (aq) µg/l <10 10

Aliphatics >C16-C21 (aq) µg/l <10 10

Aliphatics >C21-C35 (aq) µg/l <10 10

Total Aliphatics >C12-C35 (aq) µg/l <10 10

Aromatics >EC5-EC7 µg/l <10 10

Aromatics >EC7-EC8 µg/l <10 10

Aromatics >EC8-EC10 µg/l <10 10

Aromatics >EC10-EC12 µg/l <10 10

Aromatics >EC12-EC16 (aq) µg/l <10 10

Aromatics >EC16-EC21 (aq) µg/l <10 10

Aromatics >EC21-EC35 (aq) µg/l <10 10

Total Aromatics >EC12-EC35 (aq) µg/l <10 10

Total Aliphatics & Aromatics >C5-35 (aq) µg/l <10 10

Polyaromatic Hydrocarbons Naphthalene (aq) µg/l <0.1 1.2

Acenaphthene (aq) µg/l <0.015 -

Acenaphthylene (aq) µg/l <0.011 -

Fluoranthene (aq) µg/l <0.017 0.1

Anthracene (aq) µg/l <0.015 0.1

Phenanthrene (aq) µg/l <0.022 -

Fluorene (aq) µg/l <0.014 -

Chrysene (aq) µg/l <0.013 -

Pyrene (aq) µg/l <0.015 -

Benzo(a)anthracene (aq) µg/l <0.017 -

Benzo(b)fluoranthene (aq) µg/l <0.023 -Benzo(k)fluoranthene (aq) µg/l <0.027 -Sum of benzo(b)fluoranthene & benzo(k)fluoranthene µg/l <0.05 0.03

Benzo(a)pyrene (aq) µg/l <0.009 0.01

Dibenzo(a,h)anthracene (aq) µg/l <0.016 -

Benzo(g,h,i)perylene (aq) µg/l <0.016 -Indeno(1,2,3-cd)pyrene (aq) µg/l <0.014 -sum of benzo(ghi)perylene & indeno(123-cd)pyrene µg/l <0.03 0.002

PAH, Total Detected USEPA 16 (aq) µg/l -

Total DWS PAH µg/l 0.1

BH8S BH8S

06/07/2011 20/07/2011

<10 <10

<10 <10

11 29

286 461

297 490

<10 <10

<10 <10

<10 <10

<10 <10

<10 <10

<10 <10

32 195

32 195

329 685

0.144 0.141

0.0423 0.0441

0.0639 0.0622

1.72 1.53

0.146 0.139

0.697 0.59

0.0571 0.0429

1.17 0.776

1.64 1.6

0.974 0.774

1.2 0.924

1.16 1.16

2.36 2.084

1.23 1.31

0.17 0.229

1.03 0.978

0.695 0.826

1.725 1.804

12.1 11.1

4.085 3.888

Page 99: Report - LBBD

| Issue | 4 September 2019

\\GLOBAL.ARUP.COM\LONDON\PTG\ICL-JOBS\268000\268591-00 BARKING POWER STATION REMEDIATION\4 INTERNAL PROJECT DATA\4-05 ARUP REPORTS\01. CONTAM PRA AND SIS\PRA\BPS GROUND CONTAMINATION PRA ISSUE 1_FINAL.DOCX

Page D5

Appendix E

Cross-sections

Page 100: Report - LBBD

-30

-25

-20

-15

-10

-5

0

5

0 50 100 150 200 250 300 350 400 450 500 550 600 650

A1

(-34.4)

A2

(-22.0)

B71

(-36.2)EB

24

(21.3)

EB

25

(-6.4)BH

3

(16.2)BH

4

(-22.2)

BH

5

(11.8)BH

7

(25.6) BH

8

(-27.8)

Libr

ary:

aru

p_uk

lib_4

-0-0

02. R

epor

t: 2.

1.01

SE

CT

ION

WIT

H W

AT

ER

& S

PT

(A

3)D

atab

ase:

\\gl

obal

.aru

p.co

m\lo

ndon

\ptg

\icl-j

obs\

2680

00\2

6859

1-00

bar

king

pow

er s

tatio

n re

med

iatio

n\4

inte

rnal

pro

ject

dat

a\4-

09 a

rup

data

\01

cont

am\g

int\2

6859

1_bp

s_21

.08.

19.g

pj R

evP

1.1

(S0

- W

ork

in p

rogr

ess)

EL

EV

AT

ION

(m

OD

)DISTANCE ALONG BASELINE (m)

SCALE 1:194V 1:1806H @ A3-L

AR

UP

. gIN

T v

8.30

.004

Mad

e by

Ros

ie H

olde

n on

21-

Aug

-19

LEGEND

Hole offset is +veto the RIGHT ofthe baseline H

oleI

D

(Offset)

COLOUR LEGEND

Topsoil [TOP]

Made Ground [MG]

Alluvium [ALV]

River Terrace Deposits [RTD]

Lambeth Group [LMG]

Thanet Sand [THS]

Made Ground - FILL

CLAY

GRAVEL

Sandy CLAY

SAND

TOPSOIL

CONCRETE

MATERIALSPLAN

A1A2B71

EB24EB25

BH3BH4

BH5BH7

BH8

1FIGURE268591-00

BARKING POWER STATIONGEOLOGICAL CROSS SECTION

Amy.Juden
PolyLine
Amy.Juden
PolyLine
Amy.Juden
Line
Amy.Juden
Arrow
Amy.Juden
Text Box
THE SITE
Amy.Juden
PolyLine
Amy.Juden
PolyLine
Amy.Juden
Text Box
?
Amy.Juden
PolyLine
Amy.Juden
Text Box
West
Amy.Juden
Text Box
East
Amy.Juden
Call-out
Backfilled Dagenham Breach
Amy.Juden
Text Box
SECTION A
Page 101: Report - LBBD

-40

-35

-30

-25

-20

-15

-10

-5

0

5

0 50 100 150 200 250 300 350 400 450 500 550

EB

10

(18.0)

EB

11

(30.4)

EB

12

(45.4)

EB

12A

(46.4)

EB

7

(-45.3)

EB

8

(-27.7)

EB

9

(-19.1)

Libr

ary:

aru

p_uk

lib_4

-0-0

02. R

epor

t: 2.

1.01

SE

CT

ION

WIT

H W

AT

ER

& S

PT

(A

3)D

atab

ase:

\\gl

obal

.aru

p.co

m\lo

ndon

\ptg

\icl-j

obs\

2680

00\2

6859

1-00

bar

king

pow

er s

tatio

n re

med

iatio

n\4

inte

rnal

pro

ject

dat

a\4-

09 a

rup

data

\01

cont

am\g

int\2

6859

1_bp

s_21

.08.

19.g

pj R

evP

1.1

(S0

- W

ork

in p

rogr

ess)

EL

EV

AT

ION

(m

OD

)DISTANCE ALONG BASELINE (m)

SCALE 1:250V 1:1528H @ A3-L

AR

UP

. gIN

T v

8.30

.004

Mad

e by

Ros

ie H

olde

n on

21-

Aug

-19

LEGEND

Hole offset is +veto the RIGHT ofthe baseline H

oleI

D

(Offset)

COLOUR LEGEND

Made Ground [MG]

Alluvium [ALV]

River Terrace Deposits [RTD]

Lambeth Group [LMG]

Thanet Sand [THS]

Chalk [CHK]

CONCRETE

Sandy CLAY

GRAVEL

Gravelly SAND

SAND

Made Ground - FILL

Sandy gravelly CLAY

CLAY

CHALK

MATERIALSPLAN

EB10EB11EB12EB12A

EB7EB8 EB9

2FIGURE268591-00

BARKING POWER STATIONGEOLOGICAL CROSS SECTION

Amy.Juden
Arrow
Amy.Juden
Text Box
THE SITE
Amy.Juden
PolyLine
Amy.Juden
PolyLine
Amy.Juden
PolyLine
Amy.Juden
PolyLine
Amy.Juden
PolyLine
Amy.Juden
PolyLine
Amy.Juden
Text Box
West
Amy.Juden
Text Box
East
Amy.Juden
Text Box
SECTION B
Page 102: Report - LBBD

-30

-25

-20

-15

-10

-5

0

5

0 100 200 300 400 500 600 700 800

EB

11

(-17.7)

EB

13

(-49.5)

EB

14

(-12.7)

EB

14A

(-11.9) EB

15

(38.3)

EB

5

(-31.2)

EB

7

(8.5)

M1

(25.0)

M2

(-0.1)

M3

(-24.3)

M4

(-20.4)

M5

(3.4)

M6

(27.6)

PB

1

(9.7)

PB

3

(-1.7)

PB

5

(-39.1) BH

3

(16.2)

BH

5

(-41.3)

BH

6

(31.6)

BH

8

(18.3)

Libr

ary:

aru

p_uk

lib_4

-0-0

02. R

epor

t: 2.

1.01

SE

CT

ION

WIT

H W

AT

ER

& S

PT

(A

3)D

atab

ase:

\\gl

obal

.aru

p.co

m\lo

ndon

\ptg

\icl-j

obs\

2680

00\2

6859

1-00

bar

king

pow

er s

tatio

n re

med

iatio

n\4

inte

rnal

pro

ject

dat

a\4-

09 a

rup

data

\01

cont

am\g

int\2

6859

1_bp

s_21

.08.

19.g

pj R

evP

1.1

(S0

- W

ork

in p

rogr

ess)

EL

EV

AT

ION

(m

OD

)DISTANCE ALONG BASELINE (m)

SCALE 1:194V 1:2222H @ A3-L

AR

UP

. gIN

T v

8.30

.004

Mad

e by

Ros

ie H

olde

n on

21-

Aug

-19

LEGEND

Hole offset is +veto the RIGHT ofthe baseline H

oleI

D

(Offset)

COLOUR LEGEND

Topsoil [TOP]

Made Ground [MG]

Alluvium [ALV]

River Terrace Deposits [RTD]

Lambeth Group [LMG]

Thanet Sand [THS]

CONCRETE

Made Ground - FILL

Sandy CLAY

GRAVEL

Sandy gravelly CLAY

SAND

CLAY

Gravelly SAND

TOPSOIL

MATERIALSPLAN

EB11EB13EB14EB14A

EB15

EB5

EB7

M1M2M3M4M5M6

PB1

PB3

PB5

BH3BH5

BH6

BH8

3FIGURE268591-00

BARKING POWER STATIONGEOLOGICAL CROSS SECTION

Amy.Juden
Arrow
Amy.Juden
Text Box
THE SITE
Amy.Juden
PolyLine
Amy.Juden
PolyLine
Amy.Juden
PolyLine
Amy.Juden
PolyLine
Amy.Juden
PolyLine
Amy.Juden
Text Box
North
Amy.Juden
Text Box
South
Amy.Juden
Text Box
SECTION C
Page 103: Report - LBBD

| Issue | 4 September 2019

\\GLOBAL.ARUP.COM\LONDON\PTG\ICL-JOBS\268000\268591-00 BARKING POWER STATION REMEDIATION\4 INTERNAL PROJECT DATA\4-05 ARUP REPORTS\01. CONTAM PRA AND SIS\PRA\BPS GROUND CONTAMINATION PRA ISSUE 1_FINAL.DOCX

Page E2

Appendix F

Barking Power Station

environmental information

Page 104: Report - LBBD

| Issue | 4 September 2019

\\GLOBAL.ARUP.COM\LONDON\PTG\ICL-JOBS\268000\268591-00 BARKING POWER STATION REMEDIATION\4 INTERNAL PROJECT DATA\4-05 ARUP REPORTS\01. CONTAM PRA AND SIS\PRA\BPS GROUND CONTAMINATION PRA ISSUE 1_FINAL.DOCX

Page F1

F1 Barking Power Station IPPC permit

Page 105: Report - LBBD

Permit with introductory notePollution Prevention and Control (England & Wales) Regulations 2000

Barking Power Station

Thames Power Services LimitedBarking Power StationChequers LaneDagenhamEssexRM9 6PF

Permit numberRP3133BH

Page 106: Report - LBBD

Permit Number RP3133BH Page 22/12/06ii

Barking Power StationPermit Number RP3133BH

Introductory note

This introductory note does not form a part of the permit

A non-technical description of the installation is given in the Application, but the main features of theinstallation are as follows.

Barking Power Station is an electricity generating station, located at Chequers Lane, Dagenham,Essex and operated by Thames Power Services.

The installation is located within an area of primarily industrial and commercial use adjacent toDagenham Dock. It is located between Chequers Lane (to the west) and the Dagenham Breach (tothe east), approximately 1 km north of the River Thames, centred at National Grid Reference TQ490 824 (549090 182400). The installation is solely owned by Barking Power Limited and wasdeveloped for use as a power station between 1992 and 1995. The installation occupies a land areaof approximately 15 ha (37 acres).

The Barking Power Station comprises 5 gas turbines, with a combined thermal input of 2125MW, 2steam turbines and all of the ancillary equipment required for the generation of electricity for exportto the national grid.

It utilises modern gas turbines fuelled with natural gas to produce electricity. The generating stationhas a nominal capacity to produce 1000MW of electricity and is connected to the National Gridelectricity transmission system. The station operates mainly as a continuous base load plant, but itcan operate at different loads.

The power station has two CCGT modules or power blocks, capable of operating independently.Block 1 produces 400MW of electricity and Block 2 produces 600MW. Block 1 comprises two gasturbines and one steam turbine; Block 2 comprises three gas turbines and one steam turbine. Bothblocks are enclosed within a turbine hall, with a connected control room. Each block has a 55m highchimney to allow for the safe exhaust of combustion gases. Each gas turbine exhaust passesthrough a waste heat recovery boiler.

Natural gas is supplied through a buried pipeline that connects with the national gas transmissionsystem. When the gas supply is interrupted, a back up fuel of low-sulphur gas oil can be used. Gasoil is stored in purpose built secure tanks on site. The tanks are replenished from seagoing tankersusing the nearby River Thames’ jetties.

Cooling of the steam condensers is normally carried out with water drawn from and returned to theRiver Thames through deep tunnels. This “once through” cooling arrangement passes heat to theriver which is quickly dissipated through tidal and other natural actions. An alternative coolingsystem is used when the river water temperature is above 21.5O Celsius, mainly during the summermonths. This alternative system uses evaporative cooling cells that removes heat to the air ratherthan the river but with a detrimental effect on the thermal efficiency of the station.

The principal pollutants emitted are oxides of nitrogen (NOx), which results mainly from the reactionof oxygen and nitrogen from the atmosphere during the combustion process, and carbon monoxide.The back up gas oil fuel has a low sulphur content to minimise releases of sulphur dioxide.

Page 107: Report - LBBD

Permit Number RP3133BH Page 22/12/06iii

Emissions of polluting exhaust gases from the chimneys are minimised by the use of dry low NOxburners when using natural gas and water injection when using back up gas oil.

The installation is a lower tier COMAH site and has a Major Accident Prevention Policy that dealsspecifically with major accident hazards and measures to protect the environment.

Status Log of the permitDetail Date Response DateApplication RP3133BH Duly made 13/03/06Additional Information Received 17/07/06Request to extend determination 16/08/06 22/08/06Request to extend determination 24/11/06 29/11/06Permit determined 22/12/06

Superseded or Partially Superseded Licences/Authorisations/Consents relating to this installationHolder Reference Number Date of Issue Fully or Partially SupersededThames Power ServicesLimited (IPC Authorisation)

AB3838 14/05/93 Fully superseded

Thames Power ServicesLimited (Water DischargeConsent)

M6994 03/06/92 Fully superseded

Thames Power ServicesLimited (Water DischargeConsent)

WR 0353 29/06/93 Fully superseded

Other existing Licences/Authorisations/Registrations relating to this siteHolder Reference Number Date of issueThames Power Services Limited (Licence to AbstractWater)

8/37/55/89 22/06/01

End of Introductory Note

Page 108: Report - LBBD

Permit Number RP3133BH Page 22/12/061

PermitPollution Prevention and Control(England and Wales) Regulations 2000

Permit

Permit numberRP3133BH

The Environment Agency (the Agency) in exercise of its powers under Regulation 10 of thePollution Prevention and Control (England and Wales) Regulations 2000 (SI 2000 No 1973) herebyauthorises Thames Power Services Limited (“the Operator”),

whose registered office is

Chequers LaneDagenhamEssexRM9 6PF

company registration number 02624730

to operate an installation atBarking Power StationChequers LaneDagenhamEssexRM9 6PF

to the extent authorised by and subject to the conditions of this permit.

Signed Date

22/12/06

Paul Butler

Authorised to sign on behalf of the Agency

Page 109: Report - LBBD

Permit Number RP3133BH Page 22/12/062

Conditions

1 Management

1.1 General management

1.1.1 The activities shall be managed and operated:

(a) in accordance with a management system, which identifies and minimises risks ofpollution, including those arising from operations, maintenance, accidents,incidents and non-conformances and those drawn to the attention of the Operatoras a result of complaints; and

(b) by sufficient persons who are competent in respect of the responsibilities to beundertaken by them in connection with the operation of the activities.

1.1.2 Records demonstrating compliance with condition 1.1.1 shall be maintained.

1.1.3 Any person having duties that are or may be affected by the matters set out in this permitshall have convenient access to a copy of it kept at or near the place where those dutiesare carried out.

1.2 Accidents that may cause pollution

1.2.1 The Operator shall:

(a) maintain and implement an accident management plan;

(b) review and record at least every 4 years or as soon as practicable after anaccident, (whichever is the earlier) whether changes to the plan should be made;

(c) make any appropriate changes to the plan identified by a review.

1.3 Energy efficiency

1.3.1 The Operator shall:

(a) take appropriate measures to ensure that energy is used efficiently in theactivities;

(b) review and record at least every 4 years whether there are suitable opportunitiesto improve the energy efficiency of the activities; and

(c) take any further appropriate measures identified by a review.

1.4 Efficient use of raw materials

1.4.1 The Operator shall:

(a) take appropriate measures to ensure that raw materials and water are usedefficiently in the activities;

(b) maintain records of raw materials and water used in the activities;

(c) review and record at least every 4 years whether there are suitable alternativematerials that could reduce environmental impact or opportunities to improve theefficiency of raw material and water use; and

Page 110: Report - LBBD

Permit Number RP3133BH Page 22/12/063

(d) take any appropriate further measures identified by a review.

1.5 Avoidance, recovery and disposal of wastesproduced by the activities

1.5.1. The Operator shall:

(a) take appropriate measures to ensure that waste produced by the activities isavoided or reduced, or where waste is produced it is recovered whereverpracticable or otherwise disposed of in a manner which minimises its impact onthe environment;

(b) review and record at least every 4 years whether changes to those measuresshould be made; and

(c) take any further appropriate measures identified by a review.

1.6 Site security

1.6.1. Site security measures shall prevent unauthorised access to the site, as far as practicable.

Page 111: Report - LBBD

Permit Number RP3133BH Page 22/12/064

2. Operations

2.1 Permitted activities2.1.1 The Operator is authorised to carry out the activities specified in schedule 1 table S1.1 (the

“activities”).

2.2 The site

2.2.1 The activities shall not extend beyond the site, being the land shown edged in green on thesite plan at schedule 2 to this permit.

2.3 Operating techniques

2.3.1 The activities shall, subject to the conditions of this permit, be operated using thetechniques and in the manner described in the documentation specified in schedule 1 tableS1.2, unless otherwise agreed in writing by the Agency.

2.3.2 Subject to condition 2.3.3, no raw materials or fuels listed in schedule 3 table S3.1 shall beused unless they comply with the specifications set out in that table.

2.3.3 Standby fuel gas oil may be used but for no more than 1080 hours per year.

2.4 Off-site conditionsThere are no off-site conditions under this section.

2.5 Improvement programme

2.5.1 The Operator shall complete the improvements specified in schedule 1 table S1.3 by thedate specified in that table unless otherwise agreed in writing by the Agency.

2.5.2 Except in the case of an improvement which consists only of a submission to the Agency,the Operator shall notify the Agency within 14 days of completion of each improvement.

2.6 Pre-operational conditions

There are no pre-operational conditions in this permit.

2.7 Closure and decommissioning

2.7.1 The Operator shall maintain and operate the activities so as to prevent or where that is notpracticable, to minimise, any pollution risk on closure and decommissioning.

2.7.2 The Operator shall maintain a site closure plan which demonstrates how the activities canbe decommissioned to avoid any pollution risk and return the site to a satisfactory state.

2.7.3 The Operator shall carry out and record a review of the site closure plan at least every 4years.

Page 112: Report - LBBD

Permit Number RP3133BH Page 22/12/065

2.7.4 The site closure plan (or relevant part thereof) shall be implemented on final cessation ordecommissioning of the activities or part thereof.

2.8 Site protection and monitoring programme

2.8.1 The Operator shall, within 2 months of the issue of this permit, submit a site protection andmonitoring programme.

2.8.2 The Operator shall implement and maintain the site protection and monitoring programmeand shall carry out and record a review of it at least every 4 years.

Page 113: Report - LBBD

Permit Number RP3133BH Page 22/12/066

3. Emissions and monitoring

3.1 Emissions to water, air or land

3.1.1 There shall be no point source emissions to water, air or land except from the sources andemission points listed in schedule 4 tables S4.1, S4.2 and S4.3.

3.1.2 The limits given in schedule 4 shall not be exceeded.

3.1.3 Total annual emissions from the emission points set out in schedule 4 tables S4.1, S4.2and S4.3 of a substance listed in schedule 4 table S4.4 shall not exceed the relevant limitin table S4.4.

3.2 Transfers off-site

3.2.1 Records of all the wastes sent off site from the activities, for either disposal or recovery,shall be maintained.

3.3 Fugitive emissions of substances

3.3.1 Fugitive emissions of substances (excluding odour, noise and vibration) shall not causepollution. The Operator shall not be taken to have breached this condition if appropriatemeasures have been taken to prevent or where that is not practicable, to minimise, thoseemissions.

3.3.2 All liquids, whose emission to water or land could cause pollution, shall be provided withsecondary containment, unless the Operator has used other appropriate measures toprevent or where that is not practicable, to minimise, leakage and spillage from the primarycontainer.

3.4 Odour3.4.1 Emissions from the activities shall be free from odour at levels likely to cause annoyance

outside the site, as perceived by an authorised officer of the Agency, unless the Operatorhas used appropriate measures, including those specified in schedule 1 table S1.4, toprevent or where that is not practicable to minimise the odour.

3.5 Noise and vibration3.5.1 Emissions from the activities shall be free from noise and vibration at levels likely to cause

annoyance outside the site, as perceived by an authorised officer of the Agency, unlessthe Operator has used appropriate measures to prevent or where that is not practicable tominimise the noise and vibration.

3.6 Monitoring

3.6.1 The Operator shall, unless otherwise agreed in writing by the Agency, undertakemonitoring for the parameters, at the locations and at not less than the frequenciesspecified in the following tables in schedule 4 to this permit:

(a) point source emissions specified in tables S4.1, S4.2 and S4.3;

Page 114: Report - LBBD

Permit Number RP3133BH Page 22/12/067

(b) annual limits specified in table S4.4; and

(c) process monitoring specified in table S4.5.

3.6.2 The Operator shall maintain records of all monitoring required by this permit includingrecords of the taking and analysis of samples, instrument measurements (periodic andcontinual), calibrations, examinations, tests and surveys and any assessment or evaluationmade on the basis of such data.

3.6.3 Monitoring equipment, techniques, personnel and organisations employed for theemissions monitoring programme and the environmental or other monitoring specified incondition 3.6.1 shall have either MCERTS certification or MCERTS accreditation (asappropriate) unless otherwise agreed in writing by the Agency.

3.6.4 Permanent means of access shall be provided to enable sampling/monitoring to be carriedout in relation to the emission points specified in schedule 4 tables S4.1, S4.2 and S4.3unless otherwise specified in that schedule.

3.6.5 Within 6 months of the issue of this permit (unless otherwise agreed in writing by theAgency) the site reference data identified in the site protection and monitoring programmeshall be collected and submitted to the Agency.

3.7 Monitoring for the purposes of the Large CombustionPlant Directive

3.7.1 All LCP monitoring required by this permit shall be carried out in accordance with theprovisions of Annex VIII of the Large Combustion Plant Directive.

3.7.2 If the monitoring results for more than 10 days a year per gas turbine are invalidated withinthe meaning set out in Schedule 4, the Operator shall:

(a) within 28 days of becoming aware of this fact, review the causes of theinvalidations and submit to the Agency for approval, proposals for measures toimprove the reliability of the continuous measurement systems, including atimetable for the implementation of those measures; and

(b) implement the approved measures.

3.7.3 Continuous measurement systems on emission points from the LCP shall be subject toquality control by means of parallel measurements with reference methods at least onceevery calendar year.

3.7.4 Unless otherwise agreed in writing by the Agency in accordance with condition 3.7.5below, the Operator shall carry out the methods, including the reference measurementmethods, to use and calibrate continuous measurement systems in accordance with theappropriate CEN standards.

3.7.5 If CEN standards are not available, ISO standards, national or international standardswhich will ensure the provision of data of an equivalent scientific quality shall be used, asagreed in writing with the Agency.

3.7.6 Where required by a condition of this permit to check the measurement equipment theOperator shall submit a report to the Agency in writing, within 28 days of the completion ofthe check.

Page 115: Report - LBBD

Permit Number RP3133BH Page 22/12/068

4. Information

4.1 Records

4.1.1 All records required to be made by this permit shall:

(a) be legible;

(b) be made as soon as reasonably practicable;

(c) if amended, be amended in such a way that the original and any subsequentamendments remain legible, or are capable of retrieval; and

(d) be retained, unless otherwise agreed in writing by the Agency, for at least 6 yearsfrom the date when the records were made, or in the case of the following recordsuntil permit surrender:

(i) the site protection and monitoring programme.

4.1.2 Any records required to be made by this permit shall be supplied to the Agency within 14days where the records have been requested in writing by the Agency.

4.1.3 All records required to be held by this permit shall be held on the installation and shall beavailable for inspection by the Agency at any reasonable time.

4.2 Reporting

4.2.1 A report or reports on the performance of the activities over the previous year shall besubmitted to the Agency by 31 January (or other date agreed in writing by the Agency)each year. The report(s) shall include as a minimum:

(a) a review of the results of the monitoring and assessment carried out inaccordance with this permit against the relevant assumptions, parameters andresults in the assessment of the impact of the emissions submitted with theapplication;

(b) where the Operator's management system encompasses annual improvementtargets, a summary report of the previous year's progress against such targets;

(c) the annual production /treatment data set out in schedule 5 table S5.2;

(d) the performance parameters set out in schedule 5 table S5.3 using the formsspecified in table S5.4 of that schedule; and

(e) details of any contamination or decontamination of the site which has occurred.

4.2.2 Within 28 days of the end of the reporting period the Operator shall, unless otherwiseagreed in writing by the Agency, submit reports of the monitoring and assessment carriedout in accordance with the conditions of this permit, as follows:

(a) in respect of the parameters and emission points specified in schedule 5 tableS5.1;

(b) for the reporting periods specified in schedule 5 table S5.1 and using the formsspecified in schedule 5 table S5.4 ; and

(c) giving the information from such results and assessments as may be required bythe forms specified in those tables.

Page 116: Report - LBBD

Permit Number RP3133BH Page 22/12/069

4.2.3 A summary report of the waste types and quantities accepted and removed from the siteshall be made for each quarter. It shall be submitted to the Agency within one month ofthe end of the quarter and shall be in the format required by the Agency.

4.2.4 The Operator shall, unless notice under this condition has been served within thepreceding 4 years, submit to the Agency, within 6 months of receipt of a written notice, areport assessing whether there are other appropriate measures that could be taken toprevent, or where that is not practicable, to minimise pollution.

4.2.5 All reports and notifications required by the permit shall be sent to the Agency using thecontact details supplied in writing by the Agency

4.2.6 The results of reviews and any changes made to the site protection and monitoringprogramme shall be reported to the Agency, within 1 month of the review or change.

4.3 Notifications

4.3.1 The Agency shall be notified without delay following the detection of:

(a) any malfunction, breakdown or failure of equipment or techniques, accident, orfugitive emission which has caused, is causing or may cause significant pollution;

(b) the breach of a limit specified in the permit;

(c) any significant adverse environmental effects.

4.3.2 Any information provided under condition 4.3.1 shall be confirmed by sending theinformation listed in schedule 6 to this permit within the time period specified in thatschedule.

4.3.3 Prior written notification shall be given to the Agency of the following events and in thespecified timescales:

(a) as soon as practicable prior to the permanent cessation of any of the activities;

(b) cessation of operation of part or all of the activities for a period likely to exceed 1year; and

(c) resumption of the operation of part or all of the activities after a cessation notifiedunder (b) above.

4.3.4 The Agency shall be given at least 14 days notice before implementation of any part of thesite closure plan.

4.3.5 Where the Agency has requested in writing that it shall be notified when the Operator is toundertake monitoring and/or spot sampling, the Operator shall inform the Agency when therelevant monitoring is to take place. The Operator shall provide this information to theAgency at least 14 days before the date the monitoring is to be undertaken.

4.3.6 The Agency shall be notified within 14 days of the occurrence of the following matters,except where such disclosure is prohibited by Stock Exchange rules:

(a) any change in the Operator’s trading name, registered name or registered officeaddress;

(b) any change to particulars of the Operator’s ultimate holding company (includingdetails of an ultimate holding company where an Operator has become asubsidiary); and

(c) any steps taken with a view to the Operator going into administration, enteringinto a company voluntary arrangement or being wound up.

Page 117: Report - LBBD

Permit Number RP3133BH Page 22/12/0610

4.3.7 From 1 January 2008 the Operator shall inform the Agency in writing of the closure of anyLCP within 28 days of the date of closure.

4.4 Interpretation

4.4.1 In this permit the expressions listed in schedule 7 shall have the meaning given in thatschedule.

Page 118: Report - LBBD

Permit Number RP3133BH Page 22/12/0611

Schedule 1 - OperationsTable S1.1 activitiesActivity listed in Schedule 1 of thePPC Regulations

Description of specified activity Limits of specified activity

Producing electricity by burningnatural gas with gas oil as a back-up fuel in GT1A a 425 MWthcombined cycle gas turbine fittedwith DLN.

From receipt of raw materials to generationof electricity, steam and power and releaseof emissions to air through a 55m stack(General Electric gas turbine withassociated heat recovery steam generatorfor the generation of electricity for export tothe national grid).

Producing electricity by burningnatural gas with gas oil as a back-up fuel in GT1B a 425 MWthcombined cycle gas turbine fittedwith DLN.

From receipt of raw materials to generationof electricity, steam and power and releaseof emissions to air through a 55m stack(General Electric gas turbine withassociated heat recovery steam generatorfor the generation of electricity for export tothe national grid).

Producing electricity by burningnatural gas with gas oil as a back-up fuel in GT2A a 425 MWthcombined cycle gas turbine fittedwith DLN.

From receipt of raw materials to generationof electricity, steam and power and releaseof emissions to air through a 55m stack(General Electric gas turbine withassociated heat recovery steam generatorfor the generation of electricity for export tothe national grid).

Producing electricity by burningnatural gas with gas oil as a back-up fuel in CT2B a 425 MWthcombined cycle gas turbine fittedwith DLN.

From receipt of raw materials to generationof electricity, steam and power and releaseof emissions to air through a 55m stack(General Electric gas turbine withassociated heat recovery steam generatorfor the generation of electricity for export tothe national grid).

Producing electricity by burningnatural gas with gas oil as a back-up fuel in GT2C a 425 MWthcombined cycle gas turbine fittedwith DLN.

From receipt of raw materials to generationof electricity, steam and power and releaseof emissions to air through a 55m stack(General Electric gas turbine withassociated heat recovery steam generatorfor the generation of electricity for export tothe national grid).

Operation of emergency dieselgenerator 1 a 2 MWth diesel-firedstandby generator

From receipt of fuel to generation ofelectricity and release of emissions to air(handling and storage of fuel in adesignated tank for emergency use orroutine operational and maintenance testingonly).

Operation of emergency dieselgenerator 2 a 2 MWth diesel-firedstandby generator

From receipt of fuel to generation ofelectricity and release of emissions to air(handling and storage of fuel in adesignated tank for emergency use orroutine operational and maintenance testingonly).

S1.1 A1 (a)Burning any fuel in an appliance with arated thermal input of 50 megawatts ormore

Operation of gas water bath heater1 a 4 MWth gas-fired water bathheater

From receipt of fuel to generation of heatand release of emissions to air (Operationof a water bath heater to heat the naturalgas to optimise machine efficiency when theplant is burning natural gas).

Page 119: Report - LBBD

Permit Number RP3133BH Page 22/12/0612

Operation of gas water bath heater2 a 4 MWth gas-fired water bathheater

From receipt of fuel to generation of heatand release of emissions to air (Operationof a water bath heater to heat the naturalgas to optimise machine efficiency when theplant is burning natural gas).

Directly Associated ActivityDirectly associated activity Gas oil storage From receipt of raw materials to dispatch for

use.Directly associated activity Steam turbine operation (Block 1) From input of steam from the heat recovery

steam generators associated with theCCGTs in Block 1 of the power station tothe generation of electricity for export to thenational grid (includes boiler blowdown fromemission point W3 to the cooling waterpurge to the River Thames).

Directly associated activity Steam turbine operation (Block 2) From input of steam from the heat recoverysteam generators associated with theCCGTs in Block 2 of the power station tothe generation of electricity for export to thenational grid (includes boiler blowdown fromemission point W3 to the cooling waterpurge to the River Thames).

Directly associated activity Water treatment plant From receipt of raw materials to dischargeof neutralised effluent to the cooling waterpurge to the River Thames.

Directly associated activity Cooling system From intake of water from the River Thamesto discharge back to the River Thames.(Operation of a once through coolingarrangement using water drawn from theRiver Thames. Secondary evaporativecooling cell system shall be used when rivertemperature exceeds 21.5oC).

Directly associated activity Surface water discharges Handling and storage of collected sitesurface waters discharged to DagenhamBreach via a series of oil/water interceptors.

Directly associated activity Trade effluent discharge to foulsewer.

Discharge of trade effluent via an oil/waterinterceptor to sewer.

Directly associated activity Operation of diesel fire pump 1 a0.24 MWth diesel-fired fire waterpump

Handling and storage of fuel in a designatedtank for emergency use or routineoperational and maintenance testing only.

Directly associated activity Operation of diesel fire pump 2 a0.24 MWth diesel-fired fire waterpump

Handling and storage of fuel in a designatedtank for emergency use or routineoperational and maintenance testing only.

Table S1.2 Operating techniquesDescription Parts Date ReceivedApplication The response to sections 2.1 and 2.2 in the Application. 27/02/06Receipt of additionalinformation to the application

Response to the request for further information with regards to: Aqueousemissions in the event of a condenser tube leak, techniques employedto minimise the loss of VOCs from the storage of raw materials,secondary containment in the vicinity of the chemical dilution/mixingtanks, boiler blowdown, capacities and resistance of bunding, secondarycontainment of the drum storage area and pollution control measures ofthe fuel oil pipeline.

17/07/06

Page 120: Report - LBBD

Permit Number RP3133BH Page 22/12/0613

Table S1.3 Improvement programme requirementsReference Requirement DateIC1 A written plan shall be submitted to the Agency for approval. The plan shall contain the

results of a review of the discharge of chlorine to the River Thames and the appropriatemeasures required to minimise impact on the receiving watercourse. The plan shallcontain dates for the individual measures identified The notification requirements ofcondition 2.5.2 shall be deemed to have been complied with on submission of the report.

The plan shall be implemented by the Operator from the date of approval in writing by theAgency.

01/10/07

IC2 A written procedure shall be submitted to the agency detailing the measures to be used sothat monitoring equipment, personnel and organisations employed for the emissionsmonitoring programme shall have either MCERTS certification or accreditation inaccordance with condition 3.6.3. In the case of monitoring emissions to air, if themonitoring system is not certified, the Operator shall demonstrate the CEMS are fit forpurpose under the provisions of BS EN 14181.

The notification requirements of condition 2.5.2 shall be deemed to have been compliedwith on submission of the procedure.

The procedure shall be implemented by the operator from the date of approval in writing bythe Agency.

01/01/08

IC3 A written report shall be submitted to the Agency for approval. The report shall contain thefindings of a water efficiency audit in accordance with the requirements of section 2.4.3 ofIPPC Sector Guidance Note for the Combustion Sector, including dates for theimplementation of individual improvement measures identified.

The notification requirements of condition 2.5.2 shall be deemed to have been compliedwith on submission of the report.

The improvements shall be implemented by the Operator from the date of approval inwriting be the Agency.

01/01/08

IC4 A written plan shall be submitted to the Agency for approval. The plan shall contain theresults of a review of the pollution control measures in place in the drum storage area toprevent releases to the environment, and the measures required to comply with therequirements of section 2.2.9 of the IPPC Sector Guidance Note for the Combustion Sectorand Technical Guidance Note IPPC H7 for the Protection of Land. The plan shall containdates for the implementation of individual measures. The notification requirements ofcondition 2.5.2 shall be deemed to have been complied with on submission of the report.

The improvements shall be implemented by the Operator from the date of approval inwriting by the Agency.

01/01/08

IC5 The Operator shall provide secondary containment for the gas water bath heaters tocontain accidental releases of glycol in accordance with the requirements of section 2.2.9of the IPPC Sector Guidance Note for the Combustion Sector.

The Operator shall report to the Agency in writing upon completion of the improvementsabove.

01/01/09

IC6 A written site closure plan shall be submitted to the Agency for approval. The plan shallcontain the measures, which will be taken on cessation of activities, to avoid any pollutionrisk and return the site to a satisfactory state, in accordance with the requirements ofsection 2.11 of IPPC Sector Guidance Note for the Combustion Sector.

The notification requirements of condition 2.5.2 shall be deemed to have been compliedwith on submission of the report.

01/01/09

Page 121: Report - LBBD

Permit Number RP3133BH Page 22/12/0614

Table S1.4 Appropriate measures for odourMeasure DatesOdours from the cooling water debris/trash basket storage area shall be prevented by regularremoval of accumulated waste biomass and regular disinfection of containers.

22/12/06

Page 122: Report - LBBD

Permit Number RP3133BH Page 22/12/0615

Schedule 2 - Site plan

“Reproduced from the Ordnance Survey map with the permission of the Controller of Her Majesty’sStationery Office Crown Copyright 2000. Unauthorised reproduction infringes Crown Copyright and maylead to prosecution or civil proceedings.”

A10

W1W2W3W4W5

A2

A1

A3

A5

A4

W6

A8A9

S1S2

A11A12

A6A7

Page 123: Report - LBBD

Permit Number RP3133BH Page 22/12/0616

Schedule 3 - Waste types, raw materials and fuelsTable S3.1 Raw materials and fuelsRaw materials and fuel description SpecificationGas oil until 31/12/2007 Less than 0.2% w/w sulphur contentGas oil from 01/01/2008 Less than 0.1% w/w sulphur contentHg concentration in the raw materials used within the installation Discharges of mercury as a result of the impurities of raw

materials used in the water treatment plant shall be controlled byensuring that impurity levels are the minimum available in thecommercial product.

Cd concentration in the raw materials used within the installation Discharges of cadmium as a result of the impurities of rawmaterials used in the water treatment plant shall be controlled byensuring that impurity levels are the minimum available in thecommercial product.

Page 124: Report - LBBD

Permit Number RP3133BH Page 22/12/0617

Schedule 4 – Emissions and monitoring

Note

For the purposes of this Schedule, the following interpretations shall apply:

• For the continuous measurement systems fitted to the LCP release points defined in TableS4.1 the validated hourly and daily averages shall be determined from the measured validhourly average values after having subtracted the value of the 95% confidence interval.

• The 95% confidence interval for nitrogen oxides of a single measured result shall be takento be 20%.

• An invalid hourly average means an hourly average period invalidated due to malfunctionof, or maintenance work being carried out on, the continuous measurement system.However, to allow some discretion for zero and span gas checking, or cleaning (byflushing), an hourly average period will count as valid as long as data has beenaccumulated for at least two thirds of the period (40 minutes). Such discretionary periodsare not to exceed more than 5 in any one 24-hour period unless agreed in writing. Whereplant may be operating for less than the 24-hour period, such discretionary periods are notto exceed more than one quarter of the overall valid hourly average periods unless agreedin writing.

• Any day, in which more than three hourly average values are invalid shall be invalidated.

Page 125: Report - LBBD

Permit Number RP3133BH Page 22/12/0618

Table S4.1 Point source emissions to air from Gas TurbinesEmission point ref. &location

Parameter Source Limit(includingunit)

Referenceperiod

Monitoringfrequency

Monitoringstandard ormethod

A1, A2, A3, A4 and A5on site plan inschedule 2

Oxides ofNitrogen(NO and NO2

expressed asNO2)

Gas turbine firedon natural gas

60 mg/m3

Note 1

Daily meanof validatedhourlyaverages

Continuous BS EN 14181

A1, A2, A3, A4 and A5on site plan inschedule 2

Oxides ofNitrogen(NO and NO2

expressed asNO2)

Gas turbine firedon natural gas

120 mg/m3

Note 2

Daily meanof validatedhourlyaverages

Continuous BS EN 14181

A1, A2, A3, A4 and A5on site plan inschedule 2

Oxides ofNitrogen(NO and NO2

expressed asNO2)

Gas turbine firedon gas oil

123 mg/m3

Note 1

Daily meanof validatedhourlyaverages

Continuous BS EN 14181

A1, A2, A3, A4 and A5on site plan inschedule 2

Oxides ofNitrogen(NO and NO2

expressed asNO2)

Gas turbine firedon gas oil

240 mg/m3

Note 2

Daily meanof validatedhourlyaverages

Continuous BS EN 14181

A1, A2, A3, A4 and A5on site plan inschedule 2

CarbonMonoxide

Gas turbine firedon natural gas

100 mg/m3

Note 1Daily meanof validatedhourlyaverages

Continuous BS EN 14181

A1, A2, A3, A4 and A5on site plan inschedule 2

CarbonMonoxide

Gas turbine firedon gas oil

100 mg/m3

Note 1Daily meanof validatedhourlyaverages

Continuous BS EN 14181

A6 on site plan inschedule 2

No parametersset

Emergency dieselgenerator 1

- - - Permanentsamplingaccess notrequired

A7 on site plan inschedule 2

No parametersset

Emergency dieselgenerator 2

- - - Permanentsamplingaccess notrequired

A8 on site plan inschedule 2

No parametersset

Gas water bathheater 1

- - - Permanentsamplingaccess notrequired

A9 on site plan inschedule 2

No parametersset

Gas water bathheater 2

- - - Permanentsamplingaccess notrequired

A10 on site plan inschedule 2

No parametersset

Cooling cells - - - Permanentsamplingaccess notrequired

A11 on site plan inschedule 2

No parametersset

Diesel fire pump 1 - - - Permanentsamplingaccess notrequired

Page 126: Report - LBBD

Permit Number RP3133BH Page 22/12/0619

A12 on site plan inschedule 2

No parametersset

Diesel fire pump 2 - - - Permanentsamplingaccess notrequired

Note 1: This emission limit shall not apply during start-up, shutdown, overfiring, diagnostic testing and fuel changeoverperiods.

Note 2: This emission limit shall apply during start-up, shutdown, overfiring, diagnostic testing and fuel changeovers.

Page 127: Report - LBBD

Permit Number RP3133BH Page 22/12/0620

Table S4.2 Point Source emissions to water (other than sewer) – emission limits and monitoring requirementsEmission pointref. & location

Parameter Source Limit (incl.unit)

Referenceperiod

Monitoringfrequency

Monitoringstandard ormethodNote 6

W1 on site plan inschedule 2emission to RiverThames at mapreference TQ4822 8152

Flow Once-throughcooling waterdischarge

20.6 m3/s Continuous As per theapplication

W1 on site plan inschedule 2emission to RiverThames at mapreference TQ4822 8152

Temperature Once-throughcooling waterdischarge

31.5 0C Continuous Temperaturemonitoringprobe

W1 on site plan inschedule 2emission to RiverThames at mapreference TQ4822 8152

Temperature Once-throughcooling waterdischarge

34 0C Note 1 Continuous Temperaturemonitoringprobe

W2 on site plan inschedule 2emission to RiverThames at mapreference TQ4822 8152

Flow Recirculation-mode coolingwater discharge.

20.6 m3/sNote 5

Continuous As per theapplication

W2 on site plan inschedule 2emission to RiverThames at mapreference TQ4822 8152

Temperature Recirculation-mode coolingwater discharge.

30 0CNote 2

Continuous Temperaturemonitoringprobe

W2 on site plan inschedule 2emission to RiverThames at mapreference TQ4822 8152

Total chlorine Recirculation-mode coolingwater discharge.

0.5 mg/lNote 3

Continuous As agreed inwriting withthe Agency.

W3 on site plan inschedule 2emission to RiverThames at mapreference TQ4822 8152 onlyafter entering asignificantly largerdirect release

Flow Boiler blowdown 600 m3/day Continuous As agreed inwriting withthe Agency.

W4 on site plan inschedule 2emission to RiverThames at mapreference TQ4822 8152 onlyafter entering asignificantly largerdirect release

Flow Water treatmentplant effluent

770 m3/day Continuous As agreed inwriting withthe Agency.

Page 128: Report - LBBD

Permit Number RP3133BH Page 22/12/0621

Table S4.2 Point Source emissions to water (other than sewer) – emission limits and monitoring requirementsEmission pointref. & location

Parameter Source Limit (incl.unit)

Referenceperiod

Monitoringfrequency

Monitoringstandard ormethodNote 6

W4 on site plan inschedule 2emission to RiverThames at mapreference TQ4822 8152 onlyafter entering asignificantly largerdirect release

Flow Water treatmentplant effluent

1350 m3/dayNote 4

Continuous As agreed inwriting withthe Agency.

W4 on site plan inschedule 2emission to RiverThames at mapreference TQ4822 8152 onlyafter entering asignificantly largerdirect release

pH Water treatmentplant effluent

6-9 Continuous As agreed inwriting withthe Agency.

W4 on site plan inschedule 2emission to RiverThames at mapreference TQ4822 8152 onlyafter entering asignificantly largerdirect release

Mercury Water treatmentplant effluent

2 µg/l Annual Compliancebased onmass balancecalculation

W4 on site plan inschedule 2emission to RiverThames at mapreference TQ4822 8152 onlyafter entering asignificantly largerdirect release

Cadmium Water treatmentplant effluent

10 µg/l Annual Compliancebased onmass balancecalculation

W5 on site plan inschedule 2emission to RiverThames at mapreference TQ4822 8152 onlyafter entering asignificantly largerdirect release

Noparametersset

Other minor flowsas identified inAqueousReleases ReportBPS-IPPC007

- - - -

W6 on site plan inschedule 2emission toDagenhamBreach at mapreference TQ4920 8254

Oil Uncontaminatedsurface water run-off via oil/waterinterceptor

None visible Daily visualcheck

As agreed inwriting withthe Agency.

Note 1: The emission limit shall apply during periods of abnormal operation when the Operator is required by the NationalGrid to continue generation after there has been a steam turbine trip or cooling water pump failure as specified in theapplication.

Note 2: The emission limit shall not apply for the 5-minute period following commencement of flushing and cooling cell purge.

Page 129: Report - LBBD

Permit Number RP3133BH Page 22/12/0622

Note 3: This is a differential value with respect to the background level in the River Thames at the discharge location.Note 4: The discharge limit shall apply when the demineralised water tank is drained under emergency conditions and under

other emergency conditions agreed in writing with the Agency.Note 5: The duration of release shall not exceed 1 hour per day excluding gate opening and closing times.Note 6: Alternative monitoring methods as agreed in writing with the Agency.

Table S4.3 Point source emissions to sewer, effluent treatment plant or other transfers off-site– emission limits andmonitoring requirementsEmission point ref. &location

Parameter Source Limit(incl. Unit)

Referenceperiod

Monitoringfrequency

Monitoringstandard ormethod

S1 on site plan inschedule 2 emissionto Thames WaterUtilities LimitedRiverside SewageTreatment Works

No parametersset

Installationfoul sewagevia oil/waterinterceptor

- - - Permanentsamplingaccess notrequired

S2 on site plan inschedule 2 emissionto Thames WaterUtilities LimitedRiverside SewageTreatment Works

No parametersset

Installationtrade effluentvia oil/waterinterceptor

- - - Permanentsamplingaccess notrequired

Table S4.4 Annual limits Substance Medium Limit (including unit)Mercury Water 0.2 kgCadmium Water 0.5 kg

Table S4.5 Process monitoring requirementsEmission point reference orsource or description of pointof measurement

Parameter Monitoringfrequency

Monitoringstandard ormethod

Other specifications

W1 (Once-through cooling waterdischarge)

Enthalpy (GJ) Continuous As agreed inwriting withthe Agency.

W2 (Recirculation-mode coolingwater discharge)

Enthalpy (GJ) Continuous As agreed inwriting withthe Agency.

Page 130: Report - LBBD

Permit Number RP3133BH Page 22/12/0623

Schedule 5 - Reporting

Parameters, for which reports shall be made, in accordance with conditions of this permit, are listedbelow.Table S5.1 Reporting of monitoring dataParameter Emission or monitoring

point/referenceReporting period Period begins

Emissions to airParameters as required by condition 3.6.1.

A1, A2, A3, A4, A5 Every 3 months 01/01/07

Emissions to waterParameters as required by condition 3.6.1

W1, W2, W3 W4, W6 Every 6 months 01/01/07

Table S5.2: Annual production/treatmentParameter UnitsPower generated GWHrs

Table S5.3 Performance parametersParameter Frequency of assessment UnitsTotal amount of energy input (natural gas) Annually m3

Total amount of energy input (gas oil) Annually tonnesGas oil operation Annually hoursWater usage Annually m3

Table S5.4 Reporting formsMedia/parameter

Reporting format Starting Point Agencyrecipient

Date of form

Air Form Air – 1 continuous monitoring or other form asagreed in writing by the Agency

27/11/2004 SI 01/01/07

Air Form Air – 2 continuous measurement systemsinvalidation log or other form as agreed in writing bythe Agency

27/11/2004 SI & Centraloffice

01/01/07

Water Form water 1 or other form as agreed in writing bythe Agency

Permit issue SI 01/01/07

Water Form water 2 or other form as agreed in writing bythe Agency

Permit issue SI 01/01/07

Water usage Form water usage1 or other form as agreed inwriting by the Agency

Permit issue SI 01/01/07

Energyusage

Form energy 1 or other form as agreed in writing bythe Agency

Permit issue SI 01/01/07

Otherperformanceindicators

Form performance 1 or other form as agreed inwriting by the Agency

Permit issue SI 01/01/07

Page 131: Report - LBBD

Permit Number RP3133BH Page 22/12/0624

Schedule 6 - Notification

These pages outline the information that the Operator must provide.

Units of measurement used in information supplied under Part A and B requirements shall be appropriateto the circumstances of the emission. Where appropriate, a comparison should be made of actualemissions and authorised emission limits.

If any information is considered commercially confidential, it should be separated from non-confidentialinformation, supplied on a separate sheet and accompanied by an application for commercialconfidentiality under the provisions of the PPC Regulations.

Part APermit Number RP3133BHName of Operator Thames Power Services LimitedLocation of Installation Barking Power Station

Chequers LaneDagenhamEssexRM9 6PF

Time and date of the detection

(a) Notification requirements for any malfunction, breakdown or failure of equipment or techniques,accident, or fugitive emission which has caused, is causing or may cause significant pollution

To be notified within 24 hours of detectionDate and time of the event

Reference or description of the

location of the event

Description of where any release

into the environment took place

Substances(s) potentially

released

Best estimate of the quantity or

rate of release of substances

Measures taken, or intended to

be taken, to stop any emission

Description of the failure or

accident.

(b) Notification requirements for the breach of a limitTo be notified within 24 hours of detection unless otherwise specified below

Emission point reference/ source

Parameter(s)

Limit

Measured value and uncertainty

Date and time of monitoring

Measures taken, or intended to

Page 132: Report - LBBD

Permit Number RP3133BH Page 22/12/0625

be taken, to stop the emission

Time periods for notification following detection of a breach of a limitParameter Notification period

(c) Notification requirements for the detection of any significant adverse environmental effectTo be notified within 24 hours of detection

Description of where the effect on

the environment was detected

Substances(s) detected

Concentrations of substances

detected

Date of monitoring/sampling

Part B - to be submitted as soon as practicableAny more accurate information on the matters fornotification under Part A.Measures taken, or intended to be taken, toprevent a recurrence of the incidentMeasures taken, or intended to be taken, to rectify,limit or prevent any pollution of the environmentwhich has been or may be caused by the emissionThe dates of any unauthorised emissions from theinstallation in the preceding 24 months.

Name*PostSignatureDate

* authorised to sign on behalf of Thames Power Services Limited.

Page 133: Report - LBBD

Permit Number RP3133BH Page 22/12/0626

Schedule 7 - Interpretation"accident" means an accident that may result in pollution.

"annually" means once every year.

“application” means the application for this permit, together with any additional information supplied bythe Operator as part of the application and any response to a notice served under Schedule 4 to the PPCRegulations.

“authorised officer” means any person authorised by the Agency under section 108(1) of TheEnvironment Act 1995 to exercise, in accordance with the terms of any such authorisation, any powerspecified in section 108(4) of that Act.

“calendar monthly mean” means the value across a calendar month of all validated hourly means.

“Combustion Technical Guidance Note” means IPPC Sector Guidance Note Combustion Activities,version 2.03 dated 27th July 2005 published by Environment Agency.

“DLN” means dry, low NOx burners.

“emissions to land”, includes emissions to groundwater.

“fugitive emission” means an emission to air, water or land from the activities which is not controlled byan emission limit or background concentration.

“groundwater” means all water, which is below the surface of the ground in the saturation zone and indirect contact with the ground or subsoil.

“land protection guidance”, means Agency guidance "H7 - Guidance on the protection of land under thePPC Regime: application site report and site protection monitoring programme".

“large combustion plant” or “LCP” is a combustion plant or group of combustion plants discharging wastegases through a common windshield or stack, where the total thermal input is 50 MWth or more, basedon gross calorific value.

“Large Combustion Plant Directive” means Directive 2001/80/EC of the European Parliament and of theCouncil of 23 October 2001 on the limitation of emissions of certain pollutants into the air from largecombustion plants.

“MCERTS” means the Environment Agency’s Monitoring Certification Scheme.

“Natural gas” means naturally occurring methane with no more than 20% by volume of inert or otherconstituents.

“notify/notified without delay” means that a telephone call can be used, whereas all other reports andnotifications must be supplied in writing, either electronically or on paper.

“operational hours” are whole hours commencing from the first unit ending start up and ending when thelast unit commences shut down.

Page 134: Report - LBBD

Permit Number RP3133BH Page 22/12/0627

“PPC Regulations” means the Pollution, Prevention and Control (England and Wales) Regulations SI2000 No.1973 and words and expressions used in this permit which are also used in the Regulationshave the same meanings as in those Regulations.

"quarter" means a calendar year quarter commencing on 1 January, 1 April, 1 July or 1 October.

“reference conditions” means:Where a minimum limit is set for any emission parameter, for example pH, reference to exceeding thelimit shall mean that the parameter shall not be less than that limit.

“SI” means site inspector

“site protection and monitoring programme” means a document which meets the requirements for siteprotection and monitoring programmes described in the Land Protection Guidance.

“year” means calendar year ending 31 December.

Unless otherwise stated, any references in this permit to concentrations of substances in emissions intoair means:

(a) in relation to emissions from combustion processes, the concentration in dry air at a temperatureof 273K, at a pressure of 101.3 kPa and with an oxygen content of 3% dry for liquid and gaseousfuels, 6% dry for solid fuels; and/or

(b) in relation to gas turbines or compression ignition engines; an oxygen content of 15%, dry, theconcentration at a temperature of 273K and at a pressure of 101.3 kPa, for liquid and gaseousfuels.

END OF PERMIT

Page 135: Report - LBBD

Variation notice number EPR/RP3133BH/V002

Page 11 04/11/10

Page 136: Report - LBBD

Directly associated activity Trade effluent discharge to foul sewer.

Discharge of trade effluent via an oil/water interceptor to sewer.

Directly associated activity Operation of diesel fire pump 1 a 0.24 MWth diesel-fired fire water pump

Handling and storage of fuel in a designated tank for emergency use or routine operational and maintenance testing only.

Directly associated activity Operation of diesel fire pump 2 a 0.24 MWth diesel-fired fire water pump

Handling and storage of fuel in a designated tank for emergency use or routine operational and maintenance testing only.

Table S4.1 Point source emissions to air from Gas Turbines

Emission point ref. & location

Parameter Source Limit(including unit)

Reference

period

Monitoring frequency

Monitoring standard or method

A1, A2, A3, A4 and A5 on site plan in schedule 2

Oxides of Nitrogen

(NO and NO2

expressed as NO2)

Gas turbine fired on natural gas

60 mg/m3

Note 1

Daily mean of validated hourly averages

Continuous BS EN 14181

A1, A2, A3, A4 and A5 on site plan in schedule 2

Oxides of Nitrogen

(NO and NO2

expressed as NO2)

Gas turbine fired on natural gas

120 mg/m3

Note 2

Daily mean of validated hourly averages

Continuous BS EN 14181

A1, A2, A3, A4 and A5 on site plan in schedule 2

Oxides of Nitrogen

(NO and NO2

expressed as NO2)

Gas turbine fired on gas oil

123 mg/m3

Note 1

Daily mean of validated hourly averages

Continuous BS EN 14181

A1, A2, A3, A4 and A5 on site plan in schedule 2

Oxides of Nitrogen

(NO and NO2

expressed as NO2)

Gas turbine fired on gas oil

240 mg/m3

Note 2

Daily mean of validated hourly averages

Continuous BS EN 14181

A1, A2, A3, A4 and A5 on site plan in schedule 2

Carbon Monoxide

Gas turbine fired on natural gas

100 mg/m3

Note 1 Daily mean of validated hourly averages

Continuous BS EN 14181

A1, A2, A3, A4 and A5 on site plan in schedule 2

Carbon Monoxide

Gas turbine fired on gas oil

100 mg/m3

Note 1 Daily mean of validated hourly averages

Continuous BS EN 14181

A6 on site plan in schedule 2

Noparameters set

Emergency diesel generator 1

- - - Permanentsampling access not required

Variation notice number EPR/RP3133BH/V002

Page 4 04/11/10

Page 137: Report - LBBD

Emission point ref. & location

Parameter Source Limit(including unit)

Reference

period

Monitoring frequency

Monitoring standard or method

A7 on site plan in schedule 2

Noparameters set

Emergency diesel generator 2

- - - Permanentsampling access not required

A8 on site plan in schedule 2

Noparameters set

Gas water bath heater 1

- - - Permanentsampling access not required

A9 on site plan in schedule 2

Noparameters set

Gas water bath heater 2

- - - Permanentsampling access not required

A10 on site plan in schedule 2

Noparameters set

Cooling cells - - - Permanentsampling access not required

A11 on site plan in schedule 2

Noparameters set

Diesel fire pump 1

- - - Permanentsampling access not required

A12 on site plan in schedule 2

Noparameters set

Diesel fire pump 2

- - - Permanentsampling access not required

A13 on site plan in schedule 2

Noparameters set

Auxiliary steamgenerator boiler

- - - Permanentsampling access not required

Note 1: This emission limit shall not apply during start-up, shutdown, overfiring, diagnostic testing and fuel changeover periods.

Note 2: This emission limit shall apply during start-up, shutdown, overfiring, diagnostic testing and fuel changeovers.

Other conditions varied:

limits and monitoring requirements

Emission point ref. & location

Parameter Source Limit (incl. unit)

Reference period

Monitoring frequency

Monitoring standard or method Note 6

W1 on site plan in schedule 2 emission to River Thames at map reference TQ 4822 8152

Flow Once-through cooling water discharge

74,167 m3 Hourly average

Continuous As per the application

Variation notice number EPR/RP3133BH/V002

Page 5 04/11/10

Page 138: Report - LBBD

Emission point ref. & location

Parameter Source Limit (incl. unit)

Reference period

Monitoring frequency

Monitoring standard or method Note 6

W1 on site plan in schedule 2 emission to River Thames at map reference TQ 4822 8152

Temperature Once-through cooling water discharge

31.5 0C Hourly average Continuous Temperature monitoring probe

W1 on site plan in schedule 2 emission to River Thames at map reference TQ 4822 8152

Temperature Once-through cooling water discharge

34 0CNote 1

Hourly average Continuous Temperature monitoring probe

W2 on site plan in schedule 2 emission to River Thames at map reference TQ 4822 8152

Flow Recirculation-mode cooling water discharge.

74,167 m3

Note 5

Hourly average Continuous As per the application

W2 on site plan in schedule 2 emission to River Thames at map reference TQ 4822 8152

Temperature Recirculation-mode cooling water discharge.

30 0CNote 2

Hourly average Continuous Temperature monitoring probe

W2 on site plan in schedule 2 emission to River Thames at map reference TQ 4822 8152

Total chlorine

Recirculation-mode cooling water discharge.

0.5 mg/lNote 3

Spot sample Periodic prior to discharge

As agreed in writing with the Agency.

W3 on site plan in schedule 2 emission to River Thames at map reference TQ 4822 8152 only after entering a significantly larger direct release

Flow Boiler blowdown

600 m3Daily maximum Continuous As agreed in

writing with the Agency.

Variation notice number EPR/RP3133BH/V002

Page 6 04/11/10

Page 139: Report - LBBD

Emission point ref. & location

Parameter Source Limit (incl. unit)

Reference period

Monitoring frequency

Monitoring standard or method Note 6

W4 on site plan in schedule 2 emission to River Thames at map reference TQ 4822 8152 only after entering a significantly larger direct release

Flow Water treatment plant effluent

770 m3 Daily maximum Continuous As agreed in writing with the Agency.

W4 on site plan in schedule 2 emission to River Thames at map reference TQ 4822 8152 only after entering a significantly larger direct release

Flow Water treatment plant effluent

1350 m3

Note 4

Daily maximum Continuous As agreed in writing with the Agency.

W4 on site plan in schedule 2 emission to River Thames at map reference TQ 4822 8152 only after entering a significantly larger direct release

pH Water treatment plant effluent

6-9 Instantaneous Continuous As agreed in writing with the Agency.

W4 on site plan in schedule 2 emission to River Thames at map reference TQ 4822 8152 only after entering a significantly larger direct release

Mercury Water treatment plant effluent

2 g/l - Annual Compliance based on mass balance calculation

Variation notice number EPR/RP3133BH/V002

Page 7 04/11/10

Page 140: Report - LBBD

Emission point ref. & location

Parameter Source Limit (incl. unit)

Reference period

Monitoring frequency

Monitoring standard or method Note 6

W4 on site plan in schedule 2 emission to River Thames at map reference TQ 4822 8152 only after entering a significantly larger direct release

Cadmium Watertreatment plant effluent

10 g/l - Annual Compliance based on mass balance calculation

W5 on site plan in schedule 2 emission to River Thames at map reference TQ 4822 8152 only after entering a significantly larger direct release

Noparameters set

Other minor flows as identified in Aqueous Releases Report BPS-IPPC007

- - - -

W6 on site plan in schedule 2 emission to Dagenham Breach at map reference TQ 4920 8254

Oil Uncontamina-ted surface water run-off via oil/water interceptor

None detectable

- Continuous Indicative monitoring system

W7 on site plan in Schedule 2 emission to Dagenham Breach

Oil Uncontamina-ted surface water run-off via oil/water interceptor

None detectable

- Continuous Indicative monitoring system

Note 1: The emission limit shall apply during periods of abnormal operation when the Operator is required by the National Grid to continue generation after there has been a steam turbine trip or cooling water pump failure as specified in the application.

Note 2: The emission limit shall not apply for the 5-minute period following commencement of flushing and cooling cell purge.

Note 3: This is a differential value with respect to the background level in the River Thames at the discharge location.

Note 4: The discharge limit shall apply when the demineralised water tank is drained under emergency conditions and under other emergency conditions agreed in writing with the Agency.

Note 5: The duration of release shall not exceed 1 hour per day excluding gate opening and closing times. Note 6: Or alternative monitoring method as agreed in writing with the Agency.

Variation notice number EPR/RP3133BH/V002

Page 8 04/11/10

Page 141: Report - LBBD

| Issue | 4 September 2019

\\GLOBAL.ARUP.COM\LONDON\PTG\ICL-JOBS\268000\268591-00 BARKING POWER STATION REMEDIATION\4 INTERNAL PROJECT DATA\4-05 ARUP REPORTS\01. CONTAM PRA AND SIS\PRA\BPS GROUND CONTAMINATION PRA ISSUE 1_FINAL.DOCX

Page F2

F2 COMAH

Page 142: Report - LBBD
Page 143: Report - LBBD
Page 144: Report - LBBD
Page 145: Report - LBBD

| Issue | 4 September 2019

\\GLOBAL.ARUP.COM\LONDON\PTG\ICL-JOBS\268000\268591-00 BARKING POWER STATION REMEDIATION\4 INTERNAL PROJECT DATA\4-05 ARUP REPORTS\01. CONTAM PRA AND SIS\PRA\BPS GROUND CONTAMINATION PRA ISSUE 1_FINAL.DOCX

Page F3

F3 Barking Power Station pollution incident records

Page 146: Report - LBBD

From: McLay, Rod

Sent: 05 December 2008 14:58

To: Cheetham, Colin

Cc: MacDonald, Donald; Andesilic, Dragana

Subject: Boiler Blowdown

Hi Colin, Just to confirm that as we discussed yesterday we are investigating a possible leak on our main that runs from the blowdown sump to the CW return (emission point W3). We are trying to get a camera along this today to better understand the problem so that we can then decide on an appropriate fix if required. Pressure is not being retained by this line so it is quite possible that this is leaking, but once we find out more we will let you know. If we find this has been leaking, it is only boiler blowdown that this main conveys, so if anything has gone to ground it will be fairly good quality water. In the meantime we are using a diesel pump to transfer blowdown to the discharge point, but this bypasses the meter. The sump is being pumped down between two known levels and records of this kept so that a daily total is still maintained. Over the last three weeks the most blowdown we have discharged in a 24h period was 244m3 against our ELV of 600m3 so I do not envisage us getting close to ELV. Hopefully this temporary arrangement is OK? I'll update you next week once we know more. Thanks, Rod. Rod McLay HSE Engineer Thames Power Services Ltd Barking Power Station Chequers Lane Dagenham Essex RM9 6PF Tel: 0208 9845017 Mob: 07803 760180 [email protected]

Page 147: Report - LBBD

THAMES POWER SERVICES

BARKING POWER STATION

INCIDENT ON THE 27TH AUGUST 1995 The above incident involved the overflow of the cooling tower basin and the subsequent release of river water to Dagenham Breach. During the preparation for the flushing sequence it has been found that the dechlorination was taking approximately 20 minutes. The timer for this step was set for 11 minutes, and the last 120 seconds of this time will not allow a hold to be instigated. To allow for a manual check on the chlorine level prior to discharging to the river the operator instigated a hold in the sequence, but this was in the 120 second period. Although the hold had been initiated the sequence did not stop and the flushing gate started to open. Because the manual tests results were not available the flushing gate was selected to manual and closed. On another DCS screen the return gate was closing automatically as part of the sequence, because both gates were closing the tower level started to rise and overflow onto the area around the CW switch room. The water levels were high and the Shift Team Leader was concerned about safety of personnel and further ingress of water into the plant and equipment. Therefore the storm water pumps were run for approximately 10 minutes to drop the level around the site and the building main doors were closed on the turbine hall. Duncan Stewart was then contacted at home and asked if the remaining water could be pumped to the Breach, the Shift Team Leader was informed that it should not. Although the storm water system was full of river water the immediate danger to plant and personnel had passed and a tanker was called in the following morning to pump out the storm water sump and to dump it into the boiler blowdown sump which is pumped into the cooling water outlet bay. ACTIONS 1. The alphanumerics on the flush sequence screen will be discretely labelled to indicate

which timer is running in the sequence 2. Both gates to be placed on the one screen 3. Timer to be extended to match the dechlorination times 4. The tower level alarm to be made a category 1 alarm and the possibility of extra level

transmitters investigated. 5. The sequence to time out and wait for manual intervention before progressing to the

flushing stage.

Page 148: Report - LBBD
Page 149: Report - LBBD
Page 150: Report - LBBD
Page 151: Report - LBBD
Page 152: Report - LBBD

22/08/2019

1

THAMES POWER SERVICES

BARKING POWER STATION

REPORT ON THE DISCHARGE OF SALINE WATER TO DAGENHAM BREACH. ON THE

27TH AUGUST AT APPROXIMATELY 0200 HRS.

When the power station is operating in the secondary cooling mode Barking Power Station is allowed one hour out of every twenty four to flush the circuit (discharge the contents back to the river) to prevent excessive silting in the river inlet and river outlet piping systems and reduce the build up of the concentration of salts in the system. During secondary cooling, continuous injection of sodium hypochlorite (as a source of chlorine) prevents legionellosis, and reduces the build up of algae in the condenser water circuits. Prior to the flushing sequence, the water is dechlorinated, immediately before releasing it to the river. The cause of the overflow started in the timing of the dechlorination sequence. The final 120 seconds of the sequence timer does not allow any intervention. The sequence was in this 120 second step when the step hold was initiated by the operator. The step hold was initiated to provide the operator sufficient time to double check the total chlorine content of the water prior to discharging. The operator then observed that the culvert gate was opening, and not having had the result of the manual check, the gate was manually closed, via the DCS. On another screen, the return gate was also closing automatically as part of the flushing sequence. Because both gates were closing, the level in the cooling tower basin started to rise and eventually overflow towards the CW switch gear room, and across the site. The Team Leader was concerned for the safety of the operator in the CW switch gear room, and as the water was also running towards the main plant, for the safety of personnel and equipment in that area. The station storm water pumps were switched on and run for approximately 10 minutes to drop the water level and reduce the waters progress into plant and electrical equipment. The pumps were then shut off. This emergency action was followed up by the Team Leader contacting the Environmental Co-ordinator to check that the remaining water could be pumped into the Breach. When he was informed that it could not, alternative arrangements were made. These were to pump the water into tankers and discharge these tankers into the blowdown sump for discharge into the CW outlet bay.

SEQUENCE: The following steps occurred on the 27th of August. 1. 0048 hrs - C.W. Flush group start 2. 0059 hrs - Step hold initiated 3. 0110 hrs - It was observed that the culvert gate was opening. As no report back on the

total chlorine level had been received, this gate was selected to manual and closed. 4. 0116 hrs - Report back on free chlorine received. 5. 0118 hrs - Catchment Level High alarm received 6. 0125 hrs - Cooling tower basin overflowed - Culvert gate opened manually. 7. 0130 hrs - Flushing sequence re-enabled to allow flush to re-commence and to drop the

level in the cooling tower basin. 8. High levels of water on site, storm water pumps run for approximately 10 minutes 9. Remainder of the water was pumped into a tanker and discharged into the blowdown

sump and back to the river. This occurred during the day. 10. At approximately 2000 hrs notification letter sent by fax to NRA following earlier

telephone contact.

Page 153: Report - LBBD

22/08/2019

2

ACTIONS: 1. Written and verbal reinforcement to all staff regarding the

importance of operating within the consents. 2. The alpha numerics on the flush sequence screen will be

discretely labelled to indicate which timer is running in the sequence.

3. Both gates to be placed on the one screen. 4. Timer to be extended to match the de chlorination times. 5. The tower level alarm to be made a category 1 alarm and the

possibility of extra level transmitters investigated. 6. The sequence to time out and wait for manual intervention

before progressing to the flushing stage.

Completion Date complete

steps 2 to 6 will

be complete before any attempt to operate on closed loop

cooling.

Page 154: Report - LBBD

Revision 6

PROJECT No 07-TGT-057 PROJECT ENGINEER J.A.Heslop

PROJECT TITLE Bund Management

SUBMISSION DATE : 13-2-08 BOARD MEETING

DATE :

Engineering Manager Gary Smith Client / Dept.

Manager

Endorsement

Cal Lenz

Station Manager George Opocensky Commercial

Manager

Nigel Burrows

Chief Executive

c.c.

EXECUTIVE SUMMARY AND RECOMMENDATIONS :

The ground below the Oil Mist Eliminator Exhaust and adjacent to the GT Distillate fuel skids is becoming contaminated by oil leakage / spillage. The contamination is an IPPC issue and if the contamination is not contained Barking Power Station will not meet the IPPC edict which would result in warnings from the IPPC. This project proposes to contain the oil exhaust / spillage by concreting over said areas thus stopping contamination and making clean-up easier.

PROBLEM DESCRIPTION :

1. The Oil Mist Eliminator exhaust has no containment bund and the oil sprays directly onto the shingle below. The prevention of this contamination is an IPPC edict which if un-resolved could result in warnings from the IPPC. 2. The ground to the west of the GT Distillate fuel skids is becoming contaminated by oil leakage / spillage. The prevention of this contamination is an IPPC edict which if un-resolved could result in warnings from the IPPC.

POTENTIAL SOLUTIONS

Option 1 – Do nothing This is not an option as failing to meet the IPPC requirements would result in warnings from the IPPC and if not acted upon could ultimately lead to the loss of licence to generate power.

Option 2 – Concrete over the areas concerned. Concrete the shingle areas below the Oil Mist Eliminator Exhaust and to the west of the GT Distillate fuel skids thus stopping contamination and making clean-up easier. Cost of this option is £24139.50 and work would take place this financial year.

THAMES POWER SERVICES

07-TGT-057 ENGINEERING CAPITAL EXPENDITURE

JUSTIFICATION

Page 155: Report - LBBD

Revision 6

PROPOSED SOLUTION & WORK SCOPE :

Option 2 – Concrete over the areas concerned. Concrete the shingle areas below the Oil Mist Eliminator Exhaust and to the west of the GT Distillate fuel skids thus stopping contamination and making clean-up easier. Cost of this option is £24139.50 and work would take place this financial year.

JUSTIFICATION

The IPPC edict states that Barking Power Station must prevent oil contaminating the ground in the areas mentioned. Failure to do so would result in warnings from the IPPC and if not acted upon could ultimately result in the loss of licence to generate power.

SCHEDULE

The work would be carried out in this (2007 / 2008) financial year.

RECOMMENDATION

The recommendation is to contain oil leakage / spillage by concreting over the areas mentioned. The total estimated cost is £24139.50 which includes 10% contingency. Once the work is complete the oil will be contained which will adhere to the IPPC instructions. SIGN : J.A.Heslop DATE : 13.2.08

APPENDIX A.) EAR Attached B.) Purchasing Review Document C.) Supporting Data / Financial Analysis / Documentation D.) Other