REPORT OF ENVIRONMENTAL CLEAMNCE
FOR THE PERIOD OF APRIL-2O16 TO SEPTEMBER-
2016
SUBMITTED BY-
t,
5rH FLOOR,
M/S. TOPCEM INDIA
MEGHA PLAZA, CHRISTIAN BASTI, G.S
ROAD, GUWAHATI-78|oo5
M/s. Topcem India
Cement Grinding Unit (OPC/PPC, 0.66 MTPA) at P.O. cauripur, DistrictKamrup Rural, Assam
F.No. J-1 101 1/608/2009-14 ll (l), Dated July 22,2010.
Name of The Company:
Project:
EnvironmentalClearance Letter:
Page 1 of 7
AmendmentEnvironmentalClearance Letter:
of F.No. J-11011/608/2009-lA ll (l), Dated 2nd June,2011'
-We have already installed online
monitoring device and continuousmonitoring the gaseous emlsslons.The server LinkuP has beencomoleted and the SPM data is live
on CPCB server(http/1202.191.230.91/ ) & coming to
State PCB also.- Reverse pulse jet type Bag filters to
tunnel ventilation, mill & classifierventing, Silo, Cement Packing' etc.
as oollution control equipment Is
provided.- New bags(bags as Per revlseo
norms i.e. 30 mg/Nm3) has been
reDlaced in our main bag filter (which
is connected with stack) for
controlling of the emission ofParticulate Matter ^as
per revlseonorms of 30mg/Nm'
- We have obtained Consent to
operate (cTo) for the year 2015-16from the board under, Air Ac!1981vide APCB letter no.: WB/GUWiT-1241 lPt-V 12-13199-N28 dated
09t04115.- Data of ambient air, fugitive and
stack emission is being monitored.Monitoring report is enclosed as
Annexure-|,
Continuous stack monitoring facilities to monitor gaseous
emissions from all the stacks shall be provided Particulate
We are following the National AmbientAir Quality Standards issued by the
Ministrv vide G,S.R. No.: 826(E)'
dated: i6tn November, 2009 and
accordtngly monitoring is carried out
tf'e tlalionat Ambient Air Quality Standards issued by the
Ministry vide G.S.R. No.: 826(E), dated: 16'' November'
2009 should be followed.
We are controlling fugitive emissionfrom all the sources within the latest
oermissible limits issued by the MoEFguidelines using Bag filters & water
ipraying and also bY monitoring
oarameters as required Refer
Annexure-1.
i-us emission levels including secondary fugitive
emissions from all the sources shall be controlled within the
latest oermissible limits issued by the Ministry and regularly
monitored. Guidelines/Code of Practice issued by the
CPCB should be followed
Page 2 of 7
s.N. CONDITIONS REMARKSThe company shall install adequate dust collection index to control fugitiva oints, raw millco rting, stacking),ba g areas etc. All
- We have provided the reverse oulsejet type bag filter system to control thefugitive emission.- Covered storage is provided for flyash and gypsum. For Clinker RCC Silois conslructed.- All conveyers are covered with Glsheets.
Asphalting/concreting ofthe stock-yard and loadplant shall be carriedRegular water sprinklingprone to air pollution and having high levels of pM andRSPM such as haul road, loading and unloading points,transfer points and other vulnerable areas. lt ltrall Oeensured that the ambient air quality parameters conform tothe norms prescribed by the Central pollution Control Boardin thls regard,
- concreting of road is upto 70o/ocompleted and rest will be completedsoon. The Work has stopped due torain. We ensure that we sDravwate(STP treated waste wateriregularly around loading/unloadingareas and internal road in thecement grinding unit.We are measuring Ambient airquality, the Monltoring reports areenclosed as Annexure-|.
Efforts shall be made to reduce impact of the transoort ofthe.raw materials and end products on the surroundingenvironment including agricultural land. All th;raw materials including fly ash should be transported in theclosed containers only and should not be overloaded.Vehicular emissions shall be regularly monitored.
We have taken all precautions toreduce impact of transport of rawmaterlal etc in the surroundingenvironment including agriculturalland. Such as Fly ash is transported inclosed container, internal roads ofplant are paved and regular sprinklingof water done on roads. We naveseparate parkinq areas for trucks.
vii. Total water requirement for cement plant from bore weltsshall not exceed Som'/day. All the treated wastewater shallbe recycled and reused in the process and/ or for dustsuppression and green belt development and other plantrelated activities .etc. No process wastewater sha bedischarged outside the factory premises and zero discharoeshall be adopted.
- Total water requirement does notexceed 50m3/day.
- Being a Zero Discharge unit nowaste water is generated.
- Sewage Treatment Plant has Deenconstructed and waste water is usinofor spraying and plantation afteitreatment.
v r. Efforts shall be made to make use of rain water harvested.lf needed, capacity of the reservoir shall be enhanced tomeet the maximum water requirement. Only balance waterrequirement shall be met from otner sources,
Rain water harvesting system hasbeen installed for conservation of rainwater. All the rooftop water is collectedand discharging deep into the groundfor recharging the ground water.
tx. All the bag filter dust, raw meal dust, coal dust, clinker dustand cement dust from pollution control devices shall berecycled and reused in the process used for cementmanufacturing. Spent oil and batteries should be sold toauthorized recyclers / reproessors only.
Dust from the pollution control devicesis recycled and reused in the cementmanufacturing process. Spent oilreused in the plant machineries forlubrication.
X. Green belt shall be developed in an area of 6.6 acres. inand around the cement plant as per the CPCB guidelines tomitlgate the etfects of air emissions in consultation withlocal DFO.
We are developing the green bettinside the plant premises to mitigatethe effects of pollution in consultationwith local DFO.
xt. All the recommendations made in the Chapter on CoroorateResponsibility for Environment protection (CREp) fbr theCement plants shall be implemented.
All the CREP conditions for rneCement plants are implemented andfollowed.
xll Risk and Disaster Management plan along with themitigation measures shall be prepared and a copy'submitted to the Ministry's Regional Office at Shiltong',
Complied with.
TO 3of7
A ulh oiise d S iq na torY
ffisue of Environment
Cnr-wG" Oeta'ts along with time
iiir.i ""ti"" plan is prepared-
-andli,l"ou -i"utiii"d to the [esional
6in""' ot the MoEF at Shillong
X"""roi"gry corPorate Social
1""*..i6iritv abtiviiies ate being
followed with.
should bensibility and
^tan c.hottldIru itvrrv' Plan shouldstry's Regional Officeprogram should De
bound manner'
construction labour
ucture and facilities
-^hira sTP safe
:i;H;'$:iJi' H:5;::i T:iii !lii-l$1*:ii ;ri:fl :$li, *'fi l1*"':"X'* :inlioiary
structu res to be
B. General Conditions:
STATUS
- ioiilrnoi"nt air quality monitoring
;;.;;;* identified in consultation
*itn Pottution Control Board'
- Outu on ambient air quality-and
"tliaion are enclosed as Annexure-
\ ease+otz
A"reei withjl/e aA complying with all
inZ-itiprtution made.bJ th: -ttflii""t"
'iJirii". control Board and the
to the stiPulationsrol Board and the
Pt,"r "PP."a] "fthe Ministry of
Lniito"fiEnt and Forests "ll b? li!:l
i"i tirin", *p"*ion or modifications in
he Plant shall be.
the Ministry ol
no'il0 *nn. Monitoring reports are
eiclosed as Annexure-l'units shall
fied bY this
stations should be
established in the downwar 3i^*?'l^":^yL%:
l",iin"- ipCercicB once in six months'ilnq; tero discharge unit no"n?ultriui *u.t" *ater is generated
.
F^ortreated sor GSR 422{qq3 or as
(E) dated 1 e'" Mav,. 1 ?1t- "l:^1"#;;;iil"f:3^:ii ;:
amended form time to time l ne
utilized for Plantation Purpose
ilG hu-u" *d",tuken all the r"T!f:"nO "n.ut"
that noise. levels- remaln
i'j,tii" ' tn" limit. Noise monitoring
r"oortt ur" "n"foaed
as Annexure-l'
Plant area shallbebY Providing nolsehn.r.lq silencers,
;"1:i|hir;"?$'?+"i1T?"i""*.H":::1";"ffialnbient nolseprescribed underbnd 70 dBA (nigh
#Fsurveillance gl-!!9-Y9I!1€Il r!91'"-::
,4*r16sr.|s e ct Si€nalolt
s. N. CONDITIONS STATUS
done on a regular basis and records maintained as per theFactories Act.
workers is being carried out on regularbasis and records are maintained asoer the Factories Act.
v l The company shall develop surface water harvestingstructures to harvest the rain water for utilization in the leanseason besides recharging the ground water table.
Surface water harvesting(Rain waterharvesting) structures are completedWe are using the rain waler for difierentpurpose.
ix. The project proponent shall also comply with all theenvironmental protection measures and safeguardsrecommended in the El,ay'EMP report. Further, the companymust undertake socio-economic develooment activities in thesurrounding villages like community developmentprogrammes, educational programmes, drinking watersupply and health care etc.
We are complying the protectionmeasures and safeguardsrecommended in the EIA,/EMP reoortand community developmentprogrammes are initiated in the area
X Requisite amount of funds shall be earmarked for theenvironment pollution control measures to implement theconditions stipulated by the Minisky of Environment andForests as well as the State Government. An implementationschedule for implementing all the conditions stipulated hereinshall be submitted to the Regional Office of the Ministry atShillong. The funds so provided shall not be diverted for anyolner ouroose.
Complied with.
xi. A copy of clearance letter shall be sent by the proponent toconcerned Panchayat, Zila Parishad/Municipal Corporation,Urban Local Body and the local NGO, if any, from whomsuggestions/representations, if any, were received whileprocessing the proposal. The clearance lefter shall also beput on the web site of the company by the proponent.
- No such suggestions/ representationsfrom concerned Panchayat, ZilaParishad/Municipal Corporation,Urban Local Body and the local NGOwere received while processing theproposar.
- The clearance letter is uoloaded onour company website i ewww.toocem. in
xii. The project proponent shall upload the status of complianceof the stipulated environment clearance conditions, includingresults of monitored data on their website and shall uodatethe same periodically. lt shall simultaneously be sent to theRegional Office of the MoEF at Shillong. The respectiveZonal Officd of CPCB and the SPCB. The criteria pollutantlevels namely; PMro, SO2, NOx (ambient levels as well asstack emissions) or critical sectoral parameters, indicated forthe projects shall be monitored and displayed at aconvenient location near the main gate of the company in theoublic domain.
-Status of the compliance of thestiDulated environment clearancecondition including monitoring data areuploaded in our website i.e.www.toocem.in and also sent to theRegional Office of lVloEF, theresoective Zonal Office of CPCB andthe SPCB.-The new electronic eouioment fordisplaying the monitored data hasinstalled.
xlll. The project proponent shall also submit six monthly reportson the status of the comoliance of the stiDulatedenvironmental conditions including results of monitored data(both in hard copies as well as by e-mail) to the RegionalOffice of MoEF, the respective Zonal Office of CPCB and theSPCB. The Regional Office of this Ministry at Shillong/CPCB / SPCB shall monitor the stioulated conditions.
Regularly submitting six monthlyreports on the status of the complianceof the stipulated environmentalconditions including results ofmonitored data to respective agenciesas stioulated.
Author;sed Signatoty
Page 5 of 7
CONDITIONS STATUS I
The environmental statement for the
financial year 2015-16 was submitted
on 1 8th May 2016.
s. N.
xtv The environmental statement for each financlal year ending
Shillong by e-mail.
Shillong.
xv. Complied with.
XVI.Complied with.
8 The Ministry may revoke or suspend the clearance, if
imolementation of any of the above conditions is not
satisfactory.
Agreed with.
9. ft'e fvfinistry reserves the right to stipulate .additionalconditions if found necessary. The company in a trme Douno
manner shall implement these conditions.
Agreed with.
10. Agreed with.
11. r theano
ment1991
along with their amendments and Rules
Agreed with.
TOPCE DIA
Auth'Jr;se d Signatorl
Page 6 of 7
Page 7 of 7
ANNEXURE-I
MONITORING REPORTS