Page 1: Report of the SCWG to HSSC 6 November 2014

Hydrographic Services and Standards CommitteeHydrographic Services and Standards Committee

Report of the SCWGReport of the SCWGto HSSC 6to HSSC 6

November 2014November 2014

Page 2: Report of the SCWG to HSSC 6 November 2014

Principal activities and achievementsPrincipal activities and achievements

The 2The 2stst meeting of the SCWG took place at the Office of the meeting of the SCWG took place at the Office of the Department of Oceans and Fisheries (DOF), Québec City, Department of Oceans and Fisheries (DOF), Québec City, Canada from 28 to 30 May 2014 and was hosted by the Canada from 28 to 30 May 2014 and was hosted by the Canadian Hydrographic Service (CHS). The meeting was Canadian Hydrographic Service (CHS). The meeting was attended by 12 representatives from 5 IHO Member States, attended by 12 representatives from 5 IHO Member States, the IHB and expert contributors from the Center for Coastal the IHB and expert contributors from the Center for Coastal and Ocean Mapping of the University of New Hampshire and Ocean Mapping of the University of New Hampshire (UNH), SPAWAR Atlantic, Jeppesen and Caris.(UNH), SPAWAR Atlantic, Jeppesen and Caris.

Page 3: Report of the SCWG to HSSC 6 November 2014

Principal activities and achievementsPrincipal activities and achievements

The SCWG received presentations covering the analysis of a The SCWG received presentations covering the analysis of a Surface Currents design survey and results from UNH, CO-OPS Surface Currents design survey and results from UNH, CO-OPS current data telemetry and formatting from NOAA, Raster Surface current data telemetry and formatting from NOAA, Raster Surface Currents from Caris and the operational forecast model system Currents from Caris and the operational forecast model system for Surface Currents from Canadian Hydrographic Service (CHS) for Surface Currents from Canadian Hydrographic Service (CHS) respectively. The SCWG then received an analysis of the respectively. The SCWG then received an analysis of the responses to the User Survey questionnaire prepared by the responses to the User Survey questionnaire prepared by the Netherlands and Spain. Netherlands and Spain.

Page 4: Report of the SCWG to HSSC 6 November 2014

Principal activities and achievementsPrincipal activities and achievements Coverage types for currents were discussed, and a list of potential Coverage types for currents were discussed, and a list of potential

Features and Attributes was presented and revised. Features are planned Features and Attributes was presented and revised. Features are planned to include grids of water speed, direction, uncertainty in speed and to include grids of water speed, direction, uncertainty in speed and direction, and water level referenced to a suitable datum. direction, and water level referenced to a suitable datum.

It was agreed that test surface current data sets would be sent to SPAWAR It was agreed that test surface current data sets would be sent to SPAWAR Atlantic (in HDF5 format if possible) to be reviewed in preparation for Atlantic (in HDF5 format if possible) to be reviewed in preparation for creating an S-111 portrayal testing capability. creating an S-111 portrayal testing capability.

The SCWG devoted time to undertake an in-depth review of the draft The SCWG devoted time to undertake an in-depth review of the draft S-111 Product Specification, achieving significant progress towards S-111 Product Specification, achieving significant progress towards development of an initial complete first version. Scheduling for subsequent development of an initial complete first version. Scheduling for subsequent reviewing was discussed.reviewing was discussed.

Page 5: Report of the SCWG to HSSC 6 November 2014

Problems or outstanding issuesProblems or outstanding issues

Continued development of the S-111 Product Specification, Continued development of the S-111 Product Specification, especially sections not sufficiently addressed by any existing especially sections not sufficiently addressed by any existing PS (exchange of large 3-d data sets, portrayal of time series of PS (exchange of large 3-d data sets, portrayal of time series of vectors, layering and symbol priority, etc.).vectors, layering and symbol priority, etc.).

Accessing test data sets from various HOs in preparation for Accessing test data sets from various HOs in preparation for creating a S-111 test portrayal model. Establishing a common creating a S-111 test portrayal model. Establishing a common format.format.

Consulting with TWLWG on establishment of common vertical Consulting with TWLWG on establishment of common vertical datums for currents referenced to a water level. Also, datums for currents referenced to a water level. Also, transmission of real-time data.transmission of real-time data.

Page 6: Report of the SCWG to HSSC 6 November 2014

Future work programmeFuture work programme

The SCWG revised its Work Plan for the period 2015-2016, The SCWG revised its Work Plan for the period 2015-2016, which will be submitted to HSSC 6 for endorsement. which will be submitted to HSSC 6 for endorsement.

Page 7: Report of the SCWG to HSSC 6 November 2014

Action requested of HSSCAction requested of HSSC

a.a. note the SCWG report note the SCWG report b.b. re-appoint the SCWG to continue its work re-appoint the SCWG to continue its work

under under its current Terms of Referenceits current Terms of Reference c.c. endorse the draft Work Planendorse the draft Work Plan