Report of the Strategic Director (Regeneration & Culture) to the meeting of Environment and Waste Management Overview & Scrutiny Committee to be held on 28 October 2014.
R
Subject: ‘My Journey’ West Yorkshire Local Transport Plan 2011 – 2026 Progress Report
Summary statement: This report outlines progress made in developing and delivering the third West Yorkshire Local Transport Plan (LTP) during its third year of operation, with a specific focus on the Bradford elements of the Plan, and the development and initial delivery of the second LTP Implementation Plan.
Mike Cowlam Strategic Director (Regeneration & Culture)
Portfolio: Housing, Planning & Transport
Report Contact: Joe Grint – Principal Engineer (Transport Planning) Phone: (01274) 434645 E-mail: [email protected]
Overview & Scrutiny Area: Environment & Waste Management
1. SUMMARY 1.1 This report outlines progress made in developing and delivering the third West
Yorkshire Local Transport Plan (LTP) during its third year of operation, with a specific focus on Bradford elements of the Plan, and the development and initial delivery of the second LTP Implementation Plan.
2. BACKGROUND 2.1. The third West Yorkshire Local Transport Plan (LTP), which covers the years from
2011 to 2026, was approved by the then West Yorkshire Integrated Transport Authority (ITA) in March 2011.
2.2. The objectives of the plan are as follows:
• To improve connectivity to support economic activity and growth in West Yorkshire and the Leeds City Region
• To make substantial progress towards a low carbon, sustainable transport system for West Yorkshire, while recognising transport's contribution to national carbon reduction plans.
• To enhance the quality of life of people living in, working in and visiting West Yorkshire
2.3. To focus delivery of the Plan it has been split into 3 year Implementation Plans, the first of which spanned April 2011 to March 2014 with the second covering the period between April 2014 and April 2017.
Progress on Implementation Plan 1
2.4. Progress on the Integrated Transport capital schemes that have been, or are being, implemented by the Council is shown in Appendix 1. Highway Asset Management programmes are set on an annual basis and in recent years have been set by the Executive or the local Area Committees as appropriate in accordance with the delegation arrangements previously agreed. The general approach to Highways Asset Management is the subject of a future report to this Committee.
2.5. Further information about the work that has been undertaken in Bradford during
2013/14 through the LTP and a number of related funding streams is provided at Appendix 2.
LTP Implementation Plan 2
2.6 The development of the second Implementation Plan during 2013 was set in the
context of uncertainties related to the Government’s redirection of 44% of LTP Integrated Transport Funding to the Single Local Growth Fund which was the subject of a bidding process. An Interim Implementation Plan 2 of the Local Transport Plan was therefore developed during 2013 and approved by the ITA in January 2014 to allow delivery of the Plan to commence in April 2014. This Interim Implementation Plan is now being updated in the context of the Single Local Growth Fund allocation announcement made in July 2014.
2.7 More details of the funding announcement on the Single Local Growth Fund and its impact on Bradford’s strategic transport investment priorities will be provided in a report to the next meeting of this Committee.
2.8 It should be also be noted that recent changes in the way that the DfT calculate
annual Integrated Transport funding paid to authorities will result in West Yorkshire receiving approximately £2m less each year (£13m rather than £15m) than the level of funding previously expected for future years (from 2015/16). This is because one part of the formula the DfT uses has changed to reflect numbers of casualties per kilometre of road rather than absolute numbers of casualties. This generally disbenefits the Metropolitan areas and other conurbations and favours more rural authorities. It should be stressed that this may not necessarily impact on the overall Safer Roads spend across West Yorkshire as this is determined at a local level from the available funding.
2.9 The Interim Implementation Plan 2 is now at the early stage of delivery across the
following themes:
• Assets
• Network Management
• Information
• Cycling and Walking
• Integrated Public Transport
• Safer Roads
• Bids and Leverage
• Low Carbon Fuels and Technologies
• Other (feasibility, monitoring and evaluation) 2.10 Details of the individual projects and programme areas included in the Interim
Implementation Plan are contained in Appendix 3. The main change to the Plan affecting Bradford is that a scheme for Bradford City Centre Variable Message Car Park Signing is now proposed to be included in the final Implementation Plan as this is a key project that is not being funded through the Single Local Growth Fund.
2.11 The Plan is still in the early stage of delivery but projects already completed or
initiated in Bradford include:
� The low carbon fuels and technologies funding allocation has been used to match a £46k DEFRA Grant and funding from the Bradford Institute of Health Research to deliver an air quality and behaviour change research project in partnership with the Bradford Health Research Institute (BIHR). The funding will provide a two year post for a researcher and recruitment is underway.
� The same funding stream is also being utilised to fund a West Yorkshire Low
Emission Zone feasibility study which is an extrapolation of the current Bradford/Leeds work. Modelling work has started and it is expected that the study will be completed by spring 2015.
• A further £50,000 of LTP funding was allocated to Bradford in September to install five charge points at partner organisations across the district. Key facilities at the The University of Bradford, Bradford District Care Trust and Airedale General Hospital will benefit from the funding enabling staff, visitors and fleet vehicles to charge up. The installations are due to be completed by March 2015.
3. OTHER CONSIDERATIONS
Other Transport Issues
Bradford Interchange & Forster Square Station
3.1 A Project Board and working groups with officers from the Council, Metro, Network Rail and Northern Rail have been established to develop short, medium and long term interventions that will ultimately transform Bradford Interchange and Forster Square so that they reflect their status as major gateways to a Regional City. A scheme to improve pedestrian and cycling links, as well as the urban environment, between the stations themselves, and their connections to the City Centre, is currently being implemented. A funding allocation to provide improvements to ‘Gateway’ stations across West Yorkshire including the Interchange and Forster Square has been included in the West Yorkshire Plus Transport Fund with the intention of levering in other funding. To inform this potential investment Masterplans have been developed for Bradford Interchange and Forster Square Station. More information on these will be provided in a future report to this Committee.
Local Pinch Point Fund
3.2 The Council submitted a successful bid for £2.665m support from the £170m DfT Local Pinch Point Fund for junction improvements at Canal Road / Stanley Road. This bid required a 30% contribution to be made from local sources and Executive agreed to allocate £1.143m from the Capital Plan to support this scheme. The DfT funding will allow this scheme to be implemented as the first significant phase of the Canal Road Improvements proposed in the ‘West Yorkshire Plus’ Transport Fund core package. Delivery of the scheme has commenced with the first phase being the extension of a culvert under Canal Road.
Air Quality 3.3 The impact of transport on Air Quality and consequential health issues is of
increasing concern. The District has four declared Air Quality Management Areas and a large number of other locations are thought to be at or close to exceedance levels. Particulate air pollution has been assessed as is responsible for 5.3% of all deaths in the Bradford district.
3.4 The UK is currently facing infraction proceedings from the EU due to failure to meet
air quality targets. It is expected that the case will soon be referred to the European Court of Justice and the UK could be subsequently fined approximately £300 million or receive ‘unlimited’ fines. The new Localism Bill leaves specific provision for the
‘passing on’ of fines seen to be as a result of the actions or inactions of the Local Authority.
3.5 The health impact of air quality on the Bradford population and the potential of fines
being imposed by the EU are a serious concern to the Council and the importance of encouraging more sustainable modes of travel and addressing congestion issues that impact on air quality cannot be overstated. A Low Emission Strategy (LES) for Bradford has already been developed and was adopted in November 2013 (the 2nd in the UK). The Council is now managing and chairing development of a West Yorkshire LES which should be completed in early 2015. With the support of DEFRA grants and Local Transport Plan funding other initiatives are being developed across West Yorkshire to help address this important issue as outlined earlier and below.
3.6 The Council recently submitted a bid to DEFRA to fund equipment to fit 25 buses
which operate in the District with equipment to clean up their emissions and was awarded the full sum requested (£394,998). The possibility of submitting further bids to fund infrastructure to support Low Emission Vehicles through OLEV funding is also currently being considered. These work streams are reported to the Health and Well Being Board in Bradford
Strategic Transport Priorities and West Yorkshire Plus Transport Fund
3.7 A number of other issues relating to Bradford and West Yorkshire wide strategic transport priorities including the West Yorkshire Plus Transport Fund, the Calder Valley Line, links to Leeds Bradford Airport, HS2 and West Yorkshire Bus Strategy will be considered in a report to this Committee at a future meeting.
4. FINANCIAL & RESOURCE APPRAISAL 4.1 The measures being undertaken by the Council and its partners through the Local
Transport Plan are being delivered from the Capital and Revenue funding and staff resources available.
5. RISK MANAGEMENT AND GOVERNANCE ISSUES 5.1 Both the Council and the WYCA have well developed performance management
processes to manage risk in a timely and effective manner. The programmes included in this report are subject to these processes.
6. LEGAL APPRAISAL 6.1 The programmes of work identified in this report are being implemented through the
Council’s role as Highway and Traffic Regulation Authority and the WYCA’s role as Transport Authority
7. OTHER IMPLICATIONS
Fuller details of many of the other implications of LTP3 were considered in an Integrated Sustainability Appraisal (ISA) details of which were provided in the Transport Delivery Plan report to Executive in March 2011. However key points are listed below.
7.1 EQUALITY & DIVERSITY 7.1.1 The public sector equality duty in s149 of the Equality Act applies to the Council in
the exercise of its functions. Those functions will include most, if not all, of the proposals and other measures referred to in this report.
7.1.2 The duty is to "have due regard to the need to (a) eliminate discrimination,
harassment, victimisation and any other conduct that it prohibited by or under [the 2010 Act], (b) advance equality of opportunity between persons who share relevant protected characteristics and persons who do not share it, [and] (c) foster good relations between persons who share a relevant protected characteristic and persons who do not share it". In summary, this includes the need to remove or minimise disadvantages suffered by persons that are connected to that relevant protected characteristic and taking steps to meet the needs of persons who share a relevant protected characteristic that are different from the needs of persons who do not share it and encouraging persons who share a relevant protected characteristic to participate in public life. It also includes taking steps to take account of disabled persons' disabilities and makes it clear that compliance with the duties "may involve treating some persons more favourably than others".
7.1.3 The duty is ‘to have regard’ which means such regard as is appropriate in the
circumstances. The duty and its effect are wide-ranging and this is also reflected in the definition of relevant protected characteristics which are age, disability, gender reassignment, pregnancy and maternity, race. religion or belief, sex and sexual orientation.
7.1.4 It is evident that all of the schemes and proposals referred to in this report have the
potential to impact on persons who share one or more of the relevant protected characteristics. Some of these were identified in the Integrated Sustainability Assessment (ISA) undertaken on the LTP3 as identified in a report to Executive on 18 March 2011 – Transport Delivery Plan 2011/12 (Paragraphs 9.1.2 to 9.1.7).
7.1.5 The factors considered in the ISA are narrower than the definitions of relevant
protected characteristics in s149 and the duty under that section itself. Due to the nature of this report it is not possible to provide any form of detailed equality impact assessment of specific schemes. However, officers will ensure that a specific assessment is carried out as part of the preparatory work for each programme or scheme as appropriate and, as far as practicable, is taken into account in the design of each scheme with Members being consulted if issues arise which either cannot be addressed, or can only be addressed with difficulty or excessive cost, as part of the programme or scheme.
7.2 SUSTAINABILITY IMPLICATIONS
The ISA considered that there were mixed implications on sustainability with neutral impacts on noise, townscape and landscape, heritage and water. Air quality, material assets, health and the economy would be benefitted by the strategy whilst biodiversity, flora and fauna could suffer minor adverse impacts dependent on the details of the schemes implemented.
7.3 GREENHOUSE GAS EMISSIONS IMPACTS
The ISA suggested that there would be a reduction of CO2 of 19% by 2025 across West Yorkshire with LTP3 proposals (compared with a do-minimum scenario).
7.4 COMMUNITY SAFETY IMPLICATIONS
Safety and Security on the Transport Network is a key consideration for LTP3. One of the key objectives is to ‘deliver an integrated, reliable transport system that enables people and goods to move around as efficiently and safely as possible’. The ISA concluded that there would be benefits from the plan in terms of reducing deaths and injuries from collisions. The LTP Implementation Plans include projects and schemes to improve safety and reduce casualties on the highway network as well as improving personal security on the public transport network.
7.5 HUMAN RIGHTS ACT
Human Rights implications are taken into account in the development of individual schemes.
7.6 TRADE UNION There are no trade union implications 7.7 WARD IMPLICATIONS
The wards in which the measures described in this report are implemented will generally benefit from the improvements. Appropriate consultation has, and will continue, to take place with Ward Members and local communities during the development of individual projects.
8. NOT FOR PUBLICATION DOCUMENTS
None. 9. OPTIONS 9.1 The Committee could support the recommendation that progress on West Yorkshire
Local Transport 3 be noted, feedback be provided to officers and that a further progress report on these issues be submitted in Autumn 2015.
9.2 The Committee could suggest an alternative approach to receiving reports on this
issue.
10. RECOMMENDATIONS 10.1 That progress on West Yorkshire Local Transport 3 be noted and feedback to
officers be provided by the Committee. 10.2 That a further report on progress on West Yorkshire LTP3 be submitted to this
Committee in Autumn 2015. 11. APPENDICES 11.1 Appendix 1 - WY Local Transport Plan 3 – Implementation Plan 1 (2011 – 2014)
Bradford Integrated Transport Capital Programme - Progress Report 11.2 Appendix 2 - Examples of Transport Projects and Initiatives Delivered In 2013/14 11.3 Appendix 3 - West Yorkshire Local Transport Plan Interim Implementation Plan 2
2014 – 2017 11.4 Appendix 4 - Glossary of Terms and Abbreviations 12. BACKGROUND DOCUMENTS 12.1 Report to Executive 12 March 2013 – Transport Delivery Plan 2013/14 12.2 Report to Executive 18 March 2011 – Transport Delivery Plan 2011/12 12.3 ‘My Journey’ – West Yorkshire Local Transport Plan 2011 - 2026 12.4 West Yorkshire Local Transport Plan 3 Integrated Sustainability Appraisal
APPENDIX 1
WY LOCAL TRANSPORT PLAN 3 – IMPLEMENTATION PLAN 1 (2011 – 2014) BRADFORD INTEGRATED TRANSPORT CAPITAL PROGRAMME - PROGRESS REPORT
Description Comments
Local Integrated Transport
Local Integrated Transport Schemes (Area Committee Prioritised) Ongoing programme of schemes mostly delivered by end of Implementation Plan 1 with any remaining schemes being delivered early in 2014/15
Measures to support hubs including pedestrian & cycling improvements and signing.
Implementation of Shipley Hub in progress including the installation of totems, improvements to station connectivity for pedestrians and cyclists, upgrading of Shipley bus station and updating wayfinding facilities throughout the town centre
Network Management
Traffic signal upgrades. Rolling programme of minor signal improvements to improve safety and efficiency and reduce ongoing maintenance costs - complete
Freight Infrastructure Small freight related schemes in Cutler Heights Lane, Gibson Street, Foundry Lane and Linton Street areas in Bradford implemented
Central Urban Traffic Management Control and Local Signal Improvements
Project in development
Information & Ticketing
Variable Message Signing Programme implemented
City Centre Public Realm Improvements
City centre public realm / traffic management improvements LTP funded improvements delivered
Description Comments
Active modes
Connect 2 / Living Street Scheme complete
Bradford District wide walking/cycling measures inc Rights of Way
Rolling programme of Rights of Way Improvements. Airedale Greenway and Wilson Rd, Wyke cycle routes complete. Hollings Hill, Baildon complete. A629 (south of Cross Roads) cycle safety improvements due for completion this financial year.
Great Northern Trail Thornton – Queensbury section now complete
Sustainable Routes to School: Cullingworth - Harden Scheme abandoned due to objections to impact on residents’ parking arrangements. Alternative scheme to be identified.
Safety & Enforcement
Provide/renew safety cameras to ensure effective enforcement including signing/lining
Rolling programme of upgrades in partnership with other WY authorities to deliver effective enforcement. IP1 element delivered
Provide fixed bus lane enforcement cameras
Mobile CCTV enforcement unit for bus lanes
IP 1 rolling programme supporting deployment of bus lane enforcement cameras at priority locations complete.
Bus priority
Bradford - Bolton Road outbound bus lane to Queens Road Scheme complete
Woodside Road Bus Priority Scheme complete
Leeds Rd: City Centre - Thornbury Bus Measures for Hyperlink Phases 1 and 2 implemented. Phase 3 in development as part of WY+TF.
Toller Lane Bus Priority Scheme now likely to be included in WY+TF Highway Efficiency & Bus Package
Allerton Rd Bus Priority Scheme now likely to be included in WY+TF Highway Efficiency & Bus Package
Thornton Road Bus Priority Scheme now likely to be included in WY+TF Highway Efficiency & Bus Package
WYSPS & Major schemes
Connecting Airedale 1 - Saltaire Roundabout & environs Scheme complete. Detailed ‘after’ studies to be undertaken shortly
Description Comments
Highways Improvements
Canal Road/Valley Rd/Otley Rd Improvements - Scheme Development
Scheme deferred due to need to tie in with proposals contained in WY+TF, Canal Road Masterplan and the Canal Road / Stanley Road Local Pinch Point Scheme
Leeds Road / Laisterdyke Junction Improvement Scheme complete
Southfield Lane / Little Horton Lane Junction Improvement Scheme complete.
Development of proposals for Harrogate Road / New Line Design work ongoing – included as a Core Project in ‘West Yorkshire Plus’ Transport Fund
Westgate Hill Street, Wakefield Road and Tong Street Improvements
High Occupancy Vehicle Lane scheme suspended due to high levels of abuse and difficulty in securing Police enforcement. Tong Street Highway Improvements now in WY+TF ‘Core Package’ with potential to deliver a ‘Phase 1 ’ project as an ‘Early Win’ scheme
Hard Ings Road & Keighley Town Centre Improvements Schemes in development. Hard Ings Road included in WY+TF Core Package
Carlisle Road / Toller Lane Junction Design
Further development awaiting outcome of further work on ‘West Yorkshire Plus’ Transport Fund Highways Efficiency and Bus Package. Demolition of Council owned properties in poor condition planned for Spring / Summer 2015
Transport Planning
Infrastructure development & planning Funding used to support bid development eg bids to Local Pinch Point Fund, Cycle City Ambition Fund, Local Sustainable Transport Fund
APPENDIX 2
EXAMPLES OF TRANSPORT PROJECTS AND INITIATIVES DELIVERED / COMMENCED IN 2013/14
A2.1 Local Transport Plan – Implementation Plan 1 Schemes
• Completion of a major project to change Saltaire Roundabout to a signal controlled junction to improve safety and provide an enhanced public realm on the edge of the World Heritage Site;
• Completion of the section of the Great Northern Trail between Thornton and Queensbury;
• Bus Lanes implemented (with enforcement cameras) on Woodside Road at Low Moor to speed up bus operations in both directions on this important corridor;
• Casualty reduction and local improvement schemes prioritised by the Area Committees through partnership working with local communities and other stakeholders have continued to be delivered including, amongst many other schemes: traffic calming schemes in Mandale Road, Buttershaw; Duchy Drive Area Heaton; Parry Lane/Lower Lane, Bowling; Broomhill Avenue, Keighley and Long Lane, Harden;
• Traffic signal refurbishments at 13 sites;
• 4 new Variable Message Signs to provide driver information and improve management of the network in the Saltaire area;
• Upgrading of Safety Cameras to improve efficiency;
• Introduction of transport hub elements in Shipley Town Centre;
• Rationalisation of bus shelters on Market Street, Bradford;
• Continuation of development work on Low Moor Rail Station by WYCA and Bradford Council including:
� Receipt of the official certificate of deviation for the proposed new rail
station (required due to non standard track curvature;
� Investigations into additional access and car parking sites to future-proof the parking provision at the station and work on securing other land required for the station;
� Securing Planning permission –the station project currently remains
on course for opening during the December 2015 timetable;
• Resurfacing and reconstruction projects throughout the district, on all types of road as below: -
A Road: 4.5km B & C Road: 4.0km Unclassified Roads: 13.5km
Notable works completed in 2013/14 year included: -
� Resurfacing to failing sections of Hall Ings in Bradford City
Centre; � Road reconstruction to the full length of Town Gate in Wyke; � A new surface provided on B6145 Thornton Road between
Girlington and City Road; � 5 Lane Ends Roundabout in Idle resurfaced; � West Lane, Keighley resurfaced between Oakworth Road and
North Dean Road.
• Street lighting improvements have been made across the District as follows:
Constituency Area Ward Road Bradford East Bolton and Undercliffe Grove House Road LED Bolton and Undercliffe Myers Lane LED Bowling and Barkerend Burras Road LED Bowling and Barkerend Thurley Road LED Idle and Thackley Town Lane, Idle Bowling and Barkerend Broad Lane, Laisterdyke Eccleshill Rowanberry Close LED
Eccleshill Whitebeam Walk LED Bradford West City Brownroyd Street LED Manningham/City Midland Road Clayton and Fairweather Lane Ends Close LED Toller Toller Lane Clayton and Fairweather The Avenue, Clayton Bradford South Wyke Roydsdale Way
Wibsey Rooley Avenue Royds Farfield Avenue Shipley Baildon Green Road, Baildon Bingley The Drive, Crossflatts Shipley Kendall Avenue Bingley Rural Main Road, Denholme
Bingley Rural Hallows Park Road
Cullingworth LED Keighley Worth Valley Providence Lane
The lighting schemes implemented this financial year have utilised LED light sources where possible and these have been indicated on the above schedule. There are significant energy savings on these units and also a reduction in the maintenance required - potentially not requiring any
reactive maintenance for 12-15 years. The use of LEDs also allows the reduction of the lighting levels in residential areas due to the white light emitted providing better colour rendering. The LEDs also ensure that the light is directed to where it should be on the carriageway and footway. Many of the schemes are also replacing old trolley poles and overhead supplies which cause significant maintenance issues affecting large numbers of lights when there are high winds and interference with highway trees.
• Significant highways structures schemes completed include:
� Brunthwaite Culvert
� Highfield Road Retaining Wall � Bolton Road Retaining Wall � Little Brook Cottage Wall � Scott Lane Retaining Wall
A wide range of other structural work was undertaken including further progress on the Primary Road Network (PRN) and non-PRN wall strengthening programme. In 2013/14 the focus was on the A647 Scarlet Heights, Queensbury, B6160 Bolton Road Wall & Stump Hill Burr Wall (Tour de France Route) and B6143 Minor maintenance works carried out at various locations.
A2.2 Leeds Rail Growth Package (Apperley Bridge Station)
Construction of the new station started in summer 2014 and the station will open in 2015.
A2.3 Cycle City Challenge (City Connect) / Walking for Health
WYCA, Leeds City Council and Bradford Council were successful in securing £18.052m to support the construction of a high quality cycle route from the east of Leeds to Bradford City Centre together with associated traffic management measures in the corridor and towpath improvements between Armley and Shipley. A further funding bid secured £250,000 for walking encouragement and engagement activities in the corridor. Designs for the cycle routes are being consulted upon and further design work is underway. Completion is due by mid 2015. More details of this major project will be provided in the report on the District’s Cycling Strategy which is to be considered by this Committee early in 2015.
A2.4 Local Sustainable Transport Fund (LSTF) Schemes
• Completion of cycling links from local communities to the Shipley – Bradford Cycle Route that is currently partly constructed with a ‘missing’ section to be delivered shortly (with the support of Public Health funding) once issues relating to contaminated land are addressed
• Improvements to cycle links between the Learning Quarter and the University Management Centre on Emm Lane
• Cycling promotion activities at Bradford College and University
• A further award from the LSTF of £300k across West Yorkshire has secured the following:
o Further funding for the go:cycling adult cycle training
programme o Mass participation events o A regional Cycle to Work Challenge programme
• A further £70k of LSTF money has also been secured for the LSTF Thematic funding stream, Access to Education, to continue a project focusing on engaging staff and students at the university and college.
A2.5 Cycle Safety Fund
The Council was successful in securing £150,000 from the Dft to support a new cycle route between Stockbridge and Utley and the scheme is now substantially complete.
A2.6 Other Cycling Strategy Initiatives A wide range of other initiatives have been delivered in alignment with the
District’s Cycling Strategy including the District’s successful involvement with the Tour de France, cycling skills training and cycling promotion and these will described in the future report on the Cycling Strategy referred to earlier.
A2.7 Congestion Performance Reward Fund Schemes
The remaining funding from this Dft programme has been used to fund the Sustrans ‘Bike It’ officer until June 2014, expand the delivery of Junior SAFEMark workshops to all schools in the Bradford district and outlying areas, and to support Workplace Travel Planning activities.
A2.8 Traffic Light Priority (TLP) for Buses
This West Yorkshire wide scheme originally included the introduction of equipment to provide bus detection for 60 sites in Bradford all of which should be implemented by the end of the current financial year. A further four locations were identified in Bradford where the implementation of TLP is desirable to assist the recently improved 72 bus route and these have also now been implemented.
A2.9 Regional Growth Funding
The successful bid by the Council for (£17.6m) is supporting, amongst many other initiatives, the delivery of City Centre public realm improvements associated with the development of the Westfield shopping centre.
A2.10 Safer Roads Initiatives
Practical Pedestrian Training The practical pedestrian training programme has been delivered in 46 schools with 2300 pupils receiving training. The programme is a positive contribution to health and sustainable travel.
Primary School Plan The Primary School Plan has been delivered in over 56 schools reaching 16,177 children. Priority Area Work
The Road Safety Team has worked with key partners to address road safety casualties in the, Bowling and Barkerend, City, Keighley Central, Bradford Moor, Manningham and Little Horton wards. Activities involving a wide range of partners have focused on community engagement, empowerment and ownership to reduce casualties. Publicity
Drivers, passengers, adult cyclists, motorcyclists and pedestrians are targeted through publicity activities. Press releases, advertising on buses, radio, JC Decaux boards, and leaflets are used to put out key messages related to seat belt wearing, speed, the use of mobile phones, drink driving, distractions and awareness of other road users.
The Road Safety Team work with the other West Yorkshire and Yorkshire and Humber authorities on publicity campaigns and support the Governments ‘Think’ campaigns.
‘Failure to Look’ - targets all road users and is the latest campaign from the West Yorkshire Safer Roads Delivery Group encouraging all road users to share the roads safely and to look out for each other.
A2.11 Workplace Travel Plans
Workplace travel planning remains a key priority in engaging employers and their staff on the benefits of sustainable travel options. The Transport Planning team continue to comment on Travel Plans associated with new developments as well as working with existing employers to ensure that the best possible travel opportunities are made available to staff across the district.
A2.12 Electric Vehicle Charging Points
In June 2013 the Council was awarded £30,000 from the Office of Low Emission Vehicles to install electric vehicle charging points on its own estate. Match funding has been pledged from CBMDC, Keighley Town Council and Baildon Parish Council to install at facilities in local centres. The first
installation (Jacobs Well) was carried out in March with installations at Baildon and Keighley due in November. The charge points will provide charging opportunities for staff, visitors and fleet vehicles using local centres across the district.
A2.13 Smart Ticketing
To date 34,000 Young Person’s Photocards and 32,762 Scholars cards (16-18) have been issued as smartcards. Over 3,800 smart Mcards have been issued to date. In total there are nearly ½ million smartcards in circulation the majority of which are used to hold Concessionary Passes. The gates at Leeds rail station and Bradford Interchange rail station have been converted to ‘read’ annual MCards (smartcards).
Some 800,000 ‘smart’ bus boarding transactions are being recorded each week. This data will be used in future as the basis of operator payments for Concessionary Travel and for the distribution of pre-paid multi operator ticket revenues. The forward plan for the smartcard project envisages weekly and monthly tickets being sold in ‘smart’ form from May 2015. This will require the deployment of a new retail network and operators configuring ticket machines.
APPENDIX 3
WEST YORKSHIRE LOCAL TRANSPORT PLAN INTERIM IMPLEMENTATION PLAN 2 2014 – 2017
Bradford schemes shown in bold West Yorkshire wide programmes / projects shown in bold italics
Profiled capital cost
2014/15 2015/16 2016/17 3 year total
Highway Asset
Highway resurfacing / reconstruction 15,458,000 21,271,000 21,271,000 58,000,000
Bridges, structures and retaining walls 6,662,000 9,169,000 9,169,000 25,000,000
Street Lighting 1,646,000 2,117,000 2,117,000 6,000,000
TOTAL HIGHWAY ASSET 89,000,000
Y2 (2015/16) and Y3 (2016/17) allocations are indicative and subject to confirmation. Further details on Bradford allocations to be provided in future report on Highways Asset Management
TOTAL HIGHWAY MAINTENANCE BLOCK 89,000,000
Public Transport Asset
Dewsbury bus station refurbishment 0 75,000 75,000 150,000
Leeds City Bus station - Carriageway structural reconstruction and toilet charging and upgrades
600,000 0 0 600,000
CCTV system (pan, tilt, zoom) camera replacement – various bus stations
75,000 75,000 150,000
Cleckheaton bus station culvert structural repairs 100,000 0 0 100,000
Bus shelter programme – 30 shelters per year 250,000 250,000 223,000 735,000
Bus shelter refurbishment to extend asset life 167,00 424,000 424,000 1,500,000
Access bus and operational vehicle replacement tbc tbc tbc 1,015,000
MyBus extend life 250,000 250,000 250,000 750,000
ICT system infrastructure 333,000 333,000 334,000 1,000,000
TOTAL PUBLIC TRANSPORT ASSET 6,000,000
Over-programming of 18% to include Bradford Interchange roof and Real Time display units 1,080,000
Network Management
Joint UTC Control
Bradford - Link to Leeds Common Data Base 0 20,000 0 20,000
Bradford - Migrate Kirklees to Common Data Base 10,000 0 0 10,000
Bradford - Add Wakefield to Common Data Base 10,000 0 0 10,000
Bradford - Purchase Additional adaptors 0 25,000 0 25,000
Bradford - Communications Link to other authorities 5,000 5,000 0 10,000
Calderdale - Provision of high grade VPN to carry additional data (UTMC, VMS, CCTV) via from other authorities 0 16,000 0 16,000
Calderdale - Hardware and software to integrate the above 0 0 0 0
Kirklees - Migrate Bradford onto Kirklees UTMC Computer (under review) 0 80,000 0 80,000
Kirklees - High Speed Comms to Bradford for UTMC 0 20,000 0 20,000
Leeds - Provision of high grade VPN to carry additional data (UTMC, VMS, CCTV) via from other authorities 25,000 25,000 0 50,000
Leeds - Hardware and software to integrate the above 15,000 20,000 0 35,000
Leeds - Link to Bradford’s Common Data Base 0 20,000 0 20,000
Wakefield - Adaptor Software to allow connection to Bradford's CDB 40,000 0 0 40,000
Wakefield - High Speed Comms to Bradford for UTMC 20,000 0 0 20,000
West Yorkshire Improved Data Network
Bradford - Blue Tooth vehicle detectors for journey times 20,000 30,000 20,000 70,000
Bradford - Equipment for UTMC control 10,000 10,000 15,000 35,000
Bradford - Wi-Fi Improvements at 160 Sites 60,000 60,000 60,000 180,000
Bradford - Remote Monitoring of sites 50,000 50,000 45,000 145,000
Calderdale - Blue Tooth vehicle detectors for journey times 10,000 10,000 10,000 30,000
Calderdale - Modify UTMC interfaces to include Google live link speeds
3,000 0 0 3,000
Kirklees - Flint Street Mesh Manager Works 15,000 0 0 15,000
Kirklees - A629 - Halifax Road - Huddersfield 361 to IP 30,000 0 0 30,000
Kirklees - A653 - Leeds Road - Dewsbury 361 to IP 0 20,000 0 20,000
Kirklees - A640 - Trinity Street - Huddersfield 361 to IP 0 30,000 0 30,000
Kirklees - A641 - Bradford Road - Huddersfield 361 to IP 30,000 0 0 30,000
Kirklees - A62 - Birstall 361 to IP 0 40,000 0 40,000
Kirklees - A644 / Huddersfield Rd - Ravensthorpe 361 to IP 0 45,000 0 45,000
Kirklees - Air Quality and Bluetooth Sites to be Identified 15,000 15,000 20,000 50,000
Kirklees - A62 - Bradley Area - Huddersfield 361 to IP 55,000 0 0 55,000
Kirklees - A652 - Bradford Road - Batley 361 to IP 0 0 30,000 30,000
Kirklees - A62 - St Andrews Area - Huddersfield from 2.4Ghz to 5 Ghz 30,000 0 0 30,000
Kirklees - A644 - Huddersfield Road - Mirfield 361 to IP 0 15,000 0 15,000
Kirklees - A62 - Manchester Road - Huddersfield 361 to IP 0 25,000 0 25,000
Kirklees - A62 / A638 - Heckmondwike 361 to IP 0 0 35,000 35,000
Kirklees - A638 - Staincliffe 0361 to IP 0 0 25,000 25,000
Kirklees - Additional 30 Wireless Nodes 20,000 20,000 20,000 60,000
Leeds - Blue Tooth vehicle detectors for journey times 40,000 45,000 40,000 125,000
Leeds - Blue Tooth vehicle detectors for journey times 30,000 0 0 30,000
Leeds - Modify UTMC interfaces to include Google live link speeds 112,000 112,000 112,000 336,000
Wakefield - Migrate Communications to IP or Wireless Mediums 30,000 50,000 50,000 130,000
Wakefield - IP UTMC Cameras 20,000 20,000 20,000 60,000
Wakefield - Blue Tooth vehicle detectors for journey times 20,000 40,000 5,000 65,000
Improve Signals Operation
Bradford - Manningham lane / Drewton Road 77,000 0 0 77,000
Bradford - Chester Street / Little Horton Lane 57,000 0 0 57,000
Bradford - Toller Lane / Haworth Road 57,000 0 0 57,000
Bradford - Haworth Road / Chellow Grange 0 30,000 0 30,000
Bradford - Croft Street / Brittannia Street 0 36,000 0 36,000
Bradford - Harrogate Road / Tenterfields 0 25,000 0 25,000
Bradford - Thornton Road / Cemetery Road 0 25,000 0 25,000
Bradford - Fenby Ave / Cutler Heights 0 30,000 0 30,000
Bradford – Manningham Lane / Queens Road 0 0 67,000 67,000
Bradford Road / Granby Lane 0 0 57,000 57,000
Bradford - Wakefield Road Gyratory 0 0 77,000 77,000
Calderdale - A641 Bradford Road / Bailiff Bridge - MOVA Conversion 24,000 0 0 24,000
Calderdale - A629 Ovenden Road / Shroggs Road - MOVA Conversion 24,000 0 0 24,000
Calderdale - A629 Ovenden Road / North Ovenden Way - MOVA Conversion 0 24,000 0 24,000
Calderdale - A629 Ovenden Road / North Nursery Lane - MOVA Conversion 0 0 24,000 24,000
Calderdale - A672 Oldham Road / Ripponden - MOVA Conversion 0 0 24,000 24,000
Calderdale - A58 / Kings Cross / Parkinson lane 75,000 0 0 75,000
Calderdale - A641 Bradford Road / Bailiff Bridge 75,000 0 0 75,000
Calderdale - A629 Ovenden Road / North Shroggs Road 0 0 80,000 80,000
Calderdale - A58 / Wharf Street / Tuel Lane 0 75,000 0 75,000
Calderdale - A629 / Huddersfield Road / Shaw Hill / Free School Lane 0 80,000 0 80,000
Calderdale - Cycling facilities at various locations 20,000 20,000 20,000 60,000
Kirklees - A629 / SouthGate / Shorehead Roundabout 35,000 0 0 35,000
Kirklees - A62 / A652 / Birstall Smithies to M62 J27 Scoot + Bus Priority 60,000 0 0 60,000
Kirklees - A641 / Bradford Road Scoot & Bus Priority 60,000 0 0 60,000
Kirklees - A644 / Mirfield Scoot + Bus Priority 40,000 0 0 40,000
Kirklees - A62 / Leeds Road / Gt Northern Retail Park 0 130,000 0 130,000
Kirklees - A62 / Leeds Road / Old Fieldhouse Lane 0 0 105,000 105,000
Kirklees - A616 / Lockwood Bar / Swan lane 0 0 110,000 110,000
Kirklees - A62 / Castlegate / Alfred Street 0 115,000 0 115,000
Kirklees - Huddersfield & Dewsbury RR Convert 4 Duel Crossings to Puffin Crossings 30,000 30,000 60,000 120,000
Kirklees MOVA Sites - Introduce Bus Priority (7 Sites) 28,000 28,000 28,000 84,000
Kirklees Pelican Sites - Convert 3 Pelicans to Puffins 60,000 0 0 60,000
Leeds - A6120 / Lawnswood Business Park / O.R.R - MOVA 24,000 0 0 24,000
Leeds - Harrogate Road / Street Lane / Moortown Corner - MOVA 24,000 0 0 24,000
Leeds - Leeds Road / Pontefract Road / Styebank Lane - MOVA 24,000 0 0 24,000
Leeds - A650 Britannia Rd / Howley Park Rd / Co-Operative Road - MOVA 24,000 0 0 24,000
Leeds - A650 / Fountain Street / Scotchman Lane - MOVA 24,000 0 0 24,000
Leeds - Clarendon Road / Moorland Road - MOVA 24,000 0 0 24,000
Leeds - Meanwood Road / Grove Lane / Stainbeck Road / Meanwood Hotel - MOVA 24,000 0 0 24,000
Leeds - Scott Hall Road / Potternewton Lane - MOVA 24,000 0 0 24,000
Leeds - A6120 / Shadwell Lane / Moortown - MOVA 24,000 0 0 24,000
Leeds - A6120 / O.R.R / Tongue Lane / Blackmoor Road - MOVA 0 24,000 0 24,000
Leeds - A61 Wakefield Road / Leadwell Lane - MOVA 0 24,000 0 24,000
Leeds - A639 / Holmsley Lane / Haigh Road - MOVA 0 24,000 0 24,000
Leeds - Otley Road / A660 Farrar Lane / Church Lane - MOVA 0 24,000 0 24,000
Leeds - A58 Easterley Road / Wetherby Road / Boggart Hill - MOVA 0 24,000 0 24,000
Leeds - A63 Selby Road / Ninelands Ln Fire Station – MOVA
0 24,000 0 24,000
Leeds - A656 Barnsdale Road / Newton Lane / Park Lane - MOVA 0 24,000 0 24,000
Leeds - A656 Barnsdale Rd / Station Rd / Allerton Bywater - MOVA 0 24,000 0 24,000
Leeds - Henconner Lane / Green Hill Road / Stanningley Bypass - MOVA 0 24,000 0 24,000
Leeds - A643 / Bruntcliffe Lane / Corporation Street - MOVA 0 0 24,000 24,000
Leeds - A65 / Otley Road / Park Road - MOVA 0 0 24,000 24,000
Leeds - A65 / Gill Lane / Yeadon - MOVA 0 0 24,000 24,000
Leeds - St Michaels Bridge / St Michaels Lane - MOVA 0 0 24,000 24,000
Leeds - Stanningley Bypass / Richardshaw Lane - MOVA 0 0 24,000 24,000
Leeds - A6120 / Fink Hill / Broadway / Parkside - MOVA 0 0 24,000 24,000
Leeds - A63 / Selby Road / Holyshaw Lane / Colton Road - MOVA 0 0 24,000 24,000
Leeds - A6120 Ring Rd / Seacroft / Ramshead Approach/Coal Road - MOVA 0 0 24,000 24,000
Leeds - High Street / Harrogate Road / Bayton Lane - MOVA
0 0 24,000 24,000
Wakefield - Modify and refurbish 15 Identified Junctions to facilitate MOVA control 120,000 200,000 280,000 600,000
Wakefield - Implementation of SAPS on Kirkgate and Westgate 5,000 0 0 5,000
Wakefield - Localised Widening to Bell Street / Bond Street Junction 100,000 100,000 0 200,000
Wakefield - Crosshills / Market Street Modifications 50,000 0 0 50,000
Variable Message Signs and other signing
Bradford Common Data Base Works 10,000 5,000 0 15,000
Bradford new information signs - Inter Area Strategic Routes
Bradford - Leeds Road , Shipley (towards Leeds) 1,000 30,000 0 31,000
Bradford - Leeds Road , Shipley (towards Leeds) 1,000 30,000 0 31,000
Bradford - Leeds Road , Bradford (towards Leeds) 1,000 30,000 0 31,000
Bradford - Leeds Road , Bradford (towards Leeds) 1,000 30,000 0 31,000
Bradford - Wakefield Road, Bradford (towards Kirklees) 0 1,000 30,000 31,000
Bradford - Wakefield Road, Bradford (towards Kirklees) 0 1,000 30,000 31,000
Bradford - Manchester Road, Bradford (towards Kirklees) 0 1,000 30,000 31,000
Bradford - Manchester Road, Bradford (towards Kirklees) 0 1,000 30,000 31,000
Calderdale new information signs
Calderdale - A58 Whitehall Road, Nr Hellfire Corner 1,000 30,000 0 £31,000
Calderdale - A58 Godley Lane, Halifax 1,000 30,000 0 £31,000
Calderdale - A58 Bolton Brow, Sowerby Bridge 1,000 30,000 0 £31,000
Calderdale - A629 Near Calder & Hebble, Elland 0 1,000 30,000 £31,000
Calderdale - A629 Ovenden Rd, between Shroggs Rd & Orange St 0 1,000 30,000 £31,000
Kirklees Flint Street CDB Works + PGS works 20,000 0 0 20,000
Leeds VMS Phase 2 192,000 0 0 192,000
Kirklees Snow Signs / Information
Kirklees - A62 / Leeds Road / Bradley Mills - Huddersfield 1,000 30,000 0 31,000
Kirklees - A629 / Wakefield Road / Mold Green - Huddersfield 1,000 30,000 0 31,000
Kirklees - Ring Road / Nr Springwood CP - Huddersfield 1,000 30,000 0 31,000
Kirklees - Blackley New Road / Junction 24 - Ainley Top
1,000 30,000 0 31,000
Kirklees New information signs - Inter Area Strategic Routes
Kirklees - A638 / Bradford Road / Approach to M62 Juntion 26 1,000 30,000 0 31,000
Kirklees - A62 / Geldard Road / Approach to M62 Juntion 27 1,000 30,000 0 31,000
Kirklees - A62 / Geldard Road - From Junction 27 1,000 30,000 0 31,000
Kirklees - A653 / Babes in Wood / Approach to M62 Junction 28 1,000 30,000 0 31,000
Kirklees - A653 / Babes in Wood / From M62 Junction 28 1,000 30,000 0 31,000
Kirklees - A62 / Leeds Road / Outbound to M62 Junction 25 1,000 30,000 0 31,000
Kirklees - A62 / Leeds Road / Near Range Rover Garage 0 0 31,000 31,000
Kirklees - A641 / Bradford Rd / Fixby towards Brighouse & Bradford 0 0 31,000 31,000
Kirklees - A629 / Halifax Rd / Outbound to M62 Junction 24 0 0 31,000 31,000
Kirklees - A650 / Drighlington Bypass towards Bradford 0 0 31,000 31,000
Kirklees New information signs
Kirklees - A62 / Manchester Road / Near Longroyd Bridge 0 0 31,000 31,000
Kirklees - A629 / Halifax Road / Near Edgerton Road 0 0 31,000 31,000
Kirklees - A641 / Bradford Road / Fixby 0 0 31,000 31,000
Leeds New information signs
Leeds - Sites1 to 8 (details tbc) - Information Signs 8,000 240,000 0 248,000
Leeds - Site 9 to 16 (details tbc) - Information Signs 0 8,000 240,000 248,000
Wakefield New information signs
Wakefield - Sites 1 to 2 (details tbc) - Information Signs 62,000 0 0 62,000
Wakefield – Sites 3 to 4 (details tbc) - Information Signs 0 62,000 0 62,000
Wakefield – Sites 5 to 6 (details tbc) - Information Signs 0 0 62,000 62,000
Traffic Signals Maintenance
Bradford - Replacement of Obsolete Traffic Signal Poles & Controllers 80,000 80,000 90,000 250,000
Calderdale - Replacement of Obsolete Traffic Signal Poles & Controllers 30,000 30,000 40,000 100,000
Kirklees - Replacement of Obsolete Traffic Signal Poles 60,000 70,000 70,000 200,000
Leeds - Replacement of Obsolete Traffic Signal Poles & Controllers 80,000 80,000 90,000 250,000
Wakefield - Replacement of Obsolete Traffic Signal Poles & Controllers 60,000 70,000 70,000 200,000
Freight
West Yorkshire – all districts – detail to be developed 50,000 50,000 0 100,000
Other
Pinch Point Programme commitments 1,600,000 0 0 1,600,000
Horsforth roundabout, Leeds 1,300,000 0 0 1,300,000
TOTAL NETWORK MANAGEMENT 11,492,000
Over-programming of 18% - details tbc 2,068,560
Information
Transport Data management 450,000 450,000 0 900,00
Multi-modal, hubs, disruption information, web portal 550,000 550,000 0 1,100,000
Updating bus real time telematics 0 300,000 700,000 1,000,000
TOTAL INFORMATION 3,000,000
Over-programming of 18% - details tbc to include upscale of Multi-modal hubs, hubs, disruption info, web portal 540,000
Cycling and Walking
CCAG City Connect superhighway (Bradford & Leeds) 7,500,000 0 7,500,000
LCCN9 Chapel Allerton to Leeds centre route 500,000 0 0 500,000
Cycle facilities – Calderdale, Kirklees, Wakefield
• Calderdale – £180k
• Kirklees – £170k • Nagger Line, Outwood, Wakefield - shared ped/cycle use £150K
500,000 0 0 500,000
TOTAL CYCLING AND WALKING 8,500,000
Over-programming of 18% - details tbc 1,530,000
Integrated Public Transport
Bus Quality Contract / Bus Quality Partnership development tbc tbc tbc 800,000
Hubs ‘lite’ - up to 27 sites, various locations, light touch treatment (- totem, enhanced information including real time, improved signage)
210,000 210,000 205,000 630,000
Town centre Transport Hubs - More comprehensive site development to influence travel behaviours. Sites:
• Heckmondwike, Kirklees (Y1, £300k)
• Normanton, Wakefield (Y2, £150k)
• Elland, Calderdale (Y2, £170k)
300,000 320,000 0 620,000
Bus Hot Spot scheme – up to 3 schemes. Areas to be focussed on include:
• Leeds: Selby Road (A63), Whitkirk, and Stonegate Road Roundabout (A61)
• Kirklees: Wakefield Road, Huddersfield
• Wakefield: various
Schemes to be appraised for benefits / vfm
415,000 415,000 420,000 1,250,000
Castleford Bus Station 3,500,000 0 0 3,500,000
Low Moor Rail Station 0 3,100,000 100,000 3,200,000
Leeds Elland Road Park & Ride 1,600,000 0 0 1,600.000
TOTAL INTEGRATED PUBLIC TRANSPORT 11,600,000
Over-programming of 18% - details tbc to include Corn Exchange Leeds 2,088,000
Safer Roads
Bradford KSI Casualty Reduction including locally determined Traffic Management
923,000
923,000 923,000
2,769,000
Calderdale KSI Casualty Reduction including locally determined Traffic Management
442,000
442,000
442,000
1,326,000
Kirklees KSI Casualty Reduction including locally determined Traffic Management
754,000
754,000
754,000
2,262,000
Leeds KSI Casualty Reduction including locally determined Traffic Management
1,478,000 1,478,000 1,477,000 4,433,000
Wakefield KSI Casualty Reduction including locally determined Traffic Management
737,000 737,000 736,000 2,210,000
WY Safer Roads support 66,000 66,000 68,000 200,000
TOTAL SAFER ROADS 13,200,000
Over-programming of 18% - details tbc 2,376,000
Above safety allocations determined by current IP1 formula
Bids and Leverage
Rail Devolution 225,000 225,000 50,000 500,000
Rail Development programme – from RailPlan7 200,000 200,000 200,000 600,000
Station Enhancements and accessibility improvements - Match to lever in rail industry / 3rd party funds
(* dependent on external funding opportunities)
* 200,000 * 850,000 * 850,000 1,900,000
Local LTP match for funding bids. Non-rail projects e.g. Local Pinch Points, Cycle City Ambition etc
(* dependent on external funding opportunities)
* 1,666,666 * 1,666,666 * 1,666,668 5,000,000
TOTAL BIDS AND LEVERAGE 8,000,000
Over-programming of 18% - details tbc 1,440,000
Low Carbon Fuels and Technologies
Gas and electric vehicle refuelling strategy & infrastructure 60,000 50,000 40,000 150,000
Bus / HGV emissions assessment – retro-fitting emissions control technology & procurement evaluation tools
70,000 30,000 0 100,000
Demonstration Projects with local authority fleet / buses 20,000 40,000 40,000 100,000
Micro-simulation modelling to optimise UTMC to reduce traffic emissions
0 30,000 0 30,000
Low Emission Zones – Extrapolate best performing work commenced with DEFRA grant in IP1 with fleet vehicles
0 20,000 0 20,000
TOTAL LOW CARBON FUELS AND TECHNOLOGIES 400,000
Over-programming of 18% - details tbc 72,000
Other
LTP feasibility 66,000 67,000 67,000 200,000
LTP Monitoring and Evaluation / analysis
• Integrated Transport scheme monitoring (Pinch point & smaller schemes)
• Monitoring equipment
• Data extraction
100,000 100,000 100,000 300,000
TOTAL OTHER 500,000
TOTAL INTEGRATED TRANSPORT BLOCK 62,692,000
TOTAL IT BLOCK OVER-PROGRAMMING 16,886,560
APPENDIX 4
GLOSSARY OF TERMS AND ABBREVIATIONS Bike It
Cycling encouragement programme delivered by SUSTRANS in schools
Common Data Base
A ‘live’ database containing a wide range of traffic and transport data which provides information to websites, Variable Message Signs, UTC systems etc
DEFRA
Department for Environment, Food and Rural Affairs
DfT
Department for Transport
HS2
High Speed 2 Rail Link between London and Manchester / Leeds
Hub
A location where there is a focus of transport movements and where improvements are being implemented to enhance facilities
ISA
Integrated Sustainability Assessment – an assessment of the extent to which a strategic plan will help to achieve relevant environmental, economic and social objectives
KSI
Killed and Seriously Injured Road Casualties
LED
Light Emitting Diode Lighting – energy efficient lighting equipment
LES
Low Emission Strategy
LSTF
Local Sustainable Transport Fund
LTP / IP1 / IP2
Local Transport Plan / Implementation Plan 1 / Implementation Plan 2
MOVA
Micro Processor Optimised Vehicle Actuation – a sophisticated traffic signal operating system that responds to changes in traffic flows by altering green times and signal cycle times
OLEV
Office for Low Emission Vehicles
PRN
Principal Road Network – highways identified as serving the strategic needs of the nation
RailPlan7
The current rail planning document for West Yorkshire
TLP
Traffic Light Priority for Buses – a system that uses GPS positioning to trigger extended or advanced green signals for buses
Urban Traffic Management Control / UTMC / UTC
The traffic management and control system that lies behind traffic signals, variable message signs, TLP etc
WYCA
West Yorkshire Combined Authority
WY+TF
West Yorkshire Plus Transport Fund