Report of the Strategic Director (Regeneration & Culture) to the meeting of Environment and Waste Management Overview & Scrutiny Committee to be held on 28 October 2014. R Subject: ‘My Journey’ West Yorkshire Local Transport Plan 2011 – 2026 Progress Report Summary statement: This report outlines progress made in developing and delivering the third West Yorkshire Local Transport Plan (LTP) during its third year of operation, with a specific focus on the Bradford elements of the Plan, and the development and initial delivery of the second LTP Implementation Plan. Mike Cowlam Strategic Director (Regeneration & Culture) Portfolio: Housing, Planning & Transport Report Contact: Joe Grint – Principal Engineer (Transport Planning) Phone: (01274) 434645 E-mail: [email protected] Overview & Scrutiny Area: Environment & Waste Management

Upload: others

Post on 14-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Report of the Strategic Director (Regeneration & Culture) to the … · 2014-10-28 · Asset Management is the subject of a future report to this Committee. 2.5. Further information

Report of the Strategic Director (Regeneration & Culture) to the meeting of Environment and Waste Management Overview & Scrutiny Committee to be held on 28 October 2014.

R

Subject: ‘My Journey’ West Yorkshire Local Transport Plan 2011 – 2026 Progress Report

Summary statement: This report outlines progress made in developing and delivering the third West Yorkshire Local Transport Plan (LTP) during its third year of operation, with a specific focus on the Bradford elements of the Plan, and the development and initial delivery of the second LTP Implementation Plan.

Mike Cowlam Strategic Director (Regeneration & Culture)

Portfolio: Housing, Planning & Transport

Report Contact: Joe Grint – Principal Engineer (Transport Planning) Phone: (01274) 434645 E-mail: [email protected]

Overview & Scrutiny Area: Environment & Waste Management

Page 2: Report of the Strategic Director (Regeneration & Culture) to the … · 2014-10-28 · Asset Management is the subject of a future report to this Committee. 2.5. Further information

1. SUMMARY 1.1 This report outlines progress made in developing and delivering the third West

Yorkshire Local Transport Plan (LTP) during its third year of operation, with a specific focus on Bradford elements of the Plan, and the development and initial delivery of the second LTP Implementation Plan.

2. BACKGROUND 2.1. The third West Yorkshire Local Transport Plan (LTP), which covers the years from

2011 to 2026, was approved by the then West Yorkshire Integrated Transport Authority (ITA) in March 2011.

2.2. The objectives of the plan are as follows:

• To improve connectivity to support economic activity and growth in West Yorkshire and the Leeds City Region

• To make substantial progress towards a low carbon, sustainable transport system for West Yorkshire, while recognising transport's contribution to national carbon reduction plans.

• To enhance the quality of life of people living in, working in and visiting West Yorkshire

2.3. To focus delivery of the Plan it has been split into 3 year Implementation Plans, the first of which spanned April 2011 to March 2014 with the second covering the period between April 2014 and April 2017.

Progress on Implementation Plan 1

2.4. Progress on the Integrated Transport capital schemes that have been, or are being, implemented by the Council is shown in Appendix 1. Highway Asset Management programmes are set on an annual basis and in recent years have been set by the Executive or the local Area Committees as appropriate in accordance with the delegation arrangements previously agreed. The general approach to Highways Asset Management is the subject of a future report to this Committee.

2.5. Further information about the work that has been undertaken in Bradford during

2013/14 through the LTP and a number of related funding streams is provided at Appendix 2.

LTP Implementation Plan 2

2.6 The development of the second Implementation Plan during 2013 was set in the

context of uncertainties related to the Government’s redirection of 44% of LTP Integrated Transport Funding to the Single Local Growth Fund which was the subject of a bidding process. An Interim Implementation Plan 2 of the Local Transport Plan was therefore developed during 2013 and approved by the ITA in January 2014 to allow delivery of the Plan to commence in April 2014. This Interim Implementation Plan is now being updated in the context of the Single Local Growth Fund allocation announcement made in July 2014.

Page 3: Report of the Strategic Director (Regeneration & Culture) to the … · 2014-10-28 · Asset Management is the subject of a future report to this Committee. 2.5. Further information

2.7 More details of the funding announcement on the Single Local Growth Fund and its impact on Bradford’s strategic transport investment priorities will be provided in a report to the next meeting of this Committee.

2.8 It should be also be noted that recent changes in the way that the DfT calculate

annual Integrated Transport funding paid to authorities will result in West Yorkshire receiving approximately £2m less each year (£13m rather than £15m) than the level of funding previously expected for future years (from 2015/16). This is because one part of the formula the DfT uses has changed to reflect numbers of casualties per kilometre of road rather than absolute numbers of casualties. This generally disbenefits the Metropolitan areas and other conurbations and favours more rural authorities. It should be stressed that this may not necessarily impact on the overall Safer Roads spend across West Yorkshire as this is determined at a local level from the available funding.

2.9 The Interim Implementation Plan 2 is now at the early stage of delivery across the

following themes:

• Assets

• Network Management

• Information

• Cycling and Walking

• Integrated Public Transport

• Safer Roads

• Bids and Leverage

• Low Carbon Fuels and Technologies

• Other (feasibility, monitoring and evaluation) 2.10 Details of the individual projects and programme areas included in the Interim

Implementation Plan are contained in Appendix 3. The main change to the Plan affecting Bradford is that a scheme for Bradford City Centre Variable Message Car Park Signing is now proposed to be included in the final Implementation Plan as this is a key project that is not being funded through the Single Local Growth Fund.

2.11 The Plan is still in the early stage of delivery but projects already completed or

initiated in Bradford include:

� The low carbon fuels and technologies funding allocation has been used to match a £46k DEFRA Grant and funding from the Bradford Institute of Health Research to deliver an air quality and behaviour change research project in partnership with the Bradford Health Research Institute (BIHR). The funding will provide a two year post for a researcher and recruitment is underway.

� The same funding stream is also being utilised to fund a West Yorkshire Low

Emission Zone feasibility study which is an extrapolation of the current Bradford/Leeds work. Modelling work has started and it is expected that the study will be completed by spring 2015.

Page 4: Report of the Strategic Director (Regeneration & Culture) to the … · 2014-10-28 · Asset Management is the subject of a future report to this Committee. 2.5. Further information

• A further £50,000 of LTP funding was allocated to Bradford in September to install five charge points at partner organisations across the district. Key facilities at the The University of Bradford, Bradford District Care Trust and Airedale General Hospital will benefit from the funding enabling staff, visitors and fleet vehicles to charge up. The installations are due to be completed by March 2015.

3. OTHER CONSIDERATIONS

Other Transport Issues

Bradford Interchange & Forster Square Station

3.1 A Project Board and working groups with officers from the Council, Metro, Network Rail and Northern Rail have been established to develop short, medium and long term interventions that will ultimately transform Bradford Interchange and Forster Square so that they reflect their status as major gateways to a Regional City. A scheme to improve pedestrian and cycling links, as well as the urban environment, between the stations themselves, and their connections to the City Centre, is currently being implemented. A funding allocation to provide improvements to ‘Gateway’ stations across West Yorkshire including the Interchange and Forster Square has been included in the West Yorkshire Plus Transport Fund with the intention of levering in other funding. To inform this potential investment Masterplans have been developed for Bradford Interchange and Forster Square Station. More information on these will be provided in a future report to this Committee.

Local Pinch Point Fund

3.2 The Council submitted a successful bid for £2.665m support from the £170m DfT Local Pinch Point Fund for junction improvements at Canal Road / Stanley Road. This bid required a 30% contribution to be made from local sources and Executive agreed to allocate £1.143m from the Capital Plan to support this scheme. The DfT funding will allow this scheme to be implemented as the first significant phase of the Canal Road Improvements proposed in the ‘West Yorkshire Plus’ Transport Fund core package. Delivery of the scheme has commenced with the first phase being the extension of a culvert under Canal Road.

Air Quality 3.3 The impact of transport on Air Quality and consequential health issues is of

increasing concern. The District has four declared Air Quality Management Areas and a large number of other locations are thought to be at or close to exceedance levels. Particulate air pollution has been assessed as is responsible for 5.3% of all deaths in the Bradford district.

3.4 The UK is currently facing infraction proceedings from the EU due to failure to meet

air quality targets. It is expected that the case will soon be referred to the European Court of Justice and the UK could be subsequently fined approximately £300 million or receive ‘unlimited’ fines. The new Localism Bill leaves specific provision for the

Page 5: Report of the Strategic Director (Regeneration & Culture) to the … · 2014-10-28 · Asset Management is the subject of a future report to this Committee. 2.5. Further information

‘passing on’ of fines seen to be as a result of the actions or inactions of the Local Authority.

3.5 The health impact of air quality on the Bradford population and the potential of fines

being imposed by the EU are a serious concern to the Council and the importance of encouraging more sustainable modes of travel and addressing congestion issues that impact on air quality cannot be overstated. A Low Emission Strategy (LES) for Bradford has already been developed and was adopted in November 2013 (the 2nd in the UK). The Council is now managing and chairing development of a West Yorkshire LES which should be completed in early 2015. With the support of DEFRA grants and Local Transport Plan funding other initiatives are being developed across West Yorkshire to help address this important issue as outlined earlier and below.

3.6 The Council recently submitted a bid to DEFRA to fund equipment to fit 25 buses

which operate in the District with equipment to clean up their emissions and was awarded the full sum requested (£394,998). The possibility of submitting further bids to fund infrastructure to support Low Emission Vehicles through OLEV funding is also currently being considered. These work streams are reported to the Health and Well Being Board in Bradford

Strategic Transport Priorities and West Yorkshire Plus Transport Fund

3.7 A number of other issues relating to Bradford and West Yorkshire wide strategic transport priorities including the West Yorkshire Plus Transport Fund, the Calder Valley Line, links to Leeds Bradford Airport, HS2 and West Yorkshire Bus Strategy will be considered in a report to this Committee at a future meeting.

4. FINANCIAL & RESOURCE APPRAISAL 4.1 The measures being undertaken by the Council and its partners through the Local

Transport Plan are being delivered from the Capital and Revenue funding and staff resources available.

5. RISK MANAGEMENT AND GOVERNANCE ISSUES 5.1 Both the Council and the WYCA have well developed performance management

processes to manage risk in a timely and effective manner. The programmes included in this report are subject to these processes.

6. LEGAL APPRAISAL 6.1 The programmes of work identified in this report are being implemented through the

Council’s role as Highway and Traffic Regulation Authority and the WYCA’s role as Transport Authority

Page 6: Report of the Strategic Director (Regeneration & Culture) to the … · 2014-10-28 · Asset Management is the subject of a future report to this Committee. 2.5. Further information

7. OTHER IMPLICATIONS

Fuller details of many of the other implications of LTP3 were considered in an Integrated Sustainability Appraisal (ISA) details of which were provided in the Transport Delivery Plan report to Executive in March 2011. However key points are listed below.

7.1 EQUALITY & DIVERSITY 7.1.1 The public sector equality duty in s149 of the Equality Act applies to the Council in

the exercise of its functions. Those functions will include most, if not all, of the proposals and other measures referred to in this report.

7.1.2 The duty is to "have due regard to the need to (a) eliminate discrimination,

harassment, victimisation and any other conduct that it prohibited by or under [the 2010 Act], (b) advance equality of opportunity between persons who share relevant protected characteristics and persons who do not share it, [and] (c) foster good relations between persons who share a relevant protected characteristic and persons who do not share it". In summary, this includes the need to remove or minimise disadvantages suffered by persons that are connected to that relevant protected characteristic and taking steps to meet the needs of persons who share a relevant protected characteristic that are different from the needs of persons who do not share it and encouraging persons who share a relevant protected characteristic to participate in public life. It also includes taking steps to take account of disabled persons' disabilities and makes it clear that compliance with the duties "may involve treating some persons more favourably than others".

7.1.3 The duty is ‘to have regard’ which means such regard as is appropriate in the

circumstances. The duty and its effect are wide-ranging and this is also reflected in the definition of relevant protected characteristics which are age, disability, gender reassignment, pregnancy and maternity, race. religion or belief, sex and sexual orientation.

7.1.4 It is evident that all of the schemes and proposals referred to in this report have the

potential to impact on persons who share one or more of the relevant protected characteristics. Some of these were identified in the Integrated Sustainability Assessment (ISA) undertaken on the LTP3 as identified in a report to Executive on 18 March 2011 – Transport Delivery Plan 2011/12 (Paragraphs 9.1.2 to 9.1.7).

7.1.5 The factors considered in the ISA are narrower than the definitions of relevant

protected characteristics in s149 and the duty under that section itself. Due to the nature of this report it is not possible to provide any form of detailed equality impact assessment of specific schemes. However, officers will ensure that a specific assessment is carried out as part of the preparatory work for each programme or scheme as appropriate and, as far as practicable, is taken into account in the design of each scheme with Members being consulted if issues arise which either cannot be addressed, or can only be addressed with difficulty or excessive cost, as part of the programme or scheme.

Page 7: Report of the Strategic Director (Regeneration & Culture) to the … · 2014-10-28 · Asset Management is the subject of a future report to this Committee. 2.5. Further information

7.2 SUSTAINABILITY IMPLICATIONS

The ISA considered that there were mixed implications on sustainability with neutral impacts on noise, townscape and landscape, heritage and water. Air quality, material assets, health and the economy would be benefitted by the strategy whilst biodiversity, flora and fauna could suffer minor adverse impacts dependent on the details of the schemes implemented.

7.3 GREENHOUSE GAS EMISSIONS IMPACTS

The ISA suggested that there would be a reduction of CO2 of 19% by 2025 across West Yorkshire with LTP3 proposals (compared with a do-minimum scenario).

7.4 COMMUNITY SAFETY IMPLICATIONS

Safety and Security on the Transport Network is a key consideration for LTP3. One of the key objectives is to ‘deliver an integrated, reliable transport system that enables people and goods to move around as efficiently and safely as possible’. The ISA concluded that there would be benefits from the plan in terms of reducing deaths and injuries from collisions. The LTP Implementation Plans include projects and schemes to improve safety and reduce casualties on the highway network as well as improving personal security on the public transport network.

7.5 HUMAN RIGHTS ACT

Human Rights implications are taken into account in the development of individual schemes.

7.6 TRADE UNION There are no trade union implications 7.7 WARD IMPLICATIONS

The wards in which the measures described in this report are implemented will generally benefit from the improvements. Appropriate consultation has, and will continue, to take place with Ward Members and local communities during the development of individual projects.

8. NOT FOR PUBLICATION DOCUMENTS

None. 9. OPTIONS 9.1 The Committee could support the recommendation that progress on West Yorkshire

Local Transport 3 be noted, feedback be provided to officers and that a further progress report on these issues be submitted in Autumn 2015.

9.2 The Committee could suggest an alternative approach to receiving reports on this

issue.

Page 8: Report of the Strategic Director (Regeneration & Culture) to the … · 2014-10-28 · Asset Management is the subject of a future report to this Committee. 2.5. Further information

10. RECOMMENDATIONS 10.1 That progress on West Yorkshire Local Transport 3 be noted and feedback to

officers be provided by the Committee. 10.2 That a further report on progress on West Yorkshire LTP3 be submitted to this

Committee in Autumn 2015. 11. APPENDICES 11.1 Appendix 1 - WY Local Transport Plan 3 – Implementation Plan 1 (2011 – 2014)

Bradford Integrated Transport Capital Programme - Progress Report 11.2 Appendix 2 - Examples of Transport Projects and Initiatives Delivered In 2013/14 11.3 Appendix 3 - West Yorkshire Local Transport Plan Interim Implementation Plan 2

2014 – 2017 11.4 Appendix 4 - Glossary of Terms and Abbreviations 12. BACKGROUND DOCUMENTS 12.1 Report to Executive 12 March 2013 – Transport Delivery Plan 2013/14 12.2 Report to Executive 18 March 2011 – Transport Delivery Plan 2011/12 12.3 ‘My Journey’ – West Yorkshire Local Transport Plan 2011 - 2026 12.4 West Yorkshire Local Transport Plan 3 Integrated Sustainability Appraisal

Page 9: Report of the Strategic Director (Regeneration & Culture) to the … · 2014-10-28 · Asset Management is the subject of a future report to this Committee. 2.5. Further information

APPENDIX 1

WY LOCAL TRANSPORT PLAN 3 – IMPLEMENTATION PLAN 1 (2011 – 2014) BRADFORD INTEGRATED TRANSPORT CAPITAL PROGRAMME - PROGRESS REPORT

Description Comments

Local Integrated Transport

Local Integrated Transport Schemes (Area Committee Prioritised) Ongoing programme of schemes mostly delivered by end of Implementation Plan 1 with any remaining schemes being delivered early in 2014/15

Measures to support hubs including pedestrian & cycling improvements and signing.

Implementation of Shipley Hub in progress including the installation of totems, improvements to station connectivity for pedestrians and cyclists, upgrading of Shipley bus station and updating wayfinding facilities throughout the town centre

Network Management

Traffic signal upgrades. Rolling programme of minor signal improvements to improve safety and efficiency and reduce ongoing maintenance costs - complete

Freight Infrastructure Small freight related schemes in Cutler Heights Lane, Gibson Street, Foundry Lane and Linton Street areas in Bradford implemented

Central Urban Traffic Management Control and Local Signal Improvements

Project in development

Information & Ticketing

Variable Message Signing Programme implemented

City Centre Public Realm Improvements

City centre public realm / traffic management improvements LTP funded improvements delivered

Page 10: Report of the Strategic Director (Regeneration & Culture) to the … · 2014-10-28 · Asset Management is the subject of a future report to this Committee. 2.5. Further information

Description Comments

Active modes

Connect 2 / Living Street Scheme complete

Bradford District wide walking/cycling measures inc Rights of Way

Rolling programme of Rights of Way Improvements. Airedale Greenway and Wilson Rd, Wyke cycle routes complete. Hollings Hill, Baildon complete. A629 (south of Cross Roads) cycle safety improvements due for completion this financial year.

Great Northern Trail Thornton – Queensbury section now complete

Sustainable Routes to School: Cullingworth - Harden Scheme abandoned due to objections to impact on residents’ parking arrangements. Alternative scheme to be identified.

Safety & Enforcement

Provide/renew safety cameras to ensure effective enforcement including signing/lining

Rolling programme of upgrades in partnership with other WY authorities to deliver effective enforcement. IP1 element delivered

Provide fixed bus lane enforcement cameras

Mobile CCTV enforcement unit for bus lanes

IP 1 rolling programme supporting deployment of bus lane enforcement cameras at priority locations complete.

Bus priority

Bradford - Bolton Road outbound bus lane to Queens Road Scheme complete

Woodside Road Bus Priority Scheme complete

Leeds Rd: City Centre - Thornbury Bus Measures for Hyperlink Phases 1 and 2 implemented. Phase 3 in development as part of WY+TF.

Toller Lane Bus Priority Scheme now likely to be included in WY+TF Highway Efficiency & Bus Package

Allerton Rd Bus Priority Scheme now likely to be included in WY+TF Highway Efficiency & Bus Package

Thornton Road Bus Priority Scheme now likely to be included in WY+TF Highway Efficiency & Bus Package

WYSPS & Major schemes

Connecting Airedale 1 - Saltaire Roundabout & environs Scheme complete. Detailed ‘after’ studies to be undertaken shortly

Page 11: Report of the Strategic Director (Regeneration & Culture) to the … · 2014-10-28 · Asset Management is the subject of a future report to this Committee. 2.5. Further information

Description Comments

Highways Improvements

Canal Road/Valley Rd/Otley Rd Improvements - Scheme Development

Scheme deferred due to need to tie in with proposals contained in WY+TF, Canal Road Masterplan and the Canal Road / Stanley Road Local Pinch Point Scheme

Leeds Road / Laisterdyke Junction Improvement Scheme complete

Southfield Lane / Little Horton Lane Junction Improvement Scheme complete.

Development of proposals for Harrogate Road / New Line Design work ongoing – included as a Core Project in ‘West Yorkshire Plus’ Transport Fund

Westgate Hill Street, Wakefield Road and Tong Street Improvements

High Occupancy Vehicle Lane scheme suspended due to high levels of abuse and difficulty in securing Police enforcement. Tong Street Highway Improvements now in WY+TF ‘Core Package’ with potential to deliver a ‘Phase 1 ’ project as an ‘Early Win’ scheme

Hard Ings Road & Keighley Town Centre Improvements Schemes in development. Hard Ings Road included in WY+TF Core Package

Carlisle Road / Toller Lane Junction Design

Further development awaiting outcome of further work on ‘West Yorkshire Plus’ Transport Fund Highways Efficiency and Bus Package. Demolition of Council owned properties in poor condition planned for Spring / Summer 2015

Transport Planning

Infrastructure development & planning Funding used to support bid development eg bids to Local Pinch Point Fund, Cycle City Ambition Fund, Local Sustainable Transport Fund

Page 12: Report of the Strategic Director (Regeneration & Culture) to the … · 2014-10-28 · Asset Management is the subject of a future report to this Committee. 2.5. Further information

APPENDIX 2

EXAMPLES OF TRANSPORT PROJECTS AND INITIATIVES DELIVERED / COMMENCED IN 2013/14

A2.1 Local Transport Plan – Implementation Plan 1 Schemes

• Completion of a major project to change Saltaire Roundabout to a signal controlled junction to improve safety and provide an enhanced public realm on the edge of the World Heritage Site;

• Completion of the section of the Great Northern Trail between Thornton and Queensbury;

• Bus Lanes implemented (with enforcement cameras) on Woodside Road at Low Moor to speed up bus operations in both directions on this important corridor;

• Casualty reduction and local improvement schemes prioritised by the Area Committees through partnership working with local communities and other stakeholders have continued to be delivered including, amongst many other schemes: traffic calming schemes in Mandale Road, Buttershaw; Duchy Drive Area Heaton; Parry Lane/Lower Lane, Bowling; Broomhill Avenue, Keighley and Long Lane, Harden;

• Traffic signal refurbishments at 13 sites;

• 4 new Variable Message Signs to provide driver information and improve management of the network in the Saltaire area;

• Upgrading of Safety Cameras to improve efficiency;

• Introduction of transport hub elements in Shipley Town Centre;

• Rationalisation of bus shelters on Market Street, Bradford;

• Continuation of development work on Low Moor Rail Station by WYCA and Bradford Council including:

� Receipt of the official certificate of deviation for the proposed new rail

station (required due to non standard track curvature;

� Investigations into additional access and car parking sites to future-proof the parking provision at the station and work on securing other land required for the station;

� Securing Planning permission –the station project currently remains

on course for opening during the December 2015 timetable;

Page 13: Report of the Strategic Director (Regeneration & Culture) to the … · 2014-10-28 · Asset Management is the subject of a future report to this Committee. 2.5. Further information

• Resurfacing and reconstruction projects throughout the district, on all types of road as below: -

A Road: 4.5km B & C Road: 4.0km Unclassified Roads: 13.5km

Notable works completed in 2013/14 year included: -

� Resurfacing to failing sections of Hall Ings in Bradford City

Centre; � Road reconstruction to the full length of Town Gate in Wyke; � A new surface provided on B6145 Thornton Road between

Girlington and City Road; � 5 Lane Ends Roundabout in Idle resurfaced; � West Lane, Keighley resurfaced between Oakworth Road and

North Dean Road.

• Street lighting improvements have been made across the District as follows:

Constituency Area Ward Road Bradford East Bolton and Undercliffe Grove House Road LED Bolton and Undercliffe Myers Lane LED Bowling and Barkerend Burras Road LED Bowling and Barkerend Thurley Road LED Idle and Thackley Town Lane, Idle Bowling and Barkerend Broad Lane, Laisterdyke Eccleshill Rowanberry Close LED

Eccleshill Whitebeam Walk LED Bradford West City Brownroyd Street LED Manningham/City Midland Road Clayton and Fairweather Lane Ends Close LED Toller Toller Lane Clayton and Fairweather The Avenue, Clayton Bradford South Wyke Roydsdale Way

Wibsey Rooley Avenue Royds Farfield Avenue Shipley Baildon Green Road, Baildon Bingley The Drive, Crossflatts Shipley Kendall Avenue Bingley Rural Main Road, Denholme

Bingley Rural Hallows Park Road

Cullingworth LED Keighley Worth Valley Providence Lane

The lighting schemes implemented this financial year have utilised LED light sources where possible and these have been indicated on the above schedule. There are significant energy savings on these units and also a reduction in the maintenance required - potentially not requiring any

Page 14: Report of the Strategic Director (Regeneration & Culture) to the … · 2014-10-28 · Asset Management is the subject of a future report to this Committee. 2.5. Further information

reactive maintenance for 12-15 years. The use of LEDs also allows the reduction of the lighting levels in residential areas due to the white light emitted providing better colour rendering. The LEDs also ensure that the light is directed to where it should be on the carriageway and footway. Many of the schemes are also replacing old trolley poles and overhead supplies which cause significant maintenance issues affecting large numbers of lights when there are high winds and interference with highway trees.

• Significant highways structures schemes completed include:

� Brunthwaite Culvert

� Highfield Road Retaining Wall � Bolton Road Retaining Wall � Little Brook Cottage Wall � Scott Lane Retaining Wall

A wide range of other structural work was undertaken including further progress on the Primary Road Network (PRN) and non-PRN wall strengthening programme. In 2013/14 the focus was on the A647 Scarlet Heights, Queensbury, B6160 Bolton Road Wall & Stump Hill Burr Wall (Tour de France Route) and B6143 Minor maintenance works carried out at various locations.

A2.2 Leeds Rail Growth Package (Apperley Bridge Station)

Construction of the new station started in summer 2014 and the station will open in 2015.

A2.3 Cycle City Challenge (City Connect) / Walking for Health

WYCA, Leeds City Council and Bradford Council were successful in securing £18.052m to support the construction of a high quality cycle route from the east of Leeds to Bradford City Centre together with associated traffic management measures in the corridor and towpath improvements between Armley and Shipley. A further funding bid secured £250,000 for walking encouragement and engagement activities in the corridor. Designs for the cycle routes are being consulted upon and further design work is underway. Completion is due by mid 2015. More details of this major project will be provided in the report on the District’s Cycling Strategy which is to be considered by this Committee early in 2015.

A2.4 Local Sustainable Transport Fund (LSTF) Schemes

• Completion of cycling links from local communities to the Shipley – Bradford Cycle Route that is currently partly constructed with a ‘missing’ section to be delivered shortly (with the support of Public Health funding) once issues relating to contaminated land are addressed

• Improvements to cycle links between the Learning Quarter and the University Management Centre on Emm Lane

Page 15: Report of the Strategic Director (Regeneration & Culture) to the … · 2014-10-28 · Asset Management is the subject of a future report to this Committee. 2.5. Further information

• Cycling promotion activities at Bradford College and University

• A further award from the LSTF of £300k across West Yorkshire has secured the following:

o Further funding for the go:cycling adult cycle training

programme o Mass participation events o A regional Cycle to Work Challenge programme

• A further £70k of LSTF money has also been secured for the LSTF Thematic funding stream, Access to Education, to continue a project focusing on engaging staff and students at the university and college.

A2.5 Cycle Safety Fund

The Council was successful in securing £150,000 from the Dft to support a new cycle route between Stockbridge and Utley and the scheme is now substantially complete.

A2.6 Other Cycling Strategy Initiatives A wide range of other initiatives have been delivered in alignment with the

District’s Cycling Strategy including the District’s successful involvement with the Tour de France, cycling skills training and cycling promotion and these will described in the future report on the Cycling Strategy referred to earlier.

A2.7 Congestion Performance Reward Fund Schemes

The remaining funding from this Dft programme has been used to fund the Sustrans ‘Bike It’ officer until June 2014, expand the delivery of Junior SAFEMark workshops to all schools in the Bradford district and outlying areas, and to support Workplace Travel Planning activities.

A2.8 Traffic Light Priority (TLP) for Buses

This West Yorkshire wide scheme originally included the introduction of equipment to provide bus detection for 60 sites in Bradford all of which should be implemented by the end of the current financial year. A further four locations were identified in Bradford where the implementation of TLP is desirable to assist the recently improved 72 bus route and these have also now been implemented.

A2.9 Regional Growth Funding

The successful bid by the Council for (£17.6m) is supporting, amongst many other initiatives, the delivery of City Centre public realm improvements associated with the development of the Westfield shopping centre.

Page 16: Report of the Strategic Director (Regeneration & Culture) to the … · 2014-10-28 · Asset Management is the subject of a future report to this Committee. 2.5. Further information

A2.10 Safer Roads Initiatives

Practical Pedestrian Training The practical pedestrian training programme has been delivered in 46 schools with 2300 pupils receiving training. The programme is a positive contribution to health and sustainable travel.

Primary School Plan The Primary School Plan has been delivered in over 56 schools reaching 16,177 children. Priority Area Work

The Road Safety Team has worked with key partners to address road safety casualties in the, Bowling and Barkerend, City, Keighley Central, Bradford Moor, Manningham and Little Horton wards. Activities involving a wide range of partners have focused on community engagement, empowerment and ownership to reduce casualties. Publicity

Drivers, passengers, adult cyclists, motorcyclists and pedestrians are targeted through publicity activities. Press releases, advertising on buses, radio, JC Decaux boards, and leaflets are used to put out key messages related to seat belt wearing, speed, the use of mobile phones, drink driving, distractions and awareness of other road users.

The Road Safety Team work with the other West Yorkshire and Yorkshire and Humber authorities on publicity campaigns and support the Governments ‘Think’ campaigns.

‘Failure to Look’ - targets all road users and is the latest campaign from the West Yorkshire Safer Roads Delivery Group encouraging all road users to share the roads safely and to look out for each other.

A2.11 Workplace Travel Plans

Workplace travel planning remains a key priority in engaging employers and their staff on the benefits of sustainable travel options. The Transport Planning team continue to comment on Travel Plans associated with new developments as well as working with existing employers to ensure that the best possible travel opportunities are made available to staff across the district.

A2.12 Electric Vehicle Charging Points

In June 2013 the Council was awarded £30,000 from the Office of Low Emission Vehicles to install electric vehicle charging points on its own estate. Match funding has been pledged from CBMDC, Keighley Town Council and Baildon Parish Council to install at facilities in local centres. The first

Page 17: Report of the Strategic Director (Regeneration & Culture) to the … · 2014-10-28 · Asset Management is the subject of a future report to this Committee. 2.5. Further information

installation (Jacobs Well) was carried out in March with installations at Baildon and Keighley due in November. The charge points will provide charging opportunities for staff, visitors and fleet vehicles using local centres across the district.

A2.13 Smart Ticketing

To date 34,000 Young Person’s Photocards and 32,762 Scholars cards (16-18) have been issued as smartcards. Over 3,800 smart Mcards have been issued to date. In total there are nearly ½ million smartcards in circulation the majority of which are used to hold Concessionary Passes. The gates at Leeds rail station and Bradford Interchange rail station have been converted to ‘read’ annual MCards (smartcards).

Some 800,000 ‘smart’ bus boarding transactions are being recorded each week. This data will be used in future as the basis of operator payments for Concessionary Travel and for the distribution of pre-paid multi operator ticket revenues. The forward plan for the smartcard project envisages weekly and monthly tickets being sold in ‘smart’ form from May 2015. This will require the deployment of a new retail network and operators configuring ticket machines.

Page 18: Report of the Strategic Director (Regeneration & Culture) to the … · 2014-10-28 · Asset Management is the subject of a future report to this Committee. 2.5. Further information

APPENDIX 3

WEST YORKSHIRE LOCAL TRANSPORT PLAN INTERIM IMPLEMENTATION PLAN 2 2014 – 2017

Bradford schemes shown in bold West Yorkshire wide programmes / projects shown in bold italics

Profiled capital cost

2014/15 2015/16 2016/17 3 year total

Highway Asset

Highway resurfacing / reconstruction 15,458,000 21,271,000 21,271,000 58,000,000

Bridges, structures and retaining walls 6,662,000 9,169,000 9,169,000 25,000,000

Street Lighting 1,646,000 2,117,000 2,117,000 6,000,000

TOTAL HIGHWAY ASSET 89,000,000

Y2 (2015/16) and Y3 (2016/17) allocations are indicative and subject to confirmation. Further details on Bradford allocations to be provided in future report on Highways Asset Management

TOTAL HIGHWAY MAINTENANCE BLOCK 89,000,000

Public Transport Asset

Dewsbury bus station refurbishment 0 75,000 75,000 150,000

Leeds City Bus station - Carriageway structural reconstruction and toilet charging and upgrades

600,000 0 0 600,000

CCTV system (pan, tilt, zoom) camera replacement – various bus stations

75,000 75,000 150,000

Cleckheaton bus station culvert structural repairs 100,000 0 0 100,000

Bus shelter programme – 30 shelters per year 250,000 250,000 223,000 735,000

Bus shelter refurbishment to extend asset life 167,00 424,000 424,000 1,500,000

Access bus and operational vehicle replacement tbc tbc tbc 1,015,000

MyBus extend life 250,000 250,000 250,000 750,000

ICT system infrastructure 333,000 333,000 334,000 1,000,000

TOTAL PUBLIC TRANSPORT ASSET 6,000,000

Over-programming of 18% to include Bradford Interchange roof and Real Time display units 1,080,000

Network Management

Joint UTC Control

Bradford - Link to Leeds Common Data Base 0 20,000 0 20,000

Bradford - Migrate Kirklees to Common Data Base 10,000 0 0 10,000

Bradford - Add Wakefield to Common Data Base 10,000 0 0 10,000

Bradford - Purchase Additional adaptors 0 25,000 0 25,000

Bradford - Communications Link to other authorities 5,000 5,000 0 10,000

Calderdale - Provision of high grade VPN to carry additional data (UTMC, VMS, CCTV) via from other authorities 0 16,000 0 16,000

Calderdale - Hardware and software to integrate the above 0 0 0 0

Kirklees - Migrate Bradford onto Kirklees UTMC Computer (under review) 0 80,000 0 80,000

Kirklees - High Speed Comms to Bradford for UTMC 0 20,000 0 20,000

Leeds - Provision of high grade VPN to carry additional data (UTMC, VMS, CCTV) via from other authorities 25,000 25,000 0 50,000

Page 19: Report of the Strategic Director (Regeneration & Culture) to the … · 2014-10-28 · Asset Management is the subject of a future report to this Committee. 2.5. Further information

Leeds - Hardware and software to integrate the above 15,000 20,000 0 35,000

Leeds - Link to Bradford’s Common Data Base 0 20,000 0 20,000

Wakefield - Adaptor Software to allow connection to Bradford's CDB 40,000 0 0 40,000

Wakefield - High Speed Comms to Bradford for UTMC 20,000 0 0 20,000

West Yorkshire Improved Data Network

Bradford - Blue Tooth vehicle detectors for journey times 20,000 30,000 20,000 70,000

Bradford - Equipment for UTMC control 10,000 10,000 15,000 35,000

Bradford - Wi-Fi Improvements at 160 Sites 60,000 60,000 60,000 180,000

Bradford - Remote Monitoring of sites 50,000 50,000 45,000 145,000

Calderdale - Blue Tooth vehicle detectors for journey times 10,000 10,000 10,000 30,000

Calderdale - Modify UTMC interfaces to include Google live link speeds

3,000 0 0 3,000

Kirklees - Flint Street Mesh Manager Works 15,000 0 0 15,000

Kirklees - A629 - Halifax Road - Huddersfield 361 to IP 30,000 0 0 30,000

Kirklees - A653 - Leeds Road - Dewsbury 361 to IP 0 20,000 0 20,000

Kirklees - A640 - Trinity Street - Huddersfield 361 to IP 0 30,000 0 30,000

Kirklees - A641 - Bradford Road - Huddersfield 361 to IP 30,000 0 0 30,000

Kirklees - A62 - Birstall 361 to IP 0 40,000 0 40,000

Kirklees - A644 / Huddersfield Rd - Ravensthorpe 361 to IP 0 45,000 0 45,000

Kirklees - Air Quality and Bluetooth Sites to be Identified 15,000 15,000 20,000 50,000

Kirklees - A62 - Bradley Area - Huddersfield 361 to IP 55,000 0 0 55,000

Kirklees - A652 - Bradford Road - Batley 361 to IP 0 0 30,000 30,000

Kirklees - A62 - St Andrews Area - Huddersfield from 2.4Ghz to 5 Ghz 30,000 0 0 30,000

Kirklees - A644 - Huddersfield Road - Mirfield 361 to IP 0 15,000 0 15,000

Kirklees - A62 - Manchester Road - Huddersfield 361 to IP 0 25,000 0 25,000

Kirklees - A62 / A638 - Heckmondwike 361 to IP 0 0 35,000 35,000

Kirklees - A638 - Staincliffe 0361 to IP 0 0 25,000 25,000

Kirklees - Additional 30 Wireless Nodes 20,000 20,000 20,000 60,000

Leeds - Blue Tooth vehicle detectors for journey times 40,000 45,000 40,000 125,000

Leeds - Blue Tooth vehicle detectors for journey times 30,000 0 0 30,000

Leeds - Modify UTMC interfaces to include Google live link speeds 112,000 112,000 112,000 336,000

Wakefield - Migrate Communications to IP or Wireless Mediums 30,000 50,000 50,000 130,000

Wakefield - IP UTMC Cameras 20,000 20,000 20,000 60,000

Wakefield - Blue Tooth vehicle detectors for journey times 20,000 40,000 5,000 65,000

Improve Signals Operation

Bradford - Manningham lane / Drewton Road 77,000 0 0 77,000

Bradford - Chester Street / Little Horton Lane 57,000 0 0 57,000

Bradford - Toller Lane / Haworth Road 57,000 0 0 57,000

Bradford - Haworth Road / Chellow Grange 0 30,000 0 30,000

Bradford - Croft Street / Brittannia Street 0 36,000 0 36,000

Bradford - Harrogate Road / Tenterfields 0 25,000 0 25,000

Bradford - Thornton Road / Cemetery Road 0 25,000 0 25,000

Bradford - Fenby Ave / Cutler Heights 0 30,000 0 30,000

Bradford – Manningham Lane / Queens Road 0 0 67,000 67,000

Page 20: Report of the Strategic Director (Regeneration & Culture) to the … · 2014-10-28 · Asset Management is the subject of a future report to this Committee. 2.5. Further information

Bradford Road / Granby Lane 0 0 57,000 57,000

Bradford - Wakefield Road Gyratory 0 0 77,000 77,000

Calderdale - A641 Bradford Road / Bailiff Bridge - MOVA Conversion 24,000 0 0 24,000

Calderdale - A629 Ovenden Road / Shroggs Road - MOVA Conversion 24,000 0 0 24,000

Calderdale - A629 Ovenden Road / North Ovenden Way - MOVA Conversion 0 24,000 0 24,000

Calderdale - A629 Ovenden Road / North Nursery Lane - MOVA Conversion 0 0 24,000 24,000

Calderdale - A672 Oldham Road / Ripponden - MOVA Conversion 0 0 24,000 24,000

Calderdale - A58 / Kings Cross / Parkinson lane 75,000 0 0 75,000

Calderdale - A641 Bradford Road / Bailiff Bridge 75,000 0 0 75,000

Calderdale - A629 Ovenden Road / North Shroggs Road 0 0 80,000 80,000

Calderdale - A58 / Wharf Street / Tuel Lane 0 75,000 0 75,000

Calderdale - A629 / Huddersfield Road / Shaw Hill / Free School Lane 0 80,000 0 80,000

Calderdale - Cycling facilities at various locations 20,000 20,000 20,000 60,000

Kirklees - A629 / SouthGate / Shorehead Roundabout 35,000 0 0 35,000

Kirklees - A62 / A652 / Birstall Smithies to M62 J27 Scoot + Bus Priority 60,000 0 0 60,000

Kirklees - A641 / Bradford Road Scoot & Bus Priority 60,000 0 0 60,000

Kirklees - A644 / Mirfield Scoot + Bus Priority 40,000 0 0 40,000

Kirklees - A62 / Leeds Road / Gt Northern Retail Park 0 130,000 0 130,000

Kirklees - A62 / Leeds Road / Old Fieldhouse Lane 0 0 105,000 105,000

Kirklees - A616 / Lockwood Bar / Swan lane 0 0 110,000 110,000

Kirklees - A62 / Castlegate / Alfred Street 0 115,000 0 115,000

Kirklees - Huddersfield & Dewsbury RR Convert 4 Duel Crossings to Puffin Crossings 30,000 30,000 60,000 120,000

Kirklees MOVA Sites - Introduce Bus Priority (7 Sites) 28,000 28,000 28,000 84,000

Kirklees Pelican Sites - Convert 3 Pelicans to Puffins 60,000 0 0 60,000

Leeds - A6120 / Lawnswood Business Park / O.R.R - MOVA 24,000 0 0 24,000

Leeds - Harrogate Road / Street Lane / Moortown Corner - MOVA 24,000 0 0 24,000

Leeds - Leeds Road / Pontefract Road / Styebank Lane - MOVA 24,000 0 0 24,000

Leeds - A650 Britannia Rd / Howley Park Rd / Co-Operative Road - MOVA 24,000 0 0 24,000

Leeds - A650 / Fountain Street / Scotchman Lane - MOVA 24,000 0 0 24,000

Leeds - Clarendon Road / Moorland Road - MOVA 24,000 0 0 24,000

Leeds - Meanwood Road / Grove Lane / Stainbeck Road / Meanwood Hotel - MOVA 24,000 0 0 24,000

Leeds - Scott Hall Road / Potternewton Lane - MOVA 24,000 0 0 24,000

Leeds - A6120 / Shadwell Lane / Moortown - MOVA 24,000 0 0 24,000

Leeds - A6120 / O.R.R / Tongue Lane / Blackmoor Road - MOVA 0 24,000 0 24,000

Leeds - A61 Wakefield Road / Leadwell Lane - MOVA 0 24,000 0 24,000

Leeds - A639 / Holmsley Lane / Haigh Road - MOVA 0 24,000 0 24,000

Leeds - Otley Road / A660 Farrar Lane / Church Lane - MOVA 0 24,000 0 24,000

Leeds - A58 Easterley Road / Wetherby Road / Boggart Hill - MOVA 0 24,000 0 24,000

Leeds - A63 Selby Road / Ninelands Ln Fire Station – MOVA

0 24,000 0 24,000

Page 21: Report of the Strategic Director (Regeneration & Culture) to the … · 2014-10-28 · Asset Management is the subject of a future report to this Committee. 2.5. Further information

Leeds - A656 Barnsdale Road / Newton Lane / Park Lane - MOVA 0 24,000 0 24,000

Leeds - A656 Barnsdale Rd / Station Rd / Allerton Bywater - MOVA 0 24,000 0 24,000

Leeds - Henconner Lane / Green Hill Road / Stanningley Bypass - MOVA 0 24,000 0 24,000

Leeds - A643 / Bruntcliffe Lane / Corporation Street - MOVA 0 0 24,000 24,000

Leeds - A65 / Otley Road / Park Road - MOVA 0 0 24,000 24,000

Leeds - A65 / Gill Lane / Yeadon - MOVA 0 0 24,000 24,000

Leeds - St Michaels Bridge / St Michaels Lane - MOVA 0 0 24,000 24,000

Leeds - Stanningley Bypass / Richardshaw Lane - MOVA 0 0 24,000 24,000

Leeds - A6120 / Fink Hill / Broadway / Parkside - MOVA 0 0 24,000 24,000

Leeds - A63 / Selby Road / Holyshaw Lane / Colton Road - MOVA 0 0 24,000 24,000

Leeds - A6120 Ring Rd / Seacroft / Ramshead Approach/Coal Road - MOVA 0 0 24,000 24,000

Leeds - High Street / Harrogate Road / Bayton Lane - MOVA

0 0 24,000 24,000

Wakefield - Modify and refurbish 15 Identified Junctions to facilitate MOVA control 120,000 200,000 280,000 600,000

Wakefield - Implementation of SAPS on Kirkgate and Westgate 5,000 0 0 5,000

Wakefield - Localised Widening to Bell Street / Bond Street Junction 100,000 100,000 0 200,000

Wakefield - Crosshills / Market Street Modifications 50,000 0 0 50,000

Variable Message Signs and other signing

Bradford Common Data Base Works 10,000 5,000 0 15,000

Bradford new information signs - Inter Area Strategic Routes

Bradford - Leeds Road , Shipley (towards Leeds) 1,000 30,000 0 31,000

Bradford - Leeds Road , Shipley (towards Leeds) 1,000 30,000 0 31,000

Bradford - Leeds Road , Bradford (towards Leeds) 1,000 30,000 0 31,000

Bradford - Leeds Road , Bradford (towards Leeds) 1,000 30,000 0 31,000

Bradford - Wakefield Road, Bradford (towards Kirklees) 0 1,000 30,000 31,000

Bradford - Wakefield Road, Bradford (towards Kirklees) 0 1,000 30,000 31,000

Bradford - Manchester Road, Bradford (towards Kirklees) 0 1,000 30,000 31,000

Bradford - Manchester Road, Bradford (towards Kirklees) 0 1,000 30,000 31,000

Calderdale new information signs

Calderdale - A58 Whitehall Road, Nr Hellfire Corner 1,000 30,000 0 £31,000

Calderdale - A58 Godley Lane, Halifax 1,000 30,000 0 £31,000

Calderdale - A58 Bolton Brow, Sowerby Bridge 1,000 30,000 0 £31,000

Calderdale - A629 Near Calder & Hebble, Elland 0 1,000 30,000 £31,000

Calderdale - A629 Ovenden Rd, between Shroggs Rd & Orange St 0 1,000 30,000 £31,000

Kirklees Flint Street CDB Works + PGS works 20,000 0 0 20,000

Leeds VMS Phase 2 192,000 0 0 192,000

Kirklees Snow Signs / Information

Kirklees - A62 / Leeds Road / Bradley Mills - Huddersfield 1,000 30,000 0 31,000

Kirklees - A629 / Wakefield Road / Mold Green - Huddersfield 1,000 30,000 0 31,000

Kirklees - Ring Road / Nr Springwood CP - Huddersfield 1,000 30,000 0 31,000

Kirklees - Blackley New Road / Junction 24 - Ainley Top

1,000 30,000 0 31,000

Page 22: Report of the Strategic Director (Regeneration & Culture) to the … · 2014-10-28 · Asset Management is the subject of a future report to this Committee. 2.5. Further information

Kirklees New information signs - Inter Area Strategic Routes

Kirklees - A638 / Bradford Road / Approach to M62 Juntion 26 1,000 30,000 0 31,000

Kirklees - A62 / Geldard Road / Approach to M62 Juntion 27 1,000 30,000 0 31,000

Kirklees - A62 / Geldard Road - From Junction 27 1,000 30,000 0 31,000

Kirklees - A653 / Babes in Wood / Approach to M62 Junction 28 1,000 30,000 0 31,000

Kirklees - A653 / Babes in Wood / From M62 Junction 28 1,000 30,000 0 31,000

Kirklees - A62 / Leeds Road / Outbound to M62 Junction 25 1,000 30,000 0 31,000

Kirklees - A62 / Leeds Road / Near Range Rover Garage 0 0 31,000 31,000

Kirklees - A641 / Bradford Rd / Fixby towards Brighouse & Bradford 0 0 31,000 31,000

Kirklees - A629 / Halifax Rd / Outbound to M62 Junction 24 0 0 31,000 31,000

Kirklees - A650 / Drighlington Bypass towards Bradford 0 0 31,000 31,000

Kirklees New information signs

Kirklees - A62 / Manchester Road / Near Longroyd Bridge 0 0 31,000 31,000

Kirklees - A629 / Halifax Road / Near Edgerton Road 0 0 31,000 31,000

Kirklees - A641 / Bradford Road / Fixby 0 0 31,000 31,000

Leeds New information signs

Leeds - Sites1 to 8 (details tbc) - Information Signs 8,000 240,000 0 248,000

Leeds - Site 9 to 16 (details tbc) - Information Signs 0 8,000 240,000 248,000

Wakefield New information signs

Wakefield - Sites 1 to 2 (details tbc) - Information Signs 62,000 0 0 62,000

Wakefield – Sites 3 to 4 (details tbc) - Information Signs 0 62,000 0 62,000

Wakefield – Sites 5 to 6 (details tbc) - Information Signs 0 0 62,000 62,000

Traffic Signals Maintenance

Bradford - Replacement of Obsolete Traffic Signal Poles & Controllers 80,000 80,000 90,000 250,000

Calderdale - Replacement of Obsolete Traffic Signal Poles & Controllers 30,000 30,000 40,000 100,000

Kirklees - Replacement of Obsolete Traffic Signal Poles 60,000 70,000 70,000 200,000

Leeds - Replacement of Obsolete Traffic Signal Poles & Controllers 80,000 80,000 90,000 250,000

Wakefield - Replacement of Obsolete Traffic Signal Poles & Controllers 60,000 70,000 70,000 200,000

Freight

West Yorkshire – all districts – detail to be developed 50,000 50,000 0 100,000

Other

Pinch Point Programme commitments 1,600,000 0 0 1,600,000

Horsforth roundabout, Leeds 1,300,000 0 0 1,300,000

TOTAL NETWORK MANAGEMENT 11,492,000

Over-programming of 18% - details tbc 2,068,560

Information

Transport Data management 450,000 450,000 0 900,00

Multi-modal, hubs, disruption information, web portal 550,000 550,000 0 1,100,000

Updating bus real time telematics 0 300,000 700,000 1,000,000

TOTAL INFORMATION 3,000,000

Over-programming of 18% - details tbc to include upscale of Multi-modal hubs, hubs, disruption info, web portal 540,000

Page 23: Report of the Strategic Director (Regeneration & Culture) to the … · 2014-10-28 · Asset Management is the subject of a future report to this Committee. 2.5. Further information

Cycling and Walking

CCAG City Connect superhighway (Bradford & Leeds) 7,500,000 0 7,500,000

LCCN9 Chapel Allerton to Leeds centre route 500,000 0 0 500,000

Cycle facilities – Calderdale, Kirklees, Wakefield

• Calderdale – £180k

• Kirklees – £170k • Nagger Line, Outwood, Wakefield - shared ped/cycle use £150K

500,000 0 0 500,000

TOTAL CYCLING AND WALKING 8,500,000

Over-programming of 18% - details tbc 1,530,000

Integrated Public Transport

Bus Quality Contract / Bus Quality Partnership development tbc tbc tbc 800,000

Hubs ‘lite’ - up to 27 sites, various locations, light touch treatment (- totem, enhanced information including real time, improved signage)

210,000 210,000 205,000 630,000

Town centre Transport Hubs - More comprehensive site development to influence travel behaviours. Sites:

• Heckmondwike, Kirklees (Y1, £300k)

• Normanton, Wakefield (Y2, £150k)

• Elland, Calderdale (Y2, £170k)

300,000 320,000 0 620,000

Bus Hot Spot scheme – up to 3 schemes. Areas to be focussed on include:

• Leeds: Selby Road (A63), Whitkirk, and Stonegate Road Roundabout (A61)

• Kirklees: Wakefield Road, Huddersfield

• Wakefield: various

Schemes to be appraised for benefits / vfm

415,000 415,000 420,000 1,250,000

Castleford Bus Station 3,500,000 0 0 3,500,000

Low Moor Rail Station 0 3,100,000 100,000 3,200,000

Leeds Elland Road Park & Ride 1,600,000 0 0 1,600.000

TOTAL INTEGRATED PUBLIC TRANSPORT 11,600,000

Over-programming of 18% - details tbc to include Corn Exchange Leeds 2,088,000

Safer Roads

Bradford KSI Casualty Reduction including locally determined Traffic Management

923,000

923,000 923,000

2,769,000

Calderdale KSI Casualty Reduction including locally determined Traffic Management

442,000

442,000

442,000

1,326,000

Kirklees KSI Casualty Reduction including locally determined Traffic Management

754,000

754,000

754,000

2,262,000

Leeds KSI Casualty Reduction including locally determined Traffic Management

1,478,000 1,478,000 1,477,000 4,433,000

Wakefield KSI Casualty Reduction including locally determined Traffic Management

737,000 737,000 736,000 2,210,000

WY Safer Roads support 66,000 66,000 68,000 200,000

TOTAL SAFER ROADS 13,200,000

Over-programming of 18% - details tbc 2,376,000

Above safety allocations determined by current IP1 formula

Page 24: Report of the Strategic Director (Regeneration & Culture) to the … · 2014-10-28 · Asset Management is the subject of a future report to this Committee. 2.5. Further information

Bids and Leverage

Rail Devolution 225,000 225,000 50,000 500,000

Rail Development programme – from RailPlan7 200,000 200,000 200,000 600,000

Station Enhancements and accessibility improvements - Match to lever in rail industry / 3rd party funds

(* dependent on external funding opportunities)

* 200,000 * 850,000 * 850,000 1,900,000

Local LTP match for funding bids. Non-rail projects e.g. Local Pinch Points, Cycle City Ambition etc

(* dependent on external funding opportunities)

* 1,666,666 * 1,666,666 * 1,666,668 5,000,000

TOTAL BIDS AND LEVERAGE 8,000,000

Over-programming of 18% - details tbc 1,440,000

Low Carbon Fuels and Technologies

Gas and electric vehicle refuelling strategy & infrastructure 60,000 50,000 40,000 150,000

Bus / HGV emissions assessment – retro-fitting emissions control technology & procurement evaluation tools

70,000 30,000 0 100,000

Demonstration Projects with local authority fleet / buses 20,000 40,000 40,000 100,000

Micro-simulation modelling to optimise UTMC to reduce traffic emissions

0 30,000 0 30,000

Low Emission Zones – Extrapolate best performing work commenced with DEFRA grant in IP1 with fleet vehicles

0 20,000 0 20,000

TOTAL LOW CARBON FUELS AND TECHNOLOGIES 400,000

Over-programming of 18% - details tbc 72,000

Other

LTP feasibility 66,000 67,000 67,000 200,000

LTP Monitoring and Evaluation / analysis

• Integrated Transport scheme monitoring (Pinch point & smaller schemes)

• Monitoring equipment

• Data extraction

100,000 100,000 100,000 300,000

TOTAL OTHER 500,000

TOTAL INTEGRATED TRANSPORT BLOCK 62,692,000

TOTAL IT BLOCK OVER-PROGRAMMING 16,886,560

Page 25: Report of the Strategic Director (Regeneration & Culture) to the … · 2014-10-28 · Asset Management is the subject of a future report to this Committee. 2.5. Further information

APPENDIX 4

GLOSSARY OF TERMS AND ABBREVIATIONS Bike It

Cycling encouragement programme delivered by SUSTRANS in schools

Common Data Base

A ‘live’ database containing a wide range of traffic and transport data which provides information to websites, Variable Message Signs, UTC systems etc

DEFRA

Department for Environment, Food and Rural Affairs

DfT

Department for Transport

HS2

High Speed 2 Rail Link between London and Manchester / Leeds

Hub

A location where there is a focus of transport movements and where improvements are being implemented to enhance facilities

ISA

Integrated Sustainability Assessment – an assessment of the extent to which a strategic plan will help to achieve relevant environmental, economic and social objectives

KSI

Killed and Seriously Injured Road Casualties

LED

Light Emitting Diode Lighting – energy efficient lighting equipment

LES

Low Emission Strategy

LSTF

Local Sustainable Transport Fund

LTP / IP1 / IP2

Local Transport Plan / Implementation Plan 1 / Implementation Plan 2

MOVA

Micro Processor Optimised Vehicle Actuation – a sophisticated traffic signal operating system that responds to changes in traffic flows by altering green times and signal cycle times

OLEV

Office for Low Emission Vehicles

PRN

Principal Road Network – highways identified as serving the strategic needs of the nation

RailPlan7

The current rail planning document for West Yorkshire

TLP

Traffic Light Priority for Buses – a system that uses GPS positioning to trigger extended or advanced green signals for buses

Urban Traffic Management Control / UTMC / UTC

The traffic management and control system that lies behind traffic signals, variable message signs, TLP etc

WYCA

West Yorkshire Combined Authority

WY+TF

West Yorkshire Plus Transport Fund