CTC 18 May 2010 CES studies for CDR : 1. Tunnel cross section 2. Injection Complex 3. BDS Layout Experimental Area Layout Summary. Report on behalf of CLIC Civil Engineering and Services (CES) WG. 1.Tunnel cross section. 4.5m tunnel for CDR as agreed in 2009. - PowerPoint PPT PresentationTRANSCRIPT
John Osborne : GS-SEM Civil Engineering18 May 2009
Report on behalf of CLIC Civil Engineering and Services (CES) WG
CTC 18 May 2010
CES studies for CDR :
1. Tunnel cross section2. Injection Complex 3. BDS Layout4. Experimental Area Layout5. Summary
John Osborne : GS-SEM Civil Engineering18 May 2009
1.Tunnel cross section
John Osborne : GS-SEM Civil Engineering18 May 2009 3
4.5m tunnel for CDR as agreed in 2009
John Osborne : GS-SEM Civil Engineering18 May 2009 4
Drawbacks with 4.5m tunnel identified in 2009
• Positioning of electronic racks not ideal• Solution : Re-position onto tunnel floor, but possibly means deleting safety barrier
• Difficult to access ‘tunnel wall’ side of modules• Solution : remove entire module for access ?
• Access to Drive Beam dumps • Solution : Local Tunnel enlargement to allow ‘ladder’ access (see next slides)
• Impact from vibration from floor embedded pipes• Solution : Further studies in TD Phase
• Reduced space due to transversal ventilation and perhaps not sufficient cooling power • Solution : Study longitudinal ventilation system during TD Phase
• No space for vehicle powering ‘monorail’ and integration conflict• Inductive powering for vehicle ?
John Osborne : GS-SEM Civil Engineering18 May 2009
Revised 4.5m cross section
John Osborne : GS-SEM Civil Engineering18 May 2009
Access to Drive beam dump
John Osborne : GS-SEM Civil Engineering18 May 2009
John Osborne : GS-SEM Civil Engineering18 May 2009
Access to LHC Dumps at Point 6
John Osborne : GS-SEM Civil Engineering18 May 2009
Cross section for ILC Europe (CERN) 5.2m diameter for Kly-Cluster
John Osborne : GS-SEM Civil Engineering18 May 2009
Possible 5.2m cross section for CLIC
John Osborne : GS-SEM Civil Engineering18 May 2009
‘Metro standard’ 5.6m tunnel +150MCHF : Proposed at CTC May 2009
John Osborne : GS-SEM Civil Engineering18 May 2009
2. Injection Complex :Input mainly from :L.RinolfiB.JeanneretF.Stulle
John Osborne : GS-SEM Civil Engineering18 May 2009 13
Injection Complex 2009 Layout
John Osborne : GS-SEM Civil Engineering18 May 2009 14
Injection Complex 2010 Layout
• 1.1km extra tunnel for turnarounds
• 500m extra for CR, DR• Injection cut and cover
tunnels lengths increased to 1.4km (from 1km)
‘turnaround’ is now a horizontal cut/cover design
John Osborne : GS-SEM Civil Engineering18 May 2009
‘Spiral descents’ removed
John Osborne : GS-SEM Civil Engineering18 May 2009 16
Surface tunnels / halls for Injection Complex2010 Layout : Surface buildings added
John Osborne : GS-SEM Civil Engineering18 May 2009
CLIC Damping Rings schematic layout
e+ Damping Ring
e- Damping Ring
e- Pre-damping Ringe+ Pre-damping Ring
e+ linac to PDR transfer line
e- linac to PDR transfer line
e+ PDR to DR transfer line
e+ DR to Booster linac transfer line
e- PDR to DR transfer line
e- DR to Booster linac transfer line
205 m
205 m
80 m
80 m
Dump
157 m
64 m
Damping rings still to be finalised
John Osborne : GS-SEM Civil Engineering18 May 2009
ON - HOLD
John Osborne : GS-SEM Civil Engineering18 May 2009
3. BDS Layout
Input mainly from :Rogelio Tomas GarciaEdda Gschwendtner
John Osborne : GS-SEM Civil Engineering18 May 2009
Main Beam Dumps
John Osborne : GS-SEM Civil Engineering18 May 2009
Tune-Up Dumps added
John Osborne : GS-SEM Civil Engineering18 May 2009
4. Experimental Area Layout
John Osborne : GS-SEM Civil Engineering18 May 2009
CLIC Detector hall layout developed by :A.GaddiH.GerwigA.Herve
CES will now use this as starting point for CE & services design, including cost estimates
John Osborne : GS-SEM Civil Engineering18 May 2009
Machine By-Pass added
Survey gallery added
Emergency escape tunnel
Better to delete cavern ‘technical alcoves’
Gantry crane capacities to be determined
CV being consulted about requirements
John Osborne : GS-SEM Civil Engineering18 May 2009
ILC 3d models developed at CERN using CATIA :CLIC models to follow once draughtsman is identified
John Osborne : GS-SEM Civil Engineering18 May 2009Overall layout updated (full symmetry)
John Osborne : GS-SEM Civil Engineering18 May 2009
5. Summary
• Will continue to try and ‘freeze’ CE layouts at monthly CES meeting. Next major issue is amount of space required for Power Converters.
• Martin Gastal is gathering input from other technical services for experimental hall (CV,EL etc)
• Costing for CDR required for all technical infrastructure by September with assistance from Amberg consultants (same CE consultants for ILC)
• Draft layout for CDR Chapter ‘Civil Engineering and Services’ has been submitted to Hermann
John Osborne : GS-SEM Civil Engineering18 May 2009
BACK-UP SLIDE
John Osborne : GS-SEM Civil Engineering18 May 2009
CTC 19 May 2009 Summary
• With a 4.5m diameter tunnel, it appears difficult to accommodate all equipment
• 5.6m recommended by CES working group• More TBM’s of this diameter available will help with Project planning• Reduction in other costs due to more additional working space ? Space for
future requests….• Additional CE cost in the region of 150M CHF
Barcelona Metro under construction 6.6m machine external, inner 5.8m. With 0.1m tolerance on radius = 5.6m internal diameter.