    Package A5 Noi Bai Lao Cai Expressway Project

    TABLE OF CONTENT

    TABLE OF CONTENT..........................................................................................................1

    List of abbreviation, figure and table....................................................................................2

    1. Introduction.....................................................................................................................

    2. !enereal infor"ation about t#e "onitored areas........................................................

    . I"$le"entation, "onitoring ite"s, referring standards and t#e %ualit& control of

    "onitoring................................................................................................................................'

    3.1. Implementation...........................................................................................................5

    3.2. Monitoring items and referring standards..................................................................5

    3.3. Quality control............................................................................................................9

    (. Noise level "onitoring..................................................................................................1)

    4.1. Measurement method...............................................................................................104.2. Duration and freuency of noise monitoring...........................................................10

    4.3. Monitoring euipment..............................................................................................10

    4.4. !esults and assessment.............................................................................................11

    4.5. "onclusion and recommendation.............................................................................12

    '. A"bient air %ualit& "onitoring...................................................................................12

    5.1. Monitoring method...................................................................................................12

    5.2. Duration and freuency of monitoring.....................................................................13

    5.3. Monitoring euipment..............................................................................................13

    5.4. !esult and assessment..............................................................................................13

    5.5. "onclusion and recommendation.............................................................................15

    *. +ater %ualit& "onitoring.............................................................................................1'

    #.1. $nalysis method.......................................................................................................15

    #.2. %ime and freuency..................................................................................................15

    #.3. $nalysis instrument..................................................................................................1#

    #.4. !esults and assessment.............................................................................................1&

    #.5. "onclusion and recommendation.............................................................................19

    . Ecological effect and co""unit& consultation...........................................................1-

    . Conclusion......................................................................................................................1-

    A//EN0I............................................................................................................................21

    esult of anal&sis...................................................................................................................22

    /#oto albu"...........................................................................................................................2

    Report on Environment Monitoring, May !" "#$%

  • 8/10/2019 Report on Environment Monitoring May_2012_English

    2/34

    Package A5 Noi Bai Lao Cai Expressway Project

    List of abbreviation, figure and table

    Abbreviation

    '(D) 'iochemical (*ygen Demand

    "+",) "enter for +n-ironment and "leaner ,roduction"(D) "hemical (*ygen Demand

    D() Dissol-ed (*ygen

    +",) +n-ironmental "ontrol and ,rotection ,lan

    ,M10) ,articles ith a diameter of 10 micrometers or less

    %/,) %otal /uspended ,articles

    %//) %otal /uspended /olids

    List of table

    %ale 1 Q" 2#)2010 ational technical regulation on noise as

    eui-alent sound le-el 6nit) d'$.........................................................................................#

    %ale 2) ational %echnical !egulation on $mient $ir of iet am.....................................#

    %ale 3) Q"07)20078'%M% ational technical standard on surface ater...................#

    %ale 4) %he parameters of ater uality and comparati-e criteria "olumn '1 Q"

    07)2007'%M%.....................................................................................................................9

    %ale 5) :ocations duration and freuency of noise monitoring...........................................10

    %ale #) +uipment for noise monitoring...............................................................................10

    %ale &) oise le-el measured at ;m 11&

  • 8/10/2019 Report on Environment Monitoring May_2012_English

    3/34

    Package A5 Noi Bai Lao Cai Expressway Project

    1. Introductionoi 'ai :ao "ai e*pressay has 2#4 ?m in length initial point is interchange of

    ational !oad o. 2 and 'ac %hang :ong oi 'ai Aa oi e*pressay and the final point

    is located at Quang ;im "ommune 'at Bat District :ao "ai ,ro-ince.

    $lmost all parts of the highay ill go along ith the !ed !i-er di?e. %he road goesthrough 5 pro-inces and cities hich are Aa oi inh ,huc ,hu %ho Cen 'ai and :ao

    "ai. (nce completed the road ill contriute impulse to de-elopment of social economy

    shift in economic structure and guarantee national securitydefense and redistriute the

    population eteen the !ed !i-er Delta and the orthest.

    ,ac?age $5 of the proEect is currently in period of construction. ItFs essential that

    en-ironmental uality of proEect area needs to e e-aluated to ma?e sure en-ironment

    related affairs in the pre-iouslyappro-ed +I$ report and +n-ironmental "ontrol and

    ,rotection ,lan +", ill e complied tightly. %he "ontractor of this ,ac?age ;eangnam+nterprises :td agreed "enter for +n-ironmental and "leaner ,roduction "+", to e the

    Monitoring /er-ice /upplier to map out and implement en-ironmental monitoring acti-ities

    during constructional phase lasting 3# months.

    2. !enereal infor"ation about t#e "onitored areas

    No. Brief descri$tion /#otogra$#

    1

    Bao Long C#urc# area 34"

    115)')6)

    ,opulation) relati-e dense

    %errain) small hills scattering

    around the construction site.

    "onstruction status) clearance

    and aggrandi=ement

    2

    7o$ 8in# Bridge 34"

    1152)69

    ,opulation) densely li-ing

    around construction site

    %errain) almost all small hills

    "onstruction status) clearance

    and aggrandi=ement

    Report on Environment Monitoring, May !" $#$%

  • 8/10/2019 Report on Environment Monitoring May_2012_English

    4/34

    Package A5 Noi Bai Lao Cai Expressway Project

    No. Brief descri$tion /#otogra$#

    3

    National oad Bridge No.

    34" 1215(6

    ,opulation) li-ing at the one

    side of the construction site.

    /ome houses has een cleared

    for land acuisition

    %errain) /mall hills distriuting

    scatteredly

    "onstruction status) clearance

    and aggrandi=ement and

    foundation e*ca-ation

    4

    T#ia river 34" 1(' 5'))6,opulation) li-ing sparely

    %errain) small hills and ri-er

    "onstruction status) clearance

    and aggrandi=ement

    construction of ridge piles

    5

    : Can la;e 34" 12* 5)))6

    ,opulation) relati-e spare

    li-ing around the la?e

    %errain) small hills circle the

    la?e

    "onstruction status) clearance

    and aggrandi=ement

    Report on Environment Monitoring, May !" %#$%

  • 8/10/2019 Report on Environment Monitoring May_2012_English

    5/34

    Package A5 Noi Bai Lao Cai Expressway Project

    No. Brief descri$tion /#otogra$#

    #

    Nuoc 8at la;e 34" 122 5)))

    ,opulation) densely li-ing

    around the la?e

    %errain) small hills locate at

    one side of the la?e

    "onstruction status) clearance

    and aggrandi=ement

    . I"$le"entation, "onitoring ite"s, referring standards and t#e %ualit&control of "onitoring

    .1. I"$le"entation

    (n &8582012 according to sumitted plan a mission of "+", including professional

    engineers too? samples and analy=ed on site recorded rele-ant information and had a

    preliminary e-aluation on en-ironmental situation at sampling sites. >hile or?ing on site

    there as attendance of super-ision consultant and rele-ant parties.

    $fter sampling and data collection all samples consisting of air and ater samples

    ere deli-ered to laoratory for analysis as soon as possile. In addition monitoring

    acti-ities such as information collection sampling and analysis ere performed y de-ices

    on site as ell as in the :$'. $ll of these de-ices are modern and meet all reuirements

    specified in ietnam current standards and international eui-alents on en-ironment. %he

    uality control process of hole monitoring program fully complies ith I/( 1&025.

    %he report as prepared on the asis of analysis results collected information on site

    and information related to the ,roEect hich as pro-ided y the main "ontractor.

    .2. 8onitoring ite"s and referring standards

    @rom the +", monitoring items consist of)

    $ccording to plan of en-ironmental control Monitoring items consist of) oise le-el

    $ir uality around the construction areas

    /urface ater uality at the construction areas

    %he ao-e items are referred to the current standards on en-ironment specified y the

    las of ietnam.

    a) Noise level

    Table 1< =C>N 2*92)1) National tec#nical regulation on noise 3as

    e%uivalent sound level6 ?nit9 dB3A6

    Report on Environment Monitoring, May !" 5#$%

  • 8/10/2019 Report on Environment Monitoring May_2012_English

    6/34

    Package A5 Noi Bai Lao Cai Expressway Project

    No. Area Fro" * # to 21 # Fro" 21 # to * #

    1 +*tremely uiet areas) hospital

    church temple ?indergarten

    55 45

    2 (rdinary places) residential places

    hotels motel officesG

    &0 55

    b) Ambient air quality standard

    Q" 05)2009 stipulates ma*imum alloale concentration of asic pollutants in

    the air including sulfur dio*ide /(2 caron o*ide "( nitrogen o*ides (* o=one

    (3 suspended solid particles ,M10 particles H 10m and lead , in the tale 2. In this

    monitoring program the parameters in-ol-e /(2 "( (2 %/, and ,M10.

    Table 29 National Tec#nical egulation on A"bient Air of >iet Na"

    No. /ollutant Average ti"eof 1 #our

    Average ti"eof #our

    Average ti"eof 2( #our

    Average ti"eof a &ear

    1 /(2 350 125 50

    2 "( 30000 10000 5000

    3 (* 200 100 40

    4 %/, 300 200 140

    5 ,M10 150 50

    !emar?) not regulated

    c) Surface water quality standard

    Table 9 =C>N)92))@BTN8T, National tec#nical standard on surface ater

    No. /ara"eters ?nit

    8ai"u" alloable concentration

    A B

    A1 A2 B1 B2

    1 pA #7.5 #75 559 559

    2 Dissol-ed o*ygen mg8l J # J 5 J 4 J 2

    3 %// mg8l 20 30 50 100

    4 "(D mg8l 10 15 30 50

    5 '(D520o" mg8l 4 # 15 25

    # $monia as mg8l 0.1 0.2 0.5 1

    & "lorua "l mg8l 250 400 #00

    7 @lorua @ mg8l 1 1.5 1.5 2

    9 itrite (2 as mg8l 0.01 0.02 0.04 0.05

    Report on Environment Monitoring, May !" $%

  • 8/10/2019 Report on Environment Monitoring May_2012_English

    7/34

  • 8/10/2019 Report on Environment Monitoring May_2012_English

    8/34

    Package A5 Noi Bai Lao Cai Expressway Project

    No. /ara"eters ?nit

    8ai"u" alloable concentration

    A B

    A1 A2 B1 B2

    24D

    245%

    ,arauat

    mg8l

    mg8l

    mg8l

    100

    70

    900

    200

    100

    1200

    450

    1#0

    1700

    500

    200

    2000

    29 ross $lpha !adioacti-ity '8l 0.1 0.1 0.1 0.1

    30 ross 'eta !adioacti-ity '8l 1.0 1.0 1.0 1.0

    31 +. "oli M,8

    100ml

    20 50 100 200

    32 %otal "oliform M,8

    100ml

    2500 5000 &500 10000

    ote) %he classification of surface ater aims to e-aluate and control uality of ater

    sources used for different purposes)

    $1 6sed for domestic ater supply and other purposes in $2 '1 -N '2.

    $2 6sed for domestic ater supply ith a suitale treatment technology auatic

    organisms or other purposes in '1 and '2.

    '1 6sed for irrigation purposes or others hich need similar ater uality or other

    purposes specified in '2.

    '2 6sed for ater transport and other purposes ith lo ater uality.

    In the monitoring program there are 9 parameters hich are monitored in order to e

    suitale for the fact of construction. %he concentration of pollution parameters is compared

    to '1 column

    Table (9 T#e $ara"eters of ater %ualit& and co"$arative criteria 3Colu"n B1N )92))

  • 8/10/2019 Report on Environment Monitoring May_2012_English

    9/34

    Package A5 Noi Bai Lao Cai Expressway Project

    No. /ara"eter ?nit B1

    & (il and grease mg8l 0.1

    7 @ecal "oliform M,8100ml

    9 "oliform M,8100ml &500.. =ualit& control

    Quality control during monitoring process complies strictly ith the folloing

    standards and guiding documents)

    I/( 1&025)2005 eneral reuirements for the competence of testing and caliration

    laoratories.

    "ircular o. 108200&8%%'%M% uide on uality assurance and uality control in

    en-ironmental monitoring.

    Issues related to uality compliance should e riefly presented as follos)

    a) *+aity ass+rance an- .+aity contro in environmenta monitoring on site/

    Monitoring on site

    /ampling processing and preser-ing samples on site

    Deli-ering samples to laoratory

    0) *+aity ass+rance an- .+aity contro in environmenta monitoring in a0oratory/

    Issues relating to management

    +nsure uality reuirements hich are related to technical aspects including

    analytical method euipment conditions and en-ironment of the laoratory samples

    management data uality assurance.

    c) *+aity ass+rance an- .+aity contro in -ata processing an- report/

    Documents records aout monitoring acti-ities related to the monitoring on site and

    the analysis in laoratory must e fully honestly and timely repeated.

    $ll of the original documents aout monitoring acti-ities hich ere estalished

    must e stored and managed in accordance.

    Measurement data testing on site and laoratorial analysis must e chec?ed

    calculated and processed. In case of detecting errors in the monitoring %hey must e

    reported to ma?e decisions to remo-e those data. Aoe-er the original documents

    still continue to e preser-ed not destroyed.

    %he results testing on site as ell as inlaanalysis must e honestly performed and

    reported %here is no -oluntary speculation modification or supplementation of the

    data. >hen there is any suspect aout prolems or data the monitoring and analysis

    must e repeated and recorded in the monitoring documents.

    (. Noise level "onitoring(.1. 8easure"ent "et#od

    oise le-el is measured in accordance ith the folloing methods) %" 59#4 )1995 $coustics. Description and measurement of en-ironmental

    Report on Environment Monitoring, May !" 1#$%

  • 8/10/2019 Report on Environment Monitoring May_2012_English

    10/34

    Package A5 Noi Bai Lao Cai Expressway Project

    noise. 'asic uantities and procedures.

    %" 59#5 ) 1995 $coustic. Description and measurement of en-ironmental

    noise. $pplication to noise limits

    %" #399 ) 1997 $coustics. Description and measurement of en-ironmental

    noise ,art 2) $cuisition of data pertinent to land use.

    (.2. 0uration and fre%uenc& of noise "onitoring

    :ocation duration and freuency of noise monitoring ere mentioned in the +",

    and ha-e een appro-ed y ,M6 and /uper-ision "onsultant. %he detailed location

    duration and freuency as follos)

    Table '9 Locations, duration and fre%uenc& of noise "onitoring

    No. 8onitoring site Co

  • 8/10/2019 Report on Environment Monitoring May_2012_English

    11/34

    Package A5 Noi Bai Lao Cai Expressway Project

    Table 9 Noise level "easured at 4" 115)')

    tation ite

    esult 3dB6

    3average6=C>N 2*92)1) Eceeding value

    Noise value at eac# ti"e $eriod

    #h 21h 21h#h #h 21h 21h#h #h 21h 21h#h

    4"

    115)')

    'o :ong

    "hurch51.1 43.3 55 45

    the -alue of noise le-el referred to standards applied for e*tremely uiet areas

    Q" 2#)20108'%M%

    oise primarily generated from the -ehicles or motori?e ut constructional

    euipment

    Table 9 Noise level "easured at 4" 1152) and 4" 1215(

    tation ite

    esult 3dB63average6

    =C>N 2*92)1) Eceeding value

    Noise value at eac# ti"e $eriod

    #h 21h 21h#h #h 21h 21h#h #h 21h 21h#h

    ;m

    117

  • 8/10/2019 Report on Environment Monitoring May_2012_English

    12/34

    Package A5 Noi Bai Lao Cai Expressway Project

    Methods for determination of pollutant in the air are ased on the corresponding

    %" . %he methods are listed and descried in tale 9)

    Table -9 8et#ods for deter"ination of $ollutants in t#e air

    No. /ara"eter 8et#od Brief descri$tion

    1 "(%"

    59&2)1995

    $ir sample is sampled y the specific instrument

    and concentration of "( in the air is determined

    y gas chromatography using @ID detector

    1/(2

    %"

    #137)199#

    /(2 in the air is asored into

    tetrachloromercurate %"M ithin certain

    duration to form dichlorosulfitomercurate. /(2

    concentration is determined through

    dichlorosulfitomercurate and -olume of air

    sample.

    2(*

    %"

    59&1)1995

    (2 reacts ith the reagent in the asorption

    solution to form a=o dye. "oncentration of (2is

    defined y measurement of asorption of a=o dye

    solution and -olume of sample.

    3%/,

    %"

    50#&)1995

    ,rinciple of this method is eight of amount of

    dust on the filter paper after filtering a specific

    -olume of air sample.

    4 ,M10 %"50#&)1995

    ,rinciple of this method is eight of amount of

    dust on the filter paper after filtering a specific

    -olume of air sample. %he apparatus to sample

    operates than?s to inertia principle to separate dust

    into the desiredsi=e segments.

    Note:

    2C3N 51'/"115 3ietnamese stan-ar-s/ Am0ient air 4 etermination o6 t7e mass concentrationo6 C8

    2C3N 51'"/"115 3ietnamese stan-ar-s/ Am0ient air 4 etermination o6 t7e mass concentration

    o6 s+6+r -ioxi-e 4 2etrac7oromerc+rate 92CM) pararosaniine met7o-

    2C3N &"$(/"11& 3ietnamese stan-ar-s/ Am0ient air 4 etermination o6 t7e mass concentrationo6 nitrogen oxi-es 44 C7emi+minescence:s met7o-

    2C3N 5!&'/"115 3ietnamese stan-ar-s/ Air .+aity;

  • 8/10/2019 Report on Environment Monitoring May_2012_English

    13/34

  • 8/10/2019 Report on Environment Monitoring May_2012_English

    14/34

    Package A5 Noi Bai Lao Cai Expressway Project

    No.tation@sa"$ling $oint

    /ara"eter 3g@"6

    O2 CO NO T/ /81)

    $9 113 1420 113 111 113

    I. Min2* 212 12 2' 2*

    II. Max

    187.2 20!.1 1".# 1#".# 187.2

    III. Mean

    1 1(' 1' 1'(

    4 =C>N )' 9)-< Colu"n 1"0 "0000 200 "00 ater sampling at C "an :a?e position o. 4 ;m 12#

  • 8/10/2019 Report on Environment Monitoring May_2012_English

    31/34

    Package A5 Noi Bai Lao Cai Expressway Project

    >ater sampling at goi %hia !i-er;m 145 ater sampling at goi %hia !i-er;m 145

  • 8/10/2019 Report on Environment Monitoring May_2012_English

    32/34

    Package A5 Noi Bai Lao Cai Expressway Project

    >ater sampling at goi %hia !i-er;m 145 ater sampling at goi %hia !i-er;m 145

  • 8/10/2019 Report on Environment Monitoring May_2012_English

    33/34

  • 8/10/2019 Report on Environment Monitoring May_2012_English

    34/34

    Package A5 Noi Bai Lao Cai Expressway Project

    >ater sampling at uoc Mat la?e position o. 3 ;m 122 ater sampling at uoc Mat la?e position o. 4 ;m 122