REPORT ON THE
GEOPHYSICAL EXPLORATION PROGRAMME
LAC LEGRIS AREA PROPERTY
ONTARIO
JULY, 1987
2 .
*"Hm fen*
NMOL - NORTHERN MANAGEMENT i CONSULTANTS LTD.150 York Street, Suite 1814Toronto, Ontario, M5H 3S5
August 19, 1987
Heenan Senlac Resources Limited 220 Bay Street Suite 201 Toronto, Ontario M5J 1P3
Dear Sirs:
He: Geophysical Exploration Programme Legris Lake Area Property. Ontario
During the months of February, March, April, May, June and July, 1987, a geophysical exploration programme consisting of a detailed Electromagnetic Survey and a detailed Magnetometer Survey was carried out on your property located in the Legris Lake Area in the Thunder Bay Mining Division of Ontario.
The survey consisted of approximately 100 miles of line cutting and ninety-eight miles of both electromagnetic and magnetic surveys.
Summary of Results
The Electromagnetic Survey revealed a minor conductor labelled Conductor "A" on the accompanying map and a number of smaller conductors, one of which has been labelled "Minor Conductor" on the accompanying map. Conductor "A" has extremely good magnetic correlation and is believed to represent a complex zone of disseminated sulphide mineralization.
Recommendations and Conclusions
Conductor "A" probably represents a zone of minor sulphide mineralization and should be explored by a single drill hole. The Minor Conductor mapped should be prospected and mapped geologically before drilling.
Page 2
Terms of Reference
The survey was carried out on my recommendation. The survey was designed to explore a ninety-eight claim group held under option and known to be underlain by an intrusive gabbro that may be the host rock for PGM deposits. However no PGM mineralization has been noted in this intrusive to date.
The claims covered by the survey are as follows:
TB908337, TB908338, TB908339, TB908340, TB908341, TB908342, TB908343,
TB908344, TB908345, TB908346, TB909821, TB909822, TB909823, TB909824,
TB928779, TB928780, TB928781, TB928782, TB928783, TB928784, TB928785,
TB928786, TB928787, TB928788, TB928789, TB928790, TB928791, TB928792,
TB928793, TB928794, TB928795, TB928796, TB928797, TB928798, TB928799,
TB928800, TB929001, TB929002, TB929003, TB929004, TB929005, TB929006,
TB929007, TB929008, TB929013, TB929014, TB929015, TB929016, TB929017,
TB929018, TB929019, TB929020, TB929021, TB929022, TB929023, TB929024,
TB929025, TB929026, TB929027, TB929028, TB929029, TB929030, TB929031,
TB929032, TB929033, TB929034, TB929035, TB929036, TB929037, TB929038,
TB929039, TB929040, TB929041, TB929042, TB929043, TB929044, TB929045,
TB929046, TB929047, TB929048, TB929049, TB929050, TB929053, TB929054,
TB929055, TB929056, TB929057, TB929058, TB929059, TB929060, TB929063,
TB929064, TB929065, TB929066, TB929067, TB929068, TB929069, TB929070
The lines were cut by Contractor personnel and the magnetic and electromagnetic surveys were carried out under the direction of Mr. Max Juby, B.Se., on the Lake Legris property.
The lines were cut at 300 foot spacing in a N50 W direction. Station intervals were established at 100 feet with numerous 50 foot stations established in anomalous areas.
Page 3
In addition, Mr. Juby prospected the area in the vicinity of Conductor "A" and located sulphide bearing gabbros slightly north of Conductor "A".
Methods Used and the Presentation of Results
The Electromagnetic Survey
The Electromagnetic Survey employed the Max-Min Instrument operated in a horizontal-coil configuration with a 200 foot transmitter-receiver separation. Readings were taken on the high frequency at approximately 3,700 OPS. In general, readings of both the in-phases and the out-of-phase were taken and only the out-of-phase was plotted on the accompanying map. The in-phase is believed to be misrepresentative of the actual situation in view of the topographical differences experienced during the survey.
The Magnetometer Survey
The Magnetometer Survey utilized the Scintrex Proton Magnetometer Instrument and readings representing the total field variations are plotted on the accompanying map.
The readings were corrected for diurnal variations using the base station method. The magnetic results have been contoured only roughly as the geology of the area is extremely complex and experience in the area has indicated that contouring of the magnetic anomalies can frequently lead to improper interpretation if done in the normal fashion.
Interpretation of Geophysical Results
Both the electromagnetic and magnetic responses in the vicinity of Anomaly "A" represent a Zone of minor sulphide mineralization. The Conductor appears to be about 1,000 feet long. The magnetic response in the vicinity of the Conductor reinforces the interpretation of sulphide mineralization and may indicate a gabbro-gabbro contact.
All of which is t respectfully submitted,
it-'}
J. Patrick Sheridan, P.Eng. J
JPS:vfh
Ministry ofNorthern Developmentand Mines
Ontario
Report of Work
(Geophysical, Geological, Geochemical and Expenditures)
52He3Nwaaas 2.1 aa 11 MAX LAKE 900
Type of Survev(s)
Claim Holder(s)
Township or Area
JLQ^
.T.rospector's Li No.
Address
6Q3- 199 . iV .Survey Company
Narnti and ^^uress OT MUIMOT (of Geo-Technical repw . M
.T. P. ^^(ZrrHo.n 1 k S+ -
late of Survey (from Si to)
^ l Day j Mo. | Yr. j Pay |
rVrVajri (\
Vr.Total Miles of lin* Cut
M5H .'VS*Credits Requested per Each Claim in Columns at rightSpecial Provisions
For first survey:
Enter 40 days. (This includes line cutting)
For each additional survey: using the same grid:
Enter 20 days (for each)
Geophysical Days per Claim
- Electromagnetic !
- Magnetometer
- Radiometric
- Otner
Geological
Geochemical iMan Days
Complete reverse side
and enter total(s) here
Geophysical Days per Claim
- Electromagnetic ;
- Magnetometer j
- Radiometric i
- Other
Geological
Geochemical
Airborne Credits
Note: Special provisions Electromagnetic credits do not apply to Airborne Surveys, Magnetometer
| Radiometric
: Days per l Claim
Expenditures (excludes power stripping)Type of Work Performed
Performed on ClaimUI
Calculation of Expenditure Days Credits
Total ExpendituresTotal
Days Credits
InstructionsTotal Days Credits may be apportioned at the claim holder's choice. Enter number of days credits per claim selected in columns al right. f
Date 'r Wqer, ___
RecorXjTrt Htfldfcr (fr qent (Signature)
Certification Verifying Report of Work
Mfning Claims Traversed (List in numerical sequence)Mining Claim
RECftVTC. o
MfliNG LANDS
et^ct.
SECT!
Total number of mining claims covered by this report of work.
l hereby certify that l have a personal and intimate knowledge of the facts set forth in the Report of Work annexed hereto, having performed^he work
or witnessed same during and/or atter its completion and ihe annexed report is true. //l ^^^
Name and Postal Address of Person Certifying
XorUfOate Certified
an r)ICertifi
f
Assessment Work Breakdown
Man Days are based on eight (8) hour Technical or Line-cutting days. Technical days include work performed by consultants, draftsmen, etc..
Type of Survey
Manr^4orru2^rf s O-r.fl h ne?, rjurtVir.nu
Technical Days
25 x i
^jTechnical Days Line-cutting No. of Day* per
Credits Days Total Credits Claim* Claim
' = 17^ + ^7 - 222 * * o -- 22-2
Type of Survey
Technical Day* Credits
Line-cutting Days Total Credits
Days per Claim
X 7
Total CreditsDays per
Claim
x 7 -
Ministry o i R epot t of Work' if \ Northern Development
and Mines (Geophysical, Geological, Ontario Geochemical and Expenditures)
- ^ O^^^y ~jT J\ C^l f C/
hits: Mining Act
If numoeT^of mining c laimsexceeds space on this form, attach^
Note: Only days credits calculated ir^ih-e"Expenditures" section may be Enteredm the "Expend. Days Cr." columns.
Do not use shaded areas below.Type of S Jrvey(s)
__Lir^ ..cudhrn -cxr.d MaoneVo-meAerClaim Holder(s) ~) ,_j
\ ppg.rg. . .. _______
E^Y,Address
Survev Compan-'
r\ Mdr)CXQ^rn2n\ orvcima **uure- . wr Authc .or Geo-Tecnnica: repo
Date of Survev (from A to) Total Miles of l ine Ci.
Day j Mp. i Vr. j Day i Mo. ] Yr. ^ f^
^ M BHCredits R equested pei Each Claim in Columns at rightSpecial Provisions
For first survey
Enter 40 days. (This includes line cutting)
t
For each additional survey using the same grid:
Enter 20 days (for each)
Geophysical
Electromagnetic
- Maqre'o^eier
Otner
Geolog": J.
Days Der
x"
Man Days
Complete reverse side. t
and enter toudisl here
Davs -, e ,
- Other
Geoloq-^a'
A. roorne Credits
Note: S pr.'Cia : pro*. AIOPS Evr'ro 1 - v
cred.ts uo io" iippiv
to Airborne Surveys. Magne'or-,
Mining Claims Traversed (List in numerical sequence)
Expenditures (excludes power striprvru;)Type of Work Performed
Performed on Clairn(sS
Calculation o f Expenditure Days Credits
Total E xpendituresTotal
Days Credits
-r- 15
nstructionsTotal Days C redits may bo apportioned at me rin.T-i ho'nec choice. Enter n umber of c:avi rrcJrts pf -'-ITD f,-.*^~" - -- : in columns at r ight.
Min.ng C laimNumber
..9.22014- 929015
--329014- 9220.17
9250.20 ZXJ
92907.7
9Z9025 929Q26. 923Q27
^23073
.925*032
Expend. Days Cr.
x
Mining ClaimPref ;x Number
RECinVED
J'jL - l W7 j
K/KIING LANDS SECTiQN
Tote*) number o f m ining cts-ris covered tay :his report or -A or k.
Date. /
Oecor 1"/
'Certification Verifying Report/f Work
hereby cernly that 1 have a persona: ,1'it! intin or witnessed same during and. or ader n: rnino.r
Mfdrit; o( the tacts set forth in the Report of Work annexed hereto, having performer! t h" i :hc .^nnexeo 'eport .s true
Name and Postal Address of Person Cert:fV'nq i f /i
--/' //i ItDate Certified
lo.Certified turei If
1362 (85/12)
Assessment Work Breakdown
Man Days are based on eight (8) hour Technical or Line-cutting days. Technical days include work performed by consultants, draftsmen, etc..
Type of Survey
fi l('"innfp"hvirr\c?.'h?/' OvrH \ino, Pii4rtnoo
Technical Day*
51
Technical Days Line-cutting ^~^ No. of Days per Credits Days Total Credit* Claim* Claim
x 7 = ^57 + 34. * 4*51 -j- aO s Z22-6
Type of Survey
Technical Days Credits
Ljne-curtlnj Deyi Total Credit!
Days per Claim
X 7
X 7
!..m*2, Cuitifxi an'i MaorjetorvCi? in :*ou!c-r si J ^J
Iby. Lab., i Ldc ctolter.f..SM:C-0- P S L....".VC \0.
7C56 R,ce AOG -^ -f? -* 14. "ThunderS....,ffv ro".; .,ny ^
-A' :.;-.'-.', ot Mi.:ho- l t' 1 -' o T. -M. -r.-,
rvKzn o. 1^7fJ 5E5twev H'OT' S, 10: T o -a- VT^es o) l.ne Cu;
a . , yr J Day ; Mo , Y, ;
J"-' r -i;i' CI.,. .. I5o VbrL .St
r'.' w'i*.
P,l, ! -M V..,. . .y
T'Tfi '!0 tl-.ys. l l h.s :",r'.r-.- 'in.-- ,...f,. j l
F- O' c.-.v ;' j' KM; r j - r -,. .-', ,t -^ : r i' .:in-.' Q' rt
F---- /O .'. V ' i'-'
..;-l'\ '.':. .11
V. - :- ' '
J : l .
OH\S i t-r
C 1-- ;:'-'C- 'T j-.: ,* ' i -:er:'-"! , : t.'l :i-.:.:"'.l '•.••O
f .- ; -, - . ,
t-.-. ' f,'-' -::
A '. O' ne C'i- :-'.s
'\lote: Sp-.'Ciiil p'Ovi: icns t s-ci-oi'.., 3 " ,^ ,r
c-filit^ ile ne 1 ^pp'y
C:-,,-r.
F , 7 . o ' - *: V i C
i^',rnng CUii": ^ T:dvt::seci (L'si in IHI^'IIJI 'Ccl ^-1; i J c-nee) _ _
ixpenclituics (txduues power ;ii .
Type of Work
--l-r" 01- Clai:n:s)
Cal.:i.'2''0n o* C e Hoys C-i-.-;i's
Exr-,en.j.i..' t-.s ',: '~ ' -.-
M rt --1 '; C' J.ITI
F- e* -
909A2Z
P-..'' \,.-i t.. -it L-- -. - C.'
Tot^; n^'V^i.er of r,- n irg clii"l!S centre"! by this
O' .ri..... j
l hereby certify that l haw a r"- : ---J-uv . ; i,.i " or k\ t fit-ai'-d '.-- .r .!ur .'j ji,',; '.'i ,.'l:..-i :-
ar.d Postal A l.iii'ss of Ps-iC.:. C.ei(''v..ig
kro.-,!-,!op of th.? '.,i::-, i,---t fo,;h in the Report of Work annexed hereto, having performed the v-.ork j." -.: It,.- .j;: :t v- . : : - l.'.:. ; '. ;- .1''. l
k SV- . I^-r^o y iLx-ifc
Assessment Work Breakdown
Man Days are based on eight (8) hour Technical or Line-cutting days. Technical days include work performed by consultants, draftsmen, etc..
Type of Survey
Technical Dayi
\O x '
TPTP/T nrylTechnical Dayi
Credits
' = 7O
\\nj?, rudtVi ryiLine-cutting v — ' No. of
Days Total Credits Claims
•- IR - Ra -H -4Days per Claim
•-I22
X 7
X 7
X 7
A'u: \Zl T T CI
77 Mnr
NOISIAIO
''-" ; "Repoitof Work
;i'. CoologJcal.
..,.—T"n i- Ot S.i' .?, Si
" a-Mining Ac*
r "Note: ~ 0 "' v davs c reti ' ls
"E^pencMutes" section may he enieiedm the "Expend. Days Cf." columns.
__ ̂ ^ Townsli p or Aria"
ClSim Hoi.'.;' 'V
A.idrTis
o.r\,i UjJte.Licence No.
yAUUrpiS
t.6O;v IS3. Accui'ivny 6 rive.-, Sunder Sou/ OnVcxoo... .'\T?fe 5W2. ....Sur^y Cr-.-va-y ' :03:*fcf*5u-vcv {from * to) [Total M:!es of line Cut . \ ii .i l S~^ l l * il l - i
Day J Mo. i y ,, j Day J Mo. i W. J 19 .3 f/' ,-;S 'J f A.ltht,' 'O! G .''O . ?-.':' .'.li '
Ri ••|-,i. i 'h C l di m in Ci V'J••--•
For
' :i-r 40 d.^ys. (Thisf.l ..Ire" l j --'..C
For -'.t'J- .; \i : .,:' Li' ^^'v.-y i,-5 r-.g t lie ' :."ie gr.d:
t'.''..-: ,\1 ;-!,-,S ('O
C..."Tj.'e:e -. .-••-•e side a---.i ' " tft' t,.: -. s) h c-1 e
•" , i .'
- r le.- -r,..-'
- F5 3 .-'.ij,-.,
C.-.,.' -j -,i
i np,h,rr-.r al i
Al.t.O'.-ic C',,,; '.s ; j Days pIT
l C'a. m
Mute: S pt'C i' p'OViSuj.lS C lt-I-tron!, a i:H:t.C i
cr,'v! i; no not apply l '-- -- - — ---
lo A: t'C:ne Surveys, j r
R.-|d:olilBtric
kid as pi) we^ stripping)Type Of Work Performed
•for r.-.e-J on C! j fils)
a:.- :!,,i,on o' r/ r.fl'-di'uie O^ ,-s Credits
To-al F v ( ,-; . j.- .r c'STotal
! ys C'C-diiS
"o'.al Cays 'Ire-: is i:iay IK: i;-^on,o.'i fri .MI ;'ie '.Li,ir. t-cl.ier's choice. Tt,ter rn.iritjii of ,iays en-.J.is per cijij"! !.P'.
P.c-f.x
-.-•Ji v^;o ijv3; ";250G^
r--:
929060 ;\2^:9'-V3
i.. 929002 r:J:6 ':.. 923^303
929oc-i92 300^12? fo.^29ooc'
.^..929.00.7^ ; :' 9.25PC6 j....^8/799
;^^ 523Boa
Total number of mining claims covered by this report of work.
f
[ ^V
rot 31 Da /s Cr.;Cate Pe-cordedo' -j
. ,... .. .. -.... . .^....... ...y... s/ (; y -.^ - r -;q
June ioj9-ft^i....//^yf 7 .r....... J-ji li'ic^Ijun Vorif,'!!Vj J^L-jjOjjjf Work
r .-. '::.i --.! -..i •••• i '..,M..,J ..:ni 'or ..f '..-r .1: . ' : ' i\.' . : i.- " si o the- jn;.;; xfi) .••.-poit -s '.rue.
i3-.,: ri, i,?)
Assessment Work Breakdown
Man Days are based on eight (8) hour Technical or Line-cutting days. Technical days include work performed by consultants, draftsmen, etc..
Type of Survey
M n o r\e "Vorvicrf pyO
Technical Days
4k X 7 -
n r|H lino. OJa-ttinr*Technical Days Line-cutting"^
Credits Days Total Credits
322 * 85 s -307 *
No. of Days per Claims Claim
l^ - ~ 22. t
Type of Survey
Technical Days
X 7 =
Technical Days Line-cutting Credits Days Total Credits
+ = -T-
No. of Days per Claims Claim
s
Typ* of Survey
Technical Days
X 7 =
Technical Days Line-cutting Credits Days Total Credits
± = -i-
No. of Days per Claims Claim
=
Type of Survey
Technical Days
X 7 =
Technical Days Line-cutting Credits Days Total Credits
-i- = -f--. -
No. of Days per Claims Claim
s
^ H^Qk','*'''*
'-Ik V.:- '
of Work
(t...- i-' •;;'^,t'
G,,
rVfl
C f.-T, HoMei'i
c- i-' y vi..* 1 , C-.f,i'i.';j..".i..- -- -. O l- l ~ ''*'' ^r'.cm.Cd' niut Ev;,..-..,.';u;;Vsi - O j # O ' ' N jle !?-^
" " "~- "
Ml-oing c' ip..'.-t on i li.i fc.'
. . . - ..the "Expend Days Cr." Wining Act - ^ - - - ~ -- Do nol use shadrd areas below
. p o ' A '.-a
o.r\j U
309. (iUhS'.j-'.ry i..j - r'.)"/
i on Jn' ~.-o !. ~-i., j ic;. jMI
.U Um,\ed
.......™.... ..L..63QD.3L5-.- .....
o- P76T \K? , .........i* of S..i.ev ( irorr S, 10! ;To-,a. '.Wes of line C'-t
^ . Mo L vr ^ ^ ^
Cud ts R"(j.;.".'Tt i! p--; t-.uh f:: i; ;ii n C"-..!:.' f. ^-l - ".,MVi .
To- 'i--l -u'v y
f.'t.-' ^0 (fiys. l T'h-s
fi~- . -.J. -i'i.; ••ir. H T ;i-..-- ...i.-i,
~ .', - ' ,'
'"~, -^ -
^ x. ,
:--,-''. ' i.- i f v..'i?f ',,cle
- - --, , .. V. "; '-. 'P
•' - ..-:,.
A..; c-'i-.f C'f :.'i
Note- Sp-: a: p r cx o 10^5c:-:i 15 -iO nol Hpp 1 -.o A.-!.i-v.",: S'.i .r ,
E^i.\:-r;
r.jvs ,- c-
o. Q. t-.^
ci P- ;'vs C: . - -s
To:a: rx
'.'.•.I -r- ,-,.-S
: 'j'.i :?- j','. C- . . l. .1 .. v '-i --.:\ - : cho ..e. En:c' ".jn,L)0' of ,.iys C'v.-.:-.'.-. .r. .; c ' -'i- ' i; i -jht.
: r p..TJ-JVOIsedJJ.^tj^^^'i^c.v seqoci'.ce)
M.in:.g C'jim
TCi.,, 929^63 z?:9 2 j o -- vi 929065 92906 G
929069929070
.22372.5-
92B787: 5SS768: 323769 l
923791 9Z3792
K x r -•••t:Days C-.
./--7[Z-.7J
er.
Ir217 ^\ li2Z172d?j
ae^S22-",
Lr-7-
L.7
;/ n.nQ Cla.m P'C-f'x i Mom! uf
..TO; 9Z&794
E,o.-.-:a iV 5 C.
929796..923797
r...mber of mining cla.rr,-. covered by this
of '
II . -!'V c.u:.fy !i!?t l '..••-•. ,-i;,,.f.... .i! , .•.'..- :- .jf;K. i,,r!s •... l '01 1 h hi t he FJtr'Or; of Work ir to. havir.ij pei fo- nied 1 h t x
Assessment Work Breakdown
Man Days are based on eight (8) hour Technical or Line-cutting days. Technical days include work performed by consultants, draftsmen, etc..
Type of Survey
r ^ri \ \r-o. O ivrVinoiTechnical Technical Days Line-cutting'^-'^ No. of Days per ,
Days Credits Days Total Credit! Claim! Claim
72 x 7 = 5CK * irs\ s to5.*S * 28 - z 22r7
Type of Survey
Technical Days Credits
Line-cutting Days Total Credit!
De y i per Claim
X 7
' - 1 '
, C -S-.r.O
Report of Work'G. ..s.'-','.';,-, 1 . GGf -.V ' :: rn c . t : ;iiH'
Mining Act
-V 'W- •-•" P' ri'**t:'i|'*" o: rr r ,y k-
•" '.'i- i'.- •--.MO.- ".' tt; i lG' •'". ,v Net*. - O"\ v,,,' ,.'-d,'-- :,-,.:-,, r.-i-
,n \ r.f ' E ipt-no D:-ys Ci." Oo no; i^ sha.ift'
C o. (! Ho,O."
A.ilJr
Li'".O CuU\\ :a O l-..J IY:J:
i H Seus i.-1---10''s L'Ctmce No.
no:e of Su'vey ((roi" A 'o)
- V r .s j ' *' o ' - .7 -- v j , T ' - , , . . r J . . ,, - ' . ' ~ ,- j T .'- . r . : , 1 1 ' ; . . ,j i t J
J' ! ; ; 2 K.: r; Vi r. *j^...)^ '/hr: ' .1 ^ '"' 'i" is '- l ! i'- ' • "••- ( -'.. -''i .i' C-.' ! . •••ins .-rt 1'ijiit
'Toiat Miles of '."e Cu:
WO. : Vr. : IO.?J
V i nTi ' nfc ' -f ^ ;D;. ,5 ;-fr,
C'. ,n
l". ' 11 c '10 ". i' s ' f h. J 1 -:i:ii.;'. ' "' . ,.:-.:' i;l
:' : -!
r ...
V ..;
- - V^ C 3 r
Note: Sp- c ,V i ov:,f'i.-,l,'S i i O ' i'T
to A.M., :- - S :
-..-. o! f -.i - : r."
r c: 5 -
V ,. t g CM'in Pr-f )! Ni.-i: tr
9290-^3
929047.92904^
5*25000
r * ; c p -,C'.
r TV .3
J
G.
V.r-'Xj C ,i
RECEIV :P7
MINING LANDS
Tots! numijtr of mining f" lC'a :"S covered by lh:S i (-jrer;0't Of .\ork. [^ l f^i j
' li ' : . . -T. ' .:'.-. ifif ,, r:-
Assessment Work Breakdown
Man Days are based on eight (8) hour Technical or Line-cutting days. Technical days include work performed by consultants, draftsmen, etc..
Type of Survey
Mn ooc?4omp,-^J
Technical Days
A(o X 1
\*s o rvd h no, Cutti r\nTechnical Days
Credits
' z ^22
Line-cutting^ — No. of Days Total Credits Claims
i- Q5 = 4O7 * ia - -Days per Claim
' 22 G
Type 0* Survey
Technical Days Credits
Line-cutting Days Total Credits
X 7
Days per Claim
X 7
X 7
November 25. 1987 Your File: 281 Our Filet 2.10311
Mining RecorderMinistry of Northern Development and Mines435 James Street SouthP.O. Box 5000Thunder Bay, OntarioP7C 566
Dear Madam:
RE: Notice of Intent dated November 10, 1987Geophysical (Magnetometer) Survey on Mining Claims TB 929063 et al In the Area of Shelby Lake
The assessment work credits, as listed with the above-mentioned Notice of Intent, have been approved as of the above date.
Please Inform the recorded holder of these mining claims and so Indicate on your records.
Yours sincerely,
H.R. Cowan, Manager Mining Lands Section Mines and Minerals Division
Whitney Block.' Room 6610 .^^^^^. i Queen's Park Toronto, Ontario M7A 1W3
Telephone: (416) 965-4888
AB:plEnclosure: Technical Assessment Work Credits
cc: Mr. G.H. FergusonMining ft Lands Commissioner Toronto, Ontario
Mr. David B. Saunders 309 Catherine St. Thunder Bay, Ontario P7E 1K7
Resident Geologist Thunder Bay, Ontario
Ministry ofNorthern Development
MinesOntario
Technical Assessment Work Credits
Oete
November 10, 1987
Rl.2.10311
Mining Recorder'* Report of Work No. pn-
Recorded Holder
David B. Saunders•MKX&XKX Araa
Shelby LakeType of survey and number of
Assessment days credit per claim
GeophysicalElectromagnetic ,. rtayt
24.4Magnetometer * riay*
Chher Hays
Section 77 (19) See "Mining Claims Assessed" column
Genlngir.a! riays
Gerchemiral day*
Man days [~3 Airborne l l
Special provision | | Ground fXJ
l j Credits have been reduced because of partial coverage of claims.
O Credits have been reduced because of corrections to work dates and figures of applicant.
Mining Claims Assessed
TB 929063-64 929066 to 69 inclusive 928779 to 98 inclusive
Special credits under section 77 (16) for the following mining claims
No credits have been allowed for the following mining claims
Q not sufficiently covered by the survey [ | insufficient technical data filed
TB 929065 929070
The Mining Recorder may reduce the above credits if necessary in order that the total number of approved assessment days recorded on each claim does not exceed the maximum allowed as follows: Geophysical - 80; Geologocal - 40; Geochemical - 40; Section 77(19) - 60.
SS9 (B5/IS)
Wabikon Lake Area fir-773
-w—*-s^~
——Poshkokagon
O S
Legns Lake
^ w?o/* wvo/s-
49*07'30*
99 '5 CO
REFERENCES
^ifliiilU , -v 1
|\UO 6 l l:0 PM\
,T8 ,9iwui?i.u?i^?i51. t
LEGEND
HIGHWAY AND ROUTE N
OTHER ROADS
TRAILS
SURVEVfcf) UM ^TOWNSHIPS BASf l i^LOTS. M iMfgu l i A.M*-
UNSURVtVt-f; LlM ^ LOT t iN*S
t H." 'V'-" -
HAH(.l ; ^ LlC
RA'i AA v -- 'j- '
UTIi ;T - , '-- -- NON c-'t u f 'v'-'-"1
F i OODiN' j i P (J ' Si:Bi; iv-'!r,:' ' ^
H t St H v A' - ,N.-,
MARSH OR MUSKEG
MINES
TRAVERSE
DISPOSITION OF CROWN LANDS
OF DOCUMENT
PATf TJT SLMf A..F A M'fviNu ^'Gn T"
s^ -"f A;:E ntu-'Tc. ,-M ^ MINING R'f.fs ONL v
LEASE, SURFACE S M INING RIGHTS
SL'Rf-ACt Hli^H'TSOMt Y-.
MINING RIGHTS ONLY.. LICtNCE C' 1 O CCUPATIONORDER INCOUNOL
RESERVATION . . ,
CANCELLED .. . .
SAND 8, GRAVEL .^ ....
SYMBOL
T
. OC-O
. ®0
MINING H i GUTS If, P ARCb-S e A T f*, T F f. P S tO R T, -^i- 6'9 13 . f ••" C' I N nP'C, IN AI PATF*J T f' 8- T H f ' 1-'^A^-T'S *C ' H S -vj'" —At- 1HO s; . -'l "s H Si '
SCALL ' INCH 40 CHAINS
.' T "K
. .' K, K*
AREA
MAX LAKEM ft R ADMINISTRATIVE DISTRICT
THUNDER BAYMINING DIVISION
THUNDER BAYLAND nUtS/ RhGISTRY DIVISION
THUNDER BAYMinistryofNatural Management
Resources BranchOntario
D*i.
M
p
p
l
' 'l
l c l
o 3'
rn
i 2
a. o
s 5 CO.*"
n
>
m
g s
co
^
l s
o
z
2 C o 2
f
ni 0
m
ci
S l
D
DO IS i s D w -o
O M -l O z
m ~n
m ^i m j
zi
o
m
A
IO O OT
IB
LAK
E
G-7
69
^//
/U)
o
O)
U3 O
CO x
m r O)
K m m-
o ^ -l o
. W .o o" o
X m m m o i •^ ra (O
MA
X
LA
KE
G
-741
O o
m O)
IT!
Q
n i H g n x z w
-H 2) ^ r
w
O
T
33 (D DO
33 C
'C-j m 0 l
m
O rn
2!
o
49 000
89045'
Lac des Iles Area-G-7398930'
07'
06'
OS
04
03
Ol
42 41 40 39 38 37 36 35 33 32 31 89030'
EAYRS LAKE AREA G-25085aH03NW000B 2.12311 MAX LAKE 220
flab K.
00
i oDO)
(U^D
OTHER
TRAILS
SURVEYEDTOWNSHIPS. BASELOTS, M INING CLAlMS.,fARLCEs,f TC
UNSURVEYED LINES^'. . - • 1 ,-'vx- LOT LINES ;-v;.^^;-
PARCEL BOUNDARY:; MINING CLAIMS
RAILWAY AND RIGHT OF WAY.;j
UTILITY L INES /Uo^ 4^ ̂ -•-3Sf-
NON-PERENNIAL STREAM ^X\ "^1
FLOODING OR FLOODING RIGHTS
SUBDIVISION DR COMPOSITE PLAN
RESERVATIONS ^'^:; X^^;;
ORIGINAL SHORELINE CjJt {. ;4
MARSH OR
MINES
TRAVERSE
DISPOSITION OF CROWN LANDS
TYPE OF SYMBOL
PATENT. SURFACE Si M INING RIGHTS --," .SURFACE RIGHTS ONLYll,..-.-
.MINING RIGHTS ONLY .1__....
LEASE, SURFACE 8. MINING RIGHTS-_,-
" . SURFACE R IGHTS ONLY,U——— --
" .MINING RIGHTSONLY^lki;:^ ——
LICENCE OF OCCUPATION"r^-L.l'JL.,——
RESERVATION .
CANCELLED '..
SAND ft GRAVEL'-
NOTE: MINING RIGHTS IN PARCELS PATENTED PRIOR T& MAV 6 . 1913. VESTED IN ORIGINAL PATENTEE B V T HE PUBLIC
ACTV-R.S.O. 1970. CHAP 3so. SEC 63. SUBSET v
RE FERENCAREAS WITHDRAWN FROM DISPOSITI
M.R.O. - MINING RIGHTS ONLY
S-R.O-- SURFACE RIGHTS ONLY
M.+ S. - MINING AND SURFACE RIGHTS
Description Order No. Date Disposition
THUNDER BAYMINING DIVISION
Jl)N - 31987AM PH7|8|9J10|11112|I12PJ4|5|G
SCALE: l INCH ~ 40 CHAINS
FEETO 1DOO 2OOO 4OOO 6OOO 8000
O 2OOMETRES
1OOO(1 KM]
2000
AREA
SHELBY LAKE: . - P' ' :' .'' ;. -.
M.N.R. ADMINISTRATIVE DISTRICT
THUNDER BAYMINING DIVISION v v f
THUNDER BAY ;iLAND TITLES/ REGISTRY DIVISION 1 '^ ;
THUNDER BAY 5 ft
Ministryof-*".- - - -.- ' . -.--
Natural; Management
OntarioResources Branch^... , ,1 - ' ~ ." f - -j- r- •^•y?Sf'^--'- f'":.'''**'f\gy---~~.;3: -" - ^ ' ^'••t- ; ;; ::ri"S*W? ;: "" ^"~'"" rit~*
Dal* JANU A RV", 1964;
89 0 30' MAX LAKE G-741
Ta i re \
- - —.-- TTB r TB" i TB
ov j 'rt co'i obl T468aDf - CD ^
: \ L---L--_l
' Scondreft
23 22
SMILEY LAKE G-76252H03NW0008 2.10311 MAX LAKE
R f"-M c i" i;
LEGENDHIGHWAY
QTHt M Hi.
TRAILS
T\t s
LOTS t : f- '
L -'T i iNr
PARCt-i -f
. i VS t
ORIGINAL
MARSH OR
MINfcS
TRAVERSE
iluf
DISPOSITION OF CROWN LANDS
TYPE OF DOCUMENT
PA Tt \ T ' ,^f ACt A MINIM
SYMBOL
V '.r, v i rii L) H T S ON L
LtAbf j. -R- ACt i MINING
IJ * A W'.M ' M
tjRDt w :\ C N'^: j J
Rt^LM -A" \
C AfSt(,F L L L .- 'V
•i AN L. ^ * -:A . ; v. .
NOTE M'NIN-. Rlf,M'S N ^ A". t s P ArfcN 1'fc!.''1 Hi.--W ' MA- D •-91J VEST t f 1 IN O **((jiN A 'ATFNTtt B * ' "* f" ; Si If L.ANOS A' T a S O l "S 'O -'AP ) 80 Sf C 6-1 S uBSt: '
SCAl L l INCH 40 CHAINS
AREA
WHITEFIN LAKEM N R ADMINISTRATIVE D ISTRICT
THUNDER BAYMINING DIVISION
THUNDER BAYLANO riTUS/ REGISTRY DIVISION
THUNDER BAY
Ministryof L andNatural Management
Resources BranchOntario.__.__. ^Ji .(..v ( b*f .
[D t' i j NovfTiber .1982 j
t b i r
491892
PI 929034 P4 929033
929034
929033
LEGRIS LAKE929020
929038
929022
929029
286BASE
515 409 444\ LINE
508 S 649.750 709 f 017 758 W 364*0 95* 1 0351310 (395 372
wide quartz vein, minor pyrite
164
•1944 929028929046
929032
^ 929031 P2 929028 P3 929027
929027
PI 929032 XP2 929030
777
P2 929031
S2H03NW0B08 2 .18311 MAX LAKE 240
909824L E G R L S LAKE
909823
BASE LINE
w. PHOOff North to P4 9098231100ft North to
300 PI 909824
909822909339
908338
908340
908341-IO&0
978
48753038
909821908337
-4.27-IIZ4-1908
908342
929034909035
9Z47 2842
929036 s 9290331515
929042
929037929041929043
25862589
Z695Z 643 2360
929040929044
29373479
929045
ZZ80 ZZZ3 2474
600?4312 \
2389 3*5 .-550
55864738
929049 BASE
LINE2118 2833L5I32 4741
LI 11S2634 27183112 J76Z 4487 .4535 .
LII4S3975
LJ87S1*8.L96S
2598LI08S2580
27423673
347332.92
929046929048
929032
929047
20 E
30E
MAP NO-2 (SOUTH)
MAGNETOMETER SURVEY HEENAN-SENLAC PROPERTYLE6RIS LAKETHUNDER BAY MINING DIVISION ONTARIO
INSTRUMENT- SC1NTREX PROTON MAGNETOMETER
LEGEND
1900- Magnetic Field in Gammas A - Base Station
SCALE
l inch - 200 feet
M-JUBY- April 12, 1987
E-D
S2H03NW0008 2 .1*311 M AX LAKE SB0
\
.SOW
.1962
..TOW
60W929793
1789
1816
1687
1609
1367
..1519
50W
.1080
.40W
'942
737
705
.740
928783
*I474
1622
1757
1698
II34N
1462
1259
192
,833
1071
902
928794903
755
1206
978 BASE
1225
703
928798
-30 W
656
542
761
921
945
7502520
619
2201.. 1293 . 730I98S
40688
088
733
-IOE
994
1105
422
36
1120
691
929068715
1143
263
1010
1063
1085
536
N368 J191 1248
1144
1195
9290601388
855
.J208 .1317
866
i
986
830
1016
-1044
\
735 LINE
494
1236
639672
LAKE
509
211
1166
1571
557
690
762
650
964
799
.750
569
.801
928797
-023\
1072
1193
1517
956
802
540
853
2075
2057
2O84 2414 2186
9290581301
1039
1111
1422,942 1987
1334
913
1142
1290
1007
144
759
1873
1622
1661
1965
2449
78
1050
1214 2048
1214
791
1224
367
588
574
1520
3857s
31783011 .4401.5920
1481
1135
.
'
1-
-
•'
'
'
y.
,
'
-
.
'
'
.
l
'
1
y
\i
x
'
7
'
x
\
s
)920L
57
1734 T
1743 20072316
1686
1108
1304
1227
992 X
1016 S
1161
857
1221
077
971
514
818
1129
1568
784
703
686
585
\546\
932 \
763 V/-
663 S
838
748
\245
718 N.
N.9)4 V
697
627
801
283
-430
679
684 X.
994 /*\*^
477 s \
400 \ .
398
497
836
966
700
1114
1900
171623373274
1338
15552153
• 2510 2175 2035
1055 f
II76/
592
1787
.2190
397
1138
.1257
1244.2328
1194
1 ,1486
N.854^
.590 \N^
.574
778
7889782319 s/^45785534 X
'. 8 O027794 777556816558 4280 2435,5956
. I83S L
2813243020611318
•1522
1491
1169 X S
847
958
869
1331
962 f
863
954
885
808
437
969
672
928784956
879
940
737
1045
192
727
647
542 . .
.676 f
f.1043
-671
2004574 738 \.
-645 ^
.550
416
928788307
357
475
B37
.1701^^~^
807
.720
1104
.848
\. 1040
.992\
385 \
• 1764 \\
641 \
781
.1293 \\
.1056 1
.946
623 S -
800 '
S711
817
688
913
771
1384
20657181175
-1 301
1604
JI289
1565
969
1129
1453
1192
i2eN. y^
794/N
765
348
-135
-1565
4723 6052J079 (947
3863? L3270
1759 y
. 344 f
1699 \ f
1388 N.
1 29 s.
670 f
S97O
1065
798
849
830
349
567
462
711
589
479
701
5O3
706
991 y -
951 f
872
338
IOI5
469
1253
.909
.846
.926
620
414 \
615
622
-221
047
267 \.
562 N^^
[ 1941 -*~****^^ ,'. 2001
. 388
.1107
.987
, 376
.844
928796891
837
514
801
963 .
ii35 .y\ yx \ i975 X.
950
1164
1260
1066
1394
1275
1040
.985
929054.1195
.542
.1892
.1522
1741
2163
125 S
725 ,yf
1348
.1132
.1168
~\..1022
586 N
. 1405 J&
993 1248 (354
1023'
^c782
\701 \
857 X,
835
1102
828
459
794
538
646
747
735
562
503
591 S
792
665
768
302
610
5 5
865
.478
-223
471
566
.349
3O6
x^-4SK.
-003 \^
206
386 y
307 ,
.023s
899
. 1072 \^N
.1582
958
.1038
384
909
.841
1020 y1.1191
I235/
r 317
. 1020
1648
1021
^790 \
674 X.
1138
.982
825
.1131
881
620
1195
832
1050
1069 S
1388 f
1845
1367
19821496
636
1443
1082
. 1195
1287
' 1175s\1255 .816 .1266
883
783
819
598
872
638"
141 X.
703 N
675
799
702
754
695 7
864 S
795
700
832
607
416
681
68
571
445928785
1069
642
669
470
301
652
297
321
006 S582 S-59^X
f^3 X^
805
1467
1390
1016
9287871608
'1063
.I380\
1053 N.
954 y^
795 y^
.745
872
IOI9
1244
992
9290531262
906900
2253
1154
. 1124
.1156
1066
•964
957
-1127
708 .y
IO52 f
.1025
1564
020
923
9290551173
1079
1058
1040 f
1368 ^y'
mi
.833
1060
.968
1050 .412 .1755.1773 X L74S\ LI7IS BASE L
1151
*""
i 1362 \ in'ftT X
101
107
85
83
66
7IC
124
54 ^
4K
75
66
67
69
78
86
97
88
76
10
63
43
67
61
97
6'
6*3
4S
185- 3;
42
8 -
li:
91
8*
N0
91
9'
7(
71
0
17
113a'
12
13
9S
10
9(
9;
. 12
8)
9,
9(
9C
III
10
X•12
M
1C
1CS
,6(
II
10
15
II
8
9
12
6
8
15
II
.11
. 1C
8
1516
. 12
1C
9
1
1212 f * ®
833 S
. 1 081
1209
514
. 1056
20M
809
709
650
678
749
305
720
Condtctor "A11.705*
553
IOOO
767
793
.886
750
224
159
874
928782589
1410
798
818
.716 710
835
830
8O7
IOI71
666
560
857
928786745
.640
. 1081
1903
.1172
w
775
1075
1146
9290011065
122
.629
• 957
. 140
1024
1109
. 1289
1185.
1377
1359
1828
875
929O08872
757
743
.692
1587,1488.997
.1002
941
756
929056819
r825 j-079,860 I65S LINE L
612
651
1039
..268
.387
. 062
555
1034
641
058
321
,376
991
868
192
-299
666 I232 I359
1159
• 1153
1384
1153
529
.1231
\
698
888
856
921
1201
.1494
16562158
1139
1019
168
583
968
1019
565
2405928781
2170
LAKE
• 893
.767
.982
784
. 81
212
\
1112
\
\
637
743
352
6051490
201
.1364
2288\
. 1731
1417
335
1493
1267
965
3 's
2
s
3
r
14
2
6
2
5
35
3
59 y^
*sS
\o\
DO
\3
5
l
5
8
9083460
7
6
8
41
8
"\("/^4
76
13
52
929O022
13
'2
33
23 ^y
*3
I7\
i!6 N
'1
ro
!4
17
65
3
19
929007J7
26
P 5
T5
6
i5
)6 N
, 856 ,89I6S L
f4
)2
33
30
74 1^^^^^
914 '
292
072
425
430 *
539
971
982 . 1
284s
824 y -
882^
946
576
882
628
739
\789
896 \
842 \
1065
1144
509
1259
962
1197 X -
964 y772
1056
9991
599 v
s
671
863
2315 S11081005 .
1539
735
748
681
642
. 755
546
27k
.1063 \
1458 \
502
333i
319
549
1025
724
1253
1547
1382
. 1249
1333 (I228 t4262I53S L
1393
\1090
826 \ f
s\1015 f \ J87Qy N
1364
1248
956
332 233
Conductor
730
1040
964
898
928780603
880
973
900
867
.823
949
777
515
515
858
838
899
1036
.588,
801
.679
.595
•625
4854
928799670
•803
1388
L 897
741
412
572
99
508
399 .383
••584
529
386
459
.451
489
251
•449
.692
163258164966
929003954
.2021
1773
2075
.1763
2666
3747
.1824
I50S
1834
. 1200
.IOOO
/
392
1833
. 2167 •^4952507.2131 .1557I47S
379
363
1272
818
707
.935
973
794
.675
1002
929345J.100O
.871
391
152
112'
-383
083
1253
1886
1885
9288002372
2457
1085
1689
.1887
1410
. 2118
. 1304
2200 3008.3664 3823.2192 .940I4IS
929006
2653
3291
.3480
3895
11264 1874
32663598r4187
1407/1913
1052
M
HL T C
L l!
S
IV
52HMNMM8 2.18311 MAX LAKE S60
MAP NO-4 (SOUTH)
MAGNETOMETER SURVEY HEENAN - SENLAC PROPERTY
LEGRIS LAKE
THUNDER BAY MINING DIVISION
ONTARIO
INSTRUMENT - SCINTREX PROTON MAGNE
LEGEND
19000- MAGNETIC FIELD IN GAMMAS
4 BASE STATION
SCALE- l INCH ' 200
M. JUBY - AUGUST 7, 1987
2.18311 MAX LAKE
52H03NW0008 2.103!] MAX LAKE
0 E
L81
S
L
\ /' :•n
\ 5
- K
3 -f
*T
i i rr
rrrr
r TT
1 SW
AMP
V
10 E
20 E
ED
5E
Of
30E
y i i * \ \ i
78 S
L
i \ 1 3
CA
RP
) """
^/' \ 1
75 S
L
i \ , \ 1 i \ \ \ i i i * •'
1 l
72 S
L
, i '
l
/S9
S L
f ,
\ \ \ \ i t' \ i i 1 \ 1
1 \ 1
i i t/6
6S
L
f
j i i
. i \ j \ j i \ \ 1
ir i. i i
1 1H
ILL
TO
WE
ST
\ i i i
<
BA
SE
LIN
E)6
3 S
L
\ i - i \ \ f \ \ 1 \ l \ i l
- iU
l/lu
cO
l
n it
tnfe
Pi
l
SWA
MP
/ \
\ \ i i7 \ \ \
40 E
160
S L
1 H
MW
B*
\ i 1 \ i i ! \ * /' i i 1 \ y
^5
7 S
L
i ", SW
AMP
; MO
UX
t
1 1 i i i \ 1 \ 1 l
/S4 S
I
J "J
*T
sj
L.
\
i i /' i \ i i \ i i \ i i i 1
/5I
S L
\ i i \ - j i i m i
1
148
S LM
45 S
LN
? l-
\ /'\ f f
\ i i i 1 i\ i \ i i
i \ i i \ /"
\ i
\ j 1 1 t i i
i '
i\
42
S L\
\
^
1 1 \ t
f
t i \\ i i \ i \ \ j 1 \ \ \ i i :
' 1
39 S
L
{
\ i i
; /i
\ t i \ 1 \ -
\ i
- SW
AMJ i i i \
,/
36 S
L
\ j , \ ; i 1 \ f
i \ i 1 l
i
\ i i\ \ ' l i i i j j \\ i f i
33
S L
\ f \ f l \ \ i \ i i \ i i 1 - i \ i
\ ^ i \ 7 \ 130 S
L
i
, i \ l i ti \
\ i \ \ i
*
27 S
L
j
i i i \ y f \ \
i i i /
\ i \ f
24
S
LI
j - i i i
\ i i21 S
U \ \
1 N
1
1 \ 1
\ \
i l \ l \ \ s
18 S
L]
\ ' \ i \ i
l \ i ; i \ f
\ '
r i l
\ 1 \ l
I5S
L
i i \
\ \ i i
12 S
Li 1
^ —
— , ' l
i \ \ -
9 S
L 1 i
BO
TT
OM
O
F H
ILU
~~ "^™
"
i
I6S
L 3S
0
00
y y'
S•—
7
1 TO
P of
Hat
- (O
UTCR
OP)
7
'
v[/
10 E
20 E
MA
P NO
-1 (
NO
RTH
)- E
AS
T H
ALF
HO
RIZ
ON
TAL
LOO
PEL
ECTR
OM
AG
NET
IC
SUR
VEY
AP
EX
- M
AX
.-
MIN
.H
EEN
AN
SE
NLA
C
PR
OP
ER
TYTH
UN
DE
R
BAY
MIN
ING
D
IVIS
ION
ON
TAR
IO
LEG
END OU
T O
F P
HA
SE
R
ES
PO
NS
E(N
EG
ATI
VE
TO
N
OR
TH-
RIG
HT)
20
0 F
T
SE
PA
RA
TIO
NFR
EQ
UE
NC
Y -
355
5 H
z fc
ps)
SC
AL
EIN
CH
*
200 F
EE
TIN
CH
*
10 V
o
M-
JU
BY
- A
PR
IL 1
2,
1987
E
.D.
r280
LEG
RIS
LA
KE
MA
P
NO
-l (
NO
RTH
W
ES
T H
ALF
HO
RIZ
ON
TAL
LOO
P
ELE
CTR
OM
AG
NE
TIC
S
UR
VE
Y
AP
EX
- M
AX
.-M
IN.
HE
EN
AN
-SE
NL
AC
P
RO
PE
RTY
THU
ND
ER
BA
Y M
ININ
G
DIV
ISIO
N
ON
TAR
IO
LEG
EN
D
. O
UT
OF
PH
AS
E R
ES
PO
NS
E
(NE
GA
TIV
E
TO
NO
RT
H-R
IGH
T)
2OO
FT
SEPA
RA
TIO
N
FRE
QU
EN
CY
: 35
55 H
z (C
DS)
INC
H -
2O
O F
EE
T
l IN
CH
-
10*
M-J
UB
Y-
AP
RIL
12,
1987
a.1
33
11
M
AX
LAK
E2
90
LEGRIS LAKE
,, Rock x Samplel' HS-1
- byn'ft
: RockSample HS-Z
MAP NO-2 (SOUTH)
HORIZONTAL LOOP
ELECTROMAGNETIC SURVEY APEX- MAX-- MINI-
HEENAN-SENLAC PROPERTY
THUNDER BAY MINING DIVISION
ONTARIO
LE6EN D.__. OUT OF PHASE RESPONSE
(NEGATIVE TO NORTH- RIGHT) 200 FEET SEPARATION FREQUENCY-3558 Hz (cps)
SCALEl INCH - 200 FEETl INCH " 1014
M JUBY - APRfL 12, I987
ED-
52H03NWa008 2.103 l t MAX LAKE 300
-.f*
Conductor
928782
928783
928781929790
928784
929793
f 928780
928789
928785928794
928788
928786929795
928787
908346928798
929001!928796
928799928797
929053
929002
929008
929068929054
! Su/rtMP \
929003
929055
929007
929058
929056
929057L I 74S\
929006929059
929060
\CONDUCTOR
lt
V
s
S2H33NW0008 2.10311 MAX LAKE
310
i
l
929792
\
iy
\
\ 929066
\
4
\ V-
\ l \
929069\
/
BASE207S
\
929063
\
929067
\\
lrA/)
i929068
\
LINE204S
\\i
\40V\L
30
\
f 20W.
\l \
l
IOW.
929058
\201S
929059
MAP NO - 4 (SOUTH)
HORIZONTAL LOOP
ELECTROMAGNETIC SURVEY
APEX - MAX - MINHEENAN - SENLAC PROPERTY - LEGRIS THUNDER BAY MINING DIVISION
ONTARIO
LAKE
LEGENDOut of Phase Response (Negative to North -Right)
Scale- l Inch - 2OO feet - 10 -54,
200 ft Separation Frequency - 3555 Hz (cps)
M. JUBY AUGUST 7, 1987
52He3NW0eC8 2,10311 MAX LAKE 320
40 W
30W
LEGRIS LAKE
286BASE
515 409 444
9290312 9290283 929027
N
P4 929019 P3 929013 .PI 929019
5965
5730
521 i 44503285
247.3
1941
(715
1476
(350
994
986
774
978
614
53ft
41 S
347
369
4(8
461
348
574
629 679 670
36 S
746
992
1885
2112
2267
2105
212&
4321
5258
5633
582990(0
65*4
13260
2443l f 34889
765
\418
423
318
929024
250
251
215
1(3
(43
058
256
,WP- 1320 ft-North 929013
929018654
498
425
386
349
32 y
776 79333S7*0
72(
1071
1212
1422
1583
2086
2494
3095
4301
5589
6265
6307
864313733(/857
43971233Z
8839
3732
1430
666
592 fei 3
552
424
36/
3O7
30O
327
/
-141
-260
-333
754
549
403
371
446
539
62J
753 996
30S
(468
19(6
2396
2986
3848
6239
7964*
IO9O4
15636
131ZI
tee/5329
2S33I7S9
1365
862
699
513
378
342
237
/231
268
202
084
233
194
084
019
-76
-163
-894
-351
929013
WP 1000 ft N to PI 929013 J and P4 929014
929013
2917
418
597
374
417
469
607
841
1164 135?
929017
27S
1995
2941
4290
6301
9739
(1247
mi8625
7682
3664
1601
91]
653
/\
271
(84
206
929025(95
196
180
165
(45
202
134
030
027
-237
-74
506
2236
3292
?.
3243
2999
2699
2514
2178
232S 3471 3703
388
233
227
186
132
172
(25
125
191
149
[42
IJ5 -01
929026
(59
240
482
-s,
074
092
260
239
-3Z
-91
-154
O36
4- 812
969
(111
31 3(
3030
2457
1954
1333
\
EfeOl25Sfe- 2079
21 S
3004
2074
(2B9
640
360
172
-68
-32
-14
026
047
020
929025061
029
095
OO
20 W
-05
-77
•195WP 1000 f t North to
929014-216 ^"
-195
-134
929014-253
-222
-37
299
362
801930
129?1894
1981
2116
(660
1414
(68b
1979
2031
LISTS/
18 S
2060
2515
2496
31462170
1661
1217
640
J06
104
069
-(03
-159
-99
-84
929016
048
027
-31
-67
-127
-223
-620
15 S
025
625
1798
22622779
3216
3856
5061 660 J
94 B
526
095
069
066
-ai
-132
-169
-252
-324
-396
.-537 -410 -4fcOI2S
-733
-6(9
-306
170
2683
47*1
3660
2365
2375
3143
3769 446*
4923
4460
28102161
2406
966
too
500
10 W
PI 929014 929015
203 211 V280 ow
10 E
20E
142
30 E
MAP NO- -l (NORTH )
MAGNETOMETER SURVEY
HEENAN-SENLAC PROPERTY
LEGRIS LAKETHUNDER BAY MINING DIVISIONONTARIO
INSTRUMENT - SCINTREX PROTON MAGNETOMETER
LEGEND
1900- Magnetic field in gammas Base station
SCALE' l inch * 200 feet
M-JUBY - APRIL 12,1987
E-D
Conductor A7O5*
928782
14021649
233Conductor
928783 921
928779
.788
\ 9893392405
9287812170
928784
908340928780803 1838
928789
928785
1002
929345tooo
928788
928786537
929795
929344
928787
908346
844
928796891
1146
9290011065
928799670
9293431300
928797
992
9290531262
30396870
962
9290O2
1885
9288OO2372
929008
163298164366
929003954
929054
687
929043722
J-124 4 2328
929055 52345712 975
929050707
929007
3037
4398
5030X
2192
629
929004358
\ i 606
\929049595
5534
8002
9290562546
31253823.2192 .940
073
14331 -009 .664
31783011 4401 5920 39 .6326052 1079 947 420 .451 /T2IO4280 2435.5956 1050 412 .1755 333 .1228 2612 .2531 .2411 2507.2131 .1557 2200.3008.3664 480 .055 .2431214 154 2048 993 1248 .354 1255 816 1266 1587.1488 .997 823 -079 860 666 .232 856 .891
L17IS BASE LI80S 3637 I65S LINE L
612
I44S 1207
929005
9290069290571362
I0'87
MAP NO-3(SOUTH)
MAGNETOMETER SURVEY HEENAN-SENLAC PROPERTYLEGRIS LAKETHUNDER BAY MINING DIVISIONONTARIO
INSTRUMENT-SCINTREX PROTON MAGNETOMETER
LEGEND19000- MAGNETIC FIELD IN GAMMAS
t - BASE STATION
SCALE; i INCH-200 FEET
M. JUBY JUNE 20 1987
R, D. W.
MAP NO-4 (SOUTH)
'3324s~
^s*
*
-
1
1
'
X.
v .
\^
'
'
*
'
'
i
i
X1
'
1
t
-
'
t
xX1
ss.1041 1153
x^ri . ^. ' *3 ^^
.7944..9311 X..12147 ^v
.13947 i14616 1367775165820
5457
4510
9297924580
.3791
3054
.2949
2156 '
2058^
584 \
.2023 \ ,
1851
.1492
.1049
.1152
.1203
929064. 1310
,I452
.1598
.968 S .
. 1632
400'
.1088 J
1394
922
878
^894 \
1114
M57 \ .
1155 ^
1224
976
1051
989
872 929066
955
1492 J
S1014
830/
.742
.1009
780
1992
735
639
.1052
. IO50
.898
.998
.834
.269
1021
.826 S.
.860
^.731
788
.893
.1039
.1135
698 X.
966
.865
790 92 9069
.823
y918
1005^
,IO47
1005
946 1023 (9I8207^ BASEL.975
789 \
\\
4003 \.7309
, 9801 .7514.7364
- 10594 928791^.7400."5114 .4432^.4089 x
\3625
.3160
.2689
.3086 f
^231 S
2878
1711
J543
.536
.1547
556
\384
I278\
.1554 v
1368 \
.1289 \
. 49 .S
.1076
. 537
.1181
1026
.1098
818
.846
83| 929063
1455
980
958
940
731
802 \
727 \ .
633
807 A
695 ^
^
845
822* a
.997
.689
904
J020
||I8 929067
.1866
-887
.634
.907
.762
.686
.1121 ;S
.793 '
t.1013
995
.918
865929O68
.987
892
.904
.884
762
.819
881 X. S
.697 S ̂ \^
.783
.695
.892
,877
.873
745 875 8762046 LINE L.839
• 697
.523"
.716
.729
\
\^
. ItC JU
.10009r 6780
,43I7.4152
.3672
.3762
.21782672
*794
22WV/228T/ ^12246y1699
.1854247O
1595
1363
.1561
1212
'"47 9297
911
1097
901
984
716
I678//^
C 928-
809 \.
1144
1053
1261
1495
756
770
743
520
787
894
656
692
786
821
683/"
1059 \
699 \
530
493
619
630
775
679
673
339
750
773
1120
671 S
1146
1210
968
240
906
866
.888
763
804
1120
IO35
.817
869 yr
Ht33
795 929C
^K
797 x
754
.864
773
925 74520IS.785
9849290
767
625
490
455
1154.661
70W.
\
60 W.
50WJ V
40 W,
30 W"
20W,
IOW
/l
O.,
MAGNETOMETER SURVEY HEENAN - SENLAC PROPERTY
LEGRIS LAKE
THUNDER BAY MINING DIVISION
ONTARIO
INSTRUMENT - SCINTREX PROTON MAGNETOMETER
LEGEND
19000- MAGNETIC FIELD IN GAMMAS
4 BASE STATION
SCALE' l INCH * 200
M. JUBY - AUGUST 7, 1987
ROW
•'.f*
Conducttor V'A"
V^t-*w*r*^' —"t r r - *- S AH fit W S-.T
MAP NO - 3 (SOUTH)
\CONDUCTOR
iiv
S
HORIZONTAL LOOP ELECTROMAGNETIC SURVEY
APEX-MAX-MIN
HEENAN-SENLAC PROPERTY-LEGRIS LAKE THUNDER BAY MINING DIVISION
ONTARIO
LEGEND- —— - Out of Phase Response
(Negative to North-Right) 200 FT SeparationFREQUENCY- 3555 Hz (c p s) Scale l inch *20Oft
M. JUBY - JUNE 2 0, 1987
ROW 8/87