    Get the Most Out of Report

    Painter/Writer

    David Nowak

    Virtuoso, LLC

  • 7/25/2019 Report Painter Facilito Para Ti

    2/85

    What Well Cover

    Looking at Report Painter: The basics Identifying the proper data source

    Getting the most out of statistical key figures andvariables

    Working with currency translation and authorizationgroups

    Objective: Explain how to get the most out of Report Painters

    powerful, cross-module WYSIWYG reporting capabilities

  • 7/25/2019 Report Painter Facilito Para Ti

    3/85

    What Well Cover

    Looking at Report Painter: The basics Identifying the proper data source

    Getting the most out of statistical key figures andvariables

    Working with currency translation and authorizationgroups

  • 7/25/2019 Report Painter Facilito Para Ti

    4/85

    Looking at Report PainterReport Painter In Review

    What is Report Painter?! An SAP-standard visual report development tool

    ! Painter can be utilized within all financial submodules

    ! Painter offers 80%-90% of RW functionality but is 100%

    easier to use!! GUI Interface makes development a snap

    Painter reports can be used in drill-down reporting

    ! Unlike in drill-down reporting where reports and forms

    are separate, in Painter, the report form is the report

  • 7/25/2019 Report Painter Facilito Para Ti

    5/85

    Looking at Report PainterReport Painter In Review

    Report Painter functionality has remainedconsistent

    ! Painter has remained consistent across R/3 versions

    ! This has allowed the tool to remain a staple for any

    reporting strategy

  • 7/25/2019 Report Painter Facilito Para Ti

    6/85

    Looking at Report PainterWhen Should I Use Report Painter?

    Consider Report Painter before turning to an ABAPsolution

    ! Consider using it if the data you are looking for can besourced within Painter

    Report Painter excels for layout management! Use Painter instead of Writer when layout management is

    critical

    ! Painter is a GUI-based utility, so its easier to control

    report appearance

    Don't

    Forget

  • 7/25/2019 Report Painter Facilito Para Ti

    7/85

    Looking at Report PainterWhen Should I Use Report Painter? (cont.)

    Use Painter when you dont need Writers fullfunctionality like

    ! Report Writers eliminations functionality

    ! Report Writers user-defined Key Figure Sets (data sets)

    ! Complex set matrixes

    Don't

    Forget

  • 7/25/2019 Report Painter Facilito Para Ti

    8/85

    Looking at Report PainterExample: A Report Painter Report

  • 7/25/2019 Report Painter Facilito Para Ti

    9/85

    Looking at Report PainterFor Comparison: A Report Writer Report

  • 7/25/2019 Report Painter Facilito Para Ti

    10/85

    Looking at Report PainterTips When Choosing Report Painter

    Painter reports can be converted to Writer! If you need full RW functionality at a later date

    With 4.6c, some Painter terminology changed

    ! Field > Characteristic

    ! Data Set > Key Figure Set

    ! Data Field > Basic Key Figure

    These changes brought consistency acrossreporting utilities

    ! Drill-down reporting

    ! Summarization hierarchies

    ! Etc.

  • 7/25/2019 Report Painter Facilito Para Ti

    11/85

    What Well Cover

    Looking at Report Painter: The basics Identifying the proper data source

    Getting the most out of statistical key figures andvariables

    Working with currency translation and authorizationgroups

  • 7/25/2019 Report Painter Facilito Para Ti

    12/85

    Identifying the Proper Data SourceWhat Are Data Sources?

    Where is the data I need housed?! All reporting data is maintained in one or more reporting

    tables

    ! Of the 17,000 + tables that make up the SAP database,

    you will use maybe 5-8 for all your non-ABAP reportingneeds

    ! Understanding the data flows is critical to building goodreporting

  • 7/25/2019 Report Painter Facilito Para Ti

    13/85

    Identifying the Proper Data SourceWhat Are Data Sources? (cont.)

    Most of CO reporting is sourced from a singlelocation: CCSS

    ! CCSS is a central structure

    ! Contains updates for most CO objects (e.g. internal

    orders cost centers)! Many standard CO Painter reports use CCSS as the

    reporting structure

    Where

    toFIND it

  • 7/25/2019 Report Painter Facilito Para Ti

    14/85

    Identifying the Proper Data SourceOther Source Options for Painter Reporting

    Additional sources include! KKBC (Product Cost Controlling: Cost Elements)

    ! COFIT (Cost Element Reporting)

    ! RPPS (Project Systems)

    ! GLPCT (Profit Center Accounting)

    These tables have been designed for specificpurposes

    Whenever possible, use more specific reporting sources

  • 7/25/2019 Report Painter Facilito Para Ti

    15/85

    Identifying the Proper Data SourceTable KKBC

    KKBC Product Cost Controlling: Cost Elements! Traditional RW table, but can be used from within Report

    Painter

    ! KKBC is used in SAP-delivered costing reports

    When should I use KKBC?! Great source for cost element-based product cost reports

    ! Provides origin-level data that is key in a cost report

    !Examples: For resource input analysis, like materials

    consumed from the BOM, origins are key! Can be used together with summarization objects like

    order groups

    ! Great for Cost Object Hierarchy (COH) reporting

  • 7/25/2019 Report Painter Facilito Para Ti

    16/85

    Identifying the Proper Data SourceKKBC: A Practical Example

    The scenario! Manufacturing client was converting to Cost Object

    Hierarchies and required a new manufacturing activityreport

    The solution! Leverage KKBC to provide the manufacturing Activity

    detail

    ! Offered a chance to manage by COH

    By assigning additional, detail level reports, we

    were able to view the activity for this unique

    group of cost objects

  • 7/25/2019 Report Painter Facilito Para Ti

    17/85

    Identifying the Proper Data SourceKKBC: Tips For Proper Utilization

    KKBC can be tricky to use! If you are not fully aware of how your product costing

    system has been configured, KKBC can be tricky to use

    Some common areas you should revisit when using

    KKBC! Do you use order-based or period-based costing?

    ! Which variance categories are active in your system?

    ! Which cost elements and posting rules are you using for

    WIP and Variance updates?! What target cost versions do you have active within the

    system, and how do they differ?

  • 7/25/2019 Report Painter Facilito Para Ti

    18/85

    Identifying the Proper Data SourceChoosing and Using Info Structures

    Info structures are files of special statistical data! Different than standard reporting tables

    Made up of three kinds of information

    ! Characteristics (e.g., Plan, Material, Vendor)

    ! Key Figures (e.g., Sales Volume, Order Quantity,Execution Time)

    ! Period Units ( e.g., Day, Week, Month, Period)

    SAP delivers standard info structures including...

    ! S001 SIS: Customer

    ! S021 SFIS: Production Order

    ! S032 Inventory: Stocks

    You can create your own to capture specific data of interestNote

  • 7/25/2019 Report Painter Facilito Para Ti

    19/85

    Identifying the Proper Data SourceChoosing and Using Info Structures (cont.)

    Using info structures for Painter reports can betricky

    ! Not a common source for Painter reporting

    Common problems include

    ! Not being broad enough during design in the areas ofCharacteristic and Key Figure inclusion

    ! Identifying the proper update events for your structure

    !Proper timing will lead to accurate reporting data

    Overcome these problems by not trying to cover toomany reporting needs at once

    It will be easier to tackle your reporting needs if

    you have a strategy and stick to it

  • 7/25/2019 Report Painter Facilito Para Ti

    20/85

    Identifying the Proper Data SourceInfo Structures: A Practical Example

    The scenario! Client wished to have a report that provided price and

    valuation information for its top 50 materials

    ! They wanted to quickly see material price changes from

    period to period! The difficulty was in finding a utility that would allow me

    to customize the layout to meet the clients request

    The solution

    !

    Leverage an info structure, S012 in this case, to providethe material price detail needed

    ! Build the report using Painter to meet the reports layoutrequirements

    Solution

  • 7/25/2019 Report Painter Facilito Para Ti

    21/85

    Identifying the Proper Data SourceInfo Structures: A Practical Example (cont.)

    Painter example! Data would not have been available to Painter through

    standard reporting tables

  • 7/25/2019 Report Painter Facilito Para Ti

    22/85

    Identifying the Proper Data SourceData Extracts as an Alternate Data Source

    Data Extracts can be useful for controlling what infois available

    ! Can be saved automatically during execution

    ! Provide the benefit of freezing the report data for an

    unlimited amount of time! Great way to control point-in-time reporting

    Benefits include

    ! Easy to create and delete

    ! Standardization of data sources for statutory reporting! Additional level of authorization control

  • 7/25/2019 Report Painter Facilito Para Ti

    23/85

    Identifying the Proper Data SourceData Extracts as an Alternate Data Source (cont.)

    When exiting the report, SAP can be designed toprompt you to create an extract

    ! Select the Create Extract field

    ! Be sure to provide a unique naming convention

  • 7/25/2019 Report Painter Facilito Para Ti

    24/85

    Identifying the Proper Data SourceData Extracts as an Alternate Data Source (cont.)

    Begin by entering the proper characteristic valuesfor the reporting data in question

    Next, select the Data Source button in the header

  • 7/25/2019 Report Painter Facilito Para Ti

    25/85

    Identifying the Proper Data SourceData Extracts as an Alternate Data Source (cont.)

    A list of available extracts that match your criteriawill appear

    ! You now see why proper naming is important

    Once selected, the system will return to the

    reporting screen and you can execute

  • 7/25/2019 Report Painter Facilito Para Ti

    26/85

    Identifying the Proper Data SourceData Extracts as an Alternate Data Source (cont.)

    To review theselection log foryour report, usethe menu path:

    ! Extras>SelectionLog

    Extract Id

    No Extract

    Used

  • 7/25/2019 Report Painter Facilito Para Ti

    27/85

    What Well Cover

    Looking at Report Painter: The basics Identifying the proper data source

    Getting the most out of statistical key figures andvariables

    Working with currency translation and authorizationgroups

  • 7/25/2019 Report Painter Facilito Para Ti

    28/85

    Statistical Key Figures and VariablesFeature #1 - Statistical Key Figure Link with LIS

    What is a Statistical Key Figure (SKF)?! Statistical object within the CO/PCA modules that can

    be used to hold statistical quantitative data

    ! The SKF can be used to enhance both plan/actual

    allocations and reporting

  • 7/25/2019 Report Painter Facilito Para Ti

    29/85

    Statistical Key Figures and VariablesFeature #1 Posting to a Statistical Key Figure

    Data can be posted to a key figure in one of twoways

    ! Manually, through an entry transaction

    !KB31N CO Object like Cost Center/Internal

    Order/WBS Element!9KE5 PCA

    ! Automatically, through a link to an LIS informationstructure

    !This is what well cover!

  • 7/25/2019 Report Painter Facilito Para Ti

    30/85

    Statistical Key Figures and Variables1 - Statistical Key Figure Link with LIS (cont.)

    Benefits of the SKF link to LIS! Automatic updates make month end processing easier

    ! Increased accuracy in the numbers, because the actualdata is coming directly from the transactional source

    ! Nice integration back to the LIS structure forreconciliation

  • 7/25/2019 Report Painter Facilito Para Ti

    31/85

    Statistical Key Figures and Variables1 SKF Lint to LIS: The Process

    Three steps to completing the process1. Create the SKF KK01

    2. Maintain the Assignment and Variant KVA2

    3. Perform Period End Closing transfer of the LIS value

    KVA5 The following example will link an SKF used to

    capture confirmed hours with the appropriateLIS key figure

  • 7/25/2019 Report Painter Facilito Para Ti

    32/85

    Statistical Key Figures and VariablesStep 1 Create the SKF-LIS Link

    SKF Example! Standard Key Figure

    ! Notice the section at thebottom of the screen

    titled LIS Data! This indicates the origin

    of the update; the infostructure/set accessed,and the LIS key figure

    linked

  • 7/25/2019 Report Painter Facilito Para Ti

    33/85

    Statistical Key Figures and VariablesStep 1 Create the SKF-LIS Link (cont.)

    Be sure to choose the proper info structure Info Sets are used predominantly to capture sales

    related data

  • 7/25/2019 Report Painter Facilito Para Ti

    34/85

    Statistical Key Figures and VariablesStep 1 Create the SKF-LIS Link (cont.)

    SKF Link screens! With this example, we

    are linking to an InfoStructure

    ! Select the properapplication you wishto link your key figureto

  • 7/25/2019 Report Painter Facilito Para Ti

    35/85

    Statistical Key Figures and VariablesStep 1 Create the SKF-LIS Link (cont.)

    Here weve selected theShop Floor Controlselection

    Our next selection brings

    us closer by nowchoosing the proper InfoStructure

  • 7/25/2019 Report Painter Facilito Para Ti

    36/85

    Statistical Key Figures and VariablesStep 1 Create the SKF-LIS Link (cont.)

    And finally, wechoose the keyfigure

    This will be the

    last selection inlinking ourstatistical keyfigure with the LIS

    key figure

  • 7/25/2019 Report Painter Facilito Para Ti

    37/85

    Statistical Key Figures and VariablesStep 2 Maintain the Assignment and Variant

    SKF-CCA assignment! You must make the proper assignment if the key figures

    are going to transfer from LIS

    ! Enter the Cost Center of your choosing and hit enter

    T-code

    KVA2

  • 7/25/2019 Report Painter Facilito Para Ti

    38/85

  • 7/25/2019 Report Painter Facilito Para Ti

    39/85

    Statistical Key Figures and VariablesStep 2 Maintain the Assignment and Variant

    Depending on the key figure being linked, the dataon the variant screen will change

    This example shows LIS key figure for actual hoursexecuted

  • 7/25/2019 Report Painter Facilito Para Ti

    40/85

    Statistical Key Figures and VariablesStep 3 Transfer the LIS Key Figure Values

    SKF-LIS Transfer! Actual Key

    Figure transferprogram

    ! Remember to

    maintain the LISReference data

    ! LIS Referencedata provides thetransaction with

    the planningversion andfiscal year

    T-code

    KVA5

  • 7/25/2019 Report Painter Facilito Para Ti

    41/85

    Statistical Key Figures and VariablesLIS Key Figure Use in Reporting

    SKF use in report! Remember to select the proper key figure when defining

    the row/column in your report

    ! You may have to activate the key figure in your library

  • 7/25/2019 Report Painter Facilito Para Ti

    42/85

    Statistical Key Figures and VariablesFeature #2 Report Painter Variables

    Like sets, variable use is key to adding usabilityto a complex report

    ! Think of a variable as a placeholder

    ! When the report is executed, the system will replace

    the value of the variable with either:!One entered by the user, or

    !One that is interpreted by the system

  • 7/25/2019 Report Painter Facilito Para Ti

    43/85

    Statistical Key Figures and VariablesFeature #2 Report Painter Variables

    Types of variables in Painter! Value

    !Single field; values individually assigned

    ! Formula

    !For a level of complexity, formulas can be used toautomatically determine the variable replacement

    ! Set

    !Variable that assists in finding the value of a set

    !Can be either manual or automatic

  • 7/25/2019 Report Painter Facilito Para Ti

    44/85

    Statistical Key Figures and VariablesReport Painter Variables: Value Variable Example

    Consider this a basic single value entry variable

    Value can later be used by Formula variables

    Important settings

    for controlling how

    variable data can be

    determined.

  • 7/25/2019 Report Painter Facilito Para Ti

    45/85

    Statistical Key Figures and VariablesReport Painter Variables: Value Variables

    Value Variables are the most basic of the threevariable types

    However, the complexity and level of importancecan be elevated when they are used as the basis for

    more complex Formula Variables! The data entered in the value variable becomes a

    component in the Formula variables algorithm

  • 7/25/2019 Report Painter Facilito Para Ti

    46/85

    Statistical Key Figures and VariablesReport Painter Variables: Value Variables (cont.)

    Pay attention to the Entry Fields on SelectionScreen settings! Internal Variable:

    !Activation will remove the capability of the user tochange the default value of the variable during report

    execution!The variable will not appear in the selection screen

    ! Use Parameter ID:

    !When you want the field replacement to be controlledby the parameter ID, activate this field

    !To change the parameter ID, use the menu pathGoto>Parameter ID

  • 7/25/2019 Report Painter Facilito Para Ti

    47/85

    Statistical Key Figures and VariablesReport Painter Variables: Parameter ID

  • 7/25/2019 Report Painter Facilito Para Ti

    48/85

    Statistical Key Figures and VariablesReport Painter Variables: Formula, No Exit

    Formula variables can make complex valuedeterminations easy

    Key component ofthis formula

    variable is the value

    entered for Z130, a

    Value variable.

  • 7/25/2019 Report Painter Facilito Para Ti

    49/85

    Statistical Key Figures and VariablesReport Painter Variables: Formula Variables

    Most functional of the three variable types, as youcan automate value determination and replacement

    The formulas rely on Boolean Logic for its logiccontrol

    Additional value determination control offeredthrough variable user exits

  • 7/25/2019 Report Painter Facilito Para Ti

    50/85

    Statistical Key Figures and VariablesReport Painter Variables: Formula Exit - SAP

    Simple inclusionof the SAPdelivered Exit IDon the formula

    line is enough toactivate the exit

    ! All SAPdelivered Exitsbegin with the

    letter S

    To see a selection

    of SAP deliveredExits, select the

    Formula Exit

    button.

  • 7/25/2019 Report Painter Facilito Para Ti

    51/85

    Statistical Key Figures and VariablesReport Painter Variables: Formula Exit - SAP

    To get this selection screen to appear, hit theFormula Exit button

    Twelve selections in all

    Choose from one of

    the twelve exits

    offered. (Only nine

    are shown here).

  • 7/25/2019 Report Painter Facilito Para Ti

    52/85

    Statistical Key Figures and VariablesReport Painter Variables: Formula Exit - User

    User defined exitsfollowing thenaming patternUxxx

    Before including theexit ID in thevariable, it mustfirst be defined inthe Exit Pool

    ! The exit poolprogram ID isRGSVU000

    Similar to the SAP

    defined exits, the

    User defined exits

    all begin with U.

  • 7/25/2019 Report Painter Facilito Para Ti

    53/85

    Statistical Key Figures and VariablesReport Painter Variables: Formula Exits

    Naming convention is important when usingformula user exits

    ! SAP delivered exits always begin with S

    ! User defined exits begin with a U

    The User Exit pool for variable exits is RGSVU000! Your Basis team may have copied the program to a new

    program name to protect the integrity of the deliveredprogram

    !

    See settings in table T80I to see what the program nameassigned to the exits might be

  • 7/25/2019 Report Painter Facilito Para Ti

    54/85

    What Well Cover

    Looking at Report Painter: The basics Identifying the proper data source

    Getting the most out of statistical key figures andvariables

    Working with currency translation and authorizationgroups

  • 7/25/2019 Report Painter Facilito Para Ti

    55/85

    Currency Translation and Authorization GroupsCurrency Translation in Report Painter

    What is currency translation as it relates toreporting?

    ! Standard functionality that allows a single report to berun and viewed in multiple currencies.

    ! Allows the user to control the exchange rate duringreport execution.

    ! Requires some set-up

    How do I access this functionality?

    ! Tied to key figure selection during report development! No real configuration required

    ! Basic understanding of how currencies are used withinyour system

  • 7/25/2019 Report Painter Facilito Para Ti

    56/85

    Currency Translation and Authorization GroupsCurrency Translation in Report Painter (cont.)

    Report Painter will manage currency translation asit relates to the following currencies in CO:

    ! Controlling Area

    ! Transaction

    ! Object! Target

    Steps to consider prior to report development

    ! Maintain your reporting libraries

    ! Maintain the currency exchange rate tables! Review the currency settings within the FI/CO modules to

    determine what is active.

  • 7/25/2019 Report Painter Facilito Para Ti

    57/85

    Currency Translation and Authorization GroupsCurrency Translation in Report Painter (cont.)

    Maintain the reporting Library! Requires activating the proper Key Figures

    !SWZG Costs in Target Currency

    !SWKG Costs in Reporting Currency

    ! More often than not these key figures are active bydefault, but check anyway

    SWZG Costs in Target Currency

    ! Target currency will be used by the system as the

    translation basis! The key figure will house the translated currency

  • 7/25/2019 Report Painter Facilito Para Ti

    58/85

    Currency Translation and Authorization GroupsCurrency Translation in Report Painter (cont.)

    SWKG Costs in Reporting Currency! Using reporting currency offers some additional

    flexibility for standardization and automation

    ! More on this later

  • 7/25/2019 Report Painter Facilito Para Ti

    59/85

    Currency Translation and Authorization GroupsCurrency Translation-Library Maintenance

    Always be certainthese two key figures,or a derivative of thefigures, are active in

    your reportdevelopment library Activate

    Activate

  • 7/25/2019 Report Painter Facilito Para Ti

    60/85

    Currency Translation and Authorization GroupsCurrency Translation in Report Painter

    Maintain the currency exchange rate tables! If you are already in a multi-currency environment, than

    you are already doing this.

    ! However, it cant hurt for your report development teamto become familiar with the settings

    Areas to pay attention to:

    ! Exchange rate type

    ! Exchange rate dates

    C G

  • 7/25/2019 Report Painter Facilito Para Ti

    61/85

    Currency Translation and Authorization GroupsCurrency Translation-Exchange Rates

    Exchange Rate Type isthe key

    Validity Date controlswhether the setting will

    be accessed duringreport execution

    Exchange

    Rate Type

    ValidityDate

    C T l ti d A th i ti G

  • 7/25/2019 Report Painter Facilito Para Ti

    62/85

    Currency Translation and Authorization GroupsCurrency Translation in Report Painter

    All thats left is to build the report! SAP offers a number of standard reports that you

    provide currency translation functionality

    ! Use these as a point of reference if necessary

    C T l ti d A th i ti G

  • 7/25/2019 Report Painter Facilito Para Ti

    63/85

    Currency Translation and Authorization GroupsCurrency Translation-Report Development

    Rememberto use keyfigure SWZGas yourtranslation

    column/row It is the only

    key figureavailable thatwill offer the

    necessarytranslationfunctionality

    Key Figure

    SWZG

    C T l ti d A th i ti G

  • 7/25/2019 Report Painter Facilito Para Ti

    64/85

    Currency Translation and Authorization GroupsCurrency Translation-Report Development

    As a result of using SWZG, the translation sectionwill appear at the bottom of your selection screen

    Enter the target currency, exchange rate date andthe rate type

    Output for the translation will be the target keyfigure

    C T l ti d A th i ti G

  • 7/25/2019 Report Painter Facilito Para Ti

    65/85

    Currency Translation and Authorization GroupsCurrency Translation-Report Development

    Example of report run in USD

    C T l ti d A th i ti G

  • 7/25/2019 Report Painter Facilito Para Ti

    66/85

    Currency Translation and Authorization GroupsCurrency Translation-Report Development

    Same reportrun in MXN

    Same reportlayout; same

    transactioncode forexecution;unique

    result

    C T l ti d A th i ti G

  • 7/25/2019 Report Painter Facilito Para Ti

    67/85

    Currency Translation and Authorization GroupsCurrency Translation in Report Painter

    Another option to currency translation reporting isto leverage the Reporting Currency Key Figure

    ! SWKG Costs in Reporting Currency

    Basic development will establish currency

    translation defaults for the key figure There is a unique transaction code within each CO

    sub-module:

    ! Cost Center Accounting RPC0

    ! Cost Element Accounting RPA0! Internal Order Accounting RPO0

    C T l ti d A th i ti G

  • 7/25/2019 Report Painter Facilito Para Ti

    68/85

    Currency Translation and Authorization GroupsCurrency Translation-Report Currency

    Establish defaultsetting for keyfigure SWKG

    For translation,enter a targetcurrency (i.e. Euro)

    Enter thetranslation basisinformation! This is the

    reference

    information fromwhich translationwill occur

    Enter a TargetCurrency

    Maintain the

    translation

    basis.

    Currency Translation and Authorization Groups

  • 7/25/2019 Report Painter Facilito Para Ti

    69/85

    Currency Translation and Authorization GroupsCurrency Translation-Report Currency

    Settings forconverting CCAreports from theobject currency toEuros

    Remember to use keyfigure SWKG as theconverted currency

    You will more likelyknow the key figure

    SWKG by its titleCosts

    Currency Translation and Authorization Groups

  • 7/25/2019 Report Painter Facilito Para Ti

    70/85

    Currency Translation and Authorization GroupsReport Painter Variables: Parameter ID

    Currency Translation and Authorization Groups

  • 7/25/2019 Report Painter Facilito Para Ti

    71/85

    Currency Translation and Authorization GroupsCurrency Translation-Report Currency

    Output from a report utilizing both Object Currency($USD) and Euros -- Simple to build and maintain

    Currency Translation and Authorization Groups

  • 7/25/2019 Report Painter Facilito Para Ti

    72/85

    Currency Translation and Authorization GroupsAuthorization Groups in Report Painter

    What is an Authorization Group?! Little used tool to grant authorization control to a very

    specific level.

    ! Linked to an authorization object, the authorizationgroup can give you control over

    Creation/Change/Display/Execution transactions.

    Where in report painter can it be maintained?

    ! Authorization group settings can be maintained at thefollowing levels:

    !Library

    !Report group

    !Sets/Variables

    !Report Painter Reports

    Currency Translation and Authorization Groups

  • 7/25/2019 Report Painter Facilito Para Ti

    73/85

    Currency Translation and Authorization GroupsAuthorization Groups in Reporting

    A view of a Report Painter Library

    Currency Translation and Authorization Groups

  • 7/25/2019 Report Painter Facilito Para Ti

    74/85

    Currency Translation and Authorization GroupsAuthorization Groups in Reporting

    " A view of a Report

    Group

    " And Report Painter

    Header

    Currency Translation and Authorization Groups

  • 7/25/2019 Report Painter Facilito Para Ti

    75/85

    Currency Translation and Authorization GroupsAuthorization Groups in Report Painter

    Great for limiting access to certain reports, withouttaking it to a transaction level

    Because authorization control can be extended toan individual object, tremendous flexibility is

    available! Example: Report Group A can be maintained and

    executed by your team, while Report Group B cannot

    Work with your authorization team to develop a

    strategy

  • 7/25/2019 Report Painter Facilito Para Ti

    76/85

    The 7 Key Points to Take Home!

    Identify all the reporting requirements beforebeginning the development

    Look to using an info structure as your reportingsource if a useful reporting table cannot be found

    Consider the functionality of linking statistical keyfigures to LIS structures

    Familiarize yourself with the concepts of variablesto give yourself more flexibility

  • 7/25/2019 Report Painter Facilito Para Ti

    77/85

    The 7 Key Points to Take Home! (cont.)

    Save yourself some development time by applyingSAPs currency translation functionality

    If security is an issue, consider developing theAuthorization Group functionality

    Report Painter is an important tool in your toolbox(in addition to BW) that you can use to meet yourtactical and operational reporting requirements

  • 7/25/2019 Report Painter Facilito Para Ti

    78/85

    Your Turn!

    Questions?

    How to Contact Me:

    [email protected]

  • 7/25/2019 Report Painter Facilito Para Ti

    79/85

    Appendix A

    Potential Appendix Section.

    If we want, we could include some of the information fromthe prior reporting presentations I removed.

    If you would like to provide additional materialfor attendees, please send the slides as a

    separate file and we will include them on the

    CD, but, not as part of the presentation

  • 7/25/2019 Report Painter Facilito Para Ti

    80/85

    3 - Use the Export/Import Tool

    Simplifies the transport process

    ! Transaction Codes: GR27 Export; GR28 - Import

    ! No need to use the CTS system to move reports betweenclients/instances

    ! Allows for more flexibility in your choice of location for reportdevelopment

    ! You can quickly move reports to other R/3 systems

    Check with your administrator for any policies on transportingPainter reports in this way!

    3 U h E /I T l E l

  • 7/25/2019 Report Painter Facilito Para Ti

    81/85

    3 - Use the Export/Import Tool: Example

    " Report Group

    Export

    Transaction

    GR57

    " Remember: in

    this caseThe

    Presentation

    Server would

    be your

    desktop hard

    drive

    Export Report

    Group

    Hard drive location

    T-code

    GR27

    3 U th E t/I t T l E l

  • 7/25/2019 Report Painter Facilito Para Ti

    82/85

    3 - Use the Export/Import Tool: Example (contd)

    " Report Group

    Import

    Transaction

    GR58

    " Remember: in

    this caseThe

    Presentation

    Serverwould

    be your

    desktop hard

    drive

    Import Report

    Group

    T-code

    GR28

    3 U th E t/I t T l E l

  • 7/25/2019 Report Painter Facilito Para Ti

    83/85

    3 - Use the Export/Import Tool: Example (contd)

    " Output report

    from after the

    import cycle

    has run

    " Watch out for

    sets that failed

    during import

    " If sets fail to

    import, export

    and import

    themseparately

    Import Report

    Group

    T-code

    GR28

    3 E t/I t T l Ti f S

  • 7/25/2019 Report Painter Facilito Para Ti

    84/85

    3 - Export/Import Tool: Tips for Success

    This approach is the fastest way to transport

    ! Exporting/Importing groups is by far the quickest way to movereports through your landscape

    Controls and Procedures are important

    ! Controls and procedures are important to maintaining reportintegrity

    ! You should have established a report migration strategy

    ! Always move your report development through your pristine/goldconfiguration client

    Report groups are the only objects that can be moved

    !

    Summarization hierarchies, drill-down reports, ABAP lists, andqueries all must be transported in the standard way

    I C ll ti

  • 7/25/2019 Report Painter Facilito Para Ti

    85/85

    Icon Collection

    Issue

    Note

    Warning

    Where

    toFIND it

    Don't Forget

    GOTCHA!

    Solution

    Client

    IssueTip