INTRODUCTION TO
CONSTRUCTION MANAGEMENT
PREPARED BY:AILEEN REYES NATALIOBS ARCHITECTURE 5-1
SPECIALIZATION II
CONSTRUCTION INDUSTRY
• IT IS THE LARGEST INDUSTRY IN THE WORLD• IT IS MORE CHALLENGING DUE TO ITS:
•UNIQUE NATURE• EVERY PROJECT IS ONE OF A KIND• MANY CONFLICTING PARTIES ARE INVOLVED•TIME PRESSURED• MONEY AND QUALITY• HIGH RISK
CONSTRUCTION PROJECT
A Project is defined whether it is in construction or not by the following characteristics:
•A Defined goal and objectives•Specific task to be performed•A Defined Beginning and End•Resources are being Consumed
PRECONSTRUCTION PHASE
•CONCEPTUAL DESIGN •SCHEMATIC DESIGN
•DESIGN DEVELOPMENT •CONTRACT DOCUMENTS
PROCUREMENT PHASE
• BIDDING
CONSTRUCTION PHASE
CLOSE-OUT PHASE
MAJOR TYPE OF CONSTRUCTION PROJECT
•RESIDENTIAL HOUSING CONSTRUCTION
•INSTITUTIONAL AND COMMERCIAL BUILDING CONSTRUCTION
•SPECIALIZED INDUSTRIAL CONSTRUCTION
•INFRASTRACTURE AND HEAVY CONSTRUCTION
PROJECT PARTICIPANTS
• OWNER THE INDIVIDUAL OR ORGANIZATION FOR WHOM THEPROJECT IS TO BE BUILT UNDER A CONTRACT.
• THE DESIGNER THE INDIVIDUAL OR ORGANIZATION THAT INTERPRET ANDGUIDE THE OWNER IN DESIGN,CONSTRUCTION COST,SCHEDULE AND DOCUMENTS. EXAMPLES ARE ARCHITECTSAND ENGINEERS.
• THE CONSTRUCTION PROFESSIONALSTHE PARTIES THAT RESPONSIBLE FOR CONSTRUCTING THEPROJECT
• PROJECT MANAGER THE INDIVIDUAL CHARGED WITH THE OVER ALLCOORDINATION OF THE ENTIRE CONSTRUCTION PROGRAMFOR THE OWNER. THESE INCLUDE PLANNING,DESIGN,PROCUREMENT AND CONSTRUCTION
• CONSTRUCTION MANAGER
THE SPECIALIZED FIRM OR ORGANIZATION WHICHADMINISTRATES THE ON-SITE ERECTION ACTIVITIES ANDTHE CONSULTING SERVICES REQUIRED BY THE OWNERSFROM PLANNING THROUGH DESIGN AND CONSTRUCTIONTHROUGH COMMISSIONING.