Page 1: Report Turbine inspection WTG 15976, Waardtocht 4...Wind turbine inspection Waardtocht 4 WTG 15976 Date: 11-11-2015 Page 3 of 20 1 Purpose On behalf of Vattenfall an inspection has

11-11-2015

Report Turbine inspection

WTG 15976, Waardtocht 4

Report No. V662015046

Page 2: Report Turbine inspection WTG 15976, Waardtocht 4...Wind turbine inspection Waardtocht 4 WTG 15976 Date: 11-11-2015 Page 3 of 20 1 Purpose On behalf of Vattenfall an inspection has

Wind turbine inspection Waardtocht 4 WTG 15976

Date: 11-11-2015 Page 2 of 20

Contents

1 Purpose ................................................................................................................................... 3

2 Abbreviations ........................................................................................................................... 3

3 General information ................................................................................................................. 4

4 Wind turbine main components ............................................................................................... 4

5 Documents ............................................................................................................................... 5

6 Logbook: Overview of recent maintenance .............................................................................. 6

7 Logbook: Transformer ............................................................................................................. 6

8 Logbook: Notable events ......................................................................................................... 6

9 Tower and towerbase .............................................................................................................. 7

10 Yaw system .......................................................................................................................... 8

11 Cabinets nacelle ................................................................................................................... 9

12 Nacelle ............................................................................................................................... 10

13 Gearbox and main shaft ..................................................................................................... 12

14 Generator and coupling ...................................................................................................... 14

15 Hydraulic system nacelle .................................................................................................... 15

16 Rotor .................................................................................................................................. 16

17 Conclusion .......................................................................................................................... 20

Page 3: Report Turbine inspection WTG 15976, Waardtocht 4...Wind turbine inspection Waardtocht 4 WTG 15976 Date: 11-11-2015 Page 3 of 20 1 Purpose On behalf of Vattenfall an inspection has

Wind turbine inspection Waardtocht 4 WTG 15976

Date: 11-11-2015 Page 3 of 20

1 Purpose

On behalf of Vattenfall an inspection has been executed on the wind turbine. The purpose of the inspection is to

determine the technical state of the wind turbine.

2 Abbreviations

ok okay

nok not okay

na not applicable

nav not available

nc not checked

info for information purpose

Items marked with “ok” and “info” show no visual irregularities. All issues which are not acceptable are marked

with “nok”. Items which are “nok” will be classified in three different classes.

Class Clarification Description in report

Priority Low An irregularity, which is not a safety issue, and is relatively easy to solve.

Low

Priority High An irregularity, which is not a safety issue, and is more serious and is more time and/or money consuming to solve.

High

Safety Issue Issues which concern the safety of the people working in the turbine.

Safe

Page 4: Report Turbine inspection WTG 15976, Waardtocht 4...Wind turbine inspection Waardtocht 4 WTG 15976 Date: 11-11-2015 Page 3 of 20 1 Purpose On behalf of Vattenfall an inspection has

Wind turbine inspection Waardtocht 4 WTG 15976

Date: 11-11-2015 Page 4 of 20

3 General information

Wind turbine name: Waardtocht 4

Wind turbine type: V66 – 1750KW – 690V/50HZ – R7035

Wind turbine S/N: 15976

Location: Middenmeer

Hub height: 78

Total production [kWh]: 20439703 (according to display)

Total hours: 45201 (according to display)

Nominal power [kW]: 1750

Year of installation: 2003

Date of inspection: 02-11-2015

Inspectors: P. den Braber

D. Lagerweij B. van de Braak J. Langenbach

4 Wind turbine main components

Component Type Year Serial number

Nacelle V66 – 1750KW – 690V/50HZ – R7035 2002 769402-46-02-66307

Gearbox Winergy PEAB 4395 2006 4809519 – 0020 - 4

Revision gearbox - - -

Gearbox oil Castrol Alphasyn PG 320 2007 -

Generator ABB AMK 500L 4A BATYH 2005 4581390

Blade 1 Vestas 32B - 35247

Blade 2 Vestas 32B - 20527

Blade 3 Vestas 32B - 20533

Page 5: Report Turbine inspection WTG 15976, Waardtocht 4...Wind turbine inspection Waardtocht 4 WTG 15976 Date: 11-11-2015 Page 3 of 20 1 Purpose On behalf of Vattenfall an inspection has

Wind turbine inspection Waardtocht 4 WTG 15976

Date: 11-11-2015 Page 5 of 20

5 Documents

Component Remark

1 Operator manual Operating manual is available at the turbine.

Machine directive 2006/45/EC, 1.7.4.2 states as part of the Contents of

instructions:

“(e) the drawings, diagrams, descriptions and explanations necessary for the

use, maintenance and repair of the machinery and for checking its correct

functioning;”

ok

2 Wiring diagram Wiring diagrams are not available at the turbine.

Machine directive 2006/45/EC, 1.7.4.2 states as part of the Contents of

instructions:

“(e) the drawings, diagrams, descriptions and explanations necessary for the

use, maintenance and repair of the machinery and for checking its correct

functioning;”

nok

3 Hydraulic diagram Hydraulic diagrams are not available at the turbine.

Machine directive 2006/45/EC, 1.7.4.2 states as part of the Contents of

instructions:

“(e) the drawings, diagrams, descriptions and explanations necessary for the

use, maintenance and repair of the machinery and for checking its correct

functioning;”

nok

4 Maintenance manual Maintenance manual is not available at the turbine.

Machine directive 2006/45/EC, 1.7.4.2 states as part of the Contents of

instructions:

“(e) the drawings, diagrams, descriptions and explanations necessary for the

use, maintenance and repair of the machinery and for checking its correct

functioning;”

nok

5 Logbook Logbook is available at the turbine. ok

Page 6: Report Turbine inspection WTG 15976, Waardtocht 4...Wind turbine inspection Waardtocht 4 WTG 15976 Date: 11-11-2015 Page 3 of 20 1 Purpose On behalf of Vattenfall an inspection has

Wind turbine inspection Waardtocht 4 WTG 15976

Date: 11-11-2015 Page 6 of 20

6 Logbook: Overview of recent maintenance

Year Type of maintenance Date of execution Maintenance schedule

Commissioning 02-2003 2003

… … … …

9 E- 36 month service 16-02-2012 2012

9½ B - 6 month service 31-08-2012

10 G - 60 month service 11-04-2013 2013

10½ B - 6 month service 30-08-2013

11 M – 11 year service 13-03-2014 2014

11½ B - 6 month service 20-08-2014

12 N – 48 month service no service record 2015

12½ B - 6 month service 19-08-2015

7 Logbook: Transformer

Date Event

… …

25-03-2013 Transformer inspection

24-02-2014 Transformer inspection

25-02-2015 Transformer inspection

8 Logbook: Notable events

Date Event

29-01-2007 Gearbox exchange

11-01-2007 Gear oil exchanged Castrol Alphasyn PG 320

13-05-2014 Replaced DE and N-DE bearing generator

30-04-2015 Plain and sliding bearings replaced (blade A, B and C)

Page 7: Report Turbine inspection WTG 15976, Waardtocht 4...Wind turbine inspection Waardtocht 4 WTG 15976 Date: 11-11-2015 Page 3 of 20 1 Purpose On behalf of Vattenfall an inspection has

Wind turbine inspection Waardtocht 4 WTG 15976

Date: 11-11-2015 Page 7 of 20

9 Tower and towerbase

Item Remark

1 Outside ok

2 Inside Bolt of the support of the tower cables is missing (arrow).

nok

Low

3 Towerbase HV-switch overview

Info

4 Towerbase cabinet overview

Info

5 Miscellaneous The cover of the light in the tower is not mounted.

nok

Safe

Page 8: Report Turbine inspection WTG 15976, Waardtocht 4...Wind turbine inspection Waardtocht 4 WTG 15976 Date: 11-11-2015 Page 3 of 20 1 Purpose On behalf of Vattenfall an inspection has

Wind turbine inspection Waardtocht 4 WTG 15976

Date: 11-11-2015 Page 8 of 20

10 Yaw system

Item Remark

1 Yaw bearing overview

Info

2 Yaw ring teeth

Yaw ring shows no irregularities.

ok

3 Yaw pinions Yaw pinions show no irregularities.

ok

4 Yaw gears Yaw gear at the front at the right is leaking (arrow).

nok

Low

Page 9: Report Turbine inspection WTG 15976, Waardtocht 4...Wind turbine inspection Waardtocht 4 WTG 15976 Date: 11-11-2015 Page 3 of 20 1 Purpose On behalf of Vattenfall an inspection has

Wind turbine inspection Waardtocht 4 WTG 15976

Date: 11-11-2015 Page 9 of 20

11 Cabinets nacelle

Item Remark

1 Controller The controller is not modified/reinforced.

nok

High

2 Connection boxes ok

3 Cooling system Minor leakage at the coupling of the cooling system.

Radiator housing of the cooling of the convertor is corroded.

nok

Low

Page 10: Report Turbine inspection WTG 15976, Waardtocht 4...Wind turbine inspection Waardtocht 4 WTG 15976 Date: 11-11-2015 Page 3 of 20 1 Purpose On behalf of Vattenfall an inspection has

Wind turbine inspection Waardtocht 4 WTG 15976

Date: 11-11-2015 Page 10 of 20

12 Nacelle

Item Remark

1 Nacelle overview

Info

2 Frame Turbine is equipped with a welded frame.

Info

3 Nacelle housing Parts of the insulation are missing or damaged.

nok

Low

4 Weather station

Info

Page 11: Report Turbine inspection WTG 15976, Waardtocht 4...Wind turbine inspection Waardtocht 4 WTG 15976 Date: 11-11-2015 Page 3 of 20 1 Purpose On behalf of Vattenfall an inspection has

Wind turbine inspection Waardtocht 4 WTG 15976

Date: 11-11-2015 Page 11 of 20

5 Miscellaneous Insulation in the cooling duct on the roof is blocking the air flow.

nok

Low

6 Miscellaneous Minor corrosion visible at the bracket at the left at the front of the nacelle.

Cover of the light is broken.

nok

Low

Page 12: Report Turbine inspection WTG 15976, Waardtocht 4...Wind turbine inspection Waardtocht 4 WTG 15976 Date: 11-11-2015 Page 3 of 20 1 Purpose On behalf of Vattenfall an inspection has

Wind turbine inspection Waardtocht 4 WTG 15976

Date: 11-11-2015 Page 12 of 20

13 Gearbox and main shaft

Item Remark

1 Main shaft bearings

Grease of the front bearing is dark and magnetic.

nok

High

2 Radiators

ok

3 Manifold Oil present at the manifold and there is also oil visible on the plate under the manifold.

nok

High

4 CCJ-unit CCJ-filter is leaking and the connection box is mounted with cable ties.

nok

Low

Page 13: Report Turbine inspection WTG 15976, Waardtocht 4...Wind turbine inspection Waardtocht 4 WTG 15976 Date: 11-11-2015 Page 3 of 20 1 Purpose On behalf of Vattenfall an inspection has

Wind turbine inspection Waardtocht 4 WTG 15976

Date: 11-11-2015 Page 13 of 20

5 Gear oil system ok

6 Hoses and pipes Leakage at the pipes of the mechanical oil pump. An absorbing rag is already placed by the maintenance team.

nok

High

7 Torque-arms Torque-arm system has been modified.

Info

8 Paint / Corrosion ok

9 Brake-system overview

Info

10 General leakage

Due to leakage of the gearbox, the frame is covered with oil.

nok

High

Page 14: Report Turbine inspection WTG 15976, Waardtocht 4...Wind turbine inspection Waardtocht 4 WTG 15976 Date: 11-11-2015 Page 3 of 20 1 Purpose On behalf of Vattenfall an inspection has

Wind turbine inspection Waardtocht 4 WTG 15976

Date: 11-11-2015 Page 14 of 20

11 Miscellaneous Hydraulic coupling is covered with oil. The plug of the low pressure reservoir also not tightened correctly.

nok

Low

14 Generator and coupling

Item Remark

1 Coupling The composite parts of the coupling are in an acceptable condition.

ok

2 Paint / Corrosion ok

3 Slip ring The slip ring shows no visual irregularities. It is remarkable that the earth pin is

equipped with only one brush.

Info

Page 15: Report Turbine inspection WTG 15976, Waardtocht 4...Wind turbine inspection Waardtocht 4 WTG 15976 Date: 11-11-2015 Page 3 of 20 1 Purpose On behalf of Vattenfall an inspection has

Wind turbine inspection Waardtocht 4 WTG 15976

Date: 11-11-2015 Page 15 of 20

4 Miscellaneous Cables of the automatic grease unit of the generator are not mounted correctly.

nok

Low

15 Hydraulic system nacelle

Item Remark

1 Overview

Info

2 Hoses ok

3 Leakage Leakage present near the rotation unit. It is also possible that the oil is from

leakage in the hub.

nok

Low

4 Corrosion ok

Page 16: Report Turbine inspection WTG 15976, Waardtocht 4...Wind turbine inspection Waardtocht 4 WTG 15976 Date: 11-11-2015 Page 3 of 20 1 Purpose On behalf of Vattenfall an inspection has

Wind turbine inspection Waardtocht 4 WTG 15976

Date: 11-11-2015 Page 16 of 20

16 Rotor

Item Remark

1 Overview

Info

2 Paint / Corrosion Some corrosion present at the entrance of the hub and minor damage at the paint in the hub.

nok

Low

3 Connection spinner

Connection has not been reinforced. No cracks detected in the tubes (See 16.2).

ok

4 Hub cabinet

overview

Info

Page 17: Report Turbine inspection WTG 15976, Waardtocht 4...Wind turbine inspection Waardtocht 4 WTG 15976 Date: 11-11-2015 Page 3 of 20 1 Purpose On behalf of Vattenfall an inspection has

Wind turbine inspection Waardtocht 4 WTG 15976

Date: 11-11-2015 Page 17 of 20

5 Connections cylinder to the

blade

The clearance of the link bearings of pitch cylinders A, B and C are 0,04 [mm], 0,07 [mm] and 0,09 [mm]. This is acceptable according to the Vestas Manual.

ok

6 Connections cylinder to the

hub

The clearance of the slide bearings of pitch cylinders A, B and C are 0,40 [mm], 0,43 [mm] and 0,47 [mm]. This is acceptable according to the Vestas Manual.

ok

7 Hydraulics inside

the hub

ok

Page 18: Report Turbine inspection WTG 15976, Waardtocht 4...Wind turbine inspection Waardtocht 4 WTG 15976 Date: 11-11-2015 Page 3 of 20 1 Purpose On behalf of Vattenfall an inspection has

Wind turbine inspection Waardtocht 4 WTG 15976

Date: 11-11-2015 Page 18 of 20

8 Hydraulics outside the hub

ok

9 Blade bearings Minor pollution with grease from the blade bearings.

nok

Low

10 Blade covers One cover is starting to open.

nok

Low

11 Blades overview Green pollution visible on the surface of the blades.

Protective tape at the leading edge of the blades is damaged (arrows).

nok

High

Page 19: Report Turbine inspection WTG 15976, Waardtocht 4...Wind turbine inspection Waardtocht 4 WTG 15976 Date: 11-11-2015 Page 3 of 20 1 Purpose On behalf of Vattenfall an inspection has

Wind turbine inspection Waardtocht 4 WTG 15976

Date: 11-11-2015 Page 19 of 20

12 Miscellaneous A bolt is missing in the plate of blade A.

Protective sleeve of the piston of blade B is damaged.

Lightning cable of blade C is damaged.

nok

Low

Page 20: Report Turbine inspection WTG 15976, Waardtocht 4...Wind turbine inspection Waardtocht 4 WTG 15976 Date: 11-11-2015 Page 3 of 20 1 Purpose On behalf of Vattenfall an inspection has

Wind turbine inspection Waardtocht 4 WTG 15976

Date: 11-11-2015 Page 20 of 20

17 Conclusion

The logbook shows that the turbine and the transformer have been maintained on a regular basis, according to

the maintenance schedule of Vestas.

The gearbox has been exchanged in 2007. There are no indications that the generator has been replaced and

the bearings of the generator are replaced in 2014.

The link and sliding bearings of the pitch cylinders have been replaced in 2015.

The protective tape on the leading edge of the blades is damaged at all three blades.

The overall condition of the turbine is quite acceptable for a twelve year old turbine. There are however several

issues (marked as nok in this report) present and it is recommended to solve these, in order to improve the

condition of the turbine.

D. Lagerweij

11-11-2015

TeSuCon B.V.

Mercuriusweg 8 3771NC Barneveld +31610032858 [email protected] www.tesucon.nl

Page 21: Report Turbine inspection WTG 15976, Waardtocht 4...Wind turbine inspection Waardtocht 4 WTG 15976 Date: 11-11-2015 Page 3 of 20 1 Purpose On behalf of Vattenfall an inspection has

16-11-2015

Report Gearbox inspection

WTG 15976, Waardtocht 4

Report no. V662015086

Page 22: Report Turbine inspection WTG 15976, Waardtocht 4...Wind turbine inspection Waardtocht 4 WTG 15976 Date: 11-11-2015 Page 3 of 20 1 Purpose On behalf of Vattenfall an inspection has

Gearbox inspection Waardtocht 4 WTG 15976

Date: 16-11-2015 Page 2 of 14

Contents

1. Purpose ............................................................................................................. 3

2. General Information .......................................................................................... 3

3. Reporting setup ................................................................................................. 4

4. Inspection results ............................................................................................. 5

5. Summary ......................................................................................................... 14

6. Conclusion ....................................................................................................... 14

Page 23: Report Turbine inspection WTG 15976, Waardtocht 4...Wind turbine inspection Waardtocht 4 WTG 15976 Date: 11-11-2015 Page 3 of 20 1 Purpose On behalf of Vattenfall an inspection has

Gearbox inspection Waardtocht 4 WTG 15976

Date: 16-11-2015 Page 3 of 14

1. Purpose

On behalf of Vattenfall an inspection has been executed on the wind turbine gearbox. The

purpose of the inspection is to determine the technical state of the gearbox. The visual

inspection of the gearbox has been executed with a GE Everest XLG3 Videoscoop.

2. General Information

Turbine Information

Wind turbine name: Waardtocht 4

Wind turbine type: V66 – 1750KW – 690V/50HZ – R7035

Wind turbine serial no: 15976

Location: Middenmeer

Hub height: 78

Total production [kWh]: 20439703

Total hours: 45201

Nominal power [kW]: 1750

Year of installation: 2003

Date of inspection: 02-11-2015

Inspectors:

P. den Braber

D. Lagerweij

B. van de Braak

J. Langenbach

Gearbox Information

Gearbox type: Winergy PEAB 4395 i = 78,659

Gearbox serial number: 4809519 – 0020 - 4

Production year gearbox: 2006

Revision: -

Revision number: -

Oil type: Castrol Alphasyn PG 320

Date of last oil change: Gearbox exchange date

Gearbox has been exchanged on 29-01-2007

Page 24: Report Turbine inspection WTG 15976, Waardtocht 4...Wind turbine inspection Waardtocht 4 WTG 15976 Date: 11-11-2015 Page 3 of 20 1 Purpose On behalf of Vattenfall an inspection has

Gearbox inspection Waardtocht 4 WTG 15976

Date: 16-11-2015 Page 4 of 14

3. Reporting setup

The next drawing shows a cross-section of a planetary gearbox with two linear stages with

corresponding bearing positions. The drawing should be used as a reference for the bearing

position only.

Page 25: Report Turbine inspection WTG 15976, Waardtocht 4...Wind turbine inspection Waardtocht 4 WTG 15976 Date: 11-11-2015 Page 3 of 20 1 Purpose On behalf of Vattenfall an inspection has

Gearbox inspection Waardtocht 4 WTG 15976

Date: 16-11-2015 Page 5 of 14

4. Inspection results

Picture 1

Picture 1 shows bearing position no. 1, the bearing of the planet carrier at rotor side. Line of

damage is visible on the inner ring.

Picture 2

Picture 2 shows the bearing of the first planet wheel. No irregularities.

Page 26: Report Turbine inspection WTG 15976, Waardtocht 4...Wind turbine inspection Waardtocht 4 WTG 15976 Date: 11-11-2015 Page 3 of 20 1 Purpose On behalf of Vattenfall an inspection has

Gearbox inspection Waardtocht 4 WTG 15976

Date: 16-11-2015 Page 6 of 14

Picture 3

Picture 3 shows the bearing of the second planet wheel. No irregularities.

Picture 4

Picture 4 shows the bearing of the third planet wheel. No irregularities.

Page 27: Report Turbine inspection WTG 15976, Waardtocht 4...Wind turbine inspection Waardtocht 4 WTG 15976 Date: 11-11-2015 Page 3 of 20 1 Purpose On behalf of Vattenfall an inspection has

Gearbox inspection Waardtocht 4 WTG 15976

Date: 16-11-2015 Page 7 of 14

Picture 5

Picture 5 shows bearing position no. 5, the bearing of the planet carrier at generator side. The

bearing shows no irregularities.

Picture 6

Picture 6 shows bearing position no. 6, the bearing of the low speed shaft at rotor side. The

bearing shows no irregularities.

Page 28: Report Turbine inspection WTG 15976, Waardtocht 4...Wind turbine inspection Waardtocht 4 WTG 15976 Date: 11-11-2015 Page 3 of 20 1 Purpose On behalf of Vattenfall an inspection has

Gearbox inspection Waardtocht 4 WTG 15976

Date: 16-11-2015 Page 8 of 14

Picture 7

Picture 7 shows bearing position no. 7, the bearing of the low speed shaft at generator side.

Damage is visible on the inner ring.

Picture 8

Picture 8 shows bearing position no. 9, the bearing of the intermediate shaft at generator side.

The bearing shows no irregularities.

Page 29: Report Turbine inspection WTG 15976, Waardtocht 4...Wind turbine inspection Waardtocht 4 WTG 15976 Date: 11-11-2015 Page 3 of 20 1 Purpose On behalf of Vattenfall an inspection has

Gearbox inspection Waardtocht 4 WTG 15976

Date: 16-11-2015 Page 9 of 14

Picture 9

Picture 9 shows bearing position no. 11, the bearing of the high speed shaft at generator side.

The bearing shows no irregularities.

Picture 10

Picture 10 shows the active flank of the ring gear. No irregularities.

Page 30: Report Turbine inspection WTG 15976, Waardtocht 4...Wind turbine inspection Waardtocht 4 WTG 15976 Date: 11-11-2015 Page 3 of 20 1 Purpose On behalf of Vattenfall an inspection has

Gearbox inspection Waardtocht 4 WTG 15976

Date: 16-11-2015 Page 10 of 14

Picture 11

Picture 11 shows one of the planet wheels. None of the planet wheels show irregularities.

Picture 12

Picture 12 shows the active flanks of the sun pinion. No irregularities.

Page 31: Report Turbine inspection WTG 15976, Waardtocht 4...Wind turbine inspection Waardtocht 4 WTG 15976 Date: 11-11-2015 Page 3 of 20 1 Purpose On behalf of Vattenfall an inspection has

Gearbox inspection Waardtocht 4 WTG 15976

Date: 16-11-2015 Page 11 of 14

Picture 13

Picture 13 shows the active flanks of the wheel of the low speed shaft in the linear stage. No

irregularities.

Picture 14

Picture 14 shows the active flanks of the pinion of the intermediate shaft in the linear stage.

No irregularities.

Page 32: Report Turbine inspection WTG 15976, Waardtocht 4...Wind turbine inspection Waardtocht 4 WTG 15976 Date: 11-11-2015 Page 3 of 20 1 Purpose On behalf of Vattenfall an inspection has

Gearbox inspection Waardtocht 4 WTG 15976

Date: 16-11-2015 Page 12 of 14

Picture 15

Picture 15 shows the active flanks of the wheel of the intermediate shaft in the linear stage. No

irregularities.

Picture 16

Picture 16 shows the active flanks of the pinion of the high speed shaft in the linear stage. No

irregularities.

Page 33: Report Turbine inspection WTG 15976, Waardtocht 4...Wind turbine inspection Waardtocht 4 WTG 15976 Date: 11-11-2015 Page 3 of 20 1 Purpose On behalf of Vattenfall an inspection has

Gearbox inspection Waardtocht 4 WTG 15976

Date: 16-11-2015 Page 13 of 14

Picture 17

Picture 17 shows the oil level of the gearbox.

Picture 18

Picture 18 shows the place for the magnet of the gearbox. The magnet is missing in this

gearbox.

Page 34: Report Turbine inspection WTG 15976, Waardtocht 4...Wind turbine inspection Waardtocht 4 WTG 15976 Date: 11-11-2015 Page 3 of 20 1 Purpose On behalf of Vattenfall an inspection has

Gearbox inspection Waardtocht 4 WTG 15976

Date: 16-11-2015 Page 14 of 14

5. Summary

The bearing of the planet carrier at rotor side shows a line of damage on the inner ring.

The bearing of the low speed shaft at generator side shows damage on the inner ring.

The magnet in this gearbox is missing.

6. Conclusion

The condition of the gearbox is good enough to keep the gearbox in operation. The

irregularities at bearing position 1 and 7 are remarkable and it is recommended to keep

monitoring these bearings closely in the future. It is not possible to replace the bearings

without dismounting the complete gearbox.

It is also recommended to mount the original magnet in the gearbox.

Dennis Lagerweij

Barneveld, 16-11-2015

TeSuCon B.V.

Mercuriusweg 8

3771NC Barneveld

The Netherlands

Tel +31610032858

Email [email protected]

Web www.tesucon.nl