Guide to Microwave project Installation Materials Survey V1.3 for internal use only Adaptive Region Overseas regional divisions Product Name Microwave products Target Readers Survey and Configuration engineer Document Version 1.3 Compile Dept. Optical Network Engineering Dept Product Version Adaptive Products Microwave Products OptiX RTN 610&620&605, RTN910&950 Guide to Microwave Project Installation Materials Survey V1.3 Prepared by: Date Reviewed by: Date Reviewed by: Date Approved by: Date 2022-5- 15 Huawei Confidential. No disclosure without permission. Page 1 of 19

Upload: julio-jose-villa-guerrero

Post on 21-Feb-2015

204 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Report_Guide to Microwave Project Installation Materials Survey-20090728-B-1.3

Guide to Microwave project Installation Materials Survey V1.3

for internal use only

Adaptive Region

Overseas regional divisionsProduct Name

Microwave products

Target Readers

Survey and Configuration engineer

Document Version

1.3

CompileDept.

Optical Network Engineering Dept

Product Version

Adaptive Products

Microwave Products OptiX RTN 610&620&605, RTN910&950

Guide to Microwave Project

Installation Materials Survey V1.3

Prepared by: Date

Reviewed by: Date

Reviewed by: Date

Approved by: Date

Huawei Technologies Co, LtdAll Rights Reserved

2023-4-10 Huawei Confidential. No disclosure without permission.

Page 1 of 15

Page 2: Report_Guide to Microwave Project Installation Materials Survey-20090728-B-1.3

Guide to Microwave project Installation Materials Survey V1.3

for internal use only

Revision Records

DateRevised version

Description Author

2007-3-28 1.0 First draft was complete. Tianwei 62869Lixiansong 43672

2008-11-20 1.2 Detailed installation materials survey Lixiansong 436722009-7-28 1.3 Add PVC pipe Survey Lixiansong 43672

2023-4-10 Huawei Confidential. No disclosure without permission.

Page 2 of 15

Page 3: Report_Guide to Microwave Project Installation Materials Survey-20090728-B-1.3

Guide to Microwave project Installation Materials Survey V1.3

for internal use only

Contents

Chapter 1 Installation materials Survey Description.......................................................................41.1. About Microwave survey..................................................................................................41.3. Preparations for Survey...................................................................................................4

1.3.1. Liaison Meeting for survey......................................................................................41.3.2. Contract information.................................................................................................41.3.3. Prepare documentation............................................................................................51.3.4. Prepare tools.............................................................................................................5

1.3. Onsite Survey....................................................................................................................51.4. Survey report making.......................................................................................................5

Chapter 2 Guide to make Installation Materials survey report........................................................62.1. Cover..................................................................................................................................6

2.1.1. Customer Name.........................................................................................................62.1.3. Contract No................................................................................................................62.1.3. Quotation No.............................................................................................................62.1.4. Contact Ways............................................................................................................7

2.2. Engineering Site Catalog.................................................................................................72.2.1. Sites Name.................................................................................................................72.2.2. Equipment Type........................................................................................................72.2.3. Engineering Type......................................................................................................82.2.4. Survey phase.............................................................................................................8

2.3. Site Survey Information....................................................................................................82.3.1. Site information.........................................................................................................92.3.2. Installation materials................................................................................................9

1) IDU installation mode...........................................................................................................102) Height of the new rack/cabinet (mm)...............................................................................113) Floor height (mm).................................................................................................................12

2.3.3. IF cable and E1 cable survey.................................................................................121) Total length of IF cable/feeder (m)....................................................................................122) Resistance of 2 Mbit/s trunk cable...................................................................................133) 2M trunk cable length (m)...................................................................................................13

2.3.4. Power and ground Cable length............................................................................131) Power type..............................................................................................................................132) Power cable length...............................................................................................................13After the IDU installation position is determined, estimate the length of the power cable when it is connected to the connection box..................................................................................133) Grounding cable length (m)...............................................................................................13

2.3.5. Other Modules (for new add).................................................................................141) New UPM Model(220V to 48V)?..................................................................................142) UPM installation mode.........................................................................................................143) AC Power cable length........................................................................................................14

2023-4-10 Huawei Confidential. No disclosure without permission.

Page 3 of 15

Page 4: Report_Guide to Microwave Project Installation Materials Survey-20090728-B-1.3

Guide to Microwave project Installation Materials Survey V1.3

for internal use only

Chapter 1 Installation materials Survey Description

1.1. About Microwave survey

Microwave includes three type survey, and Installation survey will be described detailed.

1, Installation Materials survey

Installation Materials survey plays a very important role in a project. An accurate, detailed

and valuable survey report not only provides very important basis for correct goods

delivery of Huawei, but also gives important data and reference information for subsequent

engineering design, suite delivery and project construction.

2, Site survey

To establish precise geographic positions (coordinates) and ground elevations of proposed

sites, later used in radio frequency interference(RFI) calculations and frequency

coordination activities;

To determine tower conditions, tower heights, the minimum and maximal available

antenna height, whether there are obstacles or not around the tower;

3, LOS survey (Line Of Sight)

Surveyor performs the survey of microwave transmission paths to accomplish the following

important objectives:

To verify the “free-space” transmission conditions (i.e., sufficient clearances) can satisfy

with the proposed path, Line Of Sight, whether there are obstructions along the path, and

the obstacles heights;

To identify any potential sources of reflections, either on-path or off-path, which could

interfere with normal operation of the radio link;

1.2. Preparations for Survey

1.2.1. Liaison Meeting for survey

Prior to the field verification survey, the PM of Huawei and the surveyors shall have a

meeting together with the customer. The purposes and schedule of the survey should be

defined clearly on this liaison meeting.

1.2.2. Contract information

BOQ (Bill of quotation), materials and construction interface division, networking diagram

2023-4-10 Huawei Confidential. No disclosure without permission.

Page 4 of 15

Page 5: Report_Guide to Microwave Project Installation Materials Survey-20090728-B-1.3

Guide to Microwave project Installation Materials Survey V1.3

for internal use only

and Technical Proposal

1.2.3. Prepare documentation

Before the survey, you should prepare the following documents:

<OptiX RTN 600 Product Description>

<Microwave Installation Environment Checking Form>

<Guide to Microwave project Installation Materials Survey>

<Microwave Installation Materials Survey Report>

< Survey Checklist>

Learn the OptiX RTN 600 Product Description to know the specifications, hardware

features, and installation preparations of the OptiX RTN 600. The knowledge helps survey

engineers to obtain comprehensive information of survey sites and to provide a high-

quality survey report.

1.2.4. Prepare tools

Here following are the tools for the site survey:

S/N Tools Description Remark

1 Laptop With Pathloss link budget calculation software or equivalent.

Optional

2 Tapeline To measure the dimension of equipment room or cable tray/bridge length.

Compulsory

3 Digital Camera To snap the tower profile, to snap facing the opposite site to check the near zone clearance.

Optional

4 Rangefinder To measure the dimension of equipment room or cable tray/bridge length.

Optional

1.3. Onsite Survey

For ready sites, carry out the engineering survey. For construction data of the equipment

room, tower height, available power reservation, and other data, ask the companies from the

customer. For other data, make a record according to the survey results. Carry out the

survey based on the requirements of the contract and the survey report. Survey carefully

every item and record data in detail to ensure everything written in the Survey Report to be

realistic.

1.4. Survey report making

Survey engineers shall provide the survey report by referring to chapter 2.

2023-4-10 Huawei Confidential. No disclosure without permission.

Page 5 of 15

Page 6: Report_Guide to Microwave Project Installation Materials Survey-20090728-B-1.3

Guide to Microwave project Installation Materials Survey V1.3

for internal use only

Chapter 2 Guide to make Installation Materials survey

report

Upon return to the home office, the surveyor should immediately begin preparation of his

report using the standard report form to insure uniformity of format and content. The

standard report should include survey information form and photographs of the site,

towers, and down-path.

2.1. Cover

Fill in the cover of a survey report correctly. A survey report includes basic information about contract, engineering, survey, and personnel.

2.1.1. Customer Name

Fill in the full name of Party A in the contract, such as Posts and Telecom Materials Parent Company in Jilin Province. Note that Party A may not be the final user.

2.1.2. Contract No.

Please fill in the contract No. correctly.Example of a contract No.: 0710510506150A.

2.1.3. Quotation No.

Fill in the final contract quotation number of an office corresponding to the data in the survey report, and you can get Quotation list from requisition for engineering survey.

2023-4-10 Huawei Confidential. No disclosure without permission.

Page 6 of 15

Page 7: Report_Guide to Microwave Project Installation Materials Survey-20090728-B-1.3

Guide to Microwave project Installation Materials Survey V1.3

for internal use only

2.1.4. Contact Ways

The cover of the survey report includes such related information as the customer name (or regional offices), telephone number, fax, and contact person, which must be filled in the electronic survey report returned to Huawei.

2.2. Engineering Site Catalog

Normally, a contract includes multiple sites and one survey report may only include part of the sites mentioned in the contract, so a survey report should provide the number of surveyed sites.

2.2.1. Sites Name

The site name in the survey report must be the same as that in the quotation. If the actual site name is different from that in the quotation, clearly write the site name in the quotation just after the actual site name. For example, the actual site name is "SITE A" and the site name in the quotation is "SITE X". When filling in the survey report, write "SITE A (SITE X)" at every place where the name of the site is mentioned.

2.2.2. Equipment Type

The information of the RTN 600 must be clearly stated, including the specification (SDH/PDH) and capacity. The RTN 600 is available in two types, RTN 610 and RTN 620.

2023-4-10 Huawei Confidential. No disclosure without permission.

Page 7 of 15

Page 8: Report_Guide to Microwave Project Installation Materials Survey-20090728-B-1.3

Guide to Microwave project Installation Materials Survey V1.3

for internal use only

RTN 610

RTN 620

2.2.3. Engineering Type

The “new”, “expansion” and “reconstructed” project types are available.

2.2.4. Survey phase

“Previous survey”, “current survey”, “next survey” and “needn’t survey” are available. Please write down the reason when selecting “needn’t survey”.

2.3. Site Survey Information

The site information includes the basic information of a microwave site, the indoor condition, the outdoor condition, and various figures. The figures include the indoor cabling diagram of the microwave site, the installation position of the equipment (photo or drawing), the outdoor cabling diagram of the microwave site, the location and height of the feeder hole (photo or drawing), and the outdoor spacing of the microwave site (photo or drawing). The data must be carefully collected and recorded to guarantee that the project can be smoothly carried out.

2023-4-10 Huawei Confidential. No disclosure without permission.

Page 8 of 15

Page 9: Report_Guide to Microwave Project Installation Materials Survey-20090728-B-1.3

Guide to Microwave project Installation Materials Survey V1.3

for internal use only

2.3.1. Site information

1, Hop Name or DescriptionHop Name or Description, 1 hop includes 2 sites. Please write down the hop name or description, if you survey by hop.1 hop includes 2 sites.2, Site nameThe detailed location of a site must be provided, including the street name, building name, and building number. If possible, the site number should be provided, like 404H and 418L. In this way, one can clearly know the quantity of microwave equipment sets that use the site and know whether the site is a primary site or a non-primary site.

2.3.2. Installation materials

The following is a sketch map of a Equipment room. The manufacturing and delivery information needs the data on the indoor conditions of a microwave site. Hence, the survey engineer must carefully conduct the survey and record the results according to the facts.

2023-4-10 Huawei Confidential. No disclosure without permission.

Page 9 of 15

Page 10: Report_Guide to Microwave Project Installation Materials Survey-20090728-B-1.3

Guide to Microwave project Installation Materials Survey V1.3

for internal use only

ODU&ANT

IDUIDUDDF

ODF

②2M cable

① IF cable

③Tail fiber

DCDC

④Power cable

⑤ PGND

ODU&ANT

IDUIDUDDF

ODF

②2M cable

① IF cable

③Tail fiber

DCDC

④Power cable

⑤ PGND

1) IDU installation mode

An IDU can be installed on a desk, on the wall, in a 19-inch rack, or in an ETSI cabinet. Select an installation mode according to the situation in the equipment room of the site.

quadrant elevationquadrant elevationquadrant elevation

19inch width=483mm

quadrant elevationquadrant elevationquadrant elevation

19inch width=483mm

installed in a 19-inch rack

2023-4-10 Huawei Confidential. No disclosure without permission.

Page 10 of 15

Page 11: Report_Guide to Microwave Project Installation Materials Survey-20090728-B-1.3

Guide to Microwave project Installation Materials Survey V1.3

for internal use only

quadrant elevationquadrant elevationquadrant elevation

ETSI width=515mm

quadrant elevationquadrant elevationquadrant elevation

ETSI width=515mm

installed in a ETSI cabinet

installed on the wall,

installed on a desk

2) Height of the new rack/cabinet (mm)

If new cabinets/racks are to be added, specify this item. Otherwise, skip this item.

2023-4-10 Huawei Confidential. No disclosure without permission.

Page 11 of 15

Page 12: Report_Guide to Microwave Project Installation Materials Survey-20090728-B-1.3

Guide to Microwave project Installation Materials Survey V1.3

for internal use only

3) Floor height (mm)

If new cabinets/racks are to be added, specify this item. Otherwise, skip this item.The purpose is to check if the antistatic floor is installed in the equipment room. If not, Huawei will not ship the support unless the customer requires it. If yes, fill the height of the antistatic floor from the cement floor to the upper surface of the antistatic floor in the survey report. The survey engineer is required to use a steel rule to measure the height at the place where the rack will be installed in person.Check if there are cables, holes or other obstacles at the place where the rack will be installed. If yes, report them to the customer and coordinate with the customer to solve the problems for the convenience of equipment installation.The height of the antistatic floor refers to the vertical distance between the cement floor and the upper surface of the antistatic floor.

2023-4-10 Huawei Confidential. No disclosure without permission.

Page 12 of 15

Page 13: Report_Guide to Microwave Project Installation Materials Survey-20090728-B-1.3

Guide to Microwave project Installation Materials Survey V1.3

for internal use only

2.3.3. IF cable and E1 cable survey

1) Total length of IF cable/feeder (m)

Estimate the length of the IF cable in the equipment room (with a slack of 5%) and check if the total length of the IF cable (indoors and outdoors) is not longer than 300 meters. In the OptiX RTN 600, the IF cable can only be a maximum of 300 meters. When the total length of the IF cable does not exceed 300 meters, check the route of the IF cable in the equipment room. In addition, check if all turns of the IF cable meet the required bending radius. If not, re-design the route of the IF cable in the equipment room.

2) Resistance of 2 Mbit/s trunk cable

Check whether the impedance of the 2 Mbit/s trunk cable that already exists in the equipment room is 75 ohm or 120 ohm. Depending on the survey result, decide the impedance of the 2 Mbit/s trunk cable to be used in the OptiX RTN 600. The impedance of the 2 Mbit/s trunk cable may be 75 ohm or 120 ohm. Which impedance will be used is decided by the survey result.

3) 2M trunk cable length (m)

After the IDU installation position is determined, estimate the length of the 2M trunk cable when it is connected to the corresponding port.

2.3.4. Power and ground Cable length

1) Power type

Follow the steps below to check the power type:a) Check if the base station uses the mains supply. If not, make a detailed record. b) Check the voltage of the AC power in the equipment room. If the voltage is not 220 V (Huawei product uses the 220 V AC), make a record.c) Check if the number of the unused output terminals on the AC distribution cabinet meets the requirement of this project.d) Check the input and output voltages of the DC power supply in the equipment room. If the output DC voltage is not between -48 V and -72 V, deliver the DC power

2023-4-10 Huawei Confidential. No disclosure without permission.

Page 13 of 15

Page 14: Report_Guide to Microwave Project Installation Materials Survey-20090728-B-1.3

Guide to Microwave project Installation Materials Survey V1.3

for internal use only

supply that can be used in the OptiX RTN 600 (the normal working voltage of the OptiX RTN 600 is between -48 V and -72 V) when delivering the equipment. e) If the output DC voltage meets the power requirement of the OptiX RTN 600, check if the number of the unused output terminals on the DC distribution cabinet meets the requirement of this project.f) Check if the available power capacity in the equipment room meets the requirement of future equipment upgrades.The power type may be -48/-60 V DC, +24 V DC, 110/220 V AC, or others. If you fill "others", provide the exact power type.

2) Power cable length

After the IDU installation position is determined, estimate the length of the power cable when it is connected to the connection box.

3) Grounding cable length (m)

After the IDU installation position is determined, estimate the length of the grounding cable between the IDU and the reasonable and effective grounding point.

2.3.5. Other Modules (for new add)

1) New UPM Model(220V to 48V)?

Select "yes" or "no" according to the actual configuration situation.

2) UPM installation mode

An UPM can be installed on a desk, on the wall, in a 19-inch rack, or in an ETSI cabinet. Select an installation mode according to the situation in the equipment room of the site.

3) AC Power cable length

Fill the AC power cable length of UPM from UPM to AC power supply.

2.3.6. Path cord survey

1) Peer-end connector type of the Patch cords

Select the Peer-end connector type according to the actual configuration situation, the type of LC/PC is defaulted.

2) Patch cords length (m)

Delivery according to the quotation length (10m), please fill the actual length if you have special request.

2023-4-10 Huawei Confidential. No disclosure without permission.

Page 14 of 15

Page 15: Report_Guide to Microwave Project Installation Materials Survey-20090728-B-1.3

Guide to Microwave project Installation Materials Survey V1.3

for internal use only

3) PVC pipe length

PVC pipe is not delivery by default, if you need, please fill the length of PVC pipe.

2023-4-10 Huawei Confidential. No disclosure without permission.