reprint 879 application of satellite rain rate estimates ... · for the tc tracks, the hko’s...

23
Reprint 879 Application of Satellite Rain Rate Estimates to the Prediction of Tropical Cyclone Rainfall S.T. Chan & M.Y. Chan The 42 th Session of ESCAP/WMO Typhoon Committee, Singapore, 25-29 January 2010

Upload: others

Post on 09-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Reprint 879 Application of Satellite Rain Rate Estimates ... · For the TC tracks, the HKO’s subjective forecast tracks are used, which include the hourly forecast positions in

Reprint 879

Application of Satellite Rain Rate Estimates to the

Prediction of Tropical Cyclone Rainfall

S.T. Chan & M.Y. Chan

The 42th Session of ESCAP/WMO Typhoon Committee,

Singapore, 25-29 January 2010

Page 2: Reprint 879 Application of Satellite Rain Rate Estimates ... · For the TC tracks, the HKO’s subjective forecast tracks are used, which include the hourly forecast positions in

1

Application of Satellite Rain Rate Estimates to the Prediction of Tropical Cyclone Rainfall

Chan Sai-tick and Chan Man-yee

Hong Kong Observatory

Abstract A major calamity brought by typhoon is the flooding due to heavy rain. In the lecture, a new forecasting tool which combines subjective tropical cyclone forecast tracks with satellite rain rate estimates to generate point and areal rainfall predictions associated with tropical cyclones will be introduced. Here, the rain rate estimates are extracted from the QMORPH precipitation analyses supplied by the Climatic Prediction Center of NOAA in near real time.

Performance of the technique based on selected cases of tropical cyclones which affected Hong Kong in 2008 and 2009 and Hong Kong Observatory’s subjective forecast tracks will be shown. The potential application of EPS TC track information in the technique to generate both deterministic and probabilistic predictions will also be discussed.

Page 3: Reprint 879 Application of Satellite Rain Rate Estimates ... · For the TC tracks, the HKO’s subjective forecast tracks are used, which include the hourly forecast positions in

2

1. Introduction

Apart from bringing high winds, tropical cyclones (TCs) also cause torrential rain, leading to calamities like floods and landslides. An accurate analysis and prediction of precipitation association with TC is essential to the timely issuance of warnings. Due to the scarcity of direct observations of precipitation over the ocean, the remote sensing equipment is indispensable to forecasters in estimating the amount of rainfall accompanying a TC. Among the remote sensing observations, radar reflectivity demonstrates good correlation with the actual rain rates and its spatial resolution is also high. Yet the radars are only useful when the TCs are close enough to the radar sites. For satellites, the passive microwave channel signals detected by the polar-orbiting satellites could generate high quality and high resolution rain rate estimates, though the update frequency of once to twice a day is still inadequate. The infra-red (IR) observations from the geostationary satellites are updated much more frequently (e.g., twice an hour for MTSAT-1R), but the cloud top temperatures deduced from IR channels are less correlated with the rain rates. Combining the advantages of both types of satellite observations, high quality, high spatiotemporal resolution rainfall analysis products can be made. Notable examples include the CMORPH/QMORPH products from the Climate Prediction Centre (CPC) of NOAA (Joyce et al. 2004), the TRMM Multi-satellite Precipitation Analysis (TMPA) by NASA (Huffman et al. 2009), the blended satellite technique by the Naval Research Laboratory (NRL), Monterey of the Naval Postgraduate School (Turk and Hawkins 2004), the PERSIANN (Precipitation Estimation from Remotely Sensed Information using Artificial Neural Networks) analyses by the University of California, Irvine (Sorooshian et al. 2000) and the GSMaP (Global Satellite Mapping of Precipitation) products developed by the Japan Aerospace Exploration Agency (JAXA) (Aonashi et al. 2009).

The Hong Kong Observatory (HKO) has developed an operational

point and areal TC rainfall forecasting tool by combining the subjective TC forecast track and the satellite microwave rain rate analysis. Attempts have also been made to utilize the ensemble prediction system (EPS) TC tracks to generate deterministic and probabilistic predictions of TC rainfall. 2. TC rainfall prediction based on satellite rain rate estimates

2.1 Data and methodology

Sapiano and Arkin (2009) evaluated a number of rainfall analysis products by using the rain gauge data collected over the US continent and

Page 4: Reprint 879 Application of Satellite Rain Rate Estimates ... · For the TC tracks, the HKO’s subjective forecast tracks are used, which include the hourly forecast positions in

3

the Pacific. They found that all of the products examined were able to resolve the diurnal variation in the regional rainfall totals. Among the others, the CMORPH products by NOAA CPC yielded the highest correlation with rain gauge observations. The CMORPH technique uses precipitation estimates derived from low orbiter satellite microwave observations and the motion vectors derived from consecutive IR observations from geostationary satellites. At a given location, the shape and intensity of the precipitation in the intervening time periods between microwave scans are determined by performing a time-weighted interpolation between the precipitation features propagated forward in time from the previous microwave scan and those propagated backward in time from the following microwave scan. Based on the above method, NOAA CPC produces global precipitation analyses at a spatial resolution of 8 km every half-hourly. CMORPH estimates are available about 18 hours past real time, but NOAA CPC also produces the QMORPH estimates, which are similar to CMORPH, except that the microwave precipitation features are propagated via IR data forward in time only. QMORPH estimates are available within 3 hours of real time and are therefore more suitable for use in operation. The new forecasting tool takes the hourly QMORPH estimates at 0.25-degree resolution as one of the key input data.

For the TC tracks, the HKO’s subjective forecast tracks are used, which include the hourly forecast positions in the coming 72 hours. The tracks are available within 2 hours past real time and are updated every 3 hourly whenever a TC enters the HKO warning area, viz. within 10N-30N and 105E-125E. To obtain a TC rainfall prediction, the QMORPH rain rates are advected with the forecast track to obtain the hourly forecast positions of the rain areas, from which the forecast hourly rainfall at HKO as well as the daily rainfall totals over the coast of Guangdong and the northern part of the South China Sea in the next 3 days are computed (Fig. 1). The new product is updated every hour based on the following assumptions:

(1) The rain rate analysis from QMORPH is accurate. (2) The forecast TC track is accurate. (3) The rain areas associated with the TC move in the same

direction and speed as the storm centre during the whole forecast range (72 hours).

(4) The shape and intensity of the rain areas remain unchanged during the whole forecast range.

2.2 Validation based on 2008 dataset

Validation of the new tool was made with the 6 TCs which affected

Page 5: Reprint 879 Application of Satellite Rain Rate Estimates ... · For the TC tracks, the HKO’s subjective forecast tracks are used, which include the hourly forecast positions in

4

Hong Kong in 2008 by using the 3-hourly CMORPH estimates at 0.25-degree resolution. The predictions from the tool were verified against the observed rainfall at HKO, and compared with the corresponding predictions from the deterministic system of the European Centre for Medium-Range Weather Forecasts (ECMWF) and the Global Spectral Model (GSM) of the Japan Meteorological Agency (JMA).

Verification results showed that for the cases of Typhoon Neoguri

and Typhoon Fengshen (Table 1), the errors in the day-1 prediction of the tool were the smallest among the three forecast guidance. Besides, the new tool captured well the arrival time of the rainbands associated with Fengshen and Nuri (Figure 2).

Although the microwave-based TC rainfall prediction for 19 April

2008 was closer to actual than NWP predictions, the error was indeed very high (176.7 mm). The exceptional heavy rain was believed to be due to the interaction of Neoguri with the pre-existing northeast monsoon (Fig. 3). In general, the root mean squared error (RMSE) of the rainfall predictions increased from day 1 to day 3 (Fig. 4), the heavy rain during Neoguri was one of those cases with significant error recorded (highlighted with blue circles in Fig. 4). Negative biases were noted in the verification, in particular in day 1. This could be related to the enhancement of TC rainbands upon interaction with the terrain during the landfall phase of the TCs. The biases improved in day 2 and day 3, possibly due to the counterbalancing effect of the diminishing supply of moisture when the TCs were approaching land. Based on the validation results obtained above, the new tool was put into operation at HKO in the 2009 TC season.

2.3 Case studies using 2009 data Verification of point forecasts

Verification of the new product was made against the observed rainfall at HKO for all 8 TC cases which affected Hong Kong in 2009. Same as before, comparison was made with the corresponding predictions from the global models of ECMWF and JMA. The results given in Table 2 show that out of the 8 cases, the errors of the new product for day 1 during Severe Tropical Storm Linfa, Tropical Storm Soudelor and Typhoon Molave were the lowest among all three forecast guidance. Besides, the new product successfully predicted the arrival time of Typhoon Molave’s rainbands in Hong Kong (Fig. 5).

The new product failed to predict the heavy rain brought by Typhoon

Page 6: Reprint 879 Application of Satellite Rain Rate Estimates ... · For the TC tracks, the HKO’s subjective forecast tracks are used, which include the hourly forecast positions in

5

Koppu on 15 September 2009. An analysis of the synoptic weather pattern on that day suggested that an easterly airstream had converged with the southerly flow associated with Koppu near Hong Kong and caused the heavy rain (Fig. 6). The forecast rainfall map actually showed that the rain areas would be getting close to Hong Kong (Fig. 7), should there exist a slight error in the forecast track or the rain rate analysis, heavy rain could have affected Hong Kong.

The RMSE of the new product increased with the forecast range (Fig.

8) and the rate of increase was even speedier than the validation dataset in 2008. This is not surprising as the TC forecast tracks used in the derivation of the rainfall forecasts would increasingly deviate from actual as the forecast hour progresses. Tropical Storm Nangka and Severe Tropical Storm Goni are examples in which large errors in the forecast track have led to significant errors (red circles in Fig. 8 and Fig. 9). In general, the 2009 verification showed that the rainfall amounts for the first two days were under-estimated as in 2008, but the negative biases have been much improved for day 2. The predictions for day 3 even gave more rain than actual, due to the significant over-predictions in the cases of Tropical Storm Nangka and Severe Tropical Storm Goni. Verification of areal forecasts The capability of the new tool in forecasting areal rainfall was examined with the case of Tropical Storm Soudelor. On 10 July 2009, the rainbands associated with Soudelor were affecting the northern part of the South China Sea, at a distance away from the south China coastal region. The coverage of the rain areas associated with Soudelor was well captured by the forecast rainfall map with base time at 12 UTC, 9 July 2009 (Fig. 10a). Soudelor’s rainbands arrived at Hong Kong and the south China coastal region the next day, and that was also well predicted by the new tool (Fig. 10b). On the third day, the tool successfully predicted that the major rainbands of Soudelor would move away from Hong Kong and the eastern part of Guangdong and bring torrential rain in excess of 100 mm to Hainan Island (Fig. 10c). On the other hand, ECMWF and JMA predicted a slower than actual movement for Soudelor, resulting in the failure of the models in correctly predicting the rain areas on day 1 and day 2, as well as the torrential rain that followed on day 3 on Hainan Island (Fig. 11). 3. Ensemble rainfall prediction incorporating EPS information 3.1 Data and methodology

Page 7: Reprint 879 Application of Satellite Rain Rate Estimates ... · For the TC tracks, the HKO’s subjective forecast tracks are used, which include the hourly forecast positions in

6

Attempts have been made to combine the microwave rain rates with

the forecast TC tracks output from an EPS. The 0.25-degree resolution CMOPRH estimates and the 51 forecast TC tracks from the ECMWF EPS were used in the experiments. The forecast tracks include 12-hourly forecast positions up to T+120 hours. The following two approaches were tested in the derivation of rainfall predictions:

(1)Ensemble rainfall approach

51 rainfall maps are produced using each of the 51 forecast tracks from the ECMWF EPS, and then a final forecast map is produced by averaging the 51 maps. In addition, the probability of rainfall totals exceeding various thresholds can also be obtained based on the 51 forecast maps.

(2)Ensemble track approach

An ensemble TC track is first computed by taking the geographical average of all 51 forecast tracks and then a forecast map is obtained by advecting the microwave rain rates along the ensemble track. 3.2 Evaluation The performance of the ensemble predictions was evaluated using the same 6 cases which affected Hong Kong in 2008. Point deterministic forecast

Predictions from the ensemble rainfall approach and ensemble track approach were verified against the observed rainfall at HKO (Table 3). The results showed that the performance of both approaches were comparable for day 1 and day 2, but the errors for day 3 were smaller and correlation with actual higher for the ensemble rainfall approach. When compared with the point forecasts derived using the best track dataset in Section 2.3 above (Fig. 4), the day-3 errors of the ensemble rainfall approach were also smaller, which demonstrated the benefits of introducing perturbations in the forecast track to the tool. However, due to the smoothing resulted from taking average of the 51 forecast maps in the ensemble rainfall approach, a lot more light rain areas were generated when compared with the ensemble track approach (Fig. 12). Due to the same reason, the peak rainfall rates were also smaller in the ensemble rainfall approach.

Areal probability forecast

Verification was made of the probability forecasts derived from the

Page 8: Reprint 879 Application of Satellite Rain Rate Estimates ... · For the TC tracks, the HKO’s subjective forecast tracks are used, which include the hourly forecast positions in

7

ensemble rainfall approach with the verification domain defined to be within 12.8N-30.2N and 102.8E-127.7E. CMORPH estimates were taken as the ground truth for the purpose of verification. The results (Fig. 13) revealed that the ensemble method generally over-estimated the probability of rainfall reaching various rainfall thresholds in day 1. Besides, the forecast skill dropped rapidly as the rainfall threshold increased from 50 mm to 200 mm.

4. Discussion and conclusions The verification results showed that, given the assumptions made in Section 2.1, point and areal rainfall predictions based on microwave rain rates deliver satisfactory performance, even beating the NWP models in individual cases. As hourly rainfall amounts can be generated, the new product could more effectively assist the forecasters in assessing when the rain associated with TC would start or cease. The new product will particularly be useful when the TC motion predicted by NWP models deviates from the official forecast. With a forecast update available every hour at about 3 hours after observation time, the new tool will be able to capture the latest developments more rapidly than NWP models. Nevertheless, the following limitations of the new product should be noted:

(1)it has been assumed that the rain areas associated with the TC will move in tandem with the storm. Rotation of rainbands around the TC centre have not been considered;

(2) the shape and intensity of the rainbands may actually change with the intensity of the TC within the forecast horizon;

(3)the interaction between the TC and other weather systems has not been taken into account, in particular the interaction of TC with frontal systems will enhance the rainfall intensity whereas cold air intrusion into the TC will weaken it;

(4)the tool has not considered the impact on rainfall intensity due to the interaction of TC with the land mass.

As the forecast hour increases, the assumptions made in the tool may

become less valid. The forecast position error of the TC will also increase. As such, the skill of the tool may drop significantly in day 2 and day 3. In the attempt to extend the tool to incorporate EPS information, we have studied two different approaches. The ensemble rainfall approach

Page 9: Reprint 879 Application of Satellite Rain Rate Estimates ... · For the TC tracks, the HKO’s subjective forecast tracks are used, which include the hourly forecast positions in

8

made less significant errors in general but the forecast peak rainfall rate was usually dampened due to the smoothing applied. Since the peak rainfall rate is one of the most critical information in TC warnings, the above limitation should be duly taken into account in operation. The verification results revealed a rapid decrease in the reliability of the probability forecasts with an increase in the rainfall threshold. This could be related to the uncertainty in the microwave-based rain rates and the rain areas associated with TC. The method that we have tested incorporates only perturbations in the motion of TCs. The introduction of perturbations in the rain rates as well as rain areas may further improve the forecast accuracy. In summary, the new TC rainfall forecasting tool based on microwave observations provides high spatial and temporal resolution prediction. It offers a useful guidance other than NWP predictions for forecasters’ reference when TCs approach the northern part of the South China Sea and Hong Kong.

Page 10: Reprint 879 Application of Satellite Rain Rate Estimates ... · For the TC tracks, the HKO’s subjective forecast tracks are used, which include the hourly forecast positions in

9

5. References [1] Joyce, R. J., J. E. Janowiak, P. A. Arkin, and P. Xie, 2004: CMORPH: A method that produces global precipitation estimates from passive microwave and infrared data at high spatial and temporal resolution. J. Hydromet., 5, 487-503.

[2] Huffman, G.J., R.F. Adler, D.T. Bolvin, E.J. Nelkin, 2009: The TRMM Multi-satellite Precipitation Analysis (TMPA). Chapter in Satellite Applications for Surface Hydrology, F. Hossain and M. Gebremichael, Eds. Springer Verlag, accepted. PDF available at ftp://meso.gsfc.nasa.gov/agnes/huffman/papers/TMPA_hydro_rev.pdf.

[3] Turk, F.J., J.D. Hawkins, 2004: Gauging Tropical Rainfall Potential with a Blended Satellite Technique. 26th Conference on Hurricanes and Tropical Meteorology, Miami, FL, 2-7 May, paper 5A.7. PDF available at http://ams.confex.com/ams/pdfpapers/76007.pdf.

[4] Sorooshian, S., K-L Hsu, X. Gao, H.V. Gupta, B. Imam, and D. Braithwaite, 2000: Evaluation of PERSIANN System Satellite–Based Estimates of Tropical Rainfall. Bull. Amer. Meteor. Soc., 81, 2035-2046.

[5] Aonashi K., J. Awaka, M. Hirose, T. Kozu, T. Kubota, G. Liu, S. Shige, S. Kida, S. Seto, N. Takahashi, and Y.N. Takayabu, 2009: GSMaP passive, microwave precipitation retrieval algorithm: Algorithm description and validation. J. Meteor. Soc. Japan, 87A, 119-136.

[6] Sapiano, M.R.P., and P.A. Arkin, 2009: An Intercomparison and Validation of High-Resolution Satellite Precipitation Estimates with 3-Hourly Gauge Data. J. Hydromet., 10, 149-166.

Page 11: Reprint 879 Application of Satellite Rain Rate Estimates ... · For the TC tracks, the HKO’s subjective forecast tracks are used, which include the hourly forecast positions in

10

Name of tropical cyclone

Date Daily Rainfall recorded

Prediction from the new tool

Prediction from

ECMWF

Prediction from JMA

17/4/2008 Trace Trace Trace Trace

18/4/2008 Trace 2.3 1.3 0.8

Neoguri

19/4/2008 237.4 60.7 19.9 4.0

23/6/2008 0 0 0 0

24/6/2008 0.6 6.9 10.9 5.3

Fengshen

25/6/2008 146.1 88.8 323.8 266.6

5/8/2008 6.1 55.4 38.2 64.7

6/8/2008 74.1 29.5 22.5 40.0

Kammuri

7/8/2008 72.3 0.2 26.5 35.0

20/8/2008 0 0 0 0.1

21/8/2008 Trace 1.7 4.7 3.0

Nuri

22/8/2008 61.6 35.4 47.4 26.5

22/9/2008 0 0 1.0 2.2

23/9/2008 34.1 23.7 26.5 30.7

Hagupit

24/9/2008 43.7 9.6 37.9 20.7

2/10/2008 3 0 0.9 0.1

3/10/2008 2.4 17.5 9.6 9.2

Higos

4/10/2008 14.0 8.9 8.2 23.0

Unit:mm

Table 1 The predicted accumulated rainfall for day 1 from the new tool and ECMWF and JMA global models and the observed amount for TCs which affected Hong Kong in 2008

Page 12: Reprint 879 Application of Satellite Rain Rate Estimates ... · For the TC tracks, the HKO’s subjective forecast tracks are used, which include the hourly forecast positions in

11

Name of tropical cyclone

Date Daily Rainfall recorded

Prediction from the new tool

Prediction from

ECMWF

Prediction from JMA

20/06/2009 0 0 Trace 43 Linfa

21/06/2009 0 0.6 5 3

26/06/2009 17.7 0 10 17 Nangka

27/06/2009 46.9 35.5 28 55

10/07/2009 Trace 0 1 1

11/07/2009 8.1 6.1 12 18

Soudelor

12/07/2009 Trace 0 5 20

17/07/2009 0.4 0 Trace 2

18/07/2009 11.7 0.2 51 34

Molave

19/07/2009 124.6 83.6 32 20

03/08/2009 21.4 0 4 4

04/08/2009 21.3 0 62 29

Goni

05/08/2009 92.5 0 61 34

10/09/2009 0.9 0 8 9 Mujigae

11/09/2009 11.8 0 16 29

13/09/2009 23.4 0 3 10

14/09/2009 38.8 56.3 52 13

Koppu

15/09/2009 190.3 0.2 25 19

27/09/2009 0 0.2 2 1 Ketsana

28/09/2009 52.7 0.2 62 68

Unit:mm

Table 2 The predicted accumulated rainfall for day 1 from the tool and ECMWF and JMA global models and the observed amount for TCs which affected Hong Kong in 2009

Page 13: Reprint 879 Application of Satellite Rain Rate Estimates ... · For the TC tracks, the HKO’s subjective forecast tracks are used, which include the hourly forecast positions in

12

Day 1 Day 2 Day 3 Approach Ensemble

rainfall Ensemble

track Ensemble rainfall

Ensemble track

Ensemble rainfall

Ensemble track

RMSE (mm)

49 49 60 61 65 75

Correlation coefficient

0.64 0.64 0.30 0.29 0.14 0.05

Table 3 Verification statistics of microwave-based TC rainfall predictions for TCs which affected Hong Kong in 2008

Page 14: Reprint 879 Application of Satellite Rain Rate Estimates ... · For the TC tracks, the HKO’s subjective forecast tracks are used, which include the hourly forecast positions in

13

Figure 1 Microwave-based TC rainfall prediction during the passage of Typhoon Molave (base time 23 UTC, 17 July 2009)

Page 15: Reprint 879 Application of Satellite Rain Rate Estimates ... · For the TC tracks, the HKO’s subjective forecast tracks are used, which include the hourly forecast positions in

14

Figure 2a Observed rainfall at HKO (red line) and corresponding hourly

predictions by microwave-based TC rainfall during the passage of Typhoon Fengshen (base time 03 UTC, 22 June 2008)

Figure 2b Observed rainfall at HKO (red line) and corresponding hourly

predictions by microwave-based TC rainfall during the passage of Typhoon Nuri (base time 18 UTC, 20 August 2008)

Figure 3 Synoptic pattern on 19 April 2008

Page 16: Reprint 879 Application of Satellite Rain Rate Estimates ... · For the TC tracks, the HKO’s subjective forecast tracks are used, which include the hourly forecast positions in

15

Figure 4 Verification of the microwave-based TC rainfall predictions in 2008

Bias = -18.6 mm RMSE = 46.5 mm

Bias = -15.6 mm RMSE = 54.3 mm

Bias = -11.5 mm RMSE = 67.0 mm

Page 17: Reprint 879 Application of Satellite Rain Rate Estimates ... · For the TC tracks, the HKO’s subjective forecast tracks are used, which include the hourly forecast positions in

16

Time

0

5

10

15

20

25

30

35

2009

0718

0220

0907

1804

2009

0718

0620

0907

1808

2009

0718

1020

0907

1812

2009

0718

1420

0907

1816

2009

0718

1820

0907

1820

2009

0718

2220

0907

1824

2009

0719

0220

0907

1904

2009

0719

0620

0907

1908

2009

0719

1020

0907

1912

2009

0719

1420

0907

1916

Rai

nfal

l (m

m)

Actual Rainfall Forecast Rainfall

Figure 5 Observed rainfall at HKO and the corresponding hourly

predictions by microwave-based TC rainfall during the passage of Typhoon Molave (base time 01 UTC, 18 July 2009)

Figure 6 Synoptic pattern on 15 September 2009

Page 18: Reprint 879 Application of Satellite Rain Rate Estimates ... · For the TC tracks, the HKO’s subjective forecast tracks are used, which include the hourly forecast positions in

17

Figure 7 Day-1 prediction from the microwave-based TC rainfall during

the passage of Typhoon Koppu (base time 16 UTC, 14 September 2009)

Page 19: Reprint 879 Application of Satellite Rain Rate Estimates ... · For the TC tracks, the HKO’s subjective forecast tracks are used, which include the hourly forecast positions in

18

Rainfall for Day 1 (T+0 to T+24)

0

50

100

150

200

250

0 50 100 150 200 250

Forecast Rainfall (mm)

Act

ual R

ainf

all (

mm

)

LINFA

NANGKA

SOUDELOR

MOLAVE

GONI

MUJIGAE

KOPPU

KETSANA

Rainfall for Day 2 (T+24 to T+48)

0

50

100

150

200

250

0 50 100 150 200 250

Forecast Rainfall (mm)

Act

ual R

ainf

all (

mm

)

Rainfall for Day 3 (T+48 to T+72)

0

50

100

150

200

250

0 50 100 150 200 250

Forecast Rainfall (mm)

Act

ual R

ainf

all (

mm

)

Figure 8 Verification of the microwave-based TC rainfall predictions in 2009

Bias = -25.3 mm RMSE = 49.5 mm

Bias = -21.0 mm RMSE = 63.0 mm

Bias = 12.5 mm RMSE = 78.2 mm

Page 20: Reprint 879 Application of Satellite Rain Rate Estimates ... · For the TC tracks, the HKO’s subjective forecast tracks are used, which include the hourly forecast positions in

19

Figure 9 The HKO best track and the forecast tracks of Tropical Storm

Nangka (top) and Severe Tropical Storm Goni (down)

HKO best track 2009080300H 2009080200H

HKO best track 2009062500H

2009062600H 2009062400H

25

26

27

28

2727

27

28

2626

02 02

03

03 04

04 050605

0607

08

09

Page 21: Reprint 879 Application of Satellite Rain Rate Estimates ... · For the TC tracks, the HKO’s subjective forecast tracks are used, which include the hourly forecast positions in

20

(a)

(b)

(c)

Figure 10 Microwave-based rainfall predictions (base time 12 UTC, 9 July 2009, left panel) and corresponding daily rainfall analyses (right panel) for (a) day-1; (b) day-2 and (c) day-3 during the passage of Tropical Storm Soudelor

Page 22: Reprint 879 Application of Satellite Rain Rate Estimates ... · For the TC tracks, the HKO’s subjective forecast tracks are used, which include the hourly forecast positions in

21

Figure 11 The synoptic pattern and 12-hour accumulated rainfall predicted by ECMWF and JMA valid at (i) 00 UTC, 12 July 2009 (top) and (ii) 12 UTC, 12 July 2009 (down)

Page 23: Reprint 879 Application of Satellite Rain Rate Estimates ... · For the TC tracks, the HKO’s subjective forecast tracks are used, which include the hourly forecast positions in

22

Figure 12 Predictions by the ensemble rainfall approach (left) and the

ensemble track approach (right) during the passage of Typhoon Nuri (base time 18 UTC, 19 August 2008)

Figure 13 Reliability diagrams for day-1 prediction by microwave-based TC rainfall for rainfall thresholds of 50 mm, 100 mm, 150 mm and 200 mm

Threshold = 150 mm 1.0

0.8

0.6

0.4

0.2

0.00.0 0.2 0.4 0.6 0.8 1.0

Probability forecast

Observed Frequency

1.0

0.8

0.6

0.4

0.2

0.0 0.0 0.2 0.4 0.6 0.8 1.0

1.0

0.8

0.6

0.4

0.2

0.00.0 0.2 0.4 0.6 0.8 1.0

1.0

0.8

0.6

0.4

0.2

0.00.0 0.2 0.4 0.6 0.8 1.0

Threshold = 50 mm Threshold = 100 mm

Threshold = 200 mm

Probability forecast

Probability forecast Probability forecast

Observed Frequency

Observed Frequency

Observed Frequency