reproductions supplied by edrs are the best that can be ... · cn. modular building institute. 2000...

35
ED 471 339 TITLE INSTITUTION PUB DATE NOTE AVAILABLE FROM PUB TYPE EDRS PRICE DESCRIPTORS ABSTRACT DOCUMENT RESUME EF 006 169 Modular Building Institute 2000 Educational Showcase. Modular Building Inst., Charlottesville, VA. 2000-00-00 34p. For full text: http://www.mbinet.org/web/magazine/ showcase.html. Collected Works General (020) EDRS Price MF01/PCO2 Plus Postage. Building Design; Educational Facilities Design; Elementary Secondary Education; Higher Education; *Mobile Classrooms; *Prefabrication; *Relocatable Facilities; School Construction; *School Expansion This publication contains brief articles concerned with modular school structures. The articles offer examples of such structures at actual schools. The articles in this issue are: (1) "Elementary K-8 Modular Courtyard"; (2) "School District #33, Chilliwack, BC"; (3) "New Elementary School for Briarwood, NY"; (4) "Addition to Queens Intermediate School"; (5) "Elementary School Addition for Patterson, NJ"; (6) "Federal Way Public Academy"; (7) "Awakening Seed School"; (8) "Challenge Charter School"; (9) "Flagstaff Montessori School"; (10) "Gateway Headstart"; (11) "J. P. Ryon Elementary School Gets Temporary Classrooms"; (12) "Hartfound County, Md. Gets New Classrooms"; (13) "Children First Daycare Center"; (14) "Central High School"; (15) "College Wood Elementary"; (16) "Private School Addition, Toronto, Ontario, Canada"; (17) "Portable Classroom, Burlington, Ontario, Canada"; (18) "Echo Shaw Elementary School, Cornelius, Oregon"; (19) "Educational Classrooms, New York, New York"; (20) "Dillard University Dormitory New Orleans, Louisiana"; (21) "Temporary Classrooms, Houston, Texas"; (22) "Inland Hill Church Educational Building, China, California"; (23) "Daycare Center, Richmond, Texas"; (24) "Josiah Quincy Upper School, Boston, Massachusetts"; (25) "Special Education Building, Oberlin, OH"; (26) "St. Maximilian Kolbe Church, West Chester, Pennsylvania"; (27) "Permanent Daycare Center, Buffalo, New York"; (28) "Woodmont Academy, Woodstock, Maryland"; (29)' "Life Christian Academy, Riverside, California"; (30) "Brice Christian Academy, Columbus, Ohio"; (31) "Cincinnati Country Day School, Cincinnati, Ohio"; and (32) "Bellevue Daycare Center, Bellevue, Washington." (EV) Reproductions supplied by EDRS are the best that can be made from the original document.

Upload: others

Post on 28-Sep-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Reproductions supplied by EDRS are the best that can be ... · Cn. Modular Building Institute. 2000 Educational Showcase (2, W Elementary K-8 Modular Courtyard. School District #33,

ED 471 339

TITLE

INSTITUTIONPUB DATENOTEAVAILABLE FROM

PUB TYPEEDRS PRICEDESCRIPTORS

ABSTRACT

DOCUMENT RESUME

EF 006 169

Modular Building Institute 2000 Educational Showcase.

Modular Building Inst., Charlottesville, VA.2000-00-00

34p.

For full text: http://www.mbinet.org/web/magazine/showcase.html.

Collected Works General (020)

EDRS Price MF01/PCO2 Plus Postage.Building Design; Educational Facilities Design; ElementarySecondary Education; Higher Education; *Mobile Classrooms;*Prefabrication; *Relocatable Facilities; SchoolConstruction; *School Expansion

This publication contains brief articles concerned withmodular school structures. The articles offer examples of such structures atactual schools. The articles in this issue are: (1) "Elementary K-8 ModularCourtyard"; (2) "School District #33, Chilliwack, BC"; (3) "New ElementarySchool for Briarwood, NY"; (4) "Addition to Queens Intermediate School"; (5)

"Elementary School Addition for Patterson, NJ"; (6) "Federal Way PublicAcademy"; (7) "Awakening Seed School"; (8) "Challenge Charter School"; (9)

"Flagstaff Montessori School"; (10) "Gateway Headstart"; (11) "J. P. RyonElementary School Gets Temporary Classrooms"; (12) "Hartfound County, Md.Gets New Classrooms"; (13) "Children First Daycare Center"; (14) "CentralHigh School"; (15) "College Wood Elementary"; (16) "Private School Addition,Toronto, Ontario, Canada"; (17) "Portable Classroom, Burlington, Ontario,Canada"; (18) "Echo Shaw Elementary School, Cornelius, Oregon"; (19)

"Educational Classrooms, New York, New York"; (20) "Dillard UniversityDormitory New Orleans, Louisiana"; (21) "Temporary Classrooms, Houston,Texas"; (22) "Inland Hill Church Educational Building, China, California";(23) "Daycare Center, Richmond, Texas"; (24) "Josiah Quincy Upper School,Boston, Massachusetts"; (25) "Special Education Building, Oberlin, OH"; (26)

"St. Maximilian Kolbe Church, West Chester, Pennsylvania"; (27) "PermanentDaycare Center, Buffalo, New York"; (28) "Woodmont Academy, Woodstock,Maryland"; (29)' "Life Christian Academy, Riverside, California"; (30) "BriceChristian Academy, Columbus, Ohio"; (31) "Cincinnati Country Day School,Cincinnati, Ohio"; and (32) "Bellevue Daycare Center, Bellevue,Washington." (EV)

Reproductions supplied by EDRS are the best that can be madefrom the original document.

Page 2: Reproductions supplied by EDRS are the best that can be ... · Cn. Modular Building Institute. 2000 Educational Showcase (2, W Elementary K-8 Modular Courtyard. School District #33,

Cn Modular Building Institute2000 Educational Showcase

(2,W Elementary K-8 Modular Courtyard

School District #33, Chilliwack BC

New Elementary School for Briarwood, NY

Addition to Queens Intermediate School

Elementary School Addition for Patterson, NJ

Federal Way Public Academy

Awakening Seed School

Challenge Charter School

Flagstaff Montessori School

Gateway Headstart

J. P. Ryon Elementary School Gets Temporary Classrooms

Hartfound County, Md. Gets New Classrooms

Children First Daycare Center

Central High School

College Wood Elementary

Private School Addition, Toronto, Ontario, Canada

Portable Classroom, Burlington, Ontario, Canada

Echo Shaw Elementary School, Cornelius, Oregon

Educational Classrooms, New York, New York

Dillard University Dormitory New Orleans, Louisiana

Temporary Classrooms Houston, Texas

Inland Hill Church Educational Building, China California

Daycare Center, Richmond, Texas

Josiah Quincy Upper School, Boston, Massachussetts

Special Education Building, Oberlin, OH

St. Maximilian Kolbe Church, West Chester, Pennsylvania

Permanent Daycare Center, Buffalo, New York

Woodmont Academy, Woodstock, Maryland

Life Christian Academy, Riverside, California

Brice Christian Academy, Columbus, Ohio

Cincinnati Country Day School, Cincinnati, Ohio

Bellevue Daycare Center, Bellevue, Washington

Full text available at: http://www.mbinet.org/web/magazine/showcase.html

0)CO

CO

CDCD

LL

U.S. DEPARTMENT OF EDUCATIONOffice of Educational Research and Improvement

EDUCATIONAL RESOURCES INFORMATIONCENTER (ERIC)

XThis document has been reproduced asreceived from the person or organizationoriginating it.

Minor changes have been made toimprove reproduction quality.

Points of view or opinions stated in thisdocument do not necessarily representofficial OERI position or policy. 1

BEST COPY AVAILABLE

PERMISSION TO REPRODUCE ANDDISSEMINATE THIS MATERIAL HAS

BEEN GRANTED BY

Judy Smith

TO THE EDUCATIONAL RESOURCESINFORMATION CENTER (ERIC)

Page 3: Reproductions supplied by EDRS are the best that can be ... · Cn. Modular Building Institute. 2000 Educational Showcase (2, W Elementary K-8 Modular Courtyard. School District #33,

Elementary K-8 Modular Courtyard

MODULARauiLniNo uoriTuTE

http://www.mbinet.org/web/magazine/blaz00.html?style=printabl

MBI Net > magazine > blaz00

40.

wt-

Elementary Education, Grades K--8Portland, Oregon

Blazer Industries, Inc. and Commercial Mobile Structures designed over 25,000 sq. ft. oftemporary classroom space for this growing private school. The individual factory-builtbuildings are situated around a courtyard and are tailored to meet the needs of severaldifferent age groups. The exterior finish of the modular units compliment otherpermanent site-built buildings.

rtIML. 4

DULARIN-61,rrvit

Copyright © 2002 Modular Building Institute. All rights reserved.

Modular Building Institute, 413 Park Street, Charlottesville, VA 22902Phone 434-296-3288, Fax 434-296-3361, Email [email protected]

Toll Free: 888-811-3288

3I of I 7/24/02 11:31 Al

Page 4: Reproductions supplied by EDRS are the best that can be ... · Cn. Modular Building Institute. 2000 Educational Showcase (2, W Elementary K-8 Modular Courtyard. School District #33,

School District #33, Chilliwack BC

MODULARSUILOINO INSTITUTE

http://www.mbinet.org/web/magazine/brit00.html?style=printabl.

MBI Net > magazine > brit00

+.1

School District #33Chilliwack, British Columbia, Canada

Britco Structures worked closely with Cilliwack school's architect to provide a modularaddition that matched the interior and exterior appearance of the existing school. Themodular buildings were positioned to create four classrooms opposite each other acrossa 15 ft. corridor. The classrooms total 8,382 sq. ft. and took only 66 days to complete.

MODULARUPtbNO tin ea ft krt a

Copyright © 2002 Modular Building Institute. All rights reserved.

Modular Building Institute, 413 Park Street, Charlottesville, VA 22902Phone 434-296-3288, Fax 434-296-3361, Email [email protected]

Toll Free: 888-811-3288

41 of 1 7/24/02 11:31 AN

Page 5: Reproductions supplied by EDRS are the best that can be ... · Cn. Modular Building Institute. 2000 Educational Showcase (2, W Elementary K-8 Modular Courtyard. School District #33,

New Elementary School for Briarwood, NY

I of 1

MODULAROUILOINO INSTITUTE

hup://www.mbinet.org/web/magazine/ku1100.html?style=printabl

MBI Net > magazine > ku1100

II

PS 117 Elementary SchoolBriarwood, New York

When building school additions on tight urban sites, like this one by Kullman Industries,modular construction is ideal when it comes to safety. The job site is kept clean until theday modular units arrive. This 20,000 sq. ft. three-story addition has a brick exteriorwhile the interior features ceramic tile in the halls and restrooms. Renovations werecomplete in 240 days.

MODUS411,10,70 II,St.VW!..

Copyright © 2002 Modular Building Institute. All rights reserved.

Modular Building Institute, 413 Park Street, Charlottesville, VA 22902Phone 434-296-3288, Fax 434-296-3361, Email [email protected]

Toll Free: 888-811-3288

5 7/24/02 1 1:30 AD

Page 6: Reproductions supplied by EDRS are the best that can be ... · Cn. Modular Building Institute. 2000 Educational Showcase (2, W Elementary K-8 Modular Courtyard. School District #33,

Addition to Queens Intermediate School

MODULAREWILOINO IN91ITUTE

http://www.mbinet.org/web/magazine/ku1100_1.html?style=printabl

MBI Net > magazine > ku1100_1

IS 210 Intermediate SchoolQueens, New York

Kullman Industries also designed this 15,700 sq. ft.comprised of 51 factory-built units arranged aroundand elevator modules where the addition meets thestone panels were installed at the factory as well asmonths to complete the project.

school addition in Queens. It'sa central corridor. There are stairexisting building. Brick and castinterior ceramic tile. It took six

MODULAR

Copyright © 2002 Modular Building Institute. All rights reserved.

Modular Building Institute, 413 Park Street, Charlottesville, VA 22902Phone 434-296-3288, Fax 434-296-3361, Email [email protected]

Toll Free: 888-811-3288

6I of 1 7/24/02 11:30 Ars

Page 7: Reproductions supplied by EDRS are the best that can be ... · Cn. Modular Building Institute. 2000 Educational Showcase (2, W Elementary K-8 Modular Courtyard. School District #33,

Elementary School Addition for Patterson, NJ http://www.mbinet.org/web/magazine/ku1100_2.html?style=printabl.

MBI Net > magazine > ku1100_2

PS 27 Elementary SchoolPaterson, New Jersey

The exterior of this 30,000 sq. ft. school addition is primarily brick, while windows ofvarious sizes give it a distinctive look. Designed by Kullman Industries, the projectconsists of eight kindergarten classrooms, seven regular classrooms, two small groupinstruction rooms, a teacher's lounge, mini auditorium, and science laboratory, allcompleted in 150 days.

'NMMQOIIIAB

Copyright © 2002 Modular Building Institute. All rights reserved.

Modular Building Institute, 413 Park Street, Charlottesville, VA 22902Phone 434-296-3288, Fax 434-296-3361, Email [email protected]

Toll Free: 888-811-3288

7I of 1 7/24/02 1 1:30 AN

Page 8: Reproductions supplied by EDRS are the best that can be ... · Cn. Modular Building Institute. 2000 Educational Showcase (2, W Elementary K-8 Modular Courtyard. School District #33,

Federal Way Public Academy

I of 1

L-77714MODULAR0.1L.DINO INSTITUTE

http://www.mbinetorg/web/magazine/mcb100.html?style=printabl

MBI Net > magazine > mcb100

Federal Way Public AcademyFederal Way, Washington

School officials wanted a completely self-contained school within a school at Illahee HighSchool. So, Blazer Industries and Mckinney Mobile Modular provided three double-widemodular units with five classrooms and an office totaling 5,400 sq. ft. Inside there arecustom power drops for science labs and custom cabinetry. Complete in 15 days, theproject cost US$ 37 per sq. ft

L. 1{4111ODULAR

Copyright © 2002 Modular Building Institute. All rights reserved.

Modular Building Institute, 413 Park Street, Charlottesville, VA 22902Phone 434-296-3288, Fax 434-296-3361, Email [email protected]

Toll Free: 888-811-3288

8 7/24/02 I I :29 AA

Page 9: Reproductions supplied by EDRS are the best that can be ... · Cn. Modular Building Institute. 2000 Educational Showcase (2, W Elementary K-8 Modular Courtyard. School District #33,

Awakening Seed School

=NIMODULARDUN-DINO INSTITUTE

http://www.mbinet.org/web/magazine/modt00.html?style=printabl

MBI Net > magazine > modt00

Awakening Seed SchoolTempe, Arizona

5.

Officials at this elementary school wanted a school building that emphasized the arts andpreserved the city's frontier heritage. Modular Technology designed 17 factory-builtclassrooms totaling 15,000 sq. ft. that complemented the natural surroundings. Theclassrooms were completed in 93 days and have 12 foot ceilings and communications,fire, and security systems.

MODULAR05LRLOINO 8+4111%1ft

Copyright © 2002 Modular Building Institute. All rights reserved.

Modular Building Institute, 413 Park Street, Charlottesville, VA 22902Phone 434-296-3288, Fax 434-296-3361, Email [email protected]

Toll Free: 888-811-3288

1 of 1 9 7/24/02 11:32 Als

Page 10: Reproductions supplied by EDRS are the best that can be ... · Cn. Modular Building Institute. 2000 Educational Showcase (2, W Elementary K-8 Modular Courtyard. School District #33,

Challenge Charter School http://www.mbinet.org/web/magazine/modt00_1.html?style=printabl.

MBI Net > magazine > modt00_1

Challenge Charter SchoolGlendale, Arizona

Modular Technology designed this 450 student elementary school campus comprised of44 factory-built units offering over 23,000 sq. ft. of educational space. The classrooms,cafeteria, transporation office, nurse's station, bus verandah, administrative officesfeature varied roof pitches to create visual interest. The campus was completed in 134days for US$ 74 per sq. ft.

*numCopyright © 2002 Modular Building Institute. All rights reserved.

Modular Building Institute, 413 Park Street, Charlottesville, VA 22902Phone 434-296-3288, Fax 434-296-3361, Email [email protected]

Toll Free: 888-811-3288

101 of 1 7/24/02 11:29 AN

Page 11: Reproductions supplied by EDRS are the best that can be ... · Cn. Modular Building Institute. 2000 Educational Showcase (2, W Elementary K-8 Modular Courtyard. School District #33,

Flagstaff Montessori School

MODULARSUILOINO INSTITUTE

hap://www.mbinet.org/web/magazine/modt00_2.html?style=printabl.

MBI Net > magazine > modt00_2

Flagstaff Montessori SchoolFlagstaff, Arizona

This elementary school campus was also designed and built by Modular Technology. Ittook only 150 days to complete the 14 modules of more than 6,000 sq. ft. To achieve analpine look and accommodate for heavy winter snows, lap-siding with a high-pitchedroof was used along with an indoor corridor system connecting individual classrooms,restrooms, and kitchens.

MODULAR4L4 ?!..) ,h1,Utt

Copyright © 2002 Modular Building Institute. All rights reserved.

Modular Building Institute, 413 Park Street, Charlottesville, VA 22902Phone 434-296-3288, Fax 434-296-3361, Email [email protected]

Toll Free: 888-811-3288

11I of I 7/24/02 1 1:29 AN

Page 12: Reproductions supplied by EDRS are the best that can be ... · Cn. Modular Building Institute. 2000 Educational Showcase (2, W Elementary K-8 Modular Courtyard. School District #33,

Gateway Headstart http://www.mbinet.org/web/magazine/modt00_3.html?style=printabl.

lwtr .. ,.,,,1

MODULARatmoiNo *NSTITUTC MBI Net > magazine > modt00_3

Gateway HeadstartPhoenix, Arizona

Modular Technology was given only 90 days to complete classrooms for afederally-funded academia program for three year olds, but completed the project in 76days. The building is 2,500 sq. ft. and is made from five modular units. Its stuccoexterior and seam-metal roofing are virtually maintenance-free and match the othersite-built building perfectly.

1

:TAMMODULAR111,1.0.?,0 (Nfouvre

Copyright © 2002 Modular Building Institute. All rights reserved.

Modular Building Institute, 413 Park Street, Charlottesville, VA 22902Phone 434-296-3288, Fax 434-296-3361, Email [email protected]

Toll Free: 888-811-3288

12I of 1 7/24/02 11:28 AN

Page 13: Reproductions supplied by EDRS are the best that can be ... · Cn. Modular Building Institute. 2000 Educational Showcase (2, W Elementary K-8 Modular Courtyard. School District #33,

J. P. Ryon Elementary School Gets Temporary Classrooms http://www.mbinet.org/web/magazine/mofo00.html?style=printabl

MODULAR4.1asoLoINQ INSTITUTE MBI Net > magazine > mofo00

1

J.P. Ryon Elementary SchoolWaldorf, Maryland

r

Students and teachers needed to be relocated to temporary classrooms whilerenovations were going on at their permanent school building. Modular DesignTechnology and Forest River/Premiere Structures Division put together 36 modular unitsof 30,000 sq. ft. in 126 days. There are 26 classrooms, five restrooms, a main office, acomputer room, and a parents' room.

IIDULARineaitute

Copyright © 2002 Modular Building Institute. All rights reserved.

Modular Building Institute, 413 Park Street, Charlottesville, VA 22902Phone 434-296-3288, Fax 434-296-3361, Email [email protected]

Toll Free: 888-811-3288

131 of 1 7/24/02 11:28 AN

Page 14: Reproductions supplied by EDRS are the best that can be ... · Cn. Modular Building Institute. 2000 Educational Showcase (2, W Elementary K-8 Modular Courtyard. School District #33,

Hartfound County, Md. Gets New Classrooms http://www.mbinet.org/web/magazine/monr00.html?style=printabl.

MODULAREWILOINO INSTITUTE MBI Net > magazine > monr00

Hartford County Middle & High SchoolsHartford County, Maryland

It took Modular Design Technology and NRB, Inc. only 42 days to complete newclassrooms for Hartford County school officials. The 1,728 sq. ft. buildings were designedto allow for relocatability throughout the district. Constructed totally of steel andconcrete, the modular classrooms are practically maintenance-free, are vandal resistant,and should last indefinitely.

Copyright © 2002 Modular Building Institute. All rights reserved.

Modular Building Institute, 413 Park Street, Charlottesville, VA 22902Phone 434-296-3288, Fax 434-296-3361, Email [email protected]

Toll Free: 888-811-3288

I41 of 1 7/24/02 11:27 AN

Page 15: Reproductions supplied by EDRS are the best that can be ... · Cn. Modular Building Institute. 2000 Educational Showcase (2, W Elementary K-8 Modular Courtyard. School District #33,

Children First Daycare Center

tilriilMODULARBUILOINCI INSTITUTE

http://www.mbinet.org/web/magazine/mowhOO.html?style=printabl

MBI Net > magazine > mowhOO

-11111L__

Children First Daycare CenterCleveland, Ohio

This building, part of a city-wide rejuvenation effort, is located in a growing area ofCleveland. Colorful finishes and child-sized amenities create a fun and warmenvironment just right for kids. Modular Design Technology and Whitley Manufacturingcreated the 7,392 sq. ft. daycare center in four weeks. The wood-framed modularstructure saved the center 10% in costs

MODULARturibm* !r01,trrt

Copyright © 2002 Modular Building Institute. All rights reserved.

Modular Building Institute, 413 Park Street, Charlottesville, VA 22902Phone 434-296-3288, Fax 434-296-3361, Email [email protected]

Toll Free: 888-811-3288

151 of 1 7/24/02 11:27 AIN

Page 16: Reproductions supplied by EDRS are the best that can be ... · Cn. Modular Building Institute. 2000 Educational Showcase (2, W Elementary K-8 Modular Courtyard. School District #33,

Central High School

MODULARBUILDING INSTITUTE

http://www.mbinet.org/web/magazine/newc00.html?style=printabl

MBI Net > magazine > newc00

Central High SchoolBrooksville, Florida

ADA-compliant decking and ramps provide attractive, easy access to modular classroomsat Central High School. The portable buildings by New Castle Modular Specialties are 864sq. ft. and took only 14 days to complete. They feature acoustical ceiling tiles, oakveneer paneling, and lockable storage space. The units are also constructed to withstand110 m.p.h. winds.

L.:3P4MODULARsutto,.6 wscturt

Copyright © 2002 Modular Building Institute. All rights reserved.

Modular Building Institute, 413 Park Street, Charlottesville, VA 22902Phone 434-296-3288, Fax 434-296-3361, Email [email protected]

Toll Free: 888-811-3288

16I of 1 7/24/02 11:24 AN

Page 17: Reproductions supplied by EDRS are the best that can be ... · Cn. Modular Building Institute. 2000 Educational Showcase (2, W Elementary K-8 Modular Courtyard. School District #33,

College Wood Elementary http://www.mbinet.org/web/magazine/newc00_1.html?style=printabl.

MBI Net > magazine > newc00_1

College Wood ElementaryCarmel, Indiana

The smooth finish of aluminum siding with no exposed fasteners gives College WoodElementary's new classrooms a clean, shiny look. The single building is made up of twomodular units joined together providing students more than 1,050 sq. ft. of learningspace. New Castle Modular Specialties built and delivered the portable classroom in only14 days.

1

eunOINF) mtlINOt

Copyright © 2002 Modular Building Institute. All rights reserved.

Modular Building Institute, 413 Park Street, Charlottesville, VA 22902Phone 434-296-3288, Fax 434-296-3361, Email [email protected]

Toll Free: 888-811-3288

17I of 1 7/24/02 1 I :23 AN

Page 18: Reproductions supplied by EDRS are the best that can be ... · Cn. Modular Building Institute. 2000 Educational Showcase (2, W Elementary K-8 Modular Courtyard. School District #33,

Private School Addition, Toronto, Ontario, Canada

MODULARINSTITIJTe

http://www.mbinet.org/web/magazine/nrb00.html?style=printabl.

MBI Net > magazine > nrb00

Private School AdditionToronto, Ontario, Canada

This building by NRB, Inc. is constructed using structural steel framing with reinforcedpre-poured concrete floors. Its brick exterior matches that of the existing schoolbuilding, as do the new windows and interior and exterior colors. Each classroom hastwo large windows offering outside air is so desired. The 28,000 sq. ft. addition took 6weeks to complete.

MODUItUtIVINO to b3IYVfi

Copyright © 2002 Modular Building Institute. All rights reserved.

Modular Building Institute, 413 Park Street, Charlottesville, VA 22902Phone 434-296-3288, Fax 434-296-3361, Email [email protected]

Toll Free: 888-811-3288

181 of 1 7/24/02 11:23 Al`

Page 19: Reproductions supplied by EDRS are the best that can be ... · Cn. Modular Building Institute. 2000 Educational Showcase (2, W Elementary K-8 Modular Courtyard. School District #33,

MODULAR0,1.01,0 IPVIITUrt,

Portable Classroom, Burlington, Ontario, Canada hup://www.mbinet.org/web/magazineThrb00_1.html?style=printabl

loft

MODULARBUILOING INSTITUTE MBI Net > magazine > nrb00_1

-I, A.

Portable ClassroomBurlington, Ontario, Canada

This classroom, built by NRB, Inc., is a prototype designed to help school systems intheir fight against mold and poor indoor air quality. In its construction, NRB used as littleorganic or cellulose material as possible, including paperless sheetrock, vinyl floor tile,and steel framing. Two modular units make up the 736 sq. ft. classroom, which was builtin 40 days.

Copyright © 2002 Modular Building Institute. All rights reserved.

Modular Building Institute, 413 Park Street, Charlottesville, VA 22902Phone 434-296-3288, Fax 434-296-3361, Email [email protected]

Toll Free: 888-811-3288

97/24/02 11:23 AN

Page 20: Reproductions supplied by EDRS are the best that can be ... · Cn. Modular Building Institute. 2000 Educational Showcase (2, W Elementary K-8 Modular Courtyard. School District #33,

Echo Shaw Elementary School, Cornelius, Oregon hup://www.mbinet.org/web/magazine/pab100.html?style=printabl

MBI Net > magazine > pab100

Echo Shaw Elementary SchoolCornelius, Oregon

This building was designed to fit into a neighborhood setting at the edge of an existingschool campus. Built by Blazer Industries for Pacific Mobile Structures, the selection ofbuilding materials, shape of the structure, and colors used were selected to reflect thearchitecture of nearby homes. The building boasts over 7,500 sq. ft. and took 105 daysto complete.

MODULARtunowd mitwitvre

Copyright © 2002 Modular Building Institute. All rights reserved.

Modular Building Institute, 413 Park Street, Charlottesville, VA 22902Phone 434-296-3288, Fax 434-296-3361, Email [email protected]

Toll Free: 888-811-3288

21 of 1 7/24/02 11:22 AN

Page 21: Reproductions supplied by EDRS are the best that can be ... · Cn. Modular Building Institute. 2000 Educational Showcase (2, W Elementary K-8 Modular Courtyard. School District #33,

Educational Classrooms, New York, New York

MODULARElUILOINO INSTITUTU

http://www.mbinet.org/web/magazine/prku00.html?style=printabli

MBI Net > magazine > prku00

Educational ClassroomsNew York, New York

In five months, Provincial Partitions and Kullman Industries completely installed 60modular classrooms for a New York City school system. The classrooms total more than80,000 sq. ft. and have cost effective features including light steel framing to reduceshipping weight, easy disconnection for ease of relocation, and all furnishings includingchalkboards and tackboards.

_LAWNMODULAR,E+1/rACHNO 1Kotmos

Copyright © 2002 Modular Building Institute. All rights reserved.

Modular Building Institute, 413 Park Street, Charlottesville, VA 22902Phone 434-296-3288, Fax 434-296-3361, Email [email protected]

Toll Free: 888-811-3288

21I of I 7/24/02 1 1:22 AN

Page 22: Reproductions supplied by EDRS are the best that can be ... · Cn. Modular Building Institute. 2000 Educational Showcase (2, W Elementary K-8 Modular Courtyard. School District #33,

Dillard University Dormitory New Orleans, Louisiana hup://www.mbinet.org/web/magazine/ramt00.html?style=printabl

MODULARSUILOINS INSTITUTE MBI Net > magazine > ramt00

Dillard University DormitoryNew Orleans, Louisiana

This dormitory provides temporary housing for 168 university coeds in an environmentconductive to learning. Built by Ramtech Building Systems, efficient space planningintegrated dorm rooms with study areas, kitchens, laundry, and lounges. Individualrooms in the 38,000+ dorm have controlled heat pumps and insulated glass windows.The project was complete in 197 days.

MI IDULAR,...rtCopyright © 2002 Modular Building Institute. All rights reserved.

Modular Building Institute, 413 Park Street, Charlottesville, VA 22902Phone 434-296-3288, Fax 434-296-3361, Email [email protected]

Toll Free: 888-811-3288

22I of 1 7/24/02 11:22 AN

Page 23: Reproductions supplied by EDRS are the best that can be ... · Cn. Modular Building Institute. 2000 Educational Showcase (2, W Elementary K-8 Modular Courtyard. School District #33,

Temporary Classrooms Houston, Texas

MODULAR6111101NQ INSTITUTe

http://www.mbinet.org/web/magazine/rein00.html?style=printabt

MBI Net > magazine > rein00

Temporary ClassroomsHouston, Texas

These classrooms by Resun Leasing Incorporated and Indicom Buildings were configuredto incorporate 15,000 sq. ft. of decks, 6,000 sq. ft. of concrete, and 19,00 sq. ft. ofcanopy to form a "stand alone" campus for over 500 students in just 38 days.. Theschool's PTA was so impressed with the factory-built buildings, they asked that thebuildings become the permanent school.

MODULARs*unomd 1401ture

Copyright © 2002 Modular Building Institute. All rights reserved.

Modular Building Institute, 413 Park Street, Charlottesville, VA 22902Phone 434-296-3288, Fax 434-296-3361, Email [email protected]

Toll Free: 888-811-3288

31 of 1 7/24/02 11:21 AN

Page 24: Reproductions supplied by EDRS are the best that can be ... · Cn. Modular Building Institute. 2000 Educational Showcase (2, W Elementary K-8 Modular Courtyard. School District #33,

Inland Hill Church Educational Building, China California

MODULARBUILDING IN5TITUTI

hup://www.mbinet.org/web/magazine/rerno00.htmrstyle=printabl

MBI Net > magazine > remo00

Inland Hill Church Educational BuildingChino, California

Fifteen modular units were arranged adjacent to a permanent sanctuary as a supportcampus for a church. The classrooms feature high-wear carpet and vinyl flooring andnumerous windows. The exterior of the classrooms are painted to match existingbuildings. Resun Leasing Incorporated and Modular Structures International completedthe project in 30 days.

MODULAR

Copyright © 2002 Modular Building Institute. All rights reserved.

Modular Building Institute, 413 Park Street, Charlottesville, VA 22902Phone 434-296-3288, Fax 434-296-3361, Email [email protected]

Toll Free: 888-811-3288

241 of I 7/24/02 1 1:20 AN

Page 25: Reproductions supplied by EDRS are the best that can be ... · Cn. Modular Building Institute. 2000 Educational Showcase (2, W Elementary K-8 Modular Courtyard. School District #33,

Daycare Center, Richmond, Texas

ig1-11MODULARBUILDINQ IN9TITUTe

http://www.mbinet.org/web/magazine/repo00.html?style=printabl

MBI Net > magazine > repo00

Daycare CenterRichmond, Texas

Needing a building with an entrance at ground-level, Resun Leasing Incorporated andPorta-Kamp Manufacturing put together this daycare center, finished sitework, a 20,000sq. ft. parking lot, civic work, utilities, foundation, and water detention all within 45days. Use of a modular building now saved the owner over US$ 100,000 when building apermanent structure later.

NVMODULARdu, iS?lira ..#nf.rt

Copyright © 2002 Modular Building Institute. All rights reserved.

Modular Building Institute, 413 Park Street, Charlottesville, VA 22902Phone 434-296-3288, Fax 434-296-3361, Email [email protected]

Toll Free: 888-811-3288

25I of 1 7/24/02 I 1 :20 AN

Page 26: Reproductions supplied by EDRS are the best that can be ... · Cn. Modular Building Institute. 2000 Educational Showcase (2, W Elementary K-8 Modular Courtyard. School District #33,

Josiah Quincy Upper School, Boston, Massachussetts hup://www.mbinet.org/web/magazine/roto00.html?style=printabl

raiLMODULARBUILDING INSTITUTE MBI Net > magazine > roto00

Josiah Quincy Upper SchoolBoston, Massachussetts

Rotondo Precast Modular supplied this modular school. Composed of 30 precast concretemodules stacked side by side, a second story can be added in future years by simplystacking other modules on top. The floor, roof, and walls are cast with rigid polystyreneinsulation and with electrical conduits set inside the concrete. The 8,000 sq. ft. buildingwas completed in just 105 days.

MODULAR:01.1q0INts

Copyright © 2002 Modular Building Institute. All rights reserved.

Modular Building Institute, 413 Park Street, Charlottesville, VA 22902Phone 434-296-3288, Fax 434-296-3361, Email [email protected]

Toll Free: 888-811-3288

261 of 1 7/24/02 11:19 AN

Page 27: Reproductions supplied by EDRS are the best that can be ... · Cn. Modular Building Institute. 2000 Educational Showcase (2, W Elementary K-8 Modular Courtyard. School District #33,

Special Education Building, Oberlin, OH http://www.mbinet.org/web/magazine/soma00.html?style=printabl

MBI Net > magazine > soma00

Special Education BuildingOberlin, Ohio

School officials made a wise decision when choosing factory-built classrooms. Their newbuilding was complete in only 35 days and enabled the school to start a specialeducation program ahead of schedule. Three rooms totaling 672 sq. ft. accommodate8-12 special needs children. The facilities were built for Sommer's Mobile Leasing byManufactured Structures Corp.

SAMODULAR4$1.,flOWO ;!.tuturre.

Copyright © 2002 Modular Building Institute. All rights reserved.

Modular Building Institute, 413 Park Street, Charlottesville, VA 22902Phone 434-296-3288, Fax 434-296-3361, Email [email protected]

Toll Free: 888-811-3288

271 of 1 7/24/02 11:13 A1

Page 28: Reproductions supplied by EDRS are the best that can be ... · Cn. Modular Building Institute. 2000 Educational Showcase (2, W Elementary K-8 Modular Courtyard. School District #33,

Eligrat13MODULARgum:loft wtivittrtt

St. Maximilian Kolbe Church, West Chester, Pennsylvania

MODULARBUILDING INSTITUTE

hup://www.mbinet.org/web/magazindwiwhOO.html?style=printabl

MBI Net > magazine > wiwhOO

-Yr

St. Maximilian Kolbe ChurchWest Chester, Pennsylvania

Being in such an affluent neighborhood, church officials didn't want their new classroomto look like just an "old trailer." So, Wilmot Modular Structures and WhitleyManufacturing rose to the occasion. The church's new building had wood siding andmatched the color of the adjacent rectory. The 1,440 sq. ft. classrooms were ready foroccupancy in only 67 days.

Copyright © 2002 Modular Building Institute. All rights reserved.

Modular Building Institute, 413 Park Street, Charlottesville, VA 22902Phone 434-296-3288, Fax 434-296-3361, Email info @mbinet.org

Toll Free: 888-811-3288

2 81 of 1 7/24/02 11:13 AN

Page 29: Reproductions supplied by EDRS are the best that can be ... · Cn. Modular Building Institute. 2000 Educational Showcase (2, W Elementary K-8 Modular Courtyard. School District #33,

Permanent Daycare Center, Buffalo, New York hup://www.mbinet.org/web/magazine/wsma00.html?style=printabl

MBI Net > magazine > wsma00

Lr

Permanent Daycare CenterBuffalo, New York

For maximum efficiency, this daycare center has a zoned air conditioning and heatingsystem, children's restrooms with small fixtures, and vinyl-covered walls. Factory-builtconstruction eliminated many of the high costs associated with building in the state ofNew York. Manufactured Structures Corp. and Williams Scotsman completed the projectin three and a half months.

Eli 1E11111MODULAR40uno..0 .04rute

Copyright © 2002 Modular Building Institute. All rights reserved.

Modular Building Institute, 413 Park Street, Charlottesville, VA 22902Phone 434-296-3288, Fax 434-296-3361, Email [email protected]

Toll Free: 888-811-3288

2 91 of 1 7/24/02 11:12 AN

Page 30: Reproductions supplied by EDRS are the best that can be ... · Cn. Modular Building Institute. 2000 Educational Showcase (2, W Elementary K-8 Modular Courtyard. School District #33,

Woodmont Academy, Woodstock, Maryland

irgiqMODULAREtUILDINO INSTITUTE

http://www.mbinet.org/web/magazine/wsmi00.html?style=printabl

MBI Net > magazine > wsmi00

Woodmont AcademyWoodstock, Maryland

This stand-alone building by Williams Scotsman and Mark line Industries featuresclassrooms, restrooms, a library, and offices all under one roof. It took 122 days tocomplete the 7,200 sq. ft. building, which school officials plan to move in two to threeyears when going to a new location. The building has a low-maintenance exterior andvinyl gypsum interior walls.

MODULAR

Copyright © 2002 Modular Building Institute. All rights reserved.

Modular Building Institute, 413 Park Street, Charlottesville, VA 22902Phone 434-296-3288, Fax 434-296-3361, Email [email protected]

Toll Free: 888-811-3288

30I of 1 7/24/02 11:12 AN

Page 31: Reproductions supplied by EDRS are the best that can be ... · Cn. Modular Building Institute. 2000 Educational Showcase (2, W Elementary K-8 Modular Courtyard. School District #33,

MODULAR,NS$ 1110 t,

Life Christian Academy, Riverside, California

L.

MODULAR

http://www.mbinet.org/web/magazine/wssc00.html?style=printabl,

MBI Net > magazine > wssc00

Life Christian AcademyRiverside, California

One of the benefits of factory-built construction is the ability to reconfigure modularbuildings. This child care facility, built by Williams Scotsman and ScotsmanManufacturing, involved the conversion of the first floor of another modular building(once used as an engineering office) to the second floor of this one. The project took fivemonths and totals 4,320 sq. ft.

Copyright © 2002 Modular Building Institute. All rights reserved.

Modular Building Institute, 413 Park Street, Charlottesville, VA 22902Phone 434-296-3288, Fax 434-296-3361, Email [email protected]

Toll Free: 888-811-3288

3 I1 of 1 7/24/02 11:11 AN

Page 32: Reproductions supplied by EDRS are the best that can be ... · Cn. Modular Building Institute. 2000 Educational Showcase (2, W Elementary K-8 Modular Courtyard. School District #33,

Brice Christian Academy, Columbus, Ohio

MODULARINSTITUTE

http://www.mbinet.org/web/magazine/wswhOO.html?style=printabl

MBI Net > magazine > wswhOO

Brice Christian AcademyColumbus, Ohio

This small private school is located on the grounds of Brice United Methodist Church.School and church officials knew that factory-built construction would give them theclassroom expansion they needed fast. In just 123 days, Williams Scotsman and WhitleyManufacturing provided the new classrooms. They feature 3,600 sq. ft. of space and amaintenance-free exterior.

Copyright © 2002 Modular Building Institute. All rights reserved.

Modular Building Institute, 413 Park Street, Charlottesville, VA 22902Phone 434-296-3288, Fax 434-296-3361, Email [email protected]

Toll Free: 888-811-3288

3 2I of I 7/24/02 11:10 Als

Page 33: Reproductions supplied by EDRS are the best that can be ... · Cn. Modular Building Institute. 2000 Educational Showcase (2, W Elementary K-8 Modular Courtyard. School District #33,

Cincinnati Country Day School, Cincinnati, Ohio hup://www.mbinet.org/web/magazine/wswh00_1.html?style=printabl.

MODULARSUILOINO INSTITUTE MBI Net > magazine > wswh00_1

Cincinnati Country Day SchoolCincinnati, Ohio

Williams Scotsman and Whitley Manufacturing also designed this classroom facilityencompassing all the academic areas of a private high school curriculum. The modularbuilding is being used for a one year period during the renovation of the adjacentpermanent school building. The building is made up of 42 modular units, is 31,200 sq.ft., and was completed in 157 days.

L-111M[MULARatotrimo sallurt

Copyright © 2002 Modular Building Institute. All rights reserved.

Modular Building Institute, 413 Park Street, Charlottesville, VA 22902Phone 434-296-3288, Fax 434-296-3361, Email [email protected]

Toll Free: 888-811-3288

331 of 1 7/24/02 11:10 AN

Page 34: Reproductions supplied by EDRS are the best that can be ... · Cn. Modular Building Institute. 2000 Educational Showcase (2, W Elementary K-8 Modular Courtyard. School District #33,

DUi9S7,l0M-0 !Mit 14Pfg,

Bellevue Daycare Center, Bellevue, Washington http;//www.mbinet.org/web/rnagazine/wswh00_2.hunl?style=printabl.

MODULARSUILOINO INSTITUTE MBI Net > magazine > wswh00_2

Bellevue Daycare CenterBellevue, Washington

The architectural appearance of this daycare center by Williams Scotsman and WhitleyEvergreen blends into neighboring residential areas and an adjacent existing school. Thecenter is intended for infants to preschool age children. But as demographics change, socan the building. It can even be moved. The center is includes seven 4,990 sq. ft. unitsand was completed in 102 days.

Copyright © 2002 Modular Building Institute. All rights reserved.

Modular Building Institute, 413 Park Street, Charlottesville, VA 22902Phone 434-296-3288, Fax 434-296-3361, Email [email protected]

Toll Free: 888-811-3288

341 of 1 7/24/02 11:10 AN

Page 35: Reproductions supplied by EDRS are the best that can be ... · Cn. Modular Building Institute. 2000 Educational Showcase (2, W Elementary K-8 Modular Courtyard. School District #33,

U.S. Department of EducationOffice of Educational Research and Improvement (OERI)

National Library of Education (NLE)Educational Resources Information Center (ERIC)

NOTICE

Reproduction Basis

EduallIonol Risotto tot:militias Center

This document is covered by a signed "Reproduction Release (Blanket)"form (on file within the ERIC system), encompassing all or classes ofdocuments from its source organization and, therefore, does not require a"Specific Document" Release form.

This document is Federally-funded, or carries its own permission toreproduce, or is otherwise in the public domain and, therefore, may bereproduced by ERIC without a signed Reproduction Release form (either"Specific Document" or "Blanket").

EFF-089 (1/2003)