rept ptr.ppt

25
Variable creation in Configuration – GS12

Upload: scribdhome

Post on 11-Apr-2015

23 views

Category:

Documents


3 download

DESCRIPTION

Rept ptr

TRANSCRIPT

Page 1: Rept ptr.ppt

Variable creation in Configuration – GS12

Page 2: Rept ptr.ppt

Variables starting with 0 are SAP created

Page 3: Rept ptr.ppt

To get line items details. To verify if this done correctly it will show an * in front of the description

Page 4: Rept ptr.ppt

If you try to execute without creating a group it will prompt for report group creation

Page 5: Rept ptr.ppt

This report can also be created in GR51

Page 6: Rept ptr.ppt

Error Message

Page 7: Rept ptr.ppt

Report Group creation GR51

Page 8: Rept ptr.ppt
Page 9: Rept ptr.ppt

Ensure the report group is attached by clicking on the reports tab

Page 10: Rept ptr.ppt

Error Fixed, Company code selection was not defined in General Data Selction

Page 11: Rept ptr.ppt

Report can be executed from GRR3 or better yet create a transaction code and put in the main menu as explained in the following slides

Page 12: Rept ptr.ppt

You can check the name of the program when you execute the report from GRR3

Page 13: Rept ptr.ppt

Navigation to create a transaction SE93

Page 14: Rept ptr.ppt
Page 15: Rept ptr.ppt

Copy the name of the program to attach it to the transaction code

Page 16: Rept ptr.ppt
Page 17: Rept ptr.ppt

To attach the transaction to a particular portion in the menu we need to go to Area Menus SE43

Page 18: Rept ptr.ppt

F000 is Fin. Acct Info System

Page 19: Rept ptr.ppt

After clicking on Change mode click on EXTEND

Page 20: Rept ptr.ppt

Then we hit on the Zfinance Enhancement ID which is specific to GE

Page 21: Rept ptr.ppt
Page 22: Rept ptr.ppt
Page 23: Rept ptr.ppt
Page 24: Rept ptr.ppt

DONE !!!

Page 25: Rept ptr.ppt