republic of yemen - world bankdocuments.worldbank.org/curated/en/... · 1. introduction 1.1 1.1...

88
E-270 VOL. 2 Republic of Yemen Public Electricity Corporation Sana'a Emergency Power Project _ ~ . Environmental Assessment Final Report September 1998 Carl Bro International ais Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

Upload: others

Post on 03-Jun-2020

8 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Republic of Yemen - World Bankdocuments.worldbank.org/curated/en/... · 1. introduction 1.1 1.1 background 1.1 1.2 objective for the environmental assessment 1.1 1.3 scope of work

E-270VOL. 2

Republic of Yemen

Public Electricity CorporationSana'a Emergency Power Project

_ ~ .

Environmental Assessment

Final Report

September 1998

Carl Bro International ais

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Page 2: Republic of Yemen - World Bankdocuments.worldbank.org/curated/en/... · 1. introduction 1.1 1.1 background 1.1 1.2 objective for the environmental assessment 1.1 1.3 scope of work
Page 3: Republic of Yemen - World Bankdocuments.worldbank.org/curated/en/... · 1. introduction 1.1 1.1 background 1.1 1.2 objective for the environmental assessment 1.1 1.3 scope of work

Republic of Yemen

Public Electricity CorporationSana'a Emergency Power Project

Environmental Assessment

Final Report

September 1998

Carl Bro International ais &Cr-- ltAI,+., -Ae Cr-sir- -n + N,,;6-,

Page 4: Republic of Yemen - World Bankdocuments.worldbank.org/curated/en/... · 1. introduction 1.1 1.1 background 1.1 1.2 objective for the environmental assessment 1.1 1.3 scope of work
Page 5: Republic of Yemen - World Bankdocuments.worldbank.org/curated/en/... · 1. introduction 1.1 1.1 background 1.1 1.2 objective for the environmental assessment 1.1 1.3 scope of work

TABLE OF CONTENTS

TABLE OF CONTENTS

Page

1. INTRODUCTION 1.1

1.1 BACKGROUND 1.11.2 OBJECTIVE FOR THE ENVIRONMENTAL ASSESSMENT 1.11.3 SCOPE OF WORK 1.11.4 REPORT ORGANISATION 1.21.5 ACKNOWLEDGEMENTS 1.3

2. POLICY, LEGAL AND ADMINISTRATIVE FRAMEWORK 2.1

2.1 POLICY 2.12.2 LEGAL FRAMEWORK 2.22.3 ADMINISTRATIVE FRAMEWORK 2.32.4 PUBLIC PARTICIPATION AND NON GOVERNMENTAL

ORGANISATIONS (NGOs) 2.4

3. PROJECT DESCRIPTION 3.1

3.1 REHABILITATION OF THE EXISTING 20 MW PLANT 3.23.2 EXPANSION WITH NEW 30 MW PLANT 3.33.3 EXPANSION AND UPGRADING OF ASSER BSP 132/33 KV

SUBSTATION INCLUDING DEBOTTLENECKING ELEMENTSOF THE TRANSMISSION NETWORK IN SANA'A 3.6

4. BASELINE DATA 4.1

4.1 PROJECT AREA DESCRIPTION INCLUDING DESCRIPTIONSOF EXISTING CONDITIONS ON-SITE 4.1

4.2 CLIMATE AND AIR QUALITY IN THE PROJECT AREA 4.84.2.1 Air Quality in the Dhahban Area 4.84.2.2 Impact on Air Quality from the Existing Dhahban Power Plant 4.9

4.3 GEOLOGY 4.104.4 VEGETATION AND WILD-LIFE 4.114.5 WATER RESOURCES 4.114.6 PRESENT AND FUTURE LAND USE 4.124.7 HISTORICAL AND CULTURAL RESOURCES 4.12

C \SPPM80163901 Yemen PoWeT Plant\Final Repor\CONTENTS.doc

Page 6: Republic of Yemen - World Bankdocuments.worldbank.org/curated/en/... · 1. introduction 1.1 1.1 background 1.1 1.2 objective for the environmental assessment 1.1 1.3 scope of work

TABLE OF CONTENTS

5. ENVIRONMENTAL ASSESSMENT 5.1

5.1 SCOPEANDMETHOD 5.15.2 PROJECT COMPONENT A: REHABILITATION OF EXISTING

POWER PLANT 5.15.2.1 General Considerations for Environmental Rehabilitation

of the Power Plant 5.15.2.2 Fuel type 5.25.2.3 Climate and Air Quality 5.25.2.4 Water Resources Including Cooling Water Requirements 5.35.2.5 Impacts on Water Quality 5.45.2.6 Waste Management 5.55.2.7 Human External Environment Including Ambient Noise Levels 5.65.2.8 Workers Health and Safety 5.65.2.9 Fire Fighting and Emergency Set-up 5.85.2.10 Historical and Cultural Resources 5.8

5.3 PROJECT COMPONENT B: EXPANSION OF POWER PLANTINCLUDING REHABILITATION OF THE EXISTINGPOWER PLANT 5.85.3.1 General Considerations 5.85.3.2 Climate and Air Quality 5.95.3.3 Water Resources Including Cooling Water Requirements 5.95.3.4 Water Quality 5.105.3.5 Waste Management 5.115.3.6 Human Extemal Environment Including Noise Levels 5.115.3.7 Workers Health and Safety 5.125.3.8 Fire Fighting and Emergency Set-up 5.135.3.9 Historical and Cultural Resources 5.13

5.4 PROJECT COMPONENT C: EXPANSION AND UPGRADINGOF ASSER BSP 132/33 KV SUBSTATION INCLUDINGDEBOTTLENECKING ELEMENTS OF THE TRANSMISSIONNETWORK IN SANA'A 5.13

5.4.1 Land Use 5.165.4.2 Vegetation and Wildlife 5.165.4.3 Human Extemal Environment 5.165.4.4 Historical and Cultural Resources 5.16

5.5 SUMMARY OF ENVIRONMENTAL ASSESSMENT 5.16

6. ANALYSIS OF ALTERNATIVES 6.1

6.1 NO ACTION ALTERNATIVE 6.16.2 USING NATURAL GAS AS POWER FUEL 6.16.3 ALTERNATIVE SITING 6.26.4 SUMMARY OF ANALYSIS OF ALTERNATIVES 6.3

SPP180163901 Yemen Power PlamlFinal Report\CONTENTS.doc

Page 7: Republic of Yemen - World Bankdocuments.worldbank.org/curated/en/... · 1. introduction 1.1 1.1 background 1.1 1.2 objective for the environmental assessment 1.1 1.3 scope of work

TABLE OF CONTENTS

7. ENVIRONMENTAL MITIGATION PLAN 7.1

7.1 SUMMARY OF THE ENVIRONMENTAL MITIGATION PLAN 7.17.2 OIL SPILLWAY SYSTEMS AND OIL/WATER SEPARATION

SYSTEM FOR THE EXISTING AND NEW POWER PLANT 7.47.3 MITIGATION MEASURES FOR PLANT REHABILITATION AND

PLANT CONSTRUCTION 7.57.4 MITIGATION MEASURES FOR STANDARD OPERATIONS 7.57.5 FINAL DISPOSAL OF WASTE OIL AND OTHER WASTE 7.97.6 MEASURES RELATED TO THE MITIGATION OF

POTENTIAL ENVIRONMENTAL EFFECTS ARISING FROMPREVIOUS ROUTINES FOR WASTE WASTER HANDLING 7.9

8. ENVIRONMENTAL MANAGEMENT AND TRAINING 8.1

8.1 ENVIRONMENTAL MANAGEMENT AND TRAINING PLAN 8.18.2 OBJECTIVES 8.18.3 ENVIRONMENTAL TRAINING COMPONENTS 8.28.4 ACTIONS 8.38.5 RESULTS 8.38.6 COST ESTIMATE 8.3

9. ENVIRONMENTAL MONITORING PLAN 9.1

9.1 SUPPORT FOR IMPLEMENTATION ANDMONITORING OF MITIGATION MEASURES 9.1

'SPP\B0163901 Ye Poer Plant\Fnal Report\CONTENTS doc

Page 8: Republic of Yemen - World Bankdocuments.worldbank.org/curated/en/... · 1. introduction 1.1 1.1 background 1.1 1.2 objective for the environmental assessment 1.1 1.3 scope of work

TABLE OF CONTENTS

APPENDIXES

1. Map project area (1:50.000)2. Map project area - for EA (1:5.000)3. Map project area - site map (1:5.000)4. Dhahban Power Plant - draft drawing - site map/existing oil spillway system4A. Dhahban Power Plant - site plan prepared by Ansaldo5. Asser substation5A. Sana'a 33 kV Configuration (Golder Associates Inc.)6. Selected photographs from site visit7. List of References

ANNEXES

A. List of persons responsible for EA preparationB. List of Persons metC. List of meetings and public consultationsD. Minutes from meeting concerning public consultationE. Fuel oil specifications (Aden Refinery/Ma'rib Refinery)F. Risk assessment of groundwater contaminationG. TOR - Study for final disposal of waste oil and other oily wasteH. TOR - Mitigation of potential groundwater pollution at site of Dhahban Power PlantI. Outline - Management training programJ. TOR - Environmental consultancy assistance for PECK. Sana'a Emergency Power Project. Environmental Assessment. Supplemental

Environmental Studies. Golder Associates Inc., September 1998.

SPP\80163901 Y== Po.ffPnrtTinaJ Report\CONTENTS.doc

Page 9: Republic of Yemen - World Bankdocuments.worldbank.org/curated/en/... · 1. introduction 1.1 1.1 background 1.1 1.2 objective for the environmental assessment 1.1 1.3 scope of work

LIST OF ABBREVIATIONS

LIST OF ABBREVIATIONS

CBI Carl Bro International a/s

EIA Environmental Impact Assessment

EPC Environmental Protection Council

IDA International Development Association

m.a.s.l. meters above sea level

NEAP National Environmental Action Plan

NGO Non Governmental Organisation

NWRA National Water Resources Authority

NWSA National Water and Sanitation Authority

PEC Public Electricity Corporation

ppb part per billion

ppm part per million

UNDP United Nation Development Programme

YAR Yemen Arab Republic

\\CbisOl\ bicoP\YEMEN'\WZO6S\NEWFILES\abbrcvia coc

_-I-

Page 10: Republic of Yemen - World Bankdocuments.worldbank.org/curated/en/... · 1. introduction 1.1 1.1 background 1.1 1.2 objective for the environmental assessment 1.1 1.3 scope of work

E!:

- ~~Inernational boundary* National capital* Governorate capital

* * ~Railroad---Road :

-Track

SCALE t, 1.O1O00 i

0 50 100 150 20ZXmec

Ljmbeet Colca Cos.c ftoedai

MM~~~~~~~~~~~~~~~yM

Page 11: Republic of Yemen - World Bankdocuments.worldbank.org/curated/en/... · 1. introduction 1.1 1.1 background 1.1 1.2 objective for the environmental assessment 1.1 1.3 scope of work

1. INTRODUCTION

Page 12: Republic of Yemen - World Bankdocuments.worldbank.org/curated/en/... · 1. introduction 1.1 1.1 background 1.1 1.2 objective for the environmental assessment 1.1 1.3 scope of work
Page 13: Republic of Yemen - World Bankdocuments.worldbank.org/curated/en/... · 1. introduction 1.1 1.1 background 1.1 1.2 objective for the environmental assessment 1.1 1.3 scope of work

1 / INTRODUCTION

1. INTRODUCTION

1.1 BACKGROUND

The Public Electricity Corporation of Yemen (PEC), a state owned enterprise, ispresently planning to undertake implementation of the proposed Sana'a EmergencyPower Project with financial support of the International Development Association(IDA), an affiliate of the World Bank Group.

The objective of the proposed project would be to improve the availability andreliability of electricity in greater Sana'a, which is currently subject to serious powershortages. These shortages of electricity have various adverse environmental, socialand economic impacts on the Sana'a region. Temporary measures to correct theproblems have included development of an interconnection with Ta'iz and Aden;however, transfer of electricity from these cities is resulting in further disruption ofenergy availability at increasing number of locations. The rapid expanding use of smallgenerators in Sana'a to overcome the impact of power shortages is one example ofadverse effects, which will have significant local impacts to air quality and noise.

The proposed project will include the following physical investment components: (A)selected rehabilitation and upgrading activities for the existing 20 MW diesel-fueledpower plant at the Dhahban Power Plant site; (B) installation of an additional 30 MWof generating capacity at the existing site; and (C) expansion and upgrading of Asser132/33 kV substation also including debottlenecking elements of the transmissionnetwork in Sana'a. Further details for the planned project are given in chapter 3.

1.2 OBJECTIVE FOR THE ENVIRONMENTAL ASSESSMENT

Consistent with the policies and procedures of the Government of Yemen and theWorld Bank, an environmental assessment has been prepared as an element of theproject preparation process. The objective of the assessment is to ensure that theproposed project components and activities under consideration are environmentallysound and sustainable and that any environmental consequences are recognised early inthe project cycle and further taken into account in the project design.

1.3 SCOPE OF WORK

The IDA has entered an agreement with the Danish consulting company Carl BroIntemational (the Consultant) to carry out, on behalf of the PEC, an environmentalassessment of the Sana'a Emergency Power Project. A site visit to Sana'a, Yemen wascarried out in the period 30. November to 14. December 1997. Project documents andbaseline data were identified and interviews with relevant authorities, institutions andpersons carried out. A draft Environmental Assessment Report of the proposed projectwas submitted in the second half of January 1998 to the involved parties for comments.From the 9th to the 15th of February, a mission to Sana'a, Yemen for an interactivereview of the draft report was carried out.

A Supplemental Environmental Study was prepared by an American consultingcompany, Golder Associates Inc. in order to complement the Environmental

C \SPP\80163901 Yemen Power Piart\Ftril Report\CHAP-Ldoc

_ 1 1 -

Page 14: Republic of Yemen - World Bankdocuments.worldbank.org/curated/en/... · 1. introduction 1.1 1.1 background 1.1 1.2 objective for the environmental assessment 1.1 1.3 scope of work

1 / INTRODUCTION

Assessment prepared by Carl Bro International a/s. This study included additional fieldstudies conducted in July 1998. The Supplemental Environmental Study - which isprovided as Annex K includes three elements: (A) air quality analysis; (B)reconmmendations for air quality monitoring; and (C) findings of a field-based reviewof proposed right-of-ways for the additional project-supported transmission lines.

The study has addressed, but not been limited to the following key issues: review ofplant site; potential air quality impacts; cooling water requirements and impacts ofwater quality; waste management and disposal; workers health and safety; emergencymanagement; fuel transport and cultural heritage issues. The study has been carried outaccording to World Bank guidelines for environmental assessments (World BankOperational Directive 4.01, "Environmental Assessment" and the "World BankEnvironmental Guidelines").

1.4 REPORT ORGANISATION

The report is organised in the following manner:

Chapter I - gives an introduction and the background for the preparedenvironmental assessment.

Chapter 2 - gives a description of the present environmental policy, existinglegal and administrative framework of Yemen. It further describesthe procedures for public participation and involvement of NGOs,and the results of public consultations.

Chapter 3 - provides a description of the power rehabilitation project and thespecific project components.

Chapter 4 - provides a description of the project area and environrnentalbaseline data conceming physical, biological and socio-economicconditions.

Chapter 5 - gives a summary and a detailed description of identified positiveand negative impacts by the proposed power rehabilitationproject.

Chapter 6 - provides an analysis of project altematives including a no actionaltemative and potential use of natural gas as a fuel altemative.

Chapter 7 - provides a description of mitigation measures including amitigation plan and cost estimates.

Chapter 8 - provides a draft concept for an environmental managementtraining programme.

Chapter 9 - provides a draft environmental monitoring plan including costestimates.

.:SPPtS0163901 Yenen Powe Plant\Final Report\CHAPI. doc

~1 X

Page 15: Republic of Yemen - World Bankdocuments.worldbank.org/curated/en/... · 1. introduction 1.1 1.1 background 1.1 1.2 objective for the environmental assessment 1.1 1.3 scope of work

1 / INTRODUCTION

The appendixes and annexes are enclosed in a separate volumen. The appendixescontain the illustrating maps, selected photographs from the site visit and a list ofreferences. The annexes include list of persons met and meetings held, generalbackground information and terms of reference for the proposed additional studies.

An Executive Summary has been prepared separately.

1.5 ACKNOWLEDGEMENT

The team would like to express their sincere thanks to all officials and individuals metfor the kind support and valuable information, which the team received during its stayin Yemen and which highly facilitated the work of the team.

7\SPP\80163901 Ynnen Powr Plant\Fmd RepnT\CHAP-1 doc

-1.3-

Page 16: Republic of Yemen - World Bankdocuments.worldbank.org/curated/en/... · 1. introduction 1.1 1.1 background 1.1 1.2 objective for the environmental assessment 1.1 1.3 scope of work

2. POLICY, LEGALANDADMINISTRATIVE FRAMEWORK

Page 17: Republic of Yemen - World Bankdocuments.worldbank.org/curated/en/... · 1. introduction 1.1 1.1 background 1.1 1.2 objective for the environmental assessment 1.1 1.3 scope of work

2 / POLICY, LEGAL AND ADMINISTRATIVE FRAMEWORK

2. POLICY. LEGAL AND ADMINISTRATIVE FRAMEWORK

2.1 POLICY

The Government of Yemen is well aware of the importance of establishing means andmeasures for protection of the environment. The national development objectives andcapacity needs are described in a programmne support document (ref. 1) prepared byUnited Nations Development Programme (LTNDP). According to this document, theGovernment has stated that the interrelationship between socio-economic growth andsound environmental management is a major item on the country's developmentagenda, and its growth-oriented development strategy which aims at increased foodproduction and industrialisation, is based on continued utilisation of the country'snatural resources. These concerns are documented inter alia in the General EconomicMemorandum presented by the Govermnent at the Round Table Conference in Genevain 1992 and in the Five-year Development Plan 1996-2000 in which the NationalEnvironmental Action Plan (NEAP), prepared with assistance from the World Bank,forms the basis for the environmental chapter. National priorities for environmentalmanagement have been identified in the NEAP which was formulated through aparticipatory approach to promote sustainable use of natural resources. The plan isintended to be an important step forward for Yemen towards achieving the integrationof environmental and national economic priorities. The Government commitment toglobal efforts for the protection and conservation of the environment is reflected in theratification of many international conventions relating to biodiversity, climate changes,ozone depletion, oil pollution from ships, etc.

In 1990, the Government constituted the independent, inter-ministerial EnvironmentalProtection Council (EPC) with broad responsibilities to manage the environment,replacing similar institutions in the formner North and South Yemen. Its mandate is todevelop and propose policies to protect the environment, formulate nationalenvironmental legislation and regulations, set up national environmental standards, co-ordinate and monitor national, regional and international efforts in environmentalprotection and promote environmental education and public awareness.

With reference to the Environment Protection Law adopted in 1995, a special YemenEnvironment Protection Fund has to be established. EPC has recently taken steps toestablish the Fund, which will give the Council improved capacity to supportenvironmental activities in Yemen.

The National Environmental Action Programme has defined a priority programme forenvironmental actions. With relevance for the proposed project, a number of priorityactions are included in the programme, including improvement of the overall wastemanagement set-up, handling and routines (incl. hazardous waste management),improvement of urban waste water treatment and overall environmental institutionalstrengthening. The implementation of the NEAP is supported by a number of bilateraland multilateral donors. Since the implementation of the NEAP is still in a very earlyphase, it is the Consultant's opinion that solutions to environmental problemsidentified in the present project cannot wait and therefore will not be able to benefitfrom measures implemented through the NEAP.

C \SPP\80163901 Yemcn Power Plant\Final Report\CHAP-2.doc

- 1 -

Page 18: Republic of Yemen - World Bankdocuments.worldbank.org/curated/en/... · 1. introduction 1.1 1.1 background 1.1 1.2 objective for the environmental assessment 1.1 1.3 scope of work

2 / POLICY, LEGAL AND ADMINISTRATIVE FRAMEWORK

2.2 LEGAL FRAMEWORK

The Yemeni legal system is based on Islamic law, Turkish law, English common lawand local customary law. Statuary law was introduced by the British in former SouthYemen. According to the Unification Declaration, the existing laws and provisionsfrom each part of the previous divided Yemen remain valid as a whole, untilconsolidated or replaced by new legislation.

The following acts and regulations were identified as pertinent for the environmentalissue complex comprised by this study:

Environment Protection Law No. 26 of 1995, Republic of YemenThe Environment Protection Law, signed by the President of the Republic 29thOctober 1995, provides the legal basis for activities and regulations related toprotection of the environment of Yemen. The law is divided in 5 parts andaccompanying chapters describing the legal basis for the general rules and principles;protection of water, soil and use of pesticides; environmental damaging activities;marine pollution; violation and compensation for environmental damages. The Lawempowers the EPC, after consultations with competent bodies, to undertakepreparation, the issuance, reviewing and improving standards, criteria andspecifications for the protection of the environment. The Law also introduces theconcept of use of environmental impact assessments before issuing licenses for newand existing projects.

The Law has accordingly to be enforced by a specific number of guidelines andregulations prepared by EPC and which presently only are in a draft form. This impliesthat the only national legal and regulatory basis to be applied on environmentalproblems identified in the proposed project is constituted by Environment ProtectionLaw.

The Law for Work (published in The Gazette, Issue No. 5 published on 15th of March1995)The Law for Work performs the legal basis for occupational health and safety. Selectedparts have been translated from Arabic to English. The Law gives specific guidelinesand regulations to the Employer and Employee with respect to protection of workershealth and safety.

Law of Antiques (Law No. 21 of 1994)Law No. 8 of 1997 pertaining revision of some articles of Law No. 21 of 1994regarding Antiques.The Law of Antiques provides the legal framework for protection of antiques inYemen. The Law empowers the General Authority of Antiques, Museums and Scriptsto be responsible for all issues related to protection of historical values. No specificprocedures is stated for issuing licences for new construction projects. It is specificallystated in the Law that any person finding a movable antique (defined as more than 200years old) should inform the Authority.

International conventionsNo obligations stated in intemational conventions and signed or ratified by Yemen willbe of specific relevance for the proposed project.

C \SPPtS0163901 Yamnn Powe Piant\F,nnl Repmrt\CHAP-2.&ec

- 2.2 -

Page 19: Republic of Yemen - World Bankdocuments.worldbank.org/curated/en/... · 1. introduction 1.1 1.1 background 1.1 1.2 objective for the environmental assessment 1.1 1.3 scope of work

2 / POLICY, LEGAL AND ADMINISTRATIVE FRAMEWORK

2.3 ADMINISTRATIVE FRAMEWORK

The following authorities and institutions with relevance for the project have beenidentified during the study:

Ministry of Electricity and WaterThe Ministry is responsible for electricity supply, water supply and sanitation in theurban and rural areas. Within the Ministry, the responsibility for electricity supply hasbeen delegated to Public Electricity Corporation, while the responsibility for the urbanwater supply and sanitation has been delegated to the semi-autonomous NationalWater and Sanitation Authority (NWSA).

Public Electricity CorporationThe PEC is organised under the Ministry of Electricity and Water with a ManagingDirectors Office under which a number of administrative and technical departments areattached. Besides the Head Office in Sana'a, regional and local offices are situated allover the country. The present project is handled at Managing Director Office level andfurther decisions for the project will be taken at this level. This also goes for finalapproval of the Environment Assessment. No environmental department or otheradministrative framework devoted environmental management exists within theCorporation. The PEC institutional capacity for handling and managing theenvironmental components in relation to the proposed project must in general beassessed to be limited.

Environment Protection CouncilThe EPC is an independent inter-ministerial body organised with a Council Chairmanand a Technical Secretariat. Under the Secretariat is attached a General Directorate forEnvironmental Protection, a General Directorate of Planning and Data, a Directoratefor Financial and Administrative Affairs and an Aden Branch, all with a number ofdepartments. According to the obtained information, the EPC will have functions ashearing and advising authority in relation to environmental matters for the proposedproject.

The Governorate of Sana'aThe Govemorate of Sana'a under the Ministry of Municipalities is the regionalauthority for the Sana'a area. According to interview with the Vice Governor of Sana'aGovemorate, the regional authority will function as a hearing and advising authority inrelation to environmental matters for the proposed project.

National Water and Sanitation Authority, Sana'a BranchThe NWSA, Sana'a Branch under the Ministry of Electricity and Water is responsiblefor drinking water supply and quality in the Sana'a area. The Authority is alsoresponsible for treatment and treatment facilities in relation to waste water treatment inthe Sana'a area. The Authority will have functions as hearing and advising authority inrelation to drinking and waste water aspects of the proposed project.

The National Water Resources AuthorityNWRA was established in 1995 by Presidential Decree. The NWRA has been givenfull authority over the planning, management, and of water resources so as to achievesustainable control of the country's water resources. The Authority will have functions

C GSPP\80163901 Ymn Powc Plant\F,nal Reporn\CHAP-2 doc

Page 20: Republic of Yemen - World Bankdocuments.worldbank.org/curated/en/... · 1. introduction 1.1 1.1 background 1.1 1.2 objective for the environmental assessment 1.1 1.3 scope of work

2 / POLICY, LEGAL AND ADMINISTRATIVE FRAMIEWORK

as hearing and advising authority in relation to water resource aspects of the proposedproject.

The Department of Public Health and SafetyThe Department of Public Health and Safety under the Ministry of Labour andVocational Training is responsible for enforcement of regulations and rules foroccupational health and safety. The Department has further capacities for monitoringof workers health and safety. The Department will have functions as an advisingauthority in relation to occupational health and safety aspects of the proposed project.

The Civil Defence Head OfficeThe Civil Defence Head Office, Sana'a Hasaba Nearby under Ministry of Interior isresponsible for fire and emergency service in the Dhahban region. The Head Officewill have functions as an advising authority in relation to fire fighting and emergencyaspects of the proposed project.

2.4 PUBLIC PARTICIPATION AND NON GOVERNMENTAL ORGANISATIONS(NGO's)

According to general World Bank procedures, the borrowers are expected to take theviews of affected groups and local NGO's fully into account in project design andimplementation and in particular during the preparation of the EA.

As a part of the study, consultations have been arranged with (a) local representativesfrom the Dhahban area and (b) local non governmental organisations.

A consultation meeting was arranged with three invited community leaders from thecommunities around the power plant. A number of questions were posed and minutesof the meeting elaborated. The minutes are enclosed as Annex D.

The conclusions from the meeting were that all three participants expressed theirpositive interest in the project because they saw it as a specific solution to seriousproblems with unstable power supply in the area. Due to the location of theircommunities (1,5-5 km) from the power plant, no extemal environmental impact ornuisance has previously been observed or was expected to be observed after theexpansion of the plant. The area around the power plant was characterised as a low-density populated area, and this fact explained, according to the community leaders,why potential environmental impacts (noise, dust, exhaust gases) from the power plantwere not considered as a problem. The possibilities for additional employment forlocal people from the area at an expanded power plant were mentioned as a positiveside-effect.

Meetings with relevant non-governmental-organisation's, NGO's were arranged duringthe second visit to Sana'a: The Yemen Water Protection Society and Friends forNature, respectively. Conclusions from the meetings with the NGO's are reflected inthe List of Meetings and Public Consultations (Annex C). Copies of the draft EAreport were handed out for possible review. A copy of the draft EA report was furthersubmitted to the NGO Birdlife Intemational for review.

C \SPP\80163901 Y =eme Power Plant\Fi..] Rcpon\CHAP-2.do

-?4-

Page 21: Republic of Yemen - World Bankdocuments.worldbank.org/curated/en/... · 1. introduction 1.1 1.1 background 1.1 1.2 objective for the environmental assessment 1.1 1.3 scope of work

2 / POLICY, LEGAL AND ADMINISTRATIVE FRAMEWORK

In general, it can be concluded that the local NGO's appreciated the possibility forcommenting the proposed project. A number of raised questions and issues wereanswered and discussed. No serious concem were raised for the proposed project.

'SPP\80163901 Ya, 'cr PanmtVFinal Rcpon\CHAP-2.doc

- 2.5 -

Page 22: Republic of Yemen - World Bankdocuments.worldbank.org/curated/en/... · 1. introduction 1.1 1.1 background 1.1 1.2 objective for the environmental assessment 1.1 1.3 scope of work

3. PROJECT DESCRIPTION

Page 23: Republic of Yemen - World Bankdocuments.worldbank.org/curated/en/... · 1. introduction 1.1 1.1 background 1.1 1.2 objective for the environmental assessment 1.1 1.3 scope of work

3 / PROJECT DESCRIPTION

3. PROJECT DESCRIPTION

The proposed project will include the following physical investment components:

(A) selected rehabilitation and upgrading activities for the existing 20 MW diesel-fueled power plant at the Dhahban Power Plant site.

(B) installation of an additional 30 MW of generating capacity at the existing site.

(C) expansion and upgrading of Asser 132/33 kV substation also includingdebottlenecking elements of the transmission network in Sana'a. The existingpower supply network is planned to be expanded in the Sana'a north-west area withnew overhead 33 kV lines and underground cable lines.

It is further considered to establish a separate Operational & Maintenance ManagementContract with an extemal contractor for operation, maintenance and management ofthe Dhahban power plant.

As a part of the initial project planning, it was considered as an option to utilise naturalgas as fuel for the power plant. Natural gas fields are developed in the Ma'rib area(approx. 180 km east of Sana'a), but at present, no specific plans have been developedto supply the Sana'a region with natural gas from the Ma'rib area. Private sectorinvestors give priority to development of pipelines for gas export rather than domesticuse. On this basis, it was decided only to consider the diesel fuel option as relevant forthe Dhahban Power Plant.

The proposed project is described in 9 identified documents:

1. Revised Technical-Economic Offer dated November, 28, 1997 from AnsaldoEnergia s.p.a concerning Rehabilitation of Dhaban (Sana'a) and El Hali(Hodeidah) Power Stations (ref. 3).

2. Dhaban (Sana'a) and El-Hali (Hodeidah) Power Plants. Technical-EconomicOffer for Extraordinary Maintenance and Revamping. Not dated. Grand MotoriTrieste s.p.a., - including Technical Specification "A". Dhaban (Sana'a) PowerPlant. Technical Specification for Extraordinary Maintenance and Revamping.Not dated. Grand Motori Trieste s.p.a. (ref. 4 & 5).

3. Tender Document dated July 4, 1997 concerning Sana'a Emergency Generation.Solution 1. Diesel. (ref. 6).

4. Dhaban and El-Hali Power Station. Technical report of visit. Not dated. AnsaldoEnergia (ref. 7).

5. Sana'a 33 kV System - ConfigurationPrepared March 1998 by PEC (Appendix 5A, ref. 23).

6. Quotation of environmental mitigation measures for Dhaban Power Station New30 MW (5 x 6 MW) and Existing 20 MW (4 x 5 MW) from Ansaldo Energias.p.a dated 2 March 1998 and a technical revised version (noise component andoil/water treatment component received 8. April 1998 (ref. 19).

C SPP\80163901 Yemen Power Plant\Final Rcpon\CHAP-3.doc- 1 -

Page 24: Republic of Yemen - World Bankdocuments.worldbank.org/curated/en/... · 1. introduction 1.1 1.1 background 1.1 1.2 objective for the environmental assessment 1.1 1.3 scope of work

3 / PROJECT DESCRIPTION

7. Draft site lay-out drawing for new and existing power plant including siting ofthe new power plant and draft design of oil spillway system. (ref. 20)

8. Sana'a - Asser 132/33 Substation Upgradation Works. Project Status Report.Kennedy & Donkin Middle East Limited. Received 8. April 1998. (ref 21).

9. The World Bank draft documents. Sana'a Emergency Power Project, Annex 2:Rehabilitation of 20 MW Dhahban Diesel Plant; Annex 3: Expansion of 132/33kV Asser Substation. (ref. 22).

Besides these project documents, a number of design drawings (ref. 8) for the originalpower plant were identified.

3.1 REHABILITATION OF THE EXISTING 20 MW PLANT

As stated in the Revised Technical-Economic Offer dated November 28, 1997 fromAnsaldo Energia S.p.A conceming Rehabilitation of Dhaban (Sana'a) and El Halii(Hodeidah) Power Stations Rehabilitation of Dhaban Power Plant (ref. 3), - therehabilitation of the existing 4 units is essentially constituted by the overhauling andthe upgrading of the engines, auxiliary equipment of the engines, electrical generators,transforners, M.V. and L.V. boards and electrical auxiliary equipment of the powerplant.

It is also foreseen that one engine crankshaft has to be substituted and three enginecrankshaft repaired as stated in the elaborated technical report. Finally, spare parts anderection activities for engine auxiliary equipment will be included.

As stated in Quotation of environmental mitigation measures for Dhahban PowerStation New 30 MW (5 x 6 MW) and Existing 20 MW (4 x 5 MW) from AnsaldoEnergia s.p.a dated 2 March 1998. (ref. 19), a number of environmental mitigationmeasures are considered to be included in the project. For the existing power plant theproposed mitigation measures to be included, mainly concems reduction of ambientand indoor noise levels and rehabilitation of the oil spillway system includingimprovement of final treatment of oily waste water. The following components areconsidered to be included:

- substitution of air intake silencers- addition of air exhaust silencers- addition of local noise reduction barriers- sound barriers for radiators.

The proposed measures for the oil spillway system will be described in the followingsection.

The Dhahban 20 MW plant rehabilitation is estimated to take ten months, but someunits will be able to operate much earlier. Grandi Motori Trieste (GMT) will be used tosupervise the rehabilitation and adequate output performance must be assured byGMT, before the project is started.

C SPP\8OI63901 YcmeD POWe, Plnfftial Repoft\CHAP-3.do

- 3.2 -

Page 25: Republic of Yemen - World Bankdocuments.worldbank.org/curated/en/... · 1. introduction 1.1 1.1 background 1.1 1.2 objective for the environmental assessment 1.1 1.3 scope of work

3 / PROJECT DESCRIPTION

3.2 EXPANSION WITH NEW 30 MW PLANT

As stated in the Tender Document dated July 4 1997 concerning Sana'a EmergencyGeneration. Solution 1. Diesel (ref. 6), the scope of supply will comprise:

- 5 diesel generator sets, each having the following characteristics (site max. rating:6,000 kW; nominal voltage 11 kW; nominal frequency 50 Hz; speed 750 r.p.m;power factor 0,8)

- Associated Mechanical Equipment. Five sets of the mechanical equipmentassociated with diesel engines comprising starting air system; lube oil system; fueloil system; cooling system; air intake system; exhaust gas system. Summarisedtechnical data for the auxiliary systems are listed in the tender in a specialenclosure.

- Common Station Equipment is grouped into the following systems: Compressedair system; lube oil system; fuel oil system, station services and miscellaneous.Station services comprise ventilation and air conditioning, hoisting equipment andfire fighting equipment. Miscellaneous comprises a water treatment system,cooling water system and stacks. A sewage and oily water system is excluded inthe offer from Ansaldo Energia. Summarised technical data for the auxiliarysystems are listed in the tender in a special enclosure.

- Electrical Works. M.V. equipment, power transformner, L.V equipment, controland monitoring equipment, cables and electrical systems.

- Miscellaneous. Spanners and tools, manuals, handbooks and software.

- Civil Works. Common systems, civil work, erection and commissioning. The civilworks cover foundation of diesel generator sets and relevant auxiliaries, buildingof diesel generator sets and building for control of the plant.

Two preliminary drawings, a preliminary general lay-out of the new power plant and apreliminary general lay-out of section is enclosed the tender documents. A draft sitelay-out drawing for new and existing power plant including siting of the new powerplant and draft design of oil spillway system has been identified (ref. 20, Appendix4A).

As stated in Quotation of environmental mitigation measures for Dhahban PowerStation New 30 MW (5 x 6 MW) and Existing 20 MW (4 x 5 MW) from AnsaldoEnergia s.p.a dated 2 March 1998. (ref. 19), a number of environmental mitigationmeasures are considered to be included in the project. For the new power plant theproposed included mitigation measures mainly concems reduction of ambient andindoor noise levels and rehabilitation of the oil spillway system including improvementof final treatment of oily waste water. The following components are considered to beincluded:

- partial insulation of the building to reduce indoor and ambient noise levelsincluding addition of a noise barrier on the roof air exhausters of the machine halland addition of sound proof cladding for the machine hall.

- internal partition walls for engine maintenance.

\SPP\80163901 Yemen Por Pla,=t\Final Report\CHAP-3 doc

- 3.3 _

Page 26: Republic of Yemen - World Bankdocuments.worldbank.org/curated/en/... · 1. introduction 1.1 1.1 background 1.1 1.2 objective for the environmental assessment 1.1 1.3 scope of work

3 / PROJECT DESCRIPTION

- addition of diesel engine air intake silencers.- addition of silencers for the air exhaust stacks.- installation of radiator fans of low noise type.- rehabilitation and modification of the existing oil spillway system.- combining the existing and new oil spillway system with measures for treatment of

oily waste water in a specific oil separation unit.

The following information obtained from the tender material and later submittedmaterial is considered of specific relevance for the Environmental Assessment:

Design references. The plant will be designed in accordance with these specificationsand shall make provisions for the following:

Site reference conditions: Ambient air temperature (design): 35°CSite altitude above sea level: 2,300 mRelative humidity (design): 60%

Service conditions: Operation: Base loadCooling system (engine): Closed system by

water from radiators

The diesel engines type A32, which are proposed for Dhahban Power Plant, aredesigned for operation on heavy fuel oils up to IFO 700 (ISO classification), but thepresent specification makes provision for distillate oil corresponding to diesel oils toclass A2 (BBS 2869), alternatively to class 2D (ASTM D 975). In general, thespecified diesel oil type is named light diesel grade 2. Lube oils and service fluids shallbe in compliance with specifications from Ansaldo Energia.

The diesel engine type 16 VA 32 is a medium speed diesel engine, operating under thefour stroke diesel cycle, single acting, trunk piston, mechanical injection of fuel.Detailed specification and characteristics are given in the Tender Document. Fuel oiland lube oil total consumption under specified conditions is listed as 210 gr./kWh, 0,8gr./kWh, respectively.

It is planned to use the existing 2 x 2,000 m3 fuel oil storage also as storage for the newplant. The new plant will be equipped with two diesel oil service tanks of 20 m3 each.It will also be equipped with a fuel leakage circuit including two collecting tanks (1 m3

each).

The plant will be equipped with clean lube oil storage tank (20 in3 ). The plant will alsobe equipped with two engine sumps including drain pumps. It is noted that a systemdescribed as a used lube oil tank and an oil sludge buffer tank is excluded from theAnsaldo scope of supply.

Station services. The engine room will be ventilated by a forced ventilation systemdesigned to keep the ambient temperature at 10°C above the outdoor coincidentcondition, removing the heat emission from the machines. The engine room will beequipped with 10 ventilation units/2 units for each diesel generating set (per ventilationunit: air flow = 90,000 cu.m/hr; air pressure = 350 Pa; fan motor rating = 22 kW). Theauxiliary area will be equipped with 3 ventilation units (per ventilation unit: air flow =21,600 cu.m/hr; air pressure = 350 Pa; fan motor rating = 5,5 kW). Air conditioning by

C \SPP\0163901 Yee Po.e P?1=\Fi,,W Repon\CHAP-3 dcc

Page 27: Republic of Yemen - World Bankdocuments.worldbank.org/curated/en/... · 1. introduction 1.1 1.1 background 1.1 1.2 objective for the environmental assessment 1.1 1.3 scope of work

3 / PROJECT DESCRIPTION

means of wall mounted air conditioning (A.C.) units will be provided for the controlroom. The number of A.C. units is not specified.

Stacks. The exhaust gas stacks (one for three and one for two diesel generating sets)are made of pre-constructed steel beams housing the exhaust gas ducts. The height ofthe stacks has been estimated to approximately 15 meters. Each exhaust gas duct willbe equipped with an exhaust gas silencer. The exhaust duct single pipe diameter willbe 1,000 mm. Besides the general lay-out section of the power plant, no specificdrawings for exhaust gas system have been identified.

Measures for noise reduction.Noise emissions have been calculated by Ansaldo Energia s.p.a in a computerisednoise emission model under the precondition that the proposed noise reductionmeasures in the existing and new power plant are fully implemented. From the analysisof the results, a maximum calculated noise level of 74,4 dB(A) is expected at thereceiver located in correspondence at the plant fence at north-west side. The maximumcalculated expected noise level at north-east side of the plant fence is 66 dB(A). Themaximum calculated noise level at a distance of 100 m from the power plant (locatedat the north side) is 68,4 dB(A).

Civil works. A number of environmental mitigating measures is considered to beincluded in the project in order to improve present regimes for use of drainage systemfor rain water and the oil spillway system for oily waste water (Appendix 4A, ref. 20):

- the principle in the original design of the existing power plant with division of thewaste water systems in a drainage system and an oil spillway system will bemaintained in the project.

- the new drainage system for rain water at the new power plant site will beconnected to the existing drainage system.

- the existing oily water reception underground reservoir will be disconnected fromthe existing oil spillway system in order to avoid any further discharge into thisreservoir.

- the existing oil spillway will be inspected in order to secure that all parts andsections are intact and well functioning. Those part of the system, which wereidentified as damaged or ruined, will be removed and new parts constructed.

- the existing oil spillway system will be connected to the spillway systemconstructed for the new power plant site.

- in order to minimise rain water inlet into the oil spillway system, it is considered toredirect rain water collected in the tank yards of the diesel oil storage tanks into thedrainage system. Installation of valves at the drainage outlet has the intention tosecure that only non-polluted rain water will be directed to the drainage system.

- in order to secure proper treatment of the oily waste water, an oil/water separationunit, a sand bed filter and a water collection lagoon is considered to be added as anintegrated part of the oil spillway system. The overall system is considered to bedimensioned for a performance of a water quality of maximum 10 PPM oil product

tSPP\80163901 Yemen Power Plant\Fnai Report\CHAP-31doc

- 3.5 -

Page 28: Republic of Yemen - World Bankdocuments.worldbank.org/curated/en/... · 1. introduction 1.1 1.1 background 1.1 1.2 objective for the environmental assessment 1.1 1.3 scope of work

3 / PROJECT DESCRIPTION

concentration in the outlet water from the water collection lagoon. Preliminarycalculations for hydraulic dimensioning of the system have been prepared.

- a site for long term storage of oil polluted soil (dimensions 15 m x 15 m with aconcrete bottom) surrounded by perimetrial gratings is considered to beconstructed for storage of oil polluted soil and oily waste identified during plantrehabilitation and the construction of the new plant. The site will be drained forrain water into the oil spillway system.

- additional storage capacity for oily waste and waste oil will be provided.

Fire emergency set-up. No details are given in the tender documents conceming fireemergency set-up, except that portable fire fighting equipment for the various plantareas is foreseen. The number of equipment is not specified.

3.3 EXPANSION AND UPGRADING OF ASSER BSP 132/33 KV SUBSTATIONINCLUDING DEBOTTLENECKING ELEMENTS OF THE TRANSMISSIONNETWORK IN SANA'A.

The 132/33 kV Asser substation on the west side of Sana'a was constructed in 1982(Appendix 1, 5). The substation is the main bulk supply point to the Sana'a system.Asser substation is supplied from a 132 kV line about 150 km long that runs fromDhamar substation in the south to Amran substation in the north. Dhamar substation intum is connected to the overall PEC grid that is supplied mainly from the three steamplants Al Hiswa in the south and Ras Katenib and Al Mukha in the west.

The present arrangement at Asser substation consists of tapping the two passing 132kV circuits with connections through 132 kV breakers to two MVA 132/33 kV step-down transformers. These connect to a single 33 kV bus which supplies sevenoutgoing 33 kV lines and is connected to a switched 20 MVAR capacitor bank..

The existing Asser substation arrangement suffers from inadequate transformationcapacity and low reliability because each of the two transformers is connected to oneline; any line outage (maintenance or forced) or any transformer outage, will take outat least 50% of the substation and may interrupt the total station loads. Any fault on thesingle 33 kV bus or any maintenance work will interrupt the supply to all the 33 kVlines.

In the project for expansion and upgrading of the Asser substation, the two 132 kVcircuits will be turned into the substation and separated so there are four line sections,two to the south and two to the north with each connected by a 132 kV breaker andselection disconnects to two 132 kV buses. A third 60 MVA transformer will be addedand the three step-down transformers will connected to the double 132 kV busesthrough the breakers. The output of the transformers will connect to the 33 kV busthrough 33 kV breakers to the 33 kV bus sectionalised with breakers into three sectionsto permnit maintenance without station shutdown and to localise faults. The 33 kV buswill connect to the capacitor and nine outgoing 33 kV lines, an increase of two fromthe present arrangement.

The physical rehabilitation and const-uction work at Asser substation is restricted to:

C\SPP\=0163901 Ye nen Power Prnf\Final Rcpon1CHAP-3.doc

- 3.6 -

Page 29: Republic of Yemen - World Bankdocuments.worldbank.org/curated/en/... · 1. introduction 1.1 1.1 background 1.1 1.2 objective for the environmental assessment 1.1 1.3 scope of work

3 / PROJECT DESCRIPTION

construction of a double circuit 132 kV open switchyard with two bus sections.

addition of a third 60 MVA power transformer.

extension of access road behind the existing 33 kV switchgear building.

extension of 33 kV switchgear building to accommodate additional panels.

The transformer addition will bring Asser substation capacity to about 150 MW.Combining this with the 30 MW diesel generating capacity to be added at Dhahbanand the planned 20 MW Dhahban diesel rehabilitation, this will provide about 200MW total supply to the Sana'a 33 kV system or about 3 years load growth.

A recent study prepared by PEC (ref. 23) and a single-line and impedance diagram forSana'a power distribution system elaborated by Bechtel in 1993 for a previous study(ref. 9) forms the basis for the planned construction of transmission lines. The finaldesign of the project is still under preparation. During site inspection, a draft locationmap was elaborated for the right-of-way of the proposed lines. The configuration of the33 kV system in Sana'a is shown in Appendix 1 and Appendix 5 A.

The following components for construction of right-of-way are according to Ref. 23.included in the project:

1. A new 33 kV line from Dhahban Power Station to north-east substation - a totalof 8,6 km overhead line and 1,3 km cable.

2. A new 33 kW line from Dhahban Power Station to the Airport Road andintercepting the existing 33 kV line from Rawdan substation - a total of 3,6 kmoverhead line and 1,3 km cable.

3. A new 33 kV line from Dhahban Power Station to to Sana'a north-westsubstation - a total of 7,5 km overhead line and 1,2 km cable.

4. A new 33 kV line from Asser BSP to south-west substation - a total of 5,2 kmoverhead line and 2,5 km cable.

The PEC policy for acquiring land for right-of-way construction is not outlined orstated in any identified documents. Based on discussions with the PEC management,the following policy for construction of right-of-ways for power overhead lines wasoutlined:

- to apply existing right-of-ways or to construct right-of-ways along existing roadsand highways.

- to avoid construction of overhead lines passing over existing building and houses.

- if unavoidable for construction of the overhead line, to negotiate conditions forright-of-way passing private land with land owners.

C \SPP\O0163901 Ye Pow- Panf=l kcpoMTR\CAP-3.do

_ 7_

Page 30: Republic of Yemen - World Bankdocuments.worldbank.org/curated/en/... · 1. introduction 1.1 1.1 background 1.1 1.2 objective for the environmental assessment 1.1 1.3 scope of work

4. BASELINE DATA

Page 31: Republic of Yemen - World Bankdocuments.worldbank.org/curated/en/... · 1. introduction 1.1 1.1 background 1.1 1.2 objective for the environmental assessment 1.1 1.3 scope of work

4 / BASELINE DATA

4. BASELINE DATA

The Republic of Yemen, located in the Middle East on the south-west coast of theArabian Peninsula, is bordered by Saudi Arabia to the north, Oman to the east, theGulf of Aden to the south, and the Red Sea to the west. Its land area (527,970 squarekilometres) is about four times the size of Greece.

In the south, the coastal plain is a narrow, sandy, almost rainless area with hightemperatures. Along the west coast, a semi-desert region, the Tihmah, extends inlandan average of 48 kilometres (30 miles). Mountains, broken by deep valleys, andhighland plateaux dominate the centre of the country. The highest mountain in Yemenis Hadur Shu'ayb, which rises to 3,760 metres (12,336 feet) above sea level. Thelargest valley is Hadhramaut in the central region.

The highlands have no permanent streams, but many have cut valleys and gorges in theterrain. Near the north-eastern border, the elevations decrease, and the land isdominated by the great sandy desert of the Rub' al Khali ("Empty Quarter").

The climate of the coastal plains is hot and dry; the average annual temperature isabout 28°C (about 82°F). Average annual rainfall is 76 millimetres (3 inches) on thesouth coast, and 229 millimetres (9 inches) on the west coast. Winds blowing north-west in summer and south-west in winter bring severe sandstorms. The mountainousinterior has a temperate climate, and the winters are generally cool. Annual rainfall inthe highlands ranges from about 100 to 762 millimetres (about 4 to 30 inches).

The Republic of Yemen has a total of 16.5 million inhabitants (1995).The capital isSana'a (95Q0.000 inhabitants in 1996) located in the north-western part of the centralhighlands.

4.1 PROJECT AREA DESCRIPTION INCLUDING DESCRIPTION OFEXISTING CONDITIONS ON-SITE

Maps of the project area (1:50,000 and 1:5,000) are enclosed in Appendix 1, 2 and 3.Selected photographs from the site visit are enclosed in Appendix 6.

Location

The Dhahban power plant is situated approximately 10 km north-west of Sana'a citycentre in a scarcely populated area characterised in the immediate surrounding bysmall scale industrial activities. Nearest areas with houses are located approximatelyone kilometre from the plant site. According to interviews with the Vice Governorfrom the Govemorate of Sana'a, the overall area is intended to be used for small andmedium scale industry moving out from the city centre. The plant site is located at the2-lane main road for Amran (40 km north-west of Sana'a). Nearest larger settlementsare the village of Dhahban (1,5 km from the plant/approx. 500 inhabitants), the villageof Jader (3 kilometres from the plant/approx. 1,500 inhabitants), village of Al-Rawdah(3,5 km from the power plant/ approx. 5,000 inhabitants) and village of Algabel (5kilometres from the power plant/approx. 6,000 inhabitants). Information aboutsensitive receptors for potential environmental impact of the power plant was obtainedby interviews with power plant personal and local workers on the plant site. No

C \SPPM163901 Ycann Powc PlantTinal Rc,aort\CHAP4.doc

-4.1 -

Page 32: Republic of Yemen - World Bankdocuments.worldbank.org/curated/en/... · 1. introduction 1.1 1.1 background 1.1 1.2 objective for the environmental assessment 1.1 1.3 scope of work

4 / BASELINE DATA

potential sensitive receptors (hospitals, schools) are located in the vicinity of the plant.Nearest hospital is located in Sana'a city area, at least 10 kmn from the plant site.Nearest primary school is situated in Al-Rawdah 3,5 krn from the power plant.

Site description

The plant site (estimated overall area 250 m x 370 m) surrounded by a 2,5m high wall,is characterised as an open site with very little vegetation. The site is slightly decliningfrom a neighbouring hill site down to the highway and the guarded entrance. Mainbuildings are the existing power plant house including workshop, a separatetransformer house and fuel storage tanks. A large PEC storage building is located atthe opposite site of the plant area. In the southern part of the site, there is a largeprepared area originally destined for the new power plant. For further information seeenclosed appendix with photographs from the plant site. A PEC training facility forconducting of staff and management training in the overall organisation is next to theplant site. No public system for supply of water and collection/treatment of wastewater exists in the area. This requires the use of locally supplied water and on-sitecollection of waste water.

The existing power plant is a 3-floor building with a large joint engine hall for all 4diesel units and with a separate noise-insulated control room overlooking the enginehall. A workshop for general repair work is also located in the building adjacent to theengine hall. An office for administration and welfare facilities (dressing roomsincluding showers and toilets) are located in the building.

Technical set-up

The Dhahban power plant is equipped with 4 water cooled diesel engines each at 5,250kWele,¢m - (500 rpm). The engines (type A 420,12) were supplied by Grandi MotoriTrieste Spa. (GMT), Italy in 1979 and put into service in 1980. Engine total runninghours were in June 1997 noted to be: unit 1: 46,700 hours (in service in June 97 with3,8 MW); unit 2: 36,275 hours (shut down due to a crankpin seizure); unit 3: 47,638hours (shut down due to damage); unit 4: 39,525 hours (shut down in February 1997due to a high temperature alarm on a main bearing). The average engine operation hasbeen 32,534 or only 22% capacity factor as peaking over 17 years.

The engines are fueled with a light type of diesel oil - grade 2. The diesel fuel oil isstored in two large main storage tanks and pumped via four (1 for each diesel unit)10,8 m3 day tanks (on second floor level) to the four engines, where it is combusted.The exhaust gas is channelled from each engine through a separate exhaust gas pipe tothe air approx. 18m above surface area. Lube oil is supplied from two 10,8 m3 tanks(one shared for each two units) located adjacently to the day tanks for the fuel oil.

Cooling system

The cooling system of the diesel units consists of a closed recycled system with waterradiators, each unit containing 25 m3 of demineralised water. Once the cooling systemis filled, the only cooling water required is to compensate for water losses throughevaporation and small leakage's. Water losses were estimated, by the site engineer, tobe 1-2% daily of the total cooling volume, which adds up to 0,25 - 0,5 m3 /day per unit.The water for cooling purposes and other use is pumped from a local water well site

.SPPM80163901 Yemen Power Pianftfi Repot\CHP4 doc

-4.2 -

Page 33: Republic of Yemen - World Bankdocuments.worldbank.org/curated/en/... · 1. introduction 1.1 1.1 background 1.1 1.2 objective for the environmental assessment 1.1 1.3 scope of work

4/ BASELINE DATA

inside the plant area. Before the well water can be applied as cooling water, a pre-treatment process of the groundwater (application of an ion exchanger) has been foundnecessary, due to a high calcium carbonate content in the abstracted water (ref. 7). Thetreatment capacity available is 15 gal/min. = 82 m3/day in total. The pre-treated wateris collected in storage tanks with a total volume of 50 m3

.

Waste water s)ystem

The existing power plant has separate pipe systems for rain water drainage and forhandling of oil polluted water. The systems are described in drawings identified duringthe site visit (ref 8). The drainage system mainly drains the outdoor concrete surfaceareas for rain water. The sewer system including septic tanks for handling sewagewater from toilets and baths are also described as a part of this system, while theseparate oil spillway system (Appendix 4) collects rain water and oil/oily water fromboth out- and indoor concrete areas, where there is a high risk for pollution with oilproducts. High risk areas are i.e. the outside area around the loading place for the fueloil storage tanks and the indoor floor area beneath the diesel engines. Both of theseareas are drained by the oil spillway system. The oil/oily water in the oil spillwaysystem is intended to be collected in oil collection tanks, where the separated oil can beremoved and transferred to the waste oil collection tank. The present waste oilcollection tank is a former 20 rn3 tank from a road tank truck.

Due to lack of possibilities for final disposal of the collected oily water and waste oil,the oil spillway system has later been modified. No written data or drawings for thismodification work have been identified. Conclusions presented in this study are basedon information obtained during site observations and through a number of interviewswith local staff people and PEC. It has not been possible to determine the exact timefor the said modification, but it seems clear that the spillway system withmodifications has been functioning for at least two years. The oil spillway system wasmodified by adding a new 50-60m long pipe section to the existing spillway systemand connecting this pipe section to a partly non-lined underground reservoir situatednear the plant entrance. In Appendix 4, a sketch of the extension routing is shown. Theunderground reservoir is constructed as a hole in the ground, approximately 25m deepand covering an area of approx. 4 M2. The upper 4 meters were lined with stones andthe reservoir was closed with a concrete cover. During the site visit, it was onlypossible to note two inspections holes for the pipe section, while the top ofunderground reservoir was buried under a pile of soil. The modified system must beconsidered as a filtration system through which oily water and oil is seeping into theground. No data exists for the amount of oily water and oil, which has been collectedand transported through the system.

Fuel oil, - storage and transport

The fuel (light diesel oil - grade 2) is supplied by Yemen Petroleum Company from therefinery either in Ma'rib (180 km from Dhahban) or from the refinery in Aden (270km from Dhahban). Fuel oil specifications for the diesel oil from Ma'rib Refinery andAden Refinery is enclosed in Annex E. It is generally stated that main part of the dieseloil for the power plant comes from the Aden Refinery, but is has not been possible toobtain data of the exact amount of incoming diesel oil from Aden Refinery,respectively Ma'rib refinery.

SPP'8013901 Ynemn Power Plant\Final Repon\CHAP-4 doc

a F

Page 34: Republic of Yemen - World Bankdocuments.worldbank.org/curated/en/... · 1. introduction 1.1 1.1 background 1.1 1.2 objective for the environmental assessment 1.1 1.3 scope of work

4 / BASELINE DATA

The plant fuel storage consists of two 2,000 m3 tanks. The amount of storage fuel isequivalent to 1,5 month fuel consumption, when all 4 units are in full operation. Thefuel oil storage tanks are loaded from a single loading point. The fuel two oil tanks areeach surrounded by a concrete tank yard with the approximate dimensions: 27m x 35mx 2m holding an approximate volume of 1,900 m3 . An open drainage hole for rainwater (0,4 x 0,4m) in the bottom of the yard was observed, entailing a risk of outlet ofdiesel oil in the drainage system in case of tank leakage of diesel fuel into the tankgrave.

Fuel oil is supplied from private owned road oil tankers with transported fuel oilvolumes ranging from 30 m

3 to 70 m3 depending on truck type. As a theoreticalestimation, a number of 4-5 trucks of a volume of 30 m3 have to serve the power planton a daily basis, when and if the existing power plant achieves maximum production.

The lube oil is transported and stored in barrels (200 1) and accordingly pumpeddirectly from the barrel to the lube oil tank adjacent to the day tanks for diesel fuel oil.

It was noted that pumping routines for loading the day tanks with diesel oil from thestorage tanks, pose a risk of overflow of diesel oil into the oil spillway system. Theoverflow outlet from the day tank is connected directly to the oil collecting tank in theoil spillway system. By overloading the day tank, the surplus diesel will pass directlyinto the oil spillway system with the subsequent risk of being flushed into the previousunderground reservoir.

Waste management

The waste produced at the power plant can be divided in two types: solid wasteincluding garbage, and oily waste including waste oil.

The solid waste can be separated in ordinary garbage (paper etc.) and metal waste. Atpresent, the solid waste is dumped at a specific place at the plant site.

The amount of oily waste produced during normal power plant routine operations isnot recorded on a regular basis or has not previous been recorded. Further, due tosubstantial variations in previous production routines, it is either not possible toprepare an exact calculation of the produced amounts. It is estimated by the siteengineer that approx. 20 m3 of waste oil will be produced every 6 months, if all 4 unitsare in full operation (base load condition). Typical sources of waste oil or oily wasteare: used lube oil; oily waste from oil filter cleaning; small leakage's from engines, fueloil and lube oil systems; used transformer oil; waste oil from working routines in thework shop; waste oil from oil spills during loading routines of fuel storage tanks, fuelday tanks or lube oil tanks; oily waste from cleaning of oil spill way systems.

Traces of oil spill were noted in the paved area where diesel oil is loaded to the storagetanks and where emptied lube oil barrels were stored. A specific site for collection ofminor amounts (approximately 0.5m3) of non-liquid oily waste was also observed.

The present waste management procedures at the power plant are not described in anywritten regulations or guidelines. It has been noted that a 20 m3 tank for collection ofwaste oil is present at the plant. According to information obtained, and due to lack ofpossibilities for final disposal of the waste oil, the tank has not been emptied the last 3-

\SPP\80163901 Yemnen Power Plant\Final Repor\CHAP4.doc

-4 4-

Page 35: Republic of Yemen - World Bankdocuments.worldbank.org/curated/en/... · 1. introduction 1.1 1.1 background 1.1 1.2 objective for the environmental assessment 1.1 1.3 scope of work

4 / BASELINE DATA

4 years. Instead, it must be anticipated that the oily waste has been emptied in the oilspillway system.

It has also been noted that no environmentally sound general end solution for handlingof waste oil, oily waste or oil polluted soil at present seems to exist on a national levelin Yemen. It seems obvious that the observed problems with proper handling of wasteoil at the local plant level is very closely related to the lack of general environmentallysound procedures and techniques for these waste products at national or centralcompany level. Waste oil has previously been reported to be used as support fuel insteam-power plants or in cement factories, but apparently due to high transportationcosts, these initiatives at present seem to have been cancelled.

A number of telephone interviews have been carried out with oil companies or otherfacilities, which are supposed to have problems with or in other ways deal with oilywaste. The companies which could be contacted for interviews were: Aden Refinery,Aden Port Authority, Caltex, Canadian Oxy. On the basis of the interviews, it can beconcluded that in general Aden Refinery only has possibilities to reprocess oily waste,but the actual potential depends on the type and amount of oil waste. Aden Refineryreceives oily waste from ships in Aden Port. The other companies interviewed eitherdelivered their waste to Aden Refinery or indicated that they did not have anyproblems with oily waste.

Human External Environment Including Ambient Noise Levels

No documentation on ambient noise levels were available. Based on the field visit anddescription of the activities taking place at the site the following noise sources arerepresented:

1. Diesel engines in operation2. Stack outlets3. Ventilators4. Truck driving on site5. Delivery of oil (pumping)

Preliminary noise measurements were carried out at the entrance to the site (distanceapprox. 100 m from the engine hall). The noise measurement was carried out withNoise Measure Equipment Briiel & Kjwr Type 2225. The measurement indicated anoise immission level of 51 dB(A) when one diesel engine was in operation.

No noise emission from stack outlets and ventilators were observed.

Due to the fact that no trucks were driving or delivering oil at the time of the field visit,preliminary noise measurements could not be carried out. However, it must beexpected that the noise immission level will increase with some 5 to 6 dB(A) in case ofpumping oil at the oil storage facility.

Workers health and safety

During the field visit, a workplace assessment was carried out. As basis for theassessment, observations and interviews were carried out. No specific documentationon working environmental aspects and conditions were available at the site. In general,

SPP\80163901 Y-e,, Po.wr Plant\FRnal Rcpom\CHAP-4doc

-4.5 -

Page 36: Republic of Yemen - World Bankdocuments.worldbank.org/curated/en/... · 1. introduction 1.1 1.1 background 1.1 1.2 objective for the environmental assessment 1.1 1.3 scope of work

4 / BASELINE DATA

the following exposures/conditions were assessed: physical exposure; chemicalexposure; repetitive working procedures. Biological exposure and psycho-socialconditions were not addressed separately because the two aspects were considered ofless importance in the context given.

The power plant was sub-divided into the following workplace areas: A. Reception andstorage facilities; B. Engine hall; C. Workshop; D. Control room; E. Welfare facilities;F. Outdoor areas.

In only the areas of the plant discussed below were worker health and safety conditionsobserved to be in an-unsatisfactory manner. The main exposures to the workers healthand safety observed were:

1. Potential sources for causing injuries2. Noise3. Signing, instructions and storage facilities

Potential sources for causing injuriesThe main potential sources which could lead to injuries were identified at the diesel oilloading facility (A) due to oil spill and open spots of the drainage channels from theloading facility to the oil collection tank by the engine hall (i.e. outdoor areas, F).

In addition hereto, the above ground piping in connection with the cooling watersystem could represent barriers for normal access pathways and emergency escaperoutes at the north-eastern corner of the engine hall.

NoiseThe main noise emission source identified was the diesel engines in start-up andoperation situations. Preliminary noise levels measured at start-up did not indicateexposure above 90 dB(A).

When the engine was in full operation the preliminary noise measurements indicatedthe following levels (with indication of distance from the engine):

- 98 to 105 dB(A) at distance 2 to 3 meters- 95 to 99 dB(A) at distance 5 meters- 90 to 92 dB(A) at a distance of 10 meters or above

No measures have been implemented in order to reduce the noise emissions from theengines. Further, it was observed that both operators and repair and maintenanceworkers were working on the engines not in operation (i.e. a distance of less than 10meters from the engine in operation). Nobody working in the engine hall was usinghearing protection equipment.

Signing, instructions and storage facilitiesNo precautionary signs were observed neither in the workshop and the engine hall northe outdoor oil reception facility.

2 \SPP\80 163901 Yeen Power Plant\Fina] Repor\CHAP-4.doc

d 6-

Page 37: Republic of Yemen - World Bankdocuments.worldbank.org/curated/en/... · 1. introduction 1.1 1.1 background 1.1 1.2 objective for the environmental assessment 1.1 1.3 scope of work

41 BASELINE DATA

Further, instructions and/or data sheets from suppliers on handling and storage ofchemicals (e.g. Calcium hypochlorite 68%) for the ion exchanger were not present atthe location of the ion exchanger or the nearby storage facility.

Set-up for emergency andcfire fighting

The present emergency set-up and fire fighting procedures at the power plant are notdescribed in any written regulations or guidelines. According to the obtainedinformation, no exercises for fire fighting or test and training of emergencycontingency plans are arranged on a regular basis at the power plant. A considerablenumber of fire extinguishers were observed in the engine hall.

According to obtained information, the power plant manager and the deputy managerare responsible for safety arrangements at the plant. An element of safety is included inthe general management training and within the PEC a department is responsible forsafety issues

Production routines and experienced problems

In the period 1983-90, the power plant mainly functioned as stand-by capacity. In thelast two year period, several units have been closed down due to technical operationalproblems. Today (December 1997) only one unit (unit 1) is in operation, serving aspeak load coverage, while unit 2, 3, and 4 are closed down for overhauling. Unit 4 isexpected to be put into operation in the nearest future, while unit 2 and 3 still needssincere overhauling due to technical problems related to the crank shafts and thecooling system.

Main overall operational problems are reportedly caused by several factors: varyingquality of lubricant oil, high calcium carbonate concentration in the cooling water andirregular maintenance schedules due to lack of spare parts. Problems related to the highcalcium carbonate concentration in the cooling water have been solved by the recentinstallation of a cooling water pre-treatment plant (ion exchanger) which aims toremove the calcium carbonate and other salt components from the cooling water,before it enters into the cooling system.

Power plant administrative set-up

The manager of the power plant reports to the Department of Electricity Productionunder the Ministry of Electricity and Water.

The power plant has a staff of approx. 50 employees. The staff is organised under aPower Plant Manager and a Vice Manager (the only engineers of the permanent powerplant staff) in an operational section, a mechanical section and an electrical section, astorage section and the administration. The staff groups were characterised as 14technicians, 25 operators, 1 storage manager, 2 cleaners, 8 guards and 3 clerks.

Background data

The following key figures are based on information obtained by PEC. The cost of fuelis presently 10 Riyalllitre (1 US$ = 130 Riyal). 1 litre of diesel fuel corresponds to an

' \SPP\80163901 Ym,e- Pow,cr Plant\FinWI Repon\CHAP-4.doc

-4.7 -

Page 38: Republic of Yemen - World Bankdocuments.worldbank.org/curated/en/... · 1. introduction 1.1 1.1 background 1.1 1.2 objective for the environmental assessment 1.1 1.3 scope of work

4 / BASELINE DATA

approximately produced power of 3 kW. The price paid by the consumer for I kW isbetween 3 and 11 Riyal.

4.2 CLIMATE AND PRESENT AIR QUALITY IN THE PROJECT AREA

For the Dhahban area the maximum rainfalls occur in April and August according tothe meteorological observations from the Civil Aviation and Meteorological Institute.The annual amount of rainwater is approx. 100 to 150 mm with a typically peakmonthly rainfall in April of approx. 75 mm.

A secondary effect on rainfall is the northem and north-eastem wind which is arelatively dry and cold wind dominating the winter months.

The characteristic feature of the wind in the highland, e.g. the Dhahban area, is that thewind has a low frequency and is of low intensity. According to the observations carriedout by the Civil Aviation and Meteorological Institute in Sana'a the predominatingwind in an altitude of 10 meters has an monthly average speed of 9 to 13 m/sec. andcomes from a north-eastem direction.

The average temperatures and humidity in the highland region vary between 1 0°C and25°C with an average humidity of 50%. According to observations carried out by theCivil Aviation and Meteorological Institute the characteristics of highland regions areapplicable for the conditions in the Dhahban area.

4.2.1 Air Quality in the Dhahban Area

No air quality monitoring programme or monitoring stations exist in the Sana'a areaincluding the area of Dhahban. Accordingly, the only available air quality informationis calculated.

Two sources, which could cause impact on air quality in the Dhahban area have beenidentified during the field visit:

1. Industrial activities2. Traffic

The industrial activities taking place in the vicinity of the power plant are handling andstorage of construction materials and some small scale garage workshops. Only thehandling and storage of construction materials can represent a potential adverse impacton the air quality in terms of dust emissions. However, taking the level of activitiesinto account, the potential source of air pollution does not represent any significantadverse impact on the extemal environment.

Due to the fact that the main road to Amran passes the power plant, the traffic load hasto be taken into consideration with respect to potential sources of air pollution, mainlyin terms of CO2, NOR, and SO2. However, due to the fact that the traffic load isrelatively low the traffic does not appear to represent any significant source of airpollution.

C \SPPS0163901 YVne Power Plawn\Final Report\CHAP-4.doc

4 R-

Page 39: Republic of Yemen - World Bankdocuments.worldbank.org/curated/en/... · 1. introduction 1.1 1.1 background 1.1 1.2 objective for the environmental assessment 1.1 1.3 scope of work

41 BASELINE DATA

4.2.2 Impact on Air Quality from the Existing Dhahban Power Plant

An air quality impact analysis has been performed for nitrogen dioxide (NOj), sulfurdioxide (SO2 ) and particulate matter (PM1O) emissions due to baseline and futureoperations (Ref. Annex K). The Industrial Source Complex Short-Term (ISCST3)dispersion model, Version 97360, was used to evaluate the potential impact due topollutant emissions from the existing and proposed diesel units. All calculations havebeen made on the basis of a fuel oil analysis for light diesel oil - grade 2 from AdenRefinery. Presuming that a satisfactory rehabilitation of the diesel engines is carriedout, it is assessed that the emission of oil aerosols from the ventilation outlets on theroof of the engine hall does not represent any significant impact. At present only oneof the four 5 MW diesel engines is operating on a daily basis from 5 p.m. to 1 a.m.The following point sources were identified:

1. Four stacks (height 18 meters)2. Eight ventilation outlets on the roof of the engine hall3. Four ventilation outlets on the wall of the workshop

The latter ventilation outlets are not considered to be of any importance in terms ofenvironmental impacts due to the fact that the activity level at the workshop isrelatively low.

The exhaust gas from each of the engines is emitted through a separate stack (i.e. fourstacks, each 18 meter high). The connections from the engines to the stacks appearedto be in good condition and well maintained. No purification equipment is connectedto the stacks.

In addition to the above point sources of emission 8 ventilation outlets are situated onthe roof of the engine hall. The ventilation outlets were equipped with top covers. Itwas observed that the covers were covered with oily substances as if oil aerosols whereemitted through the ventilation outlets.

However, it is assessed that the emission of oil aerosols appears to be an occupationalhealth and safety issue rather than a significant impact on the extemal environment.This is partly due to the characteristics of the vicinity of the power plant and partly dueto the fact that the ventilation outlets were equipped with top covers and therefore theaerosols are not dispersed into the surroundings.

The pollutant emissions for the existing sources at the plant have been calculated (Ref.Annex K). The emissions of NO,, SO2 and particles compared with the World Bankguidelines are shown in the table below:

Source Pollutant Emission World Bankg/Nm3 guidelines

___________________ ~g/Nm '

Stack No. 1 NO, 0,80 2,30SO, 0,37 2,00Particles 0,05 0,05

Table 4.1 Emission of NO,, SO2 particles from existing sources at the powerplant

7 \SPP\80163901 Yen Poere Pla,n\Finfa Report\CHAP4.doc

~as9

Page 40: Republic of Yemen - World Bankdocuments.worldbank.org/curated/en/... · 1. introduction 1.1 1.1 background 1.1 1.2 objective for the environmental assessment 1.1 1.3 scope of work

4 / BASELINE DATA

As seen from the table the calculated emission of NOR, S02 and particles complies withthe requirements of the World Bank.

4.3 GEOLOGY

The Dhahban Power Station is situated in the Sana'a Basin, which is part of the CentralHighlands of Yemen. The Sana'a Basin has been intensively studied for many yearsbecause of its importance as the main source of drinking water to Sana'a City, mostrecently by the project "Sources for Sana'a Water Supply" (SAWAS - ref. 11),commenced in 1987 and finalised in 1996.

The generalised stratigraphic sequence of the subsurface can be divided into threegroups (Ref. 18):

* Quatemary sedimentary and volcanic rocks* Tertiary trap volcanic series* Mesozoic and Palaeocene sedimentary fonnations:

• Cretaceous, Tawilah sandstone formation* Jurassic - Lower Cretaceous, unnamed shale/limestone/sandstone formation* Jurassic, Amran limestone formation

In the vicinity of the Power Plant, the local stratigraphic sequence can be interpretedusing available borehole profiles. An overview of these can be seen in table 4.2.

Borehole (constr. Distance to plant Static water level GeologicalYear) seepage site (m) (m.a.s.l.)* profile available

ST6 (1972) 980 2,184 (1972) yesST6 (1987) 980 2,137 (1987) yesST7 (1972) 1570 2,195 (1972) yesST9 (1972) 625 2,100 (1995) noSTI I(1987) 2510 2,136 (1987) yesST12 (1972) 480 2,103 (1991) no

P8 (1987) 1610 2,137 (1987) yesP13 1990 2,188 (1979) yes

Table 4.2 Wells in the vicinity of the Power Plant. *m.a.s.l.: meters above sealevel

It has not been possible to obtain borehole profiles of the two wells nearest to thePower Plant: ST9 and ST12, as these apparently do not exist. The interpretation of thegeology near the Power Plant has been made with most weight put on borehole profileST6 and ST7.

The power station is located on the slope of a quatemary basalt volcano, and depositsof basalt tuff are recognised on the surface. The basalt tuff at ST6 (1987) isencountered from the top to a depth of 63 m below ground surface, but may be evengreater at the power station, due to its location with respect to the volcano. Theperrneability properties of the basalt tuffs deposits are believed to be high horizontallyand less vertically as the tuff layer consists of horizontal gravel/sand and silt/clay beds.

C \SPP\80163901 Yemen Power Plant\Final Report\CHAP-4.doc-A1n

Page 41: Republic of Yemen - World Bankdocuments.worldbank.org/curated/en/... · 1. introduction 1.1 1.1 background 1.1 1.2 objective for the environmental assessment 1.1 1.3 scope of work

4 / BASELINE DATA

The basalt tuff is underlain by the Tawilah sandstone to a depth of at least 200 m. Thepermeability of the Tawilah sandstone is primarily due to the fracturing of theformation. Cut samples from the drilling are missing in both ST6 (1987) and ST6(1972) at a depth of approximately 103-310 m which could be due to fractures in thesandstone. Pump testing in well ST6 shows a transmissivity of 160-210 m2/d of thesandstone (Sana'a Water Supply, Emergency well drilling program, June 1989). ST9and ST12 have a reported transmissivity of 300 m2/d and 110 m2/d, respectively (ref17), which gives an average permeability of 1,85 m/day and 0,65 m/day, respectively.The permeability may be entirely related to fractures in the sandstone.

4.4 VEGETATION AND WILDLIFE

The site for the present and future power plant is characterised as an already preparedand developed power plant site. No vegetation or wildlife interests will be affected bythe project.

For the construction of the right-of-way, already existing infrastructure corridors(existing right-of-way, roads) will be used for the project component.

4.5 WATER RESOURCES

The water resource in the north-western part of the Sana'a plain, where the DhahbanPower Plant is situated, are generally groundwater abstraction from the Tawilahsandstone aquifer. The Westem well-field supplying Sana'a with domestic water, hasan abstraction of approximately 22,700 m3/day from 19 wells (Source: Sana'a Branch,1997). The Westem well-field provides the Sana'a public water services withapproximately 45% of its total supply (53,000 m3/day), and is therefore of majorimportance. Private abstraction wells, mainly used for irrigation purposes, also exploitthe Tawilah Sandstone aquifer and are estimated to abstract 90,000 m3 /day or almost 4times the amount used for domestic purposes.

With a total abstraction of 113,000 m3/day alone in the north-western part of theSana'a basin and an estimated groundwater recharge for the whole Sana'a basin of80,000 m3/day (ref. 11), it is not surprising that the draw-down is increasing by anaverage of 8,3 m annually in production wells and 3,1 m in observation wells (ref 12).

As the resource is being mined, rough estimates on the remaining lifetime of selectedwells in the western well-field have been calculated by the SAWAS project, (ref. 12).The results are shown in table 4.3 for relevant wells in the vicinity of the DhahbanPower Plant.

Well Groundwater Average ann. Well Remainingidentification depth Feb. 1994 Draw-down depth lifetime

(m) (m/year) (m) (year)P8 (1987) 144,50 5,0 380 47

ST6 (1987) 140,45 6,8 323 27ST10 136,88 7,0 200 9

Table 4.3 Remaining lifetime of selected wells in the western well-field

SPP\S0163901 Yemen Power Plant\Einal Report\CHAP-4 doc

Page 42: Republic of Yemen - World Bankdocuments.worldbank.org/curated/en/... · 1. introduction 1.1 1.1 background 1.1 1.2 objective for the environmental assessment 1.1 1.3 scope of work

4/ BASELINE DATA

The saturated groundwater level below the power plant's waste water discharge pit isexpected to be situated at approximately 2,100 m.a.s.l..

4.6 PRESENT AND FUTURE LAND USE

Since the existing and planned future power plant will be located at an alreadyprepared and allocated site, no present land use interests are anticipated to be affected.According to draft development plans prepared by the Governorate of Sana'a theoverall area, including the plant site, is allocated for small and medium scale industry.This implies that there should be no conflict between future land use in the area and thesiting of the new power plant.

4.7 HISTORICAL AND CULTURAL RESOURCES

According to the information obtained, no antiquities or other historical and culturalresources have been identified at the plant site. A meeting has been held with theGeneral Organization of Antiquites, Museums and Scripts in order to obtain specificinformation for the Dhahban area and general information for rules and regulationswith respect to protection of historical sites and antiquities. The draft report has beensubmitted for review.

PSPP\B0163901 Yenen Power Piant\Ffnal Rcport\CHAP-4.dc

- 4.12 -

Page 43: Republic of Yemen - World Bankdocuments.worldbank.org/curated/en/... · 1. introduction 1.1 1.1 background 1.1 1.2 objective for the environmental assessment 1.1 1.3 scope of work

5. ENVIRONMENTAL ASSESSMENT

Page 44: Republic of Yemen - World Bankdocuments.worldbank.org/curated/en/... · 1. introduction 1.1 1.1 background 1.1 1.2 objective for the environmental assessment 1.1 1.3 scope of work

5 / ENVIRONMENTAL ASSESSMENT

5. ENVIRONMENTAL ASSESSMENT

5.1 SCOPE AND METHOD

The following 3 inter-related project components have been assessed:

(a) selected rehabilitation and upgrading activities for the existing 20 MW diesel-fueled power plant at the Dhahban Power Plant site.

(b) installation of an additional 30 MW of generating capacity at the existing site.

(c) expansion and upgrading of Asser 132/33 kV substation also includingdebottlenecking elements of the transmission network in Sana'a. The existingpower supply network is planned to be expanded in the Sana'a north-west area withnew overhead 33 kV lines and underground cable lines.

Each of the three project components has been assessed separately using a checklistmethod. The environmental impact of each project component was identified bysuperimposing project elements upon existing environmental conditions and thenapplying standard mitigation measures. The proposed mitigation measures will bedetailed and summarised in chapter 7.

The evaluation of the potential environmnental impact and the establishment of propermitigation measures has been influenced by the fact that Yemeni nationalenvironrmental standards or guidelines regulating the environmental problemsidentified in analysis of the proposed project are reported to be in a draft stage andtherefore they are not applicable for the project presently. Due to the absence offormally approved Yemeni environmental procedures and guidelines, those of theWorld Bank have been adopted for use in preparation of the environmental assessmentwith the agreement with the PEC and the Environmental Protection Council (EPC).

5.2 PROJECT COMPONENT: REHABILITATION OF EXISTING POWERPLANT

5.2.1 General Considerations for Environmental Rehabilitation of the Power Plant

The current operational status (December 1997) of the existing Dhahban Power Plantis characterised by the following:

Unit 1 is currently in operation during evening peakload with an output of 3,8 MWUnit 2 and 3 is shut down due to serious mechanical damages.Unit 4 is presently under overhauling and is expected to be put into peakload operationin the nearest future.

Based on a technical site visit report (ref. 7), it is proposed that all diesel engines haveto undergo a major overhaul, and that there has to be established a stock of spare partsin order to operate the plant on a continuous basis and on full load.

\SPP\80163901 Y n Power PInz\Finoi Report\CHAP-5.doc

-51I

Page 45: Republic of Yemen - World Bankdocuments.worldbank.org/curated/en/... · 1. introduction 1.1 1.1 background 1.1 1.2 objective for the environmental assessment 1.1 1.3 scope of work

5 / ENVIRONMENTAL ASSESSMENT

In addition, the EA process has identified a number of actions which are required tomitigate environmental problems as part of activities to rehabilitate the existing powerplant. These are intended to have the daily operation of the plant meet theenvironmental guidelines of the World Bank.

Besides the specific parameters, which will be assessed in the following sections, anumber of recommendations should be included as part of the rehabilitation project:

- environmental management of the power plant operations should be included as apart of the considered Operation & Maintenance Management contract with anexternal contractor.

- overall cleaning of the power plant including engine hall for spilt oil and otherflammable materials (especially in ventilation ducts/outlets and cable channels) inorder to reduce the risk of fire.

- detailed examination of the existing drainage system, septic tank and oil spillwaysystem in order to secure that pipes are intact and that the systems are functioningaccording to the original design.

- due to the present low consumption of fuel oil (peak load operation of one unit)and the following minimum need for re-loading of the oil storage tanks, it has notbeen possible to include on-site evaluation of fuel oil loading procedures in theassessment. Registration during site visit of previous spillages of fuel oil at theplace for loading of oil storage tankes indicates a need for updating of proceduresfor fuel oil loading. Assistance for updating of the present applied procedures hasbeen included as a part of the proposed mitigation measures.

5.2.2 Fuel type

The fuel (light diesel oil - grade 2) is supplied by Yemen Petroleum Company fromthe refinery either in Ma'rib (180 km from Dhahban) or from the refinery in Aden(270 km from Dhahban). Fuel oil specifications for the diesel oil from the aboverefineries are enclosed in Annex E. It is generally stated that main part of the diesel oilfor the power plant comes from the Aden Refinery, but it has not been possible toobtain data of the exact amount of incoming diesel oil from Aden Refinery,respectively Ma'rib Refinery. This analysis assumes that all fuel oil is delivered fromthe Aden Refinery which has a lower quality product than the smaller Ma'rib Refinery.

5.2.3 Climate and Air Quality

The pollutant emissions for the rehabilitated Units 1 to 4 at the plant have beencalculated. The air quality analysis showed that a stack height of 27 meters is requiredalso on the existing rehabilitated power plant in order to ensure compliance with theWorld Bank ambient air quality guidelines (Ref. Annex K). The emissions of NOR, SO2

and particles compared with the World Bank guidelines are shown in the table below:

C 'SPP\80163901 Yemen PoWeT Plant\Final Report\CHAP-5.doc

52 -

Page 46: Republic of Yemen - World Bankdocuments.worldbank.org/curated/en/... · 1. introduction 1.1 1.1 background 1.1 1.2 objective for the environmental assessment 1.1 1.3 scope of work

5 / ENVIRONMENTAL ASSESSMENT

Source Pollutant Emission World Bankg/Nm3 guidelines______ _____ _____g/Nm '

Unit 1 to 4 NO, 2,26 2,30SO, 0,705 2,00-Particles 0,05 0,05

Table 5.1 Emission of NO1, SO2 particles from rehabilitated Unit I to 4 at thepower plant

5.2.4 Water Resources Including Cooling Water Requirements

A drilled well situated between the main road and the Dhahban Power Plant itselfsupply water for the diesel engine cooling system and domestic water use of the plant.The well is approximately 220 meters deep and has according to the site engineer beenextended twice since 1987 due to the declining water table in the Tawilah sandstoneaquifer. The geological borehole profile is not available.

The declining of the water is by far the most caused by the rapid growth of the citySana'a (see section 4.5). As seen from below the amount of water used by the powerplant can be considered negligible compared to the amount abstracted for urbanpurposes in the city of Sana'a.

The following figures of the extension of the well depth were obtained from the powerplant management:

Year Extended well depth (m)1987 1401992 1801997 220

Table 5.2 Depth extension data of well at the Dhahban Power Plant

These data show an average declining water table of 8 m/year, which is close to theaverage for wells in the area (see table 4.3). It is therefore expected that the depth ofthe well needs to be extended 40m at least every Five years, to ensure sufficientamounts of groundwater.

The water demand of the existing power plant is mainly related to cooling water for thediesel engines and domestic purposes. As the cooling water system for the dieselengines is a closed re-circulated system the cooling water demand is limited to"topping up" in case of leakage and to refill the cooling system when overhauling theengines. Leakage was estimated to be 2% pr. day of the total volume cooling water(total volume pr. unit = 25 m3 ), which yields 2 m3/day, with four units running. If thecooling system is overhauled and emptied once a year the water demand would be 0.3m3/day additionally.

A de-mineralising unit (an ion exchanger) is installed in the power plant and is used forpurification of the cooling water for the diesel engines due to the high mineral contentof the raw well water which otherwise would precipitate, causing clogging in thecooling system. The de-mineralising process rejects 32% of the raw water when

C 'SPP\80163901 Ynenm Powr Plan\Fiinal Repoft\CHAP-5.doc

- 5.3 -

Page 47: Republic of Yemen - World Bankdocuments.worldbank.org/curated/en/... · 1. introduction 1.1 1.1 background 1.1 1.2 objective for the environmental assessment 1.1 1.3 scope of work

51 ENVIRONMENTAL ASSESSMENT

producing 68%, which leads to a total demand of raw water for the cooling process of3.4 m3/day.

The de-mineralising unit has a capacity of 15 gal/min = 82 m3/day, which is assessedto be sufficient for cooling purposes. The capacity of the 15 kW pump installed in thewell is 500 m3/day, which also is sufficient.

With the relatively small amounts of water required for cooling water purposes, it isassessed that the water abstraction will cause no noticeable effects on the water balancein the area.

5.2.5 Impacts on Water Quality

The original waste water system at Dhahban Power Plant is divided in a drainagesystem (mainly for drainage of rain water) and an oil spillway system for handling ofoil polluted waste water. An extension to the original oil spillway system has later beenconstructed by the PEC, which leads the oily waste water from the original constructedspillway system into an un-lined underground reservoir.

Three distinct sources have been identified as constituting a potential risk to the groundwater resources in the area: polluted drainage water from the drainage system, oilywaste water from the oil spillway system and oil polluted hot spots in the plant area.

It is assessed that the water from the drainage system does not constitute any risk to theground water resources as long as the drainage pipe system is intact and does not drainany oil polluted area. It is also assessed that the sewage water component of thedrainage water does not pose any risk to the ground water resources due to the limitednumber of employees and consequently, the limited use of toilet and bath facilities. Itis recomrnended that an examination of the drainage system including septic tanks iscarried out as part of the rehabilitation project.

In the present situation, a considerable amount of waste oil and diesel oil productsfrom running the power plant, are being discharged into the previous describedunderground reservoir together with reject water from the demineralisation process andpartly, water from the surface drainage. Yemeni authorities are not certain how longwaste oil has been discharged into the reservoir and do not have the information on theamounts of lubricating/diesel oil which have been discharged into the spillway system.

It is anticipated by the Consultant that this procedure has been going on for the pasttwo years, and due to the importance of the regional groundwater resources and thenearby presence of groundwater abstraction providing the capital Sana'a with drinkingwater, it is necessary to evaluate the risk of polluting the groundwater.

The practise of discharging the reject water into the spillway system should in futureinclude that the pH is being neutralised beforehand to prevent it from causing damageto vegetation and micro biological activity in the subsoil.

The risk of groundwater contamination with both light oil compounds and the heavycompounds has been estimated (see Annex F). Based on the available data, it isassessed that the light oil compounds dissolved and transported by water are not animmediate threat to the present groundwater quality in the area.

.SPP\80163901 Yemen Power Plam\Final RepoN\CHAP-5.doc

Page 48: Republic of Yemen - World Bankdocuments.worldbank.org/curated/en/... · 1. introduction 1.1 1.1 background 1.1 1.2 objective for the environmental assessment 1.1 1.3 scope of work

5 / ENVIRONMENTAL ASSESSMENT

Furthermnore, it cannot be outruled that the annually discharged oil volume maypenetrate to the saturated aquifer, and that there is a theoretical risk of contaminatingthe groundwater resources in the area with total oil concentrations much higher thanwhat is recommended by Danish standards (10 ppb). The risk assessment is veryconservative but may in the worst case reflect the reality, due to the presence offractures in the sandstone.

The World Health Organization (WHO) has not developed standards for total oilconcentrations in drinking water. Instead standards are developed for specifichydrocarbon compounds (i.e. benzen)

It is strongly recommended that the present routines for using the oil spillway systemfor discharge of waste oil and diesel oil are stopped immediately. Instead waste oil anddiesel oil used for cleaning purposes should be collected in special tanks or barrelsawaiting further processing.

It is further recommended as a part of the rehabilitation project that the new extensionof the oil spillway system should be closed and altemative solutions for handling thewaste stream from the oil spillway system should be implemented.

5.2.6 Waste Management

A rehabilitated power plant in full operation will produce increased amounts of wasteproducts including waste oil, compared to the present power production schedules.It is, as previous mentioned, estimated by the site engineer that approx. 40 m3 of wasteoil will be produced per year, if all 4 units at are in full operation (base load condition).Typical sources of waste oil or oily waste are: used lube oil; oily waste from oil filtercleaning; small leakage's from engines, fuel oil and lube oil systems; used transformeroil; waste oil from working routines in the work shop; waste oil from oil spills duringloading routines of fuel storage tanks, fuel day tanks or lube oil tanks; oily waste fromcleaning of oil spill way systems.

A clear management set-up for handling these various types and amounts of wasteshould therefore be included as a part of the rehabilitation project. The identifiedproblems with the previous handling routines for i.e. oily waste can been seen ascaused by a lack of proper waste management procedures and a lack of proper finaldisposal methods.

Since the concept of environmental management has not been a part of the previousgeneral power plant management background, it is important that proposed proceduresare easy to comprehend and apply. The problems related to waste management shouldbe divided in two parts: proper routines for collection and storage of waste products atthe power plant and final disposal of the waste.

As a part of the proposed mitigation measures, proposals for collection and finaldisposal of the waste will be included in the mitigation plan.

\SPP\80163901 Ymen POWer Plant\Final Repont\CHAP-5.dxc

- 5.5 -

Page 49: Republic of Yemen - World Bankdocuments.worldbank.org/curated/en/... · 1. introduction 1.1 1.1 background 1.1 1.2 objective for the environmental assessment 1.1 1.3 scope of work

5 / ENVIRONMENTAL ASSESSMENT

5.2.7 Human External Environment Including Ambient Noise Levels

Preliminary noise measurements performed at the border of the plant area (approx. 100m from the engine hall) during operation of diesel engine unit 1 indicated noise levelsabout 51 dB(A). When all four diesel engines will be operating, the expected ambientnoise level is estimated to be 57 dB(A) at the border of the plant area (calculated as 51dB(A) for one diesel unit, 54 dB(A) for two diesel units and 57 dB(A), when all fourdiesel units are in operation).

Therefore the impact from the engines in operation does not exceed the World Banknoise guidelines for ambient noise for new power plants which are:

Day time (7 am to 10 pm): 70 dB(A)Night time (10 pm to 7 am): 70 dB(A)

The ambient noise from ventilation systems is not considered to be of a magnitudewhich results in exceeding the World Bank guidelines on ambient noise values.

ConclusionNoise emission from the operating diesel engines is expected to meet World Bankguidelines for ambient noise.

It is not expected that the World Bank guidelines for noise will be exceeded by thepumping of diesel oil from the trucks to the storage tanks.

No nuisances of vibrations are expected from the operation of the plant.

5.2.8 Workers Health and Safety

According to the baseline description the main attention should be on: a) potentialsources causing injuries; b) noise exposure; and c) signing, instructions and storagefacilities.

Potential sources causing injuriesIn general, the welfare facilities appeared to observe the Yemeni workingenvironmental requirements concerning the Employer's responsibility to keep thefacility in healthy and clean condition (ref. 10).

The area around the open oil/waste water collection tank should be reviewed carefullyand the appropriate corrective actions should be implemented in order to eliminatepotential risk sources with respect to injuries. These are:

- Cover or fence drainage channels- Replace the pump for emptying the collection tank to ground level- Cover the collection tank

NoiseDuring the field visit it was observed that repair and maintenance works were carriedout during operation hours. The workers did not wear any kind of hearing protection

C \SPP\80163901 Yemnt Power Plant\Firal Rcpon\CHAP-.doc

- 5.6 -

Page 50: Republic of Yemen - World Bankdocuments.worldbank.org/curated/en/... · 1. introduction 1.1 1.1 background 1.1 1.2 objective for the environmental assessment 1.1 1.3 scope of work

5 / ENVIRONMENTAL ASSESSMENT

equipment although working less than five meters from the engine in operation. Nosigns were observed warning about the high noise level.

Preliminary noise measurements carried out during the field visit indicated internalnoise levels of approx. 100 dB(A) during operation of one unit, see section 4.1. As apart of the project, it is presently considered to implement the following noise reducingmeasures:

- substitution of air intake silencers- addition of air exhaust silencers- addition of local noise reduction barriers- sound barriers for radiators.

In addition hereto, it is proposed to included sound absorbing materials should beplaced on ceiling and walls. This abatement measure could most likely reduce thenoise level to approx. 85 dB(A) in the engine hall and approx. 50 dB(A) in the controlroom, depending on the specific local conditions.

Signing, instructions and storage facilitiesAlthough repair and maintenance works were taking place, it was noted that theworkers were not encouraged to wear hard hats neither by the management nor by anysigns at relevant places in the engine hall.

The chemicals used for the ion exchanger were stored in a hallway near the location ofthe ion exchanger. Instructions on how to handle the chemicals and on actions to betaken in case of incidents were not available at the storage facility.

ConclusionIn general the working environmental conditions were satisfactory. However,improvement of the working environment should be emphasised with respect to thefollowing three aspects:

- Potential risk sources with respect to injuries should be eliminated. This goesspecifically for uncovered channels and open tanks as well as areas where oil spillsmight occur

- Noise levels in the engine hall are not acceptable.- Signing was not implemented satisfactorily. Further, appropriate instructions

(instructions and data sheets) were not placed at the storage facilities of ionexchanger chemicals.

Recommendations on mitigation measuresThe following mitigation measures should be initiated in connection withimplementation of the rehabilitation project:

1. Ensure that no open channels or collection tanks are uncovered or lack fencing2. Place appropriate signing and instruction3. Noise abatement measures shall be implemented.

C \SPP\80163901 Yen, Pover Plant\inal Repon\CHAP-5.&dc

- 5.7 -

Page 51: Republic of Yemen - World Bankdocuments.worldbank.org/curated/en/... · 1. introduction 1.1 1.1 background 1.1 1.2 objective for the environmental assessment 1.1 1.3 scope of work

5/ ENVIRONMENTAL ASSESSMENT

5.2.9 Fire Fighting and Emergency Set-up

No considerations for fire fighting and emergency set-up are given in the projectdocument for rehabilitation of the Dhahban Power Plant. No emergency contingencyplan was identified at the power plant. No fuel oil loading of the storage tanks wascarried out during the site visit.

The evaluation of fire hazards mainly relates to the risk of fire when loading diesel oilinto the storage tanks, risk of direct fire in the storage tanks and risk of fire in theengine hall. In general, light diesel oil is not classified as a highly flammable oilproduct which demands specific precautions in relation to protection against fire risks.

Standard safety procedures should be applied during fuel storage loading proceduresincluding no smoking routines and avoidance of skin contact. Fire fighting equipmentsuch as fire extinguishers should be available all over the area where there is a risk offire caused by diesel fuel or other flammable items.

Top priority should be given to the establishment of a simple contingency plan whichdescribes the general procedures and contact points in case of fire or other emergencyincidents. Assistance for development of a contingency plan has been included as amitigation measure.

5.2.10 Historical and Cultural Resources

Since the rehabilitation project only concerns existing structures and buildings,potential historical and cultural interests are not affected by the project.

5.3 PROJECT COMPONENT: CONSTRUCTION OF NEW POWER PLANT OF30 MW CAPACITY INCLUDING REHABILITATION OF THE EXISTINGPOWER PLANT

5.3.1 General Considerations

As stated in the project document, the listed project activities primarily relate to theconstruction of a new 5 unit 30 MW power plant including buildings and other neededbasic facilities. In general, the main project documents describe issues relevant for thetechnical supply of engines and auxiliary equipment. A specific environmentalcomponent has accordingly been developed, mainly covering environmental mitigationmeasures related to noise abatement and treatment of oily waste water. Beside twogeneral and preliminary lay-out drawings showing the location of engines and sectionof the plant building, a draft development drawing of the actual plant siting and thebasic facility component are included.

The present assessment prepares an evaluation of the proposed project in order toinclude measures to mitigate foreseen and identified environmental problems in theproject. This is to ensure that the new power plant reaches a level where the dailyoperation of the plant meet acceptable environmental standards. Acceptableenvironmental standards are in this case defined as standards which are in accordancewith environmental guidelines developed by the World Bank.

C 'SPP\90163901 Ytmen Power Plant\Final RpaonlCHAP-5.doc

Page 52: Republic of Yemen - World Bankdocuments.worldbank.org/curated/en/... · 1. introduction 1.1 1.1 background 1.1 1.2 objective for the environmental assessment 1.1 1.3 scope of work

5 / ENVIRONMENTAL ASSESSMENT

5.3.2 Climate and Air Quality

All air quality calculations have been made on the basis of a fuel oil analysis for lightdiesel oil - grade 2 from Aden Refinery. In order to meet the requirements whenoperating the existing and the new power plant simultaneously, also the necessarystack height for the new plant has been calculated. A stack height of 27 meters isrequired in order to ensure that the requirements in the World Bank guidelines for newpower plants will not be exceeded during simultaneous operation of both plants (RefAnnex K). A summary of the calculated pollutant emissions for the existing andproposed sources at the plant are presented in Table 5.3.

Table 5.3 Comparison of Pollutant Emissions for the Existing and ProposedSources at the Dhahban Plant to the World Bank Guidelines (ref.Annex K)

Comparison of Pollutant Emissions for the Existing and Proposed Sources at the DhahbanPlant to the World Bank Guideline

Emission World BankGuideline

Source Pollutant (g/Nm3) (g/Nm3 )

Existing Operations

Unit 1- Unrehabilitated NOX 0.80 2.30SO2 0.37 2.00PM 0.05 0.05

Future OperationsRehabilitated Units 1 to 4 NOX 2.26 2.30

so, 0.705 2.00PM 0.05 0.05

Proposed- Units I to 5 NO. 2.26 2.30SO2 0.705 2.00PM 0.05 0.05

Note: Existing operations include one unit since only one unit was in operation during the sitevisit by Golder personnel.

5.3.3 Water Resources Including Cooling Water Requirements

Utilising the calculations made in the previous section 5.2.3, the existing waterresources are sufficient to provide a rehabilitated and expanded power plant withsufficient quantities of cooling water for the additional diesel units, provided the wellis extended at least 40 m every 5 years. The water abstraction will have no noticeableeffect on the water balance in the area.

Furthermore the capacity of the de-mineralising unit is found to be sufficient toprovide daily cooling water and occasionally refilling the units if they are emptiedduring overhauling.

C 'SPP\80 163901 Ynmnn Pownr Plant\Final Repon\CHAP-S.doc

- 59-

Page 53: Republic of Yemen - World Bankdocuments.worldbank.org/curated/en/... · 1. introduction 1.1 1.1 background 1.1 1.2 objective for the environmental assessment 1.1 1.3 scope of work

5 / ENVIRONMENTAL ASSESSMENT

5.3.4 Water Quality

A number of environmental mitigating measures as a part of the Ansaldo offer, - isconsidered to be included in the project in order to improve present regimes for use ofdrainage system for rain water and the oil spillway system for oily waste water(Appendix 4A, ref. 20):

a) it is recommended by the consultant that the design of the waste water system atthe existing plant is used in the new plant, which includes a division of the systeminto a clean-water system for areas that are not supposed to be oil polluted and anoil spillway system for areas that risk being polluted with diesel or lube oil.

b) the new drainage system for rain water at the new power plant site will beconnected to the existing drainage system.

c) the existing oily water reception underground reservoir will be disconnected fromthe existing oil spillway system in order to avoid any further discharge into thisreservoir.

d) the existing oil spillway will be inspected in order to secure that all parts andsections are intact and well functioning. Those part of the system, which wereidentified as damaged or ruined, will be removed and new parts constructed.

e) the existing oil spillway system will be connected to the spillway systemconstructed for the new power plant site.

f) in order to minimise rain water inlet into the oil spillway system, it is considered toredirect rain water collected in the tank yards of the diesel oil storage tanks into thedrainage system. Installation of valves at the drainage outlet has the intention tosecure that only non-polluted rain water will be directed to the drainage system.

g) in order to secure proper treatment of the oily waste water, an oil/water separationunit, a sand bed filter and a water collection lagoon is considered to be added as anintegrated part of the oil spillway system. The overall system is considered to bedimensioned for a perfornance of a water quality of maximum 10 ppm oil productconcentration in the outlet water from the water collection lagoon. Preliminarycalculations for hydraulic dimensioning of the system have been prepared.

h) a site for long term storage of oil polluted soil (dimensions 15 m x 15 m with aconcrete bottom) surrounded by perimetrial gratings is considered to beconstructed for storage of oil polluted soil and oily waste identified during plantrehabilitation and the construction of the new plant. The site will be drained forrain water into the oil spillway system.

i) additional storage capacity for oily waste and waste oil will be provided.

The proposed mitigation measures for protection of the quality of the water resourcesin the area are recommended to be included as general mandatory requirements fortreatment of waste water and oily waste in proposed project. The present preliminary

'SPP\80163901 Yemen Power Plant\Final Repot\CHAP-5 doc

- 5.10 -

Page 54: Republic of Yemen - World Bankdocuments.worldbank.org/curated/en/... · 1. introduction 1.1 1.1 background 1.1 1.2 objective for the environmental assessment 1.1 1.3 scope of work

5 / ENVIRONMENTAL ASSESSMENT

stage for design of the proposed measures do not allow for a detailed technicalassessment.

Recommendations on mitigation measuresIt is recommended to include the considered mitigation measures in the proposedproject. It is further recommended:

1. - to include assistance for final technical evaluation and monitoring of theimplementation of the proposed setup.

2. - to include a pump for lifting the oily water coming from the oil spillway systemto a reasonable level near ground level in order to reduce the depth in which theoil/water separator, sand bed filter and the water lagoon have to be established.

3. - that the water lagoon for final polishing of the waste water should be located atthe other side of the entrance road in order to avoid conflicts with the existinglocal water intake (bore hole).

4. - that it could be considered to construct the water lagoon as a lined system andconnect an overflow from the water lagoon to the drainage system for rain waterin order to control the infiltration of water from the lagoon.

It is in general assessed that a well maintained oil/water separator together with thesand bed filter will allow an oil concentration of the outlet water into the lagoon ofapprox. 10 ppm depending of the design of the sand bed filter.

5.3.5 Waste Management

No considerations conceming management of waste produced at the power plant areincluded in the proposal for the construction of the new power plant.

A new power plant in full operation will produce increased amounts of waste productsincluding waste oil, compared to the present power production schedules. A clearmanagement set-up for handling these various types and amounts of waste shouldtherefore be included as a part of the project.

Since the concept of environmental management has not been part of the previousgeneral power plant management, it is important that the proposed procedures are easyto comprehend, manage and apply. The problems related to waste management shouldbe divided in three parts: management of waste during the construction phase, properoperational routines for collection and storage of waste products at the power plant andfinal disposal of the waste.

As a part of the proposed mitigation measures, proposals for collection and finaldisposal of the waste has been included.

5.3.6 Human External Environment Including Noise Levels

The Tender material from Ansaldo does include later submitted material describingpreliminary abatement measures for reduction of noise emissions related to the

C.ASPP\80163901 Yemen Power Pl na\FinaJ Repon\CHAP-5 doc

-5.11-

Page 55: Republic of Yemen - World Bankdocuments.worldbank.org/curated/en/... · 1. introduction 1.1 1.1 background 1.1 1.2 objective for the environmental assessment 1.1 1.3 scope of work

5 / ENVIRONMENTAL ASSESSMENT

operation of the diesel engines. Calculations for expected ambient noise levels areincluded.

The following physical components are considered to be included:

- partial insulation of the building to reduce indoor and ambient noise levelsincluding addition of a noise barrier on the roof air exhausters of the machine halland addition of sound proof cladding for the machine hall.

- intemal partition walls for engine maintenance.

- addition of diesel engine air intake silencers.

- addition of silencers for the air exhaust stacks.

- installation of radiator fans of low noise type.

Based on the preliminary noise measurements as well as Ansaldo's documentation, itcan be expected that the ambient noise emission level will be approx. 68 dB(A) at theborder of the premise, including noise emission from the existing plant.

ConclusionIt is expected that nuisance of noise on the external environment will not besignificant.

Recommendations on mitigation measuresNo specific recommendations on mitigation measures to be set forth.

5.3.7 Workers Health and Safety

As mentioned in section 5.3.6, the Tender material includes a number of consideredmeasures to reduce the overall emitted noise arising from the power plant operations ofthe five diesel engines.

No calculations or other identified written material describes the expected noise levelsin the engine hall. According to information obtained directly from Ansaldo, a noiselevel of approx. 100 dB(A) has to be expected.

Safety precautions with respect to preventing injuries related to open channels andcollection tanks are not documented in Ansaldo's tender material.

Furthermore, the tender material does not contain any description or outline of theoutdoor facilities, e.g. handling and storage of oil waste, drainage system, etc. whichmight have a negative impact on the workers' health and safety conditions.

ConclusionThe noise level in the new engine hall is most likely to exceed the World Bankguideline of 90 dB(A) although the proposed abatement measures are implemented.

It is unclear which areas require signing and presence of safety instructions.

C \SPP\S0163901 Y,nn P-e PIorl\Final Rrpon\CHAP-5.dmc

- 5.12 -

Page 56: Republic of Yemen - World Bankdocuments.worldbank.org/curated/en/... · 1. introduction 1.1 1.1 background 1.1 1.2 objective for the environmental assessment 1.1 1.3 scope of work

5 / ENVIRONMENTAL ASSESSMENT

Safety precautions to be taken in connection with open channels and open collectiontanks are unclear.

Recommendations on mitigation measuresThe following mitigation measures should be initiated in connection with the detaileddesign and construction of the new power plant:

1. Implementation of proposed noise abatement measures2. Implementation of procedures of wearing hearing protection equipment3. Implementation of engine maintenance procedures4. Signing in areas with frequent noise levels above 90 dB(A)5. Place safety instructions and data sheets where hazardous materials are stored and

handled (e.g. at the ion exchanger unit)6. All channels and open tanks should be covered in order to prevent injuries.

Furthernore, adequate cleaning procedures should be implemented where oilproducts and waste is handled and stored.

5.3.8 Fire Fighting and Emergency Set-up

No considerations regarding fire fighting and emergency set-up are given in the projectdocument for construction of a new power plant, except allocation of an unspecifiednumber of portable fire fighting equipment at various plant sites. It is recommendedthat Ansaldo specify the location and the number of fire fighting equipment included inthe project proposal.

Some general considerations regarding fire fighting and emergency set-up are given inchapter 5.2.8. A proposal for mitigating measures is included as a part of theassessment.

5.3.9 Historical and Cultural Resources

The construction of the new power plant will take place on an existing developed sitewhich already partly is prepared for construction. According to obtained inforrnation,no historical values have been identified during previous ground work. It is thereforeassessed that no historical values or interests will be affected by the project component.It is recommended the company use archaeological "chance finding" proceduresdescribed in World Bank Environmental Guidelines in case buried archaeologicalmaterials are encountered during the construction process according to the rules andregulations stated in the Law of Antiquities.

5.4 PROJECT COMPONENT: EXPANSION AND UPGRADING OF ASSER BSP132/33 KV SUBSTATION INCLUDING DEBOTTLENECKING ELEMENTSOF THE TRANSMISSION NETWORK IN SANA'A.

The assessment of the project component for expansion and upgrading of AsserSubstation including debottlenecking elements of the transmission network in Sana'a, -is based on data collected during a site visit conducted in December 1997 and in thestudy carried out by Golder Associates (Ref. Anmex K).

T\SPP\80163901 Yemen Poma Plant'rinal Repon\CHAP-5.doc

- 5.13 -

Page 57: Republic of Yemen - World Bankdocuments.worldbank.org/curated/en/... · 1. introduction 1.1 1.1 background 1.1 1.2 objective for the environmental assessment 1.1 1.3 scope of work

5 / ENVIRONMENTAL ASSESSMENT

Asser Substation subcomponentThe 132/33 kV Asser Substation on the west side of Sana'a was constructed in 1982.The substation is the main bulk supply point to the Sana'a system. Asser Substation issupplied from a 132 kV line about 150 km long that runs from Dhamar Substation inthe south to Arnran substation in the north. Dhamar Substation in turn is connected tothe overall PEC grid that is supplied mainly from the three steam plants Al Hiswa inthe south and Ras Katenib and Al Mukha in the west.

The physical rehabilitation and construction work at Asser Substation is restricted to:

- construction of a double circuit 132 kV open switchyard with two bus sections.

- addition of a third 60 MVA power transformer.

- extension of access road behind the existing 33 kV switchgear building.

- extension of 33 kV switchgear building to accommodate additional panels.

Main environmental impact related to expansion and upgrading of the Asser Substationis assessed to be of very limited extent, since the substation will be expanded on analready developed site owned by PEC.

Transmission line subcomponentThe PEC policy for acquiring land for right-of-way construction is not outlined orstated in any identified documents. Based on discussions with the PEC management,the following policy for construction of right-of-ways for power overhead lines wasoutlined:

- to apply existing right-of-ways or to construct right-of-ways along existing roadsand highways.

- to avoid construction of overhead lines passing over existing building and houses.

- if unavoidable for construction of the overhead line, to negotiate conditions forright-of-way passing private land with land owners.

A recent study prepared by PEC (ref. 23) and a single-line and impedance diagram forSana'a power distribution system elaborated by Bechtel in 1993 for a previous study(ref. 9) forms the basis for the planned construction of transmission lines. The finaldesign of the project is still under preparation. During site inspection, a draft locationmap was elaborated for the right-of-way of the proposed lines. The configuration of the33 kV system in Sana'a is shown in Appendix 1 and Appendix 5 A.

The following components for construction of right-of-way are according to Ref. 23.included in the project:

1. A new 33 kV line from Dhahban Power Station to north-east substation - a totalof 8,6 km overhead line and 1,3 km cable.

C \SPP\S0163901 Ynene Powue Plant\Final Repom\CHAP-5,dmc

-514-

Page 58: Republic of Yemen - World Bankdocuments.worldbank.org/curated/en/... · 1. introduction 1.1 1.1 background 1.1 1.2 objective for the environmental assessment 1.1 1.3 scope of work

5 / ENVIRONMENTAL ASSESSMENT

2. A new 33 kW line from Dhahban Power Station to the Airport Road andintercepting the existing 33 kV line from Rawdan substation - a total of 3,6 kmoverhead line and 1,3 km cable.

3. A new 33 kV line from Dhahban Power Station to to Sana'a north-westsubstation - a total of 7,5 km overhead line and 1,2 km cable.

4. A new 33 kV line from Asser BSP to south-west substation - a total of 5,2 kmoverhead line and 2,5 km cable.

The pole planned to be applied for the 33 kV-line is an approximately 10 m highwooden pole.

The assessment has been based on a visual inspection of main parts of the right-of-wayas drawn on the draft map by PEC. The impact from the right-of-way was evaluatedwith respect to land use interests, vegetation and wildlife, human extemal environmentand historical interests. The following table summarises the right-of-way components(Appendix 5A, Annex K):

Right-of-way component Total AdverseLength Impacts

km Yes No Mitigation MeasuresComponent 1: Utilizing existing highway andDhahban PS to Sana'a north-east 9,9 X transmission ROWs for the anticipatedsubstation overhead line routing

ROW aloong Saada Road and NEperimeter road to substation.Little population along ROW

Component 2: Utilizing existing Airport Road andDhahban PS to Airport Road 4,9 X transmission ROWs

Sparsely populated along entireROW.

Component 3: Utilizing existing highway andDhahban PS to north-west 8,7 X transmission ROWssubstation

ROW follows NW perimeterroad, then over undeveloped,government land

Component 4: Route follows existing 132 kV ROWAsser BSP to south-west 7,7 X through mountains to SW Substationsubstation

ROW through rugged mountains.No population and sparsevegetation

Table 5.4 Transmission Line Route and Description of Physical Conditionsalong ROW.

C \SPP80163901 Yemen Poer Plant\Final ReponT\CHAP-5.doc

-5S15 -

Page 59: Republic of Yemen - World Bankdocuments.worldbank.org/curated/en/... · 1. introduction 1.1 1.1 background 1.1 1.2 objective for the environmental assessment 1.1 1.3 scope of work

5 / ENVIRONMENTAL ASSESSMENT

Recommendation

Once the final alignment of the right-of-ways are determined, a consultation should beundertaken with archaeological authorities.

Due to the present stage of development for this project component, it is proposed as apart of the mitigation measures to include environmental consultancy assistance forPEC. This to ensure that proper measures are applied, when the expansion andupgrading of the Asser Substation is implemented and the planned right-of-way isdesigned and constructed.

5.4.1 Land Use

According to the obtained information and the visual site inspection, no land useinterests will be affected by the right-of-way of the 33 kV overhead line. No specificmitigation measures are foreseen to be included in the project, but this will be verifiedin the project phase through specific consultancy assistance for PEC.

5.4.2 Vegetation and WildlifeDue to scarce vegetation and the location in a city suburb area, and according to theobtained information form the visual site inspection, no vegetation and wildlife interestwill be affected by the right-of-way of the 33 kV overhead line. No specific mitigationmeasures are foreseen to be included in the project, but this will be verified in theproject phase through specific consultancy assistance for PEC.

5.4.3 Human External Environment

Due to the location of the overhead lines in existing overhead line clearances or alongroads and according to the information obtained from the visual site inspection, nohuman external environment interests will be affected by the right-of-way of the 33 kVoverhead line. No resettlement is planned for the project. No specific mitigationmeasures are foreseen to be included in the project, but this will be verified in theproject phase through specific consultancy assistance for PEC.

5.4.4 Historical and Cultural Resources

Due to the location of the overhead lines in existing overhead line clearances or alongroads and according to the information obtained from the visual site inspection, nohistorical and cultural resources will be affected by the right-of-way of the 33 kVoverhead line. No specific mitigation measures are foreseen to be included in theproject, but this will be verified in the project phase through specific consultancyassistance for PEC.

5.5 SUMMARY OF ENVIRONMENTAL ASSESSMENT

The following 3 inter-related project components have been assessed:

SPP\80163901 Yemen Power Platnt\Final Rcpoet\CHAP-5.doc

- 5.16 -

Page 60: Republic of Yemen - World Bankdocuments.worldbank.org/curated/en/... · 1. introduction 1.1 1.1 background 1.1 1.2 objective for the environmental assessment 1.1 1.3 scope of work

5 / ENVIRONMENTAL ASSESSMENTT

(a) selected rehabilitation and upgrading activities for the existing 20 MW diesel-fuelled power plant at the Dhahban Power Plant site.

(b) installation of an additional 30 MW of generating capacity at the existing site.

(c) expansion and upgrading of Asser 132/33 kV substation also includingdebottlenecking elements of the transmission network in Sana'a. The existingpower supply network is planned to be expanded in the Sana'a north-west area withnew overhead 33 kV lines and underground cable lines.

Each of the three project components has been assessed separately using a checklistmethod. The environmental impact of each project component was identified bysuperimposing project elements upon existing environmental conditions and thenapplying standard mitigation measures. The proposed mitigation measures will bedetailed and summarised in chapter 7.

Table 5.5 provides a detailed summary of the findings of the environmental assessmentprocess. The table has been structured to include information on the findings andconclusions concerning potential environmental impacts and to identify proposedmitigation activities.

C \SPP\80163901 Yemen Power Pnt\Final RcpoM\CHAP-5.doc

- 5.17 -

Page 61: Republic of Yemen - World Bankdocuments.worldbank.org/curated/en/... · 1. introduction 1.1 1.1 background 1.1 1.2 objective for the environmental assessment 1.1 1.3 scope of work

5 / ENVIRONMENTAL ASSESSMENT

Table 5.5 Summary of Environmental Assessment

EA - Findings and Conclusions Proposed Mitigation MeasuresPotential Environmental Impact Brief Description

1. General conclusions

1.1 No Yemeni national environmental standardsor guidelines regulate the environmental problemsidentified in the proposed project. Instead, World Bankguidelines have been used as reference, where possible.

1.2 The PEC capacity for handling and managing IA Assistance and Terms of Reference forenvironmental components in relation to the proposed institutional support of PEC should to be included as aproject is assessed to be very limited, part of the mitigation plan:

IA, - Overall environmental consultancy assistanceIA2 - Basic environmental management training.

1B Environmental management of power plantoperations should be included as part of the consideredOperational and& Maintenance Management Contractwith an external contractor.

1.3 The evaluation of the current environmental IC EA includes recommendations for mitigationconditions in the project area has been hampered to actions to address some key data gaps which wouldsome extent been hampered by the limited availability support more effective implementation of the proposedof baseline data. project and facilitate the development of future planned

investments in the energy sector.

1.4 General procedures and options for final safe 1D Terms of Reference should be developed for andisposal of oily waste and waste oil are lacking and assistance project for development of generalhave to be developed at PEC level. procedures and options for final safe disposal of oily

waste and waste oil.

1.5 No air quality monitoring programme, 1F Terms of Reference should be developed for asystem or stations exist in the Sana'a area. baseline air quality monitoring programme.

2. COMPONENT A. Rehabilitation of theexisting 4 unit 20 MWpower plant

2.1 Draft description of mitigating elements 2A A detailed examination should be carried outcovering noise and waste water treatment are included for the existing drainage system, septic tank and oilin the project document for rehabilitation of the spillway system in order to secure that pipes are intactexisting Dhahban Power Plant. and that the systems are functioning according to the

original design.

2.2 An air quality analysis have showed that a 2B Stack height has to be raised to 27 meters. Anstack height of 27 meters is required also on the agreement has been included as a part of the projectexisting rehabilitated power plant in order to ensure that fuel with characteristics equal or better than 0.2compliance with the World Bank ambient air quality percent maximum sulfur content, 0.01 percentguidelinesThe changes in air quality caused by maximum ash content and a Cetane Index of 52 oroperation of the rehabilitated Dhahban Power Plant is better would be used in the rehabilitated power plant.assessed to be low and within World Bank guidelines.

2.3 Presuming that a satisfactory rehabilitation ofthe diesel engines is carried out, it is assessed that theemission of oil aerosols from the ventilation outlets at

\SPP\80163901 Yenen Power Pant\Frnal Report\CHAP-5.doc

- 5.1R

Page 62: Republic of Yemen - World Bankdocuments.worldbank.org/curated/en/... · 1. introduction 1.1 1.1 background 1.1 1.2 objective for the environmental assessment 1.1 1.3 scope of work

5 / ENVIRONMENTAL ASSESSMENT

EA - Findings and Conclusions Proposed Mitigation MeasuresPotential Environmental Impact Brief Description

the roof of the engine hall does not represent anysignificant impact.

2.4 It is assessed that the water abstraction forcooling water purposes and domestic water use will notcause any noticeable effects on the water balance in thearea.

2.5 It is assessed that the water from the drainagesystem does not pose any risk to the ground waterresources as long as the drainage pipe system is intactand does not drain any oil polluted area.

2.6 It is assessed that the sewage water componentof the drainage water does not constitute any risk to theground water resources.

2.7 It is recommended to pH-neutralize the reject 2C A component for pH-neutralization of thewater from the ion exchanger before discharge. reject water has to be included in the proposed projectThereafter, the individual components of the reject covering Component B and Component C.water do not cause any environmental concem.

2.8 The present routines for use of the extended 2D The present routines for discharge of wasteoil spillway system for discharge of oily water and water should be stopped immediately, the currentwaste oil into a non-lined underground reservoir do not extension of the oil spillway system closed, and ancomply with good environmental standards. altemative system placed into operation.

2.9 Altemative solutions for handling the waste 2E The oil spillway system should be replaced bywater stream from the oil spillway system should be construction of a simple oil/water separator system forimplemented. handling discharged oil polluted wastewater from the

oil spillway system.

2.10 The environmental problems related to the 2F Terms of Reference should be prepared for apresence of significant amounts of oil products mitigation project for protection of ground waterdischarged into the underground reservoir with an resources against potential oil pollution.accompanying potential risk of pollution ofgroundwater resources have been assessed, based onavailable data. Using a conservative approach andtaking into consideration some contradictions in thecollected data, it cannot be ruled out that the previousroutines for oily waste handling might constitute apollution threat to the groundwater resources in thelocal area.

2.11 Procedures for management of oily waste at 2G, Simple oil waste management proceduresthe power plant should be implemented. should be developed for handling and collection of

various types of oily waste at the power plant

2G2 Establishment of oil spill trays at "hot spots"and site preparation for long-term storage of oilpolluted soil. Handling of oil polluted soil and oilywater during construction

2G3 Establishment of additional temporarystorage capacity for waste oil and oily waste.

2.12 The extemal noise level from the rehabilitated 2H Proposed external and intemal noiseplant is expected to meet World Bank guidelines for abatement measures should be implemented.

\SPP\M0163901 Yemen Power Pla\Finti ReporCHAP-5.doc

- 519-

Page 63: Republic of Yemen - World Bankdocuments.worldbank.org/curated/en/... · 1. introduction 1.1 1.1 background 1.1 1.2 objective for the environmental assessment 1.1 1.3 scope of work

5 I ENVIRONMENTAL ASSESSMENT

EA - Findings and Conclusions Proposed Mitigation MeasuresPotential Environmental Impact Brief Description

ambient noise, when proposed noise abatementmeasures are implemented.

2.13 The intemal noise levels at the engine hall 21 Proposed intemal noise abatement measuresafter rehabilitation are not expected to meet World should be implemented.Bank guidelines.

2.14 Occupational health and safety conditions for 2J A number of recommendations should bethe power plant workers should be improved at a implemented for improvement of working conditions innumber of specific points. cooperation with expertise from the Department of

Public Health and Safety under the Ministry ofLabourLabour and Vocational Training.

2.15 No fire or emergency plan was identified at 2K A simple fire and emergency plan should bethe plant. It is recommended to prepare a simple preparedcontingency plan which describes the generalprocedures and contact points in case of fire or other 2L Overall cleaning of the power plant hallemergency incidents. should be established for removal of spilt oil and other

flanmmable materials (especially in ventilationducts/outlets and cable channels) in order to reduce therisk of fire.

2.16 It is assessed that potential historical andcultural interests will not be affected by the project.

2.17 Registration duringObservations made during 2M Present fuel oil loading procedures should besite visits of previous spillage's of fuel oil at the place updated.for loading of oil storage tanks indicates a need forupdating of procedures for fuel oil loading.

3. COMPONENT B. Construction of a new 5unit 30 MWpower plant at a site adjacent to theexisting plant site and within the existing area ofPEC

3.1 Draft descriptions of mitigating elementscovering noise and waste water treatment are includedin the project document for construction of a new 30MW plant at the Dhahban power plant site.

3.2 In order to meet the requirements when 3A The stack height should be increased to 27 m,operating both power plants simultaneously, the rather than the proposed 15 m to allow the new plant tonecessary stack height for the new plant has been be in accordance with World Bank ambient air qualitycalculated. A stack height of 27 meters is required in guidelines. An agreement has been included as a part oforder to ensure that the requirements in the World Bank the project that fuel with characteristics equal or betterguidelines for new power plants will not be exceeded than 0.2 percent maximum sulfur content, 0.01 percentduring simultaneous operation of both plants. maximum ash content and a Cetane Index of 52 or

better would be used in the rehabilitated plant and thenew power plant.

3.3 It is assessed that the water abstraction forcooling water purposes and domestic water use will notcause any noticeable effects on the groundwaterbalance in the area.

C \SPP\80163901 Yemen Power Plant\Fmal ReportNCHAP-5 doc

- 5.20-

Page 64: Republic of Yemen - World Bankdocuments.worldbank.org/curated/en/... · 1. introduction 1.1 1.1 background 1.1 1.2 objective for the environmental assessment 1.1 1.3 scope of work

5 / ENVIRONMENTAL ASSESSMENT

EA - Findings and Conclusions Proposed Mitigation MeasuresPotential Environmental Impact Brief Description

3.4 It is recommended to combine the 3B A the new drainage and wastewater systemwaste water system from the existing plant with the should be designed and constructed according tonew system in order to establish an effective system for principles laid down in the existing plant and withwaste water treatment at the Dhahban Power Plant. design of a simple oil/water separator common for bothThis implies that the joint oil/water separator should be the existing and the new system.dimensioned according to the dimensions in a jointwaste water system.

3.5 It is recommended that the the design of thewaste water system at the existing plant is used at thenew plant, which includes a division of the system in aclean-water system for areas that are not supposed to beoil polluted and an oil spillway system for areas of riskbeing polluted with diesel or lube oil.

3.6 Procedures for management of oily waste 3C Simple oil waste management proceduresshould be implemented. should be developed for handling and collection of

various types of oily waste at the power plant.

3D The proposed PEC pilot project foridentification of safe solutions for disposal of oilywaste and waste oil should be implemented.

3.7 Ansaldo provides proposals for abatement 3E Noise abatement measures proposed bymeasures for reduction of noise emissions related to the Ansaldo should be included in the project.operation of the diesel engines.

3.8 The external noise level from the operation ofthe existing and the new power plant simultaneously isexpected to be close to meet World Bank guidelines forambient noise, if proposed noise abatement proceduresare implemented.

3.9 The indoor noise levels at the engine hall are 3F Noise abatement measures proposed bynot expected to meet World Bank guidelines, unless Ansaldo should be included in the project. If Worldextensive noise abatement procedures are implemented. Bank guidelines for internal noise can not be met,

personal hearing protection has to be applied.

3.10 Occupational health and safety conditions for 3G Overall working conditions should bepower plant workers should be included in the project. improved in cooperation with expertise from the

Department of Public Health and Safety under theMinistry of LabourLabour and Vocational Training.

3.11 It is recommended to prepare a simple 3H A simple fire and emergency plan should becontingency plan which describes the general prepared.procedures and contact points in case of fire or otheremergency incidents. The plan should cover both theexisting and the new plant.

3.12 It is evaluated that potential historical and 31 The construction company should be instructed tocultural interests will not be affected by the project. use archaeological "chance finding" procedures when

encountering any archaeological materials duringconstruction work.

_ASPP\80163901 Yem Power PIn\Final Rcpot\CAP-5.,d

- S.2? 1

Page 65: Republic of Yemen - World Bankdocuments.worldbank.org/curated/en/... · 1. introduction 1.1 1.1 background 1.1 1.2 objective for the environmental assessment 1.1 1.3 scope of work

5 / ENVIRONMENTAL ASSESSMENT

EA - Findings and Conclusions Proposed Mitigation MeasuresPotential Environmental Impact Brief Description

4. COMPONENT C. Expansion and upgradingof Asser BSP 132/33 kVSubstation includingdebottlenecking elements of the transmission networkin Sana'a.

4.1 Descriptions of the two project 4A It is proposed as a part of the environmentalsubcomponents have been identified. The component assistance for PEC to include consultancy assistance tohas been assessed by Carl Bro Intemational and secure proper implementation of environmentalsupplemented by a study of Golder Associates Inc. mitigation measures related to project subcomponents

concerning transmission network upgrading. A4.2 The assessment was based on a visual preliminary review conducted by PEC, at the request ofinspection of the right-of-way as drawn on the map the World Bank, did not identify the presence of anyprovided by PEC. transformers known to have PCB's; however, the

environmental rnitigation plan is proposed to include4.3 According to the information obtained and the an independent review of PCB's in transformers.visual site inspection, no land use interests will beaffected by the right-of-way of the 33 kVkV overheadlines.

4.4 Due to scarce vegetation and the location in acity peri-suburban area, and according to theinformation obtained from the visual site inspection, novegetation and wildlife interests is assessed to beaffected by the right-of-way construction of the 33kVkV overhead lines.

4.5 Due to the location of the overhead lines inexisting overhead line clearances or along roads andaccording to the information obtained from the visualsite inspection, no human external environment interestis assessed to be affected by the right-of-way of the 33kVkV overhead lines. No resettlement is planned forthe project.

4.6 Due to the location of the overhead lines in 4B Once the final alignment of the right-of-ways areexisting overhead line clearances or along roads and determined, a consultation should be undertaken withaccording to the information obtained from the visual archaeological authorities.site inspection, no historical and cultural resources willbe affected by the right-of-way of the 33 kV overheadlines.

SPP\S0 163901 Ycmcn Pown PlanRFmal Report\CHAP-5.doc

Page 66: Republic of Yemen - World Bankdocuments.worldbank.org/curated/en/... · 1. introduction 1.1 1.1 background 1.1 1.2 objective for the environmental assessment 1.1 1.3 scope of work

6. ANALYSIS OF ALTERNATIVES

Page 67: Republic of Yemen - World Bankdocuments.worldbank.org/curated/en/... · 1. introduction 1.1 1.1 background 1.1 1.2 objective for the environmental assessment 1.1 1.3 scope of work

6 / ANALYSIS OF ALTERNATIVES

6. ANALYSIS OF ALTERNATIVES

As a part of the enviromnental assessment, alternatives to the proposed project have to bedescribed and detailed. Consequences and related impacts of the project altematives areaccordingly outlined.

6.1 NO ACTION ALTERNATIVE

The no action alternative is characterised by a situation, where financial resources for theproject are not available and the present proposed power plant rehabilitation projectaccordingly is not implemented. The following major consequences can be outlined incase the present project with its three components is not implemented:

I. Dhahban Power Plant power production can only be maintained at a maximum effectof 10 MW (2 diesel units) for an unpredictable length of time in a short-termperspective instead of an upgraded partly rehabilitated, partly new installed effect of50 MW. The lack of spare parts and the need for major overhauling of the dieselengines in present operation might influence the production stability in the short termand bring the power production to a stand-still in the medio term.

2. The unstable electricity supply in the Sana'a region will be maintained due to thelack of power production capacity. This situation will have substantial side effects onthe local economy and development, production and employment in general.

3. The rapidly expanding use of small fuel-driven power generators in Sana'a to reducethe impact of power outages will continue to increase. This could cause significantlocal impacts to air quality and noise.

4. The identified problems related to previous routines for handling oily waste andwaste water will not be solved. The identified potential risk of pollution ofgroundwater resources with oil compounds will not be determined and propermitigation measures will not be implemented.

5. The opportunity to use the present project as a pilot project in PEC forenvironmentally sound handling of oily waste products cannot be exploited.

6.2 USING NATURAL GAS AS POWER FUEL

As a part of the initial project planning, a project alternative for using natural gas asfuel for a new constructed Dhahban power plant has previous been considered. Naturalgas fields are developed in the Ma'rib area (approx. 180 km east of Sana'a), but the gassupply network for the Sana'a area has not been constructed yet and forecasts forfurther future development of this network are very uncertain. The French petroleumcompany Total, who operates some of the gas producing fields in the Ma!rib area hasset the planning horizon for establishment of an export gas pipeline passing Sana'a notearlier than approx. year 2003 - 2004. A project study for development of an energymaster plan investigating the natural gas supply as an alternative for energy productionin Yemen and the Sana'a region will be initiated medio 1998.

C \SPP\80163901 Yernr Power Plantrfinal ReportrCRAP-6.doc

- 6.1 -

Page 68: Republic of Yemen - World Bankdocuments.worldbank.org/curated/en/... · 1. introduction 1.1 1.1 background 1.1 1.2 objective for the environmental assessment 1.1 1.3 scope of work

6 / ANALYSIS OF ALTERNATIVES

From an environmental point of view, use of natural gas as power fuel is an interestingoption. Dual-fuel engines with a build-in option for switching fuel between natural gasand diesel oil are technical feasible and commercial available today, although theinvestment costs and accordingly the price per produced kW-hour are considerablehigher for dual-fuel engines compared with conventional diesel engines

Main environmental benefits using natural gas as fuel compared with diesel oil arerelated to improved air quality and less environmental problems related to oil wastemanagement. Due to the character of the fuel there will be no emission of SO.

The less adverse impact on air quality from the usage of natural gas compared todiesel oil is due to the fact that the natural gas has:

* No contents of particles* No contents of sulphur* Significant lower contents of nitrogen and therefore the emission of NO, will

correspondingly be lower than compared with diesel oil products.

In the present proposed project, use of conventional diesel engines has been selected asbasis for the power production. This decision has been made partly due to the highlyunpredictable development forecast for future natural gas supply for the Sana'a region.Also issues related investment costs, reliability of the units and that diesel units,according to the view of PEC, could be more easily operated and maintained underconditions in Yemen, has influenced the decision. The diesel engines selected to beinstalled are as such only able to operate on light diesel oil. Rebuilding for conversionfor use of natural gas as fuel is in principle possible, but high investment costs for therebuilding have to be foreseen.

6.3 ALTERNATIVE SITING

The planned siting of the proposed new power plant at the existing power plant site atDhahban is based on the following considerations:

- no land acquisition is necessary, since the site already has been prepared for futureexpansion either for a larger gas-fuelled power plant or for a diesel power plant.

- part of the basic and technical facilities are already in place including a trainingfacility for PEC.

- the site is located in an area, which, according to the Governorate of Sana'a, isplanned for small scale industry development. This implies that future housingdevelopment in the area must be anticipated to be limited.

- land acquisition in Yemen is in general an extremely complicated process. Thetribal structure of the Yemen society and the lack of a cadaster system for landownership registration will heavily influence the possibility for and availability ofland for power plant siting.

C ISPP80163901 Yanen Powe Piant\Final RepornCHAP-6.doc

- 6.2 -

Page 69: Republic of Yemen - World Bankdocuments.worldbank.org/curated/en/... · 1. introduction 1.1 1.1 background 1.1 1.2 objective for the environmental assessment 1.1 1.3 scope of work

6/ ANALYSIS OF ALTERNATIVES

An altemative siting for the project component related to construction of a new powerplant has accordingly not been considered in the present case. The overall assessment hasrevealed that the minor negative impact caused by the construction of a new plant at theselected and already developed site, by no means justifies the selection of an altemativesite.

6.4 SUMMARY OF ANALYSIS OF ALTERNATIVES

Analysis of Alternatives

Table 6.2 provides an overview of the analysis of alternatives including the no actionalternative, which was conducted as an element of the environmental assessment. As apart of the environmental assessment, altematives to the proposed project have to bedescribed and detailed. Consequences and related impacts of the project altematives areaccordingly outlined. Three alternatives have been assessed: the No Action Alternative,the Gas Fuel Alternative and the Alternative Siting Alternative.

Table 6.2 Analysis of Alternatives

Project Alternative Major Environmental and Major Environmental and_______________________ _ _O Other Benefits Other Drawbacks

No Action Alternative1. Dhahban Power Plant powerproduction can only be continued ata maximum effect of 8 MW (2diesel units) for an unpredictablelength of time in a short-termperspective.

2. The unstable electricity supplyin the Sana'a region will continue.

3. The rapidly expanding use ofsmall fuel-driven power generatorsin Sana'a to reduce the impact ofpower shortages, - will continue toincrease.

4. The identified problems relatedto previous routines for handlingoily waste and waste water will notbe solved.

5. The opportunity to use thepresent project as a pilot project inPEC for environmentally soundhandling of oily waste products willnot be realized.

_ \SPP80163901 Yem n Power Plon\Final Repo,CHAP6.doc

-6.3 -

Page 70: Republic of Yemen - World Bankdocuments.worldbank.org/curated/en/... · 1. introduction 1.1 1.1 background 1.1 1.2 objective for the environmental assessment 1.1 1.3 scope of work

6 / ANALYSIS OF ALTERNATIVES

Project Alternative Major Environmental and Major Environmental andOther Benefits Other Drawbacks

Gas Supply Alternative1. Use of natural gas as fuel will 1. At present, no specific planscreate less impact on the air quality. have been developed to supply the

Sana'a region with natural gas from2. Use of natural gas will minimise the Ma'rib area. Private sectorproblems with oil waste handling. investors give priority to

development of pipelines for gasexport rather than domestic use.

2. Dual-fuel engines have to beselected involving higherinvestment costs.

3. Taking Yemeni conditions intoconsideration, maintenance andgeneral operation will be new andprobably more complicatedcompared to diesel operations.

Alternative Siting1. Site selection can in principle be 1. It will not be possible to takemade with respect to all concerned advantage of the already preparedenvironmental and planning issues. site in Dhahban.

2. All basic and technical facilitieshave to be developed from scratch.

3. Land acquisition is necessary.

4. Land acquisition in Yemen is ingeneral an extremely complicatedprocess. The tribal structure ofYemeni society and the lack of acadaster system for land ownershipregistration will heavily influencethe possibility for and availabilityof land for power plant siting.

5. Rehabilitation and clean-upactions at the existing plant havestill have to be considered.

SPP\80 163901 Yernen PoWEr PiantFinal Repott\CHAP-6.dc

-64 -

Page 71: Republic of Yemen - World Bankdocuments.worldbank.org/curated/en/... · 1. introduction 1.1 1.1 background 1.1 1.2 objective for the environmental assessment 1.1 1.3 scope of work

7. ENVIRONMENTAL MITIGATION PLAN

Page 72: Republic of Yemen - World Bankdocuments.worldbank.org/curated/en/... · 1. introduction 1.1 1.1 background 1.1 1.2 objective for the environmental assessment 1.1 1.3 scope of work

7 / SPECIFIC ENVIRONMEENTAL MITIGATIONMEASURES INCLUDING MITIGATION PLAN

7. SPECIFIC ENVIRONMENTAL MITIGATION MEASURES INCLUDINGMITIGATION PLAN

The environmental mitigation plan intends to summarise and detail the proposedmitigation measures. The plan outline the benefits by implementing the measures,define the party responsible for the implementation and provide as far as possible costestimates for the proposed measures (investment and operational costs). Mainoperational costs can only be determined, when final design of structural mitigationmeasures is completed. Section 7.1 summarises the mitigation plan. In section 7.2 to7.6, a number of selected issues with respect to establishment of proposed mitigationmeasures are detailed

7.1 SUMMARY OF MITIGATION PLAN INCLUDING PROPOSEDENVIRONMENTAL MITIGATION'S MEASURES.

Table 7.1 provides a detailed summary of the Mitigation Plan recommended for theproposed project. It reviews each proposed mitigation action and links them to thefindings presented in Table 5.5. The presentation also provides information on theexpected benefits from each proposed mitigation action, identified the partyresponsible for implementation and estimated investment and operational costs foreach intervention.

Table 7.1 Mitigation Measures and Mitigation Plan

Proposed Mitigation Measures Expected Benefit Party Estimated(numbers in brackets refer to EA responsible for costsSummary Table) Implementation (US $)

1. General Mitigation Measures

1.1 Assistance and Terms of Referencefor institutional support of PEC includedas a part of the mitigation plan ( 1 A):

1.1.1 Overall environmental - general follow-up of PEC in co-operation 73,000 USDconsultancy assistance (1A,). TOR mitigation plan on issues with intemationalincluded as part of EA report. allocated for PEC environment

- institutional support for consultantPEC

1.1.2 Basic environmental management - introduction of PEC/EPC in co- 88,000 USDtraining (IA2). TOR included as part of environmental operation withEA report. management principles intemational

in PEC power plant environmentmanagement consultant

1.2 Assistance project for development - identification of PEC/EPC in co- 92,000 USDof general procedures and options for sustainable methods for operation withfinal safe disposal of oily waste and handling and final internationalwaste oil (1 C/3D). TOR included as part disposal of waste oil environmentof EA report. within PEC consultant

\SPPM8016390I Yemn Powfr Plant\Final Rcpon\CHAP-7.doc

-7.1-

Page 73: Republic of Yemen - World Bankdocuments.worldbank.org/curated/en/... · 1. introduction 1.1 1.1 background 1.1 1.2 objective for the environmental assessment 1.1 1.3 scope of work

7/ SPECIFIC ENVIRONMENTAL MITIGATIONMEASURES INCLUDING MITIGATION PLAN

Proposed Mitigation Measures Expected Benefit Party Estimated(numbers in brackets refer to EA responsible for costsSummary Table) Implementation (US $)

1.3 A proposal for a baseline air - provision of baseline PEC/EPC in co- 300,000 USDquality monitoring program (1D). TOR air quality monitoring operation withincluded as part of EA report. data to be used as international

background data for environmentfuture energy projects consultant

2. Structural Mitigation Measures

2.1 A detailed examination carried out - to secure that existing PEC - to be included Included infor the existing drainage system, septic piping is intact and that in final contract - Ansaldo offer (seetank and oil spillway system (2A). the systems are Contractor 2.4)

functioning according tothe original design.

2.2 Equipment for pH-neutralization of - to ensure proper quality PEC - to be included 50,000 USDthe reject water (2C). of reject water before it in final contract -

enters the oil spillway Contractorsystem.

2.3 The present inappropriate routines - to avoid further PEC - to be included Included infor discharge of waste water should be discharge of oil in final contract - Ansaldo offer (seestopped immediately and the later compounds into the Contractor 2.4)constructed extension of the oil spillway existing oily watersystem closed. Provision of temporary reservoir.storage for oily water (2D).

2.4 The oil spillway system - to ensure proper future PEC - to be included 650,000 USDreconstructed including construction of a management of oily in final contract -simple oil/water separator system for waste water. Contractorhandling discharged oil polluted wastewater from the oil spillway system. A - provision of quality PEC in co-operation Included in 1.1 .1the new drainage and wastewater system assurance of the with internationalshould be designed and constructed proposed spillway environmentaccording to principles laid down in the design. consultantexisting plant and with design of asimple oil/water separator cornmon forboth the existing and the newsystem.(2E/3B)

2.5 Mitigation project for protection of - to identify extent and PEC in co-operation 133,000 USDground water resources against potential further steps necessary, if with international (phase I)oil pollution (2F). TOR included as part extensive mitigation environmentof EA report. measures are needed. consultant

2.6 Oil waste management

2.6.1 Simple oil waste management - to improve the overall PEC in co-operation Included in 1.1.1procedures for handling and collection management regime for with internationalof various types of oily waste at the oil waste management. enviromnentpower plant (2GI/3C) consultant

2.6.2 Establishment of oil spill trays at - to ensure minimised PEC - to be included Included in"hot spots" and site preparation for long- impact from accidental in final contract - Ansaldo offer (see

'SPP\80 163901 Yemn Power Plant\Final Rcpofl\CHAP-7.doc

- 7.2 -

Page 74: Republic of Yemen - World Bankdocuments.worldbank.org/curated/en/... · 1. introduction 1.1 1.1 background 1.1 1.2 objective for the environmental assessment 1.1 1.3 scope of work

7 / SPECIFIC ENVIRONMEENTAL MITIGATIONMEASURES INCLUDING MITIGATION PLAN

Proposed Mitigation Measures Expected Benefit Party Estimated(numbers in brackets refer to EA responsible for costsSummary Table) Implementation (US $)

term storage of oil polluted soil. oil spill/long-term Contractor 2.4)Handling of oil polluted soil and oily storage of oil pollutedwater during construction (2G2) soil.

2.6.3 Establishment of additional - to ensure that sufficient PEC 2,000 US])temporary storage capacity (40 m3) for temporary storagewaste oil and oily waste (2 G3). capacity is in place for

waste oil and oily waste.

2.7. Proposed external and internal noise - to ensure compliance PEC - to be included 445.000 USDabatement measures for existing and with World Bank in final contract -new power plant to be implemented guidelines for ambient Contractor(2H121/3E/3F) and internal noise.

2.8 Overall cleaning of the existing - to reduce fire and PEC - to be included Included inpower plant hall for removal of spilt oil explosion risks in final contract - Ansaldo offerand other flammable materials Contractor(especially in ventilation ducts/outletsand cable channels) (2L)

2.9 Stack height at existing and new - to improve local air PEC - to be included Included in 1. I. Ipower plant raised to 27 m to allow for quality in final contract -compliance with World Bank} ambient Contractorair quality guidelines. (3A)

2.10 Updating of procedures for fuel oil - to minimize accidental PEC in co-operationloading (2M) oil spill during fuel oil with international

loading of storage tanks. environmentconsultant

3. Institutional Mitigation Measures(related to Dhahban Power Plant)

3.1 Environmental management of - to ensure that proper PEC to be negotiatedDhahban power plant operations to be measures are used forincluded as part of the considered environmentalOperational & Maintenance managementManagement Contract with an externalcontractor (I B).

3.2 Improvement of working - to ensure that working PEC in co-operation Included in 1.1.1conditions in cooperation with expertise conditions at the power with internationalfrom the Department of Public Health plant is in accordance environmentand Safety under the Ministry of Labour with general standards consultantand Vocational Training (2I13G)

3.3. Preparation of a simple fire and - to ensure that fast PEC in co-operation Included in 1.1.1emergency plan (2J/3H) assistance and response with international

is provided in case of environmentaccidents. consultant

3.4 The construction company should - to ensure that potential PEC in co-operation Included in 1.1.1,'be instructed to use archaeological archaeological values are with international

C \SPP;80163901 Yemn PYoer PlanlFinal Rcpon\CHAP-7.doc

- 7.3 -

Page 75: Republic of Yemen - World Bankdocuments.worldbank.org/curated/en/... · 1. introduction 1.1 1.1 background 1.1 1.2 objective for the environmental assessment 1.1 1.3 scope of work

7 / SPECIFIC ENVIRONMENTAL MITIGATIONMEASURES INCLUDING MITIGATION PLAN

Proposed Mitigation Measures Expected Benefit Party Estimated(numbers in brackets refer to EA responsible for costsSummary Table) Implementation (US $)

"chance finding" procedures when not damaged or environmentencountering any archaeological destroyed during consultantmaterials during construction work. (31) construction.

3.5 Consultancy assistance to secure - that general PEC in co-operation Included in 1. I. Iproper implementation of environmental environmental guidelines with intemationalmitigation measures related to project are observed during environmentsubcomponents concerning transmission upgrading and consultantnetwork upgrading. (4A, 4B) construction activities

7.2 OIL SPILLWAY SYSTEMS AND OIL/WATER SEPARATION SYSTEM FORTHE EXISTING AND NEW POWER PLANT

The present routines for handling oily waste water at the existing power plant haveproved to be inappropriate and cause potential serious environmental problems. It istherefore proposed to include a new set-up to solve these problems as an integratedpart of the Dhahban Power Project. The details for the proposed setup are given insection 5.3.4 of the EA report.

It is further recommended:

1. - to include assistance for final technical evaluation and monitoring of theimplementation of the proposed setup.

2. - to include a pump for lifting the oily water coming from the oil spillway systemto a reasonable level near ground level in order to reduce the depth in which theoil/water separator, sand bed filter and the water lagoon have to be established.

3. - that the water lagoon for final polishing of the waste water should be located atthe other side of the entrance road in order to avoid conflicts with the existinglocal water intake (bore hole).

4. - that it could be considered to construct the water lagoon as a lined system andconnect an overflow from the water lagoon to the drainage system for rain waterin order to control the infiltration of water from the lagoon.

It is in general assessed that a well maintained oil/water separator together with thesand bed filter will allow an oil concentration of the outlet water into the lagoon ofapprox. 10 ppm depending of the design of the sand bed filter.

SPP',80163901 Yemen Power Plam\Final Repor\CHAP-7.doc

7.4 -

Page 76: Republic of Yemen - World Bankdocuments.worldbank.org/curated/en/... · 1. introduction 1.1 1.1 background 1.1 1.2 objective for the environmental assessment 1.1 1.3 scope of work

7 / SPECIFIC ENVIRONMENTAL MITIGATIONMEASURES INCLUDING MITIGATION PLAN

7.3 MITIGATION MEASURES FOR PLANT REHABILITATION AND PLANTCONSTRUCTION

The main environmental concerns during the period of plant rehabilitation and plantconstruction are related to the following issues:

1. Handling of oil polluted soil in case polluted spots are identified during the groundwork.

2. Handling of oily waste water during the rehabilitation of the existing waste watersystem.

It is proposed to include the suggested mitigation measures as a part of the project forwhich the contractor is responsible.

Handling of oil polluted soilIt can be expected that a number of hot spots of oil polluted soil will be identifiedduring the groundwork - either during rehabilitation of the existing waste water systemor during the groundwork for the new plant. In order to avoid further ground pollutionand to be prepared for such a situation, it is recommended that a specific site isprepared for long-term storage of the oil polluted soil. As time goes by, the oilcomponents in the soil will be degraded by micro-organisms and a self-cleaningprocess on the storage site will be established.

Mechanical mixing of the soil piles and the addition of sewage waste water from thepublic sewage pond treatment plant will accelerate the cleaning processes. The siteshould at least cover a drained area of 10 x 20 m and the bottom of the site should bebonded with concrete. It is further suggested that the concrete area is drained with anumber of gratings. The drainage system should be connected to the rehabilitated oilspillway system with an inlet near the oil/water separator.

The site could on a permanent basis serve as a place for storage/disposal of non-liquidoily waste. As long as the waste is mixed in the soil, a natural degradation of the oilcompounds will take place.

Handling of oily waste waterIn order to avoid additional discharge of oily water into the existing undergroundreservoir, it is recommended that oily water and sludge collected during theexamination of the waste water system is stored in clearly marked separate tanks orbarrels.

7.4 MITIGATION MEASURES FOR STANDARD OPERATIONS

Air pollutionThe contractor shall according to calculations performed by the Consultant increase theplanned stack height for the new power plant from 15 meters to minimum 20 meters.

Indoor noise levelsDuring the field visit preliminary noise measurements indicated a noise level at thediesel engine of approx. 100 dB(A). Ansaldo has orally informed that a noise level of

C 'SPP\80163901 Yenien Power Planf\Final Report\CHAP-7.doc

- 7.5 -

Page 77: Republic of Yemen - World Bankdocuments.worldbank.org/curated/en/... · 1. introduction 1.1 1.1 background 1.1 1.2 objective for the environmental assessment 1.1 1.3 scope of work

71 SPECIFIC ENVIRONMENTAL MITIGATIONMEASURES INCLUDING MITIGATION PLAN

similar magnitude is to be expected at the new power plant. Thereforerecommendations on mitigation measures to be implemented are set forth below.

As a minimum the following specific abatement measures to be implemented are:

a) Partition wallsb) Sound absorption sheets on ceiling and walls

Implementing the above abatement measures are expected to reduce the noise level inthe engine halls from approx. 100 dB(A) to between 89 and 91 dB(A).

An alternative solution have been assessed and rejected. The alternative solution wasencapsulation of each of the engines. This solution was rejected because it is relativelycapital intensive and is most likely not satisfactory at the existing plant due to thelimited space around each of the engines.

Partition wallsThe purpose of partition walls is to prevent noise exposure when repairs andmaintenance work are carried out at an engine. By placing partition walls between theengine(s) in full operation next to the engine to be repaired the noise exposure will bereduced significantly. An illustration of the placing of partition walls is presentedbelow:

X1 10 3,

C~~~C

w wU

FIGURE 7.1 ILLUSTRATION OF PARTITION WALLS WHENREPAIRING E.G. ENGINE 2

When not in use the partition walls can be placed along the end wall. When required,the partition walls can be placed wherever needed by crane.

The partition walls might be constructed according to the following principles:

- Steel frame

aSPP\B0163901 Yemen PePlwnt\Fal Report\CHAP-7.dbc

- 7.6 -

Page 78: Republic of Yemen - World Bankdocuments.worldbank.org/curated/en/... · 1. introduction 1.1 1.1 background 1.1 1.2 objective for the environmental assessment 1.1 1.3 scope of work

7 / SPECIFIC ENVIRONMENTAL MITIGATIONMEASURES INCLUDING MITIGATION PLAN

25 mm wood material in the centre (or 2x13 mm gypsum or 2 to 3 mm steel)Both sites of the wood centre should be covered by 50 mm mineral woolThe mineral wool should be with perforated sheets having a hole area of 30%

Each of the partition wall should have a height of approx. 5 meters in order to haveaffect for workers operating on top of the engines.

The cost of the partition walls is estimated to be 150 USD/m2. The estimated cost ofconstructing 4 partition walls of 20 m2 (4 m x 5 m) each for both the existing plant andthe new plant is 24,000 USD. The costs are exclusive of transport and externalassistance to carry out the work.

Sound absorption sheetsSound absorption sheets on ceiling and walls should cover approx. 50% of the ceilingand walls. The construction work might be based on the following principles:

- The sheets should be 50 mm mineral wool products. The productionspecification should be suitable for placing on ceilings and walls.

- The mineral wool sheets placed on walls should be covered by perforatedsheets. The perforated sheets should have a hole area of 30%.

- The size of the sheet could be of 2 x 2 meters.

- The mineral wool products and the perforated sheets can be attached to the wallby a wood or steel frame

The estimated costs of establishing sound absorption on ceiling and walls will beapprox. USD 45 per m2 exclusive of transport of materials. The estimated cost ofestablishing this solution for both the existing and the new plant will be approx. USD80,000. It is expected that the plant carry out the construction work.

Occupational health and safetyThe assessment has identified a need for improvement of basic elements of workershealth and safety. It is recommended that PEC with assistance from an intemationalconsultant establish contacts with the Department of Public Health and Safety underthe Ministry of Labour and Vocational Training with the objective to secure thatstandards for workers health and safety are in accordance with present Yemenistandard on the basis of the recommendations in the assessment. During a meeting inSana'a in December 1997, the Department declared its willingness to participate andassist in such work.

Waste management including management of waste oilProper management of waste is essential for the promotion of a sustainable productionenvironment. As a part of the production process the power plant produces a number ofwaste products which have to be handled and stored in an appropriate way. At thesame time, the limited capacity for environmental management at plant level has to betaken into consideration. In order to establish a simplified set-up, is recommended toconsider waste products in three segments:

SPP\80163901 Ynen, Pofer Plant\Final Rcpon\CHAP-7.doc

- 7.7 -

Page 79: Republic of Yemen - World Bankdocuments.worldbank.org/curated/en/... · 1. introduction 1.1 1.1 background 1.1 1.2 objective for the environmental assessment 1.1 1.3 scope of work

7 / SPECIFIC ENVIRONMENTAL MITIGATIONMEASURES INCLUDING MITIGATION PLAN

* solid, non-toxic waste* solid, potential toxic waste such as e.g. oily waste* liquid oily waste

The solid, non-toxic waste could be handled as in existing procedures by disposal atthe local dump site at the plant. This dump site could be cleaned up once a year, wherethe solid waste should be transported to the municipal dump site.

Solid, potential toxic waste such as i.e. solid or semi-solid oily waste could be disposedat the prepared site for oil polluted soil. It should be secured that the waste is mixedthoroughly in the soil in order to promote degradation.

In order to handle the liquid oily waste, sufficient storage tank capacity should beprovided. The waste should be divided in three fractions and stored in clearly markedseparate tanks: used lubricant oil, used diesel oil with little or no water content, otheroily waste with varying water content. It is important for later use of waste products,that the fractions are not mixed. It is recommended that a specific person is made-responsible for this part of the waste management. The instructions should be madeavailable in writing and on signs with drawings. Special attention should be given tothe collection of waste oil from the work shop.

A specific waste management plan should be elaborated by PEC with assistance froman international consultant.

The problems concerning further handling of stored oily waste will be discussed insection 7.5.

Fuel transport and storageOil spills during fuel oil transport, pumping routines and caused by leakage in storagefacilities are the most frequent sources of oil spills. It is therefore recommended thatoil spill trays for easy collection of oil spills are established in high-risk areas.Appropriate set-ups and procedures for pumping from storage tanks to day tanksshould also be considered.

It is accordingly recommended to include in the proposed project document - as a partof the Sana'a Emergency Power Project:

* implementation of oil spill trays in high-spill risk areas such as the off-loadingplace for diesel oil, loading place for lube oil and under the diesel engines in theengine hall (existing and new plant).

* implementation of oil spill trays in places, where large amount of oil productsare used for cleaning purposes, i.e. cleaning of diesel oil filters.

Emergency set-upClear and understandable emergency procedures in case of fire or other accidents arebasic elements of the emergency set-up. Emergency phone numbers should be easilyavailable and the location of telephones clearly marked.

\SPP\S01639O1 Ynn,n Power Plant\Final Reporm\CHAP-7.doc

- 7.8 -

Page 80: Republic of Yemen - World Bankdocuments.worldbank.org/curated/en/... · 1. introduction 1.1 1.1 background 1.1 1.2 objective for the environmental assessment 1.1 1.3 scope of work

7 / SPECIFIC ENVIRONMENTAL MITIGATIONMEASURES INCLUDING MITIGATION PLAN

In order to strengthen the present emergency set-up, it is recommended PEC withassistance from an international consultant to involve the Civil Defence Head Office,Sana'a Hasaba Nearby under the Ministry of Interior in an evaluation of the presentprocedures and set-up. The capability and capacity of the local fire brigade will be adetermining factor, for how a local fire emergency contingency set-up should bedimensioned. The Civil Defence Head Office, with whom the fire emergencyresponsibility for the Dhahban Power Plant lies, declared their willingness toparticipate in such an evaluation at a meeting in December 1997.

As a specific output, the international consultant should prepare a simple fire andemergency plan in close co-operation with the power plant management.

7.5 FINAL DISPOSAL OF WASTE OIL AND OTHER WASTE

A major reason for the environmental problems related to pollution with waste oilproducts is the lack of proper possibilities for final disposal. So far no viable optionshave been identified for disposal of waste oil produced at the power plants administeredby PEC. Thorough knowledge about amounts and present handling routines should beestablished along with identification of potential techniques and facilities which are ableto utilise the waste oil products, before viable solutions can be identified. It is thereforeproposed to conduct a feasibility study in order to support PEC in finding ways to solvethe problems with increasing amounts of waste oil. Financing for such a study shouldalso be identified. Terms of Reference for such a study is included in Annex G. A totalamount of 91,750 US$ has been estimated needed for this study.

7.6 MEASURES RELATED TO THE MITIGATION OF POTENTIALENVIRONMENTAL EFFECTS ARISING FROM PREVIOUS ROUTINES FORWASTE WATER HANDLING

The environmental problems related to the presence of major amounts of oil productsdischarged into the underground reservoir with the subsequent potential risk ofpolluting groundwater resources have been assessed, based on available data. Using aconservative approach and taking into consideration some contradictions in the datacollected, it cannot be ruled out that the previous routines for oily waste handling mayconstitute a pollution threat to the groundwater resources in the area.

Accordingly a project proposal has been prepared in order to address the serious risk ofoil contamination in the groundwater resource supplying Sana'a City. The appliedproject approach is a phased approach, in which phase I intends to delineate theproblem and if needed, provide recommendations for the following phases. Terms ofReference for such a study is included in Annex H. A total amount of 132,750 US$ hasbeen estimated needed for the first phase.

\SPP\80163901 Yemen Po Plwe z\Final Rcport\CHAP-7.doc

- 7.9 -

Page 81: Republic of Yemen - World Bankdocuments.worldbank.org/curated/en/... · 1. introduction 1.1 1.1 background 1.1 1.2 objective for the environmental assessment 1.1 1.3 scope of work

8. ENVIRONMENTAL MANAGEMENTAND TRAINING

Page 82: Republic of Yemen - World Bankdocuments.worldbank.org/curated/en/... · 1. introduction 1.1 1.1 background 1.1 1.2 objective for the environmental assessment 1.1 1.3 scope of work

8 / ENVIRONMENTAL MANAGEMENT AND TRAINING

8. ENVIRONMENTAL MANAGEMENT AND TRAINING

The overall capacity for environrmental management within the PEC has during thepresent study been assessed to be very limited. In order to support PEC within thesematters for the specific project, a biased approch for project specific assistance hasbeen selected. It is accordingly suggested:

- to include specific consultancy assistance in relation to final development andimplementation of environmental management measures specific related to theDhahban Power Plant operations (as listed in the mitigation plan), and

- to apply in parallel this assistance for monitoring and quality assurance of theimplementation of the agreed structural environmental mitigation measures.

More details for the environmental monitoring part are given in Chapter 9. Besides thisspecific assistance arrangement, it has been agreed to include a specific trainingcomponent in the project, as described in the following section.

8.1 ENVIRONMENTAL MANAGEMENT TRAINING PROGRAMME

It is recommended, on the basis of discussions held with PEC during the EApreparation process, that an environmental component is integrated in the existingPublic Electricity Corporation (PEC) Management Training Programme.

The recommendation is based on the assumption that in order to comply with presentand future legislative requirements and good management practice, emphasis should beput on introducing environmental and working environmental aspects when trainingfuture management candidates of the power plants of the PEC.

The training component for future management candidates will be formed by initialtraining courses for the present PEC planners and managers in order to obtainexperiences from the given context at the existing power plants in Yemen.

8.1.1 Objectives

The main objective of including an environmental component in the managementtraining programme is to provide the PEC planner, managers and managementcandidates with a general knowledge of the environmental issues and workingenviromnent aspects related to the operation of a power plant in Yemen.

Further it is the objective of the training component to provide the students withinfornation on practical approaches which can be addressed in order to implementpreventive actions and implement relevant precautions.

The present programme focuses on the "train-the-trainer" approach in order to ensure along-term perspective in the training activities aimed for both the PEC and EPC. Inaddition to the focus of environmental sound operation of the power plants in Yementhe training programme also focuses on the environmental impact assessment

' \SPP\S01639O1 Yemen Power Plant\Final Report\CHAP-8.doc

-8.1 -

Page 83: Republic of Yemen - World Bankdocuments.worldbank.org/curated/en/... · 1. introduction 1.1 1.1 background 1.1 1.2 objective for the environmental assessment 1.1 1.3 scope of work

I8/ ENVIRONMENTAL MANAGEMENT AND TRAINING

procedures to be carnied out in connection with planning and establishing new plants,transmission lines and similar infrastructural projects.

8.1.2 Environmental Training Components

As preparation of the environmental training component an overall training componentfor PEC planners and managers at all major Yemeni power plants shall be carried out.The aim of this component is to up-date the knowledge about environmental issues ofthe present planners and managers within the PEC. In order to reach a wider targetgroup representatives from the EPC shall be invited alongside the PEC planners andmanagers. The main reason for this extension of the target group is that the trainingcomponent comprises EIA procedures as well and therefore considered relevant at ageneral national level.

Furthermore, it will provide the basis for meeting the long-term objective of train thetrainers. In practice this will be reached by establishing a team of trainers consisting ofboth Yemeni and foreign specialists.

In order to implement the above objectives of the environmental training programmethe environmental training component will focus on both environmental aspects andthe working envirom-nent of power plant operation.

This approach is based on the assumption that impacts on the environment as well asthe working environment are of equal importance. Further, the approach is based onthe assumption that these impacts often interact and thus the actions to be taken inorder to reduce such impacts should be co-ordinated in order not to create e.g. anadverse impact on the working environment when improving the environmentalperformance.

The training programme shall consist of environmental aspects related to the followingtwo components;

A. Operation of power plantsB. Planning and establishing of new plants or related infrastructure projects

Component A:The students will be introduced to methodologies of reviewing the presentenvironmental and working environmental conditions at an existing plant, assess theresults and develop a mitigation plan for improving the performance in order to meetlegal requirements in force.

Component B:In order to enable the students to conduct EA of planned changes or construction ofnew plants or transmission lines the training programme shall comprise a trainingcomponent B. This component will be an introduction to the World Bank's guidelinesof EA according to the Environmental Prevention and Abatement Handbook. Theseguidelines shall be compared to other international guidelines within the EA, e.g.European Bank for Reconstruction and Development (EBRD). In order to make thistraining component operational development of mitigation plans shall form anintegrated part.

SPP\80163901 Yemen PowerPlamt\F,nal Rcpon\CHAP4 .doc

- R.2

Page 84: Republic of Yemen - World Bankdocuments.worldbank.org/curated/en/... · 1. introduction 1.1 1.1 background 1.1 1.2 objective for the environmental assessment 1.1 1.3 scope of work

8 / ENVIRONMENTAL MANAGEMENT AND TRAINING

An outline of the training components can be found in Annex I.

8.1.3 Actions

The training programme will be arranged as 2 x 5 days training course (5 days forcomponent A and 5 days for component B with some part of component B integratedin the first week). It is proposed that the course is to be held in both Sana'a and Aden.In order to carry out the training programmes in both English and Arabic language thePEC shall apply foreign donors for financial support to;

- develop bilingual training material- reproduce the training material- employ Yemeni and foreign specialists for execution of training programme- design long-term training programme in order to ensure capacity building of

Yemeni experts

The donors to be addressed could be;

- European Union- Danish International Development Assistance (Danida)

8.1.4 Results

For PEC, the introduction of an environmental training component in the managementtraining programme will make it easier to implement environment and workingenvironment aspects in the management practices employed at the PEC's power plants.Among other things this might imply improved handling of oil waste in an improvedenvironmental sound way.

Furthermore, providing the PEC management candidates with the above environmentaltraining component will result in

- an improved basis for the PEC to implement adequate environmentalmanagement practices at the Yemeni power plants and new construction suchtransmission lines

- on-site knowledge on how to organise implementation of relevant preventivemeasures and precautions

The environmental training components are suggested to last for 2 x 5 days in order toprovide the students with sufficient time to obtain the expected knowledge accordingto the above listed results of establishing the two training component.

8.1.5 Cost estimate

The course will be conducted by 2 intemational experienced environmentalconsultants, of which one will act as course director. Two local consultants acting asassistance and interpretators have to be included. It is anticipated that the courses willbe executed in two separate sessions, which accordingly requires two visits to Yemen.No expenses have been included for renting of training course facilities.

'*SPP\80163901 Yemen PowerPlawt\E,,al Report\CHAP-S.doc

Page 85: Republic of Yemen - World Bankdocuments.worldbank.org/curated/en/... · 1. introduction 1.1 1.1 background 1.1 1.2 objective for the environmental assessment 1.1 1.3 scope of work

8 / ENVIRONMENTAL MANAGEMENT AND TRAINING

The development and execution of training programme are estimated to cost:

Activity Fee (USD) Expenditure (USD) Total (USD)Elaborate material 16,500 1,100 17,600Execution of 2 50,000 50,000training courses (2x16 days)Local assistance 4,800 4,800Translation 2,500 2,500Travel and accom. 13,000 13,000Total 7 71,300 16,600 87,900

Table 8.1 Cost Estimates

All prices are exclusive of VAT.

SPP\80163901 Yemn Powt5 Plant\Final Rcpmt\CHAP-8.doc

-8.4-

Page 86: Republic of Yemen - World Bankdocuments.worldbank.org/curated/en/... · 1. introduction 1.1 1.1 background 1.1 1.2 objective for the environmental assessment 1.1 1.3 scope of work

9. ENVIRONMENTAL MONITORING PLAN

Page 87: Republic of Yemen - World Bankdocuments.worldbank.org/curated/en/... · 1. introduction 1.1 1.1 background 1.1 1.2 objective for the environmental assessment 1.1 1.3 scope of work

9/ ENVIRONMENTAL MONITORING PLANINCLUDING COST ESTIMATES

9. ENVIRONMENTAL MONITORING PLAN INCLUDING COST ESTIMATES

9.1 SUPPORT FOR IMPLEMENTATION AND MONITORING OF MITIGATIONMEASURES

The environmental monitoring plan is proposed divided in two sections: a sectionwhich concerns support for implementation of the proposed mitigation measures, - anda section which outlines a program for the collection of measured baseline data for airquality in the Sana'a region, which could be used for general environment managementpurposes and for the design of anticipated future investments in the power sector:

(a) Technical Assistance and Training for Monitoring Measures. Assistance would beprovided to PEC by a project-funded international environmental consultant tosupport the monitoring measures. This would include a series of practical trainingseminars for PEC management and Dhahban Power Plant staff on goodenvironmental practices, proper health and safety measures, and emergencymanagement procedures. This activity would include training of Yemeni personnelin the collection, interpretation and use of data in air quality managementdecisions.

(b) Air Quality Monitoring Program. The project would support implementation of anair quality monitoring program that includes activities for emission and ambient airquality monitoring. It would support the purchase of basic portable emissionmonitoring equipment for measurement of stack gases at the rehabilitated and newpower plants and the installation of an ambient air quality monitoring station. Ifdetermined to be necessary on the basis of initial operational experience, additionalambient air quality monitoring stations would be purchased. Technical trainingwould be provided by suppliers concerning the operation and maintenance of theair quality monitoring equipment.

In addition, it is recommended that the EPC, in cooperation with PEC, seek fundingfrom a bilateral donor to support a program for the collection of measured baselinedata for air quality in the Sana'a region, which could be used for general environmentmanagement purposes and for the design of anticipated future investments in the powersector.

SUMMARY - ENVIRONMENTAL MONITORING

Table 9.1 Environmental Monitoring

Monitoring Components Expected Benefit Party EstimatedResponsible for costs

Component (US $)1. Technical Assistance and Training forMonitoring Measures

Overall environmental consultancy - general follow-up on PEC in co- Included inassistance. TOR included as part of EA mitigation and monitoring operation with consultancyreport. Would include training of plan on issues allocated for international support for

,SPP\80163901 Yemen Poer Plamti\Fm Repot\CHAP-9 d,c

-9.1 -

Page 88: Republic of Yemen - World Bankdocuments.worldbank.org/curated/en/... · 1. introduction 1.1 1.1 background 1.1 1.2 objective for the environmental assessment 1.1 1.3 scope of work

9 / ENVIRONMENTAL MONITORING PLANINCLUDING COST ESTIMATES

Monitoring Components Expected Benefit Party EstimatedResponsible for costs

Component (US $)Yemeni personnel in collection, PEC environment Mitigation Planinterpretation and use of data in air - institutional support for consultant Implementationquality management decisions. PEC

2. Plant Specific Air QualityPollutionMonitoring Program

Implementation of an air quality - provision of air quality PEC/EPC in co- 300,000 USDmonitoring program that includes monitoring data to be used operation withactivities for emission and ambient air to support management of internationalquality monitoringA proposal for a the rehabilitated and new environmentbaseline air quality monitoring program. power plants consultantTOR included as part of EA report.. Purchasing of basic portable emissionmonitoring equipment for measurementof stack gases at the rehabilitated andnew power plants is included along withinstallation of an ambient air qualitymonitoring station. Supplier providedtraining is planned for Yemeni personnelin the operation and maintenance ofequipment.

3. Proposed Baseline Regional AirQuality Monitoring Program

Subject to availability of independent - provision of air quality EPC in co- 300,000 USD (tofunding from a bilateral development monitoring data as operation with PEC be sought from adonor, it is recommended that a baseline background data for future and an international bilateral donor)air quality monitoring program be energy and industrial environmentundertaken for the Sana'a region to projects. It would also consultantprovide data for the planning and support assessment of theenvirornmental assessment of future emission impacts fromprojects various sectors. vehicles.Implementation of an air qualitymonitoring program that includesactivities for emission and ambient airquality monitoring. Purchasing of basicportable emission monitoring equipmentfor measurement of stack gases at therehabilitated and new power plants isincluded along with installation of anambient air qualitv monitoring station.Supplier provided training is planned forYemeni personnel in the operation andmaintenance of equipment.

SPP\80163901 Yemen Power Plant\Final Report\CHAP-9.doc

-9.2 -