request for proposal - cuttack … for proposal volume i project information memorandum development...
TRANSCRIPT
Development of Residential Complex over 2.465 Hec at Sec-6, Bidanasi, Cuttack, Odisha on PSP mode
1 Project Information Memorandum
CONTENTS
REQUEST FOR PROPOSAL
VOLUME I
PROJECT INFORMATION MEMORANDUM
DEVELOPMENT OF RESIDENTIAL COMPLEX OVER 2.465
HECTARES (6.093 ACRES)
AT SECTOR-6, BIDANASI, CUTTACK
ON PSP MODE
CUTTACK DEVELOPMENT AUTHORITY
ARUNODAYA BHAWAN, LINK ROAD
Cuttack – 753012, Odisha
Development of Residential Complex over 2.465 Hec at Sec-6, Bidanasi, Cuttack, Odisha on PSP mode
2 Project Information Memorandum
CONTENTS
SL.
NO.
PARTICULARS
PAGE
NO.
1 DISCLAIMER 3
2 ABBREVIATIONS 4
3 SCHEDULE OF BIDDING PROCESS 5
4 CUTTACK- City Profile 6
5 PROJECT SUMMARY 8
6 PROJECT DEVELOPMENT & BIDDING PROCESS 11
7 SITE APPRECIATION 13
8 DEVELOPMENT CONTROLS & PRODUCT MIX 14
9 APPENDIX 15
Development of Residential Complex over 2.465 Hec at Sec-6, Bidanasi, Cuttack, Odisha on PSP mode
3 Project Information Memorandum
1. Disclaimer
Though adequate care has been taken in the preparation of this Request for Proposal (hereinafter referred to as
“RfP”) document, the Bidders should satisfy themselves that the document is complete in all the respect and
the information provided is correct. In case of discrepancy, if any, intimation should be given to the Officer
Concerned in Cuttack Development Authority (whose contact details is mentioned in this document)
immediately on or before the due date specified in the Schedule of Bidding Process. If no intimation is
received by the said officer within the date as mentioned in Schedule of Bidding Process as mentioned in this
Document, it shall be deemed that the bidder is satisfied that the RfP document is complete in all respects.
Neither CDA nor their employees or Project Consultants make any representation or warranty as to the
accuracy, reliability or completeness of the information in this RfP and it is not possible for CDA to consider
the investment objectives, financial situation and particular needs of each party who reads or uses this RfP
concerning the project. Certain prospective bidders may have better knowledge of the project compared to the
others and CDA encourages all the prospective bidders to conduct their own due diligence, investigations &
analysis and check for accuracy, reliability and completeness of this RfP. The bidders are free to obtain the
independent advice from the sources appropriate to them.
Neither CDA nor their employees or Project Consultants will have any liability to any prospective bidder or
any other person under the law of contract, tort, the principles of restitution or unjust enrichment or otherwise
for any loss, expenses or damage which may arise from or to be incurred or suffered in connection with
anything contained in this RfP, any matter deemed to form part of this RfP, the award of the project, the
information and any other information supplied by or on behalf of CDA or their employees or their consultant
or otherwise arising in any way from the selection process of this project.
CDA reserves the right to reject any or all of the bids submitted in response to this RfP at any stage
without assigning any reasons whatsoever and without any liability of CDA in any manner. CDA also
reserves the right to hold or withdraw or cancel the process at any stage under intimation to the bidders,
who submit the RfP, without assigning any reasons whatsoever.
CDA reserves the right to modify or amend or add to any or all of the provisions of this RfP Document or
annul the present process. Such change would be intimated to all the parties procuring this RfP.
Neither CDA nor their employees or Project Consultants will have any liability in case addition, modification,
amendment, alteration, cancellation and /or of non-receipt of any correspondence from them to the bidders
due to the postal delays.
The Applicable law for the purpose is the laws in India.
Development of Residential Complex over 2.465 Hec at Sec-6, Bidanasi, Cuttack, Odisha on PSP mode
4 Project Information Memorandum
2. Abbreviations
CDA Cuttack Development Authority
PSP Public Sector Participation
EoI Expression of Interest
RfQ Request for Qualification
RfP Request for Proposal
IE Independent Engineer
LOA Letter of Award
SPV Special Purpose Vehicle
MLP Maximum Lease Premium
INR Indian National Rupee(s)
DU Dwelling Unit
LP Lease Premium
Development of Residential Complex over 2.465 Hec at Sec-6, Bidanasi, Cuttack, Odisha on PSP mode
5 Project Information Memorandum
3. Schedule of Bidding Process
(a) Issue of Advertisement
11.06.2015
(b) Pre-Bid Meeting
30.06.2015, at 3.00 P.M in the Conference Hall of Cuttack
Development Authority
(c) Last date of submission of Bids
15.07.2015 till 5.P.M
(d) Opening of Technical Bids
16.07.2014 at 11.00 A.M in the Conference Hall of
Cuttack Development Authority.
(d) Financial Bid Opening To be intimated later.
Development of Residential Complex over 2.465 Hec at Sec-6, Bidanasi, Cuttack, Odisha on PSP mode
6 Project Information Memorandum
4. Cuttack – City Profile
Location and Regional Setting
Cuttack city is the former capital and one of the oldest cities of Orissa. It is the administrative headquarters of
the district and is situated at a distance of about 25 km. to the north of Bhubaneswar, the present capital of
Orissa.
Broad Historic Growth Dynamics of The City
The city is located on low fine sand plateau, and it is well connected with the major Indian Metropolis like
Kolkata, Chennai and New Delhi and other urban centres of Orissa through a network of roads and rails. The
National Highway No.5 linking Kolkata and Chennai passes through Cuttack. The geography of city restricts
the growth on any direction due to existence of Kathajori and Mahanadi rivers on three sides leaving the
eastern side towards Jagatsinghpur District and Port Paradeep for limited expansion. The city is world famous
for its silver and gold filigree works, so it is called the silver city of Orissa.
Connectivity
Regional Connectivity
Cuttack is well connected with the rest of the country and the state of
Odisha by air, rail and roads. The modes of connectivity are discussed in
detail below:
Air Connectivity
The nearest airport is situated at Bhubaneswar. Cuttack is connected to
the cities of Calcutta, Delhi, Chennai, Mumbai, Vishakhapatnam,
Hyderabad, and Raipur through regular flights. Biju Patnaik Airport in
Bhubaneswar is the only major airport in the state. Till date there is no
international flight from Bhubaneswar.
Rail Connectivity
Cuttack is on the East Coast Railway with direct rail link to Kolkata,
Delhi, Hyderabad and Chennai, Bangalore, Kochi, Patna, Guwahati,
Mumbai, Bhubaneswar, Guwahati, Tirupati, and Trivandrum.
Cuttack does not have local rail service connecting different parts of the
city. However, a few passenger trains connect the city with the
adjoining region and cities such as Bhubaneswar, Puri, Bhadrak, Balugan etc
Road Connectivity
The city lies on the National Highway NH-5 and is linked to the two metro cities of Kolkata and Chennai
directly. Within the state, it has good linkages with Berhampur, Chilka, Bhubaneswar, Konark, Paradip, Puri,
Rourkela and Sambalpur. Interstate bus services operate daily between Kolkata and Puri via Bhubaneswar and
Tatanagar (Jamshedpur).
Odish
a
Development of Residential Complex over 2.465 Hec at Sec-6, Bidanasi, Cuttack, Odisha on PSP mode
7 Project Information Memorandum
Linkages and Urban Structure
Local Linkages:
• Inter-city transport – Regular buses between Cuttack and other important towns of Odisha such as
Berhampur, Chilka, Bhubaneswar, Konark, Paradip, Puri, Rourkela, Sambalpur etc. Interstate buses ply
between Kolkata (West Bengal) and Tatanagar (Jharkhand)
• Intra-city transport – Mostly dependent upon Auto and cycle rickshaw services, however taxis are
available in the city.
Development of Residential Complex over 2.465 Hectares at Sec-6, Bidanasi, Cuttack, Odisha on PSP mode
8 Project Information Memorandum
5. Project Summary
1. 4 NAME Development of Residential Complex over 2.465 Hectares (6.093 acres) of
land at Sec-6, Bidanasi Project Area, Cuttack on PSP mode
2. LOCATION Cuttack, Odisha
3. NODAL AGENCY Cuttack Development Authority (CDA)
4. LIKELY PROJECT
COMPONETS
Residential land use zone: 6.093 Acres
Residential Dwelling Units
Retail
Likely Support Facilities and Infrastructure
5. LAND AREA
Total Plot area for lease: 2.465 Hectares (6.093 acres) approx.
6. ESTIMATED BUILT-UP
AREA
Plot I: 4.077 Ac with an FAR of 2.00 (as the road width is 40 Feet wide)
Buit-Up Area of Plot I: 355188.24 Sq.ft
Plot II: 2.016 Ac with an FAR of 2.50 (as the road width is 60 Feet wide)
Buit-Up Area of Plot II: 219542.4 Sq.ft
Total approximate Built-Up Area of the project: 574730.64 Sq.ft
(FAR may vary subject to modification of regulation)
Note: Clause 8.2.5 of Vol-III states that” If and only if the Developer decides
to enhance the Floor Area Ratio (“FAR”) of the project from the effective date
and during the term, due to amendment of an existing regulation or
enactment of a new Regulation and in case the plan is approved by CDA, the
Developer would pay CDA a consideration pro-rate to the quoted MLP.
7. DEVELOPMENT
CONTROLS
The developer shall have to comply with the „Planning & Building
Standards Regulations, 2010, of the Cuttack Development Authority
8. IMPLEMENTATION
FORMAT Long Term Lease
9. LEASE FORMAT 60 years (renewable on mutually agreed terms) from the date of signing of the
Lease Deed
10. INSTITUTIONAL
STRUCTURE
Special Purpose Vehicle (SPV)- a company to be formed by the Selected bidder,
who is selected through this selection process, under Company‟s Act 1956
11. CONSTRUCTION
PERIOD
Complete all approval, clearance process within 1 year from signing of
Development Agreement;
Complete the Project within 4 (four) years from signing of the Lease
Deed
Development of Residential Complex over 2.465 Hectares at Sec-6, Bidanasi, Cuttack, Odisha on PSP mode
9 Project Information Memorandum
12. BID PARAMETER Maximum Lease Premium (MLP) - payable to CDA in 2 equal installments as
in Pt. 14 or lump sum whichever way the selected bidder chooses so.
13. MAXIMUM LEASE
PREMIUM
The Developer to pay CDA,
1/2 of MLP (Maximum Lease Premium) to be paid before signing of
Development Agreement (1st installment)
1/2 of MLP (Maximum Lease Premium) within 12 months from the
date of signing of Development Agreement ( Last Installment) and
before signing of Lease Deed* (whichever is earlier). No interest
charged for this period.
The Lease Deed will be signed on payment of full amount of Lease Premium.
The Developer has the option of making pre- payment at every stage.
N.B: All the above payments made by the developer will be subject to
applicable taxes i.e., service tax, education cess etc.
14. ANNUAL LEASE RENTAL
AND CESS
The Rate to be specified by CDA (as per Revenue Rate)
(1% of the cost of land paid by CDA to the Govt. of Orissa) + 0.75% Cess (on
this amount)
15.
PROJECT
DEVELOPMENT FEE &
EXPENSES (NON-
REFUNDABLE AND
NON-ADJUSTABLE)
0.50% of Project Cost* (plus applicable Service Tax) to be payable to
Cuttack Development Authority (CDA) within 15 days of Issue of the
Letter of Award and before signing the Development Agreement as
reimbursement of project development expenses;
0.50% of Project Cost* (plus applicable Service Tax) to be payable to
Jones Lang LaSalle Property Consultants (India) Private Limited {JLL}
within 15 days of Issue of the Letter of Award and before signing the
Development Agreement as project development fees;
* Estimated Project Cost indicated in the Technical Bid of the preferred bidder
will be adopted for this purpose.
16. BID SUBMISSION Envelope A: General Documentation & Technical Bid
Envelope B: Financial Bid
17. ENVELOPE A:
General Documentation: Duly filled up formats as specified in Annexure A-1
to Annexure A-15, Annexure B1 of Vol-II of ITB along with all the specified
supporting documents.
18. ENVELOPE B:
Price Bid Letter quoting Maximum Lease Premium Payable to CDA
Development of Residential Complex over 2.465 Hectares at Sec-6, Bidanasi, Cuttack, Odisha on PSP mode
10 Project Information Memorandum
19. CONDITION TO
CONSORTIUM BIDDERS
A Consortium of maximum three members will be allowed to
participate in the Bid
Lead Consortium member to have minimum 26% equity in Project SPV
Other members to have minimum 10% equity in SPV
Consortium to demonstrate implementation Capability to execute
project
20. ELIGIBILITY CRITERIA
The Bidder may be a single entity (“Bidding Company”) or a group of
entities (“Consortium”) coming together to implement the project subject to
compliance with applicable laws, policies and guidelines of Government of
India. The term Bidder used hereinafter would therefore apply to both a
single entity and a Consortium.
An eligible entity is one which satisfies the following:
The entity is a Company under the Companies Act, 1956.
OR
The Entity is a Trust under the Indian Trusts Act, 1882
OR
The Entity is a Statutory Board/ Authority/ Corporation created in
India under a separate Law/ Act of India/ any State Govt.
Bidder (Single or Consortium) to demonstrate the capability of:
a. Minimum Development/ Construction capability of:
at least 20,000 sq.m., Residential/Commercial built up space in the last
5 years, in a Single Project; or
at least totaling 40,000 sq.m., Residential/Commercial built up space in
the last 5 years, through a maximum of 3 Projects, with minimum
10,000 sq.m. built-up space for each project.
b. Combined Minimum Net Worth: Rs.15 Crores (Rupees Fifteen Crores
only) as on March 2014. In case of Consortium the aggregate Net-Worth as
on 31 March 2014, should meet the mentioned criteria.
21. BID EVALUATION
Envelope A:
General Documentation: Pass/Fail.
Envelope B:
Maximum Lease Premium
22. COST OF RFP
DOCUMENT
INR 52,000/- (non-refundable) to be payable in the form of Demand Draft/ Pay
Order in favour of “Cuttack Development Authority” payable at Cuttack
Development of Residential Complex over 2.465 Hectares at Sec-6, Bidanasi, Cuttack, Odisha on PSP mode
11 Project Information Memorandum
23. BID VALIDITY
180 days from the last date of submission of bid
24. BID SECURITY
1% of the total project cost. (total project cost includes land cost and cost of
development of the project) to be submitted along with the technical bid in the
form of bank guarantee.
25.
CONSTRUCTION
PERFORMANCE
SECURITY
10% of the Bid Amount in the form of Bank Guarantee
(Maximum Lease Premium would be the Bid Amount)
26.
RELEASE OF
PERFORMANCE
SECURITY
On issuance of Project Completion Certificate by CDA to the developer.
27.
VALIDITY OF
PERFORMANCE
SECURITY
Up to issue of Construction completion certificate – 5 (five) years or any extension thereof
28.
DEVELOPER’S DEFAULT
– BEFORE SIGNING OF
LEASE DEED
Forfeit Performance Security
Return of Lease Premium without any interest thereon
Cancellation of Development Agreement
No compensation to be paid by CDA
29.
DEVELOPER’S DEFAULT
– AFTER SIGNING OF
LEASE DEED
Forfeit Performance Security
Forfeit the Lease Premium paid as on that date
No compensation to be paid by CDA
Cancellation of Development Agreement and Lease Deed or keep the
option of a substitute party to be responsible for any compensation to the
developer at the discretion of CDA.
30.
RESERVE PRICE/UPSET
PRICE OF THE COST OF
LAND
INR 3520/- per sq.ft.
31. ASSUMPTIONS 1 acre=4046.85 Sq.m
1 Sq.m=10.763 Sq.ft
6. Project Development and Bidding Process
The Project Information Memorandum (PIM) is being issued to bidders as Volume I of the Request for Proposal
(RfP) and must be read in conjunction with the other volumes of the RfP as given below:
Volume – II: Instruction to Bidders
Development of Residential Complex over 2.465 Hectares at Sec-6, Bidanasi, Cuttack, Odisha on PSP mode
12 Project Information Memorandum
Volume – III: Draft Development Agreement and Draft Lease Deed
This Project Information Memorandum comprises the following:
Part 1: Summary – Project Development & Bidding Process
Part-2: Site Appreciation
Part-3: Development Controls
Cuttack city is situated in between two major rivers i.e., Mahanadi and Kathajodi, as such its geographical
expansion towards north and south is limited.
The Population of the city has been increased considerably during the last few decades. To provide residential
facilities to the increased demand of population, a High Level committee under the Chairmanship of R.D.C
(CD), Cuttack was constituted with reference to Revenue Department, Memo No. 3441/R/dt. 14.8.83 regarding
extension of Cuttack city.
The committee suggested expansion of the city towards the Bidanasi area beyond the extinting protective
embankment of Kathajori and Mahanadi. About 2000 acres of land was made available for expansion of Cuttack
City and the development work was entrusted to CDA. Accordingly CDA has taken out „Bidanasi Triangle
Development Project‟ comprising of 15 sectors sectors-1, Sector-6, Sector-7, Sector-8, Sector-9, Sector-10, Sector-
11, Sector-12(P), and Sector-13.
CDA proposes to develop the Residential Complex over 2.465 Hectares (6.093 Acres) of land at Sector-6,
Bidanasi Project Area in Cuttack. CDA proposes to develop the „Project‟ with the participation of a developer,
who would Design, Engineer, Finance, Construct, Operate & Maintain and Market the facility for the Lease
Period of 60 years including 4 years of Construction Period. The Agreement is in two parts (Part A -
Development Agreement; Part B- Lease Deed) shall form the legal basis for the Project.
On completion of the lease period (60 years) the land and building along with all immovable assets at the
project site shall be handed over to CDA by the Developer. However, the Lease may be renewed based on
mutually agreed terms and conditions.
CDA has appointed M/s Jones Lang LaSalle Property Consultants (India) Private Limited, as Transaction
Advisor for development of the Project on Public Sector Participation mode.
Development of Residential Complex over 2.465 Hectares at Sec-6, Bidanasi, Cuttack, Odisha on PSP mode
13 Project Information Memorandum
The Selected bidder (Single or Consortium) would be required to incorporate a Special Purpose Vehicle (SPV),
as the Developer, under the Companies Act, 1956 for implementing the Project and shall hold minimum 51%
equity in the SPV. In case the selected bidder is a consortium, the Lead Member of the consortium would then
become confirming party to the Development Agreement and Lease Deed. The Lead Member of the consortium
identified in the Technical Bid would hold at least 26% of the equity of the SPV. Other members in case of
Consortium of Firms shall hold at least 10% equity each in the SPV.
The Selected bidder selected through a transparent and competitive Single Stage Bidding process would be
given the right to recover its investment through the leasing / sub-leasing / licensing of built up area (including
utilities, parking lots, parks etc.) within the plot.
The financial bid variable for selection of the bidder, subject to other qualification criteria and development
controls being met, would be the highest Maximum Lease Premium (MLP) that the bidder would pay to CDA.
Bidders are required to submit separate technical and financial bids. The financial bids of only those bidders
that comply with the General Documentation submitted as a part of their technical submission will be opened.
The detailed instructions for preparation of technical and financial bids are provided as Volume II of this RfP
document.
The lease rights for this project shall be 60 (sixty) years only including scheduled construction period of the
project commencing from the date of signing of the Lease Deed. The scheduled construction period of the
project shall be 4 (four) years from the date of execution of the Lease Deed.
The Selected bidder to pay CDA liquidated damages for delay beyond the Scheduled Construction Completion
Date @ INR 15,00,000/- (Rupees Fifteen Lakhs Only) per month of delay or part thereof, as liquidated damage
charges until such construction completion is achieved beyond 4 years. However, delay in completion of
construction by more than one (1) year from the scheduled construction completion date will be construed as a
default from the part of the Developer and would lead to termination of the agreement.
7. Site Appreciation
1. The 2.465 Hectares (6.093 Acre) site is located in Bidanasi Project Area, Cuttack, and spread over Plot
No: 1571(P), 1572 to 1577 and 1578 (P) measuring 4.077 Acres and Plot No: 1382(P), 1383 to 1386 and
1387(P) measuring 2.016 Acres.
S.No Plot No. Plot Size Land use
1 No: 1571(P), 1572
to 1577 & 1578 (P)
4.077 Acres Residential
2 1382(P), 1383 to
1386 & 1387(P)
2.016 Acres Residential
Development of Residential Complex over 2.465 Hectares at Sec-6, Bidanasi, Cuttack, Odisha on PSP mode
14 Project Information Memorandum
2. The Site has an immense potential for residential development
3. The site is 6 Kms. from the City Centre of Cuttack and 9 Kms from Cuttack Railway Station.
4. Power for the site will be available from CESU, Cuttack.
5. The source of water for this area can be from PHD, Cuttack.
6. The site has significant development potential as per its location and connectivity. Located within the
residential development zone and in its vicinity to the commercial development further add up to its
value.
8. Development Controls and Product Mix
Development Regulations
The Development Controls prevailing in the site is governed by the „Planning & Building Standards
Regulations, 2010, of the Cuttack Development Authority.
The Floor Area Ratio is decided on the basis of the road width on which the plot/site abuts. The height of the
building shall be governed by the limitations of Floor Area Ratio, open space (setbacks), and the width of the
street facing the plot.
Likely Project Components
The land parcels can be utilized in the most efficient way by developing the following components as per the
guidelines/norms of the local authority i.e. Cuttack Development Authority (CDA). Some of the potential
options of which are;
Residential Development
o Housing for HIG, MIG
Likely Support Infrastructure
o Landscaping
o Community hall, Children Play ground, Swimming pool, Multi gymnasium,
o Internal Roads
o Uninterrupted Power Supply, 24x7, with battery back up
o Uninterrupted Water Supply
o Basement Parking facility
o Sewerage Treatment Plant
o Intelligent Building Management System
o Surveillance & Hi-tech security installation
Development of Residential Complex over 2.465 Hectares at Sec-6, Bidanasi, Cuttack, Odisha on PSP mode
15 Project Information Memorandum
o Disaster management services
o Sophisticated fire detection and suppression system
o Adequate Landscaping/ Green Areas
o Rain Water Harvesting
Besides the above, planning, design, materials and construction of all buildings and infrastructure have to
follow local municipal Act including ODA Act, rule(s) framed there under as the case may be and the building
bye-laws and shall be in accordance with the relevant provisions of India Standard Specifications and Codes;
and the National Building Code of India.
8. APPENDIX
Google Map 1