Request for Proposal for Design, Supply, Installation, Commissioning and Maintenance of Computerization of Travancore Devaswom Board Project. (CTDB) TENDER DOCUMENT (e-Procurement – two part tender) Tender No IT 001 dated 04/04/2016 Travancore Devaswom Board Nanthancode, Kowdiar Post, Thiruvananthapuram – 695 003, Kerala Tel: 0471-2314288 Fax: 0471-2315156 Email: devaswomcommissionertdb@gmail.com INDIA

Upload: others

Post on 16-Oct-2021

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Request for Proposal for Design, Supply, Installation

Request for Proposal

for

Design, Supply, Installation, Commissioning and

Maintenance

of

Computerization of Travancore Devaswom Board Project.

(CTDB)

TENDER DOCUMENT

(e-Procurement – two part tender)

Tender No IT 001 dated 04/04/2016

Travancore Devaswom Board

Nanthancode, Kowdiar Post,

Thiruvananthapuram – 695 003,

Kerala

Tel: 0471-2314288

Fax: 0471-2315156

Email: [email protected]

INDIA

Page 2: Request for Proposal for Design, Supply, Installation

Table of Contents 1 Notice Inviting Tender.....................................................................................................................7 2 List of Important Acronyms............................................................................................................9 3 Guidance to Bidders......................................................................................................................11 4 General Instructions To Bidders....................................................................................................13 5 Eligibility Criteria..........................................................................................................................14 6 Project Vision................................................................................................................................17 7 Scope of the Project.......................................................................................................................18 8 Technical and Functional Requirements........................................................................................19

8.1 Project Background................................................................................................................19 8.2 Conception of CTDB............................................................................................................19 8.3 Project Objectives..................................................................................................................20

9 Scope of Services..........................................................................................................................21 10 Expected benefits to the Stakeholders.........................................................................................22 11 Project Details..............................................................................................................................23

11.1 Stakeholder Analysis............................................................................................................23 11.2 Current TDB Process Assessment........................................................................................25 11.3 Current IT Assessment of TDB............................................................................................28

11.3.1 Existing Hardware and network implementation.........................................................28 11.3.2 Existing Application Assessment.................................................................................28

11.4 Handholding Support...........................................................................................................29 12 Business Process Re-engineering...............................................................................................31 13 Proposed Solution & Technology Architecture...........................................................................32

13.1 Solution Approach...............................................................................................................32 13.2 Generic Solution Requirements...........................................................................................32

13.2.1 System Administration.................................................................................................32 13.3 Organization Structure Management...................................................................................34 13.4 File Flow Management........................................................................................................34 13.5 Alert and Message Mechanism...........................................................................................34 13.6 Search Mechanism..............................................................................................................35 13.7 Report Generation................................................................................................................35 13.8 RTI/LA Interpellations.........................................................................................................35

14 Non- Functional Requirements....................................................................................................36 14.1 Reliability.............................................................................................................................36 14.2 Audit trial.............................................................................................................................36 14.3 Availability...........................................................................................................................37 14.4 System Scalability................................................................................................................37 14.5 Data Integrity.......................................................................................................................38 14.6 Security................................................................................................................................38 14.7 Software System Architecture.............................................................................................46 14.8 Deployment Architecture.....................................................................................................47 14.9 Network Architecture...........................................................................................................49 14.10 Temple Network.................................................................................................................49 14.11 KSWAN Network..............................................................................................................50

15 Identified Functional Areas.........................................................................................................51 16 Implementation Plan....................................................................................................................53

16.1 CTDB Phase I......................................................................................................................53 16.1.1 Geographical Coverage...............................................................................................53 16.1.2 Digitization/Migration of Historical Data....................................................................53 16.1.3 Application Functionalities..........................................................................................54

Page 2 / 277

Page 3: Request for Proposal for Design, Supply, Installation

16.1.4 Capacity Building Initiatives.......................................................................................54 16.2 CTDB Phase II.....................................................................................................................55

16.2.1 Geographical Coverage...............................................................................................55 16.2.2 Application Functionalities..........................................................................................55 16.2.3 Capacity Building Initiatives.......................................................................................55

16.3 CTDB Phase III...................................................................................................................56 16.3.1 Geographical Coverage...............................................................................................56 16.3.2 Application Functionalities..........................................................................................56 16.3.3 Capacity Building Initiatives.......................................................................................56

17 Bill of Materials (BOM).............................................................................................................57 17.1 Hardware for TDB Head Quarters.......................................................................................57 17.2 Hardware Items for HQ Networking...................................................................................57 17.3 Hardware Items for Attendance Management at HQ...........................................................59 17.4 Hardware for Temples..........................................................................................................59 17.5 Hardware for TDB District/Group/ Sub Group Offices......................................................60 17.6 Hardware for Strong Room..................................................................................................60 17.7 Hardware for Sabarimala.....................................................................................................61 17.8 Hardware for Sabarimala Networking (Fiber).....................................................................61 17.9 Hardware for CCTV............................................................................................................63 17.10 Data Centre for TDB..........................................................................................................64 17.11 Software Modules..............................................................................................................64 17.12 Data Degitization Charges.................................................................................................65 17.13 Capacity Building..............................................................................................................65

18 Time Schedule & Delivery.........................................................................................................66 19 Payment Terms and Service Level Agreement............................................................................67 20 Annexure A - Functional Requirement Specification.................................................................70

20.1 Temple Administration.........................................................................................................70 20.1.1 Activities of Dy. C Offices...........................................................................................70 20.1.2 Activities of AC Offices...............................................................................................71 20.1.3 Vazhipadu Counter Billing...........................................................................................73 20.1.4 Auctions.......................................................................................................................75 20.1.5 Online Booking & e Payment......................................................................................76 20.1.6 Mahassar......................................................................................................................77 20.1.7 Kanikka Counting & Scheduling.................................................................................78 20.1.8 Pooja.............................................................................................................................79 20.1.9 Temples........................................................................................................................79 20.1.10 Strong Room management.........................................................................................80 20.1.11 Grievance Redressal Cell...........................................................................................80 20.1.12 Special Activities........................................................................................................82 20.1.13 Store & Inventory.......................................................................................................82 20.1.14 Video Surveillance.....................................................................................................83 20.1.15 Advisory Committee Election....................................................................................84

20.2 HR Administration...............................................................................................................84 20.2.1 Recruitment..................................................................................................................85 20.2.2 Appointment and Posting.............................................................................................87 20.2.3 Service Book................................................................................................................88 20.2.4 Probation & Seniority..................................................................................................89 20.2.5 Promotion/Demotion....................................................................................................90 20.2.6 Transfer:.......................................................................................................................90 20.2.7 Tours & Claims/ Reimbursement.................................................................................91

Page 3 / 277

Page 4: Request for Proposal for Design, Supply, Installation

20.2.8 Pension.........................................................................................................................93 20.2.9 Provident Fund.............................................................................................................94 20.2.10 Loans..........................................................................................................................95 20.2.11 Attendance Management............................................................................................96 20.2.12 Leave Management....................................................................................................97 20.2.13 Salary Management....................................................................................................98 20.2.14 Staff Appraisal..........................................................................................................101 20.2.15 Self Service Portal....................................................................................................101 20.2.16 Liability....................................................................................................................102 20.2.17 ID card Issuance.......................................................................................................102

20.3 Devaswom Accounts..........................................................................................................103 20.4 Commissioner Office.........................................................................................................104

20.4.1 Disciplinary Action....................................................................................................104 20.4.2 Budget estimation & Fund allocation........................................................................105 20.4.3 Grants.........................................................................................................................106 20.4.4 New Schemes.............................................................................................................107 20.4.5 Land records...............................................................................................................107 20.4.6 Petition / Complaint management..............................................................................108 20.4.7 Training Programmes.................................................................................................109

20.5 Thiruvabharana Commissioner Office...............................................................................110 20.6 Board Office.......................................................................................................................112

20.6.1 Disciplinary actions against Gazetted officers...........................................................112 20.6.2 Petition/Complaint management................................................................................112 20.6.3 High Court Audit........................................................................................................113 20.6.4 Budget........................................................................................................................114 20.6.5 Grants.........................................................................................................................114 20.6.6 Transfer and Posting of Gazetted Officers.................................................................115 20.6.7 Purchase & Store Management..................................................................................115 20.6.8 College Management.................................................................................................121 20.6.9 Aided/CBSE School Management.............................................................................127 20.6.10 Board Meetings........................................................................................................130

20.7 Maramath...........................................................................................................................131 20.7.1 Registration of Contractors........................................................................................131 20.7.2 Estimation..................................................................................................................131 20.7.3 Fund Management......................................................................................................135 20.7.4 Project Management..................................................................................................136 20.7.5 e-Tendering / Quotations /Comparative Statements..................................................140 20.7.6 Work Order.................................................................................................................141 20.7.7 M-Book......................................................................................................................141 20.7.8 Recovery of Unserviceable materials.........................................................................143 20.7.9 Part Bill preparation...................................................................................................143 20.7.10 Final Bill preparation...............................................................................................144 20.7.11 Defects, Liability Period..........................................................................................145 20.7.12 Release of Security Deposits....................................................................................145 20.7.13 Auctioning of shopping complex/Estate property/Furniture....................................146

20.8 Payroll................................................................................................................................147 20.8.1 Salary Computation....................................................................................................147 20.8.2 Arrear Management (Pay & DA)...............................................................................151 20.8.3 Surrendering of Leaves..............................................................................................152 20.8.4 Surety Monitoring......................................................................................................152

Page 4 / 277

Page 5: Request for Proposal for Design, Supply, Installation

20.8.5 PF Computation.........................................................................................................152 20.8.6 Pension Computation.................................................................................................154 20.8.7 Income Tax Computation...........................................................................................155

20.9 Estate Office.......................................................................................................................158 20.9.1 Estate Management....................................................................................................158 20.9.2 Nilakkel Rubber Estate Management.........................................................................159 20.9.3 Vehicle Management..................................................................................................160 20.9.4 Guest House and Auditoriums...................................................................................162 20.9.5 Special Thahasildar Office Management...................................................................163

20.10 General.............................................................................................................................165 20.10.1 Contract Management.............................................................................................165 20.10.2 Work Flow Management..........................................................................................166 20.10.3 File Management System.........................................................................................167 20.10.4 Tappal Management.................................................................................................171 20.10.5 Scheduler..................................................................................................................172

20.11 Cultural............................................................................................................................173 20.11.1 Printing & Publishing...............................................................................................173 20.11.2 Library......................................................................................................................174 20.11.3 Book Stall.................................................................................................................175 20.11.4 Temple Arts Academy..............................................................................................176 20.11.5 Fund Management....................................................................................................177

20.12 Audit.................................................................................................................................178 20.13 Law Office.......................................................................................................................179 20.14 Vigilance..........................................................................................................................179 20.15 Sabarimala.......................................................................................................................180

20.15.1 Counter Billing.........................................................................................................181 20.15.2 Hand Held Devices:.................................................................................................182 20.15.3 Donations and sponsorships.....................................................................................183 20.15.4 Accommodation.......................................................................................................184 20.15.5 Online Booking of Vazhipadu:.................................................................................185 20.15.6 Dolly and Tractor management:..............................................................................185 20.15.7 Parking....................................................................................................................188 20.15.8 Hospital management..............................................................................................188 20.15.9 Volunteer Service (Sanaddha Pravarthanam)...........................................................190 20.15.10 Queue Management...............................................................................................190 20.15.11 Duty Deployment:..................................................................................................190 20.15.12 Appam, Aravana production and Sales Management:...........................................191 20.15.13 Annadhanam:.........................................................................................................192 20.15.14 Store management.................................................................................................192 20.15.15 Maramath...............................................................................................................194 20.15.16 Auction...................................................................................................................211 20.15.17 Video Surveillance.................................................................................................212 20.15.18 Kanikka Counting..................................................................................................212 20.15.19 Vigilance................................................................................................................213 20.15.20 Auditing..................................................................................................................214 20.15.21 Mess Management.................................................................................................214

21 Annexure B - Infrastructure Requirement.................................................................................216 21.1 Technology Architecture....................................................................................................216 21.2 Deployment Architecture...................................................................................................216 21.3 Network Architecture.........................................................................................................220

Page 5 / 277

Page 6: Request for Proposal for Design, Supply, Installation

21.4 ICT Infrastructure Requirement.........................................................................................221 21.4.1 Summary of Temples & Offices.................................................................................222 21.4.2 Hardware for TDB Head Quarters.............................................................................222 21.4.3 Hardware for Temples................................................................................................225 21.4.4 Hardware for TDB District/Group/ Sub Group Offices.............................................226 21.4.5 Hardware for Strong Room........................................................................................226 21.4.6 Hardware for Sabarimala...........................................................................................227 21.4.7 Hardware for CCTV...................................................................................................229 21.4.8 Data Centre for TDB..................................................................................................230

21.5 Detailed Technical Specification.......................................................................................231 21.5.1 Networking.................................................................................................................231 21.5.2 Software.....................................................................................................................234 21.5.3 Storage and Backup Solution.....................................................................................235

22 Annexure C - Data Digitization &Migration.............................................................................248 22.1 Objective of Data Digitization...........................................................................................248 22.2 Scope of Data Digitization.................................................................................................248 22.3 Data Digitization Requirements.........................................................................................250 22.4 Recommended Methodology for Data Digitization...........................................................251 22.5 Additional Guidelines for and Digitization........................................................................252

23 Annexure D - Capacity Building...............................................................................................253 23.1 Training Plan......................................................................................................................253

24 Annexure I – Agreement by sucessful bidder............................................................................258 25 ANNEXURE II - Gurantee Bond..............................................................................................265 26 ANNEXURE III -Format of Agreement to accompany the Tender..........................................267 27 Letter from bidder......................................................................................................................269 28 FORM – II.................................................................................................................................271 29 FORM – III................................................................................................................................272 30 FORM – V.................................................................................................................................273 31 FORM - VI................................................................................................................................274 32 FORM – VII..............................................................................................................................275 33 FORM – IX................................................................................................................................276 34 Form X.......................................................................................................................................277

Page 6 / 277

Page 7: Request for Proposal for Design, Supply, Installation

1 Notice Inviting Tender

Tender No.: IT 001 dated 04/04/2016

1. Travancore Devaswom Board (TDB) (Herein after referred to as TDB) invites e-Tenderfrom Total Solution Providers for Design, Supply, Installation, Commissioning andmaintaining of Computerization of Travancore Devaswom Board Project with asupport period of Three years as per the Schedule of Requirement given in the GeneralTerms & Conditions of the Tender.

2. Bidders shall remit the tender document fees and EMD using the on-line payment options ofe-Procurement System only. Bidders are advised to visit the “Downloads” section of e-Procurement website (www.etenders.kerala.gov.in) for detailed instructions on making on-line payment using Internet banking facility of SBT or by using NEFT facility. Biddersopting for NEFT facility of on-line payment are advised to exercise this option at least 48hours before the closing of the bid to ensure that payment towards tender document fees &EMD are credited and confirmation is reflected in the e-Procurement system. The on-lineNEFT remittance form provided by e-Procurement system for making a NEFT transaction isnot a payment confirmation. Department/ NIC/ SBT shall not be responsible for any kind ofdelay in payment status confirmation.

Schedule of Requirements

Sl.No.

Item description Qty Tender Fee EMD Amount

1

Design, Supply, Installation,Commissioning and maintainenceof Computerization of TravancoreDevaswom Board Project with a

support period of three years

1Rs. 5000.00 +

VATRs.10,00,000.00

3. The tender document should be submitted as per formats along with all relevant documents in support of Qualifications and experience.

Page 7 / 277

Page 8: Request for Proposal for Design, Supply, Installation

4. Important Dates & Time of the Tender shall be as below:

Bid calling date 04.04.2016

Pre bid conference date, time and venue11.04.2016, 3.00 PM, Devaswam Board

Office, Nanthancode.

Address for communication, submission/ opening oftechnical & commercial bid

The Devaswom CommissionerTravancore Devasowm BoardNanthancode, Kowdiar post,Thiruvananthapuram-695 003, Kerala

Contact person - phone number / faxPhone: 0471-2314288Mob: 9495823750Fax: 0471-2315156

Last date and time for receipt of e-bids 30.04.2016; 3.00PM

Opening of technical bids: date and time 03.05.2016; 3.00PM

Opening of commercial bids Will be intimated later.

5. Tender Documents shall be available only on the Internet and shall not be available for sales elsewhere.

6. TDB reserves the right to amend or cancel the tender in part or in full without prior notice at any point of time.

7. TDB reserves the right to reject the bid of parties who have failed to provide adequate after sales support for the products supplied against the order.

8. In the event of failure to perform the work as per the agreed delivery schedule without sufficientreasons, TDB shall impose Liquidated Damage, @ 0.2% of the Tender value for every weekdelay or part thereof. This will be charged against the performance bank guarantee submitted bythe bidder at the time of signing the contract. Also if the supplies are not within control, thebuyer is entitled to cancel the order and make necessary alternative arrangements. Furthermore,if the delay exceeds 30 days after the scheduled date of supply, such suppliers will not beconsidered for the subsequent tenders.

9. The Special Instructions to the Contractors/Bidders for the e-submission of the bids are givenunder “Help to Contractors” in website http://etenders.kerala.gov.in/nicgep/app.

Contact Address:

Devaswom CommissionerTravancore Devasowm BoardNanthancode, Kowdiar post,Thiruvananthapuram-695 003, Kerala

Page 8 / 277

Page 9: Request for Proposal for Design, Supply, Installation

2 List of Important Acronyms

Abbreviation

BPR Business Process Reengineering

CB Capacity Building

CCTV Closed Circuit Television

CDAC Centre for Development of Advanced Computing

CTDB Computerisation in Travancore Devaswom Board

DB Database

DC Data Centre

DMZ De-Militarized Zone

DPR Detailed Project Report

DVR Digital Video Recorder

FAQ Frequently Asked Question

FRS Functional Requirements Specification

HRMS Human Resource Management System

HTTP Hyper Text Transfer Protocol

ICT Information & Communication Technology

IP Internet Protocol

IT Information Technology

JS Junior superintendent

KSWAN Kerala State Wide Area Network

KV Kilo Volt

LA Legislative Assembly

LD Clerk Lower Division Clerk

NVR Network Video Recorder

OEM Original Equipment Manufacturer

PF Provident Fund

PKI Public Key Infrastructure

RAID Redundant Array of Independent Disks

RDBMS Relational Data Base Management System

RTI Right To Information

SAN Storage Area Network

SDA Software Development Agency

Page 9 / 277

Page 10: Request for Proposal for Design, Supply, Installation

Abbreviation

SDC State Data Centre

SET Secure Electronic Transaction

SLA Service Level Agreements

SMS Short Messaging Service

SOA Service Oriented Architecture

SOAP Simple Object Access Protocol

SPOF Single Point of Failure

SQL Structured Query Language

SSL Secured Sockets Layer

SWAN State Wide Area Network

TCP Transmission Control Protocol

TDB Travancore Devaswom Board

UD Clerk Upper Division Clerk

UPS Uninterrupted Power Supply

VPN Virtual Private Network

WSDL Web Service Description Language

XML Extensible Mark-up language

Page 10 / 277

Page 11: Request for Proposal for Design, Supply, Installation

3 Guidance to Bidders

1. Travancore Devaswom Board (TDB), Kerala desires to implement the Project ofComputerisation of Travancore Devaswom Board (CTDB) is looking for reputed,competent and professional vendors for Supply,Installation,Commissioning andMaintenance of IT Hardware, Software, Database, Network Equipment etc. in a Phasedmanner for 3 Years as per scope of work mentioned at “Technical Section & Annexures”.

2. Interested eligible bidders should register in the website http://etender.kerala.gov.inforparticipation in the tender for Travancore Devaswom Board.

3. Bidders are advised to study all Technical & Commercial aspects, instructions, forms,terms and specifications carefully in the tender document. Failure to furnish all informationrequired in the tender document or submission of a bid not substantially responsive to thetender document in every respect will be at the bidder’s risk and may result in the rejectionof the bid.

4. The tender should indicate specifically Price including all Taxes as applicable. Noadditional information will be entertained after due date. TheTravancore DevaswomBoard. may reject tenders if they do not carry such information separately and specificallyquantitatively.

5. Successful Bidder should have local presence / representative at Kerala state or agree to setup local office at K e r a l a . An undertaking in this regard should be given by the bidder.

6. The bid should indicate that the rates are for Travancore Devaswom Board.

7. Eligible vendors have to submit their bid for all the items. Partial offeres will not beconsidered.

8. All Bidders shall furnish, as part of the Bid, an Earnest Money amounting to Rs.10,00,000/-(Rs. Ten Lakhs Only) and a non refundable Tender fee of Rs. 5000 + VAT. Bids withoutthis bid security will be rejected.

9. Unsuccessful Bidder 's Bid security will be discharged or returned within sixty (60) daysafter the expiration of the period of Bid validity prescribed.

10. The successful Bidder’s Bid security will be discharged upon the Bidder signing theContract Agreement and furnishing the Performance Security.

11. The tender should clearly indicate the delivery period and validity period of the tender.

12. The tender should clearly indicate the availability of onsite after sale service and ormaintains facilities for the duration of Three years for items quoted.

13. The bidders are required to quote for each item separately. Prices must be quoted in Indiancurrency only (INR).

Page 11 / 277

Page 12: Request for Proposal for Design, Supply, Installation

14. The successful Bidder has to submit a performance Bank Guarantee from Nationalized /Scheduled Banks for a period of 36 months, as per tender conditions.

15. The bidder should submit Manufacturer Authorization Certificate for all quoted Items

16. Travancore Devaswom Board reserves the right to reject any or all tenders withoutassigning any reason whatsoever.

17. The tenders will be opened on the date and the time indicated, in the presence of bidders,who are interested to remain present. If the date of opening is declared to be a holiday, thetenders will be opened on the next working day.

18. Any damaged or unapproved goods shall be returned at the Bidders risk and cost and theincidental expenditure there upon shall be recovered from the concerned party.

19. Printed conditions of the firm sent along with the quotation, if any, shall not be binding onus.

20. Packing list must be put in all packages.

21. All items should be new and supplied in good condition at respective sites.

22. On acceptance of tender, the Implementation Schedule & response time to resolve atechnical issue should be strictly adhered to, otherwise the Travancore Devaswom Boardreserves the right to impose penalty as per penalty clause of this tender Document. TheTravancore Devaswom Board specifically and in case the order is not executed as per themanner mentioned, Travancore Devaswom Board will be at liberty to make purchasethrough other sources, and to forfeit the earnest money of the Bidder.

23. Payment of bill will be made through the crossed account payeecheque drawn in favour of bidder or through eRTGS on submission of Invoice andacceptance from the authorised person of Travancore Devaswom Board.

24. Bids containing Products of blacklisted companies will also be rejected.

25. Bidders who are black listed by State / Central Government departments andorganizations are not eligible to participate in this tender and such bids will besummarily rejected.

26. Jurisdiction: The Courts situated in Thiruvananthapuram alone will have jurisdiction onthe Contract.

27. The language of the Tender should be English and the corrections, if any, should beattested under seal.

28. Validity of the bids: 180days from the opening of technical bid.

29. Travancore Devaswom Board shall not be responsible for any postal delay about non-receipt/non-delivery of the documents.

30. Conditional bids are not acceptable and are liable for rejection.

Page 12 / 277

Page 13: Request for Proposal for Design, Supply, Installation

4 General Instructions To Bidders

a) Bidders’s are advised to study this RFP document carefully before participating. It shall bedeemed that submission of bid by the Bidder has been done after their careful study andexamination of the RFP with full understanding to its implications. Any lack of informationshall not in any way relieve the Bidder of his responsibility to fulfill his obligations underthe Bid.

b) To participate in e-Tender, the bidder shall have a valid Class-II/Class-III Digital SignatureCertificate (hence forth referred as DSC). For understanding procedures for obtaining DSC,interested bidders may refer to the website of the Controller of Certifying Authorities(CCA) at http : // c c a.go v. i n

c) Bidder shall download and carefully read all terms conditions and other contents of theRFP. Downloaded RFP has to be uploaded back and digitally signed as a part of technicalbid, as a proof of acceptance of all terms conditions in the RFP.

d) Signed and sealed copies of all relevant documents as mentioned in terms and conditionshas to be digitally signed and uploaded in technical bid part.

e) Financial BID / Bill of Quantity (BOQ) shall be downloaded, filled up properly anduploaded in the financial bid after digitally signing it. The bidder must write their name onthe appropriate field of the rate quoting sheet. The bidder shall have to quote rates for theindented items, for allocations as mentioned in the BOQ, to qualify in the bid. Commentslike ‘Not Quoted’ etc., ‘Not applicable’ should not be written in the BOQ as these will notbe accepted by the system.

f) To view the details of the BOQ, bidder should have to Enable Macros into the BOQspreadsheet.

g) To minimize the uploading time, bidder’s shall use the ‘My Document’ folder option in thee-procurement web based application, available after login and may upload all relevant nonsensitive documents [Signed copies of relevant documents as mentioned in NIT]. ‘MyDocument’ shall be populated prior to real time bidding and help the bidder to complete thebidding within the bidding session.

h) During scrutiny of tender/preparation of comparative statement/ signing agreement, eligiblebidders shall have to submit/produce original copy of the uploaded document forverification, as& when asked.

i) This is for information of all bidders that all documents uploaded in the tender shall be part& parcel of the agreement, to be signed with the successful bidder.

Page 13 / 277

Page 14: Request for Proposal for Design, Supply, Installation

5 Eligibility Criteria

S. No. Clause Documents required

1 Bidders shall remit the tender document fees and EMD

2

The Bid can be submitted by an individual company or a consortium.

In case of consortium applicant, consortia shall submit a valid Memorandum of Understanding (MOU)/agreement.

“Consortium” shall mean more than one company which joins with other companies of complementing skills to undertake the scope of work defined in this RFP. In case of consortium the same shall not consist of more than Two companies/ corporations, including the prime bidder.1. Memorandum of Understanding(MOU)/agreement among the memberssigned by the Authorized Signatories ofthe companies dated prior to the submission of the bid to be submitted in original.2. The MoU/agreement shall clearly specify the prime bidder, stake of each member and outline the roles and responsibilities of each member.

3The bidder (prime) should be a company registered under the Companies Act, 1956 / since last 7 years as on 31.03.2015

Certificate of incorporation

4

Bidder (prime) should have experience of IT System Integration/ Information Technology Infrastructure projects including implementation/ operations and should have been in the business for a period exceeding Seven years as on 31.03.2015

1.Work Orders confirming year and area of activity.2.Memorandum and Articles ofAssociations.

5Bidder (prime) must have ISO9001:2000,ISO 27001, ISO 20000 or CMMI level3 or above certification

Valid Copy of Certificate

6 The bidder (prime) should have commissioned and installed at least Two ICT /e governance project with Value not less than 10 Cr during the last 5 Years:The bidder (prime / Consortium member) should have Commissioned and installed at least one Enterprise IT project covering HR, Payroll, Billing, Inventory, Procurement etc during last 5 YearsThe bidder (prime) should have commissioned

Copy of work order / client Certificates.

Page 14 / 277

Page 15: Request for Proposal for Design, Supply, Installation

S. No. Clause Documents required

and installed at least Two Surveillance & biometric attendance System Project with each project Value not less than 2 Cr during the last 5 Years:The bidder (prime) should have commissioned and installed at least one Data Center project witha Value not less than 3Cr during the last 5 Years:

Bidder’s in house data centers shall not be considered.

Bidders who have built their own Internet Data Centre (IDC), for commercial use will be considered.

7

The bidder (prime) should have experience in providing Facility management services to at least one data center, during the last 5 years.The facility management services shall include ITinfrastructure related (e.g. Servers, storage, networks etc.) / non IT related services (Power, cooling, physical security etc.)Note:

Bidder’s in house data centers

shall not be considered. Bidders who have built their

own Internet Data Centre (IDC), for commercial use will be considered.

Copy of work order / client certificates.

8The bidder ( Consortium partner) should have a ISO Certification

Valid ISO certificate

9

The bidder Prime bidder should have at least 200 crores turnover for each of the last three financialyears, i.e. 2012-13, 2013-14 & 2014-15.

The bidder (prime / Consortium Bidder) should have positive net worth of at least 100 crores for each of the last three financial years, i.e. 2012-13,2013-14 & 2014-15.

Chartered Accountant certificate for Net- worth.

Copy of the audited profit and loss account of the company showing turnover of the company for last three years.

10

a) The bidder (prime) must have on its roll at least 100 technically qualified professionals in, networking, systems integration, and prior experience in providing the Data Center Infrastructure maintenance services as on 31-03-16.

b) At least Ten resources should be ITIL certified.

a) Certificate from bidders HR Department for number of Technically qualified professionals employed by the company.

b) Name of the employees along with certified copies of the certifications done.

Page 15 / 277

Page 16: Request for Proposal for Design, Supply, Installation

S. No. Clause Documents required

11

The Bidder and/or all/any consortium partners shall not be under a Declaration of Ineligibility for corrupt or fraudulent practices or blacklisted with any of the Government agencies, as on Bid Submission date.

Declaration in this regard by the authorized signatory of the prime bidder

12

The bidder (prime) should submit valid letter from the OEMs confirming following:

• Authorization for bidder• Confirm that the products quoted are not

“end of life or end of sale products” as on Bid Submission date. If in case the support for the product quoted has been stopped/ withdrawn till the time of delivery of equipment, the same will be changed with the superior product at no extra cost.

• Undertake that the support including spares, patches, and upgrades for the quoted products shall be available for the period of the Project.

OEMs include:

Compute Infrastructure

Networking Infrastructure

Storage Infrastructure

Surveillance

13

The bidder (prime) should have an office in the state. However, if the local presence is not there in the state, the bidder should give an undertakingfor establishment of an office, within two months of award of the contract.

Relevant Documents or Undertaking signed by the Authorized Signatory

14The bidder should submit an acceptance of Termsand Conditions contained in the RFP document.

Declaration in this regard by the authorized signatory of the prime bidder should be attached. (Annexure X)

15

The bidder should submit valid sales tax registration certificate, valid Service tax registration certificate and Permanent Account Number (PAN) issued by income Tax department.

Copy of each registration should be provided.

16The bidder should submit a copy of the entire RFP document with every page signed by an authorized signatory of the Bidder

Signed copy of RFP.

17The bidder should submit power of attorney certifying the authorized signatory.

Power of attorney.

18 The (Prime / Consortium) Bidder Should have Training Centers / Facility and sufficient Trainers in all Devaswom Districts

Documentary Proof to be submitted

Page 16 / 277

Page 17: Request for Proposal for Design, Supply, Installation

6 Project Vision

Computerization of Travancore Devaswom Board (CTDB) has been conceptualized and sponsoredby the Travancore Devaswom Board (TDB) towards enhancing the outcomes in templemanagement across the Travancore Devaswom Districts. The objective of this project is to improvethe quality of services offered by TDB Office as well as Temple Administration Offices.

It is proposed to achieve this through the adoption of the principles of e-Governance and creating acomplete networked infrastructure for supporting an ICT (Information and CommunicationTechnology) enabled state-of-the-art temple management system.

TDB Office is the central nodal agency that would manage CTDB, which would be implementedacross the Temples and its administration Offices spread across different districts in Kerala. CTDBaims at creating a comprehensive and integrated system for enhancing the efficiency and effectivetemple administration at all levels and especially at the Temple through adoption of principles of e-Governance. It aims to create infrastructure and mechanism to provide the basis for evolution of anIT enabled state-of-the-art workflow (Processes) automation system in a planned manner fromTemple level upwards and also provide public service delivery systems. It will not only automateTemple administration functions at TDB Offices and higher levels but will also create facilities andmechanism to provide public services like on-line booking of Pooja, Accommodation, Vazhipaduetc.

The scope of CTDB spans across 4 Devaswom Districts, Sabarimala and covers all 1250 Temples,282 Sub Group Offices, 21 Group Offices, 5 Deputy Commissioner Offices and Head Quarters. Italso covers the management of assets and institutions under TDB. The scope also includes the Lawand Maramath activities. CTDB also provides a user interface to all stake holders includingdevotees and public.

Page 17 / 277

Page 18: Request for Proposal for Design, Supply, Installation

7 Scope of the Project

Name of work: Design, Supply, Installation, Commissioning and maintaining of

“Computerization of Travancore Devaswom Board” Project.

The overall objective of the CTDB Project is based on enhancing the operational efficiency and effectiveness of the TDB Officials in delivering the services. The broad objectives of the project are as follows:

Make the TDB activities transparent, accountable, effective and efficient by automating the

processes and functions at all levels of TDB.

Improving delivery of devotee-centric services through effective usage of Information &

Communication Technology (ICT).

Improving the quality and transparency of services offered to Staff.

Provide the Vigilance Officers with the tools, technologies and information to facilitate

faster and more accurate detection of crimes and frauds.

Implementation of secure channels for data and information sharing. This would enable easy

sharing of real-time information/ intelligence across Temple management units under TDB.

Facilitate collection, storage, retrieval, analysis, transfer and sharing of data and Information

among different Temple units, Devaswom Districts, TDB Offices and otherorganisations/agencies, including those at Government level.

Enabling and assisting the TDB officials in better management of temples.

Reduction in manual and redundant Record keeping.

Improving security to TDB assets.

To Empower the Temple Officials on duty to effectively provide services to the devotees and

public.

To eliminate drudgery from the current Temple management process, essentially eliminating

the need of repetitive data entry at various data entry points.

To Increase operational efficiency.

To improve service delivery to all stakeholders.

Page 18 / 277

Page 19: Request for Proposal for Design, Supply, Installation

8 Technical and Functional Requirements

8.1 Project BackgroundComputerization of Travancore Devaswom Board (CTDB) has been conceptualized and sponsoredby the Travancore Devaswom Board (TDB) towards enhancing the outcomes in templemanagement across the Travancore Devaswom Districts. The objective of this project is to improvethe quality of services offered by TDB Office as well as Temple Administration Offices.

It is proposed to achieve this through the adoption of the principles of e-Governance and creating acomplete networked infrastructure for supporting an ICT (Information and CommunicationTechnology) enabled state-of-the-art temple management system.

TDB Office is the central nodal agency that would manage CTDB, which would be implementedacross the Temples and its administration Offices spread across different districts in Kerala. CTDBaims at creating a comprehensive and integrated system for enhancing the efficiency and effectivetemple administration at all levels and especially at the Temple through adoption of principles of e-Governance. It aims to create infrastructure and mechanism to provide the basis for evolution of anIT enabled state-of-the-art workflow (Processes) automation system in a planned manner fromTemple level upwards and also provide public service delivery systems. It will not only automateTemple administration functions at TDB Offices and higher levels but will also create facilities andmechanism to provide public services like on-line booking of Pooja, Accommodation, Vazhipaduetc.

The scope of CTDB spans across 4 Devaswom Districts, Sabarimala and covers all 1250 Temples,282 Sub Group Offices, 21 Group Offices, 5 Deputy Commissioner Offices and Head Quarters. Italso covers the management of assets and institutions under TDB. The scope also includes the Lawand Maramath activities. CTDB also provides a user interface to all stake holders includingdevotees and public.

8.2 Conception of CTDB

The TDB is being facing various challenges and issues in delivery of service with the currentsystem. The issues in accounting and security are at highest priority. Keeping these aspects in view,it was decided that there is a need for the TDB in leveraging the ICT possibilities to improveservices and promote information sharing among various TDB Offices.

CTDB aims at creating a comprehensive and integrated system for enhancing the efficiency andeffectiveness of temple management through adoption of a proper e-Governance solution andcreation of networked infrastructure for evolution of IT enabled governance system.

Page 19 / 277

Page 20: Request for Proposal for Design, Supply, Installation

8.3 Project Objectives

The overall objective of the CTDB Project is based on enhancing the operational efficiency and effectiveness of the TDB Officials in delivering the services. The broad objectives of the project are as follows:

Make the TDB activities transparent, accountable, effective and efficient by automating theprocesses and functions at all levels of TDB.

Improving delivery of devotee-centric services through effective usage of Information &Communication Technology (ICT).

Improving the quality and transparency of services offered to Staff.

Provide the Vigilance Officers with the tools, technologies and information to facilitatefaster and more accurate detection of crimes and frauds.

Implementation of secure channels for data and information sharing. This would enable easysharing of real-time information/ intelligence across Temple management units under TDB.

Facilitate collection, storage, retrieval, analysis, transfer and sharing of data and Informationamong different Temple units, Devaswom Districts, TDB Offices and otherorganisations/agencies, including those at Government level.

Enabling and assisting the TDB officials in better management of temples.

Reduction in manual and redundant Record keeping.

Improving security to TDB assets.

To Empower the Temple Officials on duty to effectively provide services to the devotees andpublic.

To eliminate drudgery from the current Temple management process, essentially eliminatingthe need of repetitive data entry at various data entry points.

To Increase operational efficiency.

To improve service delivery to all stakeholders.

Page 20 / 277

Page 21: Request for Proposal for Design, Supply, Installation

9 Scope of Services

CTDB project has been envisaged to cover key services delivered through the Temples, Sub-GroupOffices, Group Offices, District Offices and TDB Headquarters. The existing key services deliveredby TDB have been categorized and further broken down into processes and activities, as describedbelow:

Sl. No

Service Category Processes

1 Devotee Centric Services

Devotee Interface/ Portal Service. on-line information about Temple Services and Details. on-line Vazhipadu booking Accommodation Booking on-line Complaint Registration Pooja booking

2 Internal Services Temple Administration HR Administration Commissioner Office Management Payroll Management Devaswom Accounts Management Board Office Administration Vigilance Office Management Audit Maramath Cultural Department Management General Services like file flow, vehicle management etc. Thahasildhar Office management Law Office Sabarimala Management

3 Other Services envisaged through CTDB

User Feedback Tracking and Resolution Service Activity Log Tracking and Audit Service User Access and Authorization Management Service User Help and Assistance Service – Information Management

Service

Page 21 / 277

Page 22: Request for Proposal for Design, Supply, Installation

10 Expected benefits to the Stakeholders

Sl. No Stakeholder Benefits

1. Devotees Facilitating web based services like Advance booking, on-line booking etc.

Simplified process for accessing different services offeredby the temple and TDB.

Multiple channels to access Temple services/informationthrough mobile phone, SMS, internet, email, etc

Simplified process for registering and tracking grievances

2. TDB Enhanced tools for file management and file processing Enhanced tools for work flow management Tools for reporting Tools for maintaining registers Tools for HR related activities Tools for Office automation Tools for automating and monitoring all activities of TDB

and Temples

3. Vigilance Interface for monitoring and reporting all unlawfulactivities.

Provision for recommending disciplinary actions

4. Local Fund AuditDepartment

Enhanced mechanism for automating all activities inauditing and reporting

5. Judiciary Interface for Monitoring Temple related activities Tools for Monitoring Daily activities of TDB

6. Bank Payment Gateway interface Easy Reconciliation and Account Management

Page 22 / 277

Page 23: Request for Proposal for Design, Supply, Installation

CTDB Project

INTERNALTDB Officials

TemplesMaramath

ThahasildharLaw Office

Cultural WingAudit

Commissioner OfficeSabarimala Administrator

District OfficeGroup Offices

Sub-Group Offices

EXTERNALDevoteesTouristsPublicBank

EXTERNAL- GovernmentJudiciaryVigilance

Local Audit DepartmentOther Government Agencies

11 Project Details

11.1 Stakeholder Analysis

Assessing the needs of various stakeholders impacted by the initiative of CTDB project undertakenby TDB is imperative for designing the improvised processes and solution. There are two categoriesof identified stakeholders, i.e. Internal and External. External is again classified in to two, i.e.External-Public and External-Government

Each stakeholder mentioned in the aforementioned diagram, either plays primary or secondary rolewith respect to CTDB project. Primary Stakeholders are the ones which are directly impacted by theservice delivery of TDB through CTDB, and Secondary Stakeholders are the ones which areindirectly impacted by TDB services through CTDB application.

Page 23 / 277

Page 24: Request for Proposal for Design, Supply, Installation

Key StakeholderGroup/ Name

Role Expectation from the CTDB Project

Devotees Primary Anywhere anytime accessible points to

services of temple and TDB Effective transparency in all TDB and

Temple activities

Tourists Secondary Easy access to some basic information

about temples and its historic importance Easy access to know Temple rituals and

Festivals etc

Vigilance Primary Easy complaint tracking Easy report generation

Local Audit Primary Easy Objection tracking Easy Report generation

TDB Headquarters Primary An interface in CTDB application for

sharing of all temple management relatedinformation across the Offices

Auto-generation of periodic reports onTemple management data

Tools for Office automation Tool for financial management

Commissioner

Office

Primary Seamless information sharing from all

TDB Group Offices Compiled Temple management data of

each districts on periodic basis to beshared with TDB

Updated records of Temple registers Intelligent tools such as Business

Intelligence and Data Mining to analyzefinancial and personnel data etc

Centralized monitoring and managementof all activities

Tools for Office automation

District Offices Primary Compiled Temple related data of each

Group Offices in the concerned TDBdistrict on periodic basis to be sharedwith TDB headquarters

Standard formats for the exchange ofinformation from all Temple Units, fromwhere data can be collated and sharedwith District Offices

Tools for Office automation Easy Monitoring and management of

activities

Group Offices Primary Compiled Temple related data of each

Sub-Group Office in the concerned TDB

Page 24 / 277

Page 25: Request for Proposal for Design, Supply, Installation

Key StakeholderGroup/ Name

Role Expectation from the CTDB Project

district on periodic basis to be sharedwith TDB District Offices.

Standard formats for the exchange ofinformation from all Temple Units, fromwhere data can be collated and sharedwith Group Offices

Tools for Office automation Easy Monitoring and management of

activities

Sub-Group Offices Primary Compiled Temple related data of each

Temple Offices in the concerned TDBdistrict on periodic basis to be sharedwith TDB Group Offices.

Standard formats for the exchange ofinformation from all Temple Units, fromwhere data can be collated and sharedwith Sub-Group Offices.

Tools for Office automation

Temples Primary Better Management of vazhipad and

Pooja, their income and expenditure Automatic register maintenance Easy & dynamic report generation

Other TDB Offices Primary Easy way for getting approval for

different activities Tools for Office automation and asset

Management Decision support systems like searching

and reports

11.2 Current TDB Process Assessment

This section provides abridged version of the assessment of AS-IS processes of the services identified under the scope of this project. Key processes studied are as follows:

Temple Administration Store and Inventory Mahassar Preparation Auctions

Page 25 / 277

Page 26: Request for Proposal for Design, Supply, Installation

Vazhipad Counter Billing Kanikka counting Advisory Committee Election

Sabarimala Administration Counter Billing Accommodation Dolly and Tractor management Parking Duty Posting Appam, Aravana production and Sales Management Annadhanam Store management Auction Kanikka Counting Auditing Mess Management

HR Administration Recruitment Appointment and Posting Training Service Book Probation & Seniority Promotion/Demotion Transfer Reimbursement Pension Provident Fund Loans Attendance Management Leave Management Salary Management Staff Appraisal

Payroll Management Salary Computation PF Computation Pension Computation Recovery Computations Income Tax

Commissioner Office Disciplinary action Budget estimation & Fund allocation Fixed Deposits maintenance Elephants

Page 26 / 277

Page 27: Request for Proposal for Design, Supply, Installation

Grants New Schemes Inspection Land Records

Maramath Estimation Fund Management Tendering/ Quotations /Comparative Statements Work Order M-Book Bill preparation Payment/Part Payment Auctioning of Shopping complex/Estate property/Furniture

Board Office Purchase & Store Management College Management Aided Schools Management CBSE School Management Board Meetings

Audit Schedule and Conduct inspection Audit Objections and tracking Audit Report Reporting to Higher Authorities/High Court

Devaswom Accounts Preparation of Chart of Accounts Maintenance of Bank Accounts Budget Liability Payments Bank Reconciliation

Vigilance Schedule and Conduct inspection Petition Management Recording irregularities Recommending disciplinary actions

Cultural Printing & Publishing Library Book Stall Temple Arts Academy

Page 27 / 277

Page 28: Request for Proposal for Design, Supply, Installation

Fund management

Law Office Suite Register Maintenance Advocate fee Maintenance Case Status, Alerts (for summons etc)

Estate Office Tahsildar Complaint registration Land Register Land Encroachment Case Management

11.3 Current IT Assessment of TDB

This section provides the abridged version of the detailed assessment of existing IT implementationin the TDB, comprising of Application, Hardware, Networking.

11.3.1 Existing Hardware and network implementation

TDB has supplied a few numbers of computers to some of the Group Offices and Head Officemainly for DTP and documentation work. But no specific software is deployed and no networkingis done other than in Sabarimala. Some temples received computers and printers as offerings andthrough procurement. Minimal network is implemented in these temples to implement acomputerized Vazhipadu counter. No internet connectivity is established in any of the TDB Officesso far.

11.3.2 Existing Application Assessment

Major applications implemented in TDB temples and its identified gaps and issues are given below:

Sl. No.Name of Application

Issues/ Gaps

1. Counter Billing forVazhipadu Standalone, Not a Standardized solution

2. Sabarimala Accommodation Standalone, Not a Standardized solution

3. Sabarimala Store management Standalone, Not a Standardized solution

Page 28 / 277

Page 29: Request for Proposal for Design, Supply, Installation

11.4 Handholding Support

a) As part of the Handholding services to provide Centralized Helpdesk and Support forend users at each location Software Development Agency shall provide followingservices for 1 year as Post Implementation Support:

The service will be provided in the local language of the State.

The help desk service will serve as a single point of contact for all ICT related incidents and

service requests. The service will provide a Single Point of Contact (SPOC) and alsoresolution of incidents. TDB requires the SDA to provide Help Desk services to track androute requests for service and to assist end users in answering questions and resolvingproblems related to the software Application, Network, Data Centre, Disaster RecoveryCentre and Operating Systems at all locations. It becomes the central collection point forcontact and control of the problem, change, and service management processes. Thisincludes both incident management and service request management.

SDA shall provide a Post implementation support of 1 year for the application and technical

support at Temples, Sub-Group Offices, Group Offices, and TDB Headquarters where thesoftware, hardware, and other infrastructure will be rolled out.

SDA shall provide functional support on the application components to the end users.

Software Development Agency shall also provide System Administration, Maintenance and

Management Services, LAN Management Services, and IT Security AdministrationServices.

b) As part of the Handholding services to provide software maintenance and support servicesSDA shall provide:

The Software Maintenance and Support Services shall be provided for all software

procured and implemented by the SDA. The SDA shall render both on-site and off-sitemaintenance and support services to all the designated locations. The Maintenance andSupport Services will cover, all product upgrades, modifications, and enhancements.

Updates/Upgrades/New releases/New versions. The SDA will implement from time to

time the Updates/Upgrades/New releases/New versions of the software and operatingsystems as required after necessary approvals from TDB about the same.

Tuning of application, databases, third party software’s and any other components

provided as part of the solution to optimize the performance. The SDA shall apply regular patches to the licensed software including the operating

system and databases as released by the OEMs. Software Distribution: SDA shall formulate a distribution plan prior to rollout and

distribute/install the configured and tested software as per the plan. Software License Management: The SDA shall provide for software license management

and control. SDA shall maintain data regarding entitlement for software upgrades,enhancements, refreshes, replacements, and maintenance. SDA should perform periodicaudits to measure license compliance against the number of valid End User softwarelicenses consistent with the terms and conditions of site license agreements, volume

Page 29 / 277

Page 30: Request for Proposal for Design, Supply, Installation

purchase agreements, and other mutually agreed upon licensed software terms andconditions and report to TDB on any exceptions to SDA terms and conditions, to theextent such exceptions are discovered.

The SDA shall undertake regular preventive maintenance of the licensed software.

c) As part of the Handholding services to provide application functional support servicesSDA shall provide:

The Application Functional Support Services shall be provided for all software procured

and implemented by the SDA. The SDA shall render both on-site maintenance and supportservices to TDB from the development centre.

Enhancements and defect fixes: SDA shall incorporate technological changes, and provide

enhancements as per the requests made by TDB. SDA shall perform minor changes, bugfixes, error resolutions and minor enhancements that are incidental to proper and completeworking of the application.

Routine functional changes that include user and access management, creating new report

formats, and configuration of reports. SDA shall provide user support in case of technical difficulties in use of the software,

answering procedural questions, providing recovery and backup information, and anyother requirement that may be incidental/ancillary to the complete usage of theapplication.

The services shall include administrative support for user registration, creating and maintaining userprofiles, granting user access and authorization, providing ongoing user password support,announcing and providing networking services for users and providing administrative support forprint, file, directory and e-mail servers.

Page 30 / 277

Page 31: Request for Proposal for Design, Supply, Installation

12 Business Process Re-engineering

This section will bring out the changes required to the various processes to optimize the TDB service delivery to the Devotees and the details of the new proposed and re-engineered processes.Major Reengineering Recommendations are

Service Recommendations

Pooja, Vazhipadu and Accommodation Booking

Devotees should have multiple routes through which they can

request for Temple Services. For example, on-line - Citizen Portal/Interface Module.

on-line Pooja, Vazhipadu and Accommodation booking through e-

Payment gateway. Donations through e-Payment

Employee Identification

Unique Identification number to each employee Embedding maximum information of the employee in the ID no: Smart card based Identity Cards

Attendance Management System

Smart card based Identity Cards for Attendance

Provision for Biometric Attendance management System

Provision to mark attendance through the Smartcard readers

File Numbering Provision to identify each file by a unique file number

Provision to classify inward and outward files

Accounting Switch to Accrual Accounting Systems

Pension Computation and reimbursements

Provision to change the pension computation and reimbursement

process to the Accounts Office.

Page 31 / 277

Page 32: Request for Proposal for Design, Supply, Installation

13 Proposed Solution & Technology Architecture

This section will provide the details of Software solution approach and Infrastructure developmentalong with the detailed functional requirements that will be covered under the CTDB project.

13.1 Solution ApproachThis section describes the recommended software solution approach. The recommendations for theCTDB project are-

Open Source

Web Based

Multi Tier Architecture

Mobile Compatibility

Paperless during system evolution

Service Oriented Architecture

Data Analytics & Business Intelligence

Provide maximum relevant information to the public

Single Sign on

Role Based Access

Multi-Level Security

Audit Trial Facility

Intelligent File and Information flow

13.2 Generic Solution Requirements

13.2.1 System Administration

The various services under the system administration module are given below:

Sl. No. Services1. User Management2. User Roles Management3. Privileges Management4. Password Management

13.2.1.1 User Management

Page 32 / 277

Page 33: Request for Proposal for Design, Supply, Installation

The ''User Management” service will allow the management of the users. The functional

requirements of “User Management” are as follows:

Sl. No. Functional Requirement Specification1 The system will interface with the HR module to get access to the employee

details2 The system will display the list of users and allow each user to be assigned

roles, privileges as well as alter or revoke them3 The system will allow the system administrator to reset passwords, in which

case the user will be automatically notified using email or SMS and the user

will be asked to log in to the system within a specified period after which a

new password request will need to be made by the user

13.2.1.2 User Roles Management

The ''User Roles Management” service will allow the management of the various roles assigned to

users. The functional requirements of “User Roles Management” are as follows:

Sl. No. Functional Requirement Specification1 The system will allow the system administrator to maintain a list of roles and

assign, alter or revoke privileges to each one of them

13.2.1.3 Privileges Management

The ''Privileges Management” service will allow the management of privileges to be granted or

revoked to various users and roles. The functional requirements of ''Privileges Management” are as

follows:

Sl. No. Functional Requirement Specification1 The system will allow the system administrator to maintain a list of privileges

and assign, alter or revoke rights that may be view, add/create, edit/alter/update,

delete/remove/archive to each form control of every user interface

13.2.1.4 Password Management

The ''Password Management” service will allow effective role and user based access to the system’s

resources. The functional requirements of ''Password Management” are as follows:-

SL No Functional Requirement Specification

Page 33 / 277

Page 34: Request for Proposal for Design, Supply, Installation

1 The system should provide facility so that the passwords will consist of a

minimum set of alphanumeric characters and special characters2 The system should provide facility to change passwords with automatic

expiration after a valid period to prevent repeated or reused passwords3 The system should provide facility to allocate and reset password.4 The system should provide facility to identify any password weaknesses5 The system should provide facilities to store password in encrypted

form.6 The system should provide facility to freeze user accounts after 3 failed

login attempts. All erroneous password entries will be recorded in an

audit log for later inspection and action, as necessary. Sessions will be

suspended after specified period of inactivity and require the password

to be re-entered7 The system should provide facility to recover password.8 The system should provide facility for session management policy.

13.3 Organization Structure Management The ''Organization Structure Management” service will allow to create the structure of the

organization. The functional requirements of ''Organization Structure Management” are as follows:-

Sl. No Functional Requirement Specification1 The system should have the provision for dynamic configuration of

organization structure as per prescribed rules.

13.4 File Flow Management The ''File Flow Management” service will allow to configure the file flow within the organization.

The functional requirements of ''File Flow Management” are as follows:-

Sl. No Functional Requirement Specification1 The system should have the provision to configure the routing of the file2 The system should have the provision to override predefined route of the file

13.5 Alert and Message MechanismThere should be a separate subsystem for messaging and alerts well integrated with the CTDB

system. It should be implemented in such a way that when a user logs into his workbench he should

get all alerts and messages awaiting his attention as pop ups. The proposed messaging system

should be able to prepare, forward and send messages and alerts. Alert mechanism will be able to

generate alerts based on date, time and by the response of a specified event. Provision to prioritize a

message or alert based on the subject, time constraint etc and to depict the priority by colour code or

Page 34 / 277

Page 35: Request for Proposal for Design, Supply, Installation

pop up frequency. The mechanism should support broadcast, multicast, unicast types. Messages

and alerts with acknowledgements when the recipient opens the message should also be

implemented. Messages can be sent as emails, SMS, texts etc. The messaging conversation should

have a trailing mechanism.

13.6 Search MechanismThere should be a facility to search, advanced search, and multilevel search in all modules based on

selected parameters involved in those modules. Searches on documents by keyword and strings in

the document have to be implemented. The search mechanism should be able to generate a sorted

view and with filtering option.

13.7 Report GenerationAll modules should support a report generation system to address the statistical needs of TDB. It

should be implemented at all levels of a module and should be able to generate dynamic reports

based on all the parameters involved in that module

13.8 RTI/LA InterpellationsIt is identified that each and every section of the administration is advised to maintain an RTI wing for the maintenance of RTI, audit objection data and LA interpellations. It is suggested to develop and maintain a common RTI package to manage all the activities related to RTI and Audit which includes the following functionalities.

1. Logging of RTI requests/LA Interpellations2. Request status updating3. Audit objection registers4. Status of audit objections5. Alert mechanism based on priority/time constraint/calendar etc

Page 35 / 277

Page 36: Request for Proposal for Design, Supply, Installation

14 Non- Functional Requirements

14.1 ReliabilityThe Reliability of the system can be defined as the ability to perform the functional activities underthe stated condition for a specified period of time. To make the CTDB application system reliable, all SPOFs (Single Point of Failure) should beidentified and fail over mechanism should be specified.There are various areas which are taken into account when considering failure:

1. Power Supply 2. Network3. Servers4. RDBMS5. Storage6. Application Software

The availability of the above mentioned would need to be taken care of by respective owners. Power Supply should have a backup facility with UPS as primary and generator as

secondary. Proper network redundancy mechanism should be deployed. For Servers and DB redundancy, there would be provision for “Failover” Clustering i.e. If

one server fails; the workload of that server is taken over by another member of the cluster.

Figure 5: Cluster Deployment

Try –Catch block handles the application or code level failure of the system. At the server level, the page will display with proper user help and feedback option and

helpdesk nos. Proper testing of the application for stability and reliability.

14.2 Audit trialThe database should have inbuilt mechanisms for enforcing security of the data. Auditing of

transactions is to be provided. The sensitive information should have transaction logs, which will

Page 36 / 277

Page 37: Request for Proposal for Design, Supply, Installation

capture the pre-image and post-image of data modifications. Information regarding the users

carrying out the sensitive transactions should be captured to ensure accountability at every process

level.

14.3 AvailabilityAll the components of the system must provide adequate redundancy to ensure high availability of

all the modules in the applications. Designing for availability assumes that systems will fail, and

therefore the systems must be configured to mask and recover from component or server failures

with the minimum application outage.

The application should be available for 99.9% of the planned up-time. The critical components

should be identified and proper failover mechanism should be adopted.

The system will be available to users 24 X7 throughout the year depending on the following

assumptions:

1. Web and Application servers are up and running.2. Database server is up and running.3. No locks on the database.4. No. of user will be in defined limit.5. No upgrade activity is scheduled.6. No network latency reported.7. No failure reported with hardware, infrastructure (This also includes power) or network.

14.4 System ScalabilityApplication Scalability is the ability of an application to handle increased processing demand

without requiring architectural changes. Increase in customer expectations and dynamic usage

patterns are posing new demands of applications.

The application will be designed in a way that it can be made scalable to handle increased user

demand in the future, within defined limits.

Following are the ways, application can be made scalable:

1. Service Oriented Architecture (SOA)2. Hardware3. SAN boxes for storage4. Load Balancers5. Server pooling6. Better Garbage collection of unused object7. Role wise restricted functionality and data

Scalability and performance of the application will be ensured while load and stress testing. All the

benchmark data will be provided during performance testing.

Page 37 / 277

Page 38: Request for Proposal for Design, Supply, Installation

Following parameters should be considered in the performance analysis of the system, in a standard

environment.

1. System response time i.e. page loading, form submission &validation.2. Response time for Advanced search 3. Access time for Regular data 4. Access time for Archived data

The system should support concurrent accessibility to the application provided infrastructure and

network availability as required.

14.5 Data IntegrityData integrity refers to maintaining and assuring the accuracy and consistency of data over its entire

life-cycle. The proposed system should incorporate integrity assurance techniques like RAID,

mirroring, check summing etc.

14.6 SecurityThe system must provide clearance levels for the information offered, through means of strict and

configurable access rights. The role-based security model will offer the ability to define and manage

permissions that can be given to a group of users determining their rights on accessing and editing

of data with the exception of special authorization cases. There should also be an option to enable

full and transparent data encryption.

The system must also offer the ability to set and manage user permissions in the system's different

modules. There should be detailed procedures for keeping backups for data integrity.

The applications must support:

User access control of the system, application, entries, database and file levels. Secure managing, entry and encryption of all access passwords. Catalogue creation of authorized persons with access permissions and the authentication

procedure. Single sign-on for all subsystems. Central user management and permissions system. Permissions control in the operating system, database and application levels. Data integrity checking system. Digital signatures and PKI infrastructure. Encryption and data transfer over secure networks. Event logging.

Security is fundamentally about protecting assets, risk management and implementing effective

countermeasures. The proposed e-Governance system should support multi-level security by

providing securities in Network layer& Deployment layer, network layer, application layer and

Page 38 / 277

Page 39: Request for Proposal for Design, Supply, Installation

Physical Security and Access.

a) Network layer& Deployment layer security

Network security vulnerabilities are among the first threats to any Internet-facing or intranet-facing

application server. The system should address network segmentation; Transmission Control

Protocol/Internet Protocol (TCP/IP) stacks hardening and the use of firewalls for host protection.

The network security vulnerabilities can be reduced through the use of:

De-Militarized Zone (DMZ):-In the computer network world, a DMZ is a part of a

network separated from other systems by a Firewall which allows only certain types of

network traffic to enter or leave. A DMZ or perimeter network is a network area (a sub

network) that sits between an organization's internal network and an external network,

usually the Internet. For example, Public web servers might be placed in such a DMZ.

With the DMZ approach, large companies with complex e-commerce Internet and extranet

applications may have a two-tiered approach to firewall security. The point of a DMZ is

that connections from the internal and the external network to the DMZ are permitted,

whereas connections from the DMZ are only permitted to the external network---hosts in

the DMZ may not connect to the internal network. This allows the DMZ's hosts to provide

services to the external network while protecting the internal network in case intruders

compromise a host in the DMZ.

Firewalls: - The Firewall isolates TDB internal network from larger Internet, allowing

some packets to pass, blocking others. Two types of firewalls that can be used are packet

filter and application gateways. The implementation of firewall will prevent denial of

service attacks, prevent illegal modification/access of internal data and allow only

authorized access to the inside network (set of authenticated users/hosts). Implement

firewalls that support proxy servers and/or state-full inspection instead of simple packet-

filtering solutions. Use a firewall that supports a security paradigm in which you can deny

all services except those explicitly permitted. A dual-homed or multi-homed firewall

solution implementation will be better as this architecture provides the greatest level of

security and helps to prevent unauthorized users from bypassing the firewall security.

IPsec: - Internet Protocol Security (IPsec) is a technology protocol suite for securing

Internet Protocol communications by authenticating and/or encrypting each IP packet of a

communication session. IPSec should be used in e-Governance system to secure the

Page 39 / 277

Page 40: Request for Proposal for Design, Supply, Installation

communication channel between the Web server and the application server, and between

the application server and the database server. In IPsec protocol the Authentication Header

(AH) protocol provides source authentication and data integrity and the Encapsulation

Security Payload (ESP) protocol provides data integrity and secrecy.

Secure Electronic Transactions (SET): - In order to meet the business requirements of

the e - Governance system like on-line Vazhipadu payment etc, the system should

provide a secure means of electronic transaction. To provide the desired security

measurements the system should adhere to Secure Electronic

Transaction (SET) communications protocol standard for securing credit card

transactions over insecure networks, specifically, the Internet. SET will provide security

at three levels that includes Devotee, TDB and bank where account of TDB is

maintained.

VPN: - A VPN creates a secure communication channel from which Internet users can

safely access the applications hosted in the Datacenter. VPNs can be based on the IPSec or

SSL. Providing a VPN solution will mitigate threats and attacks while maintaining privacy

through security procedures such as encryption and tunneling protocols, but at a much

lower cost.

b) Application Layer Security

The application layer communication is a very weak link in terms of security because

that the application layer supports many protocols which provide many vulnerabilities

and access points for attackers. The design, development and implementation of the e -

Governance system should focus on the critical areas where the correct approach is

essential and where mistakes are often made. The system should try to avoid and

prevent application vulnerability through input validation, authentication, authorization,

parameterized stored procedures to prevent SQL injection attacks, filter input

parameters for special characters and encode output based on inputs for avoiding cross-

site scripting, configuration management, session management, limits the number of

requests the server will serve to prevent denial of service, cryptography, parameter

manipulation through input string encoding and handling cookies and HTTP headers ,

exception management, and auditing and logging considerations. Use Internet Protocol

Security (IPSec) or SSL to secure the communication.

Page 40 / 277

Page 41: Request for Proposal for Design, Supply, Installation

The system should try to avoid and prevent application vulnerability through

Input validation Authentication Authorization Using parameterized stored procedures to prevent SQL injection attacks Filter input parameters for special characters Encode output based on inputs for avoiding cross-site scripting Configuration management Session management Limits the number of requests the server will serve to prevent denial of service Cryptography Parameter manipulation through the input string encoding Handling cookies and HTTP headers Exception management Auditing and logging considerations. Use Internet Protocol Security (IPSec) SSL to secure the communication.

c) Physical security and access

In addition to the monitoring of security at application, network and deployment layers,

the physical security of the Data centre must take into account. The Data centre should

be equipped with multiple security systems. Passage into and out of the facility should

be controlled by card or biometric access systems. All security systems should be

monitored 24/7 and activities logged both onsite and at a remote location. All alarms

should specify the exact location of the fault so time is not wasted searching for the

source of the problem. The physical security of the Data centre environment should

range from the server being placed in a secure room under lock and key, along with

other equipment, to being in a secured alarmed cage, isolated from other computers,

monitored continuously by Closed Circuit Television (CCTV).

Implementing security measurements are only a part of the solution. Another key

concern should be on vigilance. The e-Governance system should

Monitor system's event logs. Logs should be carefully monitored so that repeated

attempts to log into the system or for excessive requests being made against Web server

will be noticed and can take percussive measures.

Continually keep the application server up to date with the latest security updates.

Provide a good antivirus solution.

Use of automated tools for application vulnerability detection.

Adhere to security protocols and certificates.

Page 41 / 277

Page 42: Request for Proposal for Design, Supply, Installation

d) Web Application Security

o

Figure 6: Web Application Security

Page 42 / 277

Page 43: Request for Proposal for Design, Supply, Installation

e) n-Tier Web Application Layer

f) Usability

System usability is the extent to which users can access the functionalities with

effectiveness, efficiency, and satisfaction to achieve specific goals. Following are the

main features necessary for ease of use

The relevant services are available to all stakeholders of CTDB The provision of proper documentation tools in work desk. The ease of navigation in moving from page to page The provision of standard fonts The support for multilingual operations The UI should be compatible for web browsers and mobile displays The provision of on-line help

g) Maintainability

This section discusses the issues affecting the maintenance of the application software system.

Maintenance of software systems is required for two reasons:

To correct the faults which only manifest themselves after the system has become

operational. To modify or enhance the functionality of the system.

The ability to maintain software is greatly enhanced if it is well designed and well written. To

Page 43 / 277

Page 44: Request for Proposal for Design, Supply, Installation

facilitate this, the software design methodology as per industry best practices would be followed.

The principal characteristics of the software developed by this methodology are:

Modular design. Each module has high internal cohesion, i.e. its components are

closely related. The relationship between modules has low coupling, i.e. the modules

are as independent as is practical. Layered design. The principles of information hiding and data abstraction are

applied to the design of the software. Documentation. The proper documentation of all the details in the process of design for

future reference.

The ability to maintain software is also enhanced if detailed software documentation is available.

Documentation will be produced for the Application software in accordance with standard

guidelines.

h) Portability

Portability is one of the key concepts of high-level programming. Portability is the software code

base feature to be able to reuse the existing code instead of creating new code when

moving software from an environment to another. The pre-requirement for portability is the

generalized abstraction between the application logic and system interfaces. When one is

targeting several platforms with the same application, portability is the key issue for

development cost reduction. The developed application should be platform independent.

For the CTDB application portability will be achieved by:

Installed .war/.cs/resource/configuration files may be transferred to another server The program may be reinstalled (from the distribution files) on another server.

I) Interoperability

Interoperability is the capabilities to communicate, execute programs, or transfer data among

various functional units in a manner that requires the user to have little or no knowledge of the

unique characteristics of those units. In CTDB application “Web Service” would be implemented to

achieve this.

Web Service is spearheading the interoperability initiative in the market. Web Service exposes

useful functionality through industry standard protocols i.e. SOAP over HTTP. Because Web

Page 44 / 277

Page 45: Request for Proposal for Design, Supply, Installation

Services are standard based and platform independent, they provide a natural fit when it comes to

getting applications on different platforms to interoperate with each other.

Web Service contains useful functionality exposed via standard protocols and the same is available

in detail in an XML file called Web Service Description Language (WSDL). WSDL is enough to

build a client application which interacts with a web service.

j) Quality Assurance

The following will be listed for quality plan. Lists all applicable standards/practices applied during the software process and any

metrics to be collected as part of the software engineering work.

Code, designs, specifications, test plans, standards, etc. can all be reviewed.

Review type Principal purpose

Design or program inspections

To detect detailed errors in the requirements, design or code.A checklist of possible error should drive their view.

Progress reviews To provide information for management about the overall progress of the project. This is both a process and a product review and is concerned with costs, plans and schedules.

Quality reviews To carry out a technical analysis of product components or documentation to find mismatches between the specificationand the component design, code or documentation and to ensure that defined quality standards have been followed.

Page 45 / 277

Page 46: Request for Proposal for Design, Supply, Installation

14.7 Software System Architecture

The ‘User’ Layer: This layer forms the internal departmental users accessing the applications overInternet or through the Network. Role based access would be defined for the internal users forhaving accessibility to the respective application modules, such as HRMS, which would beaccessed by all the TDB Officers but higher authorities would essentially be accessing reportingmodules which would help them in decision making and monitoring the overall functioning atvarious levels. Integrated database structure would ensure a one point stop search available to all theTemple Administration units. The ‘Data’ Layer: The overall solution would be based on a hybrid architecture comprising ofcentrally located databases at Data Centre as central repository and locally deployed databases atother Temple units. All the proposed applications would be able to function in an offline mode andon availability of connectivity, data would automatically replicate with the central repository inData Centre. This approach would cater to the functionalities of all the key processes and functionsperformed at Temple level and would also allow the users to have an access to the central repositoryfor comprehensive information as when required. It is recommended that the State Data Centre(SDC) should be the preferred to Third Party Data Centre option mainly on account of thefollowing: The specialized skills needed to manage a data-centre (such as security access management

through multiple delivery channels, data encryption, storage management, databaseadministration, etc.) are already being provided for at the SDC. To replicate, maintain andcontinuously upgrade these skills at a Department level would be extremely difficult, timeconsuming and waste of effort and resources.

Page 46 / 277

Page 47: Request for Proposal for Design, Supply, Installation

Cost effective option as the IT infrastructure investments would be required only for enhancing

the capacity of SDC (e.g. additional servers, Storage capacity, upgraded connectivity, etc.).

Networking: The overall networking solution would be based on a combination of Leased line,VPN over Broadband and Kerala SWAN (i.e. the State Wide Area Network established by the StateGovernment) ensuring optimum uptime at all the desired locations. The ‘Application’ Layer represents categories of modules, i.e. modules proposed for the CTDBproject. These modules will communicate with each other by sharing of data with one another, or bycoordinating an activity between two or more services. Users can easily access solution componentshaving a single sign-on facility either through internet or through KSWAN. All the modules wouldbe supported with Business Intelligence/ Data Mining tools coupled with Bi-lingual support, e-Payment gateway and workflow engine. The 'Service Delivery’ Layer represents the different modes/media of service delivery, whichwould be used for availing/accessing the services of TDB. Services would be primarily providedinternet, Mobile and SMS.

14.8 Deployment ArchitectureDeployment methodology is another major design concern while rafting the overall architecture. Byconsidering the possible deployment scenarios, a situation where the application cannot be deployedsuccessfully, or fails to perform to its design requirements due to any technical infrastructurelimitations, can be prevented. To run the application successfully on the network Web Server,Application Server, Database Server etc. will be required. A server for mail will be hosted in DC formail and messaging solution. Some other servers like Application Server, Database Server,Directory Server, Management Server etc will also be hosted for their different purposes. Thespecification of the servers shall be designed to ensure high availability of servers (clustering) at thecentral site. All the major servers would be configured in such a way that there is no single point offailure. The option of having clustered servers is to allow for redundancy and load sharing for bothdatabase management and applications.The following are the description of major servers proposed at the Data centre

Application Server & Web-server Database Server Mailing & Messaging Server

Page 47 / 277

Page 48: Request for Proposal for Design, Supply, Installation

Figure 9: Three tier Deployment Architecture

Page 48 / 277

Page 49: Request for Proposal for Design, Supply, Installation

14.9 Network Architecture

Figure 10: TDB Network Architecture

14.10 Temple Network

Figure 11: Temple Network Architecture

Page 49 / 277

Page 50: Request for Proposal for Design, Supply, Installation

14.11 KSWAN Network

Figure 12: KSWAN Network

Page 50 / 277

Page 51: Request for Proposal for Design, Supply, Installation

15 Identified Functional Areas

This section describes the proposed Software solution components. The identified functional areasto be covered are listed below.

Sl.NoCTDB Services

Functionality Requirements

1 Devotee Interface/ Portal Service

The Portal Service should enable Devotee to access/book variousTemple facilities and offerings.

2 Temple Administration

This module enables to manage the Temple activities like Activities of AC and Dy.C Offices, Vazhipadu Counter Billing, Auctions, on-line Booking & e Payment for various Poojas and Vazhipadus, Mahassar Preparation, Kanikka counting & scheduling, Store and Inventory Management etc.

3 HR Administration

This module governs the organization, by providing a system which includes functions right from the hiring process, performance appraisal, daily human resource activities, and all the way to retirement / retrenchment / benefits / payouts etc.

4 Payroll The payroll module offers following functionality to users, Salary Computation, PF Computation, Pension Computation, Recovery Computations, Income Tax etc.

5 Maramath The Maramath department is managing the following activities by using this module; Estimation, Fund Management , e-Tendering/ Quotations /Comparative Statements, Work Order, M-Book , Bill preparation, Payment/Part Payment, Auctioning ofShopping complex/Estate property/Furniture etc.

6 Board Office This module enables the board Office to manage the following activities; Purchase & Store Management, College Management ,Aided Schools Management, CBSE School Management, Board Meetings

7 Commissioner Office

This module enables the Commissioner Office to manage the activities of the Office like Disciplinary action, Budget estimation & Fund allocation, Fixed Deposits maintenance, Elephants, Grants, New Schemes, Inspection, Land Records

8 Audit This module enables the Audit department to Schedule and Conduct inspection, Audit Objections and tracking, Audit Report and Reporting to Higher Authorities/High Court.

9 Devaswom Accounts

Devaswom accounts manage Preparation of Chart of Accounts, Maintenance of Bank Accounts, Budget, Liability, Payments, andBank Reconciliation.

Page 51 / 277

Page 52: Request for Proposal for Design, Supply, Installation

10 Vigilance Vigilance department use this module to Schedule and Conduct inspection, Petition Management, Recording irregularities, and Recommending disciplinary actions.

11 Cultural Cultural module aids the following activities Printing & Publishing, Library management, Book Stall management, Temple Arts Academy management, and Fund management.

12 Law Office Law Office maintains various registers like Suite Register Maintenance, Advocate fee Maintenance, and Case Status, Alerts(for summons etc.)

13 Tahsildar This module enables the Tahsildar to do activities like Complaintregistration, Land Register , and Land Encroachment Case Management.

14 Sabarimala This module enables the entire administration of the SabharimalaTemple and associated departments.

Page 52 / 277

Page 53: Request for Proposal for Design, Supply, Installation

16 Implementation Plan

This section describes the details of the implementation framework of the CTDB project. It detailsout the relationships between different agencies involved in the implementation, the roles andresponsibilities of the agencies, information of committees to be formed for project monitoring,implementation, co-ordination and review.

It is recommended to roll out CTDB in three phases. Deployment of hardware, connectivity andother infrastructure across selected Temples, Higher Offices and other Temple units would takeplace in the first two phases. The Software application would be rolled out in three phasesdepending upon the feasibility and priority of TDB. The Software Development Agency can decideon the phasing of the project in consultation with TDB. The core focus of each of the three phases isdelineated below

16.1 CTDB Phase I

16.1.1 Geographical Coverage

During the first phase of the project, CTDB would be rolled out in selected temples and TDBOffices from the consolidated list mentioned below. The roll out would include installation andcommissioning of hardware, connectivity, other infrastructure and associated services (such ashandholding).

Sl. No. Districts in Phase- I Number of Offices Number of Temples

1 Thiruvananthapuram 5 8

2 Pathanamthitta 5 3

3 Haripad 5 7

4 Vaikom 5 5

5 TDB Headquarters 1

6 Sabarimala 1 3

16.1.2 Digitization/Migration of Historical Data

In addition to the functionality identified above, Phase-I would also include the digitization ofhistorical data. The historical data to be digitized/ migrated would include the following registers.

Sl. No. Registers/Form Name Number of records

1 Service Book ~50002 Pension Book ~50003 Office/Court/Govt. Orders ~10004 Mahassar ~3000

Detailed methodology for Data Digitisation is provided in Annexure D- Data Digitization Report.

Page 53 / 277

Page 54: Request for Proposal for Design, Supply, Installation

16.1.3 Application Functionalities

The functionalities covered during the Phase- I of CTDB implementation are listed in the table below.

Service Additional Functionalities Covered

Temple Administration Provided in Annexure A

HR Administration Provided in Annexure A

Commissioner Office Provided in Annexure A

Payroll Management Provided in Annexure A

General Provided in Annexure A

16.1.4 Capacity Building Initiatives

Under CTDB project, Capacity Building initiative for members of TDB have been classified intodifferent categories based on their roles, education and current skill set with respect to thetechnology awareness. This classification has been done to address the issue of varied roles andresponsibilities entrusted based on the hierarchical authority. It is envisaged that this classification of TDB personnel will help in understanding specific trainingrequirements for different groups of employees and hence develop capacity building exercise andtraining modules specific to requirement. The following table illustrates the basic groups/bands inwhich the TDB employees have been classified and the attributes for each of the groups:

Group Attributes Designations

A Senior Administration Highly qualified Control point functionaries Highly receptive to change High level of awareness about technology

and re-designed processes Decision making agencies

All senior Officers including Assistant Commissioner and above

B Work flow functionaries High citizen interface Medium level of technology awareness.

LD Clerk, UD clerk, JS, Head Clerk

C Field staff. High citizen interface. Low technology awareness.

Below Group B

Sabarimala Provided in Annexure A

Training Program Group A Group B Group C

Awareness and sensitization of benefits of IT. 50% 70% 90%

Role Based Application Training 100% 100% 50%

Page 54 / 277

Page 55: Request for Proposal for Design, Supply, Installation

Trainers Training. 0% 3% 0%

System Administration & Support Training. 1% 2% 0%

16.2 CTDB Phase II

16.2.1 Geographical Coverage

During Phase-II of CTDB, the remaining temple units and Higher Offices across all the Districts tobe covered under phase- II including provisioning of all the service, (as defined in phase- I andadditional detailed in this phase) installation and commissioning of hardware, connectivity andother infrastructure and associated services.

Sl.No

Districts VigilanceOffices

AuditOffices

DivisionalOffices ofMaramathDepartme

nt

SectionOffices ofMaramath

TemplesSub

groupoffices

1. Thiruvananthapuram 2 2. Kottarakkara 13. Thiruvalla 14. Aluva 15. Kottayam 1 76. Mavelikkara 17. TDB Headquarters 1 18. Temples in various

Districts1222

9 Sub group Offices 282

16.2.2 Application Functionalities

The application modules and functionalities covered during the Phase-II of CTDB implementationare listed in the table below.

Modules Additional Functionalities Covered

Devaswom Accounts Provided in Annexure ABoard Office Provided in Annexure AVigilance Provided in Annexure AAudit Provided in Annexure AMaramath Provided in Annexure AGeneral Provided in Annexure A

16.2.3 Capacity Building Initiatives

The no. of personnel in each group that would be trained on the four training themes during Phase

Page 55 / 277

Page 56: Request for Proposal for Design, Supply, Installation

-II is provided in the table below:Training Program Group A Group B Group C

Awareness and sensitization of benefits of IT 50% 70% 90%

Role based training for application users 100% 100% 40%

Trainers Training 1% 2% 0%

System Administration & Support Training 1 % 2% 0%

16.3 CTDB Phase III

16.3.1 Geographical Coverage

All TDB Offices including TDB headquarters.

Sl.No. Districts in Phase- IIICulturalOffices

Estate Total

1. Thiruvananthapuram 1 1

2. Vaikom 1 1

3. Attingal 1 1

4. Nilakkel 1 1

5. TDB Headquarters 1 1

6. Strong Room 2

16.3.2 Application Functionalities

The application modules and functionalities covered during the Phase-III of CTDB implementationare listed in the table below.

Modules Functionalities Covered

Cultural Provided in Annexure A

General Provided in Annexure A

Tahsildar Provided in Annexure A

Law Office Provided in Annexure A

16.3.3 Capacity Building Initiatives

Further refresher courses based on the four training themes proposed in this project would be carried out. All the TDB Staff would be trained in the Phase- I and Phase- II of the CTDB project implementation.

Page 56 / 277

Page 57: Request for Proposal for Design, Supply, Installation

17 Bill of Materials (BOM)

17.1 Hardware for TDB Head Quarters

Sl.No.

Product Manufacturer Unit Qty

1 Desktop Computer DELL/HP/IBM/HCL/Acer Nos 202 Printer 132 col dot matrix Epson LQ1150 Nos 23 Laser Printer HP/Epson Nos 34 Multifunction printer HP/Epson Nos 35 UPS 5 KV Emerson/APC/Hycon Nos 26 UPS 3 KV Emerson/APC/Hycon Nos 27 Scanner HP/Epson Nos 28 3 Feet patch cord Nos 309 Laser Duplex Printer HP/Epson Nos 2

17.2 Hardware Items for HQ NetworkingSl.No.

Description Unit Qty

1 24 100/1000BASE-X unpopulated SFP, 8 10/100/1000BASE-T (4 10/100/1000BASE-T and 4 10 g ports shared with SFP ports),XGM3 slot, Stacking module slot, AC PSU with one unpopulated PSU slot, Fan module and out of Band ethernet Management Port. (Extreme, Juniper, Cisco or equivalent)

Nos 1

2 24 10/100/1000BASE-T,4 1000 BASE-X unpopulated (4 SFPshared with 10/100/1000 BASE-T ports),1 x Serial (consoleport) and 1 x 10/100BASE-T out-of-band management port, 1 xRedundant Power Supply connector. (Make: Extreme, Juniper,Cisco or equivalent)

Nos 8

3 Gigabit Module– LX SC Connector Fiber Transceiver (Make:Extreme, Juniper, Cisco or equivalent )

Nos 16

4 SC-SC OFC 2 mtr Patch Cords – SMF. [Make: Digilink, AMP, Krone or equivalent ]

Nos 4

5 SC-LC OFC 2 mtr Patch Cords – SMF. [Make: Digilink, AMP, Krone or equivalent ]

Nos 22

6 UTP CAT6 Cable Rolls of 305 meters PVC conduit /Capping casing / cable management. [Make: Digilink, AMP, Krone or equivalent ]

Mtr 2000

7 CAT6 I/O key stone w/o Face Plate and SMB (single)[Make: Digilink, AMP, Krone or equivalent ]

Nos 75

8 CAT6 7’ Mounting Cords. [Make: Digilink, AMP, Krone or equivalent]

Nos 75

9 CAT6 3’ Mounting Cords. [Make: Digilink, AMP, Krone or equivalent ]

Nos 75

Page 57 / 277

Page 58: Request for Proposal for Design, Supply, Installation

Sl.No.

Description Unit Qty

10 CAT6 loaded Jack Panel (24 ports). [Make: Digilink, AMP, Krone or equivalent ]

Nos 9

11 Supply and Fixing of 19” Floor Mount Rack 27 U 600W X 800 D with 4 cable Manager, 6x5 Amps Power Distribution Box, 4 Fan, 1 Hardware Kit (Valrack or equivalent)

Nos 1

12 Supply and Fixing of 19” wall Mount Rack 12 U 600W X 600Dwith 2 cable Manager, 6x5 Amps Power Distribution Box, 2 Fan,1 Hardware Kit (Valrack or equivalent)

Nos 9

13 Supply and laying of 24 core SMF outdoor armored type cablethrough HDPE/Metal/HUME/PVC conduit pipe as required.[Make: Digilink, AMP, Krone or equivalent ]

Mtr 400

14 Supply and laying of 12 core SMF outdoor type cable throughHDPE/Metal/HUME/PVC conduit pipe as required. [Make:Digilink, AMP, Krone or equivalent ]

Mtr 400

15 Supply and laying of 6 core SMF outdoor type cable throughHDPE/Metal/HUME/PVC conduit pipe as required. [Make:Digilink, AMP, Krone or equivalent ]

Mtr 225

16 Supply, installation, testing and commissioning of fiber opticpatch panel 24 port 1 U rack mountable with SC duplex adaptorwith plate loaded complete as required.[Make: Digilink, AMP,Krone or equivalent ]

Nos 9

17 Supply, installation, testing and commissioning of OFC SCpigtail -1.5 meter -SMF as required.[Make: Digilink, AMP,Krone or equivalent]

Nos 100

18 SITC of 32mm ISI PVC Conduit / Casing Capping with all accessories required (Make: Precision, Modi or equivalent ]

Mtr 400

19 SITC of 25mm ISI PVC Conduit / Casing Capping with all accessories required (Make: Precision, Modi or equivalent ]

Mtr 300

20 Supply and laying 50mm/47.5mm (outer/inner dia) double wallcorrugated HDPE pipe with all accessories at a depth of 60cmwith all accessories including excavation, refilling the trench asrequired.[Make: Ashitech or equivalent ]

Mtr 500

21 Supply and laying 50mm/47.5mm (outer/inner dia) double wallcorrugated HDPE pipe with all accessories at a depth of 60cm inhard soil with all accessories including excavation, refilling thetrench as required.[Make: Ashitech or equivalent ]

Mtr 125

22 Supply and laying 50mm dia. B- class GI pipe at a depth of60cm including excavation, refilling the trench and providing20cm deep 1:3:6 cement concrete mix on top etc. as required.

Mtr 100

Page 58 / 277

Page 59: Request for Proposal for Design, Supply, Installation

Sl.No.

Description Unit Qty

23 SITC of brick masonry chamber with inner size of 45cmx 45cmwith cement concrete top cover slab as required.

Nos 25

24 Supplying and making cable route marker Route marker 60 X 30X 10 with cement Plastering, Lettering& painting as required.

Nos 25

17.3 Hardware Items for Attendance Management atHQ

Sl.No. Description Unit Qty

1 Smart Card Nos 6000

2 Smart card Enrollment Kit Nos 2

3 Biometric Enrollment Kit Nos 2

4 Smart Card Printer Nos 1

5 Printer Cartridge Nos 60

6 Biometric Smart Card Reader Nos 10

17.4 Hardware for Temples

Hardware Items for Grade I TemplesSl.No.

Description Manufacturer Unit Qty

1 Workstation DELL/HP/IBM Nos 12 Desktop Computer DELL/HP/IBM/HCL/Acer Nos 33 Printer Epson LQ 50 Nos 34 Multi Function Printer HP/Epson Nos 15 UPS 3 KVA Emerson/APC/Hycon Nos 16 ** Connectivity BSNL Nos 17 Networking Lump sum 68 Electrical Work Lump sum 109 Biometric Smart Card Reader Nos 1

Hardware Items for Grade II TemplesSl.No.

Description Manufacturer Unit Qty

1 Desktop Computer DELL/HP/IBM/HCL/Acer Nos 3

Page 59 / 277

Page 60: Request for Proposal for Design, Supply, Installation

2 Printer Epson LQ50 Nos 23 Laser Printer hp/Epson Nos 14 UPS 2 kVA Emerson/APC/Hycon Nos 15 **Connectivity BSNL Nos 16 Networking Lump sum 47 Electrical Work Lump sum 108 Biometric Smart Card Reader Nos 1

Hardware Items for Grade III TemplesSl.No.

Description Manufacturer Unit Qty

1 Desktop Computer DELL/HP/IBM/HCL/Acer Nos 12 Printer Epson lQ 50 Nos 13 UPS 1 KV Emerson/APC/Hycon Nos 14 **connectivity BSNL Nos 15 Electrical Work Lump sum 36 Biometric Smart Card Reader Nos

17.5 Hardware for TDB District/Group/ Sub Group Offices

Sl.No.

Description Manufacturer Unit Qty

1 Desktop Computer DELL/HP/IBM/HCL/Acer Nos 22 Multi Function Printer HP/Epson Nos 13 UPS 1 kVA Emerson/APC/Hycon Nos 14 **Connectivity BSNL Nos 15 Networking Lump sum 36 Electrical Work Lump sum 87 Biometric Smart Card Reader Nos 1

17.6 Hardware for Strong RoomSl.No.

Description Manufacturer Unit Qty

1 Camera HD/MP/PTZ/Dome Bosch/Sony Nos 12 DVR/NVR Nos 13 Desktop Computer DELL/HP/IBM/HCL/Acer Nos 14 Laser Printer HP/Epson Nos 15 Ups 1 KV Emerson/APC/Hycon Nos 16 Room Access Security System Nos 17 **Connectivity BSNL Nos 18 Networking Lump sum 39 Electrical Work Lump sum 510 Biometric Smart Card Reader Nos 1

Page 60 / 277

Page 61: Request for Proposal for Design, Supply, Installation

17.7 Hardware for SabarimalaSl.No.

Description Manufacturer Unit Qty

1 Workstation with RAID DELL/HP/IBM Nos 12 Desktop Computer(counter) DELL/HP/IBM/HCL/Acer Nos 203 Printer Epson lQ 50 Nos 94 Multifunction printer HP/Epson Nos 35 Laser Printer HP/Epson Nos 36 UPS 2 kv Emerson/APC/Hycon Nos 57 ** Connectivity 6 mbps BSNL Nos 18 Electrical Work Lump sum 509 Biometric Smart Card Reader Nos 10

17.8 Hardware for Sabarimala Networking (Fiber)Sl.No.

Description Unit Qty

1 24 100/1000BASE-X unpopulated SFP, 8 10/100/1000BASE-T (4 10/100/1000BASE-T ports shared with SFP ports), XGM3 slot, Stacking module slot, AC PSU with one unpopulated PSU slot, Fan module and out of Band ethernet Management Port. (Extreme, Juniper, Cisco or equivalent)

Nos 1

2 Ruckus Zone Director 1100 licensed for up to 12 ZoneFlex Access Points. ZD1100 can be upgraded to support up to 50 APs with AP license upgrades.3 year Partner Premium Support for ZoneFlex 7762 (Detailed specification attached)

Nos 1

3 24 10/100/1000BASE-T,2 1000 BASE-X unpopulated (4 SFP shared with 10/100/1000 BASE-T ports),(Make: Extreme, Juniper, Cisco or equivalent )

Nos 5

4 Gigabit Module– LX SC Connector Fiber Transceiver (Make: Extreme, Juniper, Cisco or equivalent )

Nos 10

5 SC-SC OFC 2 mtr Patch Cords – SMF. [Make: Digilink, AMP, Krone or equivalent ]

Nos 4

6 Of SC-LC OFC 2 mtr Patch Cords – SMF. [Make: Digilink, AMP, Krone or equivalent ]

Nos 11

7 UTP CAT6 Cable Rolls of 305 meters through PVC conduit /Capping casing / cable management. [Make: Digilink, AMP, Krone or equivalent ]

Meter 1500

8 CAT6 I/O key stone w/o Face Plate and SMB (single)[Make: Digilink, AMP, Krone or equivalent ]

Nos 40

9 CAT6 7’ Mounting Cords. [Make: Digilink, AMP, Krone or equivalent ]

Nos 40

Page 61 / 277

Page 62: Request for Proposal for Design, Supply, Installation

Sl.No.

Description Unit Qty

10 CAT6 3’ Mounting Cords. [Make: Digilink, AMP, Krone or equivalent ]

Nos 40

11 CAT6 loaded Jack Panel (24 ports). [Make: Digilink, AMP, Kroneor equivalent ]

Nos 5

12 Supply and Fixing of 19” Floor Mount Rack 27 U 600W X 800 D with 4 cable Manager, 6x5 Amps Power Distribution Box, 4 Fan, 1 Hardware Kit (Valrack or equivalent)

Nos 1

13 Supply and Fixing of 19” wall Mount Rack 12 U 600W X 600D with 2 cable Manager, 6x5 Amps Power Distribution Box, 2 Fan, 1 Hardware Kit (Valrack or equivalent)

Nos 5

14 Supply and laying of 12 core SMF outdoor armored type cable through HDPE/Metal/HUME/PVC conduit pipe as required. [Make: Digilink, AMP, Krone or equivalent ]

Meter 600

15 Supply and laying of 6 core SMF outdoor type through HDPE/Metal/HUME/PVC conduit pipe as required. [Make: Digilink, AMP, Krone or equivalent ]

Meter 700

16 Supply, installation, testing and commissioning of fiber optic patch panel 24 port 1 U rack mountable with SC duplex adaptor with plate loaded complete as required.[Make: Digilink, AMP, Krone or equivalent ]

Nos 10

17 Supply installation, testing and commissioning of OFC SC pigtail -1.5 metre -SMF as required.[Make: Digilink, AMP, Krone or equivalent ]

Nos 80

18 32mm ISI PVC Conduit / Casing Capping with all accessories required (Make: Precision, Modi or equivalent ]

Meter 250

19 25mm ISI PVC Conduit / Casing Capping with all accessories required (Make: Precision, Modi or equivalent ]

Meter 300

20 Supply and laying 50mm/47.5mm (outer/inner dia) double wall corrugated HDPE pipe with all accessories at a depth of 60cm withall accessories including excavation, refilling the trench as required.[Make: Ashitech or equivalent ]

Meter 600

21 Supply and laying 50mm/47.5mm (outer/inner dia) double wall corrugated HDPE pipe with all accessories at a depth of 60cm in hard soil with all accessories including excavation, refilling the trench as required.[Make: Ashitech or equivalent ]

Meter 125

22 Supply and laying50mm dia. B- class GI pipe at a depth of 60cm including excavation, refilling the trench and providing 20cm deep 1:3:6 cement concrete mix on top etc. as required.

Meter 100

23 Brick masonry chamber with inner size of 45cmx 45cm with cement concrete top cover slab as required.

Nos 25

Page 62 / 277

Page 63: Request for Proposal for Design, Supply, Installation

Sl.No.

Description Unit Qty

24 Supplying and making cable route marker Route marker 60 X 30 X10 with cement Plastering, Lettering & painting as required.

Nos 100

17.9 Hardware for CCTV

TDB CCTV Hardware List special Grade Temples

Sl. No.

Product Manufacturer Unit Qty

1 Camera HD/MP/PTZ/Dome Bosch/Sony Nos 10

2 DVR/NVR Bosch/Sony Nos 1

3 Video Transmitter Nos 1

4 Storage for 60 Days Nos 1

5 Networking/Cabling(100m) Lump sum 10

6 Display Nos 1

7 Power Lump sum 10

TDB CCTV Hardware List with 4 Camera

Sl. No.

Product Manufacturer Unit Qty

1 Camera HD/MP/PTZ/Dome Nos 4

2 DVR/NVR Nos 1

3 Video Transmitter Nos 1

4 Storage for 60 Days Nos 1

5 Networking/Cabling(100m) Lump sum 4

6 Display Nos 1

7 Power Lump sum 4

TDB CCTV Hardware List with 8 Camera

Sl. No.

Product Manufacturer Qty /No

1 Camera HD/MP/PTZ/Dome Nos 8

2 DVR/NVR Nos 1

Page 63 / 277

Page 64: Request for Proposal for Design, Supply, Installation

3 Video Transmitter Nos 1

4 Storage for 60 Days Nos 1

5 Networking/Cabling(100m) Lump sum 8

6 Display Nos 1

7 Power Lump sum 8

17.10 Data Centre for TDB

Data Centre at TDB HQ

Sl. No.

Product Manufacturer Unit Qty

1 Server HP/DELL/IBM Nos 4

2 Storage HP/DELL/IBM/Net App Nos 1

3 8 Port San Switch HP/Brocade Nos 1

4 Rack 42u Rittal/HCL/HP Nos 1

5 UPS 3 KV Emerson/APC/Hycon Nos 3

6 ISPN Connection BSNL Nos 1

7 Load Balancer with Fire wall Rad ware Nos 1

8 Server OS License Redhat 6 Nos 2

9 Backup device with media HP/DELL/IBM/Net App Nos 1

17.11 Software Modules

Sl. No Name

1 Temple Administration

2 HR Administration

3 Devaswom Accounts

Page 64 / 277

Page 65: Request for Proposal for Design, Supply, Installation

4 Commissioner Office

5 Board Office

6 Maramath

7 Estate Office

8 Cultural

9 Audit Office

10 Vigilance Office

11 Law Office

12 General

13 Strong Room

14 Sabarimala

15 Thiruvabharana Commissioner Office

17.12 Data Degitization Charges

Sl. No Description

1 Data digitizaton Charges

17.13 Capacity Building

Sl. No Description

1 Charges for capacity building

The above mentioned quantities are indicative only.

Page 65 / 277

Page 66: Request for Proposal for Design, Supply, Installation

18 Time Schedule & Delivery

Sl.No. Activity Time line

1 Phase I3 Months from the Date of issue of WO

2 Phase II 6 Months from the Date of issue of WO

3Phase III (Including all other Software modules as mentioned the RFP)

9 Months from the Date of issue of WO

Page 66 / 277

Page 67: Request for Proposal for Design, Supply, Installation

19 Payment Terms and Service Level Agreement

The payment for implementation of the project will be as follows:-

Sl.No. Milestone %of Payment to bereleased

Software Modules

1 Piolet implementaion of Software 30

2 Testing and Acceptance by TDB 30

3 Rollout 40

Hardware items and networking

1 Supply and installation of hardware 90

2 After Warranty period 10

Digitization and Capacity building

1 After completion of work and certification byTDB

100

If there is any deficiency in the performance of contractual obligations on the part of theBidder, the Bidder shall be liable for imposition of appropriate penalties as specified in theRFP and the Travancore Devaswom Board shall be entitled to deduct such penalties atsource while making payment to the Bidder for the services provided as mentioned &forfeit the guarantee submitted.

Liquidated Damages

For Delay:

If the Bidder fails to complete the installation and commissioning within specified months

of award of contract, the TDB shall impose Liquidated Damages, @ 2 % of the total project

cost for every month of delay or part thereof. This will be charged against the Performance

Bank Guarantee submitted by the bidder at the time of signing the contract or from the

EMD as the TDB deems it fit. Even if the vendor has installed the software, the LD will be

applicable to the entire project cost if there is delay due to non-commissioning by vendor

and /or acceptance by the TDB.

Page 67 / 277

Page 68: Request for Proposal for Design, Supply, Installation

For Non-performance:If the specifications of the RFP are not met by the Bidder during various tests, the Bidder

shall rectify the same to comply with the specifications, failing which the the TDB has the

right either to reject or to accept it finally by recovering the amount as deemed reasonable

by the TDB. Under such circumstances, the bidder should bear all costs incurred by the

TDB in this regard.

Operational Penalties

The following penalties for Operational Deficiencies shall apply for the project. Allthe items at all locations shall have a minimum availability of 97 %.

Sl. No. Condition Penalty

1 Availability less than 97 % to 90% 5 %

2 Availability less than 90%to 85% 8 %

3 Availability less than 85%to 80% 10 %

4 Availability less than 80% 15 %

Both the above deductions are independent of each other and applicable separately and concurrently.

If the Up time is less than 90% for consecutive two quarter, the Travancore DevaswomBoard shall have the right to terminate the Agreement. The Travancore DevaswomBoard shall have the right to forfeit the Bank Guarantee and blacklist the bidder.

For premature termination

If the bidder withdraws the contract prematurely before the completion of the project, they

shall be liable to compensate upto 50% of the project cost towards the damages incurred by

the TDB in this regard.

1. Performance Bank Guarantee

The bidder shall provide a revolving bank guarantee for 10% of project cost as per the

prescribed format at the time of signing the contract. The bank guarantee will be invoked by

the TDB for recovery of the amounts due on account of violation/infringement of the

respective clauses in the agreement.

The amount of such damages etc. as mentioned above will be levied and charged against the

Bank Guarantee at the sole discretion of the TDB. The bidder should ensure that the value of

Page 68 / 277

Page 69: Request for Proposal for Design, Supply, Installation

the bank guarantee is maintained at 5% of project cost at all times, during the contract

period, failing which the contract will be repudiated by the TDB on the ground of unilateral

violation of terms of the contract by the bidder and the liquidated damages for premature

termination will be charged from the bidder.

2. Taxes and Duties

All taxes and duties as applicable shall be borne by the bidder. The Bidder shall be solely

responsible for arranging the foreign exchange and import license required for import, if

any, that may be necessary for the purpose of satisfactory performance of the work under the

contract.

3. Validity

The bidder shall keep the offer valid for acceptance for six calendar months from the last

date for submission of bids.

4. Force Majeure

Force majeure is herein defined as any cause beyond the control of the bidder or TDB, as

the case may be, which they could not foresee with a reasonable amount of diligence, and

which substantially affect the performance of the contract, such as,

Natural phenomena, including but not limited to floods, draughts, earthquakes, epidemics,

acts of any Government, including but not limited to war, declared or undeclared, priorities,

quarantines, embargoes; provided either party shall within fifteen days from the occurrence

of such a cause notify the other in writing of such causes. The bidder or the TDB shall not

be liable for delays in performing their respective obligations due to any force majeure

cause as referred to and/or defined above.

Page 69 / 277

Page 70: Request for Proposal for Design, Supply, Installation

20 Annexure A - Functional Requirement Specification

20.1 Temple AdministrationThe main activities involved in Temple Administration is listed below

Sl. No Activities

1 Activities of Dy. C Offices

2 Activities of AC Offices

3 Vazhipadu Counter Billing

4 Auctions

5 Online Booking & e Payment

6 Mahassar

7 Kanikka Counting & Scheduling

8 Pooja

9 Temples

10 Strong Room Management

11 Grievance Redressal Cell

12 Special Activities

13 Store & Inventory

14 Video Surveillance

15 Advisory Committee Election

20.1.1 Activities of Dy. C Offices

Major tasks involved in this module are activities of Dy.Commissioner Office.

SL. No Activities

1 Kanikka Verification at AO grade temples

2 Sanction of programs for elephants at respective Devaswom Districts

3 Sanction of Medical treatments for elephants at respective Devaswom Districts

4 Custodian of elephants at respective Devaswom Districts

5 Sanction of Special duty on festival/season

6 Sanction of Services of smith

7 Conduct of Auctions

8 Ratification of Auctions

9 Tour Journals

10 Tour Schedules

Page 70 / 277

Page 71: Request for Proposal for Design, Supply, Installation

11 Processing of proposals from Temples forwarded by AC Office

12 Enquiry and redressal of grievances forwarded by AC Office

13 Processing of request for information and report from Commissioner Office

14 Service Matters of Dy. C Office

Sl. No Functional Requirements Specification

1 Provision to view, edit & approve Kanikka Counting Schedule

2 Provision to view, edit & approve Kanikka Counting Report

3 Provision to generate Kanikka Counting Mahassar

4 Provision to view elephant request

5 Provision to approve /reject elephant request with remarks

6 Provision to schedule elephant programs

7 Provision to capture medical expense details of elephants

8 Provision to schedule medical treatment for elephant

9 Provision to generate report of medical treatments of elephants

10 Provision to add/ edit elephant details

11 Provision to capture routine expenditure details of elephants

12 Provision to generate dynamic reports based on various parameters involved in this module

13 Provision to view/modify request for special duty

14 Provision to allocate employees for special duty

15 Provision to reject request for special duty with remarks

16 Provision to forward and receive files online

17 Provision to receive/process/ approve proposals

18 Provision to manage grievances

19 Provision to manage HR details of Dy. C Office

20 Provision to manage Service Details of Dy. C Office

21 Provision to schedule duty for smith

22 Provision to log activities of smith

20.1.2 Activities of AC Offices

Major tasks involved in this module are activities of Assistant Commissioner Office.

SI. No. Activities

1 Conduct of Inspection in Temple

2 Conduct of Audit

3 Conduct of Kanikka Counting in Temples

Page 71 / 277

Page 72: Request for Proposal for Design, Supply, Installation

4 Endorsement of salary bill forwarded from temples

5 Verification of Temple accounts

6 Conduct of auctions in Temples

7 Collection of revenue from Sub groups

8 Management of temple employees PF account

9 Elephant rent Collection

10 Processing of Proposals from Temples

11 Enquiry and Redressal of grievances

12 Processing of request for information and report from Dy. C Office

13 Service Matters of AC Office and Temple employees

14 Asset management of temples

Sl. No Functional Requirements Specification

1 Provision to Prepare schedule for Kanikka vanchi counting

2 Provision to Notify schedule for Kanikka vanchi counting to concerned temples

3 Provision to enter details of Kanikka Counting( denominations etc)

4 Provision to generate Mahassar for Kanikka Counting

5 Provision to Log Kanikka Counting details

6 Provision to manage Oil tanks of kedavilakku

7 Provision to prepare schedule for Inspection of Kedavilakku Oil Tank

8 Provision to schedule and notify Audit at various temples

9 Provision to log details of Audit Conducted

10 Provision to schedule and notify inspection at various temples

11 Provision to log details of inspection Conducted

12 Provision to forward and receive files online

13 Provision to receive/process/ approve proposals

14 Provision to manage grievances

15 Provision to manage HR details of AC Office

16 Provision to manage Service Details of AC Office

20.1.2.1 Elephants

TDB has 38 elephants now. The acquisition of elephants is mostly by offerings. There should be afund allocated for elephant feeding on every budget. The elephants shall let out on hire to privatepersons by request. The hire and feeding charges should be credited to the Devaswom Accounts.There should be insurance to the mahouts by the Devaswom board. The concerned AssistantCommissioner should be the responsible person for safe up-keep and feeding of elephants.

Sl. No Activities

1 Acquisition of elephants

Page 72 / 277

Page 73: Request for Proposal for Design, Supply, Installation

2 Allocation of fund for the feeding of elephants

3 Hiring of elephants

4 Insurance to mahouts

5 Registering of elephants

6 Expenditure statement for the elephant’s feeding and other expenses

7 Disposal of elephants as well as the tusks of deceased elephants

Sl. No Functional Requirements Specification

1 Provision to add the elephant details

2 Provision to setting unique id to the elephant

3 Provision for checking the proper elephants station i.e. nearest to the head quarters of Assistant Commissioner

4 Provision to allocate a mahout for the elephant

5 Provision for allocate the fund to the concerned AC for feeding of elephant

6 Provision to intimate the concerned Assistant Commissioner

7 Provision for checking genuineness of application for hiring

8 Provision for checking concessional rate of elephant hire

9 Provision for checking the status of elephants hired

10 Provision for checking the accounts whether the amount for hiring and feeding of elephants credited

11 Provision to prepare a inspection schedule

12 Provision for alert the concerned officer about the inspection of elephant station

13 Provision to view the inspection report submitted by concerned inspecting officer

14 Provision to add the mahouts to the insurance scheme

15 Provision to add insurance to elephants

16 Provision to maintain a register of elephants which contain complete details about each elephant

17 Provision to view the expense statements of elephants entered by AC

18 Provision for generate expense statement approved by Dy. Devaswom commissioner

19 Provision to intimate the board and Forest Department about the disposal of elephants

20 Provision to update the disposal as well as amputation of the tusks details

20.1.3 Vazhipadu Counter Billing

Each vazhipadu will have its cost saved in its master data (The table where all the details ofvazhipadu are recorded). The person handling the counter accepts payment from the devotee based

Page 73 / 277

Page 74: Request for Proposal for Design, Supply, Installation

on the vazhipadu request and issues receipt. The devotee can receive the Prasadam of vazhipadufrom the counter itself (ex: Payasam, appam etc) or he can submit the receipt to shanti/priest forconducting the vazhipadu. Sometimes the Prasadam of Vazhipadu is sent to devotee throughPost/Courier.

Sl. No Activities

1 Vazhipadu Master Data Management

2 Vazhipadu Booking

3 Bulk Vazhipadu Booking

4 Register Maintenance

5 Receipt of payment and issue of receipt to devotee

6 Deliver of vazhipadu Prasadam

7 Updating stock for vazhipadu like appam, aravana

8 Cash Account Maintenance

9 Panchangam Calendar Maintenance

10 Remitting the cash collected to bank account(periodically/ when balance goes above some limit/urgent requirement etc)

11 Alerts

12 Reports

Sl. No Functional Requirements Specification

1 Provision to identify each vazhipadu by a unique id

2 Master data management of vazhipadu i.e. a data table to maintain its cost, timings , description etc

3 Provision to maintain a daily scroll of vazhipadu conducted (maintaining a view)

4 Provision to identify each receipt by a unique id

5 Provision to maintain a template for receipt

6 Provision to use Preprinted receipts for receipt generation(Serially and with ability to edit system receipt no)

7 Provision to give advertisements on receipt

8 Provision to run Vazhipadu counter offline and ability to synchronize data to server

Periodically(automatic) On demand

9 Provision to capture details of devotee like Name, Star etc for Vazhipadu

Page 74 / 277

Page 75: Request for Proposal for Design, Supply, Installation

10 Provision to generate receipts for each vazhipadu requested with name of vazhipadu, receipt no(receipt unique id); name of devotee, star of devotee, cash paid, date and time of request, login id of counter operator, phone no: of the person to be contacted in case of any issues, TDB office no: and website

11 Provision to allocate a cash account/Teller account to each counter operator

12 System should automatically update the cash account of a counter operator after each successful vazhipadu request

13 Provision to limit the no: of vazhipadu for a date

14 Provision to record Prasadam dispatch no, update status of dispatch

15 Provision to generate a daily scroll for cash tallying purpose

16 Provision to transfer cash balance of all vazhipadu counter to a central(to temple) cash balance account

17 Provision to set ceiling to cash counter balance and central cash account

18 Provision to save the details of person who carries cash to bank with his authorized consent i.e. the person carrying cash should also approve his cash carrying duty.

19 Provision to identify each bank remittance by unique id

20 Provision to generate Challan numbers online based on Challan register

21 Provision to scan and save the bank challan after remittance.

22 Managing a mirror account as in bank to record remittances and withdrawals from temple counter revenue account and to reconcile with bank account balance periodically

23 Provision to configure Various alerts

24 Provision to generate dynamic reports based on various parameters involved in this module like list of all vazhipadu booked for a day

20.1.4 Auctions

Sl. No Activities

1 Prepares list of items to be auctioned

2 Assigns auction number and schedules auctions

3 Publishes auction notices in websites, newspapers etc.

4 Auction values sent for approval to respective Officer in Charge or to the Board office

5 Publishing of auction details

6 Conduct of Auction

7 Preparation of Mahassar

8 Settlement of auction

9 Alerts

Page 75 / 277

Page 76: Request for Proposal for Design, Supply, Installation

10 Reports

Sl. No Functional Requirements Specification

1 Provision to prepare and maintain list of items to be auctioned

2 Provision to identify each auction by a unique number

3 Provision to schedule auction date, venue and to maintain various other parameters such as EMD etc.

4 Provision for maintaining various amounts received in auctioning process

5 Provision to prepare various bills

6 Provision to forward auction details to Officer in Charge / Board office for approval

7 Provision for maintaining asset hand over details

8 Provision to enter the amount received in an auction, its mode of Payment detailslike cash/cheque no:, cheque date/ Electronic Bank account transaction no: and the approval of details entered by officer in charge

9 Provision to search and view auctions and status according to privileges assignedto various offices

10 Provision to update stock register(before and after auction )

11 Provision to configure various alerts(SMS/email)

12 Provision to generate dynamic reports based on various parameters involved in this module

20.1.5 Online Booking & e Payment

Sl. No Activities

1 Booking of Vazhipadu online

2 e Payment for online booking of Vazhipadu

3 Online receipt generation for Vazhipadu booking

4 Receipt verification at temple Counter

5 Online Pooja status verification

6 Online vazhipadu management at temple counter

7 Subscriptions for online notifications

8 Alerts

9 Reports

Sl. No Functional Requirements Specification

1 Provision to maintain a master data of all Online vazhipadu in a temple

2 Separate charge maintenance for Online booking for some special vazhipadu

Page 76 / 277

Page 77: Request for Proposal for Design, Supply, Installation

3 Provision to record off days for a particular Online vazhipadu in the master table( based on Malayalam calendar )

4 Provision to identify an online vazhipadu booking by a unique id

5 Provision to record the details of booking person like email, phone no: , address etc

6 Provision for a devotee to select a date in Panchangam calendar while booking on-line

7 Provision to display the list of vazhipadu available on the selected date

8 Provision to select a vazhipadu and make online payment

9 Provision for the devotee to download online receipt

10 Provision to send receipt via email or SMS

11 Provision to update status of vazhipadu at temple counter

12 Provision to generate list of devotees with address to send Prasadam

13 Provision to subscribe/Unsubscribe online notifications about temple events

14 Provision to configure various alerts, say alert if the vazhipadu is postponed , time change etc.

15 Provision to generate dynamic reports based on various parameters involved in this module

20.1.6 Mahassar

Mahassar is a register which is used in temples to record the details of major activities/eventsoccurred in the temple. The system suggests the use of templates to record daily activities toperform the function of Mahassar. Mahassar contains mandatory data like date, time, approval ofMahassar by officer in charge, approval of witnesses and the list of major activities with essentialdetails.Some of the activities to be recorded in Mahassar are

Charge Handover

Inspection

Auction

Kanikka Counting

Theft reporting and statements from temple employees

Other Unusual events like Ashtabandham

Sl. No Activities

1 Master data Management of Mahassar

2 Mahassar Templates

3 Mahassar Preparation

4 Report Generation of Mahassar

Page 77 / 277

Page 78: Request for Proposal for Design, Supply, Installation

5 Alerts

6 Reports

Sl. No Functional Requirements Specification

1 Master data management for types of Mahassar/activities

2 Provision to associate Mahassar with an activity

3 Provision to create a new type of activity and add to activity list(Master data Management)

4 Provision to generate and save Mahassar templates

5 Provision to choose Mahassar templates

6 Provision to identify a Mahassar by a unique id related to date

7 Provision to capture the date, time, duration, expenses, income, personals involved etc of the activity

8 Provision to add extra details, descriptions, comments etc to each activity

9 Provision to set 'Not Applicable' value in cases where the field is not applicable

10 Display only essential fields based on activities

11 Provision to set the type of activity from activity list

12 Provision for the officer in charge and witnesses to authorize Mahassar

13 Provision to capture the details of officer and witnesses who have authorized theMahassar

14 Status for Mahassar like entered, partially entered, approved etc

15 Alert mechanism when the Mahassar is pending in entered status for more than aspecific time, alert if Mahassar has not been entered etc

16 Provision to generate dynamic reports based on the various parameters involved in this module.

20.1.7 Kanikka Counting & Scheduling

Sl. No Activities

1 Schedule Kanikka Counting

2 Conduct of Kanikka Counting

3 Updating of related registers

4 Surveillance

5 Reports

Sl. No Functional Requirements Specification

1 Provision to allot staffs for Counting

Page 78 / 277

Page 79: Request for Proposal for Design, Supply, Installation

2 Provision to save details of Kanikka Counting like total amount, denominations, fake notes, soiled notes, valuables etc

3 Provision to enter details of Kanikka Counting in Mahassar

4 Provision to update register

5 Provision to record and stream Kanikka Counting video footage

6 Provision to configure various alerts , say alert if the vazhipadu is postponed , time change etc.

7 Provision to generate dynamic reports based on various parameters involved in this module

20.1.8 Pooja

Sl. No Activities

1 Definition of each Pooja

2 Scheduling of Pooja

3 Reports

Sl. No Functional Requirements Specification

1 Master Data management of Pooja

2 Provision to fix daily Pooja timings

3 Provision to mark exceptional days for Pooja in calendar

4 Provision to capture the items required for a Pooja

5 Provision to calculate Muthalkootu and supplier cost

6 Provision to calculate shantikoor for certain type of Pooja

7 Provision to generate dynamic reports based on various parameters involved in this module

20.1.9 Temples

Sl. No Activities

1 Temple Master Data Management

2 Geographical Location and plotting

3 Website maintenance

4 Temple employee structure

Sl. No Functional Requirements Specification

1 Provision to enter /update Temple Name , Logo, Address etc

2 Provision to enter Temple History, Prathishta and other details

3 Provision to associate vazhipadu & Pooja to temple

4 Provision to enter the latitude & longitude of Temple

Page 79 / 277

Page 80: Request for Proposal for Design, Supply, Installation

5 Provision to update website

6 Provide provision to devotees for subscribing and unsubscribing notifications

7 Provision to publish notices

8 Provision to send messages to Subscribed Members

9 Provision to edit/update employee structure in a Temple

20.1.10 Strong Room management

Sl. No Activities

1 Master data management of strong room

2 Asset management

3 Duty Posting and Scheduling

4 Charge Handover

5 Alerts

6 Reports

Sl. No Functional Requirements Specification

1 Provision to enter duty shifts

2 Provision to post duty persons

3 Provision to assign unique number to each asset

4 Provision to enter asset details

5 Provision to enter transaction details including check in & check out

6 Provision to record and stream asset verification during charge handover

7 Provision to schedule opening and closing of strong room

8 Provision to log Smith evaluation of assets

9 Provision to send messages to temples

10 Provision to configure various alerts

11 Provision to generate dynamic reports based on various parameters involved in this module

20.1.11 Grievance Redressal Cell

An effective complaint management system is an integral part of any quality complainant service.Often, complainants are the first to identify whenthings arenot working properly. TDB is anorganization dealing with a large number of staffs. So the chances of identifying a complaint arevery high in TDB. A complaint or an issue has to be dealt with utmost importance and care since theefficient work of an office can be hindered by a small complaint from the public. So TDB mustmaintain a grievance redressal body to take care of such issues.

Page 80 / 277

Page 81: Request for Proposal for Design, Supply, Installation

Sl. No Activities

1 Submission of a complaint/Issue

2 Complaint Resolution

3 Communication to Complainant

Sl. No Functional Requirements Specification

1 System should have the provision to capture the issue classification types2 System should have the provision to capture the classification of issues

3 Provision to forward issues to respective sections or sometimes directly to Head of office with respect to the relevance and priority of the issue reported

4 System should have the provision to define various levels of severity

5 System should have the provision to define various levels of priority

6 Ability to give unique identification no: for each issue raised.

7 Issue received and not solved is in "Open" status

8 Provision to set various status to an issue like Open, Pending, Cancelled,Settled etc

9 Issues may get solved in Section level or higher level and is communicated to complainant

10 System should have the provision to create the issue based on the issue type

11 System should have the provision to list all the issues in single view

12 Ability to push the issue to a committee if formed for this issue.

13 Provision to record all communications done by officials regarding the issue

14 System should have the provision to analyze the issue based on various criteria like Issue Classification, From date, To date, Status etc.

15 System should have a workflow definition for the issues based on their classification

16 Alert mechanism to inform the concerned official regarding the issue raised, issues pending for many days, priority based alerts etc.

17 Complainant and other authorized officials should be able to view the status of his complaint

18 System should have the provision to generate report based on the issue classification

19 System should have the provision to generate report for the issue based on various criteria like Status - Draft, Submitted, Approved, Pending, Closed etc. From Date, Todate, Assigned to , Created By

20 Provision to capture the feedback related to issues through an Android application

21 User should be able to raise new complaints referring old complaints(closed/open)

Page 81 / 277

Page 82: Request for Proposal for Design, Supply, Installation

Reports

22 Ability to generate reports for issues generated between a particular date

23 Ability to generate reports for issues pertaining to a particular dept, work, reason, staff,generated by a particular staff etc.

24 Ability to generate reports for issues pending for a particular period or above or below

25 Ability to generate reports for issues based on status, priority, severity etc. based on classification, name etc.

26 Ability to generate reports with issues sorted based on the above mentioned criterions

20.1.12 Special Activities

Sl. No Activities

1 Conduct of Special Events like festival

2 Accounting of revenue and expenditure of special events

3 Duty Posting for special events

4 Alerts

5 Reports

Sl. No Functional Requirements Specification

1 Provision to apply for approval of conduct of special events

2 Provision to schedule special events

3 Provision to notify Special events

4 Provision to account receipt of cash and kind

5 Provision to request for special duty

6 Provision to associate auction with special event

7 Provision to configure various alerts

8 Provision to generate dynamic reports based on various parameters involved in this module

20.1.13 Store & Inventory

Sl. No Activities

1 Receipt of items in the store

2 Examination of items with Purchase Order

3 Rejection of items if the item is defective, not of the specification mentioned in PO, defective packing, old stock, damaged stock etc.

4 Accounting the accepted stock in Stock register

5 Communicating to the vendor about the rejected items if any

6 Intimating the indenter about the item arrival, certifying the receipt of items

Page 82 / 277

Page 83: Request for Proposal for Design, Supply, Installation

for payment clearance after getting confirmation from the indenter.

Sl. No Functional Requirements Specification

1 System should have the provision to capture the details of defected items and provision to maintain the purchase return details

2 Provision to give a Unique id to each accepted item.

3 System should maintain the stock registers

4 System should have provision to make adjustments to inventory after physical audit

5 Ability to classify the materials on the basis of electrical, electronic etc.

6 System should have the provision to maintain invoices that have been received from suppliers

7 Ability to maintain system generated invoice no, date, supplier Invoice no, invoiced by, Item Code, Item description, Unit cost, Total cost, quantity received, quantity rejected, quantity invoiced, Taxes, Location, Address and Remarks

8 System should have the provision to associate Invoice to a goods receipt

9 System should have the option to Post invoice data to the financial system

10 System should have the provision to associate an invoice number to purchase order number

11 Provision to attach an item to a project

12 Provision to enter utilization of various assets

13 Provision to calculate depreciation of an asset and save current market value

14 System should have the provision to capture the freight charges and clearance charges

15 Ability to maintain a perpetual Stock Ledger

16 Ability to prepare a stock reconciliation statement on a daily basis

17 Ability to generate a stock report as on any date, based on the pre-determined categories

18 Ability to generate a report on the adjustments to inventory arising from Physical verification

19 Ability to provide stock aging report

20 Ability to show up reports based on stock value

21 Ability to generate reports on adjustment type of transactions

20.1.14 Video Surveillance

Sl. No Activities

1 Access control for cameras

2 Streaming of video

Page 83 / 277

Page 84: Request for Proposal for Design, Supply, Installation

3 Recording of video

4 Mobile interface

20.1.15 Advisory Committee Election

Sl. No Activities

1 Nomination of Candidates

2 Scrutinizing the eligibility of candidates

3 Selection of voters

4 Conducting election of the required type of voting(Weighted , Multi winner etc)

5 Declaration of result

Sl. No Functional Requirements Specification

1 Provision to capture the details of candidates

2 Provision to capture the details of voters

3 Provision to set the type of election

4 Provision to set the time, date and venue of election

5 Provision to calculate voting result based on voting types

6 Provision to declare the results through PRO

7 Master data management for candidates, voters, voting type

20.2 HR AdministrationHR package is the main place where all the details of the employees in the organization arerecorded and maintained. It should be able to provide the details of an employee if requested by anauthorized entity. And the employee if wants to know anything regarding his salary, deductions etc.HR package should make it available to him just after authorizing the request. So HR packagemaintains a staff database where in all the details of the employees are saved.

The HR Package should include the following functional modules/Activities

Sl. No Services

1 Recruitment

2 Appointment and Posting

3 Service Book

4 Probation & Seniority

5 Promotion and Demotion

6 Transfer

7 Tours & Claims/Reimbursement

Page 84 / 277

Page 85: Request for Proposal for Design, Supply, Installation

8 Pension

9 Provident Fund

10 Loans

11 Attendance management

12 Leave Management

13 Salary Management

14 Staff Appraisal

15 Self Service Portal

20.2.1 Recruitment

This module deals with all the recruitment activities of the TDB from post identification to appointment order. There are two types of recruitment

Direct Recruitment Recruitment by Transfer The type of vacancies can be broadly classified as Permanent Temporary Vacancies of short duration

The system will provide the following functionalities in the Online Recruitment package.

Sl. No Activities

1 Identification of posts

2 Approval of identified Posts

3 Forming of the selection board

4 Advertisements configuration

5 Post configuration

6 Advertising through PRO (Online & media)

7 Online Application configuration with proper Validations

8 Application Verification

9 Provision to enter details of non-online applications

10 Short listing and Hall ticket sending.

11 Test/Interview configuration

12 Online Tests

13 Result Publication

14 Appointment order Generation & Sending

15 Integration with HR Portal

16 Various Reports

17 Apt Security implementations

Page 85 / 277

Page 86: Request for Proposal for Design, Supply, Installation

The system should meet the following requirements to capture and process all the data related to therecruitment of the TDB

Sl. No Functional Requirements Specification

1 Provision to create man power requisitions with the following details - Ratio/ percentage fixation - Number of positions available - No of personnel required - Proposed grade of posts & Pay scale - Approval of recruitment and criteria

2 Provision to identify every recruitment with a unique number

3 Provision to configure an advertisement with parameters like Start Date, End Date and should be linked to the web site of the TDB.

4 Provision to configure a post in the system with parameters like -No: of Vacancies-Minimum qualification- Minimum & Maximum Age-Reservations & Relaxations based on various communities and categories

5 Provision to apply online for a particular job vacancy

6 Provision to identify each candidate with a unique Application number

7 Provision to capture the candidate contact information such as Name, contact and permanent address, phone, email, Date of Birth etc.

8 Provision to capture the educational qualification details of the candidate

9 Provision to capture the experience details of the candidate

10 Provision to capture community & gender of the candidate

11 Provision to attach the resume/certificates of the candidate

12 Provision to validate the application with required parameters like Maximum & minimum age, Minimum marks/ Grade etc. The system will have the Provision to stop proceeding if any of the validation is wrong

13 Provision to update the status of the candidate such as Applied/Screened/Appeared for Interview/ Selected / Rejected / Waiting / Offer letter sent/Offer accepted/ Offer not accepted. Provision to provide reasons in case of rejection or other objections..

14 Provision to verify the application and set status (in group and individual)

15 Provision to create template for various correspondence like the Hall ticket

16 Provision to make communication with individual candidate through mail/SMS

17 Provision to make On line Test with question bank and on line valuation

18 Provision to configure test and interview with parameters like-Test/Interview Date-Venue

Page 86 / 277

Page 87: Request for Proposal for Design, Supply, Installation

-Batch Scheduling

19 Provision to shortlist candidate based on different parameters like Mark, experience etc

20 Provision to generate and send Hall ticket to shorted listed candidate

21 Provision to configure the test venue with hall/Room allotments

22 Provision to generate attendance sheet based on Hall/Venue

23 Provision to enter the attendance details

24 Provision to configure and schedule interview

25 Provision to log marks obtained in the tests/interviews

26 Provision to shortlist candidate based on different parameters like-Marks-Communal Reservation-Other reservations

27 Provision to publish the rank list linked to the website of the TDB

28 Provision to send advice memo/offer letter to shorted listed candidate

29 Provision to facilitate the candidates to view the status of the application any time any where

30 Provision to integrate with the HR application for transfer of data of selected candidate

31 Provision to adapt with a manual or semi automated recruitment procedure.

32 Provision to make relaxation of eligibility as per norms.

20.2.2 Appointment and Posting

This module deals with enrolment of selected candidate to service (service book) and assignment ofduty.The system will provide the following functionalities to the user

Sl. No Functional Requirements Specification

1 Provision to verify data with recruitment package

2 Provision to verify data with external databases Like Aadhar/PAN card/Passport/Voters Id etc.

3 Provision to generate data for external agency verifications like police verification

4 Provision to save details of external agency verification

5 Provision to make detailed data entry to service book

6 Provision for posting of regular staff

7 Provision for posting of contract staff on monthly basis

8 Provision for posting contract staff on daily wages

9 Provision to issue ID cards (Smart cards/RFID/Barcode)

Page 87 / 277

Page 88: Request for Proposal for Design, Supply, Installation

20.2.3 Service Book

Sl. No Functional Requirements Specification

1 Provision to identify each employee by a unique number

2 Provision to capture the name of an employee (First name, Middle name, Last name)

3 Provision to capture the employee contact information such as permanent andcontact address, phone, email etc.

4 Provision to upload employee's photo

5 Provision to capture the date of birth of the employee

6 Provision to capture the date of joining of the employee

7 Provision to update the status of employee such as Probation/ Confirmed/ Resigned/ Terminated/ Suspended/ Deputation/ Retired/ Reemployed.

8 Provision to capture the educational qualification details of an employee.

9 Provision to capture community details of an employee.

10 Provision to capture the gender of an employee.

11 Provision to capture his assets and liabilities.

12 Provision to set category to an employee like regular, contract, Karanma

13 Provision to categorize the employee based on the nature of job (Admin/ Officers/ Menial/ others) and cadre

14 Provision to define a service type for an employee such as full time, part time, contract, deputation employee etc.

15 Provision to assign a department or section to an employee with option to record his work allotted.

16 Provision to define designation and grade for an employee.

17 Provision to define the salary of an employee using standard components (Pay scales) as defined in the Payroll. Earnings and Deductions vary based on field station

18 Provision to capture the reporting hierarchy of an employee.

19 Provision to capture PAN number, Multiple LIC, Recurring Deposit (RD), Postal Life Insurance (PLI), Society number, Loan Account number etc.

20 Provision to store personal information such as date of birth, service start date of an employee, joining date, probation period.

21 If an employee under probation avails leave(selected leaves) then the probation period will be increased accordingly.

22 Provision to capture immediate family members including spouse, children, parents and their photo

23 Provision to save leave types and leave balances

24 Provision to capture the details of publications by an employee

Page 88 / 277

Page 89: Request for Proposal for Design, Supply, Installation

25 Provision to maintain the history of all postings

26 Provision to define the home town information along with the nearest railwaystation

27 Provision to maintain various declaration details of the employee

28 Provision to maintain the nomination details for PF, Gratuity etc.

29 Provision to maintain achievements and awards of the employee and the warnings/punishments and adverse entry against the employee

30 Provision to attach Birth certificate of the employee

31 Provision to save the details of trainings attended

32 Provision to capture the Bank Account details of the employee

33 Provision to capture the various deductions LIC, RD, PLI, etc.

34 Alert mechanism for unsettled liabilities

35 Provision to integrate with leave & attendance management systems

36 Provision to capture promotion details

37 Provision to capture details of appraisals & awards

38 Provision to capture disciplinary proceedings if any

39 Provision to capture health details like Blood group, identification marks, consulting hospitals/doctors etc.

40 Provision to update qualifying and non qualifying service

41 Provision to attach project code

42 Provision to generate dynamic reports based on various parameters involved in this module

43 Provision to invalidate an employee in case of termination

44 Provision to enable workflow for approval of entries to and amendments to Employee Master Data

20.2.4 Probation & Seniority

Probation: Probation means period of service rendered by an officer when discharging duties of a post to which he is appointed for the first time on a regular basis in order to assess his performance and suitability to hold the post.

Sl. No Functional Requirements Specification

1 Provision to manage the details of probation like start date, end date(NIL for no probation)

2 Provision to manage different services, accounting for probation

3 Provision to enter or retrieve different service details for the counting of probation like-Temporary services -Service on temporary promotion

Page 89 / 277

Page 90: Request for Proposal for Design, Supply, Installation

-LWA-Interdepartmental transfers

4 Provision to capture details of declaration of probation and regularization

5 Provision to capture details of extension of probation

6 Provision to capture details of termination while on probation

7 Provision to capture any monetary compensation in case of resignation beforethe declaration of the service period.

8 Provision to record Confidential reports/Performance report of the employee

Seniority: Seniority of a person in a service, class, category or grade is determined by the date ofthe order of his first appointment to such service, class, category or grade. TDB maintain aseniority list of the employees.

Sl. No Functional Requirements Specification

1 Provision to manage rules for seniority

2 Provision to maintain the seniority of every employee by retrieving data from other modules like Service book, Leave management etc.

20.2.5 Promotion/Demotion

A promotion is the advancement of an employee's rank or position in anorganizational hierarchy system. Promotion may be an employee's reward for good performance,i.e., positive appraisal. Before a company promotes an employee to a particular position it ensuresthat the person is able to handle the added responsibilities by screening the employee withinterviews and tests and giving them training or on-the-job experience. A promotion can involveadvancement in terms of designation, salary and benefits, and in some organizations, the type of jobactivities may change a great deal. Demotion is the opposite activity of Promotion.

Sl. No Functional Requirements Specification

1 Provision to conduct test, interview for promotion

2 Provision to conduct trainings

3 Provision to change the designation, Salary components, other benefits of promoted employee

4 Pay fixation of promoted employee with the consent of the promoted employee

20.2.6 Transfer:

This module deals with transfer of staffs. The system will provide the following functionalities to the user

Sl. No Functional Requirements Specification

1 Provision to transfer the staff within the section2 Provision to transfer the staff across the section

Page 90 / 277

Page 91: Request for Proposal for Design, Supply, Installation

3 Provision to transfer the staff across departments4 Provision to make inter office transfer

5 Provision to maintain history of transfer of an employee6 Provision to update service book

20.2.7 Tours & Claims/ Reimbursement

Travelling Allowance is an allowance granted to a staff to cover the expenses incurred by him intravelling in the interest of his office. It includes allowances granted for the maintenance ofconveyance. Staffs of the TDB are provided with different allowance and they can claim for theallowances with proper supporting documents. The following are the five kinds of TA which may bedrawn in different circumstances.

1. Permanent Travelling Allowance

2. Permanent Conveyance Allowance

3. Mileage Allowance

4. Daily Allowance

5. Actual Expenses

Permanent Travelling Allowance: It is a fixed monthly allowance granted to an a staff for frequenttravel within his jurisdiction. For the withdrawal of full amount of PTA, an officer should be on touroutside a specific km from his Head Quarters for some specific days in a month and should spend atleast some specific hours outside Head Quarters on each day. If this minimum tour is not performed,PTA will be reduced proportionately. Ordinarily PTA cannot be drawn during leave, temporarytransfer or joining time and along with any other TA. Permanent conveyance Allowance: This is also a fixed monthly allowance granted to a staff fortravelling extensively within Head Quarters. PCA can be drawn in addition to other forms of TA.But it cannot be drawn during leave or temporary transfer or on holidays prefixed or suffixed toleave or joining time. Mileage Allowance: This is an allowance calculated on the distance travelled, which is granted tomeet the cost of a particular journey. Rate of mileage in respect of different modes of journey (Rail,Road, Air, and Water) is varied.Daily Allowance: This is a uniform allowance for each day of absence from Head Quarter, which isintended to cover the ordinary charges incurred by an officer in consequence of such absence.Actual Expense:This is the actual cost or part of the actual cost of TA, where no means ofconveyance by on at the expense of the Government, or to be drawn as TA, is permissible. Thecurrent activities performed at the section handling TA and claims are the following

Sl. No Activities

1 Master data management for TA and LTC 2 Master data management for Other Claims

3 TA Verification4 TA calculations

5 LTC Verification6 LTC Approval

7 Claims Verification8 Other Claims calculations

Page 91 / 277

Page 92: Request for Proposal for Design, Supply, Installation

9 Reports

Sl. No Functional Requirements Specification

1 Provision to define different types of TA 2 Provision to capture the data for TA calculation like

- Head Quarter- Grade of the staff-Rate of allowances for each grade- Rate of allowances for different mode of transportation (Rail/Road/Air/Water) etc.

3 Provision to apply for TA by the staff 4 Provision to apply and approve Tour Advance

5 Provision to capture the various types of allowance6 Provision to capture the advance and settlement details of the allowances

7 Provision for passing bill to the finance for the allowance being paid

8 Provision to automatically calculate the DA in TA ,based on the applicant's details

9 Provision to define different types of Claims and its parameters10 Provision to capture the Medical bill claims

11 Provision to attach scanned copies of bills and other documents along with the application through the system

12 Provision to verify various bills or certificates like medical certificates (scanned) within the system.

13 Provision to maintain the history of all the allowances paid14 Provision to capture the Telephone Reimbursement if existing

15 Provision to capture the General Reimbursement16 Provision to generate the salary advance

17 Provision to identify the advance settlement defaulters list18 Provision to generate the medical bills of the employee

19 Master data management for medical reimbursement say for maintaining details of eligible Hospitals, diseases etc

20 Provision to request for loan (loan associated with medical reimbursement, Loan against PF and other types of loan)

21 Provision to generate reports for the various types of allowances like LTA, TA, Telephone, Contingency, etc.

22 Provision to generate reports by various measures like Time period, Employee, Claim Type, Claim Number, Status of the claim like draft, submitted, approved, etc.

23 Provision to capture travel requisitions or Tour authorization of employees

Page 92 / 277

Page 93: Request for Proposal for Design, Supply, Installation

24 Provision to provide information about the eligibility of the employee when arequisition is received from the person

25 Provision to provide information about travel advances provided to the employee pending to be settled prior to authorization of the fresh requisition

26 Provision to alert the personnel concerned about travel advance pending withthe employee when processing a fresh advance

27 Provision to allow the employees to attach the bills with respect to the medical treatments

28 Provision to have the provision to recover the advance from the defaulters either as monthly instalments from their salary or as cash receipts

29 Provision to define different types of TA 30 Provision to capture the data for TA calculation like

- Head Quarter- Grade of the staff-Rate of allowances for each grade- Rate of allowances for different mode of transportation (Rail/Road/Air/Water) etc.

31 Provision to apply for TA by the staff

20.2.8 Pension

The main activities performed in a section dealing with pension are

Sl. No Activities

1 Verification of documents for pension 2 Calculation of pension

3 Calculation of Gratuity4 Calculation of Death-cum-Retirement Gratuity

5 Distribution of pension6 Maintenance of pension accounts

7 Maintenance & Management of pension data

Sl. No Functional Requirements Specification

1 Provision to Verify documents like medical certificate in case of Invalid Pension

2 Provision to add different parts in the calculation of pension

3 Provision to set service time for minimum pension4 Provision to assign a percentage or fixed value to each part of the pension

5 Provision to add different parameters and conditions to calculate QS (qualifying service)

6 Provision to retrieve data to calculate QS for other modules like HR and leave management

Page 93 / 277

Page 94: Request for Proposal for Design, Supply, Installation

7 Provision to calculate additional service for the calculation QS8 Provision to issue Life Certificate to pensioners

9 Provision to issue pension certificates 10 Facility to verify pension details by pensioners

11 Provision to round off QS12 Provision to calculate Gratuity

13 Provision to calculate Average Emoluments14 Provision to calculate Monthly Pension

15 Provision to calculate Death-cum-Retirement Gratuity16 Provision to calculate Family Pension

17 Provision to calculate Higher rate of Family Pension18 Provision to add Family Members eligible for Family Pension

19 Provision to include the option for Commutation Pension.20 Provision for Provisional Pension

21 Provision for Compassionate Allowance22 Provision for Residuary Gratuity

23 Provision for Anticipatory Pension24 Provision for Extraordinary Pension or Gratuity

25 Provision for ex-gratia Pension26 Provision to generate dynamic reports based on various parameters involved

in this module

27 Provision to record Commutation Table

20.2.9 Provident Fund

TDB employees are eligible for availing Provident Fund. Employees can nominate family membersas nominees. Employees can fix the PF amount and this may range from 6% of the emoluments(basic) and not more than the emoluments. The employee can intimate the fixation of the amount ofhis/her monthly subscription in every financial year. PF is computed monthly as part of salarycomputation. The fixed PF amount is deducted from salary and credited to employees PF account.Interest-bearing at such rate as prescribed from time to time by GoI and adopted by GoK subject toa minimum of four percent will be credited to the employees account. PF can be surrendered only atthe time of retirement (an exemption of 3 months is given), but employees can avail PF loans onrefundable or non-refundable basis based on rules. No interest will be calculated for PF loans.Similarly Temporary Advance for specific purposes can be sanctioned based on rules. The finalwithdrawal of accumulations in the PF is possible for an employee when he/she quits the service(on retirement, dismissal, resignation, compulsory retirement, removal, death while in service etc.,the amount standing to his credit in the fund shall become payable to the employee. During theservice period if an employee gets any pay revision arrears or DA arrears then it will be transferredto PF account (some amount may credited to salary based on TDB decision). A locking period isenforced for availing loans or advances from arrear amount transferred into PF.

Page 94 / 277

Page 95: Request for Proposal for Design, Supply, Installation

Sl. No Functional Requirements Specification

1 Provision for fixing employees PF amount and with effect date.2 Provision for capturing nominee details.

3 Provision for re-fixing the PF amount .4 Provision for defining interest percentage and the periodic changes in interest

percentage keeping the with effect date.

5 Provision to take temporary advance against PF. 6 Provision for employees to take refundable and non-refundable loans.

7 Provision for defining general rules for calculating PF.8 Provision for calculating Interest amounts.

9 Provision for merging DA/ Pay arrears to PF.10 Provision for setting lock period from availing loans or advances from arrear

amount transferred into PF.

11 Provision for employees to view the opening balance and PF statement through HR portal.

12 Provision to view PF balance for the purpose of loan eligibility calculation i.e.excluding the arrears amount credited to PF a/c which is still under lock period. PF balance for purpose of eligible loan calculation will always be <= actual PF balance at credit of the employee.

13 Provision to calculate the balance installments’ in the case of refundable loans.

20.2.10 Loans

TDB provides loans for its employees such as house building advance, Additional loan, MarriageLoan etc. The Loan request has to be approved by Board. The applicant has to submit the sufficientsecurity documents to avail the loan.The applicant should submit a bill for house loan with DCRG statement and encumbrance on astipulated time after the approval of the Board. The maximum amount of house loan limited to 10lakhs. Additional loans up to 15 lakhs can be lend to high pay employees from external banks. For thisthey have to submit a clearance certificate to the bank. The clearance certificate is issued to theapplicant through this module.The loans should be written off if the applicant is died in the loan period. For write off, survivors ofthe deceased should submit a death certificate with the request.

Sl. No Functional Requirements Specification

1 Provision to apply for loan2 Provision to scan and attach sufficient documents in the application

3 Provision to forward/recommend/approve/deny a loan request4 Provision to view the application with all documents attached

Page 95 / 277

Page 96: Request for Proposal for Design, Supply, Installation

5 Provision to reject the house building advance/additional loan application if anyone of the following document is not attached

Original deed Location certificate Possession certificated authorized by Village Officer Plan and Estimate authorized by PWD engineer Encumbrance authorized by the Registrar Title certificate

6 Provision to forward the application with attaching documents to the Board

7 Facility to assist the Concerned officer for preparing proceedings if Board released the order for sanctioning the loan

8 Provision to verify the bills for the concerned application is submitted at a stipulated time as mentioned in the proceedings

9 Provision to reject the application if bill is not submitted10 Provision to forward the bills to the concerned authority for authorization.

11 Provision to receive the write off request12 Provision to write off the loan

13 Provision to intimate the write off rejection/approval to the concerned person

20.2.11 Attendance Management

This deals with the daily attendance management of staff

Sl. No Functional Requirements Specification

1 The system should support a biometric identification system (like thumb impression/retinal scan etc.) and Smart Card ID Mechanism to record the entry time and exit time of an employee

2 Provision to record attendance if the total time between entry time and exit time exceeds or equals total working hours. In the same way marking of fullday absence and half day absence

3 The system should constrain the entry time say from 9.00 am 11.00 am. Theprovision to record half day leave if the staff spends only half of total working hours in the office

4 Provision to record extra hours of work

5 Provision to record attendance manually by the competent authority in case of any technical issues in biometrics or in some special cases

6 Provision to view punching history (Monthly/weekly/for a period)

7 Provision to make daily/weekly/monthly/yearly adjustments as per the rule

8 Provision to mark a late punching with permission and provision for grace period.

9 Provision to integrate with Leave management and Service book

Page 96 / 277

Page 97: Request for Proposal for Design, Supply, Installation

20.2.12 Leave Management

Leave means permitted absence from duty. This module deals with all the leave matters of a staff.

Sl. No Functional Requirements Specification

1 Provision to apply different type of leave like Extra Ordinary Leave (EOL), Commuted Leave, Leave Not Due, Sabbatical Leave, Maternity leave, Half Pay Leave.

2 Provision to configure the eligible number of days for each leave type based on the experience in years and employment status.

3 Provision to enter and manage all parameters of all leave types like maximum days, combinations, sanctioning authority

4 Provision to apply to the Government for LWA for a period greater than the period for local sanctioning

5 Provision to enter the applicability of encashment for each type of leave

6 Provision to configure the number of carry forward days for each type of leave

7 Provision to include or exclude weekend days for leave calculation as per policy

8 Provision to capture the grace period for each leave type

9 Provision to credit Casual Leave and Medical Leave on pro-rata basis.

10 Provision to define different levels of approval for different type of leave.

11 Provision to update the leave balance of an employee automatically based on the Leave policy

12 Provision to enter the Extraordinary Leave details if the employee is not eligible to take leave or all leave which are already taken (and the appropriatesalary deductions made in payroll).

13 Provision to maintain the leave details taken on extraordinary leave for a specific period.

14 Provision to transfer the leave when the employee is transferred to other central Government office

15 Provision to make combinations of leave

16 Provision to adjust the leave taken ( For Leave Not Due) with the future Half Pay Leave availed

17 Provision to adjust the leave availed against the ‘Leave not due’

18 Provision to maintain leave records for each employee

Page 97 / 277

Page 98: Request for Proposal for Design, Supply, Installation

19 Provision to allow the employees to access a template of the form, and fill intheir request

20 Provision to display the employee's respective leave balances and leave taken

21 Provision to accrue the leave balances automatically based on the leave takenby employees

22 Provision to integrate with Service book

20.2.13 Salary Management

Sl. No Functional Requirements Specification

1 Provision to define the relationships (formula) between various salary components. DA, HRA, CCA are components of the salary that are dependent on Basic.

2 Provision to define slabs for the required components of the salary

3 Provision to define Earnings and Deductions4 Provision to define staff quarter rent and corresponding HRA deduction

5 Provision to define different pay bands that depend on designation, grade and location

6 Each pay band should capture the minimum amount, maximum amount and grade pay

7 Provision to define pay band for an employee which may or may not be the same that defined for his Designation, grade and field station

8 Provision to support different periods for the pay band

9 Ability to disburse salary either through bank or by cash/ cheque

10 Provision to change salary based on the promotions for the employee. (Whena change in pay band occurs)

11 Provision to define rules for increments such as increments once in a year on reaching the maximum limit in a pay band without getting promoted.

12 Provision to make changes in salary based on the yearly increment, ad hoc increments, etc.

13 Provision to set stagnation increment 14 Provision to define salary for officers who have been deputed by external

agencies for a specific period of time

15 Provision to handle pensions for the employee under the Superannuation based on configuration

16 Provision to define ad-hoc payments to all employees such as pay arrear, bonus etc.

17 Provision to handle Leave encashment only during superannuation18 Provision to define salary components that are constant for all employees.

Page 98 / 277

Page 99: Request for Proposal for Design, Supply, Installation

19 Provision for disbursement of arrears and advances either through bank or bycash

20 Provision to segregate and display the deductions as Adjustments and Remittance

21 Provision for disbursement of Gratuity22 Provision to instruct the payroll to deduct the exceeding amount at TA etc.

23 Provision to amend Employee salary information in either as individual entries (or) jointly as a group based on the criteria

24 Provision to add / delete an allowance to an employee

25 Provision to view the back dated payroll entries

26 Provision to define exclusion of pay elements to pre-defined criteria (e.g., Consultants not eligible for allowance)

27 Provision to define a payroll earning or deduction as recurring or non-recurring for each employee

28 Provision to maintain multiple payment components on the system

29 Provision to define bank details of employees which can be assigned to the employee payroll

30 Provision to add a new earning/deduction to the existing pay band

31 Provision to delete an earning/deduction from the existing pay band32 Provision to hold the history of all the previous data generated with respect

to payroll

33 Provision to calculate TDS on processing the payroll34 Provision to handle arrears with retrospective effect.

35 Provision for TDS and other Income tax related deductions such as professional tax

36 Provision to allow employee to give tax exemption declarations under various heads like Section 80C , 80CC, 80U etc.

37 Provision to adjust the tax declaration and view the tax payable

38 Provision to adjust the Tax declaration within the specified time period (Timeperiod needs to be parameterized ) ex: they can adjust only up to the mid of the financial year

39 Provision to take an employee tax declaration into consideration, check it against the eligibility limit for that head, as specified by the Government, andinclude the exemption while calculating the Tax.

40 Flexibility to deduct taxes in required months and disallow deduction during others at the time of Pay-slip generation.

41 Provision to deduct the Professional Tax in specific months

42 Provision to calculate the HR Exemption as a minimum of HRA or sum of Actual House Rent and Housing Loan Interest (HLI).

43 Provision to set tax deduction frequency based on the field station for certaintax deduction like Professional Tax

Page 99 / 277

Page 100: Request for Proposal for Design, Supply, Installation

44 Provision to display the Scale of Pay as Minimum Amount, Increment Amount, Maximum Amount, Running Increment, Saturation Amount based on the designation

45 Provision to generate pay-slip and print

46 Provision to generate consolidated Deductions Employee-wise Report

47 Provision to generate Form 16, Form 24Q Report

48 Provision to generate Pay Structure Report for the selected designation

49 Provision to generate Investment Proof Report

50 Provision to generate a Salary History Report for the selected employee

51 Provision to generate Acquaintance (Bank Interface) Report

52 Provision to generate Individual/Consolidated deductions field station wise Report

53 Provision to generate a yearly Statement of Provident fund with interest

54 Provision to generate Individual/Consolidated Pay Abstract

55 Provision to generate the list of employees for each pay period with the following information, employee id, and employee name, account number, net pay.

56 Provision to generate contract employee payment report for the selected duration

57 Provision to generate the pay salary certificate report58 Provision to generate report showing the earning, deduction and tax

declaration detail of the employee (Tentative & original)

59 Provision to generate special provident fund work sheet with entire deductiondetails and calculations

60 Provision to generate Provident Fund Broad Sheet (Work Sheet)

61 Provision to generate report showing the Drawl of Arrear Dearness Relief62 Provision to generate report showing the New Pension Scheme Deduction

Statement

63 Provision to generate comparison report between the actual salary paid and the proposed salary (salary component)

64 Provision to generate a consolidated pay report for regular/non regular/contract employee respectively

65 Provision to generate reports for questions related to Ministry related to paylike actual on the pay, projected estimation to pay, vacancy details etc.

66 Master data management for Allowances and other benefits with tax components , deduction types with tax relief components

67 Provision to generate dynamic reports based

Page 100 / 277

Page 101: Request for Proposal for Design, Supply, Installation

20.2.14 Staff Appraisal

Sl. No Functional Requirements Specification

1 Provision to identify the list of Employee to be assessed for a given period.2 Provision to track all the documents submitted by the employee during

assessment initiation.

3 Provision to capture the self-assessment based on Technical & nontechnical category.

4 Provision to maintain history of the changes in the salary structure of an employee. Option to capture the effective date of the change.

5 Provision to define different types of Assessment

6 Provision to get Confidential report from the Reporting Officer with appropriate details.

7 Provision to get promotion recommendations from HOD.8 Provision to capture details of the interview conducted for an employee

9 Provision to instruct the payroll to change the pay band of the employee based on the promotion or increment given after the assessment

10 Provision to capture next assessment date for the employee who got only increment and not promotion.

11 Alert has to be sent to the employees before every assessment

20.2.15 Self Service Portal

The system should have a self service portal for the employees to give information about his servicematters.

Page 101 / 277

Page 102: Request for Proposal for Design, Supply, Installation

Sl. No Functional Requirements Specification

1 Provision to provide login facility to each employee2 Provision to manage personal details with approval from authority

3 Provision to view leave details4 Provision to view service details

5 Provision to view salary details6 Provision to print salary slip

7 Provision to send and receive messages8 Provision to maintain a calendar with events marking and alerts

9 Provision to provide hyperlink to common Govt: and other useful sites10 Provision to apply leave

11 Provision to claim expenses and allowances12 Apply for HRA, creating tour program, apply for LFC

13 Posting suggestions14 Apply for leased accommodation or Staff quarters

15 Grievance Redressal services

20.2.16 Liability

For the early settlement of liabilities outstanding and disbursement of pensioner benefits to theretired employees, the system should have facility to check the liability of staffs at any point oftime.

Sl. No Functional Requirements Specification

1 Provision to view liabilities of each staff at any point of time2 Provision to calculate liabilities outstanding for each staff

3 Provision to generate list of staffs who are due to retire within a fixed period and for whom loans and advances are outstanding

4 Provision to generate liability / non-liability certificates

5 Provision to forward liability / non-liability certificates to concerned authorities

20.2.17 ID card Issuance

The system proposes to use contactless smart cards as ID cards for all the employees of TDB. Smartcards are not expensive and with an ID card printer (with Reprint option) it becomes moreeconomical. Smart cards are of Read-Write option which enables us to modify the data content withcard writer. Smart card contains a re-writeable microchip that can be transcribed via radio wavesand use RF technology for communication. Retrieve the ID card from the staff who leaves theorganization, and this retrieved card can be reprinted and given to a new staff . The Smart card cancontain the Staff id which can be used for attendance, Mess , as Bus pass etc .

Page 102 / 277

Page 103: Request for Proposal for Design, Supply, Installation

Sl. No Functional Requirements Specification

1 ID card printer with reprint option2 Communication using RF technology

3 Provision to embed a staff id no:( 12 character ) to id card4 Provision to use this id card in Mess, Gates, buses and other future

implementations

20.3 Devaswom AccountsThe Accounts Department of Devaswom manages various types of accounts that come under TDB.Some of the major accounts are Commissioner Accounts, Accounts Officer Accounts and ACAccounts. Apart from these accounts, the department also manages Fixed Deposits (like pensionetc) and its interests. The Accounts department defines different types of account heads, sub heads etc (chart ofaccounts ) for the smooth transaction of cash. Annual Budget estimation and preparation is part ofaccounts department. Other major activities are

Sl. No Activities

1 Managing Grants to Temples, Charitable Institutions.

2 Managing Surplus & General funds

3 Salary Computations for all TDB staff

4 Pension and PF Computations

5 Managing Devaswom Liabilities(major liability heads are Devaswom Provident Fund & Pension Fund)

6 Managing Social & Cultural Advancement

7 Managing Medical Reimbursement & Medical Advance without interest

8 Managing Fixed Deposit Amount Administration

The Devaswom Accounts Officer (DAO) is responsible for the proper maintenance, audit and compilation of the accounts of all funds under the control of the Board.

Functionalities of DAO

Sl. No Functional Requirements Specification

1 The timely preparation of the consolidated detailed budget of the TDB.

2 Monitoring of all kinds of receipts and expenditure. Annual and quarterly consolidated statements of receipts and expenditure should be placed before the Board and the Deputy Director of Local Fund Audit

3 To verify accounts in all Assistant Devaswom Accounts Offices, Asst. Devaswom Commissioner Offices & Maramath Offices for ensuring proper maintenance.

4 To scrutinize and see that all expenditure incurred is regular and authorized

Page 103 / 277

Page 104: Request for Proposal for Design, Supply, Installation

and the amounts spent without proper sanction are disallowed and recovered.To see that the accounts due from the different Departments and Temples and Offices so as to enable the financial position of funds.

5 To bring to the notice of the Board serious cases of misappropriation, irregular or unwanted expenditure and negligence in the maintenance of accounts

6 To arrange for all assets and liabilities of the Devaswom Fund in relation to General Revenues being received or paid off properly and in time with sanction wherever necessary.

7 To see that the service books of Gazetted Officers are maintained in his office and the periodical increments are sanctioned on the due dates by providing pay slips.

8 To sanction increments for the members of his office establishment.

9 To sanction T.A. Bills of the establishment of various Offices situated in the Board Head Quarters and those offices receive payment through P.A.D counter.

10 To sanction casual leave to all subordinates.

11 To incur expenditure under all items of contingencies of office up to the limit of budget allotment

12 To disburse salary and allowances of the staff working in the Board Head Quarters.

13 To disburse gratuity and other pensioner benefits of all retired employees under the Board after obtaining prior sanction from the Board authorities concerned

14 To make payment of House Loan, Vehicle Loan, PF advance etc to the employees with prior sanction of the Board authorities concerned.

15 To conduct audit of paid vouchers of group Offices.

16 To pass contingent bills, TA bills and arrears bills of group offices.

17 To prepare reconciliation statement.

18 To approve the Pay fixation of employees.

20.4 Commissioner OfficeThe system proposes a GIS based interface for monitoring the activities of all temples and officesunder Commissioner Office. This view enables the higher officials to easily identify the areas ofattention and share the information to concerned authorities. It also helps to take decisions moreeffectively

20.4.1 Disciplinary Action

The definition of misconduct in office rules is any unlawful behavior by a public officer in relationto the duties of his office, willful in character. The term embraces acts which the office holder hadno right to perform, acts performed improperly and failure to act in the face of an affirmative dutyto act. Kerala Government Servant’s Conduct Rules requires that every Government Servant shall at

Page 104 / 277

Page 105: Request for Proposal for Design, Supply, Installation

all times maintain absolute integrity and devotion to duty. Anything contrary to this rule will beconsidered as misconduct. If the act or omission is such as to reflect on the reputation of the officerfor his integrity or good faith or devotion to duty, then disciplinary proceedings may be takenagainst him for that act or omission.

Sl. No Functional Requirements Specification

1 Provision to store necessary details regarding enquiry and related files2 Provision to view service details

3 Provision to keep proceedings/endorsement/memos 4 Provision to schedule an inspection

5 Provision to intimate the person to be inspected6 Provision to prepare an inspection report

7 Provision to forward the inspection report to the concerned authority8 Should maintain details regarding court cases, vigilance case, suspension of

staffs etc.

9 Provision to tracking the disciplinary action

20.4.2 Budget estimation & Fund allocation

On the beginning of each financial year budget for the year should be estimated.

Sl. No Activities

1 Intimate all departments for fund proposal2 Collect proposals from various departments of commissioner office

3 Consolidate the proposal4 Prepare estimation from the consolidated proposal and the previous year’s

budget

5 Allocation of fund6 Intimate all department about the fund allocation

7 Reappropriation of balance fund

Sl. No Functional Requirements Specification

1 Provision to intimate all departments2 Provision to collect proposals from various departments

3 Provision to consolidate the proposal4 Provision to view previous year’s budget

5 Provision to prepare a estimated proposal6 Provision to forward the estimation to concerned authority

7 Provision for allocate the fund to various departments8 Provision for re appropriate the balance fund if any departments request for

additional fund

Page 105 / 277

Page 106: Request for Proposal for Design, Supply, Installation

20.4.3 Grants

TDB permits some fixed amount grants to some temples, some festivals like Aranmula Vallasadyaand to some charitable institution like Sreeramakrishnashramam. Concerned AC should beresponsible for it. The AC should inspect the institution for checking that the grant which isinstituted is properly and satisfactorily utilized. The inspection report along with recommendationletter of AC should be submitted to the Commissioner office for the payment. The grant rate is fixedby a committee in the Commissioner office. Arrears should be given to the temples and institutionswhen the rate is renewed. The AC can recommend an institution or temple for providing grant afterinspecting there.

Sl. No Activities

1 Prepare list of temples, institution and trusts where TDB provides grants with grant amount

2 Forwarding of list

3 Preparing allotment list based on the amount balanced on the budget

4 Provision to prepare approval letter

5 Re-fixing grant amount

6 Payment of arrears of grant

7 Intimate all AC offices about the rate revision and arrears

8 Request from institution for providing grant

9 Inspection by AC before recommending a grant

10 Recommendation application to higher authorities

Sl. No Functional Requirements Specification

1 Provision to view the list of grants from all AC’s office along with attachingdocuments

2 Provision to view the budget

3 Provision to prepare allotment of grant based on the amount balanced4 Provision to prepare approval letter for the grants

5 Provision to forward the Approval letter with allotment list to concerned Dy. DC

6 Provision to re-fix the grant amount according to the decision taken by the board

7 Provision to prepare list of arrears to be paid 8 Provision to intimate all ACs about the grant rate and arrears.

9 Provision for recommending a grant to a new institution along with inspection report by AC

Page 106 / 277

Page 107: Request for Proposal for Design, Supply, Installation

20.4.4 New Schemes

Sl. No Activities

1 Approval of Temple Advisory Committee2 Approval of Special Festivals

3 Sanctioning for filming4 Rate revision of vazhipadu

5 Approval for special permission to vazhipadu rate6 Temple grade revision

7 Miscellaneous

Sl. No Functional Requirements Specification

1 Provision to receive request from different bodies2 Provision to scan and attach a written request

3 Provision to forward/deny/approve the request4 Provision to add comments to a request, to attach a file to a request

5 Provision to view the corresponding details and reports6 Provision to forward the approval letter

7 Provision to forward the post creation request to court

20.4.5 Land records

Since the formation of Devaswom Department, the Govt. had transferred certain lands andbuildings at different times for the beneficial enjoyment and use of the scheduled Devaswom andfor their proper administration. Other than this, land will be acquired by the TDB if necessary forthe proper functioning of offices or temples. The land may be leased out to private persons. Thelease amount should be fixed by TDB. Planting and cultivation on these lands are scheduled andplanned by TDB. The revenue from the lands is credited to the Devaswom accounts.

Sl. No Activities

1 Maintains land records2 Planting trees in the lands

3 Forwarding of land encroachment details on TDB lands to Special Tahsildar office

4 Approval for auctioning of trees

5 Approval for Leasing lands6 Lease revision

7 Land acquisition

Sl. No Functional Requirements Specification

1 Provision to update the records of land

Page 107 / 277

Page 108: Request for Proposal for Design, Supply, Installation

2 Provision to view the land details

3 Provision to accept complaints for the land encroachment on TDB lands4 Provision for scan and digitize the paper complaints and applications

5 Provision to forward the complaints to Special Tahsildar office6 Provision to schedules and planning of the planting of trees and cultivation in

lands

7 Provision to forward the schedule8 Provision for to forward the requests

9 Provision for accept the requests10 Provision to forward the approval letters

11 Provision to revise the lease amounts according othe board decisions12 Provision for scan the details including sketch of the land for land acquisition

13 Provision to accept the recommendation for land acquisition along with all details and reports

14 Provision to forward the land acquisition details to concerned authority and land revenue department

15 Provision to check the revenue and expenditure related with lands

20.4.6 Petition / Complaint management

Sl. No Activities

1 A staff or public can submit a complaint /issue through Grievance Redressal forum

2 Issues can be forwarded to respective sections or sometimes directly to Head of office with respect to the relevance and priority of the issue reported

3 Issue received and not solved is in "Open" status

4 Issues may get solved in Section level or higher level and is communicated to complainant - Issue is "Closed" now

5 If the complainant is not satisfied with the solution he may again raise a complaint referencing the old complaint

Sl. No Functional Requirements Specification

1 System should have the provision to capture the issue classification types2 System should have the provision to capture the classification of issues

3 System should have the provision to define various levels of severity4 System should have the provision to define various levels of priority

5 Ability to give unique identification no: for each issue raised.

Page 108 / 277

Page 109: Request for Proposal for Design, Supply, Installation

6 System should have the provision to create the issue based on the issue type

7 System should have the provision to list all the issues in single view 8 Ability to push the issue to a committee if formed for this issue.

9 Provision to record all communications done by officials regarding the issue10 System should have the provision to analyze the issue based on various criteria like

Issue Classification, From date, To date, Status etc.

11 System should have a workflow definition for the issues based on their classification

12 Alert mechanism to inform the concerned official regarding the issue raised, issues pending for many days, priority based alerts etc.

13 Complainant and other authorized officials should be able to view the status of his complaint

14 System should have the provision to generate report based on the issue classification

15 System should have the provision to generate report for the issue based on various criteria like Status - Draft, Submitted, Approved, Pending, Closed etc. From Date, To date, Assigned to , Created By

16 Provision to capture the feedback related to issues through an Android application

17 User should be able to raise new complaints referring old complaints(closed/open)

18 Reports

19 Ability to generate reports for issues generated between a particular date

20 Ability to generate reports for issues pertaining to a particular dept, work, reason, staff, generated by a particular staff etc.

21 Ability to generate reports for issues pending for a particular period or above or below

22 Ability to generate reports for issues based on status, priority, severity etc. based on classification, name etc.

23 Ability to generate reports with issues sorted based on the above mentioned criterions

20.4.7 Training Programmes

Kalapeedam is the institution managed by Cultural wing of TDB. TDB provides trainingprogrammes for the students who successfully completed the courses of Kalapeedam. The maincourses conducted are Chenda, Nadaswaram, and Panchavadyam etc. These students are appointedas trainees on temples where any of these types of vacancies are available. TDB prepares a schedulefor the training programmes for each year. According to this schedule, a call letter is sent to thestudents.

They also conduct Training programmes for newly joined staff.

Page 109 / 277

Page 110: Request for Proposal for Design, Supply, Installation

Sl. No Activities

1 Scheduling of training programmes2 Sending call letter to the students

3 Intimate training instructors

Sl. No Functional Requirements Specification

1 Provision to view the details of students who successfully completed the course at Kalapeedam

2 Provision to prepare a schedule based on the vacancy and locality of the students

3 Provision to view the vacancies in the temples4 Provision to prepare call letters based on needs

5 Provision to forward the call letter6 Provision to view the status of the students who are in training

7 Provision to view the status of the students who completed the training programmes

8 Provision schedule the training programmes for the staff

9 Provision for intimate the training instructors about the training schedule10 Provision for intimate the staff about the venue and date of training

programmes

11 Provision for entering the attendance details of trainees

20.5 Thiruvabharana Commissioner OfficeAll valuables like gold, silver etc which are not of regular use are kept in Strong Room. Someportion of these items are melted and maintained as bars. This process requires the permission ofBoard and High Court. Melting process is given to a private party after tendering. The tenderingvalue unit is rupees/gram. TCO receives request from temples to provide gold and other valuables atthe time of utsavam or for activities like covering Kodimaram with gold etc. Studies are conductedby TCO for such requests and are sanctioned or denied by this office. TCO also arranges to makegold pendants and needs permission from RBI for such activity. Devotees (Donors) sometimes offerto cover the temple with brass or other valuables. This offer is submitted to TCO through templeofficials as a request and is sanctioned or denied by TCO after conducting necessary verificationsand studies.TCO keeps a smith to verify the valuables. A separate register is maintained for vesselsDuring Kanikka opening at temples every valuable is separated with the verification of a local smithappointed by temple and is recorded in Mahassre. These valuables have to be submitted to TCO assoon as possible and during the handover process the valuables are verified and certified by theTCO smith and is kept in strong room.

Strong room is guarded by security officials who are under the control of Chief Vigilance Officer.Two officials hold the charge of strong room. Strong room can be opened only by these twoofficials. Each opening, items taken, items kept, purpose, date, time etc are properly logged in aregister.

Page 110 / 277

Page 111: Request for Proposal for Design, Supply, Installation

Sl. No Activities

1 Asset Management2 Strong room Management

3 Processing Purchase requests4 Processing requests from temples for ornaments at the time of Utsavam and

for Kodimaram covering etc

5 Contract Management for melting gold/silver items 6 Transaction Management of Thiruvabharanam

7 Providing vessels to Sadhyalayam8 Supplying furniture for TDB offices after purchase

9 Scheduling and conducting Studies, monitoring, verification etc10 Board, High Court, RBI Sanctions

11 Alerts12 Reports

Sl. No Functional Requirements Specification

1 Provision to receive requests from temples for purchase and for other activities etc

2 Provision to forward/recommend/approve/deny these requests

3 Provision to identify each valuable or a batch of valuables by a unique id4 Provision to assign and identify each valuable to a temple if necessary

5 Provision to capture the details of valuables based on weight, quality, number etc

6 Provision to capture the certification of smith for each item

7 Provision to e tender the melting process based on rupees/gram (e tendering)

8 Provision to contract the melting process (Contract management)

9 Provision to capture the details of each item supplied to temples, Sadhyalayam

10 Provision to fix a date for returning the items supplied

11 Provision to alert(SMS/email) higher officials if the items are not returned within the specified time

12 Provision to capture the details of Donors

13 Provision to record the weight and quality of brass/silver/gold etc used for covering temple, Kodimaram by Donors

14 Provision to schedule activities like study, verifications etc

15 Provision to make requests to High court, Board, RBI etc(templates for requests)

16 Provision to configure various alerts

Page 111 / 277

Page 112: Request for Proposal for Design, Supply, Installation

17 Provision to generate dynamic reports based on the parameters involved in this module

20.6 Board Office

20.6.1 Disciplinary actions against Gazetted officers

Sl. No Functional Requirements Specification

1 Provision to store necessary details regarding enquiry and related files2 Provision to view service details

3 Provision to keep proceedings/endorsement/memos 4 Provision to schedule an inspection

5 Provision to intimate the person to be inspected6 Provision to prepare an inspection report

7 Provision to forward the inspection report to the concerned authority8 Should maintain details regarding court cases, vigilance case, suspension of

staffs etc.

9 Provision to tracking the disciplinary action

20.6.2 Petition/Complaint management

Sl. No Activities

1 A staff or public can submit a complaint /issue through Grievance Redressal forum

2 Issues can be forwarded to respective sections or sometimes directly to Headof office with respect to the relevance and priority of the issue reported

3 Issue received and not solved is in "Open" status

4 Issues may get solved in Section level or higher level and is communicated to complainant - Issue is "Closed" now

5 If the complainant is not satisfied with the solution he may again raise a complaint referencing the old complaint

Sl. No Functional Requirements Specification

1 System should have the provision to capture the issue classification types

2 System should have the provision to capture the classification of issues

3 System should have the provision to define various levels of severity

4 System should have the provision to define various levels of priority

5 Ability to give unique identification no: for each issue raised.

6 System should have the provision to create the issue based on the issue type

7 System should have the provision to list all the issues in single view

Page 112 / 277

Page 113: Request for Proposal for Design, Supply, Installation

8 Ability to push the issue to a committee if formed for this issue.

9 Provision to record all communications done by officials regarding the issue

10 System should have the provision to analyze the issue based on various criteria like Issue Classification, From date, To date, Status etc.

11 System should have a workflow definition for the issues based on their classification

12 Alert mechanism to inform the concerned official regarding the issue raised, issues pending for many days, priority based alerts etc.

13 Complainant and other authorized officials should be able to view the status of his complaint

14 System should have the provision to generate report based on the issue classification

15 System should have the provision to generate report for the issue based on various criteria like Status - Draft, Submitted, Approved, Pending, Closed etc. From Date, To date, Assigned to , Created By

16 Provision to capture the feedback related to issues through an Android application

17 User should be able to raise new complaints referring old complaints(closed/open)

Reports

18 Ability to generate reports for issues generated between a particular date

19 Ability to generate reports for issues pertaining to a particular dept, work, reason, staff, generated by a particular staff etc.

20 Ability to generate reports for issues pending for a particular period or above or below21 Ability to generate reports for issues based on status, priority, severity etc. based on

classification, name etc.

22 Ability to generate reports with issues sorted based on the above mentioned criterions

20.6.3 High Court Audit

Audit is an evaluation of a person, organization, system, process, enterprise, project or product. Theterm most commonly refers to audits in accounting, internal auditing, and government auditing, butsimilar concepts also exist in project management, quality management, water management, andenergy conservation. Auditing is defined as a systematic and independent examination of data,statements, records, operations and performances (financial or otherwise) of an enterprise for astated purpose. In any auditing the auditor perceives and recognizes the propositions before him forexamination, collects evidence, evaluates the same and on this basis formulates his judgment whichis communicated through his audit report. In TDB local fund auditing section, it directly reports toOmbudsman in High Court. Some relevant issues which need more attention, Ombudsman forwardsit to General Pleader who presents the matter in High Court.

Sl. No

Activities

1 Generating reports for inspection or auditing2 Schedule and Conduct inspection

Page 113 / 277

Page 114: Request for Proposal for Design, Supply, Installation

3 Compiling Audit Report 4 Reporting to respective authorities with priorities of irregularities

5 Monitoring, action taken by departments to rectify reported irregularities

Sl. No Functional Requirements Specification

1 Provision to set the type of Audit(internal/external etc)

2 Provision to generate reports related to inspection

3 Provision to record irregularities and assign the rectification work to a particular person or office

4 Provision to identify each irregularity by a unique id

5 Provision to attach files to irregularities

6 Provision to set severity levels to irregularity(Serious/ regular/simple etc)

7 Provision to forward the irregularity to Higher authorities

8 Provision to give status to irregularity like "Open", "Pending", "Closed/rectified", "Suspended", "Deleted" etc

9 Provision to give priority levels to irregularities

10 Alert mechanism based on priority/time constraints or other parameters like pending duration, subject etc

11 Provision to generate dynamic reports based on various parameters involved in this module

20.6.4 Budget

20.6.5 Grants

Sl. No Activities

1 Prepare list of temples, institution and trusts where TDB provides grants with grant amount

2 Forwarding of list

3 Preparing allotment list based on the amount balanced on the budget4 Provision to prepare approval letter

5 Re-fixing grant amount6 Payment of arrears of grant

7 Intimate all AC offices about the rate revision and arrears8 Request from institution for providing grant

9 Inspection by AC before recommending a grant10 Recommendation application to higher authorities

Page 114 / 277

Page 115: Request for Proposal for Design, Supply, Installation

Sl. No Functional Requirements Specification

1 Provision to view the list of grants from all AC’s office along with attaching documents

2 Provision to view the budget

3 Provision to prepare allotment of grant based on the amount balanced4 Provision to prepare approval letter for the grants

5 Provision to forward the Approval letter with allotment list to concerned Dy. DC

6 Provision to re-fix the grant amount according to the decision taken by the board

7 Provision to prepare list of arrears to be paid 8 Provision to intimate all ACs about the grant rate and arrears.

9 Provision for recommending a grant to a new institution along with inspectionreport by AC

20.6.6 Transfer and Posting of Gazetted Officers

This module deals with transfer of Gazetted Officers. The system will provide the following functionalities to the user.

Sl. No Functional Requirements Specification

1 Provision to transfer the staff within the section

2 Provision to transfer the staff across the section

3 Provision to transfer the staff across departments

4 Provision to make inter office transfer

5 Provision to maintain history of transfer of an employee

6 Provision to update service book

20.6.7 Purchase & Store Management

20.6.7.1 Purchase

There are three methods of purchase based on value of purchase or the Probable Amount ofContract (PAC) for which the purchase is going to be settled with the supplier.

1. Direct Purchase2. Quotation3. Tender

Direct PurchaseTenders/Quotations need not be obtained in the cases where Purchase amount is very small.

Quotation Quotation may be invited if the estimated value of the store is below some particular value.

Page 115 / 277

Page 116: Request for Proposal for Design, Supply, Installation

Publicity of notice is not mandatory. Obtaining quotation by local inquiry is sufficient.

Tender Tenders should be invited if the estimated value of the stores to be purchased is some particular value or above. Tenders are of three kinds.

1. Open Tender2. Limited Tender, and3. Single Tender

The open tender system is an invitation to tender by public advertisement. This should be usedas a general rule and must be adopted, subject to the exceptions 2 mentioned below wheneverthe estimated value of the contract is some particular value or more. In all cases of Open Tenderit is essential that wide publicity is given to the Tender notification. Open tender need not beinvited in the following circumstances

1. When it is not in the public interest to call for tender by advertisement.2. When there is serious risk or inconvenience or loss to public service by arranging the

purchase by open tender3. When the articles are urgently required.4. In the case of special manufacture by particular agencies and patent articles. In the above

cases the purchasing officer must place on record the nature of the urgency and the reasonfor deviation from the open tender system.

Limited Tender system may be adopted whenever the above exceptions 1, 2 &3 under open tender exist.

Single Tender System may be adopted

1. When the articles required are of a proprietary character.

2. When owing to greater promptitude of supplies by particular agencies or the specialmanufacture of some articles by certain firms, substantial economy is possible by deviatingfrom the tender system. In such cases purchase direct from the firms or agencies concernedafter negotiation. This is called Negotiated Contract.

Rate and Running ContractIn the case of articles which cannot be stocked conveniently in the departmental store with safetyand convenience, the system of Running Contract should be adopted.

A Running Contract is a contract for the supply of an approximate quantity of store at a specifiedprice during a certain period. The purchaser has the right to take about 25% over or below theapproximate quantity mentioned in the contract. Usually 75% of the contracted quantity should betaken before the expiry of the contract. Dietary article, firewood, charcoal etc. comes underRunning Contract.

Rate Contract is a contract for the supply of store at a specified rate during the period covered bythe contract. No quantities are usually mentioned in the contract and the contractor is bound toaccept any order which may be placed upon him at the rates specified within the contract period.Steel furniture, photo copier, computers, fax machines etc. are some of the items coming underrate contract. Rate contracts are settled by the Stores Purchase Department only.

Page 116 / 277

Page 117: Request for Proposal for Design, Supply, Installation

Sl. No Functional Requirements Specification

Supplier

1 Ability to capture the Supplier Code, Contact information and contact person details

2 Ability to maintain each supplier terms and default mode of payment

3 Ability to maintain currency of payment and mode of payment of a supplier

4 Ability to capture the Bank account Number and bank details of a supplier

5 Ability to save supplier details based on Rate contract or Running contract

6 Ability to capture the credit limit and credit account of a supplier

7 Ability to maintain list of both registered as well as unregistered suppliers

8 Ability to capture the tax code for a supplier

9 Ability to blacklist a supplier

Material Master

10 System should maintain list of material.

11 System should be able to maintain Material code, description, type and Category (consumables and Non Consumables)

12 System should maintain the unit cost of the material

13 System should maintain the list of suppliers who supplies the material

14 System should maintain the default unit of measurement for a material and should be able to assign alternate unit of measurement

15 System should be able to capture Reorder Level and maintain Min Stock accordingly

Page 117 / 277

Sl. No Activities

1 Listing purchase requirements 2 Classification of material required

3 Tender invitation4 Receiving tenders

5 Fixing a tender6 Execution of security agreement with the tenderer and receiving security

deposits

7 Processing of tenders to obtain best tender8 Receipt of goods after inspection against purchase order, for quality and

quantity, specifications, packing quality,

9 Addition to stock/store 10 Payment and setting payment methods

11 Release of security deposits after contract fulfillment

Page 118: Request for Proposal for Design, Supply, Installation

16 System should be able to capture whether the material is an asset or other type of item

17 Ability to classify items under different categories

Tender Process/ e-Tendering

18 Capability of a user to request a material for purchase/ indent

19 System should capture the details of the indent that is identified by a unique number

20 Ability to add more than one material to an indent

21 System should have the provision for the indent to undergo various status changes like created, submitted, approved, closed, rejected and cancelled

22 Ability to check the availability of requested items in store.

23 System should have the provision to notify the appropriate persons for the indents waiting for approval

24 Ability to modify the Sanction or approval amount limit for a particular User

25 Provision to capture the remarks by different approvers

26 Ability to push the tender to any committee for approval

27 Provision to check availability of sufficient funds from the budget for an indent

28 Provision to set up Types of Tender and the days required to respond to that type of Tender

29 Provision to capture tender details like Title, Place of execution, Mandatory documents, Earnest money deposit, etc.

30 Provision to associate a tender to more than one indent

31 Ability to capture response from more than one supplier

32 Should capture the Response number, date, supplier details, contact person for a quotation

33 Ability to capture advance requested for supply of materials

34 System should have the provision to capture Indian currency, foreign currency amount and exchange rate

35 Ability to capture Guarantee/ Warranty and Validity details

36 Ability to capture the Quotation Number and Quotation Date details.

Purchase Order / Work Order

37 System should have the provision to capture taxes like Sales tax, Service tax, Customs ,duties, Central service tax, Insurance charges, Packing charges.

38 System should have the provision to capture the details of the purchase order like order number, date, document type, raised by, department, project, payment mode, dispatch mode, payment currency, store, Item, quantity, amount, the terms of payment, delivery date and special terms and conditions if any

39 Ability to provide a link to the Purchase Order to the quotation received

Page 118 / 277

Page 119: Request for Proposal for Design, Supply, Installation

40 System should have the provision to capture tax exemption details that are applicable forCustom duty, Excise duty etc.

41 Ability to map a material to a GL Account and the ability to capture the supplier creditorGL account

42 Ability to capture the delivery details of the materials in the generated Purchase Order

43 Provision to map the budget fund to the Purchase Order

44 System should have the option to amend the Purchase Order

45 System should have the provision for the approver to view Purchase Order reports

46 System should have the provision to create work order for the bidder who has quoted high

47 In the process of availing any service, System should have the disposal of materials or purchase of non standard items

48 System should have the provision to capture work order number, name of the work, date, document type, raised by, department, store, vendor details, unit price and amount, terms and conditions if any

49 Support creation of multiple types of purchase requisition transaction based on the typesof items/department

50 Ability to support multiple PO for a single reference

51 Multiple work flow/processes/types of purchase order be created to control different types of purchases:-Foreign purchases-Local purchases

Reports

52 Generate list of all funds disbursed for a period by:- Account- Vendor

53 System should provide an on-line query by:- Vendor- Voucher- Due date

54 Provide reports showing total payments to a vendor in a period

55 Ability to generate the following reports for a given period / date range:- Aging of payables:- Payment register- Payments overdue listing

56 Ability to generate withholding tax report:

57 Provision to control the Invoice amount not to exceed the limit of the PO ( With certain defined variance)

58 Provision to check and control if the invoice amount is greater than the receipt amount

Page 119 / 277

Page 120: Request for Proposal for Design, Supply, Installation

20.6.7.2 Store

Sl. No Activities

1 Receipt of items in the store

2 Examination of items with Purchase Order

3 Rejection of items if the item is defective, not of the specification mentioned in PO, defective packing, old stock, damaged stock etc.

4 Accounting the accepted stock in Stock register

5 Communicating to the vendor about the rejected items if any

6 Intimating the indenter about the item arrival, certifying the receipt of items for payment clearance after getting confirmation from the indenter.

Sl. No Functional Requirements Specification

1 System should have the provision to capture the details of defected itemsand provision to maintain the purchase return details

2 System should maintain the stock registers

3 System should have provision to make adjustments to inventory after physical audit

4 Ability to classify the materials on the basis of electrical, electronic etc.

5 System should have the provision to maintain invoices that have been received from suppliers

6 Ability to maintain system generated invoice no, date, supplier Invoice no, invoiced by, Item Code, Item description, Unit cost, Total cost, quantity received, quantity rejected, quantity invoiced, Taxes, Location, Address and Remarks

7 System should have the provision to associate Invoice to a goods receipt

8 System should have the option to Post invoice data to the financial system

9 System should have the provision to associate an invoice number to purchase order number

10 Provision to attach an item to a project

11 Provision to enter utilization of various assets

12 Provision to calculate depreciation of an asset and save current market value

13 System should have the provision to capture the freight charges and clearance charges

14 Ability to maintain a perpetual Stock Ledger

15 Ability to prepare a stock reconciliation statement on a daily basis

16 Ability to generate a stock report as on any date, based on the pre-determined categories

Page 120 / 277

Page 121: Request for Proposal for Design, Supply, Installation

17 Ability to generate a report on the adjustments to inventory arising from Physical verification

18 Ability to provide stock aging report

19 Ability to show up reports based on stock value

20 Ability to generate reports on adjustment type of transactions

20.6.8 College Management

The staffs of the colleges are appointed by the manager, who will be an Assistant Secretary inBoard. But their salary should be paid by Govt. So the post should be sanctioned by Govt. Therequest for the approval of post is forwarded to Directorate of Collegiate Education. Theadministration of colleges is under the control of concerned Zonal offices of Directorate ofCollegiate Education for the aided colleges. All other colleges are under direct control of TDB.Colleges should affiliate to any one of the five universities. There are some student related serviceslike admission, issue Certificate like TC, Course and Conduct etc., attendance management,condonation etc. There should have the facility to upload data to concerned university likeattendance of students, internal marks etc.

Sl. No Activities

1 Admission of students to all courses2 Re-admission

3 Attendance management of students4 Issue of Certificates

5 Migration6 Registration as matriculate of the University

7 Disciplinary action of students8 College Union election

9 Issue of Identity Cards10 Time Table Management

11 Aadhar No., EID etc12 Conducting of University/Internal examinations

13 Inward and Despatch14 Annual Administration Report

15 Proposals for UGC Scheme16 Conducting Courses

17 Stamp account18 College Magazine

19 College Calendar20 Reimbursements

21 Provident Fund, SLI, GIS, GPAIS22 Loans

23 LPC and Salary certificates to non-teaching

Page 121 / 277

Page 122: Request for Proposal for Design, Supply, Installation

24 Audit

25 Collection and Remittance of fees26 Educational concessions

27 Scholarships28 Refunds

29 Budget Estimation of Plan and Non Plan Funds30 Bill preparation

31 Reconciliation of expenditure32 Study Tour

33 Seminar / Workshop34 DCB statement

35 Utilization Certificate / Audit Statement36 PD Account Maintenance

Sl. No Functional Requirements Specification

1 Student Admission2 Provision to capture data on every student admitted to various courses

being conducted in college including Aadhar number or EID, if any fromthe concerned university if the admission through single window procedure.

3 Provision for provide online application to various courses4 Provision for prepare selection list considering following parameters

MeritCaste(there are reservation for certain caste)PWDSportsNSSNCC

5 Provision to publish the list6 Provision for generating unique ID for the admitted students

7 Provision for admit students on management quota8 Provision to view and search data on students based on various

parameters

9 Provision to generate Nominal Roll of students10 Provision to scan and attach photographs and various documents

(conduct certificate, transfer certificate, allotment letter) with each student data

11 Provision to access student data for generating Student ID cards12 Provision to handle college transfer details of students

13 Provision to mark details of special quota like Sports/Lakshadweep inmates etc. for students

14 Re-admission

Page 122 / 277

Page 123: Request for Proposal for Design, Supply, Installation

15 Provision to re-admit students16 Provision to attach all related documents with readmission data

17 Provision to view and search readmitted student details18 Issue of Certificates

19 Provision for college students to apply for various certificates with required documents if any

20 Provision to issue certificate to concerned students

21 Provision to view details of issued and pending certificates22 Attendance management of students

23 Provision for teaching staff in departments to enter the attendance data on students

24 Provision to view and search attendance details of students based on date, student ID etc.

25 Provision to generate various statistics related to student attendance

26 Provision for college to determine attendance shortage, if any of students

27 Provision to inform student on attendance shortage and communicate with the University for clarifications

28 Provision to intimate DCE and University

29 Provision for alerting the parents about the absence of students as SMS or E-mail

30 Migration

31 Provision to attach migration certificates issued by other universities along with student data

32 Provision to list students whose migration certificates are not received at the office

33 Registration as matriculate of the University34 Provision to forward application for matriculation with attached

documents to University through Principal

35 Provision to view migration status of students in the college36 Disciplinary Action

37 Provision to maintain disciplinary action taken against students38 Provision to inform the University and DCE on misconduct, disciplinary

action and follow up action, if any

39 Time Table Management40 Provision to automatically create time tables based on teachers, subjects

and working hours

41 Provision to manually edit / create time tables42 Provision to view and analyze teacher teaching hours.

43 Provision to print / save time tables in various formats44 College Union Election

Page 123 / 277

Page 124: Request for Proposal for Design, Supply, Installation

45 Provision to store details regarding college union election46 Provision to store data on college union executive committee

47 Issue of Identity cards48 Provision for generating cards from the students details

49 Provision to keep the issue details50 Conducting of University/Internal examinations

51 Provision to maintain details regarding invigilators 52 Provision to maintains details regarding room and seat arrangements for

examinations

53 Provision to search invigilator/room/seat arrangements of particular examinations/ student IDs

54 Provision to generate statements showing room/seat arrangements

55 Inward and Despatch56 Provision to assign file number to all incoming Tappals with appropriate

keywords.

57 Provision to view all incoming and outgoing Tappals. The system shouldhave provisions to view the list of Tappals received during a period.

58 A digitized version of Tappal movement registers to be maintained for each section.

59 A digitized version of Stamp Out Register.60 Annual Administration Report

61 Provision to generate annual administration report in pre-defined format.

62 Provision to forward annual administration report to DCE either through electronic means or typed.

63 Proposals for UGC Scheme64 Provision to maintain minutes of meeting related to the preparation of

proposals.

65 Conducting Courses66 Provision to store details on refresher course and Remedial courses such

as date, venue, list of teachers / students attending the courses etc.

67 Provision to view details on courses conducted.68 Access data to calculate extra hour teaching remuneration

69 College Magazine70 Provision to maintain details of editorial members

71 Provision to store and publish electronic copies of college magazine72 Provision to forward the magazines to other colleges and offices

73 College Calendar74 Provision to maintain details of college calendar publishing

75 Provision to store and publish electronic copies of college calendar

Page 124 / 277

Page 125: Request for Proposal for Design, Supply, Installation

76 Reimbursements

77 Provision to submit various reimbursement request 78 Provision to view sanctioned and pending reimbursements

79 Provision for Principal to approve medical reimbursement claims80 Provident Fund, SLI, GIS, GPAIS

81 Provision to submit application for admission to PF, SLI, GIS and GPAIS

82 Provision to store account details of PF, SLI, GIS and GPAIS for each staff

83 Provision view amounts available with PF, SLI and GIS accounts84 Loans

85 Provision for staffs to apply for various loans86 Provision for Principal to forward loan applications to DCE

87 Provision for DCE to receive loan applications and inform the status of loan processing

88 LPC and Salary certificates to non-teaching

89 Provision for staffs to apply for LPC and salary certificates90 Provision to issue to LPC and Salary Certificates

91 Provision to log details of staff who were issued with LPC, salary certificates etc.

92 Audit

93 Provision to receive intimations from DCE and from TDB on audit dates

94 Provision to generate audit statements

95 Provision to assist staff in answering common audit queries96 Provision to prepare an audit report

97 Provision to record audit objections and forward them concerned clerk staffs

98 Provision to forward rectifications and explanations for audit objections to DCE and TDB

99 Collection and Remittance of fees100 Provision to enter details on admission fees / tuition fees/ examination

fees / special fees collected from each student

101 Provision to view collected fee details102 Provision for generating various consolidated reports

103 Provision to store details of caution deposits collected from students104 Scholarships / e-grants system

105 Provision to include e-grants system for applying / managing scholarships

106 Provision to view details who have applied for various scholarships

Page 125 / 277

Page 126: Request for Proposal for Design, Supply, Installation

107 Provision to enter details of students applying for scholarships108 Provision to know details of students who are benefited with multiple

scholarships

109 Provision to forward the scholarship applications to concerned offices in an offline mode

110 Provision to keep list of candidates selected for scholarships in an offlinemode

111 Refunds of Caution deposits112 Provision to calculate caution deposits to be refunded to each student

considering dues, if any

113 Provision to enter details of refunded caution deposits114 Provision to view details of refunded caution deposits

115 Budget Estimation of Plan and Non Plan Funds116 Provision to prepare the proposal for both plan and non-plan fund

117 Provision to view previous year’s budget118 Provision to forward the proposal

119 Provision for allocate the fund to various purposes120 Provision for submit re-appropriation and additional fund request to

concerned authority

121 Bill preparation122 Provision to prepare various bills in pre-defined formats

123 Provision to generate bills in pre-defined formats124 Provision to forward bills to concerned authorities / offices

125 Study Tour126 Provision to enter details on new study tour plan

127 Provision to forward request to DCE for required sanctions if needed128 Provision for Principal to sanction study tours

129 Assist staff in determining the number of accompanying teachers according to rules, in calculating TA, DA, contingent expenditures etc.

130 Seminar / Workshop

131 Provision to store details on seminars / workshops. 132 Provision to view details on seminars / workshops conducted.

133 Provision to settle seminar / workshop expenses134 DCB statement

135 Provision to generate monthly DCB statements136 Provision to forward DCB statements to DCE and TDB

137 Utilization Certificate / Expenditure Statement138 Provision for preparing a Utilization Certificate/Expenditure Statement

139 Provision to forward Utilization Certificate/Expenditure Statement to concerned authority

140 PD Account Maintenance

Page 126 / 277

Page 127: Request for Proposal for Design, Supply, Installation

141 Provision to maintain heads under PD account142 Provision to store income and expenditure under each head.

143 Provision to maintain details from PD account register144 Provision to send request regarding PD account utilization to concerned

authority

20.6.9 Aided/CBSE School Management

TDB has 22 Aided Schools and 4 CBSE schools. All activities of these are under the control ofTDB. All cash transactions regarding CBSE schools are through concerned Assistant Secretary’saccount. Staffs of these schools are appointed by TDB through interview and teaching tests. But forthe teaching staffs of Aided schools there need approval of Govt. The request for approval ofteaching post is forwarded to concerned DEO office for sanction.

Sl. No Activities

1 Student Admission2 Issue of Certificates

3 Attendance management of students4 Disciplinary Action

5 Issue of Identity cards6 Collection and Remittance of fees

7 Issue of Books/ Uniforms8 Time Table Management

9 Examination 10 Issue of report Cards

11 Provident Fund, SLI, GIS, GPAIS12 Loans

13 Audit14 Budget Estimation of Plan and Non Plan Funds

15 Bill preparation16 Expenditure Statement

Sl. No Functional Requirements Specification

1 Student Admission2 Provision for apply online

3 Provision for preparing interview schedule for the admission4 Provision to prepare selection list

5 Provision to intimate parents through SMS or E-mail6 Provision to generate unique ID for admitted student

7 Provision to view and search data on students based on various parameters

Page 127 / 277

Page 128: Request for Proposal for Design, Supply, Installation

8 Issue of Certificates

9 Provision for students to apply for various certificates with required documents if any

10 Provision to issue certificate to concerned students

11 Provision to view details of issued and pending certificates12 Attendance management of students

13 Provision for teaching staff in school to enter the attendance data on students

14 Provision to view and search attendance details of students based on date,student ID etc.

15 Provision to generate various statistics related to student attendance16 Provision for school to determine attendance shortage, if any of students

17 Provision for alerting the parents about the attendance shortage of students as SMS or E-mail

18 Disciplinary Action

19 Provision to maintain disciplinary action taken against students20 Provision to inform concerned authority and parents on misconduct,

disciplinary action and follow up action, if any

21 Issue of Identity cards22 Provision for generating cards from the students details

23 Provision to keep the issue details24 Collection and Remittance of fees

25 Provision for collecting admission fees / tuition fees/ Bus fees / special fees collected from each student as e-Payment

26 Provision to view collected fee details

27 Provision for generating various consolidated reports28 Provision to intimate the parents about the due dates of fee as SMS or E-

mail

29 Issue of Books/ Uniforms30 Provision for schedule the issue dates

31 Provision for enter the details of material issued and collection of cash32 Provision for cross checking the cash with material issued

33 Time Table Management34 Provision to automatically create time tables based on teachers, subjects

and working hours

35 Provision to manually edit / create time tables36 Provision to view and analyze teacher teaching hours.

37 Provision to print / save time tables in various formats38 Examination

Page 128 / 277

Page 129: Request for Proposal for Design, Supply, Installation

39 Provision for scheduling the examination time table40 Provision for prepare the question papers from the question bank

41 Provision for prepare class wise list 42 Provision for enter teacher’s remarks

43 Provision for teachers to enter marks of each student44 Provision to view the details of marks as class wise and student wise

45 Issue of report Cards46 Provision to prepare a rank list from the entered marks

47 Provision to generate report cards of each student48 Provision to intimate parents about the report cards as SMS or E-mail

49 Provision to view and update the issue details50 Provident Fund, SLI, GIS, GPAIS

51 Provision to submit application for admission to PF, SLI, GIS, EPF, ESI and GPAIS

52 Provision to store account details of PF, SLI, GIS, EPF, ESI and GPAIS for each staff

53 Provision view amounts available with PF, SLI, EPF and GIS accounts54 Loans

55 Provision for staffs to apply for various loans56 Provision for Principal to forward loan applications to concerned office

57 Provision for TDB to receive loan applications and inform the status of loan processing

58 Audit

59 Provision to receive intimations from TDB on audit dates60 Provision to generate audit statements

61 Provision to assist staff in answering common audit queries62 Provision to prepare an audit report

63 Provision to record audit objections and forward them concerned clerk staffs

64 Provision to forward rectifications and explanations for audit objections to TDB

65 Budget Estimation of Plan and Non Plan Funds66 Provision to prepare the proposal for both plan and non-plan fund

67 Provision to view previous year’s budget68 Provision to forward the proposal

69 Provision for allocate the fund to various purposes70 Provision for submit re-appropriation and additional fund request to

concerned authority

71 Bill preparation72 Provision to prepare various bills in pre-defined formats

Page 129 / 277

Page 130: Request for Proposal for Design, Supply, Installation

73 Provision to generate bills in pre-defined formats74 Provision to forward bills to concerned authorities / offices

75 Expenditure Statement76 Provision to view student wise income and expenditure

77 Provision for preparing a monthly and yearly Expenditure Statement 78 Provision to forward Expenditure Statement to concerned authority

20.6.10 Board Meetings

Sl. No Activities

1 Conduct of meetings2 Managing data of non-staff members in the board

3 Managing of Meeting Rooms4 Managing minutes of meetings

5 Intimation & messaging to members6 Meeting calendar management

7 Various reports

Sl. No Functional Requirements Specification

1 Provision to create multiple types of meetings2 Provision to maintain check list of accessories that required for meeting

3 Provision to view meeting room details4 Provision to conduct various kind of meetings

5 Provision to manage meeting agenda (Origin/ Background etc.)6 Provision to intimate the decision taken on each agenda to the origin

7 Provision to generate draft document corresponding to the decision taken on each agenda and forward to the origin

8 Provision to create meeting events

9 Provision to capture the details of participants of a meeting10 Provision to capture & maintain MOM

11 System should provide a configurable workflow mechanism for the approval of the MOM

12 Provision to attach MOM to a file

13 The system should have the provision to create, update or deletemeeting rooms with the following attributes:

14 Provision to check for the availability of the room

15 Provision to update the room occupancy details, once it is booked16 Provision to schedule the meeting and update in the calendar.

17 Provision to create an event through scheduler.

Page 130 / 277

Page 131: Request for Proposal for Design, Supply, Installation

18 Provision to reschedule the meeting

19 Provision to send alert to participant in case of scheduling/Re-scheduling and cancelling

20 Provision to integrate with personal scheduler of each member through HR portal

21 Provision to change the status of meeting room22 Provision to generate reports to display complete meeting details

23 Provision to generate reports to display list of meetings scheduled & completed

24 System should have a common window to view all the details related to meeting module

25 Provision to search by abstract, provision to enter keywords for search, tokeep index and catalog.

20.7 Maramath

20.7.1 Registration of Contractors

If any of the contractors wants to bid for any of the TDB tender, contractor must register in theTDB. Tender forms are issued to only those registered contractors and firms of approved by theTDB.

SI. No. Activities

1 Contractors submit predefined application forms / written request2 TDB verifies eligibility and approves / rejects the contractor

Sl. No Functional Requirements Specification

1 Should have provision to submit contractor registration forms electronically / offline mechanism

2 Should have provision to enter details from contractor registration forms received offline

3 Should have provision to assist in the verification of contractor eligibility

4 Should have provision to maintain list of registered contractors in TDB

5 Should have provision to renew / expire contractor registration 6 Should have provision to search and view approved list of contractors

7 Should have provision to view and track various work done by TDB contractors

20.7.2 Estimation

Proposals for various works including both civil and electrical are identified from temples,auditoriums and other offices under TDB. The estimates are prepared by Assistant Engineers (AEs)

Page 131 / 277

Page 132: Request for Proposal for Design, Supply, Installation

based on the standard Schedule of Rates (SoR) published by Public Works Department (PWD),Govt. of Kerala. These estimates are prepared as per the standard data which includes specificstandards and rates for arriving at the cost for different structures. The materials / items for whichstandard SoR are not available, market rates are used for preparing estimates. Plan drawings areprepared manually.The approving authority for estimates is Executive Engineers of respective Divisional (District)offices. Payment approval authority up to a certain limit fixed by Board office is respectiveExecutive Engineer. Presently, this limit is Rs.50,000/- for Executive Engineers, for estimates aboveRs.50,000/- and up to Rs.1,00,000/- needs approval from concerned Chief Engineer and estimatesabove Rs.1,00,000/- is to be approved by Board Office.

SI. No. Activities

1 Receive work proposals from various offices under TDB2 Prepare estimates based on SoR

3 Prepare abstract estimate form, data form and plan drawings4 Submit for approval

Sl. No Functional Requirements Specification

1 Should allow user to login the system with a user name and password

2 Should allow to register the category of the funding agency likeSelf(TDB)Government State FundsPrivate fundInternational

3 Should allow registering the funding agency details. The different sources of funds are maintained here. This will includeAgency ID (auto number)Agency Name AddressContact number

4 Should have Provision to allocate the project to a department

5 Should have Provision to allocate the in charge officer of the project

6 Should have Provision to enter the Estimated Start Date and Estimated End Date of the project

7 Should have Provision to create a hierarchy of activities in the project with details like Start Date, End Date, Status, Allocated resource, etc.

8 Should have Provision to capture the agreement/MOU/Undertaking details

9 Should allow to register the project. The system should capture the following detailsProject detailsFund AllocationProject ScheduleProject Amendment

Page 132 / 277

Page 133: Request for Proposal for Design, Supply, Installation

10 Should have Provision to attach any documents related to the project

11 Should allow capturing the principal investigator details. List of principal investigator for projects are maintained herePrincipal investigator ID (auto number)Principal investigator NamePrincipal investigator AddressPrincipal investigator email

12 Should have provision to update the business partner types like Employee, Contractor, etc. with reference to the TOR and the agreement/MOU/ Undertaking

13 Should allow entering total manpower number, manpower categories, manpower number in each category. The different categories of employees who work on a given project and their standard rate are givenhere. This is used to calculate the manpower cost of the project.ManpowerManpower Category Manpower rate

14 Should provide a provision to update the role of the team member

15 Should have provision to update the allocation percentage of the team member in the project

16 Should allow entering the project head. The list of project heads (capital,material, travel, overhead, etc.) for projects are stored with the followingdetails.Project head codeProject head description

17 Should allow to capture the project status. The details of whether a project is ongoing or is completed are stored here. If a project is closed the closing date is also stored. The information stored are Project codeProject statusClosed date

18 Should provide the project information. The information about the project based on which the monitoring is to be performed is maintained here. This includesProject codeProject typeProject titleProject areaPrincipal investigator detailsForeign travel detailsProject commencement dateProject member details

19 Should allow to enter amount heads. When a project is registered with the fund allocated for different heads are stored here. The details include

Page 133 / 277

Page 134: Request for Proposal for Design, Supply, Installation

Project codeProject head The amount allocated

20 Should have provision to create the different roles in the project

21 Should allow to enter fund utilization details. The amount utilized by a project in different heads is stored here. The details includeProject codeProject head codeAmount utilized

22 Should allow to enter transaction details. Details about expenses incurred against each project head is maintained hereTransaction code (auto number)Project codePurchase order numberPurchase order dateProject head of transactionAmountRemarks

23 Should allow to schedule project dates. The project schedule dates such as technical closure, financial closure (original or amended ) are maintained hereProject codeDate of Technical closureDate of financial closure

24 Should allow to enter project funding schedules. Funding/payment schedule of the project is maintained hereProject codeEvent of completionScheduled dateAmount to be received

25 Should allow to enter project fund receipts. Details about fund received for the project is stored hereProject codeThe fund receivedReceived dateScheduled date

26 Should allow to generate the utilization certificate. Utilization certificateis issued for the funds received for each project. The details of whether issued or not and other information about the certificate are also stored which is used to remind the personnel to issue a certificate. The details includeProject codeUtilization certificate issue dateAmount

27 Should allow to enter receipt of funds. The funds of each project are received at different stages. The details of the amount received for each

Page 134 / 277

Page 135: Request for Proposal for Design, Supply, Installation

project is stored here. The details includeProject codeDateNumberAmount

28 Should have the provision to amend the project. The system should capture the following details.Budget ReallocationRescheduling

29 Provision to view fund details of various projects

30 Should have provision to capture and monitor any time extension, deviation in the schedule of work etc.

31 Should have provision to capture and issue work completion certificate

32 Should have provision to issue testing certificates and maintain the details of the testing done at various buildings/sites

33 Should have provision to generate the report for the list of resources allocated to the project

34 Should have provision to generate the project chart as per the plan set in the project template

35 Should have provision to generate the report for the financial estimate ofthe project (Budget Estimate vs. Actual)

36 Should have provision to generate all the receipt and expense related to the project

37 Should have the provision for fund clearance certificate in equipment, travel and capital heads

38 Should have the provision to view/print individual project details

39 Should have the provision to take reports based on various parameters40 Should have the provision for sending mails/alerts while underutilization

or overutilization of funds

41 Should have the facility to generate fund closure certificate42 Provision to update the status of the project like Initiated, In-progress,

Completed, Cancelled

43 Provision to submit proposal to government and other agencies for projects

20.7.3 Fund Management

Various fund accounts are maintained by Maramath department of TDB. For different purposes, funds deposited or withdrawn from these accounts.

SI. No. Activities

1 Maintain accounts for various fund transactions

Page 135 / 277

Page 136: Request for Proposal for Design, Supply, Installation

2 Deposit / Withdraw money from respective accounts for various purposes

3 Keeps log of entire transactions

Sl. No Functional Requirements Specification

1 Should have provision to allocate fund to various offices

2 Should have provision to monitor fund allotted according to privileges of various offices

3 Provision to maintain log of account transactions

4 Should have provision prepare expenditure statements – activity wise / account wise etc.

5 Should have provision to search and view activity wise / account wise / transaction wise income / expenditure details according to privileges assigned to various offices / officers

20.7.4 Project Management

This module handles all the information related to Project fund Monitoring and Control. Theinformation given at the time of registration of a project is saved and the fund and date of closureare monitored. Alerts are displayed when a project runs on low funds or when it exceeds theallocated Budget.The main activities of project management module are

SI. No. Activities

1 Submission of proposal2 Project Registration

3 Fund Management4 Budget monitoring

5 Report generation

SI. No Functional Requirement Specification

1 Should allow user to login the system with a user name and password

2 Should allow to register the category of the funding agency likeSelf(TDB)Government State FundsPrivate fundInternational

3 Should allow registering the funding agency details. The different sources of funds are maintained here. This will includeAgency ID (auto number)Agency Name Address

Page 136 / 277

Page 137: Request for Proposal for Design, Supply, Installation

Contact number

4 Should have Provision to allocate the project to a department

5 Should have Provision to allocate the in charge officer of the project6 Should have Provision to enter the Estimated Start Date and Estimated

End Date of the project

7 Should have Provision to create a hierarchy of activities in the project with details like Start Date, End Date, Status, Allocated resource, etc.

8 Should have Provision to capture the agreement/MOU/Undertaking details

9 Should allow to register the project. The system should capture the following detailsProject detailsFund AllocationProject ScheduleProject Amendment

10 Should have Provision to attach any documents related to the project

11 Should allow capturing the principal investigator details. List of principal investigator for projects are maintained herePrincipal investigator ID (auto number)Principal investigator NamePrincipal investigator AddressPrincipal investigator email

12 Should have provision to update the business partner types like Employee, Contractor, etc. with reference to the TOR and the agreement/MOU/ Undertaking

13 Should allow entering total manpower number, manpower categories, manpower number in each category. The different categories of employees who work on a given project and their standard rate are given here. This is used to calculate the manpower cost of the project.ManpowerManpower Category Manpower rate

14 Should provide a provision to update the role of the team member

15 Should have provision to update the allocation percentage of the team member in the project

16 Should allow entering the project head. The list of project heads (capital, material, travel, overhead, etc.) for projects are stored with thefollowing details.Project head codeProject head description

17 Should allow to capture the project status. The details of whether a project is ongoing or is completed are stored here. If a project is closed the closing date is also stored. The information stored are Project codeProject status

Page 137 / 277

Page 138: Request for Proposal for Design, Supply, Installation

Closed date

18 Should provide the project information. The information about the project based on which the monitoring is to be performed is maintainedhere. This includesProject codeProject typeProject titleProject areaPrincipal investigator detailsForeign travel detailsProject commencement dateProject member details

19 Should allow to enter amount heads. When a project is registered with the fund allocated for different heads are stored here. The details includeProject codeProject head The amount allocated

20 Should have provision to create the different roles in the project

21 Should allow to enter fund utilization details. The amount utilized by a project in different heads is stored here. The details includeProject codeProject head codeAmount utilized

22 Should allow to enter transaction details. Details about expenses incurred against each project head is maintained hereTransaction code (auto number)Project codePurchase order numberPurchase order dateProject head of transactionAmountRemarks

23 Should allow to schedule project dates. The project schedule dates such as technical closure, financial closure (original or amended ) are maintained hereProject codeDate of Technical closureDate of financial closure

24 Should allow to enter project funding schedules. Funding/payment schedule of the project is maintained hereProject codeEvent of completionScheduled dateAmount to be received

Page 138 / 277

Page 139: Request for Proposal for Design, Supply, Installation

25 Should allow to enter project fund receipts. Details about fund received for the project is stored hereProject codeThe fund receivedReceived dateScheduled date

26 Should allow to generate the utilization certificate. Utilization certificate is issued for the funds received for each project. The details of whether issued or not and other information about the certificate are also stored which is used to remind the personnel to issue a certificate. The details includeProject codeUtilization certificate issue dateAmount

27 Should allow to enter receipt of funds. The funds of each project are received at different stages. The details of the amount received for eachproject is stored here. The details includeProject codeDateNumberAmount

28 Should have the provision to amend the project. The system should capture the following details.Budget ReallocationRescheduling

29 Provision to view fund details of various projects

30 Should have provision to capture and monitor any time extension, deviation in the schedule of work etc.

31 Should have provision to capture and issue work completion certificate

32 Should have provision to issue testing certificates and maintain the details of the testing done at various buildings/sites

33 Provision to request an item from Store/Request with item name, quantity, reason, any comments, no: of days of usage, date and time of request etc

34 Should have provision to generate the report for the list of resources allocated to the project

35 Should have provision to generate the project chart as per the plan set in the project template

36 Should have provision to generate the report for the financial estimate of the project (Budget Estimate vs. Actual)

37 Should have provision to generate all the receipt and expense related tothe project

Page 139 / 277

Page 140: Request for Proposal for Design, Supply, Installation

38 Should have the provision for fund clearance certificate in equipment, travel and capital heads

39 Should have the provision to view/print individual project details

40 Should have the provision to take reports based on various parameters

41 Should have the provision for sending mails/alerts while underutilization or overutilization of funds

42 Should have the facility to generate fund closure certificate

43 Provision to update the status of the project like Initiated, In-progress, Completed, Cancelled

44 Provision to submit proposal to government and other agencies for projects

20.7.5 e-Tendering / Quotations /Comparative Statements

There should have the provision to e-Tendering. The facility should allow processing of tenders online. The system should enable the vendors to download the tender schedule free of cost and submit the bids online through this portal.

SI. No. Activities

1 Tender invitation2 Receiving tenders

3 Fixing a tender4 Execution of security agreement with the tender and receiving security

deposits

5 Processing of tenders to obtain best tender

SI. No Functional Requirement Specification

1 Capability of a user to request a material for purchase/ indent

2 System should capture the details of the indent that is identified by a unique number

3 Ability to add more than one material to an indent4 System should have the provision for the indent to undergo various

status changes like created, submitted, approved, closed, rejected and cancelled

5 Ability to check the availability of requested items in store.

6 System should have the provision to notify the appropriate persons for the indents waiting for approval

7 Ability to modify the Sanction or approval amount limit for a particular User

8 Provision to capture the remarks by different approvers

9 Ability to push the tender to any committee for approval10 Provision to check availability of sufficient funds from the budget for

an indent

Page 140 / 277

Page 141: Request for Proposal for Design, Supply, Installation

11 Provision to set up Types of Tender and the days required to respond to that type of Tender

12 Provision to capture tender details like Title, Place of execution, Mandatory documents, Earnest money deposit, etc.

13 Provision to associate a tender to more than one indent14 Ability to capture response from more than one supplier

15 Should capture the Response number, date, supplier details, contact person for a quotation

16 Ability to capture advance requested for supply of materials

17 System should have the provision to capture Indian currency, foreign currency amount and exchange rate

18 Ability to capture Guarantee/ Warranty and Validity details

19 Ability to capture the Quotation Number and Quotation Date details20 Provision for vendor management

21 Provision for Purchase Order Integration22 Provision to view Purchase Order Status

23 Provision for e-Payment24 Provision for e-Invoicing

25 Provision for contract management

20.7.6 Work Order

After finalizing tenders, work order will be issued to contractors. Selection notice and contract agreements will be executed.

SI. No. Activities

1 Prepare selection notice, agreements, and handover site

Sl. No Functional Requirements Specification

1 Should have provision to prepare selection notices

2 Should have provision to prepare contract agreements

3 Should have provision to prepare draft schedule agreements

4 Should have provision to maintain details of work order, contract agreements etc.

5 System should have provision to intimate concerned group offices

6 System should have provision to search and view work order details according to roles assigned to various offices / officers

20.7.7 M-Book

Payments for all works which are susceptible of measurement are done on the basis of measurement

Page 141 / 277

Page 142: Request for Proposal for Design, Supply, Installation

recorded in the Measurement book (M-Book). The M-Book is, therefore, an initial and veryimportant book of accounts record which should be properly maintained and safely kept by theperson to whom it is issued.All M-Books should be serially numbered and an account of their issue and receipt back should bekept in the Register of M-Books. All pages of an M-Book should be machine numbered and acertificate of number of pages contained in the M-Book should be recorded by the user on its firstpage. Instructions given in the fly leaf of MB should be carefully followed and its index should beregularly filled in. Measurements in the M-Book should be recorded by a person not below the rankof Assistant Engineer. Each set of measurement (record entry) in case of a works contract mayinclude the following entries:

Full name of the work (as given in the estimate/agreement)

Site of work Name of the contractor Agreement number and date Estimate number and date Date of record entry (measurement) Reference to last measurement Stipulated date of commencement of work Stipulated date of completion of work Actual date of completion of work (if completed)

SI. No. Activities

1 Keeps a register of M-Books with name of custodian, M-Book number with serial numbers, number of pages etc.

2 Assistant Engineers visits work sites and records measurements of work so far completed in M-Book

3 Submits M-Books for verification and approval by Executive Engineer

4 Submits M-Books for bill settlement and part / full payment

Sl. No Functional Requirements Specification

1 Should have provision to maintain M-Book electronically so that the same can be forwarded online for verification and payment approvals

2 Should have provision to identify each M-Book by a unique number

3 Should have provision to keep a log of M-Books issued, custodian, serial numbers etc.

4 Should have provision to forward M-Book to Executive Engineers for verification and approval

5 Should have provision to forward M-Book details to Executive Engineer / Chief Engineer / Board Office for full / part payment approvals

Page 142 / 277

Page 143: Request for Proposal for Design, Supply, Installation

20.7.8 Recovery of Unserviceable materials

A survey report of unserviceable materials is prepared by concerned Assistant Engineers. The valueof these unserviceable materials is calculated and a fixed percentage (currently, 20%) of this isdeducted as keeping charge. If this was done as part of work contract, the recovery bill is usuallyadjusted in the bill of contractor itself with the consent of contractor. A recovery certificate is alsoissued to the contractor stating recovery will be adjusted against contractor’s bill and hence it iscontractor’s property.

If the contractor is not willing to adjust bill for recovery part, auction notices will be declared anduntil the auction process is completed, the security deposit from the contractor will not be released.The recovery bill is approved by Executive Engineer / Chief Engineer / Board Office based onlimits setup by Board.

SI. No. Activities

1 Prepare survey report of unserviceable materials

2 Calculate unserviceable material value and keeping charges

3 Adjust the amount in the recovery part of final / part bill of contractor, if recovery is part of a work contract and contract willing to do so. Conduct auctions, otherwise

4 Submit recovery bill for approval to concerned Executive Engineer / concerned Chief Engineer / Board Office

Sl. No Functional Requirements Specification

1 Should have provision to maintain data from survey report of unserviceable materials

2 Should have provision to calculate value of unserviceable materials and also keeping charges

3 Should have provision to adjust the recovery bill against a work contract

4 Should have provision to conduct auctions, if point 3 above is not done

5 Should have provision to forward recovery bill to Executive Engineer /Chief Engineer / Board Office as per the amount limits set by Board

20.7.9 Part Bill preparation

The contractor shall notify TDB upon completion of any part of the work in respect of which anypart payment is claimed pursuant to the contract. The Assistant Engineer evaluates the work so farcompleted by the contractor and updates M-Book. The M-Book is referred for preparing part bills.

Bills are prepared in relevant formats on the basis of measurements recorded in M-Book and anydeviations from draft schedule agreements will be recorded. A fixed percentage of contractor’s partbill (currently, 10%) is withheld as retention amount and should transfer to Security Depositaccount. Recovery part, if any for the bill is also calculated. Survey Report of unserviceablematerials during renovation or construction works is prepared. The value of these unserviceable

Page 143 / 277

Page 144: Request for Proposal for Design, Supply, Installation

materials is calculated and a fixed percentage (currently, 20%) of this is deducted as keeping charge.The value of unserviceable materials is usually adjusted in the bill of contractor as recovery part ofthe bill. The part bill is approved by Executive Engineer / Chief Engineer / Board Office based onlimits setup by Board.

SI. No. Activities

1 Receive requests from contractors for part payments2 By referring M-Books and Draft schedule agreements, prepare part bill

3 Include retention amount and recovery amount, if any in part bill calculation

4 Submit part bill for payment approval to concerned Executive Engineer / concerned Chief Engineer / Board Office

Sl. No Functional Requirements Specification

1 Should have provision to receive part payment requests from concerned Assistant Engineers

2 Should have provision to refer and view current M-Book data for the work and Draft schedule agreements

3 Should have provision to assist in preparing part bill amount4 Should have provision to calculate retention amount

5 Should have provision to calculate and include recovery amount, if any6 Should have provision to forward part bill for payment approval to

concerned Executive Engineer / concerned Chief Engineer / Board Office based on limits set by Board

20.7.10 Final Bill preparation

The contractor shall notify TDB upon successful completion of contract work in respect of whichfull payment is claimed. The Assistant Engineer evaluates the work done by the contractor andupdates M-Book. The M-Book is referred for preparing final bills.

Bills are prepared in relevant formats on the basis of measurements recorded in M-Book and anydeviations from draft schedule agreements will be recorded. Recovery part, if any for the bill is alsocalculated. Survey Report of unserviceable materials during renovation or construction works isprepared. The value of these unserviceable materials is calculated and a fixed percentage (currently,20%) of this is deducted as keeping charge. The value of unserviceable materials is usually adjustedin the bill of contractor as recovery part of the bill. The final bill is approved by Executive Engineer/ Chief Engineer / Board Office based on limits setup by Board.

SI. No. Activities

1 By referring M-Books and Draft schedule agreements, prepare final bill

2 Include recovery amount, if any in final bill calculation

3 Submit final bill for payment approval to concerned Executive Engineer / concerned Chief Engineer / Board Office

Page 144 / 277

Page 145: Request for Proposal for Design, Supply, Installation

Sl. No Functional Requirements Specification

1 Provision to view status of contract works

2 Should have provision to refer and view current M-Book data for the work and Draft schedule agreements

3 Should have provision to assist in preparing final bill amount

4 Should have provision to calculate and include recovery amount, if any

5 Should have provision to forward final bill for payment approval to concerned Executive Engineer / concerned Chief Engineer / Board Office based on limits set by Board

20.7.11 Defects, Liability Period

There shall be a Defects Liability Period of fixed months (currently, 6 months) for all worksexecuted by the contractor under the agreement. If any defects detected during this period, theSecurity Deposit of the contractor will not be released until the work is redone. If the contractorrefuses to repair, Security Deposit will be forfeited to Devaswom Commissioner Account.

SI. No. Activities

1 Check whether any defects reported from work sites within 6 months of work completion by contractor

2 If defects detected, withheld security deposit of the contractor and intimate contractor about the defect

3 If no defects detected, recommend release of security deposit to the contractor

Sl. No Functional Requirements Specification

1 Should have provision to set defects, liability period

2 Should have provision to receive defect reports from work sites

3 Should have provision to prepare communications to concerned contractors

4 Should have provision to withheld security deposit of contractor

5 Should have provision to forfeit security deposit of contractor

6 Should have provision to release withheld security deposit of contract once work is redone.

20.7.12 Release of Security Deposits

After a contract has been fulfilled, any payment made the security deposit should be released orrefunded to the contract/firm. As per the current rule, the Security Deposits should be released aftera period of six months of expiration of the contract.

Page 145 / 277

Page 146: Request for Proposal for Design, Supply, Installation

SI. No. Activities

1 Release Security Deposits to contactors2 Issue of No Liability Certificate (NLC) to contractors

Sl. No Functional Requirements Specification

1 Should have provision to verify whether any defects during liability period reported

2 Should have provision to release Security Deposits to contractors

3 Should have provision to issue NLC to contractors

4 Should have provision to view the status of works and contractors to concerned offices / officers

20.7.13 Auctioning of shopping complex/Estate property/Furniture

Auctioning of TDB owned shopping complex / estate property / furniture or other items are donethrough auctioning notices which are published in TDB websites, newspapers etc. Group officesprepare a list of items to be auctioned. Intending bidders should remit Earnest Money Deposit(EMD). A fixed percentage of asset value (currently, 50%) may have to be remitted by the winner ofthe auction immediately after the auction. The asset value is remitted to the account of DevaswomCommissioner through challan. Auction values up to fixed limits are approved by Chief Engineeroffice and higher amounts by Board office.

SI. No. Activities

1 Prepares list of items to be auctioned2 Assigns auction number and schedules auctions

3 Publishes auction notices in websites, newspapers etc.4 Auction values sent for approval to respective Chief Engineer or to the

Board office

Sl. No Functional Requirements Specification

1 Should have provision to prepare and maintain list of items to be auctioned

2 Should have provision to identify each auction by a unique number

3 Should have provision to schedule auction date, venue and to maintain various other parameters such as EMD etc.

4 Should have provision for maintaining various amounts received in auctioning process

5 Should have provision to prepare various bills

6 Should have provision forward auction details to Chief Engineer office /

Page 146 / 277

Page 147: Request for Proposal for Design, Supply, Installation

Board office for approval

7 Should have provision for maintaining asset hand over details

8 Should have provision to remit auction values to Devaswom Commissioner account electronically

9 Should have provision to search and view auctions and status according toprivileges assigned to various offices

20.8 PayrollThe payroll consists of computation and disbursement of All TDB employees Salary, Arrears,Income Tax, House Loan Details, Pay Card (Annual Pay report), Insurance Details, Provident FundDetails, Professional Tax Calculation, Bonus Computation, Loans and Advances, InsurancePayments and Report Generation.

20.8.1 Salary Computation

The TDB are generating salary AT once in a month, by grouping employee’s categories. TheAdministration/HR section handle leave statements and leave settlements. A new system foremployees leave management should be incorporated with HR application. For salary computationonly the loss of pay statement generated from HR is enough. During salary computation, the systemwill take leave data from leave database and deduct the salary if is it applicable based on leaverules. The employees working in the TDB are categorized as grade/categories. Separatecomputation rules have to be defined based on categories/grades. But the salary can be processedthrough a single process window. For computing salary, salary accounts heads shall be definedunder Account Officer Head categories. If Account Officer head Balance is in sufficient thanremaining amount will transfer from commissioner account heads.

Earnings Basic Pay DA HRA CCA Special allowances DA Arrears others etc

Deductions PF GWF WF EBS LIC PLI IT etc

Recoveries

TDB loans

Page 147 / 277

Page 148: Request for Proposal for Design, Supply, Installation

Bank Loans Society Loans etc.

Salary computation rules should be defined which includes pay scales, DA, HRA, PF etc.One time fixation of pay (pay fixation) to employees should be defined through the System. Payfixation can be modified at the time of promotion or at the time of pay revision.For computing salary, the system should get data from deductions head and details from recoveryheads. By consolidating all these heads, the salary for a month can be computed. After validatingthe salary statement, bank statement for salary along with voucher is passed to cash section. Thecash section will transfer the statement along with cheque or instruction for electronic transfer tobanks. Banks will credit the salary to employee’s bank account. Similarly deductions areconsolidated separately and contingent bills generated and schedules along with voucher passed tocash section. Cheques are generated against schedules and dispatched to concern agenciesOther things to be considered for salary computation apart from monthly routines are

Probation , Confirmation of employees Promotion Deputation Demotion/ Reversion Dies-non (can be regularized latter) Maternity leaves etc

Pay and DA arrears can be computed separately and migrated to salary or PF whenever required.

Sl. No. Requirement Specifications - Salary Computation

1 Provision to get employee data from HR database.2 Provision to get data from Leave management data tables.

3 Provision for defining employee categories, if not defined in HR.4 Provision for defining Pay scales for all employees, if not defined in HR. It

shall be possible to setup the active pay scales and all changes to the pay scales will be tracked using the with effect from date.

5 Provision for defining banks. All the bank information through which different payments are made is managed through this option.

6 Provision for defining Placement Category, if not defined in HR. All the placement category information like Permanent, Contract Daily wages, Deputation etc. shall be defined here.

7 Provision for defining reliving types, if not defined in HR. Different relieving types like Retirement, Resignation, Death etc. will be defined here.

8 Provision for defining employee nominees, if not defined in HR. Employeenominee information that is required for PF and other recoveries shall be defined here.

9 Provision to get new employee data from HR. New employee data should be verified. Dates like pay scale, joining date, relieving date etc to be verified. After verification employee shall be rerolled into a payroll list.

Page 148 / 277

Page 149: Request for Proposal for Design, Supply, Installation

10 Provision for setting up of the financial year.

11 Provision for defining salary account heads. All the salary accounts ie. Earnings, Deductions and Recovery accounts shall be defined in the system. For deduction and recovery accounts it shall be possible to set the recovery priority. It shall be possible to define computation rules for different accounts like percentage of basic etc. Provision shall be given to group the salary accounts and in pay-slip and other reports group can be printed. For eg. for LIC, Housing Loans etc, multiple amounts will be grouped and printed in the payslip. The details includeAccount CodeAccount NameAccount Type (Earnings/Deduction/Recovery)Computation RuleAccount GroupTaxable or NotRecovery priorityApplicable MonthsCurrently Active or BlockedMax limit if any etc

12 Provision for defining agencies.

13 Provision for defining Loans and advance types.14 Provision for defining Policy types.

15 Provision for defining different slabs (like professional tax etc).16 Provision for defining Salary computation rules.

17 Provision for withholding salary for employees. 18 Provision for giving salary other than monthly computation (salary at the

time of withhold).

19 Provision for Fixing of Salary Heads for each employee Earnings, deduction and recovery accounts and rules that are applicable to different employees shall be defined in the system. This will be one time setup. After that the system will automatically compute the payroll based on these settings. It shall be possible to define the details for individual employee or for group of employees. Any changes made to this information will be tracked and stored as transaction history. The details includeEmployeeSalary Account (Basic, EPF etc)Individual Computation rule if anyFixed amount if anyBlocked for this monthActive/Blocked permanently

20 Provision for adding/ updating Loans & Advances.Different loans and advances taken by employees will be entered into the system. During payroll computation system will automatically take the installment amount of loans based on the balance number of installments. Provision shall be given to block/postpone the loan recovery. It shall be

Page 149 / 277

Page 150: Request for Proposal for Design, Supply, Installation

possible to store any number of loans for a particular employee. The detailsinclude

EmployeeLoan nameLoan Account NumberBank/AgencyLoan AmountInstallment amountTotal No of InstallmentsBalance InstallmentsBlocked recovery for this monthActive/Blocked permanently, etc

21 Provision for adding/ updating PoliciesDifferent Insurance policies taken by employee shall be entered into the system. It shall be possible to enter any number of policy information for an employee. During salary computation, the sum of all the policy premium amounts will be taken for calculation. Provision shall be given to block the recovery if required. The details includeEmployeePolicy Type & AgencyPolicy NumberPremium AmountBlocked recovery for this monthActive/Blocked permanently ,etc

22 Provision for import data files (excel, word, etc) against monthly deductionheads if any

23 Provision for grouping employees into different salary group for salary computation

24 Provision for Processing, Discarding and Confirming Salary computation every month.After entering all the transactions for the month, the payroll for the month can be computed. All the payroll components for the employees will be computed and the pay slip data of the employees will be generated. Variousoptions like provision to see abnormal salary etc are available at this point for verification of the payroll data.If any errors are found, the computed payroll can be discarded, the required corrections done, and the payroll computation done again. After the payroll is computed and verified it shall be possible to confirm the payroll of that month and after that it will not be possible to process the payroll.

25 Provision for generating schedules of all salary heads of employees shall be included in the system.

26 Provision for generating PF statement shall be included in the system.

27 Provision for generating monthly bank statement shall be included in the system.

Page 150 / 277

Page 151: Request for Proposal for Design, Supply, Installation

28 Provision for printing salary slip and provision for employees to view theirpay slip through HR portal should be there in the system.

29 Provision should be there for taking recovery statements ( loan, insurance etc).

30 Provision should be there for originating dynamic reports from payroll data.

31 Provision should be there for defining role-based access for data entry, processing, verifying, confirming etc.

32 Provision should be there to generate Salary bill number and other bill number based on salary head, budget head or based on agencies or banks.

33 Provision for issuing the salary certificate.34 Provision should be there for generating Salary variance report.

20.8.2 Arrear Management (Pay & DA)

Arrears were processed at the time of government order to increase the DA percentage or during thepay revisions. Arrear processing will include the calculation of DA arrears and Pay arrears due tochange in DA percentage and Basic pay with effect from a previous date. Month wise Due andDrawn amount of different salary components will be calculated and the difference will be the paidas arrears.

SL. No. Requirements Specification - Arrear Management

1 Provision for defining new DA percentage for calculating DA Arrears.

2 Provision for defining Pay revision and setting rules for calculating Pay Arrears.

3 Provision for Arrear ProcessingIt shall be possible to process the employee’s salary and apply the arrear changes and generate the arrears for any period. This shall be done as a separate process and transferred into the monthly salary or merged with PF for disbursement. Salary account wise split up of arrears shall be stored in the system. It shall be possible to compute arrears of retired/relieved employees.

4 Provision for Arrear DisbursementIt shall be possible to disburse the arrear through the monthly salary or can be merged with PF. Percentage of the amount to be merged shall be defined. Cheque disbursement provision shall also be given for arrear payment.

5 Provision should be there for editing data generated by system for adjustments.

6 Provision should be there for generating Arrear schedules.

7 Provision should be there for printing due-drawn statement.

Page 151 / 277

Page 152: Request for Proposal for Design, Supply, Installation

20.8.3 Surrendering of Leaves

TDB employees those who are in regular pay can surrender their earned leaves (EL), etc. They cansurrender 30 days EL in a financial year, otherwise they can surrender at the time of retirement.During retirement they can surrender a maximum of 300 ELs This is computed separately anddisbursed to employees. The surrendering of leaves at the time of retirement is treated as TerminalBenefits

SL. No. Requirements Specification – Surrendering of Leaves

1 Provision should be there to apply leave encashment for all employees.2 Provision should be there to get the balance days of leaves for employees.

3 Provision should be there to calculate the amount based on leave

surrendering rules.

4 Provision should be there to account the transactions in corresponding

budget heads.

5 Provision should be there generate various types of report.

20.8.4 Surety Monitoring

TDB employees have the privilege to take loans and give surety to other employees within theirsalary limitations. Based on their salary and loan/surety amount employees can take any number ofloan/surety, but conditions applied A system which can monitor all activities.

SL. No. Requirements Specification – Surety Monitoring

1 Provision for defining surety type, liability limit etc2 Provision for entering employees loan/surety data and for updation

3 Provision should be there to generate the salary certificate4 Provision should be there to generate loan/surety details

5 Provision for non-interest loan through medical reimbursement6 Provision should be there to generate employee wise/ undertaking wise etc

7 Provision to view status8 Provision to generate non-liability/ liability Certificate

20.8.5 PF Computation

As per Kerala Public Service Acts 1968, TDB employees are eligible for availing Provident Fund.Employees can nominate family members as nominees. Employees can fix the PF amount and thismay range from 6% of the emoluments (basic) and not more than the emoluments. The employee

Page 152 / 277

Page 153: Request for Proposal for Design, Supply, Installation

can intimate the fixation of the amount of his/her monthly subscription in every financial year. PF iscomputed monthly as part of salary computation. The fixed PF amount is deducted from salary andcredited to employees PF account. Interest-bearing at such rate as prescribed from time to time byGoI and adopted by GoK subject to a minimum of four percent will be credited to the employeesaccount. PF can be surrendered only at the time of retirement (an exemption of 3 months is given),but employees can avail PF loans on refundable or non-refundable basis based on rules. No interestwill be calculated for PF loans. Similarly Temporary Advance for specific purposes can besanctioned based on rules. The final withdrawal of accumulations in the PF is possible for anemployee when he/she quits the service (on retirement, dismissal, resignation, compulsoryretirement, removal, death while in service etc., the amount standing to his credit in the fund shallbecome payable to the employee.

During the service period if an employee gets any pay revision arrears or DA arrears then it will be transferred to PF account. A locking period is enforced for availing loans or advances from arrear amount transferred into PF.

SL. No. Functional Requirement – Provident Fund

1 Provision for fixing employees PF amount and with effect date.

2 Provision for capturing nominee details.

3 Provision for re-fixing the PF amount .

4 Provision for defining interest percentage and the periodic changes in

interest percentage keeping the with effect date .

5 Provision for allotting employees to take temporary advance.

6 Provision for employees to take refundable and non-refundable loans.

7 Provision for defining general rules for calculating PF.

8 Provision for calculating Interest amounts.

9 Provision for merging DA/ Pay arrears to PF.

10 Provision for setting lock period from availing loans or advances from

arrear amount transferred into PF.

11 Provision for employees to view the opening balance and PF statement

through HR portal.

12 Provision to view PF balance for the purpose of loan eligibility

calculation i.e. excluding the arrears amount credited to PF a/c which is

still under lock period. PF balance for purpose of eligible loan calculation

will always be <= actual PF balance at credit of the employee.

Page 153 / 277

Page 154: Request for Proposal for Design, Supply, Installation

13 Provision to calculate the balance installments’ in the case of refundable

loans.

20.8.6 Pension Computation

TDB IS permitting Pension facilities to employees under State government rules, KSR part III(Pension Rules). Administration section prepares a list of employee’s those who are going to retirewithin a period of six months. This is circulated in order to get the non-liability/liabilities of theretiring employee’s. This is finally circulated to Finance for calculating the employee's monthlyPension amount, Death-cum Retirement Gratuity (DCRG), Commutation Pension etc. Theemployee’s last month salary/average salary for the last 10 months prior to retirement is reckonedfor calculating Pension. Terminal benefits will be calculated based on employees number of yearsservice, EL balance etc. If employees have any recoveries then, that amount can be deducted fromterminal benefits. The TDB will keep Pension Book for each employee. Similar to salarycomputation, monthly pension computation process which includes IT deductions if any, any otherrecoveries implied to pensioners should be done. Pension can either credited to the employees bankaccount or cheques can be issued.

SL. No. Functional Requirements - Pension

1 Provision to verify employees' non-liability/ liability details.

2 Provision for enrolling/updating an employee in Pension Service Book.

3 Provision for calculating the terminal benefits under the contributory

pension scheme and also non-contributory pension scheme.

4 Provision for verifying the checklist

5 Provision for defining Qualifying Service Criteria's.

Years of experience for Minimum pension

Years of experience for Maximum pension

Years of experience for Minimum DCRG

Years of experience for Maximum DCRG

Years of experience for Minimum pension to handicapped etc.

Years of experience in other organizations prior to joining (which is

reckonable for pensioner benefits as per rules)

6 Provision for defining Average Emoluments.

7 Provision for defining DCRG computation rules.

Page 154 / 277

Page 155: Request for Proposal for Design, Supply, Installation

8 Provision for defining Family Pension rules.

9 Provision for defining Commutation Pension rules. Like max. pension

that can be commuted restoration period of commutation etc.

10 Provision for recovering any balance amount as loan from DCRG,

Commutation Pension etc.

11 Provision for Pension Arrear computation.

12 Provision for calculating revised pension, if applicable

Listing of employees who are eligible for revision

Period of revision

Defining revised slab

Computation of revision

13 Provision for deducting IT from Pensioners.14 Provision for defining IT slabs for pensioners.

15 Provision to generated IT Projections.16 Provision for recovering loans from pension as a continuation from

service.

17 Provision for defining rules for Family pension.18 Provision for computing monthly pension.

19 Provision for generating bank statement for pension.20 Provision for ITR submission.

21 Provision for generating form16 for pensioners.22 Provision for generating monthly/annual reports etc.

20.8.7 Income Tax Computation

Anticipatory statement for Income tax will be prepared for all employees with their salary details. Based on this IT deductions are forced to employees. Form16 will be prepared at the end of the tax year and given to employees.

Through the new income tax system, all the facilities for computing the employee’s income tax will be automated with salary details . It shall be possible to define the income tax rules and enter the taxrelated information of employees. Savings items will be categorized into different sections as per the income tax rules. Income tax processing will calculate the tax of employees based on the salary, other income, savings etc and applying the income tax rules. Anticipatory statement and monthly ITprojections can be automatically generated with the employee's salary data. Employees can view their IT statements through HR portal.

Page 155 / 277

Page 156: Request for Proposal for Design, Supply, Installation

SL. No. Requirement Specifications - Income Tax Computation

Page 156 / 277

Page 157: Request for Proposal for Design, Supply, Installation

1 Provision for defining different income types.2 Provision for defining IT savings section/ savings types etc.

3 Provision for defining Tax exemption limits.4 Provision for defining Tax rates.

5 Provision for defining Tax cess.6 Provision for defining rules/slabs etc.

7 Provision for entering Pan Card number, if not entered through HR.8 Provision for entering employee’s saving data.

9 Provision for entering house rents.10 Provision for entering house loan interests.

11 Provision for entering tax refunds.12 Provision for Income tax processing.

1. Tax Projection

Provision shall be given in the system to generate the tax projection of

employees based on the month and year selected by the user. The system will

automatically take the salary up to the previous month as actual salary and last

month's salary will be projected for the future months. Savings and other taxable

information entered into the system will also be considered in tax projection.

1.1 Tax Projection Processing

It shall be possible to process the tax projection of employee’s

individually or as a group. The system will generate the tax projection

data and store it in the system as projection for the particular month.

1.2Confirm Tax Recovery

After the tax projection processing, it shall be possible to recover the

monthly tax by transferring the tax recovery data into payroll (Salary

computation). Monthly tax recovery amount will be total projected tax

divided by the remaining number of months. Through the confirm tax

recovery option user can update the salary recovery in payroll.

2.Year End Tax Processing

At the end of the financial year, the final tax processing will be done and

final tax of employees will be generated. It shall be possible to update any

other tax refund/recovery into the system.

2.1 Tax Processing

Actual salary of employees for that financial year will be taken for the

final tax processing. Savings details that are verified and confirmed will

also be considered for tax calculations.

Page 157 / 277

Page 158: Request for Proposal for Design, Supply, Installation

2.2 Confirm Tax

Provision shall be given in the system for reprocessing the tax in order to

incorporate changes and corrections in the final income tax data. After

processing the tax, it shall be verified and once the tax is finalized it

should be confirmed in the system. After that it will not be possible to

incorporate any changes to the income tax data.

13 Provision should be there for taking the projection statement.14 Provision should be there for generating Form16.

15 Provision should be there for generating quarterly and annual statement.16 Provision should be there for verifying savings declaration and statement.

17 Provision should be there for listing out of employees those who didn't

submit savings statement and proof.

18 Provision should be there for generating IT variance report.

20.9 Estate Office

20.9.1 Estate Management

Sl. No Activities

1 Capture Details of Estate2 Estate Staff details

3 Plantation4 Revenue generated details on each activity

5 Alerts6 Reports

Sl. No Functional Requirements Specification

1 Provision to capture the details of estate like no: of trees, no: of blocks, area etc

2 Provision to know the details of employees assigned to estate

3 Provision to capture the no: of trees planted, the time and date of plantation, no: of blocks divided etc

4 Provision to capture the details of purchasers

5 Provision to capture the quantity, batch no/no’s: , and income after each sale

6 Provision to monitor the account head related to estate

7 Provision to capture the date of sale, date of payment receipt, staff id of officer in charge of sale etc

Page 158 / 277

Page 159: Request for Proposal for Design, Supply, Installation

8 Provision to capture the date of sale, date of payment receipt, mode of payment details like cash, cheque (if cheque then cheque no:, cheque dateetc),Electronic Bank transaction(capture Transaction no:), staff id of officer in charge of sale and auction etc

9 Provision to generate dynamic reports based on various parameters involved in this module

20.9.2 Nilakkel Rubber Estate Management

TDB owns a Rubber Estate at Nilakkel which draws in a good revenue to TDB. Rubber plantationis to be properly cared and managed. TDB has appointed many staffs as rubber tappers and caretakers. Income is proportional to the Dry Rubber Content generated (DRC) from Rubber Milk.

Sl. No Activities

1 Capture Details of Rubber Estate2 Estate Staff details

3 Rubber Plantation4 Rubber tapping

5 Rubber Latex Sale based on DRC6 Rubber Scrap sale

7 Rubber wood sale8 Other plantation item sale(plastic items/buckets etc)(mainly scraps)

9 Revenue generated details on each activity10 Alerts

11 Reports

Sl. No Functional Requirements Specification

1 Provision to capture the details of estate like no: of trees, no: of blocks, area etc

2 Provision to know the details of employees assigned to estate

3 Provision to capture the no: of trees planted, the time and date of plantation, no: of blocks divided etc

4 Provision to capture the date and blocks of tapping

5 Provision to set minimum interval between two tapping for a block

6 Provision to assign staffs to specific blocks

7 Provision to capture the quantity of rubber latex and other related rubber materials (Scrap etc) obtained in each tapping from each block . Provision to capture these with respect to staff i.e. quantity of latex and scrap collected by each staff.

8 Provision to set an estimated value for quantity of latex, scrap etc to be collected in a tapping

9 Provision to set the collected quantity from each tapping into a batch

Page 159 / 277

Page 160: Request for Proposal for Design, Supply, Installation

10 Provision to capture the quantity and batch of latex sent for DRC checking(to find the percentage of Dry Rubber Content in Latex)

11 Provision to capture the percentage of DRC after testing for a batch12 Provision to capture the details of purchasers

13 Provision to capture the quantity, batch no/no’s: , and income after each sale

14 Provision to monitor the account head related to rubber estate

15 Provision to capture the date of sale, date of payment receipt, staff id of officer in charge of sale etc

16 Provision to sale Rubber latex, Scrap, Rubber wood etc through auction

17 Provision to capture the date of sale, date of payment receipt, mode of payment details like cash, cheque (if cheque then cheque no:, cheque date etc),Electronic Bank transaction(capture Transaction no:), staff id of officerin charge of sale and auction etc

18 SMS/Email Alerts for next tapping date, Tapping date due warning, First tapping date for new plantation, alert if tapped quantity goes very below/above from estimated quantity etc

19 Provision to generate dynamic reports based on various parameters involved in this module

20.9.3 Vehicle Management

Sl. No Activities

1 Master data management for Vehicles

2 Master data management for places

3 Master data management for Government approved garages and fuel stations

4 Maintenance and Management of Log Book

5 Vehicle Requisition and requisition logging

6 Vehicle expenditure management

7 Provision to calculate depreciation and save the current market value

8 Due dates alerts (tax, test, insurance)

9 Maintenance and Management of vehicle history

10 Management of contract & hired vehicles

11 Provision to record suggestions and remarks from drivers and travelers

12 Various Reports

Sl. No Functional Requirements Specification

1 Ability to give a unique id for each vehicle. Ability to add/ delete or

Page 160 / 277

Page 161: Request for Proposal for Design, Supply, Installation

modify vehicle details

2 Provision to manage the vehicle information

3 Provision to manage the driver information

4 Provision to capture the vehicle details in the log book

5 Provision to provide the vehicle management to contractors

6 Provision to give monthly payment for the contractors

7 Provision to capture the billing information for vehicle management fromcontractors and the details of the payment

8 Provision to maintain the Bills for usage of petrol and diesel separately

9 Provision to capture the details about vehicle service

10 Provision to capture the immediate maintenance details like accident management. Depends on the damage the approval levels will vary

11 Provision to maintain the vehicle requestor details and vehicle details likevehicle number, distance travelled, start time etc.

12 Provision to capture the vehicle availability details

13 Provision to capture the hiring agency details

14 Provision to maintain the service given by the existing agency

15 Provision to maintain and generate the trip sheet information on a daily basis

16 Provision to make vehicle request by employees

17 Provision to allocate vehicle based on the availability of the vehicle

18 Provision to maintains the trip details of the vehicle

19 Provision to record the fuel usage of the vehicle, provision to display the breakup of the fuel usage information date wise/month wise

20 Provision to maintain the accident details of the vehicle

21 Provision to maintain the spared parts and other expenditure towards the vehicle

22 Provision to maintain the insurance provided details of the vehicle

23 Provision to record revenue collected by disposing old or damaged vehicles

24 Provision to maintain the vehicle service details with all applicable charges

25 Provision to record the details of Insurance and tax of vehicle

26 Provision to generate alerts for Insurance and tax renewal

27 Provision to record vehicle testing report and service report

28 Provision to record payment details after any reimbursement

29 Provision to record warranty and guarantee details

Page 161 / 277

Page 162: Request for Proposal for Design, Supply, Installation

30 Provision to generate the fuel usage report to view the filling details of the vehicle

31 Provision to generate the performance analysis report to verify the fuel efficiency and mileage

32 Provision to maintain vehicle Maintenance History Details- Vehicle Repair History

33 Provision to set ceiling points for different expenditure of the vehicle

34 Provision to raise alerts when ceiling point of expenditure is crossed

35 Provision to track each vehicle with a GPS (Optional)

36 Provision to maintain the monthly abstract for quick reference

37 Provision to generate dynamic reports based on various parameters involved in this module

20.9.4 Guest House and Auditoriums

Sl. No Activities

Guest House

1 Allocation of rooms to guests

2 Management of occupant register

3 Management and accounting of Income & expenditure

4 Collection of rent

5 Maintenance

Auditorium

6 Auditorium booking and allocation

7 Management of occupant register

8 Security deposit option

9 Management and accounting of Income & expenditure

10 Maintenance

Sl. No Functional Requirements Specification

1 Provision to add any number of guest houses with parameters like no of rooms, location etc.

2 Provision to book guest house online

3 Provision to authorize the guest house booking request by official in charge

4 Provision to capture the details of officer who has approved a guest house request

5 Provision to add room rent for each guest house

Page 162 / 277

Page 163: Request for Proposal for Design, Supply, Installation

6 Provision to allocate guests to guest house

7 Provision to capture important details of guests like Id Card etc

8 Provision to collect and record caution deposit from occupants

9 Provision to capture the purpose of guest's visit

10 Provision to set rules regarding Auditoriums/Guest House admissions

11 Provision to calculate & collect rent

12 Provision to inform the need for maintenance

13 Provision to accept online payments

14 Provision to report maintenance activity of guesthouse

15 Provision to uniquely identify each hall, stadium, room

16 Provision to set rent

17 Provision to book hall or stadium

18 Provision to record rent collected and expenditures incurred

19 Alert Mechanism

20 Provision to generate dynamic reports based on various parameters involved in this module

20.9.5 Special Thahasildar Office Management

Special Tahsildar office of TDB deals with the collection and furnishing of basic data for Land Acquisitions, Land Reforms, and check encroachments of TDB owned lands etc.

20.9.5.1 Reporting Cases of Encroachment

Cases of land encroachments may be reported from commissioner office / Board office / public. Onreception of land encroachment reports, Revenue Inspectors conduct surveys on disputed lands andreport cases of unauthorized occupation of land to the Tahsildar and the details of such occupationshall be reduced to writing in A form along with sketches.

SI. No.

Activities

1 Receive complaints regarding land encroachments

2 Schedule survey for Revenue Inspectors

3 Preparation of A Form by Revenue Inspector along with sketches

4 Report to Tahsildar regarding encroachment of property in A Form

5 Report to Tahsildar regarding transfer of materials in AA Form

Sl. No Functional Requirements Specification

Page 163 / 277

Page 164: Request for Proposal for Design, Supply, Installation

1 Should have provision to receive land encroachment reports from various offices

2 Should have provision to schedule survey for detecting reported land encroachments

3 Should have provision to assist Revenue Inspectors in preparing A report

4 Should have provision to assist Revenue Inspectors in preparing AA form regarding transfer of materials

5 Should have provision to forward A/AA report to Tahsildar

20.9.5.2 Land Register

Special Tahsildar office maintains a land record containing the present status of lands acquired by each Devaswom owned by TDB. Land recoveries made will be intimated to commissioner office. The commissioner office updates land records and publishes another copy.

SI. No. Activities

1 Maintains land record

2 Intimates commissioner office regarding new land recoveries

Sl. No Functional Requirements Specification

1 Should have provision to view and update land records maintained by commissioner office

2 Should have provision to update land records based on new land recoveries

20.9.5.3 Land Encroachment Case Management

On reception of land encroachment reports, Revenue Inspectors conduct surveys on disputed landsand report cases of unauthorized occupation of land to the Tahsildar and the details of suchoccupation shall be reduced to writing in A/AA form along with sketches. Tahsildar issues noticefor hearing in B form. If the party appears, a statement of the person may be recorded. Evidencemay be marked initialized with date and filed. Tahsildar now issues final order in C form. The finalorder of Tahsildar shall be in his own handwriting and contain the reason for decision.

SI. No.

Activities

1 Issues notice for hearing in B Form

2 Issues final order in C Form

Page 164 / 277

Page 165: Request for Proposal for Design, Supply, Installation

Sl. No Functional Requirements Specification

1 Should have provision to maintain status of each land encroachment case

2 Should have provision to update land records with land recovered through each case

20.9.5.4 Advanced Tour Programme scheduling

The Revenue Inspectors in Tahsildar office conducts tour programmes for periodic surveys or detectencroachments of lands owned by TDB. A tour programme is schedule each month which will befollowed for Revenue Inspectors

SI. No. Activities

1 Prepares a tour programme schedule each month

Sl. No Functional Requirements Specification

1 Should have provision to automatically schedule tour programmes each month listing locations of land encroachment or locations for periodic survey

2 Should have provision to intimate concerned officers about tour schedule

20.10 General

20.10.1 Contract Management

Contract can be said to be a voluntary, deliberate, and legally binding agreement between two ormore competent parties. Contracts are usually written but may be spoken or implied, and generallyhave to do with employment, sale or lease, or tenancy. In TDB many contract agreements can beseen like canteen contract, Tractor service contract(in Sabarimala), contract staff agreement etc. Alot of overhead is involved in managing and monitoring a contract. So automating some parts of thisprocedure helps in reducing a good work load on TDB.

Sl. No Activities

1 Selecting the parties involved in contracts

2 Fixing the term, period, payment, penalty and other terms and conditions of contract

3 Fixing allowances, leave and other benefits in the case of employment contract, fixing penalty in case of contract breaking.

Sl. No Functional Requirements Specification

Page 165 / 277

Page 166: Request for Proposal for Design, Supply, Installation

1 Provision to capture details of the parties involved in the contract agreement.

2 Provision to capture the type of contract

3 Provision to capture term, period, pay, allowances, leave etc. of contract

4 Provision to capture items involved in a contract say rate contract, contract for buildings, AMC etc.

5 Auto payment facility

6 Alert mechanism for contract expiry, renewal, payment etc.

7 Provision to capture service tax rate, vat and other taxes included in the payment.

8 Provision to mark any defaults, to blacklist a contract party etc.

9 Ability to generate reports based on payment, term, default, items, contract party etc.

20.10.2 Work Flow Management

Sl. No Activities

1 File Management System

2 File Flow Management

3 Document editing tools

4 Decision support system

5 Precedence linking

6 Dynamic Checklist for different types of applications

7 Dynamic file flow

8 Dynamic structural organization

9 Dynamic role setting

10 Internal logging of all activities from logging in to logging out.

11 Organization chart

12 Add roles and privileges

13 Templates and proformas

14 Non online requests scanning and forwarding

15 Manual overriding of predefined file flow

16 Provision to give additional charges to employees

Page 166 / 277

Page 167: Request for Proposal for Design, Supply, Installation

17 Management of Designation

20.10.3 File Management System

It is observed that the basic work of administration departments can be summarized as placing arequest by one person or a body and approving that request by another person or body. Usually therequest or any query submitted becomes a file which is circulated across its respective sections andfinally an action is taken for that file which then becomes a closed file. The same procedure isbehind RTI filing also. So the crux is the implementation of an efficient file and information flowsystem.

In order to create a file flow hierarchy a user in the system should have a role that defines thedomain of his activities. It would not be an efficient idea to create an automated fixed file flowhierarchy implemented in the software itself since the rules regarding the request and approvalchanges time and again. So a better adapted idea is to allow the system administrator to set up therules of file flow hierarchy and to set the role of each user as per the orders issued by the competentauthority.

Details of existing system for File Flow Management : The tapal/Postal section receives a requestfrom a department or a person. The tapal official redirects the request to its corresponding sectionafter entering it in inward register. A valid request becomes a file in that section .The file can beprocessed there itself or may be forwarded to higher officials (with any comments if needed) withrespect to the authority delegated to the official. The file may go through many sections whichdepends on case to case. Each section officer maintains a register to record the details of filesreceived at his end say time and date of receipt, subject, status, relevance etc. of the received file.

The established system enables a systematic flow and processing of requests. But file trackingbecomes a cumbersome task and the transparency involved is almost nil. The applicant is not ableto get the status of his request. Files can be kept pending in one section without the knowledge of asuperior official until an issue rises up. A staff is not able to search the list of files based on anycriteria. This results in the poor performance of the office, wastage of time for productive work.

Sl. No Functional Requirements Specification

1 System should be able to capture the details of receiving documents/letterslike Letter Ref, Letter Date, From Address etc.

2 Provision to generate a unique id for each document based on document type, receipt date, subject type etc.

3 System should be able to generate an Inward Letter No as a running serial number for each documents received.

4 System should be able to restrict or allow uploading of documents for Confidential documents

5 System should have the provision to forward the letters to various section

6 System should have the provision to capture to whom the letter is addressed to

Page 167 / 277

Page 168: Request for Proposal for Design, Supply, Installation

7 System should generate report for the letters received for the current date

8 Provision to display the list of all received currents in the First In First Out basis

9 Provision to display the returned Currents for further assignment and highlight them for differentiation

10 Provision to assign the currents to Departments and If user selects "No Action Required" then Priority should be as "Normal" and user should not be allowed to select the Priority (Disable the Dropdown with value as normal).

11 Provision to set Priority for the Currents like Normal, Urgent and Most Immediate

12 Provision to forward the assigned currents for authorization

13 System should allow re-assigning of the Current to any Department and authorize the assignment and forward to the assigned Department

14 Provision to mark the current that are not required to take any action

15 Provision to capture remarks for those marked currents and forward to respective Department

16 Provision to display the list of all authorized currents assigned to any Department

17 Provision to either accept or return the currents

18 Provision to capture the remarks for the returned currents

19 Provision to assign the accepted currents to departments

20 Provision to overwrite the Priority that is being set during Assignment to Department

21 Provision to forward the returned currents

22 Provision to view all the currents that are assigned to a section

23 Provision to attach the current or Note to a respective Current File or Temp File

24 Provision to re-attach the current to appropriate current file

25 Provision to create a new Current File for a subject

26 Provision to capture the File Name, File Initiation Date and File Closing Date

27 Provision to create/view Note for the latest Current to bring out all relevant facts to facilitate decision making

28 Provision to forward the Notes to the Departments/Sections for their views/comments

29 Provision to capture and maintain the Threads given for the Note

30 Provision to approve/disapprove the current

31 Provision to forward the approved current to the Initiator

Page 168 / 277

Page 169: Request for Proposal for Design, Supply, Installation

32 Provision to forward the disapproved currents to the selected Department/Section

33 Provision to print Thread wise given against a Note for a particular current

34 System should have a provision to initiate Note and to capture details like Internal No, Date, To Address etc.

35 Provision to auto -generate a number for Internal Note for unique identification and should re-start for every calendar year

36 System should have the provision to create Temp File to attach the Internal Note that are created for Internal Communication purpose

37 Provision to make the Current File ready for Close

38 Provision to close the Current File and capture the Closing Date of the file

39 Provision to bring the current to an end i.e., without allowing the current for further process

40 Provision to view the entire Note history maintained for a Current/Note against a particular Current File

41 Provision to view the Files under Pending status

42 Provision to view the files linked to the selected files

43 Provision to capture the gallery for the selected file

44 Provision to capture the audio/ video files for the selected file

45 Provision to capture the Minutes of meeting for the selected file

46 Provision to view file details in separate screen. On click of the file reference number File details screen should be invoked

47 Provision to maintain different types of registers likeOffice Order RegisterCall book registerDispatch RegisterPersonal register

48 Provision to circulate all Circular to all the employee or for a particular employee or for the selected department

49 Provision to send Office Order to all the employee or for a particular employee or for the selected department

50 Provision to display the approved Currents/Note

51 Provision to make the currents/note ready for dispatch and also make as Dispatch Not required

52 Provision to define multiple CC for the purpose of multiple dispatch of single current/note

53 Provision to capture the To address for each CC

54 Provision to display the Outward Files

55 Provision to auto -generate a unique number for each outward entry

Page 169 / 277

Page 170: Request for Proposal for Design, Supply, Installation

56 Provision to select the Current/Note for which the dispatch needs to be done.

57 Provision to create individual Outward Entry for a Current/Note for each CC to be done during dispatch

58 Provision to capture the details of the outgoing documents like Communication Mode, Date of Dispatch.

59 Provision to maintain the various communication modes like Special Messenger, Registered Post under acknowledgement due, Courier, ordinarypost, personal delivery, Fax, telegram etc. (Communication is done manually)

60 Provision to create outward for the current/note to send an acknowledgement to the sender before the current/note goes for circulation

61 Provision to send Current Files to Record Room

62 Provision to dispose the Current Files from Record Room

63 Provision to retrieve the Current Files from Record Room

64 Provision to forward the retrieved files to the Initiator

65 Provision to display the Disposed File Details

66 Provision to create and maintain Subject Type details like Code, Description

67 Provision to create and maintain Priority like Normal, Urgent and Most Immediate with its corresponding No of Days

68 Provision to search on File details, Current Details, Note History as well as Thread History

69 Provision to search Department wise, Section wise Current File details and its corresponding currents with relevant notes

70 Provision to generate reports on Note and Current File

71 Provision to re-assign the File to any other Department or Section

72 Provision to search for Current Details based on From Address, Letter Reference, Letter Date etc.

73 Provision to search the Data received through inward register

74 Provision to generate report on Inward Letter Details (Inward Register)

75 Provision to generate report on Outward Details (Outward Register)

76 Provision to generate report on Department wise File Details

77 Provision to generate reports on File Status Details

78 Provision to generate report on Department wise Pending Inward Letter Details

79 Provision to generate report displaying the list of Inward Letters/Internal Notes with no of days being delayed from the actual (based on priority)

80 Provision to generate reports on Note History and the header should come with all the pages

Page 170 / 277

Page 171: Request for Proposal for Design, Supply, Installation

81 Provision to generate report on Department wise Pending Internal Note Details

82 Provision to generate report on tappal Details (Inward Register based on the letter type)

83 Provision to generate reports on Dispatch Details (Inward Register based on the letter type)

84 Provision to generate report on Department wise pending file details.

85 Provision to generate reports on various registers

86 Provision to generate reports on Arrear List for section

87 Provision to generate reports on Arrear List for department

88 Provision to generate reports on Officer order register

89 Provision to generate reports on Consolidated Circular register

90 Provision to generate reports on Stamp account register

91 Provision to display Organization Structures, Reporting to hierarchy

92 Provision to define workflow based on the hierarchy

93 Provision to route the workflow based on the assignment given dynamically through the system

94 Provision to display the list of Currents Pending for action based on the login

95 Provision to display the list of Files under Movement for action based on the login

96 Provision to navigate to file search screen from dash board

97 Provision to navigate to tappal search screen from dash board

98 Provision to display the list files pending for the personal register approval based on the login person.

99 Provision to display the list of pending files based on the login person.

20.10.4 Tappal Management

Now there is no centralized inward tappal system in TDB. Each section handles its own inwardfiles. But despatch is centralized. Inward deals with receiving of tappal and a file number isassigned to all incoming letters, parcels etc and forwards to staff concerned. The file may gothrough many sections which depend upon the case. Each section head maintains a register torecord the details of files received at his end say time and date of receipt. Despatch section dealswith the centralized despatch of letters received. But file tracking becomes a cumbersome task andthe transparency is almost nil. The applicant is not able to get the status of his request. Files can bekept pending in one section without the knowledge of a superior official until an issue rises up. Astaff is not able to search the list of files based on any criteria. This results in the poor performanceof the office, wastage of time for productive work. The proposed system enables a systematic flowand processing of requests.

Sl. No Functional Requirements Specification

Page 171 / 277

Page 172: Request for Proposal for Design, Supply, Installation

1 Provision to assign a file number of all incoming tubes with appropriate keywords

2 Provision to view all incoming and outgoing tappal

3 The system should have provisions to view the list of tappal received during a period

4 A digitized version of tappal movement registers to be maintained for each section

5 A digitized version of Stamp Out Register

20.10.5 Scheduler

Since TDB offices deal with a lot of Scheduling tasks, system proposes the use of a separatescheduler module to schedule activities. This scheduler should allow an official to schedule anactivity and the official in charge to approve the schedule.

Sl. No Activities

1 List the activities to be scheduled for a day/period

2 Prepare the schedule

3 Approval/denial of schedule

Sl. No Functional Requirements Specification

1 Provision to identify a schedule by a unique id(related to date)

2 Master data management of major activities (Major activities can be meeting, inspection, audit, tour, inauguration etc

3 Provision to set priority of activity

4 Provision to set the date of activity

5 Provision to set the start time, end time of activity

6 Provision to capture the personals involved in the activity

7 Provision to set reminders as alerts for the activity (alerts to all/selected members involved in the activity)

8 Provision to set reminder date and time frequency, no: times etc

9 Provision to enter the details, venue, purpose etc of activity

10 Provision to keep status for the activity like no: of days remaining, postponed, cancelled etc

11 Provision to generate dynamic alerts based on all parameters involved in this module(ex: no: activities scheduled for a future period, no: of failed scheduled activities, postponed activities etc

Page 172 / 277

Page 173: Request for Proposal for Design, Supply, Installation

20.11 CulturalThe Cultural Wing of TDB deals with the preservation and promotion of the cultural ethos andreligious traditions of Kerala. In addition to organizing programmes and initiating cultural activities,the Directorate prints and publishes various religious books and magazines.

20.11.1 Printing & Publishing

The printing and publishing services of Cultural wing include printing of Vazhipadu Tickets,Devaswom Calendar, Panchangam, religious magazine and other religious books like Ramayana.The wing also offers religious CDs. Most of book printing is done in TDB press itself. Books likeDevaswom Diary are printed in presses outside TDB.

SI. No. Activities

1 Keeps track of number of books and CDs in each book stall owned by TDB

2 Keeps track of number of tickets printed, serial numbers issued to each Devaswom office

3 Monitors items in stock and determine when to reorder for printing

4 Issues orders for printing tickets, books and magazines

5 Determines the price and discount offered to books, magazines and CDs

6 Allows subscription to magazines

Sl. No Functional Requirements Specification

1 Should have provision to get a structured view of items in stock

2 Should have provision to discover optimum stock levels

3 Should have provision to access e-copies of books and magazines

4 Should have provision for keeping data for vazhipadu ticket registers – number of tickets printed, serial numbers issued to each office etc.

5 Should have provision to receive request for vazhipadu tickets

6 Should have provision forward orders for book, magazine and ticket printing to TDB press

7 Should have provision for maintaining prices and seasonal discounts offered to books, magazines and CDs

8 Should have provision for public to subscribe online to magazines

9 Should have provision to access list of subscribers to magazines

Page 173 / 277

Page 174: Request for Proposal for Design, Supply, Installation

10 Should have provision to subscribe to e-copies of magazines

11 Should have provision to automatically generate address slips to subscribers

12 Should have provision to maintain details of various committees in Cultural wing

13 Should have provision to maintain list of stores under TDB, view list of staffs in each bookstall

20.11.2 Library

Currently, TDB has only one library. A library management system should be developed for managing the processes and workflow of library

SI. No. Activities

1 Keeps member lists

2 Keeps list of books available in library

3 Adds new members to library

4 Handle book issues

5 Handle book returns

SI. No Functional Requirement Specification

1 Should have provision to maintain details of members

2 Should have provision to add new library members

3 Should have provision to maintain details of books

4 Should have provision to add new books

5 Should have provision to search and view member details

6 Should have provision to search and view book details

7 Should have provision to check-in book

8 Should have provision to check-out book

9 Should have provision for collecting late fees

10 Should have provision to generate member wise book issued / received report

Page 174 / 277

Page 175: Request for Proposal for Design, Supply, Installation

11 Should have provision to generate book movement report

12 Should have provision to generate daily book issued/receive report

13 Should have provision to generate member wise late fee report

14 Should have provision to generate publisher wise book report

15 Should have provision to generate supplier wise book report

16 Should have provision for maintaining the cash transactions related to library processes

17 Should have provision to maintain details of cash remittance to TDB account

20.11.3 Book Stall

Sl. No Activities

1 Sale of Books, devotional Song CDS,DVDS, Paintings, art works, sculptures etc

2 Consolidation of income received and remitting the income to TDB accounts

3 Requesting TDB for stall items

4 Procuring stall items from Local suppliers with the permission of higher authorities

5 Payment to local suppliers(after sale of items procured/advance payment/payment on receipt of items)

6 Item stock management

7 Complaint box/register

8 Alerts

Sl. No Functional Requirements Specification

1 Provision to identify each stall item by unique id.

2 Master data management of store items

3 Login authorization to store keeper

4 Provision to set and record the cost of each item, to set title, author details,subject, publisher details, video quality and sound quality (in case of songs and videos), artist details etc

5 Provision to generate sale vouchers

6 Provision to record sale details which include sold item unique id, date and time of sale, details of book stall keeper who conducted sale

Page 175 / 277

Page 176: Request for Proposal for Design, Supply, Installation

7 Provision to save the details of regular customers

8 Provision to record current balance of sale

9 Provision to give ceiling limit to current balances

10 Provision to generate remittance vouchers

11 Provision to save the details of person who carries cash to bank with his authorized consent

12 Provision to scan and save the bank challan after remittance.

13 Managing a mirror account to record remittances and withdrawals from book stall account and to reconcile with bank account balance periodically

14 Provision to make request to higher offices for stock procurement, with ability to quote required item id, item quantity, item author/artist ,any comments etc.

15 Provision to record the details of local suppliers, their bank account detailsetc to facilitate easy payment

16 Provision to blacklist a particular supplier with reasons

17 Stock updating after sale

18 Provision to public to give complaints online.

19 Provision to scan and forward to higher ups, any written complaints

20 Provision for SMS alerts , email alerts

21 Alert to inform if a stock is going to get finished

22 Provision to alert(SMS/email) regular customers (intimate details of new books, stock availability etc)

23 Provision to configure various alerts

20.11.4 Temple Arts Academy

Temple Arts Academy is an academic initiative to promote temple art forms such as Panchavadya,Thakil, Nadaswaram, Chakyarkoothu, Koodiyattam etc. Kalapeedam and Anushatana KalaKendram conduct these courses on temple art forms.

SI. No. Activities

1 Conducts admission for Kalapeedam and Anushatana Kala Kendram

2 Conducts examination for Kalapeedam and Anushatana Kala Kendram students

3 Issues diploma certificates to Kalapeedam and Anushatana Kala Kendramstudents

4 Approves stipend to Kalapeedam and Anushatana Kala Kendram students

Page 176 / 277

Page 177: Request for Proposal for Design, Supply, Installation

Sl. No Functional Requirements Specification

1 Should have provision to maintain list of applicants to courses conducted

2 Should have provision to schedule interviews

3 Should have provision to manage interview process

4 Should have provision to publish selection list to these courses

5 Should have provision to manage attendance and academic details of student admitted

6 Should have provision to conduct examinations and manage related processes

7 Should have provision to publish results

8 Should have provision to generate diploma certificates

9 Should have provision to maintain stipend details for students

20.11.5 Fund Management

Various fund accounts are maintained by Cultural Wing of TDB. For different purposes, funds deposited or withdrawn from these accounts.

SI. No. Activities

1 Maintain accounts for various fund transactions

2 Deposit / Withdraw money from respective accounts for various purposes

3 Keeps log of entire transactions

Sl. No Functional Requirements Specification

1 Should have provision to allocate fund to various offices

2 Should have provision to monitor fund allotted according to privileges of various offices

3 Provision to maintain log of account transactions

4 Should have provision prepare expenditure statements – activity wise / account wise etc.

5 Should have provision to search and view activity wise / account wise / transaction wise income / expenditure details according to privileges

Page 177 / 277

Page 178: Request for Proposal for Design, Supply, Installation

assigned to various offices / officers

20.12 AuditAudit is an evaluation of a person, organization, system, process, enterprise, project or product. Theterm most commonly refers to audits in accounting, internal auditing, and government auditing, butsimilar concepts also exist in project management, quality management, water management, andenergy conservation. Auditing is defined as a systematic and independent examination of data,statements, records, operations and performances (financial or otherwise) of an enterprise for astated purpose. In any auditing the auditor perceives and recognizes the propositions before him forexamination, collects evidence, evaluates the same and on this basis formulates his judgment whichis communicated through his audit report. In TDB local fund auditing section, it directly reports toOmbudsman in High Court. Some relevant issues which need more attention, Ombudsman forwardsit to General Pleader who presents the matter in High Court.

Sl. No Activities

1 Generating reports for inspection or auditing

2 Schedule and Conduct inspection

3 Compiling Audit Report

4 Reporting to respective authorities with priorities of irregularities

5 Monitoring, action taken by departments to rectify reported irregularities

Sl. No Functional Requirements Specification

1 Provision to set the type of Audit(internal/external etc)

2 Provision to generate reports related to inspection

3 Provision to record irregularities and assign the rectification work to a particular person or office

4 Provision to identify each irregularity by a unique id

5 Provision to attach files to irregularities

6 Provision to set severity levels to irregularity(Serious/ regular/simple etc)

7 Provision to forward the irregularity to Higher authorities

8 Provision to give status to irregularity like "Open", "Pending", "Closed/rectified", "Suspended", "Deleted" etc

9 Provision to give priority levels to irregularities

10 Alert mechanism based on priority/time constraints or other parameters like pending duration, subject etc

11 Provision to generate dynamic reports based on various parameters involved in this module

Page 178 / 277

Page 179: Request for Proposal for Design, Supply, Installation

20.13 Law Office

Sl. No Activities

1 Providing Legal Advises to Departments2 Suite Register

3 Advocate Fee Register4 Case Status, Alerts (for summons etc)

5 Communication with other Departments6 Reports

7 High Court & Lower Court petition management8 Land Cases Management

Sl. No Functional Requirements Specification

1 Provision to receive/send files from/to Departments as requests or orders

2 Provision to scan and attach files

3 Provision to add comments/recommendations/legal opinions etc to a file

4 Provision to approve/recommend or reject a request

5 Provision to give a unique id to each Suite files

6 Provision to record the status of each case , next summon date, details of court hearings and appearances

7 Provision to record the details of advocate for a case, his fees , payment details etc

8 Alert mechanism for parameters like next summon date, advocate fees etc

9 Provision to record the expenses incurred for a case

10 Provision to generate dynamic reports

20.14 Vigilance

Sl. No Activities

1 Schedule and Conduct inspection

2 Petition Management

3 Recording irregularities

4 Recommending disciplinary actions

5 Monitoring the activities of security staffs

6 Vigilance Report

7 Alerts

Page 179 / 277

Page 180: Request for Proposal for Design, Supply, Installation

Sl. No Functional Requirements Specification

1 Provision to receive a petition 2 Provision to uniquely identify each petition

3 Provision to set various status to a petition like Open, Pending, Cancelled, Settled etc

4 Provision to know the user details on whom the petition is residing.

5 Provision to schedule inspection 6 Provision to capture irregularities

7 Provision to uniquely identify each irregularity8 Provision to give different levels of severity and relevance to an

irregularity

9 Provision to assign a person to rectify or to regularize an irregularity

10 Provision to give a time period to regularize the irregularity

11 Provision to set various status to an irregularity like Open, Pending, Cancelled, Settled etc

12 Provision to generate a report to show the irregularities noted between a period(Vigilance report)

13 Provision to alert higher authorities by the severity and relevance of an irregularity, if the irregularity is not regularized within the given time

14 Provision to configure various alerts(SMS/email)

15 Provision to generate dynamic reports based on various parameters involved in this module

20.15 SabarimalaSabarimala is located in the Western Ghat mountain ranges of Pathanamthitta District,Perunad grama panchayat in Kerala. It is the largest annual pilgrimage in the world with anestimated 45–50 million devotees visiting every year. Sabarimala is believed to be the place wherethe Hindu God Ayyappan meditated after killing the powerful demoness, Mahishi. Ayyappan templeis situated here amidst 18 hills. The temple is situated on a hilltop at an altitude of 468 m (1535 ft)above mean sea level, and is surrounded by mountains and dense forests. Sabarimala is underTravancore Devaswom Board (TDB) and is the main source of revenue to TDB.

The function areas identified in Sabarimala are listed below.

Sl. No Functional Areas

1 Counter Billing

2 Hand Held Devices

3 Accommodation

4 Online Booking of Vazhipadu

5 Dolly & Tractor Management

6 Parking

7 Hospital Management

Page 180 / 277

Page 181: Request for Proposal for Design, Supply, Installation

8 Queue Management

9 Duty Deployment

10 Appam, Aravana Production & sales Management

11 Annadhanam

12 Store Management

13 Auction

14 Video Surveillance

15 Kanikka Counting

16 Auditing

17 Mess Management

20.15.1 Counter Billing

Billing Counters are maintained to charge the devotees for the Vazhipadu they are requesting. Eachvazhipadu will have its cost saved in its master table (The table where all the details of vazhipaduare recorded). So the person sitting in the counter accepts payment from the devotee based on thevazhipadu request from him and issues receipt. The devotee can receive the vazhipadu from thecounter itself (ex: Appam, Aravana etc) or he can submit the receipt to shanti for conducting thevazhipadu.

Sl. No Activities

1 Counter receives a Vazhipadu request(can be for more than one) from adevotee

2 Collection of basic details for vazhipadu from the devotee, like his name, star sign etc

3 Receipt of payment and issue of receipt to devotee

4 Deliver the vazhipadu over the counter itself for vazhipadu like appam, aravana etc

5 Updating stock for vazhipadu like appam, aravana

6 Updating respective cash account

7 Remitting the cash collected to bank account(periodically/ when balancegoes above some limit/urgent requirement etc)

Sl. No Functional Requirements Specification

1 Provision to identify each vazhipadu by a unique id

2 Master data management of vazhipadu i.e. a data table to maintain its cost, timings , description etc

3 Provision to maintain a daily scroll of vazhipadu conducted (maintaining a view)

4 Provision to identify each receipt by a unique id

Page 181 / 277

Page 182: Request for Proposal for Design, Supply, Installation

5 Provision to generate receipts for each vazhipadu requested with name of vazhipadu, receipt no(receipt unique id); name of devotee, star sign of devotee, cash paid, date and time of request, login id of counter operator, phone no: of the person to be contacted in case of any issues, TDB office no: and website

6 Provision to allocate a cash account/Teller account to each counter operator

7 System should automatically update the cash account of a counter operator after each successful vazhipadu request

8 Provision to generate a daily scroll for cash tallying purpose

9 Provision to transfer cash balance of all vazhipadu counter to a revenue account

10 Provision to set ceiling to cash counter balance and revenue account balance.

11 Provision to save the details of person who carries cash to bank with his authorized consent i.e. the person carrying cash should also approve his cash carrying duty.

12 Provision to scan and save the bank challan after remittance.

13 Managing a mirror account as in bank to record remittances and withdrawals from temple counter revenue account and to reconcile withbank account balance periodically

20.15.2 Hand Held Devices:

The system proposes the use of hand held devices for vazhipadu counter mechanism in sabarimala.Each hand held device will have a SIM to communicate to its application software via GPRS.During season time due to heavy rush it becomes very difficult for pilgrims as well as sabarimalaofficials to conduct and service vazhipadu properly. A person has to get the receipt of a vazhipadubefore standing in the queue to reach 'Nada' and conduct the vazhipadu. So if a pilgrim who doesnot know about this may stand in the queue before getting the receipt from vazhipadu counter. Sowhen he reaches 'Nada' , learning the fact that he has to get the receipt first, he will have to go tovazhipadu counter and then again stand in the queue. In order to eliminate these kinds of issues, useof hand held devices to request vazhipadu will be an efficient idea. So a TDB official can receiverequests from a pilgrim standing in the queue and can issue receipt at that moment itself afterreceiving the payment. The receipt details will be synchronised to the billing applicationperiodically via GPRS. The receipts generated by this device will have a separate identificationmechanism from typical Counter receipts and from other hand held billing device.

Sl. No Activities

1 TDB official with the device receives a vazhipadu request d

2 Collection of basic details for vazhipadu from the devotee, like his name,star sign etc

3 Receipt of payment and issue of receipt to devotee

4 Bill details synchronization

Page 182 / 277

Page 183: Request for Proposal for Design, Supply, Installation

5 Respective cash account updation

Sl. No Functional Requirements Specification

1 A separate application module for device billing mechanism

2 Provision to give an id to each device

3 Provision to write/ update details of vazhipadu into device

4 synchronize receipt details to its application Periodically On demand During switch on As last automatic activity before the battery of the device goes

down

5 Provision to generate receipts for each vazhipadu requested with name of vazhipadu, receipt no(receipt unique id); name of devotee, star sign of devotee, cash paid, date and time of request, login id of counter operator, device id, phone no: of the person to be contacted in case of any issues, TDB office no: and website. etc.

6 Provision to check the current cash balance of the device for instant cash tallying

7 Provision to generate a print of daily scroll for cash tallying purpose8 A separate vazhipadu account for cash collected through hand held

devices

9 Provision to transfer cash balance of a device to a revenue account10 Provision to generate reports like daily cash balance, revenue from a

particular vazhipadu, to generate various

20.15.3 Donations and sponsorships

Sl. No Activities

1 Receive and record Donations/Sponsorships

2 Accounting

3 Alerts

4 Reports

Sl. No Functional Requirements Specification

1 Provision to capture the details of donations

2 Provision to capture donor/sponsor details

3 Provision to capture the mode of payment like Cheque, DD, money order

4 Provision to capture Cheque no, cheque date, bank details, DD no, DD date etc

Page 183 / 277

Page 184: Request for Proposal for Design, Supply, Installation

5 Provision to alert higher authorities (SMS/email) if the validity of the cheque or DDis going to end

6 Provision to configure various alerts

7 Provision to generate dynamic reports based on various parameters involved in this module

20.15.4 Accommodation

Sabarimala has many guest houses to accommodate the pilgrims. Some of the guest houses (calledDonor House) are built by collecting funds private parties and leaving some privileges to theseparties.

SL. No Activities

1 Guest House booking and allocation of rooms to pilgrims

2 Management of occupant register

3 Management and accounting of Income & expenditure

4 Collection of rent

5 Maintenance

6 Management of occupant register

7 Management and accounting of Income & expenditure

8 Maintenance

Sl. No Functional Requirements Specification

1 Provision to add any number of guest houses with parameters like no: ofrooms, location etc.

2 Provision to add room rent for each guest house for all guest categories

3 Provision for online booking of guest house4 Provision to allocate pilgrims to a guest house and to a room

5 Provision to capture details of a pilgrim/guest6 Provision to collect and record caution deposit from occupants(optional)

7 Provision to set rules regarding Guest House admissions(Donor houses)

8 Provision to calculate & collect rent

9 Provision to collect compensation in case of any damage made by a guest

10 Provision to set the maximum capacity of pilgrims in a room

11 Provision to save the details of furniture and other accessories in a room

12 Provision to inform the need for maintenance

Page 184 / 277

Page 185: Request for Proposal for Design, Supply, Installation

13 Provision to accept online payments14 Provision to report maintenance activity of guesthouse

15 Provision to generate reports like no: of bookings in a day/week/month etc, daily scroll of cash remittance, no: of complaints received in a day/ month etc

16 Provision to generate various reports based on the parameters involved in this module

20.15.5 Online Booking of Vazhipadu:

SL. No Activities

1 Devotee can book vazhipadu requests for a future date through Sabarimala Website

2 Devotee makes payment through e Payment

3 The date and time of Vazhipadu along with Vazhipadu registration no: or booking no: is given to devotee through email or SMS

4 The devotee can come on the booked date with his booking no: and conduct his vazhipadu

5 An official can check the booking no: in the system for verification6 Alerts

Sl. No Functional Requirements Specification

1 Provision to maintain a master data of all vazhipadu in a temple

2 Provision to record holidays for a particular vazhipadu in the master table( based on Malayalam calendar )

3 Provision to identify an online vazhipadu booking by a unique id

4 Provision to record the details of booking person like email, phone no: ,address, phone no: etc

5 Provision for a devotee to select a date while booking online

6 Provision to display the list of vazhipadu available on the selected date

7 Provision to select a vazhipadu and make online payment

8 Provision to generate receipt for booking and send it to devotee via email or SMS

9 Provision to configure various alerts , say alert if the vazhipadu is postponed , time change etc.

20.15.6 Dolly and Tractor management:

20.15.6.1 Dolly Management

Since Sabarimala is located at high altitude, some pilgrims who are not able to climb the altitude

Page 185 / 277

Page 186: Request for Proposal for Design, Supply, Installation

use a carriage system called Dolly to reach Sabarimala. Dolly is basically carriage system with achair where the pilgrim sits and 4 persons lift the dolly to Sabarimala. Many parties run this Dollyservice after getting approval from Sabarimala.

SL. No Activities

1 Registration of Dolly Service with TDB

2 Online Dolly Booking

3 E payment facility

4 Receipt Generation

5 Alerts

Sl. No Functional Requirements Specification

1 Provision to maintain/enter master data of all Dolly services in Sabarimala which records details like its name , details of its members, its Bank details etc(Only after the Dolly service gets the authorization from TDB)//Registration Process.During registration, either data can be entered by Dolly agents by themselves or a TDB official can receive a written request from Dolly agents and he can enter the details in the system.

2 Verification of details entered

3 Provision to identify each Dolly service by a unique id.

4 Provision to add new Dolly services to Dolly Mater data

5 Provision to record holidays for Dolly services

6 Provision to identify an online Dolly booking by a unique id

7 Provision to record the details of booking person like email, phone no: , address, phone no: etc

8 Provision for a devotee to select a date while booking online

9 Provision to display the list of Dolly services available on the selected date

10 Provision to select a Dolly service and make online payment

11 Devotee gets the receipt and booking no: along with the location and estimated time to board

12 Provision to generate receipt for booking and send it to devotee via email or SMS

13 Provision to configure various alerts , say alert if the vazhipadu is postponed , time change etc.

20.15.6.2 Tractor Management

Since Sabarimala is located at high altitude, tractors are used to carry goods and other items from

Page 186 / 277

Page 187: Request for Proposal for Design, Supply, Installation

Pamba to sabarimala and back. So this brings out the necessity of a logistics Management. TDB hasits own tractors as well as tractors hired from private parties who are approved by TDB. Thisfacility with private parties runs on contract.

Sl. No Activities

1 Registration of a Tractor Agent with TDB on contract

2 Assign an available tractor for a freight purpose

3 Examine the items loaded to the tractor before loading and record the details of items in a register in accordance with the tractor driver.

4 A copy of this record is given to tractor driver

5 This copy is verified with the loaded items at the place of unloading by aTDB official

6 Any discrepancies are reported to higher authorities

Sl. No Functional Requirements Specification

1 Provision to maintain/enter master data of Tractor service in Sabarimala which records details like no: of tractors, its name ,its drivers name, Bank details of agent etc(Only after the Tractor service gets the authorization from TDB)//Registration Process.During registration, either data can be entered by Tractor agent by himself or a TDB official can receive a written request from tractor agentand he can enter the details in the system.

2 Verification of details entered

3 Provision to add more than one tractor agent

4 Provision to identify a tractor by a unique id

5 Provision to allot a tractor to a job and change its status(say "not available"/"assigned to job no XX" etc)

6 Provision to record the load items details before loading

7 Provision for the driver to accept the details recorded as load item details

8 Provision to forward this data to the official at load receiving end (Unloading end)

9 At the unloading end ,provision to approve/deny/report to higher authorities/add comments to the load items details record after verification of load with the load items details record

10 Provision to count the no: of assignments given to a tractor and utilize alltractors based on this count value

11 Provision to generate dynamic reports based on all the parameters involved in this module

Page 187 / 277

Page 188: Request for Proposal for Design, Supply, Installation

20.15.7 Parking

Sl. No Activities

1 Parking Space management

2 Master data Management of vehicles (different parking rates for differentvehicles)

3 Duty Allocation to Identified Areas

4 Parking Ticket Issuance

5 Alerts

6 Reports & Analytics

Sl. No Functional Requirements Specification

1 Provision to Parking space into blocks

2 Provision to identify each block uniquely

3 Provision to assign duty staffs to blocks (Duty Deployment Module)

4 Provision to generate a parking ticket for each vehicle

5 Provision to identify each ticket uniquely

6 Provision to manage data of various type of vehicles and their respective parking charges per hour

7 Provision to set a minimum parking duration and to set multiples of this duration as parking duration

8 Provision to include in ticket, details like ticket no, date, entry time, vehicle no:(optional),allowed or requested parking duration, block no, vehicle type, parking charge, user id of counter operator, contact information of the TDB official to be contacted in case of any issues

9 Provision to allocate Ticket Counters at the entry of various blocks

10 Provision to allocate cash teller accounts to the counter operator

11 Provision to configure various alerts

12 Provision to generate dynamic reports based on various parameters involved in this module

20.15.8 Hospital management

20.15.8.1 Hospital Management System (HMS) for TDB

HMS is an integrated health management system, which addresses the critical requirements ofhospitals. It is an integrated clinical information system to improve hospital administration andpatient health care. It also provides an accurate, Electronic Medical Record (EMR) of the patient. Adata warehouse of such records can be utilized for statistical and research requirements. Thesoftware could help in the following fields:

1) Hospital Administration

Page 188 / 277

Page 189: Request for Proposal for Design, Supply, Installation

2)Out Patient Management3)In Patient Management 4) Ward Management

1. Administration: The administrator can create User accounts for the staff, define the departmentsof the hospital, add Discount, add Tax and define the schedule for the doctors and other staffmembers which can be viewed all through the application.This module will covering the flowingActivities.

User creation Password Resetting Role Creation Role Allocation Access Privilege Creation Access Privilege Settings

2. OP Management Module shall be capable of handling Patient Registration and Report Generation. All patients have to report at the OP registration Counter, and then proceed to the concerned OP Clinic after being allotted a Token Number. Token Display shall be provided at the OP Clinics. This module shall also have facilities for entering and maintaining the details of Clinic Schedule like Units and Doctors, OP categories, States, Districts etc. This module will covering theflowing Activities.

New OP Registration Review OP Registration Queue Management Search Patient Accident Register Infectious Disease Patient Details Edit Log Token Reprint Reports

3. IP Management Module shall be capable of handling In Patient Admission, Re- admission, Pass issue and Report Generation. This module will covering the flowing Activities.

IP Admission IP Cancellation IP Re-Admission IP Change Ward Edit IP or OP Number Reports

4. Ward Management Module is capable of handling Patient Ward Admission, Patient Bed Allotment, Patient Ward\Department\Unit Transfer, Patient Treatment Recording, Investigation Entry and Investigation Results, Diet Register, Death Register, Discharge Summary, Census Report , Case sheet Entry and Report Generation. . This module will covering the flowing Activities.

Categorize ward/ rooms Assign Patient to Ward(room)/beds or Ward Admission

Page 189 / 277

Page 190: Request for Proposal for Design, Supply, Installation

Checking room/bead availability Bed Allotment Patient Bed/Room Transfer Details Patient Department Transfer Details Keeping of patient discharge summary or Patient History Reports

20.15.9 Volunteer Service (Sanaddha Pravarthanam)

Sl. No Functional Requirements Specification

1 Provision to register all Volunteer Services

2 Provision to capture the details of all members in the Volunteer Services

3 Provision to identify the leader for the Service

4 Provision to uniquely identify each Volunteer Service

5 Provision to allocate a job to each member/service

6 Duty Deployment(ref: Duty Deployment Module in this Volume)

7 Provision to give alerts (SMS/email) to each Volunteer Service

8 Provision to generate dynamic reports based on various parameters involved in this module

20.15.10 Queue Management

20.15.11 Duty Deployment:

The system proposes a GIS based interface for deploying staffs at various duty points. Majorposting points will be plotted on the GIS map. Selected employees for selected category of job willbe assigned to these duty points. Presence of surveillance cameras at these points (optional) willenable an efficient monitoring of workforce.

Sl. No Functional Requirements Specification

1 Provision to plot major points of interest/deployment in the GIS map

2 Provision for live streaming and monitoring through cameras deployed atthese points

3 Availability of employee master data for duty assignment

4 Provision to select and assign an employee to a point of duty

5 Provision to alert the employee about his duty

6 Provision to access the camera at a particular duty point

7 Provision to allocate his duty hours, type of duty, major objectives etc

8 Provision to set special payments to duty staffs

9 Provision to send the order of posting to staffs

10 Provision for the staff to accept his posting

Page 190 / 277

Page 191: Request for Proposal for Design, Supply, Installation

11 Provision to generate various alerts from duty points and to duty points from administration(email/SMS alerts)

12 Provision to generate dynamic reports based on all parameters included in this module

20.15.12 Appam, Aravana production and Sales Management:

Sabarimala maintains production plant for Aravana. Raw materials are feed to this unit as per the quantity and ratio specifications for Appam and Aravana. Specific quantity of raw materials can produce a specific number of aravana cans. For Appam, production is done manually but the specific quantity of raw materials required for making a specific number of appam is determined and the production is monitored accordingly.

Sl. No Activities

1 Required raw material quantity for production is intended to store for supply

2 Received quantity of raw materials are recorded in a stock register item wise

3 Workers put raw materials mix into machine in front of an official and reducing the quantity taken for production from stock register

4 The estimated quantity of aravana/appam is recorded in the register and the quantity actually produced is also saved in the register.

5 The quantities of damaged products are also recorded.

6 The finished goods are transferred to store

Sl. No Functional Requirements Specification

1 Provision to request /intend raw materials from store

2 Request should contain parameters like item name, required item quantity, requesting/forwarding/denying person's id, reason for request, date and time of request etc

3 Provision to approve/recommend/deny the request by the person in charge of production. Provision to add comments to this request

4 Provision to record the quantity of raw materials received against a store request/intend (Internal Production store)

5 Provision to record the date and time receipt of raw materials (The batches of received raw materials are to be arranged or named to understand the date and time of receipt to facilitate 'First Come First Serve' method of raw material utilization)

6 Provision to record the quantity of raw materials consumed for each production line and to update the stock.

7 Provision to enter estimated number of finished goods during each production line(in different units like packets, dozen, numbers etc)

Page 191 / 277

Page 192: Request for Proposal for Design, Supply, Installation

8 Provision to record the actual produced finished goods

9 Provision to record the quantity of damaged items

10 Provision to identify each finished item unit by a unique id say a unique id for a packet of appam and a unique id for a can of aravana or a batch of aravana.

11 Provision to transfer the finished goods to store

20.15.13 Annadhanam:

Sabarimala provides food to pilgrims during season time. Sometimes Pilgrims themselves sponsorthis activity as a vazhipadu. A huge amount is donated by pilgrims for Annadhanam.

Sl. No Functional Requirements Specification

1 Provision to account the donation received for annadhanam into an account head for this purpose

2 Provision to record revenue and expenditure to/from this account

3 Provision to intend store , items for annadhanam

4 Provision to place Purchase request for items for annadhanam

5 Provision to forward/deny/approve an intend/ Purchase order

6 Provision to add comments to an intend/purchase request

7 Provision to know the balance in Annadhanam account head

8 Provision to capture the details of items purchased and intended (details like item, quantity, unit cost etc)

9 Provision to capture the details of items used for one batch of food preparation

10 Provision to give an estimated quantity(in plates/persons) of food for one batch input of raw items (Estimation purpose)

11 Provision to capture the actual no of plates consumed in one batch(Estimation purpose/Approximate)

12 Provision to issue serial tokens to each pilgrim coming for annadhanamwhich facilitates counting purpose approximately

13 Provision to generate dynamic reports based on all parameters involvedin this module

20.15.14 Store management

Store in sabarimala stores items that are given to temple as offerings like grains, jaggary, ghee etc.Store also receives items that are purchased by various departments, examines it with the purchaseorder and intimates the intender. Appam and Aravana Production units transfer the finished goods tothe store by entering the transfer in movement register.

Sl. No Activities

Page 192 / 277

Page 193: Request for Proposal for Design, Supply, Installation

1 Receipt of intends from temples/ Production units etc2 Supply of material requested if the material is available

3 Receipt of items in the store 4 Examination of items with Purchase Order or

Movement Register

5 Rejection of items if the item is defective, not of the specification mentioned in PO or movement register, defective packing, old stock, damaged stock etc.

6 Accounting the accepted stock in Stock register

7 Communicating to the vendor about the rejected items if any8 Intimating the indenter about the item arrival, certifying the receipt of items

for payment clearance after getting confirmation from the indenter.

Sl. No Functional Requirements Specification

1 System should have the provision to capture the details of defected itemsand provision to maintain the purchase return details

2 System should maintain the stock registers

3 System should have provision to make adjustments to inventory after physical audit

4 Ability to classify the materials on the basis of electrical, electronic etc.

5 System should have the provision to maintain invoices that have been received from suppliers

6 Ability to maintain system generated invoice no, date, supplier Invoice no, invoiced by, Item Code, Item description, Unit cost, Total cost, quantity received, quantity rejected, quantity invoiced, Taxes, Location, Address and Remarks

7 System should have the provision to associate Invoice to a goods receipt

8 System should have the option to Post invoice data to the financial system

9 System should have the provision to associate an invoice number to purchase order number

10 Provision to attach an item to a project

11 Provision to enter utilization of various assets12 Provision to calculate depreciation of an asset and save current market

value

13 System should have the provision to capture the freight charges and clearance charges

14 Ability to maintain a perpetual Stock Ledger

15 Ability to prepare a stock reconciliation statement on a daily basis 16 Ability to generate a stock report as on any date, based on the pre-

determined categories

17 Ability to generate a report on the adjustments to inventory arising from

Page 193 / 277

Page 194: Request for Proposal for Design, Supply, Installation

Physical verification

18 Ability to provide stock aging report

19 Ability to show up reports based on stock value

20 Ability to generate reports on adjustment type of transactions

20.15.15 Maramath

If any of the contractors wants to bid for any of the Sabarimala tender, contractor must register with the TDB. Tender forms are issued to only those registered contractors and firms of approved by the TDB.

SI. No. Activities

1 Contractors submit predefined application forms / written request

2 TDB verifies eligibility and approves / rejects the contractor

Sl. No Functional Requirements Specification

1 Should have provision to submit contractor registration forms electronically / offline mechanism

2 Should have provision to enter details from contractor registration formsreceived offline

3 Should have provision to assist in the verification of contractor eligibility

4 Should have provision to maintain list of registered contractors in TDB

5 Should have provision to renew / expire contractor registration

6 Should have provision to search and view approved list of contractors

7 Should have provision to view and track various work done by TDB contractors

20.15.15.1 Estimation

Proposals for various works including both civil and electrical are identified from temples,auditoriums and other offices under TDB. The estimates are prepared by Assistant Engineers (AEs)based on the standard Schedule of Rates (SoR) published by Public Works Department (PWD),Govt. of Kerala. These estimates are prepared as per the standard data which includes specificstandards and rates for arriving at the cost for different structures. The materials / items for whichstandard SoR are not available, market rates are used for preparing estimates. Plan drawings areprepared manually.The approving authority for estimates is Executive Engineers of respective Divisional (District)offices. Payment approval authority up to a certain limit fixed by Board office is respectiveExecutive Engineer. Presently, this limit is Rs.50,000/- for Executive Engineers, for estimates above

Page 194 / 277

Page 195: Request for Proposal for Design, Supply, Installation

Rs.50,000/- and up to Rs.1,00,000/- needs approval from concerned Chief Engineer and estimatesabove Rs.1,00,000/- is to be approved by Board Office.

SI. No. Activities

1 Receive work proposals from various offices under TDB

2 Prepare estimates based on SoR

3 Prepare abstract estimate form, data form and plan drawings

4 Submit for approval

SI. No Functional Requirement Specification

1 Should allow user to login the system with a user name and password

2 Should allow to register the category of the funding agency like

• Self(TDB)• Government • State Funds• Private fund• International

3 Should allow registering the funding agency details. The different sources of funds are maintained here. This will include

• Agency ID (auto number)• Agency Name • Address• Contact number

4 Should have Provision to allocate the project to a department

5 Should have Provision to allocate the in charge officer of the project

6 Should have Provision to enter the Estimated Start Date and Estimated End Date of the project

7 Should have Provision to create a hierarchy of activities in the project with details like Start Date, End Date, Status, Allocated resource, etc.

8 Should have Provision to capture the agreement/MOU/Undertaking details

9 Should allow to register the project. The system should capture the following details

• Project details• Fund Allocation• Project Schedule• Project Amendment

Page 195 / 277

Page 196: Request for Proposal for Design, Supply, Installation

10 Should have Provision to attach any documents related to the project

11 Should allow capturing the principal investigator details. List of principal investigator for projects are maintained here

• Principal investigator ID (auto number)• Principal investigator Name• Principal investigator Address• Principal investigator email

12 Should have provision to update the business partner types like Employee, Contractor, etc. with reference to the TOR and the agreement/MOU/ Undertaking

13 Should allow entering total manpower number, manpower categories, manpower number in each category. The different categories of employees who work on a given project and their standard rate are given here. This is usedto calculate the manpower cost of the project.

• Manpower• Manpower Category • Manpower rate

14 Should provide a provision to update the role of the team member

15 Should have provision to update the allocation percentage of the team member in the project

16 Should allow entering the project head. The list of project heads (capital, material, travel, overhead, etc.) for projects are stored with the following details.

• Project head code• Project head description

17 Should allow to capture the project status. The details of whether a project is ongoing or is completed are stored here. If a project is closed the closing date is also stored. The information stored are

• Project code• Project status• Closed date

18 Should provide the project information. The information about the project based on which the monitoring is to be performed is maintained here. This includes

• Project code• Project type• Project title• Project area• Principal investigator details• Foreign travel details• Project commencement date

Page 196 / 277

Page 197: Request for Proposal for Design, Supply, Installation

• Project member details

19 Should allow to enter amount heads. When a project is registered with the fundallocated for different heads are stored here. The details include

• Project code• Project head • The amount allocated

20 Should have provision to create the different roles in the project

21 Should allow to enter fund utilization details. The amount utilized by a project in different heads is stored here. The details include

• Project code• Project head code• Amount utilized

22 Should allow to enter transaction details. Details about expenses incurred against each project head is maintained here

• Transaction code (auto number)• Project code• Purchase order number• Purchase order date• Project head of transaction• Amount• Remarks

23 Should allow to schedule project dates. The project schedule dates such as technical closure, financial closure (original or amended ) are maintained here

• Project code• Date of Technical closure• Date of financial closure

24 Should allow to enter project funding schedules. Funding/payment schedule of the project is maintained here

• Project code• Event of completion• Scheduled date• Amount to be received

25 Should allow to enter project fund receipts. Details about fund received for the project is stored here

• Project code• The fund received• Received date• Scheduled date

Page 197 / 277

Page 198: Request for Proposal for Design, Supply, Installation

26 Should allow to generate the utilization certificate. Utilization certificateis issued for the funds received for each project. The details of whether issued or not and other information about the certificate are also stored which is used to remind the personnel to issue a certificate. The details include

• Project code• Utilization certificate issue date• Amount

27 Should allow to enter receipt of funds. The funds of each project are received at different stages. The details of the amount received for each project is stored here. The details include

• Project code• Date• Number• Amount

28 Should have the provision to amend the project. The system should capture the following details.

• Budget Reallocation• Rescheduling

29 Provision to view fund details of various projects

30 Should have provision to capture and monitor any time extension, deviation in the schedule of work etc.

31 Should have provision to capture and issue work completion certificate

32 Should have provision to issue testing certificates and maintain the details of the testing done at various buildings/sites

33 Should have provision to generate the report for the list of resources allocated to the project

34 Should have provision to generate the project chart as per the plan set in the project template

35 Should have provision to generate the report for the financial estimate ofthe project (Budget Estimate vs. Actual)

36 Should have provision to generate all the receipt and expense related to the project

37 Should have the provision for fund clearance certificate in equipment, travel and capital heads

38 Should have the provision to view/print individual project details

39 Should have the provision to take reports based on various parameters

Page 198 / 277

Page 199: Request for Proposal for Design, Supply, Installation

40 Should have the provision for sending mails/alerts while underutilizationor overutilization of funds

41 Should have the facility to generate fund closure certificate

42 Provision to update the status of the project like Initiated, In-progress, Completed, Cancelled

43 Provision to submit proposal to government and other agencies for projects

20.15.15.2 Fund Management

Various fund accounts are maintained by Maramath department of TDB. For different purposes, funds deposited or withdrawn from these accounts.

SI. No. Activities

1 Maintain accounts for various fund transactions

2 Deposit / Withdraw money from respective accounts for various purposes

3 Keeps log of entire transactions

SI. No Functional Requirement Specification

1 Should have provision to allocate fund to various offices

2 Should have provision to monitor fund allotted according to privileges of various offices

3 Provision to maintain log of account transactions

4 Should have provision prepare expenditure statements – activity wise / account wise etc.

5 Should have provision to search and view activity wise / account wise / transaction wise income / expenditure details according to privileges assigned to various offices / officers

20.15.15.3 Project Management

This module handles all the information related to Project fund Monitoring and Control. Theinformation given at the time of registration of a project is saved and the fund and date of closureare monitored. Alerts are displayed when a project runs on low funds or when it exceeds theallocated Budget.

The main activities of project management module are

SI. No. Activities

Page 199 / 277

Page 200: Request for Proposal for Design, Supply, Installation

1 Submission of proposal

2 Project Registration

3 Fund Management

4 Budget monitoring

5 Report generation

Sl. No Functional Requirements Specification

1 Should allow user to login the system with a user name and password

2 Should allow to register the category of the funding agency like

• Self(TDB)• Government • State Funds• Private fund• International

3 Should allow registering the funding agency details. The different sources of funds are maintained here. This will include

• Agency ID (auto number)• Agency Name • Address• Contact number

4 Should have Provision to allocate the project to a department

5 Should have Provision to allocate the in charge officer of the project

6 Should have Provision to enter the Estimated Start Date and Estimated End Date of the project

7 Should have Provision to create a hierarchy of activities in the project with details like Start Date, End Date, Status, Allocated resource, etc.

8 Should have Provision to capture the agreement/MOU/Undertaking details

9 Should allow to register the project. The system should capture the following details

• Project details• Fund Allocation• Project Schedule• Project Amendment

10 Should have Provision to attach any documents related to the project

Page 200 / 277

Page 201: Request for Proposal for Design, Supply, Installation

11 Should allow capturing the principal investigator details. List of principal investigator for projects are maintained here

• Principal investigator ID (auto number)• Principal investigator Name• Principal investigator Address• Principal investigator email

12 Should have provision to update the business partner types like Employee, Contractor, etc. with reference to the TOR and the agreement/MOU/ Undertaking

13 Should allow entering total manpower number, manpower categories, manpower number in each category. The different categories of employees whowork on a given project and their standard rate are given here. This is used to calculate the manpower cost of the project.

• Manpower• Manpower Category • Manpower rate

14 Should provide a provision to update the role of the team member

15 Should have provision to update the allocation percentage of the team member in the project

16 Should allow entering the project head. The list of project heads (capital, material, travel, overhead, etc.) for projects are stored with the following details.

• Project head code• Project head description

17 Should allow to capture the project status. The details of whether a project is ongoing or is completed are stored here. If a project is closed the closing date isalso stored. The information stored are

• Project code• Project status• Closed date

18 Should provide the project information. The information about the project based on which the monitoring is to be performed is maintained here. This includes

• Project code• Project type• Project title• Project area• Principal investigator details• Foreign travel details• Project commencement date• Project member details

Page 201 / 277

Page 202: Request for Proposal for Design, Supply, Installation

19 Should allow to enter amount heads. When a project is registered with the fund allocated for different heads are stored here. The details include

• Project code• Project head • The amount allocated

20 Should have provision to create the different roles in the project

21 Should allow to enter fund utilization details. The amount utilized by a project in different heads is stored here. The details include

• Project code• Project head code• Amount utilized

22 Should allow to enter transaction details. Details about expenses incurred against each project head is maintained here

• Transaction code (auto number)• Project code• Purchase order number• Purchase order date• Project head of transaction• Amount• Remarks

23 Should allow to schedule project dates. The project schedule dates such as technical closure, financial closure (original or amended ) are maintained here

• Project code• Date of Technical closure• Date of financial closure

24 Should allow to enter project funding schedules. Funding/payment schedule of the project is maintained here

• Project code• Event of completion• Scheduled date• Amount to be received

25 Should allow to enter project fund receipts. Details about fund received for the project is stored here

• Project code• The fund received• Received date• Scheduled date

26 Should allow to generate the utilization certificate. Utilization certificate is issued for the funds received for each project. The details of whether issued or not and other information about the certificate are also stored

Page 202 / 277

Page 203: Request for Proposal for Design, Supply, Installation

which is used to remind the personnel to issue a certificate. The details include

• Project code• Utilization certificate issue date• Amount

27 Should allow to enter receipt of funds. The funds of each project are received at different stages. The details of the amount received for each project is stored here. The details include

• Project code• Date• Number• Amount

28 Should have the provision to amend the project. The system should capture the following details.

• Budget Reallocation• Rescheduling

29 Provision to view fund details of various projects

30 Should have provision to capture and monitor any time extension, deviation in the schedule of work etc.

31 Should have provision to capture and issue work completion certificate

32 Should have provision to issue testing certificates and maintain the details of the testing done at various buildings/sites

33 Provision to request an item from Store/Request with item name, quantity, reason, any comments, no: of days of usage, date and time of request etc

34 Should have provision to generate the report for the list of resources allocated to the project

35 Should have provision to generate the project chart as per the plan set in the project template

36 Should have provision to generate the report for the financial estimate of the project (Budget Estimate vs. Actual)

37 Should have provision to generate all the receipt and expense related to the project

38 Should have the provision for fund clearance certificate in equipment, travel and capital heads

39 Should have the provision to view/print individual project details

Page 203 / 277

Page 204: Request for Proposal for Design, Supply, Installation

40 Should have the provision to take reports based on various parameters

41 Should have the provision for sending mails/alerts while underutilizationor overutilization of funds

42 Should have the facility to generate fund closure certificate

43 Provision to update the status of the project like Initiated, In-progress, Completed, Cancelled

44 Provision to submit proposal to government and other agencies for projects

20.15.15.4 e-Tendering / Quotations /Comparative Statements

There should have the provision to e-Tendering. The facility should allow processing of tenders on line. The system should enable the vendors to download the tender schedule free of cost and submit the bids on line through this portal.

SI. No. Activities

1 Tender invitation

2 Receiving tenders

3 Fixing a tender

4 Execution of security agreement with the tenderer and receiving securitydeposits

5 Processing of tenders to obtain best tender

Sl. No Functional Requirements Specification

1 Capability of a user to request a material for purchase/ indent

2 System should capture the details of the indent that is identified by a unique number

3 Ability to add more than one material to an indent

4 System should have the provision for the indent to undergo various status changes like created, submitted, approved, closed, rejected and cancelled

5 Ability to check the availability of requested items in store.

6 System should have the provision to notify the appropriate persons for the indents waiting for approval

7 Ability to modify the Sanction or approval amount limit for a particular User

8 Provision to capture the remarks by different approvers

Page 204 / 277

Page 205: Request for Proposal for Design, Supply, Installation

9 Ability to push the tender to any committee for approval

10 Provision to check availability of sufficient funds from the budget for an indent

11 Provision to set up Types of Tender and the days required to respond to that type of Tender

12 Provision to capture tender details like Title, Place of execution, Mandatory documents, Earnest money deposit, etc.

13 Provision to associate a tender to more than one indent

14 Ability to capture response from more than one supplier

15 Should capture the Response number, date, supplier details, contact person for a quotation

16 Ability to capture advance requested for supply of materials

17 System should have the provision to capture Indian currency, foreign currency amount and exchange rate

18 Ability to capture Guarantee/ Warranty and Validity details

19 Ability to capture the Quotation Number and Quotation Date details20 Provision for vendor management

21 Provision for Purchase Order Integration22 Provision to view Purchase Order Status

23 Provision for e-Payment24 Provision for e-Invoicing

25 Provision for contract management

20.15.15.5 Work Order

After finalizing tenders, work order will be issued to contractors. Selection notice and contract agreements will be executed.

SI. No. Activities

1 Prepare selection notice, agreements, and handover site

Sl. No Functional Requirements Specification

1 Should have provision to prepare selection notices

2 Should have provision to prepare contract agreements

3 Should have provision to prepare draft schedule agreements

4 Should have provision to maintain details of work order, contract agreements etc.

5 System should have provision to intimate concerned group offices

6 System should have provision to search and view work order details according to roles assigned to various offices / officers

Page 205 / 277

Page 206: Request for Proposal for Design, Supply, Installation

20.15.15.6 M-Book

Payments for all works which are susceptible of measurement are done on the basis of measurementrecorded in the Measurement book (M-Book). The M-Book is, therefore, an initial and veryimportant book of accounts record which should be properly maintained and safely kept by theperson to whom it is issued.

All M-Books should be serially numbered and an account of their issue and receipt back should bekept in the Register of M-Books. All pages of an M-Book should be machine numbered and acertificate of number of pages contained in the M-Book should be recorded by the user on its firstpage. Instructions given in the fly leaf of MB should be carefully followed and its index should beregularly filled in. Measurements in the M-Book should be recorded by a person not below the rankof Assistant Engineer. Each set of measurement (record entry) in case of a works contract mayinclude the following entries:

Full name of the work (as given in the estimate/agreement) Site of work Name of the contractor Agreement number and date Estimate number and date Date of record entry (measurement) Reference to last measurement Stipulated date of commencement of work Stipulated date of completion of work Actual date of completion of work (if completed)

SI. No. Activities

1 Keeps a register of M-Books with name of custodian, M-Book number with serial numbers, number of pages etc.

2 Assistant Engineers visits work sites and records measurements of work so far completed in M-Book

3 Submits M-Books for verification and approval by Executive Engineer

4 Submits M-Books for bill settlement and part / full payment

Sl. No Functional Requirements Specification

1 Should have provision to maintain M-Book electronically so that the same can be forwarded online for verification and payment approvals

2 Should have provision to identify each M-Book by a unique number

3 Should have provision to keep a log of M-Books issued, custodian, serial numbers etc.

Page 206 / 277

Page 207: Request for Proposal for Design, Supply, Installation

4 Should have provision to forward M-Book to Executive Engineers for verification and approval

5 Should have provision to forward M-Book details to Executive Engineer/ Chief Engineer / Board Office for full / part payment approvals

20.15.15.7 Recovery of Unserviceable materials

A survey report of unserviceable materials is prepared by concerned Assistant Engineers. The valueof these unserviceable materials is calculated and a fixed percentage (currently, 20%) of this isdeducted as keeping charge. If this was done as part of work contract, the recovery bill is usuallyadjusted in the bill of contractor itself with the consent of contractor. A recovery certificate is alsoissued to the contractor stating recovery will be adjusted against contractor’s bill and hence it iscontractor’s property.

If the contractor is not willing to adjust bill for recovery part, auction notices will be declared anduntil the auction process is completed, the security deposit from the contractor will not be released.The recovery bill is approved by Executive Engineer / Chief Engineer / Board Office based onlimits setup by Board.

SI. No. Activities

1 Prepare survey report of unserviceable materials

2 Calculate unserviceable material value and keeping charges

3 Adjust the amount in the recovery part of final / part bill of contractor, ifrecovery is part of a work contract and contract willing to do so. Conduct auctions, otherwise

4 Submit recovery bill for approval to concerned Executive Engineer / concerned Chief Engineer / Board Office

Sl. No Functional Requirements Specification

1 Should have provision to maintain data from survey report of unserviceable materials

2 Should have provision to calculate value of unserviceable materials and also keeping charges

3 Should have provision to adjust the recovery bill against a work contract

4 Should have provision to conduct auctions, if point 3 above is not done

5 Should have provision to forward recovery bill to Executive Engineer /

Page 207 / 277

Page 208: Request for Proposal for Design, Supply, Installation

Chief Engineer / Board Office as per the amount limits set by Board

20.15.15.8 Part Bill preparation

The contractor shall notify TDB upon completion of any part of the work in respect of which anypart payment is claimed pursuant to the contract. The Assistant Engineer evaluates the work so farcompleted by the contractor and updates M-Book. The M-Book is referred for preparing part bills. Bills are prepared in relevant formats on the basis of measurements recorded in M-Book and anydeviations from draft schedule agreements will be recorded. A fixed percentage of contractor’s partbill (currently, 10%) is withheld as retention amount and should transfer to Security Depositaccount. Recovery part, if any for the bill is also calculated. Survey Report of unserviceablematerials during renovation or construction works is prepared. The value of these unserviceablematerials is calculated and a fixed percentage (currently, 20%) of this is deducted as keeping charge.The value of unserviceable materials is usually adjusted in the bill of contractor as recovery part ofthe bill. The part bill is approved by Executive Engineer / Chief Engineer / Board Office based onlimits setup by Board.

SI. No. Activities

1 Receive requests from contractors for part payments

2 By referring M-Books and Draft schedule agreements, prepare part bill

3 Include retention amount and recovery amount, if any in part bill calculation

4 Submit part bill for payment approval to concerned Executive Engineer /concerned Chief Engineer / Board Office

Sl. No Functional Requirements Specification

1 Should have provision to receive part payment requests from concerned Assistant Engineers

2 Should have provision to refer and view current M-Book data for the work and Draft schedule agreements

3 Should have provision to assist in preparing part bill amount

4 Should have provision to calculate retention amount

5 Should have provision to calculate and include recovery amount, if any

6 Should have provision to forward part bill for payment approval to concerned Executive Engineer / concerned Chief Engineer / Board Office based on limits set by Board

Page 208 / 277

Page 209: Request for Proposal for Design, Supply, Installation

20.15.15.9 Final Bill preparation

The contractor shall notify TDB upon successful completion of contract work in respect of whichfull payment is claimed. The Officer in charge evaluates the work done by the contractor andupdates M-Book. The M-Book is referred for preparing final bills.

Bills are prepared in relevant formats on the basis of measurements recorded in M-Book and anydeviations from draft schedule agreements will be recorded. Recovery part, if any for the bill is alsocalculated. Survey Report of unserviceable materials during renovation or construction works isprepared. The value of these unserviceable materials is calculated and a fixed percentage (currently,20%) of this is deducted as keeping charge. The value of unserviceable materials is usually adjustedin the bill of contractor as recovery part of the bill. The final bill is approved by Executive Engineer/ Chief Engineer / Board Office based on limits setup by Board.

SI. No. Activities

1 By referring M-Books and Draft schedule agreements, prepare final bill

2 Include recovery amount, if any in final bill calculation

3 Submit final bill for payment approval to concerned Executive Engineer / concerned Chief Engineer / Board Office

Sl. No Functional Requirements Specification

1 Provision to view status of contract works

2 Should have provision to refer and view current M-Book data for the work and Draft schedule agreements

3 Should have provision to assist in preparing final bill amount

4 Should have provision to calculate and include recovery amount, if any

5 Should have provision to forward final bill for payment approval to concerned Executive Engineer / concerned Chief Engineer / Board Office based on limits set by Board

20.15.15.10 Defects, Liability Period

There shall be a Defects Liability Period of fixed months (currently, 6 months) for all worksexecuted by the contractor under the agreement. If any defects detected during this period, theSecurity Deposit of the contractor will not be released until the work is redone. If the contractorrefuses to repair, Security Deposit will be forfeited to Devaswom Commissioner Account.

SI. No. Activities

1 Check whether any defects reported from work sites within 6 months of work completion by contractor

2 If defects detected, withheld security deposit of the contractor and intimate

Page 209 / 277

Page 210: Request for Proposal for Design, Supply, Installation

contractor about the defect

3 If no defects detected, recommend release of security deposit to the contractor

Sl. No Functional Requirements Specification

1 Should have provision to set defects, liability period

2 Should have provision to receive defect reports from work sites

3 Should have provision to prepare communications to concerned contractors

4 Should have provision to withheld security deposit of contractor

5 Should have provision to forfeit security deposit of contractor

6 Should have provision to release withheld security deposit of contract once work is redone.

20.15.15.11 Release of Security Deposits

After a contract has been fulfilled, any payment made as security deposit should be released orrefunded to the contract/firm. As per the current rule, the Security Deposits should be released aftera period of six months of expiration of the contract.

SI. No. Activities

1 Release Security Deposits to contactors

2 Issue of No Liability Certificate (NLC) to contractors

Sl. No Functional Requirements Specification

1 Should have provision to verify whether any defects during liability period reported

2 Should have provision to release Security Deposits to contractors

3 Should have provision to issue NLC to contractors

4 Should have provision to view the status of works and contractors to concerned offices / officers

20.15.15.12 Auctioning of shopping complex/Estate property/Furniture

Page 210 / 277

Page 211: Request for Proposal for Design, Supply, Installation

SI. No. Activities

1 Prepares list of items to be auctioned

2 Assigns auction number and schedules auctions

3 Publishes auction notices in websites, newspapers etc.

4 Auction values sent for approval to respective Chief Engineer or to the Board office

Sl. No Functional Requirements Specification

1 Should have provision to prepare and maintain list of items to be auctioned

2 Should have provision to identify each auction by a unique number

3 Should have provision to schedule auction date, venue and to maintain various other parameters such as EMD etc.

4 Should have provision for maintaining various amounts received in auctioning process

5 Should have provision to prepare various bills

6 Should have provision forward auction details to Chief Engineer office / Board office for approval

7 Should have provision for maintaining asset hand over details

8 Should have provision to remit auction values to Devaswom Commissioneraccount electronically

9 Should have provision to search and view auctions and status according to privileges assigned to various offices

20.15.16 Auction

SI. No. Activities

1 Prepares list of items to be auctioned

2 Assigns auction number and schedules auctions

3 Publishes auction notices in websites, newspapers etc.

4 Auction values sent for approval to respective Officer in Charge or to the Board office

Sl. No Functional Requirements Specification

Page 211 / 277

Page 212: Request for Proposal for Design, Supply, Installation

1 Provision to prepare and maintain list of items to be auctioned

2 Provision to identify each auction by a unique number

3 Provision to schedule auction date, venue and to maintain various other parameters such as EMD etc.

4 Provision for maintaining various amounts received in auctioning process

5 Provision to prepare various bills

6 Provision to forward auction details to Officer in Charge / Board office for approval

7 Provision for maintaining asset hand over details

8 Provision to enter the amount received in an auction, its mode of Payment details like cash/cheque no:, cheque date/ Electronic Bank account transaction no: and the approval of details entered by officer in charge

9 Provision to search and view auctions and status according to privileges assigned to various offices

20.15.17 Video Surveillance

Sl. No Activities

1 Access control for cameras

2 Streaming of video

3 Recording of video

4 Mobile interface

20.15.18 Kanikka Counting

Sl. No Activities

1 Schedule Kanikka Counting

2 Conduct of Kanikka Counting

3 Updating of related registers

4 Surveillance

5 Reports

Sl. No Functional Requirements Specification

1 Provision to allot staffs for Counting

2 Provision to save details of Kanikka Counting like total amount,

Page 212 / 277

Page 213: Request for Proposal for Design, Supply, Installation

denominations, fake notes, soiled notes, valuables etc

3 Provision to enter details of Kanikka Counting in Mahassar

4 Provision to update register

5 Provision to record and stream Kanikka Counting video footage

6 Provision to configure various alerts , say alert if the vazhipadu is postponed , time change etc.

7 Provision to generate dynamic reports based on various parameters involved in this module

20.15.19 Vigilance

Sl. No Activities

1 Schedule and Conduct inspection

2 Petition Management

3 Recording irregularities

4 Recommending disciplinary actions

5 Monitoring the activities of security staffs

6 Deploying security staffs

7 Vigilance Report

8 Alerts

Sl. No Functional Requirements Specification

1 Provision to receive a petition

2 Provision to uniquely identify each petition

3 Provision to set various status to a petition like Open, Pending, Cancelled, Settled etc

4 Provision to know the user details on whom the petition is residing.

5 Provision to schedule inspection

6 Provision to capture irregularities

7 Provision to uniquely identify each irregularity

8 Provision to give different levels of severity and relevance to an irregularity

9 Provision to assign a person to rectify or to regularize an irregularity

10 Provision to give a time period to regularize the irregularity

11 Provision to set various status to an irregularity like Open, Pending, Cancelled, Settled etc

12 Provision to generate a report to show the irregularities noted between a period(Vigilance report)

13 Provision to alert higher authorities by the severity and relevance of an

Page 213 / 277

Page 214: Request for Proposal for Design, Supply, Installation

irregularity, if the irregularity is not regularized within the given time

14 Provision to deploy security staffs at various duty points(ref: Duty Deployment)

15 Provision to configure various alerts(SMS/email)

16 Provision to generate dynamic reports based on various parameters involved in this module

20.15.20 Auditing

Sl. No Activities

1 Generating reports for inspection or auditing2 Schedule and Conduct inspection

3 Compiling Audit Report 4 Reporting to respective authorities with priorities of irregularities

5 Monitoring, action taken by departments to rectify reported irregularities

Sl. No Functional Requirements Specification

1 Provision to set the type of Audit(internal/external etc)

2 Provision to generate reports related to inspection

3 Provision to record irregularities and assign the rectification work to a particular person or office

4 Provision to identify each irregularity by a unique id

5 Provision to attach files to irregularities

6 Provision to set severity levels to irregularity(Serious/ regular/simple etc)

7 Provision to forward the irregularity to Higher authorities

8 Provision to give status to irregularity like "Open", "Pending", "Closed/rectified", "Suspended", "Deleted" etc

9 Provision to give priority levels to irregularities

10 Alert mechanism based on priority/time constraints or other parameters like pending duration, subject etc

11 Provision to generate dynamic reports based on various parameters involved in this module

20.15.21 Mess Management

Sabarimala runs a mess for its staffs or is given to private parties on contract. The proposed systemuses the staff's id card itself to deduct the amount of his canteen expenses. The contactless smartcards can be read by a smart card reader which can be placed in the mess. Every staff coming to themess has to place his id card in the proximity of the detector. The charge of the food is deductedfrom his salary and is credited to the Mess account head. The charge of the food is determined bythe time of swipe. Hand held devices with smart card detectors can also be introduced for fast and

Page 214 / 277

Page 215: Request for Proposal for Design, Supply, Installation

mobile food service. Provision for a staff to book his lunch in the morning can also be introducedwhich helps the mess to manage food quantity efficiently.

Sl. No Activities

1 Staff swipes his id card in the morning at a RF id reader device to book his lunch(separate reader device only for booking)

2 Mess manager gets the no: of bookings and makes food accordingly

3 Staffs have their lunch after using their id card to make the payment

4 Total amount credited to the mess account head transferred to Mess management monthly.

Sl. No Functional Requirements Specification

1 Provision to manage a master data ofMess food items, its cost, quantity per person, lunch timings , different rates for different employee categories etc

2 A smart card detector device to identify the staff and programmed to book lunch for the staff who places his id card to device's proximity.

3 A separate application to manage Mess bookings through Smart card

4 Provision to identify the type of food(lunch/breakfast) by the timing of swipeor to set and write the next swipe category to particular food type to the reader device

5 Hand held devices to collect charges of miscellaneous food items and to support mobile serving of food.

6 Provision to deduct charges from a staff's salary and credit the amount to mess account head during his id card swipe

Page 215 / 277

Page 216: Request for Proposal for Design, Supply, Installation

21 Annexure B - Infrastructure Requirement

21.1 Technology Architecture

Details of proposed IT solutions and its functional requirements for CTDB Project are covered in

this section. Based on the revenue and grade of the Temples, hardware requirement for each grade is

analyzed separately and list. The section also provides the details of the proposed Technology

Deployment Architecture with focus on how the solution will enable the TDB to provide services

through this consolidated suite of applications.

CTDB is deployed on a centralized architecture where various offices and temples of TDB connect

to the system through Data Centre located at Head Quarters.

21.2 Deployment Architecture

The proposed CTDB solution framework for the TDB is depicted in this section. The picture given

in this section is showing the key target areas of IT initiatives and their inter-relationships. This blue

print would be used as a communication tool that provides a snapshot of the overall goal/ direction

to be taken up for implementation of CTDB project. Stakeholder can easily understand the

functionalities of CTDB project by viewing this blueprint, without getting into the complex details

of the internal workings of each of these initiatives. All the modules depicted in the overall solution

framework and explained in detail as part of the Functional Requirement Specification – provides

the overall goal of the Devaswom Board.

Page 216 / 277

Page 217: Request for Proposal for Design, Supply, Installation

Figure 1: Overall Solution Blueprint

The ‘User’ Layer:This layer forms the internal users accessing the applications over a prioritized

virtual network overlaid on the Internet using KSWAN/Internet as a backbone. Role based access

would be defined for the internal users for having access to the respective application modules, such

Page 217 / 277

Page 218: Request for Proposal for Design, Supply, Installation

as HRMS, which would be accessed by all the TDB Officers. Higher TDB authorities would

essentially be accessing reporting modules which would help them in decision making and

monitoring the overall activities at various levels. Integrated database structure would ensure a one

point stop search available to all the TDB units

The ‘Data’ Layer: The overall solution would be based on a hybrid architecture comprising of

centrally located databases at TDB Data Centre as central repository and locally deployed databases

at other TDB units (mainly TDB Temples). The system proposed for Temples would be able to

function in an offline mode, data would automatically replicate with the central repository in TDB

Data Centre in frequent intervals. This approach would cater to the functionalities of all the key

processes and functions performed at temple level and would also allow the users to have an access

to the central repository for comprehensive information as whenever required. The TDB Data

Centre would securely host the aforementioned information databases on servers specifically for

TDB. It is recommended that the TDB should focus mainly on the following:

The specialized skills needed to manage a data-centre (such as security access management

through multiple delivery channels, data encryption, storage management, database

administration, etc.). To replicate, maintain and continually upgrade these skills at a Board level

would be extremely difficult, time consuming and waste of effort and resources.

The IT infrastructure investments would be required for enhancing the capacity of DC (e.g.

Servers, Storage capacity, upgraded connectivity, etc.).

Networking: The overall networking solution would be based on a combination of Leased line,

VPN over Broadband and Kerala SWAN (i.e. the State Wide Area Network established by the State

Government) ensuring optimum uptime at all the desired locations.

The‘Application’ Layer represents the modules that were identified based on the FRS proposed by

the Board for computerization. These modules will communicate with each other by sharing data

with one another. Users can easily access solution components (CTDB Core Application Software

modules) having a single sign-on facility either through internet or through SWAN. All the modules

would be supported by Business Intelligence, Multi-lingual support, e-Payment gateway and

workflow engine.

Page 218 / 277

Page 219: Request for Proposal for Design, Supply, Installation

The‘Service Delivery’ Layer represents the different modes/media of service delivery, which would

be used for availing/accessing the services of TDB. Services would be primarily provided through

over internet, Mobile, SMS etc.

Page 219 / 277

Page 220: Request for Proposal for Design, Supply, Installation

21.3 Network Architecture

Figure 3: Network Architecture

Figure 4: TDB Temple Network

Page 220 / 277

Page 221: Request for Proposal for Design, Supply, Installation

21.4 ICT Infrastructure Requirement

This section details out the ICT infrastructure requirement for successful implementation of CTDB

project in TDB. Category wise ICT infrastructure requirement is also detailed in this section. The

prices and numbers shown for the hardware & Networking items in this section are indicative only

Page 221 / 277

Page 222: Request for Proposal for Design, Supply, Installation

21.4.1 Summary of Temples & Offices

The table below lists the coverage of Temples and TDB Offices for Hardware & Network

deployment which would be used in subsequent sections to describe the requirement of hardware at

each location and infrastructure deployment schedule.

Temples & Offices for ICT Implementation at TDB

Category Nos.

Hardware

Grade I Temples 236

Grade II Temples 479

Grade III Temples 481

Sub Group Office 282

Group Office 21

District Office 5

TDB HQ 1

Sabarimala 1

Network

TDB HQ 1

Sabarimala 1

DataCentre

TDB HQ 1

Video Streaming

Grade I Temples 236

Grade II Temples 479

Sabarimala 1

21.4.2 Hardware for TDB Head Quarters

TDB Head Quarters located at Thiruvananthapuram consists of 5 independent buildings. Now very

few computer systems are used, so no network infrastructure facilities at HQ.

List of Hardware Items for HQ AutomationSl. No. Product Manufacturer Qty /No

1 Desktop Computer DELL/HP/IBM/HCL/Acer 202 Printer 132 col dot matrix Epson LQ1150 23 Laser Printer HP/Epson 3

Page 222 / 277

Page 223: Request for Proposal for Design, Supply, Installation

4 Multifunction printer HP/Epson 35 UPS 5 KV Emerson/APC/Hycon 26 UPS 3 KV Emerson/APC/Hycon 27 Scanner HP/Epson 28 3 Feet patch cord 309 Laser Duplex Printer HP/Epson 2

List of Hardware Items for HQ NetworkingSl. No. Particulars Qty

25 24 100/1000BASE-X unpopulated SFP, 8 10/100/1000BASE-T (4 10/100/1000BASE-T and 4 10 g ports shared with SFP ports), XGM3 slot, Stacking module slot, AC PSU with one unpopulated PSU slot, Fan module and out of Band ethernet Management Port. (Extreme , Juniper , Cisco or equivalent)

1 No.

26 24 10/100/1000BASE-T,4 1000 BASE-X unpopulated (4SFP shared with 10/100/1000 BASE-T ports),1 x Serial(console port) and 1 x 10/100BASE-T out-of-bandmanagement port , 1 x Redundant Power Supply connector.(Make: Extreme, juniper, cisco or equivalent )

8 No.

27 Gigabit Module– LX SC Connector Fiber Transceiver (Make: Extreme, juniper, cisco or equivalent )

16 No.

28 SC-SC OFC 2 mtr Patch Cords – SMF. [Make: Digilink , AMP ,Krone or equivalent ]

4 No.

29 SC-LC OFC 2 mtr Patch Cords – SMF. [Make: Digilink , AMP ,Krone or equivalent ]

22 No.

30 UTP CAT6 Cable Rolls of 305 meters PVC conduit /Capping casing / cable management. [Make: Digilink , AMP ,Krone or equivalent ]

2000 Meter

31 CAT6 I/O key stone w/o Face Plate and SMB (single)[Make: Digilink , AMP ,Krone or equivalent ]

75 No.

32 CAT6 7’ Mounting Cords. [Make: Digilink , AMP ,Krone or equivalent ]

75 No.

33 CAT6 3’ Mounting Cords. [Make: Digilink , AMP ,Krone or equivalent ]

75 No.

34 CAT6 loaded Jack Panel (24 ports). [Make: Digilink , AMP,Krone or equivalent ]

9 No.

35 Supply and Fixing of 19” Floor Mount Rack 27 U 600W X800 D with 4 cable Manager, 6x5 Amps Power DistributionBox, 4 Fan , 1 Hardware Kit (Valrack or equivalent)

1 No.

Page 223 / 277

Page 224: Request for Proposal for Design, Supply, Installation

36 Supply and Fixing of 19” wall Mount Rack 12 U 600W X 600D with 2 cable Manager, 6x5 Amps Power Distribution Box, 2 Fan , 1 Hardware Kit (Valrack or equivalent)

9 No.

37 Supply and laying of 24 core SMF outdoor armored typecable through HDPE/Metal/HUME/PVC conduit pipe asrequired. [Make: Digilink , AMP ,Krone or equivalent ]

400 Meter

38 Supply and laying of 12 core SMF outdoor type cablethrough HDPE/Metal/HUME/PVC conduit pipe asrequired. [Make: Digilink , AMP ,Krone or equivalent ]

400 Meter

39 Supply and laying of 6 core SMF outdoor type cablethrough HDPE/Metal/HUME/PVC conduit pipe asrequired. [Make: Digilink , AMP ,Krone or equivalent ]

225 Meter

40 Supply, installation, testing and commissioning of fiberoptic patch panel 24 port 1 U rack mountable with SCduplex adaptor with plate loaded complete as required.[Make: Digilink , AMP ,Krone or equivalent ]

9 No.

41 Supply, installation, testing and commissioning of OFC SCpigtail -1.5 meter -SMF as required.[Make: Digilink, AMP,Krone or equivalent ]

100 No.

42 SITC of 32mm ISI PVC Conduit / Casing Capping with all accessories required (Make: precision, Modi or equivalent ]

400 Meter

43 SITC of 25mm ISI PVC Conduit / Casing Capping with all accessories required (Make: precision, Modi or equivalent ]

300 Meter

44 Supply and laying 50mm/47.5mm (outer/inner dia) doublewall corrugated HDPE pipe with all accessories at a depthof 60cm with all accessories including excavation, refillingthe trench as required.[Make: Ashitech or equivalent ]

500 Meter

45 Supply and laying 50mm/47.5mm (outer/inner dia) doublewall corrugated HDPE pipe with all accessories at a depthof 60cm in hard soil with all accessories includingexcavation, refilling the trench as required.[Make: Ashitechor equivalent ]

125 Meter

46 Supply and laying50mm dia. B- class GI pipe at a depth of60cm including excavation, refilling the trench andproviding 20cm deep 1:3:6 cement concrete mix on top etc.as required.

100 Meter

47 SITC of brick masonry chamber with inner size of 45cmx45cm with cement concrete top cover slab as required.

25 No.

48 Supplying and making cable route marker Route marker 60X 30 X 10 with cement Plastering ,Lettering& painting asrequired.

25 No.

Page 224 / 277

Page 225: Request for Proposal for Design, Supply, Installation

List of Hardware Items for Attendance Management System at HQ

As part of TDB computerization, all employees under TDB shall be provided with Smart Identity

Card. Facility for recording daily attendance shall be envisaged along with this e-Governance

Implementation.

Sl. No. Product Qty /Nos

1 Smart Card 6000

2 Smart card Enrollment Kit 2

3 Biometric Enrollment Kit 2

4 Smart Card Printer 1

5 Printer Cartridge 60

6 Biometric Smart Card Reader 10

21.4.3 Hardware for Temples

The hardware requirement for the smooth functioning of Temples is categorized based on the grade

assigned to these Temples. TDB distinguished the Temples into Grade I, II & III based on their

revenue, etc.

List of Hardware Items for Grade I TemplesSl. No. Product Manufacturer Qty /No

1 Workstation DELL/HP/IBM 12 Desktop Computer DELL/HP/IBM/HCL/Acer 33 Printer Epson LQ 50 34 Multi Function Printer HP/Epson 15 UPS 3 KVA Emerson/APC/Hycon 16 ** Connectivity BSNL 17 Networking 68 Electrical Work 109 Biometric Smart Card

Reader1

Page 225 / 277

Page 226: Request for Proposal for Design, Supply, Installation

List of Hardware Items for Grade II TemplesSl. No. Product Manufacturer Qty /No

1 Desktop Computer DELL/HP/IBM/HCL/Acer 32 Printer Epson LQ50 23 Laser Printer hp/Epson 14 UPS 2 kVA Emerson/APC/Hycon 15 **Connectivity BSNL 16 Networking 47 Electrical Work 108 Biometric Smart Card Reader 1

List of Hardware Items for Grade III TemplesSl. No. Product Manufacturer Qty /No

1 Desktop Computer DELL/HP/IBM/HCL/Acer 12 Printer Epson lQ 50 13 UPS 1 KV Emerson/APC/Hycon 14 **connectivity BSNL 15 Electrical Work 36 Biometric Smart Card Reader

21.4.4 Hardware for TDB District/Group/ Sub Group Offices

TDB consists of 283 Sub Group Offices under 21 Group Offices which again comes under 4

District Offices. All the Temples come under Sub Group Offices. These Offices need a minimum

infrastructure for automating the activities. The infrastructure required for these Offices are

Sl. No. Product Manufacturer Qty /No1 Desktop Computer DELL/HP/IBM/HCL/Acer 23 Multi Function Printer HP/Epson 14 UPS 1 kVA Emerson/APC/Hycon 15 **Connectivity BSNL 16 Networking 37 Electrical Work 88 Biometric Smart Card

Reader1

21.4.5 Hardware for Strong Room

Sl. No. Product Manufacturer Qty /No1 Camera HD/MP/PTZ/Dome Bosch/Sony 12 DVR/NVR 1

Page 226 / 277

Page 227: Request for Proposal for Design, Supply, Installation

3 Desktop Computer DELL/HP/IBM/HCL/Acer 14 Laser Printer HP/Epson 15 Ups 1 KV Emerson/APC/Hycon 16 Room Access Security System 17 **Connectivity BSNL 18 Networking 39 Electrical Work 510 Biometric Smart Card Reader 1

21.4.6 Hardware for Sabarimala

The tables below details the list of Hardware and Networking infrastructure required at Sabaramala:

List of Hardware for Sabarimala AutomationSl. No. Product Manufacturer Qty /No

1 Workstation with RAID DELL/HP/IBM 12 Desktop Computer(counter) DELL/HP/IBM/HCL/Acer 203 Printer Epson lQ 50 94 Multifunction printer HP/Epson 35 Laser Printer HP/Epson 36 UPS 2 kv Emerson/APC/Hycon 57 ** Connectivity 6 mbps BSNL 18 Electrical Work 509 Biometric Smart Card Reader 10

List of Hardware for Sabarimala Networking (Fiber)Sl. No. Particulars Qty

1 24 100/1000BASE-X unpopulated SFP, 8 10/100/1000BASE-T (4 10/100/1000BASE-T ports shared with SFP ports), XGM3 slot, Stacking module slot, AC PSU with one unpopulated PSU slot, Fan module and out of Band ethernet Management Port. (Extreme , Juniper , Cisco or equivalent)

1 No.

2 Ruckus Zone Director 1100 licensed for up to 12 ZoneFlex Access Points. ZD1100 can be upgraded to support up to 50 APs with AP license upgrades.3 year Partner Premium Support for ZoneFlex 7762 (Detailed specification attached)

1 No.

3 24 10/100/1000BASE-T,2 1000 BASE-X unpopulated (4 SFPshared with 10/100/1000 BASE-T ports),(Make: Extreme, juniper, cisco or equivalent )

5 No.

4 Gigabit Module– LX SC Connector Fiber Transceiver (Make: Extreme, juniper, cisco or equivalent )

10 No.

5 SC-SC OFC 2 mtr Patch Cords – SMF. [Make: Digilink , AMP ,Krone or equivalent ]

4 No.

Page 227 / 277

Page 228: Request for Proposal for Design, Supply, Installation

6 Of SC-LC OFC 2 mtr Patch Cords – SMF. [Make: Digilink , AMP ,Krone or equivalent ]

11 No.

7 UTP CAT6 Cable Rolls of 305 meters through PVC conduit /Capping casing / cable management. [Make: Digilink , AMP ,Krone or equivalent ]

1500 Meter

8 CAT6 I/O key stone w/o Face Plate and SMB (single)[Make: Digilink , AMP ,Krone or equivalent ]

40 No.

9 CAT6 7’ Mounting Cords. [Make: Digilink , AMP ,Krone or equivalent ]

40 No.

10 CAT6 3’ Mounting Cords. [Make: Digilink , AMP ,Krone or equivalent ]

40 No.

11 CAT6 loaded Jack Panel (24 ports). [Make: Digilink , AMP ,Krone or equivalent ]

5 No.

12 Supply and Fixing of 19” Floor Mount Rack 27 U 600W X 800 D with 4 cable Manager, 6x5 Amps Power Distribution Box, 4 Fan , 1 Hardware Kit (Valrack or equivalent)

1 No.

13 Supply and Fixing of 19” wall Mount Rack 12 U 600W X 600D with 2 cable Manager, 6x5 Amps Power Distribution Box, 2 Fan , 1 Hardware Kit (Valrack or equivalent)

5 No.

14 Supply and laying of 12 core SMF outdoor armored type cable through HDPE/Metal/HUME/PVC conduit pipe as required. [Make: Digilink , AMP ,Krone or equivalent ]

600 Meter

15 Supply and laying of 6 core SMF outdoor type through HDPE/Metal/HUME/PVC conduit pipe as required. [Make: Digilink , AMP ,Krone or equivalent ]

700 Meter

16 Supply, installation, testing and commissioning of fiber optic patch panel 24 port 1 U rack mountable with SC duplex adaptor with plate loaded complete as required.[Make: Digilink , AMP ,Krone or equivalent ]

10 No.

17 Supply installation, testing and commissioning of OFC SC pigtail -1.5 metre -SMF as required.[Make: Digilink , AMP ,Krone or equivalent ]

80 No.

18 32mm ISI PVC Conduit / Casing Capping with all accessoriesrequired (Make: Precision, Modi or equivalent ]

250 Meter

19 25mm ISI PVC Conduit / Casing Capping with all accessoriesrequired (Make: Precision, Modi or equivalent ]

300 Meter

20 Supply and laying 50mm/47.5mm (outer/inner dia) double wall corrugated HDPE pipe with all accessories at a depth of 60cm with all accessories including excavation, refilling the trench as required.[Make: Ashitech or equivalent ]

600 Meter

Page 228 / 277

Page 229: Request for Proposal for Design, Supply, Installation

21 Supply and laying 50mm/47.5mm (outer/inner dia) double wall corrugated HDPE pipe with all accessories at a depth of 60cm in hard soil with all accessories including excavation, refilling the trench as required.[Make: Ashitech or equivalent]

125 Meter

22 Supply and laying50mm dia. B- class GI pipe at a depth of 60cm including excavation, refilling the trench and providing 20cm deep 1:3:6 cement concrete mix on top etc. as required.

100 Meter

23 Brick masonry chamber with inner size of 45cmx 45cm with cement concrete top cover slab as required.

25 No.

24 Supplying and making cable route marker Route marker 60 X30 X 10 with cement Plastering, Lettering & painting as required.

100 No.

21.4.7 Hardware for CCTV

CCTV facilities are suggested for Video Streaming & Monitoring purposes at the temples. This is

used for Security purposes and for Kanika counting. Based on the size and crowd of Temples, the

number of cameras used may differ. This report suggests 3 different packages for Video Streaming.

TDB CCTV Hardware List special Grade Temples

Sl. No. Product Manufacturer Qty /No

1 Camera HD/MP/PTZ/Dome Bosch/Sony 10

2 DVR/NVR Bosch/Sony 1

3 Video Transmitter 1

4 Storage for 60 Days 1

5 Networking/Cabling(100m) 10

6 Display 1

7 Power 10

TDB CCTV Hardware List with 4 Camera

Sl. No. Product Manufacturer Qty /No

1 Camera HD/MP/PTZ/Dome 4

2 DVR/NVR 1

3 Video Transmitter 1

Page 229 / 277

Page 230: Request for Proposal for Design, Supply, Installation

4 Storage for 60 Days 1

5 Networking/Cabling(100m) 4

6 Display 1

7 Power 4

TDB CCTV Hardware List with 8 Camera

Sl. No. Product Manufacturer Qty /No

1 Camera HD/MP/PTZ/Dome 8

2 DVR/NVR 1

3 Video Transmitter 1

4 Storage for 60 Days 1

5 Networking/Cabling(100m) 8

6 Display 1

7 Power 8

21.4.8 Data Centre for TDB

This section provides the details of the infrastructure requirements at Data Centre. If State

Government provides State Data Centre , TDB shall utilize the infrastructure of the Kerala State

Data Centre and its associated Disaster Recovery Site. Otherwise TDB can build their own Data

Centre at TDB HQ. The list shown below indicates the hardware required to build a DC at TDB

Office. TDB should provide room, Reduntant Power, Fire Security etc.

Data Centre at TDB HQ

Sl. No. Product Manufacturer Qty /No

1 Server HP/DELL/IBM 4

2 Storage HP/DELL/IBM/Net App 1

3 8 Port San Switch HP/Brocade 1

4 Rack 42u Rittal/HCL/HP 1

Page 230 / 277

Page 231: Request for Proposal for Design, Supply, Installation

5 UPS 3 KV Emerson/APC/Hycon 3

6 ISPN Connection BSNL 1

7 Load Balancer with Fire wall Rad ware 1

8 Server OS License Redhat 6 2

9 Backup device with media HP/DELL/IBM/Net App 1

21.5 Detailed Technical Specification

21.5.1 Networking

21.5.1.1 Core Router

A CoreRouter is a powerful router used in the core-zone (such as Data Centre) of large computer

networks. It deals with higher bandwidth of data and hence is faster compared with other routers in

a given network. The corerouter is installed at the data centre and manages the flow of data packets

within the network, often relying on lesser routers for connectivity. It is located in the central zone

of very large networks and processes network traffic for further processing by lower classes of

routers, such as edge routers. Edge Routers are located on the edge of a logical network and transfer

packets to other part of network(s). These routers can communicate with one another using

protocols such as Label Distribution Protocol (LDP) and Border Gateway Protocol (BGP) and share

information about the best routes to take to reach a particular network component as well as

network destinations that are/have become unreachable.

This core router is used for routing different types of networks such as MPLS -VPN and WAN

networks.

Specifications

NetworkInterface Portsand ServiceModules required

Minimum of 4 * 1 Gigabit Ethernet Interfaces (4 * 1000 Base T)16*2Mbps V.35/G.703 interfaces1*Multichannel STM-1 interface, supporting SMF

Chassis Design Modular Single Chassis, with available for any supported linecards & should have Redundant Control Processors

Processing Power Forwarding rate of minimum 30 Million packets per second andRouter throughput of at-least 20 Gbps and should be scalable.

Power Supply Redundant AC power supplies

Architecture: Should have support for Data, Voice & Video services. Should be chassis based & modular architecture for scalability and

preferably be a single box configuration for ease of management.

Page 231 / 277

Page 232: Request for Proposal for Design, Supply, Installation

Should have controller card and power supply redundancy. There should not be any impact on the router performance in case of failure

of primary controller or power supply. Should support On-line insertion and removal of all cards and power

supplies for high availability. The offered router should be able to support the following interface types:

a) Serial port with synchronous speed up to 2 Mbps with followinginterface

b) V.35,G.703, Channelized E1 interfaces for provisioning n*64 Kbpsconnectivity

c) E3 & DS3, STM1 for high speed interface requirements,d) Channelized E3 / Channelized STM-1 interfaces for aggregating

multiple 2 Mbps interfaces onto a single Channelized interfacee) Ethernet Interfaces – 1Gbps, 10Gbps,10/100 Mbps

Should have at-least 2 free slots to have scalability thereby accommodating

future expansion and growth without replacing the router. Should have hardware based Encryption card Should have capability to learn the latest MPLS route information and

reflect the same to every router across the network. Bidder can fulfil therequirement by providing external hardware.

21.5.1.2 Load Balancer

Load Balancer allows the distribution of traffic across locations based on availability, performance,

and user-defined rules to provide business continuity and improved performance across globally

distributed locations.Connection multiplexing pools a large number of incoming TCP connection

requests from individual clients into a small number of connections to the application servers,

bringing big performance and capacity gains. Compresses HTTP content returned to the client to

speed content delivery and provide better user.Protecting your application infrastructure requires

deployment of multiple prevention tools. This is a real-time network and application attack

mitigation solution that protects the application infrastructure against network & application

downtime, application vulnerability exploitation, malware spread, information theft, web service

attacks and web defacement. This features the dual Stateful Packet Inspection (SPI) and Network

Address Translation (NAT) firewall with Denial of Service (DoS) attack protection to safeguard our

network.

SpecificationAvailable

Throughput 50Mbps or higher

LAN4-port 10/100Mbps RJ-45Auto-MDI/MDIX; 802.3/802.3u

ConcurrentEstablishedConnections 75000 and above

ProtocolsSecurity: NAT, UPAP, CHAPNetwork: TCP/IP, HTTP, DHCP, PPP, UPAP, PPPoE

Page 232 / 277

Page 233: Request for Proposal for Design, Supply, Installation

Multi-session PPPoE, ICMP, ARP proxyConnection: Static IP, Dynamic IP, PPoE, PPTP

VPN PPTP & IPSec pass through

Firewall

NAT (Network Address Translation)NAPT (Network Address Port Translation)DoS (Denial of Service)Access control by groupSPI (Stateful Packet Inspection)ICMP filter for WANPing to DeathPort ScanPacket filterURL block

SecurityAdmin passwordsAuthentication with UPAP and CHAP for PPPoE

Management

Management through WAN & LAN portHTTP web based managementEmail alert of WAN failSyslog

Application

Support MSN & Net meetingSupport with H.323 VoIP productsMulti-session PPPoE(Point to Point Protocol over Ethernet)SMTP bindSNMPUPnPNAT status & connection listVirtual serverMulti-DMZMTU changeable for WANDial-on-demand & Auto-disconnectDynamic DNSMAC address cloneQoS

Firmware upgradeHTTP web based downloadTFTP download

Warranty Minimum 3 years onsite software and hardware support.

21.5.1.3 Switch Unmanaged

Switch is providing MAC address based packet distribution within a network segment, similar to

postal delivery to houses located on both sides of a street. One or more switch is provided in each

TDB office depending on the number of PC terminals allotted for that office and number of ports

available for the switch. Wherever Boardal configurations necessitating partitioning of information

are needed (may be at TDB Headquarters), we may have VLAN settings made within a switch. For

this, we may need to have managed switch. Detailed specifications for switch is given below:

Page 233 / 277

Page 234: Request for Proposal for Design, Supply, Installation

Sl. No Features Details

1.Type

16 -port Unmanaged Ethernet Switch

2.

Standards

+ IEEE 802.3 10Base-T Ethernet+ IEEE 802.3u 100Base-TX Fast Ethernet+ IEEE 802.3 Nway Auto-negotiation+ IEEE 802.3x Flow Control+ IEEE 802.1p QoS Prioritization

3.Operation Range

32°F to 104°F (0°C to 40°C)

4. Protocol CSMA / CD

5.

NETWORK DATATRANSFER RATE

+ Ethernet: 10Mbps (Half-duplex)+ Ethernet: 20Mbps (Full-duplex)+ Fast Ethernet: 100Mbps (Half-duplex)+ Fast Ethernet: 200Mbps (Full-duplex)

6.Number of Ports

16 Ports 10/100BASE-TX

7.Features

+ MAC Address Table: 8k+ Switch Fabric: 3.2Gbps+ Buffer Memory: 160KB

8.Interface Options

RJ-45: 10BASE-T, 100BASE-TX Universal UTP Cable Recognition for Straight-through or Crossover cables

9. Cables Power cable, other connectivity cables.

10.Other

Suitable to Indian operating environment parameters

11.Power

Integrated adapter with AC power Cord (220~240VAC, 50 Hz) (No external Adapter)

12.Warranty

Minimum 3 years onsite hardware and software support

13. Make Cisco / D-Link/ 3Com/ Zyxel or Equivalent

21.5.2 Software

21.5.2.1 Proposed Mail Solution

The mail solution has to be for the WAN based solution and should be platform independent. Mail

solution should support dynamic creation of email accounts with all required features to meet the

requirements of TDB. The mail servers will be placed in the Data Center. The users across the

network will use their mailboxes on the central server using POP3 clients or any other platform

Page 234 / 277

Page 235: Request for Proposal for Design, Supply, Installation

independent web interface.

Mail solution will consist of the following components:

Implementation of Postfix based Relay Server in DMZ (This mail relay will receive the

mails from public network through the firewall and forward the mail to the same server on

the Local Network (MZ)). Implementation of Postfix based Mailing Solution. Configuration of IMAP Service. Implementation of Web Server. Implementation of Web mail Interface for Mail Users. Implementation of spam assassin as Antispam. Implementation of Message Filtering. Implementation of Mail Quota. Implementation of Open LDAP as central Directory database. Implementation of Global Address Book. Implementation of DNS Server. Implementation of Proxy Server. Implementation of FTP Server. Integration with available Firewall.

21.5.3 Storage and Backup Solution

Tape Library:

Should support LTO-6 or latest technology based library with at least two LTO-6 tape drives

and at least 20 LTO Ultrium cartridge slot attachable to SAN with native FC network and

should be rack mountable. The proposed LTO library solution should be upgradeable to minimum 4 drives over 40

slots. The native LTO-6 capacity should be 1 TB compressed and native data transfer speed should

be 120Mbps. The compression ration should be 2:1 The library should be natively configured with Barcode Reader The vendor shall provide 25 x LTO 5 label Cartages + 5 Cleaning Cartages.

Backup Software:

The proposed Backup Solution should be available on various OS platforms such as

Windows and UNIX platforms and be capable of supporting SAN based backup / restore

from various platforms including UNIX, Linux, and Windows. As envisaged the proposed Backup Solution should provide a backup window of about 8

hour and multiple frequencies per day. It should also provide a complete backup every

weekend and incremental backup per day. Software should have full command line/ GUI support on above mention OS Software should have an inbuilt feature for Tape-to-tape copy feature (cloning, within the

tape library)

Page 235 / 277

Page 236: Request for Proposal for Design, Supply, Installation

The proposed backup solution shall be offered with appropriate Client license for SAN

based backup as well as LAN based backup. The proposed Backup Solution has in-built media management and supports cross platform

Device & Media sharing in SAN environment. Backup Software is able to rebuild the Backup Database/Catalogue from tapes in the event

of catalogue loss/corruption. The proposed Backup Solution has online backup solution for different type of Databases

such as Oracle, MS SQL, DB2 etc on various OS The Proposed backup solution shall be designed in such a fashion so that every client/server

in a SAN can share the robot. Backup solution should have the capabilities of backup restore & archival. Backup Solution shall be able to copy data across firewall. Backup solution should support multi-streaming. The Backup software must reduce the recovery window by collating data based on certain

parameters like clients, application, etc onto single tape or single set of tape. This activity

must not be done during backup, and must be an offline activity, within the tape library. The Backup software must also be capable of reorganizing the data onto tapes within the

library by migrating data from one set of tapes into another, so that the space available is

utilized to the maximum. The software must be capable of setting this utilization threshold

for tapes.

IT Hardware Specifications

The Hardware specifications for various devices are listed belowDesktop PC

Processor:3rd Gen Intel® Core™ i3-3210 with Intel HD Graphics 2500 (3.2

GHz, 3 MB cache, 2 cores)

Memory Type: 4GB DDR3 SDRAM at 1600Mh (Upgradeable upto 8 GB)

Memory Slot: 4 DIMM SlotsChipset: Intel® Q77Chipset Internal Hard Disk/Speed:

500 GB SATA hard drive(7200 rpm)

Optical Drive: SATA Super Multi Light Scribe DVD Writer Drive Display size: 18.5 inch LED Operating system installed:

Standard Linux OS

Graphics Controller: Intel® HD Graphics 2500 Form Factor: Convertible Minitower

External I/O ports:

Rear: 6 USB 2.0, 1 standard serial port, 1 optional serial port, 1

optional parallel port, 2 PS/2, 1 RJ-45, 1 VGA, 1 Display Port,

audio in/out; Front: 2 USB 2.0, headphone and microphone Network interface: Integrated 10/100/1000 Ethernet

Page 236 / 277

Page 237: Request for Proposal for Design, Supply, Installation

Power requirements:Input voltage 90 – 264 / 100 – 240 VAC, 50/60 Hz, 47 – 63 Hz,

active PFC (85% High Efficiency)Management: Desktop Management Tool Keyboard: PS/2 or USB Standard Keyboard

Pointing device:PS/2 2-Button Optical Scroll Mouse, USB 2-Button Optical

Scroll Mouse Warranty: 3 Years Part, 3 Years Labor, 3 Years On-Site

Workstation

Processor:Intel® Xeon® E3-1230v2 (3.3 GHz, 8 MB cache, 4 cores)/

Higher Cache: 8 MB or higher Memory Type: 8GB (2x4GB) 1600MHz DDR3 Memory Slot: 4 DIMM Slots Chipset: Intel® C216 /Higher Internal Hard Disk/Speed:

2 * 500GB Serial Attached SCSI hard drive (10000RPM)

Drive Controllers RAID card with four 2Gb/s ports supporting SATA/SAS/SSD

drives and RAID 0, 1, 5 configurations Optical Drive: SATA Super Multi Light Scribe DVD Writer Drive Display size: 18.5 inch diagonal Operating system

installed:

Standard Linux OS

Graphics Controller: Intel Graphics Media Accelerator Form Factor: Micro tower External I/O ports: Rear: 6 USB 2.0, 1 serial port, 1 parallel port, 2 PS/2, 1 RJ-45, 1

VGA, 1 audio in, 1 audio out, 1 MIC; Front: 2 USB 2.0 Display size: 18.5 inch LED

Network interface: 10/100/1000 Gigabit Ethernet controller Power requirements: Two Power Supply with a 230v Management: Management Tool Keyboard: PS/2 or USB Standard Keyboard Pointing device: PS/2 2-Button Optical Scroll Mouse, USB 2-Button Optical

Scroll Mouse Warranty: 3 Years Part, 3 Years Labour, 3 Years On-Site

Database Server

Processor Server should be populated with 2 x Intel® Xeon® E5-4640 (20M Cache, 2.4 GHz) or Higher

Chipset Intel C600 Chipset / EquivalentCache Up to 20 MB Of L3 CacheMemory The server should be supplied 64 GB RAM with 8 GB

Page 237 / 277

Page 238: Request for Proposal for Design, Supply, Installation

DIMMs.Memory Slots The Server should support minimum 32 DIMM Slots. The

memory typeshould be DDR3 SD RAM

Network Controller 2 *Quad Port Multifunction Gigabit Network AdaptersServer – Storage HBA The server should be supplied with 2* 4GB FC PortsStorage Controllers The Server should have a RAID Controller with 512MB

FBWC or BBWC orequivalent Controller

Storage Bays The server should have a minimum of 6 numbers of SFF Hot Plug drive bays

Hard Disk Drive The server should be populated with 4 x 900 GB SAS SFF Hot Plug drive bays, provided drives should be configured with RAID0,1 and 5

Optical Drive Slim DVDInterfaces The server should have 2*Serial, 1*Key Board, Video (1front

and 1rear), 1Mouse, 4 USB, 4 Network RJ-45 (Ethernet) ports, 1*Remote ManagementPort, 15 pin VGA connector

Graphics The server should have an Integrated 8MB embedded video SDRAM. Max Resolution 1280 x 1024 x 16M color Graphic

Form Factor The server form factor should not be higher than 2 U Rack Mountable

Manageability The server should have Dedicated Hardware Controller based Management

Expansion Slots The server should have a minimum of 5 Slots or HigherWarranty (parts-labor-onsite) 3/3/3

Application ServerProcessor Server should be populated with 2 Intel® Xeon® E5-2640

2.50GHz, 15M Cache, 7.2GT/s QPI, Turbo, 6C, 95W, Max Mem 1333MHz

Chipset Intel C600 Chipset / EquivalentCache Up to 15 MB Of L3 CacheMemory The server should be supplied 48 GB RAM with 8 GB

DIMMs.Memory Slots The Server should support minimum 32 DIMM Slots. The

memory type should be DDR3 SD RAMNetwork Controller Quad Port Multifunction Gigabit Network AdaptersServer – Storage HBA The server should be supplied with 2* 4GB FC PortsStorage Controllers The Server should have a RAID Controller with 1GB FBWC

or BBWC or equivalent ControllerStorage Bays The server should have a minimum of 6 numbers of SFF Hot

Plug drive baysHard Disk Drive The server should be populated with 4 x 900 GB SAS SFF

Hot Plug drive bays, provided drives should be configured with RAID0,1 and 5

Optical Drive Slim DVD

Page 238 / 277

Page 239: Request for Proposal for Design, Supply, Installation

Interfaces The server should have 2*Serial, 1*Key Board, Video (1front and 1rear), 1Mouse, 4 USB, 4 Network RJ-45 (Ethernet) ports, 1*Remote ManagementPort, 15 pin VGA connector

Graphics The server should have an Integrated 8MB embedded video SDRAM. Max Resolution 1280 x 1024 x 16M color Graphic

Form Factor The server form factor should not be higher than 2 U Rack Mountable

Manageability The server should have Dedicated Hardware Controller based Management

Expansion Slots The server should have a minimum of 5 Slots or HigherWarranty (parts-labor-onsite) 3/3/3

Mail Server/ Web Server

Processor Server should be populated with 1 x Intel® Xeon® E5-2640 2.50GHz, 15M Cache, 7.2GT/s QPI, Turbo, 6C, 95W, Max Mem 1333MHz

Chipset Intel C600 Chipset / EquivalentCache Up to 15 MB Of L3 CacheMemory The server should be supplied 32GB RAM with 8 GB

DIMMs.Memory Slots The Server should support minimum 32 DIMM Slots. The

memory type should be DDR3 SD RAMNetwork Controller Quad Port Multifunction Gigabit Network AdaptersServer – Storage HBA The server should be supplied with 2* 4GB FC Ports

Storage Controllers The Server should have a RAID Controller with 512MB FBWC or BBWC or equivalent Controller

Storage Bays The server should have a minimum of 6 numbers of SFF Hot Plug drive bays

Hard Disk Drive The server should be populated with 4 x 900 GB SAS SFF Hot Plug drive bays, provided drives should be configured with RAID0,1 and 5

Optical Drive Slim DVDInterfaces The server should have 2*Serial, 1*Key Board, Video (1front

and 1rear), 1Mouse, 4 USB, 4 Network RJ-45 (Ethernet) ports, 1*Remote ManagementPort, 15 pin VGA connector

Graphics The server should have an Integrated 8MB embedded video SDRAM. Max Resolution 1280 x 1024 x 16M color Graphic

Form Factor The server form factor should not be higher than 2 U Rack Mountable

Manageability The server should have Dedicated Hardware Controller based Management

Expansion Slots The server should have a minimum of 5 Slots or HigherWarranty (parts-labor-onsite) 3/3/3

Page 239 / 277

Page 240: Request for Proposal for Design, Supply, Installation

File Server

Processor Server should be populated with 1x Intel® Xeon® E5-2640 2.50GHz, 15M Cache, 7.2GT/s QPI, Turbo, 6C, 95W, Max Mem 1333MHz

Chipset Intel C600 Chipset / EquivalentCache Up to 15 MB Of L3 CacheMemory The server should be supplied 32 GB RAM with 8 GB

DIMMs.Memory Slots The Server should support minimum 32 DIMM Slots. The

memory type should be DDR3 SD RAMNetwork Controller Quad Port Multifunction Gigabit Network AdaptersServer – Storage HBA The server should be supplied with 2* 4GB FC Ports Storage Controllers The Server should have a RAID Controller with 512 GB

FBWC or BBWC or equivalent ControllerStorage Bays The server should have a minimum of 6 numbers of SFF Hot

Plug drive baysHard Disk Drive The server should be populated with 4 x 900 GB SAS SFF

Hot Plug drive bays, provided drives should be configured with RAID0,1 and 5

Optical Drive Slim DVDInterfaces The server should have 2*Serial, 1*Key Board, Video (1front

and 1rear), 1Mouse, 4 USB, 4 Network RJ-45 (Ethernet) ports, 1*Remote ManagementPort, 15 pin VGA connector

Graphics The server should have an Integrated 8MB embedded video SDRAM. Max Resolution 1280 x 1024 x 16M color Graphic

Form Factor The server form factor should not be higher than 2 U Rack Mountable

Manageability The server should have Dedicated Hardware Controller based Management

Expansion Slots The server should have a minimum of 5 Slots or HigherWarranty (parts-labor-onsite) 3/3/3Storage and BackupSAN Storage Model Storage must feature full Fibre Channel end-

to-end architecture. It shouldnot be a SAN emulated on File System. The storage system should support FCSAN. The system must support dual-ported Fibre Channel drives. Thearchitecture should allow modular upgrades of hardware and software forinvestment protection. Storage should have minimum hot spares of FC disks &FATA/SATA Disks (as per offered system architecture requirements

Spindle Flexibility The array should support the following spindles: 450GB ,600GB,900GB or above; 15K RPM 4Gbps FC disks, 1TB, 2TB 7200

Page 240 / 277

Page 241: Request for Proposal for Design, Supply, Installation

RPM, 6Gbps SATA II/ FATA / NL SAS. It should support SSD drives. Mix and match ofdifferent typeof spindles should be supported behind the same pair of controllers.

Array Architecture The array should be equipped with N+N( with minimum of 2 array controllers)Nos. of array controllers for better performance redundancy.The storage system should be provided with 16GB cache (8GB per controller)The storage system should be provided with 16GB cache (8GB per controller)upgradeable to 32GBThe storage system should have native support for 10GB iSCSI and 10GB FCoEports.The SAN must support synchronous, asynchronous replication. Further,the replication must be bi-directional to support multiple replication options

Host interface 4 * 8 Gb/s Fibre Channel ports

Array Features (If any of the featuresMentioned requires license the sameshould be included)

Intelligently restripe data as disks are addedto optimize performance.Boot from SAN - Allow diskless servers toshare storage resources and bootfrom the SAN. Allocate space based onactual data written (Thin Provisioning).The SAN must allow RAID levels to bechanged on the fly without taking down theserver to which the volume is attached.20 TB Usable using 900GB 15K rpm SASdisks The array should be scalable to aminimum of 75 disks of the offeredconfiguration of the disk count behind thesame controller pair by adding theappropriate number of spindles and diskshelves System should be configured withnecessary multi-pathing & load-balancingcomponents for high availability.The Storageshould support SAN Boot.Data deduplicationand data compression.Industry leading Operating System platforms including: Windows Server® 2003, WindowsServer® 2008, SunSolaris®, HP-UX®, IBM-AIX®, Linux® 2.6 and above, RHEL-5®, RHEL-6®, Oracle Linux-6®, Xen, VMware®, Hyper-V®. Storage system to

Page 241 / 277

Page 242: Request for Proposal for Design, Supply, Installation

support HARDWARE based RAID only. Must support variousHardware RAID levels such as 0, 10, 5 and 6(Dual Parity Protection). Must supportinter-mixing different RAID groups withinone storage system. Different type ofRAID levels should co-exist within the samearray simultaneously to matchdifferent protection requirements of data.The array should be scalable to a minimumof 200 disks of the offered configuration ofthe disk count behind the same controller pairby adding the appropriate number of spindlesand disk shelves The array should allowscalability to 2048 LUNS behind thecontroller pair.

Warranty (parts-labor-onsite) 3/3/3

Tape Library

Capacity Shall support Native data capacity of 50 TB (uncompressed) expandable to100 TB (2:1 compressed).Shall be offered with Minimum of two LTO5 FC tape drive. Drive shall support encryptionShall be offered with 48 Cartridge slots

Tape Drive Architecture Offered LTO5 drive in the Library shall conform to the Continuous andData rate matching technique for higher reliability.

Speed Offered LTO5 drive shall support 140MB/secin Native mode and 280MB/sec in 2:1 Compressed mode.

Connectivity Tape Library shall provide 8Gbps native FC connectivity to SANswitches.

Scalability Tape Library shall be further scalable to 160 slots and 6 LTO-6 drives eitherwithin the same frame or by cascading another frame.

Management Tape Library shall provide web based remotemanagement.

Other Features Shall be rack mountable. Tape Library shall have GUI Panel. Shall have option for redundant power supply. Tape Library shall be supplied with software which can predict

Page 242 / 277

Page 243: Request for Proposal for Design, Supply, Installation

and prevent failures. Offered Software shall also have the capability to determine when toretire the tape cartridges and what compression ratio is being achieved

Warranty 5 years 24x7 Support

San Switch 8 port

Port speed: 8 Gbps Fibre ChannelNumber of ports 16 Fibre Channel Active Management features B-series SAN Network Advisor., Integration

with Storage EssentialsSoftware Advanced Fabric OS, Advanced Zoning, Web

ToolsPower supply Minimum two numbersEthernet 10Gbit/sec Warranty 5 years 24x7 Support

Application Load Balancer

Description 10/100/1000Mbps Ethernet Ports – minimum 2 ports upgradeable to 4 ports Memory: Minimum 8GB Minimum of 4 Gbps throughput Minimum of 2 Gbps SSL throughput Minimum of 4000 SSL connections scalable to 7500 SSL connections Server Load Balancing Mechanism

Cyclic, Hash, Least numbers of users Weighted Cyclic, Least Amount of Traffic NT Algorithm / Private Algorithm / Customizable Algorithm / Response Time

Redundancy Features Supports Active-Active and Active-Standby Redundancy Segmentation / Virtualization support along with resource allocation

Server Load Balancing Features Server and Client process coexist UDP Stateless Service Failover Backup/Overflow Direct Server Return Client NAT Port Multiplexing-Virtual Ports to Real Ports Mapping DNS Load Balancing

Load Balancing Applications Application/ Web Server, MMS, RTSP, Streaming Media DNS, FTP- ACTIVE & PASSIVE, REXEC, RSH, LDAP, RADIUS

Page 243 / 277

Page 244: Request for Proposal for Design, Supply, Installation

Content Intelligent SLB HTTP Header Super Farm URL-Based SLB SLB should support below Management options

Secure Web Based Management SSH TELNET SNMP v1, 2, 3 Based GUI Command Line

Five year 24x7 warranty

KVM Console

Screen type Active Matrix TFT LCDMaximum resolution Max resolution of 1280x1024 or higherScreen size 15 inch or higherSupported refresh rates 75 Hz or higherPointing device 3 button touchpad w/scroll barConnectivity PS2 and USBForm factor 1 uOther Features KVM in same U space

Inverted T cursor keysWindows Shortcut keysUSB pass-through

UPS and Battery System

ISO 9001 certified brandTrue On Line TypeBackup period should be at least 2 Hr.

IGBT with High Frequency PWM (Pulse with Modulation) Technology Output wave form should be Sine waveCompatible with local Electricity Power GeneratorTotal Harmonic Distortion should be less than 3%Support input voltage range of 160 V to 270 VOutput Voltage should be 230 Volt AC (+/- 1%)Output frequency should be 50 Hz +/- 0.05 Hz (Crystal Controlled)Closed housing for batteries with suitable standInherent protection should be provided for overloading, low battery, over temperature, short circuits, over and under input voltageLED indicators should be provided for at least a load indication, load on battery, low battery, overload, Mains ONAudible indicator should be provided for at least load on battery, low battery, Mains failure, Overload

Printers

Multifunction Laser Printer LAN 3 in 1 Printer (Black & White)

Page 244 / 277

Page 245: Request for Proposal for Design, Supply, Installation

Printer High-speed printing, Black-and-white: up to 35ppm (draft); up to

15ppm,Duty Cycle: Up to 15,000 pages per month, Automatic two-sided

printing,250-sheet input tray, Print, scan and copy unattended with the

Automatic Document feeder, enhanced print permanence, Capable of

installation, configuring, monitoring and troubleshooting in the network,

from anywhere on the network

Scanner Flatbed with automatic document feed, up to 4800 dpi; Enhanced up to

19200 dpi; Scan size maximum (flatbed): 215.9 x 297 mm (8.5 x11.7

inches), front panel scan (scan to application.Copier Black-white colour-Upto 1200x600 dpi, Copy speed (black, draft quality,

A4):Up to 35 cpm, Copy resolution (black graphics): Up to 1200 x 600 dpi,

Copier resize: 25 to 400%, Maximum number of copies: Up to 99, Copier

smart software features: Up to 99 multiple copies, reduce/enlarge from 25 to

400%, 2-up or 4-up allowing 2 or 4 pages to be copied onto 1 page, contrast

(lighter/darker), resolution (copy quality), tray select, collate, margin, shiftMultifunction Laser Printer 3 in 1 (Coloured)

Printer Print speed (black, best quality, A4): Up to 12 ppm, Print speed (color,

normal quality, A4): Up to 8 ppm, First page out (black, A4): < 25.5 sec

(from ready mode), First page out (colour, A4): < 31.5 sec (from ready

mode), Duty cycle (monthly, A4): Up to 30000 pages, Print quality (black,

best quality): Up to 600 x 600 dpi, Print quality (colour, best quality): Up to

600 x 600 dpi, Maximum input capacity (sheets): Up to 150, Maximum

output capacity (sheets): Up to 125, Standard media sizes: A4, A5, A6, B5

(ISO, JIS), Custom media sizes: 76 x 127 to 216 x 356 mm, Media types

supported: Paper (bond, brochure, colour, glossy, letterhead, photo, plain,

preprinted, prepunched, recycled, rough), transparencies, labels, envelopes,

cardstock, Processor speed: 450 MHz, Memory: 128 MB, Standard printer

languages: HP PCL 6, HP Postscript level 3 emulation, HP PCL 5c

emulation, Standard connectivity: 1 Hi-Speed USB (compatible with USB

2.0 specifications) portScanner Scan type: Flatbed, Enhanced scanning resolution: Up to 19200 dpi, Optical

scanning resolution: Up to 1200 dpi, Bit depth: 24-bit, Scan size maximum

(flatbed): 21.6 x 29.7 cm,

Page 245 / 277

Page 246: Request for Proposal for Design, Supply, Installation

Copier Copy speed (black, best quality, A4): Up to 8 cpm, Copy speed (colour, best

quality, A4): Up to 12 cpm, Copy resolution (black graphics): Up to 600 x

600 dpi, Copy resolution (colour text and graphics): Up to 600 x 600 dpi,

Copier resize: 25 to 400%, Maximum number of copies: Up to 99, Copier

smart software features: Up to 99 multiple copies, scan once print many,

collation, reduce/enlarge from 25 to 400% (with page-size presets), fit to

page, two or four pages to one page, customisable copy presets, contrast

(lighter/darker), resolution (copy quality), network protocols supported

Disaster Recovery

A disaster recovery plan (DRP) is a comprehensive set of measures and procedures put into placewithin an organization to ensure that essential, mission critical resources and infrastructures aremaintained or backed up by alternatives during various stages of a disaster. A DRP must address three areas:

1. Prevention (pre-disaster): 2. Continuity (during a disaster): 3. Recovery (post-disaster):

Preparedness is the key. The planning process should minimize the disruption of operations andensure some level of organizational stability and an orderly recovery after a disaster.The Disaster Recovery methodology is described below.1. Obtain Top Management CommitmentTop management must support and be involved in the development of the disaster recoveryplanning process. Management should be responsible for coordinating the disaster recovery planand ensuring its effectiveness within the organization.

2. Establish a planning committeeA planning committee should be appointed to oversee the development and implementation of theplan. The planning committee should include representatives from all functional areas of theorganization and the planning process shall have scope of DRP in all 3 areas as listed above.3. Perform a risk assessmentThe planning committee should prepare a risk analysis and business impact analysis that includes arange of possible disasters, including natural, technical and human threats. Each functional area ofthe organization should be analyzed to determine the potential consequence and impact associatedwith several disaster scenarios.

4. Establish priorities for processing and operationsThe critical needs of each Board within the organization should be carefully evaluated in areas suchas functional operations, network deployment architecture, key personnel, information, processingsystems, service, documents and vital records, etc. 5. Determine Recovery Strategies

Page 246 / 277

Page 247: Request for Proposal for Design, Supply, Installation

The most practical alternatives for processing in case of a disaster should be researched andevaluated. It is important to consider all aspects of the organization such as facilities, hardware,software, communications & connectivity, data files, end-user systems, other processing operations,etc.6. Perform Data CollectionAll critical data and documents should be properly backed up based on a defined strategy. Thisstrategy shall also lay down procedures for recovery as well as minimal operations.7. Organize and document a written planAn outline of the plan’s contents should be prepared to guide the development of the detailedprocedures. Top management should review and approve the proposed plan. The outline canultimately be used for the table of contents after final revision. 8. Develop testing criteria and proceduresIt is essential that the plan be thoroughly tested and evaluated on a regular basis (at least annually).Procedures to test the plan should be documented. The tests will provide the organization with theassurance that all necessary steps are included in the plan. 9. Test the PlanAfter testing procedures have been completed, an initial test of the plan should be performed byconducting a structured walk-through test. The test will provide additional information regardingany further steps that may need to be included, changes in procedures that are not effective, andother appropriate adjustments. Relevant periodic revision shall be effected to take care of changes inthe structural configuration of the network resources from time to time.10. Approve the planOnce the disaster recovery plan has been written and tested, the plan should be approved by topmanagement. It is top management’s ultimate responsibility that the organization has a documentedand tested plan.

Page 247 / 277

Page 248: Request for Proposal for Design, Supply, Installation

22 Annexure C - Data Digitization &Migration

22.1 Objective of Data DigitizationA significant part of the envisioned benefits of CTDB would not be realized unless historical data relating to Temples, Staffs and TDB offices is digitized and made available through CTDB to the various stakeholders. The effective implementation and functioning of CTDB depends on the availability of historical data to assist TDB in the following ways:

To provide online access to historical data

To Search/Query the master database

Reporting functionality for statistical information’s

To manage huge volume of data in storage controlled access, Transfer and phase-out

In order to achieve the said purposes, the CTDB project would include a one-time effort to digitizeand digitize both electronic and non-electronic data to the master CTDB database. The historicaldata to be digitized includes data from all the temples and TDB Offices. Digitization of historicaldata would help TDB maximize benefits from features such as Search and Reporting.

Data entry help offers Data digitization services with scanning, archiving, indexing, digital imagingand analysis of ancient documents, manuscripts, paper documents, newspaper, text, sound, image orvoice. Data digitization services of Data entry help is performed with sophisticated infrastructure,high tech technology and skilled work force. Use data digitization services of Data Entry help tosafeguard or share corporate archives, newspapers, government records and documentation, librarycollections, or fragile books and documents. Data digitization services of Data entry help facilitatesclients to search across voluminous documents for obtaining a specific piece of information inquickest possible time.

22.2 Scope of Data DigitizationThe data is available both in electronic format and non electronic format. Electronic data if anyfrom TDB Offices would be digitized to the CTDB system. Non Electronic/Paper based dataaccounts for most of the historical data in TDB. This data resides in the form of paperfiles/records/registers and is maintained in various TDB Offices. These data need to be manuallyentered into the new system.

Digitization of historical data would help the TDB to maximize benefits from features such asSearch and Reporting. Digitization of historical data is covering the last 10 years. The historicaldata to be digitized includes data from all the TDB forms and other registers.

The table details the number of records which is required to be digitized to the new system.

Page 248 / 277

Page 249: Request for Proposal for Design, Supply, Installation

Sl. No. Registers/Form Name Number of records (approx)

1. Service book 5000

2. Pension Book 5000

3. Office/Court/Govt. Orders 1000

4. Mahassar 1000

1. Typical Data Digitization Model

Extract – read and gather data from source data store(s).

Source validation – confirm content and structure of extracted data.

Transformation and Integration - convert the extracted data from its previous form into the

target form. Transformation occurs by using rules or lookup tables or by combining the data

with other data.

Target validation – confirm content and structure of transformed data is valid for target.

Load - write the data into the target database.

2. Data Digitization Strategy for CTDB

Digitization of data from existing manual operations to the new System will include identificationof data digitization requirements, collection and digitization of user data, collection and digitization

Page 249 / 277

Page 250: Request for Proposal for Design, Supply, Installation

of master data, and digitization of data from the legacy systems. The Software DevelopmentAgency will digitize data from the existing and external systems to the new system. The Datadigitization to be performed by the SDA shall be based on an appropriate data digitizationmethodology, prepared by Software Development Agency and approved by TDB. Though TDB isrequired to provide formal approval for the Strategy, it is the ultimate responsibility of SDA toensure that all the data sets that are required for operation of the agreed-upon user requirements aredigitized. Any corrections identified by TDB or any appointed agency, during Data QualityAssessment and Review, in the data digitized by SDA, shall be addressed by SDA at no additionalcost to TDB. It is responsibility of the SDA to ensure that the legacy TDB data into the new Systemis successfully completed.

Data Digitization Utility

The SDA shall provide the data digitization utility along with the forms and templates to capture thedata from the existing systems. This utility/application will have all the formats and tools to load thepaper data into TDB databases. This will enable SDA to digitize data from paper based systems to the new System’s databases.

This utility will be the first to be developed and tested while Software solution for TDB project is being developed by the Software Development Agency, so that it could be handed over to the TDB at the earliest, thereby enabling TDB to initiate their effort while rest of Software solution for TDB project is being developed.

22.3 Data Digitization Requirements

The followings are indicative requirements for performing:

Since there could be differences in the data as stored currently from the new system there

should be a mapping done between the source and target data models that should be

approved by TDB. Carry out the migration of legacy electronic data if any. Provide checklists to TDB for verification, including number of records, validations (where

possible), other controls / hash totals. Highlight errors, abnormalities and deviations in the

digitized data. Clean the data and incorporate corrections as proposed. Get final sign off from TDB for digitized data. At the end of migration, all the data for old cases and registers must be available in the new

system. Old data must be indexed and should be easily searchable by running database query.

Page 250 / 277

Page 251: Request for Proposal for Design, Supply, Installation

22.4 Recommended Methodology for Data Digitization

Data digitization methodology will comprise of the steps explained as below. However, this is just aguideline for data digitization effort and the SDA will be required to devise its own detailed methodology and get it approved by TDB.Analysis:

Analysis of the legacy data and conversion, migration and transfer to the proposed new data base schema will be started during the scoping phase and shall take a parallel path during the design and development phase of the application. It will have the following steps:

Analyze the existing formats of data in lieu of the new proposed system to understand the

amount of the data and the applicability in the new System. Write a specification to create, transfer and digitize the data set. Document all exceptions, complex scenarios of the data. This phase will generate the specification for Data Take–On routines.

Transformation:

Transformation phase can be commenced after integration of testing phase. It will entail the

following steps:

Identify the fields, columns to be added/ deleted from the existing system. Identify the default values to be populated for all “not null” columns. Develop routines to create (Entry if any by data entry operators), digitize and convert the

data from hard copies, from old database (if any) and from computer records to the new

database. Develop test programs to check the digitized data from old database to the new database. Test the digitization programs using the snapshot of the production data. Tune the digitization programs and iterate the Test cycle. Validate digitized data using the application by running all the test cases. Test the success of the data take-on by doing system test.

Data Take–On:

Take–On phase will be initiated when the proposed solution is ready to be deployed. It will entail

the following steps:

Schedule data transfer of the computerized data that has been newly created by the data

entry operators based on the hard copy records. Schedule data transfer of the existing digital data in the proposed new format. Digitize the data from an old system (legacy) to the envisaged database. Test on the staging servers after the data take-on with testing routines. Deploy and rollout the system as per the project plan.

Data Quality Assessment

The data quality assessment is performed to gain a complete and thorough understanding of both source and target data. Understanding data will avoid unpredictable transformation results.

Systematic approach to gaining knowledge about data.

Page 251 / 277

Page 252: Request for Proposal for Design, Supply, Installation

Identify data anomalies.

Materially improve the quality of data content.

An Audit and Certification Agency (Third Party / Hired Agency) or TDB shall perform the Data Quality Assessment for the Data digitized by the Software Development Agency (SDA) to the system. The errors / gaps identified during the Data Quality Assessment shall be addressed by SDA before moving the data into production environment, which is a key milestone for Go-live of the solution.After moving the data into production environment, TDB with the help of SDA and/or Third Party will have to verify and confirm that all data have been digitized successfully into production environment.

22.5 Additional Guidelines for and Digitization SDA shall digitize the data at the implementation sites of TDB SDA shall formulate the “Data Digitization Strategy document” which will also include

internal quality assurance mechanism. This will be reviewed and signed–off by TDB prior to

commencement of data digitization. SDA shall incorporate all comments and suggestions of TDB in the Data digitization and

Digitization Strategy and process documents before obtaining sign–off from TDB. SDA shall perform mock data digitization tests to validate the conversion programs. SDA shall ensure complete data cleaning and validation for all data digitized from the

legacy systems to the new application. SDA shall validate the data before uploading the same to the production environment. SDA shall generate appropriate control reports before and after migration to ensure accuracy

and completeness of the data. SDA shall convey to TDB in advance, all the mandatory data fields required for functioning

of the proposed solution that are not available in the legacy systems and have to be obtained

by TDB. In the event TDB is unable to obtain all the mandatory fields as conveyed by SDA, SDA

shall suggest the most suitable workaround to TDB. SDA shall document the suggested

workaround and sign-off will be obtained from TDB for the suggested workaround. SDA shall develop data entry programs / applications that may be required for the purpose

of in order to capture data available with / obtained by TDB in non – electronic format. SDA shall conduct the acceptance testing and verify the completeness and accuracy of the

data digitized from the legacy systems to the proposed solution. TDB may, at its will, verify the test results provided by SDA.

Page 252 / 277

Page 253: Request for Proposal for Design, Supply, Installation

23 Annexure D - Capacity Building

23.1 Training PlanTraining programs would be organized under the following themes:

1. Creating awareness about the benefits of ICT and basic computer skills2. Role-based training on the CTDB application3. “Train the Trainer” programs, where members of the TDB staff would be trained to enable

them to conduct further training programs, thus helping build up scalability in the trainingprogram and also reducing the dependency on external vendors for training.

4. System Administrator training: a few members of the TDB staff with high aptitude would betrained to act as system administrators and trouble-shooters for CTDB.

The above themes are expanded below:

1. Creating awareness and sensitization regarding the benefits of ICT; and creating BasicComputer Skillso This part of the training focuses on the awareness of the general benefits of IT systems

such as automation of routine and redundant tasks or moving from the paper-basedrecords management to a more sophisticated electronic records system that can alleviatethe efforts to create reports for senior management.

o Fundamentals of computer usage should focus on the basics of using the computer,

keyboard, and mouse in order to make the users feel comfortable with the computer.o Email and Office suite training o Training on analytical functions of the computers such as worksheet applications should

be imparted to the users to actually derive the benefits of analyzing the data.

2. Role based training on application softwareo The training should focus on the users getting comfortable to use the CTDB application.o This training would be tailored according to the unique requirements of each user

category.

3. “Train the Trainer” Programso Selected set of TDB staff with high aptitude group and/or relevant prior training, are to

be trained as trainers who would, in turn, train their colleagues.o “Train the Trainer” program could be held at a central location or two o The trained trainers would, in turn, conduct training programs for their colleagues at

lower levels such as the districto Trainers would be trained to impart training in basic computer awareness & skills, and

role-based training on CTDB.

4. Specialized training on system administration and troubleshootingo Selected set of TDB staff with high aptitude group and/or relevant prior training, are to

be imparted with the training/skills to act as system administrators and also as trouble-shooters with basic systems maintenance tasks including hardware and network.

Page 253 / 277

Page 254: Request for Proposal for Design, Supply, Installation

Estimate for number of personnel for direct training

Training Program Group A Group B Group C

%to be covered

%to be covered

%to be covered

Awareness and sensitization ofbenefits of IT and Basic Computer

Awareness50% 70% 90%

Role based training for applicationusers

100% 100% 50%

Trainers Training 0% 3% 0%

Administration & Support Training 1% 2% 0%

The following is an indicative training plan for members of TDBbased on the nature of their responsibilities:

Sl. No. Level Type of Training Training Content

1 Group A Awareness and sensitization of benefits of ICT.

Principles of e-Governance.

Leadership and Team building

skills. Technology update.

Skills in troubleshooting vis-à-vis

application, standard software and networking (for those with the aptitude and/or prior training).

Basic computer awareness. Fundamentals of computer usage.

Office Suite.

Analytical & Search Capabilities.

2 Group B Awareness and sensitization of benefits of ICT.

Principles of e-Governance.

Leadership and Team building

skills. Technology update.

Skills in troubleshooting vis-à-vis

application, standard software and networking (for those with the aptitude and/or prior training).

Basic computer awareness. Fundamentals of computer usage.

Office Suite.

Analytical & Search Capabilities.

Page 254 / 277

Page 255: Request for Proposal for Design, Supply, Installation

Role based system training onCTDB Application Software.

This module is required to train the

Officers at various levels in operating the CTDB application. The topics under the scope of this training would cover mainly the post-operationalisation of CTDB. The training is to be provided to theTDB staff depending upon their role and responsibilities in the service workflow. Training would include mechanism for demonstration, practical exercises and evaluation of trainees. During this training, the trainees could alsobe asked to carry out the routine functions using the software.

Trainers Training Principles of e-Governance.

Leadership and Team building

skills. Technology update.

Skills in troubleshooting vis-à-vis

application, standard software and networking (for those with the aptitude and/or prior training).

Fundamentals of computer usage.

Office Suite.

Analytical & Search Capabilities.

Role based system training on

CTDB Application Software.

3 Group C Awareness and sensitization of benefits of ICT.

Principles of e-Governance.

Leadership and Team building

skills. Technology update.

Skills in troubleshooting vis-à-vis

application, standard software and networking (for those with the aptitude and/or prior training).

Basic computer awareness. Fundamentals of computer usage.

Office Suite.

Analytical & Search Capabilities.

Page 255 / 277

Page 256: Request for Proposal for Design, Supply, Installation

Role based system training onCTDB.

This module is required to train the

officials at various levels in operating the CTDB application. The topics under the scope of this training would cover mainly the post-operationalisation of CTDB. The training is to be provided to theemployees depending upon their role and responsibilities in the service workflow. Training would include mechanism for demonstration, practical exercises and evaluation of trainees. During this training, the trainees could alsobe asked to carry out the routine functions using the software.

Trainers Training Principles of e-Governance.

Leadership and Team building

skills. Technology update.

Skills in Troubleshooting vis-a-vis

application, standard software’s andnetworking (for those with the aptitude and/or prior training).

Fundamentals of computer usage.

Office Suite.

Analytical & Search Capabilities.

Role based system training on

CTDB Application Software. Administration & Support

Administration & Support Training

System administration

Network administration

Remote software support and

maintenance Application configuration

IT security administration

4 New Recruits

Awareness and sensitization of benefits of IT.

Principles of e-Governance.

Leadership and Team building

skills. Technology update.

Skills in Troubleshooting vis-à-vis

Page 256 / 277

Page 257: Request for Proposal for Design, Supply, Installation

application, standard software and networking (for those with the aptitude and/or prior training).

Basic computer awareness. Fundamentals of computer usage.

Office Suite.

Analytical & Search Capabilities.

Page 257 / 277

Page 258: Request for Proposal for Design, Supply, Installation

24 Annexure I – Agreement by sucessful bidder

Tender No IT 001 dated 04/04/2016(Agreement to be executed by the successful Tenderer in Stamp paper worth Rs.100)

FORM OF AGREEMENT

Articles of Agreement made the ......................................................... day

of .................................... Between Sri ......................... ...... , Devaswom Commissioner,

Travancore Dewasom Board, Thiruvananthapuram, Kerala. acting for/on behalf of

Travancore Dewasom Board.. hereinafter called the TDB of the one part and

Sri....................................... ...... of......................................

and ......................................................

......................Company Limited incorporated under

the ....................... .............................................. and having its registered Office

at ................................................ (herein after called he Contractor) of the other part.

WHEREAS the Contractor has tendered for the supply of articles for the use of M/s

Travancore Dewasom Board as per Tender notification No. ...................................................

Dated ..................

And WHEREAS M/s Travancore Dewasom Board, have been pleased to accept the contract

in respect of the articles mentioned in the copy of order attached.

And WHEREAS the Contractor has security for the satisfactory fulfilment of this contract

deposited Rs............................................ ie. a sum equal to ......... percent of the value of the

contract as per Bank Draft No. .................................................. dated................. Bank

Guarantee No.......................dated.............. of the ................................Bank duly approved

by Travancore Dewasom Board,

Now these presents witness and it is hereby mutually agreed as follows:-

5. The Contractor shall undertake to supply and install material according to the

Page 258 / 277

Page 259: Request for Proposal for Design, Supply, Installation

standard samples and specifications.

6. No representation for enhancement of rates once accepted will be considered.

7. The approximate quantities to be supplied are shown in the copy of order

No......... .....................herewith attached which shall be treated as a part of this

agreement as nearly as can be foreseen. But they are merely estimates of quantities

that may be required for general guidance of tenderers and the Travancore Dewasom

Board in no case binds itself to purchase any quantity at all during the period of

contract if no necessity arises therefore, but the Contractor shall supply any quantity

of any article at the rate tendered by him, for that article up to 25 percent, in excess

of the estimated quantity quoted, and in the event of his inability to do so or to offer

a suitable alternative to the satisfaction of Travancore Dewasom Board is at liberty to

purchase the articles or an article of similar quality from elsewhere and should the

price of the articles so purchased be in excess of the tendered rate to deduct the

difference of cost from the contractor’s bills or his security deposit, as the case may

be. The Contractor shall not however be entitled to the excess, if any, of the tendered

rate over such purchase amount.

8. In case the Contractor fails to supply and deliver any of the articles and things

tendered for by him within the time provided for delivery of the same or in case the

Contractor commits any breach of any of the covenants, stipulations and agreements

here in contained and on his part to be observed and performed, then and in any such

case, it shall be lawful for Travancore Dewasom Board (if it shall think fit to do so)

by an order in writing to put an end to this contract, and in case Travancore

Dewasom Board shall have incurred, sustained or been put to any costs damage or

expenses by reason of this contract having been so put an end to or in case any

difference in price, compensation, loss, costs, damages, expenses or other money

shall then or at any time during the continuance of this contract be payable by the

contractor to Travancore Dewasom Board under and by virtue of this contract it shall

be lawful for Travancore Dewasom Board from and out of any moneys for the time

being payable or owing to the contractor from Travancore Dewasom Board under or

by virtue of this contract or otherwise to pay and reimburse to Travancore Dewasom

Board all such costs, damages and expenses they may have sustained, incurred or

been put to by reason of this contract having been so put an end to as aforesaid, and

also all such difference in price, compensation loss, costs, damages, expenses and

other moneys as shall for the time being be payable by the Contractor aforesaid.

9. Every notice hereby required or authorized to be given may be either given to the

Contractor personally or left at his residence or last known place of abode or

Page 259 / 277

Page 260: Request for Proposal for Design, Supply, Installation

business or may be handed over to his agent personally or may be addressed to the

Contractor by Post at his usual or last known place of abode or business and if so

addressed and posted shall be deemed to have been served to contractor on the date

on which in the ordinary course of Post a letter is addressed and posted would reach

his place of abode or business.

10. All payments to the Contractor will be made in due course:

(i) By Bank’s cheques

11. The Contractor shall not assign or make over the contract or the benefits or burdens

there of or any part thereof to any other person or person or body corporate. The

Contractor shall not underlet or sublet to any person or body corporate the execution

of the contract or any part thereof without the consent in writing of Travancore

Dewasom Board, Travancore Dewasom Board shall have absolute power to refuse

such consent or rescind such consent (if given) at any time, if they are not satisfied

with the manner in which the contract is being executed and no allowance or

compensation shall be made to the Contractor or the subcontractor upon such

rescission. Provided always that if such consent be given at any time, the Contractor

shall not be relieved from any obligation, duty or responsibility under this contract.

12. In case the contractor becomes insolvent or goes into liquidation or makes or

proposes to make any assignment for the benefit of his creditors or proposes any

composition with his creditors for the settlement of his debts or carries on his

business or the contract under inspection on behalf of his creditors, or in case any

receiving order or orders for the administration of his estate are made against him, or

in case the Contractor shall commit any act of insolvency, or in case in which, under

any clause or clauses of this contract, the Contractor shall have rendered himself

liable to damages amounting to the whole of his security deposits, the contract shall

thereupon, after notice given by the Chief IT managerTravancore Dewasom Board,

Thiruvananthapuram, Kerala, to the Contractor, be determined and the Chief IT

managerTravancore Dewasom Board, Thiruvananthapuram ,may complete the

contract in such time and manner and by such person asTravancore Dewasom Board,

Thiruvananthapuram shall think fit. But such determination of the contract shall be

without any prejudice to any right of remedy of Travancore Dewasom Board against

the Contractor or his sureties in respect of any breach of contract committed by the

Contractor.

13. All expenses and damages caused toTravancore Dewasom Board by any breach of

all or any of the terms of this contract by the Contractor shall be paid by the

Contractor to the Bank and may be recovered from him.

Page 260 / 277

Page 261: Request for Proposal for Design, Supply, Installation

14. The Security Deposit/Performance Guarantee shall, subject to the conditions

specified herein be returned to the Contractor within six months after completing the

entire warranty period, but in the event of any dispute arising between Travancore

Dewasom Board and the Contractor, the Bank shall be entitled to deduct out of the

deposits or the balance thereof, until such dispute is determined the amount of such

damages, costs, charges and expenses as may be claimed the same may also be

deducted from any other sum which may be due at any time from Travancore

Dewasom Board to the Contractor.

15. The Contractor/hereby declares that the goods/stores/articles sold to buyer under this

contract shall be of the best quality (and workmanship) and shall be strictly in

accordance with the specifications and particulars contained/mentioned in the copy

of the order mentioned in clause 3 here of and the contractor/hereby guarantees that

the said goods/stores/articles would continue to conform to the description and

quality aforesaid for a period of ................ days/months from the date of delivery of

the said goods/stores/articles toTravancore Dewasom Board and that

notwithstanding the fact that Travancore Dewasom Board (Inspector) may have

inspected and/or approved the said goods/stores/articles, if during the aforesaid

period of .............. days/months the said goods/stores/articles be discovered not to

conform to the description and quality aforesaid or have deteriorated and the

decision of Travancore Dewasom Board in that behalf will be final and conclusive

Travancore Dewasom Board will be entitled to reject the said goods/stores/articles or

such portion thereof as may be discovered not to conform to the said description and

quality. On such rejection of goods/articles/stores will be at the contractor’s risk and

all the provisions herein contained relating to rejection of goods & c, shall apply. The

contractor/Seller shall if so called upon to do replace the goods & c, or such portion

thereof as is rejected by Travancore Dewasom Board , Otherwise the

Contractor/Seller shall pay to Travancore Dewasom Board such damages as may

arise by reason of the break of the conditions herein contained. Nothing herein

contained shall prejudice any other right of Travancore Dewasom Board in that

behalf under this contract or otherwise.

16. The tender documents viz: Tender Notice, Declaration by Tenderer, General

Instructions, Technical Conditions, Commercial Conditions, Performance Guarantee,

Price Bid – Schedule, General Conditions will form part of this Agreement. The

terms & conditions given in this agreement and/or the Order referred to in Clause 3

above shall supercede all the terms and conditions contained in the tender/quotation

submitted by the Contractor or in the covering letter forwarding the said

tender/quotation. Where the contractor’s terms and conditions are at variance with

Page 261 / 277

Page 262: Request for Proposal for Design, Supply, Installation

this agreement and/or the order for the supply, the latter shall prevail.

17. In case where a successful tenderer after having made partial supplies fails to fulfil

the contracts in full, all or any of the materials not supplied may, at the discretion of

the purchasing Officer be purchased by means of another tender/Quotation or by

negotiation from the next higher tenderer who had offered to supply already and the

loss, if any, caused to Travancore Dewasom Board shall thereby together with such

sums as may be fixed by towardsTravancore Dewasom Boardes be recovered from

the defaulting, tenderer.

18. Even in cases where no alternate purchases are arranged for the materials not

supplied the proportionate portion of the security deposit based on the cost of the

materials not supplied at the rate shown in the tender of the defaulter shall be

forfeited and balance alone shall be refunded.

i. The equipments supplied under this contract will be under performance guarantee valid for the

period.....................to...................(three years). The supplier shall maintain systems and peripherals

supplied and installed under this contract in accordance with the provisions laid down in the clauses

below during the above period.

ii. The supplier shall provide the following services under the performance guarantee to keep the

systems and peripherals in good working order.

a. Un scheduled on call corrective and remedial maintenance service to set right the malfunctioning

of the system. This includes replacement of unserviceable parts. The parts replaced will either be

new parts or equivalent in performance to new parts. In the case of a part, the defective part

removed from the system will become the property of the supplier,

b. Application Support : The supply is comprehensive inclusive of Application support on all the

systems supplied and installed under this contract. Any problem related with Application, device

drivers, System configuration and network configuration (if required) shall be attended & rectified

by the supplier. All required device drivers shall be provided by the supplier. The supplier shall also

keep a copy of all device drivers.

a. Maximum acceptable down time will be 24 hours for remote location . The

supplier shall also ensure an availability of 95% for all modules& accessories on a yearly basis.

This means that all the modules and accessories covered under this performance guarantee clause

shall be in operating condition at least on 95% of the normal working hours in a year.

Downtime penalty shall also be imposed for in excess of 5% allowed. This shall be calculated

Page 262 / 277

Page 263: Request for Proposal for Design, Supply, Installation

yearly and the downtime penalty already charged during that year on account of maximum

twentyfour hour continuous downtime clause shall be deducted from the downtime penalty so

calculated.

Downtime penalty shall be settled every year failing which the amount due to Travancore Dewasom

Board is liable to the realized from the Bank Guarantee furnished by the supplier.

Terms of performance guarantee and Annual Maintenance Contract.

a. If the User is not able to hand over the system to the supplier’s engineer for maintenance purpose,

such time will not be considered for the down time penalty.

b. In case of intermittent failures and repetitive problems due to improper diagnosis or repair, the

system will be treated as continuously down. out of damages caused due to fire, theft, riots,

accidents, earthquakes, storm and other natural calamities.

c. CALL REGISTRATION AND COMPLETION: All the maintenance calls will be logged using

the System Maintenance Register. Also, they may be registered with the nearest supplier’s office.

The supplier shall acknowledge each call with a unique Call no: which is to be used for reference in

future. A call service slip may be made for each call. The Call service slip shall contain the

following details: call number, reported problem, affected items, date and time of call reporting,

date and time of call attending, date and time of call completion, down time in days, fault

diagnosed, repairs carried out, components replaced etc. Completion of calls will be certified by

Travancore Dewasom Board official or by a nominee. The supplier shall prepare the call service

slips in duplicate. These will be signed by Travancore Dewasom Board Officials& the supplier. One

copy will be given to the user and one copy will be retained by the supplier. The entries in the

System Maintenance Register may also be completed based on the entries of the Call service slip

after closing the call.

d. FORCE MAJEURE: The supplier shall not be liable or deemed to be default of any delay or

failure in performance stated herein resulting directly or indirectly from causes beyond its

reasonable control. If the supplier is prevented from performing its function under the instrument

for a period longer than six months, the supplier’s liability ceases. Then both the parties shall

discuss the course of action to be taken afterwards .

In witness where of the parties hereto have hereunto set their hands the day and year first above

written.

Signed sealed and delivered

Page 263 / 277

Page 264: Request for Proposal for Design, Supply, Installation

by................................................................................................................................................

................................ Travancore Dewasom Board, Thiruvananthapuram, Kerala

In the presence of:

Witness

1.

2.

Signed sealed and delivered

by.........................................................

In the presence of (Contractor)

Witness:-

1.

2.

Page 264 / 277

Page 265: Request for Proposal for Design, Supply, Installation

25 ANNEXURE II - Gurantee Bond

GUARANTEE BOND

Tender No IT 001 dated 04/04/2016(To be used by approved Scheduled Bank)

1. In consideration of Travancore Dewasom Board. (hereinafter called “the Travancore

Dewasom Board”) having agreed to exempt ............................... herein after called “the said

Contractor(s)” from the demand. (Under the terms and conditions of an Agreement dated to be

executed as per order made between............ ........................ ...... and .....

for.............................................. herein after called “the said Agreement” of security deposit for the

due fulfillment by the said Contractor’s of the terms and conditions contained in the said Agreement

on production of a Bank guarantee for Rs...............(Rs .....................................................................

only). We .......................................Bank Ltd (herein after referred to as the Bank) do hereby

undertake to pay to the Board an amount not exceeding Rs............................

(Rs................................................................... only) against any loss or damage caused to or suffered

by or would be caused to or suffered byTravancore Dewasom Board by reason of any breach by the

said Contract(s) of any of the terms and conditions contained in the said Agreement.

2. We.........................................................................Bank Ltd. do hereby undertake to pay the

amounts due and payable under the guarantee without any demur merely on a demand from

the Travancore Dewasom Board.

stating that the amount claimed is due by way of loss or damage caused to or would be

caused to or suffered by Travancore Dewasom Board by reason of any branch by the said

contractor(s) of any of the terms and conditions contained in the said Agreement or by

reason of the Contractor’s(s) failure to perform the said Agreement. Any such demand made

on the Bank shall be conclusive, as regards the amount due and payable by the Bank under

the guarantee. However, our liability under this guarantee shall be restricted to an amount

not exceeding Rs. ..........................................

3. We ......................................................................... Bank Ltd. further agree, that the

guarantee

herein contained, shall remain in full force and effect during the period that would be taken

for the performance of the Agreement and that it shall continue to be enforceable till all the

dues of M/s Travancore Dewasom Board, under or by virtue of the said Agreement have

been fully paid and its claims satisfied or discharged till the Chief IT Manager,Travancore

Dewasom Board or other Officer in charge of the Work, certifies that the terms and

conditions of the said agreement have been fully and properly carried out by the said

Contractor(s) and accordingly discharges the guarantee. Unless a demand or claim under

Page 265 / 277

Page 266: Request for Proposal for Design, Supply, Installation

this guarantee is made on us in writing on or before the ....................................... we shall be

discharged from all liability under the guarantee thereafter.

4.. We......................................................................... Bank Ltd. further agree with

Travancore Dewasom Board that shall have the fullest liberty, without our consent and

without affecting in any manner or obligations hereunder to vary any of the terms and

conditions of the said Agreement or to extend time of performance by the said Contractor(s)

from time to time or postpone for any time or from time to time any of the powers

exercisable by Travancore Dewasom Board against the said Contractor(s) and to forbear or

enforce any of the terms and conditions relating to the said agreement and we shall not be

relieved from our liability by reason of any such variation, or extension or forbearance being

granted or allowed to the said Contractor(s) or for any of the forbearance act or omission on

the part of the Bank or any indulgence by Travancore Dewasom Board to the said

Contractor(s) or by any such matter or thing whatsoever which under law relating to sureties

would but for this provision have the effect of so relieving us.

5. To give effect to the guarantee it shall be competent for Travancore Dewasom Board to so

act, as thought the Bank were the principal debtor.

6. It is hereby expressly agreed and declared that this guarantee and the powers and

provisions herein contained are in addition to and not by way of limitation of or substitution

for any former or other guarantees or guarantee here to fore given by the Bank to Travancore

Dewasom Board and now existing un cancelled and this guarantee is not intend to and shall

not revoke or limit such other guarantees.

7. We.........................................................................Bank Limited lastly undertake not to

revokes this guarantee during its currency-except with the previous consent of Travancore

Dewasom Board in writing.

Dated he....................................day of.......................................... For.......................................

Bank Limited, ........................ .....................................................

Page 266 / 277

Page 267: Request for Proposal for Design, Supply, Installation

26 ANNEXURE III -Format of Agreement to accompany the Tender

Tender No IT 001 dated 04/04/2016(Format of Agreement to accompany the Tender

To be executed in Stamp paper worth Rs 100/-)

AGREEMENT

Articles of agreement executed on this ............................................. the ................... day

of ...................... two thousand and .................... Between Travancore Dewasom Board

action through (here enter the designation of the officer who has invited this

tender..................................... (hereinafter referred to as “Travancore Dewasom Board”) of

the one part and M/s.................................................................. ................................... (here

enter name and address of the tenderer) herein after referred as “The bounden” of the other

part.

WHEREAS in response to the invitation for tenders contained in Notification

No...................... date............... inviting tenders the bounden has submitted to the Travancore

Dewasom Board a tender for the ...............................................specified therein subject to

the terms and conditions contained in the

said tender:

WHEREAS the bounden has also deposited with Travancore Dewasom Board a sum of

Rs.................. as earnest money for execution of an agreement undertaking the due

fulfilment of the contract in case his tender is accepted by Travancore Dewasom Board.

Now THESE PRESENTS WITNESS and it is hereby mutually agreed as follows:

1. In case the tender submitted by the bounden is accepted by Travancore Dewasom Board and

the contract for ......................................................................................................... is awarded to the

bounden, the bounden shall within ......................... days of acceptance of this tender execute an

agreement with the TDB incorporating all the terms and conditions under which Travancore

Dewasom Board accepts his tender.

2. In case the bounden falls to execute the agreement as aforesaid incorporating the terms and

conditions governing the contract Travancore Dewasom Board shall have power and authority to

recover from the bounden any loss or damages caused to Travancore Dewasom Board in by such

Page 267 / 277

Page 268: Request for Proposal for Design, Supply, Installation

breach as may be determined by Travancore Dewasom Board, appropriating the earnest money

deposited by the bounden and if the earnest money is found to be inadequate, the deficit amount

may be recovered from the bounden and his properties movable and immovable also in the manner

here in after contained.

3. All sums found due to Travancore Dewasom Board under or by virtue of this agreement

shall be recoverable from the bounden and his properties, movable and immovable under the

provisions of the Revenue Recovery Act for the time being in force as though such sums are arrears

of land revenue and also in such other manner as Travancore Dewasom Board may deem fit.

4.

In witness where Sri ................................................................... (here enter name and

designation) for and on behalf of Travancore Dewasom Board and

Sri ....................................... the bounden have hereunto set their hands the day and year

shown against their respective signatures.

Signed by Sri ........................................................................(date)

In the presence of witness

1

2

Signed by Sri.........................................................................(date)

In the presence of witness

1

2

Page 268 / 277

Page 269: Request for Proposal for Design, Supply, Installation

27 Letter from bidder

PRE-QUALIFICATION INFORMATION

1. LETTER OF TRANSMITTAL.(To be submitted in applicants letterhead with complete

postal address, telephone no, fax no, and e-mail address)

Date:

To

Devaswom Commissioner

Travancore Devaswom Board

Sir,

Sub :- Submission of application for pre-qualification of firms for Design, Supply, Installation,

Commissioning and Maintenance of Computerization of Travancore Dewasom Board Project.

(CTDB) for a period of Three Years

Having examined the details given in the invitation for pre-qualification of firms for the

aforesaid

project, we hereby submit the application for pre-qualification with relevant documents.

We hereby certify that all the statements made and the information supplied and uploaded

are true and correct.

We submit the requisite Solvency Certificate and authorize Travancore Dewasom Board. to

approach the Bank issuing the Solvency Certificate to verify the correctness thereof. We also

authorise Travancore dewasom Board. to approach Individuals, Employers, Firms and

Corporations to verify our competence and general reputation.

Travancore dewasom Board.and its authorized representatives are hereby authorized to

conduct s or investigations to verify the statements, documents and information submitted in

connection with this application.Travancore dewasom Boar and its authorized

representatives may contact the following persons for further information.

Page 269 / 277

Page 270: Request for Proposal for Design, Supply, Installation

FINANCIAL ENQUIRIES

Name & Designation Tel No. Fax No. EmailContact 1

Contact 2

TECHNICAL ENQUIRIES

Name & Designation Tel No. Fax No. EmailContact 1

Contact 2

PERSONNEL ENQUIRIES

Name & Designation Tel No. Fax No. EmailContact 1

Contact 2

Signature of the authorised signatory of the Applicant/Firm

Page 270 / 277

Page 271: Request for Proposal for Design, Supply, Installation

28 FORM – II

Tender No IT 001 dated 04/04/2016

MEMBER OF A GROUP OF COMPANIES

(If the applicant is a member of a group of companies please give the following

information otherwise state, ’not applicable’)

1

2

3

Name and address of Group

Name and address and description of other companies in the group.

Name and address of the Bankers

:

:

:

Signature of the authorized signatory of the

Applicant/Firm

Page 271 / 277

Page 272: Request for Proposal for Design, Supply, Installation

29 FORM – III

Tender No IT 001 dated 04/04/2016

SUBSIDIARY OF A LARGE CORPORATION

(If the applicant is a subsidiary of a large corporation please give the following information

otherwise state, ’not applicable’)

1

2

3

Name and address of the parent Organization

State the involvement if any, the parent company have in the project

Name and address of the Bankers

:

:

:

Signature of the authorized signatory of the

Applicant/Firm

Page 272 / 277

Page 273: Request for Proposal for Design, Supply, Installation

30 FORM – V Tender No IT 001 dated 04/04/2016

FINANCIAL STATEMENT (Must be given separately for each partner in case of Consortium)

1

2

3

4

5

Name of firm

Name of partners/Director

Capital a) Authorized

b) Issued and Paid up

(a) What is the maximum annual value of the project that you can handle?

(b) What is the maximum value of the project that your Company/ group of companies have handled so far?

Have you ever been declared bankrupt? (If yes, please give details in separate sheet)

:

:

:

:

:

:

:

Certified that the following documents are furnished along with the Pre-qualification Bid

1. Balance sheet and profit and loss statement with auditors report for last two years. 2. Income tax clearance certificate

Note :Fiscal year of the company can be followed.

Signature of the authorized signatory of the Applicant/Firm

Page 273 / 277

Page 274: Request for Proposal for Design, Supply, Installation

31 FORM - VI

Tender No IT 001 dated 04/04/2016

KEY MANAGEMENT: PERSONNEL (Please attach an Organization Chart showing the structure of the Company)

A. BOARD OF DIRECTORS :

Details of key Technical and Administrative personnel who could be assigned to the work in thefollowing pro-forma.

B. KEY TECHNICAL PERSONNEL

1. Name :

2. Qualification :

3. Present position of office :

4. Professional Experience in years :

5. No of Years with the applicant :

C. KEY ADMINISTRATIVE PERSONNEL

1. Name :

2. Qualification :

3. Present position of office :

4. Professional Experience in years :

5. No of Years with the applicant :

Signature of the authorized signatory of the Applicant/Firm

Page 274 / 277

Page 275: Request for Proposal for Design, Supply, Installation

32 FORM – VII Tender No IT 001 dated 04/04/2016

KEY TECHNICAL PERSONNEL IN KERALA STATE

Sl No. Name Designation Qualification Experiencein Years

Location

Signature of the authorized signatory of the Applicant/Firm

Page 275 / 277

Page 276: Request for Proposal for Design, Supply, Installation

33 FORM – IX

Tender No IT 001 dated 04/04/2016

ADDITIONAL INFORMATION.

Any further information which the applicant considers relevant in regard to the capabilities

Signature of the authorized signatory of the Applicant/Firm

Page 276 / 277

Page 277: Request for Proposal for Design, Supply, Installation

34 Form X

Tender No IT 001 dated 04/04/2016

Undertaking

I/we .......................................................................................hereby agree to adhere to the conditions

of Travancore dewasom Board regarding delivery, Guarantee, Payment and Penalty mentioned in

this tender document.

Signature

Name and address of the Supplier.

Page 277 / 277